MONTHLY PROGRESS REPORT UPTO 31.08.2018 DEVELOPMENT PROGRAMME 2018-19 WATER SUPPLY & SANITATION Funds Revised %age Physical Remarks (including detailed physical Provision for utilized Total Exp Upto June allocation for Funds Released utilization on progress till progress) Sr. No. GS. No. New Name of Scheme District Approved Cost 2018-19 till 31.08.18 Accummulative exp: 2018 2018-19 by FD release current month (i) Date of Start of the Project till 31.08.18 31.08.18 (%age) (ii) Date of completion of the Project Total Total Ongoing Schemes Rehabilitation and Repair of Sewerage Scheme of 1 513 Housing Scheme , Gujar Khan City, Tehsil Gujar Khan, Rawalpindi 29.980 12.658 10.000 10.000 1.667 1.6 96% 14.258 48% Work in progress. District Rawalpindi A.A Date 03.09.2014. T.S Date Drainage / Sewerage System in Village Ghourgushti 29.09.2014.Date of Start of Scheme 2 514 88.786 85.975 2.811 2.811 0.469 0.469 100% 86.444 97% (Phase II), Tehsil Hazro, District attock 16.12.2014. Date of Completion of Scheme 30.06.2019. Work is in progress. A.A Date 01.10.2013. T.S Date 27.01.2014. Drainage and Sanitation scheme in village Hameed, Tehsil Date of Start of Scheme 06.03.2014. Date of 3 515 Attock 44.134 26.253 17.881 17.881 2.980 0 0% 26.253 59% Hazro, District attock Completion of Scheme 30.06.2019. Dispute of land. A.A Date 12.04.2017. T.S Date 4 516 1.523 100% 22.341 75% 18.04.2017.Date of Start of Scheme Rural Drainage Scheme in Villages Chachi, Saiden, Yasin Attock 29.955 20.818 9.137 9.137 1.523 10.06.2016.Date of Completion of Scheme 30.06.2019 Work is in progress. A.A Date 05.08.2016. T.S Date 15.08.2016. Extension of Rural Drainage Scheme in Villages Haroon, Date of Start of Scheme 16.03.2017.Date of 5 517 Attock 60.055 46.839 13.216 13.216 2.203 2.203 100% 49.042 82% Saleem Khan & Adalzai Completion of Scheme 30.06.2019. Work is in progress. A.A Date 05.08.2016.T.S Date 09.09.2016. Rural drainage Scheme in Village Mirza Phase2 Tehsil and Date of Start of Scheme 24.11.2016. Date of 6 518 Attock 104.909 28.998 20.000 20.000 3.334 3.334 100% 32.332 31% District attock. Completion of Scheme 30.06.2019. Work is in progress. A.A Date 01.04.2016. T.S Date 22.04.2016. Rural drainage scheme in villages Formli,haider Date of Start of Scheme 30.05.2016. Date of 7 519 Attock 55.840 42.497 13.343 13.343 2.224 2.224 100% 44.721 80% Mallah,District attock. Completion of Scheme 30.06.2019 Work is in progress. A.A Date 01.04.2016. T.S Date 09.09.2016. Rural drainage scheme in villages Perzai, Muraria, Date of Start of Scheme 15.12.2016. Date of 8 520 Attock 29.604 27.798 1.806 1.806 0.301 0.301 100% 28.099 95% Pandak, District attock Completion of Scheme 30.06.2019. Work is in progress. A.A Date 05.08.2016. T.S Date 15.08.2016. Rural drainage scheme in villages, , Khagwani, Date of Start of Scheme 28.11.2016. Date of 9 521 Attock 55.106 29.998 10.000 10.000 1.667 1.667 100% 31.665 57% District attock Completion of Scheme 30.06.2019. Work is in progress. Date of A.A 20.04.2017.Date of T.S 22.04.2017.Date of Start 12.06.2017. Date of 10 522 Rural Drainage Scheme Mangwal District Chakwal Chakwal 11.000 9.823 1.177 1.177 0.196 0 0% 9.823 89% completion 31.12.2018.Work is in progress. Funds released on 03-08-2018. Target progress will be achieved in next month.

Date of A.A 20.04.2017.Date of T.S 22.04.2017.Date of Start 10.06.2017 .Date of 11 523 Rural Drainage Scheme UC Udherwal District Chakwal Chakwal 14.000 12.554 1.446 1.446 0.241 0 0% 12.554 90% completion 31.12.2018.Work is in progress. Funds released on 03-08-2018. Target progress will be achieved in next month.

Date of A.A 20.04.2017.Date of T.S 22.04.2017.Date of Start 08.06.2017.Date of 12 524 Rural Drainage Scheme UC Nara Mogla District Chakwal Chakwal 11.000 9.572 1.428 1.428 0.238 0 0% 9.572 87% completion 31.12.2018.Work is in progress. Funds released on 03-08-2018. Target progress will be achieved in next month.

Date of A.A 17.09.2015.Date of T.S 13 525 Const. of Sewerage & Drainage Scheme Kallar Kahar Chakwal 98.759 47.429 10.000 10.000 1.667 1.617 97% 49.046 50% 08.10.2015.Date of Start 18.03.2016.Date of completion 31.12.2019.Work is in progress.

Date of A.A 24.08.2016 .Date of T.S 14 526 Rural Drainage Scheme Khanpur Chakwal 150.000 52.465 15.000 15.000 2.500 2.4 96% 54.865 37% 01.11.2016.Date of Start 16.01.2017.Date of completion 30.06.2020.Work is in progress.

Date of A.A 24.08.2016.Date of T.S 15 527 Sewerage Scheme Lawa, District Chakwal Chakwal 78.169 49.997 10.000 10.000 1.667 1.667 100% 51.664 66% 01.11.2016.Date of Start 23.12.2016.Date of completion 31.12.2019.Work is in progress. Date of A.A 16-03-16.Date of T.S 28-03- Improvement/Rehabilitation of Sewerage System in Bilal 2016.Revised T.S 18-10-2017.Date of 16 528 Jhelum 29.800 27.773 2.027 2.027 0.338 0 0% 27.773 93% Town Tehsil & District Jhelum Commencement 07-05-2016.Scheme Completed. Excess funded. Rural drainage scheme Pinanwal, Tehsil Pind Dadan Date of A.A 26-08-2016.Date of T.S 15-12- 17 529 Jhelum 100.000 20.000 10.000 10.000 1.667 1.667 100% 21.667 22% 2016.• Work awarded on 02-03-2017 • Work Khan. in progress. Date of A.A 27.08.2016, Date of T.S 28.10.2016, Date of Award 14.02.2017, Scheduled date of Completion on 13.02.2018, RSD Scheme Chak No 4 SP Chak No 5 NB Chak No 7 ML Date of Commencement, 14.02.2017, Funds 18 530 Sargodha 105.642 43.198 10.000 10.000 1.667 1.2 72% 44.398 42% Chak No 65 SB Hujjan District Sargodha released on 30.07.2018, Funds on-lined on 30.07.2018.Sullage Carrier 18500-Rft & Drain 8188-Rft constructed. Soling 19544-Cft laid. Work in progress.

Date of A.A 27.08.2016, Date of T.S 07.11.2016, Date of Award 10.02.2017, Scheduled date of Completion on 09.02.2018, 19 531 1.667 0% 34.990 35% Date of Commencement, 10.02.2017, Funds Rural Sewerage / Drainage PCC Scheme for Jhawarian Sargodha 100.000 34.990 10.000 10.000 0 released on 30.07.2018, Funds on-lined on 30.07.2018.6661-Rft, Nallah, Drain, 2866-Rft 01- No. collecting tank constructed. PCC slab 27375-Cft laid and Work in progress.

Date of A.A 27.08.2016, Date of T.S 28.10.2016, Date of Award 31.01.2017, Scheduled date of Completion on 30.01.2018, 20 532 1.667 0% 27.991 33% Date of Commencement, 31.01.2017, Funds Rural Sewerage / Drainage Scheme Bhagtanwala Sargodha 84.030 27.991 10.000 10.000 0 released on 04.08.2017, Funds on-lined on 04.08.2017.Drain 9908-Rft & Sullage Carrier 7838-Rft constructed. P.C.C Slab 17860-Cft & Soling 5988-Cft laid. Work in progress

Date of A.A 27.08.2016, Date of T.S 03.09.2016, Date of Award 06.12.2016, Scheduled date of Completion on 05.12.2017, Sewerage scheme Mouza Ahmaday Wala District Date of Commencement, 06.12.2016, Funds 21 533 Sargodha 23.426 19.980 3.446 3.446 0.575 0 0% 19.980 85% Sargodha released on 30.07.2018, Funds on-lined on 30.07.2018.Sullage Carrier 3250-Rft & Drain 9841-Rft constructed. PCC Slab 18393-Cft & Soling 19458-Cft laid. Work in progress.

Date of A.A 27.08.2016, Date of T.S 03.09.2016, Date of Award 08.12.2016, Scheduled date of Completion on 07.12.2017, Sewerage/Sullage Carrier for Jalpana/Chak Date of Commencement, 08.12.2016, Funds 22 534 Sargodha 30.000 21.616 8.384 8.384 1.398 0 0% 21.616 72% Muzafarabad/Masar/Sardarpur etc. released on 30.07.2018, Funds on-lined on 30.07.2018.Sullage Carrier 12165-Rft & Drain 6240-Rft constructed. P.C.C slab 20390-Cft laid. Work in progress.

Provision of Sewerage System and PCC Slabs in Village Date of AA 18.08.2017 Date of TS 23 535 Khushab 92.683 10.000 10.000 10.000 1.667 1.645 99% 11.645 13% 11.09.2017 Date of award 22.01.2018 Date of Roda. completion 30.06.2020

Date of A.A.27-05-2016, Date of T.S.19-05- 2017, Date of Start of Work. 10-05-2017, Remarks. E.R.S=3/3, Tube Well=1/1, Pump House=1/1, P/Machinery= Arranged/1, Construction of Rural water Supply Scheme Marmandi R/FMain= 6"i/d G.I Pipe=1200/1200, 4"i/d G.I 24 536 Mianwali 13.500 12.733 0.767 0.767 0.128 0 0% 12.733 94% Pipe=2240/2250, 3"i/d G.I Pipe=3020/3020, Tehsil & District Mianwali 2"i/d G.I Pipe=1400/1400, 6"i/d PVC Pipe=1900/1900, 3"i/d PVC= 9800/9805, G.S. Tank 20000-Glns=1/1, T/Line=Demand Notice paid to Wapda Connection awaited/1. Work is in progress. Date of A.A. 27-08-2016, Date of T.S.09-12- 2016, Date of Start of Work.27-01-2017, Remarks RCC Sewer=9"i/d=3200-Rft Arranged/19157,12"i/d=8504-Rft Arranged/8786,15"i/d=2792-Rft Arranged/2826,18"i/d=1600-Rft Arranged/1624,21"i/d=432-Laid & 924-Rft 25 537 2.500 17% 45.371 48% Arranged/1356,24"i/d=900-Laid & 412-Rft Rural Sewerage Scheme Harnoli Tehsil Piplan, Mianwali Mianwali 94.000 44.956 15.000 15.000 0.415 Arranged/1329, 30"i/d=380-Rft Laid/392, Screening Chamber =90%/1, Collecting Tank 20'dia =85%/1,Control Room= 80%/1,Discharge Sump=0/1, P/Machinery=0/2, S/Carrier=0/1250, S/Drain= 600/4175, PCC Slab= 99000/142412, Culvert=0/1, Electric T/Line=0/1. Work is in progress. Date of A.A.27-08-2016, Date of T.S.09-12- 2016, Date of Start of Work.03-02-2017, Remarks RCC Sewer=9"i/d=1240- Arrange/20356, 12"i/d=1130-Rft Laid & 3992- arranged/12812, 15"i/d=728-Rft Laid & 1312- 26 538 Sewerage & Sanitation Scheme Daud Khel Mianwali 98.377 19.938 20.000 20.000 3.334 0.59 18% 20.528 21% Arranged/6645, 18"i/d=1166-Rft Laid/3348, 21"i/d=832-Arranged/1768, 24"i/d=128-Rft Laid & 1296-Arranged/4870, 27"i/d=1571-Rft Laid & 1792-Arranged/5505, 33"i/d=2050- /3128, S/Carrier=0/200, PCC Slab=0/33597. Work is in progress. Date of A.A.27-08-2016, Date of T.S.06-10- 2016, Date of Start of Work.22-12-2016, 27 539 3.334 100% 33.290 35% Remarks RCC Sewer=9" i/d=15294/33286, Sewerage & Sanitation Scheme Shahbaz Khel Mianwali 95.743 29.964 20.000 20.000 3.326 12"i/d= 14502/21045, 15"i/d= 3381/3659, 21"i/d= 766/864, 24"i/d=2253/2445, PCC Slab= 0/62379. Work is in progress. Date of A.A.04-08-2015, Date of T.S.14-09- 2015, Date of Start of Work 16-11-2015, Remarks RCC Sewer=9" i/d= 23007/35130, 28 540 Sewerage / Drainage Scheme Mouch, District Mianwali Mianwali 70.000 46.432 23.568 23.568 3.928 3.89 99% 50.322 72% 12"i/d= 18238/12053, 15"i/d= 3239/4564, 18"i/d=5720/4902, 21"i/d= 1608 /1126. Sullage Carrier= 230/2411. Work is in progress. Date of A.A.27-08-2016, Date of T.S.03-09- 2016, Date of Start of Work 03-12-2016 29 541 2.238 100% 24.709 69% Remarks RCC Sewer=9" i/d=10551/13484, Sewerage / Drainage Scheme UC Rokhari Mianwali 35.900 22.472 13.428 13.428 2.237 12"i/d= 10290/7642, 15"i/d= 5982/6288, 18"i/d=1294/1299, Sullage Carrier= 0/200. Work is in progress. PCC Slab and Sewerage Scheme in Street Noon Dager Date of A.A 27.08.2016 Date of T.S 30 542 Bhakkar 48.600 29.681 10.000 10.000 1.667 1.578 95% 31.259 64% 03.09.2016 Date of Commencement UC Tehsil Kaloor Kot District Bhakkar 28.11.2016 Date of completion 28.11.2018 PCC Slab and Sewerage Scheme Shahyan Wala U.C Date of A.A 27.08.2016 Date of T.S 31 543 Bhakkar 30.000 14.397 10.000 10.000 1.667 0 0% 14.397 48% 03.09.2016 Date of Commencement Noora Sharif Tehsil Kaloor Kot District Bhakkar 09.11.2016 Date of completion 09.11.2018 Rural Sewerage Drainage Scheme PCC Slab and Brick Date of A.A 27.08.2016 Date of T.S 32 544 Bhakkar 49.998 16.599 10.000 10.000 1.667 0 0% 16.599 33% 03.09.2016 Date of Commencement Pavement in Behal City 03.11.2016 Date of completion 03.11.2018 Rural Sewerage Drainage Scheme PCC Slab and Brick Date of A.A 27.08.2016 Date of T.S 33 545 Bhakkar 39.022 17.990 10.000 10.000 1.667 0 0% 17.990 46% 03.09.2016 Date of Commencement Pavement in Notak City 28.11.2016 Date of completion 28.11.2018 Sewerage Drainage and PCC Slab and Drain in Town Date of A.A 27.08.2016 Date of T.S 34 546 Bhakkar 100.000 46.649 20.000 20.000 3.334 0 0% 46.649 47% 21.10.2016 Date of Commencement Punjgrain Tehsil Darya Khan District Bhakkar. 24.11.2016 Date of completion 28.11.2018 Date of A A 16 03 2017 Date of T S 24 03 2017 Date of Receipt of tender 20 04 2017 Date of work order 07 07 2017 Date of 35 547 Sewerage / Drainage Scheme Garh Mor, Ahmedpur Sial Jhang 81.940 20.000 25.000 25.000 4.167 4 96% 24.000 29% Completion As per PC-I06 07 2019 Anticipated date of completion 06 07 2019 Agreement Amount 74 993-Million Work is in progress 1-Date of A.A 20.10.2016 2- Date of T.S 11.11.2016 3-Date of Prequalification - 21.11.2016 4-Date of invitation of tenders 16.12.2016 5- Date of Receipt of tenders Sewerage Drainage and Street Pavement, Sandhilianwali, Toba Tek 17.12.2016 6- Date of work order - 36 548 100.000 20.000 10.000 10.000 1.667 1.667 100% 21.667 22% 27.12.2016 7- Date of completion as per PC-I District Toba Tek Singh Phase I Singh 26.12.2018 8- Anticipated date of completion 26.12.2018 9- No. of Beneficiary - 33312 Person 10-Funds Released by F.D 03.08.2018 - 11-Re-appropriation of funds(+/- ) Work in progress. Const. of disposal Sewerage Drainage PCC Scheme Morr 37 549 Gharbi Audo Rai UC Maraliwala Tehsil and 178.291 99.997 20.000 20.000 3.334 3.334 100% 103.331 58% Work in progresss Distt. Gujranwala Construction of disposal Sewerage Drainage PCC 38 550 Scheme Morr Eminabad Sharqi UC Dhillanwali Tehsil and Gujranwala 199.920 116.299 20.000 20.000 3.334 3.334 100% 119.633 60% Work in progresss Distt. Gujranwala Construction of Drains / PCC and Sewerage Scheme at 39 551 Gujranwala 67.393 17.393 20.000 20.000 3.334 3.334 100% 20.727 31% Work in progresss UC Bhikhu Pura, District Gujranwala Construction of Drains / PCC and Sewerage Scheme at 40 552 Gujranwala 64.261 19.260 15.000 15.000 2.500 1.564 63% 20.824 32% Work in progresss UC Shaheenabad, District Gujranwala Drainage Sewerage and PCC UC atawa UC Rakh Kikran 41 553 Gujranwala 280.818 151.994 42.351 42.351 7.059 4.658 66% 156.652 56% Work in progresss Wali PCC and Drainage Facility at Sadoki,Dargahapur and 42 554 Gujranwala 158.153 84.999 10.000 10.000 1.667 1.667 100% 86.666 55% Work in Progress others in Tahsil Kamoki PCC and Sewerage Schemes at Khiali Shahpur District 43 555 Gujranwala 198.537 130.783 20.000 20.000 9.552 7.642 80% 138.425 70% Work in progress Gujranwala. PCC Sewerage Drainage Scheme Disposal UC City 44 556 Gujranwala 149.647 140.599 9.048 9.048 1.508 1.508 100% 142.107 95% Work in progress Ladhywala Qila Dedar Singh Madu Khalil Ghakh Provision of Drainage PCC Facilities at UC Artali Virkan 45 557 Gujranwala 30.000 19.996 10.004 10.004 1.668 1.365 82% 21.361 71% Work in progresss Tehsil Nowshera Virkan District Gujranwala Provision of Drainage PCC Facilities at UC 46 558 Gujranwala 30.000 19.997 10.003 10.003 1.667 1.667 100% 21.664 72% Work in progresss Tehsil Nowshera Virkan District Gujranwala Provision of Drainage / PCC Schem at UC Chahal Kalan, 47 559 Gujranwala 77.757 19.999 10.000 10.000 1.667 1.365 82% 21.364 27% Work in progresss District Gujranwala Provision of PCC/Drainage Sewerage Schemes at UC No 48 560 Gujranwala 131.295 99.997 20.649 20.649 0.000 0 #DIV/0! 99.997 76% Scheme completed. Funds re-appropriated. 14, 15, 46, 50, 51, 52, 53 Gujranwala Provision of PCC/Drainage/Sewerage Scheme at 49 561 Gujranwala 194.226 74.998 20.000 20.000 3.334 3.334 100% 78.332 40% Work in progress Municipal Committee, Ghakar Mandi Provision of Sewerage Drainage and water Supply 50 562 Gujranwala 196.624 138.879 20.000 20.000 3.334 3.334 100% 142.213 72% Work in progresss scheme in Qila Dedar Singh Gujranwala Provision of Sewerage, New Disposal & PCC at Kot Qazi & 51 563 Gujranwala 186.266 79.075 30.000 30.000 5.000 5 100% 84.075 45% Work in progress Mudhokhalil, Tehsil Saddar, Gujranwala Provision of Sewerage, New Disposal & PCC at Ladhay 52 564 Gujranwala 195.240 89.479 25.000 25.000 4.167 4.167 100% 93.646 48% Work in progresss wala Warraich & Mughal Chak, Tehsil Saddar, Gujranwala RSD/ PCC Scheme UC Shamsa Dada UC Majju Chak UC 53 565 Bhoopra Kalan UC Argan UC Philloke and UC Abidabad Gujranwala 168.000 47.000 10.000 10.000 1.667 1.667 100% 48.667 29% Work in progresss Gujranwala Rural Drainage and PCC Scheme at Wandala Virkan Taly Aali Badhay new Abadi Gaibi Lunj Sharif Kolo wala, Matu 54 566 Gujranwala 50.000 19.997 10.000 10.000 1.667 0.654 39% 20.651 41% Work in progresss Bhanake Al Ditta, Ratta Goraya, Chak Poryan ana Paryan, Karyal Khan and and Adjoining Dera Jattan.

Rural Drainage PCC Scheme Kot Nisar Shah Boopara 55 567 Gujranwala 109.270 47.000 20.000 20.000 3.334 3.334 100% 50.334 46% Work in progresss Khurd Dhairr Virkan Bhirri Shah Rehman Dharoke Sadu Rural Drainage/PCC Scheme in U.C. Garmula Virkan, U.C Budha Goraya, Dogranwala, U.C Phama Sara, Kalsian 56 568 Gujranwala 109.270 30.000 15.000 15.000 2.500 2.5 100% 32.500 30% Work in progresss Dhutran, Kot Bilal and Madan Chak, Tehsil Nowshera Virkan, Dist. Gujranwala (Revised) Sewerage and PCC Scheme for Bismillah Colony Wania 57 569 Gujranwala 105.000 96.046 8.954 8.954 1.493 1.493 100% 97.539 93% Work in progress and Adjacent Area Gujranwala 58 570 Sewerage Scheme of Leftover Area Gujranwala Gujranwala 199.100 57.811 15.000 15.000 2.500 2 80% 59.811 30% Work in progress * A.A Date. 09.03.2017* T.S Date. Construction of street, Drainage and Soling of Kakka and Mandi 10.03.2017* Start Date 12.04.2017* 59 571 6.500 6.000 0.500 0.500 0.084 0.084 100% 6.084 94% Kot Jafar, Chak No.18 & 19, District M.B.Din Bahauddin Completion date 30.06.2019.* Work in progress. * A.A Date. 09.03.2017* T.S Date. Construction of street, Drainage and Soling of Khizar and Mandi 10.03.2017* Start Date 11.04.2017* 60 572 13.000 11.069 1.931 1.931 0.322 0.161 50% 11.230 86% Chak No.52, UC Chot Dheeran, District M.B.Din Bahauddin Completion date 30.06.2019.* Work in progress. * Org. A.A Date. 03.10.2011* Rev. A.A Date. Drainage/Sewerage and water Supply Scheme of Mangat Mandi 23.02.2013* T.S Date. 18.11.2011* Start Date 61 573 102.080 76.999 10.000 10.000 1.667 0 0% 76.999 75% and Rasul Bahauddin 02.11.2011* Completion date 30.06.2019.* Work in progress. * A.A Date. 28.01.2015* T.S Date. Provision of Sewerage / Drainage / Pavement in Halian & Mandi 08.02.2015* Start Date 11.04.2015* 62 574 50.000 49.243 0.757 0.757 0.126 0.126 100% 49.369 99% Ghanian, Tehsil Bahauddin Completion date 30.06.2019.* Work in progress. Provision of Sewerage / Drainage / Pavement in Jano * A.A Date. 23.09.2016* T.S Date. Mandi 28.10.2016* Start Date 24.12.2016* 63 575 Chak Khurd & Kalan , Basi Khurd & Kalan, Channi Mast, 75.571 52.498 10.000 10.000 1.667 0 0% 52.498 69% Bahauddin Completion date 30.06.2019.* Work in Aado Sarwani. progress * A.A Date. 23.09.2016* T.S Date. Provision of Sewerage / Drainage / Pavement in Narang / Mandi 28.10.2016* Start Date 24.12.2016* 64 576 64.664 50.192 14.472 14.472 2.412 0 0% 50.192 78% Saadullaha Pur / Khoosor Bahauddin Completion date 30.06.2019.* Work in progress Provision of Sewerage / Drainage / Pavement in * A.A Date. 28.01.2015* T.S Date. Mandi 08.02.2015* Start Date 11.04.2015* 65 577 Sarlay,Lasoori Kalan,Duggal, Phalia (Incl. THQ 50.000 45.264 4.736 4.736 0.790 0.79 100% 46.054 92% Bahauddin Completion date 30.06.2019.* Work in Hospital), Tehsil Pahila progress. * A.A Date. 23.09.2016* T.S Date. Rural Sewerage / Drainage Scheme of Village Bherowal Mandi 28.10.2016* Start Date 24.12.2016* 66 578 73.499 27.500 15.000 15.000 2.500 2.5 100% 30.000 41% Tehsil Phalia Distt. Mandi Bahauddin Bahauddin Completion date 30.06.2019.* Work in progress * A.A Date. 23.09.2016* T.S Date. Rural Sewerage / Drainage Scheme of Village Khai and Mandi 28.10.2016 * Start Date 06.12.2016* 67 579 74.464 61.925 12.539 12.539 2.090 1.212 58% 63.137 85% Bukkan Tehsil & Distt. M.B. Din Bahauddin Completion date 30.06.2019.* Work in progress * A.A Date. 07.09.2015* T.S Date. Rural Sewerage / Drainage Scheme Village Kuthiala Mandi 10.09.2015* Start Date 17.12.2015* 68 580 55.150 45.575 9.575 9.575 1.596 1.596 100% 47.171 86% Sheikhan, Tehsil & District M.B. DIN Bahauddin Completion date 30.06.2019.* Work in progress * A.A Date. 23.09.2016* T.S Date. Rural Sewerage, Drainage/Soling & PCC Scheme in Chak Mandi 24.09.2016* Start Date 19.11.2016* 69 581 50.000 45.999 4.001 4.001 0.667 0.667 100% 46.666 93% No. 20 With Abadies Tehsil Malikwal Distt. M.B Din Bahauddin Completion date 30.06.2019.* Work in progress Rural Sewerage, Drainage/Soling & PCC Scheme in * A.A Date. 23.09.2016* T.S Date. Mandi 28.10.2016* Start Date 07.02.2017* 70 582 Villages Main Mandi Mona Depot Pind Makko Tehsil 53.052 45.166 7.886 7.886 1.315 0.855 65% 46.021 87% Bahauddin Completion date 30.06.2019* Work in Malilwal District M.B.Din progress * A.A Date. 07.09.2015* T.S Date. Rural Sewerage/Drainage scheme village Bosal, Tehsil Mandi 10.09.2015* Start Date 17.12.2015* 71 583 90.500 79.269 11.231 11.231 1.872 0 0% 79.269 88% Malikwal, District M.B. Din Bahauddin Completion date 30.06.2019.* Work in progress. * A.A Date. 23.09.2016* T.S Date. Sewerage Drainage Scheme UC Dhok Kasib Tehsil & Mandi 24.09.2016* Start Date 23.12.2016.* 72 584 20.000 19.501 0.499 0.499 0.083 0.083 100% 19.584 98% District M B Din Bahauddin Completion date 30.06.2019.* Work in progress * A.A Date. 23.09.2016* T.S Date. Sewerage & Drainage Scheme U.C Rasul Tehsil & District Mandi 24.09.2016* Start Date 21.12.2016.* 73 585 20.000 19.448 0.552 0.552 0.092 0.092 100% 19.540 98% M.B.Din. Bahauddin Completion date 30.06.2019.* Work in progress * A.A Date. 23.09.2016* T.S Date. Sewerage / Drainage of Village Rerka Mumdana, Tehsil Mandi 24.09.2016* Start Date 29.12.2016* 74 586 41.684 24.426 17.258 17.258 2.877 1.676 58% 26.102 63% Malikwal Bahauddin Completion date 28.12.2019.* Work in progress Provision of PCC / Soling / Nullah / Street Scheme at Jassor Wala Bashamula, Chak Gillan Sharki, Chak Gillan 75 587 50.000 20.000 5.000 5.000 0.834 0.588 71% 20.588 41% Work in progress. Magrabi, Pandorian, Muhammad Pura, Gega, Addowali, Rajjokay etc.,Teshil & District Sialkot Provision of PCC / Soling / Nullah / Street Scheme Roras, Bashamula Mango Behram , Pidian, Kot Bagaa, Chak 76 588 Maluk, Chak Janta, Dhana Wali Mehad Pur, Dadowali, Sialkot 60.000 20.000 5.000 5.000 0.834 0.597 72% 20.597 34% Work in progress. Manair etc., Tehsil , District Sialkot [LO16006879]. Provision of PCC Sewerage Schemes in UC Dhuda 77 589 Sialkot 40.000 20.000 10.000 10.000 1.667 1.333 80% 21.333 53% Work in progress. Goraya, MaloMahay, Bogray SEO KE District Sialkot 78 590 Const of Streets/drains & PCC in Village Partanwali Sialkot 60.000 13.500 5.000 5.000 0.834 0.687 82% 14.187 24% Work in progress. 79 591 Const of Streets/drains & PCC in Village Saidpur Kalan Sialkot 65.000 12.500 10.000 10.000 1.667 1.32 79% 13.820 21% Work in progress. Const. of Nullah from Sublime Chowk to Uggoki More to 80 592 Sialkot 394.111 269.991 50.000 50.000 8.334 8.334 100% 278.325 71% Work in progress. Bridge to Syphonof Nullah Aik, Sialkot 81 593 Const. of PCC Drains / Sewerage Sialkot Sialkot 90.000 63.000 10.000 10.000 1.667 1.222 73% 64.222 71% Work in progress. Construction of Brick Pavement PCC Street & Drain / 82 594 Nullah U.C Mundeke, , Baddokey Cheema, Sialkot 50.000 30.000 5.000 5.000 0.834 0.602 72% 30.602 61% Work in progress. Allomahar, , Tehsil District Sialkot

Date of A.A 25.01.2016, Date of T.S 30.01.2016, Date of Award 25.01.2017, Scheduled date of Completion on 30.06.2018, Construction of Drains, Soling / PCC and Sullage Carrier Date of Commencement, 25.01.2017, Funds 83 595 Sargodha 18.164 15.000 3.164 3.164 0.528 0 0% 15.000 83% of Ghughiat, District Sargodha released on 30.07.2018, Funds on-lined on 30.07.2018.Drain 9620 Rft & Sullage Carrier 112-Rft constructed, PCC 39477-Cft & Soling 37715-Cft laid. Work in progress

Construction of PCC / Drain in Dhera Sardha District 84 596 Sialkot 50.000 48.000 2.000 2.000 0.334 0.25 75% 48.250 97% Work in progress. Sialkot Construction of PCC Drain / Tuff Tile Ward No. 1 to 30 Daska Kalan, Daska Kot, U. C Galotian Kalan, 85 597 Ranganwala, Moseywala, Gaga, Ladhey Bhanbanwal, Sialkot 70.000 40.000 10.000 10.000 1.667 1.225 73% 41.225 59% Work in progress. Thatha, Sukhar Nahar & Bhadeywala, Daska City, District Sialkot. Construction of PCC Street Drain/ Nullah Providing and Laying of RCC Sewer and Tuff Tile U/C Water Works 86 598 Sialkot 24.400 15.000 9.400 9.400 1.567 1.119 71% 16.119 66% Work in progress. (Silver star road Mohallah Islamia Park) Tehsil & District Sialkot. Construction of PCC Street, Drain/ Nullah Providing and 87 599 Laying of RCC Sewer and Tuff Tile U/C Duburj Arraian Sialkot 29.500 20.000 9.500 9.500 1.584 1.321 83% 21.321 72% Work in progress. (Moh. Baba Bari, Habib pura) Tehsil & District Sialkot Construction of PCC Street, Drain/ Nullah Providing and 88 600 Laying of RCC Sewer and Tuff Tile U/C Muhammad pura Sialkot 28.600 20.000 8.600 8.600 1.434 1.12 78% 21.120 74% Work in progress. (Nishat park) Tehsil & District Sialkot Construction of PCC Street, Drain/ Nullah Providing and 89 601 Laying of RCC Sewer and Tuff Tile U/C Water Works Sialkot 25.500 20.000 5.500 5.500 0.917 0.68 74% 20.680 81% Work in progress. (Moh. Pak pura) Tehsil & District Sialkot Construction of PCC, Solling & Drain / Nullah UCs Head Marala, Machrala, Gondal, Bolwanwala , Pindi Punjorian, 90 602 Sialkot 150.000 33.600 10.000 10.000 1.667 1.369 82% 34.969 23% Work in progress. Kaman Wala Kundan pur, Dallowali, Katchi Maund, Pholkin, Wadhgran Tehsil Sialkot Construction of RCC Sewer & RCC from Zohara Memorial Hospital Chowk to Railway Crossing to Ajmal Garden to 91 603 Sialkot 175.320 42.108 20.000 20.000 3.334 2.458 74% 44.566 25% Work in progress. Shetab Garha to Adalat Pur road to Nullah Aik, Tehsil & District Sialkot Construction of Sewerage and Drainage Scheme Village 92 604 Sialkot 30.000 25.000 5.000 5.000 0.834 0.6 72% 25.600 85% Work in progress. Kapooro Wali Tehsil & District Sialkot Providing & Laying of RCC Sewer, Tuff Tile and Construction of Disposal Station Mohallah Water Works to 93 605 Sialkot 50.000 20.000 15.000 15.000 2.500 1.82 73% 21.820 44% Work in progress. Abbot Road Phatak and along the Railway line to Dara Arrian U/C Water Works, Tehsil & District Sialkot Providing & Laying of RCC Sewer, Tuff Tile and Construction of Disposal Station Nasir Road Prem Nagar 94 606 Sialkot 50.000 20.000 15.000 15.000 2.500 1.893 76% 21.893 44% Work in progress. Road EIC School to Nullah Bhed U/C Model Town, Tehsil & District Sialkot Providing and Laying of Tuff Tile RCC Sewer and Construction of Drain / Nullah Mohallah Kashmiri Sarray 95 607 Sialkot 32.000 26.000 6.000 6.000 1.000 0.712 71% 26.712 83% Work in progress. Bhabrian Alamgir Bazar Nikhas U/C. Imam Sahib Tehsil & District Sialkot Providing and Laying Tuff Tile RCC Sewer and Construction of Drain /Nullah Mohallah Shahab Pura Bajli 96 608 Sialkot 35.000 31.000 4.000 4.000 0.667 0.52 78% 31.520 90% Work in progress. Mohallah Darbar Shahab Shah U/C. Shahab pura Tehsil & District Sialkot Provision of PCC / Soling / Nallain /Streets at Baigo wali bsmulla kot marth ,kot muhmmad hussain ,pipli wala 97 609 , adda ,bhola musa kotli bawarian, kot kuda yar Sialkot 80.000 34.497 10.000 10.000 1.667 1.347 81% 35.844 45% Work in progress. ,kot qadar daad ,randeer ,bagrian ,chak kupa ,gulab garh, doburji chanda sing ,chowkey ,r Provision of PCC / Soling / Nallain /Streets Schemes at Malkhanwala Bshmula Wan, Pasia, Firdospur, Bangla Nai 98 610 Abadi, Chak Bassawa, Dhop Sari, Hameed Colony, Sialkot 80.000 34.497 10.000 10.000 1.667 1.32 79% 35.817 45% Work in progress. Mehlowal, Abdullah abad, Dera Roshan Gujjar, Amreekh pura District Sialkot Provision of PCC / Soling / Nullah / Street Scheme at Khambranwala Bashamula, Dogree, Gorian, Sundar Pur, 99 611 Sialkot 60.000 20.000 10.000 10.000 1.667 1.228 74% 21.228 35% Work in progress. Bidar, Chak Simanwali etc., Tehsil Sambrial, District Sialkot [LO160068845]. Provision of PCC / Soling / Nullah / Street Scheme at 100 612 Bakhray Wali Bashamula, Dogranwala, Kathiala, Habibpur Sialkot 55.000 20.000 5.000 5.000 0.834 0.689 83% 20.689 38% Work in progress. etc., Tehsil Sambrial, District Sialkot [LO16006884]. Provision of PCC / Soling / Nullah / Street Scheme at Kulowal Bashamula , Aurtala Sharif, Chak Mughal , Tika , 101 613 Sialkot 100.000 20.000 10.000 10.000 1.667 1.347 81% 21.347 21% Work in progress. Tambray, Gaghar. Baseer, Jay, Ditowali, Chanigondal, etc., Tehsil Sambrial, District Sialkot Provision of PCC / Soling / Nullah / Street Scheme at Bashamula, Handlapur, Korpur, Nawan Pind, 102 614 Nangal, Ghiti Shekan, Kansarour, Tibbi, Arrian, Sialkot 200.000 20.000 10.000 10.000 1.667 1.288 77% 21.288 11% Work in progress. Saleempur, Malkay, Kalan, Malkay Khurd, Olkh Awana etc., Tehsil & District Sialkot [LO16006880]. Provision of PCC / Soling / Nullah / Street Scheme at Kapurwali, Bashamula Ajjowali, Basant Pur, Dagaray, 103 615 Malo Chak , Jorian Khurd / Kalan , Sukhnian, Bhindar, Sialkot 70.000 20.000 10.000 10.000 1.667 1.248 75% 21.248 30% Work in progress. Olakh, Saidpur, Jatta,Dusri,Kala Ghumna,Khambranwala, Kansar Pur, Canday Wali etc., Tehsil & D Provision of PCC / Soling / Nullah / Street Scheme at Jaithi Kay Bashaula, Joluki, Maja Khurd, Haddokay, Kot 104 616 Deena, Tibbi Inayat Shah, Deera Tibbi Inayat Shah, Deera Sialkot 50.000 20.000 10.000 10.000 1.667 1.266 76% 21.266 43% Work in progress. Tarraran, Dra Gujjran, Dera Arrian, Karan Wali etc.,Teshil & District Sialkot Provision of PCC/Soling /Nalian/Streets Schemes at Bohalwala Bashamula Chak Kheena, Kotli Nonaan, Kotli 105 617 Sialkot 80.000 50.000 10.000 10.000 1.667 1.223 73% 51.223 64% Work in progress. Nonaan, Dot Dharan Baddoke Cheema, Kot Bhagat, Jalianwala Ahmadabad District Sialkot Provision of PCC/Soling/nalian/Streets Scehmes at Majra kalan, Chak Ekhtiar, Dingowal, Mahiwal, rakh noshra 106 618 ,kothy pardansing (islambad)khothay chistian ,Dorarbe Sialkot 90.000 65.000 10.000 10.000 1.667 1.314 79% 66.314 74% Work in progress. Malianwala Jattan & Arrian, Pano attari Hussain Pur, Jamal Pur District Sialkot Provision of PCC/Soling/Nalian/Streets Schemes at Barath 107 619 Bhoth Bashamula Markiwal, Khorta Syedan, Ballanwala, Sialkot 50.000 30.000 5.000 5.000 0.834 0.668 80% 30.668 61% Work in progress. Machi Khokhar, Gul Bahar Khurd, Gul Bahar Kalan Provision of PCC/Soling/Nalian/Streets Schemes at 108 620 Chaprar Bashamula Punowal, Najwal, Parwal, Sagarpu, Sialkot 55.000 30.000 10.000 10.000 1.667 1.388 83% 31.388 57% Work in progress. Medhi pur, Bagh pur, Sagri pur etc Provision of PCC/Soling/Nalian/Streets Schemes at Gojra Bashamula Thatha Lathi, Qila Tek Singh, Bhonawali, 109 621 Sialkot 50.000 20.000 10.000 10.000 1.667 1.31 79% 21.310 43% Work in progress. Phangat, Dheera Sanda, Islam pura, Kotli wala, Kandan Sian Provision of PCC/Soling/Nalian/Streets Schemes at 110 622 Sialkot 75.000 50.000 10.000 10.000 1.667 1.301 78% 51.301 68% Work in progress. Mandran Wala Bashamula Adamkay Cheema, Nai Abadi,

Provision of PCC/Soling/Nalian/Streets Schemes at 111 623 Saidowali Bashamula Hambokay, Kot Mahraj, Merian Sialkot 70.000 30.000 10.000 10.000 1.667 1.389 83% 31.389 45% Work in progress. Pindi, Lalaywali, Easa pur, Khorray, Suraj, Chak Hana etc Provision of PCC/Soling/Nalian/Streets Schemes at 112 624 Shahuwala Bashamula Balo Chak, Nashtar Abad, Sialkot 28.000 20.000 8.000 8.000 1.334 0.987 74% 20.987 75% Work in progress. Zafarwali, Kamalpur, Manpur etc. Provision of PCC/Soling/nalian/Streets Schemes at Sheeni 113 625 Bashamula Chaila, bjola, Muljhan, Sagar, punwal ratwal Sialkot 90.000 72.900 10.000 10.000 1.667 1.214 73% 74.114 82% Work in progress. ,chogpur District Sialkot Provision of PCC/Soling/Nalian/Streets Schemes at Verowala Bashamula Wassankay, Magokaman, Nandpur, 114 626 Sialkot 50.000 20.000 10.000 10.000 1.667 1.219 73% 21.219 42% Work in progress. Baryar, Wan Garthal Umarkey Kalan, Umarkey Khurd, Ahmad abad, Veeramkay etc Provision of Sewerage & PCC Schemes in Pero Chak, 115 627 Sialkot 40.000 20.000 5.000 5.000 0.834 0.688 82% 20.688 52% Work in progress. Sego Wala, Adha Kanwamlit District Sialkot Provision of Sewerage & PCC Schemes UC Jharah Wala 116 628 Sialkot 40.000 20.000 5.000 5.000 0.834 0.62 74% 20.620 52% Work in progress. Salhoke, Bharlham Wala Provision of Sewerage / Drainage Scheme at UC Dhodha 117 629 Sialkot 95.020 90.000 5.020 5.020 0.837 0.602 72% 90.602 95% Work in progress. Tehsil District Sialkot Provision of Sewerage and Tuff Tile in Various UCs of District Sialkot, UCs, kotli Behram, Mubarik pura, Miana 118 630 pura, Model Town, Fateh Garh, Muzafar pur, Haji pura, Sialkot 120.000 75.000 10.000 10.000 1.667 1.32 79% 76.320 64% Work in progress. Ban, Haji pura-II, Imam Sahib, Shahab pura, Pacca Garha, Hamza Ghous. Sanitation Schemes in UCs, Gadgore, Khanawali, Alhar, 119 631 Sialkot 40.000 26.000 14.000 14.000 2.334 1.689 72% 27.689 69% Work in progress. Jassoran, Baddiana and , Tehsil Pasrur

Construction of Nalian, Soling, PCC & Boundary Walls of Graveyard in UCs Nallah, Bua, Melo Salo, Kalah, A.A. dated 23.9.2016.T.S. dated 120 632 Mainagty, Bara Manga, Kot Naina, Bahree, Ikhras Pur, Narowal 85.000 46.000 10.000 10.000 1.667 1.417 85% 47.417 56% 24.9.2016.Start Date 16.11.2016*Completion Jalala, Sujowal, Pehgwari, Pur, Fateh Pur Afghana, date 30.05.2019.Work in progress. Sahari, Ghona, Ghumtala, Kanjror, Lang

A.A. dated 23.09.2016 T.S. dated 24.09.2016 121 633 Drainage / PCC scheme for village Gorala Maanpur Narowal 50.000 34.963 10.000 10.000 1.667 1.503 90% 36.466 73% *Start Date 16.11.2016*Completion date 30.06.2019.work in progress.

PCC , Soling and Drainage Scheme in Village Babral, A.A. dated 23.09.2016 T.S. dated 24.09.2016 122 634 Narowal 41.395 25.000 10.000 10.000 1.667 1.383 83% 26.383 64% *Start Date 16.11.2016*Completion date Kallah, Mahlo, Sahlo,Tehsil Shakargarh, District Narowal 30.06.2019.work in progress.

A.A. dated 03.05.2014 T.S. dated 23.05.2014 123 635 Sewerage scheme for Ghaziwal, Narowal. Narowal 34.648 33.514 1.134 1.134 0.189 0.143 76% 33.657 97% *Start Date 18.09.2014*Completion date 30.06.2019.work in progress.

A.A. dated 07.08.2017 T.S. dated 08.08.2017 124 636 Urban / Sewerage / PCC & Tuff Tile Scheme Narowal City Narowal 174.705 54.996 20.000 20.000 3.334 3.154 95% 58.150 33% *Start Date 28.09.2017*Completion date 30.06.2019.work in progress. Physically scheme is completed, balance 125 637 Construction of PCC and Drainage at Adda Talaab Saral 30.140 28.317 1.823 1.823 0.304 0.033 11% 28.350 94% funds are required to clear the contractor's liability. 126 638 Construction of PCC and Drainage at Chung Lahore 128.380 69.005 10.000 10.000 1.667 1.336 80% 70.341 55% Work is in progress 127 639 Construction of PCC and Drainage at Khurd Pur Lahore 74.249 28.909 10.000 10.000 1.667 1.643 99% 30.552 41% Work is in progress 128 640 Construction of PCC and Drainage at Manga Mandi Lahore 199.606 43.000 15.000 15.000 2.500 0.749 30% 43.749 22% Work is in progress 129 641 Construction of PCC and Drainage at Mohlanwal Lahore 52.966 52.184 0.782 0.782 0.131 0.01 8% 52.194 99% Scheme completed Construction of PCC and Nallah from Hadyara Drain to 130 642 Lahore 29.345 18.613 10.732 10.732 1.789 0 0% 18.613 63% Work is in progress Dulam Village Construction of PCC Sewerage & Drainage System at UC 131 643 Lahore 30.000 12.371 17.629 17.629 2.938 0 0% 12.371 41% Work is in progress 260 Maraka, District Lahore Construction of PCC Sewerage & Drainage System at UC 132 644 Lahore 30.000 18.500 11.500 11.500 1.917 0 0% 18.500 62% Work is in progress 262 Shamke Bhattian, District Lahore Construction of PCC Sewerage & Drainage System at UC 133 645 Lahore 30.000 14.521 15.479 15.479 2.580 2.55 99% 17.071 57% Work is in progress 267 Manak, District Lahore 134 646 Disposal of Waste Water of Manga Mandi upto River Ravi Lahore 161.107 125.653 20.000 20.000 3.334 0.055 2% 125.708 78% Work is in progress

PCC and Drainage Scheme in Khananapal Kangra Karyal Physically scheme is completed, balance 135 647 Lahore 83.175 72.510 10.665 10.665 1.778 0.229 13% 72.739 87% funds are required to clear the contractor's Dhoondy liability. PCC and Drainage Scheme in Nanghar Katcha Tibba 136 648 Lahore 93.775 81.140 12.635 12.635 2.106 0.237 11% 81.377 87% Scheme completed Katcha Islampura Halloki Sadhuke PCC and Drainage Scheme in UC 145 Gajjumatta and Physically scheme is completed, balance 137 649 Lahore 200.014 185.659 14.355 14.355 2.393 2.369 99% 188.028 94% funds are required to clear the contractor's Adjoining Abadies. liability. 138 650 PCC and Drainage Scheme in UC 176 at Awan Dhaiwa Lahore 70.128 43.918 26.210 26.210 4.369 4.345 99% 48.263 69% work is in progress 139 651 PCC and Drainage Scheme in UC 179 at Bhaseen Lahore 90.000 68.014 21.986 21.986 3.665 0.111 3% 68.125 76% Work is in progress. 140 652 PCC and Drainage Scheme in UC 180 at Minhala Lahore 155.697 50.000 15.000 15.000 2.500 0.103 4% 50.103 32% Work is in progress. Physically scheme is completed, balance 141 653 PCC and Drainage Scheme in UC 181 at Narwar Lahore 45.000 43.000 2.000 2.000 0.334 0.31 93% 43.310 96% funds are required to clear the contractor's liability. PCC and Drainage Scheme in UC 182 at Jallo More & 142 654 Lahore 56.817 31.062 25.755 25.755 4.293 0.119 3% 31.181 55% Work is in progress. Batapur Lahore 143 655 PCC and Drainage Scheme in UC 190 at Hadiara Lahore 162.606 50.000 15.000 15.000 2.500 2.475 99% 52.475 32% Work is in progress. 144 656 PCC and Drainage Scheme in UC 194 at Liddhar Lahore 101.739 59.572 20.000 20.000 3.334 1.67 50% 61.242 60% Work is in progress. Physically scheme is completed, balance 145 657 PCC and Drainage Scheme in UC 195 at Hair Lahore 120.468 104.533 15.935 15.935 2.656 2.579 97% 107.112 89% funds are required to clear the contractor's liability. Physically scheme is completed, balance 146 658 PCC and Drainage Scheme in UC 197 at Dhalloki Lahore 100.082 91.500 8.582 8.582 1.431 0.137 10% 91.637 92% funds are required to clear the contractor's liability. PCC and Drainage Scheme in UC 243 at attari Saroba 147 659 Lahore 130.989 90.510 20.000 20.000 3.334 3.318 100% 93.828 72% Work is in progress Pind 148 660 PCC and Drainage Scheme in UC 247 at Kahna Kohna Lahore 201.357 130.000 20.000 20.000 3.334 3.291 99% 133.291 66% Work is in progress PCC and Drainage Scheme in UC 248 at Shehzada and 149 661 Lahore 151.603 130.000 21.603 21.603 3.601 0.229 6% 130.229 86% Work is in progress Pura Kahna Physically scheme is completed, balance 150 662 PCC and Drainage Scheme in UC 249 at Kamahan Lahore 80.384 70.070 10.314 10.314 1.719 0.229 13% 70.299 87% funds are required to clear the contractor's liability. Physically scheme is completed, balance 151 663 PCC and Drainage Scheme in UC 252 at Pandoki Lahore 113.315 106.999 6.316 6.316 1.053 0.229 22% 107.228 95% funds are required to clear the contractor's liability. 152 664 PCC and Drainage Scheme in UC 253 at Suraich Lahore 120.660 96.245 24.415 24.415 4.069 3.958 97% 100.203 83% work is in progress PCC and Drainage Scheme in UC 254 Deo Khurd and 153 665 Lahore 102.533 89.973 12.560 12.560 2.094 1.496 71% 91.469 89% Work is in progress Kalan 154 666 PCC and Drainage Scheme in UC 268 at Judho Dheer Lahore 102.003 90.000 12.003 12.003 2.001 0.229 11% 90.229 88% Work is in progress PCC and Drainage Scheme in UC 271 at Jia Bhagga and 155 667 Lahore 103.300 100.042 3.258 3.258 0.543 0.543 100% 100.585 97% scheme completed RO Plant at Jia Bhagga Physically scheme is completed, balance 156 668 PCC and Drainage Scheme in UC191 at Gawind Lahore 100.000 92.500 7.500 7.500 1.250 1.225 98% 93.725 94% funds are required to clear the contractor's liability. Provision of Sanitation Facilities including Construction of 157 669 Lahore 94.210 81.449 12.761 12.761 2.127 2.021 95% 83.470 89% work is in progress Lift Station at Tahayat & Chandrai Village, Lahore

158 670 Rural Drainage Scheme Kamahan & Adjoining Abadies Lahore 143.277 127.866 15.411 15.411 2.569 0 0% 127.866 89% work is in progress Up Gradation of Streets PCC Flooring in Asif Town I & II 159 671 Lahore 150.678 91.361 20.000 20.000 3.334 2.86 86% 94.221 63% Work is in progress Galaxo Town and Adjoining abadies 160 672 Provision of PCC and draniage at Manawala Sheikhupura 30.000 20.000 10.000 10.000 1.667 1 60% 21.000 70% Work in Progress Balance work of Sewerage, water Supply and PCC 161 673 Scheme Town Committtee Kot Abdul Malik, District Sheikhupura 195.462 167.941 10.000 10.000 1.667 1.667 100% 169.608 87% Work in Progress Sheikhupura Const and Rehabilitation of PCC Sewerage Scheme of 162 674 Sheikhupura 95.313 41.645 10.000 10.000 1.667 1 60% 42.645 45% Work in Progress Ravi Rayan Mannu Abad and Nazar Abad (Revised) Const. and Rehabilitation of PCC / Sewerage Scheme of 163 675 Sheikhupura 96.536 61.500 15.000 15.000 2.500 2 80% 63.500 66% Work in Progress City , District Sheikhupura (Revised) Construction of Drainage & PCC Scheme at Mariam Abad 164 676 Sheikhupura 25.000 20.000 5.000 5.000 0.834 0.834 100% 20.834 83% Work in Progress District Sheikhupura Construction of Drainage & PCC Scheme at Mian Ali 165 677 Sheikhupura 30.000 20.000 10.000 10.000 1.667 1 60% 21.000 70% Work in Progress Dogran District Sheikhupura Construction of Drainage /PCC/Soling Scheme at 166 678 Sheikhupura 125.450 49.596 10.000 10.000 1.667 1 60% 50.596 40% Work in Progress Khanqah Dogran Safdarabad Construction of PCC Tuff Tiles Sewerage Drainage 167 679 Sheikhupura 373.950 131.468 10.000 10.000 1.667 1.667 100% 133.135 36% Work in Progress Scheme in PP 163 District Sheikhupura Construction of PCC, Drain/Soling & Nullah at UC 75, 168 680 Sheikhupura 46.000 14.046 10.000 10.000 1.667 1 60% 15.046 33% Work in Progress Kakar Gill, District Sheikhupura Construction of PCC, Drain/Soling & Nullah at UC 77, 169 681 Sheikhupura 76.000 20.000 10.000 10.000 1.667 1 60% 21.000 28% Work in Progress Ajnianwala, District Sheikhupura Construction of PCC, Drain/Soling & Nullah at UC 83, 170 682 Sheikhupura 57.000 18.000 10.000 10.000 1.667 1.667 100% 19.667 35% Work in Progress Jatri Kohna, District Sheikhupura Construction of PCC, Drain/Soling & Nullah at UC 84, 171 683 Sheikhupura 58.000 27.000 10.000 10.000 1.667 1.667 100% 28.667 49% Work in Progress Makki 460, District Sheikhupura Construction of PCC, Drain/Soling & Nullah at UC 85, 172 684 Sheikhupura 40.000 15.000 10.000 10.000 1.667 1 60% 16.000 40% Work in Progress Farooqabad, District Sheikhupura Construction of PCC, Drains, Soling in District 173 685 Sheikhupura 100.000 30.000 10.000 10.000 1.667 1 60% 31.000 31% Work in Progress Sheikhupura Construction of Soling / Sewerage & Drainage Scheme at UC Anjianwala, UC Jhabran, UC Kakar Gill, UC Gujiana Nau, UC Kot Sohnda, UC Esserkay, UC Bahalikay, UC 174 686 Sheikhupura 100.000 20.000 10.000 10.000 1.667 1 60% 21.000 21% Work in Progress Jatri Kohna, UC 85Farooqabad, UC Ghazi Minara, UC Buttar, UC Jhandian Wali, UC Warn, UC Kalokay

175 687 RSD Scheme Faizpur Khurd District Sheikhupura Sheikhupura 40.000 16.500 10.000 10.000 1.667 1 60% 17.500 44% Work in Progress Rural drainage & Const of streets scheme UC Khan pur 176 688 Sheikhupura 134.768 81.863 10.000 10.000 1.667 1 60% 82.863 61% Work in Progress Sheikhupura Rural drainage & Const of streets scheme UC Mandialy 177 689 Sheikhupura 196.571 57.986 10.000 10.000 1.667 0.8 48% 58.786 30% Work in Progress Sheikhupura (Revised) Rural drainage & Const of streets scheme UC Qila Sattar 178 690 Sheikhupura 182.244 72.431 10.000 10.000 1.667 1.667 100% 74.098 41% Work in Progress Shah Sheikhupura (Revised) Rural drainage & Const of streets scheme Zia abad 179 691 Sheikhupura 177.038 52.071 10.000 10.000 1.667 0.85 51% 52.921 30% Work in Progress Sheikhupura (Revised) 180 692 Rural Drainage & PCC Scheme U.C. Ajnianwala Sheikhupura 75.000 25.595 15.000 15.000 2.500 1.5 60% 27.095 36% Work in Progress 181 693 Rural Drainage & PCC Scheme U.C. Buttar Sheikhupura 57.000 39.000 5.000 5.000 0.834 0.834 100% 39.834 70% Work in Progress 182 694 Rural Drainage & PCC Scheme U.C. Easerkey Sheikhupura 38.000 30.000 8.000 8.000 1.334 0.55 41% 30.550 80% Work in Progress Rural Drainage & PCC Scheme U.C. Gujiana Nu District 183 695 Sheikhupura 55.000 11.629 10.000 10.000 1.667 1 60% 12.629 23% Work in Progress Sheikhupura 184 696 Rural Drainage & PCC Scheme U.C. Harchand Sheikhupura 35.000 28.000 7.000 7.000 1.167 0.85 73% 28.850 82% Work in Progress 185 697 Rural Drainage & PCC Scheme U.C. Keelay Sheikhupura 48.000 20.000 5.000 5.000 0.834 0.834 100% 20.834 43% Work in Progress 186 698 Rural Drainage & PCC Scheme U.C. Kot Sonda Sheikhupura 45.000 24.000 10.000 10.000 1.667 1.667 100% 25.667 57% Work in Progress 187 699 Rural Drainage & PCC Scheme U.C. Muridke Sheikhupura 45.000 11.190 10.000 10.000 1.667 1 60% 12.190 27% Work in Progress 188 700 Rural Drainage & PCC Scheme U.C. Nookhar Sheikhupura 45.000 26.600 5.000 5.000 0.834 0.834 100% 27.434 61% Work in Progress 189 701 Rural Drainage & PCC Scheme U.C. Sacha Souda Sheikhupura 78.000 24.000 10.000 10.000 1.667 1 60% 25.000 32% Work in Progress 190 702 Rural Drainage & PCC Scheme UC Bhaianwala Sheikhupura 25.000 10.425 14.575 14.575 2.429 1.5 62% 11.925 48% Work in Progress 191 703 Rural Drainage & PCC Scheme UC Ghang Sheikhupura 20.000 16.000 4.000 4.000 0.667 0.667 100% 16.667 83% Work in Progress 192 704 Rural Drainage & PCC Scheme UC Mojoki Sheikhupura 28.000 23.000 5.000 5.000 0.834 0.834 100% 23.834 85% Work in Progress 193 705 Rural Drainage & PCC Scheme UC Warn Sheikhupura 25.000 10.510 14.490 14.490 2.415 1.5 62% 12.010 48% Work in Progress Rural Drainage & PCC scheme Union Council Burj attari, 194 706 Sheikhupura 99.509 30.000 10.000 10.000 1.667 1 60% 31.000 31% Work in Progress District Sheikhupura Rural Drainage & PCC scheme Union Council Kot 195 707 Sheikhupura 91.385 30.000 10.000 10.000 1.667 1.667 100% 31.667 35% Work in Progress Mehmood, District Sheikhupura Rural Drainage Construction of Street Scheme Chak No 196 708 Sheikhupura 199.486 74.950 10.000 10.000 1.667 1.5 90% 76.450 38% Work in Progress 44,45 and Village Jair District Sheikhupura Rural Drainage Construction Of Street Scheme Dograi Gill 197 709 Sheikhupura 195.462 125.646 10.000 10.000 1.667 1 60% 126.646 65% Work in Progress Qadeem Dograi Gill District Sheikhupura Rural Drainage PCC Scheme UC Dhamkey Sheikhupura 198 710 Sheikhupura 199.308 88.690 10.000 10.000 1.667 1.667 100% 90.357 45% Work in Progress Ferozwala Rural Drainage PCC Scheme UC Mahmood Kot, 199 711 Sheikhupura 180.146 78.279 10.000 10.000 1.667 1.667 100% 79.946 44% Work in Progress Sheikhupura , Sharqpur (Revised) Rural Drainage PCC Scheme UC Mandain Wala 200 712 Sheikhupura 191.008 106.870 10.000 10.000 1.667 1.667 100% 108.537 57% Work in Progress Sheikhupura , Sharqpur (Revised) Rural Drainage PCC Scheme UC Mhar Bhanguwan District 201 713 Sheikhupura 95.862 83.000 12.862 12.862 2.144 1 47% 84.000 88% Work in Progress Sheikhupura Rural Drainage PCC Scheme UC Quershian Sheikhupura , 202 714 Sheikhupura 87.395 66.200 10.000 10.000 1.667 0.5 30% 66.700 76% Work in Progress Sharqpur (Revised) Rural Drainage PCC Scheme, UC Sehjowal District 203 715 Sheikhupura 93.090 74.136 10.000 10.000 1.667 1.5 90% 75.636 81% Work in Progress Sheikhupura (Revised) Rural Drainage PCC Scheme, Wandala Dial Shah UC 24 204 716 Sheikhupura 144.546 142.456 2.090 2.090 0.349 0.349 100% 142.805 99% Work in Progress District Sheikhupura (Revised) Rural Drainage PCC Tuff Tile Scheme UC Sharqpur, 205 717 Sheikhupura 97.335 72.267 10.000 10.000 1.667 1.667 100% 73.934 76% Work in Progress Sheikhupura 206 718 Rural drainage scheme at UC Bhadro District Sheikhupura Sheikhupura 15.110 13.100 2.010 2.010 0.335 0 0% 13.100 87% Work in Progress 207 719 Rural Drainage Scheme Chak No 8/RB Sheikhupura Sheikhupura 75.000 17.987 10.000 10.000 1.667 1 60% 18.987 25% Work in Progress Rural Drainage Scheme Faizpur Khurd IIc abadis, Tehsil 208 720 Sheikhupura 152.400 74.217 10.000 10.000 1.667 1 60% 75.217 49% Work in Progress Ferozewala 209 721 Rural Drainage Scheme UC Chapa Minera Sheikhupura Sheikhupura 87.910 54.975 10.000 10.000 1.667 0.85 51% 55.825 64% Work in Progress

210 722 Rural Drainage Scheme UC Chichoki Malian Sheikhupura Sheikhupura 85.423 48.694 10.000 10.000 1.667 0.86 52% 49.554 58% Work in Progress 211 723 Rural Drainage Scheme UC Jahamke Sheikhupura Sheikhupura 94.134 54.999 10.000 10.000 1.667 1.667 100% 56.666 60% Work in Progress 212 724 Rural Drainage Scheme UC Mallian Kalan Sheikhupura Sheikhupura 92.869 50.900 10.000 10.000 1.667 1.667 100% 52.567 57% Work in Progress Rural Drainage/PCC Scheme at Moran Wala District 213 725 Sheikhupura 90.000 80.000 2.000 2.000 0.334 0.334 100% 80.334 89% Work in Progress Sheikhupura Rural PCC & Drainage Scheme, UC Bhaiwala Kalan, 214 726 Sheikhupura 29.000 22.000 7.000 7.000 1.167 1.167 100% 23.167 80% Work in Progress District Sheikhupura. Rural Sewerage Drainage System at Village Kot Pindi Das 215 727 Sheikhupura 199.993 185.231 14.762 14.762 2.461 0.65 26% 185.881 93% Work in Progress Tehsil Ferozewala, Distt. Sheikhupura (Revised) Construction of PCC, Drain/Soling & Nullah at UC-97, Nankana 216 728 15.000 11.509 3.491 3.491 0.582 0.3 52% 11.809 79% Work in Progress Ferozwatuan-I, District Sahib Construction of PCC, Drain/Soling & Nullah at UC-98, Nankana 217 729 15.000 8.138 6.862 6.862 1.144 0.45 39% 8.588 57% Work in Progress Ferozwatuan-II, District Nankana Sahib Sahib Nankana 218 730 Construction of Sewerage and PCC at Bucheki Town. 195.998 164.682 10.000 10.000 1.667 0 0% 164.682 84% Work is in progress. Sahib Provision of Rural Drainage / PCC Scheme for 16 Nos. of Nankana 219 731 50.000 32.599 10.000 10.000 1.667 0 0% 32.599 65% Work is in progress. Union Councils in , District Sheikhupura Sahib Provision of Sewerage System at Warburton Town Nankana 220 732 130.000 61.000 10.000 10.000 1.667 0 0% 61.000 47% Work is in progress. Nankana Sahib. Sahib Const. of Soling Nullah, PCC etc. Union Council 221 733 30.000 27.992 2.008 2.008 0.335 0.22 66% 28.212 94% Work in Progress Chirrawan, Tehsil & District Kasur Const. of Soling, Nullah PCC etc. Badian, Rai Kalan, 222 734 Kasur 30.000 24.992 5.008 5.008 0.835 0.4 48% 25.392 85% Work in Progress Khurd, Baddar Pur and adjoining abadies, Tehsil Kasur Const. of Soling, Nullah, PCC etc. Katlohi, Wadara and 223 735 Kasur 30.000 25.000 5.000 5.000 0.834 0.81 97% 25.810 86% Work in Progress adjoining abadies, Tehsil & District Kasur Construction of PCC and Tuff Tile Phoolnagar Phase-II, 224 736 Kasur 188.416 115.300 30.000 30.000 5.000 3.34 67% 118.640 63% Work in Progress Tehsil , District Kasur Construction of Sullage Carrier at Chah Kalalanwala, 225 737 Kasur 88.300 36.983 20.000 20.000 3.334 3.3 99% 40.283 46% Work in Progress Tehsil Pattoki, District Kasur PCC and drainage scheme Thieng More /Illah abad, Tehsil 226 738 Kasur 256.672 89.996 20.000 20.000 3.334 3.334 100% 93.330 36% Work in Progress , District Kasur Rural Drainage & PCC Scheme Bhamba Kalan & Khurd 227 739 Kasur 95.000 77.499 17.501 17.501 2.917 2.04 70% 79.539 84% Work in Progress and Adjoining Abadies District Kasur. Rural Drainage & PCC Scheme Bohar and Adjoining 228 740 Kasur 81.000 62.484 18.516 18.516 3.086 1.965 64% 64.449 80% Work in Progress Abadies District Kasur. 229 741 Rural Drainage & PCC Scheme Mudke UC District Kasur. Kasur 97.014 64.996 20.000 20.000 3.334 2.506 75% 67.502 70% Work in Progress Rural Drainage PCC Brick pavement Schemes Rao Khan 230 742 wala and Beroon Rao Khan Wala and Adjoining Abadies Kasur 77.000 34.998 25.000 25.000 4.167 2.699 65% 37.697 49% Work in Progress Tehsil & District Kasur 231 743 Rural Drainage PCC Scheme Dholan District Kasur. Kasur 114.588 99.662 14.926 14.926 2.488 1.19 48% 100.852 88% Work in Progress Rural Drainage PCC Scheme Theh Shaikham and 232 744 Kasur 97.400 90.288 7.112 7.112 1.186 1.15 97% 91.438 94% Work in Progress Adjoining Abadies District Kasur. Rural Drainage Scheme Baroon & Adjoining 233 745 Kasur 99.998 74.705 10.000 10.000 1.667 1.633 98% 76.338 76% Work in Progress Abadies, Tehsil & District Kasur. Rural drainage Scheme Hanjray Kalan & Allied Abadies, 234 746 , Bhaseen, Dello Multani, Wander, Jagu Wal Kasur 67.952 50.000 17.952 17.952 2.992 1.37 46% 51.370 76% Work in Progress Tehsil Pattoki District Kasur 235 747 Rural drainage scheme Hardo Sahari, District Kasur Kasur 87.235 57.098 10.000 10.000 3.167 3.101 98% 60.199 69% Work in Progress 236 748 Rural Drainage Scheme Qadiwind Kasur 99.677 59.500 15.000 15.000 2.500 2.45 98% 61.950 62% Work in Progress Rural Drainage Scheme Sarhali Kalan & Adjoining 237 749 Kasur 94.174 66.984 27.190 27.190 4.532 2.18 48% 69.164 73% Work in Progress Abadies, Tehsil & District Kasur. Rural Drainage Scheme, Lakhankey, Tehsil & District 238 750 Kasur 76.899 67.976 8.923 8.923 1.487 0.725 49% 68.701 89% Work in Progress Kasur. Rural PCC & Drainage Scheme Green Kot and 239 751 Kasur 75.000 64.971 10.029 10.029 1.672 0.63 38% 65.601 87% Work in Progress Ibrahimabad & Adjoining Abadies District Kasur. Rural PCC & Drainage Scheme Handal and Rawal 240 752 Kasur 69.000 60.776 8.224 8.224 0.000 0 #DIV/0! 60.776 88% Work in Progress Jhangar & adjoining abadies District Kasur. Rural PCC & Drainage Scheme Khara and Wadana & 241 753 Kasur 50.000 39.411 10.589 10.589 1.765 0.658 37% 40.069 80% Work in Progress adjoining abadies District Kasur. Rural PCC & Drainage Scheme Ramthaman and Matta & 242 754 Kasur 74.724 65.000 9.724 9.724 0.000 0 #DIV/0! 65.000 87% Work in Progress adjoining abadies District Kasur. Rural PCC & Drainage Scheme Zafarkey and Ghanikey & 243 755 Kasur 50.000 47.306 2.694 2.694 0.449 0.449 100% 47.755 96% Work in Progress adjoining abadies District Kasur. Water Supply & Drainage Scheme Nathey Jagir, 244 756 Lakhankay Abadies, Kamogill, Mega Jatt, Sardar Mill & Kasur 101.853 98.860 2.993 2.993 0.499 0.48 96% 99.340 98% Work in Progress Choudharian Wala. Date of AA 23.03.2016, Date of TS 25.03.2016, Date of Pre-qualification, Date of Invitation of Tender 16.05.2016, Date of Receipt of Tenders 17.05.2016 , ( No Tender Received), Date of Re-Invitation of Tender Drainage schemes and soling work at UC 103 Depalpur 11.06.2016, Date of Receipt of 245 757 Okara 28.107 13.598 14.509 14.509 2.418 0 0% 13.598 48% Tenders,13.06.2016, Date of work Order District Okara 24.06.2016, Date of completion As per PC-I. 18.06.2017, Anticipated date of completion,18.06.2018,Re-appropriation of funds (+) 3.500 dt: 16.03.2018, Projected Population 51130 Person, Work is in progress.(TPV Awaited) Date of AA 23.03.2016, Date of TS 25.03.2016, Date of Invitation of Tender 16.05.2016, Date of Receipt of Tenders 17.05.2016 , ( No Tender Received), Date of Re-Invitation of Tender 11.06.2016, Date of Drainage Schemes and soling work at UC 105 Depalpur Receipt of Tenders,13.06.2016, Date of work 246 758 Okara 27.990 24.750 3.240 3.240 0.540 0 0% 24.750 88% District Okara Order 18.06.2016, Date of completion As per PC-I. 18.06.2017, Anticipated date of completion,18.06.2018, Re-appropriation of funds (-) 3.200 dt: 29.12.2017,(-) 2.500 dt: 16.03.2018 Projected Population 51398 Person, Work is in progress.(TPV Awaited) Date of AA 06.03.2017, Date of TS 11.03.2017, Date of Invitation of Tender ,01.05.2017, Date of Receipt of Laying of Tuff Tiles / Sewerage and Sullage Carrier in Left Tender,02.05.2017, Date of work 247 759 Okara 47.436 20.500 10.000 10.000 1.667 0.8 48% 21.300 45% Order.10.05.2017, Date of completion As per Over Streets in Ward No.1 to 50 City Okara PC-I.30.06.2018 , Anticipated date of completion, 30.06.2018,Re-appropriation of funds (+) 5.000 dt: 16.03.2018, Projected Population 409924 Person. Date of AA 31.08.2016, Date of TS 22.11.2016, Date of Invitation of Tender Rural Drainage Scheme Tuff Tiles PCC Sewerage and 09.12.2016, Date of Receipt of Tenders Soling, 3SP, 43SP, Khurpy 44SP Waltoya Matan Wala 10.12.2016, Date of work Order.05.01.2017, 248 760 Okara 97.984 95.380 2.604 2.604 0.434 0.434 100% 95.814 98% Amliya Key Suhag, Nihal Muhar, Mahlo sheikhu, Mahant Date of completion As per PC-I.30.06.2018 , Darshan Nama Jindida, District Okara Anticipated date of completion, 30.06.2018, Re- Appropriation funds (+) 6.000 dt: 28-04- 2017, Projected Population 24422 Person.

Date of AA 08.03.2017, Date of TS 20.03.2017, Date of Invitation of Tender 25.05.2017, Date of Receipt of Tenders Rural water Supply & Sewerage Drainage Scheme, 26.05.2017, Date of work Order.02.06.2017, 249 761 Okara 19.053 18.075 0.978 0.978 0.163 0 0% 18.075 95% Behlolpur, Tehsil Depalpur, Okara. Date of completion As per PC- I.31.12.2017,Anticipated date of completion, 30.06.2018, Re- Appropriation funds (+) , Projected Population 24422 Person.

Date of AA 08.03.2017, Date of TS 20.03.2017, Date of Invitation of Tender 25.05.2017, Date of Receipt of Tenders Rural water Supply & Sewerage Drainage Scheme, Arrora 26.05.2017, Date of work Order.02.06.2017, 250 762 Okara 28.303 22.500 5.803 5.803 0.967 0 0% 22.500 79% Date of completion As per PC-I.31.12.2017, Mian Khan, Tehsil Depalpur, Okara. Anticipated date of completion, 30.06.2018, Re- Appropriation funds (+) 8.000 dt: 29.12.2017 and (+) 1.500 dt: 16.03.2018 Projected Population 24422 Person. Date of AA 08.03.2017, Date of TS 20.03.2017, Date of Invitation of Tender 25.05.2017, Date of Receipt of Tenders Rural water Supply & Sewerage Drainage Scheme, Bhai 26.05.2017, Date of work Order 02.06.2017, 251 763 Okara 15.441 11.060 4.381 4.381 0.730 0 0% 11.060 72% Date of completion As per PC-I.31.12.2017, Rao Key, Tehsil Depalpur, Okara. Anticipated date of completion, 31.12.2018, Re- Appropriation funds (-) 2.500 dt: 16.03.2018, Projected Population 24422 Person. Date of AA 08.03.2017, Date of TS 20.03.2017, Date of Invitation of Tender,25.05.2017, Date of Receipt of Tenders, 26.05.2017, Date of work Rural water Supply & Sewerage Drainage Scheme, Order.02.06.2017, Date of completion As per 252 764 Okara 25.728 19.500 6.228 6.228 1.038 0 0% 19.500 76% Bhukan, Tehsil Depalpur, Okara. PC-I.31.12.2017, Anticipated date of completion, 30.06.2018, Re- Appropriation funds (+) ,5.000 dt: 29.12.2017 and (+) 1.500 dt: 16.03.2018 Projected Population 24422 Person. Date of AA 08.03.2017, Date of TS 20.03.2017, Date of Invitation of Tender 25.05.2017, Date of Receipt of Tenders Rural water Supply & Sewerage Drainage Scheme, Jhunjh 26.05.2017, Date of work Order.02.06.2017, 253 765 Okara 25.728 22.610 3.118 3.118 0.520 0 0% 22.610 88% Kalan, Tehsil Depalpur, Okara. Date of completion As per PC-I.31.12.2017, Anticipated date of completion, 31.12.2018, Re- Appropriation funds (+) , Projected Population 24422 Person.

Date of AA 08.03.2017, Date of TS 20.03.2017, Date of Invitation of Tender 25.05.2017, Date of Receipt of Tenders Rural water Supply & Sewerage Drainage Scheme, Kot 26.05.2017, Date of work Order 02.06.2017, 254 766 Okara 22.049 21.030 1.019 1.019 0.170 0 0% 21.030 95% Shah Mushtaq, Tehsil Depalpur, Okara. Date of completion As per PC-I.31.12.2017, Anticipated date of completion, 31.12.2018, Re- Appropriation funds (-) Projected Population 24422 Person.

Date of AA- 08.03.2017, Date of TS- 20.03.2017, Date of Invitation of Tender 25.05.2017, Date of Receipt of Tenders Rural water Supply & Sewerage Drainage Scheme, Lalay 26.05.2017, Date of work Order.02.06.2017, 255 767 Okara 21.017 19.824 1.193 1.193 0.199 0 0% 19.824 94% Wala, Tehsil Depalpur, Okara. Date of completion As per PC-I.31.12.2017, Anticipated date of completion, 31.12.2018, Re- Appropriation funds (+) , Projected Population 24422 Person. Date of AA 08.03.2017, Date of TS 20.03.2017, Date of Invitation of Tender 25.05.2017, Date of Receipt of Tenders Rural water Supply & Sewerage Drainage Scheme, 26.05.2017, Date of work Order.02.06.2017, 256 768 Okara 23.747 18.356 5.391 5.391 0.899 0 0% 18.356 77% Phularwa Wazirkey, Tehsil Depalpur, Okara. Date of completion As per PC-I.31.12.2017, Anticipated date of completion, 31.12.2018 Re- Appropriation funds (-) 4.000 dt: 16.03.2018, Projected Population 24422 Person.

Date of AA 08.03.2017, Date of TS 20.03.2017, Date of Invitation of Tender 25.05.2017, Date of Receipt of Tenders Rural water Supply & Sewerage Drainage Scheme, Shah 26.05.2017, Date of work Order 02.06.2017, 257 769 Okara 19.862 18.979 0.883 0.883 0.147 0.147 100% 19.126 96% Pur, Tehsil Depalpur, Okara. Date of completion As per PC-I.31.12.2017, Anticipated date of completion, 31.12.2018, Re- Appropriation funds (+) , Projected Population 24422 Person. Date of AA 08.03.2017, Date of TS 20.03.2017, Date of Invitation of Tender 25.05.2017, Date of Receipt of Tenders Rural water Supply & Sewerage Drainage Scheme, 26.05.2017, Date of work Order 02.06.2017, 258 770 Okara 16.746 14.847 1.899 1.899 0.317 0 0% 14.847 89% Date of completion As per PC-I.31.12.2017, Shinwal, Tehsil Depalpur, Okara. Anticipated date of completion, 31.12.2018, Re- Appropriation funds (-) 1.500 dt- 16.03.2018, Projected Population 24422 Person. Date of AA 03.08.2016, Date of TS 20.03.2017, Date of Invitation of Tender 11.10.2016, Date of Receipt of Tenders Rural water Supply and Drainage Scheme, Jaithpur 13.10.2016, Date of work Order 17.11.2016, 259 771 Okara 20.215 19.350 0.865 0.865 0.144 0 0% 19.350 96% Depalpur Date of completion As per PC-I.31.12.2017, Anticipated date of completion, 31.12.2018, Re- Appropriation funds (+) , Projected Population 10309 Person Date of AA 22.02.2017, Date of TS 24.02.2017, Date of receipt of tender 260 772 0.374 100% 25.975 93% 20.03.2017, Date of Work Order 03.04.2017 , Sewerage Scheme in Sahiwal City Sahiwal 27.844 25.601 2.243 2.243 0.374 Date of completion as per PC-1 30.06.2018 , Anticipated date of completion 30.06.2019, Work in progress. Date of AA 10.01.2017, Date of TS 03.03.2017, Date of Pre-qualification 11.04.2017 , Date of receipt of tender Sewerage Scheme Sahiwal City, City Bund Road, LBDC, 17.04.2017, Date of Work Order 15.05.2017, 261 773 Sahiwal 167.605 74.991 30.000 30.000 5.000 5 100% 79.991 48% High Street & Girls College Road Date of completion as per PC-1 30.06.2019 , Date of completion as per agreement 30.06.2019, Anticipated date of completion 30.06.2019, Work in progress. Date of A.A= 31.08.2016, Date of T.S= 09.09.2016, Date of Prequalification = 05.01.2017, Date of receipt of tenders = 23.01.2017, Date of work order= 30.01.2017, Date of completion as per PC-1= 30.06.2018, Provision of Sewerage / Drainage / Street Pavements, etc Date of completion as per agreement= 262 774 63.462 50.997 12.465 12.465 2.078 2.078 100% 53.075 84% in Chak No. 147/EB Tehsil Arifwala District Pakpattn 30.06.2018, No. of beneficiaries= 14050 persons, Funds released by FD = 03.08.2018,Funds online = 13.08.2018,Disposal station completed and made functional and handed over to CBO.Work in progress. Date of A.A= 13.10.2016, Date of T.S= 25.10.2016, Date of invitation of tenders=18.11.2016, Date of receipt of tenders = 10.12.2016, Date of work order= Provision of Sewerage / Drainage Scheme Chak No. 02.01.2017, Date of completion as per PC-1= 263 775 Pakpattan 36.218 26.920 9.298 9.298 1.550 1.55 100% 28.470 79% 30.06.2018, Date of completion as per 64/EB, Arifwala, District Pakpattan. agreement= 30.06.2018, No. of beneficiaries= 14825 persons, Funds released by FD = 03.08.2018 ,Funds online = 13.08.2018,Scheme made functional. Work in progress. Date of A.A= 16.03.2017, Date of T.S= 20.03.2017, Date of invitation of tenders=16.05.2017, Date of receipt of tenders = 20.05.2017, Date of work order= 264 776 1.667 70% 15.158 47% 24.05.2017, Date of completion as per PC-1= Rural Sewerage/Drainage Scheme 38/EB Arifwala Pakpattan 32.095 13.998 10.000 10.000 1.16 30.06.2018, Date of completion as per agreement= 30.06.2018, No. of beneficiaries= 5749 persons, Funds released by FD = 03.08.2018,Funds online = 13.08.2018,Work in progress. 1. Date of AA 09.03.2015 (16.05.2016) 2. Date of T.S 15.05.2015 3. Dated of Prequalification __ 4. Date of invitation of tender 24.03.2015 Rural Drainage Nizam Wala Nawab Pur Road District 5. Date of Receipt of tenders 265 777 19.295 14.295 5.000 5.000 0.834 0 0% 14.295 74% 25.03.2015 Multan 6. Date of work order 29.05.2015 7. Date of Completion as per PC-l 08.03.2016 8. Anticipated date of completion 30.06.2019 9. Date of released of funds 02.08.2017. 10. No. of beneficiaries 2768 persons. 1.Date of AA 09.03.2015 2.Date of T.S 21.04.2015 3.Dated of Prequalification 28.01.2015 4.Date of invitation of tender 27.04.2015 5.Date of Receipt of tenders Rural Drainage Scheme Sewra Chok Adjoining Abadies 02.05.2015 6.Date of work order 02.06.2015 266 778 Multan 99.890 81.498 10.000 10.000 1.667 1.667 100% 83.165 83% Mouza Mubarak Pur Taj Pur Sandila 7.Date of Completion as per PC-l 08.03.2016 8. Anticipated date of completion 30.06.2019 9. Date of released of funds 02.08.2017. 10.No. of beneficiaries 46964 persons. Work is in progress

1.Date of AA 12.03.2016 2.Date of T.S 3.Dated of Prequalification 12.03.2016 4.Date of invitation of tender07.04.2016 5.Date of Rural Sewerage Drainage Scheme Chah Rattay wala Receipt of tenders09.04.2016 6.Date of work 267 779 Multan 28.800 23.800 5.000 5.000 0.834 0.834 100% 24.634 86% order 27.05.2016 7.Date of Completion as per Mouza Jangal Barirah District Multan PC-l26.11.20168. Anticipated date of completion 30.06.2019 9. Date of released of funds02.08.2017. 10.No. of beneficiaries 8253 Persons. Work is in progress

1. Date of A.A: 27.10.2016 2. Date of T.S: - 3. Date of Pre-Qualification: 30.09.2016 4. Date Invitation of Tender: 01.11.2016 5. Date of Receipt of Tender: 02.11.2016 6. Date of 268 780 Rural Sewerage Drainage Scheme Mill Sadiqabad Multan 87.080 75.000 12.080 12.080 2.014 2.014 100% 77.014 88% Award: 18.11.2016 7. Date of Completion as per PC-I: 17.05.2018 8. Anticipated date of completion 30.06.2019 9. Date of released of funds 02.08.2017 10.No. of Benificiary= 23659 Persons. Work is in progress 1.Date of AA14.11.2009 2.Date of T.S19.01.2010 3.Dated of Prequalification- 4.Date of invitation of tender 30.01.2010 5.Date of Receipt of tenders 15.03.2010 Rural Sewerage Drainage Scheme Mouza Jahangirabad 6.Date of work order 20.03.2010 7.Date of 269 781 Multan 46.400 41.400 5.000 5.000 0.834 0.834 100% 42.234 91% Multan Completion as per PC-l 08.03.2013 8. Anticipated date of completion 30.06.2019 9. Date of released of funds 02.08.2017 10.No. of beneficiaries 2250 persons. Work is in progress 1. Date of A.A: 27.08.2016 2. Date of T.S: - 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 09.11.2016 5. Date of Receipt of Rural Sewerage Drainage Scheme Pakkay Wala Anayat Tender: 10.11.2016 6. Date of Award: 270 782 Multan 29.930 26.430 3.500 3.500 0.584 0.11 19% 26.540 89% 16.12.2016 7. Date of Completion as per PC- Pur Mahota Tehsil and District Multan I:15.06.2018 8. Anticipated date of completion 30.06.2019 9. Date of released of funds 02.08.2017 10.No. of Benificiary= Persons. Work is in progress 1.Date of AA 12.03.2016 2.Date of T.S 3.Dated of Prequalification 12.03.2016 4.Date of invitation of tender07.04.2016 5.Date of Rural Sewerage Drainage Scheme Saddiqabad Hirawat Receipt of tenders09.04.2016 6.Date of work 271 783 Multan 22.840 21.296 1.544 1.544 0.258 0.06 23% 21.356 94% order 01.06.2016 7.Date of Completion as per and Yaray wala District Multan PC-l31.11.20168. Anticipated date of completion 30.06.2019 9. Date of released of funds02.08.2017 10.No. of beneficiaries 25285 Persons. Work is in progress 1.Date of AA 25.03.2017 2.Date of T.S 01.04.2017 3.Dated of Prequalification - 4.Date of invitation of tender 20.04.2017 5.Date of Receipt of tenders 21.04.2017 272 784 0.745 20% 9.040 68% 6.Date of work order23.05.2017 7.Date of Rural Sewerage Scheme Chah Sunna Wala Multan. Multan 13.360 8.890 4.470 4.470 0.15 Completion as per PC-l 22.07.2017 8. Anticipated date of completion 30.04.2019 9. Date of released of funds 02.08.2017 10.No. of beneficiaries 4648 persons. Work is in progress 1. Date of A.A: 27.08.2016 2. Date of T.S: - 3. Date of Pre-Qualification: 30.09.2016 4. Date Invitation of Tender: 01.11.2016 5. Date of Receipt of Tender: 02.11.2016 6. Date of 273 785 Rural Sewerage Schemes Ambala Multan 50.000 44.858 5.142 5.142 0.857 0.857 100% 45.715 91% Award: 10.11.2016 7. Date of Completion as per PC-I:09.05.2018 8. Anticipated date of completion 30.06.2019 9. Date of released of funds 02.08.2017 10.No. of Benificiary= Persons.Work is in progress

1. Date of A.A: 27.08.2016 2. Date of T.S: - 3. Date of Pre-Qualification: 30.09.2016 4. Date Invitation of Tender: 01.11.2016 5. Date of Receipt of Tender: 02.11.2016 6. Date of 274 786 Sewerage Drainage Scheme Matotli Qaiserpur Shujabad Multan 46.000 35.000 11.000 11.000 1.834 1.818 99% 36.818 80% Award: 10.11.2016 7. Date of Completion as per PC-I: 09.05.2018 8. Anticipated date of completion 30.06.2019 9. Date of released of funds 02.08.2017 10.No. of Benificiary= Persons. Work is in progress

1. Date of A.A: 27-08-2016. 2. Date of T.S: 26- 09-2016 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 14-11-2016 5. Date of Receipt of Tender: 15-11-2016 6. Date of Sewerage, Tuff Tiles in Remaining Portion of Gaily Wal Award: 08-12-2016 7. Date of Completion as 275 787 62.170 26.495 20.000 20.000 3.334 2.596 78% 29.091 47% City. per PC-I: 31-12-2017 8. Anticipated Date of Completion: 10-03-2018 9.Date of released of funds 10. Reason of Slow Moving: 11.No. of Benificiary= Persons. 32835 Work is in Progress. 1. Date of A.A: 27-08- 2016. 2. Date of T.S: 19-09- 2016 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 14-11- 2016 5. Date of Receipt of Tender: 15-11- 2016 6. Date of Award: 24-11- Tuff Tiles & Sewerage Scheme for remaining portion of 2016 276 788 Lodhran 45.795 32.717 13.078 13.078 2.180 0 0% 32.717 71% Gogran City. 7. Date of Completion as per PC-I: 30-06- 2017 8. Anticipated Date of Completion: 23-01- 2018 9.Date of released of funds 10. Reason of Slow Moving: 11.No. of Benificiary= Persons. 16528 Scheme is functional & handed over to the community. The funds would be utilized for restoration of the dismantled metaled road along route of trunk sewer. 1. Date of A.A: 25.04.2017 2. Date of T.S: 04.05.2017 3. Date of Pre-Qualification: ------4. Date of Invitation of Tender: 03.06.2017 5. Date of Receipt of Tender: 05.06.2017 6. Provision of Drains, Soling Culverts etc to different abadies Date of Work order: 07.06.2017 7. Date of 277 789 Khanewal 40.000 22.000 18.000 18.000 3.000 2.93 98% 24.930 62% of PP-212, Tehsil Kabirwala, Khanewal Completion as per PC-I: 30.06.2018 8. Anticipated Date of completion: 30.06.2019 9. Date of released of funds 03.08.2018 10. Reason of Slow Moving: ------11 No. of beneficiaries 7819 Persons Work in progress. 1. Date of A.A: 27.08.2016 2. Date of T.S: 25.10.2016 3. Date of Pre-Qualification: 22.10.2016 4. Date of Invitation of Tender: 29.11.2016 5. Date of Receipt of Tender: Provision / Laying of Sewer Lines in Missing Areas of 05.12.2016 6. Date of Work order: 278 790 Khanewal 100.000 55.895 20.000 20.000 3.334 3.334 100% 59.229 59% 15.12.2016 7. Date of Completion as per PC- Khanewal City including new and old Azafi Abad I: 30.06.2018 8. Anticipated Date of completion: 30.06.2019 9. Date of released of funds 03.08.2018 10. Reason of Slow Moving: ------11 No. of beneficiaries 379227 Persons Work in progress. 1. Date of A.A: 21.02.2017. 2. Date of T.S: 25.02.2017 3. Date of Pre-Qualification: 4. Date of Invitation of Tender: 20.05.2017 5. Date of Receipt of Tender: 22.05.2017 6. Provision of Tuff Pavement in Gaggo Mandi / Dharian / Date of Work order: 7. Date of Completion as 279 791 Vehari 49.970 28.703 10.000 10.000 1.667 1.667 100% 30.370 61% Chak No. 187/EB per PC-I: 21.05.2019 8. Anticipated Date of completion: 30.06.2019 9. Date of released of funds 03.08.2018 10. Reason of Slow Moving: NIL 11. No. of beneficiaries 13005 Persons Work is in progress.

1. Date of A.A: 27-08-2016. 2. Date of T.S: 02.09.2016 3. Date of Pre-Qualification: 4. Date Invitation of Tender: 06.12.2016 5. Date of Receipt of Tender: 07.12.2016 6. Date of Rehabilitation of Sewerage & Drainage Scheme Machiwal, Award: 22.12.2016 7. Date of Completion as 280 792 Vehari 22.396 19.450 2.946 2.946 0.491 0.491 100% 19.941 89% Tehsil and District Vehari. per PC-I: 21.12.2017 8. Anticipated Date of Completion: 30.06.2018 9.Date of released of funds 03.08.2018 10. Reason of Slow Moving: NIL 11 No. of beneficiaries 11435 Persons Work is in progress. 281 793 Provision of Sewerage & Tuff Tiles for Dajal City Rajanpur 120.100 35.000 85.100 85.100 14.184 14.184 100% 49.184 41% "• Date of A.A = 05.11.2016 Comprehensive Sewerage / Drainage / Soling / PCC / Tuff 282 794 Tile scheme at Sanawan Town, District Muzaffargarh Muzaffargarh 25.000 22.152 2.848 2.848 0.475 0.13 27% 22.282 89% "• Date of A.A 22-09-2016 (Remaining Portion) 283 795 Sewerage / Drainage Scheme for Rangpur Muzaffargarh Muzaffargarh 241.100 49.400 170.000 170.000 28.334 6 21% 55.400 23% "• Date of A.A 22.9.2016

Rural Sewerage/Drainage Scheme Dhori Adda & Adoining 284 796 Layyah 198.000 63.732 75.029 75.029 12.505 4.4 35% 68.132 34% • Date of AA = 25.10.2014 Abadies Chak No. 426AB & 438/TDA (Revised) Sewerage scheme Chak No. 110/TDA, Tehsil Karor, 285 797 Layyah 30.000 20.395 9.605 9.605 1.601 0.56 35% 20.955 70% • Date of AA = 22-09-2016 District Layyah Sewerage scheme Chak No. 229/TDA, Tehsil Karor, 286 798 Layyah 30.000 15.000 15.000 15.000 2.500 2.5 100% 17.500 58% • Date of AA = 22-09-2016 District Layyah Sewerage scheme Chak No. 251/TDA, Tehsil Karor, 287 799 Layyah 30.000 14.952 15.048 15.048 2.508 0.88 35% 15.832 53% • Date of AA = 22-09-2016 District Layyah Date of AA. 08.08.2016.. Date of T.S. 13.10.2016.. Tender received on 14-11-2016. Date of award-03-01-2017. Date of 288 800 Construction of Sewerage chak no. 63,DB. 18.845 14.824 4.021 4.021 0.670 0 0% 14.824 79% completion=02-12-2017. Anticipated date of completion 30-06-2019. Date of receipt of funds by F.D. 20.07.2018. Work is in progress. Date of AA. 08.08.2016.. Date of T.S. 13.10.2016.. .Tender received on 14-11- Provision of Sewerage / Tuff Tile in Basti Jhangara Sharqi, 2016. Date of award-03-01-2017. Date of 289 801 Mouza Jhangara Sharqia, Union Council Bahawalpur Bahawalpur 29.895 26.886 3.009 3.009 0.502 0 0% 26.886 90% completion=02-12-2017. Anticipated date of Ghalvan, Tehsil Ahmedpur Sharqia, District Bahawalpur. completion 30.06.2019. Date of receipt of funds by F.D. 20.07.2018. Work is in progress. Date of AA. 08.08.2016.. Date of T.S. 13.10.2016.. Date of Receipt of tender 14.11.2016.. Date of award 15.12.2016. Date 290 802 Rural Sewerage Scheme 17/F.W Bahawalpur 25.000 13.500 11.500 11.500 1.917 0 0% 13.500 54% of completion 14.11.2017.. Anticipated date of completion 30-06-2019. Date of receipt of funds by F.D. 20.07.2018. Work is in progress. Date of AA. 08.08.2016.. Date of T.S. 13.10.2016.. .Date of Receipt of tender 14.11.2016. Date of award 15.12.2016. Date 291 803 Rural Sewerage Scheme Basti Chohan Bahawalpur 21.500 10.969 10.531 10.531 1.755 0 0% 10.969 51% of completion 14.11.2017/. Anticipated date of completion 30-06-2019. Date of receipt of funds by F.D. 20.07.2018. Work is in progress. Date of AA. 08.08.2016.. Date of T.S. 13.10.2016.. .Date of receipt of Tender 14.11.2016.. Date of award 30.11.2016.. Date 292 804 Sewerage & Tuff Tile Jamalpur Bahawalpur 29.526 22.720 6.806 6.806 1.135 0 0% 22.720 77% of completion 29.10.2017.. Anticipated date of completion 30-06-2019. Date of receipt of funds by F.D. 20.07.2018. Work is in progress. Date of A.A= 18-08-2015.. Date of T.S= 28- 08-2015. Date of receipt of tenders = 08-03- 2016.. Date of work order= 18.04.2016... 293 805 0.067 0% 29.325 99% Date of completion as per Sewerage / Drainage Scheme, Chak No. 110/DB Bahawalpur 29.725 29.325 0.400 0.400 0 agreement=17.04.2017.. Anticipated date of completion = 30.06.2019. Date of receipt of funds by F.D. 20.07.2018. Work is in progress. Date of AA. 08.08.2016.. Date of T.S. 13.10.2016.. .Date of receipt of tender 14-11- 2016. Date of award 15-12-2016. Date of 294 806 Sewerage Scheme Chak no. 15/Ford wah, Tehsil Hasilpur. Bahawalpur 15.616 10.051 5.565 5.565 0.928 0 0% 10.051 64% completion 14-11-2017. Anticipated date of completion 30-06-2019. Date of receipt of funds by F.D. 20.07.2018. Work is in progress. Date of AA. 21.10.2016.. Date of T.S. 26.10.2016.. Date of Tender 12.12.2016. Funds released by FD 04-07-2017 & 06-10- Construction of Sewerage Drainage Schemes Abadi 2017.Date of receipt of tender 14-12-2016 . 295 807 Jodheka QasimKa Chak Sarkari Bagar Wala Khoo Bahawalnagar 99.996 29.990 70.006 70.006 11.668 0 0% 29.990 30% Date of award 19-01-2017. Date of Chavek, Toba Balochan Tehsil & Distt. Bahawalnagar completion 18-12-2017. Anticipated date of completion 30-06-2019. Date of receipt of funds by F.D. 20.07.2018. Work is in progress. Date of AA. 15-10-2015 . Date of TS. 22-02- 2016. Prequalification of the contractor=22-03- 2016. Date of invitation of tenders=24-03- Sewererage and Drainage Scheme Maroot Tehsil 2016. Date of receipt of tenders = 07-04- 296 808 Bahawalnagar 120.980 52.986 67.994 67.994 11.333 0 0% 52.986 44% 2016. Date of award= 30-04-2016.. Date of Fortabbas District Bahawalnagar completion as per agreement=29-04- 2018.Expected date of completion 30-06- 2019. Date of receipt of funds by F.D. 20.07.2018. Work is in progress. Date of A.A= 26-02-2016. Date of T.S= 05-05- 2016. Date of prequalification. 03-08-2016. Rahim Yar .Date of tender received on 10-10-2016. Date 297 809 Construction of Sewerage Open Drain in Chachran Sharif 97.240 53.146 44.094 44.094 7.349 0 0% 53.146 55% of award= 16-11-2016. Date of completion= Khan 15-04-2018. Expected date of completion 30- 06-2019. Date of receipt of funds by F.D. 20.07.2018. Work is in progress.. Date of AA(DDWP)=28-10-2016.. Date of T.S. 13.02.2017. Tenders received on 13-03- Provision of water Supply /Sewerage scheme for MC Rahim Yar 2017 .. Date of work awarded .25-04-2017. . 298 810 121.000 32.601 88.399 88.399 14.733 0 0% 32.601 27% Tranda Saway Khan, Tehsil & District RYK Khan Date of completion 30-06-2019. . Date of receipt of funds by F.D. 20.07.2018. Work is in progress.. Date of AA =17-09-2016. Date of TS=23-11- 2016. Prequalification of contractors 05-01- 2017. Date op receipt of Tenders 06-02- Urban water Supply / Sewerage Scheme for City Tranda Rahim Yar 2017.. Date of work awarded 17.03.2017.. 299 811 121.750 50.000 71.750 71.750 11.959 0 0% 50.000 41% Muhammad Pannah Khan Date of completion 16.09.2018.. Expected date of completion. 30-06-2019. Date of receipt of funds by F.D. 20.07.2018. Work is in progress.. 1. Date of AA = 20.10.2016 2. Date of TS = 25.10.2016 3.Date of Award of work 17.12.2016 4.Dated of Released Funds 5. No. Provision of Sewerage in Chak No 141JB Khokhran Tehsil of Beneficiaries = 1891 Persons Funds 300 812 Chiniot 31.350 25.000 6.350 6.350 1.059 0.675 64% 25.675 82% & District Chiniot Released on 03.08.2018 by the Chief Engineer (South) PHED Lahore and work is in progress. Target progress will be achieve in coming month. Date of A.A 05-08-2017. Date of T.S.05-09- Construction of Drainage Nala at Chak No. 197/RB 2017. Work order issued on 28-09-2017. 301 813 Faisalabad 3.000 2.000 1.000 1.000 0.167 0.105 63% 2.105 70% Wahga Wala Tehsil Saddar, District Faisalabad Work is in progress. Funds released on 03.08.2018 Sewerage / Drainage Schemes in Adda Pharainwali, * A.A Date. 06.09.2017* T.S Date. Mandi 24.10.2017* Start Date. 08.01.2018* 302 814 Sandhanwala, Haigerwala, Murala, Dhall, Dhola, Chhani, 247.904 70.000 20.000 20.000 3.334 3.167 95% 73.167 30% Bahauddin Completion date 07.01.2021. * Work in Lakhia, Chak No. 38., and Ahdi in District M.B.Din progress. * A.A Date. 28.07.2017* T.S Date. Provision of PCC / Sewerage / Drainage and allied Mandi 15.08.2017* Start Date. 06.01.2018* 303 815 50.000 28.500 21.500 21.500 3.584 1.397 39% 29.897 60% faiclities in PP-120, District M.B.Din Bahauddin Completion date 05.01.2019* Work in progress. * A.A Date. 25.08.2017* T.S Date. Sewerage and Drainage scheme of Sahna and Khanana, Mandi 07.09.2017* Start Date. 06.01.2018* 304 816 100.000 24.700 25.000 25.000 4.167 4.167 100% 28.867 29% District Mandi Baha Ud Din Bahauddin Completion date 05.01.2020. Work in progress. Date of A.A 29-08-2017. Date of T.S.05-09- Construction of Rural Drainage and PCC Road , UC 63 2017. Work order issued on 22-11-2017. 305 817 Faisalabad 10.000 1.000 9.000 9.000 1.500 0.95 63% 1.950 20% District Faisalabad Work is in progress. Funds released on 03.08.2018 Date of A.A 29-08-2017. Date of T.S.05-09- Construction of Rural Drainage and PCC Road at U.C. 52 2017. Work order issued on 22-11-2017. 306 818 Faisalabad 10.000 1.000 9.000 9.000 1.500 0.98 65% 1.980 20% District Faisalabad Work is in progress. Funds released on 03.08.2018 1. Date of A.A: 26.07.2017 2. Date of T.S: 08.08.2017 3. Date of Pre-Qualification: ------4. Date of Invitation of Tender: 28.09.2017 5. Date of Receipt of Tender: 29.09.2017 6. 307 819 1.167 100% 4.167 42% Date of Work order: 09.11.2017 7. Date of Drainage Scheme Chak No.88/10-R District Khanewal Khanewal 10.000 3.000 7.000 7.000 1.167 Completion as per PC-I: (6) months 8. Anticipated Date of completion: 30.06.2019 9. Date of released of funds 03.08.2018 10. Reason of Slow Moving: ------11 No. of beneficiaries 5120 Persons Work in progress.

308 820 1.667 0% 7.000 23% Funds released on 26.10.2017 Work allotted Provision of Sewerage/Drainage/Nali UC Mullah Wali Bhakkar 30.000 7.000 10.000 10.000 0 on 03.11.2017 309 821 3.334 0% 10.000 33% Funds released on 26.10.2017 Work allotted Provision of Sewerage/Drainage/Nali UC Peerashab Bhakkar 30.000 10.000 20.000 20.000 0 on 03.11.2017 Rural drainage Scheme inculding Tuff Tiles and Water Date of A.A 29-08-2017. Date of T.S.05-09- Supply Lines for left over streets for Chak No 411/GB 2017. Work order issued on 31-10-2017. 310 822 Faisalabad 10.000 5.000 5.000 5.000 0.834 0.57 68% 5.570 56% darbar Peer Kandhari tehsil Tandlianwala District Work is in progress. Funds released on Faisalabad 03.08.2018 Rural Drainage Scheme UC Chak Chattha Sabir Kalan A.A. 98.000(M) T.S.98.000 (M) work is in 311 823 Hafizabad 98.000 10.000 20.000 20.000 3.334 2.32 70% 12.320 13% Kallian Wala & Allied Abbadies progress Imrovement of Sewerage, Solling, Drain Tatley Aali Road 312 824 Gujranwala 103.000 10.000 20.000 20.000 3.334 1.798 54% 11.798 11% Work in progress Kamokay Provision of PCC/Sewerage/Drainage/Solling etc. in village 313 825 Gujranwala 15.000 10.000 5.000 5.000 0.834 0.365 44% 10.365 69% Work in progress. Chachoke Tehsil Noshera Virkan District Gujranwala

Provision of PCC/Drainage Scheme in UC Kalaske, Kot 314 826 Amar singh, Kot Shaira, Batla Janda Sigh, Uggu Chak Gujranwala 197.800 20.000 20.000 20.000 3.334 3.334 100% 23.334 12% Work in progress. Paponakha, UC 71 Khiyali # 14 MC Provision of Clean Drinking Water/Sewerage Scheme at 315 827 Gujranwala 199.779 50.000 20.000 20.000 3.334 3.334 100% 53.334 27% work in progress. Ldhay wala Waraich, Madhu Khalil, Chain Wala etc Provision of Sewerage / Drainage and PCC facilities Qila 316 828 Gujranwala 40.000 10.000 15.000 15.000 2.500 2.5 100% 12.500 31% Work in progress. didar singh Gujranwala Provision of Sewerage Drainage and PCC facilities Gakhar 317 829 Gujranwala 40.000 10.000 15.000 15.000 2.500 1.458 58% 11.458 29% Work in progresss City Gujranwala Rural Drainage Scheme UC Kot Hassan Khan Kassoki A.A. 98.000(M) T.S.98.000 (M) work is in 318 830 Hafizabad 98.000 10.000 10.000 10.000 1.667 1.25 75% 11.250 11% Karyala & Allied Abbadies progress * A.A Date. 28.07.2017* T.S Date. Rrural/Sewerage/Drainage Scheme pindi Kalu Tehsil Mandi 15.08.2017* Start Date. 06.01.2018* 319 831 50.000 15.000 35.000 35.000 5.834 3.075 53% 18.075 36% Phalian District Mandi bahauddin Bahauddin Completion date 05.01.2019* Work in progress. Construction of Drain/Nullah for Diposal of Sewerage at 320 832 Sialkot 30.000 10.000 5.000 5.000 0.834 0.604 72% 10.604 35% Work in progress. Bhadewal Tehsil Daska District Sialkot Reheblitiation of Sewerage/Drainage Scheme Mitranwali 321 833 Sialkot 20.000 10.000 10.000 10.000 1.667 1.214 73% 11.214 56% Work in progress. Tehsil Daska District Sialkot Rural Drainage Scheme Abdullah Pur Kolar Chak No 1/RB 322 834 Sheikhupura 50.000 10.000 10.000 10.000 1.667 1.667 100% 11.667 23% Work in Progress Tehsil Safdarabad District Sheikhupura Beautification of Sharqpur Sharif, Provision of PCC, 323 835 Tufftiles, Fountains, Monuments, LED Street lights and Sheikhupura 30.000 10.000 10.000 10.000 1.667 1 60% 11.000 37% Work in Progress construction of roof of Main Bazar Provision of PCC & drainage Scheme Habib ababd District 324 836 Kasur 99.000 20.000 15.000 15.000 2.500 1.17 47% 21.170 21% Work in Progress Kasur Rural Drainage Scheme Baggiana, kamogil Jahuggian, 325 837 Kasur 90.000 20.000 10.000 10.000 1.667 0.835 50% 20.835 23% Work in Progress dhinasing & Baroon Abadies Rural Drainage Scheme Nathay Khasla Sardar Mill, 326 838 Kasur 90.000 20.000 20.000 20.000 3.334 3.31 99% 23.310 26% Work in Progress Garden Adda & Chohdry Jhlar & dhana Rural Drainage Scheme Khanko more Chakoki Chak No 327 839 Kasur 95.000 20.000 20.000 20.000 3.334 2.102 63% 22.102 23% Work in Progress 04, Madarkhai Construction of Drain Brick Pavement, RCC Culverts, VR 328 840 Bridge and Sullage Carrier in UC Wainse No. 76 Tehsil Muzaffargarh 42.270 10.000 32.270 32.270 5.379 2 37% 12.000 28% "• Date of AA 31.7.2017 Jatoi Construction of Drain Brick Pavement, RCC Culverts, VR 329 841 Bridge and Sullage Carrier in UC Bairband No. 84 Tehsil Muzaffargarh 43.350 10.000 33.350 33.350 5.559 1.89 34% 11.890 27% "• Date of AA 31.7.2017 Jatoi Construction of Drain Brick Pavement, RCC Culverts, VR 330 842 Bridge and Sullage Carrier in UC Kotla Gamoon No. 77 Muzaffargarh 43.730 10.000 33.730 33.730 5.622 1.77 31% 11.770 27% "• Date of AA 31.7.2017 Tehsil Jatoi Rural Drainage/Sewerage & Nallian Mosan Shah, 331 843 Mongarh, Ahsin & Waddeh wali UC Wara Sehran Tehsil Layyah 30.000 10.000 20.000 20.000 3.334 1.35 40% 11.350 38% • Date of AA = 29.07.2017 Karoor Lal Essen District Layyah 1. Date of AA = 19.09.2017 2. Date of TS = 25.10.2017 3. Date of Work Order = Sewerage Scheme, PCC Slab Soling in Bhowana city 09.12.2017 4.Dated of Released Funds 332 844 Chiniot 77.000 20.400 25.000 25.000 4.167 4.1 98% 24.500 32% 03.11.2017 Funds Released on 03.08.2018 Chiniot by the Chief Engineer (South) PHED Lahore and work is in progress. Target progress will be achieve in coming month. Rural Drainage & PCC Scheme UC Mirza Virkan District 333 845 Sheikhupura 20.000 10.000 10.000 10.000 1.667 1 60% 11.000 55% Work in Progress Sheikhupura. Rural Drainage & PCC Scheme UC Chichoki Mallian 334 846 Sheikhupura 20.000 10.000 10.000 10.000 1.667 1 60% 11.000 55% Work in Progress District Sheikhupura. Rural Drainage & PCC Scheme Village Madar District 335 847 Sheikhupura 10.000 5.000 5.000 5.000 0.834 0.834 100% 5.834 58% Work in Progress Sheikhupura. Rural Drainage & PCC Scheme UC Mohallah Rehman 336 848 Sheikhupura 15.000 5.000 10.000 10.000 1.667 1.25 75% 6.250 42% Work in Progress Pura District Sheikhupura. Rural Drainage & PCC Scheme UC kot Ranjeet District 337 849 Sheikhupura 10.000 7.500 2.500 2.500 0.417 0.417 100% 7.917 79% Work in Progress Sheikhupura. Rural Drainage & PCC Scheme UC Kurlkey District 338 850 Sheikhupura 10.000 5.000 5.000 5.000 0.834 0.834 100% 5.834 58% Work in Progress Sheikhupura. Rural Drainage & PCC Scheme UC Mallian Kalan District 339 851 Sheikhupura 15.000 7.500 7.500 7.500 1.250 0.65 52% 8.150 54% Work in Progress Sheikhupura. 1. Date of AA 11.04.2017 2. Date of T.S - 3. Dated of Prequalification - 4. Date of invitation of tender 15.05.2017 Rural Drainage, Sewerage, Solding and Tuff Tiles Scheme 5. Date of Receipt of tenders 340 852 Gardezpur, Dhandho, Bagrain Ghangi, Amanullah Shah Multan 7.000 3.765 3.235 3.235 0.539 0 0% 3.765 54% 16.05.2017 Wains & Marha, District Multan 6. Date of work order 31.05.2017 7. Date of Completion as per PC-l 30.07.2017 8. Anticipated date of completion 30.06.2019 9. Date of released of funds 1. Date of AA 11.04.2017 2. Date of T.S - 3. Dated of Prequalification - 4. Date of invitation of tender 15.05.2017 Rural Drainage, Sewerage Scheme Mithu Shrqi, Basti 5. Date of Receipt of tenders 341 853 Mithu Gharbi, Basti Dad Shah Moosa Muqeempur, District Multan 7.000 3.964 3.036 3.036 0.506 0 0% 3.964 57% 16.05.2017 6. Date of work order Multan 31.05.2017 7. Date of Completion as per PC-l 30.07.2017 8. Anticipated date of completion 30.06.2019 9. Date of released of funds 29.11.2017. 1. Date of AA 11.04.2017 2. Date of T.S - 3. Dated of Prequalification - 4. Date of invitation of tender 15.05.2017 5. Date of Receipt of tenders Rural Drainage, Sewerage Scheme Basti Dodwpur, Basti 342 854 Multan 6.000 3.595 2.405 2.405 0.401 0 0% 3.595 60% 16.05.2017 Shahpur, District Multan 6. Date of work order 31.05.2017 7. Date of Completion as per PC-l 30.07.2017 8. Anticipated date of completion 30.06.2019 9. Date of released of funds 1.29.11.2017. Date of AA 11.04.2017 2. Date of T.S - 3. Dated of Prequalification - 4. Date of invitation of tender 15.05.2017 Rural Drainage, Sewerage Scheme Mochi - Pura, Ghajju 5. Date of Receipt of tenders 343 855 Hatta Basti Muhammad Wala and Kotli Nijabat, District Multan 5.000 0.169 4.831 4.831 0.805 0 0% 0.169 3% 16.05.2017 Multan 6. Date of work order 23.05.2017 7. Date of Completion as per PC-l 22.07.2017 8. Anticipated date of completion 30.06.2019 9. Date of released of funds Construction of PCC Streets, Drains,Tuff tiles and Soling 29.11.2017. 344 856 Sialkot 30.000 15.000 15.000 15.000 2.500 1.758 70% 16.758 56% Work in progress. in Adalat Garah, District Sialkot Construction of PCC Streets, Drains,Tuff tiles and Soling 345 857 Sialkot 6.000 3.000 3.000 3.000 0.500 0.405 81% 3.405 57% Work in progress. in Mahal Kingra & Dhanney, District Sialkot Construction of PCC Streets, Drains,Tuff tiles and Soling 346 858 Sialkot 5.000 2.500 2.500 2.500 0.417 0.302 72% 2.802 56% Work in progress. in Muzafar Pur, District Sialkot Construction of PCC Streets, Drains,Tuff tiles and Soling 347 859 Sialkot 5.000 2.500 2.500 2.500 0.417 0.318 76% 2.818 56% Work in progress. in Shatab Garah, District Sialkot Construction of PCC Streets, Drains,Tuff tiles and Soling 348 860 Sialkot 5.000 2.500 2.500 2.500 0.417 0.301 72% 2.801 56% Work in progress. in Bonkam, District Sialkot Construction of PCC Streets, Drains,Tuff tiles and Soling 349 861 Sialkot 6.000 3.000 3.000 3.000 0.500 0.35 70% 3.350 56% Work in progress. in Ganjianwali & Roheel Garah, District Sialkot Construction of PCC streets, Drains,Tuff tiles and Soling in 350 862 Sialkot 10.000 5.000 5.000 5.000 0.834 0.65 78% 5.650 57% Work in progress. Chak Adil,Chitti Shikhan,Nawan Pind, District Sialkot Construction of PCC Streets, Drains,Tuff tiles and Soling 351 863 Sialkot 10.000 5.000 5.000 5.000 0.834 0.601 72% 5.601 56% Work in progress. in Murad Pur, District Sialkot Construction of PCC Streets, Drains,Tuff tiles and Soling 352 864 Sialkot 10.000 5.000 5.000 5.000 0.834 0.639 77% 5.639 56% Work in progress. in Gohad Pur, District Sialkot Construction of PCC Streets, Drains,Tuff tiles and Soling 353 865 Sialkot 5.000 2.500 2.500 2.500 0.417 0.301 72% 2.801 56% Work in progress. in Dhanwali, District Sialkot Construction of PCC Streets, Drains,Tuff tiles and Soling 354 866 in Village Monger to Nehar Upper Chanab & Village Sialkot 6.000 3.000 3.000 3.000 0.500 0.355 71% 3.355 56% Work in progress. Ranjhai to Burj Cheema Link Way, District Sialkot

Construction of PCC Streets, Drains,Tuff tiles and Soling 355 867 Sialkot 7.000 3.500 3.500 3.500 0.584 0.41 70% 3.910 56% Work in progress. in Monger Sofen to Barthanwala, District Sialkot Construction of PCC Streets, Drains,Tuff tiles and Soling 356 868 Sialkot 5.000 2.500 2.500 2.500 0.417 0.301 72% 2.801 56% Work in progress. in Hunter Pura, District Sialkot Construnction of soling & drain/Nallian in UC Baseera 357 869 Layyah 30.000 17.200 12.800 12.800 2.134 0.85 40% 18.050 60% • Date of AA = 29.07.2017 Tehsil Karoor District Layyah NA-181 A.A. dated 03.05.2014T.S. dated 23.05.2014 358 870 Sewerage scheme for Oncha Sadawala, Narowal. Narowal 49.284 47.452 1.832 1.832 0.306 0.299 98% 47.751 97% *Start Date 18.09.2014 *Completion date 30.06.2019 work in progress. Capacity Strenghthening of Design Cell of HUD&PHED for 359 871 Punjab 180.278 64.897 25.000 25.000 4.167 4.167 100% 69.064 38% In Progress project Combined PC-II of Water Quality Survey, Identification of outlived pipes, outsourcing of water Supply schemes, 360 872 Punjab 327.683 30.000 100.000 100.000 16.667 9.632 58% 39.632 12% In Progress Rationalization of staff in WASAs, MC & PHED and pre qualification of contractors and manufacturers Construction of Residential Buildings at Lahore Head 361 873 Punjab 277.000 81.706 30.000 30.000 5.000 5 100% 86.706 31% In Progress Quarter for officers BS 16 to BS 18 PHED Establishment of Management Information System and 362 874 Punjab 175.000 45.000 35.000 35.000 5.834 2.45 42% 47.450 27% In Progress Monitoring & Evaluation (MIS & ME) For Capacity Building Establishment of PMU for WASH (Water, Sanitataion & 363 875 Punjab 35.000 1.660 9.800 9.800 1.634 1.2 73% 2.860 8% In Progress Hygiene) Establishment of regional design cell at each civil division / 364 876 Punjab 19.043 1.443 10.000 10.000 1.667 0 0% 1.443 8% In Progress Circle level Improvement and Extension of the Water Testing 365 877 Punjab 260.000 19.590 150.000 150.000 25.000 0 0% 19.590 8% In Progress Laboratories Phase I Preparation of Water Quality Survey & Sewerage Master 366 878 Punjab 18.235 13.285 4.950 4.950 0.825 0 0% 13.285 73% In Progress Plan/Development Plan of Districts, Tehsil and Rehabilitation of need based (identified through TPV) 367 879 Punjab 1146.048 730.302 200.000 200.000 33.334 0 0% 730.302 64% In Progress Dysfunctional Rural water Supply Schemes 368 880 Renovation of PHED Head Quarter Building. Punjab 41.000 38.500 2.500 2.500 0.417 0.417 100% 38.917 95% In Progress Scaling up Approach for Total Sanitation (PATS) 369 881 Punjab 399.705 290.407 50.000 50.000 8.334 0 0% 290.407 73% In Progress in Punjab (ODF) 370 882 Survey & investigation of water source Punjab 9.436 0.456 8.980 8.980 1.497 0 0% 0.456 5% In Progress Third Party Validation for Quality Control of the New 371 883 Punjab 39.847 2.301 12.546 12.546 2.091 0 0% 2.301 6% In Progress Initiatives through out Punjab Upgradation / Strengthening of Existing Laboratories at 372 884 Punjab 390.000 75.000 150.000 150.000 25.000 7 28% 82.000 21% In Progress District Head Quarter Multi Sectoral Nutrition Strategy for WASH Including 373 885 Punjab 1013.037 100.000 500.000 500.000 83.334 0 0% 100.000 10% In Progress Water Supply, Sanitation, Hygiene, Waste Water Rehabilitation of 781 dysfunctional Rural Water Supply 374 886 Punjab 9015.746 240.480 1000.000 1000.000 166.667 0 0% 240.480 3% Work in Progress Schemes 375 887 Khadim-e-Punjabb Abe Sehat Project. Punjab 9634.000 3500.000 50.000 50.000 8.334 0 0% 3500.000 36% Work in Progress A.A Date 09.01.2016. T.S Date 22.01.2016. Urban Sewerage / Drainage & PCC for City, Date of Start of Scheme 09.03.2016.Date of 376 888 Attock 99.948 83.926 16.022 16.022 2.671 2.671 100% 86.597 87% Tehsil Fateh Jhang, District attock. Completion of Scheme 30.06.2019. Work is in progress. A.A Date 28.08.2014. T.S Date 01.09.2014. Urban Sewerage / drainage scheme for Hassan Abdal City, Date of Start of Scheme 26.01.2015. Date of 377 889 Attock 195.317 170.308 25.009 25.009 4.168 4.168 100% 174.476 89% Hassan Abdal, District attock Completion of Scheme 30.06.2019.Work is in progress. Providing / laying of Sewerage System / Construction / Date of A.A 29.03.2016 (2nd Rev).Date of T.S 378 890 1.215 99% 226.718 97% 07.04.2016 (Rev) .Date of Start rehabilitation of storm water channel in Choa Saiden Shah Chakwal 232.805 225.518 7.287 7.287 1.2 21.02.2014.Date of completion District Chakwal 30.06.2019.Work is in progress. Date of A.A .14-09-2009.Date of Revise A.A 29-03-2016.Date of T.S 24-10-2009.Date of Revis T.S 31-05-2016.Date of Commencement 17-08-2016.Date of Completion 15-08-2018.Scheme has been Revised and Administratively approved vide. Urban Sewerage Scheme Jhelum with Treatment Plant No.SO(PH-S)9-16/2015 (Jhelum) dt: 379 891 Jhelum 539.592 378.607 100.000 100.000 16.667 2 12% 380.607 71% 29.03.2016. • Work awarded in 2009 to 4 District Jhelum (Four) Groups. They have gone in litigation against recovery effected on the recommendations of CMIT. Work is held up by them since July 2014.• Work to be done as per revised scope of work Revised Estimate allotted on 17-08-2016.• Work on lift station & R.C.C pipe 12" i/d in progress.

Date of A.A 22.01.2015 (3rd Rev).Date of T.S 06.02.2015 .Date of Start 13.04.2015.Date of 380 892 Urban Sewerage Scheme, Talagang City. Chakwal 99.667 84.465 15.202 15.202 2.534 1.325 52% 85.790 86% completion 30.06.2019.Work is in progress. Funds released on 03-08-2018. Target progress will be achieved in next month.

Construction of Sewerage and Drianage Scheme Sohawa Date of A.A 26-08-2016.Date of T.S 30-09- 381 893 Jhelum 30.000 17.500 12.500 12.500 2.084 1 48% 18.500 62% 2016.Work awarded on 24-01-2017.Work in City progress

Date of A.A 27.08.2016, Date of T.S 04.09.2016, Date of Award 22.02.2017, Construction of Sewerage PCC Soling in Nawab Colony Scheduled date of Completion is 30.06.2018, 382 894 Sargodha 5.430 4.789 0.641 0.641 0.107 0.097 91% 4.886 90% Date of Commencement, 22.02.2017, Funds Aziz Colony and Ghani Park Sargodha City released on 30.07.2018, Funds on-lined on 30.07.2018.RCC Sewer 12" i/d 1504-Rft laid, PCC Slab 11550-Cft laid. Work in progress

"Date of A.A 25.06.2009, Revised Date of A.A 31.01.2014, 2nd Revised Date of A.A 19.09.2016, Date of T.S 29.06.2009, Date of 2nd Revised T.S 30.09.2016, Date of Award Comprehensive Urban Sewerage Scheme Bhalwal 24.11.2009 & 04.12.2009, Scheduled date of 383 895 Sargodha 232.641 217.726 14.915 14.915 2.486 0 0% 217.726 94% Colonies Completion on 12.2010, Revised date of Completion 30.06.2018, Date of Commencement, 24.11.2009 & 04.12.2009, Funds released on 30.07.2018, Funds on- lined on 30.07.2018. Date of A.A 27.08.2016, Date of T.S 04.09.2016, Date of Award 22.02.2017, Scheduled date of Completion is 30.06.2018, Construction of Sewerage PCC Soling Resoling Bashir Date of Commencement, 22.02.2017, Funds 384 896 Sargodha 5.177 4.283 0.894 0.894 0.149 0 0% 4.283 83% Colony Sargodha City released on 30.07.2018, Funds on-lined on 30.07.2018.RCC Sewer 12" to 24" i/d 1845- Rft laid, PCC Slab 2257-Cft laid. Work in progress

Date of A.A 27.08.2016, Date of T.S 04.09.2016, Date of Award 22.02.2017, Scheduled date of Completion is 30.06.2018, Costruction of Sewerage / PCC / soling / Sullage Carrier Date of Commencement, 22.02.2017, Funds 385 897 Sargodha 5.927 4.427 1.500 1.500 0.250 0 0% 4.427 75% Mulsim Town, Usman Park, Shiraz Park, released on 30.07.2018, Funds on-lined on 30.07.2018.Sullage Carrier 1653-Rft constructed Soling 1639-Cft laid. RCC Sewer 12" i/d 961-Rft laid Work in progress

Date of A.A 27.08.2016, Date of Revised A.A 15.06.2017, Date of T.S 10.10.2016, Date of Award 16.11.2016, Scheduled date of Rehabilitation of Sewerage Scheme Kot Momin District Completion is 15.11.2017, Date of 386 898 Sargodha 152.397 37.001 10.000 10.000 1.667 0 0% 37.001 24% Commencement, 16.11.2016, Funds released Sargodha on 30.07.2018, Funds on-lined on 30.07.2018.Drain Type-I, II & III 4807-Rft, constructed. Stay order issued by the Civil Court regarding Land acquisition.

Date of A.A 25.08.2015, Date of T.S 14.10.2015, Date of Award 15.01.2016, Scheduled date of Completion on 30.06.2017, Sewerage and Drainage Scheme at Chak No.60 Shamali Date of Commencement, 15.01.2016, Funds 387 899 Sargodha 60.000 49.998 10.002 10.002 1.667 0 0% 49.998 83% Khizarabad Ghosia Mehria Colony released on 30.07.2018, Funds on-lined on 30.07.2018.Drain 34406-Rft & Sullage carrier 8212-Rft constructed, Soling 4484-Cft & PCC Slab 114865-Cft laid. work in progress.

Date of A.A 27.08.2016, Date of T.S 28.10.2016, Date of Award 14.02.2017, Scheduled date of Completion on 13.02.2018, Urban Drainage / PCC Flooring Scheme Miani District Date of Commencement, 14.02.2017, Funds 388 900 Sargodha 93.181 31.465 15.000 15.000 2.500 0 0% 31.465 34% released on 30.07.2018, Funds on-lined on Sargodha 30.07.2018.01-No. Collecting tank completed, Sullage Carrier 23424-Rft & Drain 2546-Rft constructed. P.C.C 27147-Cft & Tuff Tile 22857-Sft laid Work in progress.

Date of A.A 09.06.2015, Date of T.S 17.06.2015, Date of Award 31.07.2015, Scheduled date of Completion is 30.07.2017, Urban Sewerage Scheme for (Islam Pura, Zafar Colony, Date of Commencement, 31.07.2015, Funds Qartaba Town, Jauhar Colony, Sultan Town, Shirazi park, released on 30.07.2018, Funds on-lined on 389 901 Mujhid Colony, Ali Town, Gilwala Including Adjacent Sargodha 389.887 189.545 50.000 50.000 8.334 7.913 95% 197.458 51% 30.07.2018.02-No. screening chamber, Colonies) & Abadies of (Yousaf park, Aziz Colony, Bashir collecting tank, pumping chamber 90% Colony, Nawab Colony completed. 08-Sets Pumping Machinery out of 14-sets & 02-Sets Generator arranged at site. RCC Sewer 1958-Rft laid. RCC Box Channel 9139-Rft constructed. Work in progress.

Date of A.A. 05-09-2014, Date of T.S.03-10- 2014, Date of Start of Work,08-11-2014, , Remarks. RCC Sewer=9" i/d=13629 /15205, 12"i/d= 3959/4960, 15"i/d= 8037/8695, 18"i/d= 3678/3675, 21"i/d=184/200, 24"i/d=485/500, 27"i/d= 585/600, 30"i/d=1106/1250, 33"i/d= 3232/3330, Urban Sewerage / Drainag Scheme, Kamar Mushani, Screening Chamber=1/1, Collecting Tank 390 902 Mianwali 190.611 118.368 50.000 50.000 8.334 8.287 99% 126.655 66% Mianwali. 25'dia= 2/2, P/Machinery=0/4, Suction Delivery=1/1, Discharge Sump=1/1, Generator Room=1/1, Staff Quarter=1/1, Generator Set=1/1, Boundary Wall=1/1, S/Carrier=3120/4675, Out fall Structure=0/1, S/Drain= 14933/51760, PCC Slab= 174131/294164, Electric T/Line=0/1. Work is in progress.

Provision of PCC Slab and Sewerage Scheme in Municipal Date of A.A 27.08.2016 Date of T.S 391 903 Bhakkar 68.340 43.098 10.000 10.000 1.667 0 0% 43.098 63% 30.09.2016 Date of Commencement Committee Dullay wala 28.11.2016 Date of completion 28.11.2018 Date of A.A 20-10-2016. Date of T.S.31-10- Provision of Sewerage in Tandlianwala City District 2016. Work order issued on 17-12-2016. 392 904 Faisalabad 100.000 71.902 28.098 28.098 4.683 3.345 71% 75.247 75% Faisalabad Phase 1 Work is in progress. Funds released on 03.08.2018 Date of A A 20 10 2016 Date of T S 24 11 2016 Date of Invitation of tenders 15 12 2016 Date of Receipt of tender 24 12 2016 Date of Comprehensive Sewerage/ Drainage scheme AP Sial work order 28 12 2016 Date of Completion As 393 905 Jhang 100.000 30.000 20.000 20.000 3.334 3.2 96% 33.200 33% (Urban) per PC-I 19 10 2019 Anticipated date of completion 27 12 2019 No of Baneficiary 12731-Persons Agreement Amount 96 709- Million Work is in progress

Date of A A 25 03 2017 Date of T S 28 03 2017 Date of Invitation of tenders 18 04 2017 Construction of Sewerage, PCC Slab, Drain & Soling at Date of Receipt of tender 20 04 2017 Date of 394 906 0.334 90% 4.300 72% work order 07 09 2017 Date of Completion As Ward NO. 1,2,3,4,5&6 and adjoining abadies urban area Jhang 6.000 4.000 2.000 2.000 0.3 per PC-I 19 10 2018 Anticipated date of Jhang completion 06 07 2018 No of Baneficiary 12731-Persons Agreement Amount 4 961- Million Work is in progress

Date of A A 25 03 2017 Date of T S 28 03 2017 Date of Invitation of tenders 18 04 2017 Construction of Sewerage, PCC Slab, Drain & Soling at Date of Receipt of tender 20 04 2017 Date of 395 907 0.334 91% 4.305 72% work order 28 09 2017 Date of Completion As Ward NO. 13,14,15,16,17 & 18 and adjoining abadies Jhang 6.000 4.000 2.000 2.000 0.305 per PC-I 19 10 2018 Anticipated date of urban area Jhang completion 06 07 2018 No of Baneficiary 12709-Persons Agreement Amount 5 006- Million Work is in progress Date of A A 25 03 2017 Date of T S 28 03 2017 Date of Invitation of tenders 18 04 2017 Construction of Sewerage, PCC Slab, Drain & Soling at Date of Receipt of tender 20 04 2017 Date of 396 908 0.334 100% 4.334 72% work order 07 09 2017 Date of work order 07 Ward NO. 19,20,21,22,23 & 24 and adjoining abadies Jhang 6.000 4.000 2.000 2.000 0.334 09 2017 Date of Completion As per PC-I 19 urban area Jhang 10 2018 No of Baneficiary 12709-Persons Agreement Amount 5 491-Million Work is in progress Date of A A 25 03 2017 Date of T S 28 03 2017 Date of Invitation of tenders 18 04 2017 Construction of Sewerage, PCC Slab, Drain & Soling at Date of Receipt of tender 20 04 2017 Date of 397 909 0.334 100% 4.334 72% work order 07 09 2017 Date of Completion As Ward NO. 25,26,27,28,29 & 30 and adjoining abadies Jhang 6.000 4.000 2.000 2.000 0.334 per PC-I 19 10 2018 Anticipated date of urban area Jhang completion 06 07 2018 No of Baneficiary 112173-Persons Agreement Amount 5 494- Million Work is in progress

Date of A A 25 03 2017 Date of T S 28 03 2017 Date of Invitation of tenders 18 04 2017 Construction of Sewerage, PCC Slab, Drain & Soling at Date of Receipt of tender 20 04 2017 Date of 398 910 0.334 100% 4.334 72% work order 08 08 2017 Date of Completion As Ward NO. 31,32,33,34,35 & 36 and adjoining abadies Jhang 6.000 4.000 2.000 2.000 0.334 per PC-I 19 10 2018 Anticipated date of urban area Jhang completion 07 05 2018 No of Baneficiary 11596-Persons Agreement Amount 4 920- Million Work is in progress

Date of A A 25 03 2017 Date of T S 28 03 2017 Date of Invitation of tenders 18 04 2017 Construction of Sewerage, PCC Slab, Drain & Soling at Date of Receipt of tender 20 04 2017 Date of 399 911 0.334 100% 5.334 76% work order 07 09 2017 Date of Completion As Ward NO. 37,38,39,40,41,42, & 43 and adjoining abadies Jhang 7.000 5.000 2.000 2.000 0.334 per PC-I 19 10 2018 Anticipated date of urban area Jhang completion 06 07 2018 No of Baneficiary 13260-Persons Agreement Amount 6 191- Million Work is in progress

Date of A A 25 03 2017 Date of T S 28 03 2017 Date of Invitation of tenders 18 04 2017 Construction of Sewerage, PCC Slab, Drain & Soling at Date of Receipt of tender 20 04 2017 Date of 400 912 0.334 100% 5.334 76% work order 08 08 2017 Date of Completion As Ward NO. 44,45,46,47,48,49, & 50 and adjoining abadies Jhang 7.000 5.000 2.000 2.000 0.334 per PC-I 19 10 2018 Anticipated date of urban area Jhang completion 07 05 2018 No of Baneficiary 13015-Persons Agreement Amount 6 084- Million Work is in progress

Date of A A 25 03 2017 Date of T S 28 03 2017 Date of Invitation of tenders 18 04 2017 Construction of Sewerage, PCC Slab, Drain & Soling at Date of Receipt of tender 20 04 2017 Date of 401 913 0.334 100% 4.334 72% work order 07 09 2017 Date of Completion As Ward NO. 7,8,9,10,11&12 and adjoining abadies urban Jhang 6.000 4.000 2.000 2.000 0.334 per PC-I 19 10 2018 Anticipated date of area Jhang completion 06 07 2018 No of Baneficiary 12768-Persons Agreement Amount 5 416- Million Work is in progress

1-Date of A.A 12.11.20152- Date of T.S 25.02.20163-Date of Prequalification - 07.03.20164-Date of invitation of tenders 18.03.20165- Date of Receipt of tenders Extension Rehabilitation of Urban Sewerage Scheme Toba Tek 26.03.20166- Date of work odder - 402 914 488.756 228.499 100.000 100.000 16.667 15 90% 243.499 50% 29.04.20167- Date of completion as per PC-I Karnalia City Phase II Singh 11.11.20188- Anticipated date of completion 11.11.2018 9- No. of Beneficiary - 306625 Person10-Funds Released by F.D 03.08.2018 11-Re-appropriation of funds(+/-) Work in progress. 1-Date of A.A 12.11.20152- Date of T.S 26.02.20163-Date of Prequalification - 07.03.20154-Date of invitation of tenders 18.03.20165- Date of Receipt of tenders Extension/Rehabilitation of Urban Sewerage Scheme Toba Tek 26.03.20166- Date of work odder - 403 915 400.000 224.900 50.000 50.000 8.334 8 96% 232.900 58% 18.04.20167- Date of completion as per PC-I Gojra Singh 11.11.20188- Anticipated date of completion 11.11.20189- No. of Beneficiary -393651 Person 10-Funds Released by F.D 03.08.2018 11-Re-appropriation of funds(+/-) Work in progress. 1-Date of A.A 16.10.20142- Date of T.S 03.12.20143-Date of Prequalification 08.12.20144-Date of invitation of tenders 08.12.20145- Date of Receipt of tenders Toba Tek 23.12.20146- Date of work order 31.12.20147- 404 916 Urban Sewerage and Drainage Scheme Pir Mehal 290.000 230.000 20.000 20.000 3.334 3.334 100% 233.334 80% Singh Date of Completion as per PC-I 15.10.20178- Anticipated date of completion 30.12.20189- No. of Beneficiary - 139496 Person 10-Funds Released by F.D 03.08.2018 11-Re- appropriation of funds(+/-) Work in progress. Const of Sewerage Drainage PCC Scheme 405 917 Gujranwala 120.754 84.455 15.918 15.918 2.653 2.653 100% 87.108 72% Work in progress Talwara Tehsil Construction of Sewerage Drainage Tuff tiles in Noshera 406 918 Gujranwala 208.986 25.000 10.000 10.000 1.667 1.667 100% 26.667 13% Work in progress Virkan Provision of Sewerage & water Supply Scheme at 407 919 Gujranwala 199.871 130.786 69.085 69.085 11.514 9.326 81% 140.112 70% Work in progress Ghakhar & Ladhaywala, District Gujranwala (Revised) 408 920 5.000 70% 113.480 68% A.A 167.781 Date 04/04/2016 T.S. 167.77 Provision of Sanitation / Drainage in City Pindi Bhattian Hafizabad 167.781 109.980 30.000 30.000 3.5 date 16-05-2016 work in progress The work was alloted to the contractor on dt: 26-11-2016 and contractor started the work at site .A.A 141.240 Date 06/09/2016 T.S. 142.374 date 30-09-2016 Drain 140910 Rft, Sullage Carrier /storm water 1.5x1.5=2225 Rft 409 921 Provision of Sanitation facilities in City Sukhike Mandi Hafizabad 141.332 129.943 11.389 11.389 1.898 1.24 65% 131.183 93% 2.0x2.0=1350 Rft 2.0x2.5=2350 Rft 3.0x3.0=5878 Rft Tuff tile 60mm thick=17292 Sft 80mm thick =3200 Sft Brick Pavement/Soling = 37645 Cft, PCC 3" thick= 69726 Cft,4" thcik=56945 Cft,thick=82872 Cft, work in progress. The work was alloted to the contractor on dt: 26-11-2016 and contractor started the work at 410 922 Urban Drainage Scheme Jalapur Bhattian Hafizabad 96.640 84.989 11.651 11.651 1.942 1 51% 85.989 89% site .A.A 141.240 Date 06/09/2016 T.S. 142.374 date 30-09-2016 Drain 140910 Rft,Sullage Carrier /storm Construction of Two Pumps Station at Old G.T.Road R.A.A Date =3.05.2017R.T.S 411 923 Gujrat 108.440 66.655 41.785 41.785 6.964 0 0% 66.655 61% Drain Gujrat. date=29.9.2017.work in progress * A.A Date. 09.10.2014* T.S Date. Mandi 22.12.2014 * Start Date 16.02.2015* 412 924 Sewerage & water Supply Tank for Bhiki Sharif 116.314 90.749 25.565 25.565 4.261 4.12 97% 94.869 82% Bahauddin Completion date 30.06.2019.* Work in progress. * A.A Date. 06.01.2016* T.S Date. Mandi 15.01.2016* Start Date 11.03.2016* 413 925 Sewerage / Drainage Scheme Malikwal City, Distt.M.B.Din 237.200 61.300 25.000 25.000 4.167 3.125 75% 64.425 27% Bahauddin Completion date 10.03.2019.* Work in progress. Construction of Nallah Around Road from Uggoki to Rai 414 926 Pur Abba Baigowala Ganda Nallah Railway Station etc. Sialkot 199.826 70.000 15.000 15.000 2.500 1.768 71% 71.768 36% Work in progress. Tehsil Sambrial ,District Sialkot Construction of Street PCC / Tufff Tiles Drains & Nullah 415 927 Sialkot 80.000 50.000 10.000 10.000 1.667 1.357 81% 51.357 64% Work in progress. Fazal Pura & adjoining Streets Sambrial City Construction of Street PCC / Tufff Tiles Drains & Nullah in 416 928 Sialkot 80.000 45.000 10.000 10.000 1.667 1.368 82% 46.368 58% Work in progress. Mandi Samrial and old Sambrial Construction of Street PCC/Tuff Tiles Drains & Nullah in 417 929 Sialkot 80.000 44.996 10.000 10.000 1.667 1.221 73% 46.217 58% Work in progress. Mohallah Rasoolpur & More Sambrial, Tehsil Sambrial Construction of Streets (Drains, PCC) Mohallah Sharif 418 930 Pur, Habib Pura, Bashir Pura, Nazir Abad Colony and Sialkot 90.000 50.000 10.000 10.000 1.667 1.288 77% 51.288 57% Work in progress. others. Construction of Urban Drainage Scheme Pasrur City, 419 931 Sialkot 99.827 25.000 10.000 10.000 1.667 1.29 77% 26.290 26% Work in progress. Tehsil Pasrur, District Sialkot. Provision of PCC / Soling / Nullah / Street Scheme at Adalat Garah Bashamula, Muzaffarpura, Dhanay, 420 932 Sialkot 200.000 25.000 10.000 10.000 1.667 1.455 87% 26.455 13% Work in progress. phabarainawala, Gujayanwala, Ravail pura, Stabgary, Burj / Butter etc.,Teshil & District Sialkot Provision of Sewerage Drainage and and Tuff Tile at 421 933 Sialkot 100.000 30.000 10.000 10.000 1.667 1.297 78% 31.297 31% Work in progress. Daska City *Date of A.A 9.4.2016 *Date of T.S 19.4.2016 422 934 Const of PCC / Tuff tiles of City Package Zafarwal City Narowal 69.569 38.854 20.000 20.000 3.334 2.698 81% 41.552 60% *Start Date 6.6.2016 *Completion date 30.06.2019. Work in progress. A.A Date.3.5.2014 T.S Date.23.5.2014 *Start 423 935 Sewerage scheme for Bhindran, Narowal. Narowal 98.435 94.356 4.079 4.079 0.680 0.659 97% 95.015 97% Date 25.08.2014 *Completion date 30.06.2019.Work in progress. 424 936 PCC and drainage Scheme in UC 117 Mansoora Lahore. Lahore 202.567 119.642 15.000 15.000 2.500 2.488 100% 122.130 60% Work is in progress

Provision of clean drinking water Sewerage system PCC Physically scheme is completed, balance 425 937 Lahore 200.742 171.650 29.092 29.092 4.849 4.849 100% 176.499 88% funds are required to clear the contractor's and allied facilities in Chung Mohlanwal Manak liability. Provision of clean drinking water, Sewerage system, PCC Physically scheme is completed, balance 426 938 and allied facilities in Babo Mehar Town, Lidhar, Bedian Lahore 200.012 171.650 28.362 28.362 4.727 4.727 100% 176.377 88% funds are required to clear the contractor's Road and adjoining abadies liability. Provision of clean drinking water, Sewerage system, PCC 427 939 Lahore 509.268 156.964 80.000 80.000 13.334 10 75% 166.964 33% work is in progress and allied facilities in Jallo More, Batapur Katcha Storm / Sullage Water Channel in District 428 940 Sheikhupura 199.813 139.520 15.000 15.000 2.500 2.5 100% 142.020 71% Work in Progress Sheikhupura 429 941 Provision of Open water Supply Scheme Ferozwala. Sheikhupura 199.210 82.664 10.000 10.000 1.667 0.515 31% 83.179 42% Work in Progress Provision Of Sewerage and PCC Scheme Pir Bahar Shah, 430 942 Sheikhupura 175.000 95.000 10.000 10.000 1.667 1.667 100% 96.667 55% Work in Progress Qazi Park Ramgarah & Purana Shehar City Sheikhupura Provision of Sewerage Scheme Burjwala, Saleem Kot, 431 943 Sheikhupura 174.527 165.000 9.527 9.527 1.588 0.52 33% 165.520 95% Work in Progress Housing Colony, City Sheikhupura Provision of Sewerage system in mohllah ghareeb abad 432 944 Sheikhupura 157.452 155.000 2.452 2.452 0.409 0.409 100% 155.409 99% Work in Progress etc City Sheikhupura Urban Sewerage / Drainage Scheme Sharqpur Seikhupura 433 945 Sheikhupura 183.441 89.027 10.000 10.000 1.667 0.6 36% 89.627 49% Work in Progress , Sharqpur Urban Sewerage Scheme Ferozwala New Sewer Lines 434 946 Sheikhupura 199.330 184.330 15.000 15.000 2.500 0.75 30% 185.080 93% Work in Progress District Sheikhupura Augmentation / Rehabilitation of Urban Sewerage Scheme, Nankana 435 947 264.253 145.000 15.000 15.000 2.500 2.5 100% 147.500 56% Work is in progress. Nankana Sahib Sahib Const. of Storm Water Channel / Ext. & Improvement Nankana 436 948 119.138 99.756 19.382 19.382 3.231 0 0% 99.756 84% Work is in progress. Urban Sewerage / Drainage Scheme Shahkot Phase-II Sahib Execution of Sanitation Sector Development scheme Shah Nankana 437 949 50.000 23.600 10.000 10.000 1.667 0 0% 23.600 47% Work is in progress. Kot City District Nankana Sahib Sahib Construction of Sullage Carrier for Ultimate Disposal of 438 950 Kasur 337.971 20.000 50.000 50.000 8.334 7.125 85% 27.125 8% Work in Progress Phoolnagar City, Tehsil Pattoki, District Kasur Provision of Sewerage & Drainage System in Chunian 439 951 Kasur 99.011 64.000 10.000 10.000 4.187 2.702 65% 66.702 67% Work in Progress City, Kasur 440 952 Sewerage Drainage Scheme Kangan Pur District Kasur. Kasur 161.161 122.351 10.000 10.000 1.667 0.425 25% 122.776 76% Work in Progress 441 953 Urban Drainage Scheme Kasur city District kasur Kasur 99.827 35.000 15.000 15.000 2.500 2.5 100% 37.500 38% Work in Progress Urban Drainage, PCC & Brick Pavement scheme Kasur 442 954 Kasur 457.681 312.859 50.000 50.000 8.334 8.214 99% 321.073 70% Work in Progress city District Kasur Urban PCC & Drainage Scheme District 443 955 Kasur 112.887 104.613 8.274 8.274 1.379 0.901 65% 105.514 93% Work in Progress Kasur.

444 956 Urban Sewerage Drainage Scheme, Pattoki (Revised) Kasur 680.017 661.136 18.881 18.881 1.147 0.758 66% 661.894 97% Work in Progress

Date of AA 03.03.2014, Date of TS 05.03.2014, Date of Pre- qualification.05.05.2014, Date of Receipt of Complete Repair and renovation of Sewerage system Tenders,20.05.2014, Date of work Order. 445 957 2.003 0% 172.031 93% 30.05.2014, Date of completion As per PC-I. including PCC, Drains, water channels, soling, tuff tiles Okara 184.048 172.031 12.017 12.017 0 30.06.2016, Anticipated date of etc. in M.C. Mandi Ahmed Abad, District Okara. completion.30.06.2018, Projected Population 66950 Person, Re- Appropriation (+) 6.00 dt:28.02.2018, (+) 2.000 dt: 16.03.2018 Release of Funds 02.08.2017. Date of AA 02.04.2014, Date of TS 14.04.2014, Date of Pre- qualification.10.04.2014, Date of Invitation of Tender 05.05.2014, Date of Receipt of Construction of Sewerage Scheme Renala Khurd City, Tenders 05.05.2014, Date of work Order 446 958 Okara 327.480 296.423 31.057 31.057 5.176 0 0% 296.423 91% 13.05.2014, Date of completion As per PC-I. District Okara 30.06.2016., Anticipated date of completion,30.06.2018,Re-appropriation of funds (+) 0.200 dt: 16.03.2018, Projected Population 119573 Person, Release of Funds 02.08.2017. Date of AA 09.04.2010 ( Original), Date of Revised AA 31.10.2014 , Date of TS 18.08.2010 (Phase -I), Date of Revised TS 05.03.2015 , Date of Pre- qualification,20.03.2015, Date of Invitation of Tender 09.05.2015, Date of Receipt of 447 959 1.810 0% 289.495 96% Tenders 10.05.2015, Date of work Order Sewerage Scheme Depal Pur City District Okara Okara 300.355 289.495 10.860 10.860 0 20.06.2011 & 03.09.2015, Date of completion As per Revised PC-I. 31.12.2017, Re- appropriation of funds (-) 10.00 dt: 28.02.2018 Anticipated date of completion,30.06.2018, Projected Population 229210 Person, Release of Funds 02.08.2017. Date of AA 16.05.2014, Date of TS 28.06.2014, Date of Pre-qualification 17.06.2014, Date of Invitation of Tender 448 960 0.712 0% 94.952 96% 30.06.2014, Date of Receipt of Tenders Sewerage Scheme Shergarh Renala Khurd Okara Okara 99.224 94.952 4.272 4.272 0 30.06.2014, Date of work Order 17.09.2014, Date of completion As per PC-I.14.09.2016 , Anticipated date of completion,30.06.2017, Projected Population 26497 Person. Date of AA 13.10.2016 , Date of TS 07.12.2016, Date of Pre-qualification 08.02.2017, Date of receipt of tender Rehabilitation/Augmentation of Sewerage System at 18.02.2017 , Date of Work Order 22.03.2017 449 961 Sahiwal 78.583 56.390 22.193 22.193 3.699 1.85 50% 58.240 74% Harrappa City , Date of completion as per PC-1 30.06.2018 , Date of completion as per agreement 30.06.2018, Anticipated date of completion 30.06.2019, Work in progress. 1. Date of A.A. 15.01.2014 (21.04.2016) 2. Date of T.S. 22.01.2014 (05.08.2016) 3. Date of Prequalification 27.01.2014 4. Date of Invitation of Tender 12.02.2014 5. Date of Receipt of Tenders 24.02.2014 6. Date of work order 10.03.2014/18.11.2016 Extension of Urban Sewerage Scheme Jalalpur Pirwala, 7. Date of Completion as per PC-l 14.01.2016 450 962 Multan 196.830 159.963 36.867 36.867 6.145 0 0% 159.963 81% 8. Anticipated date of completion 30.06.2019 District Multan (Revised) 9. Date of released of funds 02.08.2017 10. No. of beneficiaries= 170275 persons. Work stopped at site by the contractor wothout informing Department. Notice served to the contractor.

1.Date of AA 11.04.2017 2.Date of T.S 08.08.2017 3.Dated of Prequalification - 4.Date of invitation of tender 27.09.2017 Provision / Rehablitation / Improvement of water Supply in 5.Date of Receipt of tenders 451 963 Urban U/Cs-12 & 13 and Construction of Drain, Tuff Tiles, Multan 6.000 4.000 2.000 2.000 0.334 0 0% 4.000 67% 18.10.2017 Sewerage in Urban U/Cs-23,24,26 & 41 Multan City 6.Date of work order 06.11.2017 7.Date of Completion as per PC-l 05.05.2018 8. Anticipated date of completion 30.06.2019 9. Date of released of funds 02.08.2017 1. Date of AA 26.08.2014. 2. Date of T.S 15.10.2014. 3. Dated of Prequalification 11.08.2014. 4. Date of invitation of tender Sewerage Water Disposal from North South Shujabad City 23.10.2014. 452 964 Multan 145.222 118.254 26.968 26.968 4.495 0 0% 118.254 81% Multan 5. Date of Receipt of tenders 24.10.2014. 6. Date of work order 08.11.2014. 7. Date of Completion as per PC-l 25.08.2016 8. Anticipated date of completion 30.06.2019 9. Date of released of funds 1. Date of A.A: 12.02.2015 2. Date of T.S: 05.03.2015. 3. Date of Pre-Qualification: 11.08.2014. 4. Date of Invitation of Tender: 23.10.2014. 5. Date of Receipt of Tender: Rehabilitation / extension of Sewerage / drainage system 24.10.2014 6. Date of Work order: 453 965 Khanewal 306.616 254.224 52.392 52.392 8.732 2.75 31% 256.974 84% 05.11.2014 7. Date of Completion as per PC- of Mian Channu City I: 25.08.2016 8. Anticipated Date of completion: 30.06.2019 9. Date of released of funds 03.08.2018 10. Reason of Slow Moving: ------11 No. of beneficiaries 200428 Persons Work in progress. 1. Date of A.A: 27.08.2016 2. Date of T.S: 25.10.2016 3. Date of Pre-Qualification: 26.10.2016 4. Date of Invitation of Tender: 03.12.2016 5. Date of Receipt of Tender: 05.12.2016 6. Date of Work order: 454 966 Revamping of Jahanian Sewerage System, Jahanian Khanewal 199.359 97.866 50.000 50.000 8.334 8.25 99% 106.116 53% 15.12.2016 7. Date of Completion as per PC- I: 30.09.2019 8. Anticipated Date of completion: 30.06.2019 9. Date of released of funds 03.08.2018 10. Reason of Slow Moving: ------11 No. of beneficiaries 65026Persons Work in progress. 1. Date of A.A: 29.12.2014. 2. Date of T.S: 12.03.2015 3. Date of Pre-Qualification: 13.03.2015 4. Date of Invitation of Tender: 10.04.2015 5. Date of receipt of Tender: Provision of drainage / Sewerage, soling & water Supply 11.04.2015 6. Date of Award: 20.04.2015 7. 455 967 Vehari 358.775 239.429 50.000 50.000 8.334 8.334 100% 247.763 69% Date of Completion as per PI: 28.12.2016 8. in Municipal Area of Burewala City. Anticipated Date of Complion: 30.06.2018 9. Date of released of funds 03.08.2018 10. Reason of Slow Moving: NIL 11. No. of Beneficiaries 226016 Persons. Work is in progress. Comprehensive Sewerage / Drainage Scheme Taunsa Dera Ghazi 456 968 485.406 200.911 100.000 100.000 16.667 6.333 38% 207.244 43% "• Date of A.A = 12.02.2015 Sharif including Tuff Tilling of Streets Khan Rural Drainage Sewerage PCC and Tuff Tile flooring Rajan 457 969 Rajanpur 40.500 25.600 14.900 14.900 2.484 2.484 100% 28.084 69% "• Date of A.A = 24.4.2015 Pur City and Adjoining Abadies UC Rajan Pur Urban drinage/Sewerage/tuff tile scheme in Jampur City 458 970 (replacement of outlived sewer and new sewer system in Rajanpur 365.753 195.169 100.000 100.000 16.667 16.667 100% 211.836 58% "• Date of A.A = 23.12.2014 Faisal Colony, Shah Jamal Colony and Tattar Wala) Open Drainage & Tuff Tile Scheme in Remaining Portion 459 971 Muzaffargarh 49.850 32.404 17.446 17.446 2.908 0.9 31% 33.304 67% "• Date of A.A 22-09--2016 of Kot Addu City Comprehensive Sewerage Scheme alongwith Tuff Tiles in 460 972 Layyah 199.995 105.377 50.000 50.000 8.334 8.285 99% 113.662 57% • Date of AA = 22-09-2016 City Chowk Azam 461 973 Urban Sewerage Scheme for Kot Sultan Layyah 191.440 152.935 20.000 20.000 3.334 1.35 40% 154.285 81% • Date of AA = 24-02-2009 Date of AA :26-02-2014. Date of TS :05-03- 2014.. Date of RAA=12-05-2016. Date of pre- qualification: 07-03-2014. . Date of receipt of Sewer Line from Bahawalpur Victoria Hospital to Disposal tenders. 02-04-2014. Date of work order :29- 462 974 Bahawalpur 175.443 142.050 33.393 33.393 5.566 0 0% 142.050 81% 04-2014.. Date of completion as per Lal Bagh Tehsil & District Bahawalpur. agreement:28.04.2016.. Anticipated date of completion=30-06-2019. Date of receipt of funds by F.D. 20.07.2018. Work is in progress. Date of AA: 11.01.2014. Date of TS: 17.01.2014. Date of RTS 23-11-2016. Date of pre-qualification: 28.02.2014.. Date of receipt of tenders = 19-03-2014. Date of work Laying of Tuff Paver and provision of water Supply order=11.04.2014.. Date of completion as per 463 975 Bahawalnagar 70.000 55.233 14.767 14.767 2.461 0 0% 55.233 79% Pipelines in City Bahawalnagar. agreement=10.04.16.. Anticipated date of completion=30-06-2019. Original scope of work is completed. Revised scope of work is in progress. Date of receipt of funds by F.D. 20.07.2018. Work is in progress. Date of AA = 29-09-2016(DDSC).. Date of T.S. 08.02.2017. Funds released by FD= 04- 07-2017 . Prequalification of the contractor 26- Provision of Sewerage Scheme Zone A with Tuff Paver at 01-2017. Tender received on 22.03.2017 . 464 976 Bahawalnagar 399.587 118.048 150.000 150.000 25.000 0.04 0% 118.088 30% Bahawalnagar Date of work awarded.03-05-2017. . Date of completion 02-05-2019. . Date of receipt of funds by F.D. 20.07.2018. Work is in progress. Date of A.A 25.05.2014 . . Date of T.S. 21-07- 2014.. Date of Prequalification. 21-07-2014. Date of receipt of tenders =12-08-2014. Date of work order= 16-09-2014.. Date of 465 977 Sewerage Scheme Chishtian City Uplift Package Chishtian Bahawalnagar 916.110 672.917 100.000 100.000 16.667 16.367 98% 689.284 75% completion as per agreement= 15.09.2017.Anticipated date of completion = 30.06.2019 .No. of beneficiaries=342309 persons. Date of receipt of funds by F.D. 20.07.2018. Work is in progress. Date of A.A(PDWP) 19-01-2017. Date of T.S 16.02.2017.. Prequalification of the contractor Rahim Yar 15.03.2017.. Date of receipt of tender:- 466 978 Mega Sewerage Scheme Liaqatpur City 500.000 50.000 200.000 200.000 33.334 0 0% 50.000 10% Khan 03.04.2017. . Date of completion. 23-07- 2019. Date of receipt of funds by F.D. 20.07.2018. Work is in progress.. Date of AA. 09-10-2014. . Date of TS. 21-11- 2014. Rev: TS 28.10.2016.. Date of prequalification. 08-12-2014.. Date of receipt of tenders = 31-12-2014.. Date of work order= Rahim Yar 10-01-2015.. Date of completion as per 467 979 Rehabilitation of Sewerage City Sadiqabad 70.326 52.373 17.953 17.953 2.992 0 0% 52.373 74% Khan agreement= 09-01-2016.Anticipated date of completion=30-06-2018. Scheme completd in saving. Date of receipt of funds by F.D. 20.07.2018. Funds not required during 2018- 2019. Date of AA. 23-09-2014. . Date of TS.. 27-11- 2014.. Date of prequalification. 08-12-2014.. Date of receipt of tenders = 31-12-2014.. Request for provision of Sewerage Scheme of Feroza Rahim Yar Date of work order=10-2-15.. Date of 468 980 199.970 160.781 39.189 39.189 6.532 0 0% 160.781 80% Town, Tehsil Liaqat Pur Khan completion as per agreement 09-8-16. Anticipated date of completion 30-06-2019. Date of receipt of funds by F.D. 20.07.2018. Work is in progress.. 1. Date of AA =02.05.2016 2. Date of TS = 19.08.2016 . 3. Date of work order= 22.10.2016. 4. Date of Completion as per PC- I = 3 Ye 5. Anticipated Date of Comp = 469 981 Comprehensive Sewerage scheme Chenab Nagar Chiniot Chiniot 757.424 170.899 200.000 200.000 33.334 29.57 89% 200.469 26% 30.06.2019 6. No. of Beneficiaries= 116058. Funds Released on 03.08.2018 by the Chief Engineer (South) PHED Lahore and work is in progress. Target progress will be achieve in coming month. 1. Date of AA =15.09.2014. 2. Date of TS =28.11.2014 3. Date of Pre-qualification =06.12.2014 4. Date of inviting Tenders=20.12.2014 5. Date receipt of New urban Sewerage scheme for Mohallah Fateh Abad Tenders= 20.12.2014 6. Date of work order= 470 982 Chiniot 206.548 103.937 50.000 50.000 8.334 6.825 82% 110.762 54% 01.01.2015 7.Date of Completion as per PC-I Rashida Osmanaabad paris road Moazam Shah Shahbaal =2 Year 8. No. of Beneficiaries 94630 Funds Released on 03.08.2018 by the Chief Engineer (South) PHED Lahore and work is in progress. Target progress will be achieve in coming month. * A.A Date. 06.09.2017* T.S Date. Urban Sewerage/ Drainage PCC and Tuff Tiles in City Mandi 24.10.2017* Start Date. 07.01.2018* 471 983 270.500 29.000 30.000 30.000 5.000 5 100% 34.000 13% Phalia Tehsil Phalia District M.B.Din Bahauddin Completion date 06.01.2021.Work in progress. * A.A Date. 25.08.2017* T.S Date. Provision of Sewerage/PCC Streets/ Drain/Tuff Tiles/Park Mandi 06.09.2017* Start Date. 06.01.2018* 472 984 75.000 35.000 20.000 20.000 3.334 3.334 100% 38.334 51% and Janazgah District M.B.Din Bahauddin Completion date 05.01.2020* Work in progress. Urban Sewerage/Drainage scheme, PCC Slab & Brick Date of A.A 15.08.2017 Date of Amended A.A 473 985 Bhakkar 833.933 40.000 150.000 150.000 25.000 0 0% 40.000 5% Pavement in Bhakkar City 16.12.2017 Date of T.S 07.02.2018 Construction of Nali Soling in UC Basti Jaam, Construction Of Nali Soling,Tough Tiles Drainage,Culverts Dera Ghazi 474 986 And Qulabas U/C Ara Jafar, Construction Of Nali 21.500 10.750 10.750 10.750 1.792 0.896 50% 11.646 54% "• Date of A.A = 04.10.2017 Khan Soling,Tough Tiles Drainage,Culverts And Qulabas U/C Kotla Ahmad Khan, District D.G. Khan.

Construction Of Nali Soling,Tough Tiles Drainage,Culverts And Qulabas Muza Chak Masso U/C Nawan Shumali, Dera Ghazi 475 987 6.000 3.000 3.000 3.000 0.500 0.5 100% 3.500 58% "• Date of A.A = 04.10.2017 Construction Of Nali Soling,Tough Tiles Drainage,Culverts Khan And Qulabas U/C Jakhar Imam Shah, District D.G. Khan.

1-Date of A.A 12.08.2017 2- Date of T.S 3- Date of Prequalification 4-Date of invitation of tenders 5- Date of Receipt of tenders 6- Date Improvement of Street / Roads of Rajana Town, District Toba Tek of work order - 7- Date of completion as per 476 988 25.000 8.000 5.000 5.000 0.834 0.825 99% 8.825 35% T.T Singh Singh PC-I 8- Anticipated date of completion 9- No. of Beneficiary - Person 10-Funds Released by F.D 03.08.2018 - 11-Re-appropriation of funds (+/-) Work in progress.

Construction Of Nali Soling,Tough Tiles Drainage,Culverts Dera Ghazi 477 989 9.000 4.500 4.500 4.500 0.750 0.75 100% 5.250 58% "• Date of A.A = 04.10.2017 And Qulabas U/C Haji Kamand, District D.G. Khan. Khan

10930 Construction Of Nali Soling,Tough Tiles Drainage,Culverts And Qulabas U/C Khan Pur Janobi, Dera Ghazi 478 990 Construction Of Nali Soling,Tough Tiles Drainage,Culverts 33.700 16.850 16.850 16.850 2.809 1.124 40% 17.974 53% "• Date of A.A = 04.10.2017 Khan And Qulabas U/C Nawan Shumali, Construction Of Nali Soling,Tough Tiles Drainage,Culverts And Qulabas U/C N Sewerage / Drainage & PCC / RCC Scheme at Rahwali 479 991 Gujranwala 392.400 125.000 48.000 48.000 14.218 4.968 35% 129.968 33% Work in progress. including Adjoining Abadies etc, Gujranwala. Construction Of Nali Soling,Tough Tiles Drainage,Culverts And Qulabas U/C Aali Wala, Construction Of Nali Dera Ghazi 480 992 Soling,Tough Tiles Drainage,Culverts And Qulabas U/C 52.000 26.000 26.000 26.000 4.334 2.2 51% 28.200 54% "• Date of A.A = 04.10.2017 Khan Jalbani, Construction Of Nali Soling,Tough Tiles Drainage,Culverts And Qulabas U/C Basti Malana,

Construction Of Nali Soling,Tough Tiles Drainage,Culverts And Qulabas U/C Tibbi Kharak, Construction Of Nali Dera Ghazi 481 993 Soling,Tough Tiles Drainage,Culverts And Qulabas U/C 130.000 65.000 18.000 18.000 3.000 3 100% 68.000 52% "• Date of A.A = 04.10.2017 Khan Chabri Zareen, Construction Of Nali Soling,Tough Tiles Drainage,Culverts And Qulabas U/C Kot,

Construction Of Nali Soling,Tough Tiles Drainage,Culverts And Qulabas U/C Darahma, Construction Of Nali Dera Ghazi 482 994 Soling,Tough Tiles Drainage,Culverts And Qulabas U/C 29.000 14.500 14.500 14.500 2.417 1.21 50% 15.710 54% "• Date of A.A = 04.10.2017 Khan Samina, Construction Of Nali Soling,Tough Tiles Drainage,Culverts And Qulabas U/C Chorahatta, Dist Construction of Nali Soling V/C Aliwala C/O Fateh Muhammad Bazgir, Construction of Nali Soling, Tuff Tiles, Dera Ghazi 483 995 10.000 5.000 5.000 5.000 0.834 0.834 100% 5.834 58% "• Date of A.A = 04.10.2017 Drainage, Culverts and Qulabas U/C Mana Ahmadani, Khan District D.G. Khan. 1. Date of A.A: 18.11.2017 2. Date of T.S: 08.12.2017 3. Date of Pre-Qualification: 06.09.2017 4. Date of Invitation of Tender: 30.01.2018 5. Date of Receipt of Tender: Provision of Urban sewerage Scheme at Kabirwala City, 31.01.2018 6. Date of Work order: 484 996 Khanewal 99.676 49.676 30.000 30.000 5.000 4.82 96% 54.496 55% 10.02.2018 7. Date of Completion as per PC- District Khanewal. I: 31.03.2019 8. Anticipated Date of completion: 30.06.2019 9. Date of released of funds 03.08.2018 10. Reason of Slow Moving: ------11 No. of beneficiaries 56299 Persons Work in progress. Construction of Nali Soling, Tuff Tiles, Drainage, Culverts Dera Ghazi 485 997 11.000 5.500 5.500 5.500 0.917 0.917 100% 6.417 58% "• Date of A.A = 04.10.2017 and Qulabas U/C Notak Mahmeed, District D.G. Khan. Khan

1-Date of A.A 19.09.2017 2- Date of T.S 19.10.2017 3-Date of Prequalification 4-Date of invitation of tenders 5- Date of Receipt of Provision of Laying Tuff Tile, Sewerage and Nullahs in Toba Tek tenders 6- Date of work order 22.11.2017 7- 486 998 150.000 75.000 25.000 25.000 4.167 2.1 50% 77.100 51% Date of completion as per PC-I 8- Anticipated Gojra, District T.T.Singh Singh date of completion 9- No. of Beneficiary - Person 10-Funds Released by F.D 03.08.2018 - 11-Re-appropriation of funds (+/- ). Work in progress.

Construction Of Nali Soling,Tough Tiles Drainage,Culverts And Qulabas U/C Darkhast Jamal Khan Darmiani, Dera Ghazi 487 999 Construction Of Nali Soling,Tough Tiles Drainage,Culverts 10.000 5.000 5.000 5.000 0.834 0.417 50% 5.417 54% "• Date of A.A = 04.10.2017 Khan And Qulabas U/C Darkhast Jamal Khan Janobi, Construction Of Nali Soling,Tough Tiles Drainage,

Construction Of Nali Soling,Tough Tiles Drainage,Culverts And Qulabas U/C Jhoke Utra, Construction Of Nali Dera Ghazi 488 1000 Soling,Tough Tiles Drainage,Culverts And Qulabas U/C 47.500 23.750 10.000 10.000 1.667 1.667 100% 25.417 54% "• Date of A.A = 04.10.2017 Khan Hazara, Construction Of Nali Soling,Tough Tiles Drainage,Culverts And Qulabas U/C Haider Quresh

Removal of ponds / construction of Pull and establishment 489 1001 Sialkot 36.043 20.643 15.400 15.400 2.567 1.788 70% 22.431 62% Work in progress. of Park at Moza Bahlor Tehsil Pasrur, District Sialkot.

Provision of Drainage / PCC Scheme at Tehsil Noshera 490 1002 Gujranwala 77.000 17.000 10.000 10.000 1.667 0.834 50% 17.834 23% Work in progress. Virkan & UC Sharan Kalan, District Gujrnawala

Date of A.A 02.01.2018, Date of T.S 13.02.2018, Date of Award 20.03.2018, Rural Drainage Scheme U.C Bhabra, U.C Halal Pur, U.C Scheduled date of Completion on 30.06.2019, 491 1003 0.834 0% 5.000 50% Date of Commencement, 20.03.2018, Funds Takhat Hazara and Adjoining Abadies Tehsil Kot Momin Sargodha 10.000 5.000 5.000 5.000 0 released on 30.07.2018, Funds on-lined on District Sargodha 30.07.2018.Drain 192-Rft constructed. P.C.C slab 6751-Cft & Soling 17594-Cft laid. Work in progress.

Date of A.A 02.01.2018, Date of T.S 13.02.2018, Date of Award 24.03.2018, Rural Drainage Scheme U.C Mouzamabd, U.C Jalla Scheduled date of Completion on 30.06.2019, 492 1004 Makhdoom, U.C Mateela including Adjoining Abadies Sargodha 10.000 5.000 5.000 5.000 0.834 0 0% 5.000 50% Date of Commencement, 24.03.2018, Funds Tehsil Kot Momin District Sargodha released on 30.07.2018, Funds on-lined on 30.07.2018.Soling 25462-Cft laid. Work in progress.

Date of A.A 02.01.2018, Date of T.S 13.02.2018, Date of Award 17.03.2018, Rural Drainage Scheme U.C Ghula Pur, U.C Chak Scheduled date of Completion on 30.06.2019, 493 1005 0.834 0% 5.000 50% Date of Commencement, 17.03.2018, Funds No.11/SB, U.C Garhi Kala and Adjoining Abadies Tehsil Sargodha 10.000 5.000 5.000 5.000 0 released on 30.07.2018, Funds on-lined on Kot Momin District Sargodha 30.07.2018.Drain 1934-Rft & Sullage Carrier 769-Rft constructed. Soling 17938-Cft laid. Work in progress.

Date of A.A 02.01.2018, Date of T.S 13.02.2018, Date of Award 20.03.2018, Rural Drainage Scheme U.C Mela, U.C Naseer Pur Kalan, Scheduled date of Completion on 30.06.2019, 494 1006 U.C Mustafa Abad and Adjoining Abadies Tehsil Kot Sargodha 10.000 5.000 5.000 5.000 0.834 0 0% 5.000 50% Date of Commencement, 20.03.2018, Funds Momin District Sargodha released on 30.07.2018, Funds on-lined on 30.07.2018.Drain 352-Rft constructed. Soling 27162-Cft laid. Work in progress.

Date of A.A 02.01.2018, Date of T.S 13.02.2018, Date of Award 20.03.2018, Rural Drainage Scheme U.C Dodha, U.C Gurna, U.C Jan Scheduled date of Completion on 30.06.2019, 495 1007 Muhammad Wala, U.C Laksian, U.C Miana Kot and Sargodha 10.000 5.000 5.000 5.000 0.834 0 0% 5.000 50% Date of Commencement, 20.03.2018, Funds Adjoining Abadies Tehsil Kot Momin District Sargodha released on 30.07.2018, Funds on-lined on 30.07.2018.Drain 376-Rft constructed. Soling 25284-Cft laid. Work in progress.

Date of A.A 02.01.2018, Date of T.S 13.02.2018, Date of Award 20.03.2018, Rural Drainage Scheme U.C Bucha Kalan, U.C Wan Scheduled date of Completion on 30.06.2019, 496 1008 Miana, U.C Midh Ranjha and Adjoining Abadies Tehsil Kot Sargodha 10.000 5.000 5.000 5.000 0.834 0 0% 5.000 50% Date of Commencement, 20.03.2018, Funds Momin District Sargodha released on 30.07.2018, Funds on-lined on 30.07.2018.Drain 1295-Rft constructed. Soling 25849-Cft laid. Work in progress. Construction of drain, brick pavement sullage carrier 497 1009 culverts & tuff tile flooring scheme of fazilpur tehsil & Rajanpur 50.000 25.000 25.000 25.000 4.167 4.167 100% 29.167 58% "• Date of A.A = 17.12.2014 district rajanpur Urban Drainage & PCC Scheme Northn Side of Railway 498 1010 Sheikhupura 96.319 48.319 15.000 15.000 2.500 1 40% 49.319 51% Work in Progress Track City Sheikhupra Providing and laying of sewerage at Ghaloria Colony 499 1011 Sheikhupura 97.683 47.683 15.000 15.000 2.500 1 40% 48.683 50% Work in Progress Farooq Nagar Shah Colony District Sheikhupura Construction of PCC, Nallah at Maraka UC-122, Shamke Physically scheme is completed, balance 500 1012 Bhattian, Chahram & mal, Manga Mandi Sunder, Kot Lahore 24.200 7.634 16.566 16.566 2.761 0.392 14% 8.026 33% funds are required to clear the contractor's Fateh Muahammad Athul, District Lahore liability. Construction of PCC Sewerage & Drainage System at UC- 501 1013 Lahore 8.000 5.581 2.419 2.419 0.403 0 0% 5.581 70% scheme completed 272 Raiwind Kalan & UC-273 Raiwind City, District Lahore

502 1014 Drainage P.C.C. & Brick pavement in Mustafabad, Kasur. Kasur 246.400 18.077 50.000 50.000 0.934 0.845 90% 18.922 8% Work in Progress Date of A.A 04.05.2016. Date of T.S 26-05- 2016. Date Awarded 11.06.2016.. Date of Sewerage / Tuff Tile in Choti Karana Tehsil & District completion 11-09-2017. Expected date of 503 1015 Bahawalpur 1.288 0.883 0.405 0.405 0.068 0 0% 0.883 69% completion 30-06-2018. Funds released by Bahawalpur. FD 20.07.2018 . Work completed during 2017- 2018. Liability of the contractor cleared.Excess funds received. Date of AA 19.03.2015. Date of T.S 18.04.2015.. Date of award 18.05.2015.. Date of completion 17.09.2015.. Expected date of Construction of Tuff Tile in Main Street Gillani City Uch completion 30-06-2018. Funds released by 504 1016 Bahawalpur 3.089 0.801 2.288 2.288 0.382 0 0% 0.801 26% Sharif Tehsil Ahmed Pur East, Bahawalpur. FD 20.07.2018 . Scheme remained unfunded during 2016-2017. Remaining work has been executed/completed by Local Government due to which funds not required.

Date of AA 19-12-2017. Date of T.S 15-02- Laying of Soling, Water Supply, Sewerage Line and Tuff Rahim Yar 2018. Tenders received on 13-03-2018 . Date 505 1017 40.000 20.000 20.000 20.000 3.334 0 0% 20.000 50% of award 18.04.2018.. Date of completion Tiles in City Sadiq Abad. Khan 12.04.2019.. Date of receipt of funds by F.D. 20.07.2018. Work is in progress. Date of AA 19-12-2017. Date of T.S 15-02- 2018. Date of receipt of tenders 13-03-2018 . Laying of Soling, Water Supply, Sewerage Line and Tuff Rahim Yar Date of work awarded 30-03-2018. Date of 506 1018 35.000 17.500 17.500 17.500 2.917 0 0% 17.500 50% completion 29-06-2019.. Anticipated date of Tiles in Rural Area Tehsil Sadiq Abad. Khan completion 30-06-2019. Date of receipt of funds by F.D. 20.07.2018. Work is in progress. Date of AA 19-12-2017. Date of T.S 16-02- 2018. Date of receipt of tenders 13-03-2018 . Laying of Soling, Water Supply, Sewerage Line and Tuff Rahim Yar Date of work awarded 07-04-2018. Date of 507 1019 8.000 4.000 4.000 4.000 0.667 0 0% 4.000 50% completion 06-06-2019.. Anticipated date of Tiles in Chak No. 148/P Tehsil Sadiq Abad. Khan completion 30-06-2019. Date of receipt of funds by F.D. 20.07.2018. Work is in progress. Date of AA 19-12-2017. Date of T.S 16-02- 2018. Tenders received on 13-03-2018.. Construction of Sewerage Line and Soling Wahid Bux Rahim Yar Dated of award 11.05.2018.. Date of 508 1020 5.000 2.500 2.500 2.500 0.417 0 0% 2.500 50% completion 26.06.2018.. Anticipated date of Mahar Tehsil Sadiq Abad. Khan completion 30-06-2019. Date of receipt of funds by F.D. 20.07.2018. Work is in progress.. Date of A.A Date of T.S Date of Extension, Improvement Complete Repair, Renovation of Prequalification Date of invitation of tenders Sewerage and and Water Supply System alongwith Date of Receipt of tenders Date of work order 509 1021 Okara 398.698 100.000 20.000 20.000 3.334 0 0% 100.000 25% Provision of Strom Water Channels, Street Lights and Tuff Date of completion as per PC-I Anticipated Tiles in Hujrah Shah Muqeem, District Okara date of completion No. of Beneficiary - Person, Work is in progress. Construction Of Nali Soling,Tough Tiles Drainage,Culverts And Qulabas U/C Khan Pur Janobi, Construction Of Nali Rahim Yar 510 1022 Soling,Tough Tiles Drainage,Culverts And Qulabas U/C 40.000 20.000 20.000 20.000 3.334 0 0% 20.000 50% Funds yet not Release. Khan Nawan Shumali, Construction Of Nali Soling,Tough Tiles Drainage,Culverts And Qulabas U/C N Work suspendwd at site due to change of water Supply Scheme Fazaiya Housing Colony Turnol intaka site by SPD Department. now NOC 511 1023 Rawalpindi 373.073 338.322 34.751 34.751 5.792 5.7 98% 344.022 92% Tehsil & District Rawalpindi granted by SPD and revised estimate under process in approval. A.A Date 21.10.2014.T.S Date 10.11.2014. Installation of water Supply scheme for residents of Fateh Date of Start of Scheme 22.01.2015.Date of 512 1024 Attock 469.913 439.913 30.000 30.000 5.000 5 100% 444.913 95% Jang attock Completion of Scheme 30.06.2019 Work is in progress. Date of A.A 17.09.2015.Date of T.S 513 1025 Est. of W.S. Scheme Talagang Chakwal 94.580 82.788 11.792 11.792 1.966 1.956 99% 84.744 90% 07.10.2015.Date of Start 26.01.2016.Date of completion 30.06.2019. Work is in progress.

Rehabilitation of Urban water Supply Scheme Kallar Date of A.A 17.09.2015.Date of T.S . Date of 514 1026 Chakwal 73.390 61.987 11.403 11.403 1.901 1.362 72% 63.349 86% Start 11.02.2016 .Date of completion Kahar District Chakwal 30.06.2019.Work is in progress. "Date of A.A 03.04.2014.Date of T.S 16.04.2014. Date of Start 30.05.2014. Date of completion 30.06.2021.Phase-I of the scheme has been completed . 2 Cusec water from Khai Dam is being supplied to M.C Chakwal since 01-2018. Tenders for Phase-II based on Dharabi Dam were invited on 18.01.2018. 515 1027 16.667 0% 347.893 34% Lowest bidder quoted rates higher than water Supply Scheme Chakwal Based on Khai Dam Chakwal 1018.160 347.893 100.000 100.000 0 permissible limit which were rejected by the competent authority. Moreover Tenders were recalled on 24.01.2018. But no tenders was issued due to non workable rates. The amended A.A has already been submitted in P&D for according approval. The tendering process of Phase-II Started after getting amended approval on current MRS.

Water Suplly Scheme based on Naroomi Dhan Spring A.A: 10-04-14.T.S: 16-4-14 .Date of 516 1028 Jhelum 298.854 286.996 11.858 11.858 1.977 1.977 100% 288.973 97% Commencement 24-10-2014.Work is in Phase II Progress.Scheme is partially operational.

Date of A.A 28.02.2014, Date of T.S 30.04.2014, Date of Award 28.06.2014, Scheduled date of Completion is 30.06.2017, Date of Commencement, 28.06.2014, Funds released on 30.07.2018, Funds on-lined on Augmentation of water Supply Scheme Sargodha based 30.07.2018.21-No. tube wells completed out 517 1029 Sargodha 268.210 197.759 50.000 50.000 8.334 3.82 46% 201.579 75% of provision 22-No. 21-No. Pump Houses on Canal water Supply Sargodha Phase I 90% completed out of provision 22-No. 31- Sets of Pumping machinery arranged. R/Main / D-System 122534-Rft laid out of provision 125047-Rft. 5-No. GSTs 90% completed out of 05-No. 05-No. Staff Quarter 85% completed. Work in progress.

Date of A.A 27.08.2016, Date of T.S 04.09.2016, Date of Award 22.02.2017, Scheduled date of Completion is 30.06.2018, Lying of water Supply Pipelines in D Block Old Satellite Date of Commencement, 22.02.2017, Funds 518 1030 Sargodha 5.386 4.139 1.247 1.247 0.208 0 0% 4.139 77% Town & Millat Abad Sargodha City released on 30.07.2018, Funds on-lined on 30.07.2018.R/Main / D-System 9395-Rft laid. P.C.C Slab 3128-Cft laid. RCC Sewer 12" i/d 531-Rft laid. Work in progress

Date of A.A 11.08.2015, Date of T.S 14.10.2015, Date of Award 16.01.2016, Scheduled date of Completion on 30.06.2017, Date of Commencement, 16.01.2016, Funds water Supply Scheme for Farooq Colony, Imtiazabad released on 30.07.2018, Funds on-lined on 519 1031 Sargodha 98.971 65.970 20.000 20.000 3.334 0 0% 65.970 67% 30.07.2018.06-No. trial bore, tube well bore & Abad Sargodha City pump house completed out of provision 06- No. 08-Sets of Pumping machinery arranged. R/Main / D-System 40803-Rft laid & 360-Rft arranged out of provision 112510-Rft. 02-No. GSTs 90% completed. Work in progress.

Date of A.A 08.10.2009 Date of T.S Comprehensive Urban water Supply and Sewerage 05.11.2009 Date of award 06.01.2010. Date 520 1032 Khushab 358.444 342.662 15.782 15.782 2.631 0 0% 342.662 96% of completion 30.06.2019 Scheme is Scheme Khushab City functional and handed over to Municipal Committee Khushab. Date of A.A 08.10.2009 Date of T.S 05.11.2009 Date of award 11.08.2010 Date of completion 30.6.2019 All 10 No. Tubewell Comprehensiver Urban water Supply and Sewereage with pump house, pumping machinary and 521 1033 Khushab 586.987 459.712 100.000 100.000 16.667 3.789 23% 463.501 79% Scheme Jauharabad GST 800000 Gln completed. Work of laying of water supply pipe line is in Progress. All 3 Nos disposal works completed and functional. Work lying lataral sewer is in progress.

Date of AA 27.08.2016 Date of TS 522 1034 Replacement of Old water Supply Pipeline in Jauharabad. Khushab 90.000 22.000 10.000 10.000 1.667 1.661 100% 23.661 26% 01.11.2016 Date of award 06.02.2017 Date of Completion 30.06.2020 Work is in progress. Replacement of Old water Supply Pipeline in Khushab Date of AA 27.08.2016 Date of TS 523 1035 Khushab 130.000 42.700 50.000 50.000 8.334 0 0% 42.700 33% 01.11.2016 Date of award 06.02.2017 Date of City. Completion. 30.06.2020 Work is in progress.

Revised Date of A.A. 16-01-2014 Date of Revised T.S.08-08-2014, Date of 2nd Revised A.A. 04-11-2015, Date of 2nd Revised T.S.10- 12-2015, Date of Start of Work.03-12-2009, Remarks. Tube-Well=8/8, Pump House=8/8, Pumping Machinery=9/9, Rising Feeding Main=12"i/d A.C= 921/940, 10" i/d A.C= 11959 /11960, 8" i/d PVC=26535 /26541, 6"i/d PVC= 30244 /30591,4"i/d PVC= 524 1036 Comprehensive water Supply Sewerage Scheme Mianwali Mianwali 494.444 462.274 20.000 20.000 3.334 0 0% 462.274 93% 40592/40583, 3"i/d PVC= 137262/137106, OHR = 3/3, Chlorinator = 8/8, T/Line 5/8, RCC Sewer=42"i/d= 480/480, 36"i/d =8385/8385, 30"i/d =2159/2159, 27"i/d= 8694/8694, 24"i/d=12415 /12415, 21"i/d= 14020/14020, 18"i/d= 23255/23357, 15"i/d= 28803 /29337, 12"i/d=137955 /137918, 9"i/d=31456/31456, Sullage Carrier=8500/8500, Oxidation Pond=2/2. Work is in progress.

1-Date of A.A 16.10.2014 2- Date of T.S 28.11.2014 3-Date of Prequalification 08.12.2014 4-Date of invitation of tenders 07.12.2014 5- Date of Receipt of tenders Toba Tek 23.12.2014 6- Date of work order 31.12.2014 525 1037 Comprehensive water Supply Scheme Kamalia City 426.211 297.725 75.000 75.000 12.500 12 96% 309.725 73% Singh 7- Date of completion as per PC-I 15.10.2017 8- Anticipated date of completion 30.12.2017 9- No. of Beneficiary - 298364 Person 10- Funds Released by F.D 03.08.2018 11-Re- appropriation of funds (+/-) Work in progress.

1-Date of A.A 01.01.2016 2- Date of T.S 30.03.2016 3-Date of Prequalification - 31.03.2016 4-Date of invitation of tenders 17.04.2016 5- Date of Receipt of tenders Toba Tek 25.04.2016 6- Date of work order - 526 1038 Urban water Supply Scheme Gojra Phase II 532.942 124.998 100.000 100.000 16.667 15 90% 139.998 26% 18.05.2016 7- Date of completion as per PC-I Singh 11.11.2018 8- Anticipated date of completion 11.11.2018 9- No. of Beneficiary - 393651 Person 10-Funds Released by F.D 03.08.2018 11- Re-appropriation of funds(+/-) .Work in progress. A.A Date =10.02.2009T.S date=6.5.2009.17 Nos Tube wells are functional and Handed over to M.C Gujrat and 17 Nos Pump House, 527 1039 16.667 6% 497.121 67% 17 Nos Machinery. 3 Nos OHR's are Construction of water Supply System Gujrat Gujrat 742.379 496.121 100.000 100.000 1 functional. 763906 Rft pipes laid & functional.House Connection= 2155 Nos..One Contract has been reinstate and work is in progress. A.A Date =23.9.2014T.S date=15.10.2014.3 Nos T/Well installed and 2 Nos out of 3 Nos are functional.3Nos Pump House, 2 set Extension of Urban water Supply and drainage scheme machinery .PVC Pipe of dias 6"= 4629 Rft,4" 528 1040 Gujrat 122.416 79.931 15.000 15.000 2.500 2.5 100% 82.431 67% =11518 Rft, 3" = 20047 Rft.PCC 104022 Cft. Azafi Abadies in Kharian City Nullah 1.5'x1.5' =240,Nullah 2'x2' 2450 Rft.2.5'x2.5'=1500, Nullah 3'x3' 1796 Rft. Drain Type-I 24717 Rft. Drain Type-II 3442 Rft.Tuff Paver= 74392 SftWork in porgress. A.A Date =23.9.2014T.S date=15.10.2014. 2 Extension of Urban water Supply and drainage scheme Nos T/Well installed.PVC Pipe of dias 8" 529 1041 Gujrat 159.603 134.306 25.297 25.297 4.216 4.216 100% 138.522 87% =5730 Rft,4"= 11152 Rft,3"=60191 Rft.PCC Sarai Alamgir City. 328408 Cft. Nullah 2.5'x3' 550 Rft. Drain Type- I 30570 Rft.Work in porgress.

A.A Date =5.9.2014T.S date=15.10.2014.4 Nos T/Well installed and 3 Nos are functional.4 Pump House, 4 set machinery. PVC Pipe of dias 8" =1875 Rft,6" =38556 Rft, Provision of water Supply and Drainage Scheme for Dinga 4" = 21248 Rft,3"=109146 Rft.PCC 156462 530 1042 Gujrat 197.050 138.580 30.000 30.000 5.000 0 0% 138.580 70% City Distt Gujrat. Cft. Nullah 1'x1'=3376 Rft & 1.5'x1.5' 1944 Rft & Nullah 2'x2' 2399 Rft. Drain Type-I 39773 Rft. Drain Type-II 1798 Rft. Soling=6069 sft, Tuff paver 80mm=17458 & 60mm=2112 sft.1 OHR 5000 Gln (90%).Work in porgress.

A.A Date =23.2.2017T.S date=6.3.2017. 531 1043 2.500 0% 40.000 20% 3Nos out of 6 T/Well installed.3 Nos Pump water Supply scheme Lalamusa and Rural Areas Gujrat 197.321 40.000 15.000 15.000 0 House, 5 set machinery. Pipe 8"=400 Rft, 4"=2000 Rft, 3'=1000 rft.Work in porgress. * A.A Date. 25.03.2016* T.S Date. Improvement / Extension of Urban water Supply Mandi 29.03.2016* Start Date 24.04.2016* 532 1044 345.995 114.999 50.000 50.000 8.334 8.334 100% 123.333 36% Sewerage & Drainage Scheme M.B.Din City Bahauddin Completion date 23.04.2019.* Work in progress. * A.A Date. 07.01.2016* T.S Date. Improvement / Extension of Urban water Supply Mandi 15.01.2016.* Start Date 01.03.2016* 533 1045 197.956 102.449 15.000 15.000 2.500 2.5 100% 104.949 53% Sewerage & Drainage Scheme Malikwal City Bahauddin Completion date 28.02.2019. * Work in progress. A.A Date =26.12.2016T.S 534 1046 water Supply & Sewerage Scheme in PP 114 Gujrat 49.997 25.000 24.997 24.997 4.166 4.166 100% 29.166 58% date=30.12.2016.Drain Type-I=23952 Rft. PCC. 1:2:4=91393 Cft.Work in progress. Rehabilitation / Augmentation of Urban water Supply A.A Date.30.9.2014 T.S Date.10.11.2014 535 1047 Narowal 185.411 102.734 40.000 40.000 6.667 4.011 60% 106.745 58% *Start Date 23.12.2014 *Completion date Scheme Narowal City 30.06.2019. Work in progress Scheme in nearing completion, 2-Nos. Tube 536 1048 Urban water Supply Scheme Kahna Phase I and II Lahore 199.405 131.209 20.000 20.000 3.334 0.254 8% 131.463 66% wells are put operational. Balance funds are required to complete the scheme. 537 1049 Provision of Open water Supply Scheme Ferozwala Sheikhupura 175.524 125.000 10.000 10.000 1.667 1.667 100% 126.667 72% Work in Progress 538 1050 Urban water Supply Scheme Muridkey Sheikhupura 450.000 298.467 50.000 50.000 8.334 4 48% 302.467 67% Work in Progress Urban water Supply and Sewerage/ Drainage Scheme 539 1051 Kasur 475.472 468.331 7.141 7.141 1.190 0.823 69% 469.154 99% Work in Progress 540 1052 water Supply Scheme Chunian Amended Kasur 228.855 220.838 8.017 8.017 1.336 1 75% 221.838 97% Work in Progress water Supply, Drainage & PCC Scheme Outside Khudian 541 1053 Kasur 176.173 172.172 4.001 4.001 0.667 0.635 95% 172.807 98% Work in Progress District Kasur Date of A.A (Revised) 22.01.2013, Date of T.S (Revised) 28.01.2013, Date of Prequalification 11.09.2012, Date of invitation of tenders 16.02.2013, Date of Receipt of Extension / Improvement of water Supply Scheme tenders 16.02.2013, Date of work order 542 1054 Okara 864.000 701.592 80.000 80.000 13.334 0 0% 701.592 81% Southern City, Okara. 21.02.2013, Date of completion as per PC-I 13.05.2015, Anticipated date of completion 30.06.2018, No. of Beneficiary - 69380 Person, Release of Funds 02.08.2017, Work is in progress. 1. Date of A.A: 17.09.2015 2. Date of T.S: 09.11.2015. 3. Date of Pre-Qualification: 18.01.2016 4. Date of Invitation of Tender: 16.02.2016 5. Date of Receipt of Tender: Rehabilitation of water Supply and Sewerage Schemes in 17.02-2016 6. Date of Work order: 543 1055 Khanewal 106.963 68.841 20.000 20.000 3.334 3.15 94% 71.991 67% 05.03.2016 7. Date of Completion as per PC- Tulamba City. I: 16-09-2017 8. Anticipated Date of completion: 30-06-2019 9. Date of released of funds 03.08.2018 10. Reason of Slow Moving: ------11 No. of beneficiaries 53394Persons Work is in progress. 1. Date of A.A: 05.09.2014 2. Date of T.S: 28.10.2014 3. Date of Pre-Qualification: 18.12.2014 4. Date of Invitation of Tender: 19.01.2015 5. Date of Receipt of Tender: 20.01.2015 6. Date of Work order: 18-02- 544 1056 Urban water Supply & Sewerage Scheme Khanewal City Khanewal 191.232 147.091 44.141 44.141 7.357 7.25 99% 154.341 81% 2015 7. Date of Completion as per PC-I: 04- 09-2016 8. Anticipated Date of completion: 30.06.2019 9. Date of released of funds 03.08.2018 10. Reason of Slow Moving: ------11 No. of beneficiaries 358569 Persons Work is in progress. 1. Date of A.A: 11.01.2016. 2. Date of T.S: 25.02.2016 3. Date of Pre-Qualification: 11.04.2015 4. Date of Invitation of Tender: 24.03.2016 5. Date of Receipt of Tender: Comprehensive water Supply & Sewerage Scheme for 02.04.2016 6. Date of Work order. 545 1057 Vehari 99.982 79.072 20.910 20.910 3.485 3.485 100% 82.557 83% 14.04.2016 7. Date of Completion as per PC- Luddan City District Vehari. I: 10.01.2018 8. Anticipated Date of completion: 30.06.2019 9. Date of released of funds 03.08.2018 10. Reason of Slow Moving: NIL 11. No. of Beneficiary= 20316 Persons Work is in progress. 1. Date of A.A: 11.04.2016. 2. Date of T.S: 29.04.2016. 3. Date of Pre-Qualification: 11.04.2015. 4. Date of Invitation of Tender: 18.05.2016. 5. Date of Receipt of Tender: Comprehensive water Supply & Sewerage Scheme for 28.05.2016. 6. Date of Award: 15.06.2016 G- 546 1058 Vehari 332.198 308.199 23.999 23.999 4.000 4 100% 312.199 94% I. 17.06.2016 G-II 7. Date of Completion as Vehari city. per PC-I: 14.06.2018 8. Anticipated Date of completion: 30.06.2018 9. Date of released of funds 03.08.2018 10. Reason of Slow Moving: NIL. 11. No. of Beneficiary= 140193 Persons Work is in progress. Dera Ghazi 547 1059 Comprehensive water Supply Scheme Taunsa Sharif 195.973 149.673 46.300 46.300 7.717 2.315 30% 151.988 78% "• Date of A.A = 12.12.2014 Khan Dera Ghazi 548 1060 Rehabilitaion of Urban water Supply Scheme Fort Minroe 257.064 243.874 13.190 13.190 2.199 0.77 35% 244.644 95% "• Date of A.A =01.04.2015 Khan Comprehensive Extension/Rehab. of Urban water Supply 549 1061 Rajanpur 49.569 25.000 24.569 24.569 4.095 4.095 100% 29.095 59% "• Date of A.A = 22.09.2016 Scheme Rojhan and adjoining abadies Enhancement of Supply of Water for Rojhan City District 550 1062 Rajanpur 30.000 20.000 10.000 10.000 1.667 1.667 100% 21.667 72% "• Date of A.A = 22.09.2016 Rajanpur Urban water Supply Scheme,Muzaffargarh(Ammended) 551 1063 Muzaffargarh 419.689 407.359 12.330 12.330 2.055 0.7 34% 408.059 97% "• Date of A.A 10.11.2008 (PSDP) Date of AA :29-11-2006. Date of TS :08-01- 2007. Date of RAA: 17-04-2014. Date of RTS. 17-04-2014. Date of receipt of tender.14- 02-2007.. Date of work order:17-03-2007.. Rehabilitation and Agumentation of water Supply Scheme, Date of completion as per agreement 16-03- 552 1064 Bahawalpur 282.533 271.119 11.414 11.414 1.903 0 0% 271.119 96% 2008.Anticipated date of completion 30-06- Bahawalpur 2019.Date of receipt of funds by F.D 20.07.2018.Three out of four portions are completed and handed over to TMA on 30-04- 2014. Balance one portion at trust colony, Model Town-B is under test operation. Date of AA(DDWP)=24-10-2016.. Date of TS=19-01-2017.. Prequalification of the contractors=05-01-2017. Date of receipt of 553 1065 3.922 0% 76.467 76% tender 27-02-2017 . Date of award=03-03- Urban water Supply Scheme for Hasilpur Bahawalpur 100.000 76.467 23.533 23.533 0 2017. Date of completion. 02-03-2018. Expected date of completion 30-06-2019.. Date of receipt of funds by F.D. 20.07.2018. Work is in progress. A.A issued on 12-05-2014. . Date of T.S. 26- 05-2014. . Date of prequalification=21-07- 2014. Date of receipt of tenders = 22-12- water Supply Scheme Sadiqabad, Tehsil Sadiqabad, Rahim Yar 2014. . Date of work order= 03-01-2015.. 554 1066 692.527 474.191 218.336 218.336 36.390 0 0% 474.191 68% Date of completion as per agreement District R.Y. Khan. Khan 30.06.17. Anticipated date of completion 30.06.2019. No. of beneficiaries=405864 persons. Date of receipt of funds by F.D. 20.07.2018. Work is in progress. Date of A.A. 05.08.2017.. Date of T.S. 09.08.2017. . Date of receipt of Tender: Urban Water Supply Scheme Bismillah Town, Thalli Road, Rahim Yar 07.09.2017.. Date of award: 31.10.2017.. 555 1067 30.000 10.000 20.000 20.000 3.334 0 0% 10.000 33% Date of completion: 31.1.2018.. Anticipated Near Madrassa Kulyat ul Islam City Rahim Yaar Khan Khan date of completion 30-06-2019. Date of receipt of funds by F.D. 20.07.2018. Work is in progress.. 1. Date of AA 05.12.2016 2. Date of T.S - 3. Dated of Prequalification - 4. Date of invitation of tender Provision and Installation of six (06) Water Purification 01.02.2017 Plants at Matotli Qaisarpur, Shah Mosa Shah Pipulwala, 5. Date of Receipt of tenders 556 1068 Basti Mahram Rukn Hatti, Chak No.13- Faiz, Chak Multan 10.722 4.461 6.261 6.261 1.044 0 0% 4.461 42% 03.02.2017 6. Date of work order Sardarpur & Basti Nawan Shehar, Tehsil Shujabad, District 11.02.2017 Multan 7. Date of Completion as per PC-l 10.06.2017 8. Anticipated date of completion 30.06.2019 9. Date of released of funds 02.08.2017. 1-Date of A.A 23.10.2017 2- Date of T.S 17.11.2017. 3-Date of Prequalification 4-Date Provision of Brick Pavements, Drains, Tuff Tiles, Water of invitation of tenders 05.12.2017 5- Date of Supply, Play Grounds, Public Parks, etc., in the Rural and Toba Tek Receipt of tenders 07.12.2017 6- Date of 557 1069 245.000 120.000 50.000 50.000 8.334 4 48% 124.000 51% work order 12.12.2017 7- Date of completion Urban Areas of Tehsil Kamalia and Tehsil Pir Mehal Singh as per PC-I 8- Anticipated date of completion District T.T. Singh 30.06.2018.9- No. of Beneficiary - Person 10- Funds Released by F.D 03.08.2018 - 11-Re- appropriation of funds (+/-) Work in progress. Improvement of Water Supply System in Murree under 558 1070 Rawalpindi 24.500 14.500 10.000 10.000 1.667 0 0% 14.500 59% Funds Released by FD on 31st July 2018 PPP Rehabilitate, Operate and Transfer (ROT Mode). Date of A.A. 11-08-2015, Date of T.S. 15-08- 2015, Date of Start of Work 28-10-2015, Remarks. Scheme completed in saving. 559 1071 0.498 0% 1.509 34% Rising Main=4"i/d PVC= 1960/1960, Water Supply Scheme Iskandarabad, District Mianwali. Mianwali 4.498 1.509 2.989 2.989 0 D/System=4"i/d G.I= 0/50, 3"i/d PVC=6000/6000, 4"i/d PVC=400/400, 6"i/d PVC 1900/1900, O.H.R=90%/1 , Repair of P/Machinery, R/F Main old=1/1. Date of AA 18.08.2015.. Date of T.S 14.09.2015. . Date of award 07.01.2016.. Rahim Yar Date of completion 30.06.2016.. Scheme 560 1072 Const. of Water Supply Scheme Tranda Sway, R.Y.Khan. 2.610 0.603 2.007 2.007 0.335 0 0% 0.603 23% Khan remained unfunded during 2016-17.. Scheme completed in saving during 2017-2018. Date of receipt of funds by F.D. 20.07.2018..

Date of AA 09.03.2010.. Date of T.S Water Supply Scheme Doonga Boonga, District 13.03.2010.. Date of award 14.05.2010.. Date 561 1073 Bahawalnagar 11.168 0.915 10.253 10.253 1.709 0 0% 0.915 8% of completion 13.05.2011.. Scheme remained Bahawalnagar. unfunded during 2011-12.. Funds released on 20-07-2018. Balance work is in progress. Date of AA 11.08.2009.. Date of T.S 31.10.2009. Date of award 13.01.2010.. Date Replacement & Up-Gradation of Urban Water Supply of completion 30.06.2014.. Scheme remained 562 1074 Bahawalnagar 214.155 211.313 2.842 2.842 0.474 0 0% 211.313 99% unfunded during 2013.14.. Scheme Scheme Bahawalnagr completed. Liabilities cleared during 2017- 2018. Date of receipt of funds by F.D. 20.07.2018. Funds not required. * A.A Date. 07.09.2015* T.S Date. Mandi 10.09.2015* Start Date 17.12.2015.* 563 1075 water Supply Scheme Chot Dhirian, M.B.Din 75.000 65.000 10.000 10.000 1.667 1.167 70% 66.167 88% Bahauddin Completion date 30.06.2019.* Work in progress Scheme completed & handed over to CBO 564 1076 R/W/S Scheme Dhamial Rawalpindi 174.866 157.848 17.018 17.018 2.837 0 0% 157.848 90% only work for restoration of desmantaied streets in process. A.A Date 03.09.2015. T.S Date 23.09.2015. Rehabilitation & Augmentation &Ext of water Supply Date of Start of Scheme 10.11.2015. Date of 565 1077 Attock 43.515 41.514 2.001 2.001 0.334 0.334 100% 41.848 96% Scheme for Village Dhullian Completion of Scheme 30.06.2019. Work is in progress. A.A Date 10.09.2016. T.S Date 02.05.2017. Augmentation / Rehabilitation of Water Supply Scheme Date of Start of Scheme 16.06.2017. Date of 566 1078 Attock 69.989 12.999 10.000 10.000 1.667 1.667 100% 14.666 21% Khour Tehsil Pindi Gheb District Attock Completion of Scheme 30.06.2019.Work is in progress.

Date of A.A 08.01.2015.Date of T.S 21.01.2015.Date of Start 20.04.2015.Date of completion 30.06.2019.Percolation well, Ground Storage Tank and Rising main completed. Work on the scheme suspended due to loss of water in newly developed source as some blasting was done by Mining Department. Now after discussion with local community. The constant monitoring has been made to check the increase in the yield of percolation well since last 18 months in order 567 1079 Rehabilitation of Rural water Supply Scheme Sarkalan Chakwal 25.000 18.475 6.525 6.525 1.088 0 0% 18.475 74% to complete and operate the scheme on original scope. But no substantial change in sub soil level of water and increase in yield observed in the already constructed percolation well. Revised Rough Cost Estimate submitted to D.C Chakwal vide T/O No.01/CH dated 01-01-2018 for according Revised A.A. The utilization against release funds in F.Y 2018-19 will be possible after getting revised approval by the competant authority and completing the tendering process against changed scope of work.

Authority to maintain & Regulate Naroomi Dhan water Date of A.A 11/2017.Revised A.A 30-111- 568 1080 Jhelum 361.446 30.000 80.000 80.000 13.334 2.9 22% 32.900 9% 2017.• Work award on 16.02.2018.Work in Supply Scheme Tehsil P.D.Khan progress. Extension of water Supply scheme Khewra, Tehsil Pind Date of A.A 11-04-2016.Revised A.A 31-03- 569 1081 Jhelum 161.845 30.000 40.000 40.000 6.667 4.7 70% 34.700 21% 2017.Date of T.S 19-08-2016.Work awarded Dadan Khan, District Jhelum on 06-02-2017.Work in progress. Date of AA 15-10-2015 Date of TS 09-11- 570 1082 Installation of 300 Hand Pumps Noushera Khushab Khushab 132.000 126.500 5.500 5.500 0.917 0.917 100% 127.417 97% 2015 Date of award 05.01.2016 Date of completion 30.06.2018 Work is in progress.

Date of AA 27.08.2016 Date of TS 03-09- 571 1083 water Supply Scheme Jhunge Walan of UC Khabeki. Khushab 24.058 14.558 9.500 9.500 1.584 0 0% 14.558 61% 2016 Date of Award 21.01.2017. Date of Completion 30.06.2019 Work is in progress.

Date of AA 27.08.2016 Date of TS 03-09- 572 1084 water Supply Scheme Kalial UC Khura. Khushab 25.996 15.996 10.000 10.000 1.667 0 0% 15.996 62% 2016 Date of Award 24.01.2017 Date of Completion 30.06.2019 work is in progress.

Date of A.A. 13-01-2017, Date of T.S. 24-01- Installation of Submersible Water Pumps, Tehsil Isa Khel 2017, Date of Start of Work. 08-05-2017, 573 1085 Mianwali 50.000 39.838 10.162 10.162 1.694 1.674 99% 41.512 83% Remarks E.R.S=130/144, Trail Bore=6/6, District Mianwali. T/Well boring= 61/72, P/Machinery= 61/72, G.S.Tank= 7/72. Work is in progress. Date of A.A.27-08-2016, Date of T.S.15-10- Provision of Submersible Pumps (UC Bani Afghan, 2016, Date of Start of Work.03-12-2016, 574 1086 2.760 100% 36.179 72% Remarks. E.R.S=35/50, T/Well boring= 87-No Sawance, Ghundi, Chakrala, Ban Hafiz Gee, Thamay Mianwali 49.980 33.419 16.561 16.561 2.76 completed/110, P/Machinery=87-No Wali, Namal) installed/110, G.S.Tank=0/62-No. Work is in progress. Date of A.A 25.08.201 Date of T.S 11.11.2015 Date of Commencement 575 1087 Extension of Sewerage and water Supply, Mankera. Bhakkar 71.300 38.497 32.803 32.803 5.467 0 0% 38.497 54% 28.12.2015 Date of completion 28.12.2017 Funds not released yet. DDO powers / authority is also awaited. 1-Date of A.A 20.10.2016 2- Date of T.S 21.10.2016 3-Date of invitation of tenders. 13.02.2017 4- Date of Receipt of tenders - 15.02.2017 5- Date of completion as per PC-I Rehab. of rural water Supply scheme Chak No. 343/GB Toba Tek 30.06.2018 6- Date of work order - 576 1088 23.943 19.988 3.955 3.955 0.659 0 0% 19.988 83% T.T. Singh Singh 06.03.2017 7- Anticipated date of completion 30.06.2018 8- No. of Beneficiary - 5333 Persons 9-Funds Released by F.D 03.08.2018 - 10-Re-appropriation of funds(+/- ) Scheme completed in saving.

1-Date of A.A 20.10.2016 2- Date of T.S 31.10.2016 3-Date of invitation of tenders.13.02.2017 4- Date of Receipt of tenders -15.02.2017 5- Date of completion as per PC-I 30.06.2018 6- Date of work order - Toba Tek 09.03.2017 7- Anticipated date of completion 577 1089 Rural water Supply Scheme Chak No.674/15/GB 31.298 22.265 9.033 9.033 1.506 0 0% 22.265 71% Singh 30.06.2018 8- No. of Beneficiary - 6390 Persons 9-Funds Released by F.D 03.08.2018 - 10-Re-appropriation of funds(+/- ) .Work could not be started due to site dispute in laying of distribution system. Progress will be achieved in next month.

1-Date of A.A 20.10.2016 2- Date of T.S 31.10.2016 3-Date of invitation of tenders.13.02.2017 4- Date of Receipt of tenders -15.02.2017 5- Date of completion as per PC-I 30.06.2018 6- Date of work order - Toba Tek 09.03.2017 7- Anticipated date of completion 578 1090 Rural water Supply Scheme Chak No.675/16/GB 28.057 20.000 8.057 8.057 1.343 0 0% 20.000 71% Singh 30.06.2018 8- No. of Beneficiary - 3561 Persons 9-Funds Released by F.D 03.08.2018 - 10-Re-appropriation of funds(+/- ) Work could not be started due to site dispute in laying of distribution system. Progress will be achieved in next month.

1-Date of A.A 20.10.2016 2- Date of T.S 31.10.2016 3-Date of invitation of tenders.13.02.2017 4- Date of Receipt of tenders -15.02.2017 5- Date of completion as per PC-I 30.06.2018 6- Date of work order - Toba Tek 04.03.2017 7- Anticipated date of completion 579 1091 Rural water Supply Scheme Chak No.685 26 GB 21.024 19.500 1.524 1.524 0.254 0 0% 19.500 93% Singh 30.06.2018 8- No. of Beneficiary - 3381 Persons 9-Funds Released by F.D 03.08.2018 - 10-Re-appropriation of funds(+/- ) - Work could not be started due to site dispute in laying of distribution system. Progress will be achieved in next month.

1-Date of A.A 10.09.2015 2- Date of T.S 25.02.2016 3-Date of Prequalification - 07.03.2016 4-Date of invitation of tenders 18.03.2016 5- Date of Receipt of tenders Rural water Supply Scheme for Chak No.407/JB, 409/JB, Toba Tek 26.03.2016 6- Date of work order - 580 1092 99.832 64.601 10.000 10.000 1.667 1.2 72% 65.801 66% 27.04.2016 7- Date of completion as per PC-I 410/JB & 411/JB Singh 09.09.2017 8- Anticipated date of completion - 09.09.2017 9- No. of Beneficiary - 15516 Person 9-Funds Released by F.D 03.08.2018 - 11-Re-appropriation of funds(+/-) Work in progress.

1-Date of A.A 20.10.2016 2- Date of T.S 31.10.2016 3-Date of invitation of tenders. 13.02.2017 4- Date of Receipt of tenders - 15.02.2017 5- Date of completion as per PC-I 30.06.2018 6- Date of work order - Rural water Supply Scheme, Chak No.709/GB and Toba Tek 09.03.2017 7- Anticipated date of completion 581 1093 18.232 16.000 2.232 2.232 0.372 0.1 27% 16.100 88% 710/GB, Tehsil Kamalia, District Toba Tek Singh Singh 30.06.2018 8- No. of Beneficiary - 5867 Persons 9-Funds Released by F.D 03.08.2018 - 10-Re-appropriation of funds(+/- ) Work could not be started due to site dispute in laying of distribution system. Progress will be achieved in next month.

1-Date of A.A 20.10.2016 2- Date of T.S 31.10.2016 3-Date of invitation of tenders.13.02.2017 4- Date of Receipt of tenders -15.02.2017 5- Date of completion as per PC-I 30.06.2018 6- Date of work order - Rural water Supply Scheme, Chak No.712/GB and Jamal Toba Tek 03.03.2017 7- Anticipated date of completion 582 1094 22.981 17.000 5.981 5.981 0.997 0.4 40% 17.400 76% Pahar, Tehsil Kamalia, District Toba Tek Singh Singh 30.06.2018 8- No. of Beneficiary - 4430 Persons 9-Funds Released by F.D 03.08.2018 - 10-Re-appropriation of funds(+/- ) Work could not be started due to site dispute in laying of distribution system. Progress will be achieved in next month.

1-Date of A.A 28.12.2015 2- Date of T.S 25.02.2016 3-Date of Prequalification - 07.03.2016 4-Date of invitation of tenders 06.03.2016 5- Date of Receipt of tenders Rural water Supply schemes Chak No.285/GB, 383/JB, Toba Tek 26.03.2016 6- Date of work order - 583 1095 90.000 69.965 10.000 10.000 1.667 1.605 96% 71.570 80% 28.04.2016 7- Date of Completion as per PC-I 390/JB, 380/JB, 382/JB Feroz and 336/GB, T.T. Singh Singh 30.07.2017 8- Anticipated date of completion 30.07.2017 9- No. of Beneficiary - 37501 Person 10-Funds Released by F.D 03.08.2018 - 11-Re-appropriation of funds(+/- ) Work in progress.

1-Date of A.A 06.12.2014 2- Date of T.S 02.03.2015 3-Date of Rev: AA 28.05.2015 4- Date of Prequalification - 16.08.2016 5-Date of invitation of tenders 03.10.2016 6- Date of water Supply & Sewerage Scheme Rajana District Toba Toba Tek Receipt of tenders 04.10.2016 7- Date of 584 1096 179.779 104.999 25.000 25.000 4.167 4.1 98% 109.099 61% work order 27.10.2016 8- Date of completion Tek Singh Singh as per PC-I 26.10.2018 9- Anticipated date of completion 26.10.2018 10- No. of Beneficiary - 21302 Person 11 -Funds Released by F.D 03.08.2018 12-Re-appropriation of funds(+/-) Work in progress.

Installation of 02 tubewells at Tahayat & Chandrai Village, Scheme completed. Funds are for the 585 1097 Lahore 36.878 20.077 16.801 16.801 2.800 0.347 12% 20.424 55% Green Town, Lahore operation & maintenance of scheme. 586 1098 1.367 43% 45.987 86% Scheme completed. Funds are for the Rural water Supply Scheme Mohlanwal Lahore 53.594 45.393 8.201 8.201 0.594 operation & maintenance of scheme. 587 1099 0.358 66% 22.567 92% Scheme completed. Funds are for the Rural water Supply Scheme Sundar Lahore 24.475 22.331 2.144 2.144 0.236 operation & maintenance of scheme. 588 1100 1.666 52% 30.334 77% Scheme completed. Funds are for the Rural water Supply Scheme Village Bath Lahore 39.469 29.475 9.994 9.994 0.859 operation & maintenance of scheme. Scheme put operational and handed over to CBO for O&M but due to damages caused by 589 1101 0.654 0% 13.007 77% Sui Gas Department during laying of their Rural water Supply Scheme Village Chah Tamoli Lahore 16.930 13.007 3.923 3.923 0 distribution network, water supply network is broken resultantly scheme is temporarily dysfunctional. Establishment/ Construction of water Supply Scheme at 590 1102 UC 30, 31, 32 wanadala dial singh and dhaka nizampura Sheikhupura 152.044 85.000 24.997 24.997 4.166 4 96% 89.000 59% Work in Progress tehsil feroz wala District Sheikhupura Rural water Supply Drainage Scheme UC Kot Ranjeet 591 1103 Sheikhupura 95.061 54.999 10.000 10.000 1.667 1 60% 55.999 59% Work in Progress Singh Sheikhupura Rural water Supply and Drainage Scheme Javed Nagar, 592 1104 Sheikhupura 198.903 72.367 20.000 20.000 3.334 2 60% 74.367 37% Work in Progress District Sheikhupura Rural water Supply Drainage Scheme Iqbal Town District 593 1105 Sheikhupura 140.161 83.696 10.000 10.000 1.667 1.6 96% 85.296 61% Work in Progress Sheikhupura Rural Warter Supply and Drainage P.C.C Scheme Tibbi 594 1106 Kasur 199.551 29.792 20.000 20.000 3.334 3.22 97% 33.012 17% Work in Progress Kamboh, Mochi Pura, Kasur City. Rural Water Drainage PCC Scheme Bhoojke, Naike & 595 1107 Kasur 114.522 97.085 17.437 17.437 2.906 1.92 66% 99.005 86% Work in Progress Adjoining Abadies District Kasur. Rural water Supply & Drainage PCC Scheme at Marali 596 1108 Kasur 97.453 82.236 15.217 15.217 2.536 1.335 53% 83.571 86% Work in Progress Hithar and Adjoining Abadies District Kasur (Revised) Rural water Supply & Drainage Scheme Chak No.14 & 597 1109 Kasur 105.412 84.160 21.252 21.252 3.542 3.542 100% 87.702 83% Work in Progress Ghandhi Otar Tehsil Pattoki District Kasur. Rural water Supply and Drainage PCC Scheme at Mandi 598 1110 Kasur 158.978 138.348 20.630 20.630 6.560 4.1 63% 142.448 90% Work in Progress Usmanwala and Adjoining Abadies District Kasur.

Rural water Supply and Drainage PCC Scheme Hardo 599 1111 Kasur 99.851 71.926 10.000 10.000 1.667 0.795 48% 72.721 73% Work in Progress Ban Bodla and Adjoining Abadies District Kasur. Rural water Supply and Drainage PCC Scheme Maan 600 1112 Kasur 178.985 170.652 8.333 8.333 1.389 0.82 59% 171.472 96% Work in Progress Bhamni Wala and Adjoining Abadies District Kasur. Rural water Supply and Drainage PCC Scheme Rajuwal 601 1113 Kasur 113.943 111.586 2.357 2.357 0.000 0 #DIV/0! 111.586 98% Work in Progress and adjoining Abadies District Kasur. water Supply & Drainage Scheme Chak No.31,32,33 602 1114 Kasur 199.992 94.728 15.000 15.000 2.500 2.5 100% 97.228 49% Work in Progress Phullani, Dhoop Sarri & Saharankey District Kasur water Supply & Drainage Scheme They Kalay, Basti Balochi, Jhalar Qadir, Jhalar Rehmani, Jhalar Choudhry & 603 1115 Kasur 119.701 80.989 10.000 10.000 1.667 1.05 63% 82.039 69% Work in Progress Jhalar Baglian Wali i/c Tubewell of Rao Tamkeen District Kasur. Water Supply and Drainage Scheme Gondy Warha, 604 1116 Lambey Jagir, Dhaban, Sherpur, Lambey Mahtam & Fatey Kasur 82.108 78.345 3.763 3.763 0.000 0 #DIV/0! 78.345 95% Work in Progress Wala. Date of AA 23.11.2016, Date of TS 07.12.2016, Date of reciept of tender 605 1117 2.300 25% 92.276 87% 07.01.2017, Date of Work Order 08.02.2017, water Supply Scheme Chak No.120/9.L Kameer. Sahiwal 105.498 91.701 13.797 13.797 0.575 Date of completion as per PC-1 31.01.2018, Anticipated date of completion 30.06.2019, Work in progress. 1.Date of AA 14.11.2009 2.Date of T.S 19.01.2010 3. Date of Pre-Qualification: - 4.Date of invitation of tender 04.03.2010 5.Date of Receipt of tenders 06.03.2010 6.Date of work order 606 1118 R/W/S/Scheme Gareywala, Nawabpur,Basti Nau Multan 70.476 63.476 7.000 7.000 1.167 0 0% 63.476 90% 14.04.2010 7.Date of Completion as per PC-l 13.02.2013 8. Anticipated date of completion 30.06.2019 9. Date of released of funds 02.08.2017. 10. No. of beneficiaries 51946 Persons. P.M. Package scheme. Work remained suspended for last 9 years. Funds received late in the end of 08/2018. Now 1.Datethe contractor of AA has taken up the work, the 14.11.2009 2.Date of T.S 19.01.2010 3. Date of Pre-Qualification: - 4.Date of invitation of tender 06.02.2010 5.Date of Receipt of tenders 08.02.2010 6.Date of work order 607 1119 R/W/S/Scheme Raja Pur, Siddiquebad, Hirwat,Yere Wala Multan 77.962 75.962 2.000 2.000 0.334 0 0% 75.962 97% 14.04.2010 7.Date of Completion as per PC-l 13.02.2013 8. Anticipated date of completion 30.06.2019 9. Date of released of funds 02.08.2017. 10. No. of beneficiaries 43334 Persons. P.M. Package scheme. Work remained suspended for last 9 years. Funds 1.Datereceived of AAlate in the end of 08/2018. Now 14.11.2009 2.Date of T.S 19.01.2010 3. Date of Pre-Qualification: - 4.Date of invitation of tender 06.02.2010 5.Date of Receipt of tenders 08.02.2010 6.Date of work order 608 1120 R/W/S/Scheme Taraggar. Multan 61.140 51.141 9.999 9.999 1.667 0 0% 51.141 84% 18.06.2010 7.Date of Completion as per PC-l 17.06.2012 8. Anticipated date of completion 30.06.2019 9. Date of released of funds 02.08.2017. 10.No. of beneficiaries 20623 Persons. P.M. Package scheme. Work remained suspended for last 9 years. Funds received late in the end of 08/2018. Now the contractor has taken up the work, the 1. Date of A.A: 27-08-2016. 2. Date of T.S: 19- 09-2016 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 14-11-2016 5. Date of Receipt of Tender: 15-11-2016 6. Date of Rural water Supply Scheme Chak No.12/M & 14/M (East Award: 08-12-2016 7. Date of Completion as 609 1121 Lodhran 29.922 21.571 8.351 8.351 1.392 1 72% 22.571 75% & West) Tehsil Dunyapur, District Lodhran per PC-I: 31-12-2017 8. Anticipated Date of Completion: 07-12-2017 9.Date of released of funds 10. Reason of Slow Moving: 11.No. of Benificiary= Persons. 6980 Work is in Progress.

1. Date of A.A: 27-08-2016. 2. Date of T.S: 19- 09-2016 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 14-11-2016 5. Date of Receipt of Tender: 15-11-2016 6. Date of 610 1122 0.861 93% 25.087 85% Award: 03-12-2016 7. Date of Completion as water Supply / Sewerage Mouza Rawani. Lodhran 29.450 24.287 5.163 5.163 0.8 per PC-I: 31-12-2017 8. Anticipated Date of Completion: 02-12-2017 9.Date of released of funds 10. Reason of Slow Moving: 11.No. of Benificiary= Persons. 8834 Work is in Progress.

1. Date of A.A (Amended) 04.04.2016 2. Date of T.S: 12.04.2016 3. Date of Pre- Qualification: 02.04.2016 4. Date of Invitation of Tender: 21.04.2016 5. Date of Receipt of Provision of water Supply Schemes in Chak No. 135/10.R, Tender: 23.04.2016 6. Date of Work order: 611 1123 Khanewal 60.664 47.747 12.917 12.917 2.153 2.01 93% 49.757 82% 30.04.2016 7. Date of Completion as per PC- District Khanewal. I: 16.09.2017 8. Anticipated Date of completion: 31.12.2018 9. Date of released of funds 03.08.2018 10. Reason of Slow Moving: ------11No. of beneficiaries 15048 Persons Work in progress. 1. Date of A.A: 04.04.2017. 2. Date of T.S: 10.04.2017 3. Date of Pre-Qualification: 4. Date of Invitation of Tender: 08.05.2017 5. Date of Receipt of Tender: 09.05.2017 6. Date of Work order: 25.11.2017 7. Date of 612 1124 water Supply Machiwal Tehsil and District Vehari. Vehari 18.710 8.754 9.956 9.956 1.660 1.66 100% 10.414 56% Completion as per PC-I: 24.11.2018 8. Anticipated Date of completion: 30.06.2019 9. Date of released of funds 03.08.2018 10. Reason of Slow Moving: NIL 11. No. of Beneficiary= 20316 Persons Work is in progress. Extension & Augmentation of water Supply Scheme Sakhi Dera Ghazi 613 1125 87.805 23.600 1.000 1.000 0.167 0.058 35% 23.658 27% "• Date of A.A = 16.12.2014 Sarwar Khan Provision of Rural water Supply Scheme Nutkani, District Dera Ghazi 614 1126 82.680 59.948 22.732 22.732 3.789 1.44 38% 61.388 74% "• Date of A.A = 23.09.2016 D.G. Khan Khan Provision of water Supply Scheme in Kundi Wala UC Dera Ghazi 615 1127 50.325 38.959 11.366 11.366 1.895 0.72 38% 39.679 79% "• Date of A.A = 22.08.2015 shadan Lund Khan Provision of water Supply Scheme in Notak Sakhani UC Dera Ghazi 616 1128 47.463 29.962 17.501 17.501 2.917 1.108 38% 31.070 65% "• Date of A.A = 22.08.2015 Kala Khan Dera Ghazi 617 1129 Provision of water Supply Scheme in Sabzani UC Kala 36.579 28.910 7.669 7.669 1.278 0.511 40% 29.421 80% "• Date of A.A = 22.08.2015 Khan water Supply Scheme at Councilor Muhammad Ali Basti Dera Ghazi 618 1130 25.000 19.360 1.000 1.000 0.167 0.067 40% 19.427 78% "• Date of A.A = 23.09.2016 Rojhani Sakhi Sarwar Khan 619 1131 Improvement of Rural water Supply Scheme Dajal Rajanpur 228.679 217.875 10.804 10.804 1.801 1.801 100% 219.676 96% "• Date of A.A = 23.12.2014 water Supply Schemes in Mouza Fateh Pur and Ali Pur 620 1132 Muzaffargarh 70.000 57.481 12.519 12.519 2.087 0.66 32% 58.141 83% "• Date of A.A 22-09-2016 District Muzaffargarh Date of AA(DDWP) 06.10.2015. . Date of TS. 22-02-2016. Date of invitation of tenders=28- Provision of Fund for Restortaion of water Supply Scheme 01-2016. Date of receipt of tenders = 02-03- in his Constituency District Bahwalnagar (i) RWSS 2016. Date of award= 30-04-2016. Date of 621 1133 Bahawalnagar 67.817 51.799 16.018 16.018 2.670 0 0% 51.799 76% Khattan,(ii) RWSS Jananay wala, (iii) RWSS Ghulab completion as per agreement= 29-04-2018. Ali,(iv) RWSS Bajak & Khamay Wala Expected date of completion 30-06-2019. Date of receipt of funds by F.D. 20.07.2018. Work is in progress. Date of A.A: 22-01-2015. . Date of T.S 26-01- 2015.. Date of revised T.S 12-01-2017. Date of receipt of tenders =15-04-2015 . Date of Rehabilitation of Rural water Supply Scheme Chak No 62 work order= 22-05-2015. Date of completion 622 1134 Bahawalnagar 38.959 38.000 0.959 0.959 0.160 0 0% 38.000 98% 4R Tehsil Haroonabad District Bahawalnagar as per agreement= 21-11-2015.Anticipated date of completion= 30-06-2019.Date of receipt of funds by F.D. 20.07.2018. Work is in progress. Date of AA. 08.08.2016.. Date of T.S. Rehabilitation of rural water Supply scheme chak no. 69/4- 21.10.2016.. Tender received on 02.11.2016.. 623 1135 Bahawalnagar 39.568 38.934 0.634 0.634 0.106 0 0% 38.934 98% Date of award. 25.11.2016. Date of R, 80/1-L & Azafi Abadis Chak No. 85/5-R completion 24.11.2017.. Anticipated date of completion 31-12-2017. Scheme completed. Date of AA. 19.08.2016.. Date of T.S. 25.10.2016. .Date of receipt of tenders= 14- Rehabilitation of Rural water Supply Schemes Muga 12-2016 . Date of award=29-12-2016. Date of 624 1136 Bahawalnagar 99.971 53.036 20.000 20.000 3.334 3.33 100% 56.366 56% completion=28-11-2017. Anticipated date of Chandna Mirdin Hakim Mirdin Mohib Ali Khazan Singh completion 30-06-2019. Date of receipt of funds by F.D. 20.07.2018. Work is in progress. Date of AA. 08.08.2016.. Date of T.S. 21.10.2016.. Tender received on 02.11.2016.. Rural water Supply scheme chak no. 128/6-R including all Date of award. 28.11.2016. Date of 625 1137 Bahawalnagar 22.200 20.593 1.607 1.607 0.268 0 0% 20.593 93% completion 27.11.2017.. Anticipated date of adjoining abadies. completion 30-06-2019. Date of receipt of funds by F.D. 20.07.2018. Work is in progress.. Date of AA(DDWP). 18-08-2015 .. Date of TS. 06-10-2015.. Date of receipt of tenders = 20-10-2015 . Date of work order= Rural water Supply Scheme Jand wala and Jand wala 04.11.2015. . Date of completion as per 626 1138 Bahawalnagar 25.000 19.550 5.450 5.450 0.909 0 0% 19.550 78% sani agreement= 03.11.16. .Anticipated date of completion 30-06-2019. Date of receipt of funds by F.D. 20.07.2018. Work is in progress.. Date of AA. 19.08.2016.. Date of T.S. 25.10.2016. .Date of receipt of tender=14-12- Rural water Supply Schemes Mouza Janu Khan Basti 2016. Date of award +19-01-2017. Date of 627 1139 Bahawalnagar 97.808 43.995 20.000 20.000 3.334 0.043 1% 44.038 45% completion+18-12-2017.. Anticipated date of Kapooran and kot Ganga Singh District Bahawalnagar completion 30-06-2019. Date of receipt of funds by F.D. 20.07.2018. Work is in progress.. Date of AA (DDSC). 15-10-2015.. Date of TS. 22-02-201`6. Date of prequalification on 22- 03-2016. Date of receipt of tenders = 07-04- 628 1140 3.334 95% 117.305 67% 2016. Date of work awarded 18.05.2016.. water Supply Scheme Doonga Boonga Bahawalnagar 174.252 114.139 20.000 20.000 3.166 Date of completion as per Agreement: 18.11.2017 .Anticipated date of completion 30- 06-2019.Date of receipt of funds by F.D. 20.07.2018. Work is in progress..

Date of AA(DDWP). 06.10.2015. . Date of TS. 22-02-2016. Date of receipt of tenders = 02- 03-2016. Date of work order=01-04-2016. 629 1141 water Supply Scheme Noor Sar (New & Old) Bahawalnagar 72.817 48.297 10.000 10.000 1.667 0 0% 48.297 66% Date of completion as per agreement= 30-10- 2017.Anticipated date of completion 30-06- 2019. Date of receipt of funds by F.D. 20.07.2018. Work is in progress.. 1. Date of AA = 15.12.2016 2. Date of TS = 23.12.2016 3.Date of Award of work . 19.05.2017 4.Dated of Released Funds 4. No. Rural water Supply Scheme, Kalowal Thathi Bala Raja of Beneficiaries = 5375 Persons Funds 630 1142 Chiniot 13.322 6.430 6.892 6.892 1.149 0.798 69% 7.228 54% Tehsil Lalian District Chiniot Released on 03.08.2018 by the Chief Engineer (South) PHED Lahore and work is in progress. Target progress will be achieve in coming month. * A.A Date. 25.08.2017* T.S Date. Construction of street / PCC / Soling / Nallian in various Mandi 13.09.2017* Start Date. 06.01.2018* 631 1143 150.000 70.000 10.000 10.000 1.667 1.667 100% 71.667 48% Ucs of District M.B.Din Bahauddin Completion date 05.01.2020 Work in progress. Construction of Road/Streets in Village Ghoon UC -Beor 632 1144 and Construction of Road/Streets & Hand Pumps in UC - Rawalpindi 8.000 6.000 2.000 2.000 0.334 0 0% 6.000 75% "Scheme completed in saving.excess funded Punjar & UC -Narar, District Rawalpindi Water Supply Scheme in Kahuta Town Tesil Kahuta, 633 1145 Rawalpindi 8.000 2.143 5.857 5.857 0.976 0.9 92% 3.043 38% Work in progress. District Rawalpindi P/I Tube Well in Latori Syedan & P/I Hand Pumps in Dhok 634 1146 Rawalpindi 5.650 3.650 2.000 2.000 0.334 0.334 100% 3.984 71% Tube Well bore completed & work in progress. Naka and Village Matore UC -Matore, District Rawalpindi Date of A.A 05-08-2017. Date of T.S.05-09- Construction of PCC in Different Streets in UC -64 District 2017. Work order issued on 31-10-2017. 635 1147 Faisalabad 5.000 2.000 3.000 3.000 0.500 0.36 72% 2.360 47% Faisalabad Work is in progress. Funds released on 03.08.2018 Date of A.A 05-08-2017. Date of T.S.05-09- Construction of PCC in Different Streets in UC -65 District 2017. Work order issued on 31-10-2017. 636 1148 Faisalabad 5.000 1.000 4.000 4.000 0.667 0.495 74% 1.495 30% Faisalabad Work is in progress. Funds released on 03.08.2018 Date of A.A 05-08-2017. Date of T.S.05-09- Construction of PCC in Different Streets in UC -66 District 2017. Work order issued on 31-10-2017. 637 1149 Faisalabad 5.000 2.000 3.000 3.000 0.500 0.399 80% 2.399 48% Faisalabad Work is in progress. Funds released on 03.08.2018 Date of A.A 05-08-2017. Date of T.S.05-09- Construction of PCC in Different Streets in UC -67 District 2017. Work order issued on 31-10-2017. 638 1150 Faisalabad 5.000 1.000 4.000 4.000 0.667 0.434 65% 1.434 29% Faisalabad Work is in progress. Funds released on 03.08.2018 Date of A.A 05-08-2017. Date of T.S.05-09- Construction of PCC in Different Streets in UC -72 District 2017. Work order issued on 31-10-2017. 639 1151 Faisalabad 5.000 1.000 4.000 4.000 0.667 0.511 77% 1.511 30% Faisalabad Work is in progress. Funds released on 03.08.2018 640 1152 Water Supply Scheme Pind burj Attari Sheikhupura 30.000 10.000 10.000 10.000 1.667 1.6 96% 11.600 39% Work in Progress Reheblitiation/Extension of Water Supply Scheme Tunga Menhal Phase-II (Basti Ouroo, Basti Jora, Basti Rind, Dera Ghazi 641 1153 20.000 4.847 15.153 15.153 2.526 0.884 35% 5.731 29% "• Date of A.A = 25.7.2017 Basti Bun Dhola, Basti Gabolan, Basti Manka & Basti Khan Mahool jee) 1. Date of A.A. 22-08- 2015. 2. Date of T.S. 27-08- 2015 Rev. T.S 07-02- 2017 3. Date of Pre-Qualification: 4. Date of invitation of tender 01-12- 2015 5. Date of Receipt of tenders 02-12- 2015 6. Date of work order 16-12- Rural Water Supply Scheme Quatabpur Dunyapur, Tehsil 642 1154 Lodhran 29.850 9.623 20.227 20.227 3.371 0 0% 9.623 32% 2015. Dunyapur, District Lohdran 7. Date of Completion as per PC-l 21-08- 2016 8. Anticipated date of completion 30-06- 2017 9.Date of released of funds 10. Reason of Slow Moving: 11.No. of beneficiaries 13535 Persons. Original approved scope of work completed.Electric connection awaited. Extra funds have been received and would be utilized to provide the water supply services to the unserved Hammad Town across Railway Line of Qutabpur, after Date of A.A 11.03.2015.Date of T.S 21.01.2015.Date of Start 20.03.2015.Date of completion 30.06.2019.Work could not be Rehabilitation of Rural Water Supply Scheme Dhoke started at site due to sever conflicts among 643 1155 Chakwal 1.620 0.719 0.901 0.901 0.150 0 0% 0.719 44% the CBO / community members. Community Khour Tehsil Talagang, Chakwal. Development Unit trying to resoved the issues in order to ensure useful utilization of funds released in F.Y 2018-19 in the best interest of work / public. Provision of Water Supply and Drainage Scheme in Village 644 1156 Gujrat 49.971 14.971 10.000 10.000 1.667 0 0% 14.971 30% Work in Progress Sher Garh UC Machiwal Tehsil & District Gujrat

645 1157 Rural Water Supply Scheme Chal No 61/SB Sargodah Sargodha 15.000 5.000 10.000 10.000 1.667 0 0% 5.000 33% Tenders invited on 26-09-2018

Date of A.A Date of T.S Date of Prequalification Date of invitation of tenders Rural Water Supply & Drainage Scheme, Qila Dewan Date of Receipt of tenders Date of work order 646 1158 Okara 22.250 0.493 21.757 21.757 3.626 3.626 100% 4.119 19% Singh Depaplur, Okara. Date of completion as per PC-I Anticipated date of completion No. of Beneficiary - Person, Work is in progress. Rehabilitation of Water Supply in Pir Qatal PP-244 District Dera Ghazi 647 1159 10.000 5.000 5.000 5.000 0.834 0.25 30% 5.250 53% "• Date of A.A = 25.7.2017 Dg Khan Khan Rehabilitation of Water Supply in Shehzada Sultan Town Dera Ghazi 648 1160 10.000 4.000 6.000 6.000 1.000 0.35 35% 4.350 44% "• Date of A.A = 25.7.2017 PP-244 District Dg Khan Khan Rehabilitation of Water Supply in Mehboob Abad PP-244 Dera Ghazi 649 1161 10.000 5.000 5.000 5.000 0.834 0.292 35% 5.292 53% "• Date of A.A = 25.7.2017 District Dg Khan Khan * A.A Date. 19.03.2015* T.S Date. Rural water Supply & Drainage Scheme Village Badshah Mandi 02.04.2015* Start Date 22.05.2015.* 650 1162 85.587 75.587 10.000 10.000 1.667 0 0% 75.587 88% Pur Tehsil Malikwal District M.B.Din Bahauddin Completion date 30.06.2019.* Work in progress. * A.A Date. 19.03.2015* T.S Date. Rural water Supply & Drainage Scheme Village Jayya Mandi 02.04.2015* Start Date 22.05.2015.* 651 1163 62.780 52.780 5.000 5.000 0.834 0 0% 52.780 84% Tehsil & District M.B.Din Bahauddin Completion date 30.06.2019.* Work in progress. Rural water Supply and drainage Scheme Bhaagowal & * A.A Date. 28.04.2015* T.S Date. Mandi 19.05.2015* Start Date 18.06.2015.* 652 1164 Noor Pur Peeran with adjecent abadies tehsil Mailk waal 50.000 45.000 5.000 5.000 0.834 0 0% 45.000 90% Bahauddin Completion date 30.06.2019.* Work in district mandi bahuddin progress. INSTALLATION OF 02 NO WATER FILTRATION PLANT Toba Tek 653 1165 IN JUSA TEHSIL PIR MAHAL DISTRICT TOB TAIKK 6.000 0.000 6.000 6.000 0.000 0 #DIV/0! 0.000 0% Estimate under process. Singh SINGH 1. Date of A.A: ------2. Date of T.S: ------3. Date of Pre-Qualification: ------4. Date of Invitation of Tender: ----- Installation of Water Filtration Plant in Abdul Hakeem city -- 654 1166 Khanewal 3.000 0.000 3.000 3.000 0.000 0 #DIV/0! 0.000 0% District Khanewal 5. Date of Receipt of Tender: ------6. Date of Work order: ------7. Date of Completion as per PC-I: ------8. Anticipated Date of completion: ------9. Date of released of funds ------10. Reason of Slow Moving: ------Installation of Water Filetartion Plant in UC 463 Teshil Case submitted for Change of Nomenclature 655 1167 Faisalabad 3.000 0.000 3.000 3.000 0.000 0 #DIV/0! 0.000 0% UC-463 to Chak No. 463/GB vide SE No. Smundri District Faisalabad 2414 dated 07.08.2018. Rehabilitation of 10 Rural Water Supply Schemes Tehsil 656 1168 Rawalpindi 34.830 10.000 10.000 10.000 1.667 1 60% 11.000 32% Work in progress Murree & Kotli Sattian, District Rawalpindi Const. of 02 Nos. Filtration Plants in each Ward of 657 1169 Chaklala Cantt Ward No.5 to 10& Const. of 0.2 MG Rawalpindi 50.000 20.000 14.000 14.000 2.334 0 0% 20.000 40% Work in progress capacity UGT at Sarwar Park LalKurti, District Rawalpindi

Const. of Bridge / Drain at Rawal Town, Tench Road/Adra 658 1170 Bridge/ Kacha Stop under Railway Track/Aliabad/Dk. Rawalpindi 50.000 20.000 20.000 20.000 3.334 0 0% 20.000 40% Work in progress Banaras/ Ahmadabad, District Rawalpindi Const. of Road / Sewerage at each Ward No.1 to 10 of 659 1171 Rawalpindi Cantt and Ward No.5 to 10 & Minority Member, Rawalpindi 50.000 20.000 20.000 20.000 3.334 0 0% 20.000 40% Work in progress District Rawalpindi Construction of streets in UCs PP-03 including Gujar Khan 660 1172 Rawalpindi 150.000 33.443 20.000 20.000 3.334 3.334 100% 36.777 25% Work in progress City, District Rawalpindi Installation of Water Filtration Plants, Ward No,1 to 10 2 661 1173 5.000 0% 2.000 6% 3 No. bores has been failed, now scheme has Nos. for each Ward Rawalpindi Cantonment Board, Rawalpindi 32.000 2.000 30.000 30.000 0 to be revised in consultation with RCB. District Rawalpindi Laying of 4’’ Dia Water Supply Pipe Line Ward No,1 to 662 1174 Ward No,10 Rawalpindi Cantonment Board ., District Rawalpindi 40.000 10.000 30.000 30.000 5.000 0 0% 10.000 25% Work is in progress Rawalpindi Const. of 02 Nos. Filtration Plants in each Ward of Rawalpindi Cantt Ward No.1 to 10 and Const. of 0.2 MG 663 1175 Rawalpindi 50.000 20.000 30.000 30.000 5.000 5 100% 25.000 50% Work is in progress. capacity UGT at Dk. Gujran Ward No.10, District Rawalpindi Construction of Under Ground Water Tank Rawalpindi 664 1176 Rawalpindi 25.000 21.657 3.343 3.343 0.557 0 0% 21.657 87% Work is in progress. Cantonment Board, District Rawalpindi 665 1177 0.867 0% 5.000 49% Work is in progress, Rising main laid & Water Supply Scheme at Dhala, District Rawalpindi Rawalpindi 10.200 5.000 5.200 5.200 0 distribution system is in progress Construction of PCC link road Jhawan to Kountrila UC 666 1178 Kountrila, length=1.70 Km, Tehsil Gujar Khan, District Rawalpindi 10.530 5.000 5.530 5.530 0.922 0.7 76% 5.700 54% Work is in progress Rawalpindi Construction of PCC link road Kanyal to Dhoke Jeaven, 667 1179 length=1.70 Km UC Mohra Noori, Tehsil Gujar Khan, Rawalpindi 10.170 5.000 5.170 5.170 0.862 0.7 81% 5.700 56% Work is in progress. District Rawalpindi Construction of PCC link road Wasla to Dhoke Bhattian, 668 1180 length=2.00 Km UC Sui Chemian, Tehsil Gujar Khan, Rawalpindi 12.815 5.000 7.815 7.815 1.303 0.8 61% 5.800 45% Work is in progress District Rawalpindi Construction of PCC link road Sattal to Sabah Sher and 669 1181 Dhoke Phugoo, length=2.00 Km, Tehsil Gujar Khan, Rawalpindi 12.881 5.000 7.881 7.881 1.314 1 76% 6.000 47% Work is in progress District Rawalpindi Construction of PCC road Dhoke Khumbail, Phase-I, 670 1182 length=1.5 Km, UC Sui Chemian, Tehsil Gujar Khan, Rawalpindi 10.569 5.000 5.569 5.569 0.928 0.6 65% 5.600 53% Work is in progress District Rawalpindi Constt. Of PCC link Road Mohri Barsal uc Jero Ratial., 671 1183 Rawalpindi 14.000 8.969 5.031 5.031 0.839 0.839 100% 9.808 70% Work is in progress District Rawalpindi Constt. Of PCC link Road Paka Khanpur UC Bhadana., 672 1184 Rawalpindi 14.000 5.000 9.000 9.000 1.500 1 67% 6.000 43% Work is in progress District Rawalpindi Constt. Of PCC link Road Dhoke Rajgan UC Qazian., 673 1185 Rawalpindi 12.000 5.000 7.000 7.000 1.167 1.167 100% 6.167 51% Work is in progress District Rawalpindi Constt. Of PCC link Road Dhoke fateh Paharian UC 674 1186 Rawalpindi 11.000 5.000 6.000 6.000 1.000 1 100% 6.000 55% Work is in progress Qazian., District Rawalpindi Constt. Of PCC link Road Dhoke Channi Dakhali Sohawa 675 1187 Rawalpindi 11.000 5.000 6.000 6.000 1.000 1 100% 6.000 55% Work is in progress Mirzian, Islam Pura Jabbar / Bewal., District Rawalpindi A.A Date 02.08.2017. T.S Date 13.09.2017. Drainage scheme at Noorpur and Lundi, Tehsil Hazro, Date of Start of Scheme 27.11.2017 . Date of 676 1188 Attock 26.139 10.000 16.139 16.139 2.690 2.69 100% 12.690 49% District Attock Completion of Scheme 30.06.19. Work is in progress. A.A Date 02.08.2017. T.S Date 13.09.2017. Drainage scheme at Khudlathi and Sarwana, Tehsil Hazro, Date of Start of Scheme 07.12.2017. Date of 677 1189 Attock 28.306 10.000 18.306 18.306 3.051 3.051 100% 13.051 46% District Attock Completion of Scheme 30.06.19Work is in progress. A.A Date 02.08.2017. T.S Date 13.09.2017 . Drainage scheme at Musa and Sherani, Tehsil Hazro, Date of Start of Scheme 27.11.2017. Date of 678 1190 Attock 26.931 15.000 11.931 11.931 1.989 1.989 100% 16.989 63% District Attock Completion of Scheme30.06.19. Work is in progress. A.A Date 02.08.2017. T.S Date 13.09.2017 . Rural drainage scheme in village Shakardara Phase-II, Date of Start of Scheme 09.12.2017. Date of 679 1191 Attock 32.394 10.000 10.000 10.000 1.667 1.667 100% 11.667 36% District Attock Completion of Scheme 30.06.2019. Work is in progress. A.A Date 02.08.2017.T.S Date Rural draiange scheme in village Ghourgushti Phase-II, 13.09.2017.Date of Start of Scheme 680 1192 Attock 19.313 10.000 9.313 9.313 1.552 1.552 100% 11.552 60% Tehsil Hazro, District Attock 09.12.2017. Date of Completion of Scheme 30.06.2019Work is in progress. A.A Date 02.08.2017.T.S Date 13.09.2017. Construction of PCC road from Kohat road Bhandar to Date of Start of Scheme 06.12.2017.Date of 681 1193 Attock 28.500 10.000 18.500 18.500 3.084 3.084 100% 13.084 46% Dhok Sanakhi UC Langar Tehsil Jand District Attock Completion of Scheme 30.06.19. Work is in progress. A.A Date 02.08.2017.T.S Date 13.09.2017 . Water Supply scheme of village Ferozwali UC Gareebwal Date of Start of Scheme 09.12.2017. Date of 682 1194 Attock 22.500 8.000 14.500 14.500 2.417 2.417 100% 10.417 46% Tehsil District Attock Completion of Scheme 30.06.2019. Work is in progress. A.A Date 16.09.2017. T.S Date 11.10.2017 . Drainage / sewerage scheme in village , Daman, Date of Start of Scheme 06.11.2017. Date of 683 1195 Attock 61.838 26.000 10.000 10.000 1.667 1.667 100% 27.667 45% Jalalia, District Attock Completion of Scheme 30.06.2019. work is in progress. A.A Date 16.09.2017. T.S Date 10.10.2017. Drainage / sewerage scheme in village Shadi Khan Phase- Date of Start of Scheme 13.12.2017.Date of 684 1196 Attock 54.788 20.000 10.000 10.000 1.667 1.667 100% 21.667 40% II, District Attock Completion of Scheme 30.06.2019. Work is in progress. A.A Date 02.08.2017. T.S Date 13.09.2017 . Drainage / Sewerage System in village , Tehsil Date of Start of Scheme 09.12.2017. Date of 685 1197 Attock 15.450 10.000 5.450 5.450 0.909 0.909 100% 10.909 71% Hazro, District Attock Completion of Scheme 30.06.2019 Work is in progress. Rural drainage scheme and water supply Oudherwal and Date of A.A 31.07.2017.Date of T.S 686 1198 Chakwal 18.000 10.000 8.000 8.000 1.334 1.25 94% 11.250 63% 08.08.2017.Date of Start 18.10.2017.Date of Mohallah Islam Pura Chakwal completion 30.06.2019.Work is in progress.

Rural drainage scheme and Water Supply in UC Dub, Date of A.A 31.07.2017.Date of T.S 687 1199 Chakwal 24.000 10.000 14.000 14.000 2.334 2.302 99% 12.302 51% 08.08.2017. Date of Start 18.10.2017.Date of District Chakwal completion 30.06.2019.Work is in progress.

Date of A.A 31.07.2017.Date of T.S Urban sewerage and drainage scheme in Chakwal City, 08.08.2017.Date of Start 19.10.2017 .Date of 688 1200 Chakwal 30.000 10.000 10.000 10.000 1.667 1.211 73% 11.211 37% completion 30.06.2020.Work is in progress. Ward No.1 to Ward No.12, District Chakwal Funds released on 03-08-2018. Target progress will be achieved in next month.

Urban Drainage & Sewerage scheme of Chakwal City from Date of A.A 31.07.2017 .Date of T.S 689 1201 Chakwal 30.000 16.000 14.000 14.000 2.334 2.125 91% 18.125 60% 08.08.2017 .Date of Start 19.10.2017 .Date of Ward No.13 to Ward No.23, District Chakwal completion 30.06.2019.Work is in progress.

Urban Drainage & Sewerage scheme of Chakwal City from Date of A.A 31.07.2017.Date of T.S 690 1202 Chakwal 30.000 10.000 10.000 10.000 1.667 1.231 74% 11.231 37% 08.08.2017.Date of Start 19.10.2017.Date of Ward No.28 to Ward No.37, District Chakwal completion 30.06.2020.Work is in progress.

Rural drainage scheme and retaining wall and Cause Way Date of A.A 31.07.2017.Date of T.S 691 1203 Chakwal 27.000 13.000 14.000 14.000 2.334 1.842 79% 14.842 55% 08.08.2017.Date of Start 23.10.2017. Date of in MC Bhaun, District Chakwal completion 30.06.2019.Work is in progress.

Date of A.A 31.07.2017.Date of T.S Rural Drainage Scheme and Retaining wall and Cause 08.08.2017.Date of Start 25.10.2017 .Date of 692 1204 Chakwal 25.000 14.000 11.000 11.000 1.834 1.798 98% 15.798 63% completion 30.06.2019.Work is in progress. way in UC Mureed, District Chakwal Funds released on 03-08-2018. Target progress will be achieved in next month.

Rural Drainage Scheme and Retaining wall and Cause Date of A.A 31.07.2017.Date of T.S 693 1205 Chakwal 20.000 10.000 10.000 10.000 1.667 1.172 70% 11.172 56% 08.08.2017.Date of Start 26.10.2017.Date of way in UC Jand Awan, District Chakwal completion 30.06.2019.Work is in progress.

Rural drainage and water supply village Tatral, District Date of A.A 31.07.2017.Date of T.S 694 1206 Chakwal 20.000 10.000 10.000 10.000 1.667 1.538 92% 11.538 58% 08.08.2017.Date of Start 26.10.2017.Date of Chakwal completion 30.06.2019.Work is in progress.

Rural Drainage scheme and Retaining wall in UC Mulhal Date of A.A 31.07.2017.Date of T.S 695 1207 Chakwal 17.000 10.000 7.000 7.000 1.167 0.842 72% 10.842 64% 08.08.2017.Date of Start 26.10.2017.Date of Mughllan, District Chakwal completion 30.06.2019.Work is in progress.

Rural draiange scheme & Retaining wall and causeway in Date of A.A 31.07.2017.Date of T.S 696 1208 Chakwal 13.000 8.000 5.000 5.000 0.834 0.834 100% 8.834 68% 08.08.2017.Date of Start 26.10.2017.Date of UC Chak Umara, District Chakwal completion 30.06.2019.Work is in progress.

Construction of PCC, Streets, Drain & Water Supply at Date of A.A 09.08.2017.Date of T.S 697 1209 Chakwal 147.248 30.000 10.000 10.000 1.667 1.627 98% 31.627 21% 02.10.2017.Date of Start 17.11.2017 .Date of Talagang, District Chakwal completion 30.06.2020.Work is in progress.

Construction of PCC, Streets, Drain & Water Supply at Date of A.A 09.08.2017.Date of T.S 698 1210 Chakwal 98.166 25.000 10.000 10.000 1.667 1.667 100% 26.667 27% 08.08.2017 . Date of Start 21.11.2017.Date of Tehsil Lawa PP-23, District Chakwal completion 30.06.2020.Work is in progress.

Rural drainage scheme UC -Jaswal, Tehsil & District Date of A.A 31.07.2017. Date of T.S 699 1211 Chakwal 20.000 10.000 10.000 10.000 1.667 0.942 57% 10.942 55% 08.08.2017.Date of Start 26.10.2017.Date of Chakwal completion 30.06.2019.Work is in progress.

Rural drainage scheme Nichandi & Dhapai, Tehsil & Date of A.A 31.07.2017.Date of T.S 700 1212 Chakwal 20.000 10.000 10.000 10.000 1.667 1.615 97% 11.615 58% 08.08.2017.Date of Start 27.10.2017.Date of District Chakwal completion 30.06.2019.Work is in progress. Restoration / Flood Rains Damages vented causeway on Dhermond to Dk. Fateh Shah Road, Vented causeway Date of A.A 31.07.2017.Date of T.S 701 1213 Chakwal 14.239 10.000 4.239 4.239 0.707 0.655 93% 10.655 75% 08.08.2017.Date of Start 27.10.2017.Date of Darot & street / drains village Wanhar, Tehsil Talagang, completion 30.06.2019.Work is in progress. District Chakwal Provision of sewerage at Ward No.36 Tehsil & District A.A Date 27-07-2017.T.S Date 09-08- 702 1214 Jhelum 15.000 8.000 7.000 7.000 1.167 1.167 100% 9.167 61% 2017.Date of Work Award 09-09-2017.Work Jhelum, District Jehlum in progress. Provision of Water Supply at Pind Sawika, Tehsil & District A.A Date 27-07-2017.T.S date 09-08- 703 1215 Jhelum 15.000 8.000 7.000 7.000 1.167 0.5 43% 8.500 57% 2017.Date of Work Award 16-09-2017.Work Jhelum in progress Provision of Sewerage system at UC Kotla Faqeer, Tehsil A.A Date 27-07-2017.T.S date 09-08- 704 1216 Jhelum 30.000 10.000 10.000 10.000 1.667 1.667 100% 11.667 39% 2017.Date of Work Award 09-09-2017.Work & District Jhelum in progress Provision of Water supply at village Kundal, District A.A Date 27-07-2017.T.S date 09-08- 705 1217 Jhelum 21.747 10.000 11.747 11.747 1.958 1.958 100% 11.958 55% 2017.Date of Work Award 13-09-2017.Work Jhelum in progress Date of A.A 20.07.2017, Date of T.S 28.07.2017, Date of Award 18.12.2017, Scheduled date of Completion is 30.06.2019, Date of Commencement, 18.12.2017, Funds Water supply scheme at Chak No.129 Janobi, Sillanwali, released on 30.07.2018, Funds on-lined on 706 1218 Sargodha 23.594 10.000 13.594 13.594 2.266 0 0% 10.000 42% 30.07.2018. 01-No. tube well, 01-No. Pump District Sargodha House completed. 01-Set of Pumping machinery arranged. R/Main / D-System 21292-Rft arranged out of provision 39635- Rft. 1-No. OHR 10% completed. Work in progress. Date of A.A 20.07.2017, Date of T.S 28.07.2017, Date of Award 18.12.2017, Scheduled date of Completion is 30.06.2019, Date of Commencement, 18.12.2017, Funds Water supply scheme at Chak No.119 Janobi, Sillanwali, released on 30.07.2018, Funds on-lined on 707 1219 Sargodha 17.002 10.000 7.002 7.002 1.167 1.167 100% 11.167 66% District Sargodha 30.07.2018. 02-No. tube well, 02-No. Pump House completed. 02-Sets of Pumping machinery arranged. R/Main / D-System 17470-Rft laid out of provision 29579-Rft. 1- No. OHR 10% completed. Work in progress.

Date of A.A 20.07.2017, Date of T.S 28.07.2017, Date of Award 18.12.2017, Scheduled date of Completion is 30.06.2019, Date of Commencement, 18.12.2017, Funds Water supply scheme at Chak No.111/107 Shumali, released on 30.07.2018, Funds on-lined on 708 1220 Sargodha 17.193 10.000 7.193 7.193 1.199 0.046 4% 10.046 58% Sillanwali, District Sargodha 30.07.2018. 02-No. tube well, 02-No. Pump House completed. 02-Sets of Pumping machinery arranged. R/Main / D-System 31142-Rft laid out of provision 36572-Rft. 1- No. OHR 10% completed. Work in progress. Water supply scheme at Chak No.140 Janobi, Sillanwali, 709 1221 Sargodha 12.961 6.000 6.961 6.961 1.160 0 0% 6.000 46% Work in progress. District Sargodha Water supply scheme at Chak No.165 Shumali, Sillanwali, 710 1222 Sargodha 10.673 5.000 5.673 5.673 0.946 0 0% 5.000 47% Work in progress. District Sargodha Construction of Drain / PCC / Soling / Sullage Carrier at 711 1223 Midh Pergana Islam Pure More, Tehsil . District Sargodha 16.130 10.000 6.130 6.130 1.022 0 0% 10.000 62% Work in progress. Sargodha Construction of PCC / Soling / Sewerage / Nullah Dera 712 1224 Abdul Sattar jhamat Chak No. 19 Shumali L= 2800 Feet, Sargodha 20.000 10.000 10.000 10.000 1.667 0 0% 10.000 50% Work in progress. District Sargodha Construction of PCC / Soling / Sewerage / Chabar Balooka 713 1225 Dera Mehar Muhammad Akhtar Lak and PCC / Soling Sargodha 20.000 10.000 10.000 10.000 1.667 0 0% 10.000 50% Work in progress. Mehar Qadir Yat Lak, UC Sakisar Baar, District Sargodha Constructio of Soling / Sewerage / PCC, Dera Jaat via Mehar Shahid Akram Lak, Ghulam Ahmed Kamrana, 714 1226 Sargodha 20.000 10.000 10.000 10.000 1.667 0 0% 10.000 50% Work in progress. Ahmed Yaar Gondal, Haji Muhammad Sher, UC Mardi Lak, District Sargodha Construction of Soling / PCC / Nullah / Dera Mahar Nasar Hayat Lak and Soling Lak More to Bonga Minhas Colony, 715 1227 Dera Jaat Mahar Muhammad Bakhsh Lak, Mahar Abdul Sargodha 20.000 10.000 10.000 10.000 1.667 0 0% 10.000 50% Work in progress. Rehamn Lak, Salah Muhammad Sipra, UC Lak More, District Sargodha Construction of Soling / PCC / UC Chak No. 58 Shumali, 716 1228 Sargodha 20.000 10.000 10.000 10.000 1.667 0 0% 10.000 50% Work in progress. District Sargodha Construciton of Soling Dera Jaat Badle Wala and PCC / 717 1229 Sewerage and repair of road Chak No. 53 Shumali, District Sargodha 20.000 10.000 10.000 10.000 1.667 0 0% 10.000 50% Work in progress. Sargodha Rural Drainage scheme for Chak No 9/SB, District 718 1230 Sargodha 29.294 10.000 10.000 10.000 1.667 0 0% 10.000 34% Work in progress. Sargodha Rural Drainage scheme for Chak No.18/SB & Colonies, 719 1231 Sargodha 25.885 10.000 10.000 10.000 1.667 0 0% 10.000 39% Work in progress. District Sargodha 720 1232 Rural Drainage scheme Chak No.2/NB, District Sargodha Sargodha 30.261 10.000 10.000 10.000 1.667 1.383 83% 11.383 38% Work in progress. 721 1233 Rural Drainage Scheme Abdal, District Sargodha Sargodha 25.667 10.000 10.000 10.000 1.667 0 0% 10.000 39% Work in progress. Construciton of Drainage / Soling, Adjoining Abadies of 722 1234 Sargodha 15.000 5.000 10.000 10.000 1.667 0 0% 5.000 33% Work in progress. Mouza Ahmaday wala, District Sargodha Rural drainage scheme UC No.64, Dharema, Sargodha, 723 1235 Sargodha 19.991 10.000 9.991 9.991 1.665 0 0% 10.000 50% Work in progress. District Sargodha Rural drainage scheme UC No.77, Hyderabaad Town, 724 1236 Sargodha 19.927 10.000 9.927 9.927 1.655 1.06 64% 11.060 56% Work in progress. District Sargodha Rural drainage scheme UC No.76, Chak No.71/NB, District 725 1237 Sargodha 19.955 10.000 9.955 9.955 1.659 1.628 98% 11.628 58% Work in progress. Sargodha Rural drainage scheme UC No.74, Chak No.79/NB, District 726 1238 Sargodha 19.987 10.000 9.987 9.987 1.665 0 0% 10.000 50% Work in progress. Sargodha Drainage scheme at Chak No.132/136, Janobi, Sillanwali, 727 1239 Sargodha 29.657 10.000 10.000 10.000 1.667 0 0% 10.000 34% Work in progress. District Sargodha Drainage scheme at Chak No.125/129 Shumali, Sillanwali, 728 1240 Sargodha 32.611 10.000 10.000 10.000 1.667 0 0% 10.000 31% Work in progress. District Sargodha Drainage scheme at Chak No.128/130 Janobi, Sillanwali, 729 1241 Sargodha 33.563 10.000 10.000 10.000 1.667 0 0% 10.000 30% Work in progress. District Sargodha Construction of road Drain / Soling / Re-Soling / PCC / Tuff 730 1242 Pavers / Sullage Carrier in Chak No 23-ASB Tehsil and Sargodha 15.000 10.000 5.000 5.000 0.834 0 0% 10.000 67% Work in progress. District Sargodha. Construction of road Drain / Soling / Re-Soling / PCC / Tuff 731 1243 Pavers / Sullage Carrier in Chak No 73/SB Tehsil and Sargodha 15.002 10.000 5.002 5.002 0.834 0 0% 10.000 67% Work in progress. District Sargodha Construction of road Drain / Soling / Re-Soling / PCC / Tuff 732 1244 Pavers / Sullage Carrier in Chak No 45/SB Tehsil and Sargodha 20.000 10.000 10.000 10.000 1.667 0 0% 10.000 50% Work in progress. District Sargodha Construction of road Drain / Soling / Re-Soling / PCC / Tuff 733 1245 Pavers / Sullage Carrier in Chak No 46/Sb tehsil and Sargodha 20.000 10.000 10.000 10.000 1.667 0 0% 10.000 50% Work in progress. District Sargodha Construction of road Drain / Soling / Re-Soling / PCC / Tuff 734 1246 Pavers / Sullage Carrier in Chak No 107/Sb Tehsil and Sargodha 20.003 10.000 10.003 10.003 1.667 0 0% 10.000 50% Work in progress. District Sargodha Construction of road Drain / Soling / Re-Soling / PCC / Tuff 735 1247 Pavers / Sullage Carrier in Chak No 85/NB tehsil and Sargodha 10.004 6.036 3.968 3.968 0.662 0.641 97% 6.677 67% Work in progress. District Sargodha Construction of road Drain / Soling / Re-Soling / PCC / Tuff 736 1248 Pavers / Sullage Carrier in Chak No 84/NB Tehsil and Sargodha 10.008 5.000 5.008 5.008 0.835 0 0% 5.000 50% Work in progress. District Sargodha Urban Sewerage & Drainage Scheme / Water Supply 737 1249 Pipeline including Disposal Station Gillwala and Tiwana Sargodha 50.000 20.000 10.000 10.000 1.667 1.643 99% 21.643 43% Work in progress. Park Sargodha City. Urban Sewerage & Drainage Scheme / Water Supply Pipeline including Disposal Station M.C No. 07 Street No. 738 1250 Sargodha 50.000 20.000 10.000 10.000 1.667 0.426 26% 20.426 41% Work in progress. 01, 02, 03, 04 & 05 to Rehman Pura Chowk via Pistool Marka Gali Sargodha City. Urban Sewerage & Drainage Scheme / Water Supply 739 1251 Sargodha 40.000 20.000 10.000 10.000 1.667 1.654 99% 21.654 54% Work in progress. Pipeline in M.C No. 08 Sargodha City. Urban Sewerage & Drainage Scheme / Water Supply 740 1252 Pipeline including Renovation of Disposal Station Eid Gah Sargodha 45.000 20.000 10.000 10.000 1.667 1.655 99% 21.655 48% Work in progress. M.C No. 09 Sargodha City. Urban Sewerage & Drainage Scheme / Water Supply 741 1253 Sargodha 50.000 20.000 10.000 10.000 1.667 0 0% 20.000 40% Work in progress. Pipeline M.C No. 11 & M.C No. 13 Sargodha City Urban Sewerage & Drainage Scheme / Water Supply 742 1254 Pipeline including Disposal Station Iqbal Colony and at Sargodha 50.000 20.000 10.000 10.000 1.667 1.649 99% 21.649 43% Work in progress. Girls Degree College to Block No. 16 Sargodha City Urban Sewerage & Drainage Scheme / Water Supply Pipeline Madina Town, New Madina Town, Muhammadi 743 1255 Sargodha 50.000 20.000 10.000 10.000 1.667 1.108 66% 21.108 42% Work in progress. Colony including Disposal Station and Main Water Works Chowk / Road Sargodha City. Urban Sewerage & Drainage Scheme / Water Supply 744 1256 Pipeline M.C No. 22 with Road Election Commission Sargodha 50.000 20.000 10.000 10.000 1.667 1.505 90% 21.505 43% Work in progress. Sargodha City. Urban Sewerage & Drainage Scheme / Water Supply 745 1257 Sargodha 40.000 20.000 10.000 10.000 1.667 0 0% 20.000 50% Work in progress. Pipeline M.C No. 20 M.C No. 21 Sargodha City. Urban Sewerage & Drainage Scheme / Water Supply Pipeline Hameed Town, Society Colony including 746 1258 Sargodha 45.000 20.000 10.000 10.000 1.667 0 0% 20.000 44% Work in progress. Renovation of Main Disposal Works Sillanwali Road Sargodha City. Urban Sewerage & Drainage Scheme in M.C-01 Sargodha 747 1259 Sargodha 50.000 20.000 10.000 10.000 1.667 0 0% 20.000 40% Work in progress. City. Urban Sewerage & Drainage Scheme in M.C-02 Sargodha 748 1260 Sargodha 30.000 15.000 10.000 10.000 1.667 0 0% 15.000 50% Work in progress. City. Urban Sewerage & Drainage Scheme in M.C-03 Sargodha 749 1261 Sargodha 30.000 15.000 10.000 10.000 1.667 0 0% 15.000 50% Work in progress. City. Urban Sewerage & Drainage Scheme in M.C-04 Sargodha 750 1262 Sargodha 50.000 20.000 10.000 10.000 1.667 0 0% 20.000 40% Work in progress. City. Urban Sewerage & Drainage Scheme in M.C-19 Sargodha 751 1263 Sargodha 40.000 20.000 10.000 10.000 1.667 0 0% 20.000 50% Work in progress. City. Urban Sewerage & Drainage Scheme in Cantonment Ward 752 1264 Sargodha 50.000 20.000 10.000 10.000 1.667 0 0% 20.000 40% Work in progress. No. 01 to 05 Sargodha City. Urban Sewerage & Drainage Scheme in Cantonment Ward 753 1265 Sargodha 50.000 20.000 10.000 10.000 1.667 1.642 99% 21.642 43% Work in progress. No. 06 to 10 Sargodha City. Rehabilitation water supply scheme Bhera Town, District 754 1266 Sargodha 80.000 40.000 10.000 10.000 1.667 1.583 95% 41.583 52% Work in progress. SargodhaPhase-I Urban Water Supply Scheme Distribution System Factory Area, Essa Nagar, Istaqlalabad, Hameed Town, 755 1267 Sargodha 30.000 15.000 10.000 10.000 1.667 0 0% 15.000 50% Work in progress. Corporation Town, Society Colony and Nallah including Slab Karkhana Bazar Sargodha City. Additional Water Supply pipeline in Cheema Colony, 756 1268 Kalyar Town, Rehmat Park, Pir Muhammad Colony & Sargodha 30.000 15.000 10.000 10.000 1.667 0 0% 15.000 50% Work in progress. Adjoining Colonies Sargodha City. Rehabilitation of Water Supply Scheme New Satellite 757 1269 Sargodha 50.000 20.000 10.000 10.000 1.667 0 0% 20.000 40% Work in progress. Town Sargodha City Providing / Fixing Ultra Filtration Plants U.F / R.O in 758 1270 Sargodha 40.000 25.000 10.000 10.000 1.667 0 0% 25.000 63% Work in progress. Wards / M.Cs in PP-34 Sargodha City 10-No. Up-gradation of Disposal Works in New Satellite Town & 759 1271 Ghani Park and laying of Distribution System in New Sargodha 48.000 25.000 10.000 10.000 1.667 0 0% 25.000 52% Work in progress. Satellite Town & adjoining abadies Sargodha City Water supply scheme at Sobaga, Sillanwali, District 760 1272 Sargodha 23.195 10.000 10.000 10.000 1.667 1.641 98% 11.641 50% Work in progress. Sargodha Construction of PCC Tuff Tiles / Tuff Pever road Liaqat Shaheed road to Merydal School & Suger Mil road to 761 1273 Lalazar Colony road & Merydal School to Sail Nallah & Sargodha 20.000 10.000 10.000 10.000 1.667 0 0% 10.000 50% Work in progress. Pathan Wala road, Street Masjid Wali, Bhalwal, District Sargodha Construciton of Sewerage Scheme, Tehsil Sahiwal, District 762 1274 Sargodha 50.000 22.000 10.000 10.000 1.667 0 0% 22.000 44% Work in progress. Sargodha Construciton of Sewerage Scheme Farooqa, District 763 1275 Sargodha 50.000 20.000 10.000 10.000 1.667 0 0% 20.000 40% Work in progress. Sargodha Construciton of Sewerage Scheme Vijh, Tehsil Sahiwal, 764 1276 Sargodha 30.000 10.000 10.000 10.000 1.667 0 0% 10.000 33% Work in progress. District Sargodha Construciton of Sewerage Scheme Nehong, Tehsil 765 1277 Sargodha 40.000 15.000 10.000 10.000 1.667 1.661 100% 16.661 42% Work in progress. Sahiwal, District Sargodha Date of AA 29.7.2017 Date of award Extension of Rural Water Supply Scheme, Malwal, District 09.12.2017 Date of completion 30.06.2019 766 1278 Khushab 24.530 10.000 14.530 14.530 2.422 0 0% 10.000 41% Tube Well 1 No. Pump House 1 No. Rising Khushab Main 9000/9000 Rft D/System 5700/7970 Rft Work is in progress. Date of AA 29.07.2017 Date of TS 04.9.2017 Extension / Improvement of Water Supply Scheme, Date of award 18.12.2017 Date of completion 767 1279 Khushab 21.225 3.000 10.000 10.000 1.667 0 0% 3.000 14% 30.06.2020 Tube Well 1 No. Pump House 1 Kuradhi UC Uchhali, District Khushab No. Pumping Machinery 1 No. Rising Main 3240/28525 Rft Work is in progress.

Date of AA 29.07.2017 Date of TS 15.8.2015 Rehabilitation / Improvement of Water Supply Scheme, Date of award 08.01.2018 Date of completion 768 1280 Khushab 12.400 6.000 6.400 6.400 1.067 1 94% 7.000 56% Fateh Pur Maira UC Gunjial Shumali, District Khushab 30.06.2019 Rising Main 9600/11500 Rft D/System 1800/2355 Rft Work is in progress. Date of AA 29.07.2017 Date of TS 5.9.2017 Date of award 23.12.2017 Date of completion Rehabilitation of Water Supply Scheme, Warcha UC 30.06.2020 Tube Well 1 No. Pump House 1 769 1281 Khushab 25.000 10.000 10.000 10.000 1.667 1.6 96% 11.600 46% Warcha, District Khushab No. Pumping Machinery 1 No. Rising Main 11880/17875 Rft D/System 0/1320 Rft Work is in progress. Date of AA 29.07.2017 Date of TS 5.9.2017 Date of award 16.12.2017 Date of completion Rehabilitation of Water Supply Scheme, Kufri UC Kufri, 30.06.2020 Tube Well 1 No. Pump House 1 770 1282 Khushab 15.230 10.000 5.230 5.230 0.872 0.8 92% 10.800 71% District Khushab No. Pumping Machinery 1 No. Rising Main 12800/12807 Rft Work is in progress.Funds for the year 2018-19 are yet awaited. Date of AA 29.07.2017 Date of TS 4.9.2017 Construciton of Water Supply Scheme of Rehman Colony Date of award 11.12.2017 Date of completion 771 1283 Khushab 30.000 15.000 10.000 10.000 1.667 1.58 95% 16.580 55% 30.06.2020 Tube Well 6/6 Set. Pumping MC Hadhali, District Khushab Machinery 6 Nos. Rising Main 50800/53196 Rft Work is in porgress. Date of AA 29.07.2017 Date of TS 4.9.2017 Construciton of Water Supply Scheme of Zaman Colony Date of award 11.12.2017 Date of completion 772 1284 Khushab 30.000 16.000 14.000 14.000 2.334 2 86% 18.000 60% 30.06.2019 Tube Well 6 Nos. Pumping MC Hadhali, District Khushab Machinery 6/6 Set. Rising Main 49480/52184 Rft Work is in progress . Date of AA 29.07.2017 Date of TS 5.9.2017 Provision of 100 Hand Pumps at Mahar Area, District Date of award 23.12.2017 Date of completion 773 1285 Khushab 30.000 10.000 10.000 10.000 1.667 1 60% 11.000 37% 30.06.2020 Hand Pump 23/34 Nos. Bore with Khushab submersible pump 13/29 Nos. G.S Tank 500 Glns 5/29 Nos. Date of AA 16.10.2017 Date of TS 15.8.2015 774 1286 1.667 77% 25.285 25% Date of award 04.01.2018 Date of completion Provision of sewerage scheme Roda, District Khushab Khushab 100.000 24.000 10.000 10.000 1.285 30.06.2020 RCC Sewer 0/1500 Rft. PCC Slab 28522/293128 Cft Work is in progress.

Date of AA 29.07.2017 Date of TS 5.9.2017 Provision of Drainage System in MC Mitha Tiwana, District Date of award 08.12.2017 Date of completion 775 1287 Khushab 49.900 15.000 10.000 10.000 1.667 0 0% 15.000 30% 30.06.2020 PCC Slab 60101/89202 Cft Khushab Surface Drain 0/19550 Rft Sullage Carrier 0/10715 Rft Work is in progress.

Date of AA 29.07.2017 Date of TS 5.9.2017 Date of award 08.12.2017 Date of completion Provision of Drainage System in MC QuaidaAbad, District 30.06.2020 RCC Sewer 5786/18305 Rft PCC 776 1288 Khushab 49.831 15.000 10.000 10.000 1.667 1.667 100% 16.667 33% Khushab Slab 40186/76862 Cft Surface Drain 0/3000 Rft work is in progrss . Funds for the year 2018-19 are yet awaited. Date of AA 29.07.2017 Date of TS Provision of Drainage System in UC Ukhli Mohla, District 05.09.2017 Date of award 09.12.2017 Date of 777 1289 Khushab 18.025 10.000 8.025 8.025 1.338 0.8 60% 10.800 60% Khushab completion 30.06.2019 PCC Slab 27608/54740 Cft work is in progress. Date of AA 29.07.2017 Date of TS 04.09.2017 Date of award 09.12.2017 Date of Construction of Drainage / Sewerage scheme, Rehman completion 30.06.2020 RCC Sewer 778 1290 Khushab 32.000 10.000 10.000 10.000 1.667 1.6 96% 11.600 36% Colony, MC Hadhali, District Khushab 7320/8700 Rft PCC Slab 17510/39304 Cft Surface Drain 4401/6000 Rft Work is in progress. Date of AA 29.07.2017 Date of TS 04.09.2017 Date of award 09.12.2017 Date of Construction of Drainage / Sewerage scheme, Zaman completion 30.06.2020 PCC Slab 779 1291 Khushab 30.000 10.000 10.000 10.000 1.667 1.588 95% 11.588 39% Colony, MC Hadhali, District Khushab 24015/27284 Cft Surface Drain 513/5000 Rft Sullage Carrier 1800/15540 Rft Work is in progress. Date of AA 29.7.2017 Date of TS 05.09.2017 Date of award 07.12.2017 Date of completion 780 1292 Construction of PCC Derajat, UC Uttra, District Khushab Khushab 20.000 10.000 10.000 10.000 1.667 1.667 100% 11.667 58% 30.06.2019 PCC Slab 46175/66532 Cft Surface Drain 0/1470 Rft Work is in progress . Funds for the year 2018-19 are yet awaited. Date of AA 29.07.2017 Date of TS 05.09.2017 Date of award 11.12.2017 Date of 781 1293 Construction of PCC Slab, UC Gunjial, District Khushab Khushab 30.000 10.000 10.000 10.000 1.667 1.667 100% 11.667 39% completion 30.06.2020 RCC Sewer 0/860 Rft Surface Drain 0/5000 Rft PCC Slab 25515/63069 Cft Work is in progrss. Date of AA 29.7.2017 Date of TS 05.09.2018 Date of award 11.12.2017 Date of completion 782 1294 Construction of PCC Slab, UC 14 MB, District Khushab Khushab 20.000 10.000 10.000 10.000 1.667 0 0% 10.000 50% 30.06.2019 PCC Slab 42293/66326 Cft Surface Drain 900/1600 Rft Work is in progress. Date of AA 11.08.2015 Date of TS 15.8.2015 Construction of Sewerage in, MC Mitha Twana, District Date of award 28.03.2018 Date of completion 783 1295 Khushab 100.000 23.000 10.000 10.000 1.667 1.601 96% 24.601 25% 30.06.2020 PCC Slab 16620/78190 Cft Khushab Surface Drain 2661/18230 Rft Sullage Carrier 0/29400 Rft work is in progress.

Date of A.A. 01-08-2017, Date of T.S. 08-08- 2017, Date of Start of Work 29-10-2017, Remarks.RCC Pipe Sewer 9"i/d=2900- Arranged/2957, 12"i/d=2800-Arranged/2878, Provision of Sewerage and Sanitation at village Dhoranka 15"i/d=1100-Arranged/1175, 18"i/d=800- 784 1296 Mianwali 20.000 2.000 10.000 10.000 1.667 0.29 17% 2.290 11% City, UC Namal, District Mianwali Arranged/828, 21"i/d= 900-Arranged/978, 24"i/d=0/942, Surface Drain=0/430, PCC Slab=0/9035, Sullage Carrier (1.25'x1.5')=0/100, (1.50'x2')=0/500, (2.50'x4')=0/1400. Work is in progress.

Date of A.A. 18-08-2017, Date of T.S. 13-11- 2017, Date of Start of Work 19-01-2018, Remarks. RCC Sewer=9" i/d=0/6890, 12"i/d= 5700-Arranged/23310, 15"i/d= 6419- Arranged/6595, 18"i/d=2538-Arranged/2590, Provision of Integrated Sewerage Scheme for Wan 21"i/d=0/150, 24"i/d=1600-Arranged/1635, 785 1297 Mianwali 75.000 12.000 10.000 10.000 1.667 0.59 35% 12.590 17% Bhachran Town, District Mianwali 27"i/d=1660-Arranged/1690, 30"i/d=1710- Arranged/1740, 33"i/d=400/510, Surface Drain= 0460, PCC Slab= 12364/98880, Sullage Carrier= 0/500, 0/150, Screening Chamber=0/1, P/Machinery=0/1, T/Line=0/1. Work is in progress. Date of A.A. 01-08-2017, Date of T.S. 08-08- 2017, Date of Start of Work 29-10-2017, Remarks.RCC Pipe Sewer 9"i/d=0/980, Provision of Sewerage and Sanitation at UC Mari, District 12"i/d=0/2532, 15"i/d=0/1418, 18"i/d=0/930, 786 1298 Mianwali 20.000 13.000 7.000 7.000 1.167 0.391 34% 13.391 67% Mianwali Surface Drain=0/1040, PCC Slab= 51729/28106, Sullage Carrier (1.25'x1.5')=0/430, (1.50'x2') =0/1850, (2.50'x4') =0/100 Work is in progress. Date of A.A. 01-08-2017, Date of T.S. 08-08- 2017, Date of Start of Work 29-10-2017, Provision of Sewerage and Sanitation at UC Kalon Wala, Remarks.RCC Pipe Sewer 12"i/d=Arranged/ 787 1299 Mianwali 20.000 12.500 7.500 7.500 1.250 0.25 20% 12.750 64% 2393, 15"i/d=0/868, 18"i/d=0/636, Surface District Mianwali Drain=700/4535, Sullage Carrier=0/955, PCC Slab= 33241/33241, Brick Pavement=0/51000. Work is in progress.

Date of A.A. 01-08-2017, Date of T.S. 08-08- 2017-, Date of Start of Work 29-10-2017, Provision of Sewerage and Sanitation at UC Manda Khel / Remarks. RCC Pipe Sewer 12"i/d=0/536, 788 1300 Mianwali 20.000 12.500 7.500 7.500 1.250 0.29 23% 12.790 64% Jalal Pur, District Mianwali 24"i/d=0/257, Surface Drain=491/3130, Sullage Carrier=350/850, PCC Slab= 40772/56009. Work is in progress.

Date of A.A. 01-08-2017, Date of T.S. 08-08- 2017, Date of Start of Work 29-10-2017, Remarks. RCC Pipe Sewer 12"i/d=950/1284, Urban sewerage drainage scheme Isa Khel, District 24"i/d =300/330, Surface Drain= 400 /4540, 789 1301 Mianwali 20.000 10.000 10.000 10.000 1.667 0.31 19% 10.310 52% Sullage Carrier=540/1335, PCC Slab= 13829 Mianwali /28996, Tuff Tiles= 3564 /3564, Replacement of Rising Main 8"i/d PE=2000-Laid & 1335- Arranged/3335, 6"i/d PVC=0/60, 4"i/d PVC = 0/60, 3"i/d PVC= 0/660. Work is in progress.

Date of A.A. 01-08-2017, Date of T.S. 08-08- 2017, Date of Start of Work 29-10-2017, Installation of Submersible Pumps in PP-43 , District Remarks. ERS=60/116, Trial Bore=06/11, 790 1302 Mianwali 50.000 22.000 10.000 10.000 1.667 0.34 20% 22.340 45% Mianwali Tube Well = 33/58, Pumping Machinery= 33/58, G.S.Tank 500-Glns=7/58. Work is in progress. Date of A.A. 01-08-2017, Date of T.S. 08-08- PCC Slab / Drainage Scheme UC Kot Chandna, Tehsil Isa 2017, Date of Start of Work 29-10-2017, 791 1303 Mianwali 20.000 12.500 7.500 7.500 1.250 1.25 100% 13.750 69% Remarks. PCC Slab= 53864/ 59483, Surface Khel, District Mianwali Drain=1630/2900, Sullage Carrier=0/350 Work is in progress. Date of A.A. 01-08-2017, Date of T.S. 08-08- 2017, Date of Start of Work 29-10-2017, 792 1304 PCC Slab at U.C Khaglanwala, District Mianwali Mianwali 20.000 10.000 10.000 10.000 1.667 0.494 30% 10.494 52% Remarks. PCC Slab=34437 /53023, Surface Drain=984/9255, Sullage Carrier=0/150, RCC Sewer 12" = 242/335. Work is in progress. Date of A.A. 01-08-2017, Date of T.S. 08-08- 2017, Date of Start of Work 29-10-2017, 793 1305 PCC Slab at U.C Vanjari, District Mianwali Mianwali 20.000 10.000 10.000 10.000 1.667 0.347 21% 10.347 52% Remarks. PCC Slab=37915/63118, Surface Drain=0/1055, Sullage Carrier=0/120. Work is in progress. Date of A.A. 01-08-2017, Date of T.S. 08-08- 2017, Date of Start of Work 29-10-2017. 794 1306 PCC Slab at U.C Chapri, District Mianwali Mianwali 20.000 10.000 10.000 10.000 1.667 0.31 19% 10.310 52% Remarks. PCC Slab= 38740/59804, Surface Drain= 0/4235, Sullage Carrier=0/600. Work is in progress. Date of A.A. 01-08-2017, Date of T.S. 08-08- 2017 Date of Start of Work 29-10-2017, 795 1307 1.667 26% 10.440 52% Remarks. RCC Pipe Sewer 12"i/d=740/1530, PCC Slab at U.C Paka Kamar Mushani, District Mianwali Mianwali 20.000 10.000 10.000 10.000 0.44 Surface Drain=0/1720, Sullage Carrier=400/400, PCC Slab=33065/57767. Work is in progress. Date of A.A. 01-08-2017, Date of T.S. 08-08- Construction of PCC Slab & Drain Kala Bagh Lari Adda, 2017, Date of Start of Work 29-10-2017, 796 1308 Mianwali 15.250 7.000 8.250 8.250 1.375 0.25 18% 7.250 48% Remarks. Surface Drain=0/7230, Sullage District Mianwali Carrier=0/100, PCC Slab=24252/35699, Tuff Tiles=0/15800. Work is in progress. Date of A.A. 01-08-2017, (Rev)Date of T.S.08- 03-2018, Date of Start of Work 29-10-2017, Remarks. RCC Pipe Sewer 9"i/d=0/938, Sewerage and Sanitation for Paki Shah Mardan District 12"i/d=590/4320, 15"i/d=1314/1276, 18"i/d= 797 1309 Mianwali 30.000 10.000 10.000 10.000 1.667 1.012 61% 11.012 37% Mianwali 2504/3950, 21"i/d=1812/1664, 24"i/d=1291/2062, Surface Drain=0/120, PCC Slab=0/4600, Sullage Carrier=350/1060. Work is in progress. Date of A.A. 01-08-2017, Date of T.S. 08-08- 2017, Date of Start of Work 29-10-2017, PCC Slab / Drainage Scheme UC vanjari, Tehsil Isa Khel, Remarks.RCC Pipe Sewer 12"i/d=2592- 798 1310 Mianwali 20.000 10.000 10.000 10.000 1.667 0.29 17% 10.290 51% Arranged/2595, 15"i/d=480-Arranged/480, District Mianwali Surface Drain=0/4535, Sullage Carrier=0/955, PCC Slab= 35812/44680. Work is in progress. Date of A.A. 01-08-2017, Date of T.S. 08-08- 2017, Date of Start of Work 29-10-2017, PCC Slab / Drainage Scheme UC Pacca Kama Mushani, Remarks. RCC Pipe Sewer 799 1311 Mianwali 40.000 10.000 20.000 20.000 3.334 3.237 97% 13.237 33% Tehsil Isa Khel, District Mianwali 12"i/d=2550/2785, 15"i/d=0/660, Surface Drain=0/1270, Sullage Carrier=0/350, PCC Slab= 77311/107505 Work is in progress. Date of A.A. 01-08-2017, Date of T.S. 08-08- PCC Slab / Drainage Scheme UC Sultan Khel, Thesil Isa 2017, Date of Start of Work 29-10-2017, 800 1312 Mianwali 20.000 10.000 10.000 10.000 1.667 0.27 16% 10.270 51% Remarks. PCC Slab= 34010/59297, Surface Khel, District Mianwali Drain 0/5945, Sullage Carrier=0/200 Work is in progress. Construction of Sewerage / Drainage scheme i/c PCC 801 1313 1.667 100% 11.660 18% Funds released on 26.10.2017 Work allotted Pavement in Street village Hussasin Shah, Tehsil Darya Bhakkar 64.920 10.000 10.000 10.000 1.66 on 08.12.2017 Khan District Bhakkar Construction of Sewerage / Drainage scheme i/c PCC 802 1314 1.090 0% 8.500 57% Funds released on 26.10.2017 Work allotted Pavement in Street village Sukha Shah, Tehsil Darya Khan Bhakkar 15.040 8.500 6.540 6.540 0 on 03.11.2017 District Bhakkar Construction of Sewerage / Drainage scheme Baranga Funds released on 26.10.2017 Work allotted 803 1315 Bhakkar 49.760 15.000 10.000 10.000 1.667 1.667 100% 16.667 33% Tehsil Darya Khan, District Bhakkar on 02.11.2017 Construction of Sewerage / Drainage scheme i/c PCC 804 1316 1.667 0% 10.000 36% Funds released on 26.10.2017 Work allotted Pavement in Street village Londi Nasheeb, Tehsil Darya Bhakkar 27.650 10.000 10.000 10.000 0 on 31.10.2017 Khan, District Bhakkar Construction of sullage carrier, surface drain, brick 805 1317 1.667 0% 10.500 22% Funds released on 26.10.2017 Work allotted pavement, PCC Slab, RCC Sewer and Disposal Station in Bhakkar 48.600 10.500 10.000 10.000 0 on 31.10.2017 Sara-e-Mohajir, Chak No.250/TDA, District Bhakkar. Construction of sullage carrier, surface drain, brick 806 1318 1.667 0% 15.500 32% Funds released on 26.10.2017 Work allotted pavement, PCC Slab, RCC Sewer and Disposal Station in Bhakkar 48.600 15.500 10.000 10.000 0 on 02.11.2017 Chak No.67/ML, District Bhakkar. Construction of sullage carrier, surface drain, brick 807 1319 1.667 95% 19.576 41% Funds released on 26.10.2017 Work allotted pavement, PCC Slab, RCC Sewer and Disposal Station in Bhakkar 47.255 18.000 10.000 10.000 1.576 on 31.10.2017 Sara-e-Mohajir Chak No.71/ML, District Bhakkar.

Construction of sullage carrier, surface drain, brick 808 1320 1.667 0% 18.000 36% Funds released on 26.10.2017 Work allotted pavement, PCC Slab, RCC Sewer and Disposal Station at Bhakkar 49.833 18.000 10.000 10.000 0 on 31.10.2017 Adda Jahan Khan, Chak No.45/TDA, District Bhakkar.

Rural sewerage, drainage, PCC Slab / brick pavement Funds released on 26.10.2017 Work allotted 809 1321 Bhakkar 57.023 17.500 10.000 10.000 1.667 0 0% 17.500 31% scheme in UC Katchi Shahani, Tehsil & District Bhakkar on 31.10.2017

Rural sewerage, drainage, PCC Slab / brick pavement Funds released on 26.10.2017 Work allotted 810 1322 Bhakkar 59.573 20.000 10.000 10.000 1.667 0 0% 20.000 34% scheme in UC Sial, Tehsil & District Bhakkar on 13.12.2017 PCC Slab/ Sewerage / Tuff tiles / RCC / Pullian / and 811 1323 3.334 0% 10.000 33% Funds released on 26.10.2017 Work allotted soling scheme UC Fazal, UC Chak No. 40/ML UC Chak Bhakkar 30.000 10.000 20.000 20.000 0 on 31.10.2017 No. 63/DB, Tshil Kallur Kot, District Bhakkar PCC Slab/ Sewerage / Tuff tiles / RCC / Pullian / and 812 1324 1.667 0% 15.000 38% Funds released on 26.10.2017 Work allotted soling scheme UC Dali Namdar UC Ghulaman No.1, UC Bhakkar 40.000 15.000 10.000 10.000 0 on 31.10.2017 Ghulaman No.2, Tehsil Kallur Kot, District Bhakkar PCC Slab/ Sewerage / Tuff tiles / RCC / Pullian / and soling scheme UC Haitthu, UC Kalul, UC Maibal, UC Funds released on 26.10.2017 Work allotted 813 1325 Bhakkar 50.000 18.000 10.000 10.000 1.667 1.66 100% 19.660 39% Kanjan and UC Noon Dagar, Tehsil Kallur Kot, District on 31.10.2017 Bhakkar Provision of PCC Pavement / Slab, Sewerage, Culverts 814 1326 1.667 0% 23.500 50% Funds released on 26.10.2017 Work allotted and Soling in UC Khaawar kala, Majoka, Lak Kalan, tehsil Bhakkar 46.563 23.500 10.000 10.000 0 on 31.10.2017 Darya Khan District Bhakkar Provision of PCC Pavement / Slab, Sewerage, Culverts 815 1327 1.667 96% 21.596 46% Funds released on 26.10.2017 Work allotted and Soling in UC Dullaywala Rural, Jhammat Shumali, Bhakkar 46.904 20.000 10.000 10.000 1.596 on 31.10.2017 Barranga, Tehsil Darya Khan District Bhakkar Provision of PCC Pavement / Slab, Sewerage, Culverts 816 1328 1.667 100% 16.660 46% Funds released on 26.10.2017 Work allotted and Soling in UC Daggar Qureshi, Wahwara, Barkatwala, Bhakkar 36.304 15.000 10.000 10.000 1.66 on 31.10.2017 Tehsil Darya Khan District Bhakkar. Provision of PCC Pavement / Slab, Sewerage, Culverts 817 1329 1.667 63% 11.056 22% Funds released on 26.10.2017 Work allotted and Soling in UC Angra Daggar, Chak No 6/TDA, Gadai Bhakkar 49.827 10.000 10.000 10.000 1.056 on 31.10.2017 Tehsil Darya Khan District Bhakkar. Provision of PCC Pavement / Slab, Sewerage, Culverts 818 1330 1.667 37% 10.625 33% Funds released on 26.10.2017 Work allotted and Soling in UC Punjigrain Daggar and Nasheb, Tehsil Bhakkar 32.268 10.000 10.000 10.000 0.625 on 31.10.2017 Darya Khan District Bhakkar. Rural Drainage scheme UC Goharwala and Khansar., Funds released on 26.10.2017 Work allotted 819 1331 Bhakkar 28.345 15.000 13.345 13.345 2.224 0 0% 15.000 53% District Bhakkar on 03.11.2017 Construction of sewerage / Drainage scheme in Chak No. Funds released on 26.10.2017 Work allotted 820 1332 Bhakkar 36.766 10.000 10.000 10.000 1.667 0 0% 10.000 27% 49/TDA Tehsil and District Bhakkar on 02.11.2017 Construction of sewerage / Drainage scheme in Chak No. Funds released on 26.10.2017 Work allotted 821 1333 Bhakkar 45.685 8.000 10.000 10.000 1.667 0 0% 8.000 18% 47/TDA Tehsil and District Bhakkar on 02.11.2017 Extension of Sewerage / Drainage Scheme and PCC 822 1334 1.667 100% 24.160 48% Funds released on 26.10.2017 Work allotted pavement in left over streets Darya Khan City, Tehsil Bhakkar 50.000 22.500 10.000 10.000 1.66 on 31.10.2017 Darya Khan District Bhakkar. 823 1335 1.667 48% 4.798 10% Funds released on 26.10.2017 Work allotted Sewerage scheme Kotla Jam, Tehsil & District Bhakkar Bhakkar 48.611 4.000 10.000 10.000 0.798 on 31.10.2017 PCC Slab and Sewerage scheme MC jandanwala, Tehsil Funds released on 26.10.2017 Work allotted 824 1336 Bhakkar 30.000 10.000 10.000 10.000 1.667 0.952 57% 10.952 37% Kallut Kot, District Bhakkar on 31.10.2017 PCC Slab and Sewerage scheme MC Kallut Kot, District Funds released on 26.10.2017 Work allotted 825 1337 Bhakkar 50.000 21.500 10.000 10.000 1.667 1.654 99% 23.154 46% Bhakkar on 31.10.2017 Construction of PCC, Soling & drains schemes in Chak Date of A.A 29-09-2017. Date of T.S.05-09- 826 1338 0.917 73% 10.670 69% 2017. Work order issued on 31-10-2017. No.409 GB, 420 GB, 410 GB, 405 GB, 407 GB, 424 GB Faisalabad 15.500 10.000 5.500 5.500 0.67 Work is in progress. Funds released on District Faisalabad 03.08.2018 Construction of PCC, Soling & drains schemes in Chak Date of A.A 29-09-2017. Date of T.S.05-09- 827 1339 0.917 66% 7.605 61% 2017. Work order issued on 31-10-2017. No. 430 GB, 422GB, 423 GB, 427 GB, 428 GB, 425 GB, Faisalabad 12.500 7.000 5.500 5.500 0.605 Work is in progress. Funds released on 404 GB District Faisalabad 03.08.2018 Construction of PCC, soling & drainage and boundary Date of A.A 29-09-2017. Date of T.S.16-09- walls of graveyards in Pindi Sheikh Musa, Mobarik Pura, 2017. Work order issued on 31-10-2017. 828 1340 Faisalabad 17.000 10.000 7.000 7.000 1.167 0.79 68% 10.790 63% Chak No.451 GB, 429 GB, 400 GB, 408 GB & Nazir Work is in progress. Funds released on Colony District Faisalabad 03.08.2018 Date of A.A 05-08-2017. Date of T.S.16-09- Rural Water Supply Scheme chak No. 203\GB Tehsil 2017. Work order issued on 31-10-2017. 829 1341 Faisalabad 23.880 10.000 13.880 13.880 2.314 1.47 64% 11.470 48% Samundari District Faisalabad Work is in progress. Funds released on 03.08.2018 Date of A.A 05-08-2017. Date of T.S.16-09- Rural Water supply Scheme chak no. 199\GB Tehsil 2017. Work order issued on 31-10-2017. 830 1342 Faisalabad 13.434 10.000 3.434 3.434 0.573 0.48 84% 10.480 78% Samundari District Faisalabad Work is in progress. Funds released on 03.08.2018 Date of A.A 05-08-2017. Date of T.S.16-09- Rural Water supply Scheme chak no. 208\GB Tehsil 2017. Work order issued on 31-10-2017. 831 1343 Faisalabad 20.359 10.000 10.359 10.359 1.727 1.212 70% 11.212 55% Samundari District Faisalabad Work is in progress. Funds released on 03.08.2018 Date of A.A 02-10-2017. Date of T.S.02-11- 832 1344 3.334 66% 23.131 23% 2017. Work order issued on 01-03-2018. PCC / Seewrage etc. Scheme Jaranwala City in NA-76 Faisalabad 100.000 20.916 20.000 20.000 2.215 Work is in progress. Funds released on 03.08.2018 Provision of Solling / Nalian / Drainage in Tandlianwala City , Mamu kanjan City, UC's Date of A.A 09-10-2017. Date of T.S.02-11- 833 1345 3.334 100% 43.334 34% 2017. Work order issued on 01-02-2018. 76,77,78,79,80,81,82,83,84,85,86,87, 88, 89, 90, 91, 92, Faisalabad 126.000 40.000 20.000 20.000 3.334 Work is in progress. Funds released on 93, 94, 95, 96, 97, 98, 99, 100, 101, 102, 103, 104, Tehsil 03.08.2018 Tandlianwala District Faisalabad Date of A.A 05-08-2017. Date of T.S.16-09- Rural Water supply Scheme chak no. 209\GB Tehsil 2017. Work order issued on 31-10-2017. 834 1346 Faisalabad 19.412 10.000 9.412 9.412 1.569 1.275 81% 11.275 58% Samundari District Faisalabad Work is in progress. Funds released on 03.08.2018 Date of A.A 05-08-2017. Date of T.S.16-09- Rural Water supply Scheme chak no. 212\GB Tehsil 2017. Work order issued on 31-10-2017. 835 1347 Faisalabad 12.439 10.000 2.439 2.439 0.407 0.305 75% 10.305 83% Samundari District Faisalabad Work is in progress. Funds released on 03.08.2018 Date of A.A 05-08-2017. Date of T.S.16-09- Rural Water supply Scheme chak no. 207\GB Tehsil 2017. Work order issued on 31-10-2017. 836 1348 Faisalabad 26.341 10.000 10.000 10.000 1.667 0.995 60% 10.995 42% Samundari District Faisalabad Work is in progress. Funds released on 03.08.2018 Date of A.A 05-08-2017. Date of T.S.16-09- Rural Water supply Scheme chak no. 211\GB Tehsil 2017. Work order issued on 31-10-2017. 837 1349 Faisalabad 11.338 6.000 5.338 5.338 0.890 0.645 72% 6.645 59% Samundari District Faisalabad Work is in progress. Funds released on 03.08.2018 Date of A.A 05-08-2017. Date of T.S.16-09- Rural Water supply Scheme chak no. 202\GB Tehsil 2017. Work order issued on 31-10-2017. 838 1350 Faisalabad 12.378 6.000 6.378 6.378 1.063 0.67 63% 6.670 54% Samundari District Faisalabad Work is in progress. Funds released on 03.08.2018 Date of A.A 05-08-2017. Date of T.S.16-09- Rural Water supply Scheme chak no. 200\GB Tehsil 2017. Work order issued on 31-10-2017. 839 1351 Faisalabad 11.850 6.000 5.850 5.850 0.975 0.68 70% 6.680 56% Samundari District Faisalabad Work is in progress. Funds released on 03.08.2018 Construction of Soling, Nallian, Pullian, Nallah and Water Date of A.A 05-08-2017. Date of T.S.16-09- 840 1352 1.667 71% 16.190 43% 2017. Work order issued on 31-10-2017. Supply at Chak No. 5 GB Kamal Pur UC 168 in District Faisalabad 37.222 15.000 10.000 10.000 1.19 Work is in progress.Funds released on Faisalabad 03.08.2018 Construction of Soling, Nallian, Pullian, Nallah and Water Date of A.A 05-08-2017. Date of T.S.16-09- 841 1353 2.116 74% 11.570 51% 2017. Work order issued on 31-10-2017. Supply at Chak No. 52 GB malal Pur UC 166 in District Faisalabad 22.692 10.000 12.692 12.692 1.57 Work is in progress. Funds released on Faisalabad 03.08.2018 ate of A.A 04-10-2017. Date of T.S.14-12- 842 1354 3.334 94% 60.634 40% 2017. Work order issued on 01-03-2018. Rural Drainage Scheme of Villages in NA-76 Faisalabad 150.000 57.500 20.000 20.000 3.134 Work is in progress. Funds released on 03.08.2018 Substitution of Schemes Already reflected in ADP 2017-18 vide No. / ASCM (Coord & Construction of Soling / Drainage / Chak no. 569/GB Abadi Dev.) / CMO / 17 / OT-47 / (SUBT) No. 843 1355 Faisalabad 34.500 12.000 10.000 10.000 1.667 0 0% 12.000 35% 152043 dated 07.2017 AA issued on Abdullah Khan, District Faisalabad 15.11.2017 for 11 No. Schemes in which 4 No. Schemes relates to XEN Higyway. Funds released on 03.08.2018 Substitution of Schemes Already reflected in ADP 2017-18 vide No. / ASCM (Coord & Dev.) / CMO / 17 / OT-47 / (SUBT) No. Construction of Soling / Drainage / Abadi Bahadur Khan, 152043 dated 07.2017 AA issued on 844 1356 Faisalabad 42.814 12.000 10.000 10.000 1.667 0 0% 12.000 28% District Faisalabad 15.11.2017 for 10 No. Schemes in which 2 No. schemes relates to XEN Building and 2 No. XEN Higyway. Funds released on 03.08.2018 Date of A.A 29-08-2017. Date of T.S.05-09- Construction of Rural Drainage and PCC Road UC 30, 2017. Work order issued on 19-01-2018. 845 1357 Faisalabad 15.000 5.000 10.000 10.000 1.667 0.99 59% 5.990 40% 194/RB, District Faisalabad Work is in progress. Funds released on 03.08.2018 ate of A.A 04-10-2017. Date of T.S.14-12- Construction of Rural Drainage and PCC Road ,UC 60 2017. Work order issued on 01-03-2018. 846 1358 Faisalabad 15.000 5.000 10.000 10.000 1.667 0.985 59% 5.985 40% District Faisalabad Work is in progress. Funds released on 03.08.2018 ate of A.A 04-10-2017. Date of T.S.14-12- Construction of Rural Drainage and PCC Road , UC 71 2017. Work order issued on 01-03-2018. 847 1359 Faisalabad 15.000 5.000 10.000 10.000 1.667 0.895 54% 5.895 39% District Faisalabad Work is in progress. Funds released on 03.08.2018 ate of A.A 04-10-2017. Date of T.S.14-12- Construction of Rural Drainage and PCC Road at U.C. 62 2017. Work order issued on 01-03-2018. 848 1360 Faisalabad 15.000 7.000 8.000 8.000 1.334 0.76 57% 7.760 52% District Faisalabad Work is in progress. Funds released on 03.08.2018 ate of A.A 04-10-2017. Date of T.S.14-12- Construction of Rural Drainage and PCC Road at U.C. 65 2017. Work order issued on 01-03-2018. 849 1361 Faisalabad 15.000 10.000 5.000 5.000 0.834 0.513 62% 10.513 70% District Faisalabad Work is in progress. Funds released on 03.08.2018 ate of A.A 04-10-2017. Date of T.S.14-12- Construction of Rural Drainage and PCC Road at U.C. 67 2017. Work order issued on 01-03-2018. 850 1362 Faisalabad 15.000 10.000 5.000 5.000 0.834 0.55 66% 10.550 70% District Faisalabad Work is in progress. Funds released on 03.08.2018 Provision of Sewerage/ Drainage Facilities in PP-57, Date of A.A 27-10-2017. Date of T.S.28-10- 851 1363 1.667 100% 21.667 43% 2017. Work order issued on 30-11-2017. District Faisalabad Faisalabad 50.000 20.000 10.000 10.000 1.667 Work is in progress. Funds released on 03.08.2018 Date of A.A 29-08-2017. Date of T.S.05-09- Rural Drainage Scheme for Muncipal committee Samundri 2017. Work order issued on 19-01-2018. 852 1364 Faisalabad 50.000 20.000 10.000 10.000 1.667 1.667 100% 21.667 43% District Faisalabad Work is in progress. Funds released on 03.08.2018 Date of A.A 29-08-2017. Date of T.S.05-09- 853 1365 1.667 100% 21.667 43% 2017. Work order issued on 19-01-2018. Rural Drainage Scheme for Samundri District Faisalabad Faisalabad 50.000 20.000 10.000 10.000 1.667 Work is in progress. Funds released on 03.08.2018 Date of A.A 29-08-2017. Date of T.S.05-09- Rural Drainage Scheme at Chak No. 263/RB, Dijkot Town 2017. Work order issued on 19-01-2018. 854 1366 Faisalabad 30.000 10.000 10.000 10.000 1.667 1.667 100% 11.667 39% Committee Tehsil ,District Faisalabad Work is in progress. Funds released on 03.08.2018 Ambiguous Nomenclature. The request has Construction of Rural Drainage Scheme / Brick Pavement been made to C.E vide SE No.2417, 855 1367 Faisalabad 24.561 10.000 14.561 14.561 2.427 0 0% 10.000 41% District Faisalabad dated:07.08.2018. Funds released on 03.08.2018 Date of A.A 29-08-2017. Date of T.S.05-09- 856 1368 1.667 100% 21.667 72% 2017. Work order issued on 19-01-2018. Sewerage Sheme in 240GB and additional Abadies Faisalabad 30.000 20.000 10.000 10.000 1.667 Work is in progress. Funds released on 03.08.2018 Date of A.A 29-08-2017. Date of T.S.05-09- Provision of PCC / Sewerage / Drainage / Tuff Tile and etc 2017. Work order issued on 19-01-2018. 857 1369 Faisalabad 50.000 25.000 10.000 10.000 1.667 1.667 100% 26.667 53% in PP-53, District Faisalabad Work is in progress. Funds released on 03.08.2018 Date of A.A 19-09-2017. Date of T.S.20-11- Water Supply Schemes in Constitutency NA-80, District 2017. Work order issued on 01-02-2018. 858 1370 Faisalabad 122.000 35.000 20.000 20.000 3.334 3.334 100% 38.334 31% Faisalabad Work is in progress. Funds released on 03.08.2018 Date of A.A 02-10-2017. Date of T.S.17-11- Provision of Installation of New Water Plant in District 2017. Work order issued on 03-03-2018. 859 1371 Faisalabad 75.000 25.000 20.000 20.000 3.334 3.334 100% 28.334 38% Faisalabad Work is in progress. Funds released on 03.08.2018 Date of A.A 02-10-2017. Date of T.S.01-11- 860 1372 3.334 65% 27.170 36% 2017. Work order issued on 08-02-2018. Construction of PCC Streets in District Faisalabad Faisalabad 75.000 25.000 20.000 20.000 2.17 Work is in progress. Funds released on 03.08.2018

Water Supply Scheme Chak No. 412 Cheemia Wali, Tehsil Date of A A 01 08 2017 Date of T S 13 09 861 1373 Shorkot, District Jhang and Construction of Tank for Water Jhang 20.303 10.000 10.303 10.303 1.717 1.6 93% 11.600 57% 2017 Work order issued on 23 11 2017 Work Supply Scheme Chak No. 412 Cheemia Wali. is in progress

Provision of Water Supply at Chak No. 498 Tehsil Shorkot, Date of A A 01 08 2017 Date of T S 13 09 862 1374 Jhang 22.000 10.000 12.000 12.000 2.000 1.8 90% 11.800 54% 2017 Work order issued on 23 11 2017 Work District Jhang. is in progress Soling / Drains / Culverts / PCC Slabs / UC No.1 to UC Date of A A 01 08 2017 Date of T S 06 09 863 1375 Jhang 13.000 7.000 6.000 6.000 1.000 0.9 90% 7.900 61% 2017 Work order issued on 31 10 2017 Work No.8 Tehsil & District Jhang is in progress Date of A A 01 08 2017 Date of T S 06 09 864 1376 Drainage Scheme Chak no. 479/JB District Jhang. Jhang 16.749 7.000 9.749 9.749 1.625 1.5 92% 8.500 51% 2017 Work order issued on 31 10 2017 Work is in progress Date of A A 01 08 2017 Date of T S 06 09 865 1377 Drainage Scheme Chak no. 482/JB District Jhang. Jhang 20.489 5.000 10.000 10.000 1.667 1.3 78% 6.300 31% 2017 Work order issued on 31 10 2017 Work is in progress Date of A A 01 08 2017 Date of T S 06 09 866 1378 Drainage Scheme Chak no. 493/JB District Jhang. Jhang 30.614 12.000 10.000 10.000 1.667 1.5 90% 13.500 44% 2017 Work order issued on 31 10 2017 Work is in progress Construction of Soling, Drains, PCC and Sullage at Date of A A 01 08 2017 Date of T S 06 09 867 1379 Jhang 14.354 10.000 4.354 4.354 0.726 0.7 96% 10.700 75% 2017 Work order issued on 31 10 2017 Work Sammunduana, Tehsil Ahmad Pur Sial District Jhang. is in progress Rural Drainage Scheme at Different Villages, 18 Hazari, in Date of A A 01 08 2017 Date of T S 13 09 868 1380 Jhang 40.000 20.000 10.000 10.000 1.667 1.667 100% 21.667 54% 2017 Work order issued on 23 12 2017 Work District Jhang is in progress Provision of 16 nos. Water Filtration Plants in Tehsil 18 Date of A A 18 10 2017 Date of T S 31 10 869 1381 Jhang 40.000 15.000 10.000 10.000 1.667 1 60% 16.000 40% 2017 Work order issued on 13 08 2018 Work Hazari, District Jhang. is in progress Provision of Sewerage & drainage At UC-46 Rustam Date of A A 01 08 2017 Date of T S 06 09 870 1382 Jhang 15.000 7.000 8.000 8.000 1.334 1.2 90% 8.200 55% 2017 Work order issued on 31 10 2017 Work Sargana Tehsil shorkot. is in progress Sewerage / Drainage Scheme for Tehsil Headquartar Date of A A 19 09 2017 Date of T S 09 10 871 1383 Jhang 100.000 30.000 20.000 20.000 3.334 3.308 99% 33.308 33% 2017 Work order issued on 17 01 2018 Work Ahmad Pur Sial District Jhang Phase-2. is in progress Hazrat Peer Abdur rehman Sewerage Scheme District Date of A A 19 09 2017 Date of T S 28 09 872 1384 Jhang 70.000 25.000 20.000 20.000 3.334 3 90% 28.000 40% 2017 Work order issued on 13 01 2018 Work Jhang. is in progress 1-Date of A.A 12.08.2017 2- Date of T.S 30.08.2017 3-Date of Prequalification 4-Date of invitation of tenders 5- Date of Receipt of Provision of Tuff Paver and Drains in Kamalia City, District Toba Tek tenders 6- Date of work order 31.10.2017 7- 873 1385 40.000 15.000 5.000 5.000 0.834 0.834 100% 15.834 40% Date of completion as per PC-I 8- Anticipated T.T.Singh Singh date of completion 9- No. of Beneficiary - Person 10-Funds Released by F.D 03.08.2018 11-Re-appropriation of funds (+/-) Work in progress.

1-Date of A.A 03.08.2017 2- Date of T.S 30.08.2017 3-Date of Prequalification 4-Date of invitation of tenders 5- Date of Receipt of Provision of Tuff Paver and Drains in Pir Mahal City, Toba Tek tenders 6- Date of work order 31.10.2017 7- 874 1386 40.000 15.000 5.000 5.000 0.834 0.834 100% 15.834 40% Date of completion as per PC-I 8- Anticipated District T.T.Singh. Singh date of completion 9- No. of Beneficiary - Person 10-Funds Released by F.D 03.08.2018 - 11-Re-appropriation of funds (+/- ) Work in progress. 1-Date of A.A 03.08.2017 2- Date of T.S 30.08.2017 3-Date of Prequalification 4-Date of invitation of tenders 5- Date of Receipt of Provision of Drainage and Soling and Replacement / new Toba Tek tenders 6- Date of work order 31.10.2017 7- 875 1387 15.000 7.500 7.500 7.500 1.250 0.602 48% 8.102 54% Date of completion as per PC-I 8- Anticipated Water Supply Pipelines in UC 14 District T.T. Singh. Singh date of completion 9- No. of Beneficiary - Person 10-Funds Released by F.D 03.08.2018 - 11-Re-appropriation of funds (+/- ) Work in progress.

1-Date of A.A 03.08.2017 2- Date of T.S 30.08.2017 3-Date of Prequalification 4-Date of invitation of tenders 5- Date of Receipt of Provision of Drainage and Soling and Replacement / new Toba Tek tenders 6- Date of work order 31.10.2017 7- 876 1388 31.000 10.000 10.000 10.000 1.667 0.809 49% 10.809 35% Date of completion as per PC-I 8- Anticipated Water Supply Pipelines in UC 15 District T.T. Singh. Singh date of completion 9- No. of Beneficiary - Person 10-Funds Released by F.D 03.08.2018 - 11-Re-appropriation of funds (+/- ) . Work in progress.

1-Date of A.A 03.08.2017 2- Date of T.S 30.08.2017 3-Date of Prequalification 4-Date of invitation of tenders 5- Date of Receipt of Provision of Drainage and Soling and Replacement / new Toba Tek tenders 6- Date of work order 31.10.2017 7- 877 1389 13.000 7.500 5.500 5.500 0.917 0.5 55% 8.000 62% Date of completion as per PC-I 8- Anticipated Water Supply Pipelines in UC 16 District T.T. Singh. Singh date of completion 9- No. of Beneficiary - Person 10-Funds Released by F.D 03.08.2018 - 11-Re-appropriation of funds (+/- ) Work in progress.

1-Date of A.A 03.08.2017 2- Date of T.S 30.08.2017 3-Date of Prequalification 4-Date of invitation of tenders 5- Date of Receipt of Provision of Drainage and Soling and Replacement / new Toba Tek tenders 6- Date of work order 31.10.2017 7- 878 1390 32.000 12.000 5.000 5.000 0.834 0.435 52% 12.435 39% Date of completion as per PC-I 8- Anticipated Water Supply Pipelines in UC 17 District T.T. Singh. Singh date of completion 9- No. of Beneficiary - Person 10-Funds Released by F.D 03.08.2018 - 11-Re-appropriation of funds (+/- ). Work in progress.

1-Date of A.A 03.08.2017 2- Date of T.S 30.08.2017 3-Date of Prequalification 4-Date of invitation of tenders 5- Date of Receipt of Provision of Drainage and Soling and Replacement / new Toba Tek tenders 6- Date of work order 31.10.2017 7- 879 1391 13.000 7.500 5.500 5.500 0.917 0.495 54% 7.995 62% Date of completion as per PC-I 8- Anticipated Water Supply Pipelines in UC 18 District T.T. Singh. Singh date of completion 9- No. of Beneficiary - Person 10-Funds Released by F.D 03.08.2018 - 11-Re-appropriation of funds (+/- ) Work in progress.

1-Date of A.A 12.08.2017 2- Date of T.S 12.08.2017 3-Date of Prequalification 4-Date of invitation of tenders 5- Date of Receipt of Provision of Drainage and Soling and Replacement / new Toba Tek tenders 6- Date of work order 31.10.2017 7- 880 1392 12.500 6.250 6.250 6.250 1.042 0.5 48% 6.750 54% Date of completion as per PC-I 8- Anticipated Water Supply Pipelines in UC 34 District T.T. Singh. Singh date of completion 9- No. of Beneficiary - Person 10-Funds Released by F.D 03.08.2018 - 11-Re-appropriation of funds (+/- ) Work in progress.

1-Date of A.A 28.09.2017 2- Date of T.S 19.10.2017 3-Date of Prequalification 4-Date of invitation of tenders 5- Date of Receipt of Laying of Soling, Resoling, Drain, Repair of Roads and Toba Tek tenders 6- Date of work order 22.11.2017 7- 881 1393 315.000 60.000 10.000 10.000 1.667 1.665 100% 61.665 20% Date of completion as per PC-I 8- Anticipated Piplelines Water and Sewerage in District T.T.Singh. Singh date of completion 9- No. of Beneficiary - Person 10-Funds Released by F.D 03.08.2018 - 11-Re-appropriation of funds (+/- ) Work in progress.

1-Date of A.A 19.09.2017 2- Date of T.S 20.10.2017 3-Date of Prequalification 4-Date of invitation of tenders 5- Date of Receipt of Laying of PCC, Tuff Tiles, Soling and Resoling, Drain, Toba Tek tenders 6- Date of work order 22.11.2017 7- 882 1394 Repair of Roads and Pipelines of water and Sewerage in 85.000 35.000 10.000 10.000 1.667 1.65 99% 36.650 43% Date of completion as per PC-I 8- Anticipated Singh District T.T.Singh. date of completion 9- No. of Beneficiary - Person 10-Funds Released by F.D 03.08.2018 - 11-Re-appropriation of funds (+/- ) Work in progress.

1-Date of A.A 19.09.2017 2- Date of T.S 20.10.2017 3-Date of Prequalification 4-Date Rehablitation of Rural Water Supply Scheme Chak # 148/ of invitation of tenders 5- Date of Receipt of GB, 149/GB, 151/GB ,153/GB, Balgn, 294/JB, 350/GB, Toba Tek tenders 6- Date of work order 22.11.2017 7- 883 1395 185.086 40.000 10.000 10.000 1.667 1.66 100% 41.660 23% Date of completion as per PC-I 8- Anticipated Rural Water Supply Scheme Chak # 258/GB Noor Mahal Singh date of completion 9- No. of Beneficiary 7006 and 292/GB Bara Rasla in District T.T.Singh. Person 10-Funds Released by F.D 03.08.2018 - 11-Re-appropriation of funds (+/- ) Work in progress.

1-Date of A.A 19.09.2017 2- Date of T.S 20.10.2017 3-Date of Prequalification 4-Date of invitation of tenders 5- Date of Receipt of Rehabalitation of Rural Water Supply Scheme Chak # Toba Tek tenders 6- Date of work order 22.11.2017 7- 884 1396 402/JB Virkan348/GB Bajra, 296/GB, 297/GB, 299/GB, 178.792 40.000 10.000 10.000 1.667 1.665 100% 41.665 23% Date of completion as per PC-I 8- Anticipated Singh 290/GB, 349/GB, and 351/GB in District T.T.Singh. date of completion 9- No. of Beneficiary -4383 Person 10-Funds Released by F.D 03.08.2018 - 11-Re-appropriation of funds (+/- ) Work in progress.

1-Date of A.A 12.08.2017 2- Date of T.S 30.08.2017 3-Date of Prequalification 4-Date of invitation of tenders 5- Date of Receipt of Water Supply Scheme in Chak no. 374/JB, 387/JB, Toba Tek tenders 6- Date of work order 31.10.2017 7- 885 1397 35.000 12.000 10.000 10.000 1.667 1.5 90% 13.500 39% Date of completion as per PC-I 8- Anticipated 385/JB, District T.T.Singh. Singh date of completion 9- No. of Beneficiary -3360 Person 10-Funds Released by F.D 03.08.2018 - 11-Re-appropriation of funds (+/- ) Work in progress.

1-Date of A.A 12.08.2017 2- Date of T.S 12.08.2017 3-Date of Prequalification 4-Date of invitation of tenders 5- Date of Receipt of Drainage/Soling and Water Supply and Road Repair UC Toba Tek tenders 6- Date of work order 31.10.2017 7- 886 1398 12.000 6.000 6.000 6.000 1.000 0.5 50% 6.500 54% Date of completion as per PC-I 8- Anticipated No. 26 in District T.T.Singh. Singh date of completion 9- No. of Beneficiary - Person 10-Funds Released by F.D 03.08.2018 - 11-Re-appropriation of funds (+/- ) Work in progress.

1-Date of A.A 12.08.2017 2- Date of T.S 12.08.2017 3-Date of Prequalification 4-Date of invitation of tenders 5- Date of Receipt of Drainage/Soling and Water Supply and Road Repair UC Toba Tek tenders 6- Date of work order 31.10.2017 7- 887 1399 12.000 6.000 6.000 6.000 1.000 0.499 50% 6.499 54% Date of completion as per PC-I 8- Anticipated No. 28 in District T.T.Singh. Singh date of completion 9- No. of Beneficiary - Person 10-Funds Released by F.D 03.08.2018 - 11-Re-appropriation of funds (+/- ) Work in progress.

1-Date of A.A 12.08.2017 2- Date of T.S 12.08.2017 3-Date of Prequalification 4-Date of invitation of tenders 5- Date of Receipt of Drainage/Soling and Water Supply and Road Repair UC Toba Tek tenders 6- Date of work order 31.10.2017 7- 888 1400 12.000 6.000 6.000 6.000 1.000 0.53 53% 6.530 54% Date of completion as per PC-I 8- Anticipated No. 32 in District T.T.Singh. Singh date of completion 9- No. of Beneficiary - Person 10-Funds Released by F.D 03.08.2018 - 11-Re-appropriation of funds (+/- ) Work in progress.

1-Date of A.A 12.08.2017 2- Date of T.S 12.08.2017 3-Date of Prequalification 4-Date of invitation of tenders 5- Date of Receipt of Drainage/Soling and Water Supply and Road Repair UC Toba Tek tenders 6- Date of work order 31.10.2017 7- 889 1401 12.000 6.000 6.000 6.000 1.000 0.54 54% 6.540 55% Date of completion as per PC-I 8- Anticipated No. 30 in District T.T.Singh. Singh date of completion 9- No. of Beneficiary - Person 10-Funds Released by F.D 03.08.2018 - 11-Re-appropriation of funds (+/- ) Work in progress.

1-Date of A.A 12.08.2017 2- Date of T.S 30.08.2017 3-Date of Prequalification 4-Date Rural Water Supply Scheme Chak No. 321/GB of invitation of tenders 5- Date of Receipt of Khumanwala Tehsil Pirmahal District Toba Tek Singh, Toba Tek tenders 6- Date of work order 31.10.2017 7- 890 1402 Chak No. 700/42 GB Pir Kadhiana – Christian Colony 49.970 18.000 15.000 15.000 2.500 2.5 100% 20.500 41% Date of completion as per PC-I 8- Anticipated Singh Tehsil Pirmahal District Toba Tek Singh, Chak No. 294/GB date of completion 9- No. of Beneficiary -5847 azafi abadi Tehsil & District Toba Tek Singh. Person 10-Funds Released by F.D 03.08.2018 - 11-Re-appropriation of funds (+/- ) Work in progress. 1-Date of A.A 19.09.2017 2- Date of T.S 20.10.2017 3-Date of Prequalification 4-Date Rehabilitation of Rural Water Supply Scheme Chak No. of invitation of tenders 5- Date of Receipt of 301/GB azafi abadi – New Chak Tehsil & District Toba Tek Toba Tek tenders 6- Date of work order 22.11.2017 7- 891 1403 Singh, Chak No. 303/GB azafi abadi Tehsil & District 72.396 20.000 10.000 10.000 1.667 1.605 96% 21.605 30% Date of completion as per PC-I 8- Anticipated Singh Toba Tek Singh, Chak No. 333/GB, District Toba Tek date of completion 9- No. of Beneficiary - Singh, Chak No. 341/GB Tehsil & District Person 10-Funds Released by F.D 03.08.2018 - 11-Re-appropriation of funds (+/- ) Work in progress.

1-Date of A.A 12.08.2017 2- Date of T.S 30.08.2017 3-Date of Prequalification 4-Date of invitation of tenders 5- Date of Receipt of Extension / Rehabilitation Rural Water Supply Scheme Toba Tek tenders 6- Date of work order 31.10.2017 7- 892 1404 24.600 19.000 5.600 5.600 0.934 0.6 64% 19.600 80% Date of completion as per PC-I 8- Anticipated Chak No.325 and 326/ GB, District T.T Singh. Singh date of completion 9- No. of Beneficiary - 13647 Person 10-Funds Released by F.D 03.08.2018 - 11-Re-appropriation of funds (+/- ) Work in progress.

1-Date of A.A 12.08.2017 2- Date of T.S 30.08.2017 3-Date of Prequalification 4-Date of invitation of tenders 5- Date of Receipt of Rural Water Supply Scheme Chak No. 671/12-GBDistrict Toba Tek tenders 6- Date of work order 31.10.2017 7- 893 1405 21.500 15.000 6.500 6.500 1.084 1.084 100% 16.084 75% Date of completion as per PC-I 8- Anticipated T.T. Singh. Singh date of completion 9- No. of Beneficiary - 4716 Person 10-Funds Released by F.D 03.08.2018 - 11-Re-appropriation of funds (+/- ) Work in progress.

1-Date of A.A 12.08.2017 2- Date of T.S 30.08.2017 3-Date of Prequalification 4-Date of invitation of tenders 5- Date of Receipt of Rural Water Supply Scheme Chak No.711/GB District T.T. Toba Tek tenders 6- Date of work order 31.10.2017 7- 894 1406 15.400 7.000 8.400 8.400 1.400 0.7 50% 7.700 50% Date of completion as per PC-I 8- Anticipated Singh. Singh date of completion 9- No. of Beneficiary -5309 Person 10-Funds Released by F.D 03.08.2018 - 11-Re-appropriation of funds (+/- ) Work in progress.

1-Date of A.A 12.08.2017 2- Date of T.S 30.08.2017 3-Date of Prequalification 4-Date of invitation of tenders 5- Date of Receipt of Rural Water Supply Scheme Chak No.662/3-GB District Toba Tek tenders 6- Date of work order 31.10.2017 7- 895 1407 29.500 10.000 10.000 10.000 1.667 1.667 100% 11.667 40% Date of completion as per PC-I 8- Anticipated T.T. Singh. Singh date of completion 9- No. of Beneficiary - 8625 Person 10-Funds Released by F.D 03.08.2018 - 11-Re-appropriation of funds (+/- ) Work in progress.

1-Date of A.A 12.08.2017 2- Date of T.S 30.08.2017 3-Date of Prequalification 4-Date of invitation of tenders 5- Date of Receipt of Rural Water Supply Scheme Chak No706/GB. District T.T. Toba Tek tenders 6- Date of work order 31.10.2017 7- 896 1408 27.300 12.000 15.300 15.300 2.550 1.5 59% 13.500 49% Date of completion as per PC-I 8- Anticipated Singh Singh date of completion 9- No. of Beneficiary - 6164 Person 10-Funds Released by F.D 03.08.2018 - 11-Re-appropriation of funds (+/- ) Work in progress.

1-Date of A.A 12.08.2017 2- Date of T.S 30.08.2017 3-Date of Prequalification 4-Date of invitation of tenders 5- Date of Receipt of Rural Water Supply Scheme Chak No.720/GB District T.T. Toba Tek tenders 6- Date of work order 31.10.2017 7- 897 1409 24.750 17.000 7.750 7.750 1.292 1.292 100% 18.292 74% Date of completion as per PC-I 8- Anticipated Singh. Singh date of completion 9- No. of Beneficiary - 11853 Person 10-Funds Released by F.D 03.08.2018 - 11-Re-appropriation of funds (+/- ) Work in progress.

1-Date of A.A 12.08.2017 2- Date of T.S 30.08.2017 3-Date of Prequalification 4-Date of invitation of tenders 5- Date of Receipt of Rural Water Supply Scheme Chak No.721/GB District T.T. Toba Tek tenders 6- Date of work order 31.10.2017 7- 898 1410 25.700 14.800 10.900 10.900 1.817 1.2 66% 16.000 62% Date of completion as per PC-I 8- Anticipated Singh. Singh date of completion 9- No. of Beneficiary -8765 Person 10-Funds Released by F.D 03.08.2018 - 11-Re-appropriation of funds (+/- ) Work in progress.

1-Date of A.A 12.08.2017 2- Date of T.S 30.08.2017 3-Date of Prequalification 4-Date of invitation of tenders 5- Date of Receipt of Rural Water Supply Scheme Chak No.722/GB District T.T. Toba Tek tenders 6- Date of work order 31.10.2017 7- 899 1411 23.500 14.000 9.500 9.500 1.584 0.999 63% 14.999 64% Date of completion as per PC-I 8- Anticipated Singh Singh date of completion 9- No. of Beneficiary -6826 Person 10-Funds Released by F.D 03.08.2018 - 11-Re-appropriation of funds (+/- ) Work in progress.

1-Date of A.A 12.01.2018 2- Date of T.S 13.01.2018 3-Date of Prequalification 4-Date of invitation of tenders 05.03.2018 5- Date of Water Supply Scheme Chak No. 317/JB and Installation of Toba Tek Receipt of tenders 06.03.2018 6- Date of 900 1412 24.587 10.000 14.587 14.587 2.431 1.256 52% 11.256 46% work order 27.03.2018 7- Date of completion Filtration Plant in Chak No.401/JB District T.T.Singh Singh as per PC-I 8- Anticipated date of completion 9- No. of Beneficiary -.. Person 10-Funds Released by F.D 03.08.2018 11-Re- appropriation of funds (+/-) Work in progress.

1-Date of A.A 12.01.2018 2- Date of T.S 13.01.2018 3-Date of Prequalification 4-Date of invitation of tenders 05.03.2018 5- Date of Rehabilitation / Improvemnet of Rural Draiange Scheme Toba Tek Receipt of tenders 06.03.2018 6- Date of 901 1413 35.000 10.000 5.000 5.000 0.834 0.5 60% 10.500 30% work order 03.04.2018 7- Date of completion Chak no. 402/GB Virkan Tehsil and District T.T.Singh Singh as per PC-I 8- Anticipated date of completion 9- No. of Beneficiary -.. Person 10-Funds Released by F.D 03.08.2018 11-Re- appropriation of funds (+/-) Work in progress.

1-Date of A.A 03.08.2017 2- Date of T.S 30.08.2017 3-Date of Prequalification 4-Date of invitation of tenders 5- Date of Receipt of Provision of Soling / Re-Soling Nali / Sewerage / PCC and Toba Tek tenders 6- Date of work order 31.10.2017 7- 902 1414 20.000 10.000 10.000 10.000 1.667 1.665 100% 11.665 58% Date of completion as per PC-I 8- Anticipated Tuff Tile Schemes in City Kamalia In District T.T.Singh Singh date of completion 9- No. of Beneficiary - Person 10-Funds Released by F.D 03.08.2018 - 11-Re-appropriation of funds (+/- ) Work in progress.

1-Date of A.A 19.09.2017 2- Date of T.S 12.10.2017 3-Date of Prequalification 4-Date of invitation of tenders 5- Date of Receipt of Soling Drainage Khalla Nalli and Pullian in UC 57, 58, 59, Toba Tek tenders 6- Date of work order 18.11.2017 7- 903 1415 60, 61, 62, 63, 66, 68, Chak No. 735/GB in Tehsil Kamalia 60.000 20.000 10.000 10.000 1.667 1 60% 21.000 35% Date of completion as per PC-I 8- Anticipated Singh District T.T.Singh date of completion 9- No. of Beneficiary - Person 10-Funds Released by F.D 03.08.2018 - 11-Re-appropriation of funds (+/- ) Work in progress.

1-Date of A.A 03.08.2017 2- Date of T.S 30.08.2017 3-Date of Prequalification 4-Date of invitation of tenders 5- Date of Receipt of Tuff Tile PCC Soling / Drainage / Sewerage in Kamalia Toba Tek tenders 6- Date of work order 31.10.2017 7- 904 1416 40.000 15.000 5.000 5.000 0.834 0.5 60% 15.500 39% Date of completion as per PC-I 8- Anticipated City Tehsil Kamalia District T.T.Singh Singh date of completion 9- No. of Beneficiary - Person 10-Funds Released by F.D 03.08.2018 - 11-Re-appropriation of funds (+/- ) Work in progress.

1-Date of A.A 03.08.2017 2- Date of T.S 30.08.2017 3-Date of Prequalification 4-Date of invitation of tenders 5- Date of Receipt of Tuff Tile PCC Soling / Re-soling Drainag, Sewerage etc for Toba Tek tenders 6- Date of work order 31.10.2017 7- 905 1417 40.000 15.000 5.000 5.000 0.834 0.6 72% 15.600 39% Date of completion as per PC-I 8- Anticipated Kamalia City Singh date of completion 9- No. of Beneficiary - Person 10-Funds Released by F.D 03.08.2018 - 11-Re-appropriation of funds (+/- ) Work in progress.

1-Date of A.A 03.08.2017 2- Date of T.S 30.08.2017 3-Date of Prequalification 4-Date of invitation of tenders 5- Date of Receipt of Construction of PCC / Tuff tile/Soling/Resoling Pirmahal Toba Tek tenders 6- Date of work order 31.10.2017 7- 906 1418 25.000 10.000 15.000 15.000 2.500 1.6 64% 11.600 46% Date of completion as per PC-I 8- Anticipated City in District T.Tsingh Singh date of completion 9- No. of Beneficiary - Person 10-Funds Released by F.D 03.08.2018 - 11-Re-appropriation of funds (+/- ) Work in progress. 1-Date of A.A 03.08.2017 2- Date of T.S 12.08.2017 3-Date of Prequalification 4-Date of invitation of tenders 5- Date of Receipt of Rural Drainage/Brick Pavement/Resoling Plot-A & azafi Toba Tek tenders 6- Date of work order 31.10.2017 7- 907 1419 3.000 1.500 1.500 1.500 0.250 0.1 40% 1.600 53% Date of completion as per PC-I 8- Anticipated abadi in District T.Tsingh Singh date of completion 9- No. of Beneficiary - Person 10-Funds Released by F.D 03.08.2018 - 11-Re-appropriation of funds (+/- ) . Work in progress.

1-Date of A.A 03.08.2017 2- Date of T.S 12.08.2017 3-Date of Prequalification 4-Date of invitation of tenders 5- Date of Receipt of Rural Drainage/Brick Pavement/Resoling Chak No. Toba Tek tenders 6- Date of work order 31.10.2017 7- 908 1420 3.000 1.500 1.500 1.500 0.250 0.102 41% 1.602 53% Date of completion as per PC-I 8- Anticipated 718/GB & azafi abadi in District T.Tsingh Singh date of completion 9- No. of Beneficiary - Person 10-Funds Released by F.D 03.08.2018 - 11-Re-appropriation of funds (+/- ) Work in progress.

1-Date of A.A 03.08.2017 2- Date of T.S 12.08.2017 3-Date of Prequalification 4-Date of invitation of tenders 5- Date of Receipt of Rural Drainage/Brick Pavement/Resoling Chak No. Toba Tek tenders 6- Date of work order 31.10.2017 7- 909 1421 3.000 1.500 1.500 1.500 0.250 0.25 100% 1.750 58% Date of completion as per PC-I 8- Anticipated 719/GB & azafi abadi in District T.Tsingh Singh date of completion 9- No. of Beneficiary - Person 10-Funds Released by F.D 03.08.2018 - 11-Re-appropriation of funds (+/- ) . Work in progress.

1-Date of A.A 03.08.2017 2- Date of T.S 12.08.2017 3-Date of Prequalification 4-Date of invitation of tenders 5- Date of Receipt of Rural Drainage/Brick Pavement/Resoling Chak No. Toba Tek tenders 6- Date of work order 31.10.2017 7- 910 1422 3.000 1.500 1.500 1.500 0.250 0.13 52% 1.630 54% Date of completion as per PC-I 8- Anticipated 720/GB & azafi abadi in District T.Tsingh Singh date of completion 9- No. of Beneficiary - Person 10-Funds Released by F.D 03.08.2018 - 11-Re-appropriation of funds (+/- ) Work in progress.

1-Date of A.A 03.08.2017 2- Date of T.S 12.08.2017 3-Date of Prequalification 4-Date of invitation of tenders 5- Date of Receipt of Rural Drainage/Brick Pavement/Resoling Chak No. Toba Tek tenders 6- Date of work order 31.10.2017 7- 911 1423 3.000 1.500 1.500 1.500 0.250 0.14 56% 1.640 55% Date of completion as per PC-I 8- Anticipated 722/GB & azafi abadi in District T.Tsingh Singh date of completion 9- No. of Beneficiary - Person 10-Funds Released by F.D 03.08.2018 - 11-Re-appropriation of funds (+/- ) . Work in progress.

1-Date of A.A 12.08.2017 2- Date of T.S 12.08.2017 3-Date of Prequalification 4-Date of invitation of tenders 5- Date of Receipt of Rural Drainage/Brick Pavement/Resoling Chak No. Toba Tek tenders 6- Date of work order 31.10.2017 7- 912 1424 3.000 1.500 1.500 1.500 0.250 0.15 60% 1.650 55% Date of completion as per PC-I 8- Anticipated 741/GB & azafi abadi in District T.Tsingh Singh date of completion 9- No. of Beneficiary - Person 10-Funds Released by F.D 03.08.2018 - 11-Re-appropriation of funds (+/- ) Work in progress.

1-Date of A.A 03.08.2017 2- Date of T.S 12.08.2017 3-Date of Prequalification 4-Date of invitation of tenders 5- Date of Receipt of Rural Drainage/Brick Pavement/Resoling Chak No. Toba Tek tenders 6- Date of work order 31.10.2017 7- 913 1425 3.000 1.500 1.500 1.500 0.250 0.133 53% 1.633 54% Date of completion as per PC-I 8- Anticipated 747/GB & azafi abadi in District T.Tsingh Singh date of completion 9- No. of Beneficiary - Person 10-Funds Released by F.D 03.08.2018 - 11-Re-appropriation of funds (+/- ) . Work in progress.

1-Date of A.A 03.08.2017 2- Date of T.S 12.08.2017 3-Date of Prequalification 4-Date of invitation of tenders 5- Date of Receipt of Rural Drainage/Brick Pavement/Resoling Chak No. Toba Tek tenders 6- Date of work order 31.10.2017 7- 914 1426 2.500 1.250 1.250 1.250 0.209 0.145 69% 1.395 56% Date of completion as per PC-I 8- Anticipated 757/GB & azafi abadi in District T.Tsingh Singh date of completion 9- No. of Beneficiary - Person 10-Funds Released by F.D 03.08.2018 - 11-Re-appropriation of funds (+/- ) Work in progress.

1-Date of A.A 03.08.2017 2- Date of T.S 12.08.2017 3-Date of Prequalification 4-Date of invitation of tenders 5- Date of Receipt of Rural Drainage/Brick Pavement/Resoling Chak No. Toba Tek tenders 6- Date of work order 31.10.2017 7- 915 1427 3.000 1.500 1.500 1.500 0.250 0.166 66% 1.666 56% Date of completion as per PC-I 8- Anticipated 759/GB & azafi abadi in District T.Tsingh Singh date of completion 9- No. of Beneficiary - Person 10-Funds Released by F.D 03.08.2018 - 11-Re-appropriation of funds (+/- ) .Work in progress.

1-Date of A.A 03.08.2017 2- Date of T.S 12.08.2017 3-Date of Prequalification 4-Date of invitation of tenders 5- Date of Receipt of Rural Drainage/Brick Pavement/Resoling Chak No. Toba Tek tenders 6- Date of work order 31.10.2017 7- 916 1428 2.500 1.250 1.250 1.250 0.209 0.1 48% 1.350 54% Date of completion as per PC-I 8- Anticipated 760/GB & azafi abadi in District T.Tsingh Singh date of completion 9- No. of Beneficiary - Person 10-Funds Released by F.D 03.08.2018 - 11-Re-appropriation of funds (+/- ) Work in progress.

1-Date of A.A 03.08.2017 2- Date of T.S 12.08.2017 3-Date of Prequalification 4-Date of invitation of tenders 5- Date of Receipt of Rural Drainage/Brick Pavement/Resoling Chak No. Toba Tek tenders 6- Date of work order 31.10.2017 7- 917 1429 3.000 1.500 1.500 1.500 0.250 0.121 48% 1.621 54% Date of completion as per PC-I 8- Anticipated 764/GB & azafi abadi in District T.Tsingh Singh date of completion 9- No. of Beneficiary - Person 10-Funds Released by F.D 03.08.2018 - 11-Re-appropriation of funds (+/- ) . Work in progress.

1-Date of A.A 03.08.2017 2- Date of T.S 12.08.2017 3-Date of Prequalification 4-Date of invitation of tenders 5- Date of Receipt of Rural Drainage/Brick Pavement/Resoling Chak No. Toba Tek tenders 6- Date of work order 31.10.2017 7- 918 1430 3.000 1.500 1.500 1.500 0.250 0.17 68% 1.670 56% Date of completion as per PC-I 8- Anticipated 660/1/GB & azafi abadi in District T.Tsingh Singh date of completion 9- No. of Beneficiary - Person 10-Funds Released by F.D 03.08.2018 - 11-Re-appropriation of funds (+/- ) Work in progress.

1-Date of A.A 03.08.2017 2- Date of T.S 12.08.2017 3-Date of Prequalification 4-Date of invitation of tenders 5- Date of Receipt of Rural Drainage/Brick Pavement/Resoling Mouza Inayat Toba Tek tenders 6- Date of work order 31.10.2017 7- 919 1431 3.000 1.500 1.500 1.500 0.250 0.25 100% 1.750 58% Date of completion as per PC-I 8- Anticipated Shah & azafi abadi in District T.Tsingh Singh date of completion 9- No. of Beneficiary - Person 10-Funds Released by F.D 03.08.2018 - 11-Re-appropriation of funds (+/- ) . Work in progress.

1-Date of A.A 03.08.2017 2- Date of T.S 12.08.2017 3-Date of Prequalification 4-Date of invitation of tenders 5- Date of Receipt of Rural Drainage/Brick Pavement/Resoling Chak No. 672/13 Toba Tek tenders 6- Date of work order 31.10.2017 7- 920 1432 3.000 1.500 1.500 1.500 0.250 0.14 56% 1.640 55% Date of completion as per PC-I 8- Anticipated GB & azafi abadi in District T.Tsingh Singh date of completion 9- No. of Beneficiary - Person 10-Funds Released by F.D 03.08.2018 - 11-Re-appropriation of funds (+/- ) . Work in progress.

1-Date of A.A 03.08.2017 2- Date of T.S 12.08.2017 3-Date of Prequalification 4-Date of invitation of tenders 5- Date of Receipt of Rural Drainage/Brick Pavement/Resoling Chak No. Toba Tek tenders 6- Date of work order 31.10.2017 7- 921 1433 3.000 1.500 1.500 1.500 0.250 0.16 64% 1.660 55% Date of completion as per PC-I 8- Anticipated 673/14/GB Harisabad & azafi abadi in District T.Tsingh Singh date of completion 9- No. of Beneficiary - Person 10-Funds Released by F.D 03.08.2018 - 11-Re-appropriation of funds (+/- ) Work in progress.

1-Date of A.A 03.08.2017 2- Date of T.S 12.08.2017 3-Date of Prequalification 4-Date of invitation of tenders 5- Date of Receipt of Rural Drainage/Brick Pavement/Resoling Chak No. Toba Tek tenders 6- Date of work order 31.10.2017 7- 922 1434 3.000 1.500 1.500 1.500 0.250 0.13 52% 1.630 54% Date of completion as per PC-I 8- Anticipated 675/16/GB & azafi abadi in District T.Tsingh Singh date of completion 9- No. of Beneficiary - Person 10-Funds Released by F.D 03.08.2018 - 11-Re-appropriation of funds (+/- ) .Work in progress. 1-Date of A.A 03.08.2017 2- Date of T.S 12.08.2017 3-Date of Prequalification 4-Date of invitation of tenders 5- Date of Receipt of Rural Drainage/Brick Pavement/Resoling Chak No. Toba Tek tenders 6- Date of work order 31.10.2017 7- 923 1435 3.000 1.500 1.500 1.500 0.250 0.16 64% 1.660 55% Date of completion as per PC-I 8- Anticipated 676/17/GB & azafi abadi in District T.Tsingh Singh date of completion 9- No. of Beneficiary - Person 10-Funds Released by F.D 03.08.2018 - 11-Re-appropriation of funds (+/- ) Work in progress.

1-Date of A.A 03.08.2017 2- Date of T.S 12.08.2017 3-Date of Prequalification 4-Date of invitation of tenders 5- Date of Receipt of Rural Drainage/Brick Pavement/Resoling Mouza Shahpur Toba Tek tenders 6- Date of work order 31.10.2017 7- 924 1436 3.000 1.000 2.000 2.000 0.334 0.2 60% 1.200 40% Date of completion as per PC-I 8- Anticipated & azafi abadi in District T.Tsingh Singh date of completion 9- No. of Beneficiary - Person 10-Funds Released by F.D 03.08.2018 - 11-Re-appropriation of funds (+/- ) Work in progress.

1-Date of A.A 03.08.2017 2- Date of T.S 12.08.2017 3-Date of Prequalification 4-Date of invitation of tenders 5- Date of Receipt of Rural Drainage/Brick Pavement/Resoling Mouza Nakrari & Toba Tek tenders 6- Date of work order 31.10.2017 7- 925 1437 3.000 1.000 2.000 2.000 0.334 0.2 60% 1.200 40% Date of completion as per PC-I 8- Anticipated azafi abadi in District T.Tsingh Singh date of completion 9- No. of Beneficiary - Person 10-Funds Released by F.D 03.08.2018 - 11-Re-appropriation of funds (+/- ) Work in progress.

1-Date of A.A 19.09.2017 2- Date of T.S 19.10.2017 3-Date of Prequalification 4-Date of invitation of tenders 5- Date of Receipt of Provision of Sewerage / Drainage / Tuff Tiles etc in District Toba Tek tenders 6- Date of work order 18.11.2017 7- 926 1438 199.924 100.000 15.000 15.000 2.500 2.5 100% 102.500 51% Date of completion as per PC-I 8- Anticipated T.T.Singh. Singh date of completion 9- No. of Beneficiary - Person 10-Funds Released by F.D 03.08.2018 - 11-Re-appropriation of funds (+/- ) Work in progress.

Construction of PCC and Sewerage at Y-Block Peoples 927 1439 Colony, X-Block Behari Colony, Shadman Town, Green Gujranwala 20.000 10.000 10.000 10.000 1.667 1.317 79% 11.317 57% Work in progress Town Ahsan Town, Hassan Town District Gujranwala Construction of PCC and Sewerage at Kot Abdullah, 928 1440 Kangni Wala, , Saddique Colony, Nabi Pura, Gujranwala 20.000 10.000 10.000 10.000 1.667 1.25 75% 11.250 56% Work in progress Illama Iqbal Town in District Gujranwala Provision of Sewerage, PCC, Street, Drain, Tuff Tile, 929 1441 Water Supply in City Wazirabad, Sodra, District Gujranwala 200.000 75.000 10.000 10.000 1.667 1.667 100% 76.667 38% Work in progress Gujranwala Constructoin of Drains PCC / RCC in UC Qila Mian Singh 930 1442 Gujranwala 50.000 13.000 15.000 15.000 2.500 2.5 100% 15.500 31% Work in progresss Uggu Chak District Gujranwala Sewerage PCC Drainage in UC Wahndo / UC Chak 931 1443 Gujranwala 60.000 20.000 20.000 20.000 3.334 1.987 60% 21.987 37% Work in progresss Ramdas in District Gujranwala Drainage and PCC Soling in UCs , Pheloke, 932 1444 Gujranwala 88.947 20.000 10.000 10.000 1.667 1.667 100% 21.667 24% Work in progress Udowali, in Saharan Chatha District Gujranwala Drainage and PCC Soling in UCs Noi wala, Jattan wali, 933 1445 Gujranwala 89.034 18.000 10.000 10.000 1.667 1.5 90% 19.500 22% Work in progress Bheri Shah Rehman, Jhallan in District Gujranwala

Drainage and PCC Soling in UCs Phama Sara, Arghan, 934 1446 Gujranwala 89.776 20.000 10.000 10.000 1.667 1.667 100% 21.667 24% Work in progress Chak Chaudhary, , in District Gujranwla Relaying of Water supply lines in Sohdara Town, Tehsil 935 1447 Gujranwala 134.586 18.000 30.000 30.000 11.218 8.974 80% 26.974 20% Work in progress Wazirabad District Gujranwala Provision of Clean Water Facility in NA-95, District 936 1448 Gujranwala 200.000 32.000 15.000 15.000 2.500 2.5 100% 34.500 17% Work in progress Gujranwala Constructoin of Drains PCC / RCC in UC Botal Jhanda 937 1449 Gujranwala 32.000 12.500 5.000 5.000 0.834 0.834 100% 13.334 42% Work in progress Singh District Gujranwala Construction of PCC Streets and Drainage in Botala Sharam Singh / Akbarian, Sansera Goraya and Muslim Chack, Attawa, Therri Sansi and Chand da Qila, Kotli 938 1450 Dianat Raye and Sheray wala, Nangray Dadan, Dera Gujranwala 50.000 20.000 15.000 15.000 2.500 2.5 100% 22.500 45% Work in progress Bhaghat Singh and Dera Hakam Singh, Chddiala Kalan and Khurd, Murali wala and Khuwasra, Dhillian wali, Chianwall, Kot Shera and Sahnaya wala Construction of Streets and Drainage at UC Marri Thakran, 939 1451 Gujranwala 30.000 10.000 10.000 10.000 1.667 1.667 100% 11.667 39% Work in progress District Gujranwala Construction of Streets and Drainage at UC Akbar 940 1452 Gujranwala 30.000 10.000 10.000 10.000 1.667 1.284 77% 11.284 38% Work in progress Ghanoke, District Gujranwala Construction of Streets and Drainage at UC Ghaniya 941 1453 Gujranwala 30.000 10.000 10.000 10.000 1.667 1 60% 11.000 37% Work in progress District Gujranwala Construction of Streets and Drainage at UC Guna Aur 942 1454 Gujranwala 30.000 9.000 10.000 10.000 1.667 1.334 80% 10.334 34% Work in progress District Gujranwala Construction of Streets and Drainage at UC 943 1455 Gujranwala 30.000 10.000 20.000 20.000 3.334 2 60% 12.000 40% Work in progress Ghoma/Harpoki District Gujranwala Construction of Streets and Drainage at UC Machrala 944 1456 Gujranwala 30.000 10.000 10.000 10.000 1.667 1.017 61% 11.017 37% Work in progress District Gujranwala Construction of Streets and Drainage at UC Sadoki District 945 1457 Gujranwala 30.000 10.000 10.000 10.000 1.667 1.667 100% 11.667 39% Work in progress Gujranwala Construction of PCC and Sewerage at sarfaraz Colony, 946 1458 Hashimi Colony, Gulshan Adeel, Mumtaz Colony, Gujranwala 40.000 15.000 5.000 5.000 0.834 0.834 100% 15.834 40% Work in progress Karmabad District Gujranwala Construction of PCC and Sewerage at Asghar Colony, 947 1459 Salamat Pura, Allah Bukhsh Colony, Nawaz Colony, Faisal Gujranwala 40.000 15.000 5.000 5.000 0.834 0.834 100% 15.834 40% Work in progress Colony District Gujranwala Construction of PCC and Sewerage at Jinnah Colony, 948 1460 Rehman Colony, Ali Pura, Bukhari Colony, Sanat Road, Gujranwala 20.000 10.000 10.000 10.000 1.667 1.084 65% 11.084 55% Work in progress Jamia Muhammadiya District Gujranwala Construction of PCC and Sewerage at Rasheed Colony, 949 1461 Ismail Pura, Abdullah Colony, W Block Peoples Colony Gujranwala 20.000 10.000 10.000 10.000 1.667 1.667 100% 11.667 58% Work in progress District Gujranwala Construction of PCC and Sewerage at Z- Block Peoples 950 1462 Gujranwala 20.000 10.000 10.000 10.000 1.667 1.334 80% 11.334 57% Work in progress Colony, X-Block Peoples Colony District Gujranwala Construction of PCC and Sewerage at Chamra Mandi, 951 1463 Wahdat Colony, Chaman Shah Road, Taj Colony, Arfat Gujranwala 20.000 10.000 10.000 10.000 1.667 1.667 100% 11.667 58% Work in progress Colony, Ferozwala Road in District Gujranwala Construction of PCC and Sewerage at Arfat Colony, Islam 952 1464 Gujranwala 15.000 10.000 5.000 5.000 0.834 0.754 90% 10.754 72% Work in progress Pura, Haidry Road in District Gujranwala Construction of PCC and Sewerage at Mujahid Pura, 953 1465 Camp No. 4, Saithy Palaza, Faisal Colony, in District Gujranwala 15.000 10.000 5.000 5.000 0.834 0.834 100% 10.834 72% Work in progress Gujranwala Construction of PCC and Sewerage at Galla Ghulam 954 1466 Thakedar Wala, Galla Mehar Noor Wala, Islam Pura, Gujranwala 20.000 10.000 10.000 10.000 1.667 1.667 100% 11.667 58% Work in progress Muslim Road in District Gujranwala 955 1467 Drainage and PCC at UC, 31,40,46 at District Gujranwala Gujranwala 150.000 30.000 15.000 15.000 2.500 2.5 100% 32.500 22% Work in progress Construction of PCC/ Tuff Tile, Drainage and Allied 956 1468 Gujranwala 50.000 30.000 10.000 10.000 1.667 1.667 100% 31.667 63% Work in progress Facilities etc in NA-96, District Gujranwala Construction of PCC, Sewerage/Drains at UC 48 District 957 1469 Gujranwala 25.000 10.000 15.000 15.000 2.500 2.25 90% 12.250 49% Work in progress Gujranwala Construction of PCC, Sewerage/Drains at UC 49 District 958 1470 Gujranwala 15.000 10.000 5.000 5.000 0.834 0.667 80% 10.667 71% Work in progress Gujranwala Construction of PCC, Sewerage/Drains at UC 50 District 959 1471 Gujranwala 15.000 10.000 5.000 5.000 0.834 0.602 72% 10.602 71% Work in progress Gujranwala Construction of PCC, Sewerage/Drains at UC 51 District 960 1472 Gujranwala 15.000 10.000 5.000 5.000 0.834 0.834 100% 10.834 72% Work in progress Gujranwala Construction of PCC, Sewerage/Drains at UC 52 District 961 1473 Gujranwala 20.000 10.000 10.000 10.000 1.667 1.334 80% 11.334 57% Work in progress Gujranwala Construction of PCC, Sewerage/Drains at UC 53 District 962 1474 Gujranwala 20.000 10.000 10.000 10.000 1.667 1.23 74% 11.230 56% Work in progress Gujranwala Construction of PCC, Sewerage/Drains at UC 54 District 963 1475 Gujranwala 20.000 10.000 10.000 10.000 1.667 1.258 75% 11.258 56% Work in progress Gujranwala Construction of PCC, Sewerage/Drains at UC 57 District 964 1476 Gujranwala 20.000 10.000 10.000 10.000 1.667 1.025 61% 11.025 55% Work in progress Gujranwala Construction of PCC, Sewerage/Drains at UC 58 District 965 1477 Gujranwala 25.000 10.000 15.000 15.000 2.500 1.456 58% 11.456 46% Work in progress Gujranwala Construction of PCC, Sewerage/Drains at UC 59 District 966 1478 Gujranwala 20.000 10.000 10.000 10.000 1.667 1.167 70% 11.167 56% Work in progress Gujranwala Construction of PCC, Sewerage/Drains at UC 60 District 967 1479 Gujranwala 25.000 10.000 15.000 15.000 2.500 2.5 100% 12.500 50% Work in progress Gujranwala Construction of PCC, Sewerage/Drains at UC 62 District 968 1480 Gujranwala 20.000 10.000 10.000 10.000 1.667 1.065 64% 11.065 55% Work in progress Gujranwala Provision of Sewerage, Drainage and PCC Scheme UC 969 1481 Gujranwala 200.000 40.000 10.000 10.000 1.667 1.667 100% 41.667 21% Work in progress Aroop, UC Butteranwali, District Gujranwala, Phase-I Provision of Sewerage, Drainage and PCC Scheme for 970 1482 Area Rahwali Sharqi, Kot Shahan And Trigri District Gujranwala 100.000 30.000 10.000 10.000 1.667 1.667 100% 31.667 32% Work in progress Gujranwala Construction of PCC/RCC/Drainage at Shaheenabad, 971 1483 Gujranwala 30.000 8.000 10.000 10.000 1.667 1.334 80% 9.334 31% Work in progress Gujranwala Construction of PCC/RCC/Drainage at Pasban Colony, 972 1484 Gujranwala 50.000 15.000 10.000 10.000 1.667 1.167 70% 16.167 32% Work in progress Gujranwala Construction of PCC/RCC/Drainage at Samnabad, 973 1485 Gujranwala 50.000 15.000 10.000 10.000 1.667 1.667 100% 16.667 33% Work in progress Gujranwala Construction of PCC/RCC/Drainage at Gondalwala, 974 1486 Gujranwala 30.000 7.000 10.000 10.000 1.667 0.865 52% 7.865 26% Work in progress Gujranwala Construction of PCC/RCC/Drainage at Aminpur, 975 1487 Gujranwala 30.000 8.000 10.000 10.000 1.667 1 60% 9.000 30% Work in progress Gujranwala Construction of PCC/RCC/Drainage at Badoki Gusaian, 976 1488 Gujranwala 30.000 8.000 10.000 10.000 1.667 1.314 79% 9.314 31% Work in progress Gujranwala Construction of PCC/RCC/Drainage at Dingranwali, 977 1489 Gujranwala 30.000 8.000 10.000 10.000 1.667 1.321 79% 9.321 31% Work in progress Gujranwala Provision of PCC / Sewerage schemes near Bypass 978 1490 Surrounding Abadies of Timber Market, District Gujranwala 190.600 40.000 10.000 10.000 1.667 1.667 100% 41.667 22% Work in progress Gujranwala Constructoin of Drains PCC / RCC in UC Kalaskay, Banka, 979 1491 Gujranwala 50.000 13.000 15.000 15.000 2.500 2.5 100% 15.500 31% Work in progress Ladheywala Cheema District Gujranwala Construction of Drains, PCC/RCC and Sullage Carrier in 980 1492 Gujranwala 30.000 10.000 10.000 10.000 1.667 1.667 100% 11.667 39% Work in progress Villages of U.C Chianwali in District Gujranwala Construction of Drains, PCC/RCC and Sullage Carrier in 981 1493 Gujranwala 30.000 10.000 10.000 10.000 1.667 1.334 80% 11.334 38% Work in progress Villages of U.C Ladhaywala Goraya in District Gujranwala Sewerage PCC Drainage in UC Malkay / UC Mari Thakran 982 1494 Gujranwala 80.000 23.500 15.000 15.000 2.500 1.367 55% 24.867 31% Work in progress / UC Ghoma in District Gujranwala Sewerage PCC Drainage in UC Talwandi MK / UC 983 1495 Gujranwala 60.000 20.000 15.000 15.000 2.500 1.452 58% 21.452 36% Work in progress Jandiala in District Gujranwala Sewerage PCC Drainage in UC Mokhal / UC Nadala / UC 984 1496 Gujranwala 80.000 23.500 10.000 10.000 1.667 1.203 72% 24.703 31% Work in progress Feroz wala in District Gujranwala Sewerage PCC Drainage in UC Nangal Dona / UC 985 1497 Gujranwala 80.000 23.500 10.000 10.000 1.667 1.5 90% 25.000 31% Work in progress Machrala in District Gujranwala Sewerage PCC Drainage in UC Sohawa / UC Kali Suba in 986 1498 Gujranwala 60.000 20.000 10.000 10.000 1.667 1.204 72% 21.204 35% Work in progress District Gujranwala Sewerage PCC Drainage in UC Sadhoki / UC Gunaur / UC 987 1499 Gujranwala 80.000 23.500 15.000 15.000 2.500 2.5 100% 26.000 33% Work in progress Mandiala Tega in District Gujranwala Construction of Drains,PCC Sullage Carrier UC Budha 988 1500 Gujranwala 20.000 10.000 10.000 10.000 1.667 1.214 73% 11.214 56% Work in progress Graya Tehsil Nowshera Virkan District Gujranwala

Construction of Drains,PCC Sullage Carrier UC Boopra 989 1501 Gujranwala 20.000 10.000 10.000 10.000 1.667 1.087 65% 11.087 55% Work in progress Kalan Tehsil Nowshera Virkan District Gujranwala Construction of Drains,PCC Sullage Carrier UC Tatlay Aali 990 1502 Gujranwala 20.000 10.000 10.000 10.000 1.667 1.097 66% 11.097 55% Work in progress Tehsil Nowshera Virkan District Gujranwala Construction of Drains,PCC Sullage Carrier UC Matto 991 1503 Gujranwala 20.000 10.000 10.000 10.000 1.667 1.024 61% 11.024 55% Work in progress Bbajme Tehsil Nowshera Virkan District Gujranwala Construction of Drains,PCC Sullage Carrier UC Karyl 992 1504 Gujranwala 20.000 10.000 10.000 10.000 1.667 1.348 81% 11.348 57% Work in progress Kalan Tehsil Nowshera Virkan District Gujranwala Provision of PCC / Sewerage / Drainage /Tuff Tiles and 993 1505 Gujranwala 100.000 28.000 15.000 15.000 2.500 1.749 70% 29.749 30% Work in progress allied facilities etc. in NA-101, District Gujranwala Provision of Water Filtration Plant / Drainage System Chak A.A.30.860 (M) T.S. 30.860 (M) work is in 994 1506 Hafizabad 30.860 10.000 10.000 10.000 1.667 1.175 70% 11.175 36% Chatha U/C no. 15, District Hafizabad progress Constrcutinn of Drain / Nallah / PCC / Soling Bateray, Kotli 995 1507 1.667 100% 21.667 43% A.A. 50.000 (M)T.S. 50.000 (M) work is in Amir Singh, Kallairwala, Muradian U/C Sagar Khan, no. Hafizabad 50.000 20.000 10.000 10.000 1.667 progress 12, District Hafizabad Constrcutinn of Drain / Nallah / PCC / Soling U/C No. 5, A.A. 50.000 (M) T.S. 50.000 (M) work is in 996 1508 Hafizabad 50.000 20.000 10.000 10.000 1.667 1.667 100% 21.667 43% District Hafizabad progress Constrcutinn of Drain / Nallah / PCC / Soling U/C No. 14, A.A. 50.000 (M) T.S. 50.000 (M) work is in 997 1509 Hafizabad 50.000 20.000 10.000 10.000 1.667 1.665 100% 21.665 43% District Hafizabad progress

Constrcutinn of Drain / Nallah / PCC / Soling and Sewer in A.A. 50.000 (M) T.S. 50.000 (M) work is in 998 1510 Hafizabad 50.000 20.000 10.000 10.000 1.667 1.25 75% 21.250 43% village Vanike Tarar U/C No. 3, District Hafizabad progress Rural Drainage Scheme Herdo Sagar, Dhnoi Dogran, 999 1511 2.501 50% 11.250 45% A.A. 25.002 (M) T.S. 25.002 (M) work is in Praim Kot, Batairay, Wingay and Bashmolajat District Hafizabad 25.005 10.000 15.005 15.005 1.25 progress Hafizabad Rural Drainage Scheme Dhunni, Jaidkey, Chak Chatha, 1000 1512 2.501 50% 11.244 45% A.A. 25.002 (M) T.S.25.002 (M) work is in Dahranwali, Thatha, Kharian, Peer Koot and Bashmolajat Hafizabad 25.002 10.000 15.002 15.002 1.244 progress District Hafizabad Construction of Streets Drains PCC/ Soling and Nallah In A.A. 20.000 (M) T.S. 20.000 (M)work is in 1001 1513 Hafizabad 20.000 10.000 10.000 10.000 1.667 1.665 100% 11.665 58% Vilaage Kassesy District Hafizabad progress Construction of Streets Drains PCC/ Soling and Nalla In A.A. 20.000 (M) T.S. 20.000 (M) work is in 1002 1514 Hafizabad 20.000 10.000 10.000 10.000 1.667 1.25 75% 11.250 56% Village Tibba Shah Balol District Hafizabad progress Construction of Streets Drains PCC/ Soling and Nallah In A.A. 20.000 (M)T.S.20.000 (M) work is in 1003 1515 Hafizabad 20.000 10.000 10.000 10.000 1.667 1.34 80% 11.340 57% Village Kot Khush hall District Hafizabad progress Construction of Streets Drains PCC/ Soling and Nallah In A.A. 25.000 (M) T.S. 25.000 (M) work is in 1004 1516 Hafizabad 25.000 10.000 15.000 15.000 2.500 2 80% 12.000 48% Village Tali Goraya and Jasso ke District Hafizabad progress Construction of Streets Drains PCC/ Soling and Nallah In A.A. 20.000 (M) T.S. 20.000 (M) work in 1005 1517 Hafizabad 20.000 10.000 10.000 10.000 1.667 1 60% 11.000 55% Village Narowal Dera Jaat District Hafizabad progress. Construction of Streets Drains PCC/ Soling and Nallah In A.A. 15.000 (M) T.S. 15.000 (M) work is in 1006 1518 Hafizabad 15.000 10.000 5.000 5.000 0.834 0.5 60% 10.500 70% Village Chak No. 474 District Hafizabad progress Construction of Streets Drains PCC/ Soling and Nallah In A.A. 15.000 (M) T.S. 15.000 (M) work is in 1007 1519 Hafizabad 15.000 10.000 5.000 5.000 0.834 0.17 20% 10.170 68% Village Matay Ke District Hafizabad progress Construction of Streets Drains PCC/ Soling and Nallah In A.A. 15.000 (M) T.S.15.000 (M) work is in 1008 1520 Hafizabad 15.000 10.000 5.000 5.000 0.834 0.5 60% 10.500 70% Village Badr Ali District Hafizabad progress Construction of Streets Drains PCC/ Soling and Nallah In A.A. 15.000 (M) T.S.15.000 (M) work is in 1009 1521 Hafizabad 15.000 10.000 5.000 5.000 0.834 0.21 25% 10.210 68% Village Khatrani District Hafizabad progress Provision of Water Filtration Plant / Drainage System Kolo A.A. 36.585 (M) T.S.36.585 (M) work is in 1010 1522 Hafizabad 36.585 12.000 10.000 10.000 1.667 1 60% 13.000 36% Tarar U/C no. 8, District Hafizabad progress Provision of Water Filtration Plant / Drainage System Kot A.A. 31.854 (M) T.S.31.854 (M) work is in 1011 1523 Hafizabad 31.854 12.000 10.000 10.000 1.667 1.175 70% 13.175 41% Said Muhammad U/C No. 1, District Hafizabad progress Provision of Water Filtration Plant / Drainage System, Kot A.A. 27.539 (M) T.S.27.539 (M) work is in 1012 1524 Hafizabad 27.539 13.000 14.539 14.539 2.423 1.221 50% 14.221 52% Ishaq U/C No. 2, District Hafizabad progress Provision of Water Filtration Plant / Drainage System A.A. 61.830 (M) T.S.61.830 (M) work is in 1013 1525 Hafizabad 61.830 20.000 20.000 20.000 3.334 2.005 60% 22.005 36% Vanike Tarar U/C No. 3, District Hafizabad progress Provision of Water Filtration Plant / Drainage System A.A. 38.225 (M) T.S.38.225 (M) work is in 1014 1526 Hafizabad 38.225 16.000 10.000 10.000 1.667 1.66 100% 17.660 46% Alaudinkey U/C no. 4, District Hafizabad progress Provision of Water Filtration Plant / Drainage System A.A. 33.136(M) T.S.33.136 (M) work is in 1015 1527 Hafizabad 33.136 12.000 10.000 10.000 1.667 1.2 72% 13.200 40% Sooianwala U/C No. 5, District Hafizabad progres Provision of Water Filtration Plant / Drainage A.A. 31.145(M) T.S.31.145 (M) work is in 1016 1528 Hafizabad 31.145 12.000 10.000 10.000 1.667 1.33 80% 13.330 43% SystemRamke Chatha U/C no. 6, District Hafizabad progress Provision of Water Filtration Plant / Drainage System A.A. 42.320(M) T.S.42.320 (M) work is in 1017 1529 Hafizabad 42.320 20.000 10.000 10.000 1.667 1.25 75% 21.250 50% Dhiranke Lalke U/C no. 7, District Hafizabad progress Provision of Water Filtration Plant / Drainage System A.A. 32.850(M) T.S.32.850 (M) work is in 1018 1530 Hafizabad 32.850 12.000 10.000 10.000 1.667 1.33 80% 13.330 41% Sandhwan Tarar U/C no. 9, District Hafizabad progress Provision of Water Filtration Plant / Drainage System Pind A.A. 30.049(M) T.S.30.049 (M) work is in 1019 1531 Hafizabad 30.049 10.000 10.000 10.000 1.667 1.5 90% 11.500 38% Bawray U/C no. 10, District Hafizabad progress Provision of Water Filtration Plant / Drainage System A.A. 28.414(M) T.S.28.414 (M) work is in 1020 1532 Hafizabad 28.414 10.000 18.414 18.414 3.069 2.2 72% 12.200 43% Sagar Kalan U/C No. 12, District Hafizabad progress Provision of Water Filtration Plant / Drainage System A.A. 34.675(M) T.S.34.675 (M) work is in 1021 1533 Hafizabad 34.675 12.000 10.000 10.000 1.667 1.2 72% 13.200 38% Dhunni U/C No. 14, District Hafizabad progress Provision of Water Filtration Plant / Drainage System A.A.29.334(M) T.S.29.334 (M) work is in 1022 1534 Hafizabad 29.334 12.000 17.334 17.334 2.889 2 69% 14.000 48% Kalianwala U/C no. 11, District Hafizabad progress Provision of Water Filtration Plant / Drainage System A.A. 28.045(M) T.S.28.045(M) work is in 1023 1535 Hafizabad 28.045 12.000 16.045 16.045 2.674 1.85 69% 13.850 49% Karyala U/C no. 19, District Hafizabad progress Provision of Water Filtration Plant / Drainage System A.A. 34.935(M) T.S.34.935 (M) work is in 1024 1536 Hafizabad 34.935 12.000 10.000 10.000 1.667 1.2 72% 13.200 38% kassoke U/C no. 20, District Hafizabad progress Provision of Water Filtration Plant / Drainage System Vinni A.A. 27.257(M) T.S.27.257 (M) work is in 1025 1537 Hafizabad 27.257 10.000 17.257 17.257 2.876 1.95 68% 11.950 44% U/C no. 16, District Hafizabad progress Provision of Water Filtration Plant / Drainage System A.A. 29.376(M) T.S.29.376 (M) work is in 1026 1538 Hafizabad 29.376 10.000 10.000 10.000 1.667 1.1 66% 11.100 38% Solangi Awan U/C no. 17, District Hafizabad progress Provision of Water Filtration Plant / Drainage System Kot A.A. 47.862(M) T.S.47.862 (M) work is in 1027 1539 Hafizabad 47.862 20.000 10.000 10.000 1.667 1.34 80% 21.340 45% Nakka progress Provision of Water Filtration Plant / Drainage System A.A. 29.486(M) T.S.29.486 (M) work is in 1028 1540 Hafizabad 29.486 10.000 10.000 10.000 1.667 1.201 72% 11.201 38% Khana Bhattian progress Provision of Water Filtration Plant / Drainage System A.A. 35.920(M) T.S.35.920 (M) work is in 1029 1541 Hafizabad 35.920 15.000 10.000 10.000 1.667 1.34 80% 16.340 45% Thata Jhaid Amirwala progress Provision of Water Filtration Plant / Drainage System A.A. 32.026(M) T.S.32.026 (M) work is in 1030 1542 Hafizabad 32.026 12.000 10.000 10.000 1.667 1.2 72% 13.200 41% North progress Provision of Water Filtration Plant / Drainage System Kot A.A. 53.655(M) T.S.53.655 (M) work is in 1031 1543 Hafizabad 53.655 20.000 10.000 10.000 1.667 1.1 66% 21.100 39% Sarwer progress Provision of Water Filtration Plant / Drainage System A.A. 25.650(M) T.S.25.650 (M) work is in 1032 1544 Hafizabad 25.650 10.000 15.650 15.650 2.609 2.1 80% 12.100 47% Mowan Bhattian progress Provision of Water Filtration Plant / Drainage System Jalal A.A. 30.000(M) T.S.30.000 (M) work is in 1033 1545 Hafizabad 30.000 10.000 10.000 10.000 1.667 1.25 75% 11.250 38% Pur Bhattian in District Hafizabad progress Exten: Construction of PCC Street / Drain, Soling, Nullah 1034 1546 and Eten: of Water Supply Scheme Fath Bhand Tehsil Gujrat 81.151 22.000 10.000 10.000 1.667 1.667 100% 23.667 29% work in progress Kharian District Gujrat Rural Water Supply and Drainage Scheme Morala Tehsil 1035 1547 Gujrat 30.000 10.000 10.000 10.000 1.667 1.667 100% 11.667 39% work in progress Kharian District Gujrat Construction of PCC Street / Drain, Soling and Nullah in U.C Gunjah, Thekarian Matwanawala, Miana Chak, Punjan 1036 1548 Khasana, Khawaspur, Bhaddhar, Kotla Qasim Khan, Gujrat 60.990 20.000 10.000 10.000 1.667 1.667 100% 21.667 36% work in progress Chakor Sher Ghazi, Deona Mandi, 1 & 2 Dinga, Addowal, Saroki, Machiana in Tehsil Kharian Distric Construction of PCC Street / Drain, Soling and Nullah in 1037 1549 Gujrat 18.400 10.000 8.400 8.400 1.400 0.472 34% 10.472 57% work in progress U.C 1 to 4 Lalamusa City Tehsil Kharian District Gujrat

Construction of PCC Street/ Drain, Soling and Nullah in 1038 1550 Bagrianwala, Baho Ghaseet Pur, Sheikh Sukha, Sabowal, Gujrat 27.604 10.000 10.000 10.000 1.667 0 0% 10.000 36% work in progress Amra Kalan, Chak Jani in Tehsil Kharian District Gujrat Construction of PCC Street/ Drain, Soling and Nullah in 1039 1551 Gujrat 20.027 10.000 10.027 10.027 1.671 0 0% 10.000 50% work in progress UC Fatta Band Tehsil Kharian District Gujrat Construction of PCC Street/ Drain, Soling and Nullah in U.C's Mirza Tahir, Nona Wali, Bumali, Kolian Shah 1040 1552 Hussain, Jora Kamana, Haji Muhammad, Sikaryali, Gujrat 69.000 20.000 10.000 10.000 1.667 1.667 100% 21.667 31% work in progress Chakori Bhailwal, Warraichanwala, Nagranwala, Ali Chak, Kulewa, Taplyala, Chak Pind in Tehsil Kharian Provisino of Sewerage / Drainage / Soling etc in Various 1041 1553 Gujrat 50.000 25.000 5.000 5.000 0.834 0.834 100% 25.834 52% work in progress UC's in PP-113, District Gujrat Provision of Streets and Drains in UC's Chak Sada, Mandhiyala, Thatha Musa, Chopala, Bharaj, Thim Ke, 1042 1554 Manju Chak, Ikhlas Garh, Fateh Pur, Daulta Nagar, Alam Gujrat 60.000 20.000 10.000 10.000 1.667 1.667 100% 21.667 36% work in progress Garh, Doga, Chachian, Jaura Jalalpur and Dhuma Malka District Gujrat Sewerage Scheme Jail Chowk to Bhimber Nullah, Gujrat 1043 1555 Gujrat 249.994 50.000 10.000 10.000 1.667 1.667 100% 51.667 21% work in progress City District Gujrat 1044 1556 Construction of Nallahs in city Sarai Alamgir District Gujrat Gujrat 82.600 22.500 10.000 10.000 1.667 0 0% 22.500 27% work in progress Provision of Sewerage / Drainage and streets / Tuff Tiles 1045 1557 Gujrat 480.000 45.000 20.000 20.000 3.334 3.334 100% 48.334 10% work in progress etc in various UCs, District Gujrat Sewerage / Drainage / PCC & Brick Pavement Scheme in villages Adda PharIanwall, HaIgher * A.A Date. 28.07.2017* T.S Date. Khurd,Haslanwala,pindl Kalu,Loha Tibba ,Chak Jano Mandi 15.08.2017* Start Date. 06.01.2018* 1046 1558 30.000 10.000 10.000 10.000 1.667 0 0% 10.000 33% Khurd, Thatha Hast, Luk, Thatha Pheray, Rajoa, Bahauddin Completion date 05.01.2019* Work in Baghanwala,kot Sattar Duborji, Kotli Qazl, Sandanwala, progress. Charranwala a Sewerage / Drainage / PCC & Brick Pavement Scheme in villages kailu, tuggal, channi syedian, Ratoo, bahri, Chak * A.A Date. 28.07.2017* T.S Date. Mandi 15.08.2017* Start Date. 06.01.2018* 1047 1559 Kamal, Melu Mahi Gheran, Aghroa, Kotha Bhola, 30.000 10.000 10.000 10.000 1.667 0 0% 10.000 33% Bahauddin Completion date 05.01.2019* Work in Maseetwali Komokay, Chak Mitha, Heigherwala, Kot progress. Phollay shah, Chak Zahir, Bahu, Manga, Arzani, S

Construction of Street Drains, Soling and PCC in Village * A.A Date. 28.07.2017* T.S Date. Gajjan, Slianman, Kot Hamid Shah, Jhanda Chohan, Mandi 15.08.2017* Start Date. 06.01.2018* 1048 1560 23.000 10.000 13.000 13.000 2.167 1.6 74% 11.600 50% Rasul Pur, Chicheranwali, Bhinder Kalan, Bhinder Khurd, Bahauddin Completion date 05.01.2019* Work in Chakora, Thatha Alia and Thatha Naik District M B Din progress.

Construction of Street Drains, Soling and PCC in Village * A.A Date. 28.07.2017* T.S Date. Bhagat, Thathi Mureed Sahnpal, Channi Sahnpal, Ranaml, Mandi 15.08.2017* Start Date. 06.01.2018* 1049 1561 26.500 15.000 11.500 11.500 1.917 1.118 58% 16.118 61% Sharif Channi Mahram, Qila Attar Singh, Ghagoki and Bahauddin Completion date 05.01.2019* Work in Sarang District M B Din progress. Construction of Street Drains, Soling and PCC in Village * A.A Date. 28.07.2017* T.S Date. Narrang, Saad Ullah Pur, Kot Pejo, Karamawala, Dhudra, Mandi 15.08.2017* Start Date. 06.01.2018* 1050 1562 26.000 10.000 16.000 16.000 2.667 0 0% 10.000 38% Long Charrhkey, Khoosar and Pindi Dotharan District M B Bahauddin Completion date 05.01.2019* Work in Din progress.

Construction of Street Drains, Soling and PCC in Village * A.A Date. 28.07.2017* T.S Date. Dhaul, Kotly Khurd, Khiyyan, Chak Jano New Abadies, Mandi 15.08.2017* Start Date. 06.01.2018* 1051 1563 31.500 10.000 21.500 21.500 3.584 0 0% 10.000 32% Addu Sarwani, Sheikh Alipur, Ransikey, Pahrianwali, Bahauddin Completion date 05.01.2019* Work in Sainthal and saida Saghar District M B Din progress. Construction of PCC / Drainage, UC Chobara District 1052 1564 Sialkot 20.000 10.000 10.000 10.000 1.667 1.308 78% 11.308 57% Work in progress. Sialkot 1053 1565 Construction of PCC / Drainage, US Kingra District Sialkot Sialkot 20.000 10.000 10.000 10.000 1.667 1.33 80% 11.330 57% Work in progress.

1054 1566 Construction of PCC / Drainage, UC Dogri District Sialkot Sialkot 15.000 7.500 7.500 7.500 1.250 0.98 78% 8.480 57% Work in progress. Construction of PCC / Drainage, UC Balagan District 1055 1567 Sialkot 20.000 10.000 10.000 10.000 1.667 1.35 81% 11.350 57% Work in progress. Sialkot Construction of PCC / Drainage, UC Malipur District 1056 1568 Sialkot 20.000 10.000 10.000 10.000 1.667 1.325 79% 11.325 57% Work in progress. Sialkot Construction of PCC / Drainage, UC Talawandi, District 1057 1569 Sialkot 20.000 10.000 10.000 10.000 1.667 1.302 78% 11.302 57% Work in progress. Sialkot Construction of PCC / Drainage, UC Chacharwali District 1058 1570 Sialkot 20.000 10.000 10.000 10.000 1.667 1.328 80% 11.328 57% Work in progress. Sialkot Construction of PCC / Drainage, UC Klasswala, District 1059 1571 Sialkot 20.000 10.000 10.000 10.000 1.667 1.358 81% 11.358 57% Work in progress. Sialkot Construction of PCC / Drainage, UC Jodhala, District 1060 1572 Sialkot 20.000 10.000 10.000 10.000 1.667 1.288 77% 11.288 56% Work in progress. Sialkot Construction of PCC, Street Drain/ Nullah Village Kundan 1061 1573 Pur Bashmola Tahthi Minderwal, Chan, Khany Chak, Sialkot 48.000 18.000 10.000 10.000 1.667 1.267 76% 19.267 40% Work in progress. Kajlewal, Mahal Tajer, Ossomata and Khurra Construction of PCC, Street Drain/ Nullah Village Chakrala 1062 1574 Bashmula Machrala, Nandpurn Rang Khokhran, Lalian, Sialkot 49.000 20.000 10.000 10.000 1.667 1.234 74% 21.234 43% Work in progress. Gaiat, Bahadur and Madina Town. Construction of PCC, Streets Drains, Tuff Tiles and Soling 1063 1575 Sialkot 15.000 10.000 5.000 5.000 0.834 0.632 76% 10.632 71% Work in progress. in UC Marakiwall in District Sialkot. Construction of PCC, Streets Drains, Tuff Tiles and Soling 1064 1576 Sialkot 15.000 10.000 5.000 5.000 0.834 0.64 77% 10.640 71% Work in progress. in UC Berth in District Sialkot Construction of PCC, Streets Drains, Tuff Tiles and Soling 1065 1577 Sialkot 15.000 10.000 5.000 5.000 0.834 0.647 78% 10.647 71% Work in progress. in UC Booth in District Sialkot Construction of PCC, Streets Drains, Tuff Tiles and Soling 1066 1578 Sialkot 12.000 9.000 3.000 3.000 0.500 0.358 72% 9.358 78% Work in progress. in UC Machranal in District Sialkot Construction of Streets / Drain / Nullah / Soling / Tuff Tiles 1067 1579 Sialkot 25.000 8.000 5.000 5.000 0.834 0.635 76% 8.635 35% Work in progress. / PCC at UC Dhilum Balagon, District Sialkot Construction of Streets / Drain / Nullah / Soling / Tuff Tiles 1068 1580 / PCC at Fardaus Pura, Nand Garh, Wan, Dhoop Sarri, Sialkot 30.000 10.000 5.000 5.000 0.834 0.625 75% 10.625 35% Work in progress. Kotli Miani, Malkhanwala, District Sialkot Construction of Streets / Drain / Nullah / Soling / Tuff Tiles 1069 1581 Sialkot 50.000 20.000 10.000 10.000 1.667 1.211 73% 21.211 42% Work in progress. / PCC at UC Bhopalwala Tehsil Sambrial, District Sialkot Construction of Streets / Drain / Nullah / Soling / Tuff Tiles 1070 1582 Sialkot 20.000 7.000 5.000 5.000 0.834 0.627 75% 7.627 38% Work in progress. / PCC at UC Alleali, District Sialkot Construction of Streets / Drain / Nullah / Soling / Tuff Tiles 1071 1583 / PCC at Villages Mundair Syedian, Mundair Khothay, Sialkot 25.000 8.000 5.000 5.000 0.834 0.688 82% 8.688 35% Work in progress. Roras, Sohowala, Kharolian etc., District Sialkot

Construction of Streets / Drain / Nullah / Soling / Tuff Tiles 1072 1584 Sialkot 40.000 12.000 10.000 10.000 1.667 1.244 75% 13.244 33% Work in progress. / PCC at UC Berowala Tehsil Daska, District Sialkot Construction of Streets / Drain / Nullah / Soling / Tuff Tiles 1073 1585 Sialkot 20.000 7.000 5.000 5.000 0.834 0.627 75% 7.627 38% Work in progress. / PCC at UC Bagowala , District Sialkot Construction of Streets / Drain / Nullah / Soling / Tuff Tiles 1074 1586 Sialkot 149.892 20.000 10.000 10.000 1.667 1.365 82% 21.365 14% Work in progress. / PCC at UC Ghuinke, District Sialkot Construction of Streets / Drain / Nullah / Soling / Tuff Tiles 1075 1587 Sialkot 40.000 12.000 10.000 10.000 1.667 1.32 79% 13.320 33% Work in progress. / PCC at UC Bharokey, District Sialkot Construction of sewerage, Nallah, PCC at UC Prochak and 1076 1588 Sialkot 20.000 11.000 9.000 9.000 1.500 1.127 75% 12.127 61% Work in progress. Alo Mahr District Sialkot. Construction of Streets / Sewerage / Tuff Tile/ PCC/ Soling 1077 1589 Sialkot 100.000 30.000 10.000 10.000 1.667 1.233 74% 31.233 31% Work in progress. in Rural UC's of NA-113 Construction of PCC, Soling / Drains in Villages of UC in 1078 1590 Sialkot 20.000 10.000 10.000 10.000 1.667 1.288 77% 11.288 56% Work in progress. Ghutalian District Sialkot Construction of PCC, Soling / Drains in Villages of UC in 1079 1591 Sialkot 15.000 10.000 5.000 5.000 0.834 0.689 83% 10.689 71% Work in progress. Chichar wali District Sialkot Construction of PCC, Soling / Drains in Villages of UC in 1080 1592 Sialkot 15.000 10.000 5.000 5.000 0.834 0.621 74% 10.621 71% Work in progress. Pejoke Qila Kalarwala District Sialkot Construction of Streets, Nullah, PCC, Soling at villages Jasso Wali Pun, Sahn Gill, pajokay, Mehmand Wali, Rata 1081 1593 jathool, Baso Panu, alawal Pur, Loharan Wali, Jhangi Sialkot 20.000 10.000 10.000 10.000 1.667 1.288 77% 11.288 56% Work in progress. Shah Khaki, Jhans, Sodian, Bhuda, Peera Baryar, Charwind, Deehr, Bhojo, Alkry, Kala Pahar, Construction of PCC, Soling / Drains in Villages of UC 1082 1594 Sialkot 25.000 12.000 5.000 5.000 0.834 0.628 75% 12.628 51% Work in progress. Sokan Wind District Sialkot Construction of Streets, Drains PCC/ Soling / Tuff Tiles in Villages of UC's Kanwanlit, Adamkey Cheema, Raja 1083 1595 Gamman, Galotian Kalan, Galotian Khurd, Goindkey, Sialkot 120.000 45.000 10.000 10.000 1.667 1.299 78% 46.299 39% Work in progress. Banbanwala, Bharokey and Mitranwali Tehsil Daska District Sialkot Constructon of Streets / Drain / Nullah / Soling at UC, 1084 1596 Sialkot 20.000 10.000 10.000 10.000 1.667 1.293 78% 11.293 56% Work in progress. Moongar, Baqarpur, Pindi Khokharn etc., District Sialkot Constructon of Streets / Drain / Nullah / Soling at, UC 1085 1597 Sialkot 20.000 10.000 10.000 10.000 1.667 1.244 75% 11.244 56% Work in progress. Kapoor Wali and Khamberwala District Sialkot Constructon of Streets / Drain / Nullah / Soling at Village 1086 1598 Satab Garah, Butter, Dhanney, Ganjaniwali etc. District Sialkot 30.000 10.000 10.000 10.000 1.667 1.302 78% 11.302 38% Work in progress. Sialkot Construction of Street / Swerage / Tuff Tile ETC in City 1087 1599 Sialkot 50.000 20.000 10.000 10.000 1.667 1.336 80% 21.336 43% Work in progress. Daska District Sialkot Construction of PCC/Streets/Nalian at U.C. Syedanwali 1088 1600 Sialkot 30.000 10.000 5.000 5.000 0.834 0.588 71% 10.588 35% Work in progress. District Sialkot Construction of PCC/Streets/Nalian at U.C.Pargpur District 1089 1601 Sialkot 30.000 10.000 5.000 5.000 0.834 0.592 71% 10.592 35% Work in progress. Sialkot Construction of PCC/Streets/Nalian at U.C. Vario District 1090 1602 Sialkot 30.000 10.000 5.000 5.000 0.834 0.62 74% 10.620 35% Work in progress. Sialkot Construction of PCC/Streets/Nalian at U.C Rasoolpur 1091 1603 Sialkot 30.000 10.000 5.000 5.000 0.834 0.627 75% 10.627 35% Work in progress. Balian District Sialkot Providing & Laying of Tuff Tile PCC and Drainge Lines in 1092 1604 Sialkot 40.000 15.000 10.000 10.000 1.667 1.255 75% 16.255 41% Work in progress. UC Providing & Laying of Tuff Tile PCC and Drainge Lines in 1093 1605 Sialkot 30.000 10.000 5.000 5.000 0.834 0.617 74% 10.617 35% Work in progress. UC Talwara Providing & Laying of Tuff Tile PCC and Drainge Lines in 1094 1606 Sialkot 20.000 10.000 10.000 10.000 1.667 1.354 81% 11.354 57% Work in progress. UC Pindi Arian Providing & Laying of Tuff Tile PCC and Drainge Lines in 1095 1607 Sialkot 30.000 10.000 5.000 5.000 0.834 0.638 76% 10.638 35% Work in progress. UC Hamza Ghous Providing & Laying of Tuff Tile PCC and Drainge Lines in 1096 1608 Sialkot 20.000 10.000 10.000 10.000 1.667 1.32 79% 11.320 57% Work in progress. UC Naika Pura Providing & Laying of Tuff Tile PCC and Drainge Lines in 1097 1609 Sialkot 20.000 10.000 10.000 10.000 1.667 1.344 81% 11.344 57% Work in progress. UC Duborji Arian Providing & Laying of Tuff Tile PCC and Drainge Lines in 1098 1610 Sialkot 30.000 10.000 5.000 5.000 0.834 0.672 81% 10.672 36% Work in progress. UC Ahmed Pura Providing & Laying of Tuff Tile PCC and Drainge Lines in 1099 1611 Sialkot 20.000 10.000 10.000 10.000 1.667 1.291 77% 11.291 56% Work in progress. UC Pura Hiran Providing & Laying of Tuff Tile PCC and Drainge Lines in 1100 1612 Sialkot 40.000 15.000 10.000 10.000 1.667 1.254 75% 16.254 41% Work in progress. UC Rangpura Providing & Laying of Tuff Tile PCC and Drainge Lines in 1101 1613 Sialkot 20.000 10.000 10.000 10.000 1.667 1.233 74% 11.233 56% Work in progress. UC Islam Abad Providing & Laying of Tuff Tile PCC and Drainge Lines in 1102 1614 Sialkot 20.000 10.000 10.000 10.000 1.667 1.278 77% 11.278 56% Work in progress. UC Kotli Barham Providing & Laying of Tuff Tile PCC and Drainge Lines in 1103 1615 Sialkot 30.000 15.000 5.000 5.000 0.834 0.612 73% 15.612 52% Work in progress. UC Paka Garh Providing & Laying of Tuff Tile PCC and Drainge Lines in 1104 1616 Sialkot 30.000 15.000 5.000 5.000 0.834 0.601 72% 15.601 52% Work in progress. UC Maina Pura Providing & Laying of Tuff Tile PCC and Drainge Lines in 1105 1617 Sialkot 20.000 10.000 10.000 10.000 1.667 1.288 77% 11.288 56% Work in progress. UC Muzafar Pur Providing & Laying of Tuff Tile PCC and Drainge Lines in 1106 1618 Sialkot 20.000 10.000 10.000 10.000 1.667 1.296 78% 11.296 56% Work in progress. UC Fathegarh Providing & Laying of Tuff Tile PCC and Drainge Lines in 1107 1619 Sialkot 20.000 10.000 10.000 10.000 1.667 1.32 79% 11.320 57% Work in progress. UC Haji Pura Ban Providing & Laying of Tuff Tile PCC and Drainge Lines in 1108 1620 Sialkot 20.000 10.000 10.000 10.000 1.667 1.333 80% 11.333 57% Work in progress. UC Imam Saheb Providing & Laying of Tuff Tile PCC and Drainge Lines in 1109 1621 Sialkot 20.000 10.000 10.000 10.000 1.667 1.358 81% 11.358 57% Work in progress. UC Mubarik Pura Provision of PCC / Sewerage / Tuff Tiles / Drainage and 1110 1622 Sialkot 100.000 45.000 10.000 10.000 1.667 1.327 80% 46.327 46% Work in progress. allied facilities in PP-122, District Sialkot Provision of PCC / Sewerage / Tuff Tiles / Drainage and 1111 1623 Sialkot 199.950 100.000 10.000 10.000 1.667 1.32 79% 101.320 51% Work in progress. allied facilities in PP-123, District Sialkot Construction of PCC, Street Drain/ Nullah Village Jallian 1112 1624 Wala Bashamula Moma Khurd, Kalan Virkan, Dulchikay, Sialkot 47.000 18.000 10.000 10.000 1.667 1.278 77% 19.278 41% Work in progress. Lodhary Dogranwala and Rai Pur. Construction of PCC, Street Drain/ Nullah Village Ghari 1113 1625 Gondal Bashmula Ahmal Pur, Sarhall, Hadali, Minal Sialkot 47.000 18.000 5.000 5.000 0.834 0.658 79% 18.658 40% Work in progress. Pathan, Bazpur and Romal Juttan. Construction of PCC, Street Drain/ Nullah Village Baghwal 1114 1626 Sialkot 46.000 18.000 15.000 15.000 2.500 1.781 71% 19.781 43% Work in progress. Awan Bashmula Harar, Noul, Dumbola and Dogran. Construction of sewerage, Nallah, PCC at UC Jaranwala 1115 1627 Sialkot 20.000 11.000 9.000 9.000 1.500 1.124 75% 12.124 61% Work in progress. and Barthanwala, District Sialkot Construction of sewerage, Nallah, PCC at UC Salhokay 1116 1628 Sialkot 20.000 11.000 9.000 9.000 1.500 1.117 74% 12.117 61% Work in progress. and Bhuda Gorya, District Sialkot Construction of sewerage, Nallah, PCC at UC Mundekay 1117 1629 Sialkot 20.000 11.000 9.000 9.000 1.500 1.201 80% 12.201 61% Work in progress. Gorya and Malomay, District Sialkot Construction of sewerage, Nallah, PCC at UC Boghray and 1118 1630 Sialkot 20.000 11.000 9.000 9.000 1.500 1.217 81% 12.217 61% Work in progress. Seo Ke, District Sialkot. Construction of sewerage, Nallah, PCC at UC Adha and 1119 1631 Sialkot 20.000 12.000 8.000 8.000 1.334 0.945 71% 12.945 65% Work in progress. Sehjo Kala District Sialkot. Construction of sewerage, Nallah, PCC at UC Ghuainkey 1120 1632 Sialkot 15.000 10.000 5.000 5.000 0.834 0.678 81% 10.678 71% Work in progress. and Badoke Cheema, District Sialkot. Construction of sewerage, Nallah, PCC at UC Jamkay 1121 1633 Sialkot 15.000 10.000 5.000 5.000 0.834 0.624 75% 10.624 71% Work in progress. Cheema and Kanwanliq, District Sialkot. 1122 1634 Construction Street Drain PCC / and Nullah U/C Jaithke Sialkot 20.000 10.000 10.000 10.000 1.667 1.275 76% 11.275 56% Work in progress.

1123 1635 Construction of Street Drain PCC / and Nullah U/C Kopra Sialkot 20.000 10.000 10.000 10.000 1.667 1.27 76% 11.270 56% Work in progress. Construction of Street Drain PCC/ and Nullah UC Majra 1124 1636 Sialkot 30.000 10.000 5.000 5.000 0.834 0.621 74% 10.621 35% Work in progress. Kalan Construction of Street Drain PCC / and Nullah U/C Village 1125 1637 Sialkot 20.000 10.000 10.000 10.000 1.667 1.279 77% 11.279 56% Work in progress. Srankey Construction of Street Drain PCC/ and Nullah U/C’s 1126 1638 Sialkot 80.000 30.000 5.000 5.000 0.834 0.633 76% 30.633 38% Work in progress. Verowala, Halewai, Habibpur 1127 1639 Construction of sewerage, PCC, Tuff Tile, District Sialkot Sialkot 50.000 20.000 10.000 10.000 1.667 1.378 83% 21.378 43% Work in progress. Construction of PCC & Drains in Village Chobara U/C 1128 1640 Sialkot 15.000 5.000 10.000 10.000 1.667 1.301 78% 6.301 42% Work in progress. Chobara District Sialkot Construction of Drainage System, PCC and Brick A.A. dated 07.08.2017 T.S. dated 08.08.2017 1129 1641 Pavement in Villages of UC Rupo Chak Tehsil Zafarwal Narowal 12.000 6.000 6.000 6.000 1.000 0.94 94% 6.940 58% *Start Date 28.09.2017*Completion date District Narowal 30.06.2019.Work in progress. Provision of Drains/Soling and PCC in UCs, Datewal, A.A. dated 03.08.2017 T.S. dated 1130 1642 1.667 96% 11.605 39% 12.08.2017*Start Date Mangolay, Hallowal, Dhrug Miana and Ghota Fateh Garh Narowal 30.000 10.000 10.000 10.000 1.605 27.10.2017*Completion date 30.06.2019.work District Narowal in progress. Provision of Drains/Soling and PCC in UCs, Talwandi A.A. dated 03.08.2017 T.S. dated 12.08.2017 1131 1643 Bhindran, Giddan, Niddokay, Kot Lakha Singh and Narowal 30.000 10.000 10.000 10.000 1.667 1.591 95% 11.591 39% *Start Date 27.10.2017*Completion date Domala, District Narowal 30.06.2019.Work in progress.

Provision of Drains/Soling and PCC in UCs, Khan Kassa, A.A. dated 03.08.2017 T.S. dated 12.08.2017 1132 1644 Dongian, Bubak Murali, Sadowala Uncha and Falezpur Narowal 30.000 10.000 10.000 10.000 1.667 1.501 90% 11.501 38% *Start Date 27.10.2017*Completion date District Narowal 30.06.2019.Work in progress.

Provision of Drains/Soling and PCC in UCs, Ahmadabad, A.A. dated 03.08.2017 T.S. dated 12.08.2017 1133 1645 Depokey, Jestiwala, Uncha, Lala and Nonar, District Narowal 30.000 10.000 10.000 10.000 1.667 1.598 96% 11.598 39% *Start Date 27.10.2017*Completion date Narowal 30.06.2019.Work in progress.

Provision of Drains/Soling and PCC in UCs, Mehlu Wala, A.A. dated 03.08.2017 T.S. dated 12.08.2017 1134 1646 Dhamthal, Langarkay, Tapiala and Sankhtara District Narowal 30.000 10.000 10.000 10.000 1.667 1.603 96% 11.603 39% *Start Date 27.10.2017*Completion date Narowal 30.06.2019.work in progress. Provision of PCC/Streets/Nalian at Bado Malihi, Chandarkay, Ransiwal, Manak, Qayampur, Agrian, A.A. dated 19.10.17 T.S. dated___ *Start 1135 1647 Narowal 130.000 35.000 20.000 20.000 3.334 3.32 100% 38.320 29% Date 18.10.2017 *Completion date Pungarian, Salukay, Dawod, Chundowal, Klass Gorya, 30.06.2019 Work in progress Muhammad Rana Wala District Narowal Construction of Drainage System, PCC and Brick A.A. dated 03.08.17 T.S. dated 08.08.2017 1136 1648 Pavement in Villages of Jandiala Tehsil Zafarwal District Narowal 15.000 5.000 10.000 10.000 1.667 1.506 90% 6.506 43% *Start Date 18.08.2017*Completion date Narowal 30.06.2019.work in progress. Provision of PCC / Sewerage / Drainage etc. in PP-133, A.A. dated 03.08.17 T.S. dated 08.08.2017 1137 1649 Narowal 25.000 10.000 5.000 5.000 0.834 0.799 96% 10.799 43% *Start Date 18.08.2017*Completion date District Narowal 30.06.2019.work in Progress. Provision of Tuff Tile from Zafarwal bypass to Chowk A.A Date.03.08.2017 T.S Date*18.09.2017 1138 1650 Narowal 22.000 10.000 12.000 12.000 2.000 1.72 86% 11.720 53% Start Date 28.09.2017 *Completion date Ghas Mandi, District Narowal 30.06.2019 Work in progress. PCC & Drainage & Sewerage System at UC-273, Raiwind 1139 1651 Lahore 50.000 39.000 11.000 11.000 1.834 1.834 100% 40.834 82% Work is in progress City, Lhr PCC & Drainage & Sewerage System at UC-112, Mustafa 1140 1652 Lahore 50.000 40.000 10.000 10.000 1.667 1.667 100% 41.667 83% Work is in progress Town, Construction of PCC/Sewerage and Link Streets UC-147 1141 1653 Lahore 50.000 35.000 15.000 15.000 2.500 0 0% 35.000 70% Work is in progress Lahore. Construction of PCC/Sewerage and Link Streets UC-148 1142 1654 Lahore 50.000 40.000 10.000 10.000 1.667 0.568 34% 40.568 81% Work is in progress Lahore. Construction of PCC/Sewerage and Link Streets UC-149 1143 1655 Lahore 50.000 40.000 10.000 10.000 1.667 1 60% 41.000 82% Work is in progress Lahore. Construction of PCC/Sewerage and Link Streets UC-150 1144 1656 Lahore 50.000 40.000 10.000 10.000 1.667 1.667 100% 41.667 83% Work is in progress Lahore. Construction of PCC/Sewerage and Link Streets UC-151 1145 1657 Lahore 50.000 40.000 10.000 10.000 1.667 1.667 100% 41.667 83% Work is in progress Lahore. Construction of PCC/Sewerage and Link Streets UC-152 1146 1658 Lahore 50.000 40.000 10.000 10.000 1.667 1.667 100% 41.667 83% Work is in progress Lahore. Construction of PCC/Sewerage and Link Streets UC-174 1147 1659 Lahore 50.000 30.000 10.000 10.000 1.667 1.667 100% 31.667 63% Work is in progress Lahore. Construction of PCC/Sewerage and Link Streets UC-175 1148 1660 Lahore 50.000 40.000 10.000 10.000 1.667 1.667 100% 41.667 83% Work is in progress Lahore. Construction of PCC/Sewerage and Link Streets UC-183 1149 1661 Lahore 50.000 40.000 10.000 10.000 1.667 1.667 100% 41.667 83% Work is in progress Lahore. Construction of PCC/Sewerage and Link Streets UC-108 1150 1662 Lahore 50.000 35.000 15.000 15.000 2.500 2.5 100% 37.500 75% Work is in progress Lahore. Construction of PCC/Sewerage and Link Streets Bhangali 1151 1663 Lahore 100.000 75.000 15.000 15.000 2.500 2.5 100% 77.500 78% Work is in progress Lahore. PCC & Drainage & Sewerage System at UC-110, Niaz 1152 1664 Lahore 50.000 40.000 10.000 10.000 1.667 1.667 100% 41.667 83% Work is in progress Baig Lahore PCC & Drainage & Sewerage System at UC-111, 1153 1665 Lahore 50.000 39.280 10.720 10.720 1.787 1.787 100% 41.067 82% Work is in progress Hunjarwal, Lahore PCC & Drainage & Sewerage System at UC-109, 1154 1666 Lahore 50.000 39.500 10.500 10.500 1.750 1.75 100% 41.250 83% Work is in progress Margzaar Colony, Lahore. PCC & Drainage & Sewerage System at UC-117, Shahpur 1155 1667 Lahore 50.000 45.000 5.000 5.000 0.834 0 0% 45.000 90% Work is in progress Kanjran, Lahore. PCC & Drainage & Sewerage System at UC-262, Shamke 1156 1668 Lahore 50.000 25.000 5.000 5.000 0.834 0.425 51% 25.425 51% Work is in progress Bhattian, Lahore. PCC & Drainage & Sewerage System at UC-255, Sattu 1157 1669 Lahore 50.000 32.000 5.000 5.000 0.834 0.834 100% 32.834 66% Work is in progress Kattla, Lahore PCC & Drainage & Sewerage System at UC-256, Ali Raza 1158 1670 Lahore 50.000 40.000 10.000 10.000 1.667 0.033 2% 40.033 80% Work is in progress Abad, Lahore PCC & Drainage & Sewerage System at UC-272, Raiwind Physically scheme is completed, balance 1159 1671 Lahore 50.000 40.000 10.000 10.000 1.667 1.667 100% 41.667 83% funds are required to clear the contractor's Kalan, Lahore liability. Provision of PCC & Drainage Facilities in Attari & allied 1160 1672 Lahore 50.000 40.000 10.000 10.000 1.667 0.023 1% 40.023 80% Scheme completed abadies. Provision of PCC & Drainage Facilities in Youhanabad, 1161 1673 Lahore 50.000 40.000 10.000 10.000 1.667 0.035 2% 40.035 80% Work is in progress Dhullu Kalan & Khurd & allied abadies. Provision of PCC & Drainage Facilities in Gajjumatta & 1162 1674 Lahore 50.000 40.000 10.000 10.000 1.667 0.02 1% 40.020 80% Scheme completed allied abadies. Provision of PCC & Drainage Facilities in Bhallar & allied 1163 1675 Lahore 50.000 40.000 10.000 10.000 1.667 0.04 2% 40.040 80% Scheme completed abadies. Provision of PCC & Drainage Facilities in Dhalloki & allied 1164 1676 Lahore 50.000 40.000 10.000 10.000 1.667 0.02 1% 40.020 80% Scheme completed abadies. Provision of PCC & Drainage Facilities in Jhulkey & allied 1165 1677 Lahore 50.000 40.000 10.000 10.000 1.667 0.022 1% 40.022 80% Scheme completed abadies. Provision of PCC & Drainage Facilities in Jaman and 1166 1678 Lahore 50.000 40.000 10.000 10.000 1.667 0.4 24% 40.400 81% Scheme completed Gawind & allied abadies. Provision of PCC & Drainage Facilities in Shahzada & 1167 1679 Lahore 50.000 40.000 10.000 10.000 1.667 0.02 1% 40.020 80% Scheme completed allied abadies. Provision of PCC & Drainage Facilities in Jia Bhagga & 1168 1680 Lahore 50.000 40.000 10.000 10.000 1.667 0.025 1% 40.025 80% Scheme completed allied abadies. Provision of PCC & Drainage Facilities in Pandoki & allied 1169 1681 Lahore 50.000 40.000 10.000 10.000 1.667 0.022 1% 40.022 80% Scheme completed abadies. Provision of PCC & Drainage Facilities in Hair & allied 1170 1682 Lahore 73.000 40.000 10.000 10.000 1.667 0.07 4% 40.070 55% Scheme completed abadies. Construction of Sewerage and Disposal Manawan Sky 1171 1683 Lahore 50.000 20.000 10.000 10.000 1.667 1.667 100% 21.667 43% Work is in progress Land & Abadies Provision of clean drinking water, sewerage system, PCC 1172 1684 and allied facilities in Manga Mandi, Raiwind Village and Lahore 300.000 140.000 25.000 25.000 4.167 4.167 100% 144.167 48% Work is in progress adjoining Abadies. Provision of PCC & Drainage in Streets UC-176 Awan 1173 1685 Lahore 50.000 40.000 10.000 10.000 1.667 0.06 4% 40.060 80% Work is in progress Dhai Wala Lahore. Provision of PCC & Drainage in Streets UC-190 Hadiara 1174 1686 Lahore 50.000 40.000 10.000 10.000 1.667 0.036 2% 40.036 80% Work is in progress Lahore. Provision of PCC & Drainage in Streets UC-180 Minhala 1175 1687 Lahore 50.000 40.000 10.000 10.000 1.667 1.667 100% 41.667 83% Work is in progress Kallan Lahore. Provision of PCC & Drainage in Streets UC-181 Wahga 1176 1688 Lahore 50.000 40.000 10.000 10.000 1.667 1.667 100% 41.667 83% Work is in progress Lahore. Provision of PCC & Drainage in Streets UC-194 Lidhar 1177 1689 Lahore 50.000 40.000 10.000 10.000 1.667 0.04 2% 40.040 80% Scheme completed Lahore. Provision of PCC, Drain, Soling, Nallah & culvert at UC 87 1178 1690 Sheikhupura 20.000 10.000 5.000 5.000 0.834 0.834 100% 10.834 54% Work in Progress Farooqabad , District Sheikhupura Provision of PCC, Drain, Soling, Nallah & culvert at UC 1179 1691 Sheikhupura 20.000 10.000 5.000 5.000 0.834 0.834 100% 10.834 54% Work in Progress Ghung, District Sheikhupura Provision of PCC, Drain, Soling, Nallah & culvert at UC 1180 1692 Sheikhupura 20.000 10.000 5.000 5.000 0.834 0.834 100% 10.834 54% Work in Progress Nokhar Nau, District Sheikhupura Provision of PCC, Drain, Soling, Nallah & culvert at UC 1181 1693 Sheikhupura 20.000 10.000 5.000 5.000 0.834 0.834 100% 10.834 54% Work in Progress Sucha Sauda, District Sheikhupura Provision of PCC, Drain, Soling, Nallah & culvert at UC 1182 1694 Sheikhupura 20.000 10.000 5.000 5.000 0.834 0.834 100% 10.834 54% Work in Progress Hardev, District Sheikhupura Construction of PCC, Soling, Drain & Nallah at Tibbi 1183 1695 Sheikhupura 15.000 2.500 5.000 5.000 0.834 0.834 100% 3.334 22% Work in Progress Humbo, UC 64, District Sheikhupura Construction of soling, PCC, Drain & Nallah UC Mojoki 1184 1696 Sheikhupura 30.000 10.000 5.000 5.000 0.834 0.834 100% 10.834 36% Work in Progress Mallian, District Sheikhupura Construction of soling, PCC, Drain & Nallah UC Jhamkay, 1185 1697 Sheikhupura 30.000 10.000 5.000 5.000 0.834 0.834 100% 10.834 36% Work in Progress District Sheikhupura Construction of soling, PCC, Drain & Nallah UC Kalokay, 1186 1698 Sheikhupura 30.000 10.000 5.000 5.000 0.834 0.834 100% 10.834 36% Work in Progress District Sheikhupura Construction of soling, PCC, Drain & Nallah UC Rakh 1187 1699 Sheikhupura 30.000 10.000 5.000 5.000 0.834 0.834 100% 10.834 36% Work in Progress Hiran Minara District Sheikhupura Construction of soling, PCC, Drain & Nallah UC Ghang 1188 1700 Sheikhupura 30.000 10.000 5.000 5.000 0.834 0.834 100% 10.834 36% Work in Progress District Sheikhupura Construction of soling, PCC, Drain & Nallah UC Warn 1189 1701 Sheikhupura 30.000 10.000 5.000 5.000 0.834 0.834 100% 10.834 36% Work in Progress Dera Bhikhi Ana District Sheikhupura Rural drainage & PCC Scheme UC Jhabran, District 1190 1702 Sheikhupura 30.000 10.000 5.000 5.000 0.834 0.834 100% 10.834 36% Work in Progress Sheikhupura Rural drainage & PCC Scheme UC Ghazi Minara, District 1191 1703 Sheikhupura 30.000 10.000 5.000 5.000 0.834 0.834 100% 10.834 36% Work in Progress Sheikhupura, Rural drainage & PCC Scheme UC Hardev, District 1192 1704 Sheikhupura 30.000 10.000 5.000 5.000 0.834 0.834 100% 10.834 36% Work in Progress Sheikhupura Construction of PCC, Drain / Soling & Nallah at UC Kakar 1193 1705 Sheikhupura 11.000 5.000 6.000 6.000 1.000 1 100% 6.000 55% Work in Progress Gill, District Sheikhupura Construction of PCC, Drain / Soling & Nallah at UC 83 1194 1706 Sheikhupura 14.000 5.000 9.000 9.000 1.500 1.5 100% 6.500 46% Work in Progress Jatri Kohna, District Sheikhupura Construction of PCC, Drain / Soling & Nallah at UC 79 1195 1707 Sheikhupura 12.000 5.000 7.000 7.000 1.167 1 86% 6.000 50% Work in Progress Harchand, District Sheikhupura Construction of PCC, Drain / Soling & Nallah at UC 81 1196 1708 Sheikhupura 16.000 5.000 11.000 11.000 1.834 0.77 42% 5.770 36% Work in Progress Sucha Sauda, District Sheikhupura Construction of PCC, Drain / Soling & Nallah at UC 80 1197 1709 Sheikhupura 14.000 5.000 9.000 9.000 1.500 1 67% 6.000 43% Work in Progress Esherke, District Sheikhupura Construction of PCC, Drain / Soling & Nallah at UC-85, 86 1198 1710 & 87 Farooqabad City & Muridke village UC-70, District Sheikhupura 55.000 20.000 10.000 10.000 1.667 1.667 100% 21.667 39% Work in Progress Sheikhupura Construction of PCC, Drain, Soling & Nallah Kala Khatai 1199 1711 Sheikhupura 20.000 10.000 10.000 10.000 1.667 0.51 31% 10.510 53% Work in Progress UC-9, District Sheikhupura Construction of PCC, Drain, Soling & Nallah Khatiala 1200 1712 Sheikhupura 30.000 10.000 10.000 10.000 1.667 0.53 32% 10.530 35% Work in Progress Virkan UC-18, District Sheikhupura Construction of PCC, Drain, Soling & Nallah Sheikhupura 1201 1713 Sheikhupura 20.000 10.000 10.000 10.000 1.667 0.63 38% 10.630 53% Work in Progress Bedad UC-15, District Sheikhupura Construction of PCC, Drain, Soling & Nallah Nangal 1202 1714 Sheikhupura 20.000 10.000 10.000 10.000 1.667 0.65 39% 10.650 53% Work in Progress Kaswala UC-14, District Sheikhupura Construction of PCC, Drain, Soling & Nallah Dharor 1203 1715 Sheikhupura 20.000 10.000 10.000 10.000 1.667 0.5 30% 10.500 53% Work in Progress Muslim UC-13, District Sheikhupura Construction of PCC, Drain, Soling & Nallah Ahdian UC-7, 1204 1716 Sheikhupura 20.000 10.000 10.000 10.000 1.667 0.5 30% 10.500 53% Work in Progress District Sheikhupura Construction of PCC, Drain, Soling & Nallah Lambray UC- 1205 1717 Sheikhupura 12.000 5.000 7.000 7.000 1.167 0.55 47% 5.550 46% Work in Progress 10, District Sheikhupura Construction of PCC, Drain, Soling & Nallah Nangal 1206 1718 Sheikhupura 20.000 5.000 5.000 5.000 0.834 0.45 54% 5.450 27% Work in Progress Sahdan UC-11, District Sheikhupura Rural Drainage and Construction of Streets Scheme at UC 1207 1719 Sheikhupura 30.000 10.000 10.000 10.000 1.667 0.6 36% 10.600 35% Work in Progress Barth District Sheikhupura. Rural Drainage and Construction of Streets Scheme at UC 1208 1720 Sheikhupura 30.000 19.000 11.000 11.000 1.834 1 55% 20.000 67% Work in Progress Chak No.22 District Sheikhupura. Rural Drainage and Construction of Streets Scheme at UC 1209 1721 Sheikhupura 35.000 19.000 5.000 5.000 0.834 0.834 100% 19.834 57% Work in Progress Faizpur Khurd District Sheikhupura. Rural Drainage and Construction of Streets Scheme at UC 1210 1722 Sheikhupura 20.000 10.000 10.000 10.000 1.667 1 60% 11.000 55% Work in Progress Luban Wala District Sheikhupura. Rural Drainage and Construction of Streets Scheme at UC 1211 1723 Sheikhupura 30.000 19.000 11.000 11.000 1.834 1 55% 20.000 67% Work in Progress Faizpur Kalan District Sheikhupura. Rural Drainage and Construction of Streets Scheme at UC 1212 1724 Sheikhupura 25.000 10.000 5.000 5.000 0.834 0.834 100% 10.834 43% Work in Progress Buraj Attari District Sheikhupura. Rural Drainage and Construction of Streets Scheme at UC 1213 1725 Sheikhupura 20.000 10.000 10.000 10.000 1.667 1.667 100% 11.667 58% Work in Progress Moran Wala District Sheikhupura. Rural Drainage and Construction of Streets Scheme at UC 1214 1726 Sheikhupura 20.000 10.000 10.000 10.000 1.667 0 0% 10.000 50% Work in Progress Rana Bhati District Sheikhupura. Rural Drainage and Construction of Streets Scheme at UC 1215 1727 Kashmir Town/Rana Town/ Galkxy Block/ Kot Hadayat/ Sheikhupura 50.000 17.500 10.000 10.000 1.667 1 60% 18.500 37% Work in Progress Haider Road District Sheikhupura. Rural Drainage and PCC at villages Samolana, Mada Treda, Pherianwala, Khanni, Jalalpur, Nizampura, 1216 1728 Sheikhupura 30.000 15.000 5.000 5.000 0.834 0.834 100% 15.834 53% Work in Progress Kukripur, Sikhanwala, Jogiwala and adjoinging abdies, District Sheikhupura Construction of PCC, Drains and Nallah at UC-37 Chak 1217 1729 Sheikhupura 15.000 5.000 10.000 10.000 1.667 0.55 33% 5.550 37% Work in Progress 575 GB District Sheikhupura Construction of Rural Draiange PCC & Tuff tiles scheme 1218 1730 Sheikhupura 20.000 10.000 10.000 10.000 1.667 1 60% 11.000 55% Work in Progress UC 27, District Sheikhupura Construction of Rural Draiange PCC & Tuff tiles scheme 1219 1731 Sheikhupura 20.000 10.000 10.000 10.000 1.667 1 60% 11.000 55% Work in Progress UC 28, District Sheikhupura Construction of Rural Draiange PCC & Tuff tiles scheme 1220 1732 Sheikhupura 15.000 10.000 5.000 5.000 0.834 0.834 100% 10.834 72% Work in Progress UC 29, District Sheikhupura Construction of Rural Draiange PCC & Tuff tiles scheme 1221 1733 Sheikhupura 15.000 10.000 5.000 5.000 0.834 0.834 100% 10.834 72% Work in Progress UC 30, District Sheikhupura Construction of Rural drainage PCC & Tuff tiles scheme 1222 1734 Sheikhupura 20.000 10.000 10.000 10.000 1.667 1 60% 11.000 55% Work in Progress UC Rana Bhatti, District Sheikhupura Construction of Rural drainage PCC & Tuff tiles scheme 1223 1735 Sheikhupura 20.000 10.000 10.000 10.000 1.667 1.667 100% 11.667 58% Work in Progress UC Mandianwala, District Sheikhupura Construction of Rural drainage PCC & Tuff tiles scheme 1224 1736 Sheikhupura 20.000 10.000 10.000 10.000 1.667 1.667 100% 11.667 58% Work in Progress UC Dhamkay, District Sheikhupura Construction of Rural drainage PCC & Tuff tiles scheme 1225 1737 Sheikhupura 20.000 10.000 10.000 10.000 1.667 1.667 100% 11.667 58% Work in Progress UC Chak No.22, District Sheikhupura Urban Sewerage, Drainage & PCC Scheme MC 1226 1738 Sheikhupura 160.000 20.000 15.000 15.000 2.500 2.5 100% 22.500 14% Work in Progress Ferozewala, Tehsil Ferozewala, District Sheikhupura Construction of PCC, Drain & Nallah Muridke City, District 1227 1739 Sheikhupura 100.000 25.000 10.000 10.000 1.667 1 60% 26.000 26% Work in Progress Sheikhupura Construction of PCC, Drain & Nallah Narang City, District 1228 1740 Sheikhupura 30.000 10.000 10.000 10.000 1.667 1 60% 11.000 37% Work in Progress Sheikhupura Provision of water supply and sewerage / drainage scheme 1229 1741 Sheikhupura 450.000 17.500 50.000 50.000 8.334 8.334 100% 25.834 6% Work in Progress city Sheikhupura Urban Sewerage, Drainage & PCC Scheme MC Kot Adbul 1230 1742 Sheikhupura 140.000 15.000 10.000 10.000 1.667 0.65 39% 15.650 11% Work in Progress Malik, Tehsil Ferozewala, District Sheikhupura Urban Sewerage, Drainage & PCC Scheme UC Momin 1231 1743 Sheikhupura 20.000 5.427 14.573 14.573 2.429 2.429 100% 7.856 39% Work in Progress Pura, Tehsil Ferozewala, District Sheikhupura Urban Sewerage, Drainage & PCC Scheme UC Shamkay, 1232 1744 Sheikhupura 100.000 9.254 10.605 10.605 1.768 1 57% 10.254 10% Work in Progress Tehsil Ferozewala, District Sheikhupura Urban Sewerage, Drainage & PCC Scheme UC Qilla 1233 1745 Sheikhupura 20.000 10.000 10.000 10.000 1.667 0 0% 10.000 50% Work in Progress Sattar Shah, Tehsil Muridkay, District Sheikhupura Provision of PCC and Tuff Tiles in City Sheikhupura PP- 1234 1746 Sheikhupura 180.000 140.000 10.000 10.000 1.667 1.667 100% 141.667 79% Work in Progress 167, District Sheikhupura Construction of PCC, Drains and Nallah at UC-57 1235 1747 Sheikhupura 15.000 5.000 10.000 10.000 1.667 1 60% 6.000 40% Work in Progress Jevanpura, District Sheikhupura Construction of PCC, Drains and Nallah at UC-58 Kadlathi, 1236 1748 Sheikhupura 15.000 5.000 10.000 10.000 1.667 1 60% 6.000 40% Work in Progress District Sheikhupura Construction of PCC, Drains and Nallah at UC-80 1237 1749 Sheikhupura 15.000 5.000 10.000 10.000 1.667 1 60% 6.000 40% Work in Progress Khariyanwala. District Sheikhupura Construction of PCC, Drains and Nallah at UC-81 Bhikhi. 1238 1750 Sheikhupura 15.000 5.000 10.000 10.000 1.667 1 60% 6.000 40% Work in Progress District Sheikhupura Construction of PCC, Drains and Nallah at UC-82 Tibbi 1239 1751 Sheikhupura 15.000 5.000 10.000 10.000 1.667 1 60% 6.000 40% Work in Progress Hambo. District Sheikhupura Construction of PCC, Drains and Nallah at UC-48 Nankana 1240 1752 15.000 5.000 10.000 10.000 1.667 0 0% 5.000 33% Work is in progress. Rehanwala District Nankana Sahib. Sahib Construction of PCC, Drains and Nallah at UC-36 Nankana 1241 1753 15.000 5.000 10.000 10.000 1.667 0 0% 5.000 33% Work is in progress. Mashrala District Nankana Sahib. Sahib Construction of PCC, Drains and Nallah at UC-39 Nankana 1242 1754 15.000 5.000 10.000 10.000 1.667 0 0% 5.000 33% Work is in progress. Meeranpur District Nankana Sahib. Sahib Construction of PCC, Drains and Nallah at UC-50 Nankana 1243 1755 15.000 5.000 10.000 10.000 1.667 0 0% 5.000 33% Work is in progress. Ganaishpur District Nankana Sahib. Sahib Construction of PCC, Drains and Nallah at UC-38 Nankana 1244 1756 15.000 5.000 10.000 10.000 1.667 0 0% 5.000 33% Work is in progress. Warbutton District Nankana Sahib. Sahib Construction of PCC, Drains and Nallah at UC-40 Shareen Nankana 1245 1757 15.000 5.000 10.000 10.000 1.667 0 0% 5.000 33% Work is in progress. Jhangaar District Sheikhupura Sahib Construction of PCC, Drains and Nallah at UC-51 Nankana 1246 1758 15.000 5.000 10.000 10.000 1.667 0 0% 5.000 33% Work is in progress. Khiarraey Kalan District Nankana Sahib. Sahib Construction of PCC, Drains and Nallah at UC-52 Chokian Nankana 1247 1759 15.000 5.000 10.000 10.000 1.667 0 0% 5.000 33% Work is in progress. Wala District Nankana Sahib. Sahib Construction of sewerage, drains, tuff tiles, PCC & LED 1248 1760 Street lights at Wandala Dial Shah & Dhaka Nizam Pura, Sheikhupura 30.000 10.000 10.000 10.000 1.667 1 60% 11.000 37% Work in Progress District Sheikhupura Construction of Drain / Nullah / Culverts / PCC and Soling Nankana 1249 1761 at UC Kari Wala i/c Mashmoola Jat, Tehsil Shah Kot, 15.000 10.000 5.000 5.000 0.834 0 0% 10.000 67% Work is in progress. Sahib District Nankana Sahib Construction of drain / soling / PCC / Nullah and Pulyat at village Nathowala 180/RB, Chak No.181/RB, Kari Wala Nankana 1250 1762 29.700 10.000 10.000 10.000 1.667 0 0% 10.000 34% Work is in progress. and Chak No.182/RB, UC Nathowala, District Nankana Sahib Sahib Construction of drain / soling / PCC / Nullah and Pulyat at village Chak No.184/RB Kot Nizam Din and Chak Nankana 1251 1763 29.300 10.000 10.000 10.000 1.667 0 0% 10.000 34% Work is in progress. No.186/RB Ghandran UC Kot Nizam Din, District Nankana Sahib Sahib Construction of drain / soling / PCC / Nullah and Pulyat at Nankana 1252 1764 vilalge Rato Ana, Kot Ghulam Rasool and village Sheedi 29.500 10.000 10.000 10.000 1.667 0 0% 10.000 34% Work is in progress. Sahib Kot UC Kot Hussain Khan, District Nankana Sahib Construction of PCC / Soling & Nallah at UC Buchoke Pur Nankana 1253 1765 30.000 10.000 10.000 10.000 1.667 0 0% 10.000 33% Work is in progress. Distirct Nankana Sahib Sahib Construction of Drain / Soling / Nallah at UC Saleem Pur Nankana 1254 1766 30.000 10.000 10.000 10.000 1.667 0 0% 10.000 33% Work is in progress. Pakka, District Nankana Sahib Sahib Construction of Drain / Soling / Nallah at UC Mangtanwala, Nankana 1255 1767 30.000 10.000 10.000 10.000 1.667 0 0% 10.000 33% Work is in progress. District Nankana Sahib Sahib Construction of Drain / Soling / Nallah at UC Chachke Gill, Nankana 1256 1768 30.000 10.000 10.000 10.000 1.667 0 0% 10.000 33% Work is in progress. District Nankana Sahib Sahib Construction of Drain / Soling / Nallah at UC Haft Madar, Nankana 1257 1769 30.000 10.000 10.000 10.000 1.667 0 0% 10.000 33% Work is in progress. District Nankana Sahib Sahib Construction of Drain / Soling / Nallah in left over area of Nankana 1258 1770 30.000 10.000 10.000 10.000 1.667 0 0% 10.000 33% Work is in progress. UC Ganaish Pur, District Nankana Sahib Sahib Construction of Drain / Soling / Nallah in left over area of Nankana 1259 1771 40.000 13.000 10.000 10.000 1.667 0 0% 13.000 33% Work is in progress. UC Jawahar Pur, Distirct Nankana Sahib Sahib Construction of Drain / Soling / Nallah in left over area of Nankana 1260 1772 30.000 10.000 10.000 10.000 1.667 0 0% 10.000 33% Work is in progress. UC Jogaykot, Distirct Nankana Sahib Sahib Construction of Drain / Soling / Nullah at UC jalal Nau, Nankana 1261 1773 15.000 10.000 5.000 5.000 0.834 0 0% 10.000 67% Work is in progress. District Nankana Sahib Sahib Construction of Drain / Soling / Nullah at Village Balaqian, Nankana 1262 1774 Dodhay, Chora, Mat Kalayian and Dharian, District 20.000 10.000 10.000 10.000 1.667 0 0% 10.000 50% Work is in progress. Sahib Nanakana Sahib Provision of sewerage, PCC & Nullah at Mouza Khiyaray Nankana 1263 1775 30.000 10.000 10.000 10.000 1.667 0 0% 10.000 33% Work is in progress. Kalan, Tehsil & District Nankana Sahib Sahib Provision of water supply sanitation and drainage facilities Nankana 1264 1776 112.768 23.200 10.000 10.000 1.667 0 0% 23.200 21% Work is in progress. at Chak No.168/RB Machar Wali District Nankana Sahib Sahib Construction of Nullah / Drain and PCC at Bucheki City and at Chak No.22/75, Chak No.18/71, Chak No.16/69, Nankana Scheme completed. Additional funds received 1265 1777 50.000 20.000 10.000 10.000 1.667 0 0% 20.000 40% Chak No.641 Bohty Wala, Lurka Jangly, District Nankana Sahib by P & D. Sahib Construction of PCC / Drain / Nullah at Burala, Maddo Ladoana, Juggian Nolan, Warra Narain Singh, Jahana Nankana 1266 1778 30.000 10.000 10.000 10.000 1.667 0 0% 10.000 33% Work is in progress. Nool, Peeray Wali, Chak Wattowan, Nodhan, Sikhanwali, Sahib Kawanwali, Nizam Pura, Baghoor, District Nankana Sahib

Construction of Soling, Drains & PCC at village Nathowala, Nankana 1267 1779 Nizampura, Nodha, Fareedabad, Kheokay Bhattian, Madu, 50.000 20.000 10.000 10.000 1.667 0 0% 20.000 40% Work is in progress. Sahib Purana Syed wala , District Nankana Sahib Construction of PCC, Soling & Nullah at UC Machrala i/c Nankana 1268 1780 Bhagor, Wakeel Wala, Adampura & Dolatpura, Distirct 30.000 10.000 10.000 10.000 1.667 0 0% 10.000 33% Work is in progress. Sahib Nankana Sahib Construction of PCC, Soling & Nullah at UC Mustafaabad / Nankana 1269 1781 25.000 10.000 10.000 10.000 1.667 0 0% 10.000 40% Work is in progress. Jislani, Distirct Nankana Sahib Sahib Construction of PCC, Soling & Nullah at UC Meeranpur, Nankana 1270 1782 25.000 10.000 10.000 10.000 1.667 0 0% 10.000 40% Work is in progress. Distirct Nankana Sahib Sahib Construction of PCC, Nallah, Drains at Syed Wala, District Nankana Scheme completed. Additional funds received 1271 1783 50.000 20.000 10.000 10.000 1.667 0 0% 20.000 40% Nankana Sahib Sahib by P & D. Rural Drainage PCC Brick pavement Schemes Beroon 1272 1784 Mustafa Abad and Adjoining Abadies, Tehsil & District Kasur 20.000 10.000 10.000 10.000 1.667 1.19 71% 11.190 56% Work in Progress Kasur Rural Drainage PCC Brick pavement Schemes Weghal 1273 1785 Kasur 15.000 5.000 10.000 10.000 1.667 1.65 99% 6.650 44% Work in Progress and Adjoining Abadies, Tehsil & District Kasur Rural Drainage PCC Brick pavement Schemes Badar Pur, 1274 1786 Kasur 15.000 5.000 10.000 10.000 1.667 0.76 46% 5.760 38% Work in Progress Ray, Badian and Adjoining Abadies, Tehsil & District Kasur Rural Drainage PCC Brick pavement Schemes Matta and 1275 1787 Kasur 20.000 10.000 10.000 10.000 1.667 0.82 49% 10.820 54% Work in Progress Adjoining Abadies, Tehsil & District Kasur Rural Drainage PCC Brick pavement Schemes Khara and 1276 1788 Kasur 15.000 5.000 10.000 10.000 1.667 0.78 47% 5.780 39% Work in Progress Adjoining Abadies, Tehsil & District Kasur Const. of Soling Drains, PCC, Culverts U.C Handal, Tehsil 1277 1789 Kasur 30.000 10.000 5.000 5.000 3.204 1.699 53% 11.699 39% Work in Progress KRK, District Kasur 1278 1790 Rural drainage scheme U.C Bhedian, District Kasur Kasur 30.000 10.000 5.000 5.000 0.834 0.389 47% 10.389 35% Work in Progress 1279 1791 Rural drainage scheme U.C Sheikhum, District Kasur Kasur 25.000 10.000 15.000 15.000 2.500 1.49 60% 11.490 46% Work in Progress 1280 1792 Rural drainage scheme U.C Fathe Pur, District Kasur Kasur 30.000 10.000 5.900 5.900 0.984 0.95 97% 10.950 37% Work in Progress Rural drainage scheme U.C Hussain Khan Wala, District 1281 1793 Kasur 30.000 10.000 20.000 20.000 3.334 3.27 98% 13.270 44% Work in Progress Kasur Construction of Sewerage / Drainage / PCC Scheme Kot 1282 1794 Kasur 199.860 35.000 10.000 10.000 5.568 5.49 99% 40.490 20% Work in Progress Radha Kishan City, District Kasur Construction of Soling, Nallah, PCC & Drain at Satoki, 1283 1795 Kasur 15.000 5.000 10.000 10.000 1.667 0.53 32% 5.530 37% Work in Progress District Kasur. Construction of Soling, Nallah, PCC & Drain at UC 1284 1796 Kasur 15.000 5.000 10.000 10.000 1.667 0.545 33% 5.545 37% Work in Progress Cheena Arla and , District Kasur Construction of Soling, Nallah, PCC & Drain at UC 1285 1797 Kasur 15.000 5.000 10.000 10.000 1.667 1.12 67% 6.120 41% Work in Progress Pemar, District Kasur Construction of soling / drains / PCC roads in Chak No.38, 1286 1798 Kasur 3.000 2.500 0.500 0.500 0.084 0.084 100% 2.584 86% Work in Progress District Kasur Construction of soling / drains / PCC roads in village 1287 1799 Kasur 3.000 2.500 0.500 0.500 0.084 0.084 100% 2.584 86% Work in Progress Chugian & Marathiwala, District Kasur Construction of soling / drains / PCC roads in village 1288 1800 Kasur 3.000 2.500 0.500 0.500 0.084 0.025 30% 2.525 84% Work in Progress Chaku , District Kasur Construction of Urban Sewerage, Drainage, PCC Scheme 1289 1801 Kasur 360.000 35.000 30.271 30.271 5.045 4.945 98% 39.945 11% Work in Progress Khudian Phase-II, District Kasur Construction of Urban Sewerage, Drainage, PCC Scheme, 1290 1802 Kasur 150.026 30.000 15.000 15.000 2.500 0.63 25% 30.630 20% Work in Progress , District Kasur 1291 1803 Urban Water supply scheme, Kasur City, District Kasur Kasur 70.526 20.000 15.000 15.000 2.500 1.521 61% 21.521 31% Work in Progress Construction of drain, PCC, Tuff Tile, Culverts, Sullage Carrier and Brick Pavement Sheikham, Kacha Pakka, 1292 1804 Kasur 144.500 28.000 15.000 15.000 2.500 2.201 88% 30.201 21% Work in Progress Padhana, Bath Kalan and , Tehsil Pattoki, District Kasur Construction of drain, PCC, Tuff Tile, Culverts, Sullage Carrier and Brick Pavement Balloki, Sandhu Kalan, Sarai 1293 1805 Kasur 149.000 28.000 15.000 15.000 2.500 2.499 100% 30.499 20% Work in Progress Mughal, Beharwal and Bhonikey, Tehsil Pattoki, District Kasur Construction of Drain, Brick Pavement & PCC in 1294 1806 Ghummankey and adjoining abadies, Tehsil Pattoki, Kasur 69.298 20.000 10.000 10.000 1.667 1.666 100% 21.666 31% Work in Progress District Kasur Construction of Drain, Brick Pavement & PCC in Bonga 1295 1807 Balochan and adjoining abadies, Tehsil Pattoki, District Kasur 66.879 20.000 10.000 10.000 1.667 1.1 66% 21.100 32% Work in Progress Kasur Construction of Drainage, Brick Pavement, PCC and 1296 1808 Sullage Carrier Scheme in Blair, Masradass i/c adjoining Kasur 50.000 18.000 10.000 10.000 1.667 1.12 67% 19.120 38% Work in Progress abadies, Tehsil Pattoki, District Kasur Rehabilitation & Re-construction of sullage carrier at Waan 1297 1809 Kasur 10.451 7.000 3.451 3.451 0.575 0.505 88% 7.505 72% Work in Progress Adhan, District Kasur Date of A.A 26.07.2017, Date of T.S 31.07.2017, Date of Prequalification 13-09- 2017, Date of invitation of tenders Rural Water Supply & Drainage Scheme, Sahbay Wala, 10.10.2017, Date of Receipt of tenders 1298 1810 Okara 20.840 10.000 10.840 10.840 1.807 1.807 100% 11.807 57% 11.10.2017, Date of work order 16-11-2017, Depal Pur Date of completion as per PC-I 30.06.2018, Anticipated date of completion 30.06.2017, No. of Beneficiary - 9822 Person, Work is in progress. Date of A.A 26.07.2017, Date of T.S 31.07.2017, Date of Prequalification 13-09- 2017, Date of invitation of tenders 10.10.2017, Date of Receipt of tenders Rural Water Supply & Drainage Scheme, Bhakho Shah, 11.10.2017, Date of work order 16-11-2017, 1299 1811 Okara 20.510 8.000 12.510 12.510 2.085 0 0% 8.000 39% Depal Pur Date of completion as per PC-I 30.06.2018, Anticipated date of completion 30.06.2018, Re- Appropriation funds (-) 2.000 dt: 16.03.2018, No. of Beneficiary - 6316 Person, Work is in progress. Date of A.A 26.07.2017, Date of T.S 31.07.2017, Date of Prequalification 13-09- 2017, Date of invitation of tenders 10.10.2017, Date of Receipt of tenders Rural Water Supply & Drainage Scheme, Dhool Choor, 11.10.2017, Date of work order 16-11-2017, 1300 1812 Okara 20.325 8.000 12.325 12.325 2.054 0 0% 8.000 39% Depal Pur Date of completion as per PC-I 30.06.2018, Anticipated date of completion 30.06.2018, Re- Appropriation funds (-) 2.000 dt: 16.03.2018, No. of Beneficiary - 9804 Person, Work is in progress. Date of A.A 26.07.2017, Date of T.S 31.07.2017, Date of Prequalification 13-09- 2017, Date of invitation of tenders Rural Water Supply & Drainage Scheme, Aman Wala, 10.10.2017, Date of Receipt of tenders 1301 1813 Okara 19.930 10.000 9.930 9.930 1.655 1.655 100% 11.655 58% 11.10.2017, Date of work order 16-11-2017, Depal Pur Date of completion as per PC-I 30.06.2018, Anticipated date of completion 30.06.2018, No. of Beneficiary - 4246 Person, Work is in progress. Date of A.A 26.07.2017, Date of T.S 31.07.2017, Date of Prequalification 13-09- 2017, Date of invitation of tenders 10.10.2017, Date of Receipt of tenders Rural Water Supply & Drainage Scheme, Dhol Gehla, 11.10.2017, Date of work order 16-11-2017, 1302 1814 Okara 17.400 8.000 9.400 9.400 1.567 0 0% 8.000 46% Depal Pur Date of completion as per PC-I 30.06.2018, Anticipated date of completion 30.06.2018, Re- Appropriation funds (-) 2.000 dt: 16.03.2018, No. of Beneficiary 3302 Person Work is in progress. Date of A.A 26.07.2017, Date of T.S 31.07.2017, Date of Prequalification 13-09- 2017, Date of invitation of tenders Rural Water Supply & Drainage Scheme, Mehro Kalan, 10.10.2017, Date of Receipt of tenders 1303 1815 Okara 17.190 7.500 9.690 9.690 1.615 0 0% 7.500 44% 11.10.2017, Date of work order 16-11-2017, Depal Pur Date of completion as per PC-I 30.06.2018, Anticipated date of completion 30.06.2018, Re- Appropriation funds No. of Beneficiary 6277 Person Work is in progress. Date of A.A 26.07.2017, Date of T.S 31.07.2017, Date of Prequalification 13-09- 2017, Date of invitation of tenders Rural Water Supply & Drainage Scheme, Somian Bholon, 10.10.2017, Date of Receipt of tenders 1304 1816 Okara 17.660 10.000 7.660 7.660 1.277 0 0% 10.000 57% 11.10.2017, Date of work order 16-11-2017, Depal Pur Date of completion as per PC-I 30.06.2018, Anticipated date of completion 30.06.2018, No. of Beneficiary 3678 Person Work is in progress. Date of A.A 26.07.2017, Date of T.S 31.07.2017, Date of Prequalification 13-09- 2017, Date of invitation of tenders 10.10.2017, Date of Receipt of tenders 1305 1817 Rural Water Supply & Drainage Scheme, Roori, Depal Pur Okara 15.520 10.000 5.520 5.520 0.920 0 0% 10.000 64% 11.10.2017, Date of work order 16-11-2017, Date of completion as per PC-I 30.06.2018, Anticipated date of completion 30.06.2018, No. of Beneficiary 3005 Person Work is in progress. Date of A.A 26.07.2017, Date of T.S 31.07.2017, Date of Prequalification 13-09- 2017, Date of invitation of tenders 10.10.2017, Date of Receipt of tenders Rural Water Supply & Drainage Scheme, Mali Singh, 11.10.2017, Date of work order 16-11-2017, 1306 1818 Okara 17.900 8.000 9.900 9.900 1.650 1.65 100% 9.650 54% Depal Pur Date of completion as per PC-I 30.06.2018, Anticipated date of completion 30.06.2018, Re- Appropriation funds (-) 2.000 dt: 16.03.2018, No. of Beneficiary 3813 Person Work is in progress. Date of A.A 26.07.2017, Date of T.S 31.07.2017, Date of Prequalification 13-09- 2017, Date of invitation of tenders Rural Water Supply & Drainage Scheme, Khan Bahadar, 10.10.2017, Date of Receipt of tenders 1307 1819 Okara 25.790 10.000 15.790 15.790 2.632 0 0% 10.000 39% 11.10.2017, Date of work order 16-11-2017, Depal Pur Date of completion as per PC-I 30.06.2018, Anticipated date of completion 30.06.2018, No. of Beneficiary 5319 Person Work is in progress. Date of A.A 26.07.2017, Date of T.S 31.07.2017, Date of Prequalification 13-09- 2017, Date of invitation of tenders 07-12-2017 Rural Water Supply & Drainage Scheme, Kalia Ibrahim, Date of Receipt of tenders 08-12-2017 Date 1308 1820 Okara 22.970 5.000 17.970 17.970 2.995 2.8 93% 7.800 34% of work order Date of completion as per PC-I Depal Pur 30.06.2018, Anticipated date of completion 30.06.2018, Re- Appropriation funds (-) 5.000 dt: 16.03.2018, No. of Beneficiary 2866 Person Work is in progress. Date of A.A 26.07.2017, Date of T.S 31.07.2017, Date of Prequalification 13-09- 2017, Date of invitation of tenders Rural Water Supply & Drainage Scheme, Shamaskay, 10.10.2017, Date of Receipt of tenders 1309 1821 Okara 19.710 10.000 9.710 9.710 1.619 0 0% 10.000 51% 11.10.2017, Date of work order 16-11-2017, Depal Pur Date of completion as per PC-I 30.06.2018, A nticipated date of completion 30.06.2018, No. of Beneficiary 2619 Person Work is in progress. Date of A.A 26.07.2017, Date of T.S 31.07.2017, Date of Prequalification 13-09- 2017, Date of invitation of tenders Rural Water Supply & Drainage Scheme, Subhan Shah, 10.10.2017, Date of Receipt of tenders 1310 1822 Okara 22.450 10.000 12.450 12.450 2.075 2.075 100% 12.075 54% 11.10.2017, Date of work order 16-11-2017, Depal Pur Date of completion as per PC-I 30.06.2018, Anticipated date of completion 30.06.2018, No. of Beneficiary 5870 Person Work is in progress. Date of A.A 26.07.2017, Date of T.S 31.07.2017, Date of Prequalification 13-09- 2017, Date of invitation of tenders Rural Water Supply & Drainage Scheme, Bothana, Depal 10.10.2017, Date of Receipt of tenders 1311 1823 Okara 21.110 10.000 11.110 11.110 1.852 0 0% 10.000 47% 11.10.2017, Date of work order 16-11-2017, Pur Date of completion as per PC-I 30.06.2018, Anticipated date of completion 30.06.2018, No. of Beneficiary 5652 Person Work is in progress. Date of A.A 26.07.2017, Date of T.S 02.08.2017, Date of Prequalification 13-09- 2017, Date of invitation of tenders 10.10.2017, Date of Receipt of tenders Rural Water Supply & Drainage Scheme, Sahniwal, Depal 11.10.2017, Date of work order 16-11-2017, 1312 1824 Okara 21.510 11.000 10.510 10.510 1.752 0 0% 11.000 51% Pur Date of completion as per PC-I 30.06.2018, Anticipated date of completion 30.06.2018,Re- appropriation of funds (+) 1.000 dt: 16.03.2018, No. of Beneficiary 4724 Person Work is in progress. Date of A.A 26.07.2017, Date of T.S 01.08.2017, Date of Prequalification 13-09- 2017, Date of invitation of tenders Rural Water Supply & Drainage Scheme, Chak no. 7/D 10.10.2017, Date of Receipt of tenders 1313 1825 Okara 17.270 10.000 7.270 7.270 1.212 0 0% 10.000 58% 11.10.2017, Date of work order 16-11-2017, Rakh Dharma, Depal Pur Date of completion as per PC-I 30.06.2018, Anticipated date of completion 30.06.2018, No. of Beneficiary - 3781 Person, Work is in progress. Date of A.A 26.07.2017, Date of T.S 02.08.2017, Date of Prequalification 13-09- 2017, Date of invitation of tenders 07-12-2017 Rural Water Supply & Drainage Scheme, Kandowal Sarai, Date of Receipt of tenders 08-12-2017 Date 1314 1826 Okara 18.500 10.000 8.500 8.500 1.417 0 0% 10.000 54% Depal Pur of work order Date of completion as per PC-I 30.06.2018, Anticipated date of completion 30.06.2018, No. of Beneficiary - 6281 Person, Work is in progress. Date of A.A 26.07.2017, Date of T.S 31.07.2017, Date of Prequalification 13-09- 2017, Date of invitation of tenders Rural Water Supply & Drainage Scheme, Chak no. 19/D, 10.10.2017, Date of Receipt of tenders 1315 1827 Okara 18.330 10.000 8.330 8.330 1.389 0 0% 10.000 55% 11.10.2017, Date of work order 16-11-2017, Depal Pur Date of completion as per PC-I 30.06.2018, Anticipated date of completion 30.06.2018, No. of Beneficiary - 4604 Person, Work is in progress. Date of A.A 26.07.2017, Date of T.S 01.08.2017, Date of Prequalification 13-09- 2017, Date of invitation of tenders Rural Water Supply & Drainage Scheme, Sarai Amar 10.10.2017, Date of Receipt of tenders 1316 1828 Okara 21.320 10.000 11.320 11.320 1.887 0 0% 10.000 47% 11.10.2017, Date of work order 16-11-2017, Singh, Depal Pur Date of completion as per PC-I 30.06.2018, Anticipated date of completion 30.06.2018, No. of Beneficiary - 6642 Person, Work is in progress. Date of A.A 26.07.2017, Date of T.S 02.08.2017, Date of Prequalification 13-09- 2017, Date of invitation of tenders Rural Water Supply & Drainage Scheme, Chak Kamboh, 10.10.2017, Date of Receipt of tenders 1317 1829 Okara 21.650 10.000 11.650 11.650 1.942 0 0% 10.000 46% 11.10.2017, Date of work order 16-11-2017, Depal Pur Date of completion as per PC-I 30.06.2018,, Anticipated date of completion 30.06.2018, No. of Beneficiary - 5441 Person, Work is in progress. Date of A.A 26.07.2017, Date of T.S 31.07.2017, Date of Prequalification 13-09- 2017, Date of invitation of tenders Rural Water Supply & Drainage Scheme, Doola Mustakim 10.10.2017, Date of Receipt of tenders 1318 1830 Okara 19.930 10.000 9.930 9.930 1.655 0 0% 10.000 50% 11.10.2017, Date of work order 16-11-2017, , Depal Pur Date of completion as per PC-I 30.06.2018, Anticipated date of completion 30.06.2018, No. of Beneficiary - 3942 Person, Work is in progress. Date of A.A 26.07.2017, Date of T.S 01.08.2017, Date of Prequalification 13-09- 2017, Date of invitation of tenders 07-12-2017 Rural Water Supply & Drainage Scheme, Bonga Saleh, Date of Receipt of tenders 08-12-2017 Date 1319 1831 Okara 21.580 10.000 11.580 11.580 1.930 1.1 57% 11.100 51% Depal Pur of work order Date of completion as per PC-I 30.06.2018, Anticipated date of completion 30.06.2018, No. of Beneficiary - 7909 Person, Work is in progress.

Date of A.A Date of T.S Date of Drainage Scheme Jandran Khurd, Somiya Bholoun, Prequalification Date of invitation of tenders Qasim Pura, Ragjarh, Salho Nooryaka, Bhele Noorayka, Date of Receipt of tenders Date of work order 1320 1832 Okara 20.820 10.000 10.820 10.820 1.804 0 0% 10.000 48% Rakkar, Batian, Shori Sial and Kawni Syedan District Date of completion as per PC-I Anticipated Okara date of completion No. of Beneficiary 11302 PersonTender Will be received 06.01.2018 Date of A.A 11.08.2017, Date of T.S 15.08.2017, Date of Prequalification 13-09- 2017, Date of invitation of tenders 08.10.2017, Date of Receipt of tenders Construction of Drain, Brick Pavement, Sullage Carrier, 09.10.2017, Date of work order 18-11-2017, 1321 1833 Okara 64.454 9.800 10.000 10.000 1.667 0 0% 9.800 15% Tuff Tile, PCC in District Okara Chak no. 38-GD Date of completion as per PC-I 30.06.2019, Anticipated date of completion 30.06.2019, Re- Appropriation funds (-) 13.200 dt: 16.03.2018, No. of Beneficiary -14313 Person, Work is in progress. Date of A.A 26.07.2017, Date of T.S 31-07- 2017, Date of Prequalification 13-09-2017, Date of invitation of tenders 27.10.2017, Date Construction of Drain, Brick Pavement, Sullage Carrier, of Receipt of tenders 28.10.2017, Date of 1322 1834 Okara 25.000 10.000 10.000 10.000 1.667 0 0% 10.000 40% Tuff Tile, PCC in District Okara Chak no. 4/GD work order , Date of completion as per PC-I 30.06.2018, Anticipated date of completion 30.06.2018, No. of Beneficiary - 10018 Person, Date of A.A 26.07.2017, Date of T.S 31-07- 2017, Date of Prequalification , Date of Soling / Sewerage and Drainage of Chak No. 53/2L, 54/2L, invitation of tenders 27.10.2017, Date of 1323 1835 Okara 20.000 10.000 10.000 10.000 1.667 0 0% 10.000 50% Receipt of tenders 28.10.2017, Date of work 55/2L, District Okara order , Date of completion as per PC-I , Anticipated date of completion , No. of Beneficiary - 51657 Person, Date of A.A 08.08.2017, Date of T.S , Date of Prequalification , Date of invitation of tenders Provision of Soling and Drainage Scheme at U.C. 27.10.2017, Date of Receipt of tenders 1324 1836 Okara 14.000 7.000 7.000 7.000 1.167 0 0% 7.000 50% 28.10.2017, Date of work order , Date of No.42/3R, District Okara completion as per PC-I , Anticipated date of completion , No. of Beneficiary - 49251 Person, Work is in progress. Date of A.A 26.07.2017, Date of T.S , Date of Prequalification , Date of invitation of tenders Provision of Soling and Drainage Scheme at U.C. 27.10.2017, Date of Receipt of tenders 1325 1837 Okara 20.000 10.000 10.000 10.000 1.667 0 0% 10.000 50% 28.10.2017, Date of work order , Date of No.35/2RA, District Okara completion as per PC-I , Anticipated date of completion , No. of Beneficiary - 33832 Person, Date of A.A 26.07.2017, Date of T.S 01.08.2017, Date of Prequalification , Date of invitation of tenders 27.10.2017, Date of Provision of Tuff Tiles Soling, PCC, and Drainage Receipt of tenders 28.10.2017, Date of work 1326 1838 Okara 48.940 17.500 10.000 10.000 1.667 0 0% 17.500 36% Schemes at Haveli Lakha and Adjoining Abadies order , Date of completion as per PC-I , Anticipated date of completion , No. of Beneficiary 42300 Person, Work is in progress. Date of A.A 11.08.2017, Date of T.S 15.08.2017, Date of Prequalification 13-09- Installation of LED Street Light 120/W, 50/W including 2017 Date of invitation of tenders 03.11.2017, Pools, Construction of Sullage Carrier / sewerage & Date of Receipt of tenders 03.11.2017, Date 1327 1839 Okara 74.312 39.000 10.000 10.000 1.667 1.667 100% 40.667 55% of work order , Date of completion as per PC-I Construction of Tuff Paver different places at Okara City , Anticipated date of completion ,Re- approx. District Okara appropriation of funds (+) 14.000 dt: 16.03.2018, No. of Beneficiary 215982 Person Work is in progress. Date of A.A 26.07.2017, Date of T.S 02.08.2017, Date of Prequalification 13-09- Construction of Tuff Tiles / Sewerage and Drainage of 2017 Date of invitation of tenders 27.10.2017, 1328 1840 Okara 40.000 15.000 10.000 10.000 1.667 1.667 100% 16.667 42% Date of Receipt of tenders 28.10.2017, Date Ward no. 1 to 50, District Okara of work order , Date of completion as per PC-I , Anticipated date of completion , No. of Beneficiary -640401 Person,

Date of A.A 26.07.2017, Date of T.S 01.08.2017, Date of Prequalification 13-09- 2017 Date of invitation of tenders 27.10.2017, City Package Renala Khurd Tuff Tile and Sewerage Date of Receipt of tenders 28.10.2017, Date 1329 1841 Okara 35.000 12.000 10.000 10.000 1.667 1.667 100% 13.667 39% Androon City Gilyat Renala Khurd In District Okara of work order , Date of completion as per PC-I , Anticipated date of completion ,Re- Appropriation funds (+)3.585 dt: 06.04.2018 No. of Beneficiary - 64595 Person,

Date of A.A 26.07.2017, Date of T.S 31.07.2017, Date of Prequalification 13-09- Sewerage Scheme at Mohallah Shakoor Abad, Mohallah 2017 Date of invitation of tenders 27.10.2017, 1330 1842 1.667 100% 24.167 48% Date of Receipt of tenders 28.10.2017, Date Eid Gah, Mohallah Masjid Basharat, Akhter Town, Haveli Okara 49.934 22.500 10.000 10.000 1.667 of work order , Date of completion as per PC-I Lakha, City. , Anticipated date of completion ,Re- appropriation of funds (+) 5.000 dt: 16.03.2018, No. of Beneficiary - Person,

Date of A.A 28-09-2017 Date of T.S 16-11- 2017 Date of Prequalification , Date of invitation of tenders 13-12-2017 Date of 1331 1843 4.167 100% 78.167 26% Receipt of tenders, Date of work order , Date Water supply Schemes for NA-145 Okara 300.000 74.000 25.000 25.000 4.167 of completion as per PC-I , Anticipated date of completion ,Re-appropriation of funds (+) 14.000 dt: 16.03.2018, No. of Beneficiary 900043 Person, Date of A.A 26.07.2017, Date of T.S 31.07.2017, Date of Prequalification 13-09- 2017 Date of invitation of tenders 27.10.2017, Construction of Drain, Brick Pavement, Sullage Carrier, Date of Receipt of tenders 28.10.2017, Date 1332 1844 Okara 23.299 11.500 10.000 10.000 1.667 0 0% 11.500 49% of work order , Date of completion as per PC-I Tuff Tile, PCC in District Okara:in Mouza Jaboka , Anticipated date of completion ,Re- appropriation of funds (+) 1.500 dt: 16.03.2018, No. of Beneficiary - 14607 Person, Date of A.A 26.07.2017, Date of T.S 02.08.2017, Date of Prequalification 13-09- 2017 Date of invitation of tenders 27.10.2017, Construction of Drain, Brick Pavement, Sullage Carrier, Date of Receipt of tenders 28.10.2017, Date 1333 1845 Okara 49.895 12.000 10.000 10.000 1.667 1.667 100% 13.667 27% Tuff Tile, PCC in District Okara Mouza Lasharian of work order , Date of completion as per PC-I , Anticipated date of completion , Re- Appropriation funds (-) 2.500 dt: 16.03.2018, No. of Beneficiary - 17695 Person,

Date of A.A 26.07.2017, Date of T.S 02.08.2017, Date of Prequalification 13-09- 2017 Date of invitation of tenders 27.10.2017, Construction of Drain, Brick Pavement, Sullage Carrier, Date of Receipt of tenders 28.10.2017, Date 1334 1846 Okara 26.331 5.000 10.000 10.000 1.667 0 0% 5.000 19% Tuff Tile, PCC in District Okara Mouza Kohla of work order , Date of completion as per PC-I , Anticipated date of completion , Re- Appropriation funds (-) 5.000 dt: 16.03.2018, No. of Beneficiary - 21476 Person,

Date of A.A 15.08.2017, Date of T.S 21.08.2017, Date of Prequalification 13-09- 2017 Date of invitation of tenders 27.10.2017, Construction of Drain, Brick Pavement, Sullage Carrier, Date of Receipt of tenders 28.10.2017, Date 1335 1847 Okara 49.960 5.000 5.000 5.000 0.834 0.834 100% 5.834 12% Tuff Tile, PCC in District Okara. Mouza Jandraka of work order , Date of completion as per PC-I , Anticipated date of completion , Re- Appropriation funds (-) 13.000 dt: 16.03.2018, No. of Beneficiary - 26866 Person, Date of A.A 26.07.2017, Date of T.S 31.07.2017, Date of Prequalification 13-09- 2017 Date of invitation of tenders 27.10.2017, Construction of Drain, Brick Pavement, Sullage Carrier, Date of Receipt of tenders 28.10.2017, Date 1336 1848 Okara 18.346 14.500 3.846 3.846 0.641 0.641 100% 15.141 83% of work order , Date of completion as per PC-I Tuff Tile, PCC in District Okara Mouza Bama Bala , Anticipated date of completion ,Re- appropriation of funds (+) 4.000 dt: 16.03.2018, No. of Beneficiary - 12896 Person, Work is in progress. Date of A.A 08.08.2017, Date of T.S 12.08.2017, Date of Prequalification 13-09- 2017 Date of invitation of tenders 27.10.2017, Construction of Drain, Brick Pavement, Sullage Carrier, Date of Receipt of tenders 28.10.2017, Date 1337 1849 Okara 27.702 15.000 12.702 12.702 2.117 0 0% 15.000 54% of work order , Date of completion as per PC-I Tuff Tile, PCC in District Okara Mouza Maroula Sharif , Anticipated date of completion ,Re- appropriation of funds (+) 5.000 dt: 16.03.2018, No. of Beneficiary - 09561 Person, Date of A.A 12-09-2017 Date of T.S 16-09- 2017 Date of Prequalification 13-09-2017 Date of invitation of tenders 27.10.2017, Date Provision of Drainage, Sewerage and Tuff Till Scheme at of Receipt of tenders 28.10.2017, Date of 1338 1850 Okara 20.000 5.500 14.500 14.500 2.417 0 0% 5.500 28% work order 20-11-2017 Date of completion as Civil Area Okara Cantt, District Okara per PC-I , Anticipated date of completion , Re- Appropriation funds (-) 6.500 dt: 16.03.2018, No. of Beneficiary 98441 Person, Work is in progress. Date of A.A 26.07.2017, Date of T.S 31.07.2017, Date of Prequalification , Date of invitation of tenders 23-12-2017, Date of Providing of Sewerage/ Tuff Tile/ Drainage System at Receipt of tenders 24-12-2017, Date of work 1339 1851 Okara 26.398 10.000 10.000 10.000 1.667 0 0% 10.000 38% order Date of completion as per PC-I , Qadarabad Tehsil Depalpurand District Okara Anticipated date of completion , No. of Beneficiary 4320 Person, Tender received on 24-12-2017Funds Released on Ork Order Issued on Water Supply / Sewerage / Filtration Plants in 13 UCs of Date of AA 06.12.2017 , Date of receipt of 1340 1852 Sahiwal 150.000 35.000 50.000 50.000 8.334 2.917 35% 37.917 25% tender 28.03.2018 ,Work order 18.04.2018 PP-221, Sahiwal ,Work in progress. Date of AA 19.08.2017, Date of Pre- 1341 1853 Water Supply Scheme for Chak No. 78/5L Sahiwal Sahiwal 30.000 10.000 20.000 20.000 3.334 1.667 50% 11.667 39% qualification , Date of Work Order 23.12.2017 , Work in progress. Construction of Drain / Soling Sewerage Nala Chak no. Date of AA 01.08.2017 , Date of receipt of 1342 1854 Sahiwal 15.000 5.000 10.000 10.000 1.667 0.75 45% 5.750 38% tender 20.11.2017 , Date of Work Order 50/12L, 105/12L, 106/12/L, District Sahiwal 02.12.2017 , Work in progress. Construction of Drain / Soling Sewerage Nala Chak Date of AA 01.08.2017 , Date of receipt of 1343 1855 Sahiwal 15.000 5.000 10.000 10.000 1.667 0.75 45% 5.750 38% tender 09.11.2017 , Date of Work Order no.38/14L,39/14L/40/14L, 41/14L , District Sahiwal 24.11.2017 , Work in progress. Construction of Drain / Soling Sewerage Nala Chak no. Date of AA 01.08.2017 , Date of receipt of 1344 1856 Sahiwal 15.000 5.000 10.000 10.000 1.667 0.834 50% 5.834 39% tenders 09.11.2017 , Date of Work Order 40/12L, 109/12L, Ghulshan Colony, District Sahiwal 24.11.2017 , Work in progress. Construction of Drain / Soling Sewerage Nala Chak no. Date of AA 01.08.2017 , Date of receipt of 1345 1857 Sahiwal 15.000 7.500 7.500 7.500 1.250 0.59 47% 8.090 54% tender 20.11.2017 , Date of Work Order 118/12L, 117/12L, Ada Kassowal, District Sahiwal 02.12.2017 , Work in progress. Contruction of Drain / Soling Sewerage Nala Chak no. Date of AA 01.08.2017 , Date of receipt of 1346 1858 119/7DR, 120/7ER, 121/7ER, 122/7ER, 117/7DR, District Sahiwal 15.000 7.500 7.500 7.500 1.250 0.625 50% 8.125 54% tender 09.11.2017 , Date of Work Order Sahiwal 24.11.2017 , Work in progress , Construction of Drain / Soling Sewerage Nala Chak no. Date of AA 01.08.2017 , Date of receipt of 1347 1859 114/7R, 115/7CR, 116/7CR Sahwa, Dharma, District Sahiwal 15.000 7.500 7.500 7.500 1.250 0.57 46% 8.070 54% tender 09.11.2017 , Date of Work Order Sahiwal 24.11.2017 , Work in progress. Construction of Drain / Soling Sewerage Nala Chak no. Date of AA 01.08.2017 , Date of receipt of 1348 1860 112/7r, 113/7r, Purani Chichawatni, Sheikh Tayyab, Sahiwal 15.000 7.500 7.500 7.500 1.250 0.625 50% 8.125 54% tender 09.11.2017 , Date of Work Order District Sahiwal 02.12.2017 , Work in progress. Date of AA 01.08.2017, Date of receipt of tender 11.09.2017, Date of Work Order 1349 1861 Installation of Filtration Plant at 60/5L in District Sahiwal Sahiwal 3.000 1.500 1.500 1.500 0.250 0 0% 1.500 50% 31.10.2017, Date of Completion 30.06.2018 ,Scheme completed. Funds will be re- appropriated. Date of AA 01.08.2017, Date of receipt of tender 11.09.2017, Date of Work Order 1350 1862 Installation of Filtration Plant at 79/5R in District Sahiwal Sahiwal 3.000 1.500 1.500 1.500 0.250 0 0% 1.500 50% 31.10.2017, Date of Completion 30.06.2018 , Scheme completed. Funds will be re- appropriated. Date of A.A= 01.08.2017, Date of T.S= Rural Water Supply Scheme ChakNo. 20/SP Tehsil and 04.08.2017, Date of receipt of tenders = 1351 1863 Pakpattan 31.190 9.000 22.190 22.190 3.699 2.55 69% 11.550 37% 24.08.2017, Date of work order= 23.09.2017, District Pakpattan Funds released by FD = 03.08.2018,Funds online = 13.08.2018,Work in progress.

Date of A.A= 01.08.2017, Date of T.S= Rural Water Supply Scheme Kumari Wala Tehsil and 04.08.2017, Date of receipt of tenders = 1352 1864 Pakpattan 34.670 19.000 15.670 15.670 2.612 1.95 75% 20.950 60% 24.08.2017, Date of work order= 31.10.2017, District Pakpattan Funds released by FD = 03.08.2018,Funds online = 13.08.2018,Work in progress.

Date of A.A= 01.08.2017, Date of T.S= Rural Water Supply Scheme Chak No. 67/D Tehsil and 04.08.2017, Date of receipt of tenders = 1353 1865 Pakpattan 32.440 9.000 23.440 23.440 3.907 3.907 100% 12.907 40% 24.08.2017, Date of work order= 23.09.2017, District Pakpattan Funds released by FD = 03.08.2018Funds online = 13.08.2018,Work in progress.

Date of A.A= 01.08.2017. Date of T.S= Rural Water Supply Scheme Dhupai Tehsil and District 04.08.2017. Date of receipt of tenders = 1354 1866 Pakpattan 29.980 16.000 13.980 13.980 2.330 2.33 100% 18.330 61% 24.08.2017. Date of work order= 18.09.2017. Pakpattan Funds released by FD = 03.08.2018Funds online = 13.08.2018,Work in progress.

Date of A.A= 01.08.2017, Date of T.S= Rural Water Supply Scheme Chak No. 29/KB in District 04.08.2017, Date of receipt of tenders = 1355 1867 Pakpattan 19.978 10.000 9.978 9.978 1.663 1.663 100% 11.663 58% 24.08.2017, Date of work order= 31.10.2017, Pakpattan Funds released by FD = 03.08.2018Funds online = 13.08.2018,Work in progress.

Date of A.A= 01.08.2017, Date of T.S= Rural Water Supply Scheme Chak No. 111/EB in District 04.08.2017, Date of receipt of tenders = 1356 1868 Pakpattan 29.412 8.000 21.412 21.412 3.569 2.81 79% 10.810 37% 24.08.2017, Date of work order= 31.10.2017, Pakpattan Funds released by FD = 03.08.2018Funds online = 13.08.2018,Work in progress.

Date of A.A= 01.08.2017, Date of T.S= Rural Drainage Scheme Chak No. 74/D Tehsil and District 04.08.2017, Date of receipt of tenders = 1357 1869 Pakpattan 27.671 15.000 12.671 12.671 2.112 1.45 69% 16.450 59% 24.08.2017, Date of work order= 23.09.2017, Pakpattan Funds released by FD = 03.08.2018Funds online = 13.08.2018,Work in progress.

Date of A.A= 01.08.2017, Date of T.S= 04.08.2017, Date of receipt of tenders = 1358 1870 Rural Drainage Scheme 8/EB Tehsil and District Pakpattn Pakpattan 23.979 12.000 10.000 10.000 1.667 1.25 75% 13.250 55% 24.08.2017, Date of work order= 31.10.2017, Funds released by FD = 03.08.2018Funds online = 13.08.2018,Work in progress.

Date of A.A= 01.08.2017, Date of T.S= 04.08.2017, Date of receipt of tenders = 1359 1871 Rural Drainage Scheme 90/D Tehsil and District Pakpattan Pakpattan 29.303 19.000 10.303 10.303 1.717 1.717 100% 20.717 71% 24.08.2017, Date of work order= 23.09.2017, Funds released by FD = 03.08.2018Funds online = 13.08.2018,Work in progress.

Date of A.A= 24.08.2017, Date of T.S= Rural Drainage scheme in Various UCs of PP-228 District 12.10.2017, Date of receipt of tenders = 1360 1872 Pakpattan 74.312 25.000 25.000 25.000 4.167 4.167 100% 29.167 39% 21.10.2017, Date of work order= 13.11.2017, Pakpattan Funds released by FD = 03.08.2018Funds online = 13.08.2018,Work in progress.

Date of A.A= 24.08.2017, Date of T.S= Provision of Sewerage/ Tuff Tile / PCC / Soling / Nallian in 12.10.2017, Date of receipt of tenders = 1361 1873 Pakpattan 74.312 25.000 49.312 49.312 8.219 5.69 69% 30.690 41% 21.10.2017, Date of work order= 13.11.2017, Various UC's of PP-228 in District Pakpattan Funds released by FD = 03.08.2018Funds online = 15.08.2018,Work in progress.

Date of A.A= 01.08.2017, Date of T.S= Rural Sewerage / Drainage Scheme Jamman Shah in 04.08.2017, Date of receipt of tenders = 1362 1874 Pakpattan 37.413 6.000 31.413 31.413 5.236 3.55 68% 9.550 26% 24.08.2017, Date of work order= 31.10.2017, District Pakpattan Funds released by FD = 03.08.2018Funds online = 13.08.2018,Work in progress.

Date of A.A= 01.08.2017, Date of T.S= Rural Sewerage / Drainage Scheme Chak No. 123/EB in 04.08.2017, Date of receipt of tenders = 1363 1875 Pakpattan 31.582 21.000 3.912 3.912 0.652 0.652 100% 21.652 69% 24.08.2017, Date of work order= 23.09.2017, District Pakpattan Funds released by FD = 03.08.2018Funds online = 13.08.2018,Work in progress.

Date of A.A= 01.08.2017, Date of T.S= Rural Sewerage / Drainage Scheme Chak No.211/EB in 04.08.2017, Date of receipt of tenders = 1364 1876 Pakpattan 36.230 28.399 7.831 7.831 1.305 1.305 100% 29.704 82% 24.08.2017, Date of work order= 23.09.2017, District Pakpattan Funds released by FD = 03.08.2018Funds online = 13.08.2018,Work in progress.

Amended A.A issued on 27.01.2018.Tender received on 07.02.2018 and Additional performance security received on 13.02.2018 Provision of Drainage/ Sewerage Schemes at Chak No. and Work order issued on 17.02.2018.Funds 1365 1877 161/E.B and Union Council NO.35 (Headquarters 13/EB) Pakpattan 35.785 15.500 20.285 20.285 3.381 0 0% 15.500 43% released by FD = 03.08.2018Funds online = Tehsil Arifwala District Pakpattan 13.08.2018,Work in progress. Contractor liability amounting to Rs.2.500 million stands. The case submitted to P&D Department Lahore for correction of project code.

Date of A.A= 24.08.2017, Date of T.S= 12.10.2017, Date of receipt of tenders = Provision of PCC / Sewerage / Drainage / Tuff tiles etc. in 21.10.2017, Date of work order= 1366 1878 Pakpattan 150.000 27.000 25.000 25.000 4.167 4.167 100% 31.167 21% PP-227, District Pakpattan 13.11.2017,Funds released by FD = 03.08.2018Funds online = 15.08.2018,Work in progress. Date of A.A= 24.08.2017, Date of T.S= 12.10.2017, Date of receipt of tenders = Provision of PCC / Sewerage / Drainage / Tuff tiles etc. in 21.10.2017, Date of work order= 1367 1879 Pakpattan 148.624 30.000 50.000 50.000 8.334 5.82 70% 35.820 24% NA-165, District Pakpattan 13.11.2017,Funds released by FD = 03.08.2018Funds online = 15.08.2018,Work in progress. Date of A.A= 24.08.2017, Date of T.S= 12.10.2017, Date of receipt of tenders = Provision of PCC / Sewerage / Drainage / Tuff Tiles etc. in 21.10.2017, Date of work order= 1368 1880 Pakpattan 148.624 32.000 25.000 25.000 4.167 2.05 49% 34.050 23% PP-231 13.11.2017,Funds released by FD = 03.08.2018Funds online = 15.08.2018,Work in progress. 1.Date of AA03.08.2017 2.Date of T.S 08.08.2017 3.Date of Prequalification 28.08.2017 4.Date of invitation of tender 02.12.2017 5.Date of Receipt of tenders Rural Water Supply and Drainage Scheme Basti Nazak 05.12.2017 6.Date of work order10.01.2018 1369 1881 Multan 49.180 15.000 34.180 34.180 5.697 1.958 34% 16.958 34% Nagar, Tehsil Jalapur Pirwala, District Multan 7.Date of Completion as per PC-l 30.06.2018 8. Anticipated date of completion 30.06.2019 9. Date of released of funds 11.10.2017 10.No. of beneficiaries 4578 persons. Work is in progress 1.Date of AA03.08.2017 2.Date of T.S08.08.2017 3.Date of Prequalification28.08.2017 4.Date of invitation of tender 02.12.2017 5.Date of Receipt of Rural Drainage / Sewerage Scheme Basti Bahadur Pur tenders 05.12.2017 6.Date of work 1370 1882 Multan 48.970 15.000 33.970 33.970 5.662 2.254 40% 17.254 35% Tehsil Jalalpur Pirwala District Multan order22.12.2017 7.Date of Completion as per PC-l 21.06.2018 8. Anticipated date of completion 30.06.2019 9. Date of released of funds 11.10.2017 10.No. of beneficiaries - persons. Work is in progress 1.Date of AA 03.08.2017 2.Date of T.S 08.08.2017 3.Date of Prequalification 28.08.2017 4.Date of invitation of tender 02.12.2017 5.Date of Receipt of tenders Rural Drainage / Sewerage Scheme Shujat Pur Tehsil 05.12.2017 6.Date of work order23.12.2017 1371 1883 Multan 49.070 15.000 34.070 34.070 5.679 2.125 37% 17.125 35% Jalalpur Pirwala District Multan 7.Date of Completion as per PC-l 22.06.2018 8. Anticipated date of completion 30.06.2019 9. Date of released of funds 11.10.2017 10.No. of beneficiaries - persons. Work is in progress 1.Date of AA 03.08.2017 2.Date of T.S 08.08.2017 3.Dated of Prequalification - 4.Date of invitation of tender 27.09.2017 5.Date of Receipt of tenders 18.10.2017 Rural Water Supply Scheme Chak No.55/M and 56/M 6.Date of work order03.11.2017 7.Date of 1372 1884 Multan 14.000 5.000 9.000 9.000 1.500 1.21 81% 6.210 44% District Multan Completion as per PC-l 02.05.2018 8. Anticipated date of completion 30.06.2019 9. Date of released of funds 11.10.2017 10.No. of beneficiaries 4572 persons. Work is in progress 1.Date of AA 03.08.2017 2.Date of T.S 08.08.2017 3.Dated of Prequalification - 4.Date of invitation of tender 27.09.2017 5.Date of Receipt of tenders 18.10.2017 Rural Water Supply Scheme Chak No.71, 72 & 73/M 6.Date of work order27.11.2017 7.Date of 1373 1885 Multan 21.000 10.000 11.000 11.000 1.834 1.055 58% 11.055 53% District Multan Completion as per PC-l 26.05.2018 8. Anticipated date of completion 30.06.2019 9. Date of released of funds 11.10.2017 10.No. of beneficiaries 6354 persons. Work is in progress 1.Date of AA 03.08.2017 2.Date of T.S 08.08.2017 3.Dated of Prequalification - 4.Date of invitation of tender 27.09.2017 5.Date of Receipt of tenders 18.10.2017 Rural Water Supply Scheme Chak No.76, 77 and 78/M 6.Date of work order27.11.2017 7.Date of 1374 1886 Multan 21.000 10.000 11.000 11.000 1.834 0.995 54% 10.995 52% District Multan Completion as per PC-l 26.05.2018 8. Anticipated date of completion 30.06.2019 9. Date of released of funds 11.10.2017 10.No. of beneficiaries 4687 persons. Work is in progress 1.Date of AA 03.08.2017 2.Date of T.S 08.08.2017 3.Dated of Prequalification - 4.Date of invitation of tender 27.09.2017 5.Date of Receipt of tenders 18.10.2017 Rural Water Supply Scheme Chak No.79, 80 & 81/M 6.Date of work order27.11.2017 7.Date of 1375 1887 Multan 21.000 10.000 11.000 11.000 1.834 1.123 61% 11.123 53% District Multan Completion as per PC-l 26.05.2018 8. Anticipated date of completion 30.06.2019 9. Date of released of funds 11.10.2017 10.No. of beneficiaries 6554 persons. Work is in progress 1.Date of AA 03.08.2017 2.Date of T.S 08.08.2017 3.Dated of Prequalification - 4.Date of invitation of tender 27.09.2017 5.Date of Receipt of tenders 18.10.2017 Rural Water Supply Scheme Mouza Obvra Shumali Saray 6.Date of work order03.11.2017 7.Date of 1376 1888 Multan 14.000 7.000 7.000 7.000 1.167 0.887 76% 7.887 56% Khara and Jungle Ameer Hussain District Multan Completion as per PC-l 02.05.2018 8. Anticipated date of completion 30.06.2019 9. Date of released of funds 11.10.2017 10.No. of beneficiaries 12354 persons. Work is in progress 1.Date of AA 03.08.2017 2.Date of T.S 08.08.2017 3.Dated of Prequalification - 4.Date of invitation of tender 27.09.2017 5.Date of Receipt of tenders 18.10.2017 Rural Water Supply Scheme Mouza Matotli and Qaiser Pur 6.Date of work order03.11.2017 7.Date of 1377 1889 Multan 14.000 7.000 7.000 7.000 1.167 0.945 81% 7.945 57% District Multan Completion as per PC-l 02.05.2018 8. Anticipated date of completion 30.06.2019 9. Date of released of funds 11.10.2017 10.No. of beneficiaries 10452 persons. Work is in progress 1.Date of AA 03.08.2017 2.Date of T.S 08.08.2017 3.Dated of Prequalification - 4.Date of invitation of tender 27.09.2017 5.Date of Receipt of tenders 18.10.2017 Rural Water Supply Scheme Mouza Sha Musa and 6.Date of work order03.11.2017 7.Date of 1378 1890 Multan 14.000 7.000 7.000 7.000 1.167 0.705 60% 7.705 55% Muqeem Pur District Multan Completion as per PC-l 02.05.2018 8. Anticipated date of completion 30.06.2019 9. Date of released of funds 11.10.2017 10.No. of beneficiaries 11365 persons. Work is in progress 1.Date of AA 03.08.2017 2.Date of T.S 08.08.2017 3.Dated of Prequalification - 4.Date of invitation of tender 27.09.2017 5.Date of Receipt of tenders 18.10.2017 Rural Water Supply Scheme Mouza Adu Wali, Inayat Pur, 6.Date of work order14.12.2017 7.Date of 1379 1891 Multan 21.000 10.000 11.000 11.000 1.834 1.005 55% 11.005 52% Mochi Panhuwah, Basti Bairar District Multan Completion as per PC-l 13.06.2018 8. Anticipated date of completion 30.06.2019 9. Date of released of funds 11.10.2017 10.No. of beneficiaries 9878 persons. Work is in progress 1.Date of AA 03.08.2017 2.Date of T.S 08.08.2017 3.Dated of Prequalification - 4.Date of invitation of tender 27.09.2017 5.Date of Receipt of tenders 18.10.2017 Rural Water Supply Scheme Mouza Obvra Janubi, Basti 6.Date of work order03.11.2017 7.Date of 1380 1892 Multan 15.000 7.000 8.000 8.000 1.334 0.885 66% 7.885 53% Lang and Nauraja Bhutta District Multan Completion as per PC-l 02.05.2018 8. Anticipated date of completion 30.06.2019 9. Date of released of funds 11.10.2017 10.No. of beneficiaries 7458 persons. Work is in progress 1.Date of AA03.08.2017 2.Date of T.S 08.08.2017 3.Date of Prequalification 28.08.2017 4.Date of invitation of tender Rural Sewerage/ Drainage scheme Katcha Talla, ict 02.12.2017 5.Date of Receipt of tenders 1381 1893 4.922 51% 17.500 39% 05.12.2017 6.Date of work order13.01.2018 Munirabad, Kot Shehbaz Pull 18-Kassi Bhdhla Road Tehsil Multan 44.530 15.000 29.530 29.530 2.5 7.Date of Completion as per PC-l 30.06.2018 & district Multan 8. Anticipated date of completion 30.06.2019 9. Date of released of funds 11.10.2017 10.No. of beneficiaries 11354 persons. Work is in progress 1.Date of AA03.08.2017 2.Date of T.S 08.08.2017 3.Date of Prequalification 28.08.2017 4.Date of invitation of tender 02.12.2017 5.Date of Receipt of tenders Rural Sewerage Scheme 18-Kassi Ghareeb Abad and 05.12.2017 6.Date of work order28.12.2017 1382 1894 Multan 44.470 15.000 29.470 29.470 4.912 0.995 20% 15.995 36% Adjoining Abadies UC Jhok Lashkar Pur District Multan 7.Date of Completion as per PC-l 27.06.2018 8. Anticipated date of completion 30.06.2019 9. Date of released of funds 11.10.2017 10.No. of beneficiaries 4687 persons. Work is in progress 1.Date of AA 03.08.2017 2.Date of T.S 08.08.2017 3.Dated of Prequalification - 4.Date of invitation of tender 27.09.2017 5.Date of Receipt of tenders 18.10.2017 Rural Sewerage Scheme Asghar Pur and Munir Abad, UC 6.Date of work order23.12.2017 7.Date of 1383 1895 Multan 15.000 10.000 5.000 5.000 0.834 0.834 100% 10.834 72% Jhok Lashkar Pur District Multan Completion as per PC-l 22.05.2018 8. Anticipated date of completion 30.06.2019 9. Date of released of funds 11.10.2017 10.No. of beneficiaries 4589 persons. Work is in progress 1.Date of AA 03.08.2017 2.Date of T.S 08.08.2017 3.Dated of Prequalification - 4.Date of invitation of tender 27.09.2017 Rural Drainage Scheme UC Kot Rab Nawaz, UC 120 5.Date of Receipt of tenders 18.10.2017 1384 1896 Multan 15.000 10.000 5.000 5.000 0.834 0.834 100% 10.834 72% 6.Date of work order14.12.2017 7.Date of District Multan Completion as per PC-l 13.05.2018 8. Anticipated date of completion 30.06.2019 9. Date of released of funds 11.10.2017 10.No. of beneficiaries persons. Work is in progress

1.Date of AA 03.08.2017 2.Date of T.S 08.08.2017 3.Dated of Prequalification - 4.Date of invitation of tender 27.09.2017 Rural Drainage Scheme UC 123 Jalal Abad Shumali 5.Date of Receipt of tenders 18.10.2017 1385 1897 Multan 15.000 10.000 5.000 5.000 0.834 0.177 21% 10.177 68% 6.Date of work order28.12.2017 7.Date of District Multan Completion as per PC-l 27.06.2018 8. Anticipated date of completion 30.06.2019 9. Date of released of funds 11.10.2017 10.No. of beneficiaries - persons. Work is in progress 1.Date of AA 03.08.2017 2.Date of T.S 08.08.2017 3.Dated of Prequalification - 4.Date of invitation of tender 27.09.2017 5.Date of Receipt of tenders 18.10.2017 1386 1898 Rural Drainage Scheme UC 131 Chatha District Multan Multan 20.000 10.000 10.000 10.000 1.667 1.25 75% 11.250 56% 6.Date of work order03.11.2017 7.Date of Completion as per PC-l 02.05.2018 8. Anticipated date of completion 30.06.2019 9. Date of released of funds 11.10.2017 10.No. of beneficiaries - persons. Work is in progress

1.Date of AA 03.08.2017 2.Date of T.S 08.08.2017 3.Dated of Prequalification - 4.Date of invitation of tender 27.09.2017 5.Date of Receipt of tenders 18.10.2017 1387 1899 Rural Drainage Scheme UC 134 Kiri Tamak District Multan Multan 20.000 10.000 10.000 10.000 1.667 1.34 80% 11.340 57% 6.Date of work order21.11.2017 7.Date of Completion as per PC-l 20.05.2018 8. Anticipated date of completion 30.06.2019 9. Date of released of funds 11.10.2017 10.No. of beneficiaries - persons. Work is in progress 1.Date of AA 03.08.2017 2.Date of T.S 08.08.2017 3.Dated of Prequalification - 4.Date of invitation of tender 27.09.2017 5.Date of Receipt of tenders 18.10.2017 Rural Sewerage Scheme Basti Beat Wala Ajwain Sharif 6.Date of work order28.12.2017 7.Date of 1388 1900 Multan 11.540 5.000 6.540 6.540 1.090 0.23 21% 5.230 45% Tehsil & District Multan Completion as per PC-l 27.06.2018 8. Anticipated date of completion 30.06.2019 9. Date of released of funds 11.10.2017 10.No. of beneficiaries 12358 persons. Work is in progress 1.Date of AA 03.08.2017 2.Date of T.S 08.08.2017 3.Date of Prequalification 28.08.2017 4.Date of invitation of tender 02.12.2017 5.Date of Receipt of tenders Rural Sewerage Scheme Tiab Masood Pur, Tehsil & 05.12.2017 6.Date of work order 23.12.2017 1389 1901 Multan 33.470 10.000 10.000 10.000 1.667 1.667 100% 11.667 35% District Multan 7.Date of Completion as per PC-l 22.06.2018 8. Anticipated date of completion 30.06.2019 9. Date of released of funds 11.10.2017 10.No. of beneficiaries 14356 persons. Work is in progress 1.Date of AA 03.08.2017 2.Date of T.S 08.08.2017 3.Dated of Prequalification - 4.Date of invitation of tender 27.09.2017 5.Date of Receipt of tenders 18.10.2017 Rural Sewerage Scheme Sharif Pura New Shalimar Tehsil 6.Date of work order19.01.2018 7.Date of 1390 1902 Multan 38.080 15.000 10.000 10.000 1.667 1.638 98% 16.638 44% & District Multan Completion as per PC-l 18.06.2018 8. Anticipated date of completion 30.06.2019 9. Date of released of funds 11.10.2017 10.No. of beneficiaries 10358 persons. Work is in progress 1.Date of AA03.08.2017 2.Date of T.S08.08.2017 3.Date of Prequalification28.08.2017 4.Date of invitation of tender 02.12.2017 5.Date of Receipt of Rural Sewerage Scheme Gareen Town Deen Pur & Jarran tenders 05.12.2017 6.Date of work 1391 1903 Multan 41.960 7.500 10.000 10.000 1.667 0.35 21% 7.850 19% Wala District Multan order14.02.2018 7.Date of Completion as per PC-l 13.08.2018 8. Anticipated date of completion 30.06.2019 9. Date of released of funds 11.10.2017 10.No. of beneficiaries 12548 persons. Work is in progress 1.Date of AA 03.08.2017 2.Date of T.S 08.08.2017 3.Date of Prequalification 28.08.2017 4.Date of invitation of tender 02.12.2017 5.Date of Receipt of tenders Rural Sewerage Scheme Basti Nandla North & South 05.12.2017 6.Date of work order 19.01.2018 1392 1904 Multan 45.000 15.000 10.000 10.000 1.667 1.667 100% 16.667 37% District Multan 7.Date of Completion as per PC-l 18.07.2018 8. Anticipated date of completion 30.06.2019 9. Date of released of funds 11.10.2017 10.No. of beneficiaries 11358 persons. Work is in progress 1.Date of AA 03.08.2017 2.Date of T.S 08.08.2017 3.Date of Prequalification 28.08.2017 4.Date of invitation of tender 02.12.2017 5.Date of Receipt of tenders Rural Sewerage Scheme Adda band Bosan, Roye Hatti & 05.12.2017 6.Date of work order 01.01.2018 1393 1905 Multan 40.600 13.000 10.000 10.000 1.667 1.667 100% 14.667 36% Mattay Hatti District Multan 7.Date of Completion as per PC-l 30.06.2018 8. Anticipated date of completion 30.06.2019 9. Date of released of funds 11.10.2017 10.No. of beneficiaries 13474 persons. Work is in progress 1.Date of AA 03.08.2017 2.Date of T.S 08.08.2017 3.Dated of Prequalification - 4.Date of invitation of tender 27.09.2017 5.Date of Receipt of tenders 18.10.2017 1394 1906 1.667 19% 15.310 41% 6.Date of work order29.12.2017 7.Date of Rural Sewerage Scheme Ghousabad, District Multan Multan 37.000 15.000 10.000 10.000 0.31 Completion as per PC-l 28.06.2018 8. Anticipated date of completion 30.06.2019 9. Date of released of funds 11.10.2017 10.No. of beneficiaries 14879 persons. Work is in progress 1.Date of AA 03.08.2017 2.Date of T.S 08.08.2017 3.Dated of Prequalification - 4.Date of invitation of tender 27.09.2017 5.Date of Receipt of tenders 18.10.2017 Rural Drainage / Sewerage Scheme Chah Bananwala 6.Date of work order 23.12.2017 7.Date of 1395 1907 Multan 14.970 10.000 4.970 4.970 0.829 0.829 100% 10.829 72% District Multan Completion as per PC-l 22.06.2018 8. Anticipated date of completion 30.06.2019 9. Date of released of funds 11.10.2017 10.No. of beneficiaries 9476 persons. Work is in progress 1.Date of AA 03.08.2017 2.Date of T.S 08.08.2017 3.Date of Prequalification 28.08.2017 4.Date of invitation of tender 02.12.2017 5.Date of Receipt of tenders Rural Sewerage Scheme Taj Pur Sandila, Dhareeban 05.12.2017 6.Date of work order 29.12.2017 1396 1908 Multan 49.980 15.000 10.000 10.000 1.667 1.667 100% 16.667 33% Thahti Sandila Faiz Town UC 95 Tehshil & District Multan 7.Date of Completion as per PC-l 28.06.2018 8. Anticipated date of completion 30.06.2019 9. Date of released of funds 11.10.2017 10.No. of beneficiaries 4658 persons. Work is in progress 1.Date of AA 03.08.2017 2.Date of T.S 08.08.2017 3.Dated of Prequalification - 4.Date of invitation of tender 27.09.2017 5.Date of Receipt of tenders 18.10.2017 Rural Sewerage Scheme Qasim Bela, Basti Langrial Tehsil 6.Date of work order 28.12.2017 7.Date of 1397 1909 Multan 32.410 14.000 10.000 10.000 1.667 1.667 100% 15.667 48% and District Multan Completion as per PC-l 27.06.2018 8. Anticipated date of completion 30.06.2019 9. Date of released of funds 11.10.2017 10.No. of beneficiaries 4789 persons. Work is in progress 1.Date of AA03.08.2017 2.Date of T.S 08.08.2017 3.Date of Prequalification 28.08.2017 4.Date of invitation of tender 02.12.2017 5.Date of Receipt of tenders Rural Sewerage Scheme Mouza Ajwani / Sharif District 05.12.2017 6.Date of work order05.01.2018 1398 1910 Multan 96.500 30.000 10.000 10.000 1.667 0.36 22% 30.360 31% Multan 7.Date of Completion as per PC-l 04.07.2018 8. Anticipated date of completion 30.06.2019 9. Date of released of funds 11.10.2017 10.No. of beneficiaries 6589 persons. Work is in progress 1.Date of AA 03.08.2017 2.Date of T.S 08.08.2017 3.Date of Prequalification 28.08.2017 4.Date of invitation of tender 02.12.2017 5.Date of Receipt of tenders Rural Drainage, Soling and Tuff Tile Scheme in Union 05.12.2017 6.Date of work order 17.01.2018 1399 1911 Multan 50.000 20.000 10.000 10.000 1.667 1.25 75% 21.250 43% Council Bagrian District Multan 7.Date of Completion as per PC-l 30.06.2018 8. Anticipated date of completion 30.06.2019 9. Date of released of funds 11.10.2017 10.No. of beneficiaries - persons. Work is in progress 1.Date of AA 03.08.2017 2.Date of T.S 08.08.2017 3.Date of Prequalification 28.08.2017 4.Date of invitation of tender 02.12.2017 5.Date of Receipt of tenders Rural Drainage, Soling and Tuff Tile Scheme in Union 05.12.2017 6.Date of work order 27.12.2017 1400 1912 Multan 50.000 20.000 10.000 10.000 1.667 0.589 35% 20.589 41% Council Hilal Wajah District Multan 7.Date of Completion as per PC-l 26.06.2018 8. Anticipated date of completion 30.06.2019 9. Date of released of funds 11.10.2017 10.No. of beneficiaries - persons. Work is in progress 1.Date of AA 03.08.2017 2.Date of T.S 08.08.2017 3.Date of Prequalification 28.08.2017 4.Date of invitation of tender 02.12.2017 5.Date of Receipt of tenders Rural Drainage, Soling and Tuff Tile Scheme in Union 05.12.2017 6.Date of work order 23.12.2017 1401 1913 Multan 50.000 20.000 10.000 10.000 1.667 1.667 100% 21.667 43% Council Gardez Pur District Multan 7.Date of Completion as per PC-l 22.06.2018 8. Anticipated date of completion 30.06.2019 9. Date of released of funds 11.10.2017 10.No. of beneficiaries - persons. Work is in progress 1.Date of AA 03.08.2017 2.Date of T.S 08.08.2017 3.Date of Prequalification 28.08.2017 4.Date of invitation of tender 02.12.2017 5.Date of Receipt of tenders Rural Drainage / Sewerage Scheme Kotla Chakar Jalalpur 05.12.2017 6.Date of work order 28.12.2017 1402 1914 Multan 50.000 20.000 10.000 10.000 1.667 1.19 71% 21.190 42% Pirwala District Multan 7.Date of Completion as per PC-l 27.06.2018 8. Anticipated date of completion 30.06.2019 9. Date of released of funds 11.10.2017 10.No. of beneficiaries 4587 persons. Work is in progress 1.Date of AA 03.08.2017 2.Date of T.S 08.08.2017 3.Dated of Prequalification - 4.Date of invitation of tender 27.09.2017 5.Date of Receipt of tenders 18.10.2017 Rural Drainage / Sewerage Scheme Basti Mithu Gharbi 6.Date of work order 10.11.2017 7.Date of 1403 1915 Multan 30.000 10.000 10.000 10.000 1.667 1.55 93% 11.550 39% District Multan Completion as per PC-l 09.05.2018 8. Anticipated date of completion 30.06.2019 9. Date of released of funds 11.10.2017 10.No. of beneficiaries 13254 persons. Work is in progress 1.Date of AA 03.08.2017 2.Date of T.S 08.08.2017 3.Dated of Prequalification - 4.Date of invitation of tender 27.09.2017 5.Date of Receipt of tenders 18.10.2017 Rural Drainage / Sewerage Scheme Muqeempur District 6.Date of work order 21.12.2017 7.Date of 1404 1916 Multan 33.000 10.000 10.000 10.000 1.667 1.05 63% 11.050 33% Multan Completion as per PC-l 20.06.2018 8. Anticipated date of completion 30.06.2019 9. Date of released of funds 11.10.2017 10.No. of beneficiaries 13546 persons. Work is in progress 1.Date of AA 03.08.2017 2.Date of T.S 08.08.2017 3.Dated of Prequalification - 4.Date of invitation of tender 27.09.2017 5.Date of Receipt of tenders 18.10.2017 Rural Drainage / Sewerage Scheme Munshi Wala District 6.Date of work order 10.01.2018 7.Date of 1405 1917 Multan 39.000 10.000 10.000 10.000 1.667 0.995 60% 10.995 28% Multan Completion as per PC-l 09.07.2018 8. Anticipated date of completion 30.06.2019 9. Date of released of funds 11.10.2017 10.No. of beneficiaries 12144 persons. Work is in progress 1.Date of AA 03.08.2017 2.Date of T.S 08.08.2017 3.Dated of Prequalification - 4.Date of invitation of tender 27.09.2017 5.Date of Receipt of tenders 18.10.2017 Rural Drainage / Sewerage Scheme Lal Wah District 6.Date of work order 11.12.2017 7.Date of 1406 1918 Multan 25.000 10.000 10.000 10.000 1.667 1.245 75% 11.245 45% Multan Completion as per PC-l 10.06.2018 8. Anticipated date of completion 30.06.2019 9. Date of released of funds 11.10.2017 10.No. of beneficiaries 14456 persons. Work is in progress 1.Date of AA 03.08.2017 2.Date of T.S 08.08.2017 3.Dated of Prequalification - 4.Date of invitation of tender 27.09.2017 5.Date of Receipt of tenders 18.10.2017 Rural Drainage / Sewerage Scheme Obara Shumali 6.Date of work order 10.11.2017 7.Date of 1407 1919 Multan 30.000 10.000 10.000 10.000 1.667 0.955 57% 10.955 37% District Multan Completion as per PC-l 09.05.2018 8. Anticipated date of completion 30.06.2019 9. Date of released of funds 11.10.2017 10.No. of beneficiaries 11243 persons. Work is in progress 1.Date of AA 03.08.2017 2.Date of T.S 08.08.2017 3.Date of Prequalification 28.08.2017 4.Date of invitation of tender 02.12.2017 5.Date of Receipt of tenders Rural Drainage / Sewerage Scheme Jagoo Wala District 05.12.2017 6.Date of work order 01.02.2018 1408 1920 Multan 50.000 10.000 10.000 10.000 1.667 0.569 34% 10.569 21% Multan 7.Date of Completion as per PC-l 30.07.2018 8. Anticipated date of completion 30.06.2019 9. Date of released of funds 11.10.2017 10.No. of beneficiaries 3547 persons. Work is in progress 1.Date of AA 03.08.2017 2.Date of T.S 08.08.2017 3.Dated of Prequalification - 4.Date of invitation of tender 27.09.2017 5.Date of Receipt of tenders 18.10.2017 Rural Sewerage / Drainage Scheme Kotla Abdul Fateh 6.Date of work order28.12.2017 7.Date of 1409 1921 Multan 20.000 10.000 10.000 10.000 1.667 0.35 21% 10.350 52% District Multan Completion as per PC-l 27.06.2018 8. Anticipated date of completion 30.06.2019 9. Date of released of funds 11.10.2017 10.No. of beneficiaries 6547 persons. Work is in progress 1.Date of AA 03.08.2017 2.Date of T.S 08.08.2017 3.Dated of Prequalification - 4.Date of invitation of tender 27.09.2017 Rural Drainage Scheme Basti Kothy Wala, New Kothy 5.Date of Receipt of tenders 18.10.2017 1410 1922 Wala, Basti Utar Wali and Haroo Wala Mouza Kothy Wala Multan 30.000 10.000 10.000 10.000 1.667 1.05 63% 11.050 37% 6.Date of work order 19.02.2018 7.Date of District Multan Completion as per PC-l 18.08.2018 8. Anticipated date of completion 30.06.2019 9. Date of released of funds 11.10.2017 10.No. of beneficiaries - persons. Work is in progress

1.Date of AA 03.08.2017 2.Date of T.S 08.08.2017 3.Dated of Prequalification - 4.Date of invitation of tender 27.09.2017 5.Date of Receipt of tenders 18.10.2017 1411 1923 Rural Drainage Scheme UC 18/MR, District Multan Multan 26.000 10.000 10.000 10.000 1.667 0.35 21% 10.350 40% 6.Date of work order28.01.2018 7.Date of Completion as per PC-l 27.07.2018 8. Anticipated date of completion 30.06.2019 9. Date of released of funds 11.10.2017 10.No. of beneficiaries - persons. Work is in progress

1.Date of AA 03.08.2017 2.Date of T.S 08.08.2017 3.Dated of Prequalification - 4.Date of invitation of tender 27.09.2017 Rural Drainage Scheme UC-Khan Pur maral, District 5.Date of Receipt of tenders 18.10.2017 1412 1924 Multan 13.000 10.000 3.000 3.000 0.500 0.5 100% 10.500 81% 6.Date of work order 30.01.2018 7.Date of Multan Completion as per PC-l 29.07.2018 8. Anticipated date of completion 30.06.2019 9. Date of released of funds 11.10.2017 10.No. of beneficiaries - persons. Work is in progress 1.Date of AA 03.08.2017 2.Date of T.S 08.08.2017 3.Date of Prequalification 28.08.2017 4.Date of invitation of tender 02.12.2017 5.Date of Receipt of tenders Funds for drain/sewerage and soling for UC 95 & 96 City 05.12.2017 6.Date of work order 05.01.2018 1413 1925 Multan 80.000 25.000 10.000 10.000 1.667 1.65 99% 26.650 33% Shujabad. District Multan 7.Date of Completion as per PC-l 30.06.2018 8. Anticipated date of completion 30.06.2019 9. Date of released of funds 11.10.2017 10.No. of beneficiaries 5587 persons. Work is in progress 1.Date of AA 03.08.2017 2.Date of T.S 08.08.2017 3.Date of Prequalification 28.08.2017 4.Date of invitation of tender 02.12.2017 5.Date of Receipt of tenders Funds for drain/sewerage, soling from Raja Ram, Bagrain 05.12.2017 6.Date of work order 23.12.2017 1414 1926 Multan 40.000 15.000 10.000 10.000 1.667 1.456 87% 16.456 41% and Shahpur. District Multan 7.Date of Completion as per PC-l 22.06.2018 8. Anticipated date of completion 30.06.2019 9. Date of released of funds 11.10.2017 10.No. of beneficiaries 6987 persons. Work is in progress 1.Date of AA 03.08.2017 2.Date of T.S 08.08.2017 3.Dated of Prequalification - Rural Sewerage and Drainage Scheme, Tuff Tile 4.Date of invitation of tender 27.09.2017 Pavement in Basti Ado Wali, Basti Adam Wali, Basti 5.Date of Receipt of tenders 18.10.2017 1415 1927 2.167 60% 16.310 58% 6.Date of work order 21.11.2017 7.Date of Dhando, Basti Hayat Pur, Basti Balocha, Wach Sandela, Multan 28.000 15.000 13.000 13.000 1.31 Completion as per PC-l 20.05.2019 8. Basti Ali Pur Sadat and Basti Gull Wala UC Ali Pur Sadat Anticipated date of completion 30.06.2018 9. District Multan Date of released of funds - 10.No. of beneficiaries 15325 persons. Work is in progress 1.Date of AA 03.08.2017 2.Date of T.S Rural Sewerage and Drainage Scheme, Tuff Tile 08.08.2017 3.Dated of Prequalification - Pavement in Basti Brar, Basti Pathan Wala, Basti Ahmad 4.Date of invitation of tender 27.09.2017 Wali, Basti Daya, Basti Barzawah, Basti Lohar, Basti 5.Date of Receipt of tenders 18.10.2017 1416 1928 3.334 46% 11.549 38% 6.Date of work order 29.11.2017 7.Date of Inayat Pur, Basti Sial, Basti Saif Ullah Shah, Basti Gakhar, Multan 30.000 10.000 20.000 20.000 1.549 Completion as per PC-l 28.05.2019 8. Basti Bagh Arain Wali, Basti Miani, Basti Ranojha, Basti Anticipated date of completion 30.06.2018 9. Saich Wali, Basti Deewan Wali and Basti Mochian Wali Date of released of funds - 10.No. of UC Inayat Pur District Multan beneficiaries 16358 persons. Work is in progress 1.Date of AA 03.08.2017 2.Date of T.S 08.08.2017 3.Dated of Prequalification - 4.Date of invitation of tender 27.09.2017 Rural Sewerage and Drainage Scheme, Tuff Tile 5.Date of Receipt of tenders 18.10.2017 Pavement in Basti Radal Pur, Basti Lutaf Pur, Chak 6.Date of work order 28.12.2017 7.Date of 1417 1929 Multan 30.000 10.000 10.000 10.000 1.667 1.25 75% 11.250 38% Numberabad, Molvi Wala, Basti Cut Wala, Tibbi Qasian, Completion as per PC-l 27.06.2019 8. Basti Balochan Wala UC Radal Pur District Multan Anticipated date of completion 30.06.2018 9. Date of released of funds - 10.No. of beneficiaries 14325 persons. Work is in progress 1.Date of AA 03.08.2017 2.Date of T.S 08.08.2017 3.Dated of Prequalification - 4.Date of invitation of tender 27.09.2017 Rural Sewerage and Drainage Scheme, Tuff Tile 5.Date of Receipt of tenders 18.10.2017 Pavement in Basti Mari Noon, Basti Godar, Basti Dogran, 6.Date of work order 28.12.2017 7.Date of 1418 1930 Multan 30.000 10.000 10.000 10.000 1.667 1.5 90% 11.500 38% Basti Khokhran, Basti Ghous Pur UC Mari Noon District Completion as per PC-l 27.05.2018 8. Multan Anticipated date of completion 30.06.2019 9. Date of released of funds 11.10.2017 10.No. of beneficiaries 12442 persons. Work is in progress Provision of Tuff Tile, Sewerage and Drainage in Urban 1419 1931 Area Municipal Committee Chowk Sarwar Shaheed District Muzaffargarh 40.000 15.000 25.000 25.000 4.167 1.1 26% 16.100 40% • Date of AA 5.8.2017 Muzaffargarh 1.Date of AA 03.08.2017 2.Date of T.S 08.08.2017 3.Dated of Prequalification - 4.Date of invitation of tender 27.09.2017 5.Date of Receipt of tenders 18.10.2017 1420 1932 1.084 100% 11.084 67% 6.Date of work order 27.11.2017 7.Date of Sewerage Scheme Zakaria Town Phase-III District Multan Multan 16.500 10.000 6.500 6.500 1.084 Completion as per PC-l 26.05.2018 8. Anticipated date of completion 30.06.2019 9. Date of released of funds 11.10.2017 10.No. of beneficiaries 14225 persons. Work is in progress 1.Date of AA03.08.2017 2.Date of T.S08.08.2017 3.Date of Prequalification28.08.2017 4.Date of invitation of tender 02.12.2017 5.Date of Receipt of Main Sewerage Line for Farrukh Town & Raja Pur, District tenders 05.12.2017 6.Date of work 1421 1933 Multan 49.990 20.000 10.000 10.000 1.667 0.331 20% 20.331 41% Multan order04.01.2018 7.Date of Completion as per PC-l 03.06.2018 8. Anticipated date of completion 30.06.2019 9. Date of released of funds 11.10.2017 10.No. of beneficiaries 11658 persons. Work is in progress 1.Date of AA 03.08.2017 2.Date of T.S 08.08.2017 3.Dated of Prequalification - 4.Date of invitation of tender 27.09.2017 5.Date of Receipt of tenders 18.10.2017 1422 1934 1.667 22% 10.360 52% 6.Date of work order14.12.2017 7.Date of Water Purification Plants 10 District Multan Multan 20.000 10.000 10.000 10.000 0.36 Completion as per PC-l 13.06.2018 8. Anticipated date of completion 30.06.2019 9. Date of released of funds 11.10.2017 10.No. of beneficiaries 14212 persons. Work is in progress 1.Date of AA 03.08.2017 2.Date of T.S 09.09.2017 3.Dated of Prequalification - 4.Date of invitation of tender 27.09.2017 Rough Cost Estimates for replacement of Old Sewer Lines 5.Date of Receipt of tenders 18.10.2017 at Muhalla Sharif Pura UC 65 Piran Ghaib II in Sub 6.Date of work order20.11.2017 7.Date of 1423 1935 Multan 12.450 10.000 2.450 2.450 0.409 0.077 19% 10.077 81% Division New Multan Sewerage Central Division WASA Completion as per PC-l 19.05.2018 8. Multan Anticipated date of completion 30.06.2019 9. Date of released of funds - 10.No. of beneficiaries 13225 persons. Work is in progress 1.Date of AA 03.08.2017 2.Date of T.S 08.08.2017 3.Dated of Prequalification - 4.Date of invitation of tender 27.09.2017 Ext. of Rual Drainage / Sewerage Scheme Chah 5.Date of Receipt of tenders 18.10.2017 1424 1936 1.667 100% 14.167 48% 6.Date of work order 22.11.2017 7.Date of Muhammad Hussain wala & Adjoining Ababdies District Multan 29.510 12.500 10.000 10.000 1.667 Completion as per PC-l 21.05.2018 8. Multan Anticipated date of completion 30.06.2019 9. Date of released of funds 11.10.2017 10.No. of beneficiaries 12455 persons. Work is in progress 1.Date of AA 03.08.2017 2.Date of T.S 08.08.2017 3.Date of Prequalification 28.08.2017 4.Date of invitation of tender 02.12.2017 5.Date of Receipt of tenders 1425 1937 1.667 96% 21.600 31% 05.12.2017 6.Date of work order 05.01.2018 Scheme / Drainage Scheme Kotli Nijabat District Multan Multan 69.500 20.000 10.000 10.000 1.6 7.Date of Completion as per PC-l 30.06.2018 8. Anticipated date of completion 30.06.2019 9. Date of released of funds 11.10.2017 10.No. of beneficiaries 15654 persons. Work is in progress 1.Date of AA 03.08.2017 2.Date of T.S 08.08.2017 3.Date of Prequalification 28.08.2017 4.Date of invitation of tender 02.12.2017 5.Date of Receipt of tenders 1426 1938 1.667 100% 24.667 38% 05.12.2017 6.Date of work order 03.03.2018 Sewerage System in UC-90 District Multan Multan 65.000 23.000 10.000 10.000 1.667 7.Date of Completion as per PC-l 02.08.2018 8. Anticipated date of completion 30.06.2019 9. Date of released of funds 11.10.2017 10.No. of beneficiaries 9876 persons. Work is in progress 1.Date of AA 03.08.2017 2.Date of T.S 08.08.2017 3.Date of Prequalification 28.08.2017 4.Date of invitation of tender 02.12.2017 5.Date of Receipt of tenders 1427 1939 1.667 19% 23.320 36% 05.12.2017 6.Date of work order20.02.2018 Sewerage System in UC-82 District Multan Multan 65.000 23.000 10.000 10.000 0.32 7.Date of Completion as per PC-l 19.02.2020 8. Anticipated date of completion 30.06.2020 9. Date of released of funds 11.10.2017 10.No. of beneficiaries 15775 persons. Work is in progress 1. Date of A.A: 26.07.2017 2. Date of T.S: 08.08.2018 3. Date of Pre-Qualification: ------4. Date of Invitation of Tender: 28.09.2017 5. Date of Receipt of Tender: 29.09.2017 6. 1428 1940 1.000 58% 6.580 55% Date of Work order: 24.10.2017 7. Date of Rural Drainage Scheme Chak No.7/9-R District Khanewal Khanewal 12.000 6.000 6.000 6.000 0.58 Completion as per PC-I: (6) month 8. Anticipated Date of completion: 31.12.2018 9. Date of released of funds 03.08.2018 10. Reason of Slow Moving: ------11 No. of beneficiaries 6340 Persons Work in progress.

1. Date of A.A: 26.07.2017 2. Date of T.S: 08.08.2017 3. Date of Pre-Qualification: ------4. Date of Invitation of Tender: 28.09.2017 5. Date of Receipt of Tender: 29.09.2017 6. Construction of Drainage Scheme Chak No.93/10-R Date of Work order: 09.11.2017 7. Date of 1429 1941 Khanewal 12.000 2.000 10.000 10.000 1.667 0.853 51% 2.853 24% District Khanewal Completion as per PC-I: (6) months 8. Anticipated Date of completion: 30.06.2019 9. Date of released of funds 03.08.2018 10. Reason of Slow Moving: ------11 No. of beneficiaries 5788Persons Work in progress.

1. Date of A.A: 26.07.2017 2. Date of T.S: 08.08.2017 3. Date of Pre-Qualification: ------4. Date of Invitation of Tender: 28.09.2017 5. Date of Receipt of Tender: 29.09.2017 6. Rural Drainage Scheme Chak No.92/10-R District Date of Work order: 09.12.2017 7. Date of 1430 1942 Khanewal 18.000 10.000 8.000 8.000 1.334 0.89 67% 10.890 61% Khanewal Completion as per PC-I: (8) months 8. Anticipated Date of completion: 30.06.2019 9. Date of released of funds 03.08.2018 10. Reason of Slow Moving: ------11 No. of beneficiaries 8140 Persons Work in progress.

1. Date of A.A: 26.07.2017 2. Date of T.S: 08.08.2017 3. Date of Pre-Qualification: ------4. Date of Invitation of Tender: 28.09.2017 5. Date of Receipt of Tender: 29.09.2017 6. 1431 1943 1.000 55% 5.550 50% Date of Work order: 24.10.2017 7. Date of Rural Drainage Scheme UC No. 48 Tehsil Mian Channu Khanewal 11.000 5.000 6.000 6.000 0.55 Completion as per PC-I: (6) months 8. Anticipated Date of completion: 30.06.2019 9. Date of released of funds 03.08.2018 10. Reason of Slow Moving: ------11 No. of beneficiaries 8265 Persons Work in progress.

1. Date of A.A: 26.07.2017 2. Date of T.S: 08.08.2017 3. Date of Pre-Qualification: ------4. Date of Invitation of Tender: 28.09.2017 5. Date of Receipt of Tender: 29.09.2017 6. 1432 1944 1.000 46% 6.460 54% Date of Work order: 09.12.2017 7. Date of Rural Drainage Scheme UC No. 51 Tehsil Mian Channu Khanewal 12.000 6.000 6.000 6.000 0.46 Completion as per PC-I: (5) months 8. Anticipated Date of completion: 30.06.2019 9. Date of released of funds 03.08.2018 10. Reason of Slow Moving: ------11 No. of beneficiaries 6568 Persons Work in progress. 1. Date of A.A: 26.07.2017 2. Date of T.S: 08.08.2017 3. Date of Pre-Qualification: ------4. Date of Invitation of Tender: 28.09.2017 5. Date of Receipt of Tender: 29.09.2017 6. Date of Work order: 24.10.2017 7. Date of 1433 1945 Rural Drainage Scheme UC No. 55 Tehsil Mian Channu Khanewal 12.000 7.000 5.000 5.000 0.834 0.38 46% 7.380 62% Completion as per PC-I: (6) months 8. Anticipated Date of completion: 30.06.2019 9. Date of released of funds 03.08.2018 10. Reason of Slow Moving: ------11 No. of beneficiaries 65619 Persons Work in progress. 1. Date of A.A: 26.07.2017 2. Date of T.S: 08.08.2017 3. Date of Pre-Qualification: ------4. Date of Invitation of Tender: 28.09.2017 5. Date of Receipt of Tender: 29.09.2017 6. 1434 1946 0.834 58% 6.480 59% Date of Work order: 17.11.2017 7. Date of Rural Drainage Scheme UC No. 56 Tehsil Mian Channu Khanewal 11.000 6.000 5.000 5.000 0.48 Completion as per PC-I: (6) months 8. Anticipated Date of completion: 30.06.2019 9. Date of released of funds 03.08.2018 10. Reason of Slow Moving: ------11 No. of beneficiaries 5790 Persons Work in progress.

1. Date of A.A: 26.07.2017 2. Date of T.S: 08.08.2017 3. Date of Pre-Qualification: ------4. Date of Invitation of Tender: 28.09.2017 5. Date of Receipt of Tender: 29.09.2017 6. 1435 1947 1.000 47% 6.465 54% Date of Work order: 24.10.2017 7. Date of Rural Drainage Scheme UC No. 62 Tehsil Mian Channu Khanewal 12.000 6.000 6.000 6.000 0.465 Completion as per PC-I: (6) months 8. Anticipated Date of completion: 30.06.2019 9. Date of released of funds 03.08.2018 10. Reason of Slow Moving: ------11 No. of beneficiaries 5689 Persons Work in progress.

1. Date of A.A: 26.07.2017 2. Date of T.S: 08.08.2017 3. Date of Pre-Qualification: ------4. Date of Invitation of Tender: 28.09.2017 5. Date of Receipt of Tender: 29.09.2017 6. Rural Drainage Scheme Chak No.134/16-L and Adjoining Date of Work order: 24.10.2017 7. Date of 1436 1948 Khanewal 12.000 6.000 6.000 6.000 1.000 0.536 54% 6.536 54% Abadies Tehsil Mian Channu Completion as per PC-I: (6) months 8. Anticipated Date of completion: 30.06.2019 9. Date of released of funds 03.08.2018 10. Reason of Slow Moving: ------11 No. of beneficiaries 6132 Persons Work in progress.

1. Date of A.A: 26.07.2017 2. Date of T.S: 08.08.2017 3. Date of Pre-Qualification: ------4. Date of Invitation of Tender: 28.09.2017 5. Date of Receipt of Tender: 29.09.2017 6. Rural Drainage Scheme Chak No 20/8-BR, 1/8-R, 2/8-R, Date of Work order: 24.10.2017 7. Date of 1437 1949 Khanewal 12.000 7.000 5.000 5.000 0.834 0.415 50% 7.415 62% 3/8-R, 4/8-R and Adjoining Abadies Tehsil Mian Channu Completion as per PC-I: (6) months 8. Anticipated Date of completion: 30.06.2019 9. Date of released of funds 03.08.2018 10. Reason of Slow Moving: ------11 No. of beneficiaries 6132 Persons Work in progress. 1. Date of A.A: 26.07.2017 2. Date of T.S: 08.08.2017 3. Date of Pre-Qualification: ------4. Date of Invitation of Tender: 28.09.2017 1438 1950 0.084 0% 2.500 83% 5. Date of Receipt of Tender: Drainage & Soling 122/15-L District Khanewal Khanewal 3.000 2.500 0.500 0.500 0 29.09.2017 6. Date of Work order: 24.10.2017 7. Date of Completion as per PC-I: (6) months 8. Anticipated Date of completion: 30.06.2019 9. Date of released of funds 03.08.2018 1.10. Date Reason of A.A: of Slow Moving: ------26.07.2017 2. Date of T.S: 08.08.2017 3. Date of Pre-Qualification: ------4. Date of Invitation of Tender: 28.09.2017 5. Date of Receipt of Tender: 1439 1951 Drainage & Soling 53/15-L District Khanewal Khanewal 3.000 2.500 0.500 0.500 0.084 0 0% 2.500 83% 29.09.2017 6. Date of Work order: 24.10.2017 7. Date of Completion as per PC-I: (3) months 8. Anticipated Date of completion: 30.06.2019 9. Date of released of funds 03-08- 2018 10. Reason of Slow Moving: ------1. Date of A.A: 26.07.2017 2. Date of T.S: 08.08.2017 3. Date of Pre-Qualification: ------4. Date of Invitation of Tender: 28.09.2017 5. Date of Receipt of Tender: 1440 1952 Drainage & Soling 58/15-L District Khanewal Khanewal 3.000 2.500 0.500 0.500 0.084 0 0% 2.500 83% 29.09.2017 6. Date of Work order: 24.10.2017 7. Date of Completion as per PC-I: (3) months 8. Anticipated Date of completion: 30.06.2019 9. Date of released of funds 03-08- 2018 10. Reason of Slow Moving: ------1. Date of A.A: 26.07.2017 2. Date of T.S: 08.08.2017 3. Date of Pre-Qualification: ------4. Date of Invitation of Tender: 28.09.2017 5. Date of Receipt of Tender: 1441 1953 Drainage & Soling 117/15-L District Khanewal Khanewal 3.000 2.500 0.500 0.500 0.084 0 0% 2.500 83% 29.09.2017 6. Date of Work order: 19.10.2017 7. Date of Completion as per PC-I: (3) months 8. Anticipated Date of completion: 30.06.2019 9. Date of released of funds 03-08- 2018 10. Reason of Slow Moving: ------1.11 Date No. ofof beneficiariesA.A: 12065 Persons 26.07.2017 2. Date of T.S: 08.08.2017 3. Date of Pre-Qualification: ------4. Date of Invitation of Tender: 28.09.2017 5. Date of Receipt of Tender: 1442 1954 Drainage & Soling 42/15-L District Khanewal Khanewal 3.000 2.500 0.500 0.500 0.084 0 0% 2.500 83% 29.09.2017 6. Date of Work order: 24.10.2017 7. Date of Completion as per PC-I: (3) months 8. Anticipated Date of completion: 30.06.2019 9. Date of released of funds 03-08- 2018 10. Reason of Slow Moving: ------11 No. of beneficiaries 1837 Persons 1. Date of A.A: 26.07.2017 2. Date of T.S: 08.08.2017 3. Date of Pre-Qualification: ------4. Date of Invitation of Tender: 28.09.2017 1443 1955 0.084 0% 2.500 83% 5. Date of Receipt of Tender: Drainage & Soling 135/16-L District Khanewal Khanewal 3.000 2.500 0.500 0.500 0 29.09.2017 6. Date of Work order: 24.10.2017 7. Date of Completion as per PC-I: (5) months 8. Anticipated Date of completion: 30.06.2019 9. Date of released of funds 03-08- 2018 10. Reason of Slow Moving: ------1. Date of A.A: 26.07.2017 2. Date of T.S: 08.08.2017 3. Date of Pre-Qualification: ------4. Date of Invitation of Tender: 28.09.2017 5. Date of Receipt of Tender: 1444 1956 Drainage & Soling Pakka Haji Majeed District Khanewal Khanewal 3.000 1.700 1.300 1.300 0.217 0 0% 1.700 57% 29.09.2017 6. Date of Work order: 24.10.2017 7. Date of Completion as per PC-I: (3) months 8. Anticipated Date of completion: 30.06.2019 9. Date of released of funds 03-08- 2018 10. Reason of Slow Moving: ------1. Date of A.A: 26.07.2017 2. Date of T.S: 08.08.2017 3. Date of Pre-Qualification: ------4. Date of Invitation of Tender: 28.09.2017 5. Date of Receipt of Tender: 1445 1957 Drainage & Soling Chak No.8-9/8-AR District Khanewal Khanewal 3.000 2.500 0.500 0.500 0.084 0 0% 2.500 83% 29.09.2017 6. Date of Work order: 24.10.2017 7. Date of Completion as per PC-I: (3) months 8. Anticipated Date of completion: 30.06.2019 9. Date of released of funds 03-08- 2018 10. Reason of Slow Moving: ------1. Date of A.A: 19.08.2017 2. Date of T.S: 22.09.2017 3. Date of Pre-Qualification: Constructino of Soling, Drains, Sullage Carrier, RCC 05.09.2017 4. Date of Invitation of Tender: Culverts in Union Councils Salar Wahan, Thull Najeeb, 09.11.2017 5. Date of Receipt of Tender: Man Kot, Chak Norang Shah, Boota Singh, Mari Sahu 11.11.2017 6. Date of Work order: 1446 1958 Khanewal 199.990 72.900 50.000 50.000 8.334 7.965 96% 80.865 40% 26.12.2017 7. Date of Completion as per PC- Ibrahim Pur, Mubarak Pur, 5-Kassi, Mula Pur, Nabi Pur, I: 31.12.2018 8. Anticipated Date of Chak Haider Abad & Monga Wala Tehsil Kabirwala in PP- completion: 30.06.2019 9. Date of released of 213 District Khanewal funds 03-08-2018 10. Reason of Slow Moving: ------11 No. of beneficiaries 11356 Persons Work in progress. 1. Date of A.A: 26.07.2017 2. Date of T.S: 20.09.2017 3. Date of Pre-Qualification: 05.09.2017 4. Date of Invitation of Tender: 09.11.2017 5. Date of Receipt of Tender: Rehabilitation of Sewerage Scheme Tulamba City in 11.11.2017 6. Date of Work order: 1447 1959 Khanewal 49.990 15.000 10.000 10.000 1.667 1.635 98% 16.635 33% 23.11.2017 7. Date of Completion as per PC- missed area Tehsil Mian Channu I: (12)months 8. Anticipated Date of completion: 31.12.2019 9. Date of released of funds 03.08.2018 10. Reason of Slow Moving: ------11 No. of beneficiaries 2690 Persons Work in progress. 1. Date of A.A: 31.07.2017. 2. Date of T.S: 08.08.2017 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 23.10.2017 5. Date of Receipt of Tender: 24.10.2017 6. Date of Water Supply Scheme Chak No.126/WB, 128/WB District Award: 11.12.2017 7. Date of Completion as 1448 1960 Vehari 28.966 10.000 18.966 18.966 3.161 3.161 100% 13.161 45% Vehari per PC-I: 10.12.2018 8. Anticipated Date of Completion: 30.06.2019 9.Date of released of funds 03.08.2018 10. Reason of Slow Moving: NIL 11. No. of Beneficiary= Persons Work is in progress.

1. Date of A.A: 31.07.2017. 2. Date of T.S: 08.08.2017 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 23.10.2017 5. Date of Receipt of Tender: 24.10.2017 6. Date of Rehabiliation of Water Supply Scheme Chak No.96/WB Award: 25.11.2017 7. Date of Completion as 1449 1961 Vehari 15.000 10.000 5.000 5.000 0.834 0.834 100% 10.834 72% District Vehari per PC-I: 24.11.2018 8. Anticipated Date of Completion: 30.06.2019 9.Date of released of funds 03.08.2018 10. Reason of Slow Moving: NIL 11. No. of Beneficiary= Persons Work is in progress.

1. Date of A.A: 31.07.2017. 2. Date of T.S: 08.08.2017 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 23.10.2017 5. Date of Receipt of Tender: 24.10.2017 6. Date of Provision of Water Supply / Filtration Plants & Sewerage Award: 25.11.2017 7. Date of Completion as 1450 1962 Vehari 17.639 10.000 7.639 7.639 1.273 1.273 100% 11.273 64% Scheme Chak No.233/EB District Vehari per PC-I: 24.11.2018 8. Anticipated Date of Completion: 30.06.2019 9.Date of released of funds 03.08.2018 10. Reason of Slow Moving: NIL 11. No. of Beneficiary= Persons Work is in progress.

1. Date of A.A: 31.07.2017. 2. Date of T.S: 08.08.2017 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 23.10.2017 5. Date of Receipt of Tender: 24.10.2017 6. Date of Provision of Water Supply / Filtration Plants & Sewerage Award: 25.11.2017 7. Date of Completion as 1451 1963 Vehari 24.842 10.000 14.842 14.842 2.474 2.474 100% 12.474 50% Scheme Chak No.249/EB District Vehari per PC-I: 24.11.2018 8. Anticipated Date of Completion: 30.06.2019 9.Date of released of funds 03.08.2018 10. Reason of Slow Moving: NIL 11. No. of Beneficiary= Persons Work is in progress.

1. Date of A.A: 31.07.2017. 2. Date of T.S: 08.08.2017 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 23.10.2017 5. Date of Receipt of Tender: 24.10.2017 6. Date of Provision of Water Supply / Filtration Plants & Sewerage Award: 25.11.2017 7. Date of Completion as 1452 1964 Vehari 23.451 10.000 13.451 13.451 2.242 2.242 100% 12.242 52% Scheme Chak No.251/EB District Vehari per PC-I: 24.11.2018 8. Anticipated Date of Completion: 30.06.2019 9.Date of released of funds 03.08.2018 10. Reason of Slow Moving: NIL 11. No. of Beneficiary= Persons Work is in prigress.

1. Date of A.A: 31.07.2017. 2. Date of T.S: 08.08.2017 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 23.10.2017 5. Date of Receipt of Tender: 24.10.2017 6. Date of Provision of Water Supply / Filtration Plants & Sewerage Award: 25.11.2017 7. Date of Completion as 1453 1965 Vehari 20.663 10.000 10.663 10.663 1.777 1.777 100% 11.777 57% Scheme Chak No.243/EB District Vehari per PC-I: 24.11.2018 8. Anticipated Date of Completion: 30.06.2019 9.Date of released of funds 03.08.2018 10. Reason of Slow Moving: NIL 11. No. of Beneficiary= Persons Work is in progress.

1. Date of A.A: 31.07.2017. 2. Date of T.S: 08.08.2017 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 23.10.2017 5. Date of Receipt of Tender: 24.10.2017 6. Date of Rural Sewerage / Drainage & Water Supply Scheme Chak Award: 25.11.2017 7. Date of Completion as 1454 1966 Vehari 31.617 10.000 10.000 10.000 1.667 1.667 100% 11.667 37% No.65/WB District Vehari per PC-I: 24.11.2018 8. Anticipated Date of Completion: 30.06.2019 9.Date of released of funds 03.08.2018 10. Reason of Slow Moving: NIL 11. No. of Beneficiary= Persons Work is in progress.

1. Date of A.A: 31.07.2017. 2. Date of T.S: 08.08.2017 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 23.10.2017 5. Date Construction of Water Filtration Plants 16-No in Chak of Receipt of Tender: 24.10.2017 6. Date of No.05/WB, 18/WB, 22/WB, 65/WB, 59/WB, 93/WB, Award: 25.11.2017 7. Date of Completion as 1455 1967 Vehari 48.000 15.000 33.000 33.000 5.500 5.5 100% 20.500 43% 97/WB, 56/Wb, 34/WB, Pull-48, Pull Mohsin Shah, per PC-I: 24.11.2018 8. Anticipated Date of 63/WB, 24/WB, 26/WB, 226/EB, Puttha Rajbah Vehari Completion: 30.06.2019 9.Date of released of funds 03.08.2018 10. Reason of Slow Moving: NIL 11. No. of Beneficiary= Persons Work is in progress.

1. Date of A.A: 31.07.2017. 2. Date of T.S: 08.08.2017 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 23.10.2017 5. Date of Receipt of Tender: 24.10.2017 6. Date of Rural Water Supply Scheme 176/WB Baghbanpura Award: 20.11.2017 7. Date of Completion as 1456 1968 Vehari 25.171 10.000 15.171 15.171 2.529 2.529 100% 12.529 50% District Vehari per PC-I: 19.11.2018 8. Anticipated Date of Completion: 30.06.2019 9.Date of released of funds 03.08.2018 10. Reason of Slow Moving: NIL 11. No. of Beneficiary= Persons Work is in progress. 1. Date of A.A: 31.07.2017. 2. Date of T.S: 08.08.2017 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 23.10.2017 5. Date of Receipt of Tender: 24.10.2017 6. Date of Rural Water Supply Scheme Chak No.182/WB District Award: 22.11.2017 7. Date of Completion as 1457 1969 Vehari 16.073 10.000 6.073 6.073 1.012 1.012 100% 11.012 69% Vehari per PC-I: 19.11.2018 8. Anticipated Date of Completion: 30.06.2019 9.Date of released of funds 03.08.2018 10. Reason of Slow Moving: NIL 11. No. of Beneficiary= Persons Work is in progress.

1. Date of A.A: 31.07.2017. 2. Date of T.S: 08.08.2017 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 23.10.2017 5. Date of Receipt of Tender: 24.10.2017 6. Date of Rural Water Supply Scheme Chak No.184/WB District Award: 25.11.2017 7. Date of Completion as 1458 1970 Vehari 28.673 10.000 18.673 18.673 3.112 3.112 100% 13.112 46% Vehari per PC-I: 24.11.2018 8. Anticipated Date of Completion: 30.06.2019 9.Date of released of funds 03.08.2018 10. Reason of Slow Moving: NIL 11. No. of Beneficiary= Persons Work is in progress.

1. Date of A.A: 31.07.2017. 2. Date of T.S: 08.08.2017 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 23.10.2017 5. Date Rural Water Supply Scheme Chak No.161/WB District of Receipt of Tender: 24.10.2017 6. Date of 1459 1971 Vehari 18.426 10.000 8.426 8.426 1.405 1.405 100% 11.405 62% Vehari Award: 20.11.2017 7. Date of Completion as per PC-I: 19.11.2018 8. Anticipated Date of Completion: 30.06.2019 9.Date of released of funds 03.08.2018 Work is in progress.

1. Date of A.A: 31.07.2017. 2. Date of T.S: 08.08.2017 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 23.10.2017 5. Date of Receipt of Tender: 24.10.2017 6. Date of Rural Water Supply Scheme Chak No.163/WB District Award: 20.11.2017 7. Date of Completion as 1460 1972 Vehari 31.485 10.000 21.485 21.485 3.581 3.581 100% 13.581 43% Vehari per PC-I: 19.11.2018 8. Anticipated Date of Completion: 30.06.2019 9.Date of released of funds 03.08.2018 10. Reason of Slow Moving: NIL 11. No. of Beneficiary= Persons Work is in progress.

1. Date of A.A: 31.07.2017. 2. Date of T.S: 08.08.2017 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 23.10.2017 5. Date of Receipt of Tender: 24.10.2017 6. Date of Rural Water Supply Scheme Chak No.159/WB District Award: 20.11.2017 7. Date of Completion as 1461 1973 Vehari 17.583 10.000 7.583 7.583 1.264 1.264 100% 11.264 64% Vehari per PC-I: 19.11.2018 8. Anticipated Date of Completion: 30.06.2019 9.Date of released of funds 03.08.2018 10. Reason of Slow Moving: NIL 11. No. of Beneficiary= Persons Work is in progress.

1. Date of A.A: 21.08.2017. 2. Date of T.S: 19.10.2017 3. Date of Pre-Qualification: 27.10.2017 4. Date Invitation of Tender: 29.11.2017 5. Date of Receipt of Tender: Rural Water Supply Scheme Chak No.50/WB Dahlu Hari 30.11.2017 6. Date of Award: 27.12.2017 7. 1462 1974 Vehari 123.590 35.000 50.000 50.000 8.334 8.334 100% 43.334 35% Chand and 52 Sharqi District Vehari Date of Completion as per PC-I: 26.12.2019 8. Anticipated Date of Completion: 30.06.2019 9.Date of released of funds 03.08.2018 10. Reason of Slow Moving: NIL 11. No. of Beneficiary= Persons Work is in progress.

1. Date of A.A: 31.07.2017. 2. Date of T.S: 08.08.2017 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 26.10.2017 5. Date of Receipt of Tender: 28.10.2017 6. Date of Sewerage Schemes Chak No.5/WB, 24/WB, 88/ WB and Award: 25.11.2017 7. Date of Completion as 1463 1975 Vehari 40.000 15.000 10.000 10.000 1.667 1.667 100% 16.667 42% 90/WB. District Vehari per PC-I: 24.11.2018 8. Anticipated Date of Completion: 30.06.2019 9.Date of released of funds 03.08.2018 10. Reason of Slow Moving: NIL 11. No. of Beneficiary= Persons Work is in progress.

1. Date of A.A: 31.07.2017. 2. Date of T.S: 08.08.2017 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 26.10.2017 5. Date of Receipt of Tender: 28.10.2017 6. Date of 1464 1976 1.667 100% 11.667 58% Award: 25.11.2017 7. Date of Completion as Drainage Sewer Scheme Chak No.110/WB District Vehari Vehari 20.000 10.000 10.000 10.000 1.667 per PC-I: 24.11.2018 8. Anticipated Date of Completion: 30.06.2019 9.Date of released of funds 03.08.2018 10. Reason of Slow Moving: NIL 11. No. of Beneficiary= Persons Work is in progress.

1. Date of A.A: 31.07.2017. 2. Date of T.S: 08.08.2017 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 26.10.2017 5. Date of Receipt of Tender: 28.10.2017 6. Date of Construction of Soling, Drainage & Culverts UC 46-173/EB Award: 25.11.2017 7. Date of Completion as 1465 1977 Vehari 15.000 7.500 7.500 7.500 1.250 1.25 100% 8.750 58% District Vehari per PC-I: 24.11.2018 8. Anticipated Date of Completion: 30.06.2019 9.Date of released of funds 03.08.2018 10. Reason of Slow Moving: NIL 11. No. of Beneficiary= Persons Work is in progress.

1. Date of A.A: 31.07.2017. 2. Date of T.S: 08.08.2017 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 26.10.2017 5. Date of Receipt of Tender: 28.10.2017 6. Date of Construction of Soling, Drainage & Culverts UC 53-275/EB Award: 25.11.2017 7. Date of Completion as 1466 1978 Vehari 15.000 7.500 7.500 7.500 1.250 1.25 100% 8.750 58% District Vehari per PC-I: 24.11.2018 8. Anticipated Date of Completion: 30.06.2019 9.Date of released of funds 03.08.2018 10. Reason of Slow Moving: NIL 11. No. of Beneficiary= Persons Work is in progress. 1. Date of A.A: 31.07.2017. 2. Date of T.S: 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 26.10.2017 5. Date of Receipt of Tender: 28.10.2017 6. Date of Award: Construction of Soling, Drainage & Culverts UC 40-128/EB 25.11.2017 7. Date of Completion as per PC- 1467 1979 Vehari 15.000 10.000 5.000 5.000 0.834 0.834 100% 10.834 72% District Vehari I: 24.11.2018 8. Anticipated Date of Completion: 30.06.2019 9.Date of released of funds 03.08.2018 10. Reason of Slow Moving: NIL 11. No. of Beneficiary= Persons Work is in progress. 1. Date of A.A: 31.07.2017. 2. Date of T.S: 08.08.2017 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 26.10.2017 5. Date of Receipt of Tender: 28.10.2017 6. Date of Construction of Soling, Drainage & Culverts UC 44-199/EB Award: 25.11.2017 7. Date of Completion as 1468 1980 Vehari 15.000 10.000 5.000 5.000 0.834 0.834 100% 10.834 72% District Vehari per PC-I: 24.11.2018 8. Anticipated Date of Completion: 30.06.2019 9.Date of released of funds 03.08.2018 10. Reason of Slow Moving: NIL 11. No. of Beneficiary= Persons Work is in progress.

1. Date of A.A: 31.07.2017. 2. Date of T.S: 08.08.2017 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 26.10.2017 5. Date of Receipt of Tender: 28.10.2017 6. Date of Construction of Soling, Drainage & Culverts UC 45-175/EB Award: 25.11.2017 7. Date of Completion as 1469 1981 Vehari 15.000 7.500 7.500 7.500 1.250 1.25 100% 8.750 58% District Vehari per PC-I: 24.11.2018 8. Anticipated Date of Completion: 30.06.2019 9.Date of released of funds 03.08.2018 10. Reason of Slow Moving: NIL 11. No. of Beneficiary= Persons Work is in progress.

1. Date of A.A: 31.07.2017. 2. Date of T.S: 08.08.2017 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 26.10.2017 5. Date of Receipt of Tender: 28.10.2017 6. Date of Construction of Soling , Drainage & Culverts UC49-233/EB Award: 25.11.2017 7. Date of Completion as 1470 1982 Vehari 25.000 12.500 12.500 12.500 2.084 2.084 100% 14.584 58% District Vehari per PC-I: 26.11.2018 8. Anticipated Date of Completion: 30.06.2019 9.Date of released of funds 03.08.2018 10. Reason of Slow Moving: NIL 11. No. of Beneficiary= Persons Work is in progress.

1. Date of A.A: 31.07.2017. 2. Date of T.S: 08.08.2017 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 26.10.2017 5. Date of Receipt of Tender: 28.10.2017 6. Date of Construction of Soling , Drainage & Culverts UC47-215/EB Award: 25.11.2017 7. Date of Completion as 1471 1983 Vehari 25.000 12.500 12.500 12.500 2.084 2.084 100% 14.584 58% District Vehari per PC-I: 24.11.2018 8. Anticipated Date of Completion: 30.06.2019 9.Date of released of funds 03.08.2018 10. Reason of Slow Moving: NIL 11. No. of Beneficiary= Persons Work is in progress. 1. Date of A.A: 31.07.2017. 2. Date of T.S: 07.08.2017 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 26.10.2017 5. Date of Receipt of Tender: 28.10.2017 6. Date of Construction of Soling , Drainage & Culverts UC48-187/EB Award: 25.11.2017 7. Date of Completion as 1472 1984 Vehari 15.000 12.500 2.500 2.500 0.417 0.417 100% 12.917 86% District Vehari per PC-I: 24.11.2018 8. Anticipated Date of Completion: 30.06.2019 9.Date of released of funds 03.08.2018 10. Reason of Slow Moving: NIL 11. No. of Beneficiary= Persons Work is in progress.

1. Date of A.A: 31.07.2017. 2. Date of T.S: 08.08.2017 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 26.10.2017 5. Date of Receipt of Tender: 28.10.2017 6. Date of Rural Sewerage / Drainage Scheme Chak No. 57/WB Award: 25.11.2017 7. Date of Completion as 1473 1985 Vehari 15.000 7.000 8.000 8.000 1.334 1.334 100% 8.334 56% Tehsil & District Vehari per PC-I: 24.11.2018 8. Anticipated Date of Completion: 30.06.2019 9.Date of released of funds 03.08.2018 10. Reason of Slow Moving: NIL 11. No. of Beneficiary= Persons Work is in progress. 1. Date of A.A: 31.07.2017. 2. Date of T.S: 08.08.2017 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 26.10.2017 5. Date of receipt of tender: 28.10.2017 6. Date of Rural Sewerage / Drainage Scheme Chak No. 53/WB Award: 25.11.2017 7. Date of Completion as 1474 1986 Vehari 16.000 8.000 8.000 8.000 1.334 1.334 100% 9.334 58% Tehsil & District Vehari per PC-I: 24.11.2018 8. Anticipated Date of Completion: 30.06.219 9.Date of released of funds 03.08.2018 10. Reason of Slow Moving: NIL 11. No. of Beneficiary= Persons Work is in progress. 1. Date of A.A: 06.09.2017. 2. Date of T.S: 08.08.2017 3. Date of Pre-Qualification: 27.10.2017 4. Date Invitation of Tender: 29.11.2017 5. Date of receipt of tender: Rehabilitation and Extension of Water Supply & Sewerage 30.11.2017 6. Date of Award: 19.01.2018 7. 1475 1987 Vehari 279.804 75.000 100.000 100.000 16.667 16.667 100% 91.667 33% Schemes Mailsi and Adjoining Abadies. District Vehari Date of Completion as per PC-I: 18.01.2021 8. Anticipated Date of Completion: 18.01.2021 9.Date of released of funds 03.08.2018 10. Reason of Slow Moving: NIL 11. No. of Beneficiary= Persons Work is in progress. Construction of Sewerage Nali Soling & Culverts / Bridge Dera Ghazi 1476 1988 11.000 5.000 6.000 6.000 1.000 0.5 50% 5.500 50% "• Date of A.A = 13.1.17 UC Khakhi. DG Khan Khan Construction of Nali Soling Tuff Tile & Culverts UC Kala Dera Ghazi 1477 1989 12.000 5.000 7.000 7.000 1.167 0.47 40% 5.470 46% "• Date of A.A = 13.1.17 DG Khan Khan Construction of Nali Soling Tuff Tile & Culverts UC Shadan Dera Ghazi 1478 1990 14.000 6.000 8.000 8.000 1.334 0.61 46% 6.610 47% "• Date of A.A = 13.1.17 Lund DG Khan Khan Construction of Nali Soling Tuff Tile & Culverts UC Kot Dera Ghazi 1479 1991 11.500 5.000 6.500 6.500 1.084 0.44 41% 5.440 47% "• Date of A.A = 13.1.17 Mubarak, Shero Satal and Yaroo DG Khan Khan Construction of Nali Soling Culverts and Tuff Tile U/C Dera Ghazi 1480 1992 20.000 10.000 10.000 10.000 1.667 0.67 40% 10.670 53% "• Date of A.A = 13.1.17 Palgah Chak NO.3 DG Khan Khan Construction of Nali Soling & Culverts UC Dagar Chitt. DG Dera Ghazi 1481 1993 13.000 7.000 6.000 6.000 1.000 0.5 50% 7.500 58% "• Date of A.A = 13.1.17 Khan Khan Construction of Nali Soling Tuff Tile of Basti Foja and Dera Ghazi 1482 1994 14.000 7.000 7.000 7.000 1.167 0.47 40% 7.470 53% "• Date of A.A = 13.1.17 Darkhast Jamal Janubi DG Khan Khan Construction of Nali Soling Tuff Tiles in UC Basti Malana Dera Ghazi 1483 1995 13.610 7.000 6.610 6.610 1.102 0.45 41% 7.450 55% "• Date of A.A = 13.1.17 DG Khan Khan Construction of Nali / Drainage Tuff Tile Choti City and Dera Ghazi 1484 1996 40.000 15.000 25.000 25.000 4.167 0.867 21% 15.867 40% "• Date of A.A = 13.1.17 Colonies DG Khan Khan Dera Ghazi 1485 1997 Water Supply Scheme City Choti Zereen District DG Khan 50.000 15.000 35.000 35.000 5.834 2.042 35% 17.042 34% "• Date of A.A = 25.7.2017 Khan Rehabilitation and Augmentation of Water Supply Scheme Dera Ghazi 1486 1998 30.000 10.000 10.000 10.000 1.667 0.583 35% 10.583 35% "• Date of A.A = 25.7.2017 of Choti Zareen Khan Construction of PCC Drainage / Tuff Tile in NA-171 DG Dera Ghazi 1487 1999 155.000 40.000 100.000 100.000 16.667 6.667 40% 46.667 30% "• Date of A.A = 16.09.2017 Khan Khan Dera Ghazi 1488 2000 Rural Water Supply Scheme Nutkani District DG Khan 80.000 20.000 30.000 30.000 5.000 1.5 30% 21.500 27% "• Date of A.A = 16.09.2017 Khan Construction of Nali Soling Tuff Tiles & Culverts UC Shero Dera Ghazi 1489 2001 3.000 2.500 0.500 0.500 0.084 0.084 100% 2.584 86% "• Date of A.A = 25.7.2017 Satai DG Khan Khan Dera Ghazi 1490 2002 Construction of Nali Soling Culverts Jhok,Uttra DG Khan 3.000 2.500 0.500 0.500 0.084 0.084 100% 2.584 86% "• Date of A.A = 25.7.2017 Khan Construction of Nali Soling in Jukharr Imam & Sherru Dera Ghazi 1491 2003 3.000 2.500 0.500 0.500 0.084 0.084 100% 2.584 86% "• Date of A.A = 25.7.2017 Qasbas Khan Rehabilitation of Water Supply in Block Churatta District Dera Ghazi 1492 2004 20.000 10.000 10.000 10.000 1.667 0.583 35% 10.583 53% "• Date of A.A = 25.7.2017 DG Khan Khan Rehabilitation of Water Supply in Union Gaddai District Dera Ghazi 1493 2005 20.000 10.000 10.000 10.000 1.667 0.583 35% 10.583 53% "• Date of A.A = 25.7.2017 DG Khan Khan Dera Ghazi 1494 2006 Sewerage and Tuff Tiles in PP-244 District DG Khan 90.000 30.000 20.000 20.000 3.334 1.2 36% 31.200 35% "• Date of A.A = 16.09.2017 Khan Rehabilitation of Rural Water Supply Scheme in Thul Sirak 1495 2007 Rajanpur 15.000 10.000 5.000 5.000 0.834 0.834 100% 10.834 72% "• Date of A.A = 09.01.2018 & Thul Jaman Tehsil Jampur, District Rajanpur. Rural drainage / sewerage, PCC & Tuff Tile Flooring 1496 2008 Rajanpur 20.000 10.000 10.000 10.000 1.667 1.667 100% 11.667 58% "• Date of A.A = 04.08.2017. Rajanpur City of left over area District Rajanpur Construction of Tuff Tile, Soling, Sewerage, Drainage and 1497 2009 Rajanpur 25.000 10.000 15.000 15.000 2.500 2.5 100% 12.500 50% "• Date of A.A = 04.08.2017. Street etc Rajan Pur City Construction of Street, Soling, Sewerage, Drainage, Tuff 1498 2010 Rajanpur 25.000 10.000 15.000 15.000 2.500 2.5 100% 12.500 50% "• Date of A.A = 04.08.2017. tiles in District Rajan Pur City Provision of Sewerage & Tuff Tile Kot Tahir City District 1499 2011 Rajanpur 20.000 10.000 10.000 10.000 1.667 1.667 100% 11.667 58% "• Date of A.A = 04.08.2017. Rajanpur Installation of 1000 Nos. Deep Hand Pumps at Pachad 1500 2012 Rajanpur 35.000 12.000 23.000 23.000 3.834 3.834 100% 15.834 45% "• Date of A.A = 04.08.2017. Area, District Rajanpur. Rehabilitation of water supply in scheme Basti Tuski in 1501 2013 Rajanpur 16.000 8.000 8.000 8.000 1.334 1.334 100% 9.334 58% "• Date of A.A = 04.08.2017. District Rajan Pur Water supply scheme in Veeni Khosa to Hajoo Via Basti 1502 2014 Rajanpur 13.000 6.000 7.000 7.000 1.167 1.167 100% 7.167 55% "• Date of A.A = 04.08.2017. Riaz hambae UC-Wah Lashari in District Rajanpur 1503 2015 Deep Hand Pump in Pachad Area 200No Rajanpur 50.000 16.000 34.000 34.000 5.667 5.667 100% 21.667 43% "• Date of A.A = 04.08.2017. Provision of Sewerage and Tuff Tile Kotla Mughlan. Disrict 1504 2016 Rajanpur 30.000 10.000 20.000 20.000 3.334 3.334 100% 13.334 44% "• Date of A.A = 04.08.2017. Rajan Pur Provision of Sewerage & Tuff Tile at Basti Cheena, Basti 1505 2017 Rajanpur 30.000 10.000 20.000 20.000 3.334 3.334 100% 13.334 44% "• Date of A.A = 04.08.2017. Talai Wala U/C Kot Janu. Disrict Rajan Pur Provision of Sewerage & Tuff Tile Noshera Gharbi. Disrict 1506 2018 Rajanpur 20.000 10.000 10.000 10.000 1.667 1.667 100% 11.667 58% "• Date of A.A = 04.08.2017. Rajan Pur Construction of Soling and Drain UC Jhugi Wala District 1507 2019 Muzaffargarh 20.000 10.000 10.000 10.000 1.667 0.4 24% 10.400 52% Date of AA 31.7.2017 Muzaffargarh Construction of Soling, Tuff Tiles & Drain UC Seetpur 1508 2020 Muzaffargarh 20.000 10.000 10.000 10.000 1.667 0.52 31% 10.520 53% Date of AA 31.7.2017 District Muzaffargarh Provision of Soling Tuff Tiles & Drains in Union Council 1509 2021 Muzaffargarh 20.000 10.000 10.000 10.000 1.667 0.47 28% 10.470 52% • Date of AA 11.01.2018 Alludewall, District Muzaffargarh (Revised) Construction of Soling Tuff Tiles & Drains in Union Council 1510 2022 Muzaffargarh 20.000 10.000 10.000 10.000 1.667 0.41 25% 10.410 52% • Date of AA 11.01.2018 Meeran Pur, District Muzaffargarh (Revised) Construction of Soling Tuff Tiles & Drains in Union Council 1511 2023 Muzaffargarh 20.000 10.000 10.000 10.000 1.667 0.49 29% 10.490 52% Date of AA 11.01.2018 Usman Koria, District Muzaffargarh (Revised) Construction of PCC/ Drainage and Tuff Tiles District 1512 2024 Muzaffargarh 90.000 25.000 20.000 20.000 3.334 0.98 29% 25.980 29% • Date of A.A 06.9.2017 Muzaffargarh Date of AA= 27-07-2017. . Date of T.S=08-08- 2017. Date of tender; 23-10-2017.. Date of Water Supply Scheme in Chak No.115/DB Kachi Tehsil award:-31-10-2017.. Date of completion. 30- 1513 2025 Bahawalpur 20.000 10.000 10.000 10.000 1.667 0 0% 10.000 50% Yazman District Bahawalpur. 07-2018.. Anticipated date of completion 30- 06-2019. Date of receipt of funds by F.D. 20.07.2018. Work is in progress. Cosntruction of Soling / Drainage and Culverts Tuff Tiles 1514 2026 Municipal Committee Daira Deen Panah District Muzaffargarh 20.000 10.000 10.000 10.000 1.667 0.45 27% 10.450 52% "• Date of AA 31.7.2017 Muzaffargarh Drainage / Soling / UC Thath Gurmani, U/C Gurmani 1515 2027 Sharqi, U/C Sheikh Umar, U/C Daya Jokha Sharqi, U/C Muzaffargarh 100.000 30.000 20.000 20.000 3.334 1.1 33% 31.100 31% "• Date of A.A 06.9.2017 Gujrat U/C Allud District Muzaffargarh Muzaffargarh City Sewerage Scheme Soling / Drainage, 1516 2028 Muzaffargarh 50.000 20.000 10.000 10.000 1.667 0.44 26% 20.440 41% "• Date of AA 31.7.2017 Tuff Tiles District Muzaffargarh Construction of Soling / Drainage Tuff Tiles Union Council 1517 2029 Muzaffargarh 30.000 10.000 10.000 10.000 1.667 0.47 28% 10.470 35% "• Date of AA 31.7.2017 Taleri Doaba District Muzaffargarh Construction of Soling / Drainage Tuff Tiles Union Council 1518 2030 Muzaffargarh 30.000 10.000 10.000 10.000 1.667 0.51 31% 10.510 35% "• Date of AA 31.7.2017 Bhutta Pur District Muzaffargarh Drainage / Soling / Tuff Tiles / Culverts K.D Qurehi, 1519 2031 Gulqaim Mastoi, Budh, Wanpitafi, Sharif Chujra, Ali Dah, Muzaffargarh 50.000 20.000 10.000 10.000 1.667 0.49 29% 20.490 41% "• Date of AA 31.7.2017 Dawna, Mehmood Kot District Muzaffargarh Construction of Soling / Drainage Tuff Tile Culverts sullage Carrier Pull Pullet PPC Allied Work etc Qureshi Aabwala 1520 2032 Rahim Ali Mulan Walidad Mazhay wala Tibbi Godar Muzaffargarh 60.000 20.000 10.000 10.000 1.667 0.42 25% 20.420 34% "• Date of AA 31.7.2017 Chowk Sanwai Syed Hassan Shah Bakhsh Wala Jada Chandai District Muzaffargarh Const: of Soling/ Sewerage Drain UC Jhanday Wali UC 1521 2033 Manikpur UC Darien UC Shahjamal UC Alludeywali District Muzaffargarh 30.000 10.000 10.000 10.000 1.667 0.44 26% 10.440 35% "• Date of AA 31.7.2017 Muzaffargarh Construction of Soling and Driange work in UC-Dammar 1522 2034 Muzaffargarh 25.000 10.000 15.000 15.000 2.500 0.84 34% 10.840 43% "• Date of AA 31.7.2017 Wala and Kotla Gmaoon, District Muzaffargarh Construction of Soling and Driange work in Calor Wali 1523 2035 Muzaffargarh 25.000 10.000 15.000 15.000 2.500 0.79 32% 10.790 43% "• Date of AA 31.7.2017 Qadir Pur and Damar Wali, District Muzaffargarh Construction of Soling and Driange work in Janda Wali 1524 2036 Muzaffargarh 15.000 7.000 8.000 8.000 1.334 0.36 27% 7.360 49% "• Date of AA 31.7.2017 Aluda Wali and Mahal Khakhi, District Muzaffargarh Const: of Soling Drain Tuff Tile VR Bridges UC Kotla 1525 2037 Muzaffargarh 30.000 10.000 20.000 20.000 3.334 1 30% 11.000 37% "• Date of AA 31.7.2017 Gamon District Muzaffargarh Const: of Soling Drain Tuff Tile VR Bridges UC Kotla Lal 1526 2038 Muzaffargarh 30.000 10.000 20.000 20.000 3.334 0.97 29% 10.970 37% "• Date of AA 31.7.2017 Shah District Muzaffargarh Const: of Soling Drain Tuff Tile VR Bridges UC Shehr 1527 2039 Muzaffargarh 30.000 10.000 10.000 10.000 1.667 0.39 23% 10.390 35% "• Date of AA 31.7.2017 Sultan District Muzaffargarh Const: of Soling Drain Tuff Tile VR Bridges UC Vains 1528 2040 Muzaffargarh 30.000 10.000 20.000 20.000 3.334 1.1 33% 11.100 37% "• Date of AA 31.7.2017 District Muzaffargarh Const: of Soling Drain Tuff Tile VR Bridges UC Jhalarin 1529 2041 Muzaffargarh 30.000 10.000 20.000 20.000 3.334 0.99 30% 10.990 37% "• Date of AA 31.7.2017 District Muzaffargarh Const: of Soling Drain Tuff Tile VR Bridges UC Bair Bund 1530 2042 Muzaffargarh 30.000 10.000 20.000 20.000 3.334 0.87 26% 10.870 36% "• Date of AA 31.7.2017 District Muzaffargarh Const: of Soling Drain Tuff Tile VR Bridges UC Binda 1531 2043 Muzaffargarh 30.000 10.000 20.000 20.000 3.334 1.2 36% 11.200 37% "• Date of AA 31.7.2017 Ishaq District Muzaffargarh Drainange / Soling / Tuff Tile / Culverts Gul Wala, Khanpur 1532 2044 Muzaffargarh 30.000 10.000 20.000 20.000 3.334 1 30% 11.000 37% "• Date of AA 31.7.2017 Fazil Kalroo District Muzaffargarh Construction of Soling and Driange work in UC-Vains and 1533 2045 Muzaffargarh 15.000 5.000 10.000 10.000 1.667 0.5 30% 5.500 37% "• Date of AA 31.7.2017 Basti Arif Wala, District Muzaffargarh Construction of Soling and Driange work in Jatoi, Rampur, 1534 2046 Nichrani, Baber, Azam Khan and Kasir Gazlani, District Muzaffargarh 15.000 7.000 8.000 8.000 1.334 0.3 22% 7.300 49% "• Date of AA 31.7.2017 Muzaffargarh Construction of Soling and Driange work in Rohilan Wali, 1535 2047 Muzaffargarh 15.000 7.000 8.000 8.000 1.334 0.4 30% 7.400 49% "• Date of AA 31.7.2017 Binday Wali and Khakhi, District Muzaffargarh Construction of Soling and Driange work in Miyan Sawar 1536 2048 Muzaffargarh 15.000 7.000 8.000 8.000 1.334 0.45 34% 7.450 50% "• Date of AA 31.7.2017 Mochi Wala Ganga and Khakhi, District Muzaffargarh

Construction of Soling and Driange work in Baily Wala and 1537 2049 Muzaffargarh 15.000 7.000 8.000 8.000 1.334 0.44 33% 7.440 50% "• Date of AA 31.7.2017 Bait Umar Draz and Bindi Pitafi, District Muzaffargarh Construction of PCC/Drainage and Tuff Tile in NA179 and 1538 2050 Muzaffargarh 65.000 25.000 20.000 20.000 3.334 1.23 37% 26.230 40% "• Date of A.A 06.9.2017 PP-258 District Muzaffargarh Construction of Tuff Tile Drainge Sewerage Soling PCC 1539 2051 Layyah 100.000 35.000 20.000 20.000 3.334 1 30% 36.000 36% • Date of AA = 15.08.2017 Slab and different work PP-262 District Layyah Construction of Tuff Tile Drainage Sewerage Soling PCC 1540 2052 Layyah 120.000 30.000 30.000 30.000 5.000 1.75 35% 31.750 26% • Date of AA = 15.08.2017 Slab and different work PP-263 District Layyah Construction of Tuff Tile Drainage Sewerage Soling PCC 1541 2053 Layyah 100.000 30.000 50.000 50.000 8.334 3.3 40% 33.300 33% • Date of AA = 15.08.2017 Slab and different work PP-264 District Layyah Comprehensive sewerage / Drainage scheme along with 1542 2054 Layyah 100.000 30.000 70.000 70.000 11.667 4.4 38% 34.400 34% • Date of AA = 15.08.2017 tuff Tile in Choubara city District Layyah. 1543 2055 Swerage Drainge / Tuff Tiles for Layyah city Layyah 300.000 75.000 150.000 150.000 25.000 9.4 38% 84.400 28% • Date of AA = 06.09.2017 Construction of Sewerage/Drains and Laying of Tuff Administrative Approval issued on dated. 08- 1544 2056 Layyah 143.137 10.000 63.891 63.891 10.649 3.7 35% 13.700 10% Tiles/Soling in UC, Sirishta Thal District Layyah 01-2018. Rural Sewerage/ Drainage / Brick Pavement / Tuff Tiles in 1545 2057 Union Council 164-A / TDA and Adjoining Abadies Tehsil Layyah 20.000 10.000 10.000 10.000 1.667 0.58 35% 10.580 53% • Date of AA = 29.07.2017 District Layyah Date of AA= 27-07-2017. . Date of T.S=08-08- 2017. Date of tender; 12-10-2017.. Date of Const. of Road, Sewerage & tuff Tile Chak No.5/BC award:-26-10-2017.. Date of completion. 25- 1546 2058 Bahawalpur 11.889 6.000 5.889 5.889 0.982 0 0% 6.000 50% District Bahawalpur 10-2018.. Anticipated date of completion 30- 06-2019. Date of receipt of funds by F.D. 20.07.2018. Work is in progress. Date of AA = 27-07-2017.. Date of T.S 29.09.2017. . Date of receipt of tender: 12-10- Const. of Road, Sewerage & Tuff Tile Basti Hansarah 2017.. Date of award: 31.10.2017.. Date of 1547 2059 Bahawalpur 15.000 6.000 9.000 9.000 1.500 0 0% 6.000 40% completion: 30.07.2018. Anticipated date of District Bahawalpur completion 30-06-2019. Date of receipt of funds by F.D. 20.07.2018. Work is in progress. Date of AA= 27-07-2017. . Date of T.S=08-08- 2017. Date of receipt of tender: 16-10-2017.. P/L of Sewerage and Tuff Tile Basti Inayati Tehsil Date of award:-31-10-2017.. Date of 1548 2060 Bahawalpur 29.000 15.000 14.000 14.000 2.334 2.11 90% 17.110 59% Khairpur Tamewali District Bahawalpur completion. 30.01.2019.. Date of receipt of funds by F.D. 20.07.2018. Work is in progress. Date of AA= 27-07-2017. . Date of T.S=08-08- 2017. Date of receipt of tender: 12-10-2017.. P/L of Sewerage and Tuff Tile Basti Bohran Tehsil Date of award:-31-10-2017.. Date of 1549 2061 Bahawalpur 15.300 5.000 10.300 10.300 1.717 1.687 98% 6.687 44% completion. 30.07.2018. Anticipated date of Khairpur Tamewali District Bahawalpur completion 30-06-2019. Date of receipt of funds by F.D. 20.07.2018. Work is in progress. Date of AA= 08.08.2017 . Date of T.S=08-08- 2017. Date of receipt of tender: 16-10-2017.. Sewerage/Drainage/Tuff Tiles/ Sullage in 189/Murad Date of award:-31-10-2017.. Date of 1550 2062 Bahawalpur 22.000 10.000 12.000 12.000 2.000 0 0% 10.000 45% adjoining Abadies District Bahawalpur completion. 30.01.2019.. Date of receipt of funds by F.D. 20.07.2018. Work is in progress. Date of AA= 08.08.2017 . Date of T.S=08-08- 2017. Date of receipt of tender: 16-10-2017.. Sewerage/Drainage/Tuff Tiles/ Sullage in 147/Murad and Date of award:-31-10-2017.. Date of 1551 2063 Bahawalpur 35.000 10.000 10.000 10.000 1.667 0 0% 10.000 29% adjoining Abadies District Bahawalpur completion. 30.01.2019.. Date of receipt of funds by F.D. 20.07.2018. Work is in progress. Date of AA= 08.08.2017 . Date of T.S=08-08- 2017. Date of receipt of tender: 16-10-2017.. Sewerage/Drainage/Tuff Tiles/ Sullage in 179/Murad and Date of award:-31-10-2017.. Date of 1552 2064 Bahawalpur 35.100 15.000 10.000 10.000 1.667 0.012 1% 15.012 43% adjoining Abadies District Bahawalpur completion. 30.01.2019.. Date of receipt of funds by F.D. 20.07.2018. Work is in progress. Date of AA= 08.08.2017 . Date of T.S=08-08- 2017. Date of receipt of tender: 16-10-2017.. Sewerage/Drainage/Tuff Tiles/ Sullage in 160/Murad Date of award:-31-10-2017.. Date of 1553 2065 Bahawalpur 35.100 15.000 10.000 10.000 1.667 0 0% 15.000 43% Adjoining Abadies, District Bahawalpur completion. 30.01.2019.. Date of receipt of funds by F.D. 20.07.2018. Work is in progress. Date of AA= 27-07-2017. . Date of T.S=08-08- 2017. Date of receipt of tender: 16-10-2017.. Const. of Sewarage & Tuff Tile Basti Kori Wala, Hoot Wala Date of award:-31-10-2017.. Date of 1554 2066 Bahawalpur 20.000 10.000 10.000 10.000 1.667 0 0% 10.000 50% completion. 30.07.2018.. Anticipated date of District Bahawalpur completion 30-06-2019. Date of receipt of funds by F.D. 20.07.2018. Work is in progress. Date of AA= 27-07-2017. . Date of T.S=08-08- 2017. Date of receipt of tender: 12-10-2017.. Rehabilitation of water supply schemes in Chak no.5/DNB Date of award:-31-10-2017.. Date of 1555 2067 Bahawalpur 20.488 10.000 10.488 10.488 1.748 0 0% 10.000 49% completion. 30.07.2018.. Anticipated date of Tehsil Yazman District Bahawalpur completion 30-06-2019. Date of receipt of funds by F.D. 20.07.2018. Work is in progress. Date of AA= 27-07-2017. . Date of T.S=08-08- 2017. Date of receipt of tender: 23-10-2017.. Rehabilitation of water supply schemes in Chak Date of award:-31-10-2017.. Date of 1556 2068 Bahawalpur 20.802 15.000 5.802 5.802 0.967 0 0% 15.000 72% completion. 30.07.2018.. Anticipated date of no.14/DNB Tehsil Yazman District Bahawalpur completion 30-06-2019. Date of receipt of funds by F.D. 20.07.2018. Work is in progress. Date of AA= 27-07-2017. . Date of T.S=08-08- 2017. Date of receipt of tender: 23-10-2017.. Rehabilitation of water supply schemes in Chak Date of award:-31-10-2017.. Date of 1557 2069 Bahawalpur 17.490 10.000 7.490 7.490 1.249 0 0% 10.000 57% completion. 30.07.2018.. Anticipated date of no.76/DNB Tehsil Yazman District Bahawalpur completion 30-06-2019. Date of receipt of funds by F.D. 20.07.2018. Work is in progress. Date of AA= 27-07-2017. . Date of T.S=08-08- 2017. Date of receipt of tender: 23-10-2017.. Rehabilitation of water supply schemes in Chak Date of award:-31-10-2017.. Date of 1558 2070 Bahawalpur 21.552 10.000 11.552 11.552 1.926 0 0% 10.000 46% completion. 30.07.2018.. Anticipated date of no.24/DNB Tehsil Yazman District Bahawalpur completion 30-06-2019. Date of receipt of funds by F.D. 20.07.2018. Work is in progress. Date of AA= 27-07-2017. . Date of T.S=08-08- 2017. Date of receipt of tender: 23-10-2017.. Rehabilitation of water supply schemes in Chak No.44/DB Date of award:-31-10-2017.. Date of 1559 2071 Bahawalpur 46.980 25.000 10.000 10.000 1.667 0 0% 25.000 53% Tehsil Yazman, District Bahawalpur. completion. 30.01.2019.. Date of receipt of funds by F.D. 20.07.2018. Work is in progress. Date of AA= 27-07-2017. . Date of T.S=08-08- 2017. Date of receipt of tender: 23-10-2017.. Rehabilitation of water supply schemes in Chak Date of award:-31-10-2017.. Date of 1560 2072 Bahawalpur 22.680 15.000 7.680 7.680 1.280 0 0% 15.000 66% completion. 30.07.2018.. Anticipated date of No.143/DB Tehsil Yazman, District Bahawalpur. completion 30-06-2019. Date of receipt of funds by F.D. 20.07.2018. Work is in progress. Date of AA= 27-07-2017. . Date of T.S=08-08- 2017. Date of receipt of tender: 23-10-2017.. Date of award:-31-10-2017.. Date of 1561 2073 Water Supply scheme of Chak No.114/DNB Bahawalpur 18.000 10.000 8.000 8.000 1.334 0.55 41% 10.550 59% completion. 30.07.2018.. Anticipated date of completion 30-06-2019. Date of receipt of funds by F.D. 20.07.2018. Work is in progress. Date of AA= 27-07-2017. . Date of T.S=08-08- 2017. Date of receipt of tender: 16-10-2017.. Date of award:-31-10-2017.. Date of 1562 2074 Sewerage Scheme Chak No.86/DB District Bahawalpur Bahawalpur 19.359 8.000 11.359 11.359 1.893 0 0% 8.000 41% completion. 30.07.2018.. Anticipated date of completion 30-06-2019. Date of receipt of funds by F.D. 20.07.2018. Work is in progress. Date of AA= 27-07-2017. . Date of T.S=08-08- 2017. Date of receipt of tender: 16-10-2017.. Date of award:-31-10-2017.. Date of 1563 2075 Sewerage Scheme Chak No.53/DB District Bahawalpur Bahawalpur 20.588 9.000 11.588 11.588 1.932 0 0% 9.000 44% completion. 30.07.2018.. Anticipated date of completion 30-06-2019. Date of receipt of funds by F.D. 20.07.2018. Work is in progress. Date of AA= 27-07-2017. . Date of T.S=08-08- 2017. Date of receipt of tender: 12-10-2017.. Date of award:-31-10-2017.. Date of 1564 2076 Sewerage Scheme Chak No.68/DB District Bahawalpur Bahawalpur 16.397 5.000 11.397 11.397 1.900 0 0% 5.000 30% completion. 30.07.2018.. Anticipated date of completion 30-06-2019.. Date of receipt of funds by F.D. 20.07.2018. Work is in progress. Date of AA= 27-07-2017. . Date of T.S= 31.07-2017. Date of tender; 12-10-2017.. Rehabilitation of Sewerage Scheme/Drainage and Tuff Date of award:-26-10-2017.. Date of 1565 2077 Bahawalpur 12.086 9.000 3.086 3.086 0.515 0 0% 9.000 74% completion. 25-09-2018.. Anticipation date of Tiles City Noor Pur Noranga District Bahawalpur completion.30-06-2019. Date of receipt of funds by F.D. 20.07.2018. Work is in progress. Date of AA= 27-07-2017. . Date of T.S=08-08- 2017. Date of receipt of tender: 16-10-2017.. P/L Sewerage /Tuff Tile City Hathaiji Mouza Hathaiji Tehsil Date of award:-31-10-2017.. Date of 1566 2078 Bahawalpur 50.000 20.000 30.000 30.000 5.000 0 0% 20.000 40% Ahmadpur East District Bahawalpur completion. 30.01.2019.. Date of receipt of funds by F.D. 20.07.2018. Work is in progress. Date of AA= 27-07-2017. . Date of T.S=09-08- 2017. Date of receipt of tender: 16-10-2017.. P/L Sewerage /Tuff Tile Mubrakpur City Tehsil Ahmadpur Date of award:-31-10-2017.. Date of 1567 2079 Bahawalpur 40.000 7.000 10.000 10.000 1.667 0 0% 7.000 18% East District Bahawalpur completion. 30.01.2019. . Date of receipt of funds by F.D. 20.07.2018. Work is in progress. Date of AA= 27-07-2017. . Date of T.S=09-08- 2017. Date of receipt of tender: 16-10-2017.. Provision of Tuff Tile & Sanitation Scheme in Hatiji Tehsil Date of award:-31-10-2017.. Date of 1568 2080 Bahawalpur 40.000 15.000 10.000 10.000 1.667 0 0% 15.000 38% Ahmadpur East Ditrict Bahawalpur completion. 30.01.2019.. Date of receipt of funds by F.D. 20.07.2018. Work is in progress. Date of A.A(DDC) 03-08-2017.. Date of T.S. 08-08-2017. Date of receipt of tender. 11-09- Provision of Water supply Chak No. 202-206/M, 128- 2017.. Date of work award. 22-09-2017. Date 1569 2081 Bahawalnagar 50.000 15.000 20.000 20.000 3.334 3.334 100% 18.334 37% of completion. 31-12-2018.. Anticipation date 132/M, 133-134/M, 176/M, 60/4/R District Bahawalnagar of completion 30-06-2019. Date of receipt of funds by F.D. 20.07.2018. Work is in progress.. Date of A.A(DDC) 03-08-2017.. Date of T.S. 08-08-2017. Date of receipt of tender. 11-09- Provision and laying of water supply schemes Chak 2017.. Date of work award. 22-09-2017. Date 1570 2082 Bahawalnagar 25.000 10.000 15.000 15.000 2.500 2.499 100% 12.499 50% of completion. 31-12-2018.. Anticipation date No.53/F alongwith allied basties District Bahawalnagar of compltion.30-06-2019. Date of receipt of funds by F.D. 20.07.2018. Work is in progress.. Date of A.A(DDC) 03-08-2017.. Date of T.S. 08-08-2017. Date of receipt of tender. 11-09- Rehabilitation of water supply schemes Chak No.45/F 2017.. Date of work award. 22-09-2017. Date 1571 2083 Bahawalnagar 15.000 10.000 5.000 5.000 0.834 0.833 100% 10.833 72% of completion. 30-09-2018.. Anticipation date Jattan wali District Bahawalnagar of completion 30-06-2019. Date of receipt of funds by F.D. 20.07.2018. Work is in progress.. Date of A.A 09-08-2017. . Date of T.S. Rural Water Supply Scheme/ Sewerage/ Drainage 12.10.2017. . prequalification of the scheme Sri Ram Pura, Khair Shah, Bhaluka, Puna, contractors. 31.10.2017. Date of receipt of 1572 2084 4.167 0% 55.014 69% Tender from prequalified contractors on 16-11- Habibka, Allah Buksh Lalika, Bunga Machi Murad Wala, Bahawalnagar 80.000 55.000 25.000 25.000 0.014 2017 .Date of award. 30-12-2017.Date of Musa Bhota Jhulan Arrain, Sanateka, Jurana Basti, Kup completion. 29-12-2018.Date of receipt of Quraishian, Chak Jodheka, Bhaluka, Chakmadrass, Distr funds by F.D. 20.07.2018. Work is in progress.. Date of A.A 09-08-2017. Date of T.S. Construction of Soling / Water Supply in Union Councils 12.10.2017. prequalification of the contractors Islam Pura, Fateh Kot, Malik Pura, Sawae Wala, completed on 31.10.2017. Date of receipt of 1573 2085 Muhammad Pur, Koryanwala, Denan, Sondha, Gulaab Ali, Bahawalnagar 100.000 30.000 30.000 30.000 5.000 4.928 99% 34.928 35% tender. 16-11-2017 .. Date of work awarded. Barah Sajwad Khan, Teko Raam, Donga Bonga District 11-12-2017.. Date of completion. 10-12- Bahawalnagar 2018.. Date of receipt of funds by F.D. 20.07.2018. Work is in progress.. Date of A.A 03-08-2017. . Date of T.S 08-08- 2017. . Date of receipt of tender 11-09-2017.. Rural Water supply scheme of Khiraaj Pura and Goband Date of work awarded 31.10.2017.. Date of 1574 2086 Bahawalnagar 15.000 7.000 8.000 8.000 1.334 0 0% 7.000 47% Pur District Bahawalnagar completion 30.10.2018.. Date of receipt of funds by F.D. 20.07.2018. Work is in progress.. Date of A.A 03-08-2017. . Date of T.S 08-08- 2017. . Date of receipt of tender received Rural Water supply scheme of Maakhe wali, Mohan Pura, 27.11.2017.. Date of work awarded. 30-11- 1575 2087 Bahawalnagar 15.000 7.000 8.000 8.000 1.334 0.042 3% 7.042 47% Jeeto, Jhugyan District Bahawalnagar 2017. Date of completion 29-12-2018 . Date of receipt of funds by F.D. 20.07.2018. Work is in progress.. Date of A.A 03-08-2017. . Date of T.S 08-08- 2017. . Date of receipt of tender 11-09-2017.. Rural water supply scheme of Taalya and Dhaban District Date of work awarded 31.10.2017.. Date of 1576 2088 Bahawalnagar 15.000 7.000 8.000 8.000 1.334 0 0% 7.000 47% Bahawalnagar completion 30.10.2018.. Date of receipt of funds by F.D. 20.07.2018. Work is in progress.. Date of A.A(DDC) 03-08-2017.. Date of T.S. Rehabilitation of Rural Water Supply Scheme Chak No. 08-08-2017. Date of receipt of tender. 11-09- 1577 2089 3.135 99% 13.100 45% 2017.. Date of work award. 22-09-2017. Date 143/6-R including all Adjoining Abadies Tehsil Haroonabad Bahawalnagar 28.807 10.000 18.807 18.807 3.1 of completion. 31-12-2018.. Date of receipt of District Bahawalnagar funds by F.D. 20.07.2018. Work is in progress.. Date of A.A 03-08-2017.. Date of T.S. 08.08.2017. .. Date of receipt of tender 11-11- Rural Water Supply Scheme Chak No. 196/HB Tehsil 2017.. Date of work award. 16-11-2017.. Date 1578 2090 Bahawalnagar 25.000 10.000 15.000 15.000 2.500 0 0% 10.000 40% Fortabbas District Bahawalnagar of completion 15-11-2018. Date of receipt of funds by F.D. 20.07.2018. Work is in progress.. Date of A.A(DDC) 03-08-2017.. Date of T.S. Rehabilitation of Rural Water Supply Scheme Chak No. 08-08-2017. Date of receipt of tender. 11-09- 1579 2091 5.000 100% 25.000 50% 2017.. Date of work award. 22-09-2017. Date 70/4-R & 84/5-R Including All Adjoining Abadies Tehsil Bahawalnagar 50.000 20.000 30.000 30.000 5 of completion. 31-12-2018.. Date of receipt of Haroonabad District Bahawalnagar funds by F.D. 20.07.2018. Work is in progress.. Date of A.A(DDC) 03-08-2017.. Date of T.S. Rural Water Supply Scheme Chak No. 237,238,239/9R & 08-08-2017. Date of receipt of tender. 11-09- 1580 2092 4.167 0% 15.000 38% 2017.. Date of work award. 02-10-2017. Date 239/HB Including All Adjoining Abadies Tehsil Fortabbas. Bahawalnagar 40.000 15.000 25.000 25.000 0 of completion. 31-12-2018.. Date of receipt of District Bahawalnagar funds by F.D. 20.07.2018. Work is in progress.. Date of A.A(DDC) 03-08-2017.. Date of T.S. Rehabilitation of Rural Water Supply Scheme Chak No. 08-08-2017. Date of receipt of tender. 11-09- 1581 2093 4.167 98% 19.100 48% 2017.. Date of work award. 22-09-2017. Date 82/5-R &138-139/6-R Including All Adjoining Abadies Bahawalnagar 40.000 15.000 25.000 25.000 4.1 of completion. 31-12-2018.. Date of receipt of Tehsil Haroonabad District Bahawalnagar funds by F.D. 20.07.2018. Work is in progress.. Date of A.A(DDC) 03-08-2017.. Date of T.S. Rehabilitation of Rural Water Supply Scheme Chak No. 08-08-2017. Date of receipt of tender. 11-09- 1582 2094 4.724 100% 20.380 46% 2017.. Date of work award. 22-09-2017. Date 53/4-R & 137/6-R Including All Adjoining Abadies Tehsil Bahawalnagar 44.000 15.658 28.342 28.342 4.722 of completion. 31-12-2018.. Date of receipt of Haroonabad District Bahawalnagar funds by F.D. 20.07.2018. Work is in progress.. Date of A.A(DDC) 03-08-2017.. Date of T.S. 08-08-2017. Date of receipt of tender. 11-09- Provision of Soling, Drainage system, Erection of Tuff 2017.. Date of work award. 02-10-2017. Date 1583 2095 Bahawalnagar 44.000 16.000 10.000 10.000 1.667 0.029 2% 16.029 36% Tiles in Mandi Sadiq Gunj city. District Bahawalnagar of completion. 31-12-2018.. Date of receipt of funds by F.D. 20.07.2018. Work is in progress.. Date of A.A(DDC) 03-08-2017.. Date of T.S. 08-08-2017. Date of receipt of tender. 11-09- Provision of Soling, Drainage System, Erection of Tuff 2017.. Date of work award. 28-10-2017. Date 1584 2096 Bahawalnagar 50.000 20.000 10.000 10.000 1.667 1.667 100% 21.667 43% Tiles in Macloed Gunj city. District Bahawalnagart of completion. 31-12-2018.. Date of receipt of funds by F.D. 20.07.2018. Work is in progress.. Date of A.A(DDC) 03-08-2017.. Date of T.S. 08-08-2017. Date of receipt of tender. 11-09- Provision of Soling, Drainage System Erection of Tuff Tiles 2017.. Date of work award. 28-10-2017. Date 1585 2097 Bahawalnagar 21.000 10.000 11.000 11.000 1.834 0 0% 10.000 48% in Madhaniwal District Bahawalnagar of completion. 31-12-2018.. Date of receipt of funds by F.D. 20.07.2018. Work is in progress.. Date of A.A 03-08-2017. . Date of T.S 08-08- 2017. . Date of Tender receipt 11-09-2017.. Provision of Soling, Drainage System, Erection of Tuff Date of award 31.10.2017.. Date of 1586 2098 Bahawalnagar 45.000 22.000 10.000 10.000 1.667 1.639 98% 23.639 53% Tiles in Hasil Sarrhu. District Bahawalnagar completion 30.01.2019.. Date of receipt of funds by F.D. 20.07.2018. Work is in progress.. Date of A.A 03-08-2017. . Date of T.S 05.08.2017. . Date of tender receipt 11-09- Provision of Soling, Tuff Tile, Drainage in Mouza 2017.. Date of award 31.10.2017. Date of 1587 2099 Bahawalnagar 12.000 10.000 2.000 2.000 0.334 0 0% 10.000 83% Muharram Cheena. District Bahawalnagar completion 30.10.2017.. Date of receipt of funds by F.D. 20.07.2018. Work is in progress.. Date of A.A(DDC) 03-08-2017.. Date of T.S. 08-08-2017. Date of receipt of tender. 11-09- Provision of Soling, Tuff Tile, Drainage in Mouza 2017.. Date of work award. 02-10-2017. Date 1588 2100 Bahawalnagar 21.000 10.000 11.000 11.000 1.834 0 0% 10.000 48% Hassanwala. District Bahawalnagar of completion. 31-12-2018.. Date of receipt of funds by F.D. 20.07.2018. Work is in progress.. Date of A.A 09-08-2017. . Date of T.S. Sewerage / drainage scheme Sri Ram Pura, Khair Shah, 12.10.2017. . prequalification of the Bhaluka, Puna, Habibka, Allah buksh Lalika, Bunga Machi contractors. 31.10.2017. . Date of receipt of 1589 2101 3.334 2% 30.058 20% Tender from prequalified contractors on 16-11- Murad wala, Musa Bhota Jhulan Arrain, Sanateka, Jattu Bahawalnagar 150.000 30.000 20.000 20.000 0.058 2017 . Date of award. 30-12-2017. Date of wal Deen Pure, Chak Hotyana and Jurana Hafizabad completion 29-03-2019.. Date of receipt of District Bahawalnagar funds by F.D. 20.07.2018. Work is in progress.. Date of A.A 09-08-2017. Date of T.S 06-11- Providing and laying sewerage schemes Chak No.98/F, 2017. Date of receipt of tender: 10-01-2018. 1590 2102 5.000 0% 30.000 30% Date of award: 23.01.2018. Date of Bakhshan Khan, Chak 54/F, 105/F, 10/FW, 174/M District Bahawalnagar 100.000 30.000 30.000 30.000 0 completion 30.06.2019. Date of receipt of Bahawalnagar funds by F.D. 20.07.2018. Work is in progress.. Date of A.A (DDSC). 28-09-2017.. Date of T.S. 17-10-2017.. Prequalification completed Rehabilitation of Sewerage, City Yazman District on 06-11-2017.. Date of receipt of tender from 1591 2103 Bahawalpur 300.000 60.000 100.000 100.000 16.667 0.075 0% 60.075 20% Prequalified contractors on 05-12-2017 .Date Bahawalpur of award. 01-01-2018.. Date of completion. 31- 12-2019. Date of receipt of funds by F.D. 20.07.2018. Work is in progress.

Date of A.A 03-08-2017. . Date of T.S 08-08- Construction of Sewer Lines and Tuff Tiles in City Area 2017.. Date of tender receipt 11-09-2017.. 1592 2104 Bahawalnagar 18.000 10.000 8.000 8.000 1.334 0 0% 10.000 56% Date of award 31.10.2017. Date of completion Haroonabad Tehsil Haroonabad District Bahawalnagar 31.10.2018.. Date of receipt of funds by F.D. 20.07.2018. Work is in progress.. Date of A.A. 09-08-2017.. Date of T.S. 04.10.2017. . Tender received on 10-01- Construction of Tuff Paverment urban area City Chistian 2018. Date of award: 23.01.2018.. Date of 1593 2105 Bahawalnagar 100.000 30.000 50.000 50.000 8.334 0 0% 30.000 30% Ward No.1 to 36 District Bahawalnagar completion 30.06.2019. Date of receipt of funds by F.D. 20.07.2018. Work is in progress.. Scheme approved on 02-11-2017 by DDC. Provision of Soling Drainage System Erection of Tuff Tile Tender received on 27-11-2017 .Date of in Moti Pur, Qadir Pur, Munshi Other, Basti Shah receipt of funds by FD.05-03-2018. Date of 1594 2106 Bahawalnagar 15.000 10.000 5.000 5.000 0.834 0 0% 10.000 67% award. 29-12-2017. Date of completion 26-06- Bharamka, Manzoor Kot, Chak Saroo, Chak Saroo, Chak 2018. Anticipated date of acompletion. 30-06- Tehsil Minchanabad District Bahawalnagar 2019. Date of receipt of funds by F.D. 20.07.2018. Work is in progress.. Date of A.A(DDC) 03-08-2017. . Date of T.S. 08-08-2017. . Date of receipt of tender.12-09- Construction of Sewer Lines and Tuff Tiles in Faqir Wali 2017.. Date of work award. 22-09-2017.. Date 1595 2107 Bahawalnagar 40.000 12.000 10.000 10.000 1.667 0.914 55% 12.914 32% Tehsil Haroonabad District Bahawalnagar of completion. 21-12-2018.. Date of receipt of funds by F.D. 20.07.2018. Work is in progress..

The scheme Provision of Soiling, Tuff Tile, Drainage in Mouza Muharram Cheena District Bahawalnagar reflected in ADP-2017-18 was substituted by Standing Committee of the Cabinet on Finance & Development in its meeting held on 20-09-2017 as proposed by Mian Fida Hussain Watto EX-MPA PP-277 and minutes of meeting issued vide S&GAD No.SO(CAB-II)1-2/2017(Fin-170) dated 06-10- 2017. Scheme approved on 02-11-2017 by Provision of Soiling, Tuff Tile, Drainage in Mouza DDC. Tender received on 27-11-2017 & 1596 2108 Bahawalnagar 3.000 2.500 0.500 0.500 0.084 0 0% 2.500 83% Muharram Cheena. District Bahawalnagar under process of award due to non availability of funds during 2017-2018. Now the substituted scheme has not been reflected in ADP-2018-2019 namely Provision of Soling, Drainage system Erection of Tuff tiles in Bhaini sikandar jassoka and Mouza Shamon Jasooka Tehsil Minchanabad, District Bahawalnagar. . Date of receipt of funds by F.D. 20.07.2018. Case has been sent to C.E(S), PHED Lahore for correction of name of scheme on 09-08-2018

Date of A.A. 05.08.2017.. Date of T.S. 09.08.2017. . Date of receipt of Tender: Constuction PCC Draiinge / Soling in NA-193 District Rahim Yar 07.09.2017.. Date of award: 31.10.2017.. 1597 2109 40.013 13.000 10.000 10.000 1.667 0 0% 13.000 32% Date of completion: 28.02.2018.. Anticipated Rahim Yar Khan Khan date of completion 30-06-2019. Date of receipt of funds by F.D. 20.07.2018. Work is in progress.. Date of A.A. 05.08.2017.. Date of T.S. 09.08.2017. . Date of receipt of Tender: Construction of laying Sewerage, Water Supply & Tuff Rahim Yar 07.09.2017.. Date of award: 31.10.2017.. 1598 2110 30.000 26.424 3.576 3.576 0.596 0 0% 26.424 88% Date of completion: 31.06.2018.. Anticipated Tiles City Sadiqabad District Rahim Yar Khan Khan date of completion 30-06-2019. Date of receipt of funds by F.D. 20.07.2018. Work is in progress.. Date of A.A. 09-08-2017. . Date of T.S 26-10- 2017. Date of receipt of Tenders from Rahim Yar prequalified contractors 27-12-2017.. Date of 1599 2111 Mega Sewerage Scheme Roads & Tuff Tile Kotsamaba 100.000 30.000 50.000 50.000 8.334 0 0% 30.000 30% Khan award 21-02-2018.. Date of completion 20-10- 2019. . Date of receipt of funds by F.D. 20.07.2018. Work is in progress. Date of A.A. 05.08.2017.. Date of T.S. 09.08.2017. . Date of receipt of Tender: Providing / Lying of Tuff Tiles Both Sides of Road from Rahim Yar 07.09.2017.. Date of award: 31.10.2017.. 1600 2112 Attock Petrolium to Chowk Din Pur Sharif Length: 1.50 KM 31.500 10.000 10.000 10.000 1.667 0 0% 10.000 32% Date of completion: 31.01.2018.. Anticipated Khan District Rahim Yar Khan date of completion 30-06-2019. Date of receipt of funds by F.D. 20.07.2018. Work is in progress.. 1. Date of AA = 02.08.2017 2. Date of TS = 28.08.2017 3.Date of Award of work P/L Tuff Tile, Sewer Line PCC and Street Lights in 31.10.2017 4.Dated of Released Funds 1601 2113 Mohallah Rehmanabad, Karamabad, Moqeet Town and Chiniot 40.827 10.000 10.000 10.000 1.667 1.525 91% 11.525 28% 30.10.2017 Funds Released on 03.08.2018 Sagheer Colony in Tehsil and District Chiniot by the Chief Engineer (South) PHED Lahore and work is in progress. Target progress will be achieve in coming month. 1. Date of AA = 02.08.2017 2. Date of TS = 28.08.2017 3.Date of Award of work Rural Drainage Scheme / PCC Slab For Mouza Rao Bagh 31.10.2017 Funds Released on 03.08.2018 1602 2114 Chiniot 29.995 7.500 10.000 10.000 1.667 1.43 86% 8.930 30% Tehsil and Distt. Chiniot by the Chief Engineer (South) PHED Lahore and work is in progress. Target progress will be achieve in coming month. 1. Date of AA = 02.08.2017 2. Date of TS = Construction of PCC / Soling / Drainage / Street and Tuff 26.08.2017 3.Date of Award of work Tiles in Mohallah Adda Road Haidry Chowk Lalian, Baldia 31.10.2017 4.Dated of Released Funds 1603 2115 Road Al Qaim Medical Store Afzal Bhatti Mehar Sikandar Chiniot 14.993 10.000 4.993 4.993 0.832 0.56 67% 10.560 70% 30.10.2017 Funds Released on 03.08.2018 Lali Chowk, Gala Mandi Paka Bazar Abadi Bil Muqabil by the Chief Engineer (South) PHED Lahore Baldiya office Aqab Abadi Police and work is in progress. Target progress will be achieve in coming month. 1. Date of AA = 02.08.2017 2. Date of TS = Construction of PCC / Soling / Drainage / Street and Tuff 28.08.2017 3.Date of Award of work Tiles in Mohallah Afzal Bhatti Doctor Bashir Road Heli 31.10.2017 4.Dated of Released Funds 1604 2116 Chowk Laliyan, beli Chowk Laliyan, Beli Chowk to soling/ Chiniot 23.000 10.000 13.000 13.000 2.167 1.69 78% 11.690 51% 30.10.2017 Funds Released on 03.08.2018 Sheikh Muhammad Hussain Airan Store Jhang Road via by the Chief Engineer (South) PHED Lahore Hujra Mor, Beli/ Hujra Road to and work is in progress. Target progress will be achieve in coming month. 1. Date of AA = 02.08.2017 2. Date of TS = Construction of PCC / Soling / Drainage / Street and Tuff 28.08.2017 3.Date of Award of work Tiles in Mohallah Ahmadabad Chowk Bazar Kocha Bandi 31.10.2017 4.Dated of Released Funds 1605 2117 Ward no. 10, Chongi no. 5 to Jamia Mosque Chowk Chiniot 17.907 10.000 7.907 7.907 1.318 1.135 86% 11.135 62% 30.10.2017 Funds Released on 03.08.2018 Bangla Road,Bangla Road to Chowk Bazar, Kot by the Chief Engineer (South) PHED Lahore Muhammad Yar- Nawab Chowk Aqeeb Baldiya Office Mo and work is in progress. Target progress will be achieve in coming month. Construction of PCC / Soling / Drainage / Street and Tuff 1. Date of AA = 02.08.2017 2. Date of TS = Tiles in Mohallah Jamiya Mosque Bangla Road Nawab 28.08.2017 3.Date of Award of work 1606 2118 1.667 78% 6.295 23% 31.10.2017 Funds Released on 03.08.2018 Chowk Imtiaz Lali Chowk, Old Eid gah Changran - Chiniot 26.900 5.000 10.000 10.000 1.295 by the Chief Engineer (South) PHED Lahore Qadirabad Wark No 3, Ghulam Mustafabad Ward no 4, and work is in progress. Target progress will Dera Mehar Imtiaz Lali to Haidery Chowk Police be achieve in coming month. 1. Date of AA = 02.08.2017 2. Date of TS = Construction of PCC / Soling / Drainage / Street and Tuff 28.08.2017 3.Date of Award of work Tiles in Mohallah Allah Chowk to Sargodha Road, Station 31.10.2017 Funds Released on 03.08.2018 1607 2119 Chiniot 25.500 5.000 10.000 10.000 1.667 1.078 65% 6.078 24% Noorpur Ward no. 2, Ward no. 5 Laliyan, Tariqabad Ward by the Chief Engineer (South) PHED Lahore no. 6 Lalian and work is in progress. Target progress will be achieve in coming month. Construction of PCC / Soling / Drainage / Street and Tuff 1. Date of AA = 02.08.2017 2. Date of TS = Tiles in Mohallah Jamia Mosque ward no 7 Laliyan, Imtia 28.08.2017 3.Date of Award of work 1608 2120 1.667 95% 6.580 31% 31.10.2017 Funds Released on 03.08.2018 Town New Eidgah Umerabad ward no. 11 Phase I, Imtiaz Chiniot 21.499 5.000 10.000 10.000 1.58 by the Chief Engineer (South) PHED Lahore Town New Eidgah Umerabad ward no 11 Phase II, and work is in progress. Target progress will including Bangla Road to Pir Qatbi Shah be achieve in coming month. Construction of PCC / Soling / Drainage / Street and Tuff 1. Date of AA = 02.08.2017 2. Date of TS = Tiles in Mohallah Dars Colony Bashir Colony Jaly Dar 28.08.2017 3.Date of Award of work 1609 2121 1.750 58% 6.023 39% 31.10.2017 Funds Released on 03.08.2018 Dakhli Laliyan, Miana Thatha Zahoor Colony Dakhli Chiniot 15.500 5.000 10.500 10.500 1.023 by the Chief Engineer (South) PHED Lahore Laliyan, Mouza oilywala Hujra Hujra Colony Abadi near and work is in progress. Target progress will Petrol Pump Dakhli Laliyan,Mouza Bhais be achieve in coming month. Construction of PCC / Soling / Drainage / Street and Tuff 1. Date of AA = 02.08.2017 2. Date of TS = Tiles in Mohallah Pulliyan Abadi Rana Colony Soling 28.08.2017 3.Date of Award of work 1610 2122 1.667 58% 5.972 19% 31.10.2017 Funds Released on 03.08.2018 remaining Portion sargodha road to Rana Colony Dakhli Chiniot 31.100 5.000 10.000 10.000 0.972 by the Chief Engineer (South) PHED Lahore Laliyan, Soling, Mouza Wala, Mouza Thathi Bala Raja, and work is in progress. Target progress will Mouza Kalu wal. be achieve in coming month. 1. Date of AA = 02.08.2017 2. Date of TS = Construction of PCC / Soling / Drainage / Street and Tuff 28.08.2017 3.Date of Award of work Tiles Pullian Mouza Ahmad Nagar, Carpet City Ladhiyan 31.10.2017 Funds Released on 03.08.2018 1611 2123 Chiniot 32.000 10.000 10.000 10.000 1.667 1.562 94% 11.562 36% Phase-I, Carpet City Ladhiyan Phase-II, and alongwith by the Chief Engineer (South) PHED Lahore Road Mouza Changarwala. and work is in progress. Target progress will be achieve in coming month. 1. Date of AA = 02.08.2017 2. Date of TS = Provision Drainage/Sewerage/Nallah/PCC/Tuff Tile /Brick 28.08.2017 3.Date of Award of work 1612 2124 1.667 98% 11.627 23% 31.10.2017 Funds Released on 03.08.2018 Pavement including all allied works of UC 11, District Chiniot 49.988 10.000 10.000 10.000 1.627 by the Chief Engineer (South) PHED Lahore Chiniot and work is in progress. Target progress will be achieve in coming month. 1. Date of AA = 02.08.2017 2. Date of TS = Provision Drainage/Sewerage/Nallah/PCC/Tuff Tile /Brick 28.08.2017 3.Date of Award of work 1613 2125 1.667 94% 16.559 33% 31.10.2017 Funds Released on 03.08.2018 Pavement including all allied works of UC 12, District Chiniot 49.990 15.000 10.000 10.000 1.559 by the Chief Engineer (South) PHED Lahore Chiniot and work is in progress. Target progress will be achieve in coming month. 1. Date of AA = 02.08.2017 2. Date of TS = Provision Drainage/Sewerage/Nallah/PCC/Tuff Tile /Brick 28.08.2017 3.Date of Award of work 1614 2126 1.667 97% 16.625 33% 31.10.2017 Funds Released on 03.08.2018 Pavement including all allied works of UC 13, District Chiniot 49.982 15.000 10.000 10.000 1.625 by the Chief Engineer (South) PHED Lahore Chiniot and work is in progress. Target progress will be achieve in coming month. 1. Date of AA = 02.08.2017 2. Date of TS = Provision Drainage/Sewerage/Nallah/PCC/Tuff Tile /Brick 28.08.2017 3.Date of Award of work 1615 2127 1.667 65% 14.078 28% 31.10.2017 Funds Released on 03.08.2018 Pavement including all allied works of UC 14, District Chiniot 49.982 13.000 10.000 10.000 1.078 by the Chief Engineer (South) PHED Lahore Chiniot and work is in progress. Target progress will be achieve in coming month. 1. Date of AA = 02.08.2017 2. Date of TS = Provision Drainage/Sewerage/Nallah/PCC/Tuff Tile /Brick 28.08.2017 3.Date of Award of work 1616 2128 2.500 68% 16.689 33% 31.10.2017 Funds Released on 03.08.2018 Pavement including all allied works of UC 15, District Chiniot 49.986 15.000 15.000 15.000 1.689 by the Chief Engineer (South) PHED Lahore Chiniot and work is in progress. Target progress will be achieve in coming month. 1. Date of AA = 02.08.2017 2. Date of TS = 28.08.2017 3.Date of Award of work Provision Drainage/Sewerage/Nallah/PCC/Tuff Tile /Brick 31.10.2017 Funds Released on 03.08.2018 1617 2129 2.500 64% 11.590 23% and work is in progress. Target progress will Pavement including all allied works of UC 21, District Chiniot 49.990 10.000 15.000 15.000 1.59 be achieve in coming month. Funds Released Chiniot on 03.08.2018 by the Chief Engineer (South) PHED Lahore and work is in progress. Target progress will be achieve in coming month. 1. Date of AA = 02.08.2017 2. Date of TS = Provision Drainage/Sewerage/Nallah/PCC/Tuff Tile /Brick 28.08.2017 3.Date of Award of work 1618 2130 2.500 69% 16.720 33% 31.10.2017 Funds Released on 03.08.2018 Pavement including all allied works of UC 22, District Chiniot 49.980 15.000 15.000 15.000 1.72 by the Chief Engineer (South) PHED Lahore Chiniot and work is in progress. Target progress will be achieve in coming month. Substitution of Schemes Already reflected in ADP 2017-18 vide No. / ASCM (Coord & Construction of Soling / Drainage / Chak No. 587/Gb, Dev.) / CMO / 17 / OT-47 / (SUBT) No. 1619 2131 Faisalabad 26.997 10.000 16.997 16.997 2.833 0 0% 10.000 37% 152043 dated 07.2017 AA issued on District Faisalabad 15.11.2017 for 8 No. Schemes in which 2 No. Schemes relates to XEN Higyway. Funds released on 03.08.2018 Construction of Streets and Drainage at Ward No.6, 1620 2132 Gujranwala 5.000 2.500 2.500 2.500 0.000 0 #DIV/0! 2.500 50% Scheme completed, funds re-approrpriated District Gujranwala Construction of Streets and Drainage at Ward No.7, 1621 2133 Gujranwala 5.000 2.500 2.500 2.500 0.000 0 #DIV/0! 2.500 50% Scheme completed, funds re-approrpriated District Gujranwala Construction of Streets and Drainage at Ward No.8, 1622 2134 Gujranwala 5.000 2.500 2.500 2.500 0.000 0 #DIV/0! 2.500 50% Scheme completed, funds re-approrpriated District Gujranwala Provision of PCC / Sewerage / Drainage / Soling etc. in 1623 2135 Gujranwala 10.000 5.000 5.000 5.000 0.000 0 #DIV/0! 5.000 50% Scheme completed. Funds re-appropriated. Village Jajoki, Teshil Nowsehra Virkan, District Gujranwala Rehabilitatin Improvement of Streets in Village Pir Kot 1624 2136 Gujranwala 10.000 5.000 5.000 5.000 0.000 0 #DIV/0! 5.000 50% Scheme completed. Funds re-appropriated. Tehsil Wazirabad, District Gujrnawala Construction of PCC, Sewerage/Drains at UC 63 District 1625 2137 Gujranwala 10.000 5.000 5.000 5.000 0.000 0 #DIV/0! 5.000 50% Scheme completed, funds re-approrpriated Gujranwala Construction of Gallian Nallian PCC Soling and Tuff Tile in 1626 2138 Gujranwala 10.000 5.000 5.000 5.000 0.000 0 #DIV/0! 5.000 50% Scheme completed, funds re-approrpriated UC Nadala Sindhowan Construction of Gallian Nallian PCC Soling and Tuff Tile in 1627 2139 Gujranwala 10.000 5.000 5.000 5.000 0.000 0 #DIV/0! 5.000 50% Scheme completed, funds re-approrpriated UC Mandiala Tabsa Construction of Gallian Nallian PCC Soling and Tuff Tile in 1628 2140 Gujranwala 10.000 5.000 5.000 5.000 0.000 0 #DIV/0! 5.000 50% Scheme completed. Funds re-appropriated. UC Chak Ram Daas Construction of Gallian Nallian PCC Soling and Tuff Tile in 1629 2141 Gujranwala 10.000 5.000 5.000 5.000 0.000 0 #DIV/0! 5.000 50% Scheme completed, funds re-approrpriated UC Dheer Bain Construction of Gallian Nallian PCC Soling and Tuff Tile in 1630 2142 Gujranwala 10.000 5.000 5.000 5.000 0.000 0 #DIV/0! 5.000 50% Scheme completed, funds re-approrpriated UC Kotli Nawab Construction of Gallian Nallian PCC Soling and Tuff Tile in 1631 2143 Gujranwala 10.000 5.000 5.000 5.000 0.000 0 #DIV/0! 5.000 50% Scheme completed, funds re-approrpriated UC Wando Construction of Gallian Nallian PCC Soling and Tuff Tile in 1632 2144 Gujranwala 10.000 5.000 5.000 5.000 0.000 0 #DIV/0! 5.000 50% Scheme completed, funds re-approrpriated UC Kali Suba Construction of Gallian Nallian PCC Soling and Tuff Tile in 1633 2145 Gujranwala 10.000 5.000 5.000 5.000 0.000 0 #DIV/0! 5.000 50% Scheme completed, funds re-approrpriated UC Sohawa Dhalwan Construction of Gallian Nallian PCC Soling and Tuff Tile in 1634 2146 Gujranwala 10.000 5.000 5.000 5.000 0.000 0 #DIV/0! 5.000 50% Scheme completed, funds re-approrpriated UC Nangal Dona Singh Construction of Gallian Nallian PCC Soling and Tuff Tile in 1635 2147 Gujranwala 10.000 5.000 5.000 5.000 0.000 0 #DIV/0! 5.000 50% Scheme completed, funds re-approrpriated UC Gona Osar Construction of Streets and Drainage at Ward No.1 District 1636 2148 Gujranwala 5.000 2.500 2.500 2.500 0.000 0 #DIV/0! 2.500 50% Scheme completed, funds re-approrpriated Gujranwala Construction of Streets and Drainage at Ward No.2, 1637 2149 Gujranwala 5.000 2.500 2.500 2.500 0.000 0 #DIV/0! 2.500 50% Scheme completed, funds re-approrpriated District Gujranwala Construction of Streets and Drainage at Ward No.3, 1638 2150 Gujranwala 5.000 2.500 2.500 2.500 0.000 0 #DIV/0! 2.500 50% Scheme completed, funds re-approrpriated District Gujranwala Construction of Streets and Drainage at Ward No.4, 1639 2151 Gujranwala 5.000 2.500 2.500 2.500 0.000 0 #DIV/0! 2.500 50% Scheme completed, funds re-approrpriated District Gujranwala Construction of Streets and Drainage at Ward No.5, 1640 2152 Gujranwala 5.000 2.500 2.500 2.500 0.000 0 #DIV/0! 2.500 50% Scheme completed, funds re-approrpriated District Gujranwala Construction of PCC Tuff Tile & Draiange at Railway Road, 1641 2153 Gujranwala 5.650 2.825 2.825 2.825 0.000 0 #DIV/0! 2.825 50% Scheme completed, funds re-approrpriated Salamat Pura, Kamoki, District Gujranwala Construction of PCC & Drainage at Street Nos.13,14,15,16,17 and St. Masjid-E-Shuhda, Ahl-E- 1642 2154 Gujranwala 6.755 3.378 3.377 3.377 0.000 0 #DIV/0! 3.378 50% Scheme completed, funds re-approrpriated Hadith, Tibba Muhammad Nagar, Kamoki, District Gujranwala 1643 2155 Installation of filteration Plant Naseebabad Lahore 5.350 0.951 4.399 4.399 0.733 0 0% 0.951 18% Site yet to be identified by community Installation of Water Filteration Plant at Village Class Marri 1644 2156 Lahore 5.350 2.833 2.517 2.517 0.420 0 0% 2.833 53% Site yet to be identified by community Lahore. Installation of Water Filteration Plant at Village Gallian 1645 2157 Lahore 5.350 0.886 4.464 4.464 0.744 0 0% 0.886 17% Site yet to be identified by community Khuda Bakhsh Lahore. Construction of PCC, Soling, Drain and Nallah in Chak No. Nankana 1646 2158 11, 8, 7, 6, 18, 16, 15, 14 GB and Chak No 01 (Khoti 30.000 10.000 10.000 10.000 1.667 0 0% 10.000 33% Work is in progress. Sahib Wala) Nizam Pura District nankanasahib 1. Date of A.A: 04-12-2017. 2. Date of T.S: 06- 12-2017 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 03-01-2018 5. Date of Receipt of Tender: 04-01-2018 6. Date of Water Supply Dera Dogran Bhutta Colony Rukn Deen Pur, Award: 10-02-2018 7. Date of Completion as 1647 2159 Lodhran 39.263 10.000 29.263 29.263 4.877 3.152 65% 13.152 33% District Lodhran per PC-I: 28-02-2018 8. Anticipated Date of Completion: 08-02-2019 9.Date of released of funds 10. Reason of Slow Moving: 11.No. of Benificiary= Persons. 3821 Work is in Progress.

1. Date of A.A: 04-12-2017. 2. Date of T.S: 06- 12-2017 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 03-01-2018 5. Date of Receipt of Tender: 04-01-2018 6. Date of 1648 2160 4.529 57% 12.576 34% Award: 07-02-2018 7. Date of Completion as Water Supply Scheme Kotli Wajjwah, District Lodhran Lodhran 37.175 10.000 27.175 27.175 2.576 per PC-I: 28-02-2018 8. Anticipated Date of Completion: 04-02-2019 9.Date of released of funds 10. Reason of Slow Moving: 11.No. of Benificiary= Persons. 5367 Work is in Progress.

1. Date of A.A: 04-12-2017. 2. Date of T.S: 06- 12-2017 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 03-01-2018 5. Date of Receipt of Tender: 04-01-2018 6. Date of Water Supply Scheme Haifzaabad Dunyapur Gharbi Award: 06-02-2018 7. Date of Completion as 1649 2161 Lodhran 49.805 10.000 39.805 39.805 6.634 3.086 47% 13.086 26% Remainig Portion Dunyapur Sharqi, District Lodhran per PC-I: 28-02-2018 8. Anticipated Date of Completion: 04-02-2019 9.Date of released of funds 10. Reason of Slow Moving: 11.No. of Benificiary= Persons. 4731 Work is in Progress.

1. Date of A.A: 04-12-2017. 2. Date of T.S: 06- 12-2017 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 03-01-2018 5. Date of Receipt of Tender: 04-01-2018 6. Date of Water Supply Scheme in Chak No.359/Wb District Award: 06-02-2018 7. Date of Completion as 1650 2162 Lodhran 19.309 10.000 9.309 9.309 1.552 1.096 71% 11.096 57% Lodhran per PC-I: 28-02-2018 8. Anticipated Date of Completion: 04-02-2019 9.Date of released of funds 10. Reason of Slow Moving: 11.No. of Benificiary= Persons. 4235 Work is in Progress.

1. Date of A.A: 04-12-2017. 2. Date of T.S: 06- 12-2017 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 03-01-2018 5. Date of Receipt of Tender: 04-01-2018 6. Date of Water Supply Scheme in Chak No.358/Wb District Award: 10-02-2018 7. Date of Completion as 1651 2163 Lodhran 26.334 10.000 16.334 16.334 2.723 2.036 75% 12.036 46% Lodhran per PC-I: 28-02-2018 8. Anticipated Date of Completion: 08-02-2019 9.Date of released of funds 10. Reason of Slow Moving: 11.No. of Benificiary= Persons. 4881 Work is in Progress.

1. Date of A.A: 04-12-2017. 2. Date of T.S: 06- 12-2017 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 03-01-2018 5. Date of Receipt of Tender: 04-01-2018 6. Date of Water Supply Scheme in Chak No.311/Wb District Award: 30-03-2018 7. Date of Completion as 1652 2164 Lodhran 36.605 10.000 26.605 26.605 4.434 2.245 51% 12.245 33% Lodhran per PC-I: 28-02-2018 8. Anticipated Date of Completion: 28-03-2019 9.Date of released of funds 10. Reason of Slow Moving: 11.No. of Benificiary= Persons. 2996 Work is in Progress.

1. Date of A.A: 04-12-2017. 2. Date of T.S: 06- 12-2017 3. Date of Pre-Qualification: - 4. Date Invitation of Tender: 03-01-2018 5. Date of Receipt of Tender: 04-01-2018 6. Date of 1653 2165 3.156 53% 11.684 40% Award: 10-02-2018 7. Date of Completion as Water Supply Scheme in Chak No.13/M District Lodhran Lodhran 28.934 10.000 18.934 18.934 1.684 per PC-I: 28-02-2018 8. Anticipated Date of Completion: 08-02-2019 9.Date of released of funds 10. Reason of Slow Moving: 11.No. of Benificiary= Persons. 1934 Work is in Progress. 1653 Total Ongoing 128508.248 59381.731 24000.000 24000.000 3998.569 2053.232 51% 61434.963 48% New Schemes 0.000 0.000 0.000 0.000 0.000 0.000 #DIV/0! 0.000 #DIV/0! 0 Total New 0.000 0.000 0.000 0.000 0.000 0.000 #DIV/0! 0.000 #DIV/0! 1653 Total Ongoing + New 128508.248 59381.731 24000.000 24000.000 3998.569 2053.232 51% 61434.963 48%