MS Consultancy

Name of Firm MS Consultancy Name of Staff: Mesfin Shenkut Date of Birth: April 1958 Nationality Ethiopian

Education: • MSc in WATER AND WASTE ENGINEERING, Loughborough University of Technology, England, Sept. 1986. • BSc in CIVIL ENGINEERING from Addis Ababa University, July 1981.

Membership in Professional Societies: . Member of the International Rainwater Catchment Association, HQ in the Philippines . Vice Chairman of the Executive Board of the Ethiopian Rainwater Harvesting Association . Member of the Int. Small Hydropower Association, Hangzhau China; . Member of the International FogQuest, Canada, . Member of the Ethiopian Civil Engineers Association, Addis Ababa . Member of the Int. Advisory Committee, Rainwater Implementation Network the Netherlands

Other Training • CERTIFICATE in SMALL HYDRO- POWER, by Hangzhau Regional Center, Hangzhau, China, May 1998. • CERTIFICATE in MANAGEMENT FOR ENGINEERS AND SCIENTISTS, by the Industrial Society, London, England, and October 1986. • CERTIFICATE in RAIN WATER HARVESTING TECHNIQUES conducted in Thailand and Indonesia, organized by UNESCO and Asian Institute of Technology, Bangkok, Thailand; May- June 1983.

Countries of Work Experience . Zimbabwe – Design of Water Supply and Sewerage system for Mimbizo/Zisco township, . Rwanda - Design of Rainwater Harvesting system for settlement areas, and Reviewed the NCA Water Program; . South Sudan – Design and installed emergency water supply systems in Southern Equatoria El-Bahargazal . Currently one of the four International Advisory Committee Members of the Rain Foundation based in Amsterdam; . Other countries professional exposure - Norway, Trondhaim– Small Waste Water Treatment Plants, - Australia, Perth Western - Sanitation and Waste in Developing Countries - Kenya, Lakipia – Community Water supply, - Bostwana, Gaboroni– community Water Supply - Tanzania, Arusha – Community Water - South Africa, Cape Town – Fog and Water - Chile, La-Serena –– Fog and Water - Canada, New Found Land,– Fog and Water - Indonsia – Rainwater Harvesting - India – Water Resources - Pakistan Islamabad–MS Water Consultancy and Waste - Mexico – Water Resources MS Consultancy MS Consultancy

- Switzerland – Water and Waste Treatment - China – Training - Thailand and Singapore training - England, Italy, USA and France Conferences

Manual and Technical Document Production • One of the authors of the Book, Biological Filtration in Water Treatment, Published by University of New Hampshire USA and University of London • One of the contributors of the Design Manual of Roughing Filters Published by SKAT • Worked as water sector expert in the development of the Water Resources Development Fund Manual; Clients the Wold Bank and MoWR • Lead the development of the Ethiopian Drinking Water Guidelines Development Project as Project Director; Clients UNDP and MoWR • Worked as a Water and Sanitation expert in the Development of Supply Chains Issue Paper in the Water and Sanitation Sector, Clients the World Bank and MoWR

Evaluation and Assessment: • Team Leader of the Rwanda Norwegian Church Aid Water Program Review, • Team Leader CPAR Water Development Study and Assessment, • Team Leader for UNICEF/Ethiopia Mid Term Review, • Team Leader -Plan Ethiopia Water and Health Program Evaluation

Diversified Skills and Knowledge Mesfin Shenkut has worked in government offices, NGOs, UN organizations (UNDP, UNICEF, WB etc.) and Sanitation currently in the private sector as well as in international exposures in his peculiar field of Water Supply and Sanitation sector.

International Award Mesfin Shenkut, who is an AWARD Winner of WHO IS WHO for his contributions for the development of Community Level Water Supply Scheme,

Publications and Paper • Mesfin Shenkut has published a number of articles and presented papers in renowned international forum. • Mesfin Shenkut invites readers to refer to internet Google web under Mesfin Shenkut which confirms the above

LANGUAGES Speaking Reading Writing Excellent Excellent Excellent English Very good Very good Very good Oromifaa Fair Fair Fair French Slight Slight Slight Employment Record: May 2003 – to date – MS Consultancy Mesfin Shenkut on top of his duties as the founder and the Managing Director of MS Consultancy responsible for theMS planning, Consultancy organizing, directing and controlling the firm assumes various professional positions in the implementation of multiple water supply and sanitation projects as detailed here under: MS Consultancy MS Consultancy

• Lead Design Engineer – Addis Ababa, Eastern Catchment water supply sytem, Dire Dawa Solid Waste Management Project, Awassa Drainage Project and Bahir Dar Drainage Project. • Water Policy Expert and Team Leader of the Integrated Water Management Strategy Development for Ethiopia Sponored by the Global Water Partnership, Water Aid Ethiopia and the Ministry of Water Resources • Senior Water Supply Engineer in Six Oromia Towns Water Supply Project and in charge of the designs of Treatment Plants for Agaro, Arsi Negele, Bedele, Chelenko, Hidhabu and Meterhara. The job involves the design review and construction supervision of the water supply projects of the towns. The source of water involves borholes, surface water and springs. It is currently the largest water supply prject in the region • Project Coordinator Dodola Water Supply Project owned by Arsi Bale Rural Development Project • 2004 - 2005 Lecturing in Addis Ababa Universtity Faculty of Technology 4th year Waste Water and Solid Waste Course and 2006 – 2007 on Water Works Construction • Supervised Graduation Thesis (5th year engineering students) on Solid Waste – 2006 and Waste Water Management Projects in 2007.

January 2003 - April 2003 Water Sector Planner in the Development of Working Guidelines for the Ethiopian Water Resources Development Fund employed by the World Bank for the Ministry of Water Resources

June 2001 – Dec 2002 Water Supply and Sanitation Expert in the Development of Supply Chains Guidelines employed by the World Bank for the Ministry of Water Resources Project.

January 1999 – May 2001 Project Director of the National Drinking Water Guidelines Development Project. This Project was owned by the Ministry of Water Resources, financed by UNDP and undertaken by Continental Consultants. The responsibility involves leading over 20 high caliber professionals to develop a National Guidelines for Drinking Water.

Senior Water Supply and Sanitation Engineer in the 25 towns water supply project treatment plant designer for 9 towns projects in Oromia, Gambella and Benshangul Regions under Norconsult.

July 1996- Nov.1998 Program Director and Deputy Country Director, Norwegian Church Aid Ethiopia. The responsibility included heading the long- term development and emergency assistance of the NCA Ethiopian Program. The Ethiopia NCA program is the largest amongst the NCA global programs spread around the world.

Jan. 1996- Jun 1996 MS Consultancy Water Development and Sanitation Program Coordinator, Norwegian church Ethiopia dealing with drilling and surface water development in Bale and South Omo. MS Consultancy

MS Consultancy MS Consultancy

March 1994- Dec 1995 Water Supply and Sanitation Engineer: • Designed and supervised construction for Gambella water supply project based on infiltration gallery intake and treatment system on Baro River. • Designed and supervised Gode water supply project involves intake from Wabe Shebelle River, treatment plant, storage and distribution systems. • Headed the Study of Harrar Emergency Water Supply Project With UNDP/UNICEF Worked as a Consultant (water supply and sanitation) in an integrated needs assessment survey for the region of Gambella to prepare a priority assistance package.

• With Action Aid Ethiopia (AAE) Designed the Dalocha Water Supply system through a national consulting firm called Geoserv Pvt. Ltd. • Addis Ababa Water and Sewerage Authority Member of the project review panel of the Addis Ababa Emergency water Supply Development Scheme.

Nov. 1990-March 1995 Head of Water Supply and Sewerage Division in the Ethiopian Water Works construction authority (EWWCA). The responsibility involved the over all Coordination, planning organizing, directing, and controlling the execution of water supply and sewerage construction projects undertaken by EWWCA.

The water supply projects for the towns of Jimma, Dire Dawa, Woldia, and Moyale which were completed under Mesfin Shenkut’s direct responsibility. The projects are designed by Canadian consulting firm called Associated Engineering and German based consulting firm called Salzigitter. The World Bank, African Development Fund and the local government funded the projects.

April 1990.- Nov.1990 Co-ordinator of Negele, Guder, and Ghimbi Water Supply Projects.

Jan. 1988- March 1990 Worked as the Designer at first and then Head of Guder Water supply and Sewerage Construction project. This project consisted of river intake, treatment plants with sedimentation tanks, horizontal roughing, filters, slow sand filters, pipe line of over 50km, storage tanks, septic tanks, sewer lines, etc. costing over 10 million dollar.

Nov.- August 1988 Head of Jimma Water Supply project costing over 9 million-dollar. This project involved the construction of weir intake, conventional treatment plants as well as pipe network of over 50km. Jan 1987 –Aug.1988 Project Engineer of Six Centers Water Supply Project responsible for the contract management of Six-Centers Water Supply Project (Debremarkos, Arbaminch, Goba, Debrezeit,MS ConsultancyMojo and Dessie). Sep. 1984- Aug 1985 Regional Manager of EWWCA, North-Western regional office. The major MS Consultancy MS Consultancy

activities involved the provision of water supply to the regions of Gojam and Gondor. There were more than 200 employees, six drilling rigs, and a vehicle fleet of more than 40.

Jan. - Sept. 1984 Regional Engineer of EWWCA, Southern Regional Office. the response)ibility involved heading the Design and Construction Sections where designs of rural water supply schemes and sanitation facilities in Southern Region.

Jan1983- Sept. 1984 Designer and Supervisor of Meslo and Dedeass Water Supply and Domestic Waste Mangement Scheme costing over 2.5 million dollar.

July 1981 – Dec 1982 Practicing Engineer in office engineering works and field construction activities in EWWCA, HQ and construction sites.

MS Consultancy MS Consultancy

MS Consultancy MS Consultancy

Proposed Position: Water Supply Engineer Name of Firm: MS consultancy Name of Staff: Assefa Nega Nationality Ethiopian Date of Birth: 1960 Years with the Firm Nine years

Education BSc. in Civil Engineering Addis Ababa University, Ethiopia, 1983 MSc. (Eng), in Water Supply & Environmental Science, Tampere University of Technology, Finland

Membership in Professional Societies: Member of the Ethiopia Civil Engineers’ Association

Countries of Work Experience Deputy Manger of Organization and Management Consultants, Space 2001 Eritrea, Pvt. Ltd. Co., Asamara, Eritrea. Resident Engineer in the study and design of upgrading of Asmara and Massawa towns water supply projects.

Employment Record: MS Consultancy Sept 2006 to date – Senior Engineer • Project Manger and Design Engineer of Awassa Drainage Project • Design Engineer Dembecha and Bure WSP • Design Engineer Debre-Markos, Dangla and Kobo Water Supply and Sanitation Project Feb 2006 – Aug 2006 Senior Water Supply and Sanitation Engineer, responsible for design and contract administration of multiple water supply and sanitation projects.

July – January 2005, Senior Water Supply Engineer, Harar Water Supply and Sanitation Project in collaboration with Concert Engineering of Ethiopia and BCEOM of France, in charge of the design review of Harar City Water Supply Distribution Network and New Design of Water Supply System for the towns of Alemaya, Aweday and Adele. The project costs USD 40,000,000 and consists of 74 km DCI 600 – 700 mm rising main with 4 booster stations, reservoirs ranging from 200 – 4000 m3 and distribution networkMS of 180 Consultancy km.

MS Consultancy MS Consultancy

Dec. 2000 – June 2005 Design Engineer and Senior Water Supply Engineer, MS Consultancy

• Team Leader of in Capacity Building and infrastructure development project of Arsi Bale Rural Development Project. • Civil Engineer in charge of design and construction supervision of ancillary buildings, access road, valve chambers and other structures in Six Oromia Water Supply Project in the towns of Agaro, Arsi Negele, Bedele, Chelenko, Hidhabu and Meterhara. • Design of the Sub-surface structure of Bori Water supply project • Design and design review of multiple rural and urban water supply projects • Preparation of complete feasibility studies with detailed cost benefit analysis for three stone crushing plant projects,

Feb 1997 – Dec. 1999 Freelance Consultant, working on the design of different development projects with focus on water supply.

April 1996 - Jan. 1997 Deputy Manger of Organization and Management Consultants, Space 2001 Eritrea, Pvt. Ltd. Co., Asamara, Eritrea. Resident Engineer in the study and design of upgrading of Asmara and Massawa towns water supply projects.

1992 - 1996 General Manager, Lalibela Engineering & Construction Enterprise, Addis Ababa, Ethiopia. Member of the Board of Directors for the Finchia Sugar Factory Project, and the Ethiopian Pesticide Formulation & Production Factory Projects, Addis Ababa, Ethiopia

March 1992 - August 1992 Construction Management Expert, the Ethiopian water works construction Authority (EWWCA), Addis Ababa, Ethiopia. Member of “Construction Sector Restructuring Task Force” in the office of the Prime Minister of the Transitional government of Ethiopia, Addis Ababa, Ethiopia.

Dec. 1989 - Sept. 1990 Resident Engineer, for the Dire Dawa City Water Supply Project, working for water supply & Sewerage Authority (WSSA), Ethiopia.

Sept. 1988- Dec.1989 Resident Engineer, Water Supply & Sewerage Authority (WSSA), for the Guder MS Consultancy /Hormat Water Supply & Sanitation Project, Guder, Ethiopia. MS Consultancy

MS Consultancy MS Consultancy

Dec. 1987 - Sept. 1988 Head of the Technical office, Blue Nile Construction Enterprise (BNCE), Main office, Addis Ababa, Ethiopia.

Sept. 1986 - Dec. 1987 Blue Nile Construction Enterprise (BNCE) Resident Engineer at the Nekemt-Bure Feeder Road Project and the Blue Nile River Bridge Project, Bure, Ethiopia.

July 1983 - Sept. 1986 Design and construction engineer as Blue Nile Construction Enterprise (BNCE) Resident Engineer at the Awassa & Shashemene Bus Terminal Projects, Awassa & Shashemene, Ethiopia. • Project Manager, the Ethiopia Coffee Plantation Development Corporation at the BebekaCoffee Plantation development Project, Bebeka, Ethiopia. • Project Manager , the Ethiopia Coffee Plantation Development Corporation at the Bebeka Coffee Plantation development Project, Bebeka, Ethiopia. • Trainee Engineer and Project Manager, the Ethiopian Transport Construction Authority (ETCA), for the Awassaa- Bule- Bore, Adele- Grawa, Goba- Meslo, Ghinir-lmi Rural Road Projects on site, Ethiopia.

Languages Speaking Reading Writing Amharic Excellent Excellent Excellent English Very good Very good Very good French Fair Fair Fair

MS Consultancy

MS Consultancy MS Consultancy

Name of Firm: MS consultancy Name of Staff: Fanuel Tadesse Profession Sanitary Engineer Date of Birth: 1958

Education:

• MSc in Sanitary Engineering, Delft Technical University, The Nethearlands,. • BSc in Civil Engineering from addis Abeba University, 1981.

Membership in Professional Societies:

. Member of the Ethiopian Civil Engineers Association, Addis Ababa

LANGUAGES Speaking Reading Writing Amharic Excellent Excellent Excellent English Very good Very good Very good

Employment Record: Jan 2004 to-date MS Consultancy

• Design Engineer Woldia Water Supply and Sanitation Project • Design Engineer, Dilla Drainage Project. • Designed or sewer lines, on site and off site waste water treatment system. • Dodola WSP project – Sanitary Engineer; Designer of semi-urban sanitation systems. • Fincha Water Supply and Sanitation Project- Sanitary Engineer

1992 to 2003

Manager in FAENG Construction PLC • Project manger Jimma Technical and Vocational Training Center of Ministry of Education. • Ground + 4 multipurpose building project manager, • Building Complex for Radio and TV station Project Manager

1988-1992

Project Manager, SB Consult, Consulting Architects and engineers • Managed and Designed of water supply and drainage system in charge of overall coordination­ of construction site supervision • Sanitary Designer, Fincha Sugar Project Total cost of the project birr 60 million . Agricultural Workshop complex MS Consultancy . Swimming, pool . Store MS Consultancy . Clinic and some others MS Consultancy MS Consultancy

. Infrastructure . Residence buildings . • Maintenance Designer and Project supervising Engineer, Saint Paul Hospital Sanitary maintenance works Total project cost birr 3 million birr • Sanitary Installation Designer, Housing and Savings Bank ( Debre Zeit) Total project cost 1.5 million • Water Supply and Drainage System Designer, Alwero State Farm Building for Awash agricultural Development Corporation. . Various types of Residence Buildings • Drainage System Designer, Massawa Salt Works for National chemical Corporation. . Store . Offices . Residence buildings Total project cost 2.7 million birr • Sanitary System Engineer, IDA VII Ambo agricultural College Extension Buildings . Various types of Staff Residence Buildings . Student dormitories, . Laboratory, . Lecture theatre . Cafeteria and other facilities Total project cost 6.0 million birr • Sanitary Engineer, IDA Vii Guest House and Pedagogical and Demonstration Center for Addis Ababa University Total project cost birr 1.1 million birr • Sanitary Installation System Designer, WTHOF Workshop and office Buildings (DireDawa, Asmara) • Designed the Sanitary Installation System of the Workshop and Office Buildings. The project cost birr 3 million birr • Sanitary Installation System Designer, Catholic Church Consulate Father . Offices . Staff Quarters Total project cost birr 2 million birr • Sanitary Installation System designer, Road Transport Authority Office Building (Diredawa) . Offices . Workshop Buildings Total project cost. birr 48 million birr

1987 - July 1988

Engineer, National engineers PLC, Consulting engineers and Economist The Firm provides consulting services in civil Engineering design-and construction and in preparingMS costConsultancy estimates.

MS Consultancy MS Consultancy

1985 – 1987

Sanitary Engineer, Ministry of Agriculture

Duties and Responsibilities:

 Statistical Calculation  Structural drawings including form work plan, slab, beam and column reinforcement drcllvings, and details  Calculation of pipe size for water supply, sewer and vent lines )  Sanitary floor plan for water supply line and waste pipes  Storm water drainage system  Water tank  Septic tank  Raiser diagrams (Sanitary) • Prepared structural and Sanitary Design for:  Regional Technology Centers embracing wood and metal Workshops, Offices, Classrooms, Dormitories, Toilets and Showers for :­ . Bahirdar, Jimma, Kombolcha and Assela Total Construction cost birr 2.5 million . Agarfa and Ardayeta Farmer’s Training Center:-­ Cafeterias, Offices, Classrooms, Staff Residences, Clinics, Kindergartens, Toilets and Showers. Total Constriction cost birr 1.0 million . Ground plus one floor Office Buildingfor Material Procurement Department of the Ministry of Agriculture, Addis Ababa . Wondo Genet Forestry Training Center cafiteria and Staff Residences Total cost of construction birr.5 million . Boter Becho Forestry Training Center Cafeteria, Classrooms and dormitories Total cost of construction birr .5 million • Rural Waste Disposal System . Study and recommendation of a rural waste disposal system and the use of night soil as fertilizers . Design pit-latrine and the construction of super structure with local material • Construction Supervision of variety of buildings . Checking and approving the depth of foundations . Supervision of works to ensure confirmation with drawings, specifications and contract documents . Quality inspection of materials and workmanship . Solving problems encountered during construction

1983 – 1984

Ministry of Urban Development and Housing MS Consultancy Prepare Structural Designs for:  Ground plus one floorMS officeConsultancy Building for Inland Revenue Administration, Ministry of Finance, Addis Ababa MS Consultancy MS Consultancy

 Ground plus one floor office Building for Dessie City Council, Dessie  Conference Hall, Ethiopian Workers Party, Addis Ababa Region  Modification of a shopping center in Dessie  Member of Technical Committee of the Ethiopian Standard Institute charged with the task of setting standards of construction materials in Ethiopia

1981 - 1983 Assistance Research Officer, Ethiopian Science and Technology Commission

Work Undertaken that Best Illustrate Capability to Handle the Tasks Name of project Dilla Drainage Project Year 2006 - 2007 Location Dilla Client Dilla City Administration Main Project Feature Design and Construction Management in Liquid Waste Projects Potion Held Project Manager Activities Performed Managing the Implementation of the Project

Name of project Fincha Sugar Factory Sanitary Project Year 1988-1992 Location Ethiopia Oromia Client Ethiopian Sugar Corp. Main Project Feature Manage the implementation of domestic waste collection, Treatment and Disposal Potion Held Project Manager Activities Performed Lead the project design and implementaioon

• Project manger Jimma Technical and Vocational Training Center of Ministry of Education. • Ground + 4 multipurpose building project manager, • Building Complex for Radio and TV station Project Manager

Proposed Position: Electro-mechanical Engineer Proposed Position Electrical Engineer Name: Shewarega Dibabu Date of Birth: 1943 Nationality: Ethiopian

EDUCATION

• B.Sc. in Electrical Engineering-MS HaileConsultancy Sellasie I University. • Diploma in Mechanical Engineering from Ethiopian Air Force Aircraft Technicians School MS Consultancy MS Consultancy

• Airfield lighting equipment installation and maintenance certificate (ENGLAND) • CLASS “A” Certificate of Professional Competency from Ethiopian Electric Agency

Other Trainings • Budgeting Course - Given by Ethiopian Airlines • Computer Training “ “ “ “ • Course on Ground Power Unites-Houchin- England • Course on Aircraft 400Hz power- Houchin- England • Project Management Course- Aiddis Ababa • Airfield Lighting Training- GCE-England

Membership in Professional Societies and Registraion • Member of the Ethiopian Electrical Engineers Association • Member of the Ethiopian Electrical Professional contractors Association

• Registered professional electrical engineer from ministry of works and construction. • Registered Professional Electro-mechanical Engineer from Ministry of Water Resources

Languages Speaking Reading Writing Amharic Excellent Excellent Excellent English Very good Very good Very good Oromifaa Fair Fair Fair

MS Consultancy MS Consultancy

MS Consultancy MS Consultancy

EXPERIENCE RECORD:

Dec 1999 to-date MS Consultancy

- Chief Electomechnaial Project of Liquid Waste and Solid Waste Management Projects – Involved in all electromechanical analysis works of equipment procurement for liquid waste and solid waste Management Projects - Coordinator of EEPCO surveying of Distribution Line Routes and Towns around under the universal electricity access program. - Head of the Electro-mechanical Engineering division, responsible for supervising all installations, quality assurance of installed materials and commissioning of all electro-mechanical projects. - Responsible for the design of all the electrical supply and installation systems of Kobo, Dangla and Debremarkos towns’ water Supply as well as preparation of tender documents and bill of Quantities. • Involved in the design review of Six Oromia Water Supply Project and electrical engineering works of Ethio-Italy Rural Development Projects such as Dodola, Asassa and Herero Water Supply Projects.

Jan 1995 - Dec 1999 Freelance consultant

Involved in the design and supervision of electrical installations of Hospitals, office Complexes, residential and industrial buildings.

April 1992 - Feb. 1994 Director Base services, Technical Services Division, Ethiopian Airlines.

• Responsible for providing general services to the company such as maintenance and upkeep of premises, maintenance of all motorized equipment and administration of the motor pool system, laundry and printing activities.

• Directing the construction of new buildings, extensions and modification of premises and domestic airfields.

• Directing the maintenance and overhaul of all motorized equipment and the installation of new electrical and sanitary installations to new facilities of the company.

• Establishing policies and procedures to the administrative and functional aspects of the Base ServiceMS ConsultancyDepartment. • Developing long term and short term goals and objectives related to the Base Services. MS Consultancy MS Consultancy

June 1991 - April 1992 Manager Motorized equipment maintenance, Ethiopian Airlines.

• Responsible for the supervision of activities related to the maintenance, repair and overhaul of all motorized and ground support equipment operated by the Airlines. July 1980 - May 1991 Electrical Engineering Division Chief Ethiopian Air Force.

• Responsible for all electrical design, production, distribution, installation and preparation of electrical master plan of all Air Force Bases.

• Design, supervision and erection of Electro - mechanical equipment such as pumps, generators and workshop machinery.

August 1975- July 1980 Electrical Engineer - Ethiopian Air Force.

• Responsible to design and supervise all internal and external electrical installations of all Air Force Bases.

• Infrastructure design and installation supervision of various facilities including water supply systems.

July 1972 - July 1975 Electrical Engineering student - June. 1963- Sept 1967 Mechanic - Ethiopian Air Force. Oct. 1961 - Dec. 1962 Aircraft Mechanic/Technician Student Ethiopian Air Force Technician’s School. Detailed Tasks Assigned Responsible for the advise in procuring solid waste skips, truks and other electromechanical aspects

Work that Best Illustrates Capability

Mechanical Engineering Training at Diploma Level and Electrical Engineer with BSc Level – Involved with UDCBO Tender analysis in the specification preparation and procurement of vehicles for liquid waste management and liquid waste management - In addition to the electrical power systems experience of more than 25 years, acquired extensive experience in all phases of project development such as feasibility studies, planning, design review, contract negotiation, tender evaluation, monitoring projects progress, report writing, managing and coordinating multi-disciplinary projects while serving in Ethiopian Air Force construction division and directing the activities of Ethiopian Airlines Base Services. MS Consultancy MS Consultancy

MS Consultancy MS Consultancy

Proposed Position: Structural and Geotechnical Engineer Name of Firm: MS Consultancy Name of Staff: Getaneh Terefe Profession: Practicing Professional Structural Engineer Date of Birth: April 1958 Nationality Ethiopian

Education

M.Sc. (with Honors) in Civil Engineering with specialization in Structural and Geotechnical Engineering with focus on Soil Mechanics and Foundation Engineering, from Petersburg University, 1982.

Membership in Professional Societies: • Member of the Ethiopian Association of Civil Engineers, • Member of the Editorial Board of the Ethiopian Association of Civil Engineers, • Member of the Editorial Board of Addis Ababa University, Publications of • Technology Faculty Journal: ZEDE; • Member of the Ethiopian Association of Seismology and Earthquake Engineering, • Member and Secretary of Code Drafting Committee for Foundation

Key Qualification

• Structural design ∙ Geotechnics ∙ Soil and rock mechanics ∙ Foundations Soil classification and load determination • Project administration and co-ordination ∙ Contract administration ∙ Reconnaissance survey for project implementations

Other Training

• Certificate in Fundamental of Project Management and Manpower Development • Training: Structural Checking Basic Computer programming Engineering Software’s

Language Speaking Reading Writing Amharic Excellent Excellent Excellent English Very good Very good Very good

Employment Record

1997 - To date Licensed Structural and Geotechnical Consulting Engineer in charge of multiple geothecncial investigation worksMS and Consultancy structural designs. He is an associate member of MS Consultancy since 2001 fully responsible for geothecchnical investigation and structural designs of intakes, reservoirs, and treatment plants, crossing structures, MS Consultancy MS Consultancy

buildings and the like.

Major Water Projects With MS Consultancy • Geothechnical and Structural Engineer of - Dire Dawa Solid Waste Management Project, Awassa Drainage Prject, Debre Markos, Dangle and Kobo Water Supply Project, Six Oromia Water Supply Project in charge of geotechnical investigation, design review and design of all structures consisting of intake on Awash and Bedena Rivers, Treatment Plants in Bedele and Metehara, Reservoirs sizes ranging from 50 – 2000 m3, crossing structures and others.

Other Relevant Projects • 9/25 World Bank Financed Water Supply Project gethecnical investigation, and structural designs of intakes, treatment plants and reservoirs, • Adwa Town Water Supply projects /Hydraulic flocculators/ (Ref.: Meteferia Consulting Engineers PLC). • Gode Irrigation Project (Ref.: TAHAL Consulting Engineers LTD, TEL-AVIV ISRAEL) [ Birr 400 Million ] • Gethecnical investigation and structural design of Nekempt Dam.

1995 - 1997 Manager, Contract Administration Department, Building Design Enterprise /BDE/ Responsible for overall management of the Department works; worked as Contract Administrator of several projects, exercising the Powers of the Engineer for the Enterprise as per the Standard Conditions of Contracts for the Constructions of Civil Works.

1992 - 1995 Manager, Materials Testing Department & Foundation Expert Building Design Enterprise /BDE/

Responsible for overall management of the Department works; administration of Geotechnical Investigations for buildings foundations, dam sites, irrigation projects and water structures; Evaluations of soils, rocks & construction materials; Foundation recommendations.

Worked as Foundation Expert for various projects (To name very few of the accomplished projects: the UN Additional Conference Facilities in Addis Ababa, Sheraton Addis Project, PTA Head Quarters Office in Lusaka-Zambia, numerous multi- storey buildings in Addis Ababa).

Worked as Professional Structural Designer. Structures designed: Several multi-storey buildings, factory buildings, warehouses, auditoriums, earth-retaining structures, hydraulic flocculators, water reservoirs etc.…)

1989 - 1992 Head, Field Investigation Division, Building Design Enterprise /BDE/ Responsible for planning, coordinating and implementing Geotechnical Investigations for foundation design. Also worked as structural designer whenever assigned.

MS Consultancy 1987 - 1989 Structural Designer & FoundationMS Expert,Consultancy Building Design enterprise

MS Consultancy MS Consultancy

Structural Engineer and Foundation Expert in supervisory capacity.

1985 - 1987 Structural Designer & Foundation Expert - Building Design Enterprise

Structural Designer & Foundation Expert in an independent capacity.

1984 - 1985 Structural Designer Ethiopian Building Construction Authority

Structural Designer and Foundation Design Advisor under supervision.

1982 - 1984 Site Engineer Ethiopian Building Construction Authority

Site Engineer for Mugher Cement Factory project.

Key Projects Accomplished & References [Estimated project cost] A. Geotechnical Investigations & Foundation Consultancy • United Nations Additional Conference Facilities, A.A [ over Birr 500 Million ] (Ref.: BDE, Addis Ababa & STUDIO VALLE PROGETTAZIONE, ITALY) • Akaki A & Sibilu Dam sites (Ref.: BDE, Addis Ababa & Seureca Consulting Engineers, 75017 Paris, France) • P.T.A. Headquarters Building, Lusaka - Zambia (Ref.: BDE, Addis Ababa & Wade Adams Piling Foundation) [ Birr 30 Million ] • Gode Irrigation Project (Ref.: TAHAL Consulting Engineers LTD, TEL-AVIV ISRAEL) [ Birr 400 Million ] • Proposed National Stadium A.A (Ref.: China National Complete Plant Export Corporation) [ Birr 100 Million ] • Sheraton-Addis Project (Ref.: BDE, Addis Ababa & BROKONSULT AB, Stockholm, Sweden) [ over Birr 900 Million ] • Ethiopian Mapping Authority Head office A.A [ Birr 5 Million ] • HALEB Ship-yard Project, HALEB (Ref.: BDE, Addis Ababa & Korean Design Firm) • Addis Tire Factory Expansion Project, A.A (Ref.: BDE, Addis Ababa & Czech Design Firm) [Birr 30 Million ] • Air Field Terminal Building , Bahir Dar (Ref.: BDE) [Birr 10 Million ] • Apartment Complex No. 12,13,14,17,A,A (Ref.: BDE) [ Birr 10-20 Million each ] • Tabor Ceramic Factory, Awassa (Ref.: BDE) [ Birr 236 Million • 5th Brewery Factory, Bedele (Ref.: BDE) ] • Sunshine Building [ over Birr 15 Million] • Future Awash International Bank and Awash Insurance Company (19-Storey with two basements) ( Ref.: Metaferia Consulting Engineers ) [over 70 Million] • Head Office Building for Nyala Insurance Share Company ( Ref.: Haile Gebriel Consult) [over 50 Million] • Federal Police Headquarters Building (Ref.: National Consultants) [Over 80 Million] MS Consultancy B. Structural Design [Project Cost] • Agro Aircraft Assembly Plant, Ethiopian Airlines, A.A ( Ref.: BDE ) MS Consultancy MS Consultancy

• Bedele 5th Brewery Factory ( Ref.: BDE ) • Water Pump Factory Buildings / Damage study and structural modification / ( Ref.: BDE) • Multi-storey Office Building, current NAZARETH BUILDING, A.A, Asmara Road (Ref.: BAKAL INTERNATIONAL IMPORT EXPORT) [ Birr 4 Million ] • Four-storey Hotel Building, current ATLAS HOTEL, A.A, Urael Road (Ref.: HaileMariam Worku Pvt. Investor) [ Birr 2.5 Million ] • Multi-stoery Multipurpose Building, A.A Bole Road, Near Japanese Embassy (Ref.: Kassaye Betre Group of Investors) [ Birr 5 Million ] • Office Building: current South African Embassy, A.A., New Kera Road (Ref.: Tadesse Endeshaw, Pvt. Investor) • St. Gabriel Cathedral Church, A.A., Ambo Road (Ref.: St. Gabrael Construction Committee) • Adwa Town Water Supply project /Hydraulic flocculators/ (Ref.: Meteferia Consulting Engineers PLC) • Radda Barnen Field Office [ Over Birr 2 Million ] (Ref.: ABAKO International Partners) • Swedish Visa Section Extension Building (Ref.: ABAKO International Partners) • ICS Middle School Building and Auditorium (Ref.: ABAKO International Partners) [ Birr 4.5 Million ] • Yidnekatchew Construction Terminal Project (Ref.: Yidnekatchew Construction PLC) [ Birr 6 Million ] • Multi-storey Apartment Building (Construction to commence soon, CMC - Road) (Ref.: Ayat Pvt. Investor) [Birr 6 Million] • Fuel station facilities (Ref.: Pasqua Guiseppe, Aluminum & Metal Industry) • Mobil Canopy design • TOTAL Canopy design • Midwifery projects to be implemented in six towns, financed by SIDA • (Ref.: ABAKO International Partners) • Eight-story shops and office building (Ref.: Mella Engineering , Addis Ababa) [ Birr 9.5 Million ] • Office building and Auditorium for Bureau of Planning and Economic Development, Bahir Dar (Ref.: ABAKO International Partners) [ Birr 4.5 Million ] • Office building and Training Center for Education Bureau, Bahir Dar (Ref.: ABAKO International Partners) [ Birr 4 Million ] • EHBC Project for Hiwot Berhan Church (Ref.: ABAKO International Partners) • [ Birr 6 Million ] • Norwegian Embassy extension building (Ref.: ABAKO International Partners) • Various facilities for Lega-Dembi Gold Mine Project (Ref.: ABAKO International Partners) • Water Reservoirs of various capacities for Oromia Region (Ref.: Norconsult International A.S.) • GIFT TRADING Nail Factory project (Ref.: Haile Gebriel Consult.) • GIFT TRADING Shops & Office Building (Ref.: Haile Gebriel Consult.)[Birr 15 Million] 2002 • Ten Sisters NGOs Headquarters Building (Re.: Ten Sisters NGOs) [Birr 25 Millon] • Tabor Ceramic products share company

MS Consultancy C. Design Checking /BDE/ • Addis Ababa Airport ExpansionMS Consultancy Project (worked as Chairman of the Design Review MS Consultancy MS Consultancy

• Committee at National level) (Ref.: The Ethiopian Ministry of Works & Urban Development) [over Birr 800 Million] • New Mugher 4th Cement Plant Expansion Project [ Birr 600 Million ] • Proposed 5th Cement Plant, Dire-Dawa [ Birr 800 Million ] • Ethiopian Insurance Corporation Head Office Building, A.A. [ over Birr 20 Million ] • Ethiopian Institute of Geological Surveys • Various Social and Industrial Buildings • Nyala Insurance Office Building, Bahir Dar [Birr 13 Million] 2000 • Martyrs Monument, Bahir Dar [Over Birr 60 Million] 2002 • Six Oromia Town Water Supply Project, designed by Sir Alexander Gibbs [Over Birr 100 Million] 2001 D. Project Management

• Worked as Contract Administrator from for BDE [ Several Projects] 1995 - 1997 • Engineer’s Representative for the Extension of the EHNRI Building, designed by Architectenassociate, The Hague, Netherlands [ Birr 4 Million] 2000 - 2003 • Contract Manager for the New Royal Netherlands Embassy Project, Addis Ababa, 2002 [Over Birr 45 Million], current - 2003 • Contract Manager for the New Addis Ababa City Office Complex Project [Over Birr 120 Million], current - 2003

E. Research and Development

1. Settlement of foundations on uniform soils (printed in 1982, “Collective works of LICE”) 2. Determination of foundation Settlements (Printed in 1995, Journal of the Ethiopian Association of Engineers and Architects) 3. Total thrust on earth-retaining structures (Printed in 1999, Journal of the Ethiopian Association of Engineers and Architects) 4. Approximate standardization of the range of values of soil deformation modules for various soil types in Addis Ababa area (under investigation)

5. Free swell and heave pressure magnitude of expansive soils (under investigation)

MS Consultancy

MS Consultancy MS Consultancy

Name: Fekadu Melese Date and Place of Birth: April 30, 1967 Nationality: Ethiopian

EDUCATION Master of Business Administration (MBA) School of Graduate Studies, Addis Ababa University, 2003.

M. Sc. in Structural Engineering, School of Graduate Studies, Addis Ababa University, 1995.

B.Sc. in Civil Engineering, Addis Ababa University, 1990.

Membership of professional bodies: Member of the Ethiopian Association Civil Engineers (EACE).

Other Training Post graduate Diploma in Earthquake Engineering, Ministry of Construction, Seismology and Earthquake Engineering, Japan. 11 months

Language Reading Speaking Writing

Amharic Excellent Excellent Excellent English Excellent Excellent Excellent Oromiffa Very Good Very Good Very Good

Employment Record

Jan 2005 – to-date MS Consultancy (on call structural and geotechnical engineer)

• Structural Engineer Addis Ababa Water Project • Structural Engineer Gondar Solid Waste Project • Structural and Geotechnical Engineer – Bishoftu Drainage Project • Design of circular and rectangular concrete water tanks of capacities 50m3, 100 m3, 150m3, 200m3 , 250, 500, 1000 m3 on ground and elevated using BS 8007 and BS 8110, used as a standard for multiple water supply projects; • Design of cross drainage concrete pipes, culverts, supporting structures primary canals and weirs for Midagtu irrigation project and Arsi Negele WSP access road project; • Design of reinforced concrete, water treatment plants, heavy duty pump houses and generator houses for different water supply projects MS Consultancy for Metehara and Bedele WSP in association with other engineers of MS Consultancy.MS Consultancy

MS Consultancy MS Consultancy

March 2004 – Sept 2005 Water Works Design and Supervision Enterprise (on call basis) • Design of Intake Towers for Tendaho and Kesem Dam and Irrigation Projects. • Design of Outlet portals to Tunnel for Tendaho Dam and Irrigation Project • Design of Cross Regulators and Head Regulators for Tendaho Dam and Irrigation Project • Design of Siphons for Tendaho Dam and Irrigation Project • Design of spillway for Kesem Dam and Irrigation Project • Design of spillway for Tendaho Dam and Irrigation Project • Design of Dam downstream Works for Koga Dam and Irrigation Project • Design of G+1 and G+2 residential houses for Tendaho and Kesem Sugar Estates in Tendaho and Kesem Dam and Irrigation Projects

Jan 2004 – April 2004 Mott MacDonald

• Structural design of reinforced concrete measuring weirs of canals for Koga Dam and Irrigation project • Design of cross drainage single and multiple box culverts supporting primary canals for Koga Dam and Irrigation project with Mott MacDonald, 2004. • Design of primary canals as culverts passing under a main highway for Koga Dam and Irrigation project f • Design of cross regulators for Koga Dam and Irrigation project • Design of access bridge to intake tower of span 29m for Koga Dam and Irrigation project • Design of Spillway Bridge of span 22m using AASHTO 98 for Koga Dam and Irrigation project with. • Design of Intake Tower for Koga Dam and Irrigation project • Design of draw off culvert for Koga Dam and Irrigation project with Mott MacDonald (a British Civil Engineering Consulting Firm). 3D finite element analysis is used for the analysis,

Jan 1999 – Nov 2003 - Structural engineer for various private and public institutions (on part time basis)

• Design of W/ro Yishamu’s G+5 apartment building to be constructed in Addis Ababa, 2003. • Design of concrete flocculation chamber and clarifier, and filter for Water Works Design and Supervision Enterprise using BS 8007 and BS 8110, 2003. • Design of circular concrete water tanks of capacities 500m3, 1000 m3, 2000 m3 and 4000 m3 as a freelancer for Water Works Design and Supervision EnterpriseMS using Consultancy BS 8007 and BS 8110, 2003. • Design of Gharta River Bridge, total span 100m using AASHTO 98, 2003. MS Consultancy MS Consultancy

• Design of a river bridge on Motta-Bahir Dar road, total span 56m using AASHTO 98, 2001. • Design of Birbir river bridge, total span 60m using AASHTO 92, 1997. • Design of Lomate river bridge, total span 40m, using AASHTO 92, 1997. • Design of shopping and Motel complex of Athlete Derartu Tulu under construction in Assela, 2003, cost 7 million birr. • Design of Rift Valley College buildings which consisted of G + 2 buildings constructed in Nazareth. 2001. • Carried out checking of the use of Forklift to fill column concrete on the slab of Bole International Airport Terminal Building upon request of the contractor in 1999 - The request was denied because the slab doesn’t have the capacity to support live load of the Forklift. • Carried out design revision of pile caps of Bole International Airport Terminal Building project due to eccentricities of pile driving, 1999. • Design of Abattoir and G+2 office buildings constructed in Modjo, 1997. Project cost about 4 million Birr. Supervised the construction periodically also. • Design of residential and office building project of Ato Ahmed’s G + 2 building constructed in Nazareth, 1997. Project cost 3 million Birr. Supervised its construction also periodically. • Involved in the design of German Community School in Addis Ababa, 1992

SUPERVISION:

• Supervision of construction of fences, compound streets and parking lots of the African Union (the former OAU), 2002. • Supervision of most of the above desings • Supervision of construction of many multi storey buildings

TOPOGRAPHIC WORK:

• Surveying, levelling, contour and site layout maps preparation, inc1udulg using Total Stations • Recent work is surveying and preparation of topographic map and profiles of 110 hectares of land for Great American Homes Inc. using Total Stations.

Detail Task Assigned

MS Consultancy Structural analysis and design, statistical calculations, preparation of structural drawings, and constructionMS supervision Consultancy Soil and geotechnical investigation to determine MS Consultancy MS Consultancy

• Suitability of proposed site for the proposed solid waste management in relation to ground waster depth, ground waster flow direction, and the suitability of the native borrow material for intended project • Assess the availability of liner and other materials that are necessary for project implementation • Identify possible borrow site, take sample and interpret the laboratory test results • Structural analysis and design, statistical calculations, preparation of structural drawings, and construction supervision regarding project structures. • Soil and geotechnical investigation, for the sites to construction and recommending mitigation measures when defects noted, • Study, analyze and recommend materials to be used for construction and follow up laboratory tests, • Check and approve materials of construction.

Work Undertaken that Best Illustrates Capacity

Beside outstanding structural and geotechnical works accomplished above, Eng. Fikadu has been instructor as indicated here below. Currently is on Sabbatical Leave.

July 1997 – To Date Lecturer structural engineering courses. Courses: Structures, Reinforced Concrete and Bridge Design. Advising final year projects.

Sept. 1995 - July 1996 Coordinator of Extension Division, Faculty of Technology, Addis Ababa University Lecturer, structures courses. Advising final year projects.

Sept. 1991 - August 1995 Assistant Lecturer, Department of civil engineering in structural engineering courses and surveying course.

Sept. 1990 - August 1991 Graduate Assistant, Department of Civil Engineering, Addis Ababa University. Assisting on structural engineering and surveying courses.

MS Consultancy

MS Consultancy MS Consultancy

Proposed position: Environmentalist Name of Firm MS Consultancy Name of Staff: Getahun Worku Date of Birth: February, 1955 Nationality: Ethiopian

Education

• Post graduate diploma (equivalent to MSc. Degree) in Environmental Science and Technology from International Institute for Hydraulic and Environmental Engineering, Delft, The Netherlands, October 1985. BSc. Degree in Chemistry

Membership of Professional Association

Member of the Ethiopian Environmental Forum

Countries of Work Experience

Ethio-Djibouti Power Extension Project – Environmentalist

Languages Speaking Reading Writing Amharic Excellent Excellent Excellent English Very good Very good Very good Oromifaa Excellent Excellent Excellent

Other Trainings

Certificate in management of Urban Water Supply and Waste Water Systems, Windhoek, Namibia, June 2001.

Certificates in Integrated Water Resource and Wetland Management, MITR, Nairobi, Kenya, Nov. 1998.

Certificate in Management of Urban Water Supply and Wastewater systems, Chalmers University of technology, Gutemberg, Sweden, oct.1997.

Certificate in Hydrometeorology, Regional Meteorological Training Center, Telavive, Israel, 1995.

Certificate in Wastewater Management, Foundation de l’eau, Limoge University, France, sep.1981. Certificate, Quality Management system ISO 9000, and ISO 14000, Addis Ababa, june 2000

Certificate in Project Management, by Umgeni Training Center in collaboration MS Consultancy with Ernest And Young Consultants, Ethiopian Management Institute, Debrezeit, Ethiopia, MSNov. 2000 Consultancy Certificate in Senior Management, by Umgeni Training Center in collaboration MS Consultancy MS Consultancy

with Ernest And Young Consultants, Ethiopian Management Institute, Debrezeit, Ethiopia, Nov. 2000

Certificate in Writing Skills , by Umgeni Training Center in collaboration with Ernest And Young Consultants, Ethiopian Management Institute, Debrezeit, Ethiopia, Jan. 2001

Certificate in computer training; Lotus 1-2-3, WP, D-Base-4, Window-95, word and excel,

WORK EXPERIENCE

Joined MS Consultancy since Feb 2004 initially on call basis and on full time basis since March 2007 as and Environmentalist and involved in the following projects;

• Addis Ababa Water and Seweage Project • Kombolcha and Dire Dawa Liquid Waste Project • Dire Dawa Solid Waste Mangement Project, • Yem special Woreda Water Supply Project, • Kombolcaha Water Project, • Bahir Dar Drainage Project • Alge Water Supply and Sanitation Project

As Consultant he has performed

Jan – Dec 2005 Project: Sekota town Water Supply and Sanitation project Activities include assessment of existing water supply and sanitation situation of the town, assessment of feasible water supply sources for the town, social and environmental impacts of the water supply and sanitation project, and proposal of the respective mitigation measures.

Feb – Aug 2004 Assignment : Environmentalist Project : Wonbera _ Guba Roads project Employer : TCDSCo

July 2004 Assignment : Environmentalist Project : Bahir Dar Town roads upgrading project Employer : TCDSCo

Aug 2004 Assignment: Environmentalist Project : Hamus Mazoria – Dugdan rural roads project Employer : TCDSCo

Oct 2004 Assignment : EnvironmentalistMS Consultancy Project : Agena – Wert – Cheza road project Employer : TCDSCo MS Consultancy MS Consultancy

2003 / 2004 Assignment: Project coordinator and wastewater management expert Employer : Addis – Mojo Edible oil factory Activities include start – up of the operation of wastewater treatment plant of the factory, training of personnel and preparation of operation & maintenance manual.

February 2003 Assignment: Environmentalist Employer : TCDSCo. Activities being environmental impact assessment study for Akaki – Aba Samual road project

August – October , 2002 Assignment: Environmentalist Employer : TCDSCo Activities : Environmental Impact Studies for Jijjga _ Kebridehar Road project.

July – September, 2001 Assignment : Environmentalist Employer : TCDE Activities being Environmental Impact Assessment studies for Gog-Akobo rural road project.

August – Oct., 2000 Assignment : Environmentalist Employer : TCDE Activities being Environmental Impact Assessment studies for new Mekele Ring Road and urban roads upgrading project.

July 1999 Assignment : Waste management and sludge expert Employer: Trust Trading and Consulting PLC. Activities being feasibility study for the establishment of organic fertilizer using municipal wastes as raw material.

June 1998 Assignment : Environmentalist Employer: Transport Construction Design Enterprise (TCDE) Activities being Environmental Impact Assessment studies for Shoa Robit – Gewane road construction project. (Ethiopia)

August-December 1997 Assignment : Environmentalist /Water and Wastewater expert / Employer : Ministry of water resources

Activities include assessment of Water supply and sanitation situation in Ethiopia and submission of technical document for the preparation of water resource policy of MS Consultancy Ethiopia.

Feb – March 1993 MS Consultancy Assignment: Waste Management expert MS Consultancy MS Consultancy

Employer : Municipality of Addis Ababa Activities include assessment of solid waste collection and disposal practices and facility requirement in the city of Addis Ababa.

AS A PERMANENT EMPLOYEE

July 1995 – Feb 2007. Assignment: Head, Sewerage Services Department. Employer: Addis Ababa Water and Sewerage Authority (AAWSA). Activities include planning, organizing, coordinating, directing, supervising and control of the proper collection, treatment and disposal of sewage generated in the city of Addis Ababa. Co-ordinate and supervise wastewater projects that are being carried out `under the department.

1994 – 1995 Assignment: Counterpart Project Environmentalist Employer: AAWSA Environmental Impact Assessment (EIA) study for the Addis Ababa water supply stage-III, including water source, transmission line and treatment plant development sites and access road construction. The project work covers development of surface and ground water sources at different sites in the north and southern part of the city with an estimated daily yield of 900,000m3 potable water for the city.

Environmental Impact Assessment of access road routes to the dam sites, to treatment plant sites, to service reservoir sites and for road a route following the transmission lines was also conducted.

1993 – 1994 Assignment: Branch Manager Employer: AAWSSA The branch renders water supply and sewage disposal services for a population estimated at 700,000 people.

1991 – 1993 Assignment: Assistant to the Head of major projects division Employer : AAWSSA

The division plans, organizes, identifies needs and directs the execution of water supply and wastewater projects of the organization.

Environmental Impact Assessment (EIA) of Wastewater treatment plant sites, sludge forest application areas and access roads designated in the wastewater master plan studies for the city of Addis Ababa.

EIA study of the road routes to the treatment plants and to forest areas located at different sites in the out skirts of the city were also conducted

1989 – 1991 MS Consultancy Assignment: Office engineer Employer: AAWSA MS Consultancy MS Consultancy

Activities include assisting the project engineer for water supply stage-IIB and Kotobe water supply and sewerage projects of the city of Addis Ababa.

The project works included construction of water supply & sewerage networks, access road and a sewage treatment plant.

1988 – 1990 Assignment: project co-ordinator for a low cost sanitation project. Employer: AAWSA

The project objectives were to assess the existing Environmental and Sanitary conditions in the city of Addis Ababa and to propose appropriate low cost sanitation technologies, especially for the urban slums.

1985 – 1989 Assignment: Counter-part sanitary Engineer A/ Head, Sewerage Services Division Employer: AAWSSA

The project work covered an experimentation works of a newly introduced sewerage system for the city of Addis Ababa, both at a laboratory and field scale. Monitoring and start up of the treatment plant included analyses of influent and effluent characteristics as well as the effect on the receiving streams and the surrounding agricultural fields.

1979 – 1985 Assignment: Water and Wastewater chemist Employer: AAWSA

Main activities being water and wastewater quality control at water sources, treatment plants, distribution networks and in reservoirs. Supervision and control of water and wastewater treatment processes.

MS Consultancy MS Consultancy

MS Consultancy MS Consultancy

Proposed Position Sociologist Name: Mengesha Hailemelekot Melkamu Name of Firm MS Consultancy Date of Birth: October 1951 Nationality Ethiopian

EDUCATION B.A. Degree in Social Work with special emphasis on Rural and Regional Development. 1978

Membership of Professional Association

1. Chairman of the Board of Directors of POC (Prosthetic & Orthotic Center). 2. Board member of ALERT (All African Leprosy Training and Rehabilitation). 3. Founding member and Vice Chairman of the Forum for street children Ethiopia. 4. Board member of Grar Bet Ledikuman (Butajera). 5. Board member of Cheshire Home for Physically Handicapped Children. 6. Board and Founding member of “Women Aid Ethiopia.” 7. Member of the Ethiopian Family Guidance Association

Other Training • I.L.O. (International Labor Organization) certificate:- • Structure and Organization of Social Rehabilitation Service. • (Lusaka, Zambia) 1981 • University of London Institute of Child Health, certificate on children in War and Difficult Circumstances.1982 • TATA Institute of Social Science (Bombay) certificate on Development and Welfare of Women and Children. (UNICEF) 1983 • International Institute on Aging United Nations- Malta Certificate in Social Gerontology. 1988 • TOT training Grass root management, World Bank Economic Development Institute (Certificate) • Entrepreneurship training and small business development (certificate from Enterprise Ethiopia and Empretec Ghana Foundation • Regional training on trade & development ( Kenya, Tanzania, Uganda TWO, Cotonuu Agreement

Employment Record

October 2003 – to date MS Consultancy

• Sociologist – Addis Ababa Water and Sewerage Projects • Sociologist – Awassa Drainage Project • Evaluation of the fifth UNICEF country Program for water sanitation program In Tigrai- Amhara , Oromia& southern Region • Consultancy work on baseMS line Consultancy survey on sanitation And health in Kewet Woreda( Amhara Region) Socio economic study of Fentale weoreda Master Plan Development

MS Consultancy MS Consultancy

• Consultancy work for IHA/UDPIntegrate wholistic Urban development work in Teklehaymanot Woreda ( jebele30. 31) to undertake urban slum upgrading & sanitation program in the area

• Conducted a study on the condition of Konso women in Konso special woreda for Farm Africa integrated woreda development program.

December 2001 -2003/ Private Consultant

Participated in the study of woreda transport and travel study (WTTP) in selected Pilot woredas in Amhara Region (Este woreda), Atsbi woreda (Tigray Region), Ado Godere woreda (Benshangul) in the capacity of rural sociologist.

Oct. 1997 - June 2001/ Private Consultant

Lead consultant to Women’s Affairs sub-sector in the Office of the Prime Minister for a project financed by the world Bank for institutional capacity building for gender sensitive development programs.

- Participated in the development of training manuals for women Grass root management training - Participated in the Planning, and formation of the Ethiopian Women’s Initiative Development Fund. - Conducted need assessment studies and base line survey in selected pilot regions. - Coordinated handcraft survey made by women in Afar, Oromiya, Southern regions and Addis Ababa - Conducted training programs for Grass root women, Women machinery’s sector bureau, NGO’s and other stakeholders. - Assisted in the study to create market outlets for women’s handcraft products by opining handcraft Emporiums in Pilot regions.

1991- 1997 General Manager of the Rehabilitation Agency.

RESPONSIBILITIES - Planning and executing Rehabilitation Programs for the socially disadvantaged groups in cooperation with NGO’s and International organizations. - Soliciting funds from NGO’s International Organizations and from other bilateral sources. (UNDP, ILO, SNV, SCF, etc.). - Conduct various kinds of studies and research regarding Rehabilitation and related fields. - Directing and managing production workshops and marketing centers of the Rehabilitation Agency - Assisting and supporting self-help groups in various income generating schemes - Participated in various kinds of staff development and training of personnel for the Agency and regions. - As manager of a government umbrella organization responsible for Rehabilitation MS Consultancy coordinated various kinds of programs run by several local and international NGO’s working in programsMS for Consultancy the needy. - Work with and assist National association of the disabled and other self help groups to form strong associations of the disabled in order to empower them to MS Consultancy MS Consultancy

become useful and productive citizens. - Designed and executed credit scheme program for disabled excombatants in southern Wollo with financial assistance from SNV (Netherlands Development Agency) - Represented Ethiopia in various International conferences and seminars related to Rehabilitation. - Doing other related works which the job demands like public relation, budget and finance, controlling, and directing and etc.

1986- 91

Head of Rehabilitation Division of the Ministry Labour and Social Affairs and Manager of a project for children in difficult circumstances financed by Radda Barnen and designed and managed income generating activities and vocational training program’s for street children and their families.

1984 - 86 Ministry of Labor and Social Affairs, head of Social Defense Section. The job position involved undertaking various types of research concerning social problems like prostitution, vagrancy, delinquent children, and street children. Supervising the Addis Ababa Remand Home and Training Center. Designing various kinds of rehabilitation and income generating projects for socially disadvantaged groups. Other administrative and organizational tasks related to the job position.

1980 - 84 Ministry of Labor and Social Affairs. Planning Expert in the Rehabilitation Agency for the Disabled counterpart to ILO consultant on rehabilitation policy and guidelines for rehabilitation services for the disabled.

1980 Ilbabor Administrative Region, Head of Social Affairs. Attached to the regional office coordinating planning and implementation of educational, health and social development with concerned agencies.

1978 - 1979 Forestry and Wild Life Development Authority as rural sociologist, undertaking research in Afforestation in Kaffa, Shoa, Arsi, Sidamo and Bale. Studied forestry practice of the peasant and coordinated FLCD (Forestry for Local Community Development) programs. Participated in the training of foresters, loggers and peasants. Attended review meetings with aid giving agencies concerning National Forestry Programs and etc.

1977 Rehabilitation Agency for the Disabled as a Social Worker in the private welfare and charity coordinating unit.

1974 - 77 Relief and Rehabilitation Commission (RRC) in Wollo, in the capacity of a coordinator. MS Consultancy Duties and responsibilities included:-

- Collecting information on drought affected children and families:- MS Consultancy MS Consultancy

- Assessing rehabilitation needs, effecting child family reunification by distributing of seeds, food, oxen and farm implements; - Carried out follow-up studies of reunified families, compiling progress reports and etc.

1973 Institute of Development Research (I.D.R) of the Addis Ababa university as a researcher in rural Economy survey in Gojjam. (Summer job)

1972 Central Statistics Office (C.S.O.) employed an enumerator in Household Economic Survey in Tigray.

1971 Ministry of Agriculture Employed in inventory work.

1969 Municipality of Addis Ababa Employed in the registering section of the revenue Department. (Summer job). 1968 Ethiopian Road Agency (ERA) employed in inventory work. (Summer job) . PAPERS AND RESEARCH UNDERTAKING 1. Study on the extent and magnitude of delinquency in Ethiopia short term consultancy ECA (Economic Commission for Africa). Nov. 1988 2. Review of Rehabilitation Services for Handicapped people in Ethiopia. 1994 3. Study on Street children in Ethiopia. 1986 4. A paper on Aging in Ethiopia 1989 5. Forestry for local Community Development in Ethiopia. 1979 6. The Role of Government in Rehabilitation. 1994 7. Response to the problem of unaccompanied children in Ethiopia (Evaluation). 1989 8. Disability Awareness Clubs the experience of Eastern Shoa. 1993 9. Socio-economic re integration of Disabled x-combatants. 1992 10. Social re integration of land mine survivors. 1995 11. Gender study on Konso Women. 2001 12. Impact assessment study on Mine risk education in Tigray Regional State (UNICEF/ RaDO) 2001 13. Study on sustainability of IHA/UDP Urban Development Project

MS Consultancy MS Consultancy

MS Consultancy MS Consultancy

Name of Staff: Alemu Asana Profession: Hydro-Geologist Date of Birth: September 1963 Years with Firm: Founder since 2003

EDUCAITON BACKGROUND: Advanced Post - Graduate Diploma in Engineering Geology (1990), International Institute of Aerospace Survey and Earth Science (ITC) Delft, The Netherlands. B.Sc. - in Geology, Addis Ababa University (1983)

SPECIAL TRAINING: • 6th international congress, association of Engineering Geologyb; August 1990; Amestrdam ,The Netherlands. • Certificate on “Community management of Water Supplies & Sanitation” Institute of Water & Sanitation Development (IWSD); University of Zimbabwe; October – November, 1994 Harare, Zimbabwe.

KEY QUALIFICATIONS: • Interpretation of Aerial Photos, remote sensing, Satellite imageries (LAND - SAT) for using Geo-information systems (GIS) for any development projects. • Hydro geological Mappings; potential sites selections for small, medium and large dams(earth, rock and gravity dams) boreholes, shallow wells for urban and rural water supply projects and production of professional reports. • Planning, Programming and Supervisions of water well drilling works; and managing drilling crews.

Employment Record:

July 2003 - todate MS Consultancy Associate Hydro geologist engaged in • Fentale water resources master plan development, • Borhole sitting and drilling control in multiple rural and urban water supply schemes, • Master plan study for Yem Special Woreda water supply development project, • Gambella and its surrounding water development study,

January 01, 2001 to February 31, 2003 Action For Development (AFD) Function/Title Project Coordinator (PC) Location Yaballo Woreda , Borana Zone, Oromia Duties CoordinateMS Consultancy the implementation of Integrated projects(which includes Dry land Agriculture, Health , Livestock Development, Water Development, Saving and Credit or Income Generation, Non-Formal Basic Education MS Consultancy MS Consultancy

, Institutional Support and Capacity Building, Emergency/ Rehabilitation projects.etc) managerial jobs, i.e. personal, property and financial management and lead all project activities of the Regional Office.

January 01, 2000 - December 31, 2000 Action for Development (AFD) Function/ Title Senior Hydrogeologist and Construction Supervisor. Location Yaballo Woreda , Borana Zone, Oromia Duties Rural Water Schemes implementation in AFD project operation areas including their monitoring and supervision The rural water works include the rehabilitation and protection of natural Ellaas , large and medium sized ponds.

July 01, 1998 - December 31, 1999 Action For Development (AFD) Function/ Title Professional (Hydrogeologist) Consultant Location Yaballo Woreda, Borana Zone, Oromia. Duties Rural water supply scheme pre-feasibility/feasibility studies in the whole Yaballo Woreda for the assessment of surface and sub-surface water resources.Preparation of proposals for the feasible investigations. Geo-technical foundation investigation on AFD small scale irrigation schemes in Wolaita Soddo (North Omo).

June 22, 1997 - June 30, 1998 Oromia Water, Mineral & Energy Resources Development Bureau.

Position Hydrologist grade V. Location Addis Ababa Duties All Hydrological Works as indicated below(see the title senior Hydrogeologist).

June 19, 1996 - June 22, 1997 Oromia Water, Mineral & Energy Resources Development Bureau. Function/Title: The head Borana Water ,Mineral and.Energy Resources Development. Department Location: Negelle, Borana Duties All Managerial Works; Personnel, Financial, Technical and Property Managements in the Fields of Water, Mineral & Energy.

December, 1994 - June 18, 1996 Oromia Water Resources, Mines & Energy Development Bureau; Department of Rural Water Supply & Sanitation. MS Consultancy Function/Title Senior Hydrogeologist Location Addis MSAbaba Consultancy Duties MS Consultancy MS Consultancy

• Carryout all Hydrogeological, Geophysical & Geological Professional Jobs, for appropriate Site Selection for Boreholes, Shallow wells and Spring Development in particular. • Determination of Catchment Hydrologic Properties for river Master plans at micro/macro levels and Analyses Potential sites selection for surface water development for urban and rural water supply projects. • Rural Water Supply Construction Follow-up & Supervision. • Control and Supervision of Drilling Rigs during Drilling Works, Mobilizations & Demobilization; and prepare specifications and bill quantities for such Works. Preparation of project proposals for new projects at Rural or Urban Levels.

February 23, 1994 - December 09, 1994 Oromia Central Region Water Supply and Sewerage Water Works Office (OCRWSSWO); named after merging the previous EWWCA-Central Regional Office & WSSA- Central Regional Office

Function/ Title the Head Location Addis Ababa Duties

Overall management i.e. planning, leading, controlling and organizing of Water supply activities; in Shoa and Arsi regions; which include: - • Urban & Rural Water Supply Rehabilitation Works. • Urban Water supply Improvement & expansion works. • Rural Water Supply implementations. • Operation & Maintenance Management for Rural and Urban Water Supplies in the Central Regions of Oromia. • Personnel Management • Financial Management • Provision of material supply management • Preparing Project Proposals for development interventions and Emergency programmers.

April 1993 - February 1994 Ethiopian Water Works Construction Authority Central Regional Office (EWWCA - CRO)

Function/Title General Manager Location Addis Ababa Duties Overall management as indicated above. September 1990 - March 1993 Ministry of Agriculture; Rural Infrastructure Main Department Irrigation Development Department (IDD) Function/ Title: Senior Engineering Geologist Location: Addis AbabaMS Consultancy Duties: Engineering Geo-technical & Hydrogeological Mapping & site Investigations MS Consultancy MS Consultancy

for different small & medium scale Irrigation Projects such as earth fill dams, rock fill dams, diversion weirs, ponds... etc. at head works and for on-farm Hydraulic facilities.

• Water resource assessment using Aerial Photos and Satellite imageries (LAND-SAT). • Monitoring & Evaluation of Engineering Constructions. • Preparation of Geo-technical & Hydrological reports for every site investigated. • Coordinating & Controlling heavy & light construction machineries & vehicles • Post- Construction follow - up • Determine means of Survey for Junior geologists and surveyors. • As counterpart & technical advisor for Foreign Consultants such as ADF, IFAD, UNV, JOCV.

September 1988 - August 1990 Ministry of Agriculture, Soil & Water Conservation Department (SWCD)

Function/ Title Senor Geologist Location Addis Ababa Duties As above

September 1983 - August 1988 Ministry of Agriculture, Soil & Water Conservation Department (SWCD) Function/Title Geologist Location Addis Ababa

Site selection for different small scale hydraulic irrigation structures • Thorough Geological investigation by means of test pits and drilling at head works & on-farm structures for foundation analyses. • On-site insitu and laboratory tests on rock & soil samples & preparation of Geo-technical report(s) on the results and findings.

LANGUAGES: Speaking Reading Writing Amharic Excellent Excellent Excellent English Very good Very good Very good Oromifaa Excellent Excellent Excellent

Name : Girma Seyoum Date of Birth : 30 November 1946 Nationality : Ethiopian MS Consultancy Profession : Economist EDUCATION MS Consultancy

MS Consultancy MS Consultancy

1974 Master of Science Degree in Economics, University of Strathclyde, Glasgow 1968 Bachelor of Arts Degree in Economics, Addis Ababa University

TRAINING

May 4 – 7, 2004 Financial Sustainability Plan (FSP) Orientation Workshop, WHO, Pretoria, South Africa 15-26 August, 2005 Training on MDGs and Reproductive Health, World Bank Institute, Turin, Italy

23-25 November 2005 Workshop on Fair and Sustainable Health Financing, WHO, Kampala, Uganda July 31- 6 August, 2005 Training on “Skills for Implementing Health Reform and Strengthening Health Systems in Ethiopia” 31/07/05 to 6/08/05

March 1994 Seminar on Central Banking, IMF Institute, Washington D.C.

Oct. - Dec., 1990 Course on Programming and Policies for Medium-term Adjustment, IMF Institute, Washington D.C.

Jan., - Mar., 1983 Course on Planning and Appraisal of Industrial Projects, Project Planning Centre, and University of Bradford.

Aug., 1970 - Jan., 1971 Course on Financial Analysis and Policy, IMF Institute, Washington D.C.

Other Skills

- Computer Proficiency, Ms Word, Ms Excel, Ms Access and Programming in Visual Basic.

LANGUAGE

SPEAKING READING WRITING MS Consultancy English Excellent Excellent Excellent Amharic Excellent Excellent Excellent MS Consultancy MS Consultancy

WORK EXPERIENCE

Sept. 2007 to date – Joined MS Consultancy as a chief economist. • Chief Economist – Kombolcha and Dire Dawa Liquid Waste and Solid Waste Management Project; • Chief Economisist – Dembecha and Bure Water Supply Project • Chief Economist Addis Ababa Water Project

January, 2004 to Sept 2007.

National Program/Health Economist, WHO Country Office

As NPO was charged with the responsibility to guide and coordinate the Macroeconomics and Health activities of the Ministry of Health. Specific responsibilities included:

• Preparing modules for studies that demonstrate the macroeconomic impact of health investments in Ethiopia and ensures the linkages of these findings to existing analyses of health sector problems. • Assisting the MOH in defining terms of reference and hiring consultants, researchers and staff that are necessary for informing policy and scaling up Ethiopian investments in health. • Assisting in facilitating consensus building among the health sector’s major stakeholders as well as those outside the sector whose activities are important to improving population health status. • Developing a Plan of action for future Macroeconomics and Health activities in Ethiopia and advising the MOH on the format. • Assisting and advising in the establishment and coordination of the Macroeconomics and Health technical working group • Coordinating the development of a health management training workshop for TOTs at district level including recruiting and hiring of trainers and organizing trainings

July 1998 – Dec 2003 Director, ABD-Consult • Economist, Study on the Development of Banking in Ethiopia and the Contribution of the Commercial Bank of Ethiopia, April 2003 • Market Analyst. Ambo Mineral Water Factory Restructuring and expansion Project, December - June, 2003 MS Consultancy • Market Analyst. Gojam Farms Project, For Midroc Ethiopia, November-July , 2003 MS Consultancy • Trainer on Tariff. Amhara Region Towns Water Sector Rehabilitation and MS Consultancy MS Consultancy

Capacity Building Program. January, 2003 • Task Manager/ Infrastructure Economist. Study on Water Resources Development Fund : Access Rules and Operational Guidelines, for the World Bank, Nov- January, 2003 • Project Manager/Economist. Study on Private Sector Participation in Ethiopia: Developments in Market Competition and in Banking and Insurance, for the Addis Ababa Chamber of Commerce, September 2002. • Market Analyst/Economist. Market Study for Ethiopian Springs PLC, February 2002. • Market Analyst/Economist. Market Study for the Establishment of a Coffee Roasting and Grinding plant in Ethiopia, for Nejat International PLC, January 2002. • Operations Analyst. Tikur Abay Transport SC, Nov-Dec, 2001 • Tariff Analyst. Tigray Region Water Supply Development and Rehabilitation Project, 2000- 2001 Project , • Project Manager/Economist. Mid-Term Assessment of CRDA Three-Year Program (1999-2000), for the Christian Relief and Development association (CRDA), for the Christian Relief and Development association (CRDA), March,2001 • Team Leader/ Economist. Market Basket Survey, for the International Livestock Research Institute (ILRI), January, 2001 • Team Leader/ Economist. CRDA Workshop Assessment, for the Christian Relief and Development association (CRDA), November, 2000 • Team Leader. Training Design and Delivery for the Amhara Rural Water Supply and Environmental Protection Program, June-July 2000 • Project Analyst. Business Plan for Kuruftu Agro Industrial Enterprise for Kuruftu Agro Industrial PLC, Feb.,2000 • Market Analyst/Economist. Feasibility Study for Gas Cylinder Manufacturing and Gas Distribution in Ethiopia, for Saudi and Ethiopian Investors, September, 1999. • Project Manager/Economist. Impact Evaluation of IDA financed Micro Enterprise Credit Programme for the Development Bank of Ethiopia, Feb- June 1999

• Team Member/Economist. Evaluation of CRDA Supported Income Generating Activities (IGAs), for the Christian Relief and Development association (CRDA), Sept-Dec. 1998

• Market Analyst/ Economist. Business valuation of Biralle Agricultural Development PLC for theMS Commercial Consultancy Bank of Ethiopia, Nov., 1998 • Market Analyst/ Economist. Dry Bulk Terminal at Djibouti for Ethiopia Amalgamated LTD in association with IFC, Allied International Marketing MS Consultancy MS Consultancy

Corporation (USA), and International port of Djibouti and other Djibouti investors, January 1999. The terminal was planned to receive, store, and ship fertilizer and grains to hinterland

• Project Analyst. Truck Tankers Project for Liquid Face Transport, for the Ghion Industrial and Commercial PLC, August 1998

Associate, ABD-Consult

• Team Leader/Economist. Micro Finance Needs Assessment and Operational Systems, Manuals and Handbooks for LFI Credit Line Relationships, for the Ethiopian Social and Rehabilitation Fund (ESRDF), 1997

• Team Leader/Economist. Evaluation of Micro Project and Children’s Fund Programmes, for CRDA, 1996

• Project Manager, /Economist. Study for Specialized Financial and Promotional Institution (A Bank for the Rural and Urban Micro Enterprises), for a group of NGOs and the National Bank of Ethiopia, 1994 1994 - 1998 Ethiopian Institute of Banking and Insurance Director

In charge of the training institute taking trainees from the Banks, Insurance Companies, and other related establishments. Development and overall supervision of the curriculum of the Institute. Organizing and leading training programmes and offering lectures and participating in the management of the National Bank of Ethiopia.

1990 -1994 National Bank of Ethiopia Director, Economic Research and Planning Department.

Responsibilities include planning, organizing and directing the research activities of the Department, supervise the preparation and publication of the quarterly and annual reports of the Bank, undertake studies and research in areas affecting the macro-economic performance of the national economy and other areas of interest to the Bank. Specific duties included: -

• Preparation of background papers for the country’s negotiations with the IMF and World Bank for a structural adjustment programme and participation in the negotiations as member of the Ethiopian MS Consultancy delegations. • Preparation of backgroundMS Consultancy papers for the consultative group donor meetings and Paris Club meeting including debt strategy & participation MS Consultancy MS Consultancy

in meetings.

• Alternate Governor of the IMF for Ethiopia since 1990.

1988 - 1990 National Bank of Ethiopia Advisor, Economic Research and Planning Department.

Undertaking studies and economic management of the country. Taking part in various negotiations with donors, lenders and working as counterpart to advisors from world financial institutions.

1982 - 1988 Agricultural & Industrial Development Bank Division Head, Medium and Large Projects Division.

Principal Loans Officer

Responsibilities included planning and supervising project studies, undertake market studies of projects, review, appraise and present loan proposals, participate in sector studies, appraise industrial projects to determine its technical economic and financial viability. Follow up implementation.

1974 - 1982 Ministry of Finance Division Head, Credit & Investment Dept. Acting Head, Credit & Investment Dept.

Responsibilities related to review of projects for external financing, follow up of applications, negotiations and implementation of external loans and credits from multilateral and bilateral sources, other functions relating to the country’s relations with external donors, including economic and trade arrangements with bilateral countries.

Specific tasks performed included: -

- Keeping necessary contact with various donors and creditors to estimate available sources of loans and credits and terms and conditions.

 Negotiating project loans and credits from the World Bank, African Development Bank and other bilateral creditors mostly OECD countries.

 Participating in joint commissions meetings with Eastern European countries in which loans and assistance for development projects in Ethiopia were negotiated.MS Consultancy

 Undertaking periodic assessment of the country’s debt stock, MS Consultancy MS Consultancy

absorption capacity and project debt servicing capacity.

 Design borrowing and debt management strategy in the light of availability of external sources. Undertake studies on financial markets developments and other multilateral and bilateral sources for the purpose.

 Collect and analyze external debt data.

 Deputy National Authorizing Officer for EEC operations in Ethiopia, duties including negotiation on projects to be funded by the EEC.

Detail Task Assigned The economist will be responsible for conducting economical survey of the Project including financial study and organizational and manpower aspect. The following are some of the activities: a) Prepare format/questionnaire for sample economical survey data collection, b) Analyse economic survey data, Economic analysis of the project in terms of cost benefit and recommend mitigation measures when drawbacks are identified.

Work Undertaken that best Illustrates Capability

July 1998 – Dec 2003 • Economist, Study on the Development of Banking in Ethiopia and the Contribution of the Commercial Bank of Ethiopia, April 2003 • Market Analyst. Ambo Mineral Water Factory Restructuring and expansion Project, December - June, 2003 • Market Analyst. Gojam Farms Project, For Midroc Ethiopia, November-July , 2003 • Trainer on Tariff. Amhara Region Towns Water Sector Rehabilitation and Capacity Building Program. January, 2003 • Task Manager/ Infrastructure Economist. Study on Water Resources Development Fund : Access Rules and Operational Guidelines, for the World Bank, Nov- January, 2003 • Project Manager/Economist. Study on Private Sector Participation in Ethiopia: Developments in Market Competition and in Banking and Insurance, for the Addis Ababa Chamber of Commerce, September 2002. • Market Analyst/Economist. Market Study for Ethiopian Springs PLC, February 2002. • Market Analyst/Economist. Market Study for the Establishment of a Coffee Roasting and Grinding plant in Ethiopia, for Nejat International PLC, January 2002. • Operations Analyst. Tikur Abay Transport SC, Nov-Dec, 2001 MS Consultancy • Tariff Analyst. Tigray Region Water Supply Development and Rehabilitation Project, 2000- 2001 ProjectMS , Consultancy • Project Manager/Economist. Mid-Term Assessment of CRDA Three-Year Program (1999-2000), for the Christian Relief and Development association (CRDA), for the MS Consultancy MS Consultancy

Christian Relief and Development association (CRDA), March,2001 • Team Leader/ Economist. Market Basket Survey, for the International Livestock Research Institute (ILRI), January, 2001 • Team Leader/ Economist. CRDA Workshop Assessment, for the Christian Relief and Development association (CRDA), November, 2000 • Team Leader. Training Design and Delivery for the Amhara Rural Water Supply and Environmental Protection Program, June-July 2000 • Project Analyst. Business Plan for Kuruftu Agro Industrial Enterprise for Kuruftu Agro Industrial PLC, Feb.,2000 Market Analyst/Economist. Feasibility Study for Gas Cylinder Manufacturing and Gas Distribution in Ethiopia, for Saudi and Ethiopian Investors, September

MS Consultancy

MS Consultancy MS Consultancy

Name: Solomon Shiferaw Yirba Nationality: Ethiopian Date of Birth: 1971 Sex: Male Profession: Civil Engineer

KEY QUALIFICATIONS:

I have 14 years of wide experience in water supply and sewerage sectors specifically on Hydraulics and Civil Engineering Projects carried out in Ethiopia since graduation. This includes town water supply and sewerage system design and supervision, supervision of hydraulic and building structures related to these sectors, leak detection on transmission and distribution system, and other related water components.

Recent experience, as a Resident Engineer, is undertaking Contract Administration and Construction Supervision of Debre Markos Water Supply Project, Mizan Teferi Town Water Supply and Sanitation Project designed and reviewed by Tropics Consulting Engineers plc (Ethiopian based Consultants). The project includes construction of Diversion Weir and Conveyance Structure; Water treatment plant, which consists of raw water header tank, Clear water tank, Parshall Flume and Flocculation chamber, sedimentation tank, rapid sand filter, and backwash water tank; Transmission mains, which comprises of raw water and clear water transmission mains; Service water reservoir; Break pressure tanks; Wet well; Distribution Network; Public fountains; Auxiliary buildings, which include workshop, operators’ dwellings; Operation buildings, which include clear water pump house, chemical building, generator house, compressor room, control panel room, and raw water pump house. The overall project ensures sufficient potable water for the town at an estimated cost of 37 million Eth. Birr.

I have also good working knowledge in application of soft wares and uses programs like Microsoft Excel for spreadsheet, Microsoft Word for Word Processing; SAP-90 & SAP-2000­ for Structural design analysis; AutoCAD; CYBERNET and WaterCAD for pipe network analysis; Sewercad for Sewerage network analysis; and lnfoCAD to make a proper utilization of the geographical information system (GIS).

EDUCATIONAL BACKGROUND:

BSC. Degree in Civil Engineering from Addis Ababa University, Technology Faculty July 2000

Advanced Diploma in Hydraulic Engineering from Arbaminch Water Technology MS Consultancy Institute June 1993 PROFESSIONAL REGISTRATION:MS Consultancy

MS Consultancy MS Consultancy

2000 Registered Professional for Design, Registration No. GCE/305 (Issued by the Ministry of Works and Urban Development)

2005 Registered Professional for Design, Registration No. HYE/128 (Issued by the Ministry of Water Resources)

2000 Registered Professional for Supervision Works, Registration No. AHE/1976 (Issued by the Ministry of Works and Urban Development)

EMPLOYMENT RECORD:

14years of experience in the field of Hydraulics and Civil Engineering from which 4 Years on design of Water Works & Water related projects, 5 years on supervision of water works, and 4 years on Design and supervision of various scales of hydraulics and civil engineering projects.

WORK EXPERIENCE: September 2007 – to date – MS Consultancy, Resident Engineer Debere Markos Water Supply Project

November 23, 2006 August 2007 Resident Engineer with Tropics Consulting Engineers plc the following duties and responsibilities have been undertaken:

• Contract Administration and Construction Supervision of Mizan Teferi Town Water Supply and Sanitation Project. The project includes construction of Diversion weir and conveyance structure; Water treatment plant, which consists of raw water header tank, Clear water tank, Parshall Flume and Flocculation chamber, Sedimentation tank, Rapid sand filter, and backwash water tank; Transmission mains with its associated elements, which comprises of raw water (650 meters) and clear water transmission mains (5.3 kilometers); Service water reservoir (300m3); two Break pressure tanks; Wet well; Distribution network, which includes pipeline laying of about 22 kilometers, construction of valve chambers, and other associated elements; Public fountains (No 10); Auxiliary buildings, which include workshop, guard houses, toilets, operators’ dwellings; Operation buildings, which include clear water pump house, chemical building, generator house, compressor room, control panel room, and raw water pump house. • Responsible for the overall management of construction supervision. • Oversee the supervision of construction and management of contracts • Organize a construction supervision team and manage the construction contracts, including quality control payment certificate, claims and preparation of project technical reports. • Performing related duties as may be assigned by the Managing Director.

December 2005 to November 22, 2006- As a Resident Engineer with Seureca Space/Tropics Consulting EngineersMS Consultancy JV the following duties and responsibilities were undertaken:

MS Consultancy MS Consultancy

• Contract Administration and Construction Supervision of Town Water Supply and Sanitation Project. The project includes construction of 11 deep ground water wells, two potable water reservoirs (2000m3 & 1O00m3) and valve chambers, two potable water pumping stations, 14.50 kilometer transmission pipelines, 44.96 kilometer distribution pipelines, 10.88km access road at well fields, 2.5km long access road at sludge disposal site, and auxiliary buildings. • Responsible for the overall management of construction supervision.

• Oversee the supervision of construction and management of contracts • Organize a construction supervision team and manage the construction contracts, including quality control payment certificate, claims and preparation of project technical reports. • Hydraulic modeling (analysis) of the transmission and distribution pipeline network as per the built configuration using WaterCAD software, and • Performing related duties as may be assigned by the Managing Director.

As a Design Engineer (part - time in the year of 2002) with Seureca Space/ Tropics Consulting Engineers JV the following duties and responsibilities were undertaken:

Population and water demand projection: Determination of water demand: The water demand has been determined with the estimation of present and future water requirements using the prevailing modes of services and commonly known demand categories relevant to urban centers. Determination of nodal demand: The nodal distribution demand has been determined in accordance with the appropriate type of population served by each node. Hydraulic design of the network system (using WaterCAD software): Transmission mains have been designed in such a way that they have hydraulically a capacity for conveying the maximum demand. The distribution network has been designed such that it economically and efficiently conveys the peak hour demands.

November 2003 to November 2005- As a Resident Engineer with Concert Engineering & Consulting Enterprise plc the following duties and responsibilities were undertaken:

• Contract Administration and Construction supervision of Kebire Water Supply Project, which includes construction of deep ground water wells, over 2 kilometer transmission pipelines, 1500m3 potable water reservoir, auxiliary buildings, and other water utilities. • Responsible for the overall management of construction supervision. • Oversee the supervision of construction and management of contracts MS Consultancy • Organize a construction supervision team and manage the construction contracts, including quality control payment certificate, claims and preparation of projectMS technical Consultancy reports. • Performing related duties as may be assigned by the Managing MS Consultancy MS Consultancy

Director.

April 2001 to October 2003- Addis Ababa Water & Sewerage Authority as Head, Leakage Control Section, the following Duties & Responsibilities were undertaken:

• Planning, organizing, directing and undertaking leakage detection activities. • Initiating, developing and implementing systems and procedures for the inspection and detection of water leakage points throughout the network to minimize unaccounted - for - water loss. • Ensuring that the locations of leakages are detected in reservoirs, transmission lines, etc. • Performing related duties as may be assigned by the Water Production and Transfer Department.

March 1999 to April 20001- With Addis Ababa Water & Sewerage Authority as a site engineer. In this Authority I was carrying out the same task as of 1994.

With Addis Ababa Water & Sewerage Authority Leak Detection Crash Program Project.

The aim of this project is to decrease the amount of unaccounted- for- water & to make a proper utilization of the geographical information system (GIS) with software (InfoCAD).

In this project the following Duties & Responsibilities were undertaken:

• Map updating • Node sketch measurement • Global Night Flow Monitoring • Sub-Zone Night Flow Monitoring (NFM) - Physical Losses Reduction - Non-physical Losses Reduction • Other related works.

From April 1995 - March 1999- with Addis Ababa Water and Sewerage Authority Water III Project Stage A (IlIA).

In this project the following Duties and Responsibilities were undertaken:

• Distribution system flow monitoring • Site plan preparation for existing & proposed reservoirs and pumping stations and digitizing • Design of major transfer & primary distribution pipelines using CYBERNET (Pipe Network Analysis Software) • Design of Hydraulic equipments of existing and proposed valve chambers MS Consultancy • Preparing pre-design & tender drawings using AutoCAD software Population & water demand projection for years 2006 & 2020 • Pipeline route identification and facilities site acquisition and other MS Consultancy MS Consultancy

relevant works. . .

This project was being carried out by AE-HBT AGRA Joint Venture: Canadian Based International Consultants.

I took also Basic & Advanced computer training in AutoCAD, CYBERNET, SAP-90 & SAP-2000, GIS, WaterCAD, Spread sheets (QPRO, Lotus & Excel),

Word processing (Word and word perfect) and obtained certificates from AE­HBT AGRA Joint Venture and BCEOM-G2C Joint Venture companies.

February 1994- in Addis Ababa Water & Sewerage Authority as a Site Engineer the following tasks were undertaken.

• Rehabilitation of old distribution & transfer pipelines • Design of secondary water distribution pipe networks • Design in Upgrading-boosting pumping stations • Planning, organizing, assigning, leading and supervising the activity of technical services of the Authority. • Undertaking water supply and distribution studies in the city. • Preparing BOQ for pipe facilities and other relevant works...

OTHERS: As a part time, I participated in the design & tender documents preparation for the rehabilitation of Gafarsa I & Il dams and Keranyo Water transmission and distribution pipe networks (Addis Ababa) undertaken by the TRACTBEL Development Engineering and COYNE ET B ELUER Joint Venture Companies in Association with AUTHENTIC Engineering Plc. The first two companies are French and Belgian Based International Consultants, respectively, and the later is Ethiopian based Consultant.

With Concert Engineering & Consulting Enterprise (Ethiopian based Consultant) I was carrying out the design of Kebire Textile Factory Water Supply Project (Mekelle)

With T AHAL Consulting Engineers (Israel Based International Consultants) I was also undertaking the flow-monitoring program of existing network, and also in the preparation of plans and sections for existing reservoirs and pumping stations under Addis Ababa Water Supply Project Stage IlIA

As a Water Supply Engineer with Hywas Engineering Consultants the following duties were undertaken:

Sanitary Design of Low Cost Housing Projects of the city of Addis Ababa

In addition to this I have been producing lots of any civil engineering drawings MS Consultancy using AutoCAD Language MS Consultancy MS Consultancy MS Consultancy

Reading Writing Speaking Amharic Excellent Excellent Excellent English Excellent Excellent Excellent

MS Consultancy

MS Consultancy MS Consultancy

Name of Staff: Habtamu Abebe Name of Firm MS Consultancy Date of Birth: July 17,1972 Nationality Ethiopian Education

1984-1988 E.C. B.Sc. Degree in Water Resources from Arba Minch Technology Institute

OTHER TRAINING

• Deploma in computer science at baron computer training center (A>A) graduated on 2ih of July 2000, • Certificate in contract Adminstration at Ethiopian management institute in time of training from July 28, to Aug. 8,2003. • Conference with world bank assistant representatives at Adama Ras Hotel from sept. 20-22 ,2005 on project, management, monitoring & evaluation • Work shop on project evaluation & monitoring by IRC fund assistants OFDA from Feb 25-27, 2006 at Asabe Teferi office • Workshop on contract Management & evaluation by CARE Asebe Teferi from July 20-25, 2006 at Asebe Teferi office “ • Conference with world bank assistant representatives at Adama Ras Hotel from July 16-17 ,2007 on project, management, monitoring & evaluation

Language Speaking Reading Writing Amharic Excellent Excellent Excellent English Very good Very good Very good Oromiffa Excellent Excellent Excellent

Employment Record

July 2007 – to date – MS Consultancy – Resident Engineer – Awassa Drainage Project

November 1996- June 2007 – Oromia Water Resources Bureau Water resources engineer in Oromia Region, West Hararge WMERDD (Water Mineral, & energy Resources Development Department) in its Previous Name. Now its name is West Hararghe Water Resources Office (Asebe Tefere).

MS Consultancy 1996-2001 • Study & design of MidhagiduMS Consultancy Irrigation Project • Supervisor engineer at Midhagidu Irrigation project, consists concrete MS Consultancy MS Consultancy

dam construction. Spill way cons. 4 km lined canal const. Which irrigates 400 ha of land • Study & design of Kaseja Irrigation project • Supervisor engineer at Kaseja Irrigation project, consists earth dam construction. Spill way cons. 15 km lined canal construction 20 km unlined canal Which irrigates 1150 ha of land • Study& design of Homich -Sogido Irrigation. Project • Supervisor engineer at Homico-Sogido lrrg project, consists concrete dam construction • Spill way construction 6km lined canal construction 8 km unlined canal Which irrigates 550 ha of land • Study & design of Hirna town water supply project • Study & design of Asebe Teferi town water supply project • Study & design of Gelemso town water supply project • Study & design of Beddessa town water supply project • Study & design of Mechara town water supply project • Study & design of Mieso town water supply project. • Study & design of Asebot town water supply project • Study & design of Mecheta town water supply project • Study & design of Mesela town water supply project • Study & design of Wachu town water supply project • Study & design of Different villages town water supply projecs

Feb 2001- Jan 2002 Counter part resident engineer at Adama ( Nazareth) town water supply project to work with Water Works Desi~n & Supervision Enterprise ( WWDSE) on project activities.

• Intake structure construction • River Diversion construction • Powr house construction • Treatment plant construction o Sedimentation tank construction o Six Prezim conic shape clarifier construction • Water reservoir constriction 3 o Two 4,000 m Capacity at lugo 3 o One 2000 m Capacity at kebele 02 3 o One 2000 m Capacity Adama college • Pillar construction for gorge crossing at six different gorges with mx height of 18m. • Pipe line constriction o 12km DCI pipe rise main with different support structures o More than 90 km distribution pipe line work both type of DCI & PYC with different support structures anchor blocks & trust block constriction MS Consultancy 2002- 2005 • Supervisor engineer at Asebe Teferi town water supply project MS Consultancy MS Consultancy

3 o Construction of 200 m Storage reservoir o Power house construction o 7km GS pipe work construction with different anchor blocks & trust block cons. • Gelemso town water supply project supervisor engineer 3 o One 200 m storage reservoir cons 3 o One 150 m storage reservoir cons o River crossing structure cons o 6.5 km GS pipe work construction with different anchor blocks & trust blocks construction. • Beddessa (own water supply project supervisor engineer 3 o One 150 m storage reservoir cons o Diversion structure cons o Storage dam construction 200 m3 Capacity of concrete type reservoir o Power Hose cons. o 8 km GS pipe work construction with different anchor blocks & trust blocks construction o Five 6m height pillar construction for river crossing • Asebot town water supply project supervisor engineer 3 o One 75 m storage reservoir cons 3 o One 50m storage reservoir cons o Power house cons o 18 km GS pipe work construction with different anchor blocks & trust blocks construction. • Mieso town water supply project supervisor engineer 3 o One 100 m storage reservoir construction 3 o One 25 111 elevated storage reservoir cons o Power house cons o 6 km GS pipe work construction with different anchor blocks & trust blocks construction. • Mechara town water supply project supervisor engineer o One 50 m3storage reservoir cons o Power house cons o 5. S km GS pipe work construction \yith different anchor blocks & trust blocks construction.

2005-2007

Assigned as Zonal Water Resources office (Asabe Teferi) Head Manger Work with Oromia Water Works Construction Enterprise (OWWCE) (the contractor) and Oromia Water Works Study & Design Enterprise (OWWDSE) ( the consultant) at water supply design & contraction of the settlement area of the zone. The Names of these settlement areas are Teffe (in Boke Woreda), Bososo (In kuni MS Consultancy woreda) and Halo Goba & korke (in Daro Lebu woreda). These projects are on going .The project activitiesMS Consultancy are:-

MS Consultancy MS Consultancy

• Study & design of water supply works for the settlers of 15,500 HH households) • diversion work construction • In takes structures construction • Four 200 m3 Concrete storage reservoir construction • Three 150 m3 concrete storage reservoir construction • One 10m3 elevated concrete balancing reservoir construction • Six power House construction • Pillar construction for river crossing • About 90 km DCI pipe work construction with different anchor blocks and trust blocks construction • About 150 km PYC pipe work construction with different anchor blocks and trust blocks construction Detail Task Assigned The Resident Engineer accountable to the Project Management and main duties will focus on:- • Supervise of the works and handle all correspondence with the contractor on behalf of the Engineer. He shall arrange to train his staff where necessary in supervision works. • establish liaison and communication with the contractor’s Agent at site. • give his decision, consent, approval, where ever required under the contract; • issue “ Notice to Commence Works” to the contractor; • examine the contractor’s submission on subcontracting and decide on the same in consultation with the Employer, where required; • maintain the contract Drawings at site and provide copies thereof to the contractor refined as per the terms of the contract; • obtain from the contractor upon issue of the Defects Lab certificate all drawings, specification and other documents provided to his under the contract; • ensure that instructions/ approvals are issued on time and no delay occurs in planning and execution of works; • issue the contractor, from time to time , supplementary drawings and instructions as necessary for proper execution of the works and remedying defects therein; • scrutinize the contractor’s performance security, mobilization guarantee, & Insurance when required by the Employer, and ensure their validity as per contract conditions; also trigger appropriate action concerning these securities; • scrutinize contractor’s program and give consent and ask for revised program when necessary; • Obtain from the contractor cash flow estimate for the works; • approve the contractor’s representative and order where appropriate removal or contractor’s personnel; • ensure that contractor follows safety measurement; • shall obtain the returns on lab Equip submitted by consultant and verify request • order tests on materials/ works as request and ensure quality control; • inspect contractor’s workshops plant and equipment • cause to maintain siteMS records Consultancy by his staff and occasional check on the following: • works in progress • approval given MS Consultancy MS Consultancy

• materials/ finished works tested • contractors labor force • contractor’s plant and equipment strength and working • physical conditions rainfall, temperature • obstruction to work • weekly/monthly summary of events • submit monthly progress on works to the Employer ; • arrange examine and measurement of works before covering • cause testing and rejection of materials/ works found not conforming to contract specifications; • order inspection of works when necessary; • examine & determine in consultation with the Employer, the contractor’s submission for extension of time; • monitor the progress with respect to program and notify the contractor of too slow progress; • organize monthly site meetings or special meetings with the contractor to discuss issues concerning the works; • take action for issue of taking over certificate/or issue instructions to contractor the works to be completed before issue of such certificate; • inspection during and towards the end of Defects ability period and instruct the contractor to take suitable action, where necessary; issue defects liability certificate when found okay;: • shall order variation of works, value the same and fix rate in consultation with the Employer, where required; • examine contractor’s claims in consultation with Employer and contractor and determine amounts due; • cause measurement of works and certify for payment; • instruct use of provisional sums of the contract; • instruct payment to nominal subcontractor; • issue final certificate ; • certify Employer on Default of the Contractor; and, • give decision on dispute arising out of the contract

MS Consultancy MS Consultancy

MS Consultancy MS Consultancy

Name of Firm: MS Consultancy Name of Staff: Beyordanos Tetemke Profession: Civil Engineer and IT Expert Date of Birth: 1980 Nationality Ethiopian

Education: ♣ BSc in Civil Engineering 2004

Additional Training ♣ GIS application

LANGUAGE Speaking Reading Writing Amharic Excellent Excellent Excellent English Very good Very good Very good

Employment Record: Permanent Employee of MS Consultancy-

Since Jan 2006 - to date - Modeler and GIS Expert Assistant Design Engineer and Quantity Surveyor:

• Bahir Dar Drainage Project • Awassa Drainage Project • Yem Special Wereda Water Supply Project • Debere Markos, Dangla and Kobo Water Supply Project

March 2005 – Jan 2006 Lead Water Resources Engineer in Data Base Establishment and .Analysis of the Nile Basin Water Resources Program under the program of the ENTRO.

Oct 2004 – Feb 2005

Assistant Project Engineer Dodola

MS Consultancy

MS Consultancy MS Consultancy

Proposed Position: Surveyor Name of Firm: MS Consultancy Name of Staff: Yonas Fikre Date of Birth: March 1978

Education: ♣ Diploma from Addis Ababa Technical School in the field of surveying in 2000

Additional Training ♣ Ethio Computer Center AutoCAD ♣ A.A.U. In African Virtual University PC (Window, Word, Excel and Accesses) ♣ 3rd. Grade driving License ♣ English language Certificate

Relevance of the Education:

The field of specialization includes the following areas. Surveying, quantity surveying & basic drafting, which are Very vital to the proposed position

LANGUAGE Speaking Reading Writing

Amharic Excellent Excellent Excellent English Very good Very good Very good Oromiffa Good - -

Employment Record:

MS Consultancy- Surveyor since October 2003 Since September 2006 – Surveyor in UEAP/Lot 21 EEPCO Project October 2003 – August 2006

♣ Finchaa Water Supply Project ♣ Alge Water Supply Project ♣ Dire Dawa Solid Waste Project ♣ Yem Water Supply Project ♣ Bahir Dar Drainage Project

Asasa and six PAS’ water supply project (client ABRDP_PCO)

The project comprises of: ♣ Construction of 100m3 Concrete reservoir ♣ Construction of seven 50m3 elevated Concrete reservoir ♣ Construction of Wet Well and Pumping station ♣ Construction of six generator and guard houses ♣ Construction of HCB office for the town Water Service ♣ Construction of HCB store for the town Water service MS Consultancy ♣ Construction of two pipe sheds ♣ 26 Km pipe line works Duties and ResponsibilitiesMS Consultancy Setting out of pipe shade office and store buildings MS Consultancy MS Consultancy

Setting out of guard houses and generator houses Setting out of public fountains and reservoir locations Setting out of pipe routes for both transmission and gravity distribution lines Running, checking, controlling pipe laying levels Checking pipe trench elevation and quantifying the excavation volumes.

January 2002 - October 2003 Mesfin Shenkut Mater Resource Management and Construction Consultant Currently MS Consultancy

Position Surveyor on Hedi Abu Abota (Ejere) Water Supply project The project comprises of: Fifteen 50m3 concrete reservoir 30 public fountains sparing box cattle troughs Pipe lines works.

Duties and Responsibilities Setting out of public fountains and reservoir locations Relocation of previously set references and bench marks Preparation of pipe line layout and profile based on surveying data gathered from the site Setting out of pipe routes for both gravity distribution liens Running, checking, controlling pipe laying levels Checking pipe trench elevations and quantifying the excavation volumes As built drawings of all construction works of the projects

May 2000 – October 2002 Surveyor on Kombolcha Depot project

The project comprises of: Asphalt road Fuel tanks of 5000M3 Capacity Loading pump station Transfer pump station Water tower Fire fighting water tanks Gravity interceptor Lorries loading station Fire pump station Lorries discharge station Guard house Watch towers Administration and operators Building Staff quarters Service quarters. MS Consultancy

MS Consultancy MS Consultancy

Proposed Position: Surveyor Name of Firm: MS Consultancy Name of Staff: Girma Sime Profession: Surveyor Date of Birth: September 1971 Years with Firm Since July 2003 Key Qualification ♣ Surveying and quantity surveyor of civil engineering works

TASKS ASSIGNED

♣ Present report on reconnaissance survey of the route corridor ♣ Responsible location, surveying and realignment of the project route with the use of total station surveying equipment and global propositioning systems (GPS) ♣ Download surveying data appropriate format of CADD

Education ♣ Diploma in Surveying From Addis Ababa Technical School ♣ Certificate in AUTO CAD and Application Soft ware

Employment Record July 2003- to date: MS Consultancy ♣ Chief surveyor EEPCO universal access program ♣ Surveyor Debre Markos, Dangla and Kobo WSP ♣ Surveyor in Herero Water Supply Project

December 20/1993-July 2003: Oromia Water Resources Bureau Senior Surveyor: Nekemte emergency Water Supply Project. Perform the following tasks ♣ Supervise day- to -day activities on rising main Pipe Line ♣ Checking setting out of different structures. ♣ Checking setting out of Earth dam &Controlling its level ♣ Checking setting out of access road and controlling its level

Senior Surveyor: Shashemene Town Water Supply Project. Perform the foil tasks. ♣ Checking setting out of Treatment Plant. ♣ Checking setting out of Intake Structure. ♣ Checking Distribution system of pipe line. ♣ Preparing plan profile of structures and pipe line. ♣ Checking laying of pipe. ♣ Checking setting out of access road and controlling its level.

Senior Surveyor: Dembidolo Town \-Vater Supply project. MS Consultancy ♣ Study of Reservoir site. ♣ Study of TreatmentMS Plant Consultancy Site. ♣ Study of Distribution System and determine its Nodal point. MS Consultancy MS Consultancy

♣ Study of Intake Site ♣ Study and determine Route line of Rising main ♣ Determine route of access road.

February 21/1988 to December 11/ 1993 : Water Resources Development Authority

Surveyor: Harbu irrigation project ♣ Construction supervision on earth dam ♣ Checking set out of different structures ♣ Preparing plan, profile and topographic surveying,

Surveyor: Jawaha irrigation project. ♣ Study of command area and weir site ♣ Preparing plan, profile and topographic surveying,

Surveyor: Bale Gardula large scale irrigation project (Bale Zone), command area extends to about 7000 hectares.

♣ Study of command area and dam site ♣ Setting out of access road alignment ♣ Preparing plan, profile and topographic surveying,

Surveyor: Dogali Under sub-surface dam (Eritrea)

♣ Study of command area and dam site ♣ Setting out of access road alignment ♣ Preparing plan, profile and topographic surveying.

Senior Surveyor: Holeta Town Water Supply project. ♣ Study of Bore hole site. ♣ Study of Reservoir site ♣ Study of Distribution System and determine its Nodal point. ♣ Study of Intake Site ♣ Study and determine Route line of Rising main ♣ Determine route of access road. ♣ Preparing Plan, Topographic map and Profile by aided Computer.

♣ Senior Surveyor: Kibre Mengist Town Water Supply project. ♣ Study of Treatment Plant site. ♣ Study of Reservoir site ♣ Study of Distribution System and determine its Nodal point. ♣ Study of Intake Site ♣ Study and determine Route line of Rising main ♣ Determine route of access road ♣ Preparing Plan, TopographicMS Consultancy map and Profile by aided Computer

Senior Surveyor: Metahara Town Water Supply Project. MS Consultancy MS Consultancy

♣ Study of Treatment Plant site. ♣ Study of Reservoir site ♣ Study of Distribution System and determine its Nodal point. ♣ Study of Intake Site ♣ Study and determine Route line of Rising main ♣ Determine route of access road. ♣ Preparing Plan, Topographic map and Profile by aided Computc

Senior Surveyor: Chelenko Town Vater Supply project.Study of Treatment Plant site. ♣ Study of Reservoir site ♣ Study of Distribution System and determine its Nodal point. ♣ Study of Intake Site. ♣ Study and determine itoute line of Rising main ♣ Determine route of access road. ‘ ♣ Preparing Plan, Togoraphic map and Profile by aided Compur ♣ Senior Surveyor: North shoa zone. ♣ Study of Large Scale Irrigation Project which is about :WOO he . Preparing Topographic map aided with computer.

October 10/1988 - January 30/1988: Higher Commission for Higher Education Quantity Surveyor.

Responsibilities include:

♣ Preparing Plan, Topographic map and Profile by aided Computer.

Languages: Speaking Reading Writing Amharic Excellent Excellent Excellent English Very good Very good Very good Oromifaa Excellent Excellent Excellent

MS Consultancy MS Consultancy

MS Consultancy MS Consultancy

Proposed Position AutoCAD Technician Name of Staff: Aemro Balihu Defabachew Profession: Assistant Engineer Date of Birth: July 12, 1980 E.C Nationality : Ethiopian Marital Status: Single Years with Firm: Since September 2005 DETAIL TASK ASSIGNED: • Prepares All Detail, Plan and Profile Drawings

Education: ♦ Advanced Diploma in Engineering, July 2004 G.C form Addis Ababa University, (Building College) ♦ High School Certificate at Ginire Secondary School ♦ Elementary Certificate at Mekuria Tessema Elementary School.

Other Skills

♦ Good knowledge of computer

Employment Record:

From September 2005 to up to-date

♦ AutoCAD Technican MS Consultancy. The main responsibilities include:surveing work  Kobo town water supply project  Fincha hydro power water supply project  AutoCAD technician in plotting surveying work on spate irrigation at west and east Harerga zone

From August 2004 to August 31st 2005

♦ AutoCAD engineer - Continental consultant for Dodola water supply project financed by Ethio Italian Corporation under Arsi Bale rural development project. The estimated total cost of the project is Fifteen million Birr. The project includes civil works construction, electromechanical supply and installation, supply of pipes and fittings. The main works include

• Spring capping workMS from Consultancy Asasa spring having an estimated yield of 500 l/s. • Wet well construction at the spring site for facilitating pumping. • Generator House construction and installation of Electro-Mechanical MS Consultancy MS Consultancy

Equipment. • Over 40 km pipe laying work in PVC & DCI pipes for the rising main and distribution system. • Booster pump station comprising a Wet well, Generator house construction work and Electro mechanical installation. • Dodola town water service office & store construction. • Pipe shed construction works. • 500m3 Reinforced concrete water reservoir. • 13 Water points construction

The main responsibilities include

♦ checking and approving of the all drawings

LANGUAGE Speaking Reading Writing

English Very good Very good Very good Amharic Excellent Excellent Excellent Ormiffa Good Good Good

MS Consultancy MS Consultancy

MS Consultancy