Planning Statement PUTEF.Pdf

Total Page:16

File Type:pdf, Size:1020Kb

Planning Statement PUTEF.Pdf Thames Tideway Tunnel Thames Water Utilities Limited Application for Development Consent Application Reference Number: WWO10001 Planning Statement Doc Ref: 7.01 Appendix D APFP Regulations 2009: Regulation 5(2)(q) Hard copy available in Box 44 Folder A Appendix D January 2013 This page is intentionally blank Thames Tideway Tunnel Planning Statement Appendix D: Putney Embankment Foreshore List of contents Page number D.1 Introduction ....................................................................................................... 1 D.2 Site description ................................................................................................. 1 D.3 Planning context ............................................................................................... 4 D.4 Site-specific description of development ....................................................... 6 Overview ............................................................................................................. 6 Application for development consent .................................................................. 8 Construction ...................................................................................................... 10 Temporary slipway ............................................................................................ 11 Site preparation ................................................................................................ 12 Shaft construction ............................................................................................. 12 Tunnelling ......................................................................................................... 12 Secondary lining of connection tunnel and shaft ............................................... 13 Construction of other structures ........................................................................ 13 Completion of works and site restoration .......................................................... 13 Operation and maintenance .............................................................................. 14 CSO drop shaft ................................................................................................. 14 Chambers and culverts ..................................................................................... 14 Ventilation structures ........................................................................................ 15 Electrical and control kiosks .............................................................................. 15 Permanent restoration and landscaping ........................................................... 15 Access .............................................................................................................. 15 Typical maintenance regime ............................................................................. 16 Scheme development ....................................................................................... 16 D.5 Site-specific planning considerations .......................................................... 22 Meeting the need .............................................................................................. 22 Good design ..................................................................................................... 24 Create a new area of public realm on the river ................................................. 25 Celebrate Putney’s river heritage ...................................................................... 26 Enhance existing moorings ............................................................................... 26 Planning Statement i D.6 Managing construction impacts .................................................................... 27 Conclusion ........................................................................................................ 27 Water quality and flood risk ............................................................................... 27 Air quality, emissions, dust and odour .............................................................. 30 Biodiversity and geological conservation .......................................................... 31 Landscape and visual impacts (include townscape) ......................................... 32 Land use including open space, green infrastructure and green belt ................ 34 Noise and vibration ........................................................................................... 37 Historic environment ......................................................................................... 39 Light...................................................................................................................43 Traffic and transport .......................................................................................... 43 Waste management .......................................................................................... 48 Socio-economic ................................................................................................ 48 D.7 Overall conclusions ........................................................................................ 50 Annex D: Drawings for Putney Embankment Foreshore ..................................... 53 List of figures Page number Figure D.1 Aerial photograph of Putney Embankment Foreshore ............................... 2 Figure D.2 Photograph of the temporary slipway site from Embankment looking east 3 Figure D.3 Photograph of the temporary slipway site from the foreshore looking east 3 Figure D.4 Functional components diagram ................................................................ 7 Figure D.5 Construction timeline ............................................................................... 10 Figure D.6 Location of the preferred site at phase one consultation ......................... 18 Figure D.7 Location of the preferred site at phase two consultation .......................... 19 Figure D.8 Location of the preferred site at targeted consultation and the proposed site at Section 48 publicity ......................................................................................... 21 Figure D.9 Estimated construction lorry profile .......................................................... 45 List of tables Page number Table D.1 Putney Embankment Foreshore: Drawings that define the proposed development ................................................................................................................ 8 Planning Statement ii Appendix D: Putney Embankment Foreshore Appendix D: Putney Embankment Foreshore D.1 Introduction D.1.1 In an average year, the Putney Bridge combined sewer overflow (CSO) discharges on average a total of 68,000m3 of untreated sewage in 33 events into the tidal Thames. On the basis that litter tonnages are proportional to discharge volumes, it also discharges approximately ten tonnes of sewage derived litter in a typical year. A worksite is required to connect the Putney Bridge CSO to the main tunnel. The proposed development site is known as Putney Embankment Foreshore, which is located in the London Borough of Wandsworth. D.1.2 The Environment Agency identified the Putney Bridge CSO as a CSO that needs to be controlled, and Thames Water’s solution to deal with this CSO is full interception. The CSO discharges have multiple impacts on water quality at the outfall location. This includes a localised effect of rapidly dropping dissolved oxygen levels, released pollutants and of sewage litter and effluent. D.1.3 Catchment modelling suggests that if the project is constructed as proposed, the annual discharge of untreated sewage into the tidal Thames would be reduced to 1,600m3, and that the number of discharges would be reduced to one event per year. The sewage derived litter from the CSO can be expected to reduce by approximately 98 per cent to less than half a tonne in a typical year. The frequency, duration and volume of spills at Putney Bridge CSO would therefore be reduced by approximately 98 per cent as a result of the operation of the project. A site location plan is included in Annex D. D.1.4 This assessment is structured as follows: a. Section D.2 provides a brief description of the Putney Embankment Foreshore site. b. Section D.3 sets out the planning context for works in this location. c. Section D.4 describes the site-specific development for which consent is sought and the way in which the proposals evolved in response to consultation d. Section D.5 provides an analysis of the principal site-specific planning considerations and how the proposals comply with relevant planning policy e. Section D.6 provides an overall conclusion of the site-specific assessment. D.2 Site description D.2.1 The site itself comprises of two areas of the foreshore of the River Thames, the main site is known as Putney Embankment Foreshore and the secondary site known as Putney Embankment Temporary Slipway. Planning Statement D-1 Appendix D: Putney Embankment Foreshore The main and secondary sites are defined by the limits of land to be acquired or used and cover areas of approximately 1.6 ha and 1.2 ha, respectively. An aerial photo of the main Putney Embankment Foreshore site is provided in Figure D.1 below. Figure D.1 Aerial photograph of Putney Embankment Foreshore D.2.2 The main site is bounded by the River Thames to the north, the Grade II* listed St Mary’s Church to the east, the Embankment carriageway and Lower Richmond Road to the south and Putney Pier to the west. The
Recommended publications
  • Rotherhithe to Canary Wharf Crossing - Meeting Note
    Rotherhithe to Canary Wharf Crossing - Meeting Note Title: R2CW Port of London Authority Liaison Date 05-03-19 Timing: 14:00-16:00 Type: Meeting Location: PLA Offices, Pinnacle House, London EC3 Attendees: Nick Evans (NE) PLA (River Pilot) Stephen Milford TfL (Sponsor) Tom Chick (TC) TfL (Sponsor) Marinas (Various) Aim of the meeting: To update the London marinas on project progress since the last consultation and gain insight into potential concerns. Topics of discussion: Key topics of discussion were: i. Project Update; ii. Marina concerns No. Action Owner Deadline 1 TfL to provide information on the minimum height SM 31-03-2019 over the main span 2 TfL to meet/liaise with SKD and Limehouse SM 31-03-2019 marinas with regards to bridge operation generally, as well as potential of communication between marina lock and bridge bookings specifically 4 5 6 7 8 9 10 Issued 14-09-18 Page 1 of 3 Rotherhithe to Canary Wharf Crossing - Meeting Note Key outcomes (dis/agreements, notable information shared) 1. Marinas concerned about vessels being unable to make bookings 2. Marinas appreciative of concept of ‘proactive bridge operator’ 3. PLA and Marinas like idea of communication between bridge and marina lock bookings 4. Marinas expect some form of accommodation for river users awaiting a lift such as mooring buoys Ref. Description Action 1.0 Introductions/Overview 1.1 NE outlined meeting agenda and gave a brief overview of planned river traffic in 2019 – the majority of commercial traffic will be due to Tideway Tunnel construction 2.0 PLA Updates 2.1 PLA/Marinas discussed licencing – all commercial vessels on the Thames must be licensced 2.2 PLA are currently reviewing the lighting arrangements for tugs 2.3 PLA gave information about the use of arches at Blackfriars Bridge: Arches 1 and 2 are currently closed for Tideway, with a ‘traffic light’ system currently on the navigational channel that sometimes requires recreational vessels to wait.
    [Show full text]
  • Teddington to Broadness  Obey the COLREGS – in Particular, Your Vessel Must Display the Length Or a Rowing Boat)
    PLA EBB TIDE FLAG WARNING ADVICE NAVIGATION RULES SPEED LIMITS – THAMES BYELAW 16 Wash - be aware of what your wash is doing, both to other users are berthed, please refer to Permanent Notice to Mariner for further When navigating on the tidal Thames you must ensure you proceed at a The PLA has established a warning system based on the tidal observed at Richmond You must comply with the International Regulations for Preventing and the banks and foreshore. If necessary, reduce speed. information. safe speed at all times. You must also take the prevailing wind and tidal Lock low water. The advice is updated daily at 06:00 and is readily available as an Collisions at Sea (the COLREGS) - as modified by the ‘Port of London VHF Radio - vessels over 13.7m in length must carry and use a conditions, the size and type of your vessel, your location in the river, and internet based widget on both homepages of: www.boatingonthethames.co.uk and Thames Byelaws’ - when navigating on the tidal Thames. As the person in VHF radio (see VHF requirements). HIGH SPEED CRAFT ZONES the safety of others into account. In addition a mandatory speed limit of 12 www.pla.co.uk. charge of a vessel, you must also comply with the ‘General Directions for Novices - complete a training course for your chosen activity knots applies between Margaretness and Wandsworth Bridge. See A High Speed Craft Zone exists in two areas (marked in yellow) between Navigation in the Port of London’. Copies of these publications can be before attempting to navigate the tidal Thames.
    [Show full text]
  • Standard-Tube-Map.Pdf
    Tube map 123456789 Special fares apply Special fares Check before you travel 978868 7 57Cheshunt Epping apply § Custom House for ExCeL Chesham Watford Junction 9 Station closed until late December 2017. Chalfont & Enfield Town Theydon Bois Latimer Theobalds Grove --------------------------------------------------------------------------- Watford High Street Bush Hill Debden Shenfield § Watford Hounslow West Amersham Cockfosters Park Turkey Street High Barnet Loughton 6 Step-free access for manual wheelchairs only. A Chorleywood Bushey A --------------------------------------------------------------------------- Croxley Totteridge & Whetstone Oakwood Southbury Chingford Buckhurst Hill § Lancaster Gate Rickmansworth Brentwood Carpenders Park Woodside Park Southgate 5 Station closed until August 2017. Edmonton Green Moor Park Roding Grange Valley --------------------------------------------------------------------------- Hatch End Mill Hill East West Finchley Arnos Grove Hill Northwood Silver Street Highams Park § Victoria 4 Harold Wood Chigwell West Ruislip Headstone Lane Edgware Bounds Green Step-free access is via the Cardinal Place White Hart Lane Northwood Hills Stanmore Hainault Gidea Park Finchley Central Woodford entrance. Hillingdon Ruislip Harrow & Wood Green Pinner Wealdstone Burnt Oak Bruce Grove Ruislip Manor Harringay Wood Street Fairlop Romford --------------------------------------------------------------------------- Canons Park Green South Woodford East Finchley Uxbridge Ickenham North Harrow Colindale Turnpike Lane Lanes
    [Show full text]
  • Upper Tideway (PDF)
    BASIC PRINCIPLES OF TIDEWAY NAVIGATION A chart to accompany The Tideway Code: A Code of Practice for rowing and paddling on the Tidal Thames > Upper Tideway Code Area (Special navigation rules) Col Regs (Starboard navigation rule) With the tidal stream: Against either tidal stream (working the slacks): Regardless of the tidal stream: PEED S Z H O G N ABOVE WANDSWORTH BRIDGE Outbound or Inbound stay as close to the I Outbound on the EBB – stay in the Fairway on the Starboard Use the Inshore Zone staying as close to the bank E H H High Speed for CoC vessels only E I G N Starboard (right-hand/bow side) bank as is safe and H (right-hand/bow) side as is safe and inside any navigation buoys O All other vessels 12 knot limit HS Z S P D E Inbound on the FLOOD – stay in the Fairway on the Starboard Only cross the river at the designated Crossing Zones out of the Fairway where possible. Go inside/under E piers where water levels allow and it is safe to do so (right-hand/bow) side Or at a Local Crossing if you are returning to a boat In the Fairway, do not stop in a Crossing Zone. Only boats house on the opposite bank to the Inshore Zone All small boats must inform London VTS if they waiting to cross the Fairway should stop near a crossing Chelsea are afloat below Wandsworth Bridge after dark reach CADOGAN (Hammersmith All small boats are advised to inform London PIER Crossings) BATTERSEA DOVE W AY F A I R LTU PIER VTS before navigating below Wandsworth SON ROAD BRIDGE CHELSEA FSC HAMMERSMITH KEW ‘STONE’ AKN Bridge during daylight hours BATTERSEA
    [Show full text]
  • Thames Tideway Tunnel
    www.WaterProjectsOnline.com Wastewater Treatment & Sewerage Thames Tideway Tunnel - Central Contract technical, logistical and operational challenges have required an innovative approach to building the Super Sewer close to some of London’s biggest landmarks by Matt Jones hames Tideway Tunnel is the largest water infrastructure project currently under construction in the UK and will modernise London’s major sewerage system, the backbone of which dates back to Victorian times. Although Tthe sewers built in the mid-19th century are still in excellent structural condition, their hydraulic capacity was designed by Sir Joseph Bazalgette for a population and associated development of 4 million people. Continued development and population growth has resulted in the capacities of the sewer system being exceeded, so that when it rains there are combined sewer overflows (CSO) to the tidal Thames performing as planned by Bazalgette. To reduce river pollution, risk to users of the river and meet bespoke dissolved oxygen standards to protect marine wildlife, discharges from these combined sewer overflows (CSOs) must be reduced. The Environment Agency has determined that building the Tideway Tunnel in combination with the already completed Lee Tunnel and improvements at five sewage treatment works would suitably control discharges, enabling compliance with the European Union’s Urban Waste Water Treatment Directive. Visualisation showing cross section through the Thames Tideway Tunnel Central Victoria CSO site – Courtesy of Tideway Project structure and programme There is also a fourth overarching systems integrator contract The Thames Tideway Tunnel closely follows the route of the river, providing the project’s monitoring and control system. Jacobs intercepting targeted CSOs that currently discharge 18Mm3 of Engineering is the overall programme manager for Tideway.
    [Show full text]
  • Rotherhithe Tunnel
    Rotherhithe Tunnel - Deformation Monitoring CLIENT: TFL/ TIDEWAY EAST / SIXENSE Senceive and Sixense worked together to design and implement a monitoring programme to safeguard crucial London road tunnel during construction of a nearby tunnel shaft Challenge Solution Outcome The Thames Tideway Tunnel will capture, store and move Monitoring experts at Sixense chose the Senceive FlatMesh™ Senceive provided a fully wireless and flexible monitoring almost all the untreated sewage and rainwater discharges wireless system as their monitoring solution. A total of system which could be installed quickly and easily within that currently overflow into the River Thames in central 74 high precision tilt sensor nodes were installed during the short night-time closures. The installed system was London. The Rotherhithe Tunnel sits in close proximity engineering closures over an eight-week period to monitor sufficiently robust to operate for years without maintenance to the Tideway East shaft site and there was a need to any convergence/divergence during the works. - therefore avoiding the disruption, cost and potential risks ensure that the construction work did not threaten the associated with repeated site visits. Impact on the structure integrity of the tunnel. The CVB consortium (Costain, VINCI Of these, 64 were installed directly onto the tunnel lining in and damage to the tiles was minimal as the nodes required Construction Grands Projets and Bachy Soletanche), along 16 arrays of four nodes. A further 10 nodes were mounted on just a single mounting point and minimal cabling. with Sixense as their appointed monitoring contractor, three-metre beams in a vertical shaft. The FlatMesh™ system required a monitoring system in place 12 months ahead allowed all the nodes to communicate with each other and The Senceive and Sixense teams worked together to modify of shaft construction to provide an adequate period measure sub-mm movements for an estimated project tiltmeter fixings in order to incorporate a 3D prism needed of baseline monitoring.
    [Show full text]
  • Name of Deceased (Surname First)
    ON Date before which Name of Deceased Address, description and date of death of Deceased Names, addresses and descriptions of Persons to whom notices of claims are to be given notices of claim s (Surname first) and names, in parentheses, of Personal Representatives to be given WILSON, George William Bndcliffe, 53', Dene View, South Gosforth, Barclays Bank Limited, Trustee Department, Collingwood Street, Newcastle upon Tyne, 31st January, 1956 Northumberland, Retired School Master. 26th July, or Wilkinson & Marshall, 1, Mosley Street, Newcastle upon Tyne, Solicitors. (156) 1955. PEROU, Leslie Arthur ... 1, Kensington Court Place, Kensington, London, William Edward Perou, 231, Putney Bridge Road, Putney, London, S.W.15, or Oswald 3rd February, 1956 Licensed Victualler's Manager. 6th August, 1955. Hanson &• Smith, 137, Hammersmith Road, London, W.I4, Solicitors. (157) PEROU, Frederick 1, Kensington Court Place, Kensington, London, William Edward Perou, 231, Putney Bridge Road, Putney, London, S.W., or Oswald 3rd February, 1956 tta»4 Licensed Victualler. 23rd July, 1955. Hanson & Smith, 137, Hammersmith Road, London, W.I4, Solicitors. (158) g NAPIER, Stanley Owen... Old Bank, Pool-in-Wharfedale, Textile Manager. Sampson, Homer & Co., Piece Hall Yard, Kirkgate, Bradford, Solicitors. (Winifred 7th February, 1956 30th July, 1955. Evelyn Chippendale.) (159) TYLER, Alfred Elmbank, Marsden Lane, Aylestone, Leicester, Retired Harvey Clarke & Adams, Selborne Buildings, Millstone Lane, Leicester, Solicitors. 31st January, 1956 i Tailor. 19th February, 1955. (William Thomas Mason and Benjamin Gordon Wisdish.) (274) P SENIOR, William 6, Viaduct View, Holsworthy, Devon, Retired Grocer. Peter Peter & Sons, Holsworthy, Devon, Solicitors. (Edgar Frederick Clark and James 14th February, 1956 7th November, 1955.
    [Show full text]
  • Statement of Common Ground Between London Borough of Southwark and the City of London Corporation
    Statement of Common Ground between London Borough of Southwark and the City of London Corporation December 2019 1 Introduction This Statement of Common Ground (SCG) addresses the strategic planning matters specific to Southwark, its neighbouring boroughs, and other strategic partner organisations. This SCG has been prepared by Southwark Council in agreement with the City of London Corporation. The purpose of the SCG is to document the strategic cross-boundary matters being addressed and progress in cooperating to address them. This SCG ensures that the requirements set out in the National Planning Policy Framework (NPPF) have been met. The NPPF states, “Local planning authorities and county councils (in two-tier areas) are under a duty to cooperate with each other, and with other prescribed bodies, on strategic matters that cross administrative boundaries.” Southwark Council engages with other boroughs and the City of London through regular meetings either between officers or elected members with formalised governance arrangements such as the London Councils Leaders’ Committee, Association of London Borough Planning Officers, the Cross River Partnership, the South East London Duty to Cooperate Group and the Southeast London Joint Waste Planning Group. We also maintain correspondence between planning departments on a variety of issues and projects and organise additional meetings on strategic planning matters when needed. Figure 1: Locations of Southwark and the City of London Corporation within Greater London. 2 Strategic Geography London Borough of Southwark Southwark is a densely populated and diverse inner London borough set over almost 30km of land to the south of the River Thames. Home to over 314,000 people, the borough is a patchwork of communities set over diverse 23 wards.
    [Show full text]
  • Exploring London from the Thames Events & Corporate Hire Welcome to London’S Leading Riverboat Service
    UNFORGETTABLE EXPERIENCES EXPLORING LONDON FROM THE THAMES EVENTS & CORPORATE HIRE WELCOME TO LONDON’S LEADING RIVERBOAT SERVICE Thank you for organising such a great event. Prosecco was flowing, great hosts and the sun even came out WELCOME for the sunset! We’re London’s leading riverboat service, providing With a choice of 18 vessels ranging from 12 to 220 our passengers a unique way to get around the capital. capacity we offer transport for sports stars and As well as catering for sightseers and commuters, rock stars to events and concerts, wedding parties, we also offer a deluxe and highly versatile corporate company functions and even a location for filming and private hire service for those wishing to explore and photoshoot. London in comfort and style. Let us show you what we can do CONTENTSEXPLORE On Board Experience 4 Catering & Hospitality 5 Branding, Corporate & Filming 6 Cruise & Excursions 7 Our Fleet 8 Rates 16 Our Route 17 Contact Details 18 4 ONBOARDLOVE EXPERIENCE IT! Thames Clippers are the fastest and most frequent fleet on the river, with 18 vessels available for private hire. Each of our catamarans are spacious, stylish and staffed by a friendly and experienced crew. For our corporate and private clients we offer seven different sizes of vessel with the option of carrying between 12 and 222 guests. The route, length and speed of journey, stop off locations, style of catering, use of facilities on board and time of travel are flexible. This means we can deliver a vast range of events; from business meetings, presentations, networking days, conferences, celebrity parties and product launches to marriage transfers and excursions for family and friends.
    [Show full text]
  • Thames Bridges Trek 2021 CHALLENGE Factsheet
    Thames Bridges Trek 2021 CHALLENGE Factsheet organised by www.ultrachallenge.com @ultrachallenges Join over 2000 walkers & hikers as we trek across the Capital taking in unrivalled views of the skyline, and historic landmarks, from its best vantage points. Setting out from the Putney Bridge start we had East towards the City, zig- zagging over the array of 16 historic bridges – each with its own fascinating story – and a mid point rest stop at The Oval Cricket Ground for some snacks & drinks. 25km later, it’s a party style atmosphere and finish line celebration in Southwark Park past the final crossing – the majestic Tower Bridge. Millennium General Key Bridge London Bridge Challenge Start Waterloo Bridge Challenge Finish Blackfriars Bridge Southwark Golden Jubilee Bridge Major Rest Stop Bridges Bridge London Tower Eye Bridge Route Direction Houses of Westminster Parliment Bridge 25k Southwark Park Lambeth Bridge Chelsea Bridge 12k Albert Bridge Vauxhall Bridge HALFWAY Battersea The Oval Bridge Battersea Cricket Ground Park Bishop’s Park Putney Bridge Fulham Railway Bridge Wandsworth Bridge Completed my first event today (Thames Bridges Trek) absolutely amazing experience! Very well organised, variety of food on offer at both the half way point and finish line and helpful staff/volunteers. Would definitely recommend and do another event with them (if my feet ever recover)! 1 TB 2021 v.1 www.ultrachallenge.com @ultrachallenges Thames Bridges Trek 2021 CHALLENGE Factsheet The Trek Fulham > Southwark Sat 11 Sep | 9:30am-midday DISTANCE: 25km REST STOPS & MEALS: 2 Stops Snacks, water & hot drinks at halfway Lunch at 25km finish Our Support An Ultra Challenge is all about pushing yourself further and setting your own goals.
    [Show full text]
  • Impact of a Single Day Major Event on a City Arup & the Boat Race Company October 2017
    The Boat Race Impact of a Single Day Major Event on a City Arup & The Boat Race Company October 2017 Executive Summary The Boat Race is an event steeped in history and tradition, with a high degree of public recognition in the UK and worldwide. Major events, of which The Boat Race is one, have undergone significant change over the last 30 years. The speed of development in equipment technology, broadcasting and spectator expectations have combined to produce events that reach far beyond their sporting origins. Through study of the economic, logistical and experiential influences on The Boat Race this document reviews the current ‘state-of-play’ for the event and makes recommendations of areas that should be considered for development in order for the event to maximise its commercial, sporting and social sustainability. Key to the future of The Boat Race is to maintain and build from its ethos of scholar athletes, elite performance, tradition and accessibility for all and to focus on how to engage with the UK and worldwide audience in order to generate income and extend the reach of the event beyond Race Day itself. The report also provides high level case studies of sporting events which have successfully managed the transition from traditional sports into highly regarded, well supported events that focus on fan experience and long term event sustainability. This document proposes that public and commercial engagement can be enhanced on various levels for The Boat Race. The report highlights the key themes for future development as digitalisation, extension of the event profile, recognition of the commercial asset, diversity of revenue streams and using the event to positively influence the sport of rowing.
    [Show full text]
  • Sustainability Statement Doc Ref: 7.07 Appendix a APFP Regulations 2009: Regulation 5(2)(Q) Appendix a Sustainabilitystatement
    Thames Tideway Tunnel Thames Water Utilities Limited Application for Development Consent Application Reference Number: WWO10001 Sustainability Statement Doc Ref: 7.07 Appendix A APFP Regulations 2009: Regulation 5(2)(q) Appendix A SustainabilityStatement Hard copy available in Box 48 Folder B January 2013 This page is intentionally blank Appendices Appendix A: Sustainability appraisal - Thematic A.1 Water quality National policy and legislation NPS (2012) The NPS sets the requirements for assessing the effects on water quality and resources. It states that the decision maker will generally need to give impacts on the water environment more weight where a project would have adverse effects on the achievement of the environmental objectives established under the Water Framework Directive, and that relevant River Basin Management Plans have been given due regard. Water Framework Directive (2000) The WFD was transposed to UK law in 20031. It is designed to prevent further deterioration of water quality and aquatic ecosystems, promote the sustainable use of water resources, reduce pollution from priority sources, and reduce groundwater pollution. The WFD has four objectives relevant to the project: • WFD objective 1: Prevent deterioration of the status of all bodies of surface water. • WFD objective 2: Protect, enhance and restore all bodies of surface water, with the aim of achieving good surface water status by 2015 (or 2027 where measures would take longer to implement). • WFD objective 3: Protect and enhance all artificial and heavily modified bodies of water, with the aim of achieving good ecological potential and good surface water chemical status by 2015 (or 2027 where measures would take longer to implement).
    [Show full text]