JOSE ARNEL P.JUAN,MSCE,MEPF,RMP MSCE-major in Construction Engineering Management (Mapua Institute of Technology) B.S.Civil Engineering, MTE(CAR), MST(Math-units), MCM(units), PhD-CE(units earned),MEPF Registered Master Plumber (8th Placer) General Luis St, Caybiga e-mail: [email protected] City North 1420 [email protected] URL: https://branded.me/viostek Tel Nos. (02)-83560535 www.woto.com/viostek 09178757642 ______Position desired: Professional Lecturer / Faculty

Job Related Skills and Work Experiences: Technical knowledge of all phases of construction engineering relating to Architectural, Civil/Structural, Electrical and Mechanical discipline interfacing with a multi-discipline operation. Thorough knowledge of construction activities as relates to engineering disciplines, cost and scheduling, contract administration and quality control activities. Having 3 decades of actual work experience leading to a thorough understanding of technical knowledge and in quality control aspects of construction inspection, testing and installation activities electrical/mechanical/plumbing works and testing & commissioning works. Demonstrated leadership in a team-based and multi-nationality environment. Knowledgeable in environmental compliance requirements of the project. General awareness of government compliance standard and of local labor laws and issues. Knowledgeable in basic occupational safety program and construction safety management. Familiar with current industry quality standard. Computer literate in word processing, spreadsheet and data base application. Experience working with, supervising and administering subcontractors. Performs leadership responsibility by providing technical direction to less experienced personnel and provide input to employee performance reviews for subordinate personnel.

Date of Birth: 04 January 1967 Years with Firm/Entity: Freelance Nationality: Filipino

Profession: PICQS Membership No.2011002211 Registered Master Plumber--PRC. License No. 0004076 MEPF Practitioner-Reg No.0060

Membership in Professional Societies: PICQS-Philippine Institute of Certified Quantity Surveyor Philippine Society of Unified Master Plumbers (PSUMP) MEPF Organization of the Philippines DOCTOR OF PHILOSOPHY IN CIVIL ENGINEERING -specialized in Construction Technology and Management (DE LaSalle University-units earned) MASTER OF SCIENCE IN CIVIL ENGINEERING- major in Construction Engineering & Management (MSCE) - MAPUA Institute of Technology (MIT), Graduated-February 12, 2015 BACHELOR OF SCIENCE IN CIVIL ENGINEERING (BSCE) - MAPUA Institute of Technology (MIT), Graduated-November 27, 1987 Master of Science in Teaching (Major in Mathematics) – (21 unit earned) Master in Technology Education-Technological University of the Philippines- (Completed Academic Requirements) Master in Construction Management- – (Units Earned)

EMPLOYMENT HISTORY:

TEACHING EXPERIENCE Name of Academic Institution: MAPUA UNIVERSITY, Muralla St. Position/Rank: Professor VI Develops syllabi that clearly outline the course requirements, rationale, goals, and objectives. Submits digital copies of syllabi and course handouts to the Office of Academic Affairs Selects textbooks and other resources for the class. Prepares class sessions and assignments to help students grasp course content and how it integrates with overall student learning outcomes for the course Teaches courses in accordance with defined course standards and outcomes Creates a learning environment that encourages student involvement and participation. Inclusive Dates: November 1987-Present Courses Taught: Graduate Course - Master Thesis 1 - Construction Administration - Personnel Management and Human Behavior - Methods of Research - Total Leadership Courses Taught: Undergraduate Course - Project Management for CEM - Quantity Surveying and Specifications - Marketing Management in Construction - Entrepreneurship in Construction - CECADD - Microeconomics - Macroeconomics - Procurement and Purchasing in Construction - Environmental Impact Studies - Management Theories and Principles - Building System Engineering - Safety Engineering Management - Financial Management - Executive Leadership - Engineering Leadership - Engineering Drawing 1, Drawing 2, Drawing 3, Drawing 4, AUTOCAD - Micro Station V8, Civil 3D - Architectural-Engineering Lecture and Drafting, Building Construction

SAFETY LECTURER Name of Academic Institution: Risk Control Development Center, CCESC, MAPUA UNIVERSITY Position/Rank: CONSTRUCTION SAFETY LECTURER Inclusive Dates: MARCH 2010-Present

CONSULTANCY COST CONSULTANT- PricewaterhouseCoopers Financial Advisors Inc. (PwCFA) and Isla Lipana - Name of Project: 2012 / 2013-17 Rate Rebasing Consultancy Services - Location: Philippines - Funding Agency: Metropolitan Waterworks and Sewerage System - Brief overview of scope and responsibilities: - Rate Rebasing for MWSS 2013-2017 Duties and Responsibilities - Assist the Regulatory Office in developing a performance monitoring system (in which key service performance indicators will be defined, measured, audited, published, and analyzed), as well as assist the Regulatory Office in reviewing engineering cost submissions provided by Concessionaires (e.g., in connection with an Extraordinary Price Adjustment) and advise on the application of the asset condition and information disclosure provisions

TRAINING SEMINARS CONDUCTED - Quality Assurance Quality Control at MEPF Building, Quezon Avenue Philippines.2018 2019 2020 - International Seminar on Adaptability and Sustainability on Transportation for Climate Change, IACE Quezon City 2018 - International Seminar on Mitigation and Flood Control, IACE Quezon City 2017 - International Seminar on Project Risk Management- IACE Quezon City 2017 - Concrete blocks and Concrete failures for Symposium of CEGE Students at AVR2 MIT Intramuros Manila,2015 - Concrete Failures on Structures-EXAN Builders Corporation and Sta. Lucia Realty and Development, Sillo Resto, Eastwood. Quezon City, November 22, 2014 - Seminar on 5S-GEGE Faculty MIT, April 5,2014 - Project Safety Training, CCESC, Manila, June2013 - Carbon Footprint Reduction-SMVA-MIT, Manila, April 2013 - Scaffolds Seminar Training, CCESC, Manila April2012 - COSH Seminar Training, CCESC, Manila May 2011 - AutoCAD for Professional- Faculty Member of CEGE Dept.Mapua Instititute-Sept,2009 CONSTRUCTION INDUSTRY EXPERIENCE 1.) AVIOR Construction Management Corporation. Senior Vice President for Project Management Main Office: City February2020 – Present Project undertaken: Project Construction Management of the Following Projects - 4-storey San Fernando Funeral Homes, Ibaan, Batangas City Duties and Responsibilities Undertaken Overview daily operations Set performance and financial goals and attain them through team direction and management Assess, evaluate, and report on overall team and individual team member performance Prepare and allocate budgets Research and identify new business opportunities Seek new business tools and methods Collaborate with other executives and SVPs to decide on business strategies Evaluate department’s profits and revenue, and calculate risks Ensure compliance with company policies and local, regional and federal regulations Build and approve the department’s hiring plan Guide and support VPs and managers 2.) RG GARCIA ENTERPRISES INC. Asst.Vice President for Operations Main Office: Pamplona Las Pinas City September 2017 – February 2020 Project undertaken: Subcontract of Structural Component of the Following Projects - 42 Storey AVIDA Residential Condominium Building, Chino Roces Makati Duties and Responsibilities Undertaken In charge of not only day-to-day operations, but also the financial well-being of the various projects under their supervision. Also in charge of hiring project managers, writing contracts, and helping design construction plans. The vice president of construction management operations serves in a hands-on role in nearly every aspect of construction management; not only are they responsible for hiring and supervising the project management team, but they are also in charge of creating and managing budgets 3.) Viostek Engineering Services (VES) Project Director Main: 195 S. Manalon St. Meycauayan City Sub-Off:293-A Gen.Luis St. Caybiga Caloocan City November2006 – September2017 Project undertaken: Detailed Engineering Design, Construction & Quality Management of the following Projects; - A/E Design and Project Management Consultancy of Residential Duplex Bldg. at PArkplace Dasma 2018 - Design, Planning and safety audit of IBM plastic Inc Warehouses at Meycauayan city 2018 - Design /Renovation and Fit-out of Aguados Place from Dormitory to Hotel/Training Center at San Miguel, Manila - A/E Design and Project Management Consultancy of Condominium Resort Tangnan, Panglao Island Bohol - Design and Renovation/Interior Fit-out and Project Construction Management of School Bldg. –Industrial Advancement Academy of the Philippines, Intramuros Manila. - Design and Renovation/Interior Fit-out Unhoop Philippines BPO, Robinsons Bldg.Ayala Makati City - Geotechnical Survey and Quantity Survey of 10-Storey Rolls-Royce/Mini-cooper showroom Bldg.BGC - A/E Design and Project Management of QURUN Aquapolis Project- Joint Project of Lim Shrimp Organization and Sultanate of Oman-detailed A/E design of 500 Hectares of Town & Community, Industrial Buildings and Aqua Farms/Ponds, 2013 - Project and Safety Management of 8-storey Bldg.Embassy of Malaysia, Makati City - A/E Design and Project Management of WOM Aquapolis Joint Project of Lim Shrimp Organization and Govt.of Papua New Guinea-detailed A/E design of 2,000 Hectares Town & Community, Industrial Buildings and Aqua Farms/Ponds Please view (http://www.youtube.com/watch?v=WfW6oAZyS_U) - 14th & 15Th Flr.SGV Renovation-DETAILED ENG’G.DESIGN under ATALYER 6760 Ayala Ave.Makati, 2011 - A/E Detailed Design, Construction and Project Management of 3-Storey Spiritual Center and School, SOLS, MUZON, San Jose Del Monte Bulacan, 2011 - Proposed Warehouse Building Sta. Maria Bul.2010 - BARACA and SANTA Aquaculture farm and resort, Ilocos Sur 2009 - A/E Detailed Design of 4-Storey Outreach Building of La Salette Sisters Muzon San Jose Del Monte Bulacan - MEPF Engineering design services of SGV Office/Lounge renovation, SGV Bldg.Ayala Ave., Makati - Structural, Electrical &Plumbing Engineering design services of Cuna Residence Dasmarinas Village Makati - Engineering design services of farm house in Ponderosa, Silang Cavite under JH Foster Consultancy - BPO center, Sunwest -under DVD Architecture - BPO center Fit-out engineering design services under American Technologies Inc.-Affinity Express - BPO center, Naga city-under DVD Architecture - Renovation- repair-maintenance -supervision of La Salette School Muzon, San Jose Bulacan - Renovation- repair-maintenance -supervision of Parking Buildings (TRINOMA) North Triangle Depot Commercial Corporation. - Rectification-construction of 3-Storey Building in Sta. Lucia Calamba (Roger & Cora Smith) - Store Outlets Renovation –TIMEZONE PHILIPPINES Ugong City-AYALA AND LEISURE AND ALLIED INDUSTRIES - 6-Unit Apartment @ Mahabang Parang Bignay Valenzuela City (Mrs. Hilaria Pacheco) - Renovation of La Salette Bldg.Cubao Q.C. and La Salette School Muzon, San Jose Bulacan - Design and Renovation of Unit 501 Villa Terraces-Pasig City (Mr. Jojo Sta. Ana) - 4-storey La Salette Sisters Bldg. Cubao Q.C. - Design Consultation and Rectification of Mechanical Exhaust Duct Leakage. 36th Storey Baywatch Tower - Plumbing Consultation on Water Feeder Line–36th Storey Baywatch Tower Condo Corp Duties and Responsibilities Undertaken Prepare annual budgets, which are approved by other top executives of the organization. Ensure that the site operates within its financial budget and ensure financial goals are met. Performs construction quality control activities in all discipline in a technical and administrative capacity, interfacing with a multi discipline operation. Inspect and documents acceptance of construction activities and installation. Monitor subcontractor and supplier workmanship, installation of materials and equipment for quality control compliance. Monitor subcontractor implementation of quality program requirements such as but not limited to Inspection Test Plan, Work Procedure, Method Statement. Over-all in charge of operations, construction and management of the Company. Engage, equip, and lead the site project manager and project engineers on the operational standards and punch list of the scope of work of the project. Monitor and supervise safety practice of all employees, workers and subcontractors following all directives in safety management. 4.) Makati Development Corporation-Project Manager Main: BTC building 1st Flr. MDC 31st Avenue Taguig November2016 – February2017 Project undertaken: Project Management of the following Projects; - BAY AREA MIX-USE Project, Asean Avenue Aseana City Paranaque Duties and Responsibilities Undertaken Over-all in charge of operations, construction and management of multi-billion-peso flagship project of MDC. Engage, equip, and lead the project in charge and project engineers on the operational standards and punch list of the scope of work of the project. Monitor and supervise safety practice of all employees, workers and subcontractors following all directives in safety management. 5.) TRINOMA- NTDCC/ Project Consultant/Parking Administrator-OIC EDSA/North Ave. Quezon City March 2008 – November 2008 Project undertaken: Construction/Implementation & quality management of the following Projects; - Construction of Two Levels Additional North Parking Building (Php300M) - Project Implementation of Parking AUTOMATION SYSTEM - Project Implementation of Way finding system - Improvement of Traffic System - Rehabilitation of Flood / Ponding problems on all Parking areas - Fine tuning of audit and collection process including documentation - Improvement of Customer Complaint Process System - Monitor/Supervise all In-house contractors but not limited to security, housekeeping and maintenance Duties and Responsibilities Undertaken AS PROJECT CONSULTANT- Performs construction quality control activities in the Architectural/Structural/Mechanical/Electrical/Plumbing discipline in a technical and administrative capacity, interfacing with a multi discipline operation. Inspect and documents acceptance of construction activities and installation. Identifies non-conforming items and corrective action requirements; initiates non- conformance reports and monitor status through to closure of corrective action. Monitor subcontractor and supplier workmanship, installation of materials and equipment for quality control compliance. Monitor subcontractor implementation of quality program requirements such as but not limited to Inspection Test Plan, Work Procedure, Method Statement. Directly reporting to the General Manager of TRINOMA AS Parking Administrator – Post-occupancy evaluation- facilitate building operations data collection (e.g., building automation system, work order system, personal observation, occupant survey), monitor data (e.g., energy usage, complaints, temperature, pressure, repair logs). Continual improvement-identify ongoing training needs for occupants, and operations and maintenance staffs, identify benchmarks that are appropriate for a building and staff productivity and its uses, evaluate processes (e.g., preventive maintenance, inventory control, staffing levels) for potential energy savings and maximize life- cycle. Costing for Building Components –Prepare and analyze Capital budget and Operations budget. Creation and Implementation of an Operations and Maintenance Program. Supervision of Operations and Maintenance. Manage Building Performance. Verify, correct, maintain and document Building Automation Systems. Document building management system programming changes. Procurement Management -Evaluate the cost/benefit of using outside contractors for projects, develop the scope of work for an outside contract, request or write purchase orders, manage purchase orders, manage contracted work, assess the environmental and energy impacts of purchased products and services. Comply with laws (e.g., environmental, occupational safety, MSDS, HAZMAT, fire and life-safety systems, labor, comply with code, identify tasks that require Authorized Persons. AS Safety Administrator – Monitor and supervise safety practice of all contractors and subcontractor following all directives in safety management. 6) JHL Engineering Services -Plumbing Consultant-Designer Vista Verde Caloocan City May2006-November2007 Project undertaken: Design and Supervision of Plumbing System, Signed and Sealed of the FFG: - 3-Storey Commercial Building with roof deck SBMA Compound Zambales City - 4-Storey School Building, Imus Institute, Cavite - 2 Storey Res. Bldg., Kawilihan, Pasig City - Pristina Clubhouse Resort, Cebu - 3-Storey Res. Bldg.Vikas Q.C. - Waffle Store SM San Lazaro Manila - 2-Storey Res. Bldg Binan Laguna - 5-Units 2-Storey Apartment Building Paco Manila 7) Vernstek Design &Construction -Project Construction Manager November 2005-Feb2008 Project undertaken: Construction & quality management of the following Projects; - BPO Office of MATAHARI STUDIO PHILIPPINES-32nd Flr. RETCC Ortigas Pasig - Res.Condo Units-BAYWATCH TOWER Manila - London Based, JOHN HALE - Office Renovation –TIMEZONE PHILIPPINES Ugong Pasig City-AYALA AND LEISURE AND ALLIED INDUSTRIES AUSTRALIA - Renovations of 5-store outlets Timezone Makati and Greenhills Duties and Responsibilities Undertaken As Project Manager-responsible for the organization and direction of construction management, multi-discipline activities related to construction management for the on time delivery of projects. Interprets design drawings and specifications. Monitor verification of materials. Monitor and reviews project controls documents on progress relating to cost and schedule. Works with Client’s resident operations manager/owner and operating personnel to coordinates construction activities. Monitor implementation control over variables affecting job progress to ensure engineering and procurement provide timely delivery of drawings, materials and equipment and that other services are fully utilized. As Safety Officer-responsible for Occupational Safety and Health administration of all employees especially workers complying to all directives in safety management. 8) JHFoster Consultancy - Project Quality Management and Multi-Discipline Engineering Consultant 182 P. Burgos St. San Juan MM January 2005-May2006 Project undertaken: Design/ Consultancy of the ffg; - 30 Storey Residential Bldg.USTFU Tower Manila, - 4-Storey Residential Bldg.McKinley Fort Bonifacio - 2-storey Residential Building Kawilihan, Pasig City - 22-Storey Fuji an Agricultural and Research Center Fujian, China, - Boracay SPA and Resort. Boracay Aklan - Split-Level Residential Bldg.Owned by Judy Ong Tierra-Bella Quezon City - Split-Level Residential Bldg.Owned by Renato Gonzales Batangas City - Warehouse Building Meycauyan Bulacan,2007 - 2-Storey Mixed-Used Bldg. San Juan MM,2008 - 2-Storey Farm House Building-Ponderosa Leisure Farm Silang, Cavite.2009 9) BMH Urban Design, – Associate Designer/ Project Coordinator Ramkangheng Bangkok Thailand July-August 2004 Project undertaken: - Resort Hotel in Kohsamui and Chonburi Thailand - 2-Storey Residential Building Ramkangheng Bangkok Thailand - One Kilometer PTT Commercial Establishment and Gasoline Stations Bangkok Thailand Duties and Responsibilities Undertaken: Involved in the design team for plan preparation and ocular site inspection from Conceptualization to Design Stage including Supervision of the initial construction of the projects Involved in Site Visit and Inspection for the Initial construction of the projects 10) Firmbuild Construction and Trading - Project Construction Manager Sampaloc Manila May 2000-March 2004 Project undertaken: - Sub-Contract for Renovation of Roofing System in Heart Center of the Phil’s - Sub-Contract Renovation of Civil Service Commission office Quezon City - Reinstallation of Curtain Wall Trafalgar Plaza Makati - Sub-Contract renovation of Embassy of Korea Trafalgar Plaza - Renovation of 2-Storey Bldg.of Mrs. Melanie Lago Makati City - Extension of 2-Storey Bldg of Eng’r. Roderick Baluyot, Cainta Rizal - 2-Storey Bldg of Eng'r. Alvin Asuncion, Vista Verde Caloocan City - Renovation of Unit 705, 1405& 1005 of Horizon Plaza Condominium Ortigas - One-storey Bldg. located at Mendoza Compound. Jordan Plain Nova. QC - Restoration of Roof Deck Slab and water Proofing Keppel Communication Phils. Inc. Makati - Electrical System Structure of Prestige Tower Condo. Corp. Emerald Ave. Pasig - Exhaust System at Horizon Plaza Center Duties and Responsibilities Undertaken As Project Manager-responsible for the organization and direction of construction management, multi-discipline activities related to construction management for the on time delivery of projects. Interprets design drawings and specifications. Monitor verification of materials. Monitor and reviews project controls documents on progress relating to cost and schedule. Works with Client’s resident operations manager/owner and operating personnel to coordinates construction activities. Monitor implementation control over variables affecting job progress to ensure engineering and procurement provide timely delivery of drawings, materials and equipment and that other services are fully utilized. As Safety Officer-responsible for Occupational Safety and Health administration of all employees especially workers complying to all directives in safety management. 11) Wilper Construction and Development. Corp. – Project Manager-Operations Rm 1808 City land 10, Tower II H.V. Dela Costa St. Salcedo Village Makati- 1999-2000 Project undertaken: - Phase 1 and 3 of Laguna Bel-Air Subdivision Sta.Rosa Laguna - Duty Free Fiesta Clark-Air Base Pampanga - Presidential Anti-Crime Commission Office Camp Came Quezon City Duties and Responsibilities Undertaken: Responsible for the over all supervision of construction and coordination with project manager for detailed completion work and detailed progress report by project engineers. 12) Joe-Tech Builders Corp K-F St. Kamuning Quezon City- General Manager 1995-1999 Project undertaken: - Office of RVS Company Design by Arch.Ricafrente, Palanan Makati City - Design, Planning of Proposed 3-Storey Bldg. Located at Gabo St. Frisco Del Monte - Design, Planning of 3-Storey Bldg., Transpacific, A. Bautista St. Makati - Columbia Global Photo Supply Store of Benito Tan IV Makati City - Sub-Contract renovation of 10-Units Rest Rooms of Glorietta III Ayala Center Makati - Renovation of Haagen-Dazs Ice Cream Parlor of Glorietta III Ayala Center Makati City - Design & Planning of 8-Units 2-Storey Apt. Bldg.located at Kaybiga Industries - Design & Planning of 24-Units Apartment Bldg.located at Kaybiga Industries - Design, Planning, Supervision and Construction of 6-Units Apartment Val. MM - Design, Planning, Supervision and Construction of 9-Units Apartment Cal. City - Design, Planning of 3-Storey Bldg of Tessie Yong, Caybiga Caloocan City - Construction of 3-unit 2-Storey Townhouses, Pasig City - QA/QC of 3-Storey Bldg. Transpacific Towage A. Bautista Palanan Makati City Duties and Responsibilities Undertaken: - Over-all in charge of operations, construction and management of the Company. Engage, equip, and lead the site project manager and project engineers on the operational standards and punch list of the scope of work of the project. oversee and manage projects to ensure that they are completed in accordance with project deadlines and budgets. Schedule and plan projects, then assign responsibilities to managers, supervisors and employees and kept aware of any problems that arise during projects to ensure that they are resolved. 13) RVS Company A. Bautista St. Palanan Makati- Project Construction Manager 1994-1995 Project undertaken: Manage the Installation and Construction of the FFG; - Lighting Arrester Tower South Woods Golf Course Santa Rosa Laguna - Renovation of Two Storey Building Tagaytay Highlands - Horseback Riding Fence Batangas City 14) C A Francisco and Associates- PROJECT ENGINEER March 1992-November1994 Project undertaken: In-Charge on the Supervision for the construction of the FFG; - 3-Storey Residential, Commercial Building. Alley 1 Project 6 Q.C. - One-Storey Residential Building Filinvest Fairview Quezon City - 2-Storey Residential Building Almar Subdivision Novaliches Quezon city - 4-unit apartment Vikas Caloocan Novaliches Quezon city 15) J. Mataragnon and Associates- Quantity Surveyor and Draftsman 1987-1991 Project undertaken: Responsible for Detailed Structural Drawing and Quantity Surveying of the FFG; - 15-Storey Residential and Commercial Building Bambang St. Sta. Cruz - 4-Storey Storage Building Blumentritt Sta.Cruz Manila - Warehouse Building Balintawak Quezon City - 3-Storey Commercial Building, Angel Linao st. Paco manila

CHARACTER REFERENCE Name Position Name of Company Dr Jose Berlin Juanzon Head CE dept and faculty PLM Engr. Efren C. Mananquil COD4 Head MDC