Resettlement Plan

49215-001 Loan: 3260

August 2017

NEP: Earthquake Emergency Assistance Project Belghari-Archalbot-Lamabagar-Sernabazar-Liture Road Project

Prepared by the Government of Nepal for Asian Development Bank (ADB).

This resettlement plan is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the terms of use section on ADB’s website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. qEIRFT

Qit(@n:sGKl 6U. Ro eY/o Y/11 Ett: &_b ftrft:

i{rqtf,iT 5+'G, ",ft fu-dT flqiqqq ilqq Resettlement p1nn kqa {trffrjrql I

sqtm vqc+qr ffi-?,t-icd-d-drr{FrTR-t-{zl!TR-@-qr++ ( 1?{3 f+f+) e-c+ 5+aiv qlz q* q-ffia q-sq' { srF q-e-{'} ?ffir q].-d{r, rlfEq 5qftqilT qrPdf,€T k4-d ao vsrka -rnqsq+ qlilt{a q-.q-fl?il eTjqt{fi Eqfl qq=tff srqr+r orm qr}+ qf {Tq qrfl 'd6tr-q|e qilfuq Fflffi qrFT qnn fik s-qflfr anihPa, RoeR' fr1 ss-r t +1 €q F-t (Y) n.'ffir trfu sq'T q-{t qfu qrm qri'+ qq Frfi c +1 q.futdsrd vc+rft, qrdqt{fi r +qdl"i .'rIqI { i c|qT ffi q-{ qqeft {Ererql rqtco or;-+q +.+vn ffi qci Tft r*-qr fr"airur 1 wnn fik tT\Iqiia Plan 4faqrfi 35rTfu q_argq fuft ?oey, oy, ol +1 s|qa Kfu tiliq P€ed Resettlement q+iia rrfrd t 6"6a rrcil q6rE\rmT 6 | grF ffi q.T'2i ?'FrTk a-dfq{ FTtqTF.{qTr

\r 4TAIq: qfuM znl-qiqq, qEEH td@T Tq,rFI \ rJ./ Central lmplementation Support Consultant (CISC) ^s C\'\, K 11 q?.qan fuiqi 3nfffir w-Frtqro .';i'e.iaJi;."'. .'Fr'-. -:, _, :

Government of Nepal Ministry of Federal Affairs and Local Development Central Level Project Implementation Unit Earthquake Emergency Assistance Project Lalitpur, Nepal

Earthquake Emergency Assistance Project (ADB Loan 3260-NEP)

Detailed Project Report

Belghari-Archalbot-Lamabagar-Sernabazar- Liture-PachokRoad Subproject, Lamjung

Section III: Social Safeguard

Volume 2: Revised Resettlement Plan

August, 2017

Prepared by:

Central Implementation Support Consultant (CISC) AF-Iteco Ltd. Switzerland Ekantakuna, Lalitpur

Table of Contents

ABBREVIATION ...... I GLOSSARY OF TERMS ...... II EXECUTIVE SUMMARY ...... III 1 PROJECT DESCRIPTION ...... 1 1.1 Scope of Land Acquisition ...... 2 1.2 Losses of Structures ...... 3 1.3 Losses of Trees, Standing Crops ...... 6 2. SOCIO-ECONOMIC PROFILE OF THE AFFECTED HOUSEHOLDS ...... 7 3. INFORMATION DISSEMINATION, CONSULTATION, PARTICIPATION, DISCLOSURE ...... 11 1 GRIEVANCE REDRESS MECHANISMS ...... 12 5. RESETTLEMENT POLICY AND LEGAL FRAMEWORK ...... 15 5.1 Nepal Government Applicable Legal and Policy Framework ...... 15 5.2 ADB‘s Involuntary Resettlement Policy Requirement ...... 19 6. ENTITLEMENTS, ASSISTANCE AND BENEFITS ...... 22 7 RELOCATION OF HOUSING AND SETTLEMENTS ...... 23 7.1 Valuation and Compensation Determination ...... 23 8 INCOME RESTORATION AND REHABILITATION PROGRAM ...... 24 9 RESETTLEMENT BUDGET...... 24 9.1 Compensation for land ...... 24 9.2 Compensation for structures ...... 25 9.3 Compensation for standing crops ...... 25 9.4 Compensation for trees ...... 25 9.5 Other Supporting Cost ...... 26 9.6 Total RP Cost Estimate of Belghari-Archalbot-Lamabagar-Sernabazar-Liture- Pachok Road Subproject ...... 27 10. INSTITUTIONAL ARRANGEMENTS ...... 29 11. IMPLEMENTATION SCHEDULE ...... 30 12. MONITORING AND EVALUATION ...... 33

APPENDICES ...... 34 Appendix I: List of Affected Households ...... 34 Appendix II: Poverty Analysis of Interviewed Households ...... 34 Appendix III: Details on Land Compensation Estimation ...... 34 Appendix IV:Details on Structure Compensation Estimation ...... 34 Appendix V: Details on Crop Compensation Estimation ...... 34 Appendix VI: Details on Private Trees Compensation Estimation ...... 34 Appendix VII: Details on CFUG Trees Compensation Estimation ...... 34 Appendix VIII: Details on Fruits Trees Compensation Estimation ...... 34 Appendix IX: Nepali Summary ...... 34 Appendix X: Entitlement Matrix for Resettlement Plan under EEAP ...... 34 Appendix XI: Consultation Meeting Minutes ...... 34 Appendix XII: Photographs of Road Alignment...... 34

ii | P a g e

List of Tables

Table 1: Land required by the Subproject ...... 2 Table 2: Summary of Affected Plots along the Alignment ...... 2 Table 3: Summary of Land Loss ...... 3 Table 4: Structure Losses along the Alignment ...... 4 Table 5: Affected Trees by the Road Alignment ...... 6 Table 6: Summary of Affected Households by the Subproject ...... 7 Table 7: Food Sufficiency and Income level of the Affected Households ...... 9 Table 8: Poverty Level of the Affected Households ...... 8 Table 9: Key Difference between ADB Policy and GoN ...... 21 Table 10: Details of Land Rate of the affected Plots ...... 25 Table 11: Labor Requirement for Cutting and Transportation of Trees ...... 25 Table 12: Summary of Harvesting and Transportation Cost of the Affected Trees ...... 26 Table 13: Budget for Resettlement Plan Implementation ...... 28 Table 14: RP Implementation Schedule for Belghar-Archalbot-Lamabagar-Sernabazar- Liture-Pachok Road Subproject, Lamjung ...... 31

iii | P a g e

ABBREVIATION

ADB The Asian Development Bank AP(s) Affected Person(s)/People CDC Compensation Determination Committee CDO Chief District Officer CFUG Community Forest Users Group CLPIU Central Level Project Implementation Unit CoI Corridor of Impact DCC District Coordination Committee DLPIU District Level Project Implementation Unit DLRO District Land Revenue Office DMS Detailed Measurement Survey DISC District Implementation Support Consultants DSO District Survey Office DTO District Technical Officer EA Executing Agency EEAP Earthquake Emergency Assistance Project FGD Focus Group Discussion GESI Gender Equality and Social Inclusion GoN Government of Nepal GRM Grievance Redress Mechanism Ha Hectare HHs Households IA Implementing Agency IR Involuntary Resettlement LRO Land Revenue Office LEST Livelihood Enhancement Skills and Training MoFALD Ministry of Federal Affairs and Local Development NRA National Reconstruction Authority NRs Nepalese Rupees RF Resettlement Framework RP Resettlement Plan SPS Safeguard Policy Statement SPAF Severely Project Affected Family sqm Square meter VDC Village Development Committee

I | P a g e

GLOSSARY OF TERMS Affected Persons All persons who as of the cut-off-date stand to lose for the project all or part of (APs) their land or other assets, irrespective of legal or ownership title. Cut-off Date The date of census survey to count the APs and their affected land and assets. Legalizable Those who do not have formal legal rights to land when APs are recorded, but could claim rights to such land under the law of Nepal. Non-titled Those who have no recognizable rights or claims to the land that they are occupying. SPS defines them as illegal inhabitants; termed as squatters or encroachers. However illegal inhabitants as per law of Nepal will be excluded from non-titled. Poverty Line The level of income below which an individual or a household is considered poor. Nepal‘s national poverty line which is based on a food consumption basket of 2,124 calories and an allowance for non food items of about two thirds of the cost of the basket will be adopted by the sub project to count APs under the poverty line. Whereas this poverty level may vary in accordance to district. Reference poverty line for poverty measurement 2015/16 for is NRs 28483.79, calculated on the basis of NRs. 18,428.00 for Rural hills- West Region. By Nepal Living Survey Standard 2010/11 The determination of poor households or persons will be based on the census and socio-economic survey and further confirmed by community meetings.

Project Affected A family consisting of APs, his/her spouse, sons, unmarried daughters, Family daughters-in law, brothers or unmarried sisters, father, mother and other legally adopted members residing with him/her and dependent on him/her for their livelihood. Severely Project A Project Affected Family that is affected by the project such as: Affected a. There is a loss of land or income such that the affected family fall below the Family/People poverty line; and/or (SPAF) b. There is a loss of residential house such that the family members are physically displaced from housing. Titled APs who have formal legal rights to land, including any customary of traditional rights recognized under the laws of Nepal. Third Party An agency or organization to witness and/or verify ―no coercion‖ clause in an agreement with APs in case of voluntary land donation. One independent agency (i.e. not involved in project implementation), preferably working on rights aspect, will be recruited in each development region to serve this function. Vulnerable Group Distinct group of people or persons who are considered to be more vulnerable to impoverishment risks than others. The poor, women-headed, Dalits and IPs households who may or may not fall below poverty line including all other APs who fall below poverty line will be counted as vulnerable APs. Women-headed Household headed by women, the woman may be divorced, widowed or household abandoned or her husband can be working away from the District for long periods of time, where the woman takes decision about the use of and access to household resources.

II | P a g e

EXECUTIVE SUMMARY

1. This Resettlement Plan (RP) has been prepared for the Belghari-Archalbot-Lamabagar- Sernabazar-Liture-Pachok Road Subproject, Lamjung district under the Earthquake Emergency Assistance Project (EEAP). The major objective of the EEAP is to restore and re-establish use of earthquake damaged infrastructures within existing facilities and Corridor-of Impact (CoI) with minimal or no land acquisition. This RP is prepared following Resettlement Framework of EEAP and in accordance with Government of Nepal Land Acquisition Act 2034, The Reconstruction Related Act 2072 and its Working Procedures 2072, and ADB Safeguard Policy Statement 2009. 2. The objectives of the RP are to ensure adequate safeguard measures and appropriate entitlements are provided to affected persons wherever involuntary resettlement is observed. The RP explains process adopted for the preparation of the resettlement plan impact due to construction of road, mitigation measures and implementation arrangement. 3. The RF will guide the preparation of resettlement plans during the project implementation, according to which EEAP subprojects will avoid or minimize land acquisition and involuntary resettlement wherever possible. In unavoidable situation, the project will ensure the AP‘s rights and they will receive appropriate assistance. 4. APs have been informed and consulted about the involuntary resettlement during the survey of subproject. Special attention has been paid to ensure that the vulnerable groups and the women-headed households receive appropriate assistance. The national laws, regulation, resettlement framework of EEAP and ADB‘s resettlement safeguard policy have been followed during the planning and preparation of Resettlement Plan. During the survey consultations, none of the household has shown interest to donate their land except the area occupied by existing road. Thus, they will further consult about project norms and regulations regarding land donation. Since safeguard issues like land loss and involuntary resettlement have been properly addressed in RP, APs will not be affected by new cutting area of the road regarding their daily livelihood, local identity and physical displacement.

5. The total length of the Belghari-Archalbot-Lamabagar-Sernabazar-Liture-PachokRoad Subproject, Lamjung is 12.59 km. The road starts from Belghari of Barte VDC and ends at Pachok of Pachok VDC. The alignment of the road passes through Bharte, Archalbot, Shree Bhanjyang, and Pachok VDCs. Six major settlements namely Belghari, Archalbot, Lamabagar, Serabazaar, Lituere, Pachok fall along the alignment. The existing alignment is predominantly earthen and have average 4 m width, which is proposed to upgrade to all weather gravel and Bituminous road (Premix Carpeting) by DDC Lamjung.

6. There are total 482 land plots to be acquired and deed transfer in the name of this road. Among the total land plots to be acquired, 425 plots are privately owned .57 plots is public land and 50 non-registered plots1 are not identified during the cadastral survey. As a part of land acquisition process, a public notice will be published and informed among the local people for the review and claim of these land plots in consultation with the LRO and DLPIU. Non-registered plot owners shall get compensation of crops loss and other losses except

1 Non registered plots: - Land plots having no official land ownership in the District Land Revenue Office, Lamjung

III | P a g e

land compensation but land compensation will be provided if these owners come up with land ownership certificate after notice publication.

7. Total 152 structures get affected due to widening the existing road and out of total 143 are private structures and 9 are public which is reinstated during construction. Among the total private structures 127 minor structures such as cattle sheds, kitchens, moveable shop and toilets etc, and 16 are private residential buildings. Likewise, among the total private residential building 4 residential structures which are lies in 10 m CoI had been fully damaged by earthquake will be shifted beyond the CoI. Further 10 are residential building which are partially affected needs to be repaired and only 2 residential building are fully affected. Except 2 none of households will be physically displaced due to the road construction. Further 4 residential building which had damaged by earthquake has already got compensation from Government will only get shifting allowances by project. However all structures owners except 4 earthquake structures owners will get compensation and other allowances as per RF. Details of structures are mentioned in table 4.

8. Similarly, the road alignment involves cutting trees within the formation width. Total of 853 private trees, 468 private fruit trees, 20 CFUG fruit trees, 253 trees belonging to 3 CFUGs need to be cleared for the road construction. In addition to the trees, standing crops from the private plots are also affected during construction. Although various crops are found in the affected plots, maize cultivation is in most of the plots.

9. The affected households verified from cadastral report showed that total of 267 HHs of different socio-economic background are affected by the road subproject. A census socio- economic and loss assessment survey of the project affected peoples was conducted in order to study the project impact upon the affected HHs. Out of 267 HHs, 148 HHs were present for the interview and rest 119 HHs were found absent in the project area, meaning they are living outside the project area. Out of total 267 HHs, 148 HHs of 834 persons were available for socio-economic survey. Of the total households, 64 households belong to Brahamin/Chhetri, 10 Newar, 11 Dalit, 63 Janajati and 7 families are headed by women.

10. In an average, the interviewed HHs have 0.90 ha of land which will reduce to 0.88 ha after subproject intervention. The interviewed HHs have both agricultural and non-agricultural sources of income. With the subproject intervention, nominal agricultural income will be affected which is compensated. The average agricultural income of the 148 affected HHs is NRs 122247.97 annually in the current situation which will decrease to NRs 118914.79 in a year after the project intervention. This shows they will loss NRs 3333 in average in a year after the loss of their land to the sub-project. Similarly, the average food sufficiency of the APs from their own agriculture production is 9.18 months, which will slightly decrease to 8.94 months following the implementation of subproject. However, the APs major income source is the non-agricultural sector which remains unaffected by the sub-project. The APs are involved in small business activities, like grocery shop, tea shop, restaurants etc. The other non-agricultural incomes of the interviewed HHs are remittance, private and government services and wage labor. The APs will be incorporated in Income Restoration and Rehabilitation Training program under RP.

IV | P a g e

11. The data analysis of the APs shows that there are 148 interviewed households.15 HHs lose more than 5 percent of their total land holding and 1 HHs are found below district poverty level. All the project affected persons to be affected from road Right of Way (10 m) have requested to be compensated in cash. The APs losing residential buildings have another house for temporary shifting making them less vulnerable in terms of resettlement and all the residential structure owners have either enough space in the same plots or other plots nearby beyond CoI of the road in order to rebuild their house. Also, the earthquake affected families, living in the temporary sheds, will be shifted in the land beyond the CoI Hence, there is no need to find new land area to resettle for the APs. Earthquake affected families have already got compensation through Government hence these families will get only transportation allowance by project.

12. The project affected HHs shared that they were severely affected by the earthquake of 2014. And 63 janajati have their own language and traditions. Apart from the mainstream festivities, ethnic communities celebrate festivals of their own. These indigenous APs lose small strip of land plots due to widening the road alignments, but according to them, there are no significant cultural resources that they are losing because of the subproject. Neither the subproject intervention has any disturbances nor any impact on the customary rights of these indigenous populations. Hence, the subproject intervention does not affect the culture or harm the identity of the indigenous people along the alignment. So no adverse impact has been assessed among indigenous households due to project intervention.

13. The interviewed indigenous APs have same level of access to the education, health and government facilities and market networks compared to the other caste groups. Thus it is expected that they have equal social status to enjoy the same level of benefits from this subproject implementation in future. This road will provide better access to market, education institutions, and health centers and government service offices.

14. A well-defined grievance redress and resolution mechanism has already been established to resolve grievances and complaints in a timely and satisfactory manner. District Level Project Implementation Unit (DLPIU) has been playing key role to effective implementation of GRM. All affected persons will be made fully aware of their rights and GRM process. The detailed grievance redress procedures will be publicized through an effective public information campaign. First Level of GRM, Second Level of GRM, Third Level of GRM and Fourth Level of GRM will be fully come into function after mobilization of contractors.

15. During the socioeconomic survey, 148 interviewed HHs have expressed their interest to be the part of the training and benefit from entrepreneurial skills. Due to constraint of budget only 162 APs will initially listed for training however priority will be given to Dalits, Janajatis, women HH-heads and BPLs HHs. Further Income restoration program (IRP) will be designed for the one person per family in 16-45 age-group. Different categories of trainings are under finalization in the district through Training Need Assessment (TNA) and the tentative cost of the training program is NRs 319584.56.

V | P a g e

16. The total cost estimated for implementation of this RP is NRs 14.96 million in which NRs 11.75 million is direct compensation amount. The other RP expense title includes deed transfer assistance amount, training amount for APs and 20 percent contingency of the total cost for any unseen expenses during implementation period.

17. The National Reconstruction Authority (NRA) is the executing agency of the project. The Central Level Project implementation Unit (CLPIU) under Ministry of Federal Affairs and Local Development (MOFALD) supported by Central Implementation Support Consultant (CISC) provides overall guide and monitoring of the project activities at central level. District Level Project Implementation Unit (DLPIU) supported by District Level Implementation Support Consultant (DISC) will be responsible to implement overall activities at district.

.

VI | P a g e

Resettlement Plan of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung

1 PROJECT DESCRIPTION

1. This Resettlement Plan(RP has been prepared for the Belghari-Archalbot-Lamabagar- Sernabazar-Liture-Pachok Road Subproject, Lamjung district under the Earthquake Emergency Assistance Project (EEAP). The major objective of the EEAP is to restore and reestablish use of earthquake damaged infrastructures within existing facilities and rights-of- way (CoI) with minimal or no land acquisition This RP is prepared following Resettlement Framework of EEAP and in accordance with Government of Nepal Land Acquisition Act 2034, The Reconstruction Related Act 2072 and its Working Procedures 2072, and ADB Safeguard Policy Statement 2009. 2. The objectives of the RP are to ensure adequate safeguard measures and appropriate entitlements are provided to affected person wherever involuntary resettlement is observed. The RP explain process adopted for preparation of the resettlement plan impact due to construction of road, mitigation measures and implementation arrangement. 3. The RF will guide the preparation of resettlement plans during the project implementation, according to which EEAP subprojects will avoid or minimize land acquisition and involuntary resettlement wherever possible. In unavoidable situation, the project will ensure the AP‘s rights and they will receive assistance.

4. The National Reconstruction Authority (NRA) is the executing agency of the project. The Central Level Project implementation Unit (CLPIU) under Ministry of Federal Affairs and Local Development (MOFALD) supported by Central Implementation Support Consultant (CISC) provides overall guide and monitoring of the project activities at central level. District Level Project Implementation Unit (DLPIU) supported by District Level Implementation Support Consultant (DISC) will be responsible to implement overall activities at district. . 5. The total length of the Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung is 12.59 km. Lamjung District is located in the in the Western Development Region of Nepal. Its elevation ranges from 1266to 1366m. Ecologically, it lies in the mountain region bordering Manang in North, Kaski in the North West, Tanahun in the South and Gorkha in the West. The road starts from Belghari of Barte VDC and ends at Pachok of Pachok VDC. The alignment of the road passes through Bharte, Archalbot, Shree Bhanjyang, Nauthar and Pachok VDCs. Six major settlements namely Belghari, Archalbot, Lamabagar, Serabazaar, Lituere, Pachok fall along the alignment.The existing alignment is predominantly earthen, which is proposed to upgrade to all weather gravel and Bituminous road (Premix Carpeting) by DDC Lamjung.

1| P a g e

Resettlement Plan of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung

1.1 Scope of Land Acquisition

6. The road subproject requires 12.59 ha of land for its implementation. Out of total required land, 9.78 ha of land are under private ownership in which 4.37ha is already occupied by the existing road. Thus, 5.41ha of new private land need to be acquired as new cutting area. Table 1 presents the detail of affected land to be acquired for the subproject.

Table 1: Land required by the Subproject SN Land Requirement within the CoI (10 m) Area in hectare 1. Private land 9.78 1.1 Private land under existing area 4.37 1.2 Private land under new cut area 5.41 2 Public land 2.28 Total land area 12.59 Source: Cadastral Survey, March, 2017

7. Cadastral survey team was mobilized after the detailed design of the subproject. According to the cadastral survey report, there are total 425 private land plots and 57 government plots to be acquired by the subproject. Among the total land plots, 50 plots belong to non- registered plots. (Refer Table 2).

Table 2: Summary of Affected Plots by the Subproject SN Affected Plot Count 1 Total Interviewed Plots 231 2 Non-Interviewed Plots 144 3 Non-Registered Plots 50 4 Public Land Plots (Government of Nepal) 57 Total plots 482 Source: Cadastral Survey, March, 2017

8. There are 50 plots which are not verified officially in DLRO of Lamjung. These are labeled as ‗non-registered‘ plots in this report. The Surveyor made field verifications checked the field books and documents at DLRO but these plots lack other information except their plot numbers. A public notice will be published and informed to local people for the review and claim of these land plots. These land plots, during household survey, were found uncultivated and none of house are found involved in that particular parcel.

2| P a g e

Resettlement Plan of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung

9. The average land holding of affected households is 0.90ha which will reduce to 0.88ha after land acquisition of the subproject. Out of 148 interviewed affected households, 15 households lose more than 5 percent but the percentage of loss does not cross more than 10% of total land holding. In average, these households lose 0.02 ha. Table 3 summarizes extent of land loss in the road sub-project.

Table 3: Summary of Land Loss Land Loss Measure Pre Project Post Project Count Percent Count Percent 1. Land Holding <0.5 ha 42 28.38 43 29.05 0.5-1.0 ha 57 38.51 59 39.86 >1.0 ha 49 33.11 46 31.08 Average Holding (ha) 0.90 0.88 2. Land Loss Losing <5% 133 89.86 Losing >5% 15 10.14 Average Holding (ha) 0.02 Source: Household Survey, March, 2017

1.2 Losses of Structures

10. Apart from land, crops, tree loss, there will be loss of structures within the CoI. Altogether 152 structures out of these 9 structures are public and 143 structures belonging to 104 owners will be affected by the road subproject. Among the private structures, 16 residential buildings are getting affected. Out of 16 residential buildings, only 6 buildings (including 4 earthquake-affected ones) will be fully affected and 10 residential buildings are partially affected can be repaired and maintenance without shifting the APs. Remaining are minor structures such as cattle sheds, kitchens, moveable kiosk and toilets etc. Public structures include chautaras, tapstands, irrigation canals, temples and health post buildings. Moreover Public structure will be restored during construction phase whereas private owners will get compensation and allowances as per entitlement matrix. Table 4 below presents a brief account of affected structures whereas details have been tabulated in Appendix IV.

3| P a g e

Resettlement Plan of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung

Table 4: Structure Losses along the Alignment Owner Cou SN Structure Type ship nt Remarks Physically Displaced (Yes/No) Total Private Privat 1 structures e 143 Yes. Though they have other houses, allowances have been allocated in accordance Privat Fully with entitlement matrix 1.1 Residence e 2 affected Yes. Though they have other houses, allowances have been allocated in accordance EQ Affected Privat Fully with entitlement matrix Residence e 4 affected Privat Partially No, allowances have been allocated in 1.2 Residences e 10 affected accordance with entitlement matrix Secondary Privat Allowances have been allocated in accordance Structures e 127 with entitlement matrix Privat Fully 1.3 Kitchen e 2 affected 1 Fully affected and 2 are Privat partially 1.4 Shop e 3 affected Privat Partially 1.5 Pali e 25 affected Privat Partially 1.6 Shaw Mill e 1 affected Privat Fully 1.7 Toilets e 3 affected Toilets with Bio Privat Fully 1.8 Gas Plant e 4 affected Privat Fully 1.9 Bio Gas Plant e 2 affected Privat Fully 1.10 Courtyard e 1 affected Privat Partially 1.11 Roof top e 1 affected Privat Partially 1.12 Chautara e 1 affected Privat Partially 1.13 Pig sty e 2 affected Privat Partially 1.14 Cattleshed e 3 affected 48 dry walls and Privat 8 masonry 1.15 Walls e 56 walls CGI fully Cabinet/Tahar Privat affected 1.16 as e 9 (Temporar

4| P a g e

Resettlement Plan of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung

y shelters) Cow/Cattle Privat CGI Fully 1.17 Sheds e 11 affected Privat CGI Fully 1.18 Chicken Coop e 3 affected Total Private Structures 143 Total Public Allowances have been allocated in accordance 4 Structures Public 9 with entitlement matrix Community 4.1 Chautara, Public 2 Public 4.2 Tap Stand Public 4 Public 4.3 Temple Public 1 Public Irrigation 4.4 Canal Public 1 Public 4.5 Health Post Public 1 Public Total Public Structures 9 Source: Household Survey, March, 2017

11. Out of 143 structures affected with the road intervention, 78 are minor structures owned by janajati and Dalit families. These structures don‘t make them physically displaced. It is learnt that they have houses elsewhere for temporary shifting making them less vulnerable in terms of resettlement. Similarly, all the residential structure owners have either enough space in the same plot or other plot nearby beyond CoI of the road in order to rebuild their houses. All structure owners will get compensation and allowances.

5| P a g e

Resettlement Plan of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung

1.3 Losses of Trees, Standing Crops

12. The road alignment passes through three community forest areas, Raniswara Community Forest Users Group (CFUG), Kerabari Community Forest Users Group (CFUG), Sikhra Community Forest Users Group. Hence, the alignment requires cutting down of trees and seedlings from the forest area and also from private land area. There are 253 trees from CFUGs and 853 trees from private land (including fruit trees, bamboo clumps and cash crops) which need to cut down and cleared for the road improvement. The affected trees are Sal, Sisau, Chilaune and Badar timber by the community people. There are also fruit trees like mango, banana, guava, pear and papaya from private land that needs to be cleared for the construction of the road. In addition to the trees, standing crops from the private plots are also affected during construction. Although various crops are found in the affected plots, maize cultivation is gCoIn in most of the plots. Table 5 presents a brief account of affected trees and crops (details have been tabulated in Appendix V).

Table 5: Affected Trees by the Road Alignment SN Ownership Count/ha. Remarks 1 Private trees 853 Private 2 Raniswara CFUG 123 3 Kerabari CFUG 3 4 Sikhra CFUG 127 5 CFUG Fruit Trees 20 6 Fruit Trees 468 Private 7 Standing Crop 5.41 Maize Source: Household Survey, March, 2017

6| P a g e

Resettlement Plan of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung

2. SOCIO-ECONOMIC PROFILE OF THE AFFECTED HOUSEHOLDS

13. A detailed socio-economic survey was conducted to investigate affected households‘ income, food sufficiency, livelihood options, loss of land, structures, trees and other assets. The affected families are included only within the families from Ch 0+000 until Ch12+59. The total affected households are 267. Socio-economic survey was carried for 148(55.43%) households‘ having 834 populations. Out of total APs, 64HHs are from Brahmin/Chettri, 10HHs from Newar, 11 HH from Dalit and 63 HHs are from Janajati. There are 7 women- headed HHs in the subproject area. The Table 6 provides summary of the affected households.

Table 6: Summary of Affected Households by the Subproject SN Variable Count 1 Total Affected HHs 267 2 Interviewed HHs 148 2.1 Dalit HHs 11 2.2 Janajati HHs 63 2.3 Newar HHs 10 2.4 Brahmin/Chettri HHs 64 3 Interviewed Population 834 3.1 Male 412 3.2 Female 422 3.3 Average HHs Size 5.64 3.4 Women headed HH 7 3.5 Non-Registered Plots (not included 50 in 267 HHs) Source: Household Survey, March, 2017

14. As per the survey, the maximum families are engaged in agricultural activity and few families are not engaged in agriculture. The families in agriculture occupation in this area are involved in the cultivation of different crops (predominantly maize). The major sources of income are running hotels, tea shops whereas remittances, pensions, petty businesses as well as jobs in different institutions from other sources of income.

15. The food sufficiency of the affected families from their own land is 9.18 month per year in an average which will reduce to 8.94 months after their land loss to the subproject. There are 86 families who reported that they have food sufficiency for 10-12 months. The food supply during the deficit period is covered through income from non-agricultural sectors. The income from agricultural income is expected to reduce by NRs 3333 due to the land loss. Table 7 gives the details of the food sufficiency and other income level.

7| P a g e

Resettlement Plan of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung

Table 7: Food Sufficiency and Income level of the Affected Households Pre-Project Post-Project Variables Frequency Percent Frequency Percent 1-3 Months 15 10.14 15 10.14 4-6 Months 35 23.65 35 23.65 7-9 Months 12 8.11 12 8.11 10-12 Months 86 58.11 86 58.11 Average (months) 9.18 8.94 1. Agriculture Income (HH) <=12000 4 2.70 5 3.38 12000-25000 7 4.73 6 4.05 >=25000 137 92.57 137 92.57 Average (NRS) 122247.97 118914.79 2. Non-Agriculture Income

(HH) <=12000 11 7.43 12000-25000 1 0.68 >=25000 136 91.89 Average (NRS) 359705.47 3.Total Income (HH) <=25000 0 0.99 0 0.99 25000-50000 0 0.00 0 0.00 >=50000 148 100.00 148 100.00 Average (NRS) 481953.38 478620.20 Source: Household Survey, March, 2017

8| P a g e

Resettlement Plan of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung

16. Table 8 reveals that the poverty analysis shows that 1 households fall below the district poverty level before and after the sub-project and 15 households will lose more than 5 percent of their total land.

Table 8: Poverty Level of the Affected Households Variables Pre-Project Post Project Frequency Percent Frequency Percent <5% Land Loss 131 88.51 131 88.51 Above Poverty Level 130 87.84 130 87.84 Below Poverty Level 1 0.68 1 0.68 >5% Land Loss 15 10.14 15 10.14 Above Poverty Level 15 10.14 15 10.14 Below Poverty Level 0 0.00 0 0.00 Source: Household Survey, March, 2017

17. The janajati APs have same level of access to the education, health and government facilities and market networks compared to the other caste groups. Thus it is expected that they have equal social status to enjoy the same level of benefits from this subproject implementation in future. This road will provide better access to market, education institutions, and health center and government service outlets.

18. The subproject has only one family that falls below poverty line. Before or after the project implementation, no landless families, no elderly or single-women and children families and neither disabled families that can be categorized under vulnerable group. This particular family will also be prioritized for benefit schemes like income restoration program in the subproject.

9| P a g e

Resettlement Plan of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung

19. The interviewed families are updated about the market information; visit local and district headquarters as per their need. Each family is active in community participation and affiliated to at least one community institution. Every house has toilet and all the children are immunized which shows that the affected families along the road alignment are well informed, have access to social networks and benefits and are mobile in their everyday life.

20. It is noted from the survey that 63 families belonging to janajati category lose small strip of land due to widening the road. Land impact is nominal because there is already existing road and they will be paid replacement cost of that small strip of land However after construction of road people will be more benefitted from the road in terms of their nominal loss .On the other hand these janajati families have their own language, customs and traditions. They celebrate Lhosar(Tamu Lhosar by Gurung community) once a year as an important festival in addition to other popular Hindu festivals as per their belief. However, project intervention doesn‘t hamper their cultural resources over the land nor any adverse impact is observed due to project intervention

21. It is expected that the road improvement will provide better access to headquarters, market, education institutions, and health centres and government offices. It will reduce the prices of everyday necessities and also accelerate the earthquake emergency works. Similarly, the janajati families have same level of access to the education, health and government facilities and market networks compared to the other caste groups. Thus, it is expected that they have equal social status to enjoy the same level of benefits from this subproject implementation in future. The female headed families, families below poverty level, families losing more than 5 percent of total land are the target population and will be prioritized for benefit schemes like income restoration program in the subproject.

10| P a g e

Resettlement Plan of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung

3. INFORMATION DISSEMINATION, CONSULTATION, PARTICIPATION, DISCLOSURE

22. The community meeting and interviews were carried out with the owners of land and structures regarding the road upgrading program along the alignment.They were provided information on ADB Policy on Involuntary resettlement, compensation and entitlement, RF of the EEAP. The communities were explained about:

1. Relevancy of the road subproject scope and schedules, 2. RP and various degrees of project impact, 3. About land acquisition, donation, compensation and other entitlements schemes, 4. About Grievance redress mechanism , and 5. Special consideration and assistance of all vulnerable groups 6. Overall projects norms, guidelines, websites and contact person for more details.

23. There were public meetings with APs, and with the other stakeholders along the alignment. The details of consultation meeting minutes have been presented in the Appendix XI. The local leaders and the villagers also facilitated for consultations with the affected people during cadastral and household listing and socio-economic and loss assessment survey of the families. During the community consultations, people expressed that they would fully support the project implementation. However, they also demanded compensation for the land loss, additional activities to prevent flood and soil loss, if any. Until RP preparation no complaints were received from affected people.

24. DLPIU will play lead role to publish notice of affected land as per the land acquisition act 2072 NRA with support of CISC and other public consultation program for RP implementation is conducted by DISC with close consultation of DLPIU. In addition, project affected people has already been informed about overall EEAP project norms, rules and regulations during HHs survey. RP has been approved by NRA, and disclosure is under process.

.

11| P a g e

Resettlement Plan of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung

4. GRIEVANCE REDRESS MECHANISMS 25. The objective the grievance redress mechanism (GRM) is to resolve complaints as quickly as possible and at the local level through a process of conciliation; and, if that is not possible, to provide clear and transparent procedures for appeal. A well-defined grievance redress and resolution mechanism is guided by the RF which will be fully informed and made aware of the rights to the APs. The grievance redress process includes four levels which is shown in the figure.

Figure 1: Grievance Redress Mechanism

Grievance

1-2 days Field Level: Grievance 1st Level Grievance Contractor, Redressed DISC,DLPIU

7 days nd Grievance 2 Level Grievance CLPIU Redressed

15 days Grievance 3rd Level Grievance Grievance Redress Redressed Committee

4th Level Higher Authority Grievance Court of Law

Note: CLPIU-Central Level Project Implementation Unit, DLPIU-District Level Project Implementation Unit, DISC-District Level Implementation Consultant

12| P a g e

Resettlement Plan of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung

a. First level of GRM: The first level and most accessible and immediate contact for the fastest resolve of grievances are the contractors, and design and supervision consultants on site. Prior to construction of any works, the CLPIU and DLPIU will ensure local community meetings are held to notify local residents and businesses of any temporary disturbances, and to inform them of the Project. If a local area committee (LAC) exists in the area, they should also be informed. If any complaints arise, the contractors, consultants, and DLPIU can immediately resolve the complaint on site. The CLPIU can also be involved in grievance redress at this stage. The CLPIU and DLPIU office phone number will be posted in public areas within the subproject areas and construction sites. Any person with a grievance related to the project works can contact the project to file a complaint. The DLPIU offices will have a safeguards focal person to field and resolve complaints. The safeguards (environment and resettlement) focal person will document the complaint, and immediately address and resolve the issue with the contractor within 1-2 days, if the complaint remains unresolved at the field level. The DLPIU may seek the assistance of the consultant safeguards specialists (the environmental specialist or social safeguards specialist) to resolve the issue. The DIU safeguards focal person will notify the CLPIU safeguards focal person that a complaint was received, and whether it was resolved. The DLPIU safeguards focal person will fully document the following information: (i) name of the person; (ii) date complaint was received; (iii) nature of complaint; (iv) location, and (v) how the complaint was resolved. b. Second level of GRM: If the grievances remain unresolved; the DLPIU will forward the complaint to the CLPIU safeguards focal person. The person filing the grievance will be notified by DLPIU safeguards focal person that the grievance was forwarded to the CLPIU safeguards focal person. The CLPIU will address the grievance. Grievances will be resolved through continuous interactions with affected persons, and the CLPIU will answer queries and resolve grievances regarding various issues including environmental or social impacts. Corrective measures will be undertaken at the field level by the CLPIU safeguards focal person within 7 days. He/she will fully document the following information: (i) name of the person; (ii) date complaint was received; (iii) nature of complaint; (iv) location and (v) how the complaint was resolved. c. Third level of GRM:If the grievance remain unresolved, the CLPIU‘s project director will activate the third level of the GRM by referring the issue (with written documentation) to a Grievance Redress Committee (GRC) constituted by the EA, which will, based on review of the grievances, address them in consultation with the CLPIU, DLPIU, and affected persons. The GRC will consist of safeguards focal person leadership, affected persons, and local area committee, among others—determined to provide impartial, balanced views on any issues. The GRC should consist of at least five persons. A hearing will be called with the GRC, if necessary, where the affected person can present his/her concern and issues. The process will promote conflict resolution through mediation. The GRC will meet as necessary when there are grievances to be addressed. The GRC will suggest corrective measures at the field level and assign clear responsibilities for implementing its decision within 15 days. The functions of the GRC are as follows: (i) to provide support to affected persons on problems arising from environmental or social disruption, asset acquisition (where required), and eligibility for entitlements, compensation, and assistance; (ii) to record grievances of affected persons, categorize and prioritize them, and provide solutions

13| P a g e

Resettlement Plan of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung

within 15 days; and (iii) to report to the aggrieved parties developments regarding their grievances and decisions of the GRC. The safeguards focal person will be responsible for processing and placing all papers before the GRC, recording decisions, issuing minutes of the meetings, and taking follow-up action to see that formal orders are issued and the decisions carried out.

d. Fourth level of GRM: In the event that a grievance is not addressed by the contractor, DISC, DLPIU, CLPIU or GRC, the affected person can seek legal redress of the grievance in the appropriate courts, the fourth level of the GRM, which is the formal legal court system. The GRM however does not prevent affected persons from seeking legal redress at any time.

26. A well-defined grievance redress and resolution mechanism has already been established to resolve grievances and complaints in a timely and satisfactory manner. District Level Project Implementation Unit (DLPIU) has been playing key role to effective implementation of GRM. All affected persons will be made fully aware of their rights, and the detailed grievance redress procedures will be publicized through an effective public information campaign. First Level of GRM, Second Level of GRM, Third Level of GRM and Fourth Level of GRM will be fully come into function after mobilization of contractors. All the grievances will be recorded and resolved as per GRM defined in RF.

14| P a g e

Resettlement Plan of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung

5. RESETTLEMENT POLICY AND LEGAL FRAMEWORK

5.1 Nepal Government Applicable Legal and Policy Framework

27. This section provides the review of national laws, policies of the donor agency and the Resettlement Framework of the EEAP that applies to the project.

28. The Land Acquisition Act, 2034 (1977) is the main legal document on land acquisition and resettlement activities in Nepal. There is provision in Clause 3 of the Act to acquire land for any public purpose, subject to award of compensation. According to Clause 4, institutions seeking land acquisition may also request the Government of Nepal to acquire land under regular provisions, subject to compensation by such institutions. Clause 27 of the Act provides for land acquisition through negotiation with the plot owners, were all processes specified in the Act is not required.

29. The Reconstruction Related Act 2072 (2015)2 is the most recent Act promulgated after the earthquake of April 2015 for the reconstruction of earthquake affected structures. The Notice 2, Part 3 and Part 5 of this Act‘s Regulation explains the land acquisition and compensation determination process and procedures, named under, ‗the working procedures on land acquisition required for reconstruction of earthquake affected structures, 2072‘. The major clauses of these working procedures related to land acquisition are highlighted under:  Clause 3-4: the land required for reconstruction project can acquire land from anywhere for the project and reserves right to enter such land.  Clause 5 (1): the project head should include the details of the land to be acquired and send for approval to NRA secretary.  Clause 5 (3): after NRA approval, the project head should publish the details of the land plots to be acquired in national or local level newspaper requesting the land owners to register complain within 15 days if they do not agree.  Clause 5 (4-10): processes of keeping such land plots on hold and resolve disagreements of the land owners if any.  Clause 6 (1): the project head will write to land registration office for transferring the ownership of the land plots acquired according to Clause 5 (3) and Clause 5 (7) in the name of Government of Nepal.  Clause 8 (2): formation of Compensation Determination Committee (CDC).  Clause 10 (1-2): CDC should determine the compensation rate on the basis of market rate, vulnerability of the loss-owner and so on which should be stated in the decision minute.  Clause 10 (3): CDC should make the compensation decisions public as soon as possible to notify the landowners, publish in national or local newspapers, notice in VDC or municipality board about details of compensation amount recipients, date and place to receive compensation and about place and duration to complain if not agree with the compensation amount.  Clause 11 (1): Unsatisfied individuals can complain about the compensation amount within 15 days of the notice publication.  Clause 11 (2-4): process of resolving complains received as per Clause 11 (1).

2 This is unofficial translation extracted from Nepal Gazet, Regulations on Reconstruction of Earthquake Affected Structures, 2072 (Nepali language), Part 3 and Part 5. 15| P a g e

Resettlement Plan of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung

 Clause 12 (1): compensation should be given to any standing crops or trees or plants of the land plots while entering in lands as per Clause 4.  Clause 13 (1-4): duration to receive compensation is 3 months from the date of notice publication as Clause 10(3). If not, the project head shall register the amount in the office and public the notice to receive the amount within 6 months. If the recipients still do not claim the amount, such amount will be no longer payable and register in reserve fund.  Clause 16: if any public land needs to acquire but occupied by any individual, government can compensate with other public land to those individual, if land is available.  Clause 17: If the remaining land area becomes unusable after land acquisition, the remaining land shall be acquired by the project if complained by the landowner within 35 days of notice publication as per Clause 10(3).

30. The National Policy on Land Acquisition, Resettlement and Rehabilitation in Infrastructure Development Projects 2015 provide clear guidelines to screen, assess and plan land acquisition and resettlement aspects in development projects. The Policy highlights the need to handle resettlement issues with utmost care and forethought particularly in case of vulnerable groups. There are provisions of voluntary land donation by non-poor. Voluntary donation will be accepted if a) donation of land is <10% of his agriculture land b) The donation is unforced, not the result of community pressure and MOU should be signed and is witnessed by third party c) Land donating HHs should not be from vulnerable group and poor families d) APs is fully consulted informed about their rights. Non- titled (encroachers/squatters) are eligible for compensation for their property except land compensation for structure; crops and tree should be calculated scientifically not less than market price.

31. The Constitution of Nepal 2015 guarantees the fundamental rights and duties of a citizen. Article 30(1) establishes the right to property for every citizen of Nepal, whereby every citizen is entitled to earn, use, sell and exercise their right to property under existing laws. Article 30 (2) states can impose taxes on the property of person as necessary on the basis of principles of progressive taxation. Article 30(3) states shall not except in the public interest, requisition or acquire, or otherwise create any encumbrance on, the property of the people. But not apply to any property acquired in an illicit manner. Article 30 (4) in requisition of private land for public interest according to sub-article (3), it shall be done on the basis of compensation and procedural law. Article 30 (5), Nothing in sub –articles (3) and (4) shall be deemed to prevent the state in enforcing land reform, management and regulation for the purpose of increasing production and productivity of land, modernization and commercialization of agriculture, environment preservation, organized housing and planned urbanization.

32. The Guthi Corporation Act 1976, in case of Guthi Land acquisition must also comply with the provisions set out in. The second amendment in 1993, section 43 of the Act states that if Government of Nepal thinks that any Guthi land is required for social welfare or community interest, such a lad can be acquired at a concessional rate. In addition, the Act states that the compensation of Guthi land will be divided into Guthi and the tenants. The Guthi will receive 33 percent and the tenant will receive 67 percent of the total compensatory amount. 16| P a g e

Resettlement Plan of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung

33. The Public Roads Act 1974 empowers the government to acquire any land on a temporary basis for storage facilities, construction camps and so on during construction and upgrading of roads. Any buildings and other structures such as houses, sheds, schools, and temples are to be avoided wherever possible. The government is required to pay compensation for any damages caused to buildings, standing crops and trees. Compensation rates are negotiated between the government and the landowners. 34. The Land Reform Act 1964 is also relevant. As per the Act, a landowner may not be compensated for more land than s/he is entitled to under the law. This Act also establishes the tiller‘s right on the land which s/he is tilling. The land reform act additionally specifies the compensation entitlements of registered tenants on land sold by the owner or acquired for the development purposes. The Act amendment most recently in 2001 has established a rule that when state acquires land under tenancy, the tenant and the landlord will each be entitled to 50 percent of the total compensation amount.

35. The Malpot Ain or Land Revenue (land administration and revenue) Act, 2034 is the main Act to carry out land administration including maintenance and updating records, collection of land revenue and settlement of the disputes after completion of survey and handing over the records to LRO by the Survey Parties. It authorizes the LRO for registration, ownership transfer and deed transfer of land. This Act also authorizes the LRO to transfer ownership and deeds of individual land, if any person applied for the ownership and deeds of individual land, if any person applied for the ownership transfer of his/her land with mutual understanding for public use with recommendation of relevant committee.

36. Local Self Governance Act 1999: The Clause 258 in the Part – 5, General Provisions relating to Local Body Chapter – 3, Miscellaneous of the Local Self-Governance Act, 1999 has provision of land acquisition. The Clause states that in case the Local body has to acquire land to carry out any development and construction works within its area, it may acquire the land required for that work by following the requirements of the prevailing law and providing compensation to the concerned land-owner for the land. The Clause 149 of the LSGA has provision of prohibition on construction of building without obtaining approval. The clause states that no person shall, without obtaining construction approval from the Mayor, do 'construction of a building'3 in the municipal area. According to the Clause 161(1) the Mayor may depute any engineer, overseer or employee to inquire into the following matters in respect to any building constructed or being constructed by anyone in the municipal area: Whether or not approval has been obtained pursuant to this Act to construct such a building, Whether or not such a building has been constructed or is being constructed in accordance with the design approved pursuant to this Act, and Whether or not any public land, road, temple, courtyard, sewerage, canal, pond etc. is encroached upon from such a building. (2) The person deputed to inquire into the matters pursuant to Subsection (1) shall have to inquire into the matter according to the prevailing law and submit a report, along with his/her suggestions, to the Mayor within fifteen days of his/her deputation. (4) In case it is held, as per the report submitted pursuant to Subsection (2) above, that anyone has constructed or is constructing a building without obtaining approval pursuant to this Act or by encroaching upon any public land,

3 The act of "construction of building" means the act to construct a new building, to reconstruct by demolishing the old building, to add a storey or to alter the facade, or to construct a window, door, veranda, attic, porch, shed, stable or garage or erecting a compound wall in alternation of the existing design 17| P a g e

Resettlement Plan of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung

road, temple, courtyard sewerage, canal, pond, etc., the Mayor shall have to order to demolish the building or any portion thereof. (5) In case it is held, as per the report submitted pursuant to Subsection (2), that any person has constructed or is constructing a building by altering the design approved pursuant to this Act without obtaining approval of the Mayor, the Mayor may order to punish such a person with a fine of up to one hundred thousand rupees or to demolish the building or any portion thereof.

37. The Clause 163 (1) mentioned that in cases where an order has been issued pursuant to Sub-section (4) or (5) of Clause 161 to demolish any building or any portion thereof, the concerned person shall have to demolish such a building or any portion thereof according to the order of the Mayor or the decision of the Appellate Court within thirty-five days of the decision made by the Appellate Court requiring the demolition of such a building or any portion thereof. (2) If the concerned person does not demolish such a building or any portion thereof within the time-limit referred to in Sub-section (1), the Municipality itself may demolish such a building or any portion thereof, and the expenditures incurred for so demolishing shall be realized from the concerned person.

18| P a g e

Resettlement Plan of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung

5.2 ADB’s Involuntary Resettlement Policy Requirement

38. The objectives of ADB‘s Safeguards Policy Statement, 2009 (SPS) with regard to involuntary resettlement are: (i) to avoid involuntary resettlement wherever possible; (ii) to minimize involuntary resettlement by exploring project and design alternatives; (iii) to enhance, or at least restore, the livelihoods of all displaced persons in real terms relative to pre-project levels; and (iv) to improve the standards of living of the displaced poor and other vulnerable groups.

39. ADB‘s SPS covers permanent and temporary physical displacement (relocation, loss of residential land, or loss of shelter) and economic displacement (loss of land, assets, access to assets, income sources, or means of livelihoods) as a result of (i) involuntary acquisition of land, or (ii) involuntary restrictions on land use or on access to legally designated parks and protected areas. The SPS covers them whether such losses and involuntary restrictions are full or partial, permanent or temporary.

40. For any ADB operation requiring involuntary resettlement, resettlement planning is an integral part of project design, to be dealt with from the earliest stages of the project cycle, taking into account the following basic principles:

I. Screen the project early on to identify past, present, and future involuntary resettlement impacts and risks. Determine the scope of resettlement planning through a survey and/or census of displaced persons, including a gender analysis, specifically related to resettlement impacts and risks. II. Carry out meaningful consultations with affected persons, host communities, and concerned nongovernment organizations (NGOs). Inform all displaced persons of their entitlements and resettlement options. Ensure their participation in planning, implementation, and monitoring and evaluation of resettlement programs. Pay particular attention to the needs of vulnerable groups, especially those below the poverty line, the landless, the elderly, women and children, and indigenous people, and those without legal title to land, and ensure their participation in consultations. Establish a grievance redress mechanism to receive and facilitate resolution of the affected persons‘ concerns. Support the social and cultural institutions of displaced persons and their host population. Where involuntary resettlement impacts and risks are highly complex and sensitive, compensation and resettlement decisions should be preceded by social preparation. III. Improve, or at least restore, the livelihoods of all displaced persons through (a) land- based resettlement strategies when affected livelihoods are land-based, or cash compensation at replacement value for land when the loss of land does not undermine livelihoods; (b) prompt replacement of assets with access to assets of equal or higher value; (c) prompt compensation at full replacement cost for assets that cannot be restored; and (d) additional revenues and services through benefit sharing schemes where possible. IV. Provide physically and economically displaced persons with needed assistant including the following: (a) if there is relocation, secured tenure to relocation land, better housing at resettlement sites with comparable access to employment and production opportunities, economic and social integration of resettled persons into their host communities, and extension of project benefits to host 19| P a g e

Resettlement Plan of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung

communities; (b) transitional support and development assistance, such as land development, credit facilities, training, or employment opportunities; and (c) civic infrastructure and community services, as required. V. Improve the standards of living of the displaced poor and other vulnerable groups, including women, to at least national minimum standards. In rural areas, provide them with legal and affordable access to land and resources, and in urban areas, provide them with appropriate income sources and legal and affordable access to adequate housing. VI. Develop procedures in a transparent, consistent, and equitable manner if land acquisition is through negotiated settlement, to ensure that people who enter into negotiated settlements will maintain the same or better income and livelihood status. VII. Ensure that displaced persons without titles to land or any recognizable legal rights to land are eligible for resettlement assistance and compensation for loss of non-land assets. VIII. Prepare a resettlement plan elaborating on displaced persons‘ entitlements, the income and livelihood restoration strategy, institutional arrangements, monitoring and reporting framework, budget, and time-bound implementation schedule. IX. Disclose a draft resettlement plan, including documentation of the consultation process in a timely manner, before project appraisal, in an accessible place and in a form and language(s) understandable to affected persons and other stakeholders. Disclose the final resettlement plan and its updates to affected persons and other stakeholders. X. Conceive and execute involuntary resettlement as part of a development project or program. Include the full costs of resettlement in the presentation of the project‘s costs and benefits. For a project with significant involuntary resettlement impacts, consider implementing the involuntary resettlement component of the project as a stand-alone operation. XI. Pay compensation and provide other resettlement entitlements before physical or economic displacement. Implement the resettlement plan under close supervision throughout project implementation. XII. Monitor and assess resettlement outcomes, their impacts on the standards of living of displaced persons, and whether the objectives of the resettlement plan have been achieved by taking into account the baseline conditions and the results of resettlement monitoring. Disclose monitoring reports.

5.3 Gap Filling Between ADB and Government of Nepal Policies

41. The Government of Nepal‘s legal frameworks and ADB‘s SPS share the following: I. Both permanent and temporary involuntary resettlement shall be avoided to the extent possible or minimized where feasible, exploring all viable alternative project designs. II. Where displacement is unavoidable, people losing assets, livelihood, or other resources shall be assisted in improving status at no cost to them.

42. There are certain differences as shown in Table 9, and where different, ADB‘s SPS will be applied for subprojects.

20| P a g e

Resettlement Plan of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung

5.4. Key Difference between ADB Policy and Government of Nepal LegalFramework

Table 9: Key Difference between ADB Policy and GoN S.N. ADB Policy Government of Nepal Legal Framework 1 Compensation for assets Legal ownership is required for compensation regardless of legal ownership. eligibility; however, tenants registered with the Land Revenue Office are also recognized. 2 Compensation to all affected Encroachers are not entitled to compensation. persons regardless of tenure for all affected structures. 3 Compensation for affected Compensation is to be determined by the assets at replacement cost. compensation Fixation Committee to be formed under the Chief District Office which may be replacement cost.

43. In cases where subprojects involve voluntary donation and no other land acquisition and involuntary resettlement impacts, the subproject will be classified as Category C, but the CLPIU will prepare a report to ADB (to be attached to the classification form) which will document that: (i) the subproject site is selected in full consultation with landowners and any non-titled affected persons; (ii) voluntary donations do not severely affect the living standards of affected persons and the amount of agricultural or other productive land to be acquired from each affected household does not exceed 5% of the total productive landholdings of the household; (iii) voluntary donations are linked directly to benefits for the affected persons; (iv) any voluntary donation will be confirmed through written record and verified by an independent third party; (v) there is an adequate grievance process (vi) no affected household will be displaced from housing and severely affected; (viii) no affected household is vulnerable; and (ix) a process is in place to provide official documentation to those who donated land of their landholding post- donation. In cases where the subproject is classified as B and involves voluntary donation, the voluntary donation report will be attached to the resettlement plan.

44. All involuntary land acquisition will be compensated at replacement cost so that the economic and social future of APs will generally be as favorable as it would have been in the absence of the project. The absence to formal title to land will not be a bar to compensation assistance for loss of assets and special attention will be paid to ensuring that households headed by women and other vulnerable groups receive appropriate assistance to help them and improve their status. The APs whose land will be affected by the road was informed by publishing notice during census survey, which will remain the ―cut-off-date (14- 03-2017) for the entitlement and owners (including non-titled) of affected assets. All the land transaction which takes place between census survey and government notice publication is also eligible for compensation. This issue will be resolved as per prevailing Act. Official owners will come up with their valid documents to get compensation that will be subsequently verified by concerned authorities. The entitlement policy/matrix is attached in Appendix X.

21| P a g e

Resettlement Plan of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung

6. ENTITLEMENTS, ASSISTANCE AND BENEFITS

45. The APs whose land is being affected by the road subproject was informed to the local people by publishing a general notice during the socioeconomic survey. The date of socio- economic survey, 14 March, 2017, will remain the cut-off-date for the entitlement that was informed to the interviewed families during the field survey and community meetings. The owners, including non-titled, of the affected assets till the cut-off-date are eligible to be categorized as APs.

46. The compensation to be paid for affected assets will be based on the principle of replacement cost, which is the amount needed to replace an affected asset without deduction for taxes and/or costs of transaction before displacement and which is operationally defined as follows:

i. Productive land (agricultural, ponds, and forest) based on replacement cost that reflect recent land sales, and in the absence of such recent sales, based on productive value; ii. Residential land based on replacement cost that reflect recent land sales, and in the absence of such recent land sales, based on similar location attributes; iii. Houses and other related structures based on replacement cost reflecting current market prices of materials and labor without depreciation nor deductions for salvaged building materials; iv. Annual crops equivalent to current market value of crops at the time of compensation. v. For perennial corps and trees, cash compensation at replacement cost is equivalent to current market value given the type, age, and productive value (future production) at the time of compensation. Timber trees based on diameter at four feet height at current market value; vi. For temporary impacts, no compensation for land if returned to the legal owners, promissory and non-legal right users, and the land restored to pre-project condition within 3 months after use. If the land is not returned and restored to pre-project condition within 3 months, the affected person will receive compensation at replacement cost for the land. A penalty clause will be included in the contractor‘s contract to ensure that the cost of such compensation is recovered from the contractor.

47. The residential and commercial loss will be provided with allowances in order to support their living condition. For the houses to be relocated, material transport allowances is provided. Similarly, if there is loss of income due to disruption of business or employment, material transport and one time assistance allowance is provided. Loss of standing crops and trees will also be compensated on the current market provision. Further the policies on compensation and other entitlements are attached in Appendix X.

48. A Gender Equality and Social Inclusion Action Plan (GESI/AP) has been prepared for the Project and subprojects will be prepared and implemented in accordance with the GESI/AP. Consistent with the GESI/AP, resettlement planning and implementation will ensure that women, as members of the affected households, are adequately considered when they are physically or economically displaced by subprojects. They will be given equal opportunity for participation in public consultations. To ensure gender-sensitive and culturally responsive measures, the executing agency and the implementing agencies will adopt suitable strategies to ensure the active involvement of women consistent with the GESI/AP.

22| P a g e

Resettlement Plan of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung

7. RELOCATION OF HOUSING AND SETTLEMENTS

49. There are 152 structures affected by the road subproject in which 9 structures are public. There are 143 private structures affected along the alignment. Out of 143 private structures, only 2 structures will be relocated beyond the CoI whereas 4 earthquake damage structures will get only material transportation allowances. Other eligible structure owners will be entitled to get transportation and other reestablishment cost based on RF. Hence, the relocation cost for structures along the sub-project is NRs. 16500(refer Appendix IV for details).

50. Although these two families are being physically displaced by the subproject, it is learnt that the families will manage another place for temporary shifting making them less vulnerable in terms of resettlement. The structure owner has enough space in the same plot beyond CoI in the same village of the road in order to rebuild the house.

51. RP has allocated full compensation amount for the physical structures and also allocated material transport allowances and one time allowance for disruption of the economic activity. The relocation of the affected residences will be completed before civil works starts at the particular chainage.

52. APs will be compensated at replacement cost for any loss of assets in addition to other assistance. Compensation will be provided as per replacement and relocation cost on the basis of entitlement matrix. Further the replacement cost for land has been proposed at 25% increment to the government rate. As per the Reconstruction Related Act 2072, The Notice 2, Part 3 and Part 5 of this Act‘s Regulation explain about the detail of CDC working procedures. Clause 8 (2) states the composition of CDC as follows:  Chief District Officer – Chairperson  Land Revenue Officer – Member  Officer appointed by NRA – Member  President/Secretary/Executive Officer from VDC/Municipality – Member  Survey Officer –Member  Project Officer – Member Secretary

7.1 Valuation and Compensation Determination

53. The survey and valuation of affected HHs‘ properties were undertaken by Consultants on the basis of respective district rate. The replacement cost for land has been proposed at 25% increment to the government rate. Compensation for structures is calculated on replacement cost on the basis of entitlement matrix provisioned in RF. Cadastral mapping has verified the land plots of road alignment for the deed transfer.

23| P a g e

Resettlement Plan of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung

8. INCOME RESTORATION AND REHABILITATION PROGRAM

54. During the socioeconomic survey, 148 interviewed HHs have expressed their interest to be the part of the training and benefit from entrepreneurial skills. 162 HHs are proposed for the training and priority will be given to Dalits, Janajatis, women HH-heads and BPLs HHs. Income restoration program (IRP) will be designed for the one person per family in 16-45 age-group. List of trainings are being finalized in the district and the tentative cost of the training program is NRs 319584.56.

55. 119 non-interviewed HHs, whenever they approach the project, will be given further consultation on entitlement, compensation. The amount of compensation has been separated in the reserve fund as the absentee assistance cost NRs 119000.00 for non- interviewed owner as a precautionary measure.

9. RESETTLEMENT BUDGET

57. The total resettlement cost includes compensation and allowances, deed transfer fees, operation and administration costs. A contingency of 20% will be included in these cost estimates to be used as required during implementation of the resettlement plan.

58. The compensation package includes compensation for affected land plots and other structures. The replacement cost for land has been proposed at 25% increment to the government rate. Compensation for structures is calculated on replacement cost on the basis of entitlement matrix provisioned in RF. Additionally, allowances for material transport and business allowances for affected structures will also be estimated as per entitlement matrix. Similarly, compensation of affected crops is valued on the basis of prevailing market rate and trees are compensated on the reference provided by Department of Forest (DoF). However, all these valuations will be endorsed by CDC before finalization of the compensation package. The detail cost estimation and basis of compensation are described under following paragraphs.

9.1 Compensation for land

59. The additional requirement of private lands (148 Interviewed HHs including 119 absentee HHs with 50 non-registered plots) for upgrading is 5.41 ha it cost NRs 4833406.74 as per the replacement cost for land. It has been proposed at 25% increment to the government rate. The rate for land compensation is presented in the Table 10.

24| P a g e

Resettlement Plan of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung

Table 10: Details of Land Rate of the affected Plots

Replacement DLRO Land Rate cost rate per per sqm. sqm.(25% S.N. Name of the VDC increment) 1 Archalbot 88.45 110.57 2 Shreebhanjyang 45.21 56.51 3 Nauthar 74.69 93.37 4 Pachok 74.69 93.37 Source: District Land Revenue office, Lamjung District

9.2 Compensation for structures 60. There are 143 private and 9 public structures affected along the alignment. Compensation amount for these structures is calculated by the technical team based on district norms taking account of RF criteria and considering recent NRA norms. The total compensation amount of the private affected structures is NRs.4445031.95 (except relocation cost) and total compensation of public structures is NRs.898829.48.

9.3 Compensation for standing crops 61. The major crop cultivated in affected land is maize. However, compensation for affected crops is calculated for all affected land plots on the basis of average Maize productivity of the available data. One crop variety is compensated from the crop cycle of the local agriculture calendar. In this road area, the amount of compensation for maize stands to NRs.692891.39 of 5.41ha. (refer Appendix V for details).

9.4 Compensation for trees 62. The affected trees are compensated not for their timber value but only for harvesting and transportation cost based on the girth and height of the tree. The man-days required for the calculation is provided by the Ministry of Forest and Soil Conservation Norms 2060 explained in Table 11 and the unskilled wage rate NRS 550.(2072/73).

Table 11: Labor Requirement for Cutting and Transportation of Trees Girth of Tree Labor Requirement (Man days) Above 12 cm to 30 cm 0.13 Above 31 cm to 60 cm 0.39 Above 61 cm to 90 cm 0.52 Above 91 cm to 120 cm 1.56 Above 121 cm to 180 cm 2.50 Above 181 cm to 240 cm 4.00 Above 242 cm to 300 cm 12.99 Above 300 cm 41.67 Distance between felling spot and stacking yard Labor Requirement (mandays) First 10 m 0.5 For each additional 10 m 0.08 25| P a g e

Resettlement Plan of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung

For first 1000 m 8.42 For each additional 1000 m 8.00 For first 5000 m 40.42 For small seedling less than 12 cm girth is NRs. 10 per seedling 4Source: Ministry of Forest and Soil Conservation, 2060

63. There are total 1106 trees affected along the road alignment in private and3CFUG forest land areas. The harvesting and transportation cost of these trees are summarized in the Table 12.

Table 12: Summary of Harvesting and Transportation Cost of the Affected Trees

Trees Transportation S.N. Ownership count Harvesting cost cost Total cost 1 Private Trees 853 140552.5 21131.7 161684

3 Raniswara CFUG 123 53619.5 9027.19 62646.69

4 Sikhra CFUG 127 164669 12063.17 76732.17 5 Kerabari CFUG 3 1947 392.04 62646.69 Total 1106 360788 42614.1 363709.8

64. There are private and CFUG fruit trees affected along the road alignment. The private and CFUG fruit trees are estimated to be NRs 462000.00 and 40000.00 respectively.

9.5 Other Supporting Cost

65. Other supporting costs in Resettlement Plan implementation includes, compensating the time given by the affected households during deed transfer and other purposes. This cost includes the amount required for management cost for APs‘ households and deed transfer fees in the district. The estimated amount for supporting cost is NRs 544000.

4MFSC. 2060. Norms, 2060. Ministry of Forests and Soil Conservation, Kathmandu. 26| P a g e

Resettlement Plan of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung

9.6 Total RP Cost Estimate of Belghari-Archalbot-Lamabagar-Sernabazar-Liture- PachokRoadSubproject

66. Resettlement budget includes compensatory amounts, implementation and management costs for APs‘. The total cost estimated for implementation of this proposed resettlement plan for Belghari-Archalbot-Lamabagar-Sernabazar-Liture- Pachok Road subproject is NRs 14966427.49. Table 13 provides the details for the resettlement implementation budgeting. The total direct compensatory cost in the road subproject is NRs 11752369.11.The estimated training cost is NRs 319584.56.

27| P a g e

Resettlement Plan of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung

Table 13: Budget for Resettlement Plan Implementation Total Amount S.N. Budget Unit loss (NRs.) Remarks 1. DIRECT COST Land Compensation of 1.1 Interviewed HHs Ha. 2.85 2655617.30 148 Interviewed HHs Land Compensation of 1.2 Absentees‘ HHs Ha. 1.83 1504586.33 119 Absentees‘ HHs Compensation for Non- 1.3 Registered Land Ha. 0.73 673203.11 50 Non-Registered Plots 1.4 Private Trees No. 853 161684.00 1.5 Private Fruit Trees No. 468 462000.00 1.6 CFUGs Trees No. 253 202025.54 3 CFUGs 1.7 CFUGs Fruit Trees No 20 40000.00 CFUG 247 HHs(including absentee HHs 1.8 Private Crops (Maize) Ha. 5.41 692891.39 and 50 non-registered plots) Total 108 structures out of this only 2 residences are fully affected and other structures are partial and small structures which details are attached 1.9 Private Structures No. 108 3914240.64 in appendix IV. Out of 6 EQ affected structures 4 are residences and 2 are affected only pali. Cost calculates only material 1.1 Private Residence EQ No. 6 317985.42 transportation. 29 Temporary CGI taharas, 1.1 Temporary CGI /taharas No. 29 212805.89 Cow/cattle sheds Relocation /Transportation 1.1 cost No. 2 16500.00 Relocate beyond the RoW. 4 tapstands, 2 chautara, 1 irrigation 1.1 Public Structures No. 9 898829.48 canal, 1 temple and 1 health post Sub Total 11752369.11 2. INDIRECT COST

2.1 Deed Transfer Fees plots 425 425000.00 @400 Deed Transfer Fees for 2.2 Absentee HHs 119 119000.00 @1000 Sub Total 544000.00 Income Generation and Livelihood Improvement 162 APs who are taken from

3 Program LS 162 319584.56 dalit,janajatis, and women HHs

4 Contingency (20%) 2350473.82 GRAND TOTAL(1+2+3+4) 14966427.49

28| P a g e

Resettlement Plan of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung

10. INSTITUTIONAL ARRANGEMENTS

67. The National Reconstruction Authority (NRA) is the executing agency of the project. The Central Level Project implementation Unit (CLPIU) under Ministry of Federal Affairs and Local Development (MOFALD) supported by Central Implementation Support Consultant(CISC) provides overall guide and monitoring of the project activities at central level. District Level Implementation Unit (DLPIU) supported by District Level Implementation Support Consultant (DISC) will be responsible to implement overall activities at district

68. The DISCs together with the CLPIU and DLPIU, will assist in developing and updating resettlement plans through the conduct of the DMS in a participatory and transparent way and consistent with the project resettlement principles and the resettlement framework. Once approved by the NRA and reviewed and concurred by ADB, the CISC will provide technical advice in the implementation of the approved resettlement plan. The CISC will likewise provide capacity-building orientation, as needed, to concerned personnel of the CLPIU and DLPIU.

69. Together with the CLPIU and DLPIU, CISC and DISC will supervise civil works activities to be carried out by contractor/s for quality assurance. Furthermore, the contractors will be responsible to pay appropriate compensation if the land is taken temporarily such as for labor camp, material storage etc. as stated in Resettlement Framework. In addition, CISC will assist the CLPIU in regular monitoring of resettlement plan implementation.

29| P a g e

Resettlement Plan of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung

11. IMPLEMENTATION SCHEDULE

70. An implementation schedule has been agreed for timely completion of implementation of RP. Table 14 below presents time-bound action plan to complete identified activities of the RP including compensation payment and transfer of deed of ownership. Draft Resettlement Plan has been disclosed to the APs and Local Government at subproject site. A translated copy of summary of resettlement plan (in Nepali) has also been shared with APs. The objective of disclosure was to inform APs regarding their entitlement and working approach and modality.

71. Though the contract has already been signed after approval of resettlement plan from NRA, contractor‘s mobilization schedule has been synchronized with the RP implementation schedule. The contractor has been well instructed to initiate the works in the sections where compensation payment is not required or the activity falls in public land. The RP implementation schedule presented in the Tables below presents the section wise implementation plan matching with contractor‘s mobilization schedule. DISC will monitor the implementation status and report to DLPIU and CISC in a periodic basis. In case of any deviation from the agreed schedule, updated schedule will be agreed and implemented in accordance with the new milestone. The DISC and DLPIU ensures that no physical possession will be taken prior to compensation payment.

30| P a g e

Resettlement Plan of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung

Road Alignment Status for construction works

S.N Chainage Land Trees Planned Compensation Proposed Contractor Remarks From To Pub Prvt. Com Prvt Distribution Completion Date 1 0+040 0+150 Yes yes 25 Nov 2017 1st Dec 2017 Will be started compensation

2 0+150 0+500 Yes yes Public land 10 Oct 2017

3 0+500 0+700 Yes yes Not yet, may be 30 Nov 2017 1st Dec 2017 Will be started compensation

4 0+700 0+800 Yes yes start from 1st 30 Nov 2017 1st Dec 2017 Will be started compensation

5 0+800 1+200 Yes yes November 25 Dec 2017 1st Jan 2018 Will be started compensation

6 1+200 1+500 Yes yes Public land 8 Sept to 19 Sept Construction ongoing

7 1+500 3+000 Yes yes 25 Dec 2017 1st Jan 2018 Will be started compensation

8 3+020 Yes 1.Hadi Khola Bridge(under construction by DOR)

9 3+020 3+890 Yes yes 10th Dec 2017 15th Dec 2017 Will be started compensation Not yet, may be 10 3+890 3+900 Yes yes start from 1st Public land 22 Oct 2017 th th 11 3+900 6+300 Yes yes November 10 Dec 2017 15 Dec 2017 Will be started compensation

12 6+300 2. Kesedi Khola Bridge DPR for Bridge construction underway by DDC

13 6+300 6+800 Yes yes 25 Dec 2017 1st Jan 2018 Will be started compensation Not yet, may be 14 6+800 7+140 Yes yes st Public land 1st Nov 2017 start from 1 15 7+000 10+500 Yes yes November 25 Dec 2017 1st Jan 2018 Will be started compensation

16 10+500 3.Saadhi Khola Bridge Slab culvert purposed

30 Dec 2017 1st Jan 2018 17 10+500 11+300 Yes yes Not yet may be Will be started compensation

start from 1st 30 Dec 2017 1st Jan 2018 18 11+300 12+590 Yes yes November Will be started compensation

19 12+590 4.Karate Khola Bridge End Point of Road

Source: DLPIU/DISC, Lamjung

31| P a g e

Resettlement Plan of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung

Table 14: RP Implementation Schedule for Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road 2017/18 Responsibility Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun S N Activities I 2 I 2 I 2 1 2 3 2 I 2 I 2 I 2 I 2 I 2 I 2 I 2 I 2 I 2 I 2 I 2 Cotrator’s oilizatio Joint construction survey, equipment mobilization Excavation and civil Excavation and civil works in reset of the DLPIU/DISC/Contractor 1 schedule and HR mobilization works in 2,6,10,14 sections (Private Land) Cadastral survey, Final list DLPIU/DISC of affected people, 2 consultation with APs Consultation and Throughout project duration CLPIU/DLPIU/DISC/GRC 3 grievances resolution HH survey and field works, CLPIU/DLPIU/DISC data analysis, draft report 4 preparation Submit final draft RP to CLPIU/DLPIU/DISC CLPIU/NRA/ADB for review 5 and approval Draft RP disclosure in site DLPIU/DISC 6 ADB comments CLPIU/DLPIU 7 incorporated Notice publication and CLPIU/DLPIU/DISC 8 grievance collection CDC meeting for CDO/NRA/CLPIU/DISC compensation 9 determination Call APs application for DLPIU/DISC 10 compensation claim Verify application NRA/DLPIU/DISC 11 documents Pay compensation to APs CLPIU/DLPIU/DISC 12 Deed Transfer DLPIU/DISC 13 Ipleetatio of AP’s CLPIU/DLPIU/DISC 14 Trainings Regular monitoring Throughout project duration NRA/CLPIU/DLPIU/DISC Evaluation of RP Implementation progress & 15 achievement

32| P a g e

Resettlement Plan of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung

12. MONITORING AND EVALUATION

72. The Project has a mechanism to monitor and evaluate the resettlement and compensation process. The CLPIU through the DLPIU, CISC and DISC will conduct regular monitoring and evaluation of the updating and implementation of the resettlement plan. Monitoring and evaluation is intended to help ensure that the resettlement plan is prepared and implemented according to the resettlement framework

73. The following key indicators will be monitored periodically by CLPIUs

(i) Compensation and entitlements are computed at rates and procedures as provided in the approved resettlement plan;

(ii) Affected households are paid as per agreement with project authorities;

(iii) Public information, public consultation and grievance redress procedures are followed as described in the approved resettlement plan;

(iv) Public facilities and infrastructure affected by the Project are restored promptly; and,

(v) The transition between resettlement and civil works is smooth.

74. The NRA as the project executing agency can monitor and supervise overall RP implementation and progress. CISC submits the monthly, quarterly semi-annual reports to CLPIU/NRA and ADB. DLPIU is primarily responsible to submit the report to CLPIU. DISC team will support to prepare the monthly report on behalf of DIPIU to be finally submitted to CLPIU through CISC.

33| P a g e

Resettlement Plan of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung

APPENDICES

Appendix I: List of Affected Households Appendix II: Poverty Analysis of Interviewed Households Appendix III: Details on Land Compensation Estimation Appendix IV:Details on Structure Compensation Estimation Appendix V: Details on Crop Compensation Estimation Appendix VI: Details on Private Trees Compensation Estimation Appendix VII: Details on CFUG Trees Compensation Estimation Appendix VIII: Details on Fruits Trees Compensation Estimation Appendix IX: Nepali Summary Appendix X: Entitlement Matrix for Resettlement Plan under EEAP Appendix XI: Consultation Meeting Minutes Appendix XII: Photographs of Road Alignment

34| P a g e

Poverty Analysis of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung Pre Project Scenerio Post Project Scenerio Land Owner Name Land Household head VDC Affected Plot no. no Sheet S.N. Ward No. Family Members Land holding, sqm Total Exisitng Area, sqm New Cut Area, sqm Affected Total area (sqm) sufficiency,food Total mth Agricultural Income Agricultural Non Income Income Total Income Per Capita Level Poverty Post Land Holding Post Food Sufficiency Month Land loss % Post Agricultural Income Post Total Income IncomePost Per Capita Level Post Poverty Remarks

Panchasingh, Deumaya 1 Deumaya Gurung Gurung Pachowk 1 5 46 094-0959 1996.83 58.28 71.31 129.59 12 190000 28000 218000 43600 1.5307 1925.52 12 3.57 183214.8 211215 42242.96 1.48 Interviewd

Lilamaya 2 Karna bdr. Gurung Gurung Pachowk 1 4 337 094-0960 37876.31 989.85 1086.24 2076.09 12 191000 35000 226000 56500 1.98358 36790.07 12 2.87 185522.39 220522 55130.60 1.94 Interviewd

3 Sita Gurung Sita Gurung Pachowk 1 3 440 094-0959 2642.93 0 13.92 13.92 6 25000 130000 155000 51666.7 1.8139 2629.01 6 0.53 24868.328 154868 51622.78 1.81 Interviewd

Harka 4 Harka bdr.Gurung bdr.Gurung Pachowk 1 6 443 094-0959 1720.6 0 17.8 17.8 12 90000 240000 330000 55000 1.93092 1702.8 12 1.03 89068.929 329069 54844.82 1.93 Interviewd

Nimba 5 Nimba Gurung Gurung Pachowk 1 3 524 094-0959 10698.82 142.4 141.41 283.81 12 100000 240000 340000 113333 3.97887 10557.41 12 1.32 98678.265 338678 112892.76 3.96 Interviewd

Ser bdr Ser bdr 6 Gurung Gurung Pachowk 1 6 336 094-0960 21210.24 25.78 38.8 64.58 4 30000 180000 210000 35000 1.22877 21171.44 4 0.18 29945.121 209945 34990.85 1.23 Interviewd

Bhairav/Makhhui Jivraj 7 Gurung Gurung Pachowk 2 8 468 094-1000 30913.36 848.62 1037.36 1885.98 12 146000 144000 290000 36250 1.27265 29876 12 3.36 141100.68 285101 35637.58 1.25 Interviewd

Som Bdr. Som Bdr. 8 Gurung Gurung Pachowk 2 6 595 094-1000 9592.05 0 2.65 2.65 12 69000 106000 175000 29166.7 1.02397 9589.4 12 0.03 68980.937 174981 29163.49 1.02 Interviewd

Aaita Bdr. Aaita Bdr. 9 Gurung Gurung Pachowk 2 4 469 094-1000 9625.95 330.53 403.61 734.14 3 44000 80000 124000 31000 1.08834 9222.34 3 4.19 42155.108 122155 30538.78 1.07 Interviewd

Amar 10 Amar Gurung Gurung Pachowk 2 5 467 094-1000 10738.89 208.04 177.63 385.67 12 45000 500000 545000 109000 3.82674 10561.26 12 1.65 44255.663 544256 108851.13 3.82 Interviewd

Bakhat Bdr. 11 Bakhat Bdr. Gurung Gurung Pachowk 3 2 914 094-1000 14154.48 206.35 267.78 474.13 12 80000 84000 164000 82000 2.87883 13886.7 12 1.89 78486.529 162487 81243.26 2.85 Interviewd Poverty Analysis of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung Pre Project Scenerio Post Project Scenerio Land Owner Name Land Household head VDC Affected Plot no. no Sheet S.N. Ward No. Family Members Land holding, sqm Total Exisitng Area, sqm New Cut Area, sqm Affected Total area (sqm) sufficiency,food Total mth Agricultural Income Agricultural Non Income Income Total Income Per Capita Level Poverty Post Land Holding Post Food Sufficiency Month Land loss % Post Agricultural Income Post Total Income IncomePost Per Capita Level Post Poverty Remarks

Dadman 12 Dadman Gurung Gurung Pachowk 3 5 900 094-1000 4945.75 20.53 37.77 58.3 3 150000 0 150000 30000 1.05323 4907.98 3 0.76 148854.47 148854 29770.89 1.05 Interviewd

Gayin singh 13 Gayin singh Gurung Gurung Pachowk 3 6 976 095-0961 15432.41 30.91 58.3 89.21 12 40000 146000 186000 31000 1.08834 15374.11 12 0.38 39848.889 185849 30974.81 1.09 Interviewd

Mann bdr. 14 Mann bdr. Gurung Gurung Pachowk 3 9 951 094-1000 13369.14 66.86 50.19 117.05 3 20000 900000 920000 102222 3.58879 13318.95 3 0.38 19924.917 919925 102213.88 3.59 Interviewd

Iman singh(surya Surya pd. 15 Prasad) Gurung Pachowk 1 5 434 094-0959 7529.22 49.62 49.6 99.22 5 30000 480000 510000 102000 3.58098 7479.62 5 0.66 29802.37 509802 101960.47 3.58 Interviewd

Dudhmaya 16 Janga sub Gurung Gurung Pachowk 1 8 447 094-0959 4635.68 170.71 214.38 385.09 3 107000 360000 467000 58375 2.04941 4421.3 3 4.62 102051.72 462052 57756.46 2.03 Interviewd

Sat Manraj 17 bdr.Gurung Gurung Pachowk 1 5 925 094-1000 14635.37 0 10.47 10.47 5 147000 0 147000 29400 1.03217 14624.9 5 0.07 146894.84 146895 29378.97 1.03 Interviewd

Yubaraj 18 Yubaraj Gurung Gurung Nauthar 8 4 555 094-0959 812.71 5.47 14.75 20.22 9 75000 90000 165000 41250 1.44819 797.96 9 1.81 73638.813 163639 40909.70 1.44 Interviewd

Ladimaya 19 Ladimaya Gurung Gurung Nauthar 2 10 62 094-0997 10840.26 27.52 41.14 68.66 6 90000 230000 320000 32000 1.12345 10799.12 6 0.38 89658.44 319658 31965.84 1.12 Interviewd

Tulasi pd. 20 Tulasi pd. Ghimire Shrestha Nauthar 8 6 115 094-0958 12182.8 10.1 19.36 29.46 8 310000 70000 380000 63333.3 2.22349 12163.44 8 0.16 309507.37 379507 63251.23 2.22 Interviewd

Badmaya 21 Badmaya Gurung Gurung Nauthar 8 14 507 094-0959 4812.94 0 30.89 30.89 9 145000 800000 945000 67500 2.36977 4782.05 9 0.64 144069.37 944069 67433.53 2.37 Interviewd

Bimaya 22 Bimaya Gurung Gurung Nauthar 5 4 465 094-0958 286.12 0 11.48 11.48 2 75000 1035000 1110000 277500 9.74238 274.64 2 4.01 71990.773 1106991 276747.69 9.72 Interviewd Poverty Analysis of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung Pre Project Scenerio Post Project Scenerio Land Owner Name Land Household head VDC Affected Plot no. no Sheet S.N. Ward No. Family Members Land holding, sqm Total Exisitng Area, sqm New Cut Area, sqm Affected Total area (sqm) sufficiency,food Total mth Agricultural Income Agricultural Non Income Income Total Income Per Capita Level Poverty Post Land Holding Post Food Sufficiency Month Land loss % Post Agricultural Income Post Total Income IncomePost Per Capita Level Post Poverty Remarks

Chature 23 Chature sarki sarki Nauthar 8 6 175 094-0958 7110.16 134.74 165.79 300.53 12 100000 320000 420000 70000 2.45754 6944.37 12 2.33 97668.266 417668 69611.38 2.44 Interviewd

Rajkumar 24 Rajkumar Shrestha Shresth Nauthar 2 6 113 094-0997 2929.08 123.39 165.8 289.19 10 8000 300000 308000 51333.3 1.80219 2763.28 9 5.66 7547.1616 307547 51257.86 1.80 Interviewd

Mohan 25 Nirmala Ghimire Pd.Ghimire Nauthar 2 4 678 094-0957 15374.96 129.54 164.01 293.55 12 105000 360000 465000 116250 4.08127 15210.95 12 1.07 103879.93 463880 115969.98 4.07 Interviewd

Dal subba 26 Dal subba Gurung Gurung Nauthar 8 5 472 094-0959 13069.82 19.29 23.39 42.68 3 40000 110000 150000 30000 1.05323 13046.43 3 0.18 39928.415 149928 29985.68 1.05 Interviewd

27 Mayanath wagle Jeunath Nauthar 2 6 69 094-0997 1089 80.82 108.76 189.58 12 12200 3850000 3862200 643700 22.5988 980.24 11 9.99 10981.568 3860982 643496.93 22.59 Interviewd

Bipinchandra Tripura 28 Ghimire Ghimire Nauthar 8 6 164 094-0958 4590.43 0 7.2 7.2 7 77000 700000 777000 129500 4.54645 4583.23 7 0.16 76879.227 776879 129479.87 4.55 Interviewd

Nardev 29 Nardev Gurung Gurung Nauthar 5 4 386 094-0958 6712.55 250.79 306.23 557.02 12 60000 480000 540000 135000 4.73954 6406.32 11 4.56 57262.769 537263 134315.69 4.72 Interviewd

Govinda 30 Govinda wagle wagle Nauthar 2 5 71 094-0997 5048.87 115.76 109.87 225.63 12 80000 120000 200000 40000 1.40431 4939 12 2.18 78259.096 198259 39651.82 1.39 Interviewd

Ramraj Bista(now- Arun kumar 31 Kunimaya Shrestha) Shrestha Nauthar 2 4 1230 094-0997 309.91 0 21.29 21.29 6 25000 360000 385000 96250 3.37911 288.62 6 6.87 23282.566 383283 95820.64 3.36 Interviewd

Yobir 32 Nalumaya Gurung Gurung Nauthar 2 7 1184 094-0997 6829.6 3.97 11.94 15.91 12 265000 0 265000 37857.1 1.32908 6817.66 12 0.17 264536.71 264537 37790.96 1.33 Interviewd

Kam singh Kam singh 33 Gurung gurung Nauthar 8 5 441 094-0959 11503.53 113.87 133.92 247.79 12 65000 124000 189000 37800 1.32707 11369.61 12 1.16 64243.293 188243 37648.66 1.32 Interviewd Poverty Analysis of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung Pre Project Scenerio Post Project Scenerio Land Owner Name Land Household head VDC Affected Plot no. no Sheet S.N. Ward No. Family Members Land holding, sqm Total Exisitng Area, sqm New Cut Area, sqm Affected Total area (sqm) sufficiency,food Total mth Agricultural Income Agricultural Non Income Income Total Income Per Capita Level Poverty Post Land Holding Post Food Sufficiency Month Land loss % Post Agricultural Income Post Total Income IncomePost Per Capita Level Post Poverty Remarks

Jabarsingh/Tulsi Man pd. 34 Gurung Gurung Nauthar 8 4 534 094-0959 12264.77 18.32 33.35 51.67 12 225000 300000 525000 131250 4.60788 12231.42 12 0.27 224388.19 524388 131097.05 4.60 Interviewd

Purnaa/Mekhraj Mekhraj 35 Gurung Gurung Nauthar 8 4 499 094-0959 9132.77 171.43 188.85 360.28 10 60000 600000 660000 165000 5.79277 8943.92 10 2.07 58759.303 658759 164689.83 5.78 Interviewd

Kum bdr. 36 Kum bdr. Gurung Gurung Nauthar 8 7 554 094-0959 2454.14 60.55 52.16 112.71 3 210000 300000 510000 72857.1 2.55785 2401.98 3 2.13 205536.68 505537 72219.53 2.54 Interviewd

Manmaya 37 Manmaya Sarki Sarki Nauthar 8 6 621 094-0958 3262.87 90.55 91.01 181.56 7 225000 0 225000 37500 1.31654 3171.86 7 2.79 218724.16 218724 36454.03 1.28 Interviewd

Aasbahadur 38 Aasbahadur Gurung Gurung Nauthar 8 4 552 094-0959 826.7 28.31 33.83 62.14 12 140000 400000 540000 135000 4.73954 792.87 12 4.09 134270.96 534271 133567.74 4.69 Interviewd

39 Kale Gurung Kale gurung Nauthar 8 3 156 094-0958 10891.95 311.21 390.64 701.85 6 290000 0 290000 96666.7 3.39374 10501.31 6 3.59 279599.14 279599 93199.71 3.27 Interviewd

Som 40 Kamini sarki bahadur Nauthar 5 5 436 094-0958 15659.26 117.47 142.56 260.03 12 252000 0 252000 50400 1.76943 15516.7 12 0.91 249705.82 249706 49941.16 1.75 Interviewd

Chyangre 41 Chyangre Sarki sarki Nauthar 8 2 466 094-0959 7311.17 57.19 103.13 160.32 12 210000 0 210000 105000 3.68631 7208.04 12 1.41 207037.78 207038 103518.89 3.63 Interviewd

Rishikumar 42 Ram bdr. Gurung Gurung Nauthar 2 14 77 094-0997 19903.45 120.54 108.8 229.34 12 100000 804000 904000 64571.4 2.26695 19794.65 12 0.55 99453.361 903453 64532.38 2.27 Interviewd

Mait Mait bahadur bahadur 43 Gurung Gurung Nauthar 2 4 1183 094-0997 1844.15 45.23 39.46 84.69 3 5000 360000 365000 91250 3.20358 1804.69 3 2.14 4893.013 364893 91223.25 3.20 Interviewd

Subba 44 Subba Gurung Gurung Nauthar 5 5 437 094-0958 759.14 72.73 53.95 126.68 12 2500 270000 272500 54500 1.91337 705.19 11 7.11 2322.3318 272322 54464.47 1.91 Interviewd Poverty Analysis of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung Pre Project Scenerio Post Project Scenerio Land Owner Name Land Household head VDC Affected Plot no. no Sheet S.N. Ward No. Family Members Land holding, sqm Total Exisitng Area, sqm New Cut Area, sqm Affected Total area (sqm) sufficiency,food Total mth Agricultural Income Agricultural Non Income Income Total Income Per Capita Level Poverty Post Land Holding Post Food Sufficiency Month Land loss % Post Agricultural Income Post Total Income IncomePost Per Capita Level Post Poverty Remarks

Krishna/Bhupati raj Krishna Raj 45 Pandey Pandey Nauthar 2 16 126 094-0997 13741.67 34.59 61.65 96.24 12 140000 750000 890000 55625 1.95287 13680.02 12 0.45 139371.91 889372 55585.74 1.95 Interviewd

Atimaya, Ram Atimaya 46 bdr.Sarki Sarki Shreemjyang 2 2 183 094-1076 1879.87 0 25.44 25.44 12 124000 220000 344000 172000 6.03852 1854.43 12 1.35 122321.93 342322 171160.96 6.01 Interviewd

Gore 47 Dhan bdr. Shrestha Shrestha Shreemjyang 8 6 887 094-0997 826.6 25.56 36.35 61.91 6 140000 60000 200000 33333.3 1.17026 790.25 6 4.40 133843.46 193843 32307.24 1.13 Interviewd

Om 48 Om bdr.Gurung bdr.Gurung Shreemjyang 4 6 12 094-1037 9548.08 31.98 80.25 112.23 12 130000 420000 550000 91666.7 3.2182 9467.83 12 0.84 128907.37 548907 91484.56 3.21 Interviewd

Sukman Sukman 49 Gurung Gurung Shreemjyang 8 8 921 094-0997 10603.67 237.97 276.4 514.37 7 100000 412000 512000 64000 2.24689 10327.27 7 2.61 97393.355 509393 63674.17 2.24 Interviewd

Balkrishna Balkrishna Upadhya Upadhya 50 Ghimire Ghimire Shreemjyang 4 6 20 094-1037 12034.02 282.54 351.2 633.74 12 501200 168000 669200 111533 3.91568 11682.82 12 2.92 486573.01 654573 109095.50 3.83 Interviewd

Bhuwan singh Pushparaj 51 Gurung Gurung Shreemjyang 4 11 9 094-1037 12538.59 142.84 174.47 317.31 6 310000 350000 660000 60000 2.10646 12364.12 6 1.39 305686.46 655686 59607.86 2.09 Interviewd

52 Samser sarki Gopal Sarki Shreemjyang 2 3 188, 189 094-1076 8747.66 156.64 332.83 489.47 12 34000 102000 136000 45333.3 1.59155 8414.83 12 3.80 32706.372 134706 44902.12 1.58 Interviewd

Arjun 53 Arjun kunwar kunwar Shreemjyang 2 4 239, 238 094-1076 12970.23 0 41.57 41.57 12 96000 100000 196000 49000 1.72028 12928.66 12 0.32 95692.317 195692 48923.08 1.72 Interviewd

Dambar 54 Dambar bdr.Gurung bdr.Gurung Shreemjyang 8 6 82 094-0997 8321.83 61.73 39.17 100.9 12 60000 740000 800000 133333 4.68103 8282.66 12 0.47 59717.586 799718 133286.26 4.68 Interviewd

Ganesh Bdr. 55 Ganesh Bdr. Kunwar Kunwar Shreemjyang 2 9 237 094-1076 14423.1 0 41.42 41.42 12 80000 600000 680000 75555.6 2.65258 14381.68 12 0.29 79770.257 679770 75530.03 2.65 Interviewd Poverty Analysis of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung Pre Project Scenerio Post Project Scenerio Land Owner Name Land Household head VDC Affected Plot no. no Sheet S.N. Ward No. Family Members Land holding, sqm Total Exisitng Area, sqm New Cut Area, sqm Affected Total area (sqm) sufficiency,food Total mth Agricultural Income Agricultural Non Income Income Total Income Per Capita Level Poverty Post Land Holding Post Food Sufficiency Month Land loss % Post Agricultural Income Post Total Income IncomePost Per Capita Level Post Poverty Remarks

Aasbahadur 56 Aasbahadur Nepali Nepali Shreemjyang 2 3 186 094-1076 1851.63 7.85 26.86 34.71 6 170000 200000 370000 123333 4.32995 1824.77 6 1.45 167533.96 367534 122511.32 4.30 Interviewd

Kumar 1258, 57 Kumar Pandey Pandey Nauthar 2 5 109, 108 094-0997 5576.01 224.68 254.72 479.4 12 50000 432000 482000 96400 3.38438 5321.29 11 4.57 47715.929 479716 95943.19 3.37 Interviewd

Goth Bdr. 254, 256, 58 Goth Bdr. Gurung Gurung Nauthar 5 6 438 094-0958 19403.28 742.6 900.34 1642.94 12 175000 180000 355000 59166.7 2.0772 18502.94 11 4.64 166879.75 346880 57813.29 2.03 Interviewd

Dhan Bdr. 59 Gaini Gurung Gurung Nauthar 8 2 551 094-0959 786.78 42.46 51.9 94.36 4 50000 20000 70000 35000 1.22877 734.88 4 6.60 46701.746 66702 33350.87 1.17 Interviewd

60 Aaita Sarki Aaita Sarki Shreemjyang 2 3 187, 182 094-1076 8631.76 412.23 329.34 741.57 9 110000 35000 145000 48333.3 1.69687 8302.42 9 3.82 105803.01 140803 46934.34 1.65 Interviewd

456, 511, Sarki (Shor Bdr. Shor Bdr. 26202, 61 Gurung) Gurung Nauthar 8 10 422 094-0959 18778.93 415.68 523.33 939.01 12 70000 620000 690000 69000 2.42243 18255.6 12 2.79 68049.245 688049 68804.92 2.42 Interviewd

Nabraj 62 Nabraj Ghimire Ghimire Shreemjyang8 5 86, 094-0997 9271.93 172.58 125.86 298.44 12 90000 610000 700000 140000 4.91508 9146.07 12 1.36 88778.313 698778 139755.66 4.91 Interviewd

Paal Jung 63 Paal Jung Gurung Gurung Shreemjyang4 2 11, 5 094-1037 16052.23 497.8 653.57 1151.37 12 62000 500000 562000 281000 9.86526 15398.66 12 4.07 59475.657 559476 279737.83 9.82 Interviewd

Yagyanath 64 Yagyanath Ghimire Ghimire Shreemjyang 8 4 65 094-0997 7460.02 289.28 225.23 514.51 3 205000 300000 505000 126250 4.43235 7234.79 3 3.02 198810.72 498811 124702.68 4.38 Interviewd

Gaumati Gurung, 65 Jabi Gurung Jabi Gurung Shreemjyang 8 14 67, 45 094-0997 37532.84 462.2 341.01 803.21 12 180000 950000 1130000 80714.3 2.83369 37191.83 12 0.91 178364.58 1128365 80597.47 2.83 Interviewd

Birdhoj 66 Birdhoj Gurung Gurung Nauthar 5 2 250, 251 094-0958 5343.52 157.73 203.04 360.77 12 100000 50000 150000 75000 2.63308 5140.48 12 3.80 96200.258 146200 73100.13 2.57 Interviewd Poverty Analysis of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung Pre Project Scenerio Post Project Scenerio Land Owner Name Land Household head VDC Affected Plot no. no Sheet S.N. Ward No. Family Members Land holding, sqm Total Exisitng Area, sqm New Cut Area, sqm Affected Total area (sqm) sufficiency,food Total mth Agricultural Income Agricultural Non Income Income Total Income Per Capita Level Poverty Post Land Holding Post Food Sufficiency Month Land loss % Post Agricultural Income Post Total Income IncomePost Per Capita Level Post Poverty Remarks

Mama Maya 457, 29, Shrestha, Hiralal Hiralal 26, 33, 67 Shrestha Shrestha Shreemjyang 4 7 34, 470 094-1037 31528.15 573.6 730.93 1304.53 12 130000 620000 750000 107143 3.76154 30797.22 12 2.32 126986.16 746986 106712.31 3.75 Interviewd

Kum Bdr. 68 Kum Bdr. Gurung Gurung Shreemjyang 8 11 57, 49 094-0997 10486.61 232.9 461.8 694.7 6 245000 500000 745000 67727.3 2.37775 10024.81 6 4.40 234210.91 734211 66746.45 2.34 Interviewd

Bishnu ghimire, Rajya Prasad Bishnu 69 Ghimire Ghimire Shreemjyang 8 3 58, 55 094-0997 6400.61 212.51 248.16 460.67 6 110000 200000 310000 103333 3.62779 6152.45 6 3.88 105735.16 305735 101911.72 3.58 Interviewd

Kamaljit 264, 263, 70 Rojina Gurung Gurung Nauthar 5 5 309, 310 094-0958 19919.88 576.18 665.66 1241.84 10 45000 168000 213000 42600 1.49559 19254.22 10 3.34 43496.241 211496 42299.25 1.49 Interviewd

71 Yesraj Thapa Magar Gaj Bd Archalbot 9 6 673 094-1116 3014.31 15.45 19.8 35.25 12 215000 348000 563000 93833.3 3.29427 2994.51 12 0.66 213587.74 561588 93597.96 3.29 Interviewd

Dhana bdr. 72 Dhanamaya Adhikari Adhikari Archalbot 8 6 172 094-1116 2652.67 61.21 91.9 153.11 12 383900 630000 1013900 168983 5.93261 2560.77 12 3.46 370600.04 1000600 166766.67 5.85 Interviewd

Mina 73 Mina Poudel Poudel Archalbot 9 6 316 094-1156 4620.22 50.16 64.11 114.27 7 150000 300000 450000 75000 2.63308 4556.11 7 1.39 147918.61 447919 74653.10 2.62 Interviewd

Hari 74 Hari bdr.Khadka bdr.Khadka Archalbot 6 5 183 094-1076 7890.8 181.94 200.87 382.81 12 80000 400000 480000 96000 3.37034 7689.93 12 2.55 77963.502 477964 95592.70 3.36 Interviewd

Ram bdr. 75 Srijana Pariyar Pariyar Archalbot 9 3 330 094-1156 510.72 11.41 12.05 23.46 6 15000 440000 455000 151667 5.32467 498.67 6 2.36 14646.088 454646 151548.70 5.32 Interviewd

Sushila Ramesh 76 Pariyar Pariyar Archalbot 9 4 667 094-1156 3922.78 297.41 356.18 653.59 6 105000 55000 160000 40000 1.40431 3566.6 5 9.08 95466.225 150466 37616.56 1.32 Interviewd

nanda bdr.Lamichh 77 Gopal Lamichhane ane Archalbot 9 8 332 094-1156 4248.54 15.44 19.7 35.14 6 145000 600000 745000 93125 3.2694 4228.84 6 0.46 144327.65 744328 93040.96 3.27 Interviewd Poverty Analysis of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung Pre Project Scenerio Post Project Scenerio Land Owner Name Land Household head VDC Affected Plot no. no Sheet S.N. Ward No. Family Members Land holding, sqm Total Exisitng Area, sqm New Cut Area, sqm Affected Total area (sqm) sufficiency,food Total mth Agricultural Income Agricultural Non Income Income Total Income Per Capita Level Poverty Post Land Holding Post Food Sufficiency Month Land loss % Post Agricultural Income Post Total Income IncomePost Per Capita Level Post Poverty Remarks

Min bdr. 78 Min bdr. Bhujel Bhujel Archalbot 9 6 556 094-1116 8780.97 120.81 134.85 255.66 12 70000 472000 542000 90333.3 3.17139 8646.12 12 1.54 68925.005 540925 90154.17 3.17 Interviewd

Devi bhakta 79 Devi bhakta Regmi Regmi Archalbot 9 4 516 094-1116 4348.06 68.07 157.78 225.85 6 60000 310000 370000 92500 3.24746 4190.28 6 3.63 57822.753 367823 91955.69 3.23 Interviewd

Krishna bdr. 80 Krishna bdr. Gharti Gharti Archalbot 9 6 557 094-1116 6213.76 54.88 118.08 172.96 12 150000 300000 450000 75000 2.63308 6095.68 12 1.90 147149.55 447150 74524.93 2.62 Interviewd

81 Subhadra Regmi Milan RegmiArchalbot 9 5 97, 98 094-1116 16576.81 327.48 386.11 713.59 6 73000 420000 493000 98600 3.46162 16190.7 6 2.33 71299.671 491300 98259.93 3.45 Interviewd

Balram 82 Bimala Adhikari Adhikari Archalbot 9 3 49 094-1116 5746.69 54.79 54.21 109 12 64500 375000 439500 146500 5.14328 5692.48 12 0.94 63891.555 438892 146297.18 5.14 Interviewd

Shanta Pashupati Thapa kumari 83 Kunwar Kunwar Archalbot 7 5 619 094-1076 6422.32 43.19 52.53 95.72 12 19400 600000 619400 123880 4.34914 6369.79 12 0.82 19241.322 619241 123848.26 4.35 Interviewd

Amrit Balkrishna 84 Lamichhane Lamichhane Archalbot 6 6 174 094-1076 910.01 35.71 40.13 75.84 9 52000 144000 196000 32666.7 1.14685 869.88 9 4.41 49706.882 193707 32284.48 1.13 Interviewd

Bhart bdr. 85 Kalpana Adhikari Kunwar Archalbot 7 3 674 094-1116 374.35 34.53 28.26 62.79 6 5000 200000 205000 68333.3 2.39903 346.09 6 7.55 4622.5457 204623 68207.52 2.39 Interviewd

Kirtiman 86 Kirtiman Kunwar Kunwar Archalbot 8 8 160 094-1116 9390.91 16.31 29.99 46.3 12 105000 500000 605000 75625 2.65502 9360.92 12 0.32 104664.68 604665 75583.09 2.65 Interviewd

Ram Ram chandra chandra 87 Adhikari Adhikari Archalbot 6 3 793 094-1076 7302.68 53.79 86.73 140.52 12 140000 280000 420000 140000 4.91508 7215.95 12 1.19 138337.3 418337 139445.77 4.90 Interviewd

Maan bdr. 88 Sita devi kunwar Kunwar Archalbot 7 4 664 094-1116 3022.48 47.59 47.69 95.28 6 85000 299000 384000 96000 3.37034 2974.79 6 1.58 83658.833 382659 95664.71 3.36 Interviewd Poverty Analysis of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung Pre Project Scenerio Post Project Scenerio Land Owner Name Land Household head VDC Affected Plot no. no Sheet S.N. Ward No. Family Members Land holding, sqm Total Exisitng Area, sqm New Cut Area, sqm Affected Total area (sqm) sufficiency,food Total mth Agricultural Income Agricultural Non Income Income Total Income Per Capita Level Poverty Post Land Holding Post Food Sufficiency Month Land loss % Post Agricultural Income Post Total Income IncomePost Per Capita Level Post Poverty Remarks

Jit bdr. 89 Jit bdr. Lamichhane Lamichhane Archalbot 9 9 76, 78 094-1116 11744.11 304.91 276.91 581.82 12 150000 696000 846000 94000 3.30012 11467.2 12 2.36 146463.21 842463 93607.02 3.29 Interviewd

Bishnulal 90 Bishnulal Shrestha Shrestha Archalbot 9 7 492, 390 094-1156 3835.05 96.66 121.53 218.19 12 90000 800000 890000 127143 4.46369 3713.52 12 3.17 87147.964 887148 126735.42 4.45 Interviewd

Teklal 494, 427, 91 Tankalal Shrestha Shrestha Archalbot 9 5 391 094-1156 6966.91 215.89 255.39 471.28 12 250000 600000 850000 170000 5.96831 6711.52 12 3.67 240835.61 840836 168167.12 5.90 Interviewd

Kalawati Rana Janga Bdr. 92 Magar Ale Magar Archalbot 9 5 633 094-1116 583.45 23.82 26.52 50.34 2 30000 600000 630000 126000 4.42357 556.93 2 4.55 28636.387 628636 125727.28 4.41 Interviewd

Badrinath Badrinath 93 Lamichhane Lamichhane Archalbot 9 4 635, 538 094-1116 9375.11 35.64 52.22 87.86 12 60000 60000 120000 30000 1.05323 9322.89 12 0.56 59665.796 119666 29916.45 1.05 Interviewd

Bishnu Bdr. 588, 591, 94 Gangamaya Suyal Suyal Archalbot 9 4 585 094-1156 13264.08 456.96 388.64 845.6 12 120000 35000 155000 38750 1.36042 12875.44 12 2.93 116483.98 151484 37870.99 1.33 Interviewd

Govindaraj 723, 443, 95 Khem Kumari Joshi Joshi Shreemjyang 2 4 722 094-1037 10408.86 216.8 392.77 609.57 12 84000 230000 314000 78500 2.75595 10016.09 12 3.77 80830.327 310830 77707.58 2.73 Interviewd

Tilak Bdr. 155, 531, 96 Tilak Bdr. Kunwar Kunwar Archalbot 8 14 534 094-1116 13357.53 400.79 436.28 837.07 6 135000 980000 1115000 79642.9 2.79608 12921.25 6 3.27 130590.67 1110591 79327.90 2.79 Interviewd

Shovita+Shrijana Shovita 477, 676, 97 Kunwar Kunwar Archalbot 8 3 675 094-1116 5659.42 272.52 283.99 556.51 12 75000 99000 174000 58000 2.03625 5375.43 11 5.02 71236.496 170236 56745.50 1.99 Interviewd

Dhub 98 Ganga Kunwar Kunwar Archalbot 7 4 620 094-1076 10544.17 409.38 500.41 909.79 12 150000 480000 630000 157500 5.52946 10043.76 11 4.75 142881.23 622881 155720.31 5.47 Interviewd

Bal Bdr. 99 Prasansha Kunwar Kunwar Archalbot 7 6 663 094-1116 5277.69 41.92 40.17 82.09 12 175000 276000 451000 75166.7 2.63893 5237.52 12 0.76 173668.03 449668 74944.67 2.63 Interviewd Poverty Analysis of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung Pre Project Scenerio Post Project Scenerio Land Owner Name Land Household head VDC Affected Plot no. no Sheet S.N. Ward No. Family Members Land holding, sqm Total Exisitng Area, sqm New Cut Area, sqm Affected Total area (sqm) sufficiency,food Total mth Agricultural Income Agricultural Non Income Income Total Income Per Capita Level Poverty Post Land Holding Post Food Sufficiency Month Land loss % Post Agricultural Income Post Total Income IncomePost Per Capita Level Post Poverty Remarks

Narayan 100 Narayan Kunwar Kunwar Archalbot 8 5 530, 535 094-1116 2289.25 65.35 139.09 204.44 2 196000 150000 346000 69200 2.42945 2150.16 2 6.08 184091.45 334091 66818.29 2.35 Interviewd

Gokul Prasad 101 Gokul Prasad Regmi Regmi Archalbot 9 6 541 094-1116 8781.15 95.23 97.38 192.61 12 180000 400000 580000 96666.7 3.39374 8683.77 12 1.11 178003.86 578004 96333.98 3.38 Interviewd

Harka Harka Kumar Kumar 102 Shrestha Shrestha Archalbot 9 4 424 094-1156 4975.99 177.38 214.95 392.33 6 81000 120000 201000 50250 1.76416 4761.04 6 4.32 77501.008 197501 49375.25 1.73 Interviewd

Ram 103 Ram bdr.Parajuli bdr.Parajuli Archalbot 9 8 425 094-1156 3066.19 128.82 145.16 273.98 6 103000 500000 603000 75375 2.64624 2921.03 6 4.73 98123.759 598124 74765.47 2.62 Interviewd

104 Bishnu Giri Bishnu Giri Archalbot 9 6 413 094-1156 554.88 21.77 53.58 75.35 5 196000 480000 676000 112667 3.95547 501.3 5 9.66 177073.96 657074 109512.33 3.84 Interviewd

Krishna Pd. Krishna Pd. 105 Mareta Mareta Archalbot 8 5 585 094-1116 361.61 14.03 28.36 42.39 11 110000 50000 160000 32000 1.12345 333.25 10 7.84 101373.03 151373 30274.61 1.06 Interviewd

Ram 801, 181, Ram bdr.Gharti bdr.Gharti 178, 799, 106 Bhujel Bhujel Archalbot 6 6 792 094-1076 11876.75 354.87 366.21 721.08 12 150000 384000 534000 89000 3.12458 11510.54 12 3.08 145374.87 529375 88229.15 3.10 Interviewd

Hari bdr. 107 Aaitimaya Pariyar Pariyar Archalbot 9 6 329 094-1156 969.77 0 40.88 40.88 6 250000 108000 358000 59666.7 2.09476 928.89 6 4.22 239461.42 347461 57910.24 2.03 Interviewd

Muktinath Bhimnaya 108 Lamichhane Lamichhane Archalbot 9 6 636 094-1116 6643.06 57.72 126.7 184.42 12 185000 430000 615000 102500 3.59854 6516.36 12 1.91 181471.58 611472 101911.93 3.58 Interviewd

Hira devi 109 Hira devi Marhattha Marhattha Archalbot 8 3 584 094-1116 1969.06 0.6 19.43 20.03 7 148000 0 148000 49333.3 1.73198 1949.63 7 0.99 146539.59 146540 48846.53 1.71 Interviewd

Ishwori pd. 110 Ishwori pd. Regmi Regmi Archalbot 9 4 558 094-1116 2022.89 0 33.61 33.61 12 98000 360000 458000 114500 4.01983 1989.28 12 1.66 96371.745 456372 114092.94 4.01 Interviewd Poverty Analysis of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung Pre Project Scenerio Post Project Scenerio Land Owner Name Land Household head VDC Affected Plot no. no Sheet S.N. Ward No. Family Members Land holding, sqm Total Exisitng Area, sqm New Cut Area, sqm Affected Total area (sqm) sufficiency,food Total mth Agricultural Income Agricultural Non Income Income Total Income Per Capita Level Poverty Post Land Holding Post Food Sufficiency Month Land loss % Post Agricultural Income Post Total Income IncomePost Per Capita Level Post Poverty Remarks

Ram pd. Ram pd. 111 Poudel Poudel Archalbot 9 10 ,317,649 094-1156 7016.21 199.15 236.14 435.29 12 92000 180000 180000 18000 0.63194 6780.07 12 3.37 88903.616 268904 26890.36 0.94 Interviewd

Ramdevi 112 Klaimaya Kunwar Kunwar Archalbot 6 3 175 094-1076 3578.49 0 24.04 24.04 4 170000 200000 370000 123333 4.32995 3554.45 4 0.67 168857.95 368858 122952.65 4.32 Interviewd

Kausila 170, 179, 113 Ishwori pd. Adhikari Adhikari Archalbot 8 5 578 094-1116 11118.45 432.74 516.69 949.43 12 160000 38400 198400 39680 1.39307 10601.76 11 4.65 152564.58 190965 38192.92 1.34 Interviewd

Hasta bdr. 114 Sukumaya Ghale Ghale Nauthar 8 4 455, 460 094-0959 18057.63 166.24 191.94 358.18 12 80000 144000 224000 56000 1.96603 17865.69 12 1.06 79149.656 223150 55787.41 1.96 Interviewd

115 Ser Ghale Kali Ghale Nauthar 8 5 459, 469 094-0959 14973.08 350.58 434.39 784.97 12 70000 370000 440000 88000 3.08948 14538.69 12 2.90 67969.202 437969 87593.84 3.08 Interviewd

Saharsha 116 Tara devi Ghimire jibi Ghimire Nauthar 5 3 378, 400 094-0958 9838.39 242.85 289.47 532.32 12 36000 600000 636000 212000 7.44283 9548.92 12 2.94 34940.79 634941 211646.93 7.43 Interviewd

Lila Poudel, Rishiram 318, 315, 117 Mahendra Poudel Poudel Archalbot 9 10 668 094-1156 9502.53 182.19 242.24 424.43 12 45000 1090000 1135000 113500 3.98472 9260.29 12 2.55 43852.853 1133853 113385.29 3.98 Interviewd

Yesh raj Mayadevi Thapa Thapa 411,326, 118 Magar magar Archalbot 9 8 526 094-1156 5049.55 273.86 332.13 605.99 9 65000 210000 275000 34375 1.20683 4717.42 8 6.58 60724.678 270725 33840.58 1.19 Interviewd

Ram 119 Ram bdr.Gurung bdr.Gurung Archalbot 9 3 564 094-1116 25462.02 27.78 20.63 48.41 12 190000 300000 490000 163333 5.73426 25441.39 12 0.08 189846.06 489846 163282.02 5.73 Interviewd

Chijmaya 120 Chijmaya Gurung Gurung Archalbot 7 3 493 094-1116 695.43 34.69 38.58 73.27 3 20000 704000 724000 241333 8.47266 656.85 3 5.55 18890.471 722890 240963.49 8.46 Interviewd

Prem bdr. 121 Chandra bdr. Thapa Thapa Archalbot 9 5 389, 333 094-1156 11932.41 92 135.76 227.76 12 295000 0 295000 59000 2.07135 11796.65 12 1.14 291643.66 291644 58328.73 2.05 Interviewd Poverty Analysis of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung Pre Project Scenerio Post Project Scenerio Land Owner Name Land Household head VDC Affected Plot no. no Sheet S.N. Ward No. Family Members Land holding, sqm Total Exisitng Area, sqm New Cut Area, sqm Affected Total area (sqm) sufficiency,food Total mth Agricultural Income Agricultural Non Income Income Total Income Per Capita Level Poverty Post Land Holding Post Food Sufficiency Month Land loss % Post Agricultural Income Post Total Income IncomePost Per Capita Level Post Poverty Remarks

Maan bdr. 583, 587, 122 Maan bdr. Thapa Thapa Archalbot 9 5 590 094-1156 7870.8 112.04 147.99 260.03 12 96000 750000 846000 169200 5.94022 7722.81 12 1.88 94194.969 844195 168838.99 5.93 Interviewd

Eghane 123 Edhane Gurung Gurung Pachowk 2 6 439, 450 094-1000 9832.34 316.09 386.2 702.29 12 65000 199000 264000 44000 1.54474 9446.14 12 3.93 62446.895 261447 43574.48 1.53 Interviewd

Demraj 124 Karna singh Ghale Ghale Pachowk 3 6 511, 915 094-1000 14085.25 212.1 259.4 471.5 12 42000 1210000 1252000 208667 7.3258 13825.85 12 1.84 41226.51 1251227 208537.75 7.32 Interviewd

Kami 125 Kami Gurung Gurung Pachowk 3 6 953, 960 094-1000 4885.81 111.08 76.24 187.32 6 76000 300000 376000 62666.7 2.20008 4809.57 6 1.56 74814.068 374814 62469.01 2.19 Interviewd

Kumraj 126 Maya Gurungseni Gurung Pachowk 3 5 886, 897 094-1000 12650.11 301.96 364.92 666.88 12 66000 448000 514000 102800 3.60907 12285.19 12 2.88 64096.086 512096 102419.22 3.60 Interviewd

127 Bhagawati Bhagawati Nauthar 5 5 80, 690 094-0957 10327.55 214.6 327.22 541.82 12 85000 208000 293000 58600 2.05731 10000.33 12 3.17 82306.844 290307 58061.37 2.04 Interviewd

Birta 128 Birta Gurung Gurung Nauthar 5 6 420, 424 094-0958 10045.31 248.11 261.17 509.28 10 240000 400000 640000 106667 3.74482 9784.14 10 2.60 233760.19 633760 105626.70 3.71 Interviewd

Jangasubba 129 Bamsyo Gurungseni Gurung Nauthar 5 4 479, 480 094-0958 9009.98 281.36 362.48 643.84 6 90000 550000 640000 160000 5.61723 8647.5 6 4.02 86379.215 636379 159094.80 5.59 Interviewd

Sitaram 471, 620, 130 Sitaram Gurung Gurung Nauthar 5, 8 7 618, 377 094-0958 55959.16 248.65 303.9 552.55 12 42000 706000 748000 106857 3.75151 55655.26 12 0.54 41771.909 747772 106824.56 3.75 Interviewd

Sarba Singh 131 Sarba Singh Gurung Gurung Nauthar 8 10 508, 563 094-0959 12457.34 423.42 533.26 956.68 6 600000 110000 710000 71000 2.49265 11924.08 6 4.28 574315.87 684316 68431.59 2.40 Interviewd

Mauli 132 Nalu Kumari Gurung Gurung Nauthar 8 6 622 094-0958 4935.91 108.53 81.13 189.66 6 40000 516000 556000 92666.7 3.25331 4854.78 6 1.64 39342.533 555343 92557.09 3.25 Interviewd Poverty Analysis of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung Pre Project Scenerio Post Project Scenerio Land Owner Name Land Household head VDC Affected Plot no. no Sheet S.N. Ward No. Family Members Land holding, sqm Total Exisitng Area, sqm New Cut Area, sqm Affected Total area (sqm) sufficiency,food Total mth Agricultural Income Agricultural Non Income Income Total Income Per Capita Level Poverty Post Land Holding Post Food Sufficiency Month Land loss % Post Agricultural Income Post Total Income IncomePost Per Capita Level Post Poverty Remarks

Pode 615, 442, 133 Dhanmaya Gurung Gurung Pachowk 1 10 475 094-0959 10332.95 262.05 353.93 615.98 6 377000 0 377000 37700 1.32356 9979.02 6 3.43 364086.78 364087 36408.68 1.28 Interviewd

Hari Bdr. Kunwar, Hari Bdr. 134 Devi Kumari Kunwar Kunwar Archalbot 6 4 147, 752 094-1076 9071.59 287.19 301.81 589 6 107000 370000 477000 119250 4.18659 8769.78 6 3.33 103440.13 473440 118360.03 4.16 Interviewd

Aashkaji 135 Aashkaji Shrestha Shrestha Archalbot 9 6 417 094-1156 3123.57 0 16.96 16.96 9 105000 710000 815000 135833 4.76879 3106.61 9 0.54 104429.88 814430 135738.31 4.77 Interviewd

Lal Bd 136 Kshamamta Gurung Gurung Archalbot 7 5 677 094-1116 649.63 32.3 27.34 59.64 5 63000 115000 178000 35600 1.24983 622.29 5 4.21 60348.614 175349 35069.72 1.23 Interviewd

Gir Bdr. 137 Gir Bdr. Kunwar Kunwar Archalbot 7 6 541 094-1076 12044.13 193.29 235.07 428.36 12 151000 300000 451000 75166.7 2.63893 11809.06 12 1.95 148052.87 448053 74675.48 2.62 Interviewd

Himraj+Umakanta Umakanta 138 Paudel Paudel Archalbot 9 3 327, 321 094-1156 10828.41 242.54 330.61 573.15 12 130000 250000 380000 126667 4.44697 10497.8 12 3.05 126030.88 376031 125343.63 4.40 Interviewd

Shiva Prasad Shiva Prasad 139 Adhikari Adhikari Archalbot 8 4 152 094-1116 6195.96 19.62 29.31 48.93 12 175000 350000 525000 131250 4.60788 6166.65 12 0.47 174172.16 524172 131043.04 4.60 Interviewd

Man Bdr. 140 Man Bdr. Thapa Thapa Archalbot 7 3 617 094-1116 312.76 32.85 27.93 60.78 6 135000 242000 377000 125667 4.41187 284.83 5 8.93 122944.27 364944 121648.09 4.27 Interviewd

141 Devi Gurung Devi Gurung Archalbot 7 5 495 094-1116 669.61 13.72 26.45 40.17 2 45000 115000 160000 32000 1.12345 643.16 2 3.95 43222.473 158222 31644.49 1.11 Interviewd

Janaki Paudel, Dinanath 565, 527, 142 Dinnath Paudel Paudel Archalbot 9 7 525 094-1116 5724.91 31.33 34.8 66.13 12 120000 535000 655000 93571.4 3.28508 5690.11 12 0.61 119270.56 654271 93467.22 3.28 Interviewd

Rishiram Shrestha, Rishiram 394, 395, 143 Gyanmaya Shrestha Shrestha Archalbot 9 2 392 094-1156 8197.28 362.28 461.32 823.6 3 28000 52000 80000 40000 1.40431 7735.96 3 5.63 26424.238 78424 39212.12 1.38 Interviewd Poverty Analysis of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung Pre Project Scenerio Post Project Scenerio Land Owner Name Land Household head VDC Affected Plot no. no Sheet S.N. Ward No. Family Members Land holding, sqm Total Exisitng Area, sqm New Cut Area, sqm Affected Total area (sqm) sufficiency,food Total mth Agricultural Income Agricultural Non Income Income Total Income Per Capita Level Poverty Post Land Holding Post Food Sufficiency Month Land loss % Post Agricultural Income Post Total Income IncomePost Per Capita Level Post Poverty Remarks

Bil Bdr. 144 Bil Bdr. Shrestha Shrestha Archalbot 9 7 398 094-1156 1949.41 0 17.89 17.89 1 60000 150000 210000 30000 1.05323 1931.52 1 0.92 59449.372 209449 29921.34 1.05 Interviewd

Durga 584, 497, 145 Amrit Bdr. Thapa Thapa Archalbot 9 3 589 094-1156 7459.39 163.98 210.99 374.97 12 145000 0 145000 48333.3 1.69687 7248.4 12 2.83 140898.65 140899 46966.22 1.65 Interviewd

Amrit(Amite), Amrit(Amite 802, 799, 146 Sommaya Bhujel ) Gharti Archalbot 6 10 794 094-1076 11678.22 204.14 232.94 437.08 12 195000 500000 695000 69500 2.43998 11445.28 12 1.99 191110.43 691110 69111.04 2.43 Interviewd

300, 53, Padamlal Paudel, Manmaya 51, 50, 147 Manmaya Paudel Paudel Archalbot 9 11 486, 485 094-1116 28417.47 781.51 974.87 1756.38 12 235000 500000 735000 66818.2 2.34583 27442.6 12 3.43 226938.25 726938 66085.30 2.32 Interviewd

Durga 148 Maansingh Gurung bdr.Gurung Pachowk 1 5 476 094-0959 5849.99 226.83 271.75 498.58 6 160000 360000 520000 104000 3.6512 5578.24 6 4.65 152567.51 512568 102513.50 3.60 Interviewd Sub-Project: Belghari-Archalbot-Lamabagar-Sherabazar-Letaure-Pachok Road District: Lamjung Appendix 2.1 : Photographs of the Affected Structure with Estimated Cost(Private Structures) Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 1 from CL 1 0+580 Rishiam Shrestha 395 941156 3.8 Archalbot-9 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) House (Fully) 90812.99 as per estimate sheet

Land Owner Name: Rishiam Shrestha Total 90812.99

Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 2 from CL 2 1+130 Man Maya Paudel 486 941116 4 Archalbot-9 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) House(Partial) as per estimate sheet 59709.15

Land Owner Name: Man Maya Paudel Total 59709.15 Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 3 from CL 3 1+730 Man Maya Paudel 486 941116 4 Archalbot-9 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) Saw Mill(Partial) as per estimate sheet 46981.31

Land Owner Name: Man Maya Paudel Total 46981.31

Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 4 from CL 4 1+540 Muktinath Lamichane 636 941116 4.5 Archalbot-9 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) House(Shop) Top as per estimate sheet 37869.71 only

Land Owner Name: Muktinath Lamichane Total 37869.71 Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 5 from CL 5 1+560 Badri Lamichane 635 941116 3.5 Archalbot-9 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) Houses Partially as per estimate sheet 37433.87

Land Owner Name: Badri Lamichane Total 37433.87

Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 6 from CL 6 1+570 Badri Lamichane 538 941116 3.5 Archalbot-9 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) Shop Partially as per estimate sheet 101756.98

Land Owner Name: Badri Lamichane Total 101756.98 Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 7 from CL 7 1+650 Kalika Lamichane 66 941116 4 Archalbot-9 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) House partially as per estimate sheet 84527.92

Land Owner Name: Kalika Lamichane Total 84527.92

Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 8 from CL 8 1+720 Kalika Lamichane 491 941116 4 Archalbot-9 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) Shop Partially as per estimate sheet 80286.54

Land Owner Name: Kalika Lamichane Total 80286.54 Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 9 from CL 9 1+770 Shubhadra Regmi 98 941116 3.2 Archalbot-9 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) House CGI Pali as per estimate sheet 16151.14

Land Owner Name: Shubhadra Regmi Total 16151.14

Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 10 from CL 10 1+930 Takraj Thapa magar 634 941116 3.8 Archalbot-9 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) 2 Story as per estimate sheet 368262.75 House(Shop) Partially

Land Owner Name: Takraj Thapa magar Total 368262.75 Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 11 from CL 11 2+530 Man Bahadur Rimal 496 941116 3.1 Archalbot 7 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm)

House (Full) as per estimate sheet 136942.41

Land Owner Name: Man Bahadur Rimal Total 136942.41

Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks from CL 12 Bijman Nepali(Ram bdr 12 6+220 Public 3.8 Shreevanjyang gurung) Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) House(Partially) as per estimate sheet 52607.46

Land Owner Name: Ram Bdr Gurung Total 52607.46 Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 13 from CL 13 6+660 Ladi Gurung 62 940997 2.8 Sherabazar Nauthar-2 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm)

House (Partially) as per estimate sheet 19687.35

Land Owner Name: Ladi Gurung Total 19687.35

Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks from CL 14 14 6+760 Budhmaya(Shyamlal) Gurung 696 940997 4.3 Sherabazar Nauthar-2 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) House as per estimate sheet 29616.12 Kitchen(Partial) Land Owner Name: Budhmaya(Shyamlal) Gurung Total 29616.12

Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 15 from CL 15 10+120 Ram bdr gurung 77 940959 3 Nauthar 2 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) House (Partial) as per estimate sheet 57808.41

Land Owner Name: Ram bdr gurung Total 57808.41

Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 16 from CL 16 10+130 Jabbar Sing gurung 534 940959 4.4 Nauthar 8 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) House (Partial) as per estimate sheet 188750.57

Land Owner Name: Jabbar Sing gurung Total 188750.57 Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks from CL 17 17 11+300 Chattur Bdr Gurung(Gamere)Public Land 2.6 Pachok Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) Shop (Full) as per estimate sheet 49852.33

Land Owner Name: Gameere Gurung Total 49852.33

Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 18 from CL 18 12+440 Teklal Gurung Public Land 4 Pachok Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) House (Partial) as per estimate sheet 87386.87

Land Owner Name: Ram bdr Ghale Total 87386.87 Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 19 from CL 19 12+500 Shuv Raj gurung 979 950961 2 Pachok 3 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) House(Partial) as per estimate sheet 130590.47

Land Owner Name: Shuv Raj gurung Total 130590.47

Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 20 from CL 20 0+750 Aaitemaya Pariyar 329 941156 4 Archalbot-9 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) House CGI as per estimate sheet 15108.28 Pali(Kitchen)

Land Owner Name: Aaitemaya Pariyar Total 15108.28 Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 21 from CL 21 1+930 Bimala Adhikari 49 941116 4.5 Archalbot-9 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) House CGI Pali as per estimate sheet 37161.06

Land Owner Name: Bimala Adhikari Total 37161.06

Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 22 from CL 22 2+000 Indra Prasad marahatha Public Land 4.2 Archalbot-9 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) House CGI Pali as per estimate sheet 16313.34

Land Owner Name: Indra Prasad marahatha Total 16313.34 Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 23 from CL 23 2+200 Narayan Pd Marahatha Public Land 4 Archalbot-9 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) House CGI Pali as per estimate sheet 6236.52

Land Owner Name: Narayan Pd Marahatha Total 6236.52

Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 24 from CL 24 2+280 Narayan Kubar 530 941116 4.35 Archalbot 8 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) House CGI Pali as per estimate sheet 6236.52

Land Owner Name: Narayan Kubar Total 6236.52 Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 25 from CL 25 2+500 Chiz Maya gurung 493 941116 3.7 Archalbot 7 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) House CGI Pali, as per estimate sheet 12720.52 Courtyard

Land Owner Name: Chiz Maya gurung Total 12720.52

Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 26 from CL 26 3+890 Bimla Bhujel Public Land 3.4 Shreevanjyang Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) House CGI pali as per estimate sheet 7558.38

Land Owner Name: Bimla Bhujel Total 7558.38 Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 27 from CL 27 5+170 Hiralal Shrestha 26 941037 3.4 Shreevanjyang 4 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) Hose CGI pali, as per estimate sheet 24283.28 courtyard

Land Owner Name: Hiralal Shrestha Total 24283.28

Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks from CL 28 SuvadraGurung(ManjungGuru 28 5+170 5 941037 4 Shreevanjyang 4 ng) Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) House CGI pali, as per estimate sheet 29499.50 courtyard

Land Owner Name: Pal Jung Gurung Total 29499.50 Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 29 from CL 29 5+480 Goma ghimire 58 940997 4.2 Shreevanjyang 8 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) House pali and as per estimate sheet 49656.55 courtyard

Land Owner Name: Bishnu Ghimire Total 49656.55

Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 30 from CL 30 6+640 Kumar Pandey 1258 940997 4.7 Sherabazar Nauthar-2 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) Courtyard as per estimate sheet 10935.84

Land Owner Name: Kumar Pandey Total 10935.84 Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 31 from CL 31 8+100 Subba Gurung 437 940958 2.5 Nauthar 5 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) House CGI Pali as per estimate sheet 21392.97

Land Owner Name: Subba Gurung Total 21392.97

Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 32 from CL 32 8+952 Shuvi gurung Public Land 4 Jetaure Nauthar Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) House CGI Pali as per estimate sheet 15190.17

Land Owner Name: Shuvi gurung Total 15190.17 Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 33 from CL 33 9+680 Dal Subba gurung 472 940959 3 Nauthar 8 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) House CGI Pali as per estimate sheet 20884.26

Land Owner Name: Dal Subba gurung Total 20884.26

Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 34 from CL 34 10+100 Durga Bdr Gurung Public Land 4.8 Nauthar Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) House CGI Pali, as per estimate sheet 26136.94 Courtyard

Land Owner Name: Durga Bdr Gurung Total 26136.94 Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 35 from CL 35 10+120 Gaine Gurung 551 940959 3 Nauthar 8 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) House CGI Pali as per estimate sheet 20583.78

Land Owner Name: Gaine Gurung Total 20583.78

Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 36 from CL 36 11+260 Manmaya gurung Public Land 4 Pachok Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) House CGI Pali as per estimate sheet 12963.37

Land Owner Name: Manmaya gurung Total 12963.37 Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 37 from CL 37 11+270 Shanata maya Gurung Public Land 3 Pachok Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) House CGI Pali as per estimate sheet 9221.84

Land Owner Name: Shanata maya Gurung Total 9221.84

Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 38 from CL 38 0+780 Maiya Pariyar 49 941116 4 Archalbot-9 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) Pig Farm as per estimate sheet 36933.32

Land Owner Name: Maiya Pariyar Total 36933.32 Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 39 from CL 39 5+860 Dhan Bdr Shrestha 887 940997 2 Shreevanjyang 8 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) Pig Farm as per estimate sheet 12553.90

Land Owner Name: Dhan Bdr Shrestha Total 12553.90

Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 40 from CL 40 9+680 Dal Subba gurung 472 940959 3 Nauthar 8 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm)

Cow farm as per estimate sheet 23725.19

Land Owner Name: Dal Subba gurung Total 23725.19 Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 41 from CL 41 11+750 Buddhe Gurung Public Land 3 Pachok Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) Cow farm as per estimate sheet 37231.22

Land Owner Name: Buddhe Gurung Total 37231.22

Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks from CL 42 42 12+160 Him Kumari gurung(Gausari)Public Land 4 Pachok VDCoff. Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) Caw Farm CGI as per estimate sheet 22571.30 Pali

Land Owner Name: Gausari gurung Total 22571.30 Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 43 from CL 43 0+750 Aaitemaya Pariyar 329 941156 4 Archalbot-9 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) Toilet and Gobar as per estimate sheet 39323.85 Gas

Land Owner Name: Manjung Gurung Total 39323.85

Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 44 from CL 44 0+780 Maiya Pariyar 588 941156 4 Archalbot-9 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) Toilet and as per estimate sheet 30487.08 Gobargas Land Owner Name: Ganga Maya Suwal Total 30487.08 Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 45 from CL 45 1+770 Shree Bhakta Regmi Public Land 3 Archalbot-9 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) Toilet as per estimate sheet 34240.84

Land Owner Name: Shree Bhakta Regmi Total 34240.84

Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 46 from CL 46 2+420 Tirtha Raj Adhikari 476 941116 5 Archalbot-9 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) Toilet and as per estimate sheet 31026.50 gobargas

Land Owner Name: Laxima Total 31026.50 Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 47 from CL 47 2+470 Tola Kumari lamichane Public Land 4 Archalbot-9 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) Toilet as per estimate sheet 29778.29

Land Owner Name: Tola Kumari lamichane Total 29778.29

Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 48 from CL 48 2+510 Devi Gurung 495 941116 4 Archalbot-9 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) Gobar Gas as per estimate sheet 17543.14

Land Owner Name: Devi Gurung Total 17543.14 Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 49 from CL 49 2+510 Nabaraj Adhikari Public Land 5 Archalbot-9 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) Toilet and as per estimate sheet 47405.60 Gobargas

Land Owner Name: Nabaraj Adhikari Total 47405.60

Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 50 from CL 50 6+660 Ladi Gurung 62 940997 3 Sherabazar Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) Gobargas as per estimate sheet 19297.61

Land Owner Name: Ladi Gurung Total 19297.61 Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 51 from CL 51 10+120 Gaine Gurung 551 940959 3 Nauthar Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) Toilet as per estimate sheet 23333.78

Land Owner Name: Gaine Gurung Total 23333.78

Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 52 from CL 52 0+850 Santa Bdr Pariyar 336 941156 4 Archalbot-9 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) Dry Wall as per estimate sheet 19737.30

Land Owner Name: Santa Bdr Pariyar Total 19737.30 Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 53 from CL 53 0+980 Mina Paudel 318 9841156 4 Archalbot-9 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) Masonary as per estimate sheet 10184.00 Wall(Chautaro)

Land Owner Name: Lila Total 10184.00

Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 54 from CL 54 1+600 Ram Pd Paudel 649 941116 4 Archalbot-9 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) Dry Wall as per estimate sheet 56792.06

Land Owner Name: Ram Pd Paudel Total 56792.06 Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 55 from CL 55 1+770 Shree Bhakta Regmi Public Land 3 Archalbot-9 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) Masonary Wall as per estimate sheet 58463.72

Land Owner Name: Shree Bhakta Regmi Total 58463.72

Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 56 from CL 56 1+740 Suvadra Regmi 98 941116 3 Archalbot-9 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) Dry Wall as per estimate sheet 19097.33

Land Owner Name: Suvadra Regmi Total 19097.33 Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 57 from CL 57 2+205 Man Bdr Khadka 598 941116 3 Archalbot-9 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) Dry Wall as per estimate sheet 35168.28

Land Owner Name: Man Bdr Khadka Total 35168.28

Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 58 from CL 58 2+280 Narayan Kubar 530 941116 4 Archalbot-9 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) Masonary Wall as per estimate sheet 3486.52

Land Owner Name: Total 3486.52 Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 59 from CL 59 2+320 Tilak Kubar 531 941116 5 Archalbot 8 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) Masonary Wall as per estimate sheet 74594.65

Land Owner Name: Tilak Kubar Total 74594.65

Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 60 from CL 60 2+400 Sovita Kubar 477 941116 4 Archalbot-9 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) Dry Wall as per estimate sheet 95552.46

Land Owner Name: Sovita Kubar Total 95552.46 Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 61 from CL 61 2+400 Hari Bahadur Khadka Public Land 4 Archalbot-9 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) Masonary Wall as per estimate sheet 6064.23

Land Owner Name: Hari Bahadur Khadka Total 6064.23

Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 62 from CL 62 2+420 Tirtha Raj Adhikari 476 941116 5 Archalbot 8 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) Masonary wall as per estimate sheet 25526.50

Land Owner Name: Tirtha Raj Adhikari Total 25526.50 Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 63 from CL 63 2+440 Kalpana Kubar 674 941116 4 Archalbot 7 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) Dry Wall as per estimate sheet 12057.70

Land Owner Name: Kalpana Kubar Total 12057.70

Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 64 from CL 64 2+470 Sangita Adhikari 673 941116 4 Archalbot-9 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) Masonary Wall as per estimate sheet 58392.80

Land Owner Name: Sangita Adhikari Total 58392.80 Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 65 from CL 65 2+470 Tola Kumari lamichane Public Land 4 Archalbot-9 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) Dry Wall as per estimate sheet 37680.30

Land Owner Name: Tola Kumari lamichane Total 37680.30

Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 66 from CL 66 2+480 Devi Sannani suhel 419 941156 4 Archalbot-9 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) Dry Wall as per estimate sheet 17416.67

Land Owner Name: Laxmi Gurung Total 17416.67 Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 67 from CL 67 2+480 Man Bdr Thapa 617 941116 4 Archalbot 7 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm)

Dry and Brick Wall as per estimate sheet 33261.18

Land Owner Name: Man Bdr Thapa Total 33261.18

Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 68 from CL 68 2+280 Narayan Kubar 530 941156 4.35 Archalbot-9 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) Dry wall as per estimate sheet 13403.42

Land Owner Name: Narayan Kubar Total 13403.42 Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 69 from CL 69 2+510 Devi Gurung 495 941116 4 Archalbot 7 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) Dry Wall as per estimate sheet 15502.75

Land Owner Name: Devi Gurung Total 15502.75

Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 70 from CL 70 2+510 Nabaraj Adhikari Public Land 5 Archalbot-9 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) Dry Wall as per estimate sheet 10137.80

Land Owner Name: Nabaraj Adhikari Total 10137.80 Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 71 from CL 71 2+530 Man Bahadur Rimal 496 941116 3 Archalbot 7 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) Dry Wall as per estimate sheet 13636.68

Land Owner Name: Man Bahadur Rimal Total 13636.68

Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 72 from CL 72 2+540 Sita devi Kubar 664 941116 3 Archalbot 7 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) Dry wall as per estimate sheet 20634.45

Land Owner Name: Sita devi Kubar Total 20634.45 Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 73 from CL 73 2+580 Parsamsa Kubar 663 941116 3 Archalbot 7 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) Dry wall as per estimate sheet 26125.01

Land Owner Name: Gamere Gurung Total 26125.01

Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 74 from CL 74 2+470 Sangita Adhikari 673 941116 3.8 Archalbot 7 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) Dry wall and as per estimate sheet 34974.33 courtyard

Land Owner Name: Sangita Adhikari Total 34974.33 Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 75 from CL 75 2+600 Ramesh Raj Kubar Public Land 4 Archalbot-9 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) Dry wall and as per estimate sheet 45988.85 courtyard

Land Owner Name: Ramesh Raj Kubar Total 45988.85

Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 76 from CL 76 2+610 Sabitra Kubar Public Land 4 Archalbot-9 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) Dry wall as per estimate sheet 27318.22

Land Owner Name: Gausari Gurung Total 27318.22 Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 77 from CL 77 2+640 Gir bdr Kubar 541 941076 4 Archalbot 7 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) Dry wall as per estimate sheet 49594.45

Land Owner Name: Gir bdr Kubar Total 49594.45

Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 78 from CL 78 2+660 Pabitra Thapa Kubar Public Land 4 Archalbot-9 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) Dry wall and as per estimate sheet 35385.06 courtyard

Land Owner Name: Pabitra Thapa Kubar Total 35385.06 Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 79 from CL 79 2+720 Ganga Kubar 620 941076 5 Archalbot 7 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) Dry wall and as per estimate sheet 57508.46 courtyard

Land Owner Name: Ganga Kubar Total 57508.46

Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 80 from CL 80 2+880 Ram bdr gharti Bhujel 178 941076 5 Archalbot 6 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) Dry wall as per estimate sheet 86485.26

Land Owner Name: Ram bdr gharti Bhujel Total 86485.26 Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 81 from CL 81 3+890 Bimla Bhujel Public Land 3 Shreevanjyang Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) Dry wall as per estimate sheet 4934.33

Land Owner Name: Bimla Bhujel Total 4934.33

Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 82 from CL 82 3+900 Nalmaya Bohara Public Land 3 Shreevanjyang Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) Dry wall as per estimate sheet 12685.70

Land Owner Name: Nalmaya Bohara Total 12685.70 Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 83 from CL 83 8+970 Sher bdr Gurung 45 940997 3 Jetaure Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) Dry wall as per estimate sheet 14802.98

Land Owner Name: Gaumati Gurung Total 14802.98

Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 84 from CL 84 5+860 Dhan Bdr Shrestha 887 940997 2 Shreevanjyang 8 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) Dry wall as per estimate sheet 39474.60

Land Owner Name: Dhan Bdr Shrestha Total 39474.60 Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 85 from CL 85 5+900 Laxmi B.K 888 940997 3 Shreevanjyang 8 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) Dry wall as per estimate sheet 31699.30

Land Owner Name: Bishnu Kr. Shrestha Total 31699.30

Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 86 from CL 86 6+010 Bishnu Kumar Shrestha 804 940997 4 Shreevanjyang 8 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) Dry wall as per estimate sheet 47324.66

Land Owner Name: Bishnu Kumar Shrestha Total 47324.66 Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 87 from CL 87 6+030 Indrajit Gurung Public Land 3 Shreevanjyang Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) Dry wall as per estimate sheet 47698.48

Land Owner Name: Indrajit Gurung Total 47698.48

Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 88 from CL 88 6+660 Ladi Gurung 62 940997 3 Sherabazar Nauthar 2 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) Dry wall as per estimate sheet 22069.89

Land Owner Name: Ladi Gurung Total 22069.89 Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 89 from CL 89 6+680 Ram bdr gurung 77 940997 3 Sherabazar Nauthar 2 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) Dry wall as per estimate sheet 12918.96

Land Owner Name: Ram bdr gurung Total 12918.96

Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 90 from CL 90 6+700 Nalumaya Gurung 1184 940997 2 Sherabazar Nauthar 2 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) Dry wall as per estimate sheet 43296.46

Land Owner Name: Nalumaya Gurung Total 43296.46 Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks from CL 91 91 6+760 Budhmaya(Shyamlal) Gurung 696 940997 4 Sherabazar Nauthar 2 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) Dry Wall as per estimate sheet 22877.33

Land Owner Name: Budhmaya(Shyamlal) Gurung Total 22877.33

Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 92 from CL 92 7+500 Palman Magar 81 940957 2 Nauthar 5 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) Dry wall as per estimate sheet 6280.05

Land Owner Name: Palman Magar Total 6280.05 Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 93 from CL 93 8+100 Subba Gurung 437 940958 3 Nauthar 5 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) Dry wall as per estimate sheet 12021.81

Land Owner Name: Subba Gurung Total 12021.81

Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 94 from CL 94 8+600 Kamsi gurung 441 940959 5 Nauthar 8 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) Dry Wall as per estimate sheet 12596.95

Land Owner Name: Kamsi gurung Total 12596.95 Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 95 from CL 95 8+930 Bamse guruseni 479 940958 4 Jetaure Nauthar 5 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) Masonary wall for as per estimate sheet 21065.10 Tap

Land Owner Name: Bamse guruseni Total 21065.10

Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 96 from CL 96 8+945 varat gurung 397 940958 4 Jetaure Nauthar-5 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) Dry wall as per estimate sheet 4859.56

Land Owner Name: Birkha Total 4859.56 Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 97 from CL 97 8+952 Shuvi gurung Public Land 4 Jetaure Nauthar Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) Dry wall as per estimate sheet 20395.21

Land Owner Name: Shuvi gurung Total 20395.21

Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 98 from CL 98 8+970 Sher bdr Gurung 469 940959 3 Jetaure Nauthar 8 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) Dry wall as per estimate sheet 24596.86

Land Owner Name: Sher Bd. Ghale Total 24596.86 Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 99 from CL 99 8+990 Kumar gurung Public Land 3 Jetaure Nauthar Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) Dry wall for tap as per estimate sheet 3364.31 pad

Land Owner Name: Kumar gurung Total 3364.31

Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 100 from CL 100 9+470 Kal bahadur gurung 156 940958 3 Nauthar 8 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) Dry wall as per estimate sheet 10765.80

Land Owner Name: Kal bahadur gurung Total 10765.80 Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 101 from CL 101 9+660 Kamala Ghale Public Land 3 Nauthar Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) Dry wall as per estimate sheet 6280.05

Land Owner Name: Kamala Ghale Total 6280.05

Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 102 from CL 102 9+795 Kamsing Gurung 441 940959 3 Nauthar 8 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) Dry wall as per estimate sheet 17494.43 Land Owner Name: Kamsing Gurung Total 17494.43

Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 103 from CL 103 9+795 Sur bahadur gurung 456 940959 4 Nauthar 8 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) Dry wall as per estimate sheet 5024.04

Land Owner Name: Bhairab Total 5024.04

Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 104 from CL 104 11+270 Shanata maya Gurung Public Land 3 Pachok Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) Dry wall as per estimate sheet 8522.93 Land Owner Name: Shanata maya Gurung Total 8522.93

Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks from CL 105 105 11+300 Chattur Bdr Gurung(Gamere)Public Land 3 Pachok Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) Dry Wall as per estimate sheet 10909.34

Land Owner Name: Gameere Gurung Total 10909.34

Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 106 from CL 106 12+017 Chunu Ghale Public Land 3 Pachok Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) Dry wall as per estimate sheet 6728.63 Land Owner Name: Gameere Gurung Total 6728.63

Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks from CL 107 107 12+160 Him Kumari gurung(Gausari) Public Land 4 Pachok VDCoff. Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) Dry Wall as per estimate sheet 17071.30

Land Owner Name: Gausari Gurung Total 17071.30

Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 108 from CL 108 12+440 Teklal Gurung Public Land 4 Pachok Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) Dry wall as per estimate sheet 18242.05 Land Owner Name: Teklal Gurung Total 18242.05

. Sub-Project: Belghari-Archalbot-Lamabagar-Sherabazar-Letaure-Pachok Road District: Lamjung Appendix 2.2 : Photographs of the Affected Structure with Estimated Cost(EQ Effected Structures) Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 1 from CL 109 2+540 Sita devi Kubar 664 941116 3 Archalbot 7 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) EQ affected House 111384.29 Material transporttaion and relocatio cost only

Land Owner Name: Sita devi Kubar Total 111384.29

Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 2 from CL 110 2+540 Shanti Kubar Public Land 3 Archalbot-9 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) EQ affected House 101706.64 Material transporttaion and relocatio cost only

Land Owner Name: Shanti Kubar Total 101706.64 Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks from CL 3 111 5+630 Yeggyenath Ghimere 65 940997 4.2 Shreevanjyang 8 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) EQ affected CGI Pali 1383.23 Material transporttaion and relocatio cost only

Land Owner Name: Yeggyenath Ghimere Total 1383.23

Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 4 from CL 112 8+600 Kamsi gurung 441 940959 4.8 Nauthar 8 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) EQ affected CGI Pali 3853.63 Material transporttaion and relocatio cost only

Land Owner Name: Kamsi gurung Total 3853.63 Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 5 from CL 113 8+930 Bamse guruseni 479 940958 3.5 Jetaure Nauthar 5 Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) EQ affected House 32065.78 as per estimate sheet

Land Owner Name: Bamse guruseni Total 32065.78

Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 6 from CL 114 12+450 Ram Bdr Ghale Public Land 2 Pachok Affected Total Area Rate Total Type of Structure Area Storey ( sqm) /sqm Amount (sqm) EQ affected House 67591.86 as per estimate sheet

Land Owner Name: Ram Bdr Ghale Total 67591.86 Sub-Project: Belghari-Archalbot-Lamabagar-Sherabazar-Letaure-Pachok Road District: Lamjung Appendix 2.3 : Photographs of the Affected Structure with Estimated Cost(Tin Taharas) Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 1 from CL 115 2+000 Indra Prasad marahatha 612 941116 4.2 Archalbot 8 Total Area Affected Rate Total Type of Structure Storey ( sqm) Area (sqm) /sqm Amount Goat Cabinet as per estimate sheet 2750.00

Land Owner Name: Indra Prasad marahatha Total 2750.00

Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 2 from CL 116 2+060 Ishwori Adhikari 170 941116 4 Archalbot 8 Total Area Affected Rate Total Type of Structure Storey ( sqm) Area (sqm) /sqm Amount House Pali and Cow as per estimate sheet 7938.47 Farm

Land Owner Name: Ishwori Adhikari Total 7938.47 Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 3 from CL 117 2+205 Man Bdr Khadka 598 941116 3.3 Archalbot 8 Total Area Affected Rate Total Type of Structure Archalbot 8 ( sqm) Area (sqm) /sqm Amount Goat Cabinet as per estimate sheet 2750.00

Land Owner Name: Man Bdr Khadka Total 2750.00

Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 4 from CL 118 2+480 Man Bdr Thapa 617 941116 3.7 Archalbot 7 Total Area Affected Rate Total Type of Structure Storey ( sqm) Area (sqm) /sqm Amount Goat Cabinet as per estimate sheet 2750.00

Land Owner Name: Man Bdr Thapa Total 2750.00 Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 5 from CL 119 2+510 Nabaraj Adhikari 531 941116 4.5 Archalbot 8 Total Area Affected Rate Total Type of Structure Storey ( sqm) Area (sqm) /sqm Amount Goat Cabinet as per estimate sheet 2750.00

Land Owner Name: Nabaraj Adhikari Total 2750.00

Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 6 from CL 120 2+860 Som Maya Bhujel 799 941076 3.4 Archalbot 6 Total Area Affected Rate Total Type of Structure Storey ( sqm) Area (sqm) /sqm Amount Tahara CGI as per estimate sheet 25558.83

Land Owner Name: Som Maya Bhujel Total 25558.83 Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 7 from CL 121 3+570 Joikane Gurung Public Land 3.5 Shreevanjyang Total Area Affected Rate Total Type of Structure Storey ( sqm) Area (sqm) /sqm Amount CGI pali as per estimate sheet 1487.44

Land Owner Name: Joikane Gurung Total 1487.44

Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks from CL 8 122 5+142 Gorey Tamang(Hiralal Shrestha) 470 941037 4.7 Shreevanjyang 4 Total Area Affected Rate Total Type of Structure Storey ( sqm) Area (sqm) /sqm Amount CGI Tahara as per estimate sheet 7359.79

Land Owner Name: Hiralal Shrestha Total 7359.79 Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 9 from CL 123 6+010 Bishnu Kumar Shrestha 804 940997 3.5 Shreevanjyang 8 Total Area Affected Rate Total Type of Structure Storey ( sqm) Area (sqm) /sqm Amount Goat Cabinet as per estimate sheet 2750.00

Land Owner Name: Hiralal Shrestha Total 2750.00

Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks from CL 10 124 6+700 Govinda Wagle 71 940997 3.8 Sherabazar Nauthar 2 Total Area Affected Rate Total Type of Structure Storey ( sqm) Area (sqm) /sqm Amount CGI Cabinet as per estimate sheet 8575.82

Land Owner Name: Govinda Wagle Total 8575.82 Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 11 from CL 125 6+760 Budhmaya(Shyamlal) Gurung 696 940997 4.3 Sherabazar Nauthar 2 Total Area Affected Rate Total Type of Structure Storey ( sqm) Area (sqm) /sqm Amount Goat Cabinet as per estimate sheet 2750.00

Land Owner Name: Budhmaya(Shyamlal) Gurung Total 2750.00

Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 12 from CL 126 7+500 Palman Magar Public Land 2.4 Nauthar Total Area Affected Rate Total Type of Structure Storey ( sqm) Area (sqm) /sqm Amount cow theched roof as per estimate sheet 5500.00

Land Owner Name: Palman Magar Total 5500.00 Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 13 from CL 127 8+952 Shuvi gurung Public Land 4 Jetaure Total Area Affected Rate Total Type of Structure Storey ( sqm) Area (sqm) /sqm Amount Goat Cabinet as per estimate sheet 2750.00

Land Owner Name: Shuvi gurung Total 2750.00

Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 14 from CL 128 8+960 Vaye Gurung 442 940958 4 Jetaure Nauthar 5 Total Area Affected Rate Total Type of Structure Storey ( sqm) Area (sqm) /sqm Amount CGI House Pali as per estimate sheet 2457.42

Land Owner Name: Vaye Gurung Total 2457.42 Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 15 from CL 129 8+940 Suman gurung Public Land 4.3 Jetaure Nauthar Total Area Affected Rate Total Type of Structure Storey ( sqm) Area (sqm) /sqm Amount Chicken Khor as per estimate sheet 1100.00

Land Owner Name: Suman gurung Total 1100.00

Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 16 from CL 130 9+200 Mangle Guruseni Public Land 4.1 Nauthar Total Area Affected Rate Total Type of Structure Storey ( sqm) Area (sqm) /sqm Amount CGI House and CGI as per estimate sheet 16105.91 khor

Land Owner Name: Mangle Guruseni Total 16105.91 Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 17 from CL 131 9+220 Sher Bdr gurung Public Land 4.2 Nauthar Total Area Affected Rate Total Type of Structure Storey ( sqm) Area (sqm) /sqm Amount CGI House and CGI as per estimate sheet 17244.09 kitchen

Land Owner Name: Sher Bdr gurung Total 17244.09

Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 18 from CL 132 9+270 Mangalsing Gurung Public Land 4.1 Nauthar Total Area Affected Rate Total Type of Structure Storey ( sqm) Area (sqm) /sqm Amount CGI Ghumti as per estimate sheet 6374.17

Land Owner Name: Mangalsing Gurung Total 6374.17 Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 19 from CL 133 9+560 Bhimraj gurung Public Land 2.6 Nauthar Total Area Affected Rate Total Type of Structure Storey ( sqm) Area (sqm) /sqm Amount Cow farm as per estimate sheet 9169.50

Land Owner Name: Bhimraj gurung Total 9169.50

Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 20 from CL 134 9+660 Jalsupa Gurung Public Land 2.9 Nauthar Total Area Affected Rate Total Type of Structure Storey ( sqm) Area (sqm) /sqm Amount Cow farm as per estimate sheet 5894.13

Land Owner Name: Jalsupa Gurung Total 5894.13 Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 21 from CL 135 10+250 Gum Bdr Gurung Public Land 4.7 Nauthar end Total Area Affected Rate Total Type of Structure Storey ( sqm) Area (sqm) /sqm Amount Chicken Khor as per estimate sheet 2750.00

Land Owner Name: Public Land Total 2750.00

Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 22 from CL 136 10+700 Aaita sing gurung 469 941000 3.5 Pachok Total Area Affected Rate Total Type of Structure Storey ( sqm) Area (sqm) /sqm Amount House CGI Pali and as per estimate sheet 9260.28 Khor

Land Owner Name: Aaita sing gurung Total 9260.28 Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 23 from CL 137 10+710 Mani gurung Public Land 3.8 Pachok Total Area Affected Rate Total Type of Structure Storey ( sqm) Area (sqm) /sqm Amount Chicken Khor as per estimate sheet 4818.12

Land Owner Name: Mani gurung Total 4818.12

Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 24 from CL 138 10+720 Shanta kumari Gurung Public Land 3.2 Pachok Total Area Affected Rate Total Type of Structure Storey ( sqm) Area (sqm) /sqm Amount CGI Cabinet as per estimate sheet 8235.96

Land Owner Name: Shanta kumari Gurung Total 8235.96 Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 25 from CL 139 11+690 Aaitemaya Gurung(Maikhu) 468 941000 3 Pachok 2 Total Area Affected Rate Total Type of Structure Storey ( sqm) Area (sqm) /sqm Amount Chiken Khor and as per estimate sheet 13655.49 CGI House

Land Owner Name: Maikhu Gurung Total 13655.49

Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 26 from CL 140 11+690 Yupeni gurung(Amar gurung) 467 941000 2.6 Pachok 2 Total Area Affected Rate Total Type of Structure Storey ( sqm) Area (sqm) /sqm Amount CGI cabinet as per estimate sheet 11469.59

Land Owner Name: Amar Gurung Total 11469.59 Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 27 from CL 141 12+080 Kharjung Gurung 479 940959 4.7 Pachok 1 Total Area Affected Rate Total Type of Structure Storey ( sqm) Area (sqm) /sqm Amount CGI Cow farm as per estimate sheet 4690.75

Land Owner Name: Guman Sing Total 4690.75

Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 28 from CL 142 12+120 Ram Bdr Gurung(Gausari) Public Land 4.1 Pachok Total Area Affected Rate Total Type of Structure Storey ( sqm) Area (sqm) /sqm Amount CGI Cabinet and as per estimate sheet 12910.15 CGI khor

Land Owner Name: Gausari Gurung Total 12910.15 Distance Structure No Chainage House Owner Name Plot no Sheet no Address Remarks 29 from CL 143 12+500 Shuv Raj gurung 979 950961 2 Pachok 3 Total Area Affected Rate Total Type of Structure Storey ( sqm) Area (sqm) /sqm Amount Chiken farm as per estimate sheet 11000.00

Land Owner Name: Gausari Gurung Total 11000.00

212805.89 Sub-Project: Belghari-Archalbot-Lamabagar-Sherabazar-Letaure-Pachok Road District: Lamjung Photographs of Public Affected Structure with Estimated Cost(Public Structures) Structure House Owner Chainage Plot no Sheet no Distance from CL Address Remarks No Name 1

1 1+540 Public Strcuture 4 Archalbot

Type of Total Area Affected Area Storey Rate /sqm Total Amount Structure ( sqm) (sqm)

Tap Stand as per estimate sheet 19784.98

Land Owner Public Strcuture Total 19784.98

Structure House Owner Chainage Plot no Sheet no Distance from CL Address Remarks 2 No Name 2 1+980 Public Structure 3 Archalbot

Type of Total Area Affected Area Storey Rate /sqm Total Amount Structure ( sqm) (sqm)

Krishna Mandir as per estimate sheet 111790.04

Land Owner Public Structure Total 111790.04 Structure House Owner Chainage Plot no Sheet no Distance from CL Address Remarks 3 No Name 3 2+307 Public Strcuture 4 Archalbot

Type of Total Area Affected Area Storey Rate /sqm Total Amount Structure ( sqm) (sqm)

Tap Stand as per estimate sheet 19784.98

Land Owner Public Strcuture Total 19784.98

Structure Chainage House Owner Name Plot no Sheet no Distance from CL Address Remarks 4 No 4 2+350 Public Strcuture 4 Archalbot

Type of Total Area Affected Area Storey Rate /sqm Total Amount Structure ( sqm) (sqm)

Tap Stand as per estimate sheet 19784.98

Land Owner Public Strcuture Total 19784.98 Structure House Owner Chainage Plot no Sheet no Distance from CL Address Remarks 5 No Name 5 2+530 Public Strcuture 3 Archalbot

Type of Total Area Affected Area Storey Rate /sqm Total Amount Structure ( sqm) (sqm)

Chautaro as per estimate sheet 10927.48

Land Owner Public Strcuture Total 10927.48

Structure House Owner Chainage Plot no Sheet no Distance from CL Address Remarks No Name 6 Shreevanjyan 6 3+925 Public Strcuture 3.2 g

Type of Total Area Affected Area Storey Rate /sqm Total Amount Structure ( sqm) (sqm)

Chautaro as per estimate sheet 10927.48

Land Owner Public Strcuture Total 10927.48 Structure House Owner Chainage Plot no Sheet no Distance from CL Address Remarks No Name 7 Shreevanjyan 7 5+540 Public Strcuture 3.6 g

Type of Total Area Affected Area Storey Rate /sqm Total Amount Structure ( sqm) (sqm)

Chautaro as per estimate sheet 9839.80

Land Owner Public Strcuture Total 9839.80

Structure House Owner Chainage Plot no Sheet no Distance from CL Address Remarks No Name 8 Shreevanjyan 8 5+700 Public Strcuture 3.5 g

Type of Total Area Affected Area Storey Rate /sqm Total Amount Structure ( sqm) (sqm)

Irrigation Canal as per estimate sheet 289351.60

Land Owner Public Strcuture Total 289351.60 Structure House Owner Chainage Plot no Sheet no Distance from CL Address Remarks 9 No Name 9 12+450 Public Structure 1.9 Pachok

Type of Total Area Affected Area Storey Rate /sqm Total Amount Structure ( sqm) (sqm)

Pachok Health Post and Dry as per estimate sheet 397780.63 wall

Land Owner Public Structure Total 397780.63 Cost Calculation of Lands of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung Land Owner Name Land Household head VDC Affected Plot no. S.N. Ward No. Exisitng Area, sqm New Cut Area, sqm Affected Total area (sqm) Replacement cost rate per sqm.(25% increment) Cost NRs. Total Remarks Panchasingh, Deumaya 1 Gurung Deumaya Gurung Pachowk 1 46 58.28 71.31 129.59 93.37 6658.21 Interviewed 2 Karna bdr. Gurung Lilamaya Gurung Pachowk 1 337 989.85 1086.24 2076.09 93.37 101422.23 Interviewed 3 Sita Gurung Sita Gurung Pachowk 1 440 0 13.92 13.92 93.37 1299.71 Interviewed 4 Harka bdr.Gurung Harka bdr.Gurung Pachowk 1 443 0 17.8 17.8 93.37 1661.99 Interviewed 5 Nimba Gurung Nimba Gurung Pachowk 1 524 142.4 141.41 283.81 93.37 13203.45 Interviewed 6 Ser bdr Gurung Ser bdr Gurung Pachowk 1 336 25.78 38.8 64.58 93.37 3622.76 Interviewed 7 Makhhui Gurung Jivraj Gurung Pachowk 2 468 848.62 1037.36 1885.98 93.37 96858.30 Interviewed 8 Som Bdr. Gurung Som Bdr. Gurung Pachowk 2 595 0 2.65 2.65 93.37 247.43 Interviewed 9 Aaita Bdr. Gurung Aaita Bdr. Gurung Pachowk 2 469 330.53 403.61 734.14 93.37 37685.07 Interviewed 10 Amar Gurung Amar Gurung Pachowk 2 467 208.04 177.63 385.67 93.37 16585.31 Interviewed

11 Bakhat Bdr. Gurung Bakhat Bdr. Gurung Pachowk 3 914 206.35 267.78 474.13 93.37 25002.62 Interviewed 12 Dadman Gurung Dadman Gurung Pachowk 3 900 20.53 37.77 58.3 93.37 3526.58 Interviewed

13 Gayin singh Gurung Gayin singh Gurung Pachowk 3 976 30.91 58.3 89.21 93.37 5443.47 Interviewed 14 Mann bdr. Gurung Mann bdr. Gurung Pachowk 3 951 66.86 50.19 117.05 93.37 4686.24 Interviewed

15 Iman singh(surya Prasad) Surya pd. Gurung Pachowk 1 434 49.62 49.6 99.22 93.37 4631.15 Interviewed 16 Janga sub Gurung Dudhmaya Gurung Pachowk 1 447 170.71 214.38 385.09 93.37 20016.66 Interviewed 17 Sat bdr.Gurung Manraj Gurung Pachowk 1 925 0 10.47 10.47 93.37 977.58 Interviewed 18 Yubaraj Gurung Yubaraj Gurung Nauthar 8 555 5.47 14.75 20.22 93.37 1377.21 Interviewed 19 Ladimaya Gurung Ladimaya Gurung Nauthar 2 62 27.52 41.14 68.66 93.37 3841.24 Interviewed

20 Tulasi pd. Ghimire Tulasi pd. Shrestha Nauthar 8 115 10.1 19.36 29.46 93.37 1807.64 Interviewed 21 Badmaya Gurung Badmaya Gurung Nauthar 8 507 0 30.89 30.89 93.37 2884.20 Interviewed 22 Bimaya Gurung Bimaya Gurung Nauthar 5 465 0 11.48 11.48 93.37 1071.89 Interviewed 23 Chature sarki Chature sarki Nauthar 8 175 134.74 165.79 300.53 93.37 15479.81 Interviewed 24 Rajkumar Shresth Rajkumar Shresth Nauthar 2 113 123.39 165.8 289.19 93.37 15480.75 Interviewed 25 Nirmala Ghimire Mohan Pd.Ghimire Nauthar 2 678 129.54 164.01 293.55 93.37 15313.61 Interviewed 26 Dal subba Gurung Dal subba Gurung Nauthar 8 472 19.29 23.39 42.68 93.37 2183.92 Interviewed 27 Mayanath wagle Jeunath Nauthar 2 69 80.82 108.76 189.58 93.37 10154.92 Interviewed 28 Bipinchandra Ghimire Tripura Ghimire Nauthar 8 164 0 7.2 7.2 93.37 672.26 Interviewed 29 Nardev Gurung Nardev Gurung Nauthar 5 386 250.79 306.23 557.02 93.37 28592.70 Interviewed 30 Govinda wagle Govinda wagle Nauthar 2 71 115.76 109.87 225.63 93.37 10258.56 Interviewed Ramraj Bista(now- 31 Kunimaya Shrestha) Arun kumar Shrestha Nauthar 2 1230 0 21.29 21.29 93.37 1987.85 Interviewed 32 Nalumaya Gurung Yobir Gurung Nauthar 2 1184 3.97 11.94 15.91 93.37 1114.84 Interviewed 33 Kam singh gurung Kam singh gurung Nauthar 8 441 113.87 133.92 247.79 93.37 12504.11 Interviewed

34 Jabarsingh/Tulsi Gurung Man pd. Gurung Nauthar 8 534 18.32 33.35 51.67 93.37 3113.89 Interviewed

35 Purnaa/Mekhraj Gurung Mekhraj Gurung Nauthar 8 499 171.43 188.85 360.28 93.37 17632.92 Interviewed 36 Kum bdr. Gurung Kum bdr. Gurung Nauthar 8 554 60.55 52.16 112.71 93.37 4870.18 Interviewed 37 Manmaya Sarki Manmaya Sarki Nauthar 8 621 90.55 91.01 181.56 93.37 8497.60 Interviewed

38 Aasbahadur Gurung Aasbahadur Gurung Nauthar 8 552 28.31 33.83 62.14 93.37 3158.71 Interviewed 39 Kale Gurung Kale gurung Nauthar 8 156 311.21 390.64 701.85 93.37 36474.06 Interviewed 40 Kamini sarki Som bahadur Nauthar 5 436 117.47 142.56 260.03 93.37 13310.83 Interviewed 41 Chyangre Sarki Chyangre sarki Nauthar 8 466 57.19 103.13 160.32 93.37 9629.25 Interviewed

42 Ram bdr. Gurung Rishikumar Gurung Nauthar 2 77 120.54 108.8 229.34 93.37 10158.66 Interviewed Cost Calculation of Lands of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung Land Owner Name Land Household head VDC Affected Plot no. S.N. Ward No. Exisitng Area, sqm New Cut Area, sqm Affected Total area (sqm) Replacement cost rate per sqm.(25% increment) Cost NRs. Total Remarks

43 Mait bahadur Gurung Mait bahadur Gurung Nauthar 2 1183 45.23 39.46 84.69 93.37 3684.38 Interviewed 44 Subba Gurung Subba Gurung Nauthar 5 437 72.73 53.95 126.68 93.37 5037.31 Interviewed Krishna/Bhupati raj 45 Pandey Krishna Raj Pandey Nauthar 2 126 34.59 61.65 96.24 93.37 5756.26 Interviewed Shreebhanjya 46 Atimaya, Ram bdr.Sarki Atimaya Sarki ng 2 183 0 25.44 25.44 56.51 1437.61 Interviewed Shreebhanjya 47 Dhan bdr. Shrestha Gore Shrestha ng 8 887 25.56 36.35 61.91 56.51 2054.14 Interviewed Shreebhanjya 48 Om bdr.Gurung Om bdr.Gurung ng 4 12 31.98 80.25 112.23 56.51 4534.93 Interviewed Shreebhanjya 49 Sukman Gurung Sukman Gurung ng 8 921 237.97 276.4 514.37 56.51 15619.36 Interviewed Balkrishna Upadhya Balkrishna Upadhya Shreebhanjya 50 Ghimire Ghimire ng 4 20 282.54 351.2 633.74 56.51 19846.31 Interviewed Shreebhanjya 51 Bhuwan singh Gurung Pushparaj Gurung ng 4 9 142.84 174.47 317.31 56.51 9859.30 Interviewed Shreebhanjya 188, 52 Samser sarki Gopal Sarki ng 2 189 156.64 332.83 489.47 56.51 18808.22 Interviewed Shreebhanjya 239, 53 Arjun kunwar Arjun kunwar ng 2 238 0 41.57 41.57 56.51 2349.12 Interviewed Shreebhanjya 54 Dambar bdr.Gurung Dambar bdr.Gurung ng 8 82 61.73 39.17 100.9 56.51 2213.50 Interviewed Shreebhanjya 55 Ganesh Bdr. Kunwar Ganesh Bdr. Kunwar ng 2 237 0 41.42 41.42 56.51 2340.64 Interviewed Shreebhanjya 56 Aasbahadur Nepali Aasbahadur Nepali ng 2 186 7.85 26.86 34.71 56.51 1517.86 Interviewed

1258, 109, 57 Kumar Pandey Kumar Pandey Nauthar 2 108 224.68 254.72 479.4 93.37 23783.21 Interviewed 254, 256, 58 Goth Bdr. Gurung Goth Bdr. Gurung Nauthar 5 438 742.6 900.34 1642.94 93.37 84064.75 Interviewed 59 Gaini Gurung Dhan Bdr. Gurung Nauthar 8 551 42.46 51.9 94.36 93.37 4845.90 Interviewed Shreebhanjya 187, 60 Aaita Sarki Aaita Sarki ng 2 182 412.23 329.34 741.57 56.51 18611.00 Interviewed

456, 511, 26202 61 Sarki (Shor Bdr. Gurung) Shor Bdr. Gurung Nauthar 8 , 422 415.68 523.33 939.01 93.37 48863.32 Interviewed Shreebhanjya 62 Nabraj Ghimire Nabraj Ghimire ng 8 86, 172.58 125.86 298.44 56.51 7112.35 Interviewed Shreebhanjya 63 Paal Jung Gurung Paal Jung Gurung ng 4 11, 5 497.8 653.57 1151.37 56.51 36933.24 Interviewed Shreebhanjya 64 Yagyanath Ghimire Yagyanath Ghimire ng 8 65 289.28 225.23 514.51 56.51 12727.75 Interviewed Gaumati Gurung, Jabi Shreebhanjya 65 Gurung Jabi Gurung ng 8 67, 45 462.2 341.01 803.21 56.51 19270.48 Interviewed 250, 66 Birdhoj Gurung Birdhoj Gurung Nauthar 5 251 157.73 203.04 360.77 93.37 18957.84 Interviewed 457, 29, 26, 33, Mama Maya Shrestha, Shreebhanjya 34, 67 Hiralal Shrestha Hiralal Shrestha ng 4 470 573.6 730.93 1304.53 56.51 41304.85 Interviewed Shreebhanjya 68 Kum Bdr. Gurung Kum Bdr. Gurung ng 8 57, 49 232.9 461.8 694.7 56.51 26096.32 Interviewed Cost Calculation of Lands of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung Land Owner Name Land Household head VDC Affected Plot no. S.N. Ward No. Exisitng Area, sqm New Cut Area, sqm Affected Total area (sqm) Replacement cost rate per sqm.(25% increment) Cost NRs. Total Remarks

Bishnu ghimire, Rajya Shreebhanjya 58, 69 Prasad Ghimire Bishnu Ghimire ng 8 55 212.51 248.16 460.67 56.51 14023.52 Interviewed 264, 263, 309, 70 Rojina Gurung Kamaljit Gurung Nauthar 5 310 576.18 665.66 1241.84 93.37 62152.67 Interviewed 71 Yesraj Thapa Magar Gaj Bd Archalbot 9 673 15.45 19.8 35.25 110.57 2189.29 Interviewed

72 Dhanamaya Adhikari Dhana bdr. Adhikari Archalbot 8 172 61.21 91.9 153.11 110.57 10161.38 Interviewed 73 Mina Poudel Mina Poudel Archalbot 9 316 50.16 64.11 114.27 110.57 7088.64 Interviewed 74 Hari bdr.Khadka Hari bdr.Khadka Archalbot 6 183 181.94 200.87 382.81 110.57 22210.20 Interviewed 75 Srijana Pariyar Ram bdr. Pariyar Archalbot 9 330 11.41 12.05 23.46 110.57 1332.37 Interviewed 76 Sushila Pariyar Ramesh Pariyar Archalbot 9 667 297.41 356.18 653.59 110.57 39382.82 Interviewed

77 Gopal Lamichhane nanda bdr.Lamichhane Archalbot 9 332 15.44 19.7 35.14 110.57 2178.23 Interviewed 78 Min bdr. Bhujel Min bdr. Bhujel Archalbot 9 556 120.81 134.85 255.66 110.57 14910.36 Interviewed 79 Devi bhakta Regmi Devi bhakta Regmi Archalbot 9 516 68.07 157.78 225.85 110.57 17445.73 Interviewed

80 Krishna bdr. Gharti Krishna bdr. Gharti Archalbot 9 557 54.88 118.08 172.96 110.57 13056.11 Interviewed

81 Subhadra Regmi Milan Regmi Archalbot 9 97, 98 327.48 386.11 713.59 110.57 42692.18 Interviewed 82 Bimala Adhikari Balram Adhikari Archalbot 9 49 54.79 54.21 109 110.57 5994.00 Interviewed

83 Pashupati Thapa Kunwar Shanta kumari Kunwar Archalbot 7 619 43.19 52.53 95.72 110.57 5808.24 Interviewed

84 Amrit Lamichhane Balkrishna Lamichhane Archalbot 6 174 35.71 40.13 75.84 110.57 4437.17 Interviewed 85 Kalpana Adhikari Bhart bdr. Kunwar Archalbot 7 674 34.53 28.26 62.79 110.57 3124.71 Interviewed 86 Kirtiman Kunwar Kirtiman Kunwar Archalbot 8 160 16.31 29.99 46.3 110.57 3315.99 Interviewed

87 Ram chandra Adhikari Ram chandra Adhikari Archalbot 6 793 53.79 86.73 140.52 110.57 9589.74 Interviewed 88 Sita devi kunwar Maan bdr. Kunwar Archalbot 7 664 47.59 47.69 95.28 110.57 5273.08 Interviewed

89 Jit bdr. Lamichhane Jit bdr. Lamichhane Archalbot 9 76, 78 304.91 276.91 581.82 110.57 30617.94 Interviewed 492, 90 Bishnulal Shrestha Bishnulal Shrestha Archalbot 9 390 96.66 121.53 218.19 110.57 13437.57 Interviewed 494, 427, 91 Tankalal Shrestha Teklal Shrestha Archalbot 9 391 215.89 255.39 471.28 110.57 28238.47 Interviewed

92 Kalawati Rana Magar Janga Bdr. Ale Magar Archalbot 9 633 23.82 26.52 50.34 110.57 2932.32 Interviewed 635, 93 Badrinath Lamichhane Badrinath Lamichhane Archalbot 9 538 35.64 52.22 87.86 110.57 5773.97 Interviewed 588, 591, 94 Gangamaya Suyal Bishnu Bdr. Suyal Archalbot 9 585 456.96 388.64 845.6 110.57 42971.92 Interviewed 723, Shreebhanjya 443, 95 Khem Kumari Joshi Govindaraj Joshi ng 2 722 216.8 392.77 609.57 56.51 22195.43 Interviewed 155, 531, 96 Tilak Bdr. Kunwar Tilak Bdr. Kunwar Archalbot 8 534 400.79 436.28 837.07 110.57 48239.48 Interviewed 477, 676, 97 Shovita+Shrijana Kunwar Shovita Kunwar Archalbot 8 675 272.52 283.99 556.51 110.57 31400.77 Interviewed 98 Ganga Kunwar Dhub Kunwar Archalbot 7 620 409.38 500.41 909.79 110.57 55330.33 Interviewed 99 Prasansha Kunwar Bal Bdr. Kunwar Archalbot 7 663 41.92 40.17 82.09 110.57 4441.60 Interviewed Cost Calculation of Lands of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung Land Owner Name Land Household head VDC Affected Plot no. S.N. Ward No. Exisitng Area, sqm New Cut Area, sqm Affected Total area (sqm) Replacement cost rate per sqm.(25% increment) Cost NRs. Total Remarks 530, 100 Narayan Kunwar Narayan Kunwar Archalbot 8 535 65.35 139.09 204.44 110.57 15379.18 Interviewed

101 Gokul Prasad Regmi Gokul Prasad Regmi Archalbot 9 541 95.23 97.38 192.61 110.57 10767.31 Interviewed

102 Harka Kumar Shrestha Harka Kumar Shrestha Archalbot 9 424 177.38 214.95 392.33 110.57 23767.02 Interviewed 103 Ram bdr.Parajuli Ram bdr.Parajuli Archalbot 9 425 128.82 145.16 273.98 110.57 16050.34 Interviewed 104 Bishnu Giri Bishnu Giri Archalbot 9 413 21.77 53.58 75.35 110.57 5924.34 Interviewed

105 Krishna Pd. Mareta Krishna Pd. Mareta Archalbot 8 585 14.03 28.36 42.39 110.57 3135.77 Interviewed 801, 181, 178, 799, 106 Ram bdr.Gharti Bhujel Ram bdr.Gharti Bhujel Archalbot 6 792 354.87 366.21 721.08 110.57 40491.84 Interviewed 107 Aaitimaya Pariyar Hari bdr. Pariyar Archalbot 9 329 0 40.88 40.88 110.57 4520.10 Interviewed

108 Muktinath Lamichhane Bhimnaya Lamichhane Archalbot 9 636 57.72 126.7 184.42 110.57 14009.22 Interviewed

109 Hira devi Marhattha Hira devi Marhattha Archalbot 8 584 0.6 19.43 20.03 110.57 2148.38 Interviewed 110 Ishwori pd. Regmi Ishwori pd. Regmi Archalbot 9 558 0 33.61 33.61 110.57 3716.26 Interviewed ,317,6 111 Ram pd. Poudel Ram pd. Poudel Archalbot 9 49 199.15 236.14 435.29 110.57 26110.00 Interviewed 112 Klaimaya Kunwar Ramdevi Kunwar Archalbot 6 175 0 24.04 24.04 110.57 2658.10 Interviewed 170, 179, 113 Ishwori pd. Adhikari Kausila Adhikari Archalbot 8 578 432.74 516.69 949.43 110.57 57130.41 Interviewed 455, 114 Sukumaya Ghale Hasta bdr. Ghale Nauthar 8 460 166.24 191.94 358.18 93.37 17921.44 Interviewed 459, 115 Ser Ghale Kali Ghale Nauthar 8 469 350.58 434.39 784.97 93.37 40558.99 Interviewed 378, 116 Tara devi Ghimire Saharsha jibi Ghimire Nauthar 5 400 242.85 289.47 532.32 93.37 27027.81 Interviewed 318, Lila Poudel, Mahendra 315, 117 Poudel Rishiram Poudel Archalbot 9 668 182.19 242.24 424.43 110.57 26784.48 Interviewed 411,3 26, 118 Mayadevi Thapa Magar Yesh raj Thapa magar Archalbot 9 526 273.86 332.13 605.99 110.57 36723.61 Interviewed 119 Ram bdr.Gurung Ram bdr.Gurung Archalbot 9 564 27.78 20.63 48.41 110.57 2281.06 Interviewed 120 Chijmaya Gurung Chijmaya Gurung Archalbot 7 493 34.69 38.58 73.27 110.57 4265.79 Interviewed 389, 121 Chandra bdr. Thapa Prem bdr. Thapa Archalbot 9 333 92 135.76 227.76 110.57 15010.98 Interviewed 583, 587, 122 Maan bdr. Thapa Maan bdr. Thapa Archalbot 9 590 112.04 147.99 260.03 110.57 16363.25 Interviewed 439, 123 Edhane Gurung Eghane Gurung Pachowk 2 450 316.09 386.2 702.29 93.37 36059.49 Interviewed 511, 124 Karna singh Ghale Demraj Ghale Pachowk 3 915 212.1 259.4 471.5 93.37 24220.18 Interviewed 953, 125 Kami Gurung Kami Gurung Pachowk 3 960 111.08 76.24 187.32 93.37 7118.53 Interviewed 886, 126 Maya Gurungseni Kumraj Gurung Pachowk 3 897 301.96 364.92 666.88 93.37 34072.58 Interviewed 127 Bhagawati Bhagawati Nauthar 5 690 214.6 327.22 541.82 93.37 30552.53 Interviewed 420, 128 Birta Gurung Birta Gurung Nauthar 5 424 248.11 261.17 509.28 93.37 24385.44 Interviewed 479, 129 Bamsyo Gurungseni Jangasubba Gurung Nauthar 5 480 281.36 362.48 643.84 93.37 33844.76 Interviewed Cost Calculation of Lands of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung Land Owner Name Land Household head VDC Affected Plot no. S.N. Ward No. Exisitng Area, sqm New Cut Area, sqm Affected Total area (sqm) Replacement cost rate per sqm.(25% increment) Cost NRs. Total Remarks 471, 620, 618, 130 Sitaram Gurung Sitaram Gurung Nauthar 5, 8 377 248.65 303.9 552.55 93.37 28375.14 Interviewed 508, 131 Sarba Singh Gurung Sarba Singh Gurung Nauthar 8 563 423.42 533.26 956.68 93.37 49790.49 Interviewed 132 Nalu Kumari Gurung Mauli Gurung Nauthar 8 622 108.53 81.13 189.66 93.37 7575.11 Interviewed 615, 442, 133 Dhanmaya Gurung Pode Gurung Pachowk 1 475 262.05 353.93 615.98 93.37 33046.44 Interviewed Hari Bdr. Kunwar, Devi 147, 134 Kumari Kunwar Hari Bdr. Kunwar Archalbot 6 752 287.19 301.81 589 110.57 33371.13 Interviewed 135 Aashkaji Shrestha Aashkaji Shrestha Archalbot 9 417 0 16.96 16.96 110.57 1875.27 Interviewed 136 Kshamamta Gurung Lal Bd Gurung Archalbot 7 677 32.3 27.34 59.64 110.57 3022.98 Interviewed 137 Gir Bdr. Kunwar Gir Bdr. Kunwar Archalbot 7 541 193.29 235.07 428.36 110.57 25991.69 Interviewed 327, 138 Himraj+Umakanta Paudel Umakanta Paudel Archalbot 9 321 242.54 330.61 573.15 110.57 36555.55 Interviewed

139 Shiva Prasad Adhikari Shiva Prasad Adhikari Archalbot 8 152 19.62 29.31 48.93 110.57 3240.81 Interviewed 140 Man Bdr. Thapa Man Bdr. Thapa Archalbot 7 617 32.85 27.93 60.78 110.57 3088.22 Interviewed 141 Devi Gurung Devi Gurung Archalbot 7 495 13.72 26.45 40.17 110.57 2924.58 Interviewed 565, Janaki Paudel, Dinnath 527, 142 Paudel Dinanath Paudel Archalbot 9 525 31.33 34.8 66.13 110.57 3847.84 Interviewed 394, Rishiram Shrestha, 395, 143 Gyanmaya Shrestha Rishiram Shrestha Archalbot 9 392 362.28 461.32 823.6 110.57 51008.15 Interviewed 144 Bil Bdr. Shrestha Bil Bdr. Shrestha Archalbot 9 398 0 17.89 17.89 110.57 1978.10 Interviewed 584, 497, 145 Amrit Bdr. Thapa Durga Thapa Archalbot 9 589 163.98 210.99 374.97 110.57 23329.16 Interviewed 802, Amrit(Amite), Sommaya 799, 146 Bhujel Amrit(Amite) Gharti Archalbot 6 794 204.14 232.94 437.08 110.57 25756.18 Interviewed 300, 53, 51, 50, Padamlal Paudel, 486, 147 Manmaya Paudel Manmaya Paudel Archalbot 9 485 781.51 974.87 1756.38 110.57 107791.38 Interviewed 148 Maansingh Gurung Durga bdr.Gurung Pachowk 1 476 226.83 271.75 498.58 93.37 25373.30 Interviewed

Total 231 23566.28 28516.32 52082.6 2655617.301 1 Bimaya Gurung Khushiram Archalbot 9 496 36.64 32.54 69.18 110.57 3597.95 Non-Interview 2 Laxmi Gurung Tej Bdr Archalbot 9 419 0 438 438 110.57 48429.66 Non-Interview 3 Santa Bdr Damai Harka Bdr Archalbot 9 336 11.56 34.49 46.05 110.57 3813.56 Non-Interview 4 Mayadevi maretha Bhimnath Archalbot 8 177 128.38 157.13 285.51 110.57 17373.86 Non-Interview 5 Bishnumaya Adhikari Kedarnath Archalbot 8 589 0 3.58 3.58 110.57 395.84 Non-Interview 6 Gita thapa Kunwar Indra bdr. Archalbot 8 555 19.5 25.17 44.67 110.57 2783.05 Non-Interview 7 Laxima Adhikari Tirtharaj Archalbot 8 476 20.35 20.78 41.13 110.57 2297.64 Non-Interview 8 Krishna bdr Gurung Balaram Archalbot 8 476 0 79.22 79.22 110.57 8759.36 Non-Interview 9 Ojraj sedai Ramchandra Archalbot 7 337 100.18 145.98 246.16 110.57 16141.01 Non-Interview 10 Amrit bdr.Kunwar Hari bdr. Archalbot 7 538 40.73 48.94 89.67 110.57 5411.30 Non-Interview 11 Ganga Kuwar Babu Laxman Archalbot 6 822 248.42 213.13 461.55 110.57 23565.78 Non-Interview 177, 12 Devi kunwar chhetri surya bdr. Archalbot 6 173 43.12 107.57 150.69 110.57 11894.01 Non-Interview 13 Gyan bdr.Kunwar Pahalman Archalbot 6 151 231.69 291.94 523.63 110.57 32279.81 Non-Interview Cost Calculation of Lands of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung Land Owner Name Land Household head VDC Affected Plot no. S.N. Ward No. Exisitng Area, sqm New Cut Area, sqm Affected Total area (sqm) Replacement cost rate per sqm.(25% increment) Cost NRs. Total Remarks Shreebhanjya 14 Apsara Kunwar Thapa Sashi thapa ng 2 223 0 12.89 12.89 56.51 728.41 Non-Interview Shreebhanjya 15 Gyanraj gurung Prithiman ng 2 473 139.39 166.22 305.61 56.51 9393.09 Non-Interview Shreebhanjya Gyanraj gurung Prithiman ng 2 474 139.39 162.65 302.04 56.51 9191.35 Non-Interview Shreebhanjya 181, 16 Jit jung gurung Udaya jung ng 2 169 279.35 309.43 588.78 56.51 17485.89 Non-Interview Shreebhanjya 770, 17 Lalman gurung Harkaman ng 2 777 575.31 575.36 1150.67 56.51 32513.59 Non-Interview Shreebhanjya 18 Sabita sarki Nepali Jag bdr ng 2 768 52.58 65.02 117.6 56.51 3674.28 Non-Interview Shreebhanjya 19 Harka Bdr Sarki Lato ng 2 476 499.11 625.87 1124.98 56.51 35367.91 Non-Interview Shreebhanjya 20 Hari Kumari Sedhai Laxman ng 2 478 176.53 124.19 300.72 56.51 7017.98 Non-Interview

Bod Kumari Gurung (aka Shreebhanjya 21 Budh Kumari Gurung) Bhupal Pd ng 2 766 272.4 333.76 606.16 56.51 18860.78 Non-Interview Shreebhanjya 22 Faud Bdr Khadka Bal Bdr ng 2 405 48.05 65.83 113.88 56.51 3720.05 Non-Interview Nyepu (Ajuti Maya Shreebhanjya 23 Gurung) Nanda Jung ng 2 170 361.71 425.41 787.12 56.51 24039.92 Non-Interview Shreebhanjya 24 Govinda Jung Gurung Udaya jung ng 2 168 0 15.16 15.16 56.51 856.69 Non-Interview Shreebhanjya 25 Gopal Raj Joshi Devi Raman ng 2 724 40.8 52.48 93.28 56.51 2965.64 Non-Interview Shreebhanjya 26 Gopal Jung Gurung Udaya jung ng 2 167 137.76 179.24 317 56.51 10128.85 Non-Interview Shreebhanjya 27 Aash Bdr Gurung Dholi ng 2 469 481.74 597.12 1078.86 56.51 33743.25 Non-Interview Shreebhanjya 445, 28 Seti Gurung Raj Kumar ng 2 444 507.67 498.28 1005.95 56.51 28157.80 Non-Interview Ram Chandra + Laxman Shreebhanjya 29 Sedhai Dayanidhi ng 2 441 70.1 81.69 151.79 56.51 4616.30 Non-Interview Shreebhanjya 30 Tularaj Gurung Khamba Singh ng 4 458 3.66 36.35 40.01 56.51 2054.14 Non-Interview

Shreebhanjya 36, 31 Tej Bahadur Gurung Reshamlal ng 4 35, 22 160.67 266.78 427.45 56.51 15075.74 Non-Interview Shreebhanjya 32 Mayanath Ghimire Gangadatta ng 4 39 0 13.52 13.52 56.51 764.02 Non-Interview Shreebhanjya 33 Aaita Singh Gurung Shukaman ng 4 4 162.8 194.75 357.55 56.51 11005.32 Non-Interview

Shreebhanjya 48, 34 Bir Bdr Gurung Gunjaman ng 8 47, 40 0 128.71 128.71 56.51 7273.40 Non-Interview Shreebhanjya 35 Dinesh Ghimire ng 8 66 91.31 80.28 171.59 56.51 4536.62 Non-Interview

889, 888, 804, Shreebhanjya 753, 36 Bishnukumar shrestha Buddhiman ng 8 15, 84 206.5 347.6 554.1 56.51 19642.88 Non-Interview Shreebhanjya 37 Surya bdr. Bhujel Jitbdr ng 8 890 3.76 44.43 48.19 56.51 2510.74 Non-Interview Shreebhanjya 38 Aita kumari Gurung Mohanman ng 8 85 45.71 80.37 126.08 56.51 4541.71 Non-Interview Shreebhanjya 13, 39 Lalmati Gurung Nairaj ng 8 206 78.47 91.21 169.68 56.51 5154.28 Non-Interview Cost Calculation of Lands of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung Land Owner Name Land Household head VDC Affected Plot no. S.N. Ward No. Exisitng Area, sqm New Cut Area, sqm Affected Total area (sqm) Replacement cost rate per sqm.(25% increment) Cost NRs. Total Remarks Shreebhanjya 40 Purna pd. Ghimire Mayanath ng 8 204 170.37 161.72 332.09 56.51 9138.80 Non-Interview Shreebhanjya 41 Krishna hari Wagle Dolnath ng 8 207 185.17 221.29 406.46 56.51 12505.10 Non-Interview Shreebhanjya 42 Sun bdr gurung Kaam singh ng 8 918 0 7.67 7.67 56.51 433.43 Non-Interview Shreebhanjya 43 Kopila Wagle Chetnath ng 8 230 2.16 34.41 36.57 56.51 1944.51 Non-Interview Shreebhanjya 44 Jhamdi Gurung Ganesh bdr. ng 8 231, 1 269.42 266.01 535.43 56.51 15032.23 Non-Interview 45 Mohani Gurung Pancha bdr. Nauthar 8 623 83.78 184.99 268.77 93.37 17272.52 Non-Interview 46 Tula kumari Pandey Dilliraj Nauthar 2 120 142.28 166.33 308.61 93.37 15530.23 Non-Interview 47 Chini kumari Pandey Khilnidhi Nauthar 2 121 4.79 18.15 22.94 93.37 1694.67 Non-Interview 48 Dilliram Pandey Khaganidhi Nauthar 2 123 14.74 12.86 27.6 93.37 1200.74 Non-Interview 49 Ram Kumar Thapa Prem bahadur Nauthar 2 115 74.24 93.9 168.14 93.37 8767.44 Non-Interview 50 Kum raj Gurung Gangaram Nauthar 2 61 16.01 45.29 61.3 93.37 4228.73 Non-Interview

63, 51 Chetnath Wagle Bishnu datta Nauthar 2 1182 83.47 150.25 233.72 93.37 14028.84 Non-Interview 52 Suk bdr.Tamang Gagan bdr. Nauthar 2 1042 106.07 71.32 177.39 93.37 6659.15 Non-Interview 53 Arun kumar Shrestha Rajkumar Nauthar 2 78 134.78 163.71 298.49 93.37 15285.60 Non-Interview 54 Bhagawati Wagle Devi prasad. Nauthar 2 84 0 3.71 3.71 93.37 346.40 Non-Interview 55 Loknath Wagle Laxman Nauthar 2 85 127.56 148.45 276.01 93.37 13860.78 Non-Interview 56 Budhamaya Gurung Chitraman Nauthar 2 696 0 7.46 7.46 93.37 696.54 Non-Interview 57 Bishnumaya Adhikari Padam Pd. Nauthar 8 517 192.96 220.77 413.73 93.37 20613.29 Non-Interview 58 Chandra kanta Wagle Bamdev Nauthar 2 697 219.37 210.01 429.38 93.37 19608.63 Non-Interview 59 Dipendra Ghimire Ramkrishna Nauthar 2 680 142.99 174.75 317.74 93.37 16316.41 Non-Interview

60 Pashupatinath Ghimire Laxmi pd. Nauthar 2 687 233.32 282.58 515.9 93.37 26384.49 Non-Interview 61 Dipak babu Ghimire ShreeKrishna Nauthar 2 688 257.62 264.87 522.49 93.37 24730.91 Non-Interview

62 Sharman, Pahalman Magar Krishna bdr. Nauthar 5 81 0 18.13 18.13 93.37 1692.80 Non-Interview 63 Laxima pd. Bhatta Motiram Nauthar 5 79 97.65 103.57 201.22 93.37 9670.33 Non-Interview

64 Bhagawati Devi Ghimire Purosuttom Nauthar 5 80 194.59 268.7 463.29 93.37 25088.52 Non-Interview 65 Liladevi Ghimire Kumar pd. Nauthar 5 419 0 16.12 16.12 93.37 1505.12 Non-Interview 66 Jire Gurung Nardhoj Nauthar 5 426 17.68 37.38 55.06 93.37 3490.17 Non-Interview 67 Jagdish Ghimire Purushottam Nauthar 5 240 30.66 98.76 129.42 93.37 9221.22 Non-Interview 242, 68 Usha Ghimire Chetnath Nauthar 5 243 4.42 79.34 83.76 93.37 7407.98 Non-Interview 69 Shree krishna Ghimire Yogyenidhi Nauthar 5 241 450.74 407.6 858.34 93.37 38057.61 Non-Interview

70 Pashupatinath Ghimire Bhabilal Nauthar 5 247 0 10.98 10.98 93.37 1025.20 Non-Interview 71 Shree bhakta Ghimire Ramchandra Nauthar 5 249 113.9 119.56 233.46 93.37 11163.32 Non-Interview 72 Sita Ghimire Tirtharaj Nauthar 5 266 2.56 45.49 48.05 93.37 4247.40 Non-Interview 73 Singha raas gurung Dhanlal Nauthar 5 262 86.97 104.84 191.81 93.37 9788.91 Non-Interview 74 Tul bdr. Gurung Gaj bdr. Nauthar 5 260 3.85 40.44 44.29 93.37 3775.88 Non-Interview 75 Sabitra Gurung Sukman Nauthar 5 396 95.01 115.99 211 93.37 10829.99 Non-Interview 76 Brikh bdr. Gurung Amardhoj Nauthar 5 397 42.25 50.79 93.04 93.37 4742.26 Non-Interview 77 Dattamaya Gurung Chatursingh Nauthar 5 467 64.07 67.84 131.91 93.37 6334.22 Non-Interview 401, 78 Gunmaya Tamang Purna bdr. Nauthar 5 402 119.01 153.25 272.26 93.37 14308.95 Non-Interview Gunmaya Tamang Purna bdr. Nauthar 5 401 119.01 142.04 261.05 93.37 13262.27 Non-Interview Cost Calculation of Lands of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung Land Owner Name Land Household head VDC Affected Plot no. S.N. Ward No. Exisitng Area, sqm New Cut Area, sqm Affected Total area (sqm) Replacement cost rate per sqm.(25% increment) Cost NRs. Total Remarks 79 Laxmi Ramtel Chitra bdr. Nauthar 5 470 3.42 6.64 10.06 93.37 619.98 Non-Interview 80 Anita Gurung Singhram Nauthar 8 150 183.35 208.61 391.96 93.37 19477.92 Non-Interview 81 Prabin Ghimire Taramali Nauthar 8 558 0 38.28 38.28 93.37 3574.20 Non-Interview

82 Surya narayan Ghimire Taramali Nauthar 8 559 220.72 281.73 502.45 93.37 26305.13 Non-Interview 83 Kamala devi Ghimire Pashupati Nauthar 8 114 148.45 169.63 318.08 93.37 15838.35 Non-Interview 84 Kedar bdr. Sarki Chyangre Nauthar 8 176 145.67 178.96 324.63 93.37 16709.50 Non-Interview 85 Mahendra raj Malla Badriraj Nauthar 8 467 109.57 153.65 263.22 93.37 14346.30 Non-Interview 86 Purna bdr Gurung Lal bdr. Nauthar 8 470 29.62 36.02 65.64 93.37 3363.19 Non-Interview 87 Gopiraj Gurung N/A Pachowk 1 579 66.65 91.92 158.57 93.37 8582.57 Non-Interview Chandraman/Rudra 44, 88 bdr.Shrestha Bhakti pd Pachowk 1 480 256.64 314.52 571.16 93.37 29366.73 Non-Interview 89 Guman singh Gurung Pancha subba Pachowk 1 479 96 115.15 211.15 93.37 10751.56 Non-Interview 90 Sovraj gurung Gaj bdr. Pachowk 1 481 35.78 38.08 73.86 93.37 3555.53 Non-Interview 91 Durga singh Gurung Kaam singh Pachowk 1 523 70.85 121.1 191.95 93.37 11307.11 Non-Interview 92 Indra Gurung Indra Pachowk 1 531 80.9 97.33 178.23 93.37 9087.70 Non-Interview 93 Kamal jit Gurung Ajamsingh Pachowk 1 521 317.29 387.66 704.95 93.37 36195.81 Non-Interview 94 Udd Bd. Gurung Gore Pachowk 1 520 163.26 199.66 362.92 93.37 18642.25 Non-Interview 95 Chitra maya Gurung Khadgasingh Pachowk 1 331 151.62 185.67 337.29 93.37 17336.01 Non-Interview

96 Shreemati Parwati Gurung suk bdr Pachowk 1 335 292.86 350.34 643.2 93.37 32711.25 Non-Interview 97 Bindhoj Gurung Bhakta Pachowk 2 547 0 59.94 59.94 93.37 5596.60 Non-Interview

98 Reju Gurseni,Amar Gurung N/A Pachowk 2 449 0 13.47 13.47 93.37 1257.69 Non-Interview 99 Kabiraj Gurung Paanbir Pachowk 2 451 170.15 206.76 376.91 93.37 19305.18 Non-Interview 100 Maisari Gurung Chamar Singh Pachowk 2 466 158.92 175.21 334.13 93.37 16359.36 Non-Interview 101 Singharaj Gurung Madan singh Pachowk 2 627 29.48 113.16 142.64 93.37 10565.75 Non-Interview 102 Gaj bdr. Gurung Naram singh Pachowk 2 510 58.96 62.35 121.31 93.37 5821.62 Non-Interview 103 Badmaya Gurung Gujman Pachowk 2 508 123.08 155.24 278.32 93.37 14494.76 Non-Interview 104 Adar Gurung Sukalal Pachowk 2 507 88.63 108.32 196.95 93.37 10113.84 Non-Interview 105 Dhanmaan Ghale Chandra Pachowk 3 901 47 56.7 103.7 93.37 5294.08 Non-Interview 106 Chandraman Guruung Sanke Pachowk 3 899 90.61 100.42 191.03 93.37 9376.22 Non-Interview 107 Mankauri Ghale Udbdr. Pachowk 3 908 126.38 160.09 286.47 93.37 14947.60 Non-Interview 108 Gore Gurung Dal bdr. Pachowk 3 662 18.45 24.68 43.13 93.37 2304.37 Non-Interview 109 Dasir gurung Garja bdr. Pachowk 3 526 375.07 417.98 793.05 93.37 39026.79 Non-Interview 110 Asur Gurung chandrasingh Pachowk 3 529 0 4.98 4.98 93.37 464.98 Non-Interview 952, 111 Tak bdr.Ghale Maan bdr Pachowk 3 963 346.05 451.32 797.37 93.37 42139.75 Non-Interview 112 Balbir Gurung Hukke Pachowk 3 950 0 3.16 3.16 93.37 295.05 Non-Interview 113 Karansingh Gurung Top Pachowk 3 49 0 5.36 5.36 93.37 500.46 Non-Interview 114 Rabi Gurung Bagan singh Pachowk 3 961 2.4 26.31 28.71 93.37 2456.56 Non-Interview 115 Giujman Gurung Harka Bdr Pachowk 3 954 39.99 130.81 170.8 93.37 12213.73 Non-Interview 957, 959, 116 Amar singh gurung Agam Pachowk 3 977 390.96 726.63 1117.59 93.37 67845.44 Non-Interview

117 Mangale/man bdr. Gurung Aaitasingh Pachowk 3 956 6.27 75.02 81.29 93.37 7004.62 Non-Interview 118 Mana Gurung Bahadur Pachowk 3 978 11.11 13.44 24.55 93.37 1254.89 Non-Interview 119 Kaami Gurung Dilbahadur Pachowk 3 1072 233.99 262.62 496.61 93.37 24520.83 Non-Interview Total 144 14009 18293.3 32302.27 1504586.34 1 Non-Registered Archalbot 8 564 106.82 60.79 167.61 110.57 6721.55 Non-Registered Cost Calculation of Lands of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung Land Owner Name Land Household head VDC Affected Plot no. S.N. Ward No. Exisitng Area, sqm New Cut Area, sqm Affected Total area (sqm) Replacement cost rate per sqm.(25% increment) Cost NRs. Total Remarks 2 Non-Registered Archalbot 9 412 64.51 28 92.51 110.57 3095.96 Non-Registered 3 Non-Registered Archalbot 9 429 998.42 1218.91 2217.33 110.57 134774.88 Non-Registered 4 Non-Registered Archalbot 9 504 66.32 75.05 141.37 110.57 8298.28 Non-Registered 5 Non-Registered Archalbot 9 702 31.56 38.38 69.94 110.57 4243.68 Non-Registered 6 Non-Registered Archalbot 9 701 50.98 63.37 114.35 110.57 7006.82 Non-Registered 7 Non-Registered Archalbot 9 700 73.57 88.65 162.22 110.57 9802.03 Non-Registered 8 Non-Registered Archalbot 9 337 4.44 35.3 39.74 110.57 3903.12 Non-Registered 9 Non-Registered Archalbot 9 77 10.11 36.99 47.1 110.57 4089.98 Non-Registered 10 Non-Registered Archalbot 9 75 0 27.68 27.68 110.57 3060.58 Non-Registered 11 Non-Registered Archalbot 9 491 160.45 156.84 317.29 110.57 17341.80 Non-Registered 12 Non-Registered Archalbot 9 66 197.39 165.43 362.82 110.57 18291.60 Non-Registered 13 Non-Registered Archalbot 9 634 17.28 27.06 44.34 110.57 2992.02 Non-Registered 14 Non-Registered Archalbot 8 614 151.9 144.25 296.15 110.57 15949.72 Non-Registered 15 Non-Registered Archalbot 8 613 1.23 17.14 18.37 110.57 1895.17 Non-Registered 16 Non-Registered Archalbot 8 612 97.18 120.19 217.37 110.57 13289.41 Non-Registered 17 Non-Registered Archalbot 8 611 83.8 81.12 164.92 110.57 8969.44 Non-Registered 18 Non-Registered Archalbot 8 598 90.41 111.31 201.72 110.57 12307.55 Non-Registered 19 Non-Registered Archalbot 8 563 35.94 47.31 83.25 110.57 5231.07 Non-Registered 20 Non-Registered Archalbot 8 120 170.91 161.51 332.42 110.57 17858.16 Non-Registered 21 Non-Registered Archalbot 8 119 67.38 134.35 201.73 110.57 14855.08 Non-Registered 22 Non-Registered Archalbot 7 496 123.14 154.93 278.07 110.57 17130.61 Non-Registered 23 Non-Registered Archalbot 7 257 160.06 196.4 356.46 110.57 21715.95 Non-Registered 24 Non-Registered Archalbot 6 171 0 2.14 2.14 110.57 236.62 Non-Registered Shreebhanjya 25 Non-Registered ng 2 471 253.08 301.28 554.36 56.51 17025.33 Non-Registered Shreebhanjya 26 Non-Registered ng 2 442 282.13 337.74 619.87 56.51 19085.69 Non-Registered Shreebhanjya 27 Non-Registered ng 4 484 117.23 95.64 212.87 56.51 5404.62 Non-Registered Shreebhanjya 28 Non-Registered ng 4 483 0 4.63 4.63 56.51 261.64 Non-Registered Shreebhanjya 29 Non-Registered ng 8 908 0 3.4 3.4 56.51 192.13 Non-Registered Shreebhanjya 30 Non-Registered ng 8 907 0 41.78 41.78 56.51 2360.99 Non-Registered Shreebhanjya 31 Non-Registered ng 8 891 0.02 49.63 49.65 56.51 2804.59 Non-Registered Shreebhanjya 32 Non-Registered ng 8 203 294.79 354.73 649.52 56.51 20045.79 Non-Registered Shreebhanjya 33 Non-Registered ng 8 81 44.54 28.27 72.81 56.51 1597.54 Non-Registered Shreebhanjya 34 Non-Registered ng 8 14 0 92.85 92.85 56.51 5246.95 Non-Registered Shreebhanjya 35 Non-Registered ng 8 885 0 25.07 25.07 56.51 1416.71 Non-Registered Shreebhanjya 36 Non-Registered ng 8 205 347.03 439.83 786.86 56.51 24854.79 Non-Registered 37 Non-Registered Nauthar 2 9801 135.08 192.63 327.71 93.37 17985.86 Non-Registered 38 Non-Registered Nauthar 2 1229 68.87 43.11 111.98 93.37 4025.18 Non-Registered 39 Non-Registered Nauthar 2 116 146.53 163.23 309.76 93.37 15240.79 Non-Registered 40 Non-Registered Nauthar 2 1041 0 48.81 48.81 93.37 4557.39 Non-Registered 41 Non-Registered Nauthar 2 72 0 9.98 9.98 93.37 931.83 Non-Registered 42 Non-Registered Nauthar 2 679 162.59 198.5 361.09 93.37 18533.95 Non-Registered Cost Calculation of Lands of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Lamjung Land Owner Name Land Household head VDC Affected Plot no. S.N. Ward No. Exisitng Area, sqm New Cut Area, sqm Affected Total area (sqm) Replacement cost rate per sqm.(25% increment) Cost NRs. Total Remarks 43 Non-Registered Nauthar 5 237 307.25 332.7 639.95 93.37 31064.20 Non-Registered 44 Non-Registered Nauthar 5 387 182.48 204.67 387.15 93.37 19110.04 Non-Registered 45 Non-Registered Nauthar 5 442 36.74 48.16 84.9 93.37 4496.70 Non-Registered 46 Non-Registered Nauthar 8 458 58.21 97.8 156.01 93.37 9131.59 Non-Registered 47 Non-Registered Nauthar 8 457 105.08 113.07 218.15 93.37 10557.35 Non-Registered 48 Non-Registered Pachowk 1 460 329.62 358.19 687.81 93.37 33444.20 Non-Registered 49 Non-Registered Pachowk 2 440 399.09 485.11 884.2 93.37 45294.72 Non-Registered 50 Non-Registered Pachowk 3 979 47.73 58.6 106.33 93.37 5471.48 Non-Registered Total 50 6081.89 7322.51 13404.4 673203.11 Grand Total 425 43657 54132 97789.27 4833406.75 43 42 41 40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 Cost Calculation of Crops of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Road of CropsCost Calculation of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok S.N. Gurung Panchasingh, Deumaya a d.Grn ihkmrGrn ata 2 2 8 5 8 Nauthar Nauthar Nauthar Nauthar Mait bahadur Gurung Nauthar Rishikumar Gurung Mait bahadur Gurung Chyangre sarki Som bahadur 8 Ram bdr. Gurung Kale gurung 8 Nauthar Chyangre Sarki 8 Nauthar Kamini sarki Aasbahadur Gurung Nauthar Manmaya Sarki Kale Gurung 8 Aasbahadur Gurung bdr. Kum Gurung Nauthar 8 Manmaya Sarki 8 2 Nauthar bdr.Kum Gurung Mekhraj Gurung Nauthar Nauthar Purnaa/Mekhraj Gurung 2 Man pd. Gurung Kam gurung singh 5 Jabarsingh/Tulsi Gurung Nauthar Yobir Gurung 2 Nauthar Kam gurung singh Nauthar Govinda wagle 8 Nalumaya Gurung Nardev Gurung Kunimaya Shrestha) Nauthar 8 Ramraj Bista(now- 2 8 Govinda wagle Nauthar Jeunath Tripura Ghimire 2 Nardev Gurung Nauthar Nauthar Gurung Dal subba 5 Bipinchandra Ghimire Nauthar Mohan Pd.Ghimire Mayanath wagle Nauthar 8 Rajkumar Shresth Chature sarki Gurung Dal subba Nirmala Ghimire Nauthar Bimaya Gurung 8 Rajkumar Shresth 2 8 Badmaya Gurung Nauthar Chature sarki 1 Nauthar Tulasi pd. Shrestha Nauthar Bimaya Gurung Pachowk Badmaya Gurung Ladimaya Gurung Yubaraj Gurung 1 Tulasi pd. Ghimire Manraj Gurung Pachowk Ladimaya Gurung 1 Dudhmaya Gurung 3 Yubaraj Gurung Pachowk Sat bdr.Gurung Pachowk 3 3 Janga Gurung sub Surya pd. Gurung Mann bdr. Gurung Pachowk 2 Pachowk Iman singh(surya Prasad) Gayin Gurung singh 3 Pachowk Dadman Gurung Mann bdr. Gurung Pachowk Gayin Gurung singh 2 Bakhat Bdr. Gurung 2 Amar Gurung 2 Pachowk Dadman Gurung 1 Pachowk Pachowk Bakhat Bdr. Gurung 1 Aaita Bdr. Gurung Pachowk 1 Som Bdr. Gurung Pachowk Amar Gurung Jivraj Gurung Pachowk Aaita Bdr. Gurung 1 Ser bdr Gurung Som Bdr. Gurung Nimba Gurung Pachowk Makhhui 1 Gurung Sita Gurung Harka bdr.Gurung Ser bdr Gurung Pachowk Nimba Gurung Lilamaya Gurung Harka bdr.Gurung Sita Gurung Karna bdr. Gurung Land Owner Name rnkmrSrsh ata 2 Nauthar Arun kumar Shrestha 1 Pachowk Deumaya Gurung Household head

VDC

Ward No. 1230 46 1183 77 466 436 156 552 621 554 499 534 441 1184 71 386 164 69 472 678 113 175 465 507 115 62 555 925 447 434 951 976 900 914 467 469 595 468 336 524 443 440 337 Affected Plot no. 12 12 az 0.32 Maize 21.29 21.29 0 0.32 Maize 129.59 71.31 58.28 52 94 46 az 0.32 Maize 0.32 0.32 Maize 84.69 0.32 39.46 Maize 0.32 229.34 0.32 45.23 Maize 108.8 160.32 0.32 Maize Maize 120.54 103.13 260.03 0.32 142.56 701.85 57.19 Maize 62.14 0.32 390.64 117.47 Maize 0.32 33.83 181.56 311.21 Maize 112.71 28.31 91.01 Maize 0.32 0.32 52.16 360.28 90.55 188.85 51.67 60.55 Maize Maize 0.32 171.43 33.35 0.32 247.79 15.91 18.32 0.32 Maize 133.92 11.94 Maize 113.87 0.32 Maize 0.32 3.97 7.2 225.63 Maize 109.87 557.02 0.32 Maize 7.2 0.32 306.23 115.76 0.32 189.58 250.79 0.32 Maize 0.32 42.68 108.76 Maize 0 Maize 23.39 0.32 293.55 80.82 Maize Maize 289.19 164.01 19.29 11.48 0.32 165.8 300.53 Maize 129.54 30.89 0.32 11.48 0.32 165.79 123.39 30.89 Maize 134.74 29.46 Maize Maize 0 19.36 0.32 0.32 68.66 0 20.22 10.47 10.1 41.14 Maize 0.32 Maize 14.75 0.32 10.47 27.52 385.09 5.47 0.32 Maize 99.22 Maize 214.38 0 49.6 117.05 170.71 Maize 0.32 89.21 49.62 50.19 0.32 0.32 Maize 58.3 58.3 66.86 0.32 Maize 30.91 Maize 37.77 474.13 0.32 Maize 267.78 20.53 0.32 0.32 385.67 2.65 206.35 0.32 177.63 734.14 Maize 0.32 Maize 2.65 Maize 403.61 208.04 Maize 330.53 64.58 1885.98 Maize 1037.36 0 17.8 0.32 38.8 283.81 848.62 13.92 141.41 17.8 25.78 Maize 13.92 142.4 0 2076.09 1086.24 0 989.85 Exisitng Area, sqm

New Cut Area, sqm

Total Affected area (sqm)

Name of the Crops

Production kg per sqm. 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 District Rate per sqm. 272.512 912.768 505.088 1392.64 1320.064 1824.768 5000.192 433.024 1164.928 667.648 2417.28 426.88 1714.176 152.832 1406.336 3919.744 92.16 1392.128 299.392 2099.328 2122.24 2122.112 146.944 395.392 247.808 526.592 188.8 134.016 2744.064 634.88 642.432 746.24 483.456 3427.584 2273.664 5166.208 33.92 13278.208 496.64 1810.048 227.84 178.176 13903.872

Total Cost NRs. Lamjung Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Remarks 69 68 67 66 65 64 63 62 61 60 59 58 57 56 55 54 53 52 51 50 49 48 47 46 45 44 Cost Calculation of Crops of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Road of CropsCost Calculation of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok S.N. Ghimire Balkrishna Upadhya Kum Bdr. Gurung Kum Bdr. Kum Gurung Prasad Ghimire ghimire,Bishnu Rajya 5 Bdr.Kum Gurung Nauthar Hiralal Shrestha Mama Maya Shrestha, Gurung Birdhoj Gurung Birdhoj Yagyanath Ghimire Gurung Paal Gurung Jung Gaumati Gurung, Jabi Yagyanath Ghimire Nabraj Ghimire 8 2 Paal Gurung Jung Shreemjyang Nauthar Nabraj Ghimire Shor Bdr. Gurung 8 Aaita Sarki Sarki (Shor Bdr. Gurung) Nauthar 5 Bdr. Dhan Gurung 2 Nauthar Nauthar Aaita Sarki Goth Bdr. Gurung Gaini Gurung Kumar Pandey Goth Bdr. Gurung Kumar Pandey Aasbahadur Nepali Ganesh Bdr. Kunwar Aasbahadur Nepali Dambar bdr.Gurung kunwar Arjun Ganesh Bdr. Kunwar Gopal Sarki Dambar bdr.Gurung kunwar Arjun Samser sarki Pushparaj Gurung Gurung singh Bhuwan Sukman Gurung Om bdr.Gurung 2 Sukman Gurung Nauthar 5 Gore Shrestha Om bdr.Gurung Krishna Pandey Raj Nauthar bdr.Dhan Shrestha Atimaya Sarki Atimaya, Ram bdr.Sarki Subba Gurung Pandey Krishna/Bhupati raj Subba Gurung Land Owner Name Ghimire Balkrishna Upadhya Bishnu GhimireBishnu Hiralal Shrestha Jabi Gurung Household head ng Shreebhanjya ng Shreebhanjya ng Shreebhanjya ng Shreebhanjya ng Shreebhanjya ng Shreebhanjya ng Shreebhanjya ng Shreebhanjya ng Shreebhanjya ng Shreebhanjya ng Shreebhanjya ng Shreebhanjya ng Shreebhanjya ng Shreebhanjya ng Shreebhanjya ng Shreebhanjya ng Shreebhanjya ng Shreebhanjya VDC 1 9. 5.715.7Mie0.32 0.32 Maize Maize 1151.37 653.57 298.44 497.8 125.86 11, 5 172.58 4 86, 8 0.32 2 Maize 2 317.31 8 174.47 2 142.84 2 9 4 4 8 4 8 2 7 9229418647Mie0.32 Maize 694.7 461.8 8 232.9 57, 49 0.32 8 4 Maize 803.21 341.01 462.2 67, 45 8 8 Ward No. 186 237 82 20 921 12 887 183 65 238 239, 189 188, 55 58, 470 34, 33, 26, 29, 457, 251 250, , 422 26202 511, 456, 182 187, 438 256, 254, 108 109, 1258, 551 126 437 Affected Plot no. .52.63.1Mie0.32 0.32 Maize Maize 0.32 34.71 41.42 Maize 26.86 41.42 7.85 100.9 0 39.17 0.32 61.73 0.32 Maize 0.32 Maize 633.74 0.32 0.32 Maize 351.2 514.37 Maize 282.54 276.4 Maize 112.23 237.97 80.25 61.91 25.44 31.98 36.35 25.44 25.56 0 8.8252 1.1Mie0.32 Maize 514.51 225.23 289.28 5.4328 8.7Mie0.32 Maize 489.47 332.83 156.64 1.1281 6.7Mie0.32 Maize 0.32 460.67 248.16 Maize 212.51 1304.53 0.32 730.93 573.6 Maize 360.77 203.04 157.73 0.32 Maize 0.32 939.01 523.33 Maize 415.68 0.32 741.57 0.32 Maize 329.34 412.23 1642.94 Maize 900.34 742.6 479.4 254.72 0.32 224.68 Maize 41.57 41.57 0 24 199.6Mie0.32 Maize 94.36 51.9 42.46 0.32 0.32 Maize Maize 96.24 61.65 126.68 34.59 53.95 72.73 Exisitng Area, sqm

New Cut Area, sqm

Total Affected area (sqm)

Name of the Crops

Production kg per sqm. 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 District Rate per sqm. 343.808 530.176 501.376 4495.36 3537.92 1027.2 465.28 325.632 2882.944 8365.696 1611.008 4260.224 2233.216 3176.448 5911.04 9355.904 2598.912 4364.928 6698.624 4215.552 11524.352 3260.416 532.096 664.32 789.12 690.56

Total Cost NRs. Lamjung Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Remarks 102 101 100 99 98 97 96 95 94 93 92 91 90 89 88 87 86 85 84 83 82 81 80 79 78 77 76 75 74 73 72 71 70 Cost Calculation of Crops of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Road of CropsCost Calculation of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok S.N. ak ua hetaHraKmrSrsh rhlo 9 9 8 Archalbot Harka Kumar Shrestha Archalbot Archalbot 7 Gokul 7 Prasad Regmi Harka Kumar Shrestha Archalbot Narayan Kunwar Archalbot Gokul Prasad Regmi Bal Bdr. Kunwar Kunwar Dhub Narayan Kunwar 8 Archalbot 8 Prasansha Kunwar Archalbot Ganga Kunwar Shovita Kunwar Tilak Bdr. Kunwar Shovita+Shrijana Kunwar 9 Tilak Bdr. Kunwar Govindaraj Joshi Archalbot Bdr. Bishnu Suyal Khem Kumari Joshi 9 Gangamaya Suyal 9 9 Archalbot Badrinath Lamichhane Archalbot Archalbot Badrinath Lamichhane Janga Bdr. Ale Magar 276.91 Teklal Shrestha 9 304.91 Kalawati Rana Magar 76, 78 Archalbot 9 Tankalal Shrestha Bishnulal Shrestha 0.32 7 Archalbot Archalbot bdr. Jit Lamichhane Bishnulal Shrestha Maize Maan bdr. Kunwar 8 6 bdr. Jit Archalbot Lamichhane 7 713.59 Archalbot Ram chandra Adhikari Archalbot 386.11 Sita devi kunwar Kirtiman Kunwar 327.48 Ram chandra Adhikari Bhart bdr. Kunwar 6 97, 98 9 Archalbot Balkrishna Lamichhane 9 Kirtiman Kunwar Archalbot Archalbot Kalpana Adhikari 7 Amrit Lamichhane Balram Adhikari Archalbot Shanta kumari Kunwar Milan 9 Regmi Pashupati Thapa Kunwar Archalbot 9 9 Bimala Adhikari Archalbot Krishna bdr. Gharti Archalbot Subhadra Regmi 9 bhakta Devi Regmi Min bdr. Bhujel Krishna bdr. Gharti 9 Archalbot 9 9 Archalbot nanda bdr.Lamichhane Archalbot bhaktaDevi Regmi 6 Archalbot Ramesh Pariyar Min bdr. Bhujel Archalbot Ram bdr. Pariyar Gopal Lamichhane 9 Hari bdr.Khadka Mina Poudel Archalbot Sushila Pariyar 5 8 Srijana Pariyar Archalbot Nauthar Hari bdr.Khadka Dhana bdr. Adhikari Mina Poudel Kamaljit Gurung Gaj Bd Dhanamaya Adhikari Yesraj Thapa Magar Gurung Rojina Land Owner Name

Household head ng Shreebhanjya VDC 2 Ward No. 310 309, 263, 264, 535 530, 675 676, 477, 534 531, 155, 722 443, 723, 585 591, 588, 538 635, 391 427, 494, 390 492, 424 541 663 620 633 664 793 160 674 174 619 49 557 516 556 332 667 330 183 316 172 673 Affected Plot no. 7.8656 218 az 0.32 Maize 1241.84 665.66 576.18 53 3.9244 az 0.32 Maize 0.32 204.44 139.09 Maize 0.32 65.35 556.51 0.32 Maize 283.99 272.52 837.07 Maize 0.32 436.28 609.57 400.79 0.32 Maize 392.77 Maize 216.8 845.6 388.64 0.32 87.86 456.96 52.22 0.32 Maize 35.64 471.28 Maize 255.39 218.19 215.89 121.53 96.66 7.8249 9.3Mie0.32 0.32 Maize Maize 0.32 392.33 214.95 192.61 0.32 Maize 177.38 97.38 95.23 Maize 82.09 40.17 909.79 500.41 41.92 409.38 0.32 Maize 50.34 26.52 23.82 0.32 0.32 Maize 0.32 Maize 0.32 95.28 Maize 0.32 140.52 47.69 Maize 0.32 86.73 Maize 46.3 47.59 62.79 53.79 29.99 Maize 75.84 28.26 16.31 40.13 95.72 34.53 0.32 35.71 52.53 0.32 Maize 43.19 54.21 0.32 0.32 Maize 54.79 172.96 Maize Maize 118.08 0.32 225.85 0.32 54.88 157.78 255.66 35.14 0.32 Maize Maize 134.85 68.07 0.32 19.7 0.32 120.81 653.59 Maize 23.46 15.44 0.32 Maize 356.18 Maize 12.05 382.81 297.41 114.27 Maize 200.87 11.41 153.11 64.11 181.94 91.9 35.25 50.16 61.21 19.8 15.45 Exisitng Area, sqm

New Cut Area, sqm 109 8.2Mie0.32 Maize 581.82 Total Affected area (sqm) az 0.32 Maize Name of the Crops

Production kg per sqm. 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 District Rate per sqm. 8520.448 1780.352 3635.072 5584.384 5027.456 4974.592 668.416 3268.992 1555.584 2751.36 1246.464 514.176 6405.248 339.456 610.432 1110.144 383.872 361.728 513.664 672.384 1511.424 2019.584 1726.08 252.16 4559.104 154.24 2571.136 820.608 1176.32 253.44 4942.208 693.888 3544.448

Total Cost NRs. Lamjung Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Remarks 132 131 130 129 128 127 126 125 124 123 122 121 120 119 118 117 116 115 114 113 112 111 110 109 108 107 106 105 104 103 Cost Calculation of Crops of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Road of CropsCost Calculation of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok S.N. Poudel Lila Poudel, Mahendra auKmr uugMuiGrn ata 8 Nauthar 5,8 8 Nauthar Nauthar Mauli Gurung Sarba Singh Gurung Sitaram 5 Gurung Nalu Kumari Gurung 5 Sarba Singh Gurung Nauthar 5 Nauthar Sitaram Gurung Nauthar Birta Gurung Jangasubba Gurung 3 3 Bhagawati Pachowk Pachowk Bamsyo Gurungseni 3 Birta Gurung Kumraj Gurung Kami Gurung Pachowk 2 Bhagawati Pachowk Maya Gurungseni Demraj Ghale 9 Kami Gurung Eghane Gurung Archalbot Karna Ghale singh Maan bdr. Thapa 9 Edhane Gurung Archalbot 7 9 Archalbot Maan bdr. Thapa Prem bdr. Thapa Archalbot Chijmaya Gurung Chandra bdr. Ram Thapa bdr.Gurung 9 8 Chijmaya Gurung Archalbot Nauthar Ram bdr.Gurung raj Yesh Thapa magar Mayadevi Thapa Magar 5 Nauthar Kali Ghale 8 Saharsha Ghimire jibi Nauthar Tara devi Ghimire 8 Hasta bdr. Ghale Archalbot Ser Ghale 6 9 Kausila Adhikari Archalbot Sukumaya Ghale Archalbot Ramdevi Kunwar Ishwori pd. Adhikari 9 Ram pd. Poudel Archalbot 8 Klaimaya Kunwar Ishwori pd. Regmi Archalbot Ram pd. Poudel 9 Hira devi Marhattha Ishwori pd. Regmi Archalbot 9 Hira devi Marhattha Archalbot Bhimnaya Lamichhane Hari bdr. Pariyar 6 Muktinath Lamichhane 9 Archalbot Archalbot Ram bdr.Gharti Bhujel Aaitimaya Pariyar 8 Ram bdr.Gharti Bhujel Archalbot 9 Giri Bishnu Krishna Pd. Mareta Archalbot Krishna Pd. Mareta Ram bdr.Parajuli Giri Bishnu Ram bdr.Parajuli Land Owner Name ihrmPue rhlo 9 Archalbot Rishiram Poudel Household head

VDC

Ward No. 49 ,317,6 792 799, 178, 181, 801, 563 508, 377 618, 620, 471, 480 479, 424 420, 690 897 886, 960 953, 915 511, 450 439, 590 587, 583, 333 389, 526 26, 411,3 668 315, 318, 400 378, 469 459, 460 455, 578 179, 170, 622 493 564 175 558 584 636 329 585 413 425 Affected Plot no. 9.5261 3.9Mie0.32 Maize 435.29 236.14 199.15 0.32 Maize 721.08 366.21 354.87 2.2532 5.8Mie0.32 0.32 Maize Maize 956.68 0.32 533.26 552.55 423.42 0.32 303.9 Maize 0.32 248.65 Maize 643.84 0.32 Maize 362.48 0.32 509.28 281.36 Maize 0.32 261.17 541.82 Maize 248.11 327.22 666.88 Maize 0.32 364.92 214.6 187.32 301.96 0.32 Maize 76.24 471.5 111.08 259.4 Maize 702.29 212.1 386.2 260.03 316.09 147.99 0.32 112.04 Maize 0.32 92 605.99 Maize 0.32 332.13 273.86 0.32 424.43 Maize 242.24 0.32 Maize 182.19 532.32 0.32 289.47 Maize 784.97 242.85 434.39 Maize 358.18 350.58 191.94 949.43 166.24 516.69 432.74 0.38.3196 az 0.32 Maize 189.66 81.13 108.53 0.32 0.32 Maize Maize 73.27 48.41 38.58 20.63 34.69 27.78 0.32 Maize 0.32 0.32 24.04 Maize 24.04 Maize 0.32 0.32 33.61 0 33.61 20.03 Maize Maize 19.43 184.42 0 40.88 0.6 126.7 40.88 0.32 57.72 0.32 0 Maize 0.32 Maize 42.39 Maize 28.36 75.35 14.03 53.58 273.98 145.16 21.77 128.82 Exisitng Area, sqm 3.6277 az 0.32 Maize 227.76 135.76 New Cut Area, sqm

Total Affected area (sqm)

Name of the Crops

Production kg per sqm. 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 District Rate per sqm. 3022.592 4687.488 6825.728 3889.92 4639.744 3342.976 4188.416 4670.976 975.872 3320.32 4943.36 1894.272 4251.264 3100.672 3705.216 5560.192 2456.832 6613.632 1038.464 493.824 264.064 307.712 430.208 248.704 1621.76 523.264 363.008 685.824 1858.048 1737.728

Total Cost NRs. Lamjung Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Remarks 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 148 147 146 145 144 143 142 141 140 139 138 137 136 135 134 133 Cost Calculation of Crops of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Road of CropsCost Calculation of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok S.N. Bhujel Amrit(Amite), Sommaya Gyanmaya Shrestha Rishiram Shrestha, Paudel Janaki Paudel, Dinnath Kumari Kunwar Hari Bdr. Kunwar, Devi i uggrn Udaya jung Prithiman 6 gurung jung Jit Prithiman Archalbot 6 Gyanraj gurung 6 Archalbot 7 Gyanraj gurung Archalbot Sashi thapa 7 Pahalman Archalbot Archalbot Apsara Kunwar Thapa 8 surya bdr. Babu Laxman 8 Gyan bdr.Kunwar Archalbot Archalbot Ramchandra kunwarDevi chhetri 8 Hari bdr. Archalbot Ganga Kuwar 8 8 Amrit bdr.Kunwar 9 Balaram 9 Tirtharaj Archalbot Archalbot Ojraj sedai Archalbot Archalbot Indra bdr. Krishna bdr Gurung 9 Laxima Adhikari Archalbot Kedarnath Bhimnath Gita thapa Kunwar Harka Bdr Bdr Tej Bishnumaya Adhikari Mayadevi maretha Khushiram 1 Santa Bdr Damai Pachowk Laxmi Gurung Bimaya Gurung Durga bdr.Gurung Maansingh Gurung Manmaya Paudel Padamlal Paudel, 9 Archalbot 9 Durga Thapa Archalbot Bil Bdr. Shrestha Amrit Bdr. Thapa 7 Archalbot Bil Bdr. Shrestha 7 Gurung Devi Archalbot Man Bdr. Thapa 8 7 Archalbot Gurung Devi Shiva Prasad Adhikari Archalbot 9 Man Bdr. Thapa 7 Archalbot Shiva Prasad Adhikari Archalbot Gir 9 Bdr. Kunwar Umakanta Paudel Archalbot Himraj+Umakanta Paudel 1 Lal Gurung Bd Aashkaji Shrestha Gir Bdr. Kunwar Pachowk Kshamamta Gurung Aashkaji Shrestha Pode Gurung Dhanmaya Gurung Land Owner Name amy adlAcabt 9 Archalbot Manmaya Paudel 6 Archalbot Amrit(Amite) Gharti 9 Archalbot 9 Rishiram Shrestha Archalbot Dinanath Paudel 6 Archalbot Hari Bdr. Kunwar Household head ng Shreebhanjya ng Shreebhanjya ng Shreebhanjya ng Shreebhanjya VDC Total 2 2 2 2 Ward No. 231 474 473 223 525 527, 565, 321 327, 752 147, 475 442, 615, 169 181, 173 177, 485 486, 50, 51, 53, 300, 794 799, 802, 589 497, 584, 392 395, 394, 151 822 538 337 476 476 555 589 177 336 419 496 476 398 495 617 152 541 677 417 Affected Plot no. 36.82563 52082.6 28516.32 23566.28 3.9126 0.4Mie0.32 0.32 0.32 Maize Maize Maize 302.04 162.65 305.61 12.89 139.39 166.22 12.89 139.39 0 13 486.3Mie0.32 Maize 66.13 34.8 0.32 31.33 Maize 573.15 330.61 242.54 0.32 Maize 301.81 615.98 287.19 353.93 262.05 7.5394 8.8Mie0.32 Maize 588.78 309.43 279.35 0.32 Maize 150.69 107.57 43.12 0.32 Maize 1756.38 0.32 974.87 781.51 Maize 0.32 437.08 Maize 232.94 0.32 204.14 374.97 210.99 Maize 163.98 823.6 461.32 362.28 3.9219 2.3Mie0.32 Maize 0.32 0.32 0.32 523.63 0.32 Maize Maize 291.94 0.32 Maize 231.69 0.32 0.32 461.55 Maize 89.67 213.13 Maize 79.22 48.94 Maize 246.16 Maize 248.42 79.22 145.98 40.73 0.32 0.32 41.13 100.18 44.67 3.58 20.78 0 Maize 0.32 Maize 25.17 3.58 20.35 285.51 19.5 Maize 46.05 157.13 0 0.32 34.49 128.38 69.18 11.56 Maize 32.54 0 498.58 36.64 271.75 226.83 0.32 Maize 17.89 17.89 0.32 0.32 0 0.32 Maize Maize Maize 40.17 60.78 26.45 0.32 0.32 0.32 48.93 27.93 13.72 29.31 32.85 Maize Maize Maize 19.62 428.36 59.64 16.96 235.07 27.34 16.96 193.29 32.3 0 Exisitng Area, sqm 3 438 438 New Cut Area, sqm 589 Total Affected area (sqm) az 0.32 Maize az 0.32 Maize Name of the Crops

Production kg per sqm. 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 District Rate per sqm. 2081.92 2127.616 164.992 445.44 4231.808 4530.304 365008.896 3960.704 1376.896 12478.336 2981.632 2700.672 5904.896 3736.832 2728.064 626.432 1868.544 1014.016 265.984 322.176 45.824 2011.264 441.472 416.512 3478.4 228.992 338.56 357.504 375.168 3008.896 349.952 217.088 3863.168 5606.4

Total Cost NRs. Lamjung Non-Interview Non-Interview Non-Interview Interviewed Interviewed Interviewed Non-Interview Non-Interview Interviewed Interviewed Interviewed Interviewed Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Interviewed Non-Interview Remarks 44 43 42 41 40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 Cost Calculation of Crops of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Road of CropsCost Calculation of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok S.N. Sedhai Ram Chandra + Laxman Gurung) MayaNyepu (Ajuti KumariBudh Gurung) KumariBod Gurung (aka hmiGrn Ganesh bdr. Chetnath Jhamdi Gurung Kaam singh Kopila Wagle Dolnath Sun bdr gurung Mayanath Krishna hari Wagle Nairaj Purna pd. Ghimire Mohanman Lalmati Gurung Jitbdr Aita kumari Gurung Surya bdr. Bhujel Buddhiman Bishnukumar shrestha Lekhnath Gunjaman Ghimire Dinesh Bir Bdr Gurung Shukaman Gangadatta Aaita Singh Gurung Reshamlal Mayanath Ghimire Khamba Singh BahadurTej Gurung Kumar Raj Tularaj Gurung Dholi Seti Gurung Udaya jung BdrAash Gurung Raman Devi Gopal Gurung Jung Gopal Joshi Raj Udaya jung Govinda Gurung Jung Bal Bdr Faud Bdr Khadka Laxman Lato Hari Kumari Sedhai Jag bdr Harka Bdr Sarki Harkaman Sabita sarki Nepali Lalman gurung Land Owner Name Dayanidhi Nanda Jung Bhupal Pd Household head ng Shreebhanjya ng Shreebhanjya ng Shreebhanjya ng Shreebhanjya ng Shreebhanjya ng Shreebhanjya ng Shreebhanjya ng Shreebhanjya ng Shreebhanjya ng Shreebhanjya ng Shreebhanjya ng Shreebhanjya ng Shreebhanjya ng Shreebhanjya ng Shreebhanjya ng Shreebhanjya ng Shreebhanjya ng Shreebhanjya ng Shreebhanjya ng Shreebhanjya ng Shreebhanjya ng Shreebhanjya ng Shreebhanjya ng Shreebhanjya ng Shreebhanjya ng Shreebhanjya ng Shreebhanjya ng Shreebhanjya VDC 6. 9.5375 az 0.32 Maize 357.55 194.75 8 162.8 8 4 4 4 4 4 2 2 2 2 2 2 2 2 2 2 2 2 2 8 8 8 8 8 8 8 8 8 Ward No. 66 39 458 441 469 167 724 168 170 405 766 478 476 768 230 918 207 204 85 890 777 770, 231, 1 231, 206 13, 15, 84 753, 804, 888, 889, 47, 40 48, 35, 22 36, 444 445, Affected Plot no. 13 02 7.9Mie0.32 Maize 171.59 0.32 80.28 Maize 91.31 13.52 0.32 13.52 0.32 Maize 0 Maize 40.01 36.35 151.79 0.32 81.69 3.66 0.32 Maize 0.32 70.1 1078.86 Maize 597.12 Maize 481.74 93.28 0.32 179.24 15.16 0.32 52.48 137.76 Maize 15.16 0.32 40.8 Maize 787.12 0 Maize 425.41 113.88 0.32 361.71 65.83 606.16 0.32 Maize 48.05 0.32 333.76 272.4 Maize 300.72 Maize 124.19 1124.98 176.53 625.87 117.6 499.11 65.02 52.58 .63.13.7Mie0.32 0.32 Maize Maize 36.57 0.32 7.67 34.41 0.32 Maize 7.67 2.16 Maize 406.46 0.32 0 221.29 0.32 332.09 185.17 Maize 161.72 Maize 170.37 126.08 80.37 48.19 44.43 45.71 3.76 7.1553 106 az 0.32 Maize 1150.67 575.36 575.31 6.2260 3.3Mie0.32 Maize 535.43 266.01 269.42 0.32 Maize 169.68 0.32 91.21 Maize 78.47 554.1 347.6 0.32 206.5 Maize 128.71 128.71 0.32 0 Maize 427.45 266.78 0.32 160.67 Maize 1005.95 498.28 507.67 Exisitng Area, sqm

New Cut Area, sqm 317 Total Affected area (sqm) az 0.32 Maize Name of the Crops

Production kg per sqm. 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 District Rate per sqm. 1027.584 173.056 465.28 1045.632 7643.136 671.744 194.048 5445.248 842.624 4272.128 1589.632 8011.136 832.256 440.448 98.176 2832.512 2070.016 1028.736 568.704 2294.272 2492.8 7364.608 3404.928 1167.488 4449.28 1647.488 3414.784 6377.984

Total Cost NRs. Lamjung Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Remarks 87 86 85 84 83 82 81 80 79 78 77 76 75 74 73 72 71 70 69 68 67 66 65 64 63 62 61 60 59 58 57 56 55 54 53 52 51 50 49 48 47 46 45 Cost Calculation of Crops of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Road of CropsCost Calculation of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok S.N. oia uugNAPcwk1 Pachwok 8 Nauthar 8 8 Nauthar Nauthar N/A 8 Lal bdr. 8 8 Nauthar 8 Gopiraj Gurung Badriraj Nauthar Chyangre Nauthar 5 Purna bdr Gurung Nauthar Mahendra raj Malla Nauthar Pashupati 5 Kedar bdr. Sarki Taramali Taramali 5 Kamala devi Ghimire Singhram Nauthar Surya narayan Ghimire Chitra bdr. Nauthar 5 5 5 Prabin Ghimire Purna 5 bdr. Nauthar Gurung Anita Nauthar Nauthar Purna bdr. Laxmi Ramtel 5 Nauthar 5 Gunmaya Tamang Chatursingh Nauthar Nauthar Gunmaya Tamang Amardhoj Sukman Dattamaya Gurung Gaj bdr. 5 5 Brikh bdr. Gurung Tirtharaj 5 Sabitra Dhanlal Gurung Nauthar Nauthar 5 bdr.Tul Gurung Nauthar 5 Singha raas gurung Nauthar 5 Ramchandra Nauthar Sita Ghimire Bhabilal Nauthar 5 Shree bhakta Ghimire Chetnath Pashupatinath Ghimire Yogyenidhi Nauthar Purushottam Nardhoj Shree krishna Ghimire 5 5 Usha Ghimire Nauthar Kumar pd. Nauthar Jagdish Ghimire Jire Gurung 5 2 Liladevi Ghimire Purosuttom Motiram 2 Nauthar Nauthar Bhagawati Ghimire Devi 2 Nauthar 2 Laxima pd. Bhatta Nauthar ShreeKrishna Krishna bdr. Sharman, Pahalman Magar Nauthar 2 8 2 Laxmi pd. Dipak babu Ghimire Nauthar Nauthar Ramkrishna Nauthar Pashupatinath Ghimire 2 Bamdev 2 Dipendra Ghimire 2 Nauthar Padam Pd. Chandra kanta Wagle Laxman Chitraman Nauthar 2 Nauthar Bishnumaya Adhikari prasad. Devi Nauthar Budhamaya Gurung 2 Loknath Wagle Gagan bdr. Rajkumar Nauthar Bhagawati Wagle 2 datta Bishnu 2 Arun kumar Shrestha Nauthar 2 Suk bdr.Tamang 2 Nauthar Gangaram Chetnath Wagle Nauthar 8 Nauthar Prem bahadur Khaganidhi Nauthar rajKum Gurung Ram Kumar Thapa Khilnidhi Dilliram Pandey Dilliraj Pancha bdr. Chini kumari Pandey Tula kumari Pandey Mohani Gurung Land Owner Name

Household head

VDC

Ward No. 1182 63, 402 401, 243 242, 579 470 467 176 114 559 558 150 470 401 467 397 396 260 262 266 249 247 241 240 426 419 80 79 81 688 687 680 697 517 696 85 84 78 1042 61 115 123 121 120 623 Affected Plot no. 34 5.5237 az 0.32 Maize 233.72 150.25 83.47 1.1132 7.6Mie0.32 Maize 272.26 153.25 119.01 0.32 Maize 83.76 79.34 4.42 66 19 5.7Mie0.32 0.32 Maize 0.32 Maize 0.32 158.57 0.32 Maize 65.64 91.92 0.32 0.32 Maize 36.02 263.22 66.65 Maize Maize 153.65 324.63 29.62 Maize 0.32 0.32 178.96 318.08 109.57 169.63 502.45 38.28 145.67 Maize 0.32 Maize 281.73 148.45 38.28 220.72 10.06 391.96 0.32 Maize 0.32 208.61 0 6.64 261.05 183.35 Maize 0.32 Maize 142.04 3.42 131.91 119.01 0.32 0.32 Maize 93.04 67.84 0.32 50.79 0.32 Maize Maize 64.07 44.29 115.99 42.25 Maize 40.44 191.81 Maize 95.01 48.05 0.32 104.84 3.85 45.49 10.98 233.46 86.97 Maize 0.32 119.56 10.98 2.56 0.32 0.32 113.9 858.34 Maize 0 Maize Maize 407.6 0.32 129.42 450.74 0.32 0.32 55.06 16.12 98.76 Maize 37.38 16.12 Maize 30.66 Maize 463.29 17.68 0.32 0.32 268.7 18.13 0 201.22 194.59 Maize 103.57 18.13 0.32 Maize 0.32 97.65 0.32 522.49 0 0.32 Maize 264.87 515.9 0.32 Maize Maize 282.58 257.62 317.74 0.32 Maize 233.32 Maize 174.75 429.38 7.46 210.01 413.73 142.99 0.32 Maize 7.46 0.32 220.77 219.37 3.71 276.01 192.96 Maize 3.71 Maize 148.45 0 0.32 298.49 127.56 0.32 177.39 163.71 0 0.32 Maize 71.32 134.78 0.32 Maize 106.07 Maize 61.3 Maize 0.32 168.14 45.29 0.32 27.6 93.9 16.01 Maize 22.94 12.86 Maize 74.24 18.15 308.61 14.74 268.77 166.33 4.79 184.99 142.28 83.78 Exisitng Area, sqm

New Cut Area, sqm 211 Total Affected area (sqm) az 0.32 Maize Name of the Crops

Production kg per sqm. 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 District Rate per sqm. 1923.2 1961.6 1015.552 1176.576 461.056 1966.72 2290.688 2171.264 3606.144 489.984 2670.208 84.992 1818.112 868.352 650.112 517.632 1341.952 582.272 1530.368 140.544 5217.28 1264.128 478.464 206.336 3439.36 1325.696 232.064 3390.336 3617.024 2236.8 2688.128 2825.856 95.488 1900.16 47.488 2095.488 912.896 579.712 1201.92 164.608 232.32 2129.024 2367.872 1484.672

Total Cost NRs. Lamjung Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Remarks 12 11 10 9 8 7 6 5 4 3 2 1 119 118 117 116 115 114 113 112 111 110 109 108 107 106 105 104 103 102 101 100 99 98 97 96 95 94 93 92 91 90 89 88 Cost Calculation of Crops of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Road of CropsCost Calculation of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok S.N. bdr.Shrestha Chandraman/Rudra am uugDlaau aho 3 3 Pachwok Pachwok 3 Dilbahadur 3 Pachwok Bahadur Pachwok 3 3 Kaami Gurung Pachwok 3 3 Pachwok Mana Gurung Pachwok Agam Aaitasingh Pachwok Mangale/man bdr. Gurung 3 Harka Bdr Bagan singh Amar gurung singh Pachwok 3 3 3 Hukke Pachwok Giujman Gurung Top Pachwok Pachwok 3 Maan bdr Rabi Gurung Karansingh Gurung Pachwok chandrasingh 3 Balbir Gurung 2 Garja bdr. 3 Tak bdr.Ghale Dal bdr. Pachwok Pachwok Pachwok 2 Gurung Asur Udbdr. Dasir gurung Pachwok 2 Gore Gurung Chandra Sukalal Sanke Pachwok 2 Mankauri Ghale 2 2 Chandraman Guruung Pachwok Pachwok Gujman Pachwok Dhanmaan Ghale Naram singh 2 Adar Gurung 2 Madan singh Badmaya Gurung Pachwok Chamar Singh Pachwok Gaj bdr. Gurung Paanbir 1 Singharaj Gurung 1 Maisari Gurung Pachwok 1 Pachwok 1 Bhakta Kabiraj Gurung 1 Pachwok N/A Pachwok Gurseni,AmarReju Gurung Pachwok 1 Gurung Bindhoj bdr suk 1 Khadgasingh Pachwok Gore Shreemati Parwati Gurung Pachwok Ajamsingh Indra Chitra maya Gurung 1 Bd. Gurung Udd Gaj bdr. Kamal Gurung jit Kaam singh Pachwok Indra Gurung Durga Gurung singh Pancha subba Sovraj gurung Guman Gurung singh Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Land Owner Name hkip aho 1 Pachwok Bhakti pd Household head rhlo 9 Archalbot 9 Archalbot 9 Archalbot 9 Archalbot 9 Archalbot 9 Archalbot 9 Archalbot 9 Archalbot 9 Archalbot 9 Archalbot 9 Archalbot 8 Archalbot VDC Total

Ward No. 480 44, 977 959, 957, 963 952, 1072 978 956 954 961 49 950 529 526 662 908 899 47 901 507 508 510 627 466 451 449 547 335 331 520 521 531 523 481 96 479 66 491 75 77 337 700 701 702 504 429 412 564 4 14009 144 Affected Plot no. 5.4345 7.6Mie0.32 Maize 571.16 314.52 256.64 9.6766 175 az 0.32 Maize 1117.59 726.63 390.96 0.32 Maize 797.37 451.32 346.05 3.9226 9.1Mie0.32 0.32 0.32 Maize Maize Maize 496.61 24.55 262.62 81.29 0.32 0.32 0.32 13.44 233.99 75.02 0.32 11.11 Maize Maize Maize 6.27 Maize 0.32 170.8 28.71 5.36 130.81 26.31 3.16 Maize 5.36 39.99 0.32 3.16 0.32 2.4 4.98 0 0.32 Maize Maize 0 4.98 0.32 793.05 Maize 43.13 0.32 Maize 417.98 0 24.68 286.47 375.07 0.32 0.32 191.03 Maize 160.09 18.45 100.42 0.32 126.38 Maize Maize 196.95 90.61 0.32 0.32 108.32 Maize 278.32 0.32 121.31 0.32 155.24 88.63 Maize Maize 62.35 142.64 123.08 Maize 113.16 Maize 334.13 58.96 0.32 13.47 175.21 376.91 29.48 13.47 206.76 59.94 158.92 0.32 Maize 170.15 0.32 59.94 0 0.32 Maize 0.32 643.2 Maize 350.34 0 0.32 337.29 Maize 0.32 Maize 292.86 185.67 362.92 Maize 199.66 704.95 151.62 178.23 Maize 387.66 163.26 97.33 191.95 317.29 73.86 121.1 80.9 38.08 70.85 35.78 9.9154 362.82 27.68 165.43 317.29 27.68 197.39 156.84 47.1 160.45 39.74 36.99 0 35.3 162.22 10.11 114.35 88.65 4.44 69.94 63.37 73.57 141.37 38.38 50.98 75.05 31.56 2217.33 66.32 1218.91 998.42 167.61 64.51 60.79 106.82 Exisitng Area, sqm 67137Mie0.32 Maize 103.7 56.7 0.32 Maize 211.15 115.15 28 89. 32302.27 18293.3 New Cut Area, sqm 92.51 Total Affected area (sqm) az 0.32 0.32 0.32 Maize 0.32 Maize 0.32 Maize 0.32 Maize 0.32 Maize 0.32 Maize 0.32 Maize 0.32 Maize Maize 0.32 Maize Maize az 0.32 Maize Name of the Crops

Production kg per sqm. 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 District Rate per sqm. 4025.856 9300.864 5776.896 3361.536 172.032 960.256 1674.368 336.768 68.608 40.448 63.744 5350.144 315.904 2049.152 1285.376 1386.496 1987.072 798.08 1448.448 2242.688 2646.528 172.416 767.232 4484.352 2376.576 2555.648 4962.048 1245.824 1550.08 487.424 2117.504 2007.552 354.304 473.472 451.84 1134.72 811.136 491.264 960.64 15602.048 778.112 358.4 234154.368 725.76 1473.92

Total Cost NRs. Lamjung Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Interview Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Interview Non-Interview Remarks 50 49 48 47 46 45 44 43 42 41 40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 Cost Calculation of Crops of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok Road Subproject, Road of CropsCost Calculation of Belghari-Archalbot-Lamabagar-Sernabazar-Liture-Pachok S.N. Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Land Owner Name

Household head ng Shreebhanjya ng Shreebhanjya ng Shreebhanjya ng Shreebhanjya ng Shreebhanjya ng Shreebhanjya ng Shreebhanjya ng Shreebhanjya ng Shreebhanjya ng Shreebhanjya ng Shreebhanjya ng Shreebhanjya Total ahk3 2 Pachok 1 Pachok 8 Pachok 8 Nauthar 5 Nauthar 5 Nauthar 5 Nauthar 2 Nauthar 2 Nauthar 2 Nauthar 2 Nauthar 2 Nauthar 2 Nauthar Nauthar 6 Archalbot 7 Archalbot 7 Archalbot 8 Archalbot 8 Archalbot 8 Archalbot 8 Archalbot 8 Archalbot 8 Archalbot 8 Archalbot 8 Archalbot 9 Archalbot Grand Total Grand VDC 8 8 8 8 8 8 8 8 4 4 2 2 Ward No. 205 885 14 81 203 891 907 908 483 484 442 471 979 440 460 457 458 442 387 237 679 72 1041 116 1229 9801 171 257 496 119 120 563 598 611 612 613 614 634 50 2 35 54132 43657 425 Affected Plot no. 50 25.07 786.86 439.83 25.07 92.85 347.03 92.85 0 72.81 0 28.27 649.52 44.54 49.65 354.73 41.78 294.79 49.63 3.4 41.78 0.02 3.4 4.63 0 4.63 0 212.87 0 95.64 619.87 117.23 337.74 554.36 282.13 301.28 253.08 77 86106.33 58.6 884.2 47.73 485.11 687.81 399.09 358.19 218.15 156.01 329.62 113.07 84.9 97.8 105.08 48.16 58.21 387.15 36.74 639.95 204.67 9.98 182.48 361.09 332.7 48.81 9.98 307.25 198.5 48.81 162.59 0 309.76 111.98 0 163.23 43.11 146.53 327.71 68.87 192.63 135.08 2.14 2.14 356.46 0 196.4 278.07 160.06 201.73 154.93 134.35 123.14 332.42 83.25 67.38 161.51 47.31 170.91 201.72 164.92 111.31 35.94 81.12 90.41 217.37 18.37 120.19 83.8 17.14 97.18 296.15 44.34 144.25 1.23 27.06 151.9 17.28 018 325 13404.4 7322.51 6081.89 Exisitng Area, sqm

New Cut Area, sqm 78.7692891.392 97789.27 Total Affected area (sqm) az 0.32 Maize az 0.32 0.32 Maize 0.32 Maize 0.32 Maize 0.32 Maize 0.32 Maize 0.32 Maize 0.32 Maize 0.32 Maize 0.32 Maize 0.32 Maize Maize az 0.32 0.32 0.32 Maize 0.32 Maize 0.32 Maize 0.32 Maize 0.32 Maize 0.32 Maize 0.32 Maize 0.32 Maize 0.32 Maize 0.32 Maize 0.32 Maize 0.32 Maize Maize Maize 0.32 0.32 0.32 Maize 0.32 Maize 0.32 Maize 0.32 Maize 0.32 Maize 0.32 Maize 0.32 Maize 0.32 Maize 0.32 Maize 0.32 Maize Maize Maize Name of the Crops

Production kg per sqm. 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 40 District Rate per sqm. 93728.128 3856.384 5629.824 320.896 1188.48 361.856 4540.544 635.264 534.784 43.52 59.264 1224.192 4323.072 750.08 6209.408 4584.832 1447.296 1251.84 616.448 2619.776 4258.56 2540.8 127.744 624.768 2089.344 551.808 2465.664 27.392 2513.92 1983.104 1719.68 2067.328 605.568 1424.768 1038.336 1538.432 219.392 1846.4 346.368

Total Cost NRs. Lamjung Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Non-Registered Remarks Cost calculation of Private Trees: Belghari-Archalbot-Lamabagar-Serabazar-Letaure-Pachok Road, Lamjung

Owner Addres Total Dista Transportat S.N Name Ch. s Girth Height Man Harvesting Harvesting Vol nce MDs/cu MDs/ District Tranport ion Cost Total Cost From Species No (cm) (m) days Cost (NRs.) Cost (NRs.) ume (m) m Tree Rate Cost/nos (NRs.) (NRs.) Harka Kumar Khadayo Archal 5 50.00 5 0.39 214.50 1072.50 0.04 30 0.66 0.03 550 14.18 70.90 1143.40 1 Shrestha 0+000 bot-9 Archal Khadayo bot-9 6 80.00 7 0.52 286.00 1716.00 0.14 30 0.66 0.09 550 50.82 304.92 2020.92 Sub-Total 11 3164.32 Bishnu lal Archal 2 Shrestha 0+170 Khadayo bot-9 5 80.00 7 0.52 286.00 1430.00 0.14 30 0.66 0.09 550 50.82 254.10 1684.10 Khadayo 1 160.00 10 2.50 1375.00 1375.00 0.80 30 0.66 0.53 550 290.40 290.40 1665.40 Sub-Total 6 3349.50 Bill Bdr. Archal 3 Shrestha 0+480 Badar bot-9 3 50.00 5 0.39 214.50 643.50 0.04 30 0.66 0.03 550 14.18 42.54 686.04 Sub-Total 3 686.04 Rishi Ram Archal 4 Shrestha 0+560 Siris bot-9 1 50.00 5 0.39 214.50 214.50 0.04 30 0.66 0.03 550 14.18 14.18 228.68 Archal Siris bot-9 1 80.00 7 0.52 286.00 286.00 0.14 30 0.66 0.09 550 50.82 50.82 336.82 Sub-Total 2 565.50 Ganga maya Archal 50.00 5 0.39 214.50 1287.00 0.04 30 0.66 0.03 550 14.18 85.08 1372.08 5 Suyal 0+580 Khadayo bot-9 6 80.00 7 0.52 286.00 572.00 0.14 30 0.66 0.09 550 50.82 101.64 673.64 Total 8 2045.72 Hemraj + Umakanta Archal 1 50.00 5 0.39 214.50 214.50 0.04 30 0.66 0.03 550 14.18 14.18 228.68 6 Paudel 0+700 Badar bot-9 0+935 Khadayo 7 50.00 5 0.39 214.50 1501.50 0.04 30 0.66 0.03 550 14.18 99.26 1600.76 Khadayo 8 80.00 7 0.52 286.00 2288.00 0.14 30 0.66 0.09 550 50.82 406.56 2694.56 Total 16 4524 Aaiti maya Archal 7 Pariyar 0+750 Siris bot-9 2 50.00 5 0.39 214.50 429.00 0.04 30 0.66 0.03 550 14.18 28.36 457.36 Cost calculation of Private Trees: Belghari-Archalbot-Lamabagar-Serabazar-Letaure-Pachok Road, Lamjung

Owner Addres Total Dista Transportat S.N Name Ch. s Girth Height Man Harvesting Harvesting Vol nce MDs/cu MDs/ District Tranport ion Cost Total Cost From Species No (cm) (m) days Cost (NRs.) Cost (NRs.) ume (m) m Tree Rate Cost/nos (NRs.) (NRs.) Archal Siris bot-9 1 80.00 7 0.52 286.00 286.00 0.14 30 0.66 0.09 550 50.82 50.82 336.82 Total 3 794.18 Amrit Bdr. Archal 8 Thapa 0+870 Bakaino bot-9 8 50.00 5 0.39 214.50 1716.00 0.04 30 0.66 0.03 550 14.18 113.44 1829.44 Archal 0+890 Bakaino bot-9 1 50.00 5 0.39 214.50 214.50 0.04 30 0.66 0.03 550 14.18 14.18 228.68 Archal 0+933 Bakaino bot-9 7 50.00 5 0.39 214.50 1501.50 0.04 30 0.66 0.03 550 14.18 99.26 1600.76 Archal 0+940 Bamboo bot-9 20 30.00 15 0.13 71.50 1430.00 0.04 30 0.66 0.03 550 15.31 306.28 1736.28 Archal 1+505 Bakaino bot-9 1 80.00 7 0.52 286.00 286.00 0.14 30 0.66 0.09 550 50.82 50.82 336.82 Archal 1+505 Bakaino bot-9 1 160.00 10 2.50 1375.00 1375.00 0.80 30 0.66 0.53 550 290.40 290.40 1665.40 Total 38 7397.38 Santa Archal 9 Bdr.Damai 0+825 Khadayo bot-9 2 50.00 5 0.39 214.50 429.00 0.04 30 0.66 0.03 550 14.18 28.36 457.36 Total 2 457.36 Maya Devi Thapa Archal 3 50.00 5 0.39 214.50 643.50 0.04 30 0.66 0.03 550 14.18 42.54 686.04 10 Magar 0+920 Bakaino bot-9 Archal Bakaino bot-9 2 80.00 7 0.52 286.00 572.00 0.14 30 0.66 0.09 550 50.82 101.64 673.64 Total 5 1359.68 Ram Prasad 1 80.00 7 0.52 286.00 286.00 0.14 30 0.66 0.09 550 50.82 50.82 336.82 11 Paudel 0+945 Bakaino Total 1 336.82 Sushila 12 Pariyar 0+980 Bakaino 5 50.00 5 0.39 214.50 1072.50 0.04 30 0.66 0.03 550 14.18 70.90 1143.40 Total 5 1143.40 Cost calculation of Private Trees: Belghari-Archalbot-Lamabagar-Serabazar-Letaure-Pachok Road, Lamjung

Owner Addres Total Dista Transportat S.N Name Ch. s Girth Height Man Harvesting Harvesting Vol nce MDs/cu MDs/ District Tranport ion Cost Total Cost From Species No (cm) (m) days Cost (NRs.) Cost (NRs.) ume (m) m Tree Rate Cost/nos (NRs.) (NRs.)

13 Lila Paudel 1+000 Bakaino 12 50.00 5 0.39 214.50 2574.00 0.04 30 0.66 0.03 550 14.18 170.16 2744.16 Bakaino 7 80.00 7 0.52 286.00 2002.00 0.14 30 0.66 0.09 550 50.82 355.74 2357.74 Bakaino 1 160.00 10 2.50 1375.00 1375.00 0.80 30 0.66 0.53 550 290.40 290.40 1665.40 Total 20 6767.30 Padam Lal Archal 14 Paudel 1+510 Badar bot-9 4 50.00 5 0.39 214.50 858.00 0.04 30 0.66 0.03 550 14.18 56.72 914.72 Archal Bamboo bot-9 40 30.00 15 0.13 71.50 2860.00 0.04 30 0.66 0.03 550 15.31 612.56 3472.56 Archal Bakaino bot-9 2 80.00 7 0.52 286.00 572.00 0.14 30 0.66 0.09 550 50.82 101.64 673.64 Archal Bakaino bot-9 5 160.00 10 2.50 1375.00 6875.00 0.80 30 0.66 0.53 550 290.40 1452.00 8327.00 Archal 1+740 Bakaino bot-9 3 50.00 5 0.39 214.50 643.50 0.04 30 0.66 0.03 550 14.18 42.54 686.04 Archal Bakaino bot-9 3 80.00 7 0.52 286.00 858.00 0.14 30 0.66 0.09 550 50.82 152.46 1010.46 Total 57 15084.42 Muktinath Lamichhan Archal 2 50.00 5 0.39 214.50 429.00 0.04 30 0.66 0.03 550 14.18 28.36 457.36 15 e 1+520 Khadayo bot-9 Archal Bamboo bot-9 40 30.00 15 0.13 71.50 2860.00 0.04 30 0.66 0.03 550 15.31 612.56 3472.56 Archal Badar bot-9 5 80.00 7 0.52 286.00 1430.00 0.14 30 0.66 0.09 550 50.82 254.10 1684.10 Archal Bakaino bot-9 1 160.00 10 2.50 1375.00 1375.00 0.80 30 0.66 0.53 550 290.40 290.40 1665.40 Total 48 7279.42 Jit Bdr.Lamich Archal 2 50.00 5 0.39 214.50 429.00 0.04 30 0.66 0.03 550 14.18 28.36 457.36 16 hane 1+530 Khadayo bot-9 Archal Khadayo bot-9 8 80.00 7 0.52 286.00 2288.00 0.14 30 0.66 0.09 550 50.82 406.56 2694.56 Cost calculation of Private Trees: Belghari-Archalbot-Lamabagar-Serabazar-Letaure-Pachok Road, Lamjung

Owner Addres Total Dista Transportat S.N Name Ch. s Girth Height Man Harvesting Harvesting Vol nce MDs/cu MDs/ District Tranport ion Cost Total Cost From Species No (cm) (m) days Cost (NRs.) Cost (NRs.) ume (m) m Tree Rate Cost/nos (NRs.) (NRs.) Total 10 3151.92 Kalika Lamichhan Archal 4 50.00 5 0.39 214.50 858.00 0.04 30 0.66 0.03 550 14.18 56.72 914.72 17 e 1+620 Khadayo bot-9 Archal Khadayo bot-9 3 80.00 7 0.52 286.00 858.00 0.14 30 0.66 0.09 550 50.82 152.46 1010.46 Total 7 1925.18

Dev Bhakta Archal 3 50.00 5 0.39 214.50 643.50 0.04 30 0.66 0.03 550 14.18 42.54 686.04 18 Regmi 1+710 Khadayo bot-9 Total 3 686.04 Manmaya Archal 19 Paudel 1+720 Khadayo bot-9 3 80.00 7 0.52 286.00 858.00 0.14 30 0.66 0.09 550 50.82 152.46 1010.46 Archal Khadayo bot-9 1 160.00 10 2.50 1375.00 1375.00 0.80 30 0.66 0.53 550 290.40 290.40 1665.40 Total 4 2675.86 Min Bdr. Archal 20 Bhujel 1+730 Bakaino bot-9 3 80.00 7 0.52 286.00 858.00 0.14 30 0.66 0.09 550 50.82 152.46 1010.46 Total 3 1010.46 Man Bdr. Archal 21 Khadka 1+750 Bakaino bot-8 2 50.00 5 0.39 214.50 429.00 0.04 30 0.66 0.03 550 14.18 28.36 457.36 Total 2 457.36 Nawraj Archal 22 Adhikari 1+760 Bakaino bot-7 2 80.00 7 0.52 286.00 572.00 0.14 30 0.66 0.09 550 50.82 101.64 673.64

Sub- 2 Total 673.64 Kamal Archal 23 Bdr.Rimal 1+765 Bakaino bot-7 1 50.00 5 0.39 214.50 214.50 0.04 30 0.66 0.03 550 14.18 14.18 228.68

Sub- 1 Total 228.68 Cost calculation of Private Trees: Belghari-Archalbot-Lamabagar-Serabazar-Letaure-Pachok Road, Lamjung

Owner Addres Total Dista Transportat S.N Name Ch. s Girth Height Man Harvesting Harvesting Vol nce MDs/cu MDs/ District Tranport ion Cost Total Cost From Species No (cm) (m) days Cost (NRs.) Cost (NRs.) ume (m) m Tree Rate Cost/nos (NRs.) (NRs.) Sita Devi Archal 24 kunwar 1+770 Badar bot-7 1 50.00 5 0.39 214.50 214.50 0.04 30 0.66 0.03 550 14.18 14.18 228.68

Sub- 1 Total 228.68 Hari Bdr. Archal 25 Khadka 1+780 Bakaino bot-7 2 50.00 5 0.39 214.50 429.00 0.04 30 0.66 0.03 550 14.18 28.36 457.36

Sub- 2 Total 457.36 Ram Bdr. Gharti Archal 11 50.00 5 0.39 214.50 2359.50 0.04 30 0.66 0.03 550 14.18 155.98 2515.48 26 Bhujel 2+790 Bakaino bot-7

Sub- 11 Total 2515.48 Som Maya Archal 27 Bhujel 2+800 Bakaino bot-7 5 50.00 5 0.39 214.50 1072.50 0.04 30 0.66 0.03 550 14.18 70.90 1143.40

Sub- 5 Total 1143.40 Hari Bdr. Archal 28 Kunwar 2+830 Khadayo bot-6 5 50.00 5 0.39 214.50 1072.50 0.04 30 0.66 0.03 550 14.18 70.90 1143.40 Archal Bamboo bot-6 25 30.00 15 0.13 71.50 1787.50 0.04 30 0.66 0.03 550 15.31 382.85 2170.35

Sub- 30 3314 Total Karna Bdr Archal 29 Adhikari 2+780 Bamboo bot-7 50 30.00 15 0.13 71.50 3575.00 0.04 30 0.66 0.03 550 15.31 765.70 4340.70

Sub- 50 4341 Total Cost calculation of Private Trees: Belghari-Archalbot-Lamabagar-Serabazar-Letaure-Pachok Road, Lamjung

Owner Addres Total Dista Transportat S.N Name Ch. s Girth Height Man Harvesting Harvesting Vol nce MDs/cu MDs/ District Tranport ion Cost Total Cost From Species No (cm) (m) days Cost (NRs.) Cost (NRs.) ume (m) m Tree Rate Cost/nos (NRs.) (NRs.) Gyan Bdr. Archal 30 Kunwar 2+810 Bamboo bot-7 40 30.00 15 0.13 71.50 2860.00 0.04 30 0.66 0.03 550 15.31 612.56 3472.56

Sub- 40 3473 Total Laxmi Archal 31 Kunwar 2+910 Bamboo bot-7 60 30.00 15 0.13 71.50 4290.00 0.04 30 0.66 0.03 550 15.31 918.84 5208.84

Sub- 60 5209 Total Shree Gyan Raj Bhanjy 2 50.00 5 0.39 214.50 429.00 0.04 30 0.66 0.03 550 14.18 28.36 457.36 32 Gurung Khadayo ang-2

Sub- 2 Total 457.36 Shree Aaita Bhanjy 4 50.00 5 0.39 214.50 858.00 0.04 30 0.66 0.03 550 14.18 56.72 914.72 33 Bdr.Nepali 3+850 Khadayo ang-2 Shree Bhanjy 20 30.00 15 0.13 71.50 1430.00 0.04 30 0.66 0.03 550 15.31 306.28 1736.28 Bamboo ang-2 Shree Bhanjy 4 50.00 5 0.39 214.50 858.00 0.04 30 0.66 0.03 550 14.18 56.72 914.72 Bakaino ang-2

Sub- 28 3565.72 Total Shree Samser bdr Bhanjy 60 30.00 15 0.13 71.50 4290.00 0.04 30 0.66 0.03 550 15.31 918.84 5208.84 34 Nepali 3+860 Bamboo ang-2 Shree Bhanjy 1 50.00 5 0.39 214.50 214.50 0.04 30 0.66 0.03 550 14.18 14.18 228.68 Badar ang-3 Cost calculation of Private Trees: Belghari-Archalbot-Lamabagar-Serabazar-Letaure-Pachok Road, Lamjung

Owner Addres Total Dista Transportat S.N Name Ch. s Girth Height Man Harvesting Harvesting Vol nce MDs/cu MDs/ District Tranport ion Cost Total Cost From Species No (cm) (m) days Cost (NRs.) Cost (NRs.) ume (m) m Tree Rate Cost/nos (NRs.) (NRs.)

Sub- 61 5438 Total Shree Aash Bhanjy 2 50.00 5 0.39 214.50 429.00 0.04 30 0.66 0.03 550 14.18 28.36 457.36 35 Bdr.Nepali Khadayo ang-2

Sub- 2 Total 457.36 Shree Ram Bhanjy 7 50.00 5 0.39 214.50 1501.50 0.04 30 0.66 0.03 550 14.18 99.26 1600.76 36 Bdr.Nepali Badar ang-2

Sub- 7 Total 1600.76 Shree Lal man Bhanjy 1 50.00 5 0.39 214.50 214.50 0.04 30 0.66 0.03 550 14.18 14.18 228.68 37 Gurung Khadayo ang-2 Shree Bhanjy 20 30.00 15 0.13 71.50 1430.00 0.04 30 0.66 0.03 550 15.31 306.28 1736.28 Bamboo ang-2

Sub- 21 1964.96 Total Shree Jit jung Bhanjy 2 50.00 5 0.39 214.50 429.00 0.04 30 0.66 0.03 550 14.18 28.36 457.36 38 Gurung Dabdabe ang-2 Shree Bhanjy 1 200.00 12 4.00 2200.00 2200.00 1.50 30 0.66 0.99 550 544.50 544.50 2744.50 Pipal ang-2

Sub- 3 3201.86 Total Cost calculation of Private Trees: Belghari-Archalbot-Lamabagar-Serabazar-Letaure-Pachok Road, Lamjung

Owner Addres Total Dista Transportat S.N Name Ch. s Girth Height Man Harvesting Harvesting Vol nce MDs/cu MDs/ District Tranport ion Cost Total Cost From Species No (cm) (m) days Cost (NRs.) Cost (NRs.) ume (m) m Tree Rate Cost/nos (NRs.) (NRs.) Shree Aash Bdr. Bhanjy 1 50.00 5 0.39 214.50 214.50 0.04 30 0.66 0.03 550 14.18 14.18 228.68 39 Bhujel Khadayo ang-2

Sub- 1 Total 228.68 Shree Sati Bhanjy 1 50.00 5 0.39 214.50 214.50 0.04 30 0.66 0.03 550 14.18 14.18 228.68 40 Gurung 4+200 Aaijel ang-2

Sub- 1 Total 228.68 Shree Raj kumar Bhanjy 6 50.00 5 0.39 214.50 1287.00 0.04 30 0.66 0.03 550 14.18 85.08 1372.08 41 Gurung 4+300 Bakaino ang-2

Sub- 6 Total 1372.08 Shree Mam Maya Bhanjy 3 50.00 5 0.39 214.50 643.50 0.04 30 0.66 0.03 550 14.18 42.54 686.04 42 Shrestha Siris ang-2

Sub- 3 Total 686.04 Shree Hira lal Bhanjy 3 50.00 5 0.39 214.50 643.50 0.04 30 0.66 0.03 550 14.18 42.54 686.04 43 Shrestha Siris ang-4

Sub- 3 Total 686.04 Bhuwan Shree Sing Bhanjy 1 50.00 5 0.39 214.50 214.50 0.04 30 0.66 0.03 550 14.18 14.18 228.68 44 Gurung 5+300 Bakaino ang-4 Cost calculation of Private Trees: Belghari-Archalbot-Lamabagar-Serabazar-Letaure-Pachok Road, Lamjung

Owner Addres Total Dista Transportat S.N Name Ch. s Girth Height Man Harvesting Harvesting Vol nce MDs/cu MDs/ District Tranport ion Cost Total Cost From Species No (cm) (m) days Cost (NRs.) Cost (NRs.) ume (m) m Tree Rate Cost/nos (NRs.) (NRs.)

Sub- 1 Total 228.68 Shree Aait Sing Bhanjy 1 50.00 5 0.39 214.50 214.50 0.04 30 0.66 0.03 550 14.18 14.18 228.68 45 Gurung 5+300 Khadayo ang-4

Sub- 1 Total 228.68 Shree Bishnu Bhanjy 4 50.00 5 0.39 214.50 858.00 0.04 30 0.66 0.03 550 14.18 56.72 914.72 46 Ghimire 5+660 Bakaino ang-8 Shree Bhanjy 30 30.00 15 0.13 71.50 2145.00 0.04 30 0.66 0.03 550 15.31 459.42 2604.42 Bamboo ang-2

Sub- 34 3519.14 Total Bishow Shree Bdr. Bhanjy 4 50.00 5 0.39 214.50 858.00 0.04 30 0.66 0.03 550 14.18 56.72 914.72 47 Gurung 5+670 Bakaino ang-8 Shree Bhanjy 1 80.00 7 0.52 286.00 286.00 0.14 30 0.66 0.09 550 50.82 50.82 336.82 Bakaino ang-8 Shree Bhanjy 1 50.00 5 0.39 214.50 214.50 0.04 30 0.66 0.03 550 14.18 14.18 228.68 Bakaino ang-8

Sub- 6 1480.22 Total Shree Yagya nath Bhanjy 9 50.00 5 0.39 214.50 1930.50 0.04 30 0.66 0.03 550 14.18 127.62 2058.12 48 Ghimire 5+680 Khadayo ang-8 Cost calculation of Private Trees: Belghari-Archalbot-Lamabagar-Serabazar-Letaure-Pachok Road, Lamjung

Owner Addres Total Dista Transportat S.N Name Ch. s Girth Height Man Harvesting Harvesting Vol nce MDs/cu MDs/ District Tranport ion Cost Total Cost From Species No (cm) (m) days Cost (NRs.) Cost (NRs.) ume (m) m Tree Rate Cost/nos (NRs.) (NRs.) Shree Bhanjy 5 80.00 7 0.52 286.00 1430.00 0.14 30 0.66 0.09 550 50.82 254.10 1684.10 Khadayo ang-8 Shree Bhanjy 25 30.00 15 0.13 71.50 1787.50 0.04 30 0.66 0.03 550 15.31 382.85 2170.35 Bamboo ang-8 Shree Bhanjy 3 160.00 10 2.50 1375.00 4125.00 0.80 30 0.66 0.53 550 290.40 871.20 4996.20 ang-8

Sub- 42 10908.77 Total Shree Dhan Bdr. Bhanjy 9 50.00 5 0.39 214.50 1930.50 0.04 30 0.66 0.03 550 14.18 127.62 2058.12 49 Shrestha 5+860 Badar ang-8

Sub- 9 Total 2058.12 Bishnu Shree Kumar Bhanjy 5 50.00 5 0.39 214.50 1072.50 0.04 30 0.66 0.03 550 14.18 70.90 1143.40 50 Shrestha 6+010 Bakaino ang-8 Shree Bhanjy 7 80.00 7 0.52 286.00 2002.00 0.14 30 0.66 0.09 550 50.82 355.74 2357.74 ang-8

Sub- 12 3501.14 Total Shree Bhanjy 5 50.00 5 0.39 214.50 1072.50 0.04 30 0.66 0.03 550 14.18 70.90 1143.40 51 Laxmi B.K 5+900 Chilaune ang-4

Sub- 5 Total 1143.40 Cost calculation of Private Trees: Belghari-Archalbot-Lamabagar-Serabazar-Letaure-Pachok Road, Lamjung

Owner Addres Total Dista Transportat S.N Name Ch. s Girth Height Man Harvesting Harvesting Vol nce MDs/cu MDs/ District Tranport ion Cost Total Cost From Species No (cm) (m) days Cost (NRs.) Cost (NRs.) ume (m) m Tree Rate Cost/nos (NRs.) (NRs.) Shree Lalmati Bhanjy 1 50.00 5 0.39 214.50 214.50 0.04 30 0.66 0.03 550 14.18 14.18 228.68 52 Gurung 6+220 Siris ang-8

Sub- 1 Total 228.68 Shree Krishna Bhanjy 4 50.00 5 0.39 214.50 858.00 0.04 30 0.66 0.03 550 14.18 56.72 914.72 53 Hari Wagle 6+220 Siris ang-8

Sub- 4 Total 914.72 Chetnath Nautha 54 Wagle 6+645 Badar r-2 3 50.00 5 0.39 214.50 643.50 0.04 30 0.66 0.03 550 14.18 42.54 686.04

Sub- 3 Total 686.04 Ram Bdr. Nautha 55 Gurung Siris r-2 1 80.00 7 0.52 286.00 286.00 0.14 30 0.66 0.09 550 50.82 50.82 336.82

Sub- 1 Total 336.82 Nalu Maya Nautha 56 Gurung Bakaino r-2 1 50.00 5 0.39 214.50 214.50 0.04 30 0.66 0.03 550 14.18 14.18 228.68

Sub- 1 Total 228.68 Shree Kopila Bhanjy 1 80.00 7 0.52 286.00 286.00 0.14 30 0.66 0.09 550 50.82 50.82 336.82 57 Wagle 6+800 Khadayo ang-8

Sub- 1 Total 336.82 Cost calculation of Private Trees: Belghari-Archalbot-Lamabagar-Serabazar-Letaure-Pachok Road, Lamjung

Owner Addres Total Dista Transportat S.N Name Ch. s Girth Height Man Harvesting Harvesting Vol nce MDs/cu MDs/ District Tranport ion Cost Total Cost From Species No (cm) (m) days Cost (NRs.) Cost (NRs.) ume (m) m Tree Rate Cost/nos (NRs.) (NRs.) Shree Maya Bhanjy 2 50.00 5 0.39 214.50 429.00 0.04 30 0.66 0.03 550 14.18 28.36 457.36 58 Gururng Bakaino ang-8 Shree Bhanjy 1 80.00 7 0.52 286.00 286.00 0.14 30 0.66 0.09 550 50.82 50.82 336.82 Bakaino ang-8

Sub- 3 794.18 Total Nirmal Nautha 59 Ghimire Siris r-2 3 50.00 5 0.39 214.50 643.50 0.04 30 0.66 0.03 550 14.18 42.54 686.04 Siris 1 80.00 7 0.52 286.00 286.00 0.14 30 0.66 0.09 550 50.82 50.82 336.82

Sub- 4 1022.86 Total Bhagwati Devi Nautha 3 50.00 5 0.39 214.50 643.50 0.04 30 0.66 0.03 550 14.18 42.54 686.04 60 Ghimire Badar r-5 Nautha Badar r-5 1 160.00 10 2.50 1375.00 1375.00 0.80 30 0.66 0.53 550 290.40 290.40 1665.40

Sub- 4 2351.44 Total Got Bdr. Nautha 61 Gurung Siris r-5 2 50.00 5 0.39 214.50 429.00 0.04 30 0.66 0.03 550 14.18 28.36 457.36 Nautha Siris r-5 1 80.00 7 0.52 286.00 286.00 0.14 30 0.66 0.09 550 50.82 50.82 336.82

Sub- 3 794.18 Total Kam Sing Nautha 62 Gurung Khadayo r-5 2 50.00 5 0.39 214.50 429.00 0.04 30 0.66 0.03 550 14.18 28.36 457.36 Cost calculation of Private Trees: Belghari-Archalbot-Lamabagar-Serabazar-Letaure-Pachok Road, Lamjung

Owner Addres Total Dista Transportat S.N Name Ch. s Girth Height Man Harvesting Harvesting Vol nce MDs/cu MDs/ District Tranport ion Cost Total Cost From Species No (cm) (m) days Cost (NRs.) Cost (NRs.) ume (m) m Tree Rate Cost/nos (NRs.) (NRs.)

Sub- 2 Total 457.36 Kamal Nautha 63 Gurung Siris r-5 1 80.00 7 0.52 286.00 286.00 0.14 30 0.66 0.09 550 50.82 50.82 336.82 Nautha Bamboo r-5 10 30.00 15 0.13 71.50 715.00 0.04 30 0.66 0.03 550 15.31 153.14 868.14

Sub- 11 1204.96 Total

Bamasyo Nautha 1 220.00 12 4.00 2200.00 2200.00 1.82 30 0.66 1.20 550 658.85 658.85 2858.85 64 Gurungseni Siris r-5 Nautha Bamboo r-5 10 30.00 15 0.13 71.50 715.00 0.04 30 0.66 0.03 550 15.31 153.14 868.14

Sub- 11 3726.99 Total Datta maya Nautha 2 50.00 5 0.39 214.50 429.00 0.04 30 0.66 0.03 550 14.18 28.36 457.36 65 Gurung Khadayo r-5

Sub- 2 Total 457.36 Tara Devi Nautha 66 Ghimire Bakaino r-5 2 80.00 7 0.52 286.00 572.00 0.14 30 0.66 0.09 550 50.82 101.64 673.64

Sub- 2 Total 673.64 Sita Ram Nautha 67 Gurung Khadayo r-5 2 50.00 5 0.39 214.50 429.00 0.04 30 0.66 0.03 550 14.18 28.36 457.36

Sub- 2 Total 457.36 Cost calculation of Private Trees: Belghari-Archalbot-Lamabagar-Serabazar-Letaure-Pachok Road, Lamjung

Owner Addres Total Dista Transportat S.N Name Ch. s Girth Height Man Harvesting Harvesting Vol nce MDs/cu MDs/ District Tranport ion Cost Total Cost From Species No (cm) (m) days Cost (NRs.) Cost (NRs.) ume (m) m Tree Rate Cost/nos (NRs.) (NRs.) Nara Dev Nautha 68 Gurung Bamboo r-5 10 30.00 15 0.13 71.50 715.00 0.04 30 0.66 0.03 550 15.31 153.14 868.14

Sub- 10 Total 868.14 Bipin Chandra Nautha 1 50.00 5 0.39 214.50 214.50 0.04 30 0.66 0.03 550 14.18 14.18 228.68 69 Ghimire 9+270 Siris r-8

Sub- 1 Total 228.68 Bhu Maya Nautha 70 Ghale 9+270 Siris r-8 2 50.00 5 0.39 214.50 429.00 0.04 30 0.66 0.03 550 14.18 28.36 457.36

Sub- 2 Total 457.36 Purna Bdr. Nautha 71 Gurung Khadayo r-8 1 50.00 5 0.39 214.50 214.50 0.04 30 0.66 0.03 550 14.18 14.18 228.68 Nautha Bamboo r-8 25 30.00 15 0.13 71.50 1787.50 0.04 30 0.66 0.03 550 15.31 382.85 2170.35

Sub- 26 2399.03 Total

Surwa Sing Nautha 1 50.00 5 0.39 214.50 214.50 0.04 30 0.66 0.03 550 14.18 14.18 228.68 72 Gurung 9+290 Khadayo r-8

Sub- 1 Total 228.68 Durga Sing Nautha 73 Gurung Khadayo r-8 3 50.00 5 0.39 214.50 643.50 0.04 30 0.66 0.03 550 14.18 42.54 686.04

Sub- 3 Total 686.04 Cost calculation of Private Trees: Belghari-Archalbot-Lamabagar-Serabazar-Letaure-Pachok Road, Lamjung

Owner Addres Total Dista Transportat S.N Name Ch. s Girth Height Man Harvesting Harvesting Vol nce MDs/cu MDs/ District Tranport ion Cost Total Cost From Species No (cm) (m) days Cost (NRs.) Cost (NRs.) ume (m) m Tree Rate Cost/nos (NRs.) (NRs.) Kam Sing Nautha 74 Gurung Siris r-8 2 50.00 5 0.39 214.50 429.00 0.04 30 0.66 0.03 550 14.18 28.36 457.36

Sub- 2 Total 457.36 Nepu Pachok- 75 Gurung Siris 1 5 50.00 5 0.39 214.50 1072.50 0.04 30 0.66 0.03 550 14.18 70.90 1143.40

Sub- 5 Total 1143.40 Sita Pachok- 76 Gurung Khadayo 1 1 50.00 5 0.39 214.50 214.50 0.04 30 0.66 0.03 550 14.18 14.18 228.68 Pachok- Khadayo 1 1 80.00 7 0.52 286.00 286.00 0.14 30 0.66 0.09 550 50.82 50.82 336.82

Sub- 2 565.50 Total Pothe Pachok- 77 Gurung Khadayo 1 3 50.00 5 0.39 214.50 643.50 0.04 30 0.66 0.03 550 14.18 42.54 686.04

Sub- 3 Total 686.04 Harka Bdr. Pachok- 78 Gurung siris 1 3 50.00 5 0.39 214.50 643.50 0.04 30 0.66 0.03 550 14.18 42.54 686.04 Pachok- Siris 1 1 80.00 7 0.52 286.00 286.00 0.14 30 0.66 0.09 550 50.82 50.82 336.82

Sub- 4 1022.86 Total Jug Subba Pachok- 79 Gurung Chilaune 1 9 50.00 5 0.39 214.50 1930.50 0.04 30 0.66 0.03 550 14.18 127.62 2058.12 Pachok- Chilaune 1 1 80.00 7 0.52 286.00 286.00 0.14 30 0.66 0.09 550 50.82 50.82 336.82 Cost calculation of Private Trees: Belghari-Archalbot-Lamabagar-Serabazar-Letaure-Pachok Road, Lamjung

Owner Addres Total Dista Transportat S.N Name Ch. s Girth Height Man Harvesting Harvesting Vol nce MDs/cu MDs/ District Tranport ion Cost Total Cost From Species No (cm) (m) days Cost (NRs.) Cost (NRs.) ume (m) m Tree Rate Cost/nos (NRs.) (NRs.)

Sub- 10 2394.94 Total Aashpati Pachok- 80 Gurung Chilaune 1 3 50.00 5 0.39 214.50 643.50 0.04 30 0.66 0.03 550 14.18 42.54 686.04 Pachok- Siris 1 1 80.00 7 0.52 286.00 286.00 0.14 30 0.66 0.09 550 50.82 50.82 336.82

Sub- 4 1022.86 Total Mir sing Pachok- 81 Gurung Chilaune 1 1 80.00 7 0.52 286.00 286.00 0.14 30 0.66 0.09 550 50.82 50.82 336.82

Sub- 1 Total 336.82 Buddhi Maya Pachok- 3 80.00 7 0.52 286.00 858.00 0.14 30 0.66 0.09 550 50.82 152.46 1010.46 82 Gurung Siris 1

Sub- 3 Total 1010.46 Som Raj Pachok- 83 Gurung Bakaino 1 3 50.00 5 0.39 214.50 643.50 0.04 30 0.66 0.03 550 14.18 42.54 686.04 Pachok- Bakaino 1 1 80.00 7 0.52 286.00 286.00 0.14 30 0.66 0.09 550 50.82 50.82 336.82

Sub- 4 1022.86 Total Mimmwa Pachok- 84 Gurung Khadayo 1 1 80.00 7 0.52 286.00 286.00 0.14 30 0.66 0.09 550 50.82 50.82 336.82

Sub- 1 Total 336.82 Cost calculation of Private Trees: Belghari-Archalbot-Lamabagar-Serabazar-Letaure-Pachok Road, Lamjung

Owner Addres Total Dista Transportat S.N Name Ch. s Girth Height Man Harvesting Harvesting Vol nce MDs/cu MDs/ District Tranport ion Cost Total Cost From Species No (cm) (m) days Cost (NRs.) Cost (NRs.) ume (m) m Tree Rate Cost/nos (NRs.) (NRs.) Man Raj Pachok- 85 Gurung Chilaune 1 4 50.00 5 0.39 214.50 858.00 0.04 30 0.66 0.03 550 14.18 56.72 914.72

Sub- 4 Total 914.72 Karna Bahadur Pachok- 4 50.00 5 0.39 214.50 858.00 0.04 30 0.66 0.03 550 14.18 56.72 914.72 86 Gurung Chilaune 1

Sub- 4 Total 914.72 Maikhu Pachok- 87 Gurung Badar 2 2 50.00 5 0.39 214.50 429.00 0.04 30 0.66 0.03 550 14.18 28.36 457.36

Sub- 2 Total 457.36 Gausari Pachok- 88 Gurung Chilaune 3 2 50.00 5 0.39 214.50 429.00 0.04 30 0.66 0.03 550 14.18 28.36 457.36

Sub- 2 Total 457.36 Grand Total 853 161684 Cost Calculation of Private Fruit Trees: Belghari-Archalbot-Lamabagar-Serabazar-Letaure-Pachok Road, Lamjung

S.N Owners Name Address Chainage Species No Rate/ Tree Total Cost (NRs.) Remarks

Rishi Ram Shrestha 0+560 Mango 1 3000 3000 1 Archalbot-9 Banana 7 1000 7000 2 Amrit Bdr. Thapa Archalbot-9 Mango 2 3000 6000

0+745 Banana 15 1000 15000 3 Aaiti maya Pariyar Archalbot-9

Papaya 1 1500 1500 4 Santa Bdr Pariyar Archalbot-9

Maya Devi Thapa 0+940 Banana 4 1000 4000 5 Archalbot-9 Archalbot-9 1+065 Banana 3 1000 3000 6 Sushila Pariyar Pear 1 1000 1000 Archalbot-9 1+550 Banana 10 1000 10000 7 Bishnu lal Shrestha Lemon 2 1000 2000

1000 8000 8 Kalika Lamichhane Archalbot-9 1+550 Banana 8 9 Padam Lal Paudel Archalbot-9 1+750 Gauva 4 700 2800 Gauva 2 700 1400 10 Bal Ram Adhikari Archalbot-9 1+900 Banana 9 1000 9000 11 Tula Kumari Khanal Archalbot-8 2+200 Banana 8 1000 8000 Gauva 13 700 9100 12 Rama kunwar khadka Archalbot-7 2+300 Banana 14 1000 14000 13 Tola Maya lamichhane Archalbot-7 2+500 Mango 1 3000 3000 14 San nani suyal Thapa Archalbot-7 Banana 10 100 1000 15 Nabraj Adhikari Archalbot-7 Banana 8 1000 8000 16 Man Bdr. Khadka Archalbot-8 2+500 Banana 4 1000 4000 17 Sita Devi Kunwar Archalbot-7 Banana 5 1000 5000 Archalbot-7 2+650 Banana 15 1000 15000 18 Rajan Gurug Archalbot-7 2+600 Banana 5 1000 5000 Gauva 2 700 1400 19 Ganga Devi Kunwar Archalbot-7 Banana 30 1000 30000 20 Ram Bdr. Bhujel Archalbot-6 Banana 5 1000 5000 21 Hari Bdr.Kunwar Archalbot-6 Banana 13 1000 13000 22 Som maya Bhujel Archalbot-6 Banana 6 1000 6000 23 Ram Bdr. Bhujel Archalbot-6 2+800 Mango 1 3000 3000

5000 24 Gyan Raj Gurung Shree Bhanjyanj-2 3+000 Banana 5 1000

30000 25 Samsher Bdr. Sarki Shree Bhanjyanj-2 Banana 30 1000

6000 26 Jit jung Gurung Shree Bhanjyanj-2 3+090 Banana 6 1000

6000 27 Raj Kumar Gurung Shree Bhanjyanj-2 3+690 Banana 6 1000 Pear 2 1000 2000 Gauva 3 700 2100

700 28 Bal Krishna Ghimire Shree Bhanjyanj-4 5+300 Gauva 1 700

1000 29 Aaita Sing Gurung Shree Bhanjyanj-4 5+300 Banana 1 1000 Cost Calculation of Private Fruit Trees: Belghari-Archalbot-Lamabagar-Serabazar-Letaure-Pachok Road, Lamjung

S.N Owners Name Address Chainage Species No Rate/ Tree Total Cost (NRs.) Remarks

1000 30 Laxmi B.K Shree Bhanjyanj-4 Mango 1 1000 Papaya 1 1000 1000 Aaru 1 1000 1000 31 Nalu Maya Gurung Nauthar-2 Banana 15 1000 15000 32 Kamasoye Gurung Nauthar-5 Banana 5 1000 5000 33 Santa Bdr. Gurung Nauthar-8 Banana 4 1000 4000 34 Kale Gurung Nauthar-8 Banana 110 1000 110000 35 Durga Gurung Nauthar-8 Banana 2 1000 2000 36 Gaini Gurung Nauthar-8 Banana 10 1000 10000 37 Sarv Sing Gurung Nauthar-8 9+290 Banana 13 1000 13000 Nauthar-8 Banana 13 1000 13000 38 Durga Sing Gurung Nauthar-8 Banana 2 1000 2000 39 Gaini Gurung Nauthar-8 Banana 10 1000 10000 40 Karna Bdr.Gurung Pachok-1 Banana 6 1000 6000 41 Maikhu Gurung Pachok-2 Banana 2 1000 2000 42 Buddhe Gurung Pachok-2 Banana 10 1000 10000 Total Amount 468 462000 Cost Calculation of Raniswara Shakhar Pakhar CFUG Belghari-Archalbot-Lamabagar-Serabazar-Letaure-Pachok Road, Lamjung Girth Height Man Harvesting Total Distance MDs/ District Tranport Transportation Total Cost Chainage Species No Volume MDs/cum (cm) (m) days Cost Harvesting (m) Tree Rate Cost/nos Cost (NRs.) 0+200 Chilaune 1 80 7 0.52 286.00 286.00 0.14 30 0.66 0.09 550 50.82 50.82 336.82 Chilaune 1 150 10 2.5 1,375.00 1,375.00 0.70 30 0.66 0.46 550 255.23 255.23 1630.23 0+210 Chilaune 1 80 7 0.52 286.00 286.00 0.14 30 0.66 0.09 550 50.82 50.82 336.82 Chilaune 1 150 10 2.5 1,375.00 1,375.00 0.70 30 0.66 0.46 550 255.23 255.23 1630.23 0+220 Chilaune 2 40 5 0.39 214.50 429.00 0.03 30 0.66 0.02 550 9.08 18.15 447.15 Chilaune 4 80 7 0.52 286.00 1,144.00 0.14 30 0.66 0.09 550 50.82 203.28 1347.28 Chilaune 1 200 12 4 2,200.00 2,200.00 1.50 30 0.66 0.99 550 544.50 544.50 2744.50 0+250 Chilaune 1 80 7 0.52 286.00 286.00 0.14 30 0.66 0.09 550 50.82 50.82 336.82 Chilaune 1 150 10 2.5 1,375.00 1,375.00 0.70 30 0.66 0.46 550 255.23 255.23 1630.23 0+255 Chilaune 1 40 5 0.39 214.50 214.50 0.03 30 0.66 0.02 550 9.08 9.08 223.58 Chilaune 2 85 7 0.52 286.00 572.00 0.16 30 0.66 0.10 550 57.37 114.74 686.74 0+260 Bakaino 2 70 7 0.52 286.00 572.00 0.11 30 0.66 0.07 550 38.91 77.82 649.82 Bakaino 1 50 5 0.39 214.50 214.50 0.04 30 0.66 0.03 550 14.18 14.18 228.68 Bakaino 1 160 10 2.5 1,375.00 1,375.00 0.80 30 0.66 0.53 550 290.40 290.40 1665.40 0+280 Bakaino 1 80 7 0.52 286.00 286.00 0.14 30 0.66 0.09 550 50.82 50.82 336.82 Chilaune 1 150 10 2.5 1,375.00 1,375.00 0.70 30 0.66 0.46 550 255.23 255.23 1630.23 0+290 Chilaune 2 50 5 0.39 214.50 429.00 0.04 30 0.66 0.03 550 14.18 28.36 457.36 0+300 Chilaune 3 50 5 0.39 214.50 643.50 0.04 30 0.66 0.03 550 14.18 42.54 686.04 0+320 Chilaune 4 50 5 0.39 214.50 858.00 0.04 30 0.66 0.03 550 14.18 56.72 914.72 Chilaune 9 80 7 0.52 286.00 2,574.00 0.14 30 0.66 0.09 550 50.82 457.38 3031.38 0+340 Badar 5 80 7 0.52 286.00 1,430.00 0.14 30 0.66 0.09 550 50.82 254.10 1684.10 0+350 Chilaune 6 80 7 0.52 286.00 1,716.00 0.14 30 0.66 0.09 550 50.82 304.92 2020.92 0+360 Chilaune 3 50 5 0.39 214.50 643.50 0.04 30 0.66 0.03 550 14.18 42.54 686.04 Chilaune 8 80 7 0.52 286.00 2,288.00 0.14 30 0.66 0.09 550 50.82 406.56 2694.56 Chilaune 1 160 10 2.5 1,375.00 1,375.00 0.80 30 0.66 0.53 550 290.40 290.40 1665.40 0+370 Chilaune 9 50 5 0.39 214.50 1,930.50 0.04 30 0.66 0.03 550 14.18 127.62 2058.12 0+400 Chilaune 1 50 5 0.39 214.50 214.50 0.04 30 0.66 0.03 550 14.18 14.18 228.68 0+520 Chilaune 4 50 5 0.39 214.50 858.00 0.04 30 0.66 0.03 550 14.18 56.72 914.72 Chilaune 1 70 7 0.52 286.00 286.00 0.11 30 0.66 0.07 550 38.91 38.91 324.91 0+570 Badar 4 80 7 0.52 286.00 1,144.00 0.14 30 0.66 0.09 550 50.82 203.28 1347.28 1+200 Badar 5 50 5 0.39 214.50 1,072.50 0.04 30 0.66 0.03 550 14.18 70.90 1143.40 Badar 6 70 7 0.52 286.00 1,716.00 0.11 30 0.66 0.07 550 38.91 233.45 1949.45 Badar 3 140 10 2.5 1,375.00 4,125.00 0.61 30 0.66 0.40 550 222.34 667.01 4792.01 1+450 Badar 10 80 7 0.52 286.00 2,860.00 0.14 30 0.66 0.09 550 50.82 508.20 3368.20 Girth Height Man Harvesting Total Distance MDs/ District Tranport Transportation Total Cost Chainage Species No Volume MDs/cum (cm) (m) days Cost Harvesting (m) Tree Rate Cost/nos Cost (NRs.) Badar 9 160 10 2.5 1,375.00 12,375.00 0.80 30 0.66 0.53 550 290.40 2613.60 14988.60 1+500 Badar 8 50 5 0.39 214.50 1,716.00 0.04 30 0.66 0.03 550 14.18 113.44 1829.44 Total 123 62646.69 Cost calculation of Kerabari CFUG: Belghari-Archalbot-Lamabagar-Serabazar-Letaure-Pachok Road, Lamjung Total Height Man Harvesting MDs/ District Tranport Transportation Chainage Species No Girth (cm) Harvesting Volume Distance (m) MDs/cum Total Cost (m) days Cost Tree Rate Cost/nos Cost Cost 3+890 Chilaune 1 80 7 0.52 286.00 286.00 0.14 30 0.66 0.09 550 50.82 50.82 336.82 Chilaune 1 160 10 2.50 1,375.00 1,375.00 0.80 30 0.66 0.53 550 290.40 290.40 1,665.40 3+900 Chilaune 1 80 7 0.52 286.00 286.00 0.14 30 0.66 0.09 550 50.82 50.82 336.82 Total 3 62,646.69 Cost calculation of Sikhra CFUG: Belghari-Archalbot-Lamabagar-Serabazar-Letaure-Pachok Road, Lamjung Total Dista Distri Height Man Harvesting MDs/c MDs/ Tranport Transportation Chainage Species No Girth (cm) Harvesting Volume nce ct Total Cost (m) days Cost um Tree Cost/nos Cost Cost (m) Rate 6+800 Chilaune 8 50 5 0.39 214.50 1,716.00 0.04 30 0.66 0.03 550 14.18 113.44 1,829.44 Chilaune 9 80 7 0.52 286.00 2,574.00 0.14 30 0.66 0.09 550 50.82 457.38 3,031.38

Bakaino 4 160 10 2.5 1,375.00 5,500.00 0.80 30 0.66 0.53 550 290.40 1,161.60 6,661.60

6+820 Bakaino 2 80 7 0.52 286.00 572.00 0.14 30 0.66 0.09 550 50.82 101.64 673.64 Chilaune 5 160 10 2.5 1,375.00 6,875.00 0.80 30 0.66 0.53 550 290.40 1,452.00 8,327.00

6+830 Chilaune 3 80 7 0.52 286.00 858.00 0.14 30 0.66 0.09 550 50.82 152.46 1,010.46 6+840 Chilaune 4 50 5 0.39 214.50 858.00 0.04 30 0.66 0.03 550 14.18 56.72 914.72 Sisau 27 80 7 0.52 286.00 7,722.00 0.14 30 0.66 0.09 550 50.82 1,372.14 9,094.14

Sisau 4 160 10 2.5 1,375.00 5,500.00 0.80 30 0.66 0.53 550 290.40 1,161.60 6,661.60

6+860 Sisau 18 80 7 0.52 286.00 5,148.00 0.14 30 0.66 0.09 550 50.82 914.76 6,062.76 6+870 Sisau 3 50 5 0.39 214.50 643.50 0.04 30 0.66 0.03 550 14.18 42.54 686.04 Chilaune 4 80 7 0.52 286.00 1,144.00 0.14 30 0.66 0.09 550 50.82 203.28 1,347.28

Chilaune 7 160 10 2.5 1,375.00 9,625.00 0.80 30 0.66 0.53 550 290.40 2,032.80 11,657.80

6+880 Chilaune 6 50 5 0.39 214.50 1,287.00 0.04 30 0.66 0.03 550 14.18 85.08 1,372.08 Chilaune 2 160 10 2.5 1,375.00 2,750.00 0.80 30 0.66 0.53 550 290.40 580.80 3,330.80

6+890 Saal 1 50 5 0.39 214.50 214.50 0.04 30 0.66 0.03 550 14.18 14.18 228.68 Saal 4 80 7 0.52 286.00 1,144.00 0.14 30 0.66 0.09 550 50.82 203.28 1,347.28

Saal 6 160 10 2.5 1,375.00 8,250.00 0.80 30 0.66 0.53 550 290.40 1,742.40 9,992.40

6+900 Saal 3 50 5 0.39 214.50 643.50 0.04 30 0.66 0.03 550 14.18 42.54 686.04 Saal 2 80 7 0.52 286.00 572.00 0.14 30 0.66 0.09 550 50.82 101.64 673.64

6+920 Saal 1 50 5 0.39 214.50 214.50 0.04 30 0.66 0.03 550 14.18 14.18 228.68 6+950 Saal 4 50 5 0.39 214.50 858.00 0.04 30 0.66 0.03 550 14.18 56.72 914.72 Total 127 76,732.17 Cost calculation of Fruit Trees: Belghari-Archalbot-Lamabagar-Serabazar-Letaure-Pachok Road,Lamjung Chainag S.N Owners Name Address e Species No Rate/ Tree Total Cost (NRs.) Remarks Ranishawara Archalbot-9 1+250 Lapsi 10 2000 20000 1 Community Archalbot-9 1+450 Lapsi 10 2000 20000 Total Amount 20 40000 a]n3f/L—cRfn]af]6–nfdfju/–z]gf{ahf/–ln6"/]–kfRff]s ;8s v08 pkcfof]hgf -!@=%( ls=dL _, ndh'Ë = k'g{af; of]hgfs]f sfo{sf/L ;f/+z

!=o; k'g{jf; of]hgf -Resettlement Plan_ n] cfktsflng e'sDk ;xfotf of]hgf -EEAP_ cGtu{t ;+rflnt a]n3f/L—cRfn]af]6–nfdfju/–z]gf{ahf/–ln6"/]–kfRff]s ;8s v08 pk– cfof]hgfaf6 k|efljt 3/ w'/Lsf] ;fdflhs–cfly{s cj:yf, To; pk cfof]hgf jf6 x'g] Iflt tyf IfltnfO{ Go"lgs/0f ug}{ pkfox? ;fy} cfof]hgfaf6 k'Ug] kmfO{bf tyf d"ntM c:j]lR5s k'g{af; of]hgfsf] k|s[of tyf gLltnfO{ JofVof u/]sf]] 5 . of] k'gjf{; of]hgf g]kfn ;/sf/sf] d'nt hUuf k|flKt P]g @)#$ tyf k'glg{df{0f ;DaGwL P]g / To;sf] sfo{ljlw @)&@ nfO{ cfwf/ dfGb} Pl;ofnL lasfz a}+ssf] ;'/Iff gLlt @))( cg'?k agfO{Psf] 5 .

@=k"gjf{; of]hgfsf] k|d'v p2]Zo c:j]+lR5s k'gjf{;sf sf/0faf6 x'g] gsf/fTds c;/nfO{ Go"lgs/0f u/L k|efljt kl/jf/nfO{ Ifltk"lt{ tyf ljleGg tflndsf dfWodaf6 nfeflGjt u/fpg' xf] . EEAP cGt/ut cfof]hgfsf] k"g{jf; gLlt tyf lgb]{lzsf -RF) n] Joj:yf u/] cg';f/ c:j]+lR5s k"g{jf;sf] sf/0faf6 x'g] ;a} k|sf/sf] ;DktLsf] Ifltsf] nflu k|lt:yfkg d"No a/fj/sf] Ifltk"lt{ k|bfg ul/g]5 . c:j]+lR5s k"g{jf;nfO{ ;s];Dd lg?T;flxt u/L o; k"g{jf; of]hgfaf6 k|efljt JolQmutsf] hLjg:t/df ;'wf/ Nofpg] gLlt cg'?k o; k'g{jf; of]hgf tof/ ul/Psf] 5 .

#=k"g{jf; gLlt tyf lgb]{lzsf -RF_ sf l;4fGtnfO{ k"0f{tof kfng u/L cfjZos k/fdz{, e]nf, 5nkmn uf=lj=;= 6f]n a}7s / 3/w'/L ;a]{If0fsf] tYof+ssf] cfwf/df k'g{jf; of]hgf tof/ ul/Psf] xf] . o; k"gjf{; of]hgfsf] k|efjsf/L sfof{Gjogsf] nflu lgb]{lzt gLlt adf]lhd rflxg] cfjZos ljleGg ;ldltx? u7g ul/g]5 . o; k'g{jf; of]hgfdf hf]lvddf /x]sf kl/jf/, dlxnf 3/d'nL /x]sf] kl/jf/, blnt hghflt kl/jf/x?nfO{ ljz]if Wofg k'¥ofOPsf] 5 . lkmN8 ;e]{sf] bf}/fg s'g} klg kl/jf/n] hUuf bfgsf] OR5f gb]vfPsf] x'Fbf hUufwgLx?nfO{ hUuf bfgsf] lgDtL hf]8 ul/Psf] 5}g . To;y{, ;8sdf rflxg] ;Dk'0f{ gofF hldgnfO{ d'cfAhfsf] lglDt cufl8 a8fOPsf] 5 .

$=of] ;8s pk–cfof]hgf klZrdf~rn ljsf; If]q cGtu{t u08sL c~rnsf] ndh'Ë =lhNnfdf kb{5 . o; cfof]hgf ndh'Ë lhNnfsf] a]n3f/Lsf] etf{ uf lj ; af6 z'? eO{ kfrf]s sf] kfrf]s uf lj ; df uO{ cGTo x'G5 . o; ;8s pkcfof]hgf a]n3f/Lsf] etf{ uf lj ; x'b} cRfn]af]6, >LemmHofË, gf}y/ clg kfrf]s x'Fb} hfG5 . ctM lhNnfsf] ;du| ljsf;df o; pkcfof]hgfsf] ljz]if dxTj /x]sf] 5 . a]n3f/L—cRfn]af]6–nfdfju/– z]gf{ahf/–ln6"/]–kfRff]s ;8s v08 cfof]hgfsf] s"n nDafO{ !@=%( ls=dL= /x]sf] 5 clg !) ld6/ ef]uclwsf/ If]q (RoW) tf]lsPsf] 5 .

%=o; pkcfo]fhgf ;a} df};ddf rNg], !) ld rf}8fO ePsf], ;]G6/nfOgaf6 % ld bfofF / afofF, sfnf] kq] ul/g]5 . lsQfgfkL gS;f ;j]{If0f cg';f/ o; pkcfof]hgfn]] hDdf !@=%(

Page- 1

x]S6/ hldg lng]5, h; cGt/ut $=#& x] klxNo} ;8sdf k/]sf] 5 / cGo %=$! x] gofF hldg lng' kg]{5 . o; pk–cfof]hgfn] JolQmut hldg afx]s ;fd"bflos jg pkef]Qmf, ;d"x, /fli6«o jgsf] pkef]Qmf ;d"x / e"–efu ;d]tsf] hUuf clws/0f ug'{ kg]{ b]lvG5 .

^=s'n @^& 3/w'/Ldf dWo] !$* 3/w'/L ;j]{If0fsf] ;do e]6 eP]sf]]n] lt 3/w'/Lx?sf] lj:t[t ;j]{If0fdf ljz]ifu/L k|efljt kl/jf/sf] cfly{s cj:yf, cfo Joo, s[lif hGo pTkfbgaf6 vfgk'Ug] dlxgf, of]hgf k"j{ tyf kZrft k|efljt kl/jf/sf] cfly{s cj:yfdf kg]{ k|efj, hflto jlu{s/0f tyf kx'Frsf] af/]df ljZn]if0f ul/Psf] 5 . ;j]{If0fsf] tYof+s cg';f/ !$* k|efljt 3/w'/L dWo] !! 3/w'/L blnt, ^# 3/w'/L hghftL , !) 3/w'/L g]jf/L tyf afFsL ^$ 3/w'/L a|Xdf0f÷If]qL÷7s'/L÷/x]sf 5g\ . !% 3/w'/Ln] s'n hldgsf] %Ü eGbf a9L hldg u'dfpg] tYof+saf6 b]lvG5 . slif k]zf b]zsf] cu| k]zf ePem} o; cfof]hgfsf cfwsf+z kl/jf/n] s[lif k]zf c+ufn]sf 5g\ tyfkL s[lif pTkfbgaf6 pgLx?nfO{ jif{ el/ vfgk'Ug] cj:yf g/x]sf] kfO{G5 . k|lt 3/w'/Lsf] cf}ift cfDbfgL ?= !@@@$&=(& /x]sf] / To;sf] s]jn @%=#&Ü dfq s[lif If]qsf] of]ubfg /x]sf] 5 . of]hgfsf] sfof{Gjog kZrft k|efljt 3/w'/LnfO{ kg]{ k|efjnfO{ x]bf{ s[lifdf x'g] cfodf cf}ift ?= $)!% sd x'g] tYof+saf6 b]lvG5 . ctM o; pk–cfof]hgfsf] afl;Gbfsf] d'Vo cfDbfgLsf] >f]t u}/ s[lif ePsf]n] ;Dk"0f{ k|efljt kl/jf/sf] u}/ s[lifIf]qsf] cfDbfgLdf s'g} c;/ gkg]{ b]lvG5 .

&=k|fljlws 6f]nLsf] lj:t[t k|fljlws cWoog -Detail Technical Design and Survey_ kZrft lsQf gfkL gS;f -Cadastral Survey_ sf] cfwf/df tof/ ul/Psf] ;Dkltsf] Ifltsf] ljj/0f adf]lhd !@=%( ls=ld= ;8s v08af6 k|efljt 3/w'/Lsf] ;fdflhs tyf cfly{s cj:yfsf] hfgsf/Lsf] nflu 3/w'/L ;j]{If0f tyf k/fdz{ kZrft of] k'gjf{; of]hgf tof/ ul/Psf] xf] .

*=lsQf gfkL gS;f ;j]{If0f cg';f/ o; pk–cfof]hgfn] @^& 3/w'/Lsf] s"n $@% lsQfaf6 !@=%( x]S6/ JolQmut tyf gLlh hUuf clws/0f ug'{ kg]{ b]vfp5 . ;fy} s'n !@=%( x]S6/ dWo] (=&* x]S6/ dfq JolQmut tyf gLlh hUuf clws/0f ug'{ kg]{ x'Fbf k|efljt hldgsf] clwsf+z e"–efu ;/sf/L hldg jf ;d"bflos jg If]qaf6 ;8s /]vfª\g uPsf] b]lvG5 . t;y{ s"n JolQmut hUufsf] Iflt Go"g ePsf] xf] . JolQmut s'n *%# ?v lj?jf -gLlh_, # j6f ;fd"bflos agaf6 @%# j6f ?v lj?jf, @) j6f ;fd"bflos kmnkm'nsf] af]6, $^* kmnkm'nsf] af]6 x6fpg' kg]{ / !$# j6f JolQmut ;+/rgf tyf ( j6f ;fd"bflos ;+/rgf, s'n u/]/ !%@ j6f ;+/rgf x6fpg' kg]{ b]lvG5 . o; x6fpg' kg]{ ;+/rgfx?df -hDdf ^ j6f JolQmut 3/df, $ j6f e'sDkaf6 Iflt ePsf]]_, @ j6f lsrg, # j6f zf}rfno, $ j6f zf}rfno / afof]Uof;, @ j6f afof]Uof;, !! j6f uf]7 , % j6f s'v'/fsf] vf]/ k"g{:yfkgf ug'{kg]{ b]lvG5 . ;;fgf !!) j6f JolQmut ;+/rgfx? klg Iflt eP]sf]n] k"g{:yfkgf ug'{kg]{ b]lvG5 . ;fy} (j6f ;d"bflos ;+/rgfx? klg k"g{:yfkgf ug'{kg]{ b]lvG5 .

Page- 2

(=o; pk–cfof]hgfsf kl/jf/sf] cf}ift s"n hUuf )=() x]S6/ tyf cf}iftdf )=** x]S6/ hldg ;8ssf] sf/0fn] u'dfpg] tYof+sn] b]vfp5 . oxfFsf] kfl/jfl/s cj:yf slif tyf u}/ s[lif k]zfdf ;+Nug /x]sf 5g\ . tfyflk ;8ss]f sf/0f s[lifhGo cfodf Åf; cfpg]5 . k|lt 3/w'/Lsf] cf}ift s[lif cfDbfgL ?=!@@@$&=(& /x]sf] 5 h'g ;8sdf hldg u'dfP jfkt ? !!*@##=)$ df emg]{ b]lvG5 . o;/L ;8ssf sf/0f k|lt kl/jf/ cf}iftdf ?= $)!% aflif{s ?kdf u'd]sf] b]lvPtf klg of] Iflt ;fdfGo ?kdf dfGg ;lsG5 . lsgls oxfFsf kl/jf/x?sf] s[lifaf6 s]xL cfDbfgL ePtf klg pgLx? u}/ s[lif If]qdf klg cfl>t 5g\ . To:t} cf}ift cfkm\gf] pTkfbgaf6 *^ 3/w'/LnfO{ !) b]lv !@ dlxgf vfg k'Ug] b]lvG5 . t/ ;du|df o; pk–cfof]hgfsf] afl;Gbfsf] d'Vo cfDbfgLsf] >f]t u}/ s[lif ePsf]n] ;Dk"0f{ k|efljt kl/jf/sf] lhjg:t/df kg]{ c;/ Ifl0fs dfq x'g]5 . ;fgf k;n, k]g;g, a}b]lzs /f]huf/ tyf Hofnf dhb'/L h:tf u}/ s[lif If]qsf] cfDbfgLdf TofxfFsf kl/jf/x? cfl;|t 5g\ h'g k]zfdf ;8sn] s'g} g/fd|f] c;/ gkg]{ b]lvG5 . k|efljt kl/jf/sf] hLjg:t/ psf:gsf] lglDt o; pkcfof]hgfn] tflnd of]hgf klg o; k'g{af; of]hgfn] ;d]6\5 .

!)=3/w'/L ;j]{If0fn] !% kl/jf/n] s'n hldg :jfldTjsf] % k|ltzt eGbf w]/} hldg ;8sdf kg]{ b]vfp5 eg] dfq ! kl/jf/ ul/aLsf] /]vf d'gL kg]{ b]lvG5 . ;Dk'0f{ kl/jf/sf] yˆ cfjZos hldgsf] d'cfAhfsf] k|s[ofdf nluPsf] 5 . 3/af;df c;/ k'Ug] kl/jf/sf] cGo a:g] 7fpF /x]sf] x'bfF pSt kl/jf/nfO{ k'g{af;sf] w]/} hl6ntf cfpg] 5}g elg ;f]lrPsf] 5 . To;t} cGo ;+/rgfjfnfx?sf] ;f]lx hldgsf] aflsF cz+df 3/ ;fg]{ of]hgf /x]sf] 5 . t;y{ k'g{af;sf] lgDtL o; ;8s v08df s'g} klg gofF hldgsf] cfjZostf b]lvb}g .

!!=o; ;8s v08df hghftL kl/jf/x?nfO{ c;/ kg]{ ePtf klg o; ;8s /]vfdf pgLx?sf] s'g} ;f+:s[lts tyf wflds{ cf:yfsf] hldg kg]{ 5}g . To; cy{df of] ;8sn] Toxf a;f]af; ul//x]sf hghflt ;d'bfonfO{ pgLx?sf klxrfgsf] ljifodf 7f]; c;/ kg]{ b]lvb}g . ;j]{If0f ul/Psf] hghflt kl/jf/sf] cfly{s, z}lIfs / cGo ;fdflhs :t/ cGo ;d'bfosf] t'ngfdf p:t} b]lvPsf] 5 . To;}n] o; ;8sn] Nofpg] ;sf/fTds kl/jt{g tyf cGo ;'ljwfx?df klg hghftL ;d'bfon] cGo ;d'bfo ;/x nfe p7fpg ;Sg] 7flgPsf] 5 . o; ;8sn] o; If]qsf afl;Gbfx?nfO{ ahf/, lzIff, :jf:Yo / ;/sf/L lgsfosf ;]jfx? cem} /fd|f] lnª\s k'¥ofpg]5 .

!@=cg'kl:yt 3/w'/Lsf ;b:ox? of]hgf :yndf kms]{kl5 pgLx?sf] cfly{s cj:yf x]/L Ifltk"lt{ ljt/0f ug]{ of]hgf agfO{Psf] 5 . To:t} u'gf;f] lgbfg ;ldtLx? klxnf], bf];|f], t];|f] / rf}yf] n]en ul/ rf/ r/0fsf] aGg]5 . t/ k|d'v lhNnf clwsf/Lsf] cWoIftfdf ! k6ssf] a}7saf6 hUuf, / ;+/rgfsf] Ifltk"lt /]6 / /sd lg0f{o ul/G5 .

Page- 3

!#= ;Dk'0f{ hldgsf] s'n d'cfAhf /sd ? #%#(^@#=^* /x]sf] 5 . hDdf !%@ j6f k|efljt ;+/rgf dWo] JolQmut !$# JolQmut ;+/rgfsf]] d'cfAhf /sd ? $$$%)#!=(% /x]sf]5 ;fy} @ j6f 3/sf] d]l6l/on 6«;kf]6];g /sd ? !^%))=)) eg] ;a} ( j6f ;fd"bflos ;+/rgfsf] d'cfAhf/sd ? *(**@(=$* /x]sf]5 .

!$=3/w'/L ;j]{If0fsf] s|ddf ;Dk'0f{ kl/jf/n] cfo:t/ a[l¢ tflnddf efu lng] OR5f b]vfPsf 5g\ . To;}n] of]hgf sfJo{gogsf a]nf cfj:ostf klxrfg ul/ hLljsf]kfh{g ;'wf/ lzk ljsf; tflnd g]kfn lzk kl/If0f jf]8{ -NSTB_af6 lgwf{l/t dfkb08 adf]lhd :t/–! a/fj/sf] cfjfl;o tflndsf] of]hgf agfOg] 5 . o;} cfwf/df !^–$% jif{ leqsf ;b:ox?, blnt, hghflt, dlxnf 3/d'nL ePsf ;b:ox?nfO{ u|fxotfdf /flvg]5 . xfn o; tflnd of]hgfnfO{ rflxg] /sd ? @*&$^)=#@ k|:tfj ul/Psf] 5 .

!%=o; k'g{af; of]hgfsf] sfof{Gjogsf nflu sl/a ! s/f]8 $( nfv #$ xhf/ # ;o # ¿k}of @% k};f ?k}of vr{ nfUg]5 h'g cGt/ut ! s/f]8 !& nfv %@ xhf/ # ;o #* ¿k}of $% k};f k|ToIf vr{ d'cfAhfdf ljt/0f x'g]5 . cGo k'g{af; of]hgf vr{ cGt/ut hldgsf] nfut s§f u/fpg nfUg] vr{, tflnd vr{ / @) k|ltzt eljiodf e}kl/ cfpg] vr{sf] nflu 5'§fOPsf]5 .

Page- 4

28 August, 2017

ADB's Comments Incorporation for Involuntary Resettlement Plan of Belghari-Aarchalbot Road Sub-Project, Lamjung

S.N ADB Comment on Resettlement Plan Response Section a) Project description, introduction of Incorporated and avoiding the repetitions. 1: RP, project information and subproject information are mixed with each other. Present related information in one paragraph for one aspect.

b) Number of plots given in text and Tallied and consistency made. table are not matching. The statement given in the paragraphs does not clearly mentioned whether all plots will be affected or part of the plot is affected. The sentence in this regards may be interpreted as impact on all land parcel. Maintain consistency and revise the presentations.

c) Mentioned that 50 plots are lacking Land is barren and none of households official land ownership. But the report have claimed their right over the land does’t eplai how the are treated during household survey. People can claim for impact and compensation. after notice publication and they will be Whether the plots are cultivated by paid if claim is genuine. people or not, whether there is customary claim or land use claim by the affected persons exists or not. Further assessment on land use pattern and status, customary claim is needed. Further elaborate last two sentence written in the paragraph.

d) review all paragraphs in relation to Incorporated. impact assessment for loss of different types of structures. The definition of physical displacement has been interpreted differently. As per SPS 2009- physical displacement is reloatio, loss of residetial lad, or loss of shelter as a result of (i) involuntary acquisition of land, or (ii) involuntary restrictions on land use or on access to legally designated parks ad proteted areas.

e) States that most of the private IPs are categorized (Tamang and Gurung) structures owned by indigenous impact is well defined. IPs loses minor people but the assessment of impact structure and only two structures are fully on them have been presented in affected and only one structure owned by generic way using standard language Newar. for all RPs. Further, assessment of impact on indigenous people is needed.

2 The paragraphs written in section-2: Socioeconomic analysis data regarding socio-economic analysis contains differing agricultural and non-agricultural incomes statements, figures and analysis. The are verified and corrected. Thus, analysis presented in para 10,11 and 13 contradictions are sorted out. have different sets of interpretation on income loss and livelihood strategy of the affected persons. The interpretation presented in paragraphs and figures presented in table are not complementing each other. Carefully review the section and revise interpretation and analysis of the information in line with figures and numbers.

a) Last sentence of para 19 talk about No impact on cultural heritages due to impact on their customary right. But project intervention. the impact assessment section explains that there is no customary Impact on customary rights is omitted. claim of land as all land are titled or recorded in the cadastral map and are individually owned. Further elaborate what type of customary rights exists in the area and how they are not affected.

b) Para 20 explains that most of affected None of the affected HHs found vulnerable families are earth quake affected due to land acquisition. families. Further assessment is needed to those families whether they will be further vulnerable due to land acquisition or not.

3 Para 16 states that the RP will be disclosed Para 16; Comments incorporated. to APs as soon as DLPIU is formed. As we know all required offices and committees have already formed. Revise the text accordingly. The disclosure of draft RP is required prior to approval. Ensure that RP is duly disclosed.

4 Para 26 revised the text in relation to Revised. formation of DLPIU. Follow the resettlement framework provision regarding timing of GRM formation.

5 Para 43: There is long gap between date Yes, there is long gap between date of of census and government notice census and government notice. All the land publication of for land acquisition. Assess transaction which takes place between whether the cutoff date is still valid or not. census survey and government notice If there is transaction of the land in publication is also eligible for between then there could be problem in compensation. This issue will be resolved as paying entitlement. Refer second last per prevailing Act. sentence of the para and revise accordingly, if needed.

6 Para 48 and other para: regarding Allowances and assistances have been allowances and other assistance, the revised as per entitlement matrix. recommendation has been proposed based on ad hoc basis. There are clear provisions in the entitlement policy matrix attached to the RP. Revise all recommendation adopting provisions specified in entitlement matrix.

7 Para 53-56: Explain rationale for Number of trainees has been identified as recommendation of life skill training. It per training criteria and lump sum budget seems that the skill trainings are proposed has been mentioned. by assumptions. If the impact assessment identified that there will be impact on income source or livelihood strategy, the skill development training could be one of mitigation measure and strategy to restore income and livelihood. In that case, the name of affected person, required skill, other stipends need to be finalized in advance and to be included in RP with details of implementation arrangement and budget. If it is only for enhancement measure in addition to mitigation measures explain it very clearly. The eligibility of APs for skill training is not clearly defined and not consistent with skill training provisions in entitlement matrix. Review the presentation on these paras and revise it following scope of income/livelihood restoration and entitlement matrix.

8 Para 58: The recommendation of land Proposed cost is included in the report. compensation is based on LRO rate. It is After finalized by CDC, cost will be updated. not clear whether the recommended rate represent the replacement cost. As per entitlement matrix and SPS requirement all compensation must be paid in replacement cost principle. So, assess the replacement cost for land and recommend in line with policy provisions.

9 Table 13: The total loss by category and Verified and revised. reoeded udget does’t represet the multiple of rate and loss of land. In the section 1 it is mentioned that the loss in new cutting (due to project cause) is less compare to area of land loss in the table. Verify the figures and revise accordingly. Revise recommendation for allowances following provisions in entitlement matrix. The cost and source for management cost for absentee is not clear. Revise it accordingly.

10 Revise the sentences in institutional Revised. arrangement with updated information on formation of different institutions for project implementation. Elaborate the section how the RP will be implemented and develop TOR if any new arrangement other than DISC and CISC is proposed.

11 The attached implementation schedule Complete table is revised and attached. given in table 14 is blank. Revise the table comparing activity of civil works and provisions of loan agreement and covenants.

12 Section 1.2 monitoring and evaluation: Revised. Revise name of different institution proposed for monitoring and supervision following updated institutional arrangement for project implementation.

13 Para 74: NRA cannot be external monitor Unnecessary lines are omitted and as it is executing agency. Revise the corrections are made where necessary. provision and propose new arrangement if external monitoring deemed necessary. The last sentence of the para has proposed for post-resettlement implementation evaluation study. Develop TOR for the activity with cost estimate and procurement process.

14 Appendix III: Review the loss area. In Reviled. number of cases the area of land loss is significantly big. So, further impact assessment is required for those who lose large area of land despite the %loss is less than 10% of total productive assets.

15 There is special provision in entitlement Verified at field level and corrected in RP matrix for the households losing more too. than 10% of their productive assets. But, no entitlements have been recommended for this category despite there is record of >10% loss. Verify the information and revise the entitlements.

16 Appendix IV: Cross verify the Verified. recommendation of valuation of structures as there are omissions, and cross posting of value and allowances.

17 Revise executive summary following Revision is made revisions in the main report.

18 Above are the major comments minor Comments are incorporated step by step. comments are written in hard copies. While revising the documents please go through all sections and paragraphs to avoid omission, repetitions, and unclear sentences.