The Contractor is to check and verify all building and site dimensions, levels and sewer invert levels at connection S111 Clearance Plan points before work starts. The Contractor is to comply in all respects with current Building Legislation, British Standard Scale = 1:200 Specifications , Building Regulations, Construction (Design & Management) Regulations, Party Wall Act, etc. whether or not specifically stated on this drawing. This drawing must Priority sign, lighting & pole be read with and checked against any structural, geotechnical or other specialist documentation provided. to be removed. This drawing is not intended to show details of foundations, ground conditions or ground contaminants. Each area of ground relied upon to support any structure depicted Electrical supply cable to (including drainage) must be investigated by the Contractor. A suitable method of foundation should be provided allowing be disconnected and pot for existing ground conditions. Any suspect or fluid ground, contaminates on or within the ground, should be further investigated by a suitable expert. Any earthwork ended by Eon Energy. constructions shown indicate typical slopes for guidance only & should be further investigated by a suitable expert. Where existing trees / structures are to be retained they White lining should be subject to a full specialist inspection for safety. All Sign 557.1, Plate 557.2 & trees are to be planted so as to ensure they are a minimum to be removed of 5 metres from buildings. A suitable method of foundation pole to be removed. is to be provided to accommodate the proposed tree planting. HB2 Kerbs to be removed. Residential & Commercial Engineering Limited do not accept any responsibility for any losses (financial or otherwise) to And build out removed. any Client or third party arising out of the Clients (be it Developer or Contractor but not limited thereto) non- compliance with afore mentioned provisos. c This drawing is the property of Residential & Commercial Engineering Limited and may not be copied or used for any purpose other than that for which it is supplied without the express written authority of Residential & Commercial Engineering Limited.

Key: Sign 811, Plate 811.1 & pole to be removed. =HB2 kerbs to be removed Bollards to be removed. Electric supply cable to be Electric supply cable to disconnected and pot =2 x speed cushions to be removed disconnected and pot ended ended by Eon Energy. =Build out to be removed by Eon Energy. =Section 111 Legal Areas =White Lining S111 Works Plan =White Lining to be Removed Notes: Scale = 1:250 All Manhole Cover and Frames shall comply with the relevant provisions of BS EN 124, BS 7903 and Highways Bradbury ŐĞŶĐLJ'ƵŝĚĂŶĐĞŽĐƵŵĞŶƚ,ϭϬϰͬϬϵ͘ >ŽĂĚŝŶŐůĂƐƐŝĨŝĐĂƚŝŽŶƐƐ&ŽůůŽǁƐ͙ In Carriageways and Roads (including shared surface streets), hard shoulders & parking areas, Class D400. Rise In Driveways, footways and comparable locations, Class Worn Manhole Cover to be B125 replaced with similar In gardens, Class E2.32. approved D400 Cover. All Road Specification as per County Council's Residential Design Guide - Highway Specification Documents.

DOXEY ³7KHUHTXLUHGVXEEDVHFDSSLQJWKLFNQHVVIRUDUHDVRIODQG forming carriageway/footways adoptable as public highway Doxey Road subject to ground improvement/stabilisation shall be determined following on-site testing by or in the presence of the County Council's Highway Authority. All testing techniques/procedures shall be agreed with Staffordshire County Council as Highway Authority in liaison with SCC Laboratory. CBR Values may be used in all other areas of land in which the adoptable areas of carriageway/footway DUHWREHFRQVWUXFWHGXSRQQDWXUDOIRUPDWLRQ´ Diag 1004 All white lining is to be reinstated and/or additional white lining to be added were necessary in ³1RFHPHQWVWDELOLVHGJURXQGLVWREHSURYLGHGZLWKLQWKH New white lining to XSSHUOD\HUVRIJURXQGVXVFHSWLEOHWRIURVW´ conjunction with the Traffic Signs Manual, Chapter 5, be provided to tie in Disconnection to be made by Eon Energy Section 4 (longitudinal Lines). with existing centre Rev E: Drawing updated to SCC comments line. 08.03.17 TH (PT) All White lining is to be agreed on site with the SCC Rev D: Drawing updated to SCC comments clerk of works. 01.02.17 TH (PT) Rev C: Drawing updated to SCC comments 06.09.16 TH (PT) S111 Legal Plan Rev B: Drawing updated to SCC comments Scale = 1:200 01.08.16 PT Rev A: Updated to include additional speed cushions. 16.05.16 GR Revisions:

Drawing Status: Subject to technical approvals

Client: Tie-in Detail Bellway Homes Scale = NTS

Project: Doxey Road,

Title: Section 111 Clearance, Works, Legal & Construction Plan

Job Number. Scale: See Drwg @ A1 RACE/BH/DRS Date: Nov ' 15 Drawing No. ENG 700 Drawn by: GR Revision. E Checked by: GJ

Contact us : Unit 17, Lakeside Business Park, Walkmill Lane, , WS11 0XE Tel : 01922 411 552