What Is South Bank and Where Is
Total Page:16
File Type:pdf, Size:1020Kb
THE HEADROW A64(M) WOR KRAP WOR EASTGATE GREEK ST ST PAUL’S ST Lands Lane Albion Pl WHAT IS SOUTH BANKYORK RD PARK PL LEEDS SHANNON ST LEEDS KIRKGATE AND WHERE IS IT? QUEEN ST YORK PL MARKET VICAR LN LEEDS BUS YORK ST – South Bank, Leeds refers to a series of initiatives BRIGGATE STATION RAILWAY ST WELLINGTON ST LEEDS STATION and projects that will double the size of Leeds © Tom Joy © Tom SOUTHERN ENTRANCE City Centre TRINITY CORN RICHMOND EXCHANGE HILL – This will see the city centre grow to include land the size of 250 football pitches south of the River LEEDS THE CALLS MARSH LN Aire’s bank, across Holbeck and Hunslet LP BRIDGE END CROWN POINT –XALF The area is home to over 30 listed buildings and WHITEHALL RD BRIDGE GRANARY landmark buildings like Temple Works, Tower WHARF DOCK ST Works, Hunslet Mill, and newer buildings at SOVEREIGN ST BREWERY GranaryBOW ST Wharf, Brewery Wharf and Leeds Dock WHARF CANDLE HOUSE WATERMAN’S – The area currently includes vast amounts of TOWER PLACE cleared land or unused buildings WORKS CROWN POINT RD WATER LN EAST ST MARSHALL ST CHADWICK ST SHEAF ST SALEM THE TETLEY The Walk MARSHALL’S CHAPEL DUKE ROYAL MILL ROUND BRIDGEWATER A61 STUDIOS BLACK BULL ST ARMOURIES A61 FOUNDRY PLACE MANOR RD VICTORIA RD CROWN POINT RETAIL PARK MEADOW LN LEEDS COLLEGE OF HOLBECK A61 BUILDING LEEDS TEMPLE DOCK Joy © Tom WORKS SWEET ST W CARLISLE RD KIDACRE ST SWEET ST HOLMES ST SAYNER RD CLARENCE RD What are your thoughts LEEDS CITY COLLEGE - A6 on South Bank? DISCOVERY CENTRE 3 TRENT ST PRINTWORKS CAMPUS @LeedsSouthBank #Southbankleeds DEWSBURY RD www.southbankleeds.co.uk A61 OLD LIBRARY [email protected] BUILDING BRAIME PRESSINGS A61 MEADOW RD IVORY ST LEATHLEY RD COSTCO PEARSON ST HUNSLET MILL HOLBECK MOOR RD HUNSLET ENGINE HOUSE JACK LN GRAPE ST GOODMAN ST YARN ST M621 HUNSLET © OpenStreetMap © Tom Joy © Tom © Tom Joy © Tom NATIONAL @ LeedsSouthBank #Southbankleeds www.southbankleeds.co.uk [email protected] BEESTON M621 ST WE HAVE EXCITING PLANS FOR THE SOUTH BANK THE FUTURE OF SOUTH BANK – TEN THEMES The vision is to double the size of Leeds city centre by transforming South Bank into a distinctive European destination for investment, living, learning, creativity and leisure. 3. INTEGRATING LEEDS 5. BETTER PEDESTRIAN & The framework sets out our ideas to create a destination that STATION & THE NEW CYCLING CONNECTIONS 1. NEW PUBLIC TRANSPORT 2. A CITY PARK & SIX NEW HS2 STATION TO FORM A 4. MAKING THE RIVER AIRE BETWEEN SOUTH BANK – provides 35,000 jobs – retains historic assets as central to our LINKS & ROAD NETWORKS PUBLIC SPACES YORKSHIRE HUB A USABLE PUBLIC SPACE & THE CITY CENTRE placemaking – has over 4,000 homes – is a leading destination for leisure – 9. LANDMARK – showcases the diversity of the Leeds with distinctive and diverse public BUILDINGS & economy, where a range of sectors spaces, and a green city centre park 6. CREATING MAINTAINING are located and where the global BETTER CONNECTIONS LEEDS’ 10. NEW FLOODING TECHNOLOGY BETWEEN EXISTING 7. IMPROVED ACCESSIBILITY 8. NEW HOMES, COMMERCIAL HERITAGE meets the local – has a world class waterfront & SUSTAINABLE COMMUNITIES & THE CENTRE & COMMUNITY SAFETY & LEISURE DEVELOPMENTS BUILDINGS DEVELOPMENTS – is inclusive and connects people to jobs by improving links between South Bank and surrounding neighbourhoods – makes the most of the opportunity presented by HS2 and Northern Powerhouse Rail. @ LeedsSouthBank #Southbankleeds www.southbankleeds.co.uk [email protected] CHALLENGES The framework identifies a number of challenges that the city aims to overcome. These are set out below and we would like your thoughts on the challenges faced. LIVING WORKING NEIGHBOURHOODS HERITAGE & ASSETS CONNECTIVITY Which of these – Most residential areas lie at – South Bank currently lacks – Communities are separated from – Heritage buildings have – South Bank is divided by the challenges is the the periphery or outside of the critical mass to be an each other and from South Bank successfully been clustered in north/south running A653 South Bank employment centre by major infrastructure the Holbeck area of South Bank most important to you – Over-engineered road network – There is a lack of activity during – For the most part, existing – Poor pedestrian and cycling – In other areas of South Bank makes the realisation of an and how do you think non-working hours enterprise and industry connectivity exacerbates the heritage and assets exist in active waterfront in South it can be overcome? operate in isolation spatial segregation isolation and are unconnected Bank difficult and underutilised @LeedsSouthBank #Southbankleeds – South Bank is used as a www.southbankleeds.co.uk movement corridor for residents [email protected] from southern areas to get the to city centre TRANSPORT WALKING & CYCLING PUBLIC SPACES FLOODING PERCEPTION HS2 INFRASTRUCTURE – Large areas of South Bank are – There is an inconsistent cycling – South Bank lacks significant – Much of South Bank is at – South Bank is considered – Further severance of not served by public transport network lacking legibility and public spaces significant risk of flooding peripheral to the city centre South Bank true connectivity – Even places like the Holbeck area – There is no clear network – Significant development and – Greater difficulty in – Lack of integration with the of South Bank are poorly serviced, – Quality of existing cycle routes is infrastructure proposed within attracting investment city fabric – The waterfront is not used to limiting its potential for growth extremely variable South Bank its full potential – 1.6 km of viaduct frontage – Opportunity to integrate through South Bank additional flood resilience, building on benefits from the Are there any other challenges you feel are important? Phase 1 Flood Alleviation Strategy #Southbankleeds www.southbankleeds.co.uk [email protected] @ LeedsSouthBank #Southbankleeds www.southbankleeds.co.uk [email protected] WHAT IS PROPOSED? We are proposing nine key moves. These are basically projects Each key move includes projects that we and concepts to transform how South Bank looks and feels, propose to do more work on to design and 1. CREATE A RATIONALISED 2. IMPROVE ACCESS BEYOND 3. IMPLEMENT A SUSTAINABLE ROAD HIERARCHY THE INNER RING ROAD PARKING STRATEGY and to overcome the challenges. deliver the ambitions that are set out. What do you want South Do you have any ideas 4. EXPAND THE 5. CONNECT THE GREEN & 6. ACTIVATE THE Bank to be like both now on what we should do to PEDESTRIAN AREA BLUE NETWORK WATERFRONT and in the future? transform South Bank? @LeedsSouthBank #Southbankleeds @LeedsSouthBank #Southbankleeds www.southbankleeds.co.uk www.southbankleeds.co.uk [email protected] [email protected] 7. ADAPT HERITAGE AND 8. CREATE AND REVITALISE 9. IMPROVE RESILIENCE LINK EXISTING ASSETS THE CENTRE AND SUSTAINABILITY 9 KEY PROPOSALS #Southbankleeds www.southbankleeds.co.uk [email protected] @ LeedsSouthBank #Southbankleeds www.southbankleeds.co.uk [email protected] The concept for the parking strategy aims to reduce vehicle intensity ROADS, TRANSPORT towards the city centre and the pedestrian box. Therefore, park and rides are located outside the outer ring road, long stay parking is located AND ACCESS Do you have any views on the outside the city boulevard and predominantly short stay parking is provided in the city centre. proposal to change the roads Four of our main key moves are focussed on access. and public transport? We propose to 6. East Street Crossing @LeedsSouthBank #Southbankleeds – upgrade the environment for pedestrians by www.southbankleeds.co.uk [email protected] reducing the amount of lanes for traffic and calming traffic across the area – create a boulevard across the area – where road and pavements are separated by planting and other 5. Hunslet Road features to make the area feel safer and calmer – create more cycling and walking routes, to 6. nearby areas and across the waterfront 1. – put in place a parking strategy with car parks located in strategic positions, supported by new park and ride links – increase the amount of public transport – such as buses, by extending bus routes to this part of the city. 2. 4. 5. 3. = Ideas and inspiration from other leading cities Inner ring road City boulevard Pedestrian prescient (public transport box) 0 100 200m Strategic green links Finer grain network 1. Holbeck Viaduct 2. Beeston Road Underpass 3. Cemetery Road Bridge 4. Dewsbury Road Brighton New Road © Gehl Architects Passeig De StJoan Boulevard, Barcelona © Adria Goula Pavement 7m Cycle Green Carriageway Traffic Carriageway Green Cycle Pavement 7m Lane 1.5m 4m island 4m 1.5m Lane 2m 1m 2m 30m © Erion Shehaj, Flickr, CC © West 8, Simcoe Wavedeck at Toronto Central Waterfront @ LeedsSouthBank #Southbankleeds www.southbankleeds.co.uk [email protected] WATERFRONT, GREEN Potential location for water retention Permeability of viaduct NETWORKS AND RESILIENCE Potential Hol Beck diversion How would you These key moves aim to like to see the waterfront used? – make the River Aire and areas close to it a major leisure, events and recreation space for people of all ages to @LeedsSouthBank #Southbankleeds enjoy, through play, leisure and high quality design www.southbankleeds.co.uk [email protected] – create a clear pedestrian route across the River Aire – deliver at least six pieces of new major public realm Brygge harbour, Copenhagen © Henning Thomsen – make the area more resilient to climate change impacts, including flooding risks, by investing in infrastructure – embed environmental features to deliver sustainable development. What would a good quality public space look like to you? The High Line © James Corner Field Operations (project lead) with Diller, Scofidio + Renfro and Piet Oudolf @LeedsSouthBank #Southbankleeds www.southbankleeds.co.uk [email protected] 0 100 P © HafenCity Hamburg GmbH/Thomas Hampel Leeds Dock Leeds Dock #Southbankleeds www.southbankleeds.co.uk [email protected] @ LeedsSouthBank #Southbankleeds www.southbankleeds.co.uk [email protected] LAND USE AND HERITAGE South Bank is and will continue to be a mixed use area.