Report No 2 of 2016

Total Page:16

File Type:pdf, Size:1020Kb

Report No 2 of 2016 Report of the Comptroller and Auditor General of India on Public Sector Undertakings For the year ended 31 March 2015 Government of Jharkhand Report No. 2 of the year 2016 Table of Contents Particulars Reference to Paragraph(s) Page(s) Preface v Overview vii – xii Chapter – I Functioning of State Public Sector Undertakings Introduction 1.1 1 Accountability framework 1.2 – 1.4 1-2 Stake of Government of Jharkhand 1.5 2 Investment in State PSUs 1.6 - 1.7 3-4 Special support and returns during the year 1.8 4-5 Reconciliation with Finance Accounts 1.9 5-6 Arrears in finalisation of accounts 1.10 - 1.11 6-7 Placement of Separate Audit Reports 1.12 7 Impact of non-finalisation of account 1.13 7 Performance of PSUs as per their latest finalised 1.14-1.17 7-9 accounts Accounts Comments 1.18 - 1.19 9-10 Response of the Government to Audit 1.20 10 Follow up action on Audit Reports 1.21 - 1.23 10 –12 Coverage of this Report 1.24 12 Chapter – II Performance Audit of Government Company Working of the Jharkhand Tourism Development 2.1 13 Corporation Limited Executive Summary - 13 – 14 Introduction 2.1.1 15 Organisational Setup 2.1.2 15 Audit Objectives 2.1.3 15-16 Audit Criteria 2.1.4 16 Audit Scope and Methodology 2.1.5 16 Financial Management 2.1.6 16-17 Utilisation of funds 2.1.6.1 17-18 Non recovery of outstanding dues 2.1.6.2 18 Loss due to non collection of service tax from 2.1.6.3 18-19 customers/lessees Loss due to non-availing of flexi deposit facility in 2.1.6.4 19 current account Tourism Policy and Planning 2.1.7 19-20 Self managed hotels and tourist complexes 2.1.8 20 Tourist inflow 2.1.8.1 20 Audit Report on Public Sector Undertakings for the year ended 31 March 2015 Low occupancy of Hotels 2.1.8.2 20-21 Lack of policy for tariff fixation 2.1.8.3 21 Operations through Public Private Partnerships (PPP) 2.1.9 21-23 Leased out assets 2.1.10 24-26 Infrastructural development activities 2.1.11 27-30 Transport services 2.1.12 30-31 Internal control and monitoring mechanism 2.1.13 32 Conclusion and Recommendations 32-33 IT Audit on “Systems for Collection of Baseline 2.2 34 Data and Applications for Energy Accounting in Jharkhand Bijli Vitran Nigam Limited under the R-APDRP” Executive Summary 2.2 34-35 Introduction 2.2.1 35-36 Audit Objectives 2.2.2 36 Audit Criteria 2.2.3 36-37 Organisation Set-up 2.2.4 37 Audit Scope and Methodology 2.2.5 37-38 Financial Performance 2.2.6 38 Planning and implementation of IT infrastructure 2.2.7 38 Non-fulfilment of objectives due to tardy execution of 2.2.7.1 38-39 the project Delayed appointment of IT Implementing Agency 2.2.7.2 39-40 Incomplete Asset Mapping and Consumer Indexing 2.2.7.3 40 Deficiencies in setting-up of Data Centre and Disaster 2.2.7.4 40-41 Recovery Centre Deficiency in preparation of DPRs 2.2.7.5 42 Inadequate manpower 2.2.7.6 42 Insufficient Capacity Building 2.2.7.7 42-43 Observations on Application Software 2.2.8 43-44 Inadequate input and validation controls 2.2.8.1 44 Inadequate controls for Data Security 2.2.8.2 44-45 Un-metered consumers in R-APDRP project area 2.2.8.3 45 DC and DRC established in the same seismic zone 2.2.8.4 46 Conclusion and Recommendations 46-47 Chapter – III Transaction Audit Observations 3 49 Jharkhand Hill Area Lift Irrigation Corporation Limited Loss due to of non-claiming refund of tax deducted at 3.1 49-50 source Jharkhand Urja Utpadan Nigam Limited and Tenughat Vidyut Nigam Limited Irregular expenditure 3.2 50-51 ii Table of Contents Jharkhand Bijli Vitran Nigam Limited Avoidable expenditure 3.3 52-53 Loss of revenue due to non-conversion of consumers’ 3.4 53-54 category Loss of revenue due to incorrect application of 3.5 54-55 multiplying factor Annexures Sl. No. Particulars Reference to Paragraph(s) Page(s) 1.1 Statement showing investments made by State 1.11 57 Government in PSUs whose accounts are in arrears 1.2 Summarised financial position and working 1.14 58-60 results of Government companies and Statutory Corporations as per their latest finalised financial statements/ accounts 2.1.1 Details of self managed hotels/tourist 2.1.1 61 complexes and leased out properties 2.1.2 Statement showing properties handed over to 2.1.1 62 the Company by the Department for operation and maintenance 2.1.3 Organisational Structure of JTDC 2.1.2 63 2.1.4 Statement showing financial position and 2.1.6 64 working results 2.1.5 Details of tourist inflow in the State alongwith 2.1.8 65 details of tourist who availed accommodation facility of the Company during the year 2010-11 to 2014-15 2.1.6 Statement showing properties leased through 2.1.9.1 66-68 PPP mode 2.2.1 Organisational chart for implementation of 2.2.4 69 R-APDRP 2.2.2 List of project towns selected for R-APDRP 2.2.6 70 2.2.3 List of 17 modules of R-APDRP Application 2.2.8 71 software 2.2.4 Some examples of Non-Communicating 2.2.8.1 72 Meters 3.1 Detail of loss of the company due to violation 3.4 73 of the tariff orders 3.2 Statement showing lower billing to the 3.5 74 customers due to difference in MF iii Audit Report on Public Sector Undertakings for the year ended 31 March 2015 iv Preface This Report deals with the results of audit of Government companies of Jharkhand for the year ended 31 March 2015. The accounts of Government Companies (including companies deemed to be Government companies as per the provisions of the Companies Act) are audited by the Comptroller and Auditor General of India (CAG) under the provisions of Section 619 of the Companies Act 1956 and Sections 139 and 143 of the Companies Act, 2013. The Accounts certified by the Statutory Auditors (Chartered Accountants) appointed by the CAG under the Companies Act are subject to supplementary audit by officers of the CAG and the CAG gives his comments or supplements the reports of the Statutory Auditors. In addition, these companies are also subject to test audit by the CAG. Reports in relation to the accounts of a Government Company or Corporation are submitted to the Government by the CAG for laying before State Legislature of Jharkhand under the provisions of Section 19-A of the Comptroller and Auditor General's (Duties, Powers and Conditions of Service) Act, 1971. The instances mentioned in this Report are those, which came to notice in the course of test audit during the year 2014-15 as well as those which came to notice in earlier years, but could not be reported in the previous Audit Reports; matters relating to the period subsequent to 2014-15 have also been included, wherever necessary. The Audit has been conducted in conformity with the Auditing Standards issued by the Comptroller and Auditor General of India. Overview 1. Functioning of State Public Sector Undertakings Audit of Government companies is governed by Section 139 and 143 of the Companies Act, 2013. As on 31 March 2015, the State of Jharkhand had 18 Government Companies (all working). The accounts of Government companies are audited by Statutory Auditors appointed by the Comptroller and Auditor General of India (CAG). These accounts are also subject to supplementary audit conducted by CAG. Audit of Jharkhand State Electricity Board (JSEB), an erstwhile statutory corporation, for which CAG was the sole auditor was governed by the Electricity Act, 2003. JSEB had been re-organised (January 2014) in to four power sector Government companies. However, JSEB had finalised its accounts for the year 2013-14 (upto 05.01.2014) during 2014-15. The working PSUs employed 7023 employees as on 31 March 2015. The PSUs (including JSEB) registered a turnover of ` 3205.87 crore as per their latest finalised accounts as of September 2015. (Paragraphs 1.1 and 1.3) Investment in PSUs As on 31 March 2015, the investment (Capital and Long term loans) in 18 PSUs was ` 1784.33 crore. It decreased by 65.65 per cent from ` 5195.28 crore in 2010-11 due to the reason that assets and liabilities of erstwhile JSEB had not been transferred to its successor companies as per Jharkhand State Electricity Reform Transfer Scheme, 2013 and they formed part of residuary assets and liabilities to be retained by the State Government. Out of total investment in PSUs, 11.32 per cent was towards Capital and 88.68 per cent was towards Long-term loans. Power sector accounted for 94.35 per cent of the total investment in 2014-15. The Government contributed ` 2903.79 crore towards equity, loans and grants/ subsidies during 2014-15. (Paragraphs 1.6, 1.7 and 1.8) Arrears in Accounts Eighteen PSUs had arrears of 57 accounts as of September 2015. The extent of arrears was one to nine years. The PSUs need to set targets for the work relating to preparation of accounts with special focus on clearance of arrears.
Recommended publications
  • Central Administrative Tribunal Principal Bench New Delhi OA No.2242/2012 This the 18Th Day of April, 2017 Hon'ble Mr. Justice
    Central Administrative Tribunal Principal Bench New Delhi OA No.2242/2012 This the 18th day of April, 2017 Hon’ble Mr. Justice Permod Kohli, Chairman Hon’ble Mrs. P. Gopinath, Member (A) Madhu Sudan Bari S/o Narayan Bari, Addl. S.P. Lohardaga, Jharkhand. ... Applicant ( By Advocate: Mr. Abhishek Garg ) Versus 1. Union of India through Secretary, Ministry of Home Affairs, North Block, New Delhi. 2. Union Public Service Commission through its Secretary, Dholpur House, Shahjahan Road, New Delhi. 3. Government of Jharkhand through its Chief Secretary, Secretariat, Ranchi, Jharkhand. 4. Nirmal Kumar Mishra 5. Nagendra Choudhary 6. Amerjit Balihar 7. Awadh Bihari Ram 8. Prashant Kumar Karan 9. Amarnath Mishra 10. Vipul Shukla 11. Niranjan Prasad 12. Madan Mohan Lal 2 OA-2242/2012 13. Manoj Kumar Singh 14. Chandra Shekhar Prasad Respondents 4 to 14 C/o Chief Secretary, Government of Jharkhand, Secretariat, Ranchi, Jharkhand. ... Respondents ( By Advocates: Mr. Rajeev Kumar and Mr. Jayesh Gaurav ) O R D E R Justice Permod Kohli, Chairman : The applicant appeared for State Civil Service examination conducted by the Bihar Public Service Commission in the year 1989. He was treated as a general category candidate and could not find place in the select list. He approached the Hon’ble High Court of Patna by filing a writ petition praying for treating him as ST category candidate. This writ petition was allowed and under the directions of the Hon’ble High Court, the applicant came to be appointed as Dy. SP on 01.06.1992 with retrospective effect. 2. On re-organization of the State of Bihar, a separate State of Jharkhand was created on 15.11.2000.
    [Show full text]
  • Transport Linkage Analysis of Rural Markets in Peripheral Blocks of Ranchi, Jharkhand
    Jharkhand Journal of Development and Management Studies XISS, Ranchi, Vol. 15, No.4, December 2017, pp.7507-7525 TRANSPORT LINKAGE ANALYSIS OF RURAL MARKETS IN PERIPHERAL BLOCKS OF RANCHI, JHARKHAND Shiv Kumar1 Transport linkages are the wealth of a nation. They act as a tool for social inclusion, economic development and environmental sustainability. Transport link communities and their agricultural produce to the main transport system and markets. This results in increased production and productivity, crop diversification and increased profitability. Network has great impact on rural markets. The selling and buying activity has increased to a large extent due to the inner-connecting lanes of the markets. One characteristic feature of the rural markets of Ranchi city and its periphery is that they have developed with close association with network i.e. transportation routes. In a city like Ranchi, two types of transport network predominate - Roadways and Railways. This paper aims to throw light on network of rural markets in the periphery of Ranchi city and assesses how they can be improved. The existing inadequacy of network in the peripheral area has been discussed in this study which is mainly based on the collection of primary data. A total of 52 rural markets were surveyed from 3 peripheral blocks (Kanke -20, Namkum -15 and Ratu -17 rural markets). The study concludes that the existence of rural markets is threatened due to the lack of connectivity as the producers/sellers are not getting adequate benefit from their produce as lot of profit is lost by the middlemen, cost of transport, perishable goods rot during the time taken to reach the market.
    [Show full text]
  • 5. Effects of Landuse and Landcover Dynamics on the Migration And
    Kathwas A. K., Patel N. EFFECTS OF LANDUSE AND LANDCOVER DYNAMICS ON THE MIGRATION AND DEMOGRAPHIC PATTERN OF TRIBAL POPULATION USING GEOSPATIAL TECHNIQUES EFFECTS OF LANDUSE AND LANDCOVER DYNAMICS ON THE MIGRATION AND DEMOGRAPHIC PATTERN OF TRIBAL POPULATION USING GEOSPATIAL TECHNIQUES Management Amar Kumar KATHWAS 9 Department of Remote Sensing, Birla Institute of Technology, Mesra, Ranchi, Jharkhand, India [email protected] 201 Nilanchal PATEL Department of Remote Sensing, Birla Institute of Technology, Mesra, Ranchi, Jharkhand, India August [email protected] / 3 Abstract Demography is considered as the major influencing parameter for landuse and landcover (LULC) change. LULC dynamics is invariably associated with various forms of land and ecological degradation. Identification of drivers and mechanism of LULC dynamics is also crucial for alleviation of land degradation. This paper investigates the Issue Issue spatio-temporal dynamics of LULC and demography and their inter-relationship in the different administrative blocks located within parts of Subarnarekha watershed, Jharkhand state, India, which comprises a large 14 concentration of tribal population. The investigation was conducted in two successive time gradients i.e. 1987- 2000 and 2000-2013 corresponding to the pre- and post-state formation in order to assess the impact of urbanization on the LULC dynamics and demographic characteristics subsequent to the formation of the state. Three indices viz. Net Change Ratio, Annual Rate of Change and Single Index of Dynamic Extent were used to determine the spatio-temporal dynamics of five major LULC categories viz. builtup, builtup with vegetation, Volume Volume cropland, dense vegetation, and sparse vegetation with scrubs, while the demographic parameters used are namely Population Density, House Hold Density and percent Tribal Population.
    [Show full text]
  • RANCHI Birsa Agricultural University Jharkhand AICRIP at Kanke Under Birsa Agricultural University, Ranchi, Jharkhand Was Started in the Year 1981
    RANCHI Birsa Agricultural University Jharkhand AICRIP at Kanke under Birsa Agricultural University, Ranchi, Jharkhand was started in the year 1981. The soil and climate of the state are very much favourable for hybrid rice cultivation and hybrid rice along with SRI has been able to provide good yield of rice in the farmers’ field. This center is associated with the development of Sahbhagidhan with 115-120 days duration and yield potential of 40-50 q ha-1. Major Achievements Crop Improvement Varieties released/ identified: S. Variety Characters No 1 Birsa Dhan-101 Tolerant to blast, BLB, stem borer and drought. Suitable for rainfed upland ecosystem. Matures in 80-85 days, yield potential 8-10 q/acre. 2 Birsa Gora-102 Red rice, resistant to drought but susceptible to Brown spot, Gundhi bug & Stem borer. Matures in 90-95 days, yield potential 7.0 to 7.5 q/acre. 3 Birsa Dhan-103 Tolerant to brown spot, blast, BLB, Stem borer and Gall midge. Suitable for rainfed upland ecosystem. 95-110 days duration, yield potential 12 to 14 q/acre. 218 S. Variety Characters No 4 Birsa Dhan-104 Long and bold seed. Tolerant to blast, BLB, Stem borer, BPH and Gall midge. Suitable for rainfed upland ecosystem. Matures in 85-90 days, 8 to 10 q/acre yield. 5 Birsa Dhan-105 Tolerant to blast, BLB, Stem borer and Gall midge. Suitable for rainfed upland ecosystem. Matures in 85-90 days, yield potential 10 to 12 q/acre. 6 Birsa Dhan-106 Tolerant to blast, BLB and Stem borer. Matures in 90-95 days, yield potential 10 to 12 q/acre.
    [Show full text]
  • Sabotaged Schooling
    Sabotaged Schooling Naxalite Attacks and Police Occupation of Schools in India’s Bihar and Jharkhand States Copyright © 2009 Human Rights Watch All rights reserved. Printed in the United States of America ISBN: 1-56432-566-0 Cover design by Rafael Jimenez Human Rights Watch 350 Fifth Avenue, 34th floor New York, NY 10118-3299 USA Tel: +1 212 290 4700, Fax: +1 212 736 1300 [email protected] Poststraße 4-5 10178 Berlin, Germany Tel: +49 30 2593 06-10, Fax: +49 30 2593 0629 [email protected] Avenue des Gaulois, 7 1040 Brussels, Belgium Tel: + 32 (2) 732 2009, Fax: + 32 (2) 732 0471 [email protected] 64-66 Rue de Lausanne 1202 Geneva, Switzerland Tel: +41 22 738 0481, Fax: +41 22 738 1791 [email protected] 2-12 Pentonville Road, 2nd Floor London N1 9HF, UK Tel: +44 20 7713 1995, Fax: +44 20 7713 1800 [email protected] 27 Rue de Lisbonne 75008 Paris, France Tel: +33 (1)43 59 55 35, Fax: +33 (1) 43 59 55 22 [email protected] 1630 Connecticut Avenue, N.W., Suite 500 Washington, DC 20009 USA Tel: +1 202 612 4321, Fax: +1 202 612 4333 [email protected] Web Site Address: http://www.hrw.org December 2009 1-56432-566-0 Sabotaged Schooling Naxalite Attacks and Police Occupation of Schools in India’s Bihar and Jharkhand States I. Summary ......................................................................................................................... 1 Attacks on schools by Naxalites ..................................................................................... 2 Occupation of schools by security forces ........................................................................ 3 Barriers caused to education .......................................................................................... 6 The broader context ........................................................................................................ 8 II. Recommendations ........................................................................................................ 10 To the Communist Party of India (Maoist) .....................................................................
    [Show full text]
  • Railways Track Electrification Project: Ranchi-Lohardaga-Tori Subproject
    Draft Resettlement Plan Document stage: Draft for consultation Project Number: 51228-001 February 2018 IND: Railways Track Electrification Project Ranchi - Lohardaga - Tori Subproject Prepared by Central Organisation for Railway Electrification (CORE), Ministry of Railways, Government of India for the Asian Development Bank This resettlement plan is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature. ABBREVIATIONS ADB – Asian Development Bank CD – Community Development Block CPD – Chief Project Director CORE – Central Organisation for Railway Electrification DC – District Collector DCEE – Deputy Chief Engineer Electrical DH – Displaced Household DMS – Detailed Measurement Surveys DP – Displaced Person EA – Executing Agency GOI – Government of India GoJ – Government of Jharkhand GRC – Grievance Redressal Committee IAY – Indira Awaas Yojana INR – Indian Rupee IRFC – Indian Railways Finance Corporation JUSNL – Jharkhand Urja Sancharan Nigam Limited LA – Land Acquisition NGO – Non Government Organization NH – National Highway RFCTLARR – The Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 R&R – Rehabilitation and Resettlement RF – Resettlement Framework RO – Resettlement Officer RP – Resettlement Plan RSIP – Railway Sector Investment Program SC – Scheduled Caste SP – Sectioning and Paralleling Post SPS – Safeguard Policy Statement SSE – Senior Section Engineer SSP
    [Show full text]
  • S.No Shri Madhup K. Tiwari, IPS Inspector General of Police Police
    List of Nodal Officers as on Feb, 2020 Name of S.No Details State/UTs Name Shri Madhup K. Tiwari, IPS Designation Inspector General of Police 1 A&N Islands Office Address Police Head Quarter, Atlanta Point, S/Andaman-744104 Email ID [email protected] Name Sri G.Palaraju Designation DIG, Technical Services Andhra 2 Address: AP police Tech towers, Pradesh Office Address Mangalagiri, Andhra Pradesh 522502 Email ID [email protected] Name Chandan Chowdhary, IPS Arunachal Designation AIGP(Planning), PHQ Itanagar, AP 3 Pradesh Office Address Police HQ, Itanagar Email ID [email protected] / [email protected] Name Dr. L. R. Bishnoi, IPS Designation Addl. D.G. P CID 4 Assam Office Address O/O Addl. Director General of Police, CID, Assam, Ulubari Email ID [email protected] Name Dr. Kamal Kishore Singh Designation Inspector General of Police (SCRB) 5 Bihar C-508, Sardar Patel Bhawan Office Address Jawahar Lal Nehru Marg, Patna-800023 Name Ms. Nilambari Jagadale, IPS Designation SSP, UT Chandigarh 6 Chandigarh Additional Deluxe Building, Chandigarh Police Headquarters, Sector 9D Office Address Chandigarh -160009 Email ID [email protected], [email protected] Name Shri Rajinder Kumar Vij, IPS Designation Nodal Officer CCTNS Block-1, PHQ, Sector 19 7 Chhattisgarh Office Address Nava Raipur, Atal Nagar - 492002 Chhattisgarh Email ID [email protected] Name Dr. Rishi Pal, IPS 8 DD & DNH Designation Deputy Inspector General of Police Office Address O/o DIGP, Police Head Quarter, near Zanda Chowk, Silvassa, DNH Name Dr.Ajit Kumar Singla Designation Addl.CP/Crime (N) 3rd Floor, 9 Delhi Office Address PS Kamla Market, Delhi Email ID [email protected] Name Shri Pankaj Kumar Singh, IPS Designation SP Crime Superintendent of Police Crime office, Institude of Management, Ribandar - Office Address 10 Goa Goa Email ID [email protected] Contact person Shri Terence Vaz, PSI Name Name Dr.
    [Show full text]
  • (Civil) Under Article 32 of the Constitution of India Public Interest Litigation Writ Petition (C) No
    WWW.LIVELAW.IN IN THE SUPREME COURT OF INDIA CIVIL ORIGINAL JURISDICTION WRIT PETITION (CIVIL) UNDER ARTICLE 32 OF THE CONSTITUTION OF INDIA PUBLIC INTEREST LITIGATION WRIT PETITION (C) NO. OF 2020 IN THE MATTER OF : Prahlad Narayan Singh ….Petitioner VERSUS 1. Union of India Through Ministry of Home Affairs, North Block, Central Secretariat, New Delhi – 110001 2. State of Jharkhand through Chief Secretary, 1st Floor, Project Building, Dhurwa, Ranchi – 834004 (Jharkhand) 3. Shri M. Vishnu Vardhan Rao DG, Home Guards and Fire Services, Additional Charge, DGP, Jharkhand Office at DGP Office Jharkhand, Jharkhand Police Headquarters, Dhurwa, Ranchi – 834004 (Jharkhand) 4. Union Public Service Commission, Dholpur House, Shahjahan Road, New Delhi – 110069 ….Respondents WWW.LIVELAW.IN CIVIL WRIT PETITION UNDER ARTICLE 32 OF THE CONSTITUTION OF INDIA FOR WRIT OF DECLARATION OR ANY OTHER WRIT OR ORDER TO PROTECT HIS FUNDAMENTAL RIGHT GUARANTEED BY ARTICLE 14 AND 16 IN THE MATTER OF APPOINTMENT OF DIRECTOR GENERAL OF POLICE BEFORE THE EXPIRY OF TWO YEARS PERIOD AS MANDATED BY LAW LAID DOWN IN PRAKASH SINGH VERSUS UNION OF INDIA (2006) 8 SCC 1 And Other Consequential Directions TO, THE HON’BLE CHIEF JUSTICE OF INDIA AND HIS COMPANION JUSTICES OF THE HON’BLE SUPREME COURT OF INDIA. THE HUMBLE PETITION OF THE ABOVENAMED PETITIONERS MOST RESPECTFULLY SHOWETH:- 1. That the present civil writ petition under article 32 of the Constitution of India for writ of declaration or any other writ or order to protect his fundamental right guaranteed by article 14 and 16 in the matter of appointment of director general of police before the expiry of two years period as mandated by law laid down in Prakash Singh versus Union of India (2006) 8 SCC 1 and other consequential directions.
    [Show full text]
  • Ranchi District, Jharkhand State Godda BIHAR Pakur
    भूजल सूचना पुस्तिका रा車ची स्जला, झारख車ड Ground Water Information Booklet Sahibganj Ranchi District, Jharkhand State Godda BIHAR Pakur Koderma U.P. Deoghar Giridih Dumka Chatra Garhwa Palamau Hazaribagh Jamtara Dhanbad Latehar Bokaro Ramgarh CHHATTISGARH Lohardaga Ranchi WEST BENGAL Gumla Khunti Saraikela Kharsawan SIMDEGA East Singhbhum West Singhbhum ORISSA के न्द्रीय भूमिजल बोड ड Central Ground water Board जल स車साधन ि車त्रालय Ministry of Water Resources (Govt. of India) (भारि सरकार) State Unit Office,Ranchi रा煍य एकक कायाडलय, रा更ची Mid-Eastern Region िध्य-पूर्वी क्षेत्र Patna पटना मसि車बर 2013 September 2013 भूजल सूचना पुस्तिका रा車ची स्जला, झारख車ड Ground Water Information Booklet Ranchi District, Jharkhand State Prepared By हﴂ टी बी एन स (वैज्ञाननक ) T. B. N. Singh (Scientist C) रा煍य एकक कायाडलय, रा更ची िध्य-पूर्वी क्षेत्र,पटना State Unit Office, Ranchi Mid Eastern Region, Patna Contents Serial no. Contents 1.0 Introduction 1.1 Administration 1.2 Drainage 1.3 Land use, Irrigation and Cropping pattern 1.4 Studies, activities carried out by C.G.W.B. 2.0 Climate 2.1 Rainfall 2.2 Temperature 3.0 Geomorphology 3.1 Physiography 3.2 Soils 4.0 Ground water scenario 4.1 Hydrogeology Aquifer systems Exploratory Drilling Well design Water levels (Pre-monsoon, post-monsoon) 4.2 Ground water Resources 4.3 Ground water quality 4.4 Status of ground water development 5.0 Ground water management strategy 6.0 Ground water related issues and problems 7.0 Awareness and training activity 8.0 Area notified by CGWA/SCGWA 9.0 Recommendations List of Tables Table 1 Water level of HNS wells in Ranchi district (2012) Table 2 Results of chemical analysis of water quality parameters (HNS) in Ranchi district Table 3 Block-wise Ground water Resources of Ranchi district (2009) List of Figures Fig.
    [Show full text]
  • Profile of Dr Kaushal Kumar 22-1-14.Pdf
    PROFILE Name: DR. KAUSHAL KUMAR Address: Subject Matter Specialist (Forestry) Department of Forest Products & Utilization Faculty of Forestry Birsa Agricultural University, Kanke Ranchi- 834006, Jharkhand Telephone: 07765999397/ 09470173376 E-mail: [email protected] Qualification: Ph.D.( in the area of Ethnobotany) Area(s) of Specialization: Ethnobotany/Medicinal Plants/Forest Products & Utilization Occupation/Designation: Subject Matter Specialist (Forestry) (Equivalent to Associate Professor) Department of Forest Products & Utilization Faculty of Forestry Birsa Agricultural University, Kanke Ranchi- 834006, Jharkhand Major Activities: i. More than 18 years of research experience including teaching. ii. Doctoral work (1997) in Advanced interdisciplinary research work from Faculty of Ayurveda, Institute of Medical Sciences, Banaras Hindu University(BHU), Varanasi in the area of Ethnobotany entitled, “Pharmacognostical studies on some Ethno-medicinal Plants of Santhal Pargana (Bihar)” iii. Research Associate (1997-2000), Scientist ‘B’ & ‘C’ (2000-2006) at Ethnobotany Section, National Botanical Research Institute (CSIR), Lucknow; Senior Scientist & Head (2007-2009) - Patanjali Herbal Garden & Agro Research Department, off. Patanjali Yogpeeth, Haridwar, and Subject Matter Specialist (Forestry) w.e,f. 2009 to continue at Department of Forest Products & Utilization, Faculty of Forestry , Birsa Agricultural University, Kanke, Ranchi- 834006, Jharkhand. iv. Carried out 08 projects including Ministry of Environment & Forests,
    [Show full text]
  • List of Our Branches
    LIST OF OUR BRANCHES SR REGION BRANCH CODE BRANCH NAME DISTRICT ADDRESS PIN CODE E-MAIL CONTACT NO 1 Ranchi 419 DORMA KHUNTI VILL+PO-DORMA,VIA-KHUNTI,DISTT-KHUNTI-835 227 835227 [email protected] 0 2 Ranchi 420 JAMHAR KHUNTI VILL-JAMHAR,PO-GOBINDPUR RD,VIA-KARRA DISTT-KHUNTI. 835209 [email protected] 0 3 Ranchi 421 KHUNTI (R) KHUNTI MAIN ROAD,KHUNTI,DISTT-KHUNTI-835 210 835210 [email protected] 0 4 Ranchi 422 MARANGHADA KHUNTI VILL+PO-MARANGHADA,VIA-KHUNTI,DISTT-KHUNTI 835210 [email protected] 0 5 Ranchi 423 MURHU KHUNTI VILL+PO-MURHU,VIA-KHUNTI, DISTT-KHUNTI 835216 [email protected] 0 6 Ranchi 424 SAIKO KHUNTI VILL+PO-SAIKO,VIA-KHUNTI,DISTT-KHUNTI 835210 [email protected] 0 7 Ranchi 425 SINDRI KHUNTI VILL-SINDRI,PO-KOCHASINDRI,VIA-TAMAR,DISTT-KHUNTI 835225 [email protected] 0 8 Ranchi 426 TAPKARA KHUNTI VILL+PO-TAPKARA,VIA-KHUNTI, DISTT-KHUNTI 835227 [email protected] 0 9 Ranchi 427 TORPA KHUNTI VILL+PO-TORPA,VIA-KHUNTI, DISTT-KHUNTI-835 227 835227 [email protected] 0 10 Ranchi 444 BALALONG RANCHI VILL+PO-DAHUTOLI PO-BALALONG,VIA-DHURWA RANCHI 834004 [email protected] 0 11 Ranchi 445 BARIATU RANCHI HOUSING COLONY, BARIATU, RANCHI P.O. - R.M.C.H., 834009 [email protected] 0 12 Ranchi 446 BERO RANCHI VILL+PO-BERO, RANCHI-825 202 825202 [email protected] 0 13 Ranchi 447 BIRSA CHOWK RANCHI HAWAI NAGAR, ROAD NO. - 1, KHUNTI ROAD, BIRSA CHOWK, RANCHI - 3 834003 [email protected] 0 14 Ranchi 448 BOREYA RANCHI BOREYA, KANKE, RANCHI 834006 [email protected] 0 15 Ranchi 449 BRAMBEY RANCHI VILL+PO-BRAMBEY(MANDER),RANCHI-835205 835205 [email protected] 0 16 Ranchi 450 BUNDU
    [Show full text]
  • LIST of VALID Rqps AS on 20/08/2015 RANCHI REGIONAL OFFICE
    LIST OF VALID RQPs AS ON 20/08/2015 RANCHI REGIONAL OFFICE NO. NAME AND ADDRESS OF RQP VALID UP TO QUALIFICATION 1 SIDDHARTHA RAKSHIT 11/09/2017 B.E. (MINING) JINDAL STEEL & POWER LTD. (JSPL) 241/B, ASHOK PATH, ROAD NO. 2 RANCHI-834002 RANCHI JHARKHAND 834002 2 MANOJ KUMAR MODI 11/09/2017 B.E. (MINING), M.TECH MINES DIVISION, M/S HINDALCO (MINING) INDUSTRIES LTD., COURT ROAD, LOHARDAGA- 835 302 LOHARDAGA JHARKHAND 835302 3 BRAJESH KUMAR 13/09/2017 B. TECH (MINING ENGG.) QUARTER NO. N-130, SHYAMALI COLONY, DORANDA, RANCHI - 834002 RANCHI JHARKHAND 834002 4 TARAPADA MOHAPATRA 22/08/2017 B.TECH (HONS.) C/O CHIEF RESIDENT EXECUTIVE, TATA STEEL LTD., 391, B ROAD, 4C, ASHOKNAGAR, RANCHI - 834 002 RANCHI JHARKHAND 834002 5 SURENDRA SAI 12/09/2017 M. Sc. (GEOLOGY) VILL.- NADINAGRA, P.O. - NAGRA, DISTT.- LOHARDAGA (JHK) LOHARDAGA JHARKHAND 835302 6 NAWAL KISHORE SINGH 11/09/2017 B. Sc. (HONS.) MINING NEAR 2ND ARMY GATE, OPP. P.P. NARAYAN INDUSTRIES, DIPATOLI, RANCHI - 834009 RANCHI JHARKHAND 834009 7 BRAJ KISHORE JHA 08/01/2017 M.Sc. (Geology) D-16, HINDALCO COMPLEX, COURT ROAD, LOHARDAGA (JHK)- 835302 LOHARDAGA JHARKHAND 835302 8 RAJ NARAYAN PANDAY 14/03/2017 B.Sc. (Hons.), Mining C/o Sh. Dhananjay Kr. Panday Engineering Quarter No.- 783 CD, At/PO- Bhawnathpur Township (Garhwa GARWAH JHARKHAND 822129 Page 1 LIST OF VALID RQPs AS ON 20/08/2015 RANCHI REGIONAL OFFICE NO. NAME AND ADDRESS OF RQP VALID UP TO QUALIFICATION 9 08/01/2017 M/S HINDALCO INDUSTRIES LTD., COURT ROAD, PO & DISTT.
    [Show full text]