POLAND I. Information on the major projects adopted on 2 April 2019

Total Project Project Title Sector EU funding (EUR) cost (EUR) Deepening of the approach fairway and internal areas of the Port of 1 Gdynia - stages I and III and reconstruction of quays in the Port of Ports 132,497,592 64,947,424 Gdynia - stages II and III 2 Construction of S7 express road, section Warszawa – Grójec Roads 346,969,401 129,049,874 3 Construction of section –Lubawka Roads 972,775,961 105,046,235 Construction of A2 motorway, section Warszawa (junction Lubelska) - 4 Roads 197,519,422 78,406,900 Mińsk Mazowiecki 5 Construction of the Olsztyn bypass in route of road DK16 Roads 115,375,255 87,204,519 6 Modernisation of breakwaters in the North Harbour in Gdansk Ports 182,746,018 155,204,033 Construction of the Wielkopolska Children's Health Center (pediatric 7 Health 101,206,915 56,219,639 hospital) with its equipment) 8 Equipment for University Hospital Krakow - Prokocim Health 294,056,114 60,733,659 Construction of the Metropolitan Railway with the use of 9 Rail 182,471,778 126,098,383 existing sections of railway lines No. 406, 273, 351 Accelerate comfortably - modernisation of wagons and purchase of 10 Rail 219,647,842 57,903,214 locomotives for PKP Intercity S.A. 11 The purchase of 16 pieces of new five-part Electric Traction Units Rail 95,330,862 38,738,044 Total 2,840,597,159 959,551,923 Project descriptions 1. Deepening of the approach fairway and internal areas of the Port of Gdynia The project concerns the construction/modernisation of quays and hydro-technical engineering structures to allow ships of up to 15 m draught to enter the Port of Gdynia, thus decreasing transport costs, increasing traffic safety, and decreasing negative impact on the environment due to bigger ships and reduction of emission per amount of transported goods. 2. Construction of S7 express road, section Warszawa - Grójec 29.16 km of a new expressway will be built, of which 23.64 km as dual carriageway (2x2) and 5.52 km in 2x3 profile. The new section will link with S2/S79 Warsaw airport junction at the north and with existing S7 bypass of Grójec at the south. 3. Construction of S3 express road, section Legnica - Lubawka A dual carriageway with two lanes and four new road junctions: Jawor Północ, Jawor Wschód, Jawor Południe and Bolków. 25 bridges and overpasses over the express road. 4. Construction of A2 motorway, section Warszawa (Lubelska junction) - Mińsk Mazowiecki 14.8 km of a new motorway that will link Warsaw Southern by-pass from Lubelska junction with the existing stretch of A2 motorway near Mińsk Mazowiecki. The project also involves construction of one new road interchange “Konik” with existing national road DK2. 5. Construction of Olsztyn by-pass along national road No 16 A 10 km section of the Olsztyn by-pass along the national road no 16 will be constructed. It will bypass the city of Olsztyn from the south-west and will connect the Olsztyn Zachód node with the Olsztyn Południe node. 6. Modernisation of breakwaters in the North Harbour in Gdansk The primary objective of the project is to increase safety and security of operations within the Port of Gdańsk and to develop further maritime transport and the competitiveness of the Port. The project will result in the construction and modernisation of the four breakwaters with a total length of 3 957 m, as well as the construction of two internal waterways (approach channels) and turning basin, for safe navigation of vessels in the North Port of the Port of Gdańsk. 7. Construction of the Wielkopolska Children's Health Centre with its equipment A new complex of the Regional Centre of Children Health in Poznan will be constructed along with the acquisition and installation of equipment. The new hospital building and its health services are expected to increase the quality of healthcare in the Region of Wielkopolska affecting over 720,000 people by 2023. 8. Equipment for University Hospital Krakow – Prokocim The investment comprises the purchase of 8,580 units of equipment and medical equipment (including assembly, commissioning, training and other services) benefitting over 3.3 million inhabitants by 2021. 9. Construction of the Szczecin Metropolitan Railway The project concerns the construction of the fast city rail system called Szczecin Metropolitan Railway, which will connect main municipalities of the West Pomerania region using the existing layout of railway tracks and stations benefitting around half million inhabitants by 2022. The project include modernisation of 23.7 km of line 406 and construction/modernisation of rail stations: 10 new passenger stops and 30 stations modernised. 10. Accelerate comfortably -modernisation of wagons and purchase of locomotives for PKP Intercity With the project 152 passenger carriages will be modernised and 20 new electric locomotives will be purchased to offer modern, reliable and comfortable journeys to commuters 11. Purchase of 16 five-parts Electric-Multiple Units by Mazovian Railway The project consists of the purchase of 16 Electric Multiple Units (EMUs) for a total of 3450 passengers to be operated by the Mazovian Railway in the Warsaw agglomeration area, mainly on the railway sections Zielonka – Tłuszcz, Warszawa Rembertów – Zielonka and Warszawa Wileńska – Zielonka. II. Information on all major projects approved in in 2014-2020 programming period Major Projects by Total project cost by sector EU funding by sector sector (EUR) (EUR) Roads 45 14,375,490,238 6,741,854,852 Rails 20 4,046,140,808 2,498,340,844 Ports 3 653,115,053 507,342,184 Urban 14 3,107,974,455 1,655,917,427 ENV 7 1,318,108,462 616,035,764 Energy 6 980,849,506 452,979,342 ICT 1 38,510,460 29,687,462 Health 3 518,583,220 169,681,241 TOTAL 99 25,038,772,202 12,671,839,116