PacifiCorp Generation Interconnection Queue As of: 9/28/2012 In-Service Date Location of (Commercial Interconnect Request Information Max MW Output Generating Facility Location of Interconnection Operations) Reports Projected Actual Request Request Service Application Commercial Commercial Feasibility System Impact Schedule Q# Company Name S W County ST Region Point of Interconnection Type Facility Study Request Status Explanation Date Status Type Rules Operations Operations Study Study Deviation Date Date 1 9/1/2000 In Service FPL Energy Vansycle, LLC N/A LGI 210 210 Walla Walla WA PACW Wallula Substation 6/1/2001 ? Wind N/A Available N/A I/A signed April 28, 2005 2 1/19/2001 In Service S. F. Phosphates Limited Company N/A QFSGI 11 11 Sweetwater WY PACE SF Phosphates Substation 2/1/2002 ? Natural Gas N/A Available N/A I/A signed June 1, 2001 3 1/23/2001 In Service PacifiCorp Power Marketing, Inc. N/A LGI 200 200 Salt Lake UT PACE West Valley Substation, 138 kV 9/1/2001 ? Natural Gas N/A Available N/A I/A signed October 17, 2001 4 1/31/2001 In Service TDY Industries Inc, (Wah Chang) N/A DGI 14 14 Linn OR PACW Near Murder Creek Substation, 12 kV circuit 6/1/2001 ? Natural Gas N/A Available N/A I/A signed June 4, 2001 5 2/16/2001 In Service Roseburg Forest Products Inc. N/A SGI 20 20 Douglas OR PACW Roseburg Lumber Substation ? Biomass N/A Available N/A I/A signed December 21, 2001 6 2/20/2001 In Service PPM Energy, Inc. N/A LGI 100 100 Klamath OR PACW Meridian-Captain Jack Line 9/1/2003 ? Natural Gas N/A Available N/A I/A signed May 23, 2002 7 3/7/2001 In Service Rock River I, LLC N/A LGI 50 50 Carbon WY PACE Foote Creek Substation, 34.5 kV circuit 8/1/2001 ? Wind N/A Available N/A I/A signed November 30, 2004 8 3/8/2001 In Service Exxon Mobil Production Company N/A LGI 110 110 Lincoln WY PACE Monument Switching Station 4/1/2003 10/1/2004 Natural Gas N/A Available N/A I/A signed May 28, 2004 9 4/1/2001 In Service Exxon Mobil Production Company N/A QFLGI 80 80 Tooele UT PACE Rowley Substation 6/15/2001 6/25/2001 Natural Gas N/A Available N/A I/A signed July 9, 2001 10 4/25/2001 Deactivated Iberdrola Renewables, Inc. N/A LGI 500 500 Klamath OR PACW Meridian-Captain Jack Line 12/1/2005 11/15/2014 Natural Gas N/A Available N/A WITHDRAWN BY CUSTOMER 11 7/20/2001 In Service PacifiCorp Commercial & Trading N/A LGI 120 120 Salt Lake UT PACE Gadsby Substation 9/1/2002 ? Natural Gas N/A Available N/A No I/A necessary 12 8/27/2001 In Service FPL Energy Wyoming, LLC N/A LGI 146 146 Uinta WY PACE Longhollow Switching Station 12/26/2003 ? Wind N/A Available N/A I/A February 16, 2005 13 9/21/2001 In Service PacifiCorp Commercial & Trading N/A LGI 140.4 140.4 Columbia WA PACW Walla Walla - N. Lewiston Line 12/15/2004 11/1/2007 Wind N/A Available Available I/A signed September 18, 2007 14 9/21/2001 In Service PacifiCorp Commercial & Trading N/A LGI 70.2 70.2 Columbia WA PACW Walla Walla - N. Lewiston Line 12/15/2005 11/1/2007 Wind N/A Available Available I/A signed September 18, 2007 I/A signed December 13, 2004 15 10/11/2001 Deactivated Spring Canyon Energy, LLC N/A LGI 550 550 Juab UT PACE Mona Substation 6/1/2005 5/1/2007 Natural Gas N/A Available Available REMOVED-LACK OF PROGRESS 16 11/8/2001 In Service Vansycle III, LLC ER LGI 98.9 98.9 Walla Walla WA PACW Wallula Substation 8/1/2003 12/21/2009 Wind N/A Available Available More Info I/A signed April 28, 2005 17 8/14/2002 In Service Eurus Combine Hills I, LLC N/A LGI 41 41 Umatilla OR PACW Walla Walla Central - Pendleton Line 12/22/2003 ? Wind N/A Available N/A I/A signed June 14, 2004 18 10/21/2002 In Service Tesoro Refining & Marketing Company N/A QFLGI 25 25 Salt Lake UT PACE Northwest Substation, 46 kV Circuit 1/1/2004 10/6/2004 Natural Gas N/A N/A N/A I/A signed July 23, 2004 19 4/1/2003 Deactivated N/A N/A LGI 800 800 Elmore ID PACE Midpoint - Burns Line 6/1/2009 Coal N/A Available N/A REMOVED-LACK OF PROGRESS 20 4/30/2003 In Service PacifiCorp Commercial & Trading N/A LGI 280 280 Juab UT PACE Mona Substation 6/1/2005 3/22/2006 Natural Gas N/A Available Available I/A signed April 26, 2004 21 4/30/2003 In Service PacifiCorp Commercial & Trading N/A LGI 245 245 Juab UT PACE Mona Substation 3/1/2006 3/22/2006 Natural Gas N/A Available Available I/A signed April 26, 2004 22 4/30/2003 Deactivated PacifiCorp Commercial & Trading N/A LGI 525 525 Juab UT PACE Mona Substation 1/1/2007 6/1/2008 Natural Gas N/A Available Available WITHDRAWN BY CUSTOMER 23 6/23/2003 Deactivated N/A N/A LGI 100 100 Lane OR PACW Diamond Hill - Alvey Line 4/1/2006 Natural Gas N/A Available N/A WITHDRAWN BY CUSTOMER 24 6/23/2003 Deactivated N/A N/A LGI 300 300 Lane OR PACW Diamond Hill - Alvey Line 2/1/2007 Natural Gas N/A Available N/A WITHDRAWN BY CUSTOMER 25 8/5/2003 Deactivated N/A N/A LGI 50 50 Elmore ID PACE Midpoint - Burns Line 6/1/2009 Coal N/A Available N/A REMOVED-LACK OF PROGRESS 26 9/12/2003 Deactivated N/A N/A LGI 300 300 Lincoln WY PACE Naughton - Birch Creek 7/1/2006 Wind N/A Available N/A WITHDRAWN BY CUSTOMER 27 9/15/2003 Deactivated N/A N/A LGI 200 200 Uinta WY PACE Long Hollow Switching Station 12/1/2004 9/1/2005 Wind N/A Available N/A REMOVED-LACK OF PROGRESS 28 9/15/2003 Deactivated N/A N/A LGI 820 890 Utah UT PACE Emery - Camp Williams Line 4/1/2006 Natural Gas N/A Available N/A More Info REMOVED-LACK OF PROGRESS 29-A 9/18/2003 In Service Wolverine Creek Goshen Interconnection, LLC N/A LGI 64.5 64.5 Bonneville ID PACE Goshen Substation (Idaho) 1/1/2005 2/12/2006 Wind N/A Available Available I/A signed October 11, 2006 I/A signed October 11, 2006 29-B 9/18/2003 In Service Wolverine Creek Goshen Interconnection, LLC N/A LGI 124.5 124.5 Bonneville ID PACE Goshen Substation (Idaho) 1/1/2005 10/20/2010 Wind N/A Available Available Revised I/A w/ Q0243 signed Dec. 30, 2009 30 10/27/2003 Deactivated N/A N/A LGI 101 101 Uinta WY PACE Long Hollow Switching Station 12/31/2004 Wind N/A N/A N/A WITHDRAWN BY CUSTOMER 31 11/13/2003 Deactivated N/A N/A DGI 85 85 Gilliam OR PACW Dalreed Substation, 34.5 kV circuit 4/1/2005 Wind N/A Available Available REMOVED-LACK OF PROGRESS 32 12/9/2003 Deactivated N/A ER LGI 200 200 Carbon WY PACE Miners - Dificulty Line 10/15/2005 Wind Available N/A N/A More Info REMOVED-LACK OF PROGRESS 33 12/9/2003 Deactivated N/A ER LGI 100 100 Carbon WY PACE Miners - Dificulty Line 10/15/2007 Wind Available N/A N/A More Info REMOVED-LACK OF PROGRESS 34 12/16/2003 Deactivated N/A N/A LGI 200 200 Beaver UT PACE Cameron Substation Wind N/A N/A N/A REMOVED-LACK OF PROGRESS 35 12/22/2003 Deactivated N/A N/A LGI 100 100 Washington UT PACE Coleman - Gateway Line 12/1/2005 Wind N/A N/A N/A REMOVED-LACK OF PROGRESS 36 12/22/2003 Deactivated N/A N/A LGI 104 104 Iron UT PACE Sigurd - Parowan Line OR Cameron - West Cedar Line 12/1/2005 Wind N/A Available N/A REMOVED-LACK OF PROGRESS 37 1/28/2004 Deactivated N/A ER LGI 310 285 Utah UT PACE Emery - Camp Williams Line 4/1/2006 Natural Gas N/A N/A N/A More Info REMOVED-LACK OF PROGRESS 38 2/20/2004 Deactivated N/A NR LGI 150 150 Power ID PACE Lauray - Treasureton Line 8/1/2005 11/1/2006 Wind Available Available N/A WITHDRAWN BY CUSTOMER 39 3/9/2004 In Service Southern California Public Power Authority N/A SGI 13.6 13.6 Benton WA PACW Tieton Substation 3/1/2005 9/6/2006 Hydro N/A Available Available I/A signed April 1, 2006 40 3/10/2004 Deactivated N/A ER LGI 250 285 Campbell WY PACE North of Antelope Mine Substation 11/30/2007 TBD Coal Available Available Available More Info WITHDRAWN BY CUSTOMER 41 3/16/2004 Deactivated N/A NR with ER LGI 100 100 Walla Walla WA PACW Wallula Substation 11/30/2005 Wind N/A Available N/A WITHDRAWN BY CUSTOMER 42 4/28/2004 In Service Southern California Public Power Authority N/A SGI 5.6 5.6 Benton WA PACW Tieton Substation 3/1/2005 9/6/2006 Hydro N/A Available Available I/A signed October 22, 2007 43 5/12/2004 Deactivated N/A ER LGI 535 567 Utah UT PACE Emery - Camp Williams Line 5/15/2007 Natural Gas Available N/A N/A REMOVED-LACK OF PROGRESS 44 6/3/2004 In Service PacifiCorp Commercial & Trading (fka Lakeside) ER LGI 535 567 Utah UT PACE Timp - Tri-City Line 5/15/2007 7/29/2007 Natural Gas Available Available Available I/A signed March 2, 2005 45 7/9/2004 Deactivated N/A N/A DGI 12 12 Wasatch UT PACE Distribution Feeder of New Jordanelle Dam Distribution Substation 1/1/2007 Hydro N/A N/A N/A WITHDRAWN BY CUSTOMER 46 9/27/2004 Deactivated N/A NR with ER LGI 300 300 Lincoln WY PACE Naughton - Ben Lomond 7/1/2006 Wind Available Available N/A WITHDRAWN BY CUSTOMER I/A signed November 14, 2006 47 10/4/2004 Deactivated Schwendiman Wind, LLC N/A QFSGI 19.5 19.5 Bonneville ID PACE Goshen - Rigby Line 2/25/2005 11/30/2007 Wind N/A Available Available IA Terminated 8/27/12 48 11/18/2004 Deactivated N/A N/A QFSGI 3 3 Utah UT PACE Spanish Fork Substation, 46 kV circuit 7/1/2005 Wind N/A N/A N/A REMOVED-LACK OF PROGRESS 49 11/18/2004 Deactivated N/A N/A QFSGI 10.5 10.5 Utah UT PACE Spanish Fork Substation, 46 kV circuit 7/1/2007 Wind N/A N/A N/A REMOVED-LACK OF PROGRESS 50 1/27/2005 Deactivated N/A N/A QFLGI 500 500 Converse WY PACE Dave Johnston Substation 1/1/2006 Natural Gas N/A N/A N/A REMOVED-LACK OF PROGRESS 51 2/22/2005 Deactivated N/A N/A QFLGI 25 31 Tooele UT PACE Rowley Substation 1/1/2006 6/1/2007 Natural Gas N/A Available Available REMOVED-LACK OF PROGRESS 52 3/28/2005 In Service Salt Lake Energy Systems LLC N/A SGI 3.2 3.2 Salt Lake UT PACE Terminal Substation Distribution Circuit, 12.47 kV circuit 12/15/2005 7/20/2006 Biogas N/A Available Available I/A signed December 29, 2005 53 4/5/2005 In Service Douglas County Forest Products N/A QFSGI 6.25 6.25 Douglas OR PACW Line 66: Oakland - Winchester Segment 11/30/2005 9/13/2006 Biomass N/A Available Available I/A signed December 29, 2005 54 4/21/2005 In Service Roseburg Forest Products Inc. N/A QFSGI 10 10 Siskiyou CA PACW Line in Weed, CA 6/1/2006 12/30/2010 Biomass N/A Available Available I/A signed June 30, 2006 55 5/18/2005 Deactivated N/A N/A DGI 9.54 9.54 Morrow OR PACW Willow Creek - Boeing Distribution Line, 34.5 kV circuit 4/1/2007 Biogas Available Available N/A REMOVED-LACK OF PROGRESS 56 6/30/2005 In Service Evergreen BioPower LLC [Freres Lumber] N/A QFSGI 6 6 Linn OR PACW Santiam - Hazelwood Line (at Lyons, OR) 1/1/2007 11/1/2007 Biomass Available Available Available I/A signed October 19, 2006 57 7/14/2005 Deactivated N/A N/A SGI 20 20 Coos OR PACW South Dunes Substation 11/1/2009 Natural Gas N/A N/A N/A REMOVED-LACK OF PROGRESS 58 8/11/2005 Deactivated N/A N/A QFLGI 36 38 Beaver UT PACE Sevier - Cameron Line (near Mother Earth Substation) 12/31/2007 Geothermal Available N/A N/A REMOVED-LACK OF PROGRESS 59 8/24/2005 In Progress Two Elk Generation Partners, LP NR LGI 250 285 Campbell WY PACE North of Antelope Mine Substation 6/1/2008 6/1/2011 Coal N/A Available Available More Info I/A signed October 23, 2007 I/A signed May 12, 2009 60 10/3/2005 Suspended Milford Wind Cooridor I, LLC Phase I ER LGI 200 200 Beaver UT PACE Pavant - Gonder Line 12/31/2007 12/31/2011 Wind Available Available Available Suspended March 11, 2010 I/A signed May 12, 2009 61 10/3/2005 Suspended Milford Wind Cooridor I, LLC Phase II ER LGI 200 200 Beaver UT PACE Pavant - Gonder Line 6/30/2008 12/31/2011 Wind Available Available Available Suspended March 11, 2010 62 11/10/2005 Deactivated N/A N/A SGI 6 20 0 CA PACW TBD 12/1/2007 Geothermal N/A N/A N/A WITHDRAWN BY CUSTOMER 63 11/22/2005 Deactivated N/A NR with ER LGI 50 50 Lake OR PACW Mile High - Alturas 12/31/2008 Wind Available Available N/A WITHDRAWN BY CUSTOMER 64 11/22/2005 Deactivated N/A NR with ER LGI 50 50 Lake OR PACW Mile High - Alturas 6/30/2009 Wind Available Available N/A WITHDRAWN BY CUSTOMER 65 11/30/2005 Deactivated N/A N/A QFLGI 135 145 Clatsop OR PACW TBD 7/1/2010 Natural Gas N/A N/A N/A WITHDRAWN BY CUSTOMER
Page 1 of 9 PacifiCorp Generation Interconnection Queue As of: 9/28/2012 In-Service Date Location of (Commercial Interconnect Request Information Max MW Output Generating Facility Location of Interconnection Operations) Reports Projected Actual Request Request Service Application Commercial Commercial Feasibility System Impact Schedule Q# Company Name S W County ST Region Point of Interconnection Type Facility Study Request Status Explanation Date Status Type Rules Operations Operations Study Study Deviation Date Date 66 12/5/2005 In Service PacifiCorp Energy NR LGI 11 15 Beaver UT PACE Near Existing Blundell Geothermal Substation, 46 kV circuit 11/1/2007 10/19/2007 Geothermal Available Available Available I/A signed February 9, 2007 I/A signed May 17, 2007 67 12/14/2005 Deactivated PacifiCorp Energy ER LGI 41 50 Beaver UT PACE Cove Fort Substation 1/1/2008 11/1/2009 Geothermal N/A Available Available More Info Suspended November 26, 2008 IA Terminated 11/26/2011 68 12/28/2005 In Service PacifiCorp Commercial & Trading NR with ER LGI 25 25 Klamath OR PACW JC Boyle Hydro Plant Substation 6/22/2007 Hydro N/A Available Available I/A signed January 11, 2007 69 12/29/2005 Deactivated N/A N/A QFSGI 4.2 4.2 Utah UT PACE TBD 8/1/2006 Wind N/A N/A N/A REMOVED-ERROR IN ENTRY 70 12/29/2005 Deactivated N/A N/A QFSGI 10.5 10.5 Utah UT PACE Spanish Fork Substation, 46 kV circuit 8/1/2006 Wind N/A N/A N/A WITHDRAWN BY CUSTOMER 71 1/17/2006 In Service Threemile Canyon Wind, LLC N/A DGI 10 10 Morrow OR PACW Dalreed Substation on Simtag Feeder, 34.5 kV circuit 2/1/2007 7/15/2009 Wind Available Available Available I/A signed July 15, 2008 72-A 3/22/2006 Deactivated N/A NR with ER LGI 535 535 White Pine NV PACE Terminal Substation 6/1/2010 Coal Available N/A N/A REMOVED-LACK OF PROGRESS 72-B 3/22/2006 Deactivated N/A NR with ER LGI 535 535 White Pine NV PACE Terminal Substation 6/1/2011 Coal Available N/A N/A REMOVED-LACK OF PROGRESS 73 3/27/2006 In Service Spanish Fork Wind Park 2, LLC N/A QFSGI 18.9 18.9 Utah UT PACE Spanish Fork - Santaquin Line, 46 kV circuit 5/1/2007 7/31/2008 Wind N/A Available Available I/A signed November 2, 2007 74 4/13/2006 Deactivated N/A NR with ER LGI 115 115 Box Elder UT PACE Wheelon - Malad Line 12/31/2007 Wind Available N/A N/A WITHDRAWN BY CUSTOMER 75 4/21/2006 In Service PacifiCorp Energy NR LGI 3 3 Douglas OR PACW Clearwater Switching Station 3/7/2008 Hydro N/A Available Available I/A signed May 30, 2007 76 4/21/2006 Deactivated N/A NR LGI 2.5 2.5 Jackson OR PACW Prospect Central Substation Hydro N/A N/A N/A REMOVED-ERROR IN ENTRY 77 4/25/2006 Deactivated N/A N/A SGI 4.8 5.8 Salt Lake UT PACE University Substation, 46 kV circuit 12/31/2007 Natural Gas N/A N/A N/A REMOVED-LACK OF PROGRESS 78 4/25/2006 In Service PacifiCorp Commercial & Trading NR LGI 59 59 Juab UT PACE Mona Substation 4/25/2006 Natural Gas N/A Available N/A Revised Appendix C of Q0020 / Q0021 79 4/27/2006 Deactivated N/A ER LGI 101 101 Umatilla OR PACW Umapine Substation 10/31/2007 Wind N/A N/A N/A REMOVED-LACK OF PROGRESS 80 5/8/2006 Deactivated Iberdrola Renewables, Inc. ER LGI 240 240 Rich UT PACE Birch Creek - Ben Lomond OR Naughton - Ben Lomond 9/1/2008 11/1/2009 Wind Available Available Available WITHDRAWN BY CUSTOMER 81 5/23/2006 Deactivated N/A ER LGI 540 540 Butte ID PACE Antelope-Amps 12/31/2009 Wind N/A N/A N/A REMOVED-LACK OF PROGRESS 82 5/30/2006 Deactivated N/A N/A QFSGI 9 9 Umatilla OR PACW Pilot Rock Substation 9/30/2007 9/30/2008 Wind Available Available N/A REMOVED-LACK OF PROGRESS 83 5/30/2006 Deactivated N/A N/A QFSGI 9 9 Umatilla OR PACW Pilot Rock Substation 9/30/2007 9/30/2008 Wind Available Available N/A REMOVED-LACK OF PROGRESS 84 5/30/2006 Deactivated N/A N/A QFSGI 10 10 Umatilla OR PACW Pilot Rock Substation 9/30/2007 9/30/2008 Wind Available Available N/A REMOVED-LACK OF PROGRESS 85 5/30/2006 Deactivated N/A N/A QFSGI 9 9 Umatilla OR PACW Pilot Rock Substation 9/30/2007 9/30/2008 Wind Available Available N/A REMOVED-LACK OF PROGRESS 86 5/30/2006 Deactivated N/A N/A QFSGI 10 10 Umatilla OR PACW Pilot Rock Substation 9/30/2007 9/30/2008 Wind Available Available N/A REMOVED-LACK OF PROGRESS 87 6/6/2006 Deactivated N/A N/A DGI 10 10 Morrow OR PACW Willow Creek OR Dalreed Substation, 34.5 kV circuit 2/1/2007 Wind N/A N/A N/A WITHDRAWN BY CUSTOMER 88 6/6/2006 Deactivated N/A N/A DGI 10 10 Morrow OR PACW Willow Creek OR Dalreed Substation, 34.5 kV circuit 2/1/2007 Wind N/A N/A N/A WITHDRAWN BY CUSTOMER I/A signed February 20, 2008 89 6/16/2006 Deactivated Iberdrola Renewables, Inc. ER LGI 201 201 Carbon WY PACE Miners-Difficulty Line 11/1/2008 2/28/2011 Wind Available Available Available Suspended February 25, 2009 IA terminated 2/17/12 90 6/22/2006 In Service Mountain Wind Power, LLC ER QFLGI 60 60 Uinta WY PACE Muddy Creek Substation 12/31/2007 5/15/2008 Wind N/A Available Available I/A signed December 2, 2007 91 6/23/2006 Deactivated N/A N/A LGI 40.1 44.2 Coos OR PACW South Dunes-Lockhart Line 1/31/2010 Natural Gas N/A Available N/A WITHDRAWN BY CUSTOMER 92 9/1/2006 Deactivated N/A N/A DGI 5 5 Morrow OR PACW Dalreed Substation on Simtag Feeder, 34.5 kV circuit 2/1/2007 7/1/2007 Wind N/A Available Available WITHDRAWN BY CUSTOMER 93 9/19/2006 In Service Tooele Army Depot N/A DGI 1 1 Tooele UT PACE Tooele substation, 47 kV 12/31/2007 3/1/2008 Wind Available N/A N/A No I/A necessary 94 10/6/2006 Deactivated N/A N/A DGI 4.5 4.5 Gilliam OR PACW Arlington Substation, 12.47 kV circuit 12/31/2007 Wind N/A Available N/A More Info REMOVED-LACK OF PROGRESS I/A signed February 8, 2008 95 10/6/2006 Deactivated Pioneer Ridge, LLC NR with ER LGI 71.4 71.4 Tooele UT PACE Tooele-Dugway line, 46 kV circuit 12/31/2007 6/30/2008 Wind N/A Available Available Suspended February 25, 2008 Withdrawn May 4, 2011-End of Suspension 96 10/9/2006 In Service Mountain Wind Power II, LLC NR with ER QFLGI 79.5 79.5 Uinta WY PACE Muddy Creek Substation 12/31/2007 7/2/2008 Wind N/A Available Available I/A signed December 2, 2007 I/A signed June 29, 2007 97 10/16/2006 In Service Rough & Ready Lumber N/A DGI 1.5 1.5 Josephine OR PACW Near O'Brien Substation, 12.47 kV circuit 10/15/2007 2/18/2008 Biomass Available Available Available In service as of 02/15/08 98 10/17/2006 Deactivated N/A ER LGI 150 150 Benton WA PACW TBD 9/1/2008 Wind N/A N/A N/A WITHDRAWN BY CUSTOMER 99 10/20/2006 In Progress Meduri Farms, Inc. N/A DGI 0.848 0.848 Polk OR PACW Distribution feeder 4M100, 20.8 kV circuit 2/26/2007 TBD Biomass N/A Available Available I/A signed October 14, 2007 I/A signed June 6, 2008 100-A 11/2/2006 Deactivated Gaelectric ER LGI 99 99 Big Horn MT PACE Yellowtail-Frannie line, Township 7 South, Range 25 East, MPM 12/31/2008 Wind Available Available Available Suspended June 24, 2008 I/A Terminated January 4, 2010 I/A signed June 6, 2008 100-B 11/2/2006 Deactivated Gaelectric ER LGI 99 99 Big Horn MT PACE Yellowtail-Frannie line, Township 7 South, Range 25 East, MPM 12/31/2008 12/31/2009 Wind Available Available Available Suspended June 24, 2008 I/A Terminated January 4, 2010 I/A signed June 6, 2008 100-C 11/2/2006 Deactivated Gaelectric ER LGI 57 57 Big Horn MT PACE Yellowtail-Frannie line, Township 7 South, Range 25 East, MPM 12/31/2008 12/31/2010 Wind Available Available Available Suspended June 24, 2008 I/A Terminated January 4, 2010 101 11/6/2006 Deactivated N/A N/A DGI 2 2 Coos OR PACW Feeder 5C24 near Jordan Point Substation, 12.47 kV circuit 12/31/2007 Biomass Available Available N/A More Info REMOVED-LACK OF PROGRESS 102 11/7/2006 In Service Exelon Wind, LLC N/A QFSGI 9.9 9.9 Umatilla OR PACW Hinkle Substation 12/15/2007 2/23/2009 Wind Available Available Available More Info I/A signed October 22, 2008 103 11/7/2006 In Service Exelon Wind, LLC N/A QFSGI 6.6 3.3 Umatilla OR PACW Hinkle Substation 12/15/2007 2/23/2009 Wind Available Available Available More Info I/A signed October 22, 2008 104 11/7/2006 In Service Exelon Wind, LLC N/A QFSGI 10 10 Umatilla OR PACW Hinkle Substation 12/15/2007 1/7/2010 Wind Available Available Available More Info I/A signed May 28, 2009 105 11/7/2006 In Service Exelon Wind, LLC N/A QFSGI 9.9 9.9 Umatilla OR PACW Hinkle Substation 12/15/2007 2/23/2009 Wind Available Available Available More Info I/A signed October 22, 2008 106 11/7/2006 In Service Exelon Wind, LLC N/A QFSGI 10 10 Umatilla OR PACW Hinkle Substation 12/15/2007 1/7/2009 Wind Available Available Available More Info I/A signed May 28, 2009 107 11/14/2006 In Service PacifiCorp Commercial & Trading (fka Lakeside) NR LGI 79 49 Utah UT PACE Timp - Tri-City Line 5/15/2007 8/18/2008 Natural Gas N/A Available N/A I/A signed March 12, 2008 108 11/28/2006 In Service Cameron A. Curtiss N/A DGI 0.75 0.75 Klamath OR PACW Rocky Point Feeder near Running Y Substation, .48 kV circuit 12/31/2007 8/18/2008 Hydro N/A N/A N/A I/A signed November 19, 2007 109 12/4/2006 Deactivated N/A N/A DGI 0.12 0.12 Klamath OR PACW 4033 Miller Avenue, Klamath Falls, Oregon 12/31/2007 Solar N/A N/A N/A WITHDRAWN BY CUSTOMER 110 12/5/2006 Deactivated N/A N/A DGI 9 9 Jefferson OR PACW Feeder 4D68 circuit 12/31/2007 Biomass N/A Available N/A REMOVED-LACK OF PROGRESS 111 12/8/2006 In Service Draper Irrigation Co. N/A DGI 0.511 0.511 Salt Lake UT PACE 2700 East 11600 South, Sandy, Utah 12/31/2007 8/9/2007 Hydro N/A N/A N/A I/A signed August 9, 2007 I/A signed June 11, 2008 112-A 12/12/2006 Deactivated Northwest Wind Partners ER LGI 165 165 Benton WA PACW Union Gap - Midway 9/1/2008 8/15/2010 Wind N/A Available Available Suspended February 24, 2009 Terminated February 25, 2012 I/A signed June 11, 2008 112-B 12/12/2006 Deactivated Northwest Wind Partners ER LGI 185 185 Benton WA PACW Union Gap - Midway 9/1/2008 11/1/2010 Wind N/A Available Available Suspended February 24, 2009 Terminated February 25, 2012 113 12/21/2006 Deactivated N/A N/A DGI 0.2 0.2 Jackson OR PACW Feeder 4R1, 20.8 kV circuit 8/1/2007 Hydro N/A Available N/A WITHDRAWN BY CUSTOMER 114 12/21/2006 Deactivated N/A N/A DGI 0.4 0.4 Jackson OR PACW Feeder 4R1, 20.8 kV circuit 8/1/2007 Hydro N/A N/A N/A REMOVED-LACK OF PROGRESS 115 12/27/2006 Deactivated N/A NR with ER LGI 39.6 39.6 Columbia WA PACW Between Dayton and Pomeroy on the Dry Gulch-Mill Creek line 12/15/2008 Wind Available N/A N/A WITHDRAWN BY CUSTOMER
Page 2 of 9 PacifiCorp Generation Interconnection Queue As of: 9/28/2012 In-Service Date Location of (Commercial Interconnect Request Information Max MW Output Generating Facility Location of Interconnection Operations) Reports Projected Actual Request Request Service Application Commercial Commercial Feasibility System Impact Schedule Q# Company Name S W County ST Region Point of Interconnection Type Facility Study Request Status Explanation Date Status Type Rules Operations Operations Study Study Deviation Date Date 116 1/5/2007 Deactivated N/A N/A SGI 6.56 8.2 Gilliam OR PACW Klondike Line 8/1/2007 Biogas N/A N/A N/A REMOVED-LACK OF PROGRESS 117 1/18/2007 In Service PacifiCorp Commercial & Trading ER LGI 99 99 Carbon WY PACE Freezeout Substation 3/1/2008 12/9/2008 Wind N/A Available Available I/A signed February 27, 2008 118 1/18/2007 In Service PacifiCorp Commercial & Trading ER LGI 19.5 19.5 Carbon WY PACE Freezeout Substation 4/1/2008 12/9/2008 Wind N/A Available Available I/A signed February 27, 2008 119-A 1/29/2007 In Service PacifiCorp Commercial & Trading (GreenWing) ER LGI 127.5 127.5 Carbon WY PACE Foote Creek Substation 10/31/2008 9/30/2009 Wind Available Available Available I/A signed October 8, 2008 119-B 1/29/2007 Deactivated PacifiCorp Commercial & Trading (GreenWing) ER LGI 0 0 Carbon WY PACE Foote Creek Substation 10/31/2009 10/1/2010 Wind Available Available Available Rolled into Q0119A 120 2/8/2007 In Service Laramie County Community College N/A DGI 0.65 0.65 Laramie WY PACE Existing point of service in Laramie, Wyoming 2/1/2007 10/4/2007 Wind N/A Available Available I/A signed July 13, 2007 121 2/13/2007 Deactivated N/A NR with ER LGI 240 270 Sevier UT PACE Sigurd Substation 6/15/2009 Coal Available N/A N/A REMOVED-LACK OF PROGRESS 122 2/16/2007 In Service PacifiCorp Commercial & Trading NR LGI 10.8 10.8 Columbia WA PACW Talbot Switchyard near Dayton, WA 11/1/2007 8/1/2008 Wind N/A Available Available I/A signed March 17, 2008 I/A signed May 29, 2008 123 3/5/2007 Deactivated PacifiCorp Commercial & Trading N/A SGI 13 13 Converse WY PACE Windstar Substation near Dave Johnston Coal Mine Substation, 34.5 kV circuit 3/1/2008 10/1/2008 Wind N/A Available Available I/A withdrawn November 5, 2009 124 3/5/2007 Deactivated PacifiCorp Commercial & Trading ER LGI 99 99 Converse WY PACE Dave Johnston Coal Mine Substation 3/1/2008 10/1/2008 Wind N/A Available N/A WITHDRAWN BY CUSTOMER 125 3/5/2007 Deactivated PacifiCorp Commercial & Trading ER LGI 99 99 Converse WY PACE Windstar Substation near Dave Johnston Plant 3/1/2008 Wind N/A Available N/A REMOVED-LACK OF PROGRESS 126 3/5/2007 In Service PacifiCorp Commercial & Trading ER LGI 237 237 Converse WY PACE Windstar Substation near Dave Johnston Plant 3/1/2008 1/2/2009 Wind N/A Available Available I/A signed May 29, 2008 127 3/13/2007 Deactivated N/A NR with ER LGI 110 110 Sweetwater WY PACE Rock Springs-Monument line 11/1/2009 Wind Available N/A N/A WITHDRAWN BY CUSTOMER I/A signed March 12, 2010 128 3/13/2007 Suspended Evergreen Wind Power Partners, LLC ER LGI 80 80 Beaver UT PACE Near Cove Fort substation 11/1/2009 10/31/2011 Wind Available Available Available Suspended April 21, 2010 129 3/30/2007 In Service Granger Electric of South Jordan LLC N/A QFSGI 4.8 4.8 Salt Lake UT PACE Oquirrh - Lark, 46 kV circuit 9/1/2008 4/1/2009 Biogas N/A Available Available I/A signed March 28, 2008 I/A signed July 1, 2009 130 4/26/2007 Suspended Clipper Windpower Development Company, Inc ER LGI 300 300 Carbon WY PACE Miners-Difficulty Line 10/1/2011 Wind Available Available Available Suspended October 29, 2010 131 5/2/2007 Deactivated N/A N/A DGI 1.1 1.1 Deschutes OR PACW TBD 6/30/2008 Biogas N/A N/A N/A REMOVED-LACK OF PROGRESS I/A signed July 2, 2008 132 5/7/2007 Suspended Iberdrola Renewables, Inc. ER LGI 361 361 Albany WY PACE Miners-Difficulty Line 10/1/2012 Wind N/A Available Available Suspended December 2, 2010 133 5/8/2007 Deactivated N/A N/A DGI 8.5 8.5 Jackson WY PACE Beall Lane Substation, 12.47 kV circuit 5/14/2007 Biomass N/A N/A N/A REMOVED-ERROR IN ENTRY 134 5/16/2007 Deactivated N/A N/A QFLGI 430 430 Carbon WY PACE Foote-Creek-Miners line 12/1/2010 Coal Gas N/A Available N/A REMOVED-LACK OF PROGRESS I/A signed July 1, 2009 135 5/22/2007 Suspended Clipper Windpower Development Company, Inc. ER LGI 500 500 Converse WY PACE Windstar Plant 12/31/2011 10/1/2012 Wind Available Available Available Suspended October 28, 2010 I/A signed July 1, 2009 136 5/22/2007 Suspended Clipper Windpower Development Company, Inc ER LGI 500 500 Converse WY PACE Windstar Plant 12/31/2012 10/1/2013 Wind Available Available Available Suspended October 28, 2010 I/A signed July 1, 2009 137 5/22/2007 Suspended Clipper Windpower Development Company, Inc ER LGI 1,000 1,000 Converse WY PACE Windstar Plant 12/31/2013 7/1/2014 Wind Available Available Available Suspended October 28, 2010 138 5/22/2007 In Service Thayn Hydro LLC N/A DGI 0.575 0.575 Emery UT PACE Green River 12 circuit, 12.5 kV circuit 12/31/2007 5/22/2009 Hydro N/A Available Available I/A signed February 26, 2008 139 5/25/2007 In Service University of Utah N/A DGI 7.6 7.6 Salt Lake UT PACE University Substation, 46 kV circuit 12/1/2007 10/9/2009 Natural Gas N/A Available Available I/A signed July 21, 2008 140 6/5/2007 Deactivated N/A NR with ER LGI 99 99 Power ID PACE Lauray-Treasureton line 7/1/2008 Wind N/A N/A N/A REMOVED-LACK OF PROGRESS 141 6/12/2007 In Service Swalley Irrigation District N/A DGI 0.75 0.75 Deschutes OR PACW Distribution Feeder 5D128 out of the Overpass Substation 4/14/2008 5/14/2010 Hydro N/A Available Available I/A signed September 18, 2008 I/A signed November 17, 2008 142 6/22/2007 Deactivated Bridger Butte Power, LLC ER LGI 98.7 98.7 Uinta WY PACE Muddy Creek Switching station on the Long Hollow-Naughton Line 12/31/2009 12/31/2010 Wind Available Available Available Suspended November 17, 2008 I/A Terminated October 27, 2010 I/A signed November 17, 2008 143 6/22/2007 Deactivated Bridger Butte Power, LLC ER LGI 79.8 79.8 Uinta WY PACE Muddy Creek Switching station on the Long Hollow-Naughton Line 12/31/2009 12/31/2010 Wind Available Available Available Suspended November 17, 2008 I/A Terminated October 27, 2010 144 6/25/2007 Deactivated N/A N/A DGI 1.5 1.5 Jefferson ID PACE 12.47-kV HPS 12 circuit 9/30/2008 Biogas N/A Available Available REMOVED-LACK OF PROGRESS 145-A 7/2/2007 In Service Excelon Wind, LLC N/A QFSGI 8.25 8.25 Umatilla OR PACW Hinkle Substation 12/15/2007 1/11/2010 Wind N/A Available Available I/A signed October 22, 2008 145-B 7/2/2007 In Service Excelon Wind, LLC N/A QFSGI 4.95 4.95 Umatilla OR PACW Hinkle Substation 12/15/2007 1/11/2010 Wind N/A Available Available I/A signed November 6, 2008 146 7/2/2007 In Service Excelon Wind, LLC N/A QFSGI 1.65 1.65 Umatilla OR PACW Hinkle Substation 12/15/2007 1/11/2010 Wind N/A Available Available I/A signed November 6, 2008 147 7/2/2007 In Service Excelon Wind, LLC N/A QFSGI 3.3 3.3 Umatilla OR PACW Hinkle Substation 12/15/2007 1/11/2010 Wind N/A Available Available I/A signed November 6, 2008 I/A signed December 19, 2008 148 7/3/2007 Suspended Iberdrola Renewables, Inc. ER LGI 100.8 100.8 Umatilla OR PACW Wallula - McNary, five miles S of Wallula 11/1/2009 10/1/2009 Wind Available Available Available Suspended December 16, 2008 Resuspended May 9, 2011 149 7/3/2007 Deactivated N/A N/A DGI 0.75 0.75 Salt Lake UT PACE 24.9-kV Circuit, QRY15, out of Quarry Substation 3/1/2008 Hydro N/A N/A N/A REMOVED-LACK OF PROGRESS 150 7/13/2007 In Service Cottonwood Hydro N/A DGI 1 1 Salt Lake UT PACE 24.9-kV Circuit, QRY15, out of Quarry Substation 3/1/2008 6/18/2009 Hydro N/A Available Available I/A signed June 10, 2008 151 7/16/2007 In Service Biomass One, LP N/A QFLGI 30 30 Jackson OR PACW Existing System on Line 40 from White City to Vilas Road 9/10/2007 2/3/2009 Biomass N/A Available Available MOU signed September 17, 2008 I/A signed April 27, 2009 152 7/30/2007 Deactivated BP Alternative Energy North America, Inc. NR LGI 250 250 Lincoln WY PACE Ben Lomond - Naughton Line TBD Wind Available Available Available More Info I/A Terminated April 15, 2010 I/A signed January 29, 2009 153 8/8/2007 In Service Top of the World Wind Energy, LLC ER LGI 200.5 200.5 Converse WY PACE Dave Johnston-Yellowcake Line 12/31/2009 10/28/2010 Wind Available Available Available Suspended March 12, 2009 Recommenced August 6, 2009 154 8/10/2007 In Progress Black Canyon, LLC N/A QFSGI 19.8 19.8 Bonneville ID PACE Goshen-Ucon Line 12/31/2009 12/15/2012 Wind Available Available Available I/A signed February 23, 2009 155 8/10/2007 Deactivated N/A N/A QFSGI 20 20 Bonneville ID PACE Goshen-Ucon Line 12/31/2009 Wind Available N/A N/A REMOVED-LACK OF PROGRESS 156 8/10/2007 Deactivated PacifiCorp Commercial & Trading N/A SGI 12 12 Lincoln WY PACE Monument-Naughton 9/30/2009 Waste Heat N/A N/A N/A WITHDRAWN BY CUSTOMER 157 8/13/2007 Deactivated PacifiCorp Commercial & Trading N/A SGI 2.5 2.5 Uinta WY PACE Evanston-Anchutz 9/30/2009 Waste Heat N/A N/A N/A WITHDRAWN BY CUSTOMER 158 8/13/2007 Deactivated PacifiCorp Commercial & Trading N/A SGI 4.5 4.5 Salt Lake UT PACE Near Terminal Substation 12/1/2009 Waste Heat N/A N/A N/A WITHDRAWN BY CUSTOMER 159 8/13/2007 Deactivated PacifiCorp Commercial & Trading N/A SGI 2.5 2.5 Utah UT PACE Mona-Camp Williams 1/1/2010 Waste Heat N/A N/A N/A WITHDRAWN BY CUSTOMER 160 8/13/2007 Deactivated PacifiCorp Commercial & Trading N/A SGI 7.5 7.5 Washington UT PACE Red Butte-Harry Allen 2/28/2010 Waste Heat N/A N/A N/A WITHDRAWN BY CUSTOMER 161 9/4/2007 In Service BP America Production Company NA, Inc. N/A DGI 0.05 0.05 Sublette WY PACE 14.4 kV Circuit out of Pinedale Substation TBD 1/22/2009 Solar Available N/A N/A I/A signed June 30, 2008 162 9/28/2007 In Service Intermountain Renewable Power, LLC N/A DGI 10 11 Beaver UT PACE 24.9-kV Circuit, SML21, out of South Milford Substation 9/30/2008 2/6/2009 Geothermal N/A Available Available I/A signed June 17, 2009 163 10/10/2007 Deactivated N/A N/A QFSGI 20 20 Jefferson OR PACW Transmission line where it passes through Customer's plant site 7/1/2009 Biomass N/A N/A N/A REMOVED-LACK OF PROGRESS 164-A 10/12/2007 Deactivated N/A N/A SGI 2.6 2.6 Clatsop OR PACW Knappa Svensen Substation 6/1/2008 Wind N/A N/A N/A REMOVED-LACK OF PROGRESS 164-B 10/12/2007 Deactivated N/A N/A SGI 1.7 1.7 Clatsop OR PACW Knappa Svensen Substation 6/1/2008 Wind N/A N/A N/A REMOVED-LACK OF PROGRESS 165 10/12/2007 In Service University of Wyoming Research Corporation N/A DGI 0.03 0.03 Laramie WY PACE 3474 N. 3rd Street 11/28/2007 3/11/2008 Natural Gas Available N/A N/A I/A signed February 19, 2009
Page 3 of 9 PacifiCorp Generation Interconnection Queue As of: 9/28/2012 In-Service Date Location of (Commercial Interconnect Request Information Max MW Output Generating Facility Location of Interconnection Operations) Reports Projected Actual Request Request Service Application Commercial Commercial Feasibility System Impact Schedule Q# Company Name S W County ST Region Point of Interconnection Type Facility Study Request Status Explanation Date Status Type Rules Operations Operations Study Study Deviation Date Date I/A signed December 9, 2008 166 10/15/2007 Deactivated Tasco Engineering, Inc. NR LGI 79.5 79.5 Rock Springs WY PACE Rock Springs - Naughton Line 12/31/2009 Wind Available Available Available Suspended December 4, 2008 IA Terminated 12/5/11 167 10/16/2007 Deactivated N/A NR with ER LGI 299 299 Natrona WY PACE Riverton-Casper Line 12/31/2011 Wind Available N/A N/A REMOVED-LACK OF PROGRESS 168 10/31/2007 Deactivated N/A NR LGI 78 78 Big Horn MT PACE Yellowtail-Frannie line, Township 7 South, Range 25 East, MPM 12/31/2012 Wind N/A N/A N/A REMOVED-LACK OF PROGRESS 169 11/6/2007 In Progress N/A N/A DGI 0.05 0.05 Marion OR PACW 11028 Stayton Road SE, Aumsville, Oregon TBD Hydro Available N/A N/A 170 11/8/2007 In Progress N/A N/A DGI 0.075 0.075 Marion OR PACW 366 E Water Street, Stayton, Oregon TBD Hydro Available N/A N/A 171 11/8/2007 In Service Chevron Global Generation N/A QFSGI 19.5 19.5 Natrona WY PACE Sand Hills Line between Casper & Platte Junction 12/1/2009 12/25/2009 Wind Available Available Available I/A signed April 29, 2009 I/A signed March 5, 2009 172-A 11/19/2007 Suspended Evergreen Wind Power Partner, LLC ER LGI 150 150 Sweetwater WY PACE Firehole - Flaming Gorge 6/1/2012 Wind Available Available Available Suspended July 1, 2010 I/A signed March 5, 2009 172-B 11/19/2007 Suspended Evergreen Wind Power Partner, LLC ER LGI 150 150 Sweetwater WY PACE Firehole - Flaming Gorge 4/1/2013 Wind Available Available Available Suspended July 1, 2010 I/A signed March 5, 2009 173 11/20/2007 Suspended Evergreen Wind Power Partner, LLC ER LGI 150 150 Sweetwater WY PACE Firehole Substation 6/1/2012 Wind Available Available Available Suspended July 1, 2010 174 12/5/2007 In Service Oregon State University N/A DGI 6.475 6.475 Benton OR PACW 20.8 kV Sunset Feeder 4M182 out of Hillview Substation 2/28/2009 7/9/2010 Natural Gas N/A Available Available I/A signed June 24, 2009 I/A signed November 24, 2009 175 12/7/2007 Suspended Third Planet Windpower, LLC ER LGI 150 150 Lincoln WY PACE Craven Creek to Chappel Creek 9/31/2011 11/30/2012 Wind Available Available Available suspended 2/15/11 176 12/26/2007 In Service Stahlbush Island Farms, Inc. N/A DGI 1.6 1.6 Linn OR PACW 20.8 kV Peoria Circuit four miles our of Buchanan Substation 10/31/2008 6/17/2009 Biogas Available Available Available I/A signed October 1, 2008 177 12/27/2007 Deactivated N/A NR with ER LGI 1500 1500 Carbon WY PACE Line near proposed Aeolus Substation. 10/1/2014 Wind Available N/A N/A WITHDRAWN BY CUSTOMER 178 12/31/2007 Deactivated N/A NR with ER LGI 199.5 199.5 Umatilla OR PACW Enterprise - Walla Walla line 10/31/2010 11/15/2011 Wind Available Available Available More Info WITHDRAWN BY CUSTOMER 179 1/7/2008 Deactivated PacifiCorp Commercial & Trading NR with ER LGI 99 99 Natrona WY PACE Near Spence Substation 3/1/2010 6/30/2009 Wind Available Available N/A REMOVED-LACK OF PROGRESS 180 1/7/2008 Deactivated PacifiCorp Commercial & Trading NR with ER LGI 98 98 Natrona WY PACE Near Spence Substation 6/1/2010 9/30/2009 Wind Available Available N/A REMOVED-LACK OF PROGRESS 181 1/7/2008 Deactivated PacifiCorp Commercial & Trading NR with ER LGI 99 99 Natrona WY PACE Near Spence Substation 3/1/2011 3/1/2010 Wind Available Available N/A REMOVED-LACK OF PROGRESS 182 1/7/2008 Deactivated PacifiCorp Commercial & Trading NR with ER LGI 99 99 Natrona WY PACE Near Spence Substation 3/1/2011 6/1/2010 Wind Available Available N/A REMOVED-LACK OF PROGRESS 183 1/7/2008 Deactivated PacifiCorp Commercial & Trading NR with ER LGI 98 98 Natrona WY PACE Near Spence Substation 3/1/2012 3/1/2011 Wind Available Available N/A REMOVED-LACK OF PROGRESS I/A signed June 15, 2009 184 1/7/2008 Suspended PacifiCorp Commercial & Trading NR with ER LGI 99 99 Albany WY PACE Miners - Difficulty line 10/1/2009 10/1/2012 Wind Available Available Available Suspended 12/20/10 I/A signed June 15, 2009 185 1/7/2008 Suspended PacifiCorp Commercial & Trading NR with ER LGI 98 98 Albany WY PACE Miners - Difficulty line 12/31/2009 10/1/2012 Wind Available Available Available Suspended 12/20/10 I/A signed June 15, 2009 186 1/7/2008 Suspended PacifiCorp Commercial & Trading NR with ER LGI 99 99 Albany WY PACE Miners - Difficulty line 3/1/2010 10/1/2012 Wind Available Available Available Suspended 12/20/10 187 1/9/2008 Deactivated N/A NR LGI 104 104 Harney OR PACW Burns Reactor 12/1/2009 12/1/2010 Wind N/A Available WITHDRAWN BY CUSTOMER 188 1/9/2008 Deactivated N/A NR LGI 104 104 Harney OR PACW Burns Reactor 12/1/2010 Wind N/A Available WITHDRAWN BY CUSTOMER 189 1/9/2008 Deactivated N/A NR LGI 104 104 Harney OR PACW Burns Reactor 12/1/2011 Wind N/A Available WITHDRAWN BY CUSTOMER I/A signed October 1, 2009 190 1/11/2008 Deactivated Iberdrola (fka Marubeni Sustainable Energy, Inc.) N/A QFSGI 15 15 Lake OR PACW Chiloquin - Mile Hi, Line 61 7/1/2012 Biomass N/A Available Available More Info Project rolled to Q0319 I/A signed July 24, 2009 191 1/25/2008 Suspended Eurus Middlewood Wind, LLC ER LGI 500 500 Carbon WY PACE Jim Bridger - Aeolus 12/31/2012 8/1/2014 Wind Available Available Available Suspended 7/6/12 192 1/28/2008 Deactivated N/A N/A QFLGI 30 30 Douglas OR PACW Roseburg Lumber Substation TBD Biomass N/A N/A N/A WITHDRAWN BY CUSTOMER 193-A 1/28/2008 Deactivated N/A NR LGI 104 104 Harney OR PACW Burns Reactor 12/1/2011 Wind N/A Available WITHDRAWN BY CUSTOMER 193-B 1/28/2008 Deactivated N/A NR LGI 104 104 Harney OR PACW Burns Reactor 12/1/2012 Wind N/A Available WITHDRAWN BY CUSTOMER 194 2/7/2008 Deactivated N/A N/A DGI 3.2 3.2 Jackson OR PACW 20.8 kV circuit, Antelope Feeder 4R41 out of Stevens Road Substation TBD Biogas N/A Available N/A WITHDRAWN BY CUSTOMER 195 2/12/2008 Deactivated N/A NR with ER QFSGI 10 11 Klamath OR PACW 12.5 kV distribution line near Lot 3 T40S R9E Section 34 Willamette Meridian 11/30/2008 Geothermal N/A N/A N/A WITHDRAWN BY CUSTOMER 196-A 2/13/2008 Deactivated N/A N/A DGI 2.6 2.6 Clatsop OR PACW Knappa Svensen Substation 12/31/2008 Wind Available N/A N/A REMOVED-LACK OF PROGRESS 196-B 2/13/2008 Deactivated N/A N/A DGI 1.7 1.7 Clatsop OR PACW Knappa Svensen Substation 12/31/2008 Wind Available N/A N/A REMOVED-LACK OF PROGRESS I/A signed July 13, 2009 197 2/18/2008 Deactivated Columbia Energy Partners, LLC N/A DGI 2 2 Gilliam OR PACW Distribution Feeder, 5K25, out of Arlington Substation 12/1/2011 Solar N/A Available Available IA Terminated July 13, 2011 I/A signed May 29, 2009 198 2/20/2008 Deactivated Rim Rock Power Partners ER LGI 100 100 Carbon WY PACE Miners-Freezeout Line 12/31/2010 12/31/2010 Wind Available Available Available Suspended September 1, 2009 IA Terminated June 18, 2012 I/A signed December 15, 2009 199 2/20/2008 In Progress Simpson Ridge Wind Farm, LLC ER LGI 200 200 Carbon WY PACE proposed Aeolus Substation 12/31/2011 12/1/2014 Wind Available Available Available Suspended 9/1/09 I/A signed December 15, 2009 200 2/20/2008 In Progress Simpson Ridge Wind Farm, LLC ER LGI 100 100 Carbon WY PACE proposed Aeolus Substation 12/31/2012 12/1/2014 Wind Available Available Available Suspended 9/1/09 201 2/20/2008 In Progress Simpson Ridge Wind Farm, LLC ER LGI 100 100 Carbon WY PACE proposed Aeolus Substation 12/31/2013 12/31/2015 Wind Available Available Available 202 2/25/2008 Deactivated N/A N/A QFLGI 23 23 Sweetwater WY PACE Blacks Fork Substation in Southwest Wyoming. 7/1/2008 Coal N/A N/A N/A REMOVED-LACK OF PROGRESS 203 2/26/2008 In Service PacifiCorp Commercial & Trading ER LGI 111 111 Carbon WY PACE Shirley-Basin Substation on the Miners - Difficulty Line 9/30/2010 9/30/2010 Wind N/A Available Available I/A signed April 15, 2009 204 2/26/2008 Deactivated N/A NR with ER LGI 168 168 Harney OR PACW Burns - Midpoint Line 12/31/2012 Wind Available N/A N/A WITHDRAWN BY CUSTOMER 205 2/26/2008 Deactivated N/A NR with ER LGI 168 168 Harney OR PACW Burns - Midpoint Line 12/31/2012 Wind Available N/A N/A WITHDRAWN BY CUSTOMER 206 2/26/2008 Deactivated N/A NR with ER LGI 168 168 Harney OR PACW Burns - Midpoint Line 12/31/2012 Wind Available N/A N/A WITHDRAWN BY CUSTOMER 207 3/7/2008 Deactivated N/A NR with ER LGI 625 625 Utah UT PACE Proposed substation located adjacent to, on the north side, of existing project. 6/1/2012 Natural Gas N/A N/A N/A WITHDRAWN BY CUSTOMER I/A signed March 25, 2009 208 3/14/2008 Deactivated Gaelectric NR LGI 78 78 Big Horn MT PACE Yellowtail-Frannie Line 12/31/2012 Wind Available Available Available Suspended April 10, 2009 I/A Terminated December 24, 2009 I/A signed August 25, 2009 209 4/1/2008 Suspended AES Wind Generation, Inc. ER LGI 55.5 55.5 Carbon/Albany WY PACE 34.5 kV Foote Creek Substation circuit 9/15/2010 12/17/2010 Wind N/A Available Available Revised I/A w/ Q257 signed August 13, 2009 Suspended 5-18-10 210-A 4/8/2008 Deactivated N/A NR with ER LGI 100.5 100.5 Carbon WY PACE Proposed Aeolus Substation 12/31/2009 12/31/2010 Wind Available N/A N/A More Info REMOVED-LACK OF PROGRESS 210-B 4/8/2008 Deactivated N/A NR with ER LGI 199.5 199.5 Carbon WY PACE Proposed Aeolus Substation 12/31/2010 12/31/2011 Wind Available N/A N/A More Info REMOVED-LACK OF PROGRESS 211 4/11/2008 Deactivated N/A N/A DGI 2.75 2.75 Lake OR PACW 12.6 kV circuit, Mile-Hi Substation 10/1/2008 Solar N/A Available N/A WITHDRAWN BY CUSTOMER 212-A 4/21/2008 Deactivated N/A ER LGI 10.125 11 Beaver UT PACE Line Out of Cameron Substation 12/30/2008 Geothermal N/A N/A N/A WITHDRAWN BY CUSTOMER
Page 4 of 9 PacifiCorp Generation Interconnection Queue As of: 9/28/2012 In-Service Date Location of (Commercial Interconnect Request Information Max MW Output Generating Facility Location of Interconnection Operations) Reports Projected Actual Request Request Service Application Commercial Commercial Feasibility System Impact Schedule Q# Company Name S W County ST Region Point of Interconnection Type Facility Study Request Status Explanation Date Status Type Rules Operations Operations Study Study Deviation Date Date 212-B 4/21/2008 Deactivated N/A ER LGI 10.125 11 Beaver UT PACE Line Out of Cameron Substation 8/30/2009 Geothermal N/A N/A N/A WITHDRAWN BY CUSTOMER 213 4/22/2008 In Service Bell Mountain Hydro, LLC N/A DGI 0.3 0.3 Butte ID PACE Bernice #22 circuit out of Bernice Substation 10/15/2008 8/4/2009 Hydro N/A Available N/A I/A signed December 2, 2008 214 4/24/2008 In Service AntiCline Disposal, LLC N/A DGI 1.96 1.96 Sublette WY PACE Pinedale circuit # 23 8/1/2008 2/18/2009 Natural Gas Available N/A N/A I/A signed July 21, 2008 215 4/29/2008 Deactivated N/A N/A DGI 0.675 0.675 Tooele UT PACE 1600 West B Ave, Utah Industrial Depot, Tooele, Utah 84074 9/15/2008 Solar Available N/A N/A WITHDRAWN BY CUSTOMER 216 4/29/2008 Deactivated N/A NR with ER LGI 150 150 Sweetwater WY PACE Jim Bridger - Kingport line 12/31/2010 Wind Available N/A N/A REMOVED-LACK OF PROGRESS 217 5/1/2008 In Progress N/A N/A SGI 6 6 Lincoln WY PACE Craven Creek Substation 6/30/2008 3/1/2009 Natural Gas N/A Available Available 218-A 5/5/2008 Deactivated N/A NR with ER LGI 80 80 Iron UT PACE 11 miles west of Cedar Substation 12/31/2010 Wind Available Available N/A REMOVED-LACK OF PROGRESS 218-B 5/5/2008 Deactivated N/A NR with ER LGI 45 45 Iron UT PACE 12 miles west of Cedar Substation 12/31/2011 Wind Available Available N/A REMOVED-LACK OF PROGRESS 219-A 5/5/2008 Deactivated N/A ER LGI 100 100 San Juan UT PACE Pinto Substation 12/31/2010 Wind Available N/A N/A REMOVED-LACK OF PROGRESS 219-B 5/5/2008 Deactivated N/A ER LGI 100 100 San Juan UT PACE Pinto Substation 12/31/2011 Wind Available N/A N/A REMOVED-LACK OF PROGRESS 220 5/12/2008 In Service Three Buttes Windpower NR with ER LGI 100.5 100.5 Converse WY PACE Latigo substation between Casper and Windstar line 12/31/2009 11/20/2009 Wind N/A Available Available I/A signed July 6, 2009 221-A 5/20/2008 Deactivated N/A NR with ER LGI 80 80 Summit UT PACE Thief Creek - Evanston Substations 12/31/2010 Wind Available Available N/A REMOVED-LACK OF PROGRESS 221-B 5/20/2008 Deactivated N/A NR with ER LGI 80 80 Summit UT PACE Thief Creek - Evanston Substations 7/31/2011 Wind Available Available N/A REMOVED-LACK OF PROGRESS 221-C 5/20/2008 Deactivated N/A NR with ER LGI 50 50 Summit UT PACE Thief Creek - Evanston Substations 12/31/2011 Wind Available N/A N/A WITHDRAWN BY CUSTOMER 221-D 5/20/2008 Deactivated N/A NR with ER LGI 100 100 Uinta WY PACE On the line east of project between Thief Creek & Evanston substations 7/31/2012 Wind N/A N/A N/A WITHDRAWN BY CUSTOMER 221-E 5/20/2008 Deactivated N/A NR with ER LGI 100 100 Uinta WY PACE TBD 12/31/2012 Wind N/A N/A N/A WITHDRAWN BY CUSTOMER 221-F 5/20/2008 Deactivated N/A NR with ER LGI 100 100 Uinta WY PACE TBD 7/31/2013 Wind N/A N/A N/A WITHDRAWN BY CUSTOMER 222 5/20/2008 Deactivated PacifiCorp Energy NR with ER LGI 300 300 Converse WY PACE Windstar Substation 6/1/2011 Natural Gas N/A Available N/A REMOVED-LACK OF PROGRESS 223 5/20/2008 Deactivated N/A NR with ER LGI 300 300 Salt Lake UT PACE Terminal Substation 6/1/2011 Natural Gas Available N/A N/A REMOVED-LACK OF PROGRESS 224-A 5/27/2008 Suspended PacifiCorp Commercial & Trading ER LGI TBD TBD Juab UT PACE Mona Substation 6/1/2012 5/15/2015 Natural Gas N/A Available Available I/A signed August 18, 2009 224-B 5/27/2008 Suspended PacifiCorp Commercial & Trading ER LGI TBD TBD Juab UT PACE Mona Substation 6/1/2013 5/15/2015 Natural Gas N/A Available Available I/A signed August 18, 2009 I/A signed September 9, 2009 225 5/30/2008 Suspended Athena-Weston Wind Power Project, LLC NR with ER LGI 151.2 151.2 Umatilla OR PACW New substation on Walla-Walla - Enterprise transmission line 12/31/2013 Wind Available Available Available More Info Suspended August 31, 2011 226 5/30/2008 In Progress Athena-Weston Wind Power Project, LLC NR with ER LGI 151.2 151.2 Umatilla OR PACW New substation on Walla-Walla - Enterprise transmission line 12/31/2013 Wind Available Available Available More Info I/A signed September 9, 2009 227 6/4/2008 Deactivated N/A NR with ER LGI 625 625 Utah UT PACE Proposed substation located adjacent to existing project. 6/1/2012 Natural Gas N/A Available N/A WITHDRAWN BY CUSTOMER 228 6/5/2008 Deactivated N/A N/A DGI 0.75 0.75 Jackson OR PACW 12.47 kV circuit 5R40 6/30/2009 Hydro Available Available Available More Info REMOVED-LACK OF PROGRESS 229 6/16/2008 Deactivated enXco Development Corporation ER LGI 50 50 Umatilla OR PACW Pilot Rock Substation 12/31/2012 12/31/2010 Wind N/A Available Available WITHDRAWN BY CUSTOMER 230 6/23/2008 In Progress Klamath Geothermal No. 1 KL-01, LLC (fka Columbia ReneNR with ER SGI 14 14 Klamath OR PACW Line 5, transmission line in Klamath County, OR 11/30/2008 10/19/2014 Geothermal N/A Available Available More Info I/A signed April 20, 2009 231-A 6/23/2008 Deactivated N/A ER LGI 28 22 Beaver UT PACE Line Out of Cameron Substation 12/30/2008 Geothermal N/A Available N/A More Info WITHDRAWN BY CUSTOMER 231-B 6/23/2008 Deactivated N/A ER LGI 14 11 Beaver UT PACE Line Out of Cameron Substation 8/30/2009 Geothermal N/A Available N/A More Info WITHDRAWN BY CUSTOMER 232 6/27/2008 Deactivated N/A N/A DGI 4.5 4.5 Salt Lake UT PACE 46 kV Line circuit from Terminal to Grow Substation 2/16/2011 Waste Heat N/A N/A N/A WITHDRAWN BY CUSTOMER I/A signed November 4, 2009 233 7/1/2008 Suspended PacifiCorp Commercial & Trading NR with ER LGI 200.5 200.5 Carbon WY PACE Shirley-Basin Substation on the Miners - Difficulty line 12/31/2009 12/31/2010 Wind N/A Available Available Suspended May 1, 2010 234 7/1/2008 In Progress WKN Chopin, LLC ER LGI 300 300 Umatilla OR PACW Walla Walla - Enterprise Transmission Line near T5N R36 Section 27 12/31/2012 12/31/2013 Wind Available Available Available I/A signed December 15, 2009 235 7/16/2008 Deactivated N/A N/A SGI 12.9 14 Millard UT PACE Pole #75 on PacifiCorp's 46 kV Line Delta to Greymont 8/30/2009 Geothermal N/A Available N/A More Info REMOVED-LACK OF PROGRESS I/A signed May 29, 2009 236 7/21/2008 Deactivated Rim Rock Power Partners ER LGI 100 100 Carbon WY PACE Miners - Freezeout Line 12/31/2010 12/31/2010 Wind N/A Available Available Suspended September 1, 2009 IA Terminated June 18, 2012 237-A 7/31/2008 Suspended PacifiCorp Commercial & Trading NR LGI 25 25 Skamania WA PACW Swift No. 1 switching station adjacent to Swift No. 1 Hydro Plant 12/31/2012 Hydro N/A Available Available I/A signed July 1, 2009 237-B 7/31/2008 Suspended PacifiCorp Commercial & Trading NR LGI 25 25 Skamania WA PACW Swift No. 1 switching station adjacent to Swift No. 1 Hydro Plant 12/31/2013 Hydro N/A Available Available I/A signed July 1, 2009 237-C 7/31/2008 Suspended PacifiCorp Commercial & Trading NR LGI 25 25 Skamania WA PACW Swift No. 1 switching station adjacent to Swift No. 1 Hydro Plant 12/31/2014 Hydro N/A Available Available I/A signed July 1, 2009 238 8/1/2008 Deactivated N/A N/A DGI 1.25 1.25 Douglas OR PACW 20.8 kV circuit 4U30 out of Southgate Substation TBD Biogas Available Available N/A REMOVED-LACK OF PROGRESS 239 8/15/2008 Deactivated N/A NR with ER LGI 250 250 Freemont WY PACE Mustang - Spence Transmission Line 12/31/2012 Wind Available N/A N/A REMOVED-LACK OF PROGRESS 240 9/24/2008 Deactivated N/A NR with ER LGI 544 636.3 Utah UT PACE System on Camp Williams/Hunter Emery Line near Lakeside Plant 6/1/2012 5/1/2012 Natural Gas N/A Available N/A WITHDRAWN BY CUSTOMER 241 10/6/2008 Deactivated N/A NR with ER LGI 300 300 Carbon WY PACE Proposed Aeolus Substation 10/1/2012 Wind Available N/A N/A REMOVED-LACK OF PROGRESS 242 10/14/2008 Deactivated N/A NR with ER DGI 7 7 Beaver UT PACE 25 kV South Milford Distribution Line out of South Milford Substation 1/1/2009 Geothermal N/A N/A N/A REMOVED-LACK OF PROGRESS 243 11/6/2008 Deactivated Ridgeline Alternative Energy, LLC NR with ER LGI 64.8 64.8 Bonneville ID PACE Line to existing Wolverine Creek Goshen substation phase II 11/1/2009 8/15/2010 Wind N/A Available Available Project rolled to Q029-b 244 11/6/2008 Deactivated N/A NR with ER LGI 345 380 Weber UT PACE Line originating from Ben Lomand substation 5/1/2012 Natural Gas Available N/A N/A WITHDRAWN BY CUSTOMER 245 11/6/2008 Deactivated N/A NR with ER LGI 345 380 Salt Lake UT PACE Line originating from Terminal substation 5/1/2012 Natural Gas N/A N/A N/A WITHDRAWN BY CUSTOMER 246 11/12/2008 Deactivated N/A NR with ER LGI 345 380 Salt Lake UT PACE Camp Williams to Mona transmission line 5/1/2012 Natural Gas Available N/A N/A WITHDRAWN BY CUSTOMER 247 11/12/2008 In Progress GreenWing Energy, Ltd. NR with ER LGI 90 90 Lake OR PACW Line between Mile Hi and Fish Hole substations 10/1/2015 Wind Available Available Available I/A signed February 17, 2010 248 11/14/2008 In Service Central Oregon Irrigation District N/A OGI 5 5 Deschutes OR PACW Tumalo Line (Bend - Redmond) south of Deschutes Substation. 9/1/2010 10/11/2010 Hydro N/A Available Available I/A signed February 1, 2010 I/A signed September 16, 2009 249 11/17/2008 Deactivated Energy Recovery Group, LLC N/A DGI 2.3 2.3 Klamath OR PACW 12 kV circuit Riverside Feeder 5L18 (D) 3/31/2009 Solar N/A Available Available IA Terminated for Default May 24, 2011 250-A 11/20/2008 Deactivated N/A NR LGI 150 150 Millard UT PACE Pavant - Gondor line approx. 50 miles from the Gondor substation 7/15/2010 Wind Available N/A N/A REMOVED-LACK OF PROGRESS 250-B 11/20/2008 Deactivated N/A NR LGI 150 150 Millard UT PACE Pavant - Gondor line approx. 50 miles from the Gondor substation 7/15/2011 Wind Available N/A N/A REMOVED-LACK OF PROGRESS 251 11/20/2008 In Service Oregon Institute of Technology N/A DGI 0.28 0.28 Klamath OR PACW 12.0 kV circuit 5L49 out of Lakeport Substation 2/28/2009 1/6/2010 Geothermal Available N/A N/A I/A signed July 31, 2009 252 11/25/2008 In Progress N/A N/A QFSGI 0.23 0.23 Davis UT PACE Customer's existing 46 kV system fed from Riverdale Substation 3/1/2009 Solar Available N/A N/A 253 11/26/2008 In Service Carlisle SynTec, Inc. N/A DGI 0.05 0.05 Tooele UT PACE 1600 West B Avenue, Utah Industrial Depot, Tooele, Utah 12/31/2008 3/20/2009 Solar Available N/A N/A I/A signed February 19, 2009 254 12/18/2008 Deactivated N/A NR LGI 90 90 Iron UT PACE transmission line tap between the Enterprise and Moyle substations 8/1/2011 Solar Available Available N/A WITHDRAWN BY CUSTOMER 255 12/23/2008 In Progress N/A ER QFLGI 151.8 151.8 Bingham ID PACE 3.2 miles NE of Goshen Substation 7/1/2010 5/20/2012 Wind N/A Available Available 256 1/14/2009 In Service Cargill Environmental Finance NA DGI 1.696 1.696 Jefferson ID PACE HPS 12 circuit 4/15/2009 3/2/2011 Biogas N/A Available Available I/A signed December 01, 2009 257 1/28/2009 Deactivated AES Wind Generation, Inc. NR with ER LGI 6 6 Carbon/Albany WY PACE 34.5 kV connection to Foote Creek Substation 10/30/2010 12/17/2010 Wind N/A Available N/A Project rolled to Q0209 258 2/2/2009 Deactivated N/A ER LGI 165 165 Beaver UT PACE WECCO line Northwest of Cedar City, Utah 3/15/2011 Geothermal N/A Available N/A WITHDRAWN BY CUSTOMER 259 2/3/2009 Deactivated N/A N/A DGI 4 4 Big Horn WY PACE 24.9 distribution Fourbear feeder, 4H36, out of Pitchfork substation 3/31/2011 Hydro Available N/A N/A REMOVED-LACK OF PROGRESS High Plateau Windfarm, LLC (fka Oregon Windfarms, 260 3/3/2009 Suspended N/A QFSGI 10 10 Umatilla OR PACW Hinkle Substation 12/30/2009 12/31/2013 Wind Available Available Available More Info I/A signed 1/20/12 LLC) Mule Hollow Windfarm, LLC (fka Oregon Windfarms, 261 3/3/2009 Suspended N/A QFSGI 10 10 Umatilla OR PACW Hinkle Substation 12/30/2009 12/31/2013 Wind Available Available Available More Info I/A signed 1/20/12 LLC) Lower Ridge Windfarm, LLC (fka Oregon Windfarms, 262 3/3/2009 Suspended N/A QFSGI 10 10 Umatilla OR PACW Hinkle Substation 12/30/2009 12/31/2013 Wind Available Available Available More Info I/A signed 1/20/12 LLC)
Page 5 of 9 PacifiCorp Generation Interconnection Queue As of: 9/28/2012 In-Service Date Location of (Commercial Interconnect Request Information Max MW Output Generating Facility Location of Interconnection Operations) Reports Projected Actual Request Request Service Application Commercial Commercial Feasibility System Impact Schedule Q# Company Name S W County ST Region Point of Interconnection Type Facility Study Request Status Explanation Date Status Type Rules Operations Operations Study Study Deviation Date Date
263 3/3/2009 Suspended Pine City Windfarm, LLC (fka Oregon Windfarms, LLC) N/A QFSGI 10 10 Umatilla OR PACW Hinkle Substation 12/30/2009 12/31/2013 Wind Available Available Available More Info I/A signed 1/20/12 264 3/9/2009 Deactivated N/A NR with ER LGI 345 380 Weber UT PACE Ben Lomond - Warren Transmission Line 3/1/2012 Natural Gas N/A N/A N/A WITHDRAWN BY CUSTOMER 265 3/17/2009 Deactivated PacifiCorp Energy ER LGI - - Douglas OR PACW None provided. 11/17/2009 None N/A N/A N/A REMOVED-LACK OF PROGRESS 266 3/27/2009 Deactivated N/A N/A DGI 6 7.5 Converse WY PACE 12.47 gas plant feeder, circuit 5H102 1/31/2011 Waste Heat Available N/A N/A WITHDRAWN BY CUSTOMER 267-A 4/13/2009 In Progress PacifiCorp Energy NR with ER LGI 18.3 22 Sweetwater WY PACE Jim Bridger Power Plant, Point of Rocks, WY 6/12/2010 6/9/2019 Coal N/A Available Available More Info I/A signed June 3, 2010 267-B 4/13/2009 In Progress PacifiCorp Energy NR with ER LGI 18.3 22 Sweetwater WY PACE Jim Bridger Power Plant, Point of Rocks, WY 5/5/2013 Coal N/A Available Available More Info I/A signed June 3, 2010 267-C 4/13/2009 In Progress PacifiCorp Energy NR with ER LGI 18.3 22 Sweetwater WY PACE Jim Bridger Power Plant, Point of Rocks, WY 5/22/2011 Coal N/A Available Available More Info I/A signed June 3, 2010 267-D 4/13/2009 In Progress PacifiCorp Energy NR with ER LGI 18.3 22 Sweetwater WY PACE Jim Bridger Power Plant, Point of Rocks, WY 5/27/2012 Coal N/A Available Available More Info I/A signed June 3, 2010 268 4/13/2009 Deactivated N/A NR with ER LGI 50 50 Beaver UT PACE Line near Cove Fort 6/1/2013 Geothermal Available Available N/A More Info WITHDRAWN BY CUSTOMER 269 4/17/2009 Deactivated N/A NR with ER LGI 200 200 Campbell WY PACE Approx. 35 miles SW of the City of Gillette 12/31/2010 Wind Available Available N/A WITHDRAWN BY CUSTOMER 270-A 4/30/2009 In Service PacifiCorp Energy ER LGI 16.2 16.2 Emery UT PACE Huntington Power Plant, Huntington, Utah 11/20/2010 1/13/2012 Coal N/A Available Available I/A signed May 19, 2010 270-B 4/30/2009 In Service PacifiCorp Energy ER LGI 16.2 16.2 Emery UT PACE Huntington Power Plant, Huntington, Utah 11/27/2011 4/30/2015 Coal N/A Available Available I/A signed May 19, 2010 271-A 4/30/2009 In Service PacifiCorp Energy ER LGI 17 17 Emery UT PACE Huntington Power Plant, Huntington, Utah 12/26/2015 5/2/2012 Coal N/A Available Available I/A signed April 13, 2010 271-B 4/30/2009 In Service PacifiCorp Energy ER LGI 17 17 Emery UT PACE Huntington Power Plant, Huntington, Utah 4/29/2011 4/30/2015 Coal N/A Available Available I/A signed April 13, 2010 271-C 4/30/2009 In Service PacifiCorp Energy ER LGI 8.7 8.7 Emery UT PACE Huntington Power Plant, Huntington, Utah 4/1/2012 4/30/2016 Coal N/A Available Available I/A signed April 13, 2010 272 5/14/2009 In Service PacifiCorp Commercial & Trading NR with ER LGI 237 34.5 Carbon WY PACE Proposed new substation on the Miners-Difficulty Line 9/30/2010 9/30/2010 Wind N/A Available N/A Project rolled to Q0203 273 5/28/2009 Deactivated N/A N/A DGI 0.19635 0.19635 Jackson OR PACW Low side of 12.5 kV/277/480 V transformer at existing tap line, Hwy. 234 10/16/2009 Solar Available N/A N/A REMOVED-LACK OF PROGRESS 274 6/4/2009 Deactivated N/A N/A DGI 10 10 Douglas OR PACW 12.47 kV Industrial Feeder, Circuit 5R143 6/20/2010 Biomass Available N/A N/A WITHDRAWN BY CUSTOMER 275 6/5/2009 Deactivated N/A N/A DGI 3 3 Umatilla OR PACW Boeing feeder 4K46 circuit out of Dalreed Substation 8/30/2009 Wind N/A Available N/A WITHDRAWN BY CUSTOMER 276 6/11/2009 In Progress NEXTera Energy Resources, LLC NR with ER LGI 98.9 98.9 Umatilla OR PACW Wallula Substation 1/1/2011 12/31/2015 Wind N/A Available Available I/A signed August 31, 2011 277 6/16/2009 Deactivated N/A NR with ER LGI 50 55 Klamath OR PACW Line 9 between Junction Tap & Dairy Substation 7/1/2014 Geothermal Available Available N/A WITHDRAWN BY CUSTOMER 278 6/22/2009 Deactivated N/A N/A DGI 1.2 1.2 Umatilla OR PACW 12 kV circuit, 5W82, out of Hinkle Substation 11/1/2009 Hydro Available N/A N/A REMOVED-LACK OF PROGRESS 279 6/30/2009 In Service Farmers Irrigation District N/A QFSGI 4.8 4.8 Hood River OR PACW Powerdale - Woody Gutherie Line 1/1/2011 1/25/2011 Hydro N/A N/A Available I/A signed November 24, 2010 280 7/17/2009 Deactivated N/A N/A DGI 2 2 Klamath OR PACW 12.0 kV Circuit 5L1 out of Beatty Substation 8/1/2010 Solar Available N/A N/A WITHDRAWN BY CUSTOMER 281 7/30/2009 Deactivated N/A N/A DGI 2 2 Lake OR PACW 12.0 kV Circuit 5L100 out of Lakeview Substation 7/30/2010 Solar Available N/A N/A WITHDRAWN BY CUSTOMER 282 8/7/2009 In Service ATK Space Systems N/A SGI 0.0358 0.0358 Box Elder UT PACE Lampo Substation 9/24/2009 9/24/2009 Wind Available N/A N/A No I/A necessary 283 8/17/2009 In Service Duane Wiggins Hydro N/A DGI 0.02 0.02 Wallowa OR PACW Creighton Feeder, 4W8 circuit out of Enterprise Substation 5/1/2010 11/1/2010 Hydro Available N/A N/A I/A signed February 15, 2010 284 8/19/2009 In Service PacifiCorp Energy ER LGI 6 6 Douglas OR PACW Lomolo Switchyard 11/17/2009 7/21/2011 Hydro N/A Available Available I/A signed July 14, 2010 285 9/8/2009 Deactivated N/A N/A OGI 0.9 0.9 Sherman OR PACW 20.8 kV feeder, 4k1 circuit out of Moro Substation 9/30/2010 Wind N/A N/A N/A WITHDRAWN BY CUSTOMER 286 9/8/2009 Deactivated N/A N/A OGI 0.675 0.675 Sherman OR PACW 20.8 kV feeder, 4k1 circuit out of Moro Substation 9/30/2010 Wind N/A N/A N/A WITHDRAWN BY CUSTOMER 287-A 9/15/2009 Deactivated N/A NR with ER LGI 111.3 111.3 Natrona WY PACE Spence – Mustang line ~ 55 miles west of Casper, Wyoming 6/31/2012 Wind N/A Available N/A REMOVED-LACK OF PROGRESS 287-B 9/15/2009 Deactivated N/A NR with ER LGI 100.8 100.8 Natrona WY PACE Spence – Mustang line ~ 55 miles west of Casper, Wyoming 12/31/2012 Wind N/A Available N/A WITHDRAWN BY CUSTOMER 288 9/21/2009 In Service Growpro, Incorporated N/A DGI 0.075 0.075 Siskiyou CA PACW 12.0 kV Yuba Feeder circuit 6/1/2009 12/14/2010 Natural Gas Available N/A N/A I/A signed February 5, 2010 289 9/21/2009 Suspended Ridgeline Energy, LLC NR with ER LGI 501 501 Lake OR PACW PacifiCorp's bus in BPA's Summer Lake substation 9/1/2014 Wind Available Available Available I/a signed January 12, 2011 290-A 9/22/2009 In Progress Sweeney Park Wind Farm NR/ER LGI 100.8 100.8 Sweetwater WY PACE 17 Miles South SE of Rock Springs, Wyoming 06/31/2012 Wind Available Available Available I/A signed May 31, 2011 290-B 9/22/2009 In Progress Sweeney Park Wind Farm NR/ER LGI 100.8 100.8 Sweetwater WY PACE 17 Miles South SE of Rock Springs, Wyoming 12/31/2012 Wind Available Available Available I/A signed May 31, 2011 290-C 9/22/2009 In Progress Sweeney Park Wind Farm NR/ER LGI 50.4 50.4 Sweetwater WY PACE 17 Miles South SE of Rock Springs, Wyoming 06/31/2013 Wind Available Available Available I/A signed May 31, 2011 291 9/25/2009 Suspended DEGS Wind I, LLC NR/ER LGI 100 100 Carbon/Utah UT PACE Emery to Spanish Fork 9/25/2013 Wind N/A Available Available I/A signed June 29, 2011 292 9/25/2009 Deactivated N/A NR/ER LGI 35 35 Douglas OR PACW Roseburg Lumber Substation 1/1/2010 7/1/2012 Biomass N/A Available WITHDRAWN BY CUSTOMER 293-A 9/29/2009 Deactivated N/A NR/ER LGI 30 30 Weber UT PACE Ben Lomond - Western Zirconium 12/31/2012 Solar Available Available N/A REMOVED-LACK OF PROGRESS 293-B 9/29/2009 Deactivated N/A NR/ER LGI 15 15 Weber UT PACE Ben Lomond - Western Zirconium 12/31/2013 Solar Available Available N/A REMOVED-LACK OF PROGRESS 293-C 9/29/2009 Deactivated N/A NR/ER LGI 10 10 Weber UT PACE Ben Lomond - Western Zirconium 138 kV Line 12/31/2014 Solar Available Available N/A REMOVED-LACK OF PROGRESS 294 10/1/2009 Deactivated N/A NR/ER LGI 200 200 Carbon WY PACE Bus at Shirley Basin Substation 12/31/2014 Wind Available Available N/A REMOVED-LACK OF PROGRESS 295 10/1/2009 In Progress Shamrock Wind, LLC NR/ER LGI 403.2 403.2 Carbon WY PACE Bus at Aeolus Basin Substation 12/31/2014 8/5/2015 Wind Available Available Available More Info I/A signed March 17, 2011 296 10/5/2009 In Progress City of Portland Water Bureau N/A OGI 0.03 0.03 Multnomah OR PACW 12.5 kV Circuit 5P395 06/31/2010 5/30/2011 Hydro N/A N/A Available I/A signed November 2, 2010 297 10/7/2009 Deactivated N/A NR/ER LGI 100.5 100.5 Coos OR PACW Tap on Coquille-Lockhart Line 6/1/2011 Wind Available N/A N/A WITHDRAWN BY CUSTOMER 298 10/15/2009 Deactivated N/A NR/ER LGI 400 400 Albany WY PACE Shirley Basin substation 6/1/2011 Wind Available N/A N/A WITHDRAWN BY CUSTOMER 299 10/13/2009 In Progress City of Portland Water Bureau N/A OGI 1.1 1.1 Klamath OR PACW 12.0 kV Crystal Springs circuit, 5L45, out of Hornet substation 4/30/2012 4/27/2012 Hydro N/A Available Available More Info I/A signed July 18, 2011 300 10/19/2009 Deactivated N/A NR/ER LGI 362 362 Rich UT PACE Birch Creek - Ben Lomond Line 12/31/2013 Wind Available N/A N/A REMOVED-LACK OF PROGRESS 301 10/27/2009 In Progress PacifiCorp Energy (PAC C&T) NR/ER LGI 636 636 Utah UT PACE New Steel Mill substation 6/1/2015 6/1/2014 Natural Gas N/A Available Available I/A signed December 20, 2010 302 11/10/2009 Deactivated N/A N/A OGI 1.19 1.19 Umatilla OR PACW Boeing feeder 4K46 circuit out of Dalreed Substation 7/1/2011 Wind N/A Available N/A WITHDRAWN BY CUSTOMER 303 11/13/2009 In Service RES Agriculture, LLC N/A OGI 0.165 0.165 Marion OR PACW Aumsville feeder, Circuit 4M19, out of Stayton Substation 8/31/2011 2/20/2012 Biogas N/A Available Available I/A signed September 8, 2010 304 11/13/2009 Deactivated N/A NR LGI 102.5 102.5 Lake OR PACW Line from proposed project site to the Pondorosa substation 12/31/2012 Wind Available N/A N/A WITHDRAWN BY CUSTOMER 305-A 11/13/2009 Deactivated N/A NR/ER LGI 121.8 121.8 Carbon WY PACE Platte Substation 8/1/2012 Wind Available N/A N/A WITHDRAWN BY CUSTOMER 305-B 11/13/2009 Deactivated N/A NR/ER LGI 121.8 121.8 Carbon WY PACE Platte Substation 12/31/2012 Wind Available N/A N/A WITHDRAWN BY CUSTOMER 305-C 11/13/2009 Deactivated N/A NR/ER LGI 121.8 121.8 Carbon WY PACE Platte Substation 6/30/2013 Wind Available N/A N/A WITHDRAWN BY CUSTOMER 305-D 11/13/2009 Deactivated N/A NR/ER LGI 136.5 136.5 Carbon WY PACE Platte Substation 12/31/2013 Wind Available N/A N/A WITHDRAWN BY CUSTOMER 306-A 12/3/2009 Suspended Pioneer Wind Park I, LLC NR/ER QFLGI 48.3 48.3 Converse WY PACE Amassa Substation, (DJ - Difficulty) 1/31/2011 10/27/2012 Wind N/A Available Available I/A signed 12/12/11 306-B 12/3/2009 Deactivated N/A NR/ER LGI 50.4 50.4 Converse WY PACE Amassa Substation, (DJ - Difficulty) 1/31/2011 Wind N/A Available Available WITHDRAWN BY CUSTOMER 306-C 12/3/2009 Deactivated N/A NR/ER LGI 298.2 298.2 Converse WY PACE Amassa Substation, (DJ - Difficulty) 12/31/2012 Wind N/A Available Available WITHDRAWN BY CUSTOMER 307 12/9/2009 Deactivated N/A NR/ER LGI 380 400 Weber UT PACE Interconnection to Ben Lomond - Warren Line 5/1/2013 Natural Gas Available N/A N/A WITHDRAWN BY CUSTOMER 308 12/9/2009 Deactivated N/A NR/ER LGI 345 380 Salt Lake UT PACE Camp Williams - Mona 5/1/2014 Natural Gas N/A N/A N/A WITHDRAWN BY CUSTOMER 309 12/10/2009 Deactivated N/A N/A QFSGI 20 20 Hood River OR PACW Willard - Johnson Line 4/15/2012 Wind Available N/A N/A REMOVED-LACK OF PROGRESS 310 12/21/2009 In Progress Parowan Solar Energy, LLC (fka SolarReserve, LLC) N/A DGI 20 20 Iron UT PACE 34.5 kV Parowan Substation circuit 10/31/2010 9/10/2017 Solar Available Available Available I/A signed 12/20/11 311 12/21/2009 In Progress N/A N/A UGI 14 14 Iron UT PACE Circuit ENO12, Enoch #12, out of Enoch substation 10/31/2010 12/31/2013 Solar Available Available Available 312 12/21/2009 Deactivated N/A N/A QFSGI 20 20 Iron UT PACE Enterprise Valley Substation 10/31/2010 Solar Available N/A N/A WITHDRAWN BY CUSTOMER 313 12/22/2009 In Progress ENEL Cove Fort, LLC ER LGI 25 65 Beaver UT PACE Proposed Tushar substation 12/31/2012 12/31/2013 Geothermal N/A Available Available I/A signed 1/19/12 314 12/31/2009 In Progress Cedar Solar Energy, LLC (fka SolarReserve, LLC) N/A DGI 20 20 Iron UT PACE 34.5 kV West Cedar Substation circuit 12/31/2010 9/10/2017 Solar Available Available Available I/A signed 12/20/11 315 1/19/2010 Deactivated N/A NR/ER LGI 160 160 Power ID PACE T8S, R32E, SW Section 22 11/1/2012 12/1/2013 Wind Available Available Available WITHDRAWN BY CUSTOMER 316 1/27/2010 In Progress N/A NR/ER LGI 100 100 Umatilla OR PACW Breaker ring bus station ~ 5 mi. south of Wallula 230 kV substation 11/1/2011 10/1/2012 Wind N/A Available Available More Info
Page 6 of 9 PacifiCorp Generation Interconnection Queue As of: 9/28/2012 In-Service Date Location of (Commercial Interconnect Request Information Max MW Output Generating Facility Location of Interconnection Operations) Reports Projected Actual Request Request Service Application Commercial Commercial Feasibility System Impact Schedule Q# Company Name S W County ST Region Point of Interconnection Type Facility Study Request Status Explanation Date Status Type Rules Operations Operations Study Study Deviation Date Date 317 2/3/2010 Deactivated N/A N/A SGI 19.9 19.9 Weber UT PACE 46 kV bus at PacifiCorp's existing Little Mountain Substation 12/31/2012 Solar N/A N/A N/A REMOVED-LACK OF PROGRESS 318 2/4/2010 Deactivated N/A NR/ER LGI 102.5 102.5 Lake OR PACW Line from proposed project site to the Pondorosa substation 12/31/2012 Wind N/A N/A N/A More Info WITHDRAWN BY CUSTOMER I/A signed December 13, 2010 319 2/4/2010 Suspended Lakeview Cogeneration, LLC (Iberdrola) N/A LGI 26 26 Lake OR PACW Chiloquin - Mile Hi, Line 61 7/1/2012 9/1/2013 Biomass N/A Available N/A Suspended 10/21/11 320 2/12/2010 Deactivated N/A N/A DGI 3 3 San Juan UT PACE 12.47 kV Carbide Sub circuit 1/0/1900 Solar N/A N/A N/A REMOVED-LACK OF PROGRESS 321 2/19/2010 Deactivated N/A NR with ER LGI 50 50 Beaver UT PACE Substation, located near the Mother Earth tap point 7/25/2016 Geothermal Available N/A N/A WITHDRAWN BY CUSTOMER 322 2/22/2010 Deactivated N/A N/A QFSGI 15.6 15.6 Clark ID PACE Jefferson-Dubois Line 9/30/2011 TBD Biomass Available Available Available More Info REMOVED-LACK OF PROGRESS Power County Wind Park North, LLC (fka Power County 323-A 3/3/2010 In Progress NR with ER QFLGI 21.6 21.6 Power ID PACE Sunbeam Substation 5/31/2011 12/16/2011 Wind N/A Available Available IA Signed 3/11/11 Wind Parks, LLC (fka Windland, Inc.)) Power County Wind Park South, LLC (fka Power County 323-B 3/3/2010 In Progress NR with ER QFLGI 21.6 21.6 Power ID PACE Sunbeam Substation 11/30/2011 12/16/2011 Wind N/A Available Available IA Signed 3/11/11 Wind Parks, LLC (fka Windland, Inc.)) 324 3/8/2010 Suspended Utah Red Hills Renewable Park, LLC NR with ER LGI 40 40 Iron UT PACE Parowan - Rocky Mountain Power Substation 6/31/2011 8/10/2012 Solar N/A Available Available IA Signed 5/27/2011 325 3/8/2010 Deactivated N/A N/A QFSGI 9 9 Bonneville ID PACE Goshen - Rigby line 11/1/2011 Wind N/A N/A N/A WITHDRAWN BY CUSTOMER 326-A 3/16/2010 Deactivated N/A ER LGI 21.2 21.2 Beaver UT PACE Milford Substation 7/1/2014 Geothermal N/A Available Available REMOVED-LACK OF PROGRESS 326-B 3/16/2010 Deactivated N/A ER LGI 21.2 21.2 Beaver UT PACE Milford Substation 7/1/2014 Geothermal N/A Available Available REMOVED-LACK OF PROGRESS 326-C 3/16/2010 Deactivated N/A ER LGI 21.2 21.2 Beaver UT PACE Milford Substation 7/1/2014 Geothermal N/A Available Available REMOVED-LACK OF PROGRESS 326-D 3/16/2010 Deactivated N/A ER LGI 21.2 21.2 Beaver UT PACE Milford Substation 7/1/2014 Geothermal N/A Available Available REMOVED-LACK OF PROGRESS 326-E 3/16/2010 Deactivated N/A ER LGI 21.2 21.2 Beaver UT PACE Milford Substation 7/1/2014 Geothermal N/A Available Available REMOVED-LACK OF PROGRESS 326-F 3/16/2010 Deactivated N/A ER LGI 21.2 21.2 Beaver UT PACE Milford Substation 7/1/2014 Geothermal N/A Available Available REMOVED-LACK OF PROGRESS 326-G 3/16/2010 Deactivated N/A ER LGI 5 5 Beaver UT PACE Milford Substation 7/1/2014 Solar N/A Available Available WITHDRAWN BY CUSTOMER 327 3/22/2010 Deactivated N/A N/A SGI 20 20 Douglas OR PACW Substation located at the existing generation facility 6/1/2012 Biomass N/A N/A N/A WITHDRAWN BY CUSTOMER 328 4/5/2010 Deactivated N/A N/A SGI 10 10 Siskiyou CA PACW 12.47 kV Circuit, 5G149 out of Yreka Substation 4/1/2012 Biomass N/A N/A N/A WITHDRAWN BY CUSTOMER 329 4/6/2010 Deactivated N/A N/A OGI 0.425 0.425 Klamath OR PACW 12.0-kV Town Feeder; circuit 5L14, out of Bly substation 10/1/2010 Solar Available N/A N/A REMOVED-LACK OF PROGRESS 330 4/9/2010 Deactivated N/A NR/ER LGI 200 200 Juab UT PACE Mona Substation 12/31/2014 Wind N/A N/A N/A More Info WITHDRAWN BY CUSTOMER 331 4/26/2010 In Progress Del Rio Vineyards, LLC N/A OGI 0.193 0.193 Jackson OR PACW Low side of 12.5 kV/277/480 V transformer at existing tap line, Hwy. 234 12/22/2015 Solar N/A N/A N/A I/A signed June 24, 2010 332 4/29/2010 In Progress N/A N/A SGI 2.8 2.8 Beaver UT PACE 24.9 kV circuit, SML21, out of South Milford Substation 6/1/2011 TBD Biogas N/A Available Available Blue Mountain Biogas, LLC (fka Alpental Energy Partners, 333 5/17/2010 In Progress N/A SGI 3.2 3.2 Beaver UT PACE 24.9 kV circuit, SML21, out of South Milford Substation 10/1/2011 8/6/2012 Biogas N/A Available Available IA signed 2/27/12 LLC) 334 5/24/2010 Deactivated N/A N/A UGI 0.45 0.45 Beaver UT PACE 12.5-kV Circuit, SML11, out of South Milford Substation 9/1/2010 Wind Available N/A N/A WITHDRAWN BY CUSTOMER 335 6/1/2010 In Progress N/A NR/ER QFLGI 49.6 49.6 Converse WY PACE Amassa Substation, (DJ - Difficulty) 12/31/2012 3/1/2013 Wind N/A Available Available 336 6/2/2010 Deactivated PacifiCorp Energy (PAC C&T) NR/ER LGI 71 34 Utah UT PACE Steel Mill substation 6/1/2015 Natural Gas N/A Available N/A Project rolled to Q0301 337 6/3/2010 Deactivated N/A NR/ER LGI 174 174 Washington UT PACE Hurricane West Substation 7/12/2005 Hydro Available N/A N/A WITHDRAWN BY CUSTOMER 338 6/3/2010 Deactivated N/A NR/ER LGI 33.15 33.15 Washington UT PACE Section 10, T435, R13W 7/12/2005 Hydro N/A N/A N/A WITHDRAWN BY CUSTOMER 339 6/3/2010 Deactivated N/A N/A SGI 2 2 Washington UT PACE Windy Ridge - Twin Cities Transmission Line 4/1/2020 Hydro Available N/A N/A WITHDRAWN BY CUSTOMER 340 6/3/2010 Deactivated N/A N/A SGI 5.2 5.2 Washington UT PACE Section 10, T425, R13W 1/0/1900 Hydro N/A N/A N/A WITHDRAWN BY CUSTOMER Meadow Creek Project Company, LLC (FKA Ridgeline 341 6/10/2010 In Progress NR/ER QFLGI 120 120 Bonneville ID PACE Goshen Substation 11/1/2011 11/1/2012 Wind N/A Available Available I/A signed 1/18/12 Energy) 342 6/15/2010 Deactivated N/A N/A DGI 5 5 Beaver UT PACE 24.9-kV Circuit, SML21, out of South Milford Substation 3/31/2011 Solar N/A Available N/A WITHDRAWN BY CUSTOMER 343 6/21/2010 Deactivated N/A NR/ER LGI 397.5 397.5 Millard UT PACE Pavant - Gonder Line 11/1/2013 Wind Available N/A N/A REMOVED-LACK OF PROGRESS 344 6/23/2010 Deactivated N/A N/A QFSGI 3.6 3.6 Fremont ID PACE 12.5-kV Circuit, STA13, out of St. Anthony Substation 1/1/2012 Hydro N/A N/A N/A WITHDRAWN BY CUSTOMER 345-A 7/15/2010 Deactivated N/A N/A SGI 14 14 Washington UT PACE Coleman - Toquerville line 10/1/2010 Wind N/A Available N/A REMOVED-LACK OF PROGRESS 345-B 7/15/2010 Deactivated N/A N/A SGI 3.3 3.3 Washington UT PACE Coleman - Toquerville line 10/1/2010 Hydro N/A Available N/A REMOVED-LACK OF PROGRESS 346 7/20/2010 Deactivated N/A NR/ER LGI 599.4 599.4 Umatilla OR PACW Proposed line from Boardman to Hemingway 12/31/2015 Wind N/A N/A N/A More Info WITHDRAWN BY CUSTOMER 347 7/26/2010 Deactivated N/A N/A UGI 6.8 7.5 Washington UT PACE 34.5-kV Circuit,MDD24, out of Middleton Substation 11/30/2010 Natural Gas Available Available N/A WITHDRAWN BY CUSTOMER 348 8/9/2010 In Progress Cottonwood Hydro, LLC N/A UGI 0.22 0.22 Salt Lake UT PACE 24.9-kV Circuit, QRY15, out of Quarry Substation 4/30/2011 Hydro N/A N/A Available I/A signed July 26, 2011 349 8/13/2010 Deactivated N/A N/A OGI 8.556 8.556 Multnomah OR PACW 12.5-kV Circuit, 5P123, out of Killingsworth Substation 12/31/2011 Biomass N/A Available Available REMOVED-LACK OF PROGRESS 350 9/8/2010 In Progress AG Hydro, LLC N/A OGI 10 10 Jackson OR PACW Line 32 7/1/2012 12/31/2012 Hydro N/A Available Available I/A signed April 4, 2011 351 9/8/2010 Suspended Klamath Falls Bioenergy, LLC NR QFLGI 35 39 Klamath OR PACW Line 18 transmission line in Klamath County, OR 4/30/2012 3/31/2013 Biomass N/A Available Available I/A signed 11/18/11 352 9/15/2010 In Progress City of Astoria N/A OGI 0.032 0.032 Clatsop OR PACW Knappa Svensen Substation, 12.47 kV circuit 5A92 1/15/2012 Hydro Available N/A N/A I/A signed 11/23/11 353 10/7/2010 Deactivated N/A N/A OGI 0.02 0.02 Clatsop OR PACW 12.47-kV Distribution line circuit out of Warrenton Substation TBD Wind N/A N/A N/A REMOVED-LACK OF PROGRESS 354 10/12/2010 Deactivated N/A NR/ER QFLGI 32 32.5 Polk OR PACW BPA Salem-Dallas transmission line 12/1/2013 Biomass Available N/A N/A REMOVED-LACK OF PROGRESS 355 11/1/2010 In Service Mountain Energy Inc. N/A OGI 0.05 0.05 Josephine OR PACW 12.5-kV Distribution line circuit out of Cave Junction Substation TBD 4/29/2011 Hydro N/A N/A N/A I/A signed March 2, 2011 356 11/3/2010 Deactivated N/A N/A OGI 0.43 0.43 Marion OR PACW 20.8 kV Mint circuit, 4M125, out of Jefferson Substation TBD Biomass N/A Available Available WITHDRAWN BY CUSTOMER 357 11/3/2010 Deactivated N/A N/A OGI 0.43 0.43 Marion OR PACW 20.8 kV Mint circuit, 4M125, out of Jefferson Substation 12/1/2011 Biomass N/A Available Available WITHDRAWN BY CUSTOMER 358 11/4/2010 In Service Odell Creek Hydro N/A OGI 0.225 0.225 Hood River OR PACW 12.58-kV South circuit, 5K74, out of Hood River Substation 2/8/2011 2/8/2011 Hydro N/A N/A N/A I/A signed February 8, 2011 359 11/10/2010 Deactivated N/A NR/ER LGI 269.4 275 Salt Lake UT PACE Kennecott Power Plant, Magna Gate 1/1/2014 Natural Gas N/A N/A N/A WITHDRAWN BY CUSTOMER 360 11/11/2010 In Progress TMF Biofuels, LLC N/A OGI 4.8 4.8 Morrow OR PACW 34.5-kV Sim/Tag circuit, 4K40, out of Dalreed Substation 11/30/2011 5/8/2013 Biogas N/A Available Available I/A signed September 1, 2011 361 11/12/2010 Deactivated N/A N/A OGI 1.5 1.5 Klamath OR PACW 12.0-kV Crystal Springs Circuit, 5L45, out of Hornet Substation 12/31/2011 Solar N/A N/A N/A WITHDRAWN BY CUSTOMER 362 11/12/2010 Deactivated N/A N/A OGI 1.5 1.5 Klamath OR PACW 12.0-kV Crystal Springs Circuit, 5L45, out of Hornet Substation 12/31/2011 Solar N/A N/A N/A WITHDRAWN BY CUSTOMER 363 12/13/2010 In Progress J Bar 9 Ranch, Inc. N/A DGI 0.1 0.1 Park WY PACE 24.9-kV Southfork circuit, 4H27, out of South Cody Substation 10/15/2011 1/27/2012 Wind Available N/A N/A I/A signed March 29, 2011 364 12/15/2010 In Progress Dorena Lake, LLC N/A OGI 6.83 6.83 Lane OR PACW 20.8-kV Village Green Substation 7/1/2012 Hydro N/A Available Available I/A Signed August 3, 2011 365 12/20/2010 In Progress Bureau of Land Management - Rawlins Office N/A DGI 0.11 0.11 Carbon WY PACE 34.5-kV N. Rawlins Curcuit, 9H440, out of Platte Substation 5/1/2011 10/15/2011 Wind Available N/A N/A I/A Signed April 4, 2011 366 12/22/2010 In Progress Roseburg LFG Energy, LLC N/A OGI 1.6 1.6 Douglas OR PACW 20.8-kV Circuit 4U30 out of Southgate Substation 10/1/2011 11/21/2011 Biogas N/A Available Available I/A signed August 12, 2011 367 12/27/2010 In Progress N/A NR/ER LGI 169 172 Iron UT PACE Sigurd-Red Butte transmission line 1/1/2014 Solar Available Available Available 368 1/18/2011 Deactivated N/A N/A OGI 1.6 1.6 Douglas OR PACW 20.8-kV Circuit 4U38 out of Cloake Substation 10/1/2011 Biogas N/A Available N/A REMOVED-LACK OF PROGRESS 369 2/4/2011 Deactivated N/A NR LGI 100 100 Iron UT PACE Line near the Newcastle Substation 10/1/2013 Solar N/A N/A N/A WITHDRAWN BY CUSTOMER 370 2/14/2011 Deactivated N/A N/A OGI 4.8 4.8 Morrow OR PACW 34.5-kV Sim/Tag circuit, 4K40, out of Dalreed Substation 11/30/2011 Biogas N/A Available N/A Project rolled in to Q0360 371 2/16/2011 Deactivated N/A N/A OGI 2.403 2.403 Jefferson OR PACW 12.47-kV Madras Rural circuit, 5D52, out of Madras Substation 3/31/2012 Solar N/A N/A N/A WITHDRAWN BY CUSTOMER 372 2/25/2011 In Progress EBD Hydro, LLC N/A OGI 2.999 2.999 Jefferson OR PACW 12.47-kV Culver circuit, 5D5, out of Culver Substation 4/30/2012 8/15/2012 Hydro N/A Available Available I/A signed 9/17/12 373 2/28/2011 In Progress Aurora Solar, LLC (Iberdrola Renewables) ER SGI 5 5 Klamath OR PACW Existing Klamath Peaker Substation 3/15/2012 10/1/2012 Solar N/A Available Available I/A signed 2/27/12
Page 7 of 9 PacifiCorp Generation Interconnection Queue As of: 9/28/2012 In-Service Date Location of (Commercial Interconnect Request Information Max MW Output Generating Facility Location of Interconnection Operations) Reports Projected Actual Request Request Service Application Commercial Commercial Feasibility System Impact Schedule Q# Company Name S W County ST Region Point of Interconnection Type Facility Study Request Status Explanation Date Status Type Rules Operations Operations Study Study Deviation Date Date I/A signed 1/9/12 374 2/28/2011 Deactivated OM Power 1, LLC N/A OGI 8 8 Klamath OR PACW Transmission Line #9, Klamath Falls to Fish Hole 2/28/2012 Geothermal N/A Available Available I/A Terminated 7/1/12 375 3/4/2011 In Progress Eurus Dry Creek Wind LLC NR/ER LGI 230 230 Carbon WY PACE Proposed Heward substation 10/1/2014 Wind Available Available Available I/A signed 8/20/12 376 3/4/2011 Deactivated N/A N/A OGI 10 10 Crook OR PACW 12.47-kV Rimrock Circuit 5D126, out of Prineville Substation 12/31/2011 Solar N/A Available N/A WITHDRAWN BY CUSTOMER 377 3/9/2011 In Progress N/A ER/NR LGI 269.4 275 Salt Lake UT PACE Kennecott Power Plant, proposed Curry Peak Substation 1/1/2014 Natural Gas N/A Available Available 378 3/31/2011 Deactivated N/A NR QFLGI 80 80 Morrow / Umatilla OR PACW Hat Rock -- McNary Line 10/30/2012 Wind Available N/A N/A WITHDRAWN BY CUSTOMER 379 3/31/2011 Deactivated N/A NR QFLGI 80 80 Morrow / Umatilla OR PACW Hat Rock -- McNary Line 10/30/2012 Wind Available N/A N/A WITHDRAWN BY CUSTOMER 380 3/31/2011 Deactivated N/A NR QFSGI 10 10 Morrow / Umatilla OR PACW Hat Rock -- McNary Line 10/30/2012 Wind Available N/A N/A WITHDRAWN BY CUSTOMER 381 3/31/2011 Deactivated N/A NR QFSGI 10 10 Morrow / Umatilla OR PACW Hat Rock -- McNary Line 10/30/2012 Wind Available N/A N/A WITHDRAWN BY CUSTOMER 382 3/31/2011 Deactivated N/A NR QFSGI 10 10 Morrow / Umatilla OR PACW Hat Rock -- McNary Line 10/30/2012 Wind Available N/A N/A WITHDRAWN BY CUSTOMER 383 3/31/2011 Deactivated N/A NR QFSGI 10 10 Morrow / Umatilla OR PACW Hat Rock -- McNary Line 10/30/2012 Wind Available N/A N/A WITHDRAWN BY CUSTOMER 384 3/30/2011 In Progress N/A NR/ER LGI 60 60 San Juan UT PACE Pinto Substation 12/31/2012 Wind N/A Available Available 385 4/13/2011 Deactivated N/A N/A OGI 2.75 2.75 Jefferson OR PACW 12.47-kV Madras Rural circuit, 5D52, out of Madras Substation 6/30/2013 Solar N/A Available N/A WITHDRAWN BY CUSTOMER 386 4/15/2011 Deactivated N/A N/A OGI 1.64 1.64 Polk OR PACW 20.8-kV Buena Vista circuit, 4M22, out of Independence Substation 7/31/2012 Biogas N/A Available N/A REMOVED-LACK OF PROGRESS 387 4/19/2011 Deactivated N/A N/A OGI 10 10 Klamath OR PACW 12.0-kV Malin City circuit, 5L20, out of Turkey Hill Substation 12/30/2012 Solar N/A N/A N/A WITHDRAWN BY CUSTOMER 388 5/4/2011 Deactivated N/A N/A UGI 3 3 Iron UT PACE 12.5-kV West Parowan valley circuit, BRT11, out of Burton Substation 9/30/2011 Solar N/A N/A N/A WITHDRAWN BY CUSTOMER 389-A 5/20/2011 In Progress Black Cap Solar, LLC N/A OGI 2 2 Lake OR PACW 12.0 kV Circuit 5L105 out of Mile Hi Substation 12/15/2011 7/1/2012 Solar N/A Available Available IA signed 12/27/11 389-B 5/20/2011 Deactivated N/A N/A OGI 5 5 Lake OR PACW 12.0 kV Circuit 5L100 out of Mile Hi Substation 12/15/2011 Solar N/A N/A N/A Resubmitted as Q392 390 5/23/2011 Deactivated N/A N/A SGI 0.4 0.4 Beaver UT PACE 24.9 kV circuit, SML21, out of South Milford Substation 10/1/2011 Biogas N/A N/A N/A Rolled into Q333 391 6/24/2011 Deactivated N/A N/A OGI 1.425 1.425 Deschutes OR PACW Circuit 5D243, Black Bear Feeder out of Shevlin Park Substation 10/1/2013 Hydro N/A N/A N/A WITHDRAWN BY CUSTOMER 392 6/28/2011 Deactivated N/A N/A OGI 2 2 Lake OR PACW 12.0 kV Circuit 5L105 out of Mile Hi Substation 12/15/2011 7/1/2012 Solar N/A Available Available REMOVED-LACK OF PROGRESS 393 7/5/2011 In Progress N/A NR/ER LGI 19.5 27 Lake OR PACW Mile-Hi substation 12/31/2013 Geothermal Available Available 394 7/5/2011 Deactivated N/A NR/ER LGI 48.547 49.035 Linn OR PACW Conser Tap - Fry 115kV transmission line 5/1/2013 Natural Gas Available N/A N/A REMOVED-LACK OF PROGRESS 395 7/27/2011 Deactivated N/A N/A OGI 1.6 1.6 Deschutes OR PACW Circuit 5D243, Black Bear Feeder out of Shevlin Park substation 10/1/2013 Hydro N/A Available Available REMOVED-LACK OF PROGRESS 396 8/4/2011 In Progress eBay, Inc N/A UGI 0.585 0.585 Salt Lake UT PACE Circuit OQU18, Oquirrh #18 feeder, out of Oquirrh substation 12/1/2011 12/15/2012 Solar Available N/A N/A I/A signed 1/9/12 397 8/19/2011 In Progress N/A N/A QFSGI 16 16 Washington UT PACE Coleman - Toquerville line 6/1/2012 4/1/2013 Wind Available More Info 398-A 8/26/2011 Deactivated N/A NR LGI 192 192 Bonneville ID PACE Proposed Twin Buttes substation on Goshen-Bonneville 161-kV Line 12/15/2012 Wind Available N/A N/A WITHDRAWN BY CUSTOMER 398-B 8/26/2011 Deactivated N/A NR LGI 288 288 Bonneville ID PACE Proposed Twin Buttes substation on Goshen-Bonneville 161-kV Line 12/15/2012 Wind N/A N/A N/A WITHDRAWN BY CUSTOMER 399 8/29/2011 Deactivated N/A NR/ER LGI 45 45 Crook OR PACW Ponderosa substation 6/30/2015 Solar N/A N/A N/A WITHDRAWN BY CUSTOMER 400 9/8/2011 Deactivated N/A NR QFLGI 80 80 San Juan UT PACE Moab - Pinto Line, Pole #387 3/1/2013 Wind N/A N/A N/A WITHDRAWN BY CUSTOMER 401 9/6/2011 In Progress CBG Portland, LLC (fka Columbia Biogas, LLC) N/A OGI 8.56 8.56 Multnomah OR PACW Circuit 5P123, Killingsworth #3, out of Killingsworth substation 3/15/2013 6/1/2013 Biogas N/A Available Available I/A signed 7/11/12 402 10/20/2011 Deactivated PacifiCorp Energy (PAC C&T) ER/NR LGI 92 92 Albany WY PACE Foote Creek Substation 9/30/2018 Wind N/A N/A N/A WITHDRAWN BY CUSTOMER 403 10/25/2011 In Progress N/A NR/ER LGI 525 525 Sevier UT PACE Sigurd substation 7/1/2014 Natural Gas Available Available More Info 404 11/7/2011 Deactivated N/A N/A QFSGI 11.8 11.8 Sanpete UT PACE Jerusalem-Moroni Feed Line 11/1/2013 Biogas N/A Available REMOVED-LACK OF PROGRESS 405 10/25/2011 Deactivated N/A N/A UGI 1.56 1.56 Tooele UT PACE Tooele substation, 46 kV 4/25/2013 Wind N/A N/A N/A REMOVED-LACK OF PROGRESS 406 1/9/2012 Deactivated N/A NR/ER LGI 65 65 Emery UT PACE Helper-Moab, 138kV 1/1/2014 Natural Gas Available N/A N/A REMOVED-LACK OF PROGRESS Rock Springs-Palisades switching station transmission line, 6mi West of Rock 407 1/17/2012 In Progress N/A NR/ER LGI 79.8 79.8 Sweetwater WY PACE 12/31/2012 Wind N/A Available Springs, Wy 408 1/23/2012 Deactivated N/A N/A SGI 20 20 Yakima WA PACW White Swan Substation 9/30/2013 Biomass N/A REMOVED-LACK OF PROGRESS 409 1/26/2012 In Progress N/A NR/ER LGI 320 320 Albany WY PACE Freezeout Substation 9/30/2014 Wind Available Available 410 1/27/2012 Deactivated N/A N/A OGI 0.32 0.32 Deschutes OR PACW Circuit 5D106, Nez Perce, out of Overpass substation 1/0/1900 Hydro N/A N/A N/A WITHDRAWN BY CUSTOMER 411 2/16/2012 In Progress N/A ER LGI 98.4 98.4 Umatilla OR PACW Pole #7/28, Pendleton-Weston Line 12/31/2013 Wind N/A Available 412 2/17/2012 Deactivated N/A N/A QFSGI 0.1 0.1 Caribou ID PACE Circuit COV12, Cove #12, out of Cove substation 12/31/2012 Hydro Available N/A N/A WITHDRAWN BY CUSTOMER 413 2/24/2012 In Progress N/A N/A OGI 0.3 0.3 Jefferson OR PACW Circuit 5D5, Culver circuit, out of Culver substation 4/30/2013 Hydro Available N/A Available 414 3/8/2012 In Progress N/A N/A OGI 1.75 1.75 Klamath OR PACW 12.0 kV circuit 5L49 out of Lakeport Substation 11/1/2012 Geothermal N/A Available 415 3/12/2012 In Progress Thermo No. 1 BE-01, LLC (Cyrq Energy) N/A SGI 11 11 Beaver UT PACE 24.9-kV Circuit, SML21, out of South Milford Substation 12/1/2012 4/1/2013 Geothermal N/A Available N/A I/A signed 8/6/12 416 3/14/2012 Deactivated N/A NR/ER LGI 80 80 San Juan UT PACE Pinto Substation 8/30/2014 Wind N/A N/A N/A WITHDRAWN BY CUSTOMER 417 3/19/2012 In Progress N/A N/A QFSGI 1.36 1.36 Sanpete UT PACE Nebo-Gunnison, Manti City Tap 10/1/2012 10/31/2013 Hydro Available Available 418 3/22/2012 Deactivated N/A NR/ER LGI 80 80 San Juan UT PACE Moab - Pinto Line, Pole #365 8/31/2014 Wind N/A N/A N/A REMOVED-LACK OF PROGRESS 419 3/23/2012 Deactivated N/A NR/ER LGI 320 375 Cowlitz WA PACW Speelyai Line, just east of BPA Woodland sub 12/1/2015 Natural Gas N/A N/A N/A WITHDRAWN BY CUSTOMER 420 3/26/2012 In Progress N/A NR/ER LGI 140 140 San Juan UT PACE Moab – Pinto transmission line at or near pole 390 10/1/2014 Wind Available 421 3/29/2012 Deactivated N/A N/A DGI 5 5 Yakima WA PACW Circuit 5Y312, VanBelle circuit, out of Sunnyside substation 6/1/2015 Solar N/A N/A N/A WITHDRAWN BY CUSTOMER 422 3/29/2012 In Progress N/A N/A DGI 5 5 Yakima WA PACW Circuit 5Y243, West Rural circuit, out of Toppenish substation 6/1/2015 Solar N/A Available 423 4/16/2012 Deactivated N/A ER LGI 230 230 Salt Lake UT PACE Oquirrh substation 5/1/2015 Natural Gas WITHDRAWN BY CUSTOMER 424 4/20/2012 Deactivated N/A ER LGI 175 175 Weber UT PACE Ben Lomond - Warren Line 5/1/2015 Natural Gas WITHDRAWN BY CUSTOMER 425 6/1/2012 In Progress N/A N/A QFLGI 132.8 156.2 Sublette WY PACE Chappel Creek substation 7/30/2016 Natural Gas Available 426 6/26/2012 In Progress N/A NR/ER LGI 80 80 San Juan UT PACW Moab-Pinto Line, Pole #365 8/31/2014 Wind 427 7/18/2012 In Progress N/A N/A QFLGI 80 80 Sweetwater WY PACE Firehole substation 12/31/2015 Wind 428 7/5/2012 In Progress N/A N/A SGI 0.195 0.195 Box Elder UT PACE Lampo Substation 10/31/2012 Other 429 7/20/2012 In Progress N/A N/A OGI 10 10 Klamath OR PACW Transmission Line #9, Klamath Falls to Fish Hole 12/31/2013 Geothermal 430 7/19/2012 In Progress N/A N/A SGI 12 12 Klamath OR PACW Pole 14/9, Klamath-Fishhole line 10/1/2013 Geothermal 431 7/19/2012 In Progress N/A N/A SGI 12 12 Siskiyou CA PACW Pole 3/19, Dorris-Tunnel line 10/1/2013 Geothermal 432 8/9/2012 In Progress N/A N/A QFSGI 6.3 6.3 Salt Lake UT PACE Customer's existing 138kV substation 5/1/2013 Other 433 8/27/2012 In Progress N/A N/A OGI 9 9 Jefferson OR PACW Customer's existing substation 9/30/2013 Biomass 434 8/24/2012 Deactivated N/A N/A QFLGI 80 80 Crook OR PACW Ponderosa substation 9/30/2014 Solar WITHDRAWN BY CUSTOMER 435 8/24/2012 Deactivated N/A N/A QFLGI 80 80 Crook OR PACW Ponderosa substation 9/30/2014 Solar WITHDRAWN BY CUSTOMER 436 9/4/2012 In Progress N/A NR/ER LGI 50 50 Iron UT PACE Pole 265 on the West Cedar-Middleton line 10/31/2013 Solar 437 9/17/2012 In Progress N/A N/A DGI 0.5 0.5 Franklin ID PACE Circuit PRS13, Preston #13, out of Preston substation ? Hydro 438 8/17/2012 In Progress N/A N/A UGI 1.75 1.75 Tooele UT PACE Customer's electric system from Tooele Depot substation ? Solar 439 8/17/2012 In Progress N/A N/A UGI 1.56 1.56 Tooele UT PACE Customer's electric system from Tooele Depot substation ? Wind
Page 8 of 9 PacifiCorp Generation Interconnection Queue As of: 9/28/2012 In-Service Date Location of (Commercial Interconnect Request Information Max MW Output Generating Facility Location of Interconnection Operations) Reports Projected Actual Request Request Service Application Commercial Commercial Feasibility System Impact Schedule Q# Company Name S W County ST Region Point of Interconnection Type Facility Study Request Status Explanation Date Status Type Rules Operations Operations Study Study Deviation Date Date
Download PDF of this Report Get Acrobat Reader
Company Name: Only displayed after Interconnection Agreement has been filed with FERC. Service Type: Not applicable to Large Generator Interconnection requests made prior to 01/20/2004, Small Generator Interconnection requests, or Qualifying Facility Interconnection requests. ER: Energy Resource Interconnection Service NR: Network Resource Interconnection Service NR with ER: Network Resource Interconnection Service requested, but also studied as Energy Resource. Customer will choose Service Type (ER or NR) prior to Facilities Study. Study Reports: If displayed, click "Available" link to view PDF files. Study Schedule Deviation: If displayed, click "More Info" link to view PDF files. Deactivated Explanation WITHDRAWN BY CUSTOMER: Interconnection Customer requested application be withdrawn from queue. REMOVED-LACK OF PROGRESS: Removed by PacifiCorp due to lack of progress through procedures by Interconnection Customer. REMOVED-ERROR IN ENTRY: Removed by Pacificorp due to entry error by PacifiCorp.
Page 9 of 9