44192-016: Draft Initial Environmental Examination Initial Environmental Examination (Draft) May 2015 BAN: Second SASEC Bangladesh-India Electrical Grid Interconnection Project Prepared by Power Grid Company of Bangladesh Limited (PGCB) for the Asian Development Bank. Table of contents Table of contents ................................................................................................................... i List of Tables ......................................................................................................................... iii List of Figures ....................................................................................................................... iv List of Maps ........................................................................................................................... iv List of Photographs ............................................................................................................ iv Currency Equivalents .......................................................................................................... v Weights and Measures ...................................................................................................... ix Executie Summary ............................................................................................................... x 1. Introduction ................................................................................................................... 1 1.1 Overview of the Investment Programme .......................................................... 3 1.2 Environmental Requirements ............................................................................... 3 1.3 Structures of the Report ....................................................................................... 3 2. Policy, Legal and Administrative Framework ..................................................... 4 2.1 National Environmental Requirements .............................................................. 4 2.1.1 Environmental Authority ................................................................................ 4 2.1.2 Securing Environmental Clearance ............................................................. 4 2.1.3 Relevant International Environmental Agreements ................................ 6 2.2 Environmental Requirements of ADB ................................................................. 7 3. Baseline, Potential Impacts and Environmental Management Plan ......... 10 3.1 Project Description ............................................................................................... 10 3.1.1 Objectives and Benefits ............................................................................... 10 3.1.2 Project components and activities ............................................................. 10 3.1.3 Implementation Activities ............................................................................ 12 Pre-construction phase ............................................................................................... 13 Construction phase .................................................................................................... 13 Post-construction phase ............................................................................................ 14 3.2 Availability of construction equipment and work schedule ......................... 15 3.3 Analysis of Alternatives........................................................................................ 15 3.4 Description of the Existing Environment ......................................................... 18 3.4.1 Natural Hazards ............................................................................................ 18 3.4.2 Meteorology .................................................................................................... 22 i 3.4.3 Surface Water Quality .................................................................................. 22 3.4.4 Ground Water Quality ................................................................................... 22 3.4.5 Air Quality ....................................................................................................... 23 3.4.6 Noise Quality ........................................................................................... ....... 23 3.4.7 Agriculture Resources ................................................................................... 24 3.4.8 Terrestrial Flora .............................................................................................. 24 3.4.9 Terrestrial Fauna........................................................................................ .... 25 3.4.10 Socio-economic Profile ................................................................................. 25 3.5 Anticipated Environmental Impacts and Mitigation Measures ................... 27 3.5.1 Pre-construction and Design Phase ........................................................... 27 3.5.2 Construction Phase ....................................................................................... 27 3.5.3 Operation Phase ............................................................................................. 29 3.6 Public and Stakeholder Consultations .............................................................. 30 3.7 Grievance Redress Mechanism .......................................................................... 31 3.8 Environmental Management Plan ..................................................................... 31 3.8.1 Mitigation ......................................................................................................... 31 3.8.2 Monitoring ....................................................................................................... 37 3.8.3 Implementation Arrangement .................................................................... 38 3.8.4 EMP and Monitoring Budget ........................................................................ 38 3.9 Conclusion and Recommendations ................................................................... 39 Appendix 1 ............................................................................................................................ 41 Environment Conservation Rules 1997 ....................................................................... 41 Appendix 2 Environment Conservation Rules 1997 ................................................ 46 Appendix 3 Name of Participants ................................................................................. 51 Appendix 4 Layout Plans.................................................................................................. 52 ii List of Tables Table 1: Tentative Financial Plan (US $ million) ........................................................ 3 Table 2: Comparison of Environmental Requirements of ADB and GOB ....................... 8 Table 3: Project Components and activities ........................................................... 10 Table 4: Comparisons of Alternative Routes ........................................................... 15 Table 5: Administrative units crossed by TL ........................................................... 18 Table 6: Water level at Padma River in different return periods ................................ 18 Table 7: Surface Water Quality Analysis Report ...................................................... 22 Table 8: Ground Water Quality Analysis Report ...................................................... 23 Table 9: Base information of Ambient Air Quality ................................................... 23 Table 10: Bangladesh Standards for Ambient Air Quality ......................................... 23 Table 11: Noise Monitoring Report ........................................................................ 24 Table 12: Standard for Ambient Noise .................................................................. 24 Table 13: Environmental Management Plan (EMP) for proposed project..................... 32 Table 14: Environmental Monitoring Plan for the Proposed Project ............................ 37 Table 15: Budget for the EMP and Monitoring Plan .................................................. 39 Table 16: Name of Participants ............................................................................ 51 iii List of Figures Figure 1: DOE Application Process for Securing ECC ....................................................... 5 Figure 2: Grievance Redress Committee ........................................................................... 31 List of Maps Map 1: Base Map of the Project ...................................................................... 2 Map 2: Proposed Bheramara - Ishwardi 230 kV T/L ..........................................11 Map 3: Proposed New AP of TL ......................................................................17 Map 4: Flood vulnerability map of Bangladesh..................................................19 Map 5: Seismic zone of Bangladesh ................................................................21 List of Photographs Photo 1: Proposed place in Bheramara sub-station ...........................................11 Photo 2: Proposed place in Ishwardi sub-station ...............................................12 Photo 3: RL : 16.054 m PWD (Ishwardi SS) .....................................................20 Photo 4: RL: 17.462 m PWD (Bheramara SS) ..................................................20 Photo 5: RL : 13.649 m PWD (agricultural land- Char Mokarampur) ....................20
Recommended publications
  • Initial Environmental Examination
    SASEC Second Bangladesh–India Electrical Grid Interconnection Project (RRP BAN 44192) Initial Environmental Examination August 2015 BAN: SASEC Second Bangladesh–India Electrical Grid Interconnection Project Prepared by Power Grid Company of Bangladesh Limited (PGCB) for the Asian Development Bank. This is a revised version of the draft originally posted in May 2015 available on http://www.adb.org/sites/default/files/project-document/162107/44192-016-iee-01.pdf ii CURRENCY EQUIVALENTS (as of as of 17 August 2015) Currency unit – BDT (Tk.) Tk.1.00 = $0.0128 $1.00 = Tk. 77.77 ABBREVIATIONS ADB Asian Development Bank AEZ Agro-ecological Zone AIS Air Insulated Switchgear AP Angle Point ASA Association for Social Advancement BBS Bangladesh Bureau of Statistics BEZ Bio-ecological Zone BMD Bangladesh Meteorological Department BPDB Bangladesh Power Development Board BRAC Bangladesh Rural Advancement Committee BWDB Bangladesh Water Development Board CEGIS Center for Environmental and Geographic Information Services CITES Convention on International Trade in endangered species DAE Department of Agricultural Extension DC Deputy Commissioner/ Double Circuit DEM Digital Elevation Model DEPC Department of Environmental Pollution Control DG Director General DIA Direct Impact Area DOE Department of Environment DOF Department of Fisheries DOL Department of Livestock DPP Development of Project Proforma EC Electrical Conductivity ECA Environment Conservation Act EIA Environmental Impact Assessment EMP Environmental Management Plan EQS Environment Quality
    [Show full text]
  • Terms of Reference (Tor)
    Terms of Reference (ToR) for Feasibility study for Construction of Bridges over the river Meghna on Shariatpur- Chandpur road & Gazaria-Munshigonj road and preparation of Master Plan for Bangladesh Bridge Authority. 1. Background 1.1 Introduction of the organization Bangladesh Bridge Authority (BBA) is a statutory body under Bridges Division of the Ministry of Road Transport & Bridges. It is the mandate of BBA to undertake technical research, feasibility study, development planning, detailed design, activities associated with the project implementation (including Public Private Partnership projects), monitoring, evaluation, operation and maintenance of 1500 m and over Bridges, Tunnels, Elevated Expressways and related Flyovers, cause way & ring road. Since its establishment in 1985, the BBA has successfully constructed the Bangabandhu Bridge in 1998 and Mukterpur Bridge in 2008, which are now operated and maintained by the same organization. The other major projects under implementation by the BBA includes: Padma Multipurpose Bridge Project at Mawa-Janjira, Dhaka Elevated Expressway PPP Project, Karnaphuli Tunnel Project (Bangabandhu Sheikh Mujibur Rahman Tunnel), Dhaka-Ashulia Elevated Expressway, Dhaka Bus Rapid Transport Corridor (BRT) Project (Elevated Portion), SASEC Road Connectivity Project (Elenga-Htikamrul part). All these Projects are being implemented through different procurement modes. In addition, feasibility studies for construction of subway in Dhaka city and Five new Bridges at different locations (Paira Bridge, Karkhana Bridge, Meghna Bridge, Bhola Bridge and Biskhali Bridge) are progressing. Some other mega projects in the pipeline are Dhaka East-West Elevated Expressway and feasibility study for Tunnel under the river Jamuna. Bangladesh is a riverine country and the whole country is divided into 3 (Three) parts like East, North and South by the river Jamuna, Padma & Meghna.
    [Show full text]
  • Social Impact Assessment (SIA)
    *OFFICIAL USE ONLY Government of the People’s Republic of Bangladesh Western Economic Corridor & Regional Enhancement Program (WeCARE-AIIB Program) Hatikumrul-Bonpara –Jhenaidah Road Phase 1 (Khustia-Jhenaidah-66.7 km) Social Impact Assessment (SIA) Roads and Highways Department (RHD) October 2020 *OFFICIAL USE ONLY Social Impact Assessment (SIA) Abbreviations AIIB Asian Infrastructure Investment Bank BBS Bangladesh Bureau of Statistics BRTA Bangladesh Road Transport Authority CPR Community Property Resources DCs Deputy Commissioners EC Executive Committee ESF Environmental and Social Framework ESSs Environmental and Social Standards FD Forest Department GIS Geographical Information System GOB Government of Bangladesh GRC Grievance Redress Committee GRM Grievance redress mechanism HHs Households MOA Ministry of Agriculture MoRTB Ministry of Road Transport & Bridges NGO Non-Governmental Organization PAPs Project Affected Persons PIU Project Implementation Unit PPEs Personal Protection Equipment RHD Roads and Highways Department RoW Right of Way SWR South- West Region WB World Bank i | P a g e *OFFICIAL USE ONLY Social Impact Assessment (SIA) Table of Contents Abbreviations ................................................................................................................................................ i Executive Summary ..................................................................................................................................... vii Chapter One: Introduction and Project Description ...................................................................................
    [Show full text]
  • STE-4584.Pdf
    Proceedings of the 5th International Conference on Civil Engineering for Sustainable Development (ICCESD 2020), 7~9 February 2020, KUET, Khulna, Bangladesh (ISBN-978-984-34-8764-3) A STUDY ON IMPACTS, CONSTRUCTION CHALLENGES AND OVERCOMES OF PADMA MULTIPURPOSE BRIDGE, BANGLADESH Md. Munirul Islam*1, A. S. M. Fahad Hossain2, S. M. Abbas3, Sadia Silvy4 and Md. Sayeed Hasan5 1Assistant Professor, Ahsanullah University of Science and Technology, e-mail: [email protected] 2Assistant Professor, Ahsanullah University of Science and Technology, e-mail: [email protected] 3Graduate Student, Ahsanullah University of Science and Technology, e-mail: [email protected] 4Graduate Student, Ahsanullah University of Science and Technology, e-mail: [email protected] 5Graduate Student, Ahsanullah University of Science and Technology, e-mail: [email protected] *Corresponding Author ABSTRACT Bangladesh is the riverine country located in South Asia with a coastline of 580 km on the northern littoral of the Bay of Bengal. There are 213 rivers in our country where 20 major bridges were constructed in our country. Five more bridges are now under construction among them Padma Multipurpose Bridge is the largest and most challenging. It will be the first fixed river crossing for road traffic and it will connect Louhajong, Munshiganj to Shariatpur and Madaripur, linking the south-west of the country, to northern and eastern regions. With 150 m span, 6150 m total length and 18.10 m width it is going to be the largest bridge in the Padma-Brahmaputra-Meghna river basins of country in terms of both span and the total length. The study discusses about both positive and negative impacts of the project on different aspects of Bangladesh.
    [Show full text]
  • Results of Hydrological Studies and Channel Analysis of the Ganges (Padma) River at the Construction Site of the “Rooppur” NPP
    6 GEOGRAPHY AND TOURISM, Vol. 6, No. 1 (2018), 41-53, Semi-Annual Journal eISSN 2449-9706, ISSN 2353-4524, DOI: 10.5281/zenodo.1314016 © Copyright by Kazimierz Wielki University Press, 2017. All Rights Reserved. http://geography.and.tourism.ukw.edu.pl A.S. Zavadsky1, D.V. Botavin, P.P. Golovlev, N.M. Mikhailova, E.A. Morozova, E.V. Promakhova, L.A. Turykin M.V. Lomonosov Moscow State University, Maccaveev Research Laboratory of Soils Erosion and Channel Processes 1 email: [email protected] Results of hydrological studies and channel analysis of the Ganges (Padma) River at the construction site of the “Rooppur” NPP Abstract: This work presents the results of research on channel processes in the Padma River (Republic of Bangladesh) at the construction site of the “Ruppur” Nuclear Power Plant (NPP). The fluvial characteristics of the Padma River were presented, including: the water outflow regime, characteristics of anthropogenic impact on the river outflow and assess- ment of the present state of the channel and floodplain. The research was conducted based on field expeditions, during which data on morphology, dynamics, hydrological and hydraulic conditions for the formation of the floodplain-channel complex were collected. Moreover, the water discharges and suspended sediments, as well as the longitudinal profiles of the water level and the channel morphology were measured. The presented research has shown that comprehensive and planned regulation of selected sections of rivers could lead to the channel stabilization and support the rational use of water resources for different purposes, e.g. power plants, municipal purposes, etc. Moreover, detailed research on channel deformation in selected areas indicated the major role of natural factors (geological structure, the type of sediments deliv- ered to the river, vegetation cover, etc.) in the past and present fluvial processes.
    [Show full text]
  • Souvenir(PDF Format)
    Japan-Bangladesh Joint Seminar on Advances in Bridge Engineering ."7 -:JSCE fi~± *~~ ~PAN SOCIETYOF CIVILENGINEERS Civil Engineering Division Committee of Steel Structures Institution of Engineers, Bangladesh Japan Society of Civil Engineers Jamuna Multipurpose Bridge Authority Roads and Highways Department Government of the Peoples I Republic of Government of the Peoples I Republic of . Bangladesh Bangladesh Civil Engineering Division, The Institution of Engineers, Bangladesh. Roads and Highways Department, Government of the Peoples' Republic of Bangladesh. Professor A.M.M. Safiullah Department of Civil Engineering Bangladesh University of Engineering and Technology, Dhaka 1000, Bangladesh. Md. Idrish Miah Additional Chief Engineer (Bridge Management Wing) Roads and Highways Department, Bangladesh. Dr. A.EM. Saiful Arnin Department of Civil Engineering Bangladesh University of Engineering and Technology, Dhaka 1000, Bangladesh. Copyright © The Institution of Engineers, Bangladesh and Roads and Highways Department, Government of the Peoples' Republic of Bangladesh. This publication or any part of it can be reproduced in any form with due acknowledgement. Left: The Akashi Kaikyo Bridge (AKB) is a three-span, two-hinged stiffening girder system suspension bridge that spans the Akashi Strait between Maiko, Tarumi-ward in Kobe, and Matsuho, on Awaji Island. After various investigations including aerodynamic tests on large scale three dimensional prototypes, actual construction of the bridge began in May 1988, and took a total often years. The AKB was opened to traffic on April 5, 1998. The AKB become the longest suspension bridges in the world, surpassing the Humber Bridge (England, 1,410 meter center span) by 581 meters. Although in primary design the AKB was 3,910 meters long overall, with a center span of 1,990 meters, it was extended 1 meter by the Great Hanshin Earthquake (January 17, 1995).
    [Show full text]
  • Supplemental Survey on Jamuna Railway Bridge Construction Project in the People’S Republic of Bangladesh
    People’s Republic of Bangladesh Bangladesh Railway Supplemental Survey On Jamuna Railway Bridge Construction Project in the People’s Republic of Bangladesh Final Report November 2015 Japan International Cooperation Agency Chodai Co., Ltd. 南ア CR(5) 15-054 Table of Contents Page EXECUTIVE SUMMARY ------------------------------------------------------------------------------ S- 1 Chapter 1 PREFACE 1.1 Background of the Survey ------------------------------------------------------------------------ 1- 1 1.2 Purpose of the Survey ----------------------------------------------------------------------------- 1- 3 1.3 Survey Area ------------------------------------------------------------------------------------------ 1- 6 Chapter 2 WORK PLAN 2.1 Work Formation ------------------------------------------------------------------------------------- 2- 1 2.2 Work Schedule -------------------------------------------------------------------------------------- 2- 1 2.3 Work Method ----------------------------------------------------------------------------------------- 2- 2 2.4 Work Counterparts --------------------------------------------------------------------------------- 2- 4 Chapter 3 SITE CONDITIONS 3.1 Natural Condition ----------------------------------------------------------------------------------- 3- 1 3.2 Navigational Condition ----------------------------------------------------------------------------- 3- 5 3.3 Condition of the Bangabandhu Bridge --------------------------------------------------------- 3- 8 3.4 Design Conditions ---------------------------------------------------------------------------------
    [Show full text]
  • Prefeasibility Study for Bishek
    Economic and Social Commission for Asia and the Pacific Promotion of Investment in the selected Asian Highway Routes in four countries (Bangladesh, Kyrgyzstan, Mongolia and Myanmar) Final Report Prefeasibility Study of Upgrading Jessore – Banpara Highway (AH41) in Bangladesh This study was undertaken with the financial assistance of Korea Expressway Corporation Bangkok November 2014 Disclaimer The analyses, findings, views and opinions expressed and arguments employed in the report are those of the study team members involved with the prefeasibility study, and do not necessarily reflect the official views of the ESCAP secretariat or of the Government of Bangladesh. The data and other information, analyses, and findings presented in the report are provided without warranty of any kind, either express or implied, including their accuracy and completeness for investment or for any other purpose. The user of the report specifically acknowledges the limitations of the study and agrees that the use of any materials of the report is at the user’s sole risk. The designations employed and the presentation of the material including on the maps in this report do not imply the expression of any opinion whatsoever on the part of the Secretariat of the United Nations concerning the legal status of any country territory, city or area or of its authorities, or concerning the delimitation of its frontiers or boundaries. Mention of firm names and commercial products does not imply the endorsement of the United Nations. This report has been issued without formal editing. i Foreword This prefeasibility study is based primarily on data that were readily available from various secondary sources, including concerned government departments, and previous studies and reports.
    [Show full text]
  • Making a Bridge Between Japan and Bangladesh (June 2006)
    Making a Bridge between Japan and Bangladesh Collected Essays & Speeches of H.E. Mr. Matsushiro Horiguchi Ambassador of Japan to Bangladesh May 2006 Embassy of Japan in Bangladesh P r e f a c e I am pleased to deliver to you this booklet: "Making a Bridge between Japan and Bangladesh," the compilation of my essays and major speeches, the interview of the Minister for Foreign Affairs of Japan, H.E. Mr. Taro Aso, the Japan-Bangladesh Joint Press Statement and contributions from people who are engaged in Japan-Bangladesh relations. I hope that you find this booklet useful in enhancing your understanding of the strong partnership between Japan and Bangladesh. I have enjoyed the opportunity to visit many places all over Bangladesh and to meet a great number of people in various fields since I came to Bangladesh in May 2003. I have articulated my thoughts and observations gained through these experiences through my speeches on various occasions and essays in our Embassy's biweekly E-Bulletins. I would like to take this opportunity to express my sincere gratitude to the people who contributed their essays to the E-Bulletin and shared their experiences and ideas on our two countries’ relations in the fields of business, development, culture, etc. Thanks to their contributions, the E-Bulletin has become a very effective tool for us to bring together people who are engaged in nurturing Japan-Bangladesh relations. I will soon leave Bangladesh upon completion of my three-year assignment as the Ambassador of Japan to Bangladesh. Even after leaving my position, I intend to continue sending my best wishes to the Bangladeshi people, that they realize a prosperous country as soon as possible.
    [Show full text]
  • Sections Under Study (ADB)
    ANNEX PROFILES OF PRIORITY PROJECTS ALONG THE ASIAN HIGHWAY A. Afghanistan 1. Project name: AH77, Bamiyan – Changcharan, AH71, Herat – Touraghandi. 2. Location: The Bamiyan – Changcharan section is part of AH77 and the central East-West corridor connecting Herat and Kabul, with a length of 344 km. The Herat – Touraghandi section is part of AH71 connecting Afghnistan and Turkmenistan, with a length of 120 km. 3. Brief outline of the project: The Asian Highway network in Afghanistan consists of a ring road, central East-West road and links to the neighbouring countries. The road connection to: (a) the Islamic Republic of Iran is through Zarang and Islam Qila; (b) Pakistan through Spin Boldak and Torkham: (c) Tajikistan through Shrikhan; (d) Uzbekistan through Hairatan; and (e) Turkmenistan through Tourghandi. Most of the roads in Afghanistan have been damaged by war, and need upgrading and rehabi- litation. Various sections of the Asian Highway in Afghanistan are under construction or in the feasibility study stage with support from multilateral and bilateral donors. The Bamiyan – Changcharan (AH77) and Herat – Touraghandi (AH71) sections of the Asian Highway need to be upgraded to establish efficient East-West link and connection to Turkmenistan. In addition to the above sections, substantial financial assistance will be necessary for undertaking other projects along the Asian Highway and national roads that are currently at the feasibility study stage. 4. Rationale and objectives: The rehabilitation of the Asian Highway and roads in Afghanistan will restore the road network in the country. This will contribute to efficient transport, a reduction in vehicle operating costs and savings in travel times as well as help to stabilize economic activities in Afghanistan.
    [Show full text]
  • Country Presentation: Bangladesh Nuclear Power Program
    Regional Workshop on Essential Knowledge of Site Evaluation Report for Nuclear Power Plants 26-30 August, 2013, Kuala Lumpur, Malaysia Country Presentation: Bangladesh Nuclear Power Program Engr. Md. Monirul Islam Member(Engineering) Bangladesh Atomic Energy Commission Outline Bangladesh Overview Present Power Situation Current & Future plans for NP development Rooppur NPP Site Overview. Historical Background. Recent Progress Structure of NEPIO Challenges of NEPIO–Bangladesh Case Public Awareness Program Bangladesh: Overview Area: 147,570 sq. km. Population: 160 million GDP: 848 US$ GDP Growth: 6~6.5 % Energy Consumption Total: 230 kgOE Electricity: 320 kWh (approx.) Access to Electricity: 50% (approx.) Bangladesh: Overview Political Map of Bangladesh with Neighboring Countries China Rooppur NPP site Country without Nuclear Power Country with Nuclear Power Reactor Reactor Present Power Situation Electricity Generation Scenario Electricity Generation Capacity: 8525 MW (December, 2012) Public Sector: 4794(56%) Private Sector: 3731(44%) Fuel Type Contribution Diesel Hydro Domestic 6% 3% Coal Natural Gas 67.21% Furnace 2% Oil Furnace Oil 22.33 % Imported 22% Diesel 5.52 % Natural Gas Hydro 2.58 % 67% Domestic Coal 2.35 % Max. Demand Served: 6350 MW(August 04, 2012) 6080 MW(March15, 2013) (aged plants, poor capacity factor) Current & Future plans for NP development Policy Documents Perspective Plan of Bangladesh 2010~2021 Vision 2021: -Digital Bangladesh -Electricity for all Power system Master plan: 2010~2030 Vision:
    [Show full text]
  • Environmental and Social Management Planning Framework (ESMPF)
    *OFFICIAL USE ONLY Government of the People’s Republic of Bangladesh Western Economic Corridor & Regional Enhancement Program (WeCARE-AIIB Program) Bonpara –Jhenaidah Road Phase 1 (Kushtia-Jhenaidah section-66.7 km) Environmental and Social Management Planning Framework (ESMPF) Roads and Highways Department (RHD) October 2020 COD Chemical Oxygen Demand *OFFICIAL USE ONLY Environmental and social Management Planning Framework (ESMPF) Abbreviations CSO Civil Society Organizations DAE Department of Agriculture Extension DIFE Department of Inspection for Factories and Establishments DLS Department of Livestock Services DoE Department of Environment DoF Department of Fisheries DSM Design Supervision Management EA Environmental Assessment ECA Ecological Critical Area ECA Environmental Conservation Act ECC Environmental Clearance Certificate ECoP’s Environmental Code of Practices ECR Environment Conservation Rules EHS Environmental, Health and Safety EIA Environmental Impact Assessment EMF Environmental Management Framework EMIS Environmental Management Information System EMP Environmental Management Plan EMU Environmental Management Unit ESA Environmental and Social Assessment ESF Environmental and Social Framework ESIA Environmental and Social Impact Assessment ESMPF Environmental and Social Management Plan Framework ESMP Environmental and Social Management Plan ESR Environmental Screening Report ESS Environmental and Social Standards FGD Focus Group Discussion GAP Gender Action Plan GBV Gender Based Violence GoB Government of Bangladesh GRC