Deadline Remark Page

Timetable  Important adresses  Plan of the Fairground  Traffic,Logistics  Real-name Authentication Erection/Transport contractor certificates obtainment  Rules and Regulations  Technical Guideline  Passes & Tickets Exhibitor badges Form A 1 19.08.2016 Submit online for All Exhibitors  Visitor Invitation Form A 2 19.08.2016  Stand Construction Shell scheme Form B 1 22.08.2016 ComPulsory for Shell Scheme Exhibitors  Special design stand construction Form B 2 22.08.2016 ComPulsory for Raw Space Exhibitors  Stand layout plan Form B 3 22.08.2016 ComPulsory for Raw Space Exhibitors  Electrical installations for Lighting Form B 4 22.08.2016 ComPulsory for Raw Space Exhibitors  Electrical installations for Machinery/Equipment Form B 5 22.08.2016  !Only for exhibitors,who are constructing their Stand lighting Form B 6 22.08.2016 booths by the official stand-fitting contractor!  Water,Compressed air Form B 7 22.08.2016  Telephone,Internet Form B 8 22.08.2016  Labour,Stand cleaning Form B 9 22.08.2016  Fumiture,Stand equipment Form B 10 22.08.2016  Audio-Visual Equipment Form B 11 22.08.2016  Hanging Point Form B 12 22.08.2016  Digital Print Form B 13 22.08.2016  Promotional Services

Technical seminar Form C 1 19.08.2016  Advertising on the Trade Fair Grounds Form C 2 19.08.2016  Advertising on the Metro Stations Form C 3 12.08.2016  Promotional advertising Form C 4 19.08.2016  Press Form C 5 19.08.2016  Catalogue Form C 6 19.08.2016  Travel and Hotel

Personnel service Form D 1 12.08.2016  Accommodation Form D 2 12.08.2016  Travel package Form D 3 12.08.2016  Visa Application Form D 4 12.08.2016 

 Timetable

26-29 September 2016 Shanghai New International Expo Centre, China

Construction Show Time *OYSGTZROTM This Schedule is Complied 23 September 24 September 25 September 26 September 27 September 28 September 29 September 29 September as a guideline Friday Saturday Sunday Monday Tuesday Wednesday Thursday Thursday

Floor Marking 13:30-16:30 - -

Package Stand Carpet Laying 15:00-21:00 - - Opening hours Move-in of Stand-built Materials 16:30-19:00 - - For Exhibitorsφ For Visitorsφ Dismantling Building of Package Stand 13:30-19:00 09:00-18:00 - 26-28 September 2016 08:00-17:30 09:00-16:30 29 September 2016 08:00-16:00 09:00-16:00 29 September 2016 Building of Special Design 13:30-19:00 09:00-18:00 09:00-21:00

 Heavy & Large Exhibits Move-in 13:30-19:00 09:00-18:00 09:00-21:00 16:00-22:00

Water/Exectricity/Air Supply - 10:00-18:00 09:00-21:00 Note: Telephone/Internet Installation - - 13:00-17:30 Electricity, Water & Compressed air will be cut off at 16:00 on 29 September 2016. Please apply for extension of power, water or Furniture Distribution - 09:00-18:00 09:00-21:00 air supply before 12:00 on 29 September 2016, if required. Interior Decoration - 09:00-18:00 09:00-21:00

Hand-Carried Goods Move-in - 09:00-18:00 09:00-21:00

Apply OT(if any) Before 15:00 of the day intended

Exhibitors are requested to coordinate with the Stand-fitting Contractor and Freight Forwarder for their work schedule. Exhibitors are required to inform the show management of any overtime work before 15:00 each day. Overdue is subject to a 50% surcharge.The charge for overtime work: 18:00-22:00(one hour at least) RMB 1,200 per hour for every 1000 square meter hall area 22:00-08:00(one hour at least) RMB 2,400 per hour for every 1000 square meter hall area If your booth is less than 1000 square meter, according to the 1000 square meter charge. The power supply will be started at 24th September 2016 and switched off 30 minutes after the Exhibition closes each day. If you (or your contractor) need the supply ahead of time or continuous supply, please apply to the official stand-fitting contractor. Important Adresses

26-29 September 2016 Shanghai New International Expo Centre, China

Exhibition Management Ms.Mary Cao Phoneφ+86(0)21-6169 8369 Faxφ +86(0)21-6169 8301 e-Mailφ[email protected]

Exhibitor Services Ms.Cecilia Wang Phoneφ+86(0)21-6169 8322 (wire China) Faxφ +86(0)21-6169 8301 e-Mailφ[email protected] Ms.Michelle Xiao Phoneφ+86(0)21-6169 8313 (Tube China) Faxφ +86(0)21-6169 8301 e-Mailφ[email protected]

Technical Services Ms.Alain Wang Phoneφ+86(0)21-6169 8302 Faxφ +86(0)21-6169 8301 e-Mailφ[email protected] Mr.Peter Sun Phoneφ+86(0)21-6169 8387 Faxφ +86(0)21-6169 8301 e-Mailφ[email protected]

Press and Advertising Services Ms.Qin Jing Phoneφ+86(0)21-6169 8343 Faxφ +86(0)21-6169 8301 e-Mailφ[email protected] Ms.Bella Wen Phoneφ+86(0)23-8860 5906-8052 Faxφ +86(0)23-8860 5908 e-Mailφ[email protected]

Official Standfitting Contractor Shanghai SYMA-EXPO Ltd. Mr.Terry Yuan Phoneφ+86(0)21-6238 8811-154 e-Mailφ[email protected]

Ms.Summer Cheng Phoneφ+86(0)21-6238 8811-135 e-Mailφ[email protected]

Official Freight Forwarder Schenker China Ltd. Fairs & Events Dept Mr.Aaron Dong Phoneφ+86(0)21-2890 6228-28/16 Hall W1δwire China 2016) Mr.Ash Li Faxφ +86(0)21-2890 6223 e-Mailφ[email protected] [email protected] Phoneφ+86 180 1743 8029 +86 189 1779 0390

Hall E1δTube China 2016) APT Showfreight Shanghai Co., Ltd. Mr.Louis Liu Phoneφ+86(0)21-6124 0090 Faxφ +86(0)21-6124 0091 e-Mailφ[email protected] Phoneφ+86 135 1213 2873

Official Hotel Travel Service Shanghai Vision Expo & Meeting Solutions Co., Ltd. Ms.Jenny Zhang Phoneφ+86(0)21-5481 6052 * 813 Mr.Billy Xu Faxφ +86(0)21-5481 6032 e-Mailφ[email protected] [email protected]

 26-29 September 2016 Shanghai New International Expo Centre, China

6RGTULZNKLGOXMXU[TJ 

===OXK )GHRK

+ ,GYZKTKX

++:[HK Traffic, Logistics

26-29 September 2016 Shanghai New International Expo Centre, China

1.Traffic Route SNIEC is strategically located in ’s key economic development 2.Freight Forwarding Services zone, 600 metres away from the subway station Longyang Road, and only 8 minutes’ ride by train from Shanghai Pudong Interna- Official Freight Forwarder tional Airport. 2# Entrance Hall next to the subway station Huamu Hall W1 (wire China2016) Road. Situated right next to the Inner Ring, SNIEC offers you an easy access to the city centre. Schenker China Ltd. Fairs & Events Dept Room W2B3, Shanghai NewInternational Expo Centre By Flight No.2345, Longyang Road, Shanghai 201204, P.R.China The expo centre is located half way between Pudong International Airport and Hongqiao Airport, 35 km away from Pudong International Mr. Aaron Dong Airport to the east, and 32 km away from Hongqiao Airport to the west. Mr. Ash Li You can take the airport bus or maglev directly to the expo center. Phone:+86(0)21-2890 6228-28/16 Fax :+86(0)21-2890 6223 By Train e-Mail:[email protected] Take metro line at , Shanghai Hongqiao [email protected] Railway Station and Shanghai South Railway Station. Phone: +86 180 1743 8029 +86 189 1779 0390 By Transrapid (maglev train) The maglev only takes 8 minutes directly from Pudong Airport to Long Hall E1 (Tube China2016) Yang Rd, where SNIEC is located, and is running every 20 minutes. APT Showfreight Shanghai Co., Ltd. Room 2005, Modern Plaza Tower 1, By Subway 369 Xian Xia Road, Shanghai 200336 P.R.China Take metro line 1 to People's Square, line 3 or line 4 to Zhongshan Park, then change to metro towards and Mr. Louis Liu get off at . Then take the shuttle bus to the Phone:+86(0)21-6124 0090 expo center. You can also take metro to Huamu Road. Fax :+86(0)21-6124 0091 e-Mail:[email protected] By Public Transport Phone: +86 13512132873 Bus routes 975, Bus routes 976, Bus routes 989,Da Qiao line 6, Pudong routes 11, Airport line 3 & line 7 will take you directly to the Cargo deadlines expo center. Direct Shippement to Shanghai Overseas Cargo Arrvial Shanghai Seaport 9-10 September 2016 By Self-Driving Overseas Cargo Arrvial Shanghai Airport 10-11 September 2016 The expo centre is located next to the Inner Ring. You can drive the car directly to the expo center through Nanpu Bridge from the city centre. a) Exhibitors can use their own forwarder for transportation of Taxi exhibits up to Shanghai. However, on-site forwarding MUST be Available at the entrances of the SNIEC fairground. done by the official freight forwarder. If exhibitors use their own freight forwarder, please inform the official freight forwarder the name, contact person and mobile phone number of the appointed companies. For better arrangement, exhibitors who use their own appointed freight forwarder are highly recommended to get the on-site contacts of the responsible person. It is because ONLY the official standfitting contractors and freight forward will set up onsite offices to serve the exhibitors.

b) The official freight forwarder appointed by the organizer has the sole handling right within the SNIEC Fairground, i.e. the overall organization of freight/exhibits transportation within the exhibition hall, incl. the disposal of the necessary technical equipment as well as customs clearance procedures for temporary and/or permanent importations.

c) Exhibitors shall be responsible for all consequences if their exhibits’ dimensions, weight or floor-loading exceed the limits stated(please refer to Technical Guidelines) and have not official freight forwarder in advance for special arrangement.

d) Prior arrangements must be made with the official freight forwarder for on-site storage of exhibitors’ properties, packing cases and surplus materials.



26-29 September 2016 Shanghai New International Expo Centre, China

ਭ㓵 ਭ㓵 ਭ㓵 ਭ㓵 11 Line 11 7 Line 7 1 Line 1 3 Line 3 ⊕ᶞ्䐥 㗄ަ⒌ ሂ䭜䐥 Jiangyang Rd.(N) ిᇐ् Meilan Lake Fujin Rd. North Jiading 䫷࣑䐥 㖍঍᯦ᶇ Tieli Rd. Luonan Xincun ਁ䉀㾵䐥 Youyi Rd.(W) ిᇐ㾵 West Jiading ਁ䉀䐥 ▎ᒵ䐥 Youyi Rd. Panguang Rd. ᇓᆿޢ䐥 Bao’an Highway ࡎ㺂 ᇓᶞ䐥 ⲳ䬬䐥 Liuhang Baoyang Rd. Baiyin Rd. ާሂ᯦ᶇ 亴ᶇޢണ Gongfu Xincun Gucun Park ≪ӝ䐥 р⎭䎑䖜൰ Shuichan Rd. Shanghai Circuit ిᇐ᯦ค Jiading Xincheng ਭ㓵 ᱂ਿђ䐥 ⽷঄䐥 р⎭ཝᆜ લަ䐥 ਭ㓵 Changji Rd.(E) Hulan Rd. 6 Line 6 11 Line 11 Qihua Rd. ␔┞䐥 ঍㘊 Songbin Rd. 傢䱼 Nanxiang ⑥ค䐥 Malu ঍䱾䐥 Gangcheng Rd. Nanchen Rd. 䙐⋩᯦ᶇ 㣧ẛ ݿ᱄䐥 ݼѦ䐥 ᆿӣ р⎭⊳䖜ค Tonghe Xincun Huaqiao Guangming Rd. Zhaofeng Rd. Anting Shanghai Automobile City ᕖ঄⎒ ṹ⎜᯦ᶇ Zhanghuabang Taopu Xincun рཝ䐥 Shangda Rd. ␔ਇ䐥 Songfa Rd. ཌ儎ẛؓい॰् ާᓭ䐥 ਭ㓵 ਭ㓵 Waigaoqiao Free Trade Zone(N) ↜့䐥 Gongkang Rd. 10 8 Wuwei Rd. Line 10 Line 8 ൰ѣ䐥 䮵⊕঍䐥 Changzhong Rd. Changjiang Rd.(S) ᯦⊕⒴ค ᐸݿ䐥 ⽷䘔ኧ䐥 Xinjiangwancheng Shiguang Rd. Qilianshan Rd ᖣ⎜᯦ᶇ . Pengpu Xincun 㡠⍛䐥 ཝ൰䭽 ⇭儎㾵䐥 Hangjin Rd. Dachang Town Yingao Rd.(W) ⇭儎ђ䐥 ᶄᆆണ Yingao Rd.(E) Liziyuan ⊬≪䐥 ᄟ⊕䐥 㺂⸛䐥 Wenshui Rd. ⊕⒴䭽 Nenjiang Rd. Xingzhi Rd. Jiangwan Town п䰞䐥 Sanmen Rd. ཌ儎ẛؓい॰঍ р⎭㾵ㄏ Waigaoqiao Free Trade Zone(S) Shanghai West Railway Station ཝḅṇ ⊕⒴։㛨൰ ཝ঄п䐥 р⎭傢ᡅค Dabaishu Dahuasan Rd. Shanghai Circus World 㘊⇭䐥 ⵕྸ Xiangyin Rd. Zhenru 䐥. 䘆 ӊ䀈൰ 䠇 䠇⋏⊕㾵䐥Ѧᒺ ⽷䘔ኧ঍䐥 Wujiaochang ਭ㓵 Jinyun Rd Jinshajiang Rd.(W) Fengzhuang Qilianshan Rd.(S) 䎚ጦ䐥 ⍨⎭䐥 13 Line 13 ᯦ᶇ䐥 Chifeng Rd. Zhouhai Rd. Xincun Rd. ᔬ䮵䐥 Yanchang Rd. ളᵹ䐥 ᷡẛ䐥 Guoquan Rd. 哺ުޢണ Fengqiao Rd. . Huangxing Park ⵕ्䐥 ዐⳁ䐥 .(N) Zhenbei Rd. Langao Rd. ੂ⎄ཝᆜ ⋩䐥 ѣኧ्䐥 㾵㰅्䐥 㲯ਙ䏩⨹൰ ᴨ䱩䐥 ⑗ Zhongshan Rd.(N) Xizang Rd Hongkou Football Stadium Quyang Rd ӊ⍨ཝ䚉 ᴯᶞ䐥 䭽ච䐥 ѣ▣䐥 Wuzhou Ave. ཝ Caoyang Rd. Zhenping Rd. Zhongtan Rd. Daduhe Rd. ഑ᒩ䐥 Siping Rd. ᔬਿѣ䐥 Yanji Rd.(M) 䠇⋏⊕䐥 ䷃ኧ᯦ᶇ ⊕⎜䐥 哺ު䐥 Jinshajiang Rd. ѣު䐥 ђᇓު䐥 Anshan Xincun Jiangpu Rd. Huangxing Rd. Zhongxing Rd. Dongbaoxing Rd. 䛤⭫᯦ᶇ ђ䶌䐥 Youdian Xincun Dongjing Rd. р⎭⚡䖜ㄏ ␔㲯䐥 ᯦्⌴ Shanghai Railway Station ᇓኧ䐥 ⎭՜䐥 Songhong Rd. Beixinjing 䲼ᗭ䐥 䮵ስ䐥 ⊕ᆷ䐥 Baoshan Rd. Hailun Rd. Ѫᒩ䐥 Longde Rd. Changshou Rd. Jiangning Rd. ≿ѣ䐥 Linping Rd. ့ᆷ䐥 Hanzhong Rd. . Weining Rd. ཝ䘔䐥 ᱂䐥 ള䐥 ↜ᆷ䐥 ᴨ䱒䐥 Dalian Rd. ⊕⎜ޢണ ᆷള䐥 䲼 ⡧ གྷުዑ ђ䱼䐥 ᐞጦ䐥 ᶞ儎्䐥 䠇Ӣ䐥 ⭩⊕䐥 Wuning Rd. Qufu Rd. ഑ᐓ्䐥 Jiangpu Park Ningguo Rd. Longchang Rd. Aiguo Rd. Fuxing Island Donglu Rd. Jufeng RdRd. Yanggao Rd.(N) Jinjing Rd. Shenjiang Rd. ်ኧީ䐥 ѣኧޢണ Sichuan Rd.(N) Loushanguan Rd. Zhongshan Park 㠠❬ঐ⢟侼 ᱂ᒩ䐥 Natural History Museum ᯦䰮䐥 Changping Rd. Xinzha Rd. ᶞṇ⎜䐥 ⊕㤅䐥 Yangshupu Rd. ਭ㓵 䠇⎭䐥 Jiangsu Rd. ཟ▲䐥 ള䱻ᇘ䘆ѣᗹ ᨆ㈤ẛ 4 Jinhai Rd. Tiantong Rd. International Cruise Terminal Tilanqiao Line 4 ӊ㧨䐥 Wulian Rd. 䶏ᆿሰ ঍Ӣ㾵䐥 Ӱ≇ᒵ൰ ᗆ⌴ђ 㲯ẛ⚡䖜ㄏ㲯ẛਭ㡠ㄏᾲ . Jing’an Temple Nanjing Rd.(W) People’s Square East Xujing Hongqiao Railway HongqiaoStation Airport Terminal 2 ᔬᆿ㾵䐥 ਭ㓵 㲯ẛਭ㡠ㄏᾲр⎭ࣞ⢟ണ嗏ⓠ䐥 ≪ค䐥 Yan’an Rd.(W) 䱼ᇬ౪ ਭ㓵 2 Line 2 Hongqiao Airport TerminalShanghai 1 Zoo Longxi Rd Shuicheng Rd. 12 Line 12 ঍Ӣђ䐥 ⎜ђཝ䚉 Հ⢷䐥 ␤⎭ѣ䐥 Nanjing Rd.(E) Pudong Ave. Yili Rd. Huaihai Rd.(M) ঐު䐥 ഴҜ侼 ᑮ⟕䐥 䲋㾵঍䐥 Boxing Rd. Changshu Rd. Shaanxi Rd.(S) 哺䱸঍䐥 ཝь⮂ ᇁണ䐥 Huangpi Rd.(S) Dashijie ђ᱂䐥 嗏ḅ᯦ᶇ Songyuan Rd. 㲯ẛ䐥 Dongchang Rd. Ⓠ␧։㛨ѣᗹ≇⭕䐥 ्⍁⌴䐥 ᗭᒩ䐥 Ӈኧ䐥 Longbai Xincun Hongqiao Rd. Ӛ䙐ཝᆜ р⎭ Yuanshen Stadium Minsheng Rd. Beiyangjing Rd. Deping Rd. Yunshan Rd. Jiao Tong UnivercityUniversity ь㓠ཝ䚉 Century Ave. 䠇ẛ䐥 䊡ണ Jinqiao Rd. ᯦ཟ൦ Yuyuan Garden 㘷㾵䰞 ਭ㓵 㺗ኧ䐥 Laoximen 10 㡠ѣ䐥 ㍡㰚䐥 Hengshan Rd. Line 10 Hangzhong Rd. Ziteng Rd. ୼ค䐥 㚽ి⎒䐥 ి஺䐥 Shangcheng Rd. Zhaojiabang Rd. Jiashan Rd. ᢉ⎜ẛ Dapuqiao ᶞ儎ѣ䐥 ቅ঍䰞 Yanggao Rd.(M) ਭ㓵 ᇒኧ䐥 Xiaonanmen 9 Line 9 Yishan RdRd.. ᗆᇬ≽ 䱼ᇬ⎒䐥 . 傢ᖉ䐥 Lujiabang Rd. ⎜⭫䐥 . Madang Rd. Pudian Rd. р⎭〇ᢶ侼 ⌍⌴ ғӣ ѣᱛ䐥 йᇓ ᱕ѣ䐥 ਾᐓ䐥 ╋⋩⌴ᔶਇ॰Ṹ᷍䐥 Shanghai Science & Technology Museum Sijing Jiuting Zhongchun Rd. Xingzhong Rd Hechuan Rd Caohejing Hi-Tech Park Guilin Rd. ⎜⭫䐥 р⎭։㛨൰ ђᆿ䐥 ཝᵞẛ䐥 劷⨣䐥 㾵㰅঍䐥 ঍⎜ཝẛ Pudian Rd. Dong’an Rd. Damuqiao Rd. Luban Rd. Xizang Rd.(S) Nanpu Bridge р⎭։㛨侼 ь㓠ޢണ ຎẛ Tangqiao 㬓ᶇ䐥 ਭ㓵 Lancun Rd. 7 ֎ኧ ьঐՐঐ⢟侼 㣧ᵞ䐥 Line 7 Sheshan ╋ⓠ䐥 р⎭⑮〈侼 World Expo Museum Huamu Rd. Caoxi RdRd.. Shanghai Swimming Center ਭ㓵 Line 13 р⎭ݵㄛॱᆜѣᗹ 13 嗏╋䐥 嗏঄ Shanghai Children’s Medical Center ࡑ᯦ѣ䐥 㲯ẻ䐥 㲯╋䐥 Ṹ᷍ޢണ╋ᇓ䐥 Longcao Rd. Longhua 嗏঄ѣ䐥 Chuangxin Rd.(M) Hongmei Rd. Hongcao Rd. Guilin Park Caobao Rd. Longhua Rd.(M) ѣ঄㢰ᵥᇡ ⍔⌴ ੄┟ Dongjing Houtan Ѫ⊸᯦ᶇ ᕖ⊕儎〇 䠇〇䐥 ᒵަ䐥 ୆䭽 ьঐཝ䚉 㣩঄䐥 Zhangjiang High TechJinke Park Rd Guanglan Rd. Tangzhen Shibo Ave. Linyi Xincun Fanghua Rd. ঄ཅђ䐥 嗏䱩䐥 Huaxia Rd.(E) ђަ䐥 Longyang Rd. . й㧎䐥 㲯㧎䐥 亴ᡪ䐥 Donglan Rd. ⸩嗏䐥 Ӈ䭜䐥 Qixin Rd. Hongxin Rd. Gudai Rd. Shilong Rd. ਭ㓵 Yunjin Rd. ᐓ⋏Chuansha ࠂグ䐥Lingkong Rd. 䘒ђཝ䚉Yuandong Ave. ᶴ⊕ཝᆜค 12 Line 12 р⎭঍ㄏ 䮵␻䐥 㘶঄䐥 Ӈਦ䐥 儎〇㾵䐥 ᶞ儎঍䐥 䭜㔙䐥 Songjiang University Town Shanghai South Railway Station Changqing Rd. Yaohua RdRd.. Yuntai Rd. Gaoke Rd.(W)Rd.(W) Yanggao Rd.(S) Jinxiu Rd. ⎭ཟп䐥 嗏㘶䐥 Haitiansan Rd. Longyao Rd. ਭ㓵 ⎜ђള䱻ᵰ൰ 䭜⊕҆ണ ਭ㓵 ђ᱄䐥 16 Pudong Airport Jinjiang Park 3 Line 3 Dongming Rd. ᡆኧ䐥 ਭ㓵 ᶴ⊕᯦ค Chengshan Rd. Songjiang Xincheng ᶞᙓ ঄ཅѣ䐥 2 Line 2 㧨㣧䐥 Yangsi Huaxia Rd.(M) Lianhua Rd. 儎䶈䐥 Gaoqing Rd. ᶴ⊕։㛨ѣᗹ Songjiang Sports Center ཌ⧥䐥 ਭ㓵 Waihuanlu 1 Line 1 ђᯯ։㛨ѣᗹ ⚫ዟ঍䐥 р঍䐥 ঄ཅ㾵䐥 Oriental Sports Center Lingyan Rd.(S) Shangnan Rd. Huaxia Rd.(W) ਭ㓵 㧎ᒺ 6 Line 6 Ჸᵠᔶ䙐 Xinzhuang ਭ㓵 㖍ኧ䐥 ⿶⋵䐥 ᓭ᯦ޢ䐥 䘠༡ቲ 䞿ⲳ⊖ 5 Luoshan Rd. Xiuyan Rd. Kangxin Highway Disney Resort Zuibaichi Park Line 5 ࠂݼ᯦ᶇ ᱛ⭩䐥 Lingzhao Xincun Chunshen Rd. п᷍ п᷍ђ ⎜п䐥 ᗗẛ Sanlin East Sanlin Pusan Rd. Yuqiao ᶴ⊕঍ㄏ 㣜ᚈ䐥 11 ਭ㓵 Songjiang South Railway Station 䬬䜳䐥 Luheng Rd Line 11 Yindu Rd. . ઞ⎜ђ East Zhoupu 仑ẛ ਭ㓵 Zhuanqiao ⎜⊕䭽 9 Line 9 Pujiang Town 咚⋏㡠ค Heshahangcheng ्ẛ Beiqiao ⊕ᴾ䐥 Jiangyue Rd. 㡠ཪђ ᯦൰ 䠄⭕ࣞ⢟ണ ᜖঍ ࢇᐓ䐥 East Hangtou Xinchang Wild Animal Park Huinan Jianchuan Rd. 㚊㡠䐥 Lianhang Rd. ᜖঍ђ ђᐓ䐥 East Huinan 䰫㺂ᔶਇ॰ᮽӋ䐥 ঄ᆷ䐥 䠇ᒩ䐥 Dongchuan Rd. ਭ㓵 Minhang DevelopmentWenjing Zone Rd. Huaning Rd. Jinping Rd. ⊾ᶒޢ䐥 ਭ㓵 5 Line 5 Shendu Highway 8 Line 8 Ҝ䲘 Shuyuan Ѫ⑥ཝ䚉 Lingang Ave.

┪≪⒌ ᵰ൰ ⚡䖜ㄏ ⻷⎤㓵 㓵䐥ਭ 哺⎜⊕ ঋ㓵䖜ㄏ ⴪᧛ᦘҎ䖜ㄏ ࠰ㄏᦘҎ䖜ㄏ Dishui Lake Airport Railway Station Maglev Line 1 Metro Line Huangpu River ਭ㓵 16 Line 16

ਭ㓵 ਭ㓵 ਭ㓵 ਭ㓵 ਭ㓵 ਭ㓵 ਭ㓵 ⑟俞ᨆ⽰ ਭ㓵 ਭ㓵 ਭ㓵 ਭ㓵 ਭ㓵 ਭ㓵 ਭ㓵 ҎᇘᤷޢާӚ䙐গਥ൞࠰ㄏ੄Ⲻ࠼䫕޻θ൞р⎭⚡䖜ㄏㄏ δਭ㓵Ƚਭ㓵εȽ঍Ӣ㾵䐥ㄏδਭ㓵Ƚਭ㓵Ƚਭ㓵εȽ 嗏঄ㄏδਭ㓵Ƚਭ㓵εȽ㲯ẛਭ㡠ㄏᾲㄏδਭ㓵Ƚਭ㓵ε 䘑㺂ж⾞ᦘҎθӡ਍䘔㔣䇗䍯χ :GQKSKZXUROTKZURUTM_GTM8UGJ9ZGZOUTUXZGQKSKZXUROTKZU ঋぁ⾞䈭䠃᯦䍣⾞Ⱦ .[GS[8UGJ9ZGZOUTZUZNKK^VUYZGZOUT

 26-29 September 2016 Shanghai New International Expo Centre, China

Traffic Map 

Distance between Hongqiao airport and SNIECφapprox.32 kilometer 㲯ẛᵰ൰㠩р⎭᯦ള䱻ঐ㿾ѣᗹ䐓⿱㓜Ѱ32ޢ䠂 Distance between Pudong airport and SNIEC: approx.35 kilometer ⎜ђള䱻ᵰ൰㠩р⎭᯦ള䱻ঐ㿾ѣᗹⲺ䐓⿱㓜Ѱ35ޢ䠂 Distance between Shanghai Railway Station and SNIEC: approx.20 kilometer р⎭⚡䖜ㄏ㠩р⎭᯦ള䱻ঐ㿾ѣᗹⲺ䐓⿱㓜Ѱ20ޢ䠂 Real-name Authentication

26-29 September 2016 Shanghai New International Expo Centre, China

ީӄ㔕ж㇗⨼ᩣᔰ୼਀䘆䗉୼䇷ԬⲺ䙐⸛ Notice on the Unified Management of Certifi- cates of Constractors and forwarders ṯᦤр⎭ᐸ⎜ђ᯦॰ޢᆿቶީӄᩣᔰ䇷Ԭжᗁ᯳㺂ᇔ੃࡬਀➝ ⡽ौⲺ㾷≸θѰҼࣖᕰр⎭᯦ള䱻ঐ㿾ѣᗹᴿ䲆ޢਮδԛсㆶ In response to the request of Pudong New Area’s Security Bureau to 〦ѣᗹεኋ侼޻ԛ਀ম䍝॰Ⲻᆿޞ㇗⨼θ᭯਎ⴤࢃᐹ᫚ኋᐛӰ practice a real-name authentication and photo system in regards to 䇷Ԭ㇗⨼␭ҧⲺ⧦⣬θᡇѣᗹ࡬ᇐҼᩣᔰ୼਀䘆䗉୼䇷Ԭ㇗⨼ workers involved in erection work, the Shanghai New International ᧠᯳ྸсφ Expo Centre Co., Ltd.( hereinafter refer to as the SNIEC) has formu- lated the following measures to change the undesirable situation in managing the certificates of workers involved in booth erection and 1Ƚ㠠 2011 ᒪ 1 ᴾ 1 ᰛ䎭θᡶᴿᐹ᫚ኋᐛӰδऻᤢཝՐ᤽ᇐᩣ dismantling, and to ensure a safe environment within the SNIEC’s ᔰ୼θ⢯㻻ኋਦᩣᔰ୼਀ཝՐ᤽ᇐ䘆䗉୼ε൞ᐹ᫚ኋᵕ䰪 exhibition halls and unloading areas. Ⲻ䙐㺂䇷ሼ⭧ᡇѣᗹ㔕жⲱ䇦ȽᇗṮȽ࡬֒ૂ㇗⨼Ⱦ 1. From Jan 1st, 2011, all workers involved in exhibition booth 2Ƚࣔ䇷ᢁ㔣Ѱ᯳ᐛ䍕䍙Ӱ䍕䍙࡬θ঩᯳ᐛ䍕䍙ӰਥѰཐփᐛ erection and dismantling (including those from the exhibition’s ᐛӰ䓡Գ䇷৕ԬεȾѰ㢸בӰ⭩亼䙐㺂䇷δ⧦൰ࣔ⨼䴶ᨆ official constractor, raw space constractor, and official forwarder) 㓜⧦൰ⲱ䇦ᰬ䰪θᡇѣᗹሼᔰ㄁㖇р人㓜ࣔ䇷㌱㔕Ⱦ2010 will be required to obtain passes from the SNIEC, who is ᒪ 7 ᴾ 1ᰛ䎭θᡶᴿ䴶㾷൞㖇р人㓜ⲱ䇦਀⧦൰ⲱ䇦ࣔ⨼ exclusively respon- sible for the registration, checking, produc- 䇷ԬⲺᩣᔰ୼਀䘆䗉୼᯳ᐛ䍕䍙Ӱθ൞ެኋՐᐹኋࢃθ䴶 tion, and management of the aforementioned passes. 㾷㠩ቇᨆࢃ 15 Ѡᐛ֒ᰛθࢃᶛᡇѣᗹࣔ⨼ᇔ੃䇚䇷ᢁ㔣Ⱦ

2. Person in charge of the work can apply for passes of any workers 3Ƚ㠠 2012 ᒪ 5 ᴾ 1 ᰛ䎭θࣔ⨼ᇔ੃䇚䇷ᡶ䴶䍺ᯏѰφ᯳ᐛ䍕 under him. (On-the-spot application requires the originals of the 䍙Ӱӂԙ䓡Գ䇷৕Ԭδу᭥ᤷжԙ䓡Գ䇷਀ᣚ➝εȽӂԙ workers’ ID cards). To reduce the time spent in on-the-spot 䓡Գ䇷གྷদԬδ↙ਃ䶘ȽњԳεȽޢਮ㩛ѐᢝ➝གྷদԬ registration, the SNIEC will set up an on-line appointment system δ䴶ࣖⴌޢㄖθњԳεȽɅᇔ੃䇚䇷㺞ṲɆδ䱺Ԭ for the issuance of the certificates. From July 1st, 2010, all εȽɅᩣᔰ୼ᆿޞᢵ䈰ҜɆδ䱺ԬεȽɅ᯳ᐛঋփ਀᯳ persons in charge of the work of erection contractors and ᐛ䍕䍙Ӱ㠠᝵᧛਍⸣ؗ䙐⸛⺤䇚ҜɆδ䱺ԬεȾԛрᡶᴿ transport contractors are required to go through the Real-name 㺞Ṳ਀䇷᱄ᗻ亱Ѱ↙ᾭມߏⲺ৕Ԭθ⭧਺ޢਮ䍕䍙Ӱㆴ㖨 Authentication procedures at the SNIEC at least 15 days prior to ᒬࣖⴌޢㄖȾྸᵢӰᰖ⌋ࢃᶛⲺθ䘎ᗻ亱࠰ޭ⭧ညᢎӰ਀ the start of their work. ਍ᢎӰਂᯯㆴ㖨ᒬࣖⴌޢㄖⲺɅᦾᵹညᢎҜɆδ䱺ԬεȾ 3. From May 1st 2012, Documents required for Real-name Authen- 4Ƚ2010 ᒪ 9 ᴾ 1 ᰛ੄θᵠ൞ኋࢃ 15 Ѡᐛ֒ᰛ㠩ᡇѣᗹᨆࢃ tication procedures include the original and 2 photo copies ( ࣔ⨼ᇔ੃䇚䇷ᢁ㔣Ⲻᩣᔰঋփ਀䘆䗉ঋփ᯳ᐛ䍕䍙Ӱθሼ front and back sides) of second-generation ID cards ( first-gener- уޭ༽㖇р人㓜ⲱ䇦ⲺᶗԬȾ⧦൰ࣔ⨼䇷Ԭᰬ᯳ᐛ䍕䍙Ӱԃ ation ID cards or passports are not supported) of the person in р䘦䍺ᯏ䘑㺂⧦൰ᇔ੃䇚䇷θੂᰬሯެ⧦൰ᧈ䱕ⲱב䴶ᨆ charge of the work from the contractor; originals and 2 photo 䇦Ƚ䇚䇷ȽᇗṮ਀亼䇷⍷ぁѣᦕཧⲺᐹኋᰬ䰪ૂެԌ੄ copies of relevant industry training certificates; the Real-name ᷒θ⭧᯳ᐛঋփ䍕䍙Ӱ㠠㺂ᢵ᣻Ⱦ Authentication Form for Erection Contractors and Transport Contractors Appendix 1); the Safety Commitment of Erection ⢯↚䙐⸛θᮢ䈭䚫ᆾȾ ( Contractor(Appendix 2); and the confirmation letter to accept SMS notice Appendix 3). All the above-mentioned forms and р⎭᯦ള䱻ঐ㿾ѣᗹᴿ䲆ޢਮ ( certificates must be originals that have been filled out in block ӂɂжӂᒪ഑ᴾ letters and bear the signature of the head of the respective company and its company seal. If the holder of the certificates and documents cannot make it to the SNIEC to go through the procedures in person, a Letter of Authorization signed and stamped by the entrusting party and the entrusted party must be provided(Appendix 6).

4. After Sep 1st, 2010, the person in charge of the work from the constractor or forwarder who fails to go through the Real-name Authentication procedures 15 days prior to the start of the exhibition will lose the privilege of making registration appoint- ments online. The person in charge of the work will still have to go through the Real-name Authentication procedures on the spot, and the person in charge of the work shall bear all responsi- bilities for any time loss or other consequences resulting from the queuing, and prolonged authen- tication, registration, checking, and certificate obtaining, etc.

Please follow the instructions of the Notice.

Shanghai New International Expo Centre Co., Ltd. April, 2012

Erection/Transport contractor certificates obtainment 26-29 September 2016 Shanghai New International Expo Centre, China

For Now: mation by the in chage fom the contacto " $R$ ;"< Pe in chage of the k $=>?>>$" pepa elevant [$\]$$$ < 15 days prior to the start of exhibition >$$$^ preparation work, the in chage Not Passed of the go though eal-name " authentication at SNIEC $$< $ Passed =\_ $$< Send the name and d via SMS In the futur(once confirmed by SCEIA) to the mobile of the in chage of the `{ who can then the info to log on the on-line appointment m " Not Passed

Apply for certificate on On- line appointment the spot Check on the if the ID cad of ]$ the in chage of the k | h pad the authentication $$ $ Passed

With addition

>$ <} ` R

Without addition >$} [~?$]$ at the Official Contractor’s counter

~?$] at Exhibition Hall Owner’s on-site counter $$ €<$€<$" {‚ƒ $}{~\~

>$~?$ ]$$}" at SNIEC Certification Center on the South Square „ †‡‚";ˆ;†‰‚‡ˆ‚‚

Pay the fees

Print; get the certificates Š${‹${" { R${ ˆ„‚‚$>Œ^

 Appendix 1 Real-name Authentication Form 26-29 September 2016 for Erection Contractor and Shanghai New International Expo Centre, China Transport Contractor

Please fill in the form in block letters

Company Name:

Company Address:

Zip Code: Tel (Including Area Code):

His/Her Mobile Number (Their Person in Charge of the Work: Unique Number ) His/Her Identity Card No. (Second-generation Card, 18-digits)

Email Address ( The Unique Address)

Person in Charge of the Site His/her Mobile Number

Person in Charge of Safety His/her Mobile Number

Please transcribe in block letters the following text: I have fully understood the contents of the Safety Commitment. I am committed to strictly obeying the rules set out in the Safety Commitment. Should there be and quality, fire, or safety problems due to workers on behalf of whom I have applied for relevant permits and passes, Iand my company shall bear all resulting economic and legal liablilities.

______

______

______

Company Seal: Signature of Person in Charge of the Work:

Date: ______/ ______/ ______(DD/MM/YY)

Return Receipt

Company Name: Person in Charge of the Work: Mobile:

(The following is to be filled in by SNIEC)

SNIEC Seal: SNIEC Executive:

Date: _____ / ______/ ______(DD/MM/YY)

 Appendix 2 Safety Commitment of the 26-29 September 2016 Erection Contractor Shanghai New International Expo Centre, China

We, the erection contractor (hereinafter referred to as “the Contractor”), are committed to strictly obeying the following rules during exhibition hall improvements, booth erection, and dismantling operations within the confines of the Shanghai New International Expo Centre Co., Ltd. (hereinafter referred to as the “SNIEC”), so as to ensure the common facilities within the SNIEC are well protected, the construction work is carried out in a safe manner, and the SNIEC is kept quiet, safe, and clean.

1. The Contractor shall strictly abide by the laws, rules and regulations on work safety, fire safety, and labor protec- tion promulgated by the state and Shanghai municipal governments and relevant administrative departments.

2. The Contractor shall take charge to educate its on-site workers on work safety, ensuring that the workers carry all relevant work permits, and ensuring that all its workers work with their helmets on and, when working at heights above 2 meters, wear safety harnesses. The Contractor shall urge its transport staff to work according to all relevant safety regulations, and take protective measures to endure work safety and fire safety according to regulations. The Contractor shall designate a person, who shall be readily recognizable at the site, to take charge of on-site day-to-day safety supervision.

3. The workers of the Contractor shall closely follow the rules on the operation and use of the facilities and equip- ment in and out of the exhibition hall, and facilitate the checking and supervision of the SNIEC’s staff on the improvement work.

4. During work execution, the Contractor shall strictly follow the SNIEC’s rules on work safety and fire safety; and shall bear all responsibilities and consequences in result of the failure the stipulated rules.

5. For work at height, the worker shall be a holder of a work-at-height permit or other relevant qualifications, and take all appropriate safety measures. Should there be any accident, the Contractor shall bear all responsibili- ties, liabilities and consequences.

6. During work execution, the Contractor shall keep the constructions, structures, facilities, equipment, and fittings in the exhibition hall clean and well protected. Should there be any damage or pollution, compensation shall be made according to the SNIEC’s “Damage Price List of Constructions and Structures” and “Damage Price List of Facilities, Equipment, and Fittings”.

7. Fire and explosion prevention rules shall be strictly observed. Smoking is prohibited in the exhibition hall. No explosive and inflammables (such as paint, banana oil, dimethyl benzene, etc) may be taken into the exhibition hall. No fire, electric furnace and welding equipment may be used within the exhibition hall.

8. Materials must not be stored at the fire exits. All fire exits, safety passages, and common walkways must be kept free of any obstructions.

9. During work execution, no action shall be carried out that may affect the structures and safety of the building.

10. Workers must not undertake other transport tasks that are irrelevant to the designated exhibition, or solicit work from other concurring exhibitions.

11. The Contractor must not subcontract the work of exhibition booth erection or dismantling to individual persons, other private entities or entities that do not carry legal person status and relevant certifications.

12. The Contractor must not use the materials and facilities for improvement that have been expressly banned by national laws and regulations.

Should there be any consequences due to the Contractor’s failure to follow the aforementioned rules, the Contrac- tor will be liable for punishment from the SNIEC, the sponsors of the exhibition, and the security staff of the exhibi- tion hall, and bear all possible resulting economic and legal liabilities.

No. & Name of the Booth: Seal of the Contractor: Signature of the Person in Charge: Date: / / (DD/MM/YY)  Appendix 3 Confirmation Letter of SMS 26-29 September 2016 Voluntary Acceptance Shanghai New International Expo Centre, China

Shanghai New International Expo Centre Co., Ltd.:

In order to receive in a timely manner information on real-name authentication, and to strengthen safety manage- ment for the construction crew, our company and the person in charge under our company will voluntarily accept all SMS notifications sent from information source 10657109090799 with the suffix [SNIEC]. The SMS notifica- tions include but are not limited to: password notifications, real-name authentication expiration reminders, remind- ers of real-name authentication related matters, reminders of exhibition assembling and dismantling schedules, notifications of venue safety regulations, notifications of violations, special notifications and emergency notifica- tions.

In the event that our company and the person in charge under our company no longer wish to accept any SMS notification, our company will send a Cancellation Application and a Letter of Authorization, both with official stamp, and a copy of the company’s business license with a courier to the SNIEC real-name authentication window for cancellation procedures. In the event that our company name, construction foreman, SMS acceptance number or other information has changed, our company will start, on the day of the information change, informa- tion change procedures at the SNIEC real-name authentication window with an Application for SMS Accep- tance No. Change, a Letter of Authorization, both with official stamp, and a copy of the company’s business license. Our company will be responsible for consequences of delay in applying for cancellation or information change.

Name of construction company:______

Official stamp:______

Signature of the person in charge:______

SMS acceptance No.:______

Date:______

 Appendix 6 Letter of Authorization 26-29 September 2016 Shanghai New International Expo Centre, China

Company Name of Entrusting Party: Address: Designated Person of Entrusting Party: Title: ID Card (Passport) Number:

Name of Entrusted Party: Sex: ID Card Number: Address: Tel:

Mr./Ms ______is entrusted by our company to handle real-name authentication at the Shanghai New International Expo Centre with delegated responsibilities and authority as follows: 1.To sign for and submit real-name authentication forms and on-site constructor passes obtaining required documents, forms and other materials, including but not limited to "Real-name Authentication Form", "Constructor Passes Application Form," "Safety Commitment of Erection Contractor" , and “Safety Commitment of Transport Contractor ". 2. To obtain the passes for costructors, report any loss of passes, and file for card replacement and other relevant matters. 3. To conduct other procedures that are related to real-name authentication and obtaining constructor passes. 4. The authorization effective duration of the authorization is from the date of signing of this document until the end date of the dismantling work of the exhibition.

The Entrusting Party recognizes that the activities, commitments, and actions of the Entrusted Party, and documents signed by the Entrusted Party within the above scope of authorization are effective, and will bear any possible legal consequences.

Client Signature of Entrusting Party: Company Seal of Entrusting Party:

Signature of Entrusted Party:

Date: ______/ ______/ ______(DD/MM/YY)

Please also provide the ID card photo copies (front and back side, 2 copies) or passport photo copies (2 copies)of the Entrusting Party and ID card’s original and photo copies (front and back sides, 2 copies) of the Entrusted Party.

 Rules and Regulations

26-29 September 2016 Shanghai New International Expo Centre, China

1. Admission 6. Operation of stand Exhibitors Exhibitors shall observe strictly the opening hours of the exhibition and SHOULD Exhibitors may access the exhibition hall half hour before the show starts and half NOT: hour after the show closes, on each day, to service their booths and equipment, - Leave the booth unattended. during exhibitions days, Approval should be obtained from the Organizers for working - Remove the exhibits from the booth or exhibition venue unless special permission before or beyond these hours. Exhibitors are responsible for the overtime charges. has been given by the Organizer. - Dismantle the booth before the official closing time on the last day of the exhibition. Visitors - Leave any items or exhibits in the exhibition halls after the move-out period. Trade visitors must complete a registration from before entry. Only those related to Without special instructions from exhibitors, the Organizer and the venue manage- the industry and properly attired will be allowed. Admission of visitors is solely at the ment will discard all items or exhibits left in the exhibition hall after the move-out discretion of the Organizers. period. Please note that only Official Trade Invitations issued by the Organizers are valid for No retail sales are allowed in the exhibition. For those who failed to comply, the entry to the exhibition. Privately printed invitation cards will not be accepted. Visitors Organizer reserved the rights to adjoum the exhibitor from entering the hall. below 18 years of age are strictly not allowed into the exhibition hall. 7. Live performance/film/audio-visual of demonstration Contractors Any films, video cassettes, slides or audio-visual demonstration to be shown to the All contractors (standfitting, interior decorating etc.),other than the official contractor, public during the exhibition must obtain prior approval from the authorities confirmed. are required to apply the contractor badge by signing an undertaking guaranteeing Exhibitor can appoint the Official Freight Forwarder to arrange on their behalf. their observance of regulations laid down by the official standfitting contractor before admission passes are issued for carrying out construction/dismantling works during Exhibitors are prohibited from causing annoyance to visitors or other exhibitors. build-up/teardown periods. Acceptable noise level will be at the Organizer’s discretion. Any complaints raised which the Organizer finds justifiable, the Organizer reserves the right to impose During the show period, if your appointed contractor’s staff request to do the daily limitation on the operation of the exhibits or presentation as well as imposing cleaning and control the electricity power, please apply the on-site personnel badge limitation or terminating any live performance/audio-visual demonstration at their own for show period from the Official Standfitting Contractor discretion, Exhibitors are required to control the sound level of live performance/au- dio-visual demonstration in such a manner that a maximum of 75 decibels (dB) 2. Insurance, liability and risks measured at the aisle(s) adjacent to their booth or at the nearest border of their All exhibitors shall insure, indemnify and hold the Organizer and venue owner neighboring booth will be allowed. Besides, the output power of each speaker should harmless in respect of all costs, claims demands and expenses of the exhibitor upon not exceed 1000W. the Organizer shall be the sole orbiter of acceptability of sound any person or things at the exhibition venue during the move-in, show days and levels. move-out periods. 8. Demonstration and operation of exhibits Exhibitors are strongly advised to insure their exhibits or other valuable properties An exhibitor intends to demonstrate or operate exhibits at his stand MUST ensure: against theft, loss or damage including the risk of fire they should also provide an – The exhibits are operated under strict control and comply with proper safety insurance coverage for their own staff against injury and third party liability for visitors conditions. at their booths. – The exhibits are equipped with suffucient safety devices which can only be removed The Organizer shall not in any event be held responsible for any restrictions or when it is not in operation and not connected to the power source. conditions which prevent the construction, erection, completion, alteration and - All moving parts of the exhibits should be kept within the rented booth area dismantling of stand, or for any of the service or amenities provided at the exhibition whenever it is operating or not, and with adequately guard to against possible injury to any person. center or for the cancellation or partial opening of the exhibition either as a whole or - No annoyance is caused to visitor or other exhibitors. Any complaints raised which in part or for the amendments or alterations to all or any of the rules & regulations the Organizer finds justifiable, the Organizer reserves the right to impose limitation caused by circumstances beyond the Organizer’s control. on the operation of the exhibits. - Do not use any industrial gas of inflammable or toxic nature for demonstration 3. Freight forwarding purpose. Only the Official Freight Forwarder is entrusted with the overall organization of freight/ - To be responsible for the removal and disposal of waste materials generated by exhibits transportation within the exhibition hall. No trucks, cars, forklifts or handling working demonstration of exhibits. equipment (trolleys, lift, jacks, etc.) other than that of the Official Freight Forwarder (except exhibits). Will be permitted inside the exhibition halls. prior arrangements 9. Distribution of promotional materials must be made with the Official Freight Forwarder for on-site storage of exhibitors’ Exhibitors are requested to distribute their promotional materials such as leaflets, properties, packing cases and surplus materials. brochures and product catalogues within the booth. No exhibitors are allowed to distribute any promotional materials, souvenirs and etc. in public area of the 4. Hand carried goods exhibition hall. - Exhibitors can fill in the move-out permit and start to move-in and move-out hand-carried goods according to the Move-In and Move-Out Schedule issued by 10. Photographing and video recording the Organizer and with prior notice to the Official Freight Forwarder. No photography, filming, sound or video recording, telecasting and broadcasting is - During move-in period, please ensure that your booth is ready to receive such allowed in the exhibition center, unless approved by the Organizer in writing in exhibits and please take into consideration the risk of leaving valuable exhibits on advance. your booth too early. - For hand-carried goods, whether you are bringing in yourself from overseas or 11. Catering other parts of PR China, you MUST inform the Official Freight Forwarder at the To ensure food safety, outside food and drink are not allowed into the exhibition hall. entrance of the exhibition hall for the purpose of customs clearance/declaration Please order via the official caterers of the exhibition hall or buy from restaurants or before they can be move out of the exhibition hall. cafeteria at the exhibition venue. - Please Do Not send any item by express delivery service to the venue. 12. Stand cleaning 5. Security The Organizer will provide general cleaning of the exhibition hall (excluding exhibits) While the organizer shall take up the necessary security precautions in the interest of prior to the opening of the exhibition and daily thereafter. During the show period, cleaning inside the package stands will be provided by the official standfitting contrac- the exhibition as a whole, the organizer shall not be liable for any lass or damage to tor. For raw space exhibitor, cleaning inside the booth should be provided by their own exhibits or other properties of the exhibitor or any injury to persons in any time before, appointed Standfitting Contractor. However, it is the responsibility of the exhibitors to during and after the exhibition. keep their stand tide at all times. Exhibitors must make their own arrangements for removal of their packing materials, cartons, boxes, crates, construction debris etc. - General security service will be provided within the exhibition venue, but it is and be responsible for any expenses incurred. important for all the exhibitors to take utmost care of their exhibits and belongings. The organizer undertakes no responsibility for them. 13. Authority on the premises - Exhibitors are recommended to incorporate a lockable cabinet in their booths for In the event of any dispute on site, the Organizer reserves the right to pursue any souvenirs, consumable & important items and be sure to lock up before leaving action it deems necessary in the best interest of the exhibition and in fairness to all their booths at the end of the day – display only when your booth is manned. exhibitors. As the Organizer of the exhibition, the decision of the Organizer will be - On the last day of the exhibition, exhibitors are reminded to remove all items from final. the cabinet as the furniture will be retrieved by the contractor once the show is officially closed. 14. Intellectual property rights - The stand-by security guards have the right to check all goods moving-in out of the The exhibitors shall be in possession of all intellectual property rights regarding their exhibition hall. exhibits on display during the show. NO infringement of any registered trademark, design patent, innovation and/or patent is allowed in the exhibition. Any dispute of intellectual property right arises; the concerned exhibitor should remove related exhibits and bear the full responsibility. And the exhibition fee paid by the exhibitor, or any part thereof, may not be refunded to the exhibitor.  Technical Guideline

26-29 September 2016 Shanghai New International Expo Centre, China

1. Construction and dismantling d) Suspensions No hanging object is allowed in the Centre without permission. Each permitted 1.1 Construction and dismantling times hanging point may bear an object which weighs no more than 200KG. There are Exhibitors are notified by circular of any change to these time at a particular event. For two rows of hanging points on the high beam with the distance between hanging general safety reasons, access to both halls and grounds is prohibited outside the points at 850MM. The Exhibition Hall Owner shall conduct the hanging work. The stated times. During the construction period, if exhibitors wish to work overtime, you hanging Point cannot be used to fix the structure connected with the floor and shall should raise an application to the organizer before 3 p.m. each day and pay fees not be used for lifting facilities and for bearing any moveable objects. according to the service charge list. Overdue is subject to a 50% surcharge. Any goods that have not been unpacked by 8.30 p.m. on the last day for setting up are to be removed/put into storage at the cost of the Exhibitor and may only be delivered again 1.4 Transport, exhibition and dismantling of goods after 5 p.m. on the first day of the fair, at the earliest. Manufacturers and distributors are liable to take back packaging, such as cartons, wrappings, cases, pallets, etc., or to make arrangements for their material to be 1.2 Technical data for the halls and the exhibition grounds utilized. Accordingly, for any packaging required again for dismantling the empties Hall dimensions warehouse of our forwarding agents should be used. Packaging not being re-used can be forwarded for materials recycling via our service partners. Hall Max. Max. const.height floor loading 1.5 Customs formalities Hall E1-E4, 6 metres for one-storey booths and Exhibition Hall is regarded as Bonded Area. All goods inside the exhibition hall are tax 3t/sqm exempted except alcoholic drinks and other beverages during the exhibition. No W1-W5 7.5 metres for two-storey booths or above goods are allowed to be taken out of the halls without prior approval of the Customs. Exhibitors are requested to inform the Official Freight Forwarder for customs clearance of exhibits. ”Import License” and “ Quarantine & Health Inspection Foundations, excavations Certificate” are required for all the import of alcoholic drinks and other beverages. All Whether for booth or exhibit fixing, no nailing,drilling on the floor will be allowed. these items shall be subject to examination and approval in accordance with the relevant regulations of the state. Please contact the official freight forwarder for details. For hand-carried goods, whether you are bringing in yourself from overseas or 1.3 Electricity, water, compressed air and vertical suspensions other parts of P.R. China, you MUST inform the Security Department at the entrance of the exhibition halls for the purpose of Customs clearance / declaration before they a) Electricity can be moved into or out of the exhibition halls. Giveaway & souvenir items are Power supply:380v 50Hz 3 phase 5 wire system; 220 50Hz AC single phase 3 wire permitted but are subject to import duty. Exhibitors should submit the packing list with system. Exhibitors requiring special arrangements (e.g. different voltages and quantity and prices to Customs office via Official Freight Forwarder before giving the frequency or connections to equipment) must arrange for their own transformers, souvenir away. Please make sure you always keep all receipt issued by the Customs converters, etc. from themselves or the Official Standfitting Contractor. which you might need for collection of the exhibits through the Official Freight Forwarder. The safe loading capacity shall be taken into consideration when exhibitors apply for electric wattage. The electric facilities must not be overloaded and the safe operation must be ensured. 2. General stand construction regulations 2.1 Stand design and construction Only qualified electrical materials are used in the build-up of booths (including both All booth designs and construction must comply with the guidelines, rules and standard and special booths). double-sheath copper wires and cable lines must be regulations laid down by the relevant government authorities, as well as both the Organizer’s and the Exhibition Hall Owner’s requirement. All the preparation and materials must be equipped with enough safe loading capacity. It is strictly construction work shall not be commenced until the approval from the Organizer/hall forbidden to use single wires with no sheath, twist pairs or aluminium wires. Electric owner is obtained. Otherwise the exhibitor or the constructors shall bear all the power consumption and lighting should be used separately. Separately for each consequences incurred. road to install the power protection device should not be overloaded with electricity. All metallic structures and shells shall have a reliable grounding. The conducting wires should be fixed in a cellular or other form instead of being randomly installed Backs of stands measuring 2.50 m in height or over must be a neutral white. Operators of such on roads, grounds or doorways. Electric lines crossing passageway shall be stands are responsible for ensuring this to ensure the interests of neighbouring stands are not protected by a cable bridge. When sub-circuits are connected, insulating porcelain affected. Stand walls bordering visitor aisles must include glass panels, alcoves and displays etc. in and plastic joints must be used instead of being wrapped directly by insulating order to provide an open and friendly atmosphere as an exhibition stand at the event. No more than adhesive tape before any insulation protection measures are taken. Electric power 50% of the stand facing any one aisle may be of closed construction unless stated to the contrary consumption and lighting should be used separately. Separately for each road to install the power protection device should not be overloaded with electricity. All in the Conditions of Participation. When constructing stands care must be taken to ensure access lighting must have at least 30cm clearance off exhibits. Lighting fixtures that create is barrier free. Booth allowed. Aisle Op en A variety of routes during the construction period should be fixed in the through the X door, the location of access, should be used to cover (such as wood, iron) to protect them. Booth Aisle Y Boot h A Y Aisle Booth b) water X For operational safety reasons, only the Organizers and the Exhibition Hall Owner For example,booth A’s can carry out the installation work required. Supply will be turned off daily at the end Aisle dimensions: X * Y and 4 sides of the show. Booth open. So the frontage shoul d c) Compressed air keep at least: 1/2X and 1/2Y According to the Fair Safety Regulations stipulated by the Shanghai Public Security Bureau, all air compressors must be placed outside the Exhibition hall. This rule will be strictly enforced. Hall components and technical facilities may not be damaged, soiled or in any way changed (e.g. drilling of holes, the use of nails and screws, glue, welding). The WARNING 1.3 a), 1.3 b) and 1.3 c) application of paint, paper or adhesive to the walls and columns of the halls is not permitted. The hall components and technical facilities may not be subjected to any For the security reason, the connection of water/power/compress air from main switch strain from stand constructions or exhibits. Hall columns / supports within the stand is installed by the exhibition hall. Supply will be turned off daily at the end of the show. area may, however, be screened up to the permitted construction heights provided they are not damaged. No inscription may be directly attached to hall walls and The stand area is identified by Fair organization, Following stand allocation, every columns. exhibitor is obliged to check in situ the location and size of existing installations, in particular fire alarms, columns, supply ducts, ventilation grilles, escape hatches, etc., Carpet or other floor material must be laid on to the contracted floor space and may and, where necessary, to instruct the stand builder accordingly. The stand boundaries not protrude beyond the stand area. Only environment-friendly carpet and double-sid- must be observed. Every exhibitor / stand erector shall be obliged to check on whether ed cloth adhesive tapes can be laid on the floor. Inferior carpets containing CaCo3, the stand grounds are in good order before any erection work begins. Any damage Double-sided blown-sponge or any other materials difficult to clean up are forbidden. shall have to be reported to the hall master immediately and before beginning stand All materials used must be removed with no remains. Substances such as oil, grease, construction/erection. All faults not reported shall be repaired after the end of the event paint and similar materials must be removed from the hall floors immediately . Neither at the expense of the exhibitor concerned. paint nor adhesive may be used on the hall floors. Costs for repairing floors shall be borne by the exhibitor.

 Technical Guideline

26-29 September 2016 Shanghai New International Expo Centre, China

a) Shell scheme with supports fitted in between the columns at the bottom of columns, so as to All exhibits, materials and fittings used or displayed in the stand must be properly ensure the overall stiffness and stability of the exhibition stand. fire-proofed and be in accordance with all applicable fire prevention and building - For construction of all exhibition stands in which the structural designs involve regulations. No nailing, drilling or fixtures of any kinds are allowed to be affixed onto stage or platform structure with a height of over 1.2 m, as well as all indoor the partitions, floor, ceiling or any hall structure. Exhibitors will be liable for any two-deck, multiple-deck or complicatedly structured exhibition stands, their damage to their booths, fixtures & fittings and the exhibition hall. exhibition stand structural drawings must be provided, which shall be imprinted with seals of National Grade A Registered Structural Engineer for confirmation, The socket of 220V is only allowed for use with TV / PC / Cell phone chargers and accompanied by structural calculation sheet. All exhibitors and construction so on. Connecting to machine and lights are strictly forbidden. Attempt to modify institutions shall give full consideration to the safety of exhibition stand from Expo Center’s electrical system and lighting is prohibited. Outlet has a maximum design to construction, so as to ensure the soundness of each connecting joints capacity of 500watt. No more than one extension cord shall be connected to any of the exhibition stand and the overall structure of the exhibition stand. one socket. No multiplug is allowed to be used. Exhibitor must make sure the total - Construction of double-deck or multiple-deck exhibition stand must be equipped usage of all exhibits stay below 500W. The Organizer reserves the right to make with re extinguishers that have passed annual inspection. changes on the facilities provided at any time before the commencement of the - All structural back walls of neighboring exhibition stands must be properly Fair. Main switch and distribution board may be required to be installed within decorated. booth area at the Organizer’s discretion. - It is strictly prohibited for indoor exhibition stands to adopt totally enclosed type b) Contracting work done within organizer’s shell scheme booths ceilings, Exhibition stand ceilings must not obstruct the fire-fighting facilities on Exhibitors may employ a contractor of his choice to construct booth interiors and the top of the exhibition hall. It must also be ensured that the ceiling shall have any freestanding displays or fittings that may be required, subject to the following an open space of over 50% of its total area, so as to ensure the fire prevention rules: safety of the exhibition stand. - The fascia panel and its fixing structure must not be removed. - All construction institutions must no damage all facilities in the exhibition hall or - All built-in structures including the lighting fixtures within the shell scheme must alter its application nature and position. They are not allowed to drive nails, not be removed without the prior approval from the organizer. punch holes, paste adhesives, apply colorful paints or post advertisements within - All lighting fixtures must not be tampered; if necessary, the work should be done the exhibition hall, on exterior floor, or on wall surface. by a locally qualified electrician. - When each construction institution is constructing exhibition stand, it shall not set - All structures brought in must not be attached, by any means, to the aluminum up obstructions in front of the fire-fighting facilities, electric equipment, emergen- profiles of the shell scheme. Any resulting damages due to unauthorized cy exits and audience passages, etc. inside the exhibition hall. attachment will be borne by the corresponding exhibitor. - No inflammable and explosive materials shall be used for construction of - All structures brought in must be removed at the end of the fair. The organizer exhibition stand, and no paint spraying or paint coating shall be carried out inside reserves the right to claim any waste disposal cost from the corresponding the exhibition hall. exhibitor due to their negligence. - When personnel of each construction institution are making mid-air operations, - Any drilling/nailing to the shell scheme panels and shelves is strictly not allowed. they shall use qualified and safe elevators and operation platform, construction - The use of strong adhesives and glues to the shell scheme panels and shelves personnel shall tie up safety belt. To protect personal safety, a safety zone shall is strictly not allowed. be set up in its surrounding area, which shall be monitored by dedicated - Any stickers applied to the shell scheme panels and shelves have to be removed personnel, with conspicuous warning signs set up around the safety zone. at the end of the fair. The organizer reserves the right to claim the cleaning cost - After the exhibition starts, the construction institution must appoint site safety from the corresponding exhibitor if stickers not removed. principal and dedicated personnel to stay on duty at the site, in order to facilitate - All the shell scheme structures, lighting fixtures any furniture items are property problem handling when problems crop up. of the Official Stand-fitting Contractor. The furniture items must be kept within the - For exhibition stands that have safety hazards during construction period, the booth area and the remaining items in their original place as evidence of construction institution must make prompt rectification after receiving “Notice of complete hand over of the booth after dismantling by your contractor. Any Rectification”, and feedback the rectification results to Show Management Office. missing or damaged items due to proper procedures not followed will be at the - Construction institutions shall complete the construction within the prescribed account of the corresponding exhibitor. time and area, and take care of security work such as fire and burglary - The exhibitor undertakes to indemnify the organizer from any claims caused by prevention. Construction institutions must appoint site principal at the construc- their own works done to the shell scheme. tion site, whose registration and ling shall be done at the time of completing - Please inform the Official Contractor in advance on the stand interiors arrange- construction formalities. ment. - Processing tools such as electric saw, electric plane shall not be used for construction inside the exhibition hall, nor shall open fire operations such as c) Space Only electric welding and pneumatic welding be executed. Below rules and regulations apply to all raw space / special design booths - The selection of construction materials for exhibition stand must comply with (including standard package booths with special design interior). criteria issued by relevant national authoritative departments regarding material Exhibitors and/or their appointed contractor should strictly follow the move-in and usage for temporary buildings, and be implemented in a rational way by taking move-out schedule set by the Organizer. No prior move-in and move-out is into consideration the features of the exhibition; the selected materials must allowed, unless approved by the Organizer in writing in advance. conform to national requirements on environment protection and fire-fighting. - Exhibition stand structure shall not use thin load-bearing structural parts with its The appointed contractor need to submit the design according to the rule and pipe wall thickness < 0.8mm, nor shall heavily rusted load-bearing structural regulation and to pay for all related fees. parts be used. - The structure of all specially structured exhibition stands must be reasonably - Please note all electrical installation and water link-up must be ordered from the designed, so as to ensure security and safety of the constructed structure. The Official standfitting Contractor. construction materials shall use non-inflammable or fire retardant materials. - Goods are not allowed to be stored outside the booth area, included aside - The designed structural strengths of all exhibition stands shall meet the strength entrances or windows of exhibition halls. It is the appointed contractor’s required by the load, during the construction period efforts shall be made to responsibility for day-to-day removal of all rubbish, packing of waste materials ensure the overall strength, stiffness, stability and local stability of the exhibition from the exhibition venue. Failure to do so will be liable for service fees incurred stand structure. in rubbish removal. - The area of exhibition stand constructed by each construction institution must - Exhibitors are responsible for insurance which indemnifies the organizer from all comply with the area specified in the submitted application. The area of an claims caused by the exhibitors’ on-site operatives working directly or indirectly. exhibition stand constructed by construction institutions shall not exceed the leased area, and its projected side line must not extend beyond the leasing 2.2 Construction height border line. Exhibitors should construct their own walls to divide from neighboring booths, and - For exhibition stand structures decorated with glass ornaments, the glass must should not use other's back walls. use safety glass, so as to ensure security in construction and installation, and marked with conspicuous signs in order to prevent glass breaking to cause Back sides of stands shall have to be painted in neutral white above a height of 2.5m personal injury or death. by the holder of the stand involved, so as not to curtail the interests of the holders of - For exhibition stand using steel structure standing post, the standing post shall neighbouring stands, but with NO company’s identities such as company names, use welding-free material with a diameter of over 100mm, its bottom shall be logos, etc on the backside of partition walls or booth structures over 2.5m and face to welded with a secure base, with a flange welded onto its upper structure to the neighboring booth. If not, the exceeding part of the structure should keep at least increase its load bearing area of the standing post, so as to ensure the 1m away from the neighboring booth or the written agreement of the neighboring stand soundness of exhibition stand structure. must be obtained. Exhibits are not subject to these restrictions. - The ground contact width of the main load-bearing wall in all exhibition stand structures shall not be less than 120mm, so as to ensure the contact area 3-dimensional display units, advertisement and signboards may not face an adjacent between wall body and the ground. For walls with a large span of over 6m and booth from within 3 meters. The back of the 3-dimensional display units, advertisement steel column framework structures, connecting beams shall be added on the top, and signboards must be suitably covered and approved by the Organizer.  Technical Guideline

26-29 September 2016 Shanghai New International Expo Centre, China

2.3 Stand construction approval Balloons The drawings of all two-storey, multiple-storey, outdoor stands, the custom-built booth whose The use of balloons filled with flammable gas is prohibited in the halls and exhibition indoor single-storey height exceeds 4.5m (including 4.5m) or top construction space exceeds grounds. Balloons may be brought into the exhibition hall only with the prior written over 50% of the booth area (including 3D prospective plan, measurement drawing, booth floor approval of the Organizer and the Exhibition Hall Owner. plan, elevation structure plan, dead load, list of materials and related data) shall be reviewed or Pyrotechnics verified by HAH consulting & Exhibition Co., Ltd. Shanghai (agent appointed by SNIEC for review Fumes, exhaust gas and other gaseous irritants generated by the working exhibits drawing and event management). must be piped and discharged through the hall’s air filtration and exhaust system. This must be arranged through the Organizers, a quotation will be provided upon If exhibitors or stand fitters appoint a Chartered Structure Engineer to check the application. drawings, they shall submit the original drawings stamped by a Chartered Structure Engineer and copies of documents supporting the qualifications of such Chartered Structure Engineer to HAH Consulting & Exhibition Co., Ltd. Shanghai. HAH Consult- Pressure tanks ing & Exhibition Co., Ltd. Shanghai shall charge fees in accordance with verification Exhibitors shall be responsible for the proper transportation and storage of all pressure standards. tanks such as those containing helium, compressed air, argon, carbon dioxide etc. Pressure tanks improperly secured will be immediately removed from the Exhibition Exhibitors or stand fitters shall submit design drawing of booth construction (including hall upon notice being given to exhibitors by the Organizer. All pressure vessels and 3D prospective plan, measurement drawing, booth floor plan, elevation structure plan, equipment brought into the Centre must conform to all relevant safety standards and dead load, list of materials and related data) to HAH Consulting & Exhibition Co., Ltd. regulations. The safe pressure of the materials and tubes for pneumatic equipment Shanghai 4 weeks prior to the move-in. !(##$*+# any other materials. For design drawings for two-storey, multiple-storey and outdoor stands, if neither reviewed by Grade A registered structural engineer nor re-inspected by HAH Consult- Painting ing & Exhibition Co., Ltd. Shanghai, the organizer, SNIEC and HAH are authorized to Large-scale painting is not permitted in the exhibition halls. However, small scale stop the booth construction in the scope of SNIEC. “touch-up” painting of the exhibits and stands is permitted during the Move-in Period with all necessary safety precautions in place. These precautions include: HAH Consulting & Exhibition Co., Ltd. Shanghai: - Painting in an area properly ventilated; Tel: +86 21 28906633/28906634/28906635 - Use of Non Toxic Paints; Email: [email protected] - Covering all the floor within the Centre with dry paper or plastic film; - No painting near the Centre’s vertical structure ( i.e. walls); 2.4 Fire prevention and Safety - No washing of paint material within or surrounding the Centre. Responsibility All Exhibitors must comply with and ensure that all their contractors, staff, agents and Spray guns, lacquers, paints containing solvents and cleaning servant, etc, comply with the prevailing government fire protection law and the fire agents/detergents safety regulations and building codes of the Exhibition Hall Owner. Any person who It is prohibited to use open-fire, electric furnace or welding in the exhibition halls. encounter an outbreak of fire, however slight, should activate the fire alarm and subsequently endeavor to extinguish it or confine it be the use of the fire extinguishers Empties and/or remove all items in that vicinity. The storage of empties of all kinds (e.g. packaging and packing material) within the stands or anywhere in the halls is prohibited. Empties must be taken without delay to Written approval must be obtained from the Shanghai Fire Safety Bureau for the the storage area for empties by the transport agents appointed for the exhibition following: grounds. The Organizer and the Exhibition Hall Owner hall be entitled to remove any - Display and operation of any heater, barbecue, heat producing or open flame empties stored in contravention of these regulations at the expense and the risk of the devices, candles, lanterns, torches, welding equipment or other smoke emitting materials as part of the exhibit. exhibitor concerned. - Display and operation of any electrical, mechanical, or chemical devices which may be deemed hazardous. If there is any question, if devices may be deemed Fire extinguisher hazardous, submit them to the appropriate controlling authorities for approval. Construction of double-deck or multiple-deck exhibition stand must be equipped with - All toxic and hazardous material, including flammable liquids, compressed gas or fire extinguishers that have passed annual inspection. something like that must hide from the view the fire protection system, air conditioning, mechanical ventilation vents, fire safety equipment, fire hose Overhead work feel/riser cabinets, fire alarm pull stations, house lighting fixtures and supervising All the contractors shall have the helmet in the exhibition halls during the move-in and systems. move-out period. To those who fail to wear the helmet, SNIEC security guard of has Any behavior which could hamper the normal operation of the fire protection system the right to stop them entering the exhibition hall. and central supervising system, including the fire-alarm bell contact, the fire hydrant, - Operators who are engaged in overhight work (height >=2m) must use qualified fire extinguisher and fire escape is forbidden. Free movement in and access to the fire scaffolding, probihit using ladder. Wheels of scaffolding should be locked during control aisles, emergency fire escape routes and emergency exits must be ensured. use. ? @# JXZ[ + Stand construction and decorative materials helmets and safety belts, and carry out other necessary safety measures against Material for booth decoration must comply with the safe standard and rule of the fire $+$ regulation. No inflammable explosives, poison and corrosion shall be used for - Only qualified over head operation tools may be used; unqualified ones are decoration. Decorative materials of any kind must comply at least with class B1. *#+ # # $ wooden material must be coated with fireproof paint or other fireproof layer. No Z??#+$+ transformer shall be attached to any combustible material’s surface. or lifting up and/or down with ropes, shall be adopted. - Unqualified operators are forbidden to do overhead work, and it is also strictly Hazardous Materials forbidden to do overhead work after drinking alcohol. Unless approved by the Organizer, the Exhibition Hall Owner and the relevant authorities in writing: 3. During the fair of exhibition - No open fire or combustible gas is allowed to be used in the Centre. - No explosive, petrol and highly flammable toxic or corrosive substance are allowed 3.1 High frequency and other radio equipment, wireless transmissions to be used in the hall. Radioactive substances shall not be brought into the Centre. Ensure that all the relevant local government authority license(s) and/or permit(s) are - No more than one day’s supply of any solid or liquid hazardous material shall be obtained and its stipulated regulations and conditions observed and abided with for the stored within the Leased Area or stands at any time, and the remainder should be demonstration and/or use of electronics, radio and/or satellite transmitting equipment. stored in special containers and sealed in a location confirmed by the government departments, the Organizer and the Exhibition Hall Owner. 3.2 Cranes, forklifts, empties - Toxic wastes must be sealed in suitable containers with clear markings, and must Exhibitors are not permitted to use their own cranes and forklifts on the exhibition be handled according to the relevant government rules governing waste disposal. grounds. Only equipment of the accredited shipping agents permitted on site may be The following articles are forbidden to be exhibited in or brought into the Centre: operated. The forwarding agents have sole handling rights in the exhibition grounds, - arms, guns, swords, ammunition, explosives, inflammable materials, radioactive i.e. carriage of exhibits, stand structures, etc., to the stand, including provision of any substances and any other dangerous goods. auxiliary equipment required, as well as customs clearance for temporary or - goods prohibited for import. permanent importation. The Organizer is not liable for any risks that may arise from the - goods infringing upon patent rights work of the forwarding agents. The storage of empties of all kinds on the stand is - goods that may affect the normal operation of the Organizer and any item prohibit- prohibited. Empties must be transported without delay to the storage area for empties ed by the relevant government departments. by the transport agents appointed for the exhibition grounds. Smoking Smoking is prohibited in the hall.  Exhibitor badges Compulsory for all Exhibitors Form A1 Kindly complete and return by: 19 August 2016

Company name

Address

Postal Code/City/Country MESSE DÜSSELDORF (SHANGHAI) CO., LTD Contact person Units 307 - 308, Tower 1, German Centre for Industry and Trade Shanghai Phone

88 Keyuan Road, Zhangjiang Hi-Tech Park, Fax Pudong, Shanghai 201203. e-Mail Ms.Cecilia Wang(wire 2016) Phone:+86(0)21-6169 8322 Fax:+86(0)21-6169 8301 e-Mail:[email protected] 26-29 September 2016 Ms.Michelle Xiao(Tube 2016) Shanghai New International Phone:+86(0)21-6169 8313 Fax:+86(0)21-6169 8301 Expo Centre, China e-Mail:[email protected]

Exhibitor’s Badge will be supplied by the Organizer only to exhibitors. Exhibitor’s badges are to be collected at the exhibitors Registration Counter on-site from the first move-in day. Please register all personnel from your company and associated companies who will be manning the exhibition stand. Free Exhibitor’s badge will be issued based on the booth size: - 2 badges for every subsequent 12 sqm. - Up to a Maximum of 60 badges per exhibitor.

Please use CAPITAL LETTERS and sttach a separate sheet if more space is required:

______Company Name

______Staff Full Name Job Title Nationality

______Staff Full Name Job Title Nationality

______Staff Full Name Job Title Nationality

______Staff Full Name Job Title Nationality

______Staff Full Name Job Title Nationality

Company stamp, signature Date  Visitor Invitation

Form A2 Kindly complete and return by: 19 August 2016

Company name

Address

Postal Code/City/Country MESSE DÜSSELDORF (SHANGHAI) CO., LTD Contact person Units 307 - 308, Tower 1, German Centre for Industry and Trade Shanghai Phone

88 Keyuan Road, Zhangjiang Hi-Tech Park, Fax Pudong, Shanghai 201203. e-Mail Ms.Cecilia Wang(wire 2016) Phone:+86(0)21-6169 8322 Fax:+86(0)21-6169 8301 e-Mail:[email protected] 26-29 September 2016 Ms.Michelle Xiao(Tube 2016) Shanghai New International Phone:+86(0)21-6169 8313 Fax:+86(0)21-6169 8301 Expo Centre, China e-Mail:[email protected]

Limited number of admission tickets will be available to exhibitors for their own distribution. If exhibitors wish to invite their own clients to the exhibiton, please advise the quantities by filling out the blank at the bottom of this page. The organizers will send you admission tickets accordingly.

Number of admission tickets required for exhibitors’ own invitations:______.

______Company Name

______Mailing address

______Postal Code/City/Country

______Contact person Phone Fax

Company stamp, signature Date  * Wereservetorightmakeminoralterationsequipment.Nofinancial creditwillbegivenforanypackageitemnotutilize Equipment* Services includedinthepackage: damage thepanels, exhibitors arerequested nottousethem.Theexhibitor will bebilledfor anydamagecaused. 2.5 mhighstandpartitionwallsinwhite. Screws, nails, bolts, glue, paintanddouble-sided adhesivetapewillpermanently Important note: '<9UIQKZ=+3 9VUZROMNZ= =GYZKVGVKXHGYQKZ 9W[GXKZGHRK ZOKXY_YZKSOTLUIU[TZKX]OZNRUIQ (RGIQINGOX 'XKGOTYW[GXKSKZKXY Stand assemblyanddismantling. one fasciaattheaislewithlettering(withoutlogo)aisle. 2.5 mhighstandpartitionwallstotheneighbouringboothsinwhite. Covering theentirefloorareaofboothwithgreyneedlepunchcarpet Shanghai NewInternationalExpoCentre,China 26-29 September2016        YVUZROMNZVKXS   ULYZGTJYVGIK      . for shellschemebooth d. Package STANDBUILDING Shell scheme Compulsory for shell scheme Exhibitors A surcharge of 35 % will be applied for orders which arrive after the deadline Form B1 Kindly complete and return by: 22 August 2016

Company name

Address Shanghai SYMA-EXPO Ltd Postal Code/City/Country ,4K]2UTM3GXIN([YOTKYY([ORJOTM Contact person @NKTHKO8UGJ Phone

9NGTMNGO68)NOTG Fax

e-Mail

Hall/Stand-No. Contact:Terry Yuan/Summer Cheng 26-29 September 2016 Phone:+86(0)21-6238 8811-154/135 Shanghai New International e-Mail:[email protected] Expo Centre, China [email protected]

To help us service your requriements please fill the below information:

A: Floor covering Covering the entire floor area of the booth with needle punch carpet.

B: Fascia name Each open aisle on your stand will have one set of company name in English & Chinese on the fascia board for each principal exhibitor and co-exhibitor (line-height 10 cm). Exhibitors may add a company logo not higher than 20cm(chargeable).

Chinese Characters (Maximum 15 Characters):

English Lettering (Maximum 30 Letters):

Company stamp, signature Date  Special design stand construction Compulsory for raw space Exhibitors Form B2 Kindly complete and return by: 22 August 2016

Company name

Address Shanghai SYMA-EXPO Ltd Postal Code/City/Country ,4K]2UTM3GXIN([YOTKYY([ORJOTM Contact person

@NKTHKO8UGJ Phone

9NGTMNGO68)NOTG Fax

e-Mail

Hall/Stand-No. Contact:Terry Yuan/Summer Cheng 26-29 September 2016 Phone:+86(0)21-6238 8811-154/135 Shanghai New International e-Mail:[email protected] Expo Centre, China [email protected] This form is only applicable to exhibitors who have contracted for Space Only and will be engaging their own stand fitting contractor or building their own stand.

The Exhibitor and his appointed contractor hereby agree to abide by all Rules and Regulations of the exhibition and comply withall statutory obligations.

The Exhibitor’s contractor is required to enclose construction drawings (Elevations, Layout Plans & Perspective) illustrating the design and dimensions of the stand and the relative locations of all equipment/machinery on display, for approval by the relevant authorities. The construction drawings should be supplied in duplicate color originals with clear indication of dimensions in plan and top views. The drawings of all two-storey, multiple-storey,outdoor stands, the custom-built booth whose indoor single-storey height exceeds 4.5m (including 4.5m) or top construction space exceeds over 50% of the booth area(including 3D prospective plan, measurement drawing,booth floor plan,elevation structure plan,dead load, list of materials and related data) shall be reviewed or verified by HAH Consulting & Exhibition Co., Ltd. Shanghai (agent appointed by SNIEC for review of drawings and event management). The approval procedure fees will be invoiced to the exhibitor/stand constructor. Tel:+86(0)21 28906633/28906634/28906635 Email:[email protected]

Hall Management Fee All special design stand contractors will be required to pay SNIEC, a hall management fee of RMB20 per square meter, for on-site co-ordination, design approval submission to the relevant government authorities and construction deberis disposal. This is without prejudice to any additional claims that SNIEC may have on the contractor and/or exhibitor if any cost exceeds this fee.

Performance Bond If the Exhibitor’s contractor is not the official stand fitting contractor, this contractor will be required to lodge with the official stand fitting contractor a refund- able deposit at RMB 10,000 for single-storey RMB 20,000 for two-storey As a performance bond, to cover any damage arising directly or indirectly in the course of carrying ou the works.

Contractor Badge Cost All workers involved in exhibition booth erection and dismantling will be required to obtain passes form the SNIEC, who is exclusively responsible for the registration, checking, photos, production, and management of the passes. Charge of Contractor Badge:RMB50/piece. The process of production and regulation see page 9 to 14.

This form must be jointly signed by the appointed contractor and submitted by the Exhibitor. Stand fitting contractor : ______

Address : ______

Person in charge : ______E-mail : ______

Mobile phone : ______Fax : ______

Signature : ______Date : ______

Company stamp, signature Date  Stand layout plan Compulsory for raw space exhibitors Form B3 Kindly complete and return by: 22 August 2016

Company name

Address Shanghai SYMA-EXPO Ltd Postal Code/City/Country ,4K]2UTM3GXIN([YOTKYY([ORJOTM Contact person @NKTHKO8UGJ Phone

9NGTMNGO68)NOTG Fax

e-Mail

Hall/Stand-No. Contact:Terry Yuan/Summer Cheng 26-29 September 2016 Phone:+86(0)21-6238 8811-154/135 Shanghai New International e-Mail:[email protected] Expo Centre, China [email protected] Please indicate the location of your utilities, such as power points, spotlights, air compressor, water / drainage points, telephone/fax connection points on the below plan or sketch on a separate drawing.

Exhibitors are strongly advised to provide this information since it will be used to make the required installation in the correct locations before your arrival.

If the exhibitor fails to submit a sketch of his stand indicating the positioning of the equipment mentioned above, it will be the official stand-fitting contractor’s right to allocate the equipment. It will charge for any re-positioning on site. Scale 1:50 or 1:100 Back of Stand

Front of Stand

Company stamp, signature Date  Electrical installations for lighting Compulsory for raw space Exhibitors Form A surcharge of 50 % will be applied for orders B4 which arrive after the deadline Kindly complete and return by: 22 August 2016

Company name

Address Shanghai SYMA-EXPO Ltd Postal Code/City/Country ,4K]2UTM3GXIN([YOTKYY([ORJOTM Contact person @NKTHKO8UGJ Phone

9NGTMNGO68)NOTG Fax

e-Mail

Hall/Stand-No. Contact:Terry Yuan/Summer Cheng 26-29 September 2016 Phone:+86(0)21-6238 8811-154/135 Shanghai New International e-Mail:[email protected] Expo Centre, China [email protected] Power current:Three-phase five-wire system, 380 Volt It should be separate for apply lighting and machine, if mix apply, we will penalty. For the security reason,the connection of water/power/compress air from main switch is installed by the official stand-fitting contractor or the exhibition hall. The exhibitor is responsible for the connection to their machine and equipment.

No. Quantity Switch Box Unit Unit price in EUR Sum EUR

EM32 380 V Switch Box 15 A Each 259

EM33 380 V Switch Box 30 A Each 460 EM34 380 V Switch Box 40 A Each 537 EM35 380 V Switch Box 60 A Each 844

Subtotal

The Exhibitor assumes liability for the materials once it is delivered until it is returned. As stock is limited, late orders cannot be assured. All items are on a rental basis, inclusive of inspection and approval fees, installation, power consumptio and standby maintenance. Each supply line is for one piece of equipment/exhibit only - no interconnection, multi-way adaptor, tee-off or splitting is allowed, to avoid damage or injury; failing which, the Organizers reserve the right to terminate the operation & demonstration of the working exhibits. Please contact the official stand-fitting contractor for a quotation of any other electrical requirements. The rates quoted in the forms are applicable for the supplies from 24th to 29th September 2016, any earlier or extended usage needs to be applied together with the orders, and exhibitors need to cover the additional consumption fee according to the request. For safety reasons, electricity supply will be switched off 30 minutes after the Exhibition closes each day. Exchange rate will be adopted at 1 EURO=7.5 RMB, if the applicant is going to settle the payment in RMB.

Company stamp, signature Date  Electrical installations For Machinery/Equipment

Form B5 A surcharge of 50 % will be applied for orders which arrive after the deadline Kindly complete and return by: 22 August 2016

Company name

Address Shanghai SYMA-EXPO Ltd Postal Code/City/Country ,4K]2UTM3GXIN([YOTKYY([ORJOTM Contact person @NKTHKO8UGJ Phone

9NGTMNGO68)NOTG Fax

e-Mail

Hall/Stand-No. Contact:Terry Yuan/Summer Cheng 26-29 September 2016 Phone:+86(0)21-6238 8811-154/135 Shanghai New International e-Mail:[email protected] Expo Centre, China [email protected] Power current:Three-phase five-wire system, 380 Volt It should be separate for apply lighting and machine, if mix apply, we will penalty. For the security reason,the connection of water/power/compress air from main switch is installed by the official stand-fitting contractor or the exhibition hall. The exhibitor is responsible for the connection to their machine and equipment.

No. Quantity Switch Box Unit Unit price in EUR Sum EUR EM32 380 V Switch Box 15 A Each 191 EM33 380 V Switch Box 30 A Each 326 EM34 380 V Switch Box 40 A Each 385 EM35 380 V Switch Box 60 A Each 579

EM36 380 V Switch Box 100 A Each 794 EM37 380 V Switch Box 150 A Each 1,193 EM38 380 V Switch Box 200 A Each 1,769 EM39 380 V Switch Box 250 A Each 2,255 EM40 380 V Switch Box 300 A Each 2,568

EM41 380 V Switch Box 350 A Each 3,591 EM42 380 V Switch Box 400 A Each 4,259

Subtotal

The Exhibitor assumes liability for the materials once it is delivered until it is returned. As stock is limited, late orders cannot be assured. All items are on a rental basis, inclusive of inspection and approval fees, installation, power consumptio and standby maintenance. Each supply line is for one piece of equipment/exhibit only - no interconnection, multi-way adaptor, tee-off or splitting is allowed, to avoid damage or injury; failing which, the Organizers reserve the right to terminate the operation & demonstration of the working exhibits. Please contact the official stand-fitting contractor for a quotation of any other electrical requirements. The rates quoted in the forms are applicable for the supplies from 24th to 29th September 2016, any earlier or extended usage needs to be applied together with the orders, and exhibitors need to cover the additional consumption fee according to the request. For safety reasons, electricity supply will be switched off 30 minutes after the Exhibition closes each day. Exchange rate will be adopted at 1 EURO=7.5 RMB, if the applicant is going to settle the payment in RMB.

Company stamp, signature Date  Stand lighting !Only for exhibitors, who are constructing their booths by the official stand-fitting contractor! A surcharge of 35 % will be applied for orders Form B6 which arrive after the deadline Kindly complete and return by: 22 August 2016

Company name

Address Shanghai SYMA-EXPO Ltd Postal Code/City/Country ,4K]2UTM3GXIN([YOTKYY([ORJOTM Contact person @NKTHKO8UGJ Phone

9NGTMNGO68)NOTG Fax

e-Mail

Hall/Stand-No. Contact:Terry Yuan/Summer Cheng 26-29 September 2016 Phone:+86(0)21-6238 8811-154/135 Shanghai New International e-Mail:[email protected] Expo Centre, China [email protected] Please supply us with (an installation plan is appended-see form B3):

No. Quantity Unit Unit price in EUR Sum EUR

EL01 Spotlight 100 W Each 14

EL02 Long-arm Sporlight 100 W Each 17

EL16 Fluorescent Tube 40 W Each 14

EL04 Halogen Spotlight 50 W Each 17

EL05 Floodlight 300 W Each 50

EL07 HalogenLong-arm Sporlight 50 W Each 26

EM01 5A/220V SOCKET(MAX.500W)-NORMAL HOUR Each 18

EM02 5A/220V SOCKET(MAX.500W)-24 HOUR Each 27

EM03 Light Fitting Connection per 50W Each 7

Subtotal

The Exhibitor assumes liability for the materials once it is delivered until it is returned. As stock is limited, late orders cannot be assured. All items are on a rental basis, inclusive of inspection and approval fees, installation, power consumptio and standby maintenance. Each supply line is for one piece of equipment/exhibit only - no interconnection, multi-way adaptor, tee-off or splitting is allowed, to avoid damage or injury; failing which, the Organizers reserve the right to terminate the operation & demonstration of the working exhibits. Please contact the official stand-fitting contractor for a quotation of any other electrical requirements. The rates quoted in the forms are applicable for the supplies from 24th to 29th September 2016, any earlier or extended usage needs to be applied together with the orders, and exhibitors need to cover the additional consumption fee according to the request. For safety reasons, electricity supply will be switched off 30 minutes after the Exhibition closes each day. Exchange rate will be adopted at 1 EURO=7.5 RMB, if the applicant is going to settle the payment in RMB.

Company stamp, signature Date  Water,Compressed air A surcharge of 50% will be applied for orders which arrive after the deadline Form B7 Kindly complete and return by: 22 August 2016

Company name

Address Shanghai SYMA-EXPO Ltd Postal Code/City/Country ,4K]2UTM3GXIN([YOTKYY([ORJOTM Contact person @NKTHKO8UGJ Phone

9NGTMNGO68)NOTG Fax

e-Mail

Hall/Stand-No. Contact:Terry Yuan/Summer Cheng 26-29 September 2016 Phone:+86(0)21-6238 8811-154/135 Shanghai New International e-Mail:[email protected] Expo Centre, China [email protected]

All air compressors must be placed outside the Exhibition hall. This rule will be strictly enforced. All pressure vessels and equipment brought into the SNIEC must submit a written application to organizer and get permission. All pressure vessels and equipment conform to all relevant safety standards and regulations and put in the specified location outside the Hall. The safe pressure of the materials and tubes for pneumatic equipment shall115kg/cm2,and the pipe joint must be fixed by hoop instead of iron wires or any other materials. For the security reason, the connection of water\power\compress air from main switch is installed by the official stad-fitting contractor or the exhibition hall.The exhibitor is responsible for the connection to their machine and equipment.

Please supply us with (an installation plan is appended-see form B3): No. Quantity Water Unit Unit price in EUR Sum EUR WATER SUPPLY AND DRAINAGE FOR KITCHEN (incl. consumption):

FA07 Water supply to booth with 10m pipe up & down. Ø 15mm, P. 4kgf/cm2 Each 405

WATER SUPPLY AND DRAINAGE FOR MACHINES (incl. consumption):

FA08 Water supply to booth with 10m pipe up & down. Ø 20mm, P. 4kgf/cm2 Each 606

No. Quantity Compressed air Unit Unit price in RMB Sum RMB

FA01 $‚<~~0‚<€$3/Min & 8~10kgf/cm2 ), Ø 10mm Each 606

FA02 $‡~ˆ‚~0‚<‰$3/Min & 8~10kgf/cm 2 "-ˆ‰$$ Each 707

FA03 Compressed air 10 Bar 1m3/Min, Ø 25mm Each 808

Water supply pressure is approximately 4 kgf/cm2. Pressure reducers, connectors or joints are to be provided by exhibitors or their own contractors. The rates quoted in the forms are applicable for the supplies from 24th to 29th September 2016, any earlier or extended usage needs to be applied together with the orders, and exhibitors need to cover the additional consumption fee according to the request. Exchange rate will be adopted at 1 EURO=7.5 RMB, if the applicant is going to settle the payment in RMB.

Company stamp, signature Date  Telepphone, Internet A surcharge of 50% will be applied for orders which arrive after the deadline Form B8 Kindly complete and return by: 22 August 2016

Company name

Address Shanghai SYMA-EXPO Ltd Postal Code/City/Country ,4K]2UTM3GXIN([YOTKYY([ORJOTM Contact person @NKTHKO8UGJ Phone

9NGTMNGO68)NOTG Fax

e-Mail

Hall/Stand-No. Contact:Terry Yuan/Summer Cheng 26-29 September 2016 Phone:+86(0)21-6238 8811-154/135 Shanghai New International e-Mail:[email protected] Expo Centre, China [email protected] Please supply us with (an installation plan is appended-see form B3):

No. Quantity Unit price in EUR Sum EUR

B801 Telephone with Local line 123

B802 Telephone with DDD line Call deposit EUR 147 163

B803 Telephone with IDD Line Call deposit EUR 588 465

B804 1M Fiber-based broadband 1 Public static IP address 667

B805 2M Fiber-based broadband 1 Public static IP address 687

B806 1M Fiber-based broadband 1 Public dedicated IP address 949

B807 2M Fiber-based broadband 1 Public dedicated IP address 969

B808 4M Fiber-based broadband 1 Public dedicated IP address 1,040

B809 6M Fiber-based broadband 1 Public dedicated IP address 1,110

B810 8M Fiber-based broadband1 Public dedicated IP address 1,171

B811 10M Fiber-based broadband 1 Public dedicated IP address 1,211

B812 20M Fiber-based broadband1 Public dedicated IP address 2,218

B813 40M Fiber-based broadband 1 Public dedicated IP address 4,032

Subtotal

For the telephone rental, the applicant is required to settle an extra deposit RMB600 onsite (refundable). The Exhibitor is responsible for all costs due to any damage or loss of equipment issued. All equipment will be distributed to booth on 25th September 2016 and to be returned at the end of the exhibition. Exchange rate will be adopted at 1 EURO=7.5 RMB, if the applicant is going to settle the payment in RMB.

Company stamp, signature Date  Labour Stand cleaning A surcharge of 35 % will be applied for orders which arrive after the deadline Form B9 Kindly complete and return by: 22 August 2016

Company name

Address Shanghai SYMA-EXPO Ltd Postal Code/City/Country ,4K]2UTM3GXIN([YOTKYY([ORJOTM Contact person @NKTHKO8UGJ Phone

9NGTMNGO68)NOTG Fax

e-Mail

Hall/Stand-No. Contact:Terry Yuan/Summer Cheng 26-29 September 2016 Phone:+86(0)21-6238 8811-154/135 Shanghai New International e-Mail:[email protected] Expo Centre, China [email protected]

No. Unit price in EUR No. of People Date from/to Amount (EUR) Specific skills that are required

B901 Craftsman, per day 39

B902 General labor, per day 32 With vacuum cleaners and for show B903 Stand cleaning, per sqm 5 period clearing of wastebaskets.

Subtotal

Exchange rate will be adopted at 1 EURO=7.5 RMB, if the applicant is going to settle the payment in RMB.

Company stamp, signature Date  Furniture, Stand equripment A surcharge of 35 % will be applied for orders which arrive after the deadline Form B10 Kindly complete and return by: 22 August 2016

Company name

Address Shanghai SYMA-EXPO Ltd Postal Code/City/Country ,4K]2UTM3GXIN([YOTKYY([ORJOTM Contact person @NKTHKO8UGJ Phone

9NGTMNGO68)NOTG Fax

e-Mail

Hall/Stand-No. Contact:Terry Yuan/Summer Cheng 26-29 September 2016 Phone:+86(0)21-6238 8811-154/135 Shanghai New International e-Mail:[email protected] Expo Centre, China [email protected]

No. Quantity Rental price in EUR No. Quantity Rental price in EUR

)*' Folding chair  39 Shelf rack (100cm/50cm/220cmh)  )* Black leather chair  39 Shelf-flat (100cm/30cm )  )* Bar stool  39 Shelf-slope (100cm/30cm )  )* Black chair (basic item)  39 Literature rack  )* Swivel typist chairs  39 Free standing literature rack 

9* Single seat sofa  +2 140l refrigerator-exclude power point 

:( Information counter(95cm/45cm/75cmh)  5: Waste paper basket  :( Square table (75cm/75cm/75cmh)  5: 2-tier system system info counter(basic item)  :( Rectangular table(120cm/75cm/75cmh)  9* Double seat sofa  :( Coffee table(45cm/45cm/45cmh)  5: Water dispenser, incl. 19 liters water x2 (excl. power)  :( Round table (75cm/75cmh)  5: Distilled coffee maker  :( Tv rack (70cm/50cm/130cmh)  5: Potted plant, 150cmh 

:( = Bistro table  5: System ceiling frame, white, 100cm×100cm  *6 Lockable cupboard (95cm/45cm/75cmh)  5: Metal ceiling perforated panels, white, 100cm×100cm  *6 Table showcase (100cm/50cm/100cmh)  5: Needle punch carpet/sqm ~ color:  *6 Tall showcase (100cmx50cmx220cmh)  5: White laminated timber fascia board, 37cmh/r.m 

*6 Display cube (50cm/50cm/80cmh)  5: Color laminated timber fascia board, 37cmh/r.m 

39 Wall panel (100cm/250cmh)  5: Wall panel(50cm/250cmh) 

39 Curtain (100cm/200cm)  39 Lockable door (100cm/200cm)  39 Folding door (100cm/200cm)  Subtotal (EUR) 39 Coat hanger (100cmw)  39 Movable clothes rack (100cm/100cm/130cmh) 

Prices include material (rental), construction and dismantling. As stock is limited, late orders cannot be assured. The Exhibitor assumes liability for the furniture once it is delivered until it is returned. Exchange rate will be adopted at 1 EURO=7.5 RMB, if the applicant is going to settle the payment in RMB.

Company stamp, signature Date  Furniture Stand lighting 26-29 September 2016 Shanghai New International Expo Centre, China see Form B6 & B10

 Furniture Stand lighting 26-29 September 2016 Shanghai New International Expo Centre, China see Form B6 & B10

 Audio-visual equipment A surcharge of 35 % will be applied for orders which arrive after the deadline Form B11 Kindly complete and return by: 22 August 2016

Company name

Address Shanghai SYMA-EXPO Ltd Postal Code/City/Country ,4K]2UTM3GXIN([YOTKYY([ORJOTM Contact person @NKTHKO8UGJ Phone

9NGTMNGO68)NOTG Fax

e-Mail

Hall/Stand-No. Contact:Terry Yuan/Summer Cheng 26-29 September 2016 Phone:+86(0)21-6238 8811-154/135 Shanghai New International e-Mail:[email protected] Expo Centre, China [email protected] Please supply us with (an installation plan is appended-see form B3):

No. Quantity Unit Unit price in EUR Sum EUR

B1101 TV rack Each 50

B1102 42” Plasma, incl. DVD player Set 169

B1103 50” Plasma, incl. DVD player Set 330

B1105 Printer, Color, Ink Jet, A4 Each 323

B1104 Printer, Black Ink, Laser Jet, A4 Each 162 PC (PIV, 20-80G/256M/CD Rom, 10/100 NIC, B1106 Keyboard and Mouse, 17” LCD Monitor) Each 142

B1107 Notebook (PIV, 30-40G/256M/CD Rom, 10/100 NIC) Each 236

Subtotal

All are on a rental basis, inclusive of delivery, installation, standby maintenance and removal. As stock is limited, late orders cannot be assured. Important: After the exhibitor takes possession of the rented equipment he assumes liability until the equipment is returned. Exchange rate will be adopted at 1 EURO=7.5 RMB, if the applicant is going to settle the payment in RMB.

Company stamp, signature Date  Hanging point A surcharge of 50 % will be applied for orders which arrive after the deadline Form B12 Kindly complete and return by: 22 August 2016

Company name

Address Shanghai SYMA-EXPO Ltd Postal Code/City/Country ,4K]2UTM3GXIN([YOTKYY([ORJOTM Contact person @NKTHKO8UGJ Phone

9NGTMNGO68)NOTG Fax

e-Mail

Hall/Stand-No. Contact:Terry Yuan/Summer Cheng 26-29 September 2016 Phone:+86(0)21-6238 8811-154/135 Shanghai New International e-Mail:[email protected] Expo Centre, China [email protected] Please supply us with (an installation plan is appended-see form B3):

No. Quantity Max. load 200 kg each point Unit Unit price in EUR Sum EUR

B1201 Hanging point Point 304

B1202 Hanging Point for advertising Release(<=5m2,one side) one side 606

B1203 Hanging Point for advertising Release(>5m2,sqm) Sqm 62

Subtotal

Loading capacity 200kg/point, unit weight less than 1t, only steel structure can be hung. This form must be submitted with your booth construction layout and perspective view showing the hanging points details. Any items separated from the booth structure and with company names or logos are treated as advertising release, and need to order Item B1202 and B1203 based on the dimension of the hanging items. The Official Contractor and the hall owner will double check on the quantity of hanging points ordered based on the submitted booth layout and hanging point capacities, the final confirmed orders are subject to the on-site confirmation. Exchange rate will be adopted at 1 EURO=7.5 RMB, if the applicant is going to settle the payment in RMB.

Company stamp, signature Date  Digital Prints

A surcharge of 35 % will be applied for orders which arrive after the deadline Form B13 Kindly complete and return by: 22 August 2016

Company name

Address Shanghai SYMA-EXPO Ltd Postal Code/City/Country ,4K]2UTM3GXIN([YOTKYY([ORJOTM Contact person @NKTHKO8UGJ Phone

9NGTMNGO68)NOTG Fax

e-Mail

Hall/Stand-No. Contact:Terry Yuan/Summer Cheng 26-29 September 2016 Phone:+86(0)21-6238 8811-154/135 Shanghai New International e-Mail:[email protected] Expo Centre, China [email protected]

No. Quantity Unit Unit price in EUR Sum EUR

B1301 Digital print Per sqm 17

B1302 Digital print on foam board Per sqm 23

Subtotal

Exchange rate will be adopted at 1 EURO=7.5 RMB, if the applicant is going to settle the payment in RMB.

Company stamp, signature Date  Technical seminar A surcharge of 50% will be applied for orders which arrive after the deadline Form C1 Kindly complete and return by: 19 August 2016

Company name

Address

Postal Code/City/Country MESSE DÜSSELDORF (SHANGHAI) CO., LTD Contact person Units 307 - 308, Tower 1, German Centre for Industry and Trade Shanghai Phone

88 Keyuan Road, Zhangjiang Hi-Tech Park, Fax Pudong, Shanghai 201203. e-Mail

Hall/Stand-No. Contact:Amy Li Phone: +86(0)24-2250 5105 26-29 September 2016 Fax: +86(0)24-2250 5106 Shanghai New International Expo Centre, China e-Mail: [email protected]

A program of technical seminar will be run in conjunction with the exhibition. This program gives participating companies the opportunity to discuss their products and services in technical detail and exchange ideas with end-users on potential application of their products. A 500-word summary in Chinese language of your proposed seminar must be enclosed with this form to be approved by the Chinese Authorities. Please refer to the enclosed sheet for seminar room reservation.

Seminar topic(s):

Number of participants: people D a t e :

Event times: 10:00-11:30 13:00-14:30 15:00-16:30

Name of Speaker: Language to be used:

Need Room No. Area Style Seats Price(EUR) Need Room No. Area Style Seats Price(EUR) W1-M1 110VTP 7KHDWHU 64 488/time slot E2-M17 232VTP &ODVV 120 813/time slot W2-M2 110VTP 7KHDWHU 64 488/time slot E2-M18 232VTP 7KHDWHU 160 813/time slot W2-M3 110VTP 7KHDWHU 64 488/time slot E2-M19 292VTP 7KHDWHU 220 975/time slot W3-M4 110VTP &ODVV 40 488/time slot E2-M20 90VTP 7KHDWHU 64 488/time slot W3-M5 110VTP 7KHDWHU 64 488/time slot E3-M21 105VTP &ODVV 40 488/time slot W4-M6 110VTP 7KHDWHU 64 488/time slot E3-M22 105VTP 7KHDWHU 64 488/time slot W4-M7 110VTP 7KHDWHU 64 488/time slot E3-M23 240VTP &ODVV 120 813/time slot W5-M8 110VTP 7KHDWHU 64 488/time slot E3-M24 220VTP 7KHDWHU 160 813/time slot W2-M9 220VTP 7KHDWHU 160 813/time slot E4-M25 105VTP 7KHDWHU 64 488/time slot W3-M10 220VTP &ODVV 120 813/time slot E4-M26 105VTP 7KHDWHU 64 488/time slot E1-M11 75VTP 7KHDWHU 60 325/time slot E4-M27 220VTP 7KHDWHU 160 813/time slot E1-M12 75VTP 7KHDWHU 60 325/time slot 3URMHFWRU LQFOXGHSURMHFWRUVFUHHQ 325/time slot E1-M13 101VTP 7KHDWHU 64 488/time slot SURMHFWRUVFUHHQδ1.6M*2.2M) 25/time slot E2-M14 101VTP &ODVV 40 488/time slot ZLUHOHVVPLFURSKRQH 38/HDFKtime slot

E1-M15 232VTP 7KHDWHU 160 813/time slot This cost will include podium, white board, chairs and microphones, but exclude the invitation of attendants. E1-M16 232VTP 7KHDWHU 160 813/time slot Meeting room ordered for other usage is not accepted. No posting, hanging.Furnitures/facilities can not be removed from the room. Exchange rate will be adopted at 1 EURO=7.5 RMB, if the applicant is going to settle the payment in RMB.

Company stamp, signature Date  Outdoor advertising on the Trade Fair Grounds A surcharge of 50% will be applied for orders which arrive after the deadline Form C2 Kindly complete and return by: 19 August 2016

Company name

Address

Postal Code/City/Country MESSE DÜSSELDORF (SHANGHAI) CO., LTD Contact person Units 307 - 308, Tower 1, German Centre for Industry and Trade Shanghai Phone

88 Keyuan Road, Zhangjiang Hi-Tech Park, Fax Pudong, Shanghai 201203. e-Mail

Hall/Stand-No. Contact:Alain Wang Phone: +86(0)21-6169 8302 26-29 September 2016 Fax: +86(0)21-6169 8301 Shanghai New International Expo Centre, China e-Mail: [email protected]

No. Quantity Item Size Unit Unit price in EUR Sum EUR

' Ad flag South Square, up to 6pcs 0.9 × 2.5mH × 4side Each  Ground Ad release indoor and Location with the organizers ( ͽ3sqm sqm outdoor of exhibition halls to confirm 

) Ad above arch in Entry Hall 1# Entry Hall 5<W<8m,3<H<5m sqm  Ground Ad release indoor and Location with the organizers * ͽ3sqm sqm outdoor of exhibition halls to confirm  Between 1# Entry Hall and W1, + Corridor Ad board 8.0m × 3mH Each  up to 2pcs

, Movable Ad outdoor board South Square 8.0m × 5.0mH Each 

- Two-sided Ad outdoor post South Square, up to 20pcs 2.8m × 1.2mH × 2side Each 

. Movable Ad post 4m × 5mH × 3side Each 

/ Corridor Ad on the ceiling W1-W5 5.0m × 0.7mH Each 

1#Entry Hall to E1 3.5m × 0.7mH Each 

0 Scrolling lighting panel Ad South Square, up to 2packages 3.0m × 1.4mH × 4pcs Each  Located at LongYang Rd. 1 Ad tower 10.6m × 14.7mH Each near FangDian Rd.w  Located at FangDian Rd. 7.5m × 16.6mH Each near Hall W3 

2 Substation fences Ad board 4.95m × 3.8mH Each 

10.4m × 3.8mH Each 

3 Ad. Set-Top Triangle Board 2.4m × 0.7mH Each 

4 Ad.Traffic shed 3.0m × 1.0mH Each 

Exchange rate will be adopted at 1 EURO=7.5 RMB, if the applicant is going to settle the payment in RMB.

Advertising Specifications: The exhibitors is responsible to provide the ready-to-print high-resoulution(more than 300dpi) in TIF,PSD,AI and EPSformat.Please make sure all text is converted to curves/paths. Becaus of material,advertisement may appear a little bit chromatism The advertisement order is randomized,we don't provide specifying the location The exhibitors is responsible to provide the files before the deadline or advertisement can not be release.

Company stamp, signature Date   26-29 September 2016 Shanghai New International Expo Centre, China

Outdoor Advertisement on the Trade Fair Grounds

ཝශᇚཌ〱ࣞ㄁⢂ Movable advertisement outdoor board ᇚཌਂ䶘ᒵ઀㄁⢂ Two-sided Ad outdoor post 〱ࣞᕅኋ侼ᒵ઀⢂ Movable advertisement post  ཝශп䶘։ᒵ઀⢂ Advertisement tower 䘔᧛䮵ᔀᛢᤸ⁠ᑻ Corridor advertisement on the ceiling ┐ࣞᕅ⚥㇧ᒵ઀⢂ Scrolling lighting panel Ad 䓡ᒵ઀ם䖜ἐُ Ad.Traffic shed ᇚཌᒵ઀ᰍ Advertisement falg post ਎⭫ㄏപṅᒵ઀ Ad. Service substation fences Ad board Outdoor advertising

26-29 September 2016 Shanghai New International Expo Centre, China see Form C2

' ((** )

+ -

. , 0

/ 3

1 2244

 Outdoor advertising Metro Stations A surcharge of 50% will be applied for orders which arrive after the deadline Form C3 Kindly complete and return by: 12 August 2016

Company name

Address

Postal Code/City/Country MESSE DÜSSELDORF (SHANGHAI) CO., LTD Contact person Units 307 - 308, Tower 1, German Centre for Industry and Trade Shanghai Phone

88 Keyuan Road, Zhangjiang Hi-Tech Park, Fax Pudong, Shanghai 201203. e-Mail

Hall/Stand-No. Contact:Bella Wen Phone: +86(0)23-8860 5906-8052 26-29 September 2016 Fax: +86(0)23-8860 5908 Shanghai New International Expo Centre, China e-Mail: [email protected]

No. Quantity Item Size Unit Unit price in EUR Sum EUR

C31 Metro Line 2 Long Yang Road station platform(12-Sheet light box) 3 m x 1.5 mH Each/4weeks 8,375 C32 Metro Line 7 Long Yang Road station platform(12-Sheet light box) 3 m x 1.5 mH Each/4weeks 8,375 C33 Metro Line 7 Hua Mu Road station platform(12-Sheet light box) 3 m x 1.5 mH Each/4weeks 8,375

Exchange rate will be adopted at 1 EURO=7.5 RMB, if the applicant is going to settle the payment in RMB.

12-Sheet light box

Please provide CD-ROM with the readt-to-print high resolution(at least 300 dpi) scalable files in JPG or PDF or AI format. Ad location will be arranged by organizer, following the rule of “first-come, first-served”.

Company stamp, signature Date  Promotional Advertrsing

Form C4 Kindly complete and return by: 19 August 2016

Company name

Address

Postal Code/City/Country MESSE DÜSSELDORF (SHANGHAI) CO., LTD Contact person Units 307 - 308, Tower 1, German Centre for Industry and Trade Shanghai Phone

88 Keyuan Road, Zhangjiang Hi-Tech Park, Fax Pudong, Shanghai 201203. e-Mail

Hall/Stand-No. Contact:Bella Wen Phone: +86(0)23-8860 5906-8052 26-29 September 2016 Fax: +86(0)23-8860 5908 Shanghai New International Expo Centre, China e-Mail: [email protected]

No. Quantity Service Unit Unit Price in EUR

C401 Ticket AD 10,000/set(1side only) 1,210 AD on the lanyard C402 for visitor badges 10,000/set 3,620

C403 AD on the show bags 5,000/set(1side only) 3,620

Exchange rate will be adopted at 1 EURO=7.5 RMB, if the applicant is going to settle the payment in RMB.

No. Quantity Service Unit Unit Price in EUR

C404 On-line press release Your press release will be published in English and Chinese on www.wirechina.net & Each free of charge! www.tubechina.net. Please e–mail your releases (no more than 2 articles) in bilingual (up to two web pages each) in DOC or RTF format and pictures to [email protected] Flight Date (Start Date): ______

C405 Virtual Exhibition Offered by the show organizer, Virtual Exhibition is an online service extension to provide exhibitors Each free of charge! and visitors 24 hrs a day and 7 days a week non-stop online exhibition service. In virtual exhibition, exhibitors are able to display their products for preview and review without any constraints under the physical environment; it allows the buyers to obtain product information while the sellers can promote their products online. Virtual exhibition intends to foster seller-buyer interaction and relations hip more effectively and dynamically.

C406 Social Media (Wechat) Wechat, like twitter, facebook, is the most popular Each free of charge! social media in China. There are more than 600 million users. In order to help promote your company and products in China, we will provide you the value-added service to release your information on certificated show Wechat. If you need the service, please send the materials (picture and company/product profile, etc.) to [email protected].

Remark: As the information will be released in Chinese, it is highly appreciated if you could provide your company/product profile in Chinese. If it is in English, please keep the content within 300 words and we will translate it into Chinese. The organizer reserves the right to make the final decision.

Company stamp, signature Date  Press

A surcharge of 35% will be applied for orders which arrive after the deadline Form C5 Kindly complete and return by: 19 August 2016

Company name

Address

Postal Code/City/Country MESSE DÜSSELDORF (SHANGHAI) CO., LTD Contact person Units 307 - 308, Tower 1, German Centre for Industry and Trade Shanghai Phone

88 Keyuan Road, Zhangjiang Hi-Tech Park, Fax Pudong, Shanghai 201203. e-Mail

Hall/Stand-No. Contact:Bella Wen Phone: +86(0)23-8860 5906-8052 26-29 September 2016 Fax: +86(0)23-8860 5908 Shanghai New International Expo Centre, China e-Mail: [email protected]

No. Quantity Service Unit Unit Price in EUR

C501 Press Shelf In the press office, jurnalists from all over the world can collect information from press Each 30 Shelves. This is a particular popular way for the trade journalists to find out more about in Press Office your company.

C502 Video Shooting A professional film crew will be standing-by, producing live videos for any of your important Each 4,000 meetings or demostrations on site. The package price in cludes 3 hours video shooting with editing, video with opening and ending effects, background music and digital output in CD-ROM. The videos will be edited within five working days after the show and returned with a CD-ROM. Furthermore, we could offer professional video production services for your corporate promotional video played on site(including video shooting,editing, special effects, dubbing, background music, etc.). Please contact the Organizers if you need this service. Prices will be offered upon request.

Exchange rate will be adopted at 1 EURO=7.5 RMB, if the applicant is going to settle the payment in RMB.

Company stamp, signature Date  Catalogue

Form C6 Kindly complete and return by: 22 August 2016

Please Contact the official Catalogue partner to submit the information

MESSE DÜSSELDORF (SHANGHAI) CO., LTD Units 307 - 308, Tower 1, German Centre for Industry and Trade Shanghai 88 Keyuan Road, Zhangjiang Hi-Tech Park, Pudong, Shanghai 201203.

Hall/Stand-No.

26-29 September 2016 Shanghai New International Expo Centre, China

“Neureuter Fair Media Hong Kong Ltd.” is the official catalogue partner of “THE 7TH ALL CHINA - INTERNATIONAL WIRE & CABLE INDUSTRY TRADE FAIRE” and “ THE 7TH ALL CHINA - INTERNATIONAL TUBE & PIPE INDUSTRY TRADE FAIR. Please contact the following way to get the catalogue form:

Neureuter Fair Media Hong Kong Ltd.

Contact: Danny Chan, Senior Project Manager

Address: Room C2, 3/F, Po Yip Building, 23 Hing Yip Street, Kwun Tong, Kowloon, Hong Kong

Tel: +852-2519 3581; Fax: +852-2519 7134

E-mail: [email protected] (for wire China)

E-mail: [email protected] (for Tube China)

Neureuter Fair Media Hong Kong Ltd.(Guangzhou Representative Office)

Contact: Angel Wong, Project Manager

Address: Room 2814, 28/F, Wayne (Vili International), No.167 Lin He Xi Road, Tianhe District, Guangzhou 510610, P.R. China

Tel: +86-20-8770 5883; Fax: +86-20-8770 5886;

E-mail: [email protected] (for wire China)

E-mail: [email protected] (for Tube China)

Company stamp, signature Date  Personnel Service A surcharge of 30 % will be applied for orders which arrive after the deadline Form D1 Kindly complete and return by: 12 August 2016

Company name

Address

Postal Code/City/Country MESSE DÜSSELDORF (SHANGHAI) CO., LTD Contact person Units 307 - 308, Tower 1, German Centre for Industry and Trade Shanghai Phone

88 Keyuan Road, Zhangjiang Hi-Tech Park, Fax Pudong, Shanghai 201203. e-Mail

Hall/Stand-No. Contact:Mona Zhou Phone: +86(0)21-6169 8324 26-29 September 2016 Fax: +86(0)21-6169 8301 Shanghai New International Expo Centre, China e-Mail: [email protected]

Place and Date Type Starting Date Ending Date of interview No. of Persons Unit Unit price in RMB

Advance interpreter A English Day/person 1,200

Advance interpreter B German Day/person 1,500

Advance interpreter C Japanese Day/person 1,500

Ordinary interpreter English Day/person 800

Hostess English Day/person 800

Temp Staff English Day/person 500

Others (Please specify):

All other languages require a minimum of 30 days advance request and are subject to availability. This form should be completed and returned for all exhibitors who require temporary interpreter/explainer services during the exhibition duration. Exhibitors are strongly encouraged to engage the services of an interpreter in view of the large number of Chinese-speaking visitors expected at the exhibition. Exhibitors will be responsible for the safety of temporary staff on duty at their stand. The Organizers will not be responsible for any loss or damage caused by such personnel.

Company stamp, signature Date  Accommodation

Form Kindly complete and return by: D212 August 2016

Company name

Address

Postal Code/City/Country Shanghai Vision Expo & Meeting Solutions Co., Ltd. Contact person

Unit 703,New Caohejing Building, 509 Caobao Road Phone

Shanghai 200233 Fax

e-Mail Contact:Jenny Zhang / Billy Xu Hall/Stand-No. Phone: +86(0)21-5481 6052 * 813 Fax:+86 (0)21-5481 6032 26-29 September 2016 e-Mail: [email protected] Shanghai New International [email protected] Expo Centre, China

RoomType Arrival Departure Quantity

Single Room elbuoD mooR ot

Hotel Distance Website Type Single room Double room from hotel price in RMB price in RMB

Kerry Hotel Pudong Shanghai Deluxe room 1,550+16.6% 1,750+16.6%

Jumeirah Himalayas Hotel Shanghai Deluxe room 1,200+15% 1,350+15% Radisson Blu Hoteel Pudong Centery Park Deluxe room 900+15% 900+15% Renaissance Shanghai Pudong Hotel Deluxe room 850+16.6% 850+16.6%

Dongjiao State Guest Hotel Deluxe room 780 780 Deluxe citi\yview Dorsett Shanghai room 750 800

Parkview Hotel Shanghai Superior room 550 600

Grand Metro Park Jiayou Hotel Standard room 380 380

Price/room/night - including breakfast This form should be completed and returned for all exhibitors who require accommodation services during the exhibition duration. For more hotel selections, please contact our official travel agent Shanghai Vision Expo & Meeting Solutions Co., Ltd.

Guest Name: Hotel Limo Airport Pickup Service: First Name Last Name First Name Last Name No Yes. Arrival Flight / Time:______

Remarks: 1 Cancellation must be made in writing and 7 days prior to arrival. 3 days advance notice is required to modify a confirmed reservation. Late cancellationswill cause a penalty of one night room charge. 2、Once you have submitted your hotel reservation form to Shanghai Vision Expo & Meeting Solutions Co., Ltd., a hotel booking confirmation will be sent to you either by fax or email. Credit card is required to guarantee the booking. On the arrival day, guests should proceed to the hotel reception counter to Check in. All room rental charges plus all incidental charges must be settled upon check out at the hotel cashier counter.

Company stamp, signature Date Travel Package

A surcharge of 30 % will be applied for orders which arrive after the deadline Form D3 Kindly complete and return by: 12 August 2016

Company name

Address

Postal Code/City/Country Shanghai Vision Expo & Meeting Solutions Co., Ltd. Contact person

Unit 703,New Caohejing Building, 509 Caobao Road Phone

Shanghai 200233 Fax

e-Mail Contact:Jenny Zhang / Billy Xu Hall/Stand-No. Phone: +86(0)21-5481 6052 * 813 Fax:+86 (0)21-5481 6032 26-29 September 2016 e-Mail: [email protected] Shanghai New International Expo Centre, China [email protected]

Tour Date No. of Persons Guest Name Unit Unit price in RMB

One Day Wonderful Shanghai City Tour Day/person 560 Yuyuan Garden, Shanghai Old Street, Bund, , Former French Concession District, Souvenir Shop, , Xin Tian Di

Half Day Wonderful Shanghai City Tour Day/person 350 Bund, , Former French Concession District, Souvenir Shop, Shanghai Old Street, Xin Tian Di

Others (Please specify):

I will pay with: Cash Account/Bank transfer Credit card: Valid until: Credit card No.: Owner:

This form should be completed and returned for all exhibitors who require post show trip services after the exhibition duration . The above tours are on sit-in-coach basis with other visitors join in from other hotels.

Shanghai Old Street Former French Concession District Xin Tian Di

Yu GardGardenen Bund Jade Buddha Temple

Company stamp, signature Date

 Visa Application

Form Kindly complete and return by:D4 12 August 2016

Company name

Address

Postal Code/City/Country MESSE DÜSSELDORF (SHANGHAI) CO., LTD Contact person Units 307 - 308, Tower 1, German Centre for Industry and Trade Shanghai Phone

88 Keyuan Road, Zhangjiang Hi-Tech Park, Fax Pudong, Shanghai 201203. E-Mail

Hall/Stand-No. Contact:Bob Zhong Phone: +86(0)21-6169 8327 26-29 September 2016 Fax: +86(0)21-6169 8301 Shanghai New International Expo Centre, China e-Mail: [email protected]

Please chose the exhibition:

VISA APPLICATION TO CHINA All foreigners must obtain an entry visa before proceeding to China. Exhibitors are strongly recommended to process the application one month before departure from the country of origin. EXHIBITORS WITH INVITATION All the applicants for visas are required to have an Invitation Letter from the Chinese authority. We will coordinate and forward information of the application to the Chinese authorities for issuing the Business Invitation Letter which will be ready within 5 working days and presented to your company by fax or email. You are required to send your clearly photo-copy of applicant’s passport and credit card,hotel confirmation letter and intinerary in china to us. ATTENTION Passports must be valid for at least SIX MONTHS beyond the intended date of entry into China. The cost to issue of Invitation Letter for business visa is RMB 180/person, 5 working days; Express service RMB 280/person, 3 working days(Your embassy or consulate may have an additional charge for their paperwork.) Please make enough copies for each application and return the typewritten form to us before the deadline. BUSINESS INVITATION LETTER APPLICATION FORM

______Surname Given Name ______Nationality Gender Passport No. ______Date of Birth Place of Birth ______Date of Entry to China Date of Exit from China ______Company Name ______Address ______Tel Fax Contact Person ______Position Will you apply Chinese visa in your state of nationality? If not, please specify in which country you will submit your visa application We understand that our visa invitation will only be processed when we return this form with full payment of the application feebefore deadline. I will pay with Credit Card - Credit Card Type: MasterCard Visa Valid until: Credit card No.: Credit card Holder:

Company stamp, signature Date