OFC position Sl. File No & address of the party. Location. Remarks. No.

1. J/W.384/11/OFC/26/2015 Km.558/0- Final permission (Reliance/). 100 given to the party between on 04.01.2016 LDY- MNY Rly. Stations. 2. J/W.384/11/OFC/27/2015 543/5-6. Final permission (Reliance/Kochi). between given to the party on Parali and 10.03.2016. Mankarai Rly. Stations. 3. J/W.384/15/OFC/28/2015 55/4-5 near Final permission (Sri. Piyush S. Prem, VNB Rly. given to the party Manager/Vodafone Cellular/Cochin). Station. on 01.02.2016. 4. J/W.384/TIR/OFC/29/2015 623/33-4. Proposal not feasible (Reliance/Kochi). and party advised vide letter dtd. 06.05.2016. 5. J/W.384/17/OFC/30/2015 714/9 & Final permission (Reliance/Kochi). 715/0. given to the party on 26.02.2016. 6. J/W.384/TIR/OFC/31/2015 629/700- Final permission (Reliance/Kochi). 800 given to the party on 10.08.2016. 7. J/W.384/TIR/OFC/32/2015 647/500- Final permission (Reliance/Kochi). 600 (LC given to the party on No. 174). 11.07.2016. 8. J/W.384/TIR/OFC/33/2015 626/700- Final permission (Reliance/Kochi) 800. given to the party on . 10.08.2016.. 9. J/W`.384/16/OFC/34/2015 654/500- Proposal cancelled (K.K.Haridas/Asianet Satellite 600 due to non- response Communications Ltd./CLT). from the party vide letter dtd.09.02.2017. 10. J/W.384/17/OFC/35/2015 710/4-5 Proposal cancelled and (Sri.P.N.Sugesh/Badagara). party advised on 08.12.207 , since there is no response from this office letter. 11. J/W.384/KLGD/OFC/36/2015 133/600- .Final permission (Reliance/). 700. given to the party on 29.07.2016. 12. J/W.384/17/OFC/37/2015 713/5-6. Proposal cancelled (Reliance/Kochi). due to party’s request dtd. 06.06.2016. 13. J/W.384/17/OFC/38/2015 695/6-7. Final permission (Reliance/Kochi). given to the party on 16.02.2017.(Signed agt. Forms sent to party vide letter dtd.14.03.2017). . 14. J/W.384/16/OFC/39/2015 686/1-2. Final permission (Reliance/Kochi). given to the party on 10.08.2016. 15. J/W.384/16/OFC/40/2015 679/1-2. Final permission (Reliance/Kochi). given to the party on 11.08.2016.

16. J/W.384/16/OFC/41/2015 673/5-6. Final permission (Reliance/Kochi). given to the party on 04.08.2016. 17. J/W.384/PAY/OFC/42/2015 805/300- Final permission (Reliance/Kochi). 400. given to the party on 13.07.2016. 18. J/W.384/PAY/OFC/43/2015 810/100- Final permission (Reliance/Kochi). 200. given to the party on 04.08.2016. 19. J/W.384/18/OFC/44/2015 743/100- Final permission given (Reliance/Kochi). 200. to the party on 04.08.2016. 20 J/W.384/18/OFC/45/2015 743/200-300. Proposal cancelled, (Reliance/Kochi). due to party’s request dtd. 06.06.2016.

21. J/W.384/19/OFC/46/2015. Km.20/300- Proposal cancelled , 400. since there is no (M/S. Ltd./SBC). response from the party.(party contacted over phone on 22.09.2017 and they told that the project was dropped). 22. J/W.384/KLGD/OFC/47/2015 122/200- Proposal cancelled (Reliance/Chennai). 300. based on the party’s request dtd.29.06.2016. 23. J/W.384/15/OFC/48/2015 26/0-1. Final permission (Reliance/Kochi). given to the party on 25.05.2016. 24. J/W.384/19/OFC/49/2015 882/900 & Proposal cancelled (Idea Cellular Ltd/SBC) 883/000. (since there is no response from party) vide letter dtd.05.10.2017. 25. J/W.384/15/OFC/50/2016. (Idea 21/100-200. Final permission given Cellular Ltd/ERS) to the party on 01.06.2016. 26. J/W.384/15/OFC/51/2016. (Idea 13/400-500. Final permission given Cellular Ltd/ERS) to the party on 02.06.2016. 27. J /W.384/15/OFC/52/2016. (Idea 55/400-500. Final permission given Cellular Ltd/ERS) to the party on 01.09.2016.. 28. J/W.384/11/OFC/53/2016. 534/7-8. Final permission given (Reliance/Kochi). to the party vide letter dtd.23.01.2017. 29. J/W.384/OFC/11/54/2016.(Defence). 495/900 and Proposal not feasible 496/000. (through Stn yard) and party advised vide letter dtd.04.05.2016.. 30. J/W.384/11/OFC/55/2016. 546/300-400. Final permission given to the party vide letter (Sri.Piush S.Prem, AGM- Transmission , dtd.10.02.2017. Vodafone Mobile/ERS). 31. J/W.384/OFC/KLGD/56/2016. Sub – Way Proposal cancelled and (Sri.Maneeswaran.V, Dy. No.2/0-100. advised to party on GM, Aircel Ltd., CBE) 10.10.2017( since there is no response to resubmit the agreement forms ). 32. J/W.384/OFC/KLGD/57/2016. 121/500- (i).SSE/P.Way/ 600.. KLGD has been (Sri.Maneeswaran.V, Dy. GM, Aircel advised to send a Ltd., CBE) detailed sketch vide letter dtd.03.02.2017. (ii).Party advised to remit the centage charges vide letter dtd.10.10.2017. (iii). Proposal cancelled vide letter dtd. 15.02.2108, since there is no response from this office letter .

33. J/W.384/OFC/KLGD/58/2016. 3/600-700. Proposal cancelled and advised to party on 10.10.2017( since there is no (Sri.Maneeswaran.V, Dy. GM, response to resubmit the Aircel Ltd., CBE) agreement forms ). 34. J/W.384/18/OFC/59/2016. 761/90 and Final permission Sri.Alex Joseph Valluvassery, Deputy 762/0. given to the party on General Manager, Net wok Services, 27.03.2017. Idea Cellular Ltd., 2nd Floor, V.J Tower, Vytilla, Ernakulam, Kochi- 682019 35. J/W.384/19/172/12. 21/100-200. ISPRL has been ISPRL/MAQ. advised that the said work has completed vide letter dtd. 03.09.2018(Folio - 128).

36. J/W.384/15/OFC/60/2016. 13/400-500. Final permission given (Sri. Piyush S Prem, AGM- to the party vide letter Transmission Vodafone Mobile Services dtd.04.04.2017. Limited, 4th Floor, (ADEN/SRR has been Angel’s Arcade, south Kalamassery, CUSAT advised that the location (P.O), Kochi- 682022 , Ernakulam, ). change is approved vide letter dtd.31.07.2017). 37. J/W.384/KLGD/OFC/61/2016. 29/300-400 Proposal is not (Sri. Piyush S Prem, AGM- feasible and party Transmission Vodafone Mobilec advised vide letter Services Limited, 4th dtd. 10.08.2016. Floor, Angel’s Arcade, south Kalamassery, CUSAT (P.O), Kochi- 682022 , Ernakulam, Kerala). 38. J/W.384/17/OFC/62/2016. 733/800- Sri. Piyush Prem, AGM- Final permission Transmission Vodafone Mobile Services Limited, 4th 900. given to the party Floor, Angel’s Arcade, south Kalamassery, CUSAT (P.O), Kochi- 682022 , Ernakulam, Kerala). vide letter dtd.04.04.2017. 39. J/W.384/19/BSNL/63/2016. 9/400 - Proposal cancelled Dy.GM. Telecom(Planning)/MAQ. 10/00. and party advised vide letter dtd.18.08.2016.(SSE/ P.Way/MAQ has been advised to furnish the remarks based on the reply received from XEN/CN/MAQ vide letter dtd.30.03.2017. 40. J/W.384/OFC/ BSNL/17/64/2016. 690/600 – Final permission 700 given to the party (BSNL/CLT). on 08.06.2018. 41. J/W.384/KLGD/OFC/65/2016. 29/400-300. Final permission Sri.Piyush Prem, AGM/Transmission, given to the party on Vodafone Mobile Services 13.10.2017. Ltd./l;lCochin. 42. J/W.384/West/PTJ/OFC/66/2016. 490/300- Final permission (M/s./CBE). 400 given to the party on 13.07.2017. 43. J/W.384/KLGD/OFC/67/2016 48/900 and Final permission (KSPPL/ERS). 49/000. given to the party vide letter dtd.02.05.2017. 44 J/W.384/KLGD/GAS Pipe 48/900 and Final permission lie/68/2016 49/000. given to the party (KSPPL/ERS). vide letter dtd.02.05.2017. 45 J/W.384/16/OFC/69/2016. 669/700- Final permission give (Reliance/Kochi). 800. to the party vide letter dtd.17.03.2017.

46. J/W.384/16/OFC/70/2016. 662/400- Final permission give (Reliance/Kochi). 500. to the party vide letter dtd.27.02.2017.

47. J/W.384/17/OFC/71/2016. 711/200- Feasibility report (Reliance/Kochi). 300. called for from SSE/P.Way/QLD vide letter dtd.20.09.2016 and reminded on 15.05.2017. (There is no response from the party to contact SSE/P.Way/QLD to conduct a joint inspection vide letter dtd.20.09.2016. Hence, the proposal cancelled). 48. J/W.384/17/OFC/72/2016. 663/700- Final permission (Reliance/Kochi). 800. given to the party on 25.04.2017.

49. J/W.384/18/OFC/73/2016. 749/700- Final permission (Reliance/Kochi). 800. given to the party on 15.05.2017.

50. J/W.384/18/OFC/74/2016. 750/400- Final permission (Reliance/Kochi). 500. given to the party vide letter dtd.28.03.2017.

51. J/W.384/16/OFC/75/2016. 670/000- Proposal cancelled (Reliance/Kochi). 100. vide letter dtd.16.11.2016. 52. J/W.384/16/OFC/76/2016. 665/100- Final permission (Reliance/Kochi). 200. given to the party vide letter dtd.16.02.2017.(Signe d agt. Forms sent to party vide letter dtd.14.03.2017). 53. J/W.384/12/OFC/77/2016. 579/134- Final permission given (Alex Joseph Valluvasssery, Dy. 334. to the party vide letter GM/Idea Cellular Ltd./ERS. dtd.27.11.2017. 54. J/W.384/18/OFC/78/2016. 775/1-2. Party has been (Reliance/Kochi). advised to remit the centage charges vide letter dtd.23.10.2017. 55. J/W.384/11/OFC/80/2016. 496/000- Final permission (Regional Co-ordinator, Southern 100. given to the party Region, Naval Base, Kochi). vide letter dtd.10.07.2017. 56. J/W.384/12/OFC/82/2016. 589/800- Final permission (Reliance/Kochi). 900. given to the party vide letter dtd.23.05.2018. 57. J/W.384/18/OFC/83/2016. 738/400- Final permission (Reliance/Kochi). 500. given to the party vide letter dtd.02.09.2019.

58. J/W.384/OFC/KLGD/84/2016. 42/400-500. Agt. forms sent to party vide letter dtd.20.09.2017(Party (Reliance/Kochi). advised to remit the required amount and duly signed by the agreement within 15 days from the date of receipt this letter vide letter dtd.11.12.2017). Proposal has been dropped on 04.07.2019, since the party has not remitted the way leave charges and not responded to this office letter dtd.20.09.2017 and reminder dtd. 11.12.2017. 59. J/W.384/OFC/KLGD/85/2016. 35/600-700. Final permission (Asianet Satellite Communications given to the party on Ltd./PGT). 08.11.2017.

60. J/W.384/19/OFC/86/2017 0/300-400. Final permission given (Reliance/SBC). to the party vide letter dtd.18.12.2017. 61. J/W.384/19/OFC/87/2017 882/900 and Final permission given (Reliance/SBC). 883/000. to the party vide letter dtd.18.12.2017. 62. J/W.384/17/OFC/88/2017 701/200-300. Feasibility report called (Reliance/Kochi). for from SSE/P.Way/QLD vide letter dtd.27.01.2017.(Reminde d on 12.05.2017 , 20.11.2017 & 19.03.2018.).(Proposal cancelled, since there is no response from the party to this office letter dtd.27.01.2018 for site inspection). 63. J/W.384/12/OFC/89/2017. 597/200-300 Final permission (Reliance/Kochi). has been given to the party on 22.05.2018.

64 J/W.384/OFC/PAY/90/2017. 787/900 and Party has been advised (Reliance/Kochi). 788/000. to remit centage charges vide letter dtd.07.12.2017. 65 J/W.384/OFC/18/91/2017. 768/100-200. Party has been advised (Reliance/Kochi). to send a willingness letter to shift the location near LC No.252 with centage charges vide letter dtd.24.10.2017. 66 J/W.384/West/PTJ/OFC/92/2017. 500/400-500 Final permission has (Reliance/Chennai). been given to the party vide letter dtd.14.05.2018. 67 J/W.384/OFC/18/93/2017. 775/3-15. Village Officer/Madayi (BSNL). has been advised to furnish the market value vide letter dtd. 12.03.2018. 68 J/W.384/OFC/18/94/2017. 774/20-28 Village (BSNL). Officer/Cherukunnu has been advised to furnish the market value vide letter dtd. 28.02.2018. 69 J/W.384/OFC/18/95/2017. 740/10- (1).Village (BSNL) 740/20. Officer/Muzhupplingad Village has been advised to furnish the market value vide letter dtd. 12.03.2018

70 J/W.384/KLGD/OFC/96/2017. 1/900-2/000. Final permission has (M/s.Reliance/Chennai). been given to the party on 30.11.2018.

71 J/W.384/KLGD/OFC/97/2017. 125/300-400. Based on the Hd.Qrs (M/S.Reliance/Chennai). letter dtd.02.07.2019,Sr.DEN/ Co-ord/MDU has been advised to furnish the remarks raised by Hd.Qrs vide letter dtd.08.07.2019 72. J/W.384/16/OFC/98/2018. 682/300-400. Final permission has (Alex Joseph Valluvassery). been given to the party on 30.07.2018. 73. J/W.384/KLGD/OFC/99/2018. 6/100-200. Final permission (M/s. Reliance/Cehnnai.). given to the party on 19.08.2019.

74. J/W.384/OFC/KLGD/100/2018. 42/400-500. Final permission given (Asianet Satellite Communications to the party on Ltd./PGT). 27.05.2019. 75. J/W.384/OFC/KLGD/101/2018. 52/700-800. Final permission given (Asianet Satellite Communications to the party on Ltd./PGT). 08.05.2019. 76. J/W.384/OFC/KLGD/102/2018. 48/100-200 Final permission given (Asianet Satellite Communications to the party on Ltd./PGT). 08.05.2019. 77. J/W.384/KLGD/OFC/103/2018. 123/000- Final permission given (Reliance/Chennai). 100. to the party vide letter dtd.19.08.2019. 78. J/W.384/15/OFC/104/2018 39/860 and Final permission given (Reliance/Kochi). 39/900. to the party vide letter dtd.06.04.2019. 79. J/W.384/15/OFC/105/2018 65/620 and Final permission given (Reliance/Kochi). 65/700. to the party vide letter dtd.06.04.2019. 80. J/W.384/19/OFC/106/2018 877/200 Proposal not feasible (Reliance/SBC). and and party advised vide 877/300. letter dtd.11.06.2018. 81. J/W.384/19/OFC/107/2018 879/300 Proposal not feasible (Reliance/SBC). and and party advised vide 879/400. letter dtd.11.06.2018. 82. J/W.384/12/OFC/108/2018. 603/100- Final approval given to (Gail Authorities of India). 200. the party on 24.01.2019. 83. J/W.384/KGQ/OFC/109/2018 806/270. Proposal not feasible (Divl .Engineer/Transmission Project, and BSNL authorities Telephone Bhavan/CLT). has been advised vide letter dtd.24.06.2019. 84 J/W.384/19/OFC/110/2018. 876/400- Final permission given (M/s. Reliance/SBC). 500 to the party on 22.03.2019..

85. J/W.384/18/OFC/111/2018 677/200- Proposal was dropped (BSNL/CLT). 600. based on the BSNL’s letter No.DE/TXN/VLL/ Korappuzha/2018-19/13 dtd. dtd. 29.12.2018. 86. J/W.384/KLGD/OFC/112/2018. 134/6-7 Party advised to remit Sri.Shanmugharaj/Kinattu Kadavu. centage charges along with license certificate vide letter dtd.07.02.2019. 87. J/W.384/16/OFC/01/2019. 660/300- Party advised to 200 remit centage charges vide letter dtd.11.12.2019. 88. J/W.384/16/OFC/02/2019. 655/100- Party advised to 200. send a detailed sketch showing the cable route plan etc vide letter dtd.11.12.2019. 89. J/W.384/16/OFC/03/2019. 656/200- Party advised to 300 remit centage charges vide letter dtd.11.12.2019. 90. J/W.384/19/OFC/04/2019. 879/300- 1. M/s. Reliance authority 400 has been advised to attend office to sign the GAD vide letter dtd.20.12.2019.

2. Agt.forms sent to party vide letter dtd.12.03.2020.

91. J/W.384/KLGD/OFC/05/ 2019. 136/985. Final permission given to the party vide letter dtd.23.01.2020. 92. J/W.384/19/GAS/Oil 20/560-565. 1. Village Officer, pipeline/06/2019. Thokur village has been advised to furnish the market value vide letter dtd.09.03.2020. 2. GAD returned by CBE stating that soil checked by reputed organization like IIT, NIT vide letter dtd.04.06.2020. 93. J/W.384/KLGD/OFC/07/2019. 132/7-8. Proposal not feasible( through the carriage way of ROB) and party advised vide letter dtd.26.12.2019. 94. J/W.384/KLGD/OFC/08/2019. 136/A2 and As per the party’s 137/00-100 request dtd. 26.08.2019, the proposal cancelled. 95. J/W.384/19/Gas pipeline/09/2019. 23/4 & Party advised to 24/6. remit supervision charges vide Correct letter dtd. location 15.07.2020. 27/703. 96. J/W.384/18/OFC/10/2019. 747/9 and Party advised to 748/0. remit centage charge vide letter dtd.14.01.2020. 97. J/W.384/PAY/OFC/11/2019. 792/700- Agt.forms sent to 800. party vide letter dtd.23.01.2020. J/W.384/PAY/OFC/12/2019. 795/500- Agt.forms sent to 98. 600. party vide letter dtd.23.01.2020. 99. J/W.384/PAY/OFC/13/2019. 781/600- Agt.forms sent to 700. party vide letter dtd.22.01.2020. 100. J/W.384/PAY/OFC/14/2019. 787/900 & Agt.forms sent to 788/000. party vide letter dtd.17.01.2020. J/W.384/PAY/OFC/15/2019. 791/500- Agt.forms sent to 101. 600. party vide letter dtd.16.01.2020. 102. J/W.382/19/LNG/16/2019. 181/497 1. GAIL authorities and have been advised to 181/561. attend office to sign the GAD vide letter dtd.09.03.2020. 2. Village Officer, Kannur village has been advised to furnish the market value vide letter dtd.09.03.2020. 3.GAD put up to DRM through Sr.DSTE on 13.03.2020 103. J/W.384/19/OFC/17/2019. 12/600-700. 1. M/s. Digital Fibre Private Limited/SBC authorities have been advised to attend office to sign the GAD vide letter dtd.04.06.2020. 2. Village Officer, Pachanday village has been advised to furnish the market value vide letter dtd.04.06.2020. 104. J/W.384/16/OFC/01/2020. 662/19. Feasibility report called for from SSE/P.Way/CLT vide letter dtd.09.01.2020. 105. J/W.384/TIR/OFC/02/2020. 626/7-8. 1. Party advised to attend office and to sign the GAD vide letter dtd.07.07.2020. 2. Letter addressed to Village Officer/Tanallur vide letter dtd.07.07.2020. 3. Proposal sent to Sr.DFM through DEN/East on 23.07.2020. 106. J/W.384/18/OFC/03/2020. 760/590 After remitting the and centage charges, the 762/170. proposal put up to SSE/Drg./LM on 23.07.2020. 107. J/W.384/18/OFC/04/2020. 768/40 and After remitting the 775/650. centage charges, the proposal put up to SSE/Drg./LM on 23.07.2020. 108. J/W.384/TIR/OFC/05/2020. 642/5-6. Feasibility report called for from SSE/P.Way/TIR vide letter dtd.21.01.2020. 109. J/W.384/KLGD/OFC/06/2020. 134/600- Feasibility report 700 called for from SSE/P.Way/KLGD vide letter dtd.29.01.2020. 110. J/W.384/KLGD/OFC/07/2020. 120/398 1. Village and Officer/POY has 120/848 been advised to furnish the market value vide letter dtd.28.07.2020. 2. 2. Party advised to attend office and to sign the GAD vide letter dtd.28.07.2020. 3. GAD sent to Sr.DSTE through DEN/East, Co-ord on 28.07.2020 (through ‘E’ office) 111. J/W.384/KLGD/OFC/08/2020. 7/900 and 1. Village 8/00 Officer/Subiyak oundam Pudur Village has been advised to furnish the market value vide letter dtd.28.07.2020. 2. 2. Party advised to attend office and to sign the GAD vide letter dtd.28.07.2020. 3.GAD sent to Sr.DSTE through DEN/East, Co-ord on 28.07.2020 (through ‘E’ office) 112. J/W.384/15/OFC/09/2020. 55/4-5 1. Party advised to attend office and to sign the GAD vide letter dtd.05.05.2020.

2. Proposal put up to DRM through ( ‘E’ office’) DEN/East & Co-ord on 21.07.2020. 113. J/W.384/PAY/OFC/10/2020. 777/5 Feasibility report called for from SSE/P.Way/PAY vide letter dtd.20.02.2020. 114. J/W.384/KGQ/OFC/11/2020. 831/7-8 Feasibility report called for from SSE/P.Way/KGQ vide letter dtd.20.02.2020. 115. J/W.384/17/OFC/12/2020. 722/3-4 Feasibility report called for from SSE/P.Way/QLD vide letter dtd.20.02.2020. 116. J/W.384/West-PTJ/GAS/13/2020. 488/900 Feasibility report and 489/00 called for from SSE/P.Way/West- PTJ vide letter dtd.03.03.2020. 117. J/W.384/KLGD/OFC/14/2020. 48/44 and Party advised to 49/875 remit centage charges vide letter dtd.21.07.2020. 118. J/W.384/19/Gas/Oil 24/400-500. Feasibility report pipeline/15/2020. called for from SSE/P.Way/MAQ vide letter dtd. 25.06.2020.

119. J/W.384/15/OFC/16/2020. 19/100-200 After receipt of the feasibility report, the proposal put up to SSE/Drg./LM on 24.07.2020 120. J/W.384/15/OFC/17/2020. 39/800-900 After receipt of feasibility report,, the proposal put up to SSE/Drg./LM on 24.07.2020 121. J/W.384/15/OFC/18/2020. 45/800-900 After receipt of feasibility report,, the proposal put up to SSE/Drg./LM on 30.07.2020 122. J/W.384/15/OFC/19/2020. 18/400-500 Feasibility report called for from SSE/P.Way/AAM vide letter dtd. 07.07.2020. 122. J/W.384/15/OFC/20/2020. 19/400-500 Proposal not feasible (since the location is in cutting with a depth of 3.00m and rock formation) and party advised vide letter dtd.27.07.2020. 123. J/W.384/18/OFC/21/2020. 760/700- Feasibility report 800. called for from SSE/P.Way/CAN vide letter dtd. 07.07.2020. 124. J/W.384/18/OFC/22/2020. 761/900- Feasibility report 762/0 called for from SSE/P.Way/CANvi de letter dtd. 07.07.2020. 125. J/W.384/18/OFC/23/2020. 775/100- Feasibility report 200 called for from SSE/P.Way/CAN vide letter dtd. 07.07.2020. 126. J/W.384/16/OFC/24/2020. 688/100- Feasibility report 200 called for from SSE/P.Way/CLT vide letter dtd. 07.07.2020. 127. J/W.384/KGQ/OFC/25/2020. 827/100- Feasibility report 200 called for from SSE/P.Way/KGQ vide letter dtd. 07.07.2020. 128. J/W.384/KGQ/OFC/26/2020. 832/700- Feasibility report 800 called for from SSE/P.Way/KGQ vide letter dtd. 07.07.2020. 129. J/W.384/West- PGT/OFC/27/2020. 543/400- Feasibility report 500 called for from SSE/P.Way/West/ PGT vide letter dtd. 07.07.2020. 130 J/W.384/15/OFC/28/2020. 42/600-700 After receipt of feasibility report,, the proposal put up to SSE/Drg./LM on 30.07.2020 131 J/W.382/18/OFC/29/2020. 744/400- Feasibility report called 500. for from SSE/P.Way/CAN vide letter dtd. 09.07.2020. 132 J/W.382/18/OFC/30/2020. 746/400- Feasibility report called 500 for from SSE/P.Way/CAN vide letter dtd. 09.07.2020. 133 J/W.382/18/OFC/31/2020. 759/01. Feasibility report called for from SSE/P.Way/CAN vide letter dtd. 09.07.2020. J/W.382/PAY/OFC/32/2020. 817/5-6 Feasibility report called 134 for from SSE/P.Way/PAY vide letter dtd. 09.07.2020. 135 J/W.382/PAY/OFC/33/2020. 822/9- Feasibility report called 823/100. for from SSE/P.Way/ PAY vide letter dtd. 09.07.2020. 136 J/W.382/PAY/OFC/34/2020. 800/1-2. Feasibility report called for from SSE/P.Way/PAY vide letter dtd. 09.07.2020. 137 J/W.382/PAY/OFC/35/2020. 801/5-6 Feasibility report called for from SSE/P.Way/PAY vide letter dtd. 09.07.2020. 138 J/W.382/18/OFC/36/2020. 760/7-8 Feasibility report called for from SSE/P.Way/CAN vide letter dtd. 09.07.2020. 139 J/W.382/18/OFC/37/2020. 775/1-2 Feasibility report called for from SSE/P.Way/CAN vide letter dtd. 09.07.2020.