TX 130063 (Issue 1)

Date Issue Originator Checked Authorised Details

11.02.2019 One AMD CMD AMD Issued for design team review and in support of the planning application

This document is provided for demonstrating compliance with the appropriate performance levels required by a designated third party. It should not be divulged to any other parties without the approval of the client for whom it was produced. It CMF – Codrin Florescu MEng(Hons) AIFireE – Fire Engineer should not be manipulated, abridged or otherwise presented without the written consent of Trenton Fire Ltd

This report is issued Commercial in Confidence AMD – Alexandru Dragan MEng (Hons) AIFireE – Business Manager & Fire Engineer

TX 130063 (Issue 1) Page 2 of 29 Fire Safety Strategy Report February 2019 Kettering Science Academy

CONTENTS

4.6 Compartmentation and fire-resisting ------12 EXECUTIVE SUMMARY 4 4.7 Low- and high-hazard ancillary rooms ------13 1. INTRODUCTION 5 4.8 Automatic fire barriers ------13 1.1 Background ------5 4.9 Robust construction ------13 1.2 Legislative requirements ------5 4.10 Fire-stopping and penetrations through fire-resisting construction ------14 1.3 Aims and objectives ------5 4.11 Concealed Spaces ------14 1.4 Design basis and guidance ------5 5. EXTERNAL FIRE SPREAD 15 1.5 Regulatory approvals ------5 5.1 External surfaces of walls ------15 2. PROJECT OVERVIEW AND OCCUPANCY 6 5.2 Roof coverings ------15 2.1 Building description ------6 5.3 Space separation and unprotected façade areas ------15 2.2 Design occupancy ------7 6. ACCESS AND FACILITIES FOR THE FIRE AND RESCUE SERVICE 16 2.3 Occupancy risk profile ------7 6.1 Means of notifying the fire and rescue service ------16 Table 3 – Design occupancies ------7 6.2 Vehicle access to and around the site ------16 3. MEANS OF WARNING AND ESCAPE 8 6.3 Firefighting facilities provided within the development ------16 3.1 Evacuation Regime ------8 6.4 Water supplies ------16 3.2 Means of detection and alarm ------8 6.5 First-aid firefighting ------17 3.3 Means of escape provisions ------8 7. FIRE SAFETY MANAGEMENT 18 3.4 Horizontal evacuation ------8 7.1 Overview ------18 3.5 Vertical evacuation ------9 7.2 Fire safety management documentation ------18 3.6 Roof escape provisions ------9 7.3 Regulatory Reform (Fire Safety) Order 2005 ------18 3.7 Escape beyond the final exits ------9 7.4 General responsibilities of the Fire Safety Manager ------18 3.8 Means of escape for disabled occupants ------9 7.5 Specific fire safety management requirements------18 3.9 Fire doors and escape doors ------10 3.10 Emergency lighting ------10 8. DESIGNER’S ASSESSMENT FOR FIRE SAFETY DURING CONSTRUCTION 20 3.11 Fire safety signage ------11 8.1 Introduction ------20 3.12 Out-of-hours school use ------11 8.2 Key fire safety challenges ------20 8.3 Possible suitable construction solution ------20 4. INTERNAL FIRE SPREAD 12 4.1 Internal Linings ------12 9. REFERENCES 21 4.2 Displays on circulation routes ------12 APPENDIX A – FIRE SAFETY MARK-UPS 23 4.3 Displays on teaching room walls ------12 4.4 Fire suppression ------12 4.5 Structural fire resistance ------12

TX 130063 (Issue 1) Page 3 of 29 Fire Safety Strategy Report February 2019 Kettering Science Academy

EXECUTIVE SUMMARY

Trenton Fire have been appointed by to provide fire safety design services in support of the Kettering Science Table 1 - Summary of fire safety design challenges & departures from guidance Academy in Kettering. Design item Challenge Proposal Reference This fire safety strategy has been developed to satisfy the requirements for fire safety under the Building Regulations 2010 (including amendments). This has been achieved through compliance with the recommendations for life safety of B1 Escape within 4.5m of A secondary means of escape will be provided from those 4.8.2 “BS 9999:2017 – Fire safety in the design, management and use of buildings – Code of practice” (BS 9999) in the first a void edge classrooms, which will enable occupants to avoid having to instance. In line with the objectives set by the client, the strategy has not been developed to include any additional specific travel within 4.5m of a void edge. measures for the protection of property. However, features that are included for life safety will contribute in some extent to property protection and business continuity. B4 Non-compliant In order to reduce the risk to life safety posed by fire 5.3.3 and notional boundaries spread in between the existing and proposed school 5.3.4 Apart from where noted in this report, the designs will be in accordance with the recommendations of BS 9999. To facilitate imposed by site buildings on the same larger site, it is proposed to operate ease of review by the building control body, the items departing from BS 9999 are identified in Table 1, along with the condition both as a single building, supported by an interlinked fire respective proposed alternative fire engineering solutions. All aspects of the fire safety design will be subject to review by detection and alarm system and emergency voice the building control body and the local fire and rescue service, and ultimately formal approval by the building control body. communication system. Additionally, enhanced provisions The school is a rectangular three-storey building (G+2) serving secondary school students. The building will have a footprint for the fire and rescue service are proposed. of approximately 960m2 and a combined floor area of circa 2,880m2. The building will have a typical storey height of approximately 3.6m, with the finished floor level of the topmost floor level (2nd floor) located approximately 7.2m above fire and rescue service access level (ground floor). The school is intended to accommodate a total of 722 pupils and members of staff. The site to be developed will be part of the larger school site and in very close proximity to the main school building. Access to the above-ground storeys will be provided via three stairs. Community access will be provided out-of-hours only to the ground floor of the building. Trenton Fire understand that the provision of a property protection sprinkler system is not a requirement of the project stakeholders. The fire safety provisions contained within the strategy will be sufficient in order to meet the life-safety requirements of the Building Regulations without the inclusion of a life-safety sprinkler system, and as such, a sprinkler system will not be provided. A simultaneous building evacuation regime will be utilised for the new building which will be connected to the existing building, with a single-stage alarm protocol, i.e. evacuation of both buildings upon automatic detection or operation of a manual call point anywhere in either building. In support of the evacuation regime, the fire detection and alarm systems and the emergency voice communication systems will be interlinked in between the existing and new buildings in order for both to be operated as a single larger building. Evacuation from the above-ground floors will be via the two lobby protected escape stairs. Disabled occupants will be assisted in their evacuation where required, and will be provided with suitable refuge areas. Ground floor occupants will be able to escape via final exits leading directly to the outside. The school will be constructed as a single fire compartment. Fire-resisting construction is utilised in support of the means of escape arrangements, including cross-corridor separations and protection to dead-end areas. Ancillary areas having a heightened fire risk (e.g. changing rooms, store rooms, kitchen, plant rooms, server rooms, lifts) will be enclosed by 30- minute or 60-minute fire-resisting construction. Firefighting access and facilities in the building will be provided in excess of minimum code compliance recommendations. It is proposed to provide firefighting access to 25% of the building perimeter, with primary access provided via external doors into the northern lobby-protected stair that will also include a dry rising fire main. Hose coverage will be achieved for all areas of the building within 45m from a dry riser outlet. The water supplies for firefighting operations will be provided via either existing or new hydrants.

TX 130063 (Issue 1) Page 4 of 29 Fire Safety Strategy Report February 2019 Kettering Science Academy

1. INTRODUCTION

1.1 Background 1.2.6 This strategy does not provide a comprehensive assessment of site fire safety during the building works or the 1.1.1 Trenton Fire have been appointed by Pick Everard to provide fire safety design services in support of the Kettering phasing of these works. The Fire Protection Association [2] and the Health and Safety Executive (HSE) [3] issues Science Academy in Kettering. guidance on identifying and managing fire precautions during the works, which should be consulted by the contractor or their specialist advisor when developing their construction fire safety plan. 1.1.2 It is intended that this report will primarily inform discussions with the building control body, assisting with the project’s Building Regulations submission, including their consultation with the local fire and rescue service. It will 1.3 Aims and objectives also serve to assist the client and the design team in progressing the detailed fire safety provisions for the project 1.3.1 The overall aim of this report is to present the fire safety strategy. This is supported by several objectives as follows: through to construction information. However, this report will also represent supporting documentation in the  Identify fire safety design challenges and outline proposed solutions; current planning application for the scheme.  To present any opportunities for the rationalisation of the fire safety design; and 1.1.3 The final fire safety strategy report should form part of the information pack handed over to the building operator, under Regulation 38 of the Building Regulations, to aid their Responsible Person in maintaining the fire risk  Raise queries that require response to assist fire strategy development. assessment for the premises. 1.4 Design basis and guidance 1.1.4 This fire safety strategy is not intended to portray detailed design information. As a strategic document supporting 1.4.1 The fire safety strategy has been developed to satisfy the requirements for fire safety under the Building and informing the wider design, it should be read in conjunction with the wider project design documentation. Regulations 2010 through compliance with the recommendations of BS 9999:2017, and the codes of practice 1.1.5 This strategy is developed based upon the project documentation referenced in Table 2. Additional information or referenced therein, in the first instance. Where not specifically stated, fire safety provisions should be specified variations to that supplied may render the conclusions and recommendations within this report invalid. and installed according to the current edition of relevant published guidance and the standards referenced therein. 1.1.6 This report should be read in conjunction with the fire safety strategy mark-ups, as included in Appendix A. 1.4.2 Fire engineering principles are employed to support alternative solutions where strict adherence to the codes would conflict with the wider aspirations for the scheme. Departures from the codes are identified and alternative 1.2 Legislative requirements proposals (and associated analysis) are documented, see summary. In accordance with the fire safety engineering 1.2.1 Fire safety in buildings is governed by two pieces of legislation in the UK. The Building Regulations 2010, Part B, principles detailed in the PD 7974 [4] codes of practice, it is deemed appropriate that all fire precautions are Fire Safety applies to building design, whilst for fire safety management in buildings, compliance with the determined based on there being one seat of fire (i.e. accidental fires). Regulatory Reform (Fire Safety) Order 2005 (FSO) is needed. 1.4.3 External references utilised in the generation of this report are summarised in Section 9. 1.2.2 The strategy has been developed to identify fire safety requirements for the project necessary to satisfy the 1.5 Regulatory approvals substantive requirements for fire safety under the Building Regulations 2010 (as amended): 1.5.1 This report has yet to be formally reviewed by the building control authority or the fire and rescue service. All  B1 – Means of warning and escape; aspects of the fire safety design remain subject to a formal review by the building control body (including their  B2 – Internal fire spread (linings); statutory consultation with the local fire and rescue service) and, ultimately, formal approval by the building control body.  B3 – Internal fire spread (structure); Table 2 – Project documentation referenced  B4 – External fire spread; and Description Reference Revision  B5 – Access and facilities for the fire and rescue service. 1.2.3 The strategy has not been developed to address property protection. However, the features that are included for Ground Floor Plan BRO046-PEV-01-00-DR-A-9010 P01 life safety, as recommended by BS 9999:2017 [1], will contribute in some extent to business and property First Floor Plan BRO046-PEV-01-01-DR-A-9011 P01 protection. Second Floor Plan BRO046-PEV-01-02-DR-A-9012 P01 1.2.4 The advice has been developed in cognisance of the Construction (Design and Management) Regulations 2015 (CDM 2015), which sets out what designers are required to consider in order to protect anyone involved in the Roof Plan BRO046-PEV-01-RF-DR-A-9013 P01 construction or ongoing use of a project. Proposed Site Plan BRO046-PEV-00-ZZ-DR-A-9002 P01 1.2.5 The strategy does not address any phasing of the works nor the provision of appropriate access to fire safety systems, which should be considered during the detailed design of said systems following product selection, in line Building Section BRO046-PEV-01-SX-DR-A-9015 P01 with CDM 2015 recommendations.

TX 130063 (Issue 1) Page 5 of 29 Fire Safety Strategy Report February 2019 Kettering Science Academy

2. PROJECT OVERVIEW AND OCCUPANCY

2.1 Building description 2.1.1 The school is a rectangular three-storey building (G+2) serving secondary school students. The building will have a footprint of approximately 960m2 and a combined floor area of circa 2,880m2. 2.1.2 The building will have a typical storey height of approximately 3.6m, with the finished floor level of the topmost floor level (2nd floor) located approximately 7.2m above fire and rescue service access level (ground floor). 2.1.3 The school is intended to accommodate a total of 722 pupils and members of staff. 2.1.4 The site to be developed will be part of the larger school site and in very close proximity to the main school building as presented in Figure 1. Access to the above-ground storeys will be provided via three stairs as presented in Figure 1. Community access will be provided out-of-hours only to the ground floor of the building.

Figure 2 - Indicative first floor general arrangement

Figure 1 – Indicative ground floor general arrangement

Figure 3 - Indicative second floor general arrangement

TX 130063 (Issue 1) Page 6 of 29 Fire Safety Strategy Report February 2019 Kettering Science Academy

2.2 Design occupancy Table 3 – Design occupancies 2.2.1 This strategy is based on occupancy levels determined using floor space factors for each area, as set out in Table 9 Floor Area Occupancy Risk Profile of BS 9999, input from the design team, as well as Trenton Fire’s design experience with schools. The calculated design occupancies noted in Table 3 will be utilised when determining the required capacity of the means of escape Lecture Theatre 56 A2 routes. Second General Classroom (6 No.) 28 A2 2.2.2 The strategy assumes that where out-of-hours or public events are to be held within the school on the ground floor, the maximum occupancies will not exceed those stated within Table 3, unless subject to a suitable fire risk Small Group Room 4 A2 assessment for the proposed use and mitigated accordingly. Total for second floor 228 A2 2.3 Occupancy risk profile 2.3.1 BS 9999 recommends fire safety provisions such as warning systems, means of escape and compartment sizes, First General Classroom (6 No.) 28 A2 based on assumed risk. This is achieved by allocating a risk profile based on occupancy (e.g. A – awake and familiar, or B – awake but unfamiliar) and the likely fire growth rate (e.g. 2 – medium growth rate, or 3 – fast growth rate). ICT Classroom (2 No.) 28 A2 2.3.2 BS 9999 does not describe in detail what constitutes the characteristics of risk profiles “A” or “B”. However, the Deputy Office 3 A2 following occupant characteristics will be applied: Total for first floor 227 A2  Any group utilising the building with regularity (e.g. students and staff) are occupant characteristic “A”; Ground Common / Dining Room (community use) 160 B2  Small groups (e.g. visitors and parents) that are accompanied at all times by trained staff are acceptable in a building of occupancy characteristic “A”. Staff should provide a fire safety / evacuation induction; and Library 20 B3

 Groups utilising the building infrequently (i.e. community use), are considered as occupant characteristic “B”. ICT Resource 15 B3 2.3.3 In support of out-of-hours or community use, ground floor areas (except staff areas) will conservatively be assumed Study Area 40 B3 to employ a B occupancy characteristic, assuming occupants are not familiar with the building. All areas on the first and second floor as well as staff only areas on the ground floor level will employ an A type occupancy characteristic, Small Group Room (2 No.) 4 B2 assuming occupants herein are familiar with the premises. Deputy Office 3 B2 2.3.4 For standard risk areas, a base fire growth rate of “Medium” (2) will be applied, while for areas deemed to have a greater fire growth rate, a base fire growth rate of “Fast” (3) will be applied. Conference Room 12 B2

2.3.5 Certain areas will be enclosed within construction having a fire-resistance rating of 30 minutes or better, thereby Interview Room 3 B2 protecting the occupants of other rooms on that storey. Accordingly: Staff Work Prep 10 B2  The building will generally be assigned a medium fire growth rate, with an fast fire growth rate being applied to higher fire hazard rooms, which will be enclosed in fire-resisting construction; and Total for ground floor 267 B2  Areas used outside of school hours will be assigned a B occupancy characteristic. Rooms having a fire hazard Total for building 722 B2 rating (i.e. plant, kitchens, science labs) will not be occupied by unfamiliar occupants unless subject to a suitable fire risk assessment. Notes: 2.3.6 All plant, kitchen, cleaner and store areas will employ a fast fire growth rate. All other areas will employ a medium Transient areas have not been considered with respect to total building occupancy in order to avoid double fire growth rate. No reduction in the fire growth rate is proposed at this stage as an automatic water fire counting occupants. suppression system will not be provided. Transient areas include the following areas: Class Resource (Store), Plant Room, Cleaner Store, Central Resources (Stores), ICT Hub, Equipment Store, Premises Store, Furniture Store, Kitchen Servery, Kitchen 2.3.7 As the ground floor community use areas are connected through the void towards the above floors, the B2 risk Cleaner, Tank Room, Plant Room, etc. profile has been conservatively adopted for sizing the vertical means of escape. All the aforementioned transient areas include a A3 risk profile. 2.3.8 Risk profiles for each area of the building are summarised in Table 3 and are applied throughout the remaining sections of this report. Individual rooms with a high growth rate are separated from the remainder of the storey / compartment by fire rated construction, thus allowing for the more onerous risk profile to be assigned to the individual room in isolation while the wider storey was assigned a medium fire growth rate.

TX 130063 (Issue 1) Page 7 of 29 Fire Safety Strategy Report February 2019 Kettering Science Academy

3. MEANS OF WARNING AND ESCAPE

The Building Regulations requirement B1 states: 3.3.2 BS 9999 recommends escape widths, escape distances and stair widths based on the risk profile and the minimum fire protection measures. The BS 9999 recommendations for travel distance and horizontal escape width have been “The building shall be designed and constructed so that there are appropriate provisions for the early warning of extracted as presented in Table 4. fire, and appropriate means of escape in case of fire from the building to a place of safety outside the building capable of being safely and effectively used at all material times.” 3.1 Evacuation Regime Table 4 –Escape width and travel distance limitations 3.1.1 A simultaneous building evacuation regime will be utilised for the new building which will be connected to the Risk profile A2 A3 B2 B3 Roof level existing building, with a single-stage alarm protocol, i.e. evacuation of both buildings upon automatic detection or operation of a manual call point anywhere in either building. Escape width (mm/person) 3.6 4.6 4.1 6.0 N/A 3.2 Means of detection and alarm Escape in a single direction (m) 22.0 18.0 20.0 16 60 3.2.1 To support the simultaneous evacuation regime, an automatic fire detection and alarm system will be provided throughout the building. In support of the fire safety strategy for the building, a Category L1(M) system will be Escape in multiple directions (m) 55.0 45.0 50.0 40 200 provided within the building, designed, installed and maintained in accordance with BS 5389-1 [7]. General escape width considerations 3.2.2 The fire detection and alarm system will be interlinked with the system covering the existing building using a robust wired connection. This will enable an alarm to be activated immediately upon detection anywhere in either Exits that serve more than 60 people should open in the direction of escape. building. Exits should achieve a minimum clear width of 800mm. Exits should achieve a clear width of 850 mm where 3.2.3 The system will include automatic smoke detection throughout the building. Additional recommendations should unassisted wheelchair access is necessary, see Clause 16.6.1.b of BS 9999. Approved Document M [9] may require additional width. be considered for boiler / plant rooms / kitchen. These include (but are not limited to): Capacity of exits less than 1,050mm in width should be calculated on a clear door width of 500mm, as per  Heat detection linked to the fire alarm system; Clause 16.6.1 of BS 9999.  A means of automatically shutting off the fuel supply in the event of a fire; Where double doors are provided the clear width of one of the leaves should be not less than 800 mm. The roof level travel distance limitations are applicable for external roof areas (not weather housed plant), as  Carbon monoxide or carbon dioxide detection. The detection system should both raise an alarm and per Table F.1 of BS 9999. automatically isolate the fuel supply; 3.3.3 For the purpose of this report:  An unburned gas detection system for gas fired boilers suitably located within the plant room depending on the fuel type (natural gas at high level and Liquefied Petroleum Gas at low level). This detection system should  During the horizontal phase of the means of escape, the individual storey escape routes and exit widths will also both raise an alarm and automatically isolate the fuel supply; and be based on the conservative assumption that each floor is at 100% utilisation (see Table 3); and

 An alarm that gives a visual indication if the ambient noise levels are so great as to make and alarm inaudible.  during the vertical phase of the means of escape, the stair widths will be based on the following conservative 3.2.4 Manual call points will be provided at every storey exit and exit to outside, whether or not they are a designated assumptions: fire exit, in accordance with BS 5839-1. The call points should be provided with a cover in order to prevent  The total design occupancy for the above ground floors are conservatively applied as 100% utilisation; accidental or malicious operation. and 3.2.5 A suitable method of warning (e.g. a visual and audible fire alarm signal) should be provided in areas where it is  At ground floor level, there is no merging flow at the final exits from the protected stair enclosures, anticipated that one or more persons with impaired hearing may be in relative isolation and where there is no given the fact that ground floor areas are provided with multiple independent exits to outside. other suitable method of alerting them, e.g. roof, WCs and shower areas. This may also apply in mechanical / electrical plant rooms where there could be large amounts of background noise. 3.4 Horizontal evacuation

3.2.6 In accordance with the recommendations of BS 5839-1, the fire alarm and detection engineer must submit the 3.4.1 In general, the building escape provisions are in keeping with the recommendations of BS 9999. That is, the travel design certificate for the scheme to the Approving Authority prior to commencement of the installation on site. distances, exit numbers and widths meet the recommendations of BS 9999 (as shown in Table 4) for the risk profiles and likely occupancy. General consideration will need to be given to the layout of equipment and furniture within 3.3 Means of escape provisions rooms to ensure that actual travel distances remain within these stated limits. 3.3.1 The general philosophy for means of escape is that the occupants of a building should be able to turn their back 3.4.2 A number of areas that are accessed via the circulation corridors are to be considered as inner rooms, as the on a fire and escape via the nearest exit without additional assistance from other occupants or firefighters. This is circulation areas include the open plan dining area at ground floor, along with other combustibles in a number of achieved by providing alternative escape routes where necessary, limiting travel distances, providing sufficient exit locations. Most of the rooms accessible off the main dining / common area will also be classed as inner rooms. The width and escape routes that, depending upon the use of the building, will have specified periods of fire resistance. provision of the Category L1(M) detection and alarm system (see Section 3.2.1) provides single knock detection coverage throughout the circulation (and classroom) areas, thereby meeting the recommendations of Clause

TX 130063 (Issue 1) Page 8 of 29 Fire Safety Strategy Report February 2019 Kettering Science Academy

16.3.4 of BS 9999 without requiring additional measures specifically to address this issue. All inner rooms will have and smoke shutter (see Section 4.8.2), to start close immediately upon activation of the fire alarm. This shutter occupancies not exceeding 60 persons, and will not be accessible via rooms of special fire hazard. should also be provided with an emergency fireman’s override switch. 3.4.3 All doors should have a minimum clear effective width of 800 mm, or 850 mm where unassisted wheelchair access 3.5.4 Handrails which do no protrude more than 100 mm into the clear stair width may be disregarded as impacting is required, unless specifically identified below or on the accompanying fire mark-ups. However, BB 77 [10] upon the recommended stair width. (replaced by BB 102 [11]), BB 99 [12], Approved Document M (ADM), Approved Document K (ADK) [13], and the Standard Specifications Layouts and Dimensions (SSLD) for School Buildings booklets may require additional width. 3.5.5 The ground floor final exits are considered to provide sufficient capacity for ground floor occupants to evacuate It is recommended that the doors leading into a disabled refuge location are wide enough to accommodate without significant numbers of occupants having to evacuate via the base of the stairs (approx. 60 occupants as a unassisted wheelchair access. maximum). Therefore, it is considered that merging flow scenarios need not be applied when determining the final exit widths from the protected stairs. 3.4.4 Where corridors greater than 12 m in length connect storey or final exits, these are sub-divided by FD30S cross- corridor doors. These are provided throughout the building. 3.5.6 The final exits from the stairs at ground level will each provide a clear width of 1,600mm which is in excess of the widths of the approaching stairs. 3.4.5 To assist with day-to-day circulation, any cross-corridor doors will be provided with magnetic door hold-opens, as detailed in Section 3.9. The cross-corridor doors should provide a clear width of at least 1,050 mm, and be dual- 3.6 Roof escape provisions swing doors, in order to accommodate over 60 occupants in either direction of escape. These doors should be 3.6.1 Roof access and egress will be provided via a hatch. The current design includes a hatch leading into the plantroom released at night time to reduce the chance of long term warping of the door as it is held back at a single point of on the second floor which is not permitted, therefore this should be relocated to discharge within the northern contact. protected stair enclosure. The hatch and any roof level walkways will be arranged such that travel distances do not exceed 45m in a single direction. 3.4.6 All dead-end corridors greater than 2 m in length will be provided with 30-minutes fire-resisting construction and any doors opening into them should be protected by FD30S door sets. Low hazard ancillary accommodation areas 3.6.2 All maintenance staff accessing the roof areas should be able to evacuate via escape hatches unaided of the routes (e.g. stores) which open into a dead-end corridor will be provided with FD30S doors. Dead-ends will serve small described in this section unaided, and should be fully briefed with regards to the emergency evacuation procedures numbers of occupants, and not more than 60 people. (see Section 7.5.5). 3.4.7 Rooms containing fume cupboards, such as the general science classrooms if applicable, science prep room and 3.7 Escape beyond the final exits the specialist lab, should be provided with two separate means of escape. Fume cupboards should be located as 3.7.1 Travel beyond the building final exits must be away from the building, towards a place of safety, and not be far as reasonably practicable from the room exits. jeopardised by unprotected openings of the building. It is proposed that this is achieved through a combination of the following: 3.4.8 The ground floor main dining / common room has a maximum design occupancy of 160 people. Two 1,800mm wide exits leading outside are provided, allowing sufficient egress capacity for 300 occupants per exit (B2 risk  Alternative paths along the building that cannot be impacted by a single fire location; profile). Two additional exits (850mm wide each) providing a combined capacity of 166 people are also provided  Exit paths provided that lead away from the building. via the Library / ICT / Study areas which should be available even in the case of a major fire within the neighbouring existing school building. 3.7.2 Final exits should not present an obstacle to wheelchair users and other people with disabilities. Where a final exit is accessed without the need to traverse steps then a level threshold and, where necessary, a ramp should be 3.4.9 The ground floor Library / ICT / Study area has a maximum design occupancy of 75 people. Two 1,600mm wide provided. Where steps are required, and a ramp cannot be incorporated, a suitably protected refuge area should exits leading outside are provided, allowing sufficient egress capacity for 266 occupants per exit (B3 risk profile). be provided in the vicinity of the final exit. 3.4.10 The above ground floors are served by two storey exits, each with a clear width of 1,050mm, providing sufficient 3.7.3 All final exits, including those which represent the final exit from a stair, should include accessible escape routes egress width for 291 occupants. By discounting one of the two exits on each floor separately, the remaining exits for disabled occupants up to a designated assembly point. These escape routes should be suitable for the use of a provide sufficient capacity for all occupants on that level. disabled occupant. This is likely to impact on landscaping design. 3.5 Vertical evacuation 3.7.4 In order to avoid having protected façade as a consequence of maintaining disabled escape routes, the entire perimeter of the building should include a 2m wide accessible route. This would result in the disabled occupant 3.5.1 The two protected stairs will each have a minimum clear width of 1,300 mm, providing a total vertical egress having a choice of two direction of escape on this level, once outside the building. capacity of 650, which is considered sufficient to accommodate the maximum design occupancy for the above ground level of the school (455). 3.7.5 The determination of suitable assembly areas is an operator-led exercise. Assembly areas should be located such that they are remote from access routes for the fire and rescue service and evacuation from the building can be 3.5.2 Both protected stairs will be lobby-protected on all floors, therefore no discounting of stairs has been employed in achieved without exposure to a hazard from a building fire. design. The western accommodation stair however is not protected and has therefore been assumed to not be used during an evacuation. 3.7.6 Escape beyond the final exits, including to and from assembly points should be usable by all occupants, e.g. a need to cross grass may not be appropriate for all mobility aids. Egress routes should meet the accessibility 3.5.3 The passenger lift will not be designed as an evacuation lifts, and it will not be available for vertical means of escape. recommendations of Approved Document M or BS 8300 [15]. Upon activation of the fire alarm, the lift should stop at first floor level, with the lift remaining inactive until the fire alarm has been reset. The lift aperture on the ground floor level however will be provided with a FR30 minutes fire 3.8 Means of escape for disabled occupants 3.8.1 Disabilities refer to any physical, sensory or cognitive impairments, being permanent or temporary, which may affect an occupant’s ability to evacuate a building unassisted in the event of a fire. The following guidance details

TX 130063 (Issue 1) Page 9 of 29 Fire Safety Strategy Report February 2019 Kettering Science Academy

recommendations to meet the requirements of the Building Regulations, but does not necessarily address all 3.9.7 Doors on escape routes from rooms with an occupant capacity of more than 60 should either not be fitted with a circumstances. In general, school management should assess the individual needs of disabled occupants and lock, latch or bolt fastening, or should be fitted with panic fastenings in accordance with BS EN 1125 [17]. provide additional evacuation support as appropriate. 3.9.8 Fire doors may generally be maintained open during day-to-day use, e.g. to facilitate circulation in common areas, 3.8.2 It is envisaged that most people will be able to escape to a place away from danger without assistance from trained using magnetic hold-open devices. Any fire doors fitted with hold-open devices should release on: fire wardens. However, there will be a certain proportion of building occupants, such as those who are non-  Manual operation or operation of a hand-operated switch fitted in a suitable position, if necessary; ambulant disabled (e.g. wheelchair users), who will not be able to negotiate stairs unaided. In these instances, an environment should be provided in which their safety can be assured for a given period of time (e.g. refuge areas)  Actuation of the fire alarm system; or prior to being assisted to ultimate safety outside.  Failure of the electricity supplies. 3.8.3 It should be noted that under the Regulatory Reform (Fire Safety) Order 2005, it is the duty of the responsible 3.9.9 Any power sliding doors should also default open in-line with the scenarios noted in Section 3.9.8. person along with their appointed safety assistants to assist everyone to a place of ultimate safety outside the building in the event of an emergency. 3.9.10 Any doors fitted with an electronic latch, e.g. operated by a swipe card reader, code, biometric data or similar means, should return to the unlocked position: 3.8.4 Disabled persons should be provided with a suitable number of refuge areas at the upper floors, protected from the effects of a fire. These will be provided above-ground within the protected stair enclosures (each at least 1,400  On operation of the fire alarm system; x 900mm) located in a position that does not encroach on the effective width of the stair. These refuges will enable  On loss of power or system error; and them to await further assistance from suitably trained staff members in a place of safety, before they make their way out of the building at their own pace with assistance.  On activation of a manual door release unit (Type A) to BS EN 54-11 [8] positioned at the door on the side approached by people making their escape. Where the door provides escape in either direction, a unit should 3.8.5 Each refuge space shall be provided with an emergency voice communication system (EVC system). The system be installed on both sides of the door. shall comply with BS 5839-9:2011 [16] and consist of Type B outstations which communicate with a station located near the building control room or the fire alarm panel. 3.9.11 Fire-rated doors shall be fitted with smoke seals where specified. Complete door assemblies will be able to demonstrate compliance with: 3.8.6 The EVC system for the new building should be interlinked with the one covering the existing building, including all supporting management procedures to assist disabled occupants from both buildings at the same time in a fire  BS 476-22 [18] or BS EN 1634-2 [19] for fire resistance; and where appropriate scenario anywhere in either building.  BS 476-31 [20] or BS EN 1634-3 [21] for smoke leakage. 3.8.7 The school should develop a Personal Emergency Evacuation Plan (PEEP) for any student or member of staff with 3.10 Emergency lighting mobility, sensory and/or cognitive impairments, and the procedures should be practiced during fire drills. A Generic 3.10.1 Emergency lighting will be installed to provide temporary illumination in the event of failure of the primary power Emergency Evacuation Plan (GEEP) will need to be written for members of the public who would need assistance supplies to the normal lighting system. As part of the emergency lighting system, escape lighting will be provided to escape. These plans should not rely on assistance from the fire and rescue service and should the plans include to ensure the escape routes are illuminated at all material times. Adequate artificial lighting will be provided in all hardware such as descent aides, consideration for location/storage can be incorporated into the design at this escape routes and will be of a sufficient standard to enable persons to see during escape. stage. Further information can be found in BS 8300 and the DCLG Publication “Fire Safety Risk Assessment Supplementary Guide – Means of Escape for Disabled People”. 3.10.2 Emergency lighting will be installed in accordance with the recommendations of BS 5266: Parts 1-2 [22] and 4-6, BS EN 1838 [23], and BS EN 60598-2-22 [24]. 3.9 Fire doors and escape doors 3.9.1 All fire doors should be provided in accordance with Clause 32.1 of BS 9999. 3.10.3 Emergency lighting will illuminate all occupied areas, common evacuation routes (internal and external as necessary) and essential areas including plant areas (external plant also). It will also illuminate a safe exit route 3.9.2 All doors on common escape routes will either not be provided with a securing device, or be provided with a including fire exits, fire alarm call points, changes in level or direction and fire-fighting equipment. Lighting to securing device that is easily openable from the inside without the use of a key and without having to manipulate escape stairs should be on a separate circuit from that supplying any other part of the escape route. more than one mechanism. Doors should open in the direction of escape where possible. 3.10.4 Primary and emergency lighting will be required for any external escape routes that will not be lit by surrounding 3.9.3 Doors on escape routes will generally be hung to open in the direction of exit (apart from certain instances where street lighting. the doors will serve less than 60 people), will open not less than 90° and have a swing which is clear of any change in level, other than a threshold or single step on the line of a doorway. 3.10.5 Where used, it must be ensured that the emergency lighting will provide at least the minimum level of illumination to photo-luminescent escape signage (Clause 5.3 of BS 5499-4 [25] - a minimum of 100 lux on the vertical and in 3.9.4 The clear widths of exit doors should, as a minimum, meet the recommendations of Table 4 and Section 3.4. the event of mains failure conditions a minimum of 5 lux in the vertical, with a uniformity of 0.7). 3.9.5 Doors opening onto stairways or corridors will be sited so as not to encroach on the effective width of any stairway, 3.10.6 Emergency lighting will illuminate common areas and the exit routes including fire exits, changes in level or landing or corridor. direction and firefighting equipment. Lighting to escape stairs should be on a separate circuit from that supplying 3.9.6 Vision panels will be provided in any doors that swing in both directions and in doors sub-dividing corridors on any other part of the escape route. escape routes. Other vision panels may be required as part of accessibility requirements.

TX 130063 (Issue 1) Page 10 of 29 Fire Safety Strategy Report February 2019 Kettering Science Academy

3.10.7 A facility should be provided for periodic testing of the emergency lighting luminaires without having to switch the relevant circuit off. A full discharge / recharge test must be performed for every luminaire during commissioning procedures. 3.10.8 Discharge lighting installations may operate at voltages that are a hazard to firefighters. An exterior discharge lighting installation, or an interior discharge lighting installation operating unattended, operating at a voltage exceeding low voltage (as defined in Statutory Instrument number 1018, part of the Building Regulations), should be controlled by a firefighter’s emergency switch, installed and situated in accordance with BS 7671 [26] and the requirements of the fire authority. 3.11 Fire safety signage 3.11.1 Fire safety signs will be installed in common areas where necessary to provide clear identification of fire precautions, fire equipment and means of escape in the event of fire. All parts of the building will be fitted with appropriate fire safety signage to comply with The Health and Safety (Signs and Signals) Regulations 1996, i.e. signage to be in accordance with BS ISO 3864-1 [27], BS 5499-4 [28], BS 5499-10 [29] and the Safety Signs and Signals: Guidance on Regulations publication [30]. 3.11.2 The purpose of fire signage is to direct persons towards fire exits, or to provide specific information or warning about equipment, doors, rooms or procedures. They should be recognisable, readable and informative, as they convey essential information to regular and infrequent users of the premises, and the Fire and Rescue Service (FRS). 3.11.3 Fire notices should be permanently displayed in conspicuous positions throughout the building, including storey exits, and should have been updated to provide information specific to building. 3.11.4 All fire doors will be marked with the appropriate fire safety sign conforming to BS 5499-1 [31] (white on blue) according to whether the door is:  To be kept closed when not in use (‘FIRE DOOR - KEEP SHUT’);

 To be kept locked when not in use (‘FIRE DOOR - KEEP LOCKED’); or  Held open by an automatic release mechanism (‘AUTOMATIC FIRE DOOR - KEEP CLEAR’). 3.11.5 Fire doors to cupboards and to service ducts should be marked on the outside at about eye level. All other fire doors should be marked on both sides at approximately eye level. 3.11.6 Any emergency securing device fitted to doors on escape routes are to be provided with instruction notices, adjacent to the device, indicating the method of operation. 3.12 Out-of-hours school use 3.12.1 It is expected that many areas within the building will be utilised outside of school hours, or for community use, including the dining / common room, along with adjacent areas at ground floor. The means of escape from the building provide suitable escape width to allow community use. 3.12.2 It should be ensured that where members of the public are allowed access to other areas of the school, they will be accompanied at all times by a member of school staff. 3.12.3 In the event of an out-of-hours fire, the magnetic locking systems installed on exits located within the secure line should deactivate upon detection, allowing occupants to use the same egress routes that would be available during school hours use. These arrangements should be incorporated into the fire-safety management plan for the building, when developed (see Section 7.5.6). 3.12.4 The means of escape for ground floor areas with both community use and school use have been designed based on the more onerous B2/B3 risk profile, such that these exits are able to accommodate both use types, provided that the maximum occupancies in Table 3 are followed.

TX 130063 (Issue 1) Page 11 of 29 Fire Safety Strategy Report February 2019 Kettering Science Academy

4. INTERNAL FIRE SPREAD

The Building Regulations requirement B2 states: 4.2 Displays on circulation routes “(1) To inhibit the spread of fire within the building, the internal lining shall: 4.2.1 It is common in schools to use corridors and other circulations spaces to house display items, posters, artwork, etc. (a) Adequately resist the spread of flame over their surfaces; and The provision of such features or items (such as displays, posters, artwork pieces, etc.) may be included with appropriate consideration, justification and on-going control as part of the Responsible Person’s duty under the (b) Have, if ignited, a rate of heat release or a rate of fire growth, which is reasonable in the circumstances. FSO to maintain an up to date fire risk assessment for the building. (2) In this paragraph ‘internal linings’ mean the materials or products used in lining any partition, wall, ceiling or 4.2.2 The school’s circulation areas, excluding the protected stairs, may be used for relaying information and displaying other internal structure.” pupils’ work. It is recommended that notice boards in circulation spaces be no wider than 3 m and separated by a The Building Regulations requirement B3 states: 1 m gap (from each other and room access doors). “(1) The building shall be designed and constructed so that, in the event of fire, its stability will be maintained for a 4.2.3 Notice boards in protected or dead-end corridors should be fitted with a glass or polycarbonate cover, preferably reasonable period. top hung, which cannot be left projecting into the corridor. (2) A wall common to two or more buildings shall be designed and constructed so that it adequately resists the 4.2.4 Any lockers in corridors should be made of a material of limited combustibility and all rooms accessed from these spread of fire between those buildings. For the purposes of this sub paragraph a house in a terrace and a semi- corridors should be treated as inner rooms (see Section 3.4.2). Also, lockers are not permitted within stairs or detached house are each to be treated as a separate building. lobbies providing protection to escape stairs. (3) Where reasonably necessary to inhibit the spread of fire within the building, measures shall be taken, to an extent appropriate to the size and intended use of the building, comprising either or both of the following: 4.3 Displays on teaching room walls 4.3.1 In classrooms, notice boards with a surface spread of flame no poorer than Class 3 or D-s3, d2 are permitted, but (a) sub-division of the building with fire resisting construction; should not extend more than 2.5 m without having a break between them of not less than 0.4 m. (b) installation of suitable automatic fire suppression systems. 4.4 Fire suppression (4) The building shall be designed and constructed so that the unseen spread of fire and smoke within concealed 4.4.1 A fire suppression system is not required to comply with the recommendations of BS 9999 and will not be provided spaces in its structure and fabric is inhibited.” in the building. The fire safety strategy is designed such that the building meets the functional requirements of 4.1 Internal Linings Parts B1-B5 of the Building Regulations without the provision of a life-safety sprinkler system. 4.1.1 In the early stages of a fire in a building, the choice of material for the lining of walls and ceilings can significantly 4.4.2 Within the kitchen, considerations should be given to providing a proprietary extinguishing system, should cooking affect the spread of fire and its rate of growth. Wall and ceiling linings should achieve at the surface spread of flame facilities be employed within this area at any time. If applicable, proprietary extinguishing systems covering hob and fire classifications outlined in Table 33 of BS 9999, as summarised in Table 5, as a minimum. Materials are top and the cooker hoods should be considered. This will be of benefit to both life safety and the minimisation of permitted to meet either the UK National or the European classifications noted. fire damage. 4.1.2 Parts of the wall area of an individual room are permitted to be of a poorer performance classification than those 4.5 Structural fire resistance set out in Table 5, but no worse than UK National Class 3 or European Class D-s3, d2. This variation is limited to an 4.5.1 As the building will have top storey height above access level of approximately 7.2 m, elements of structure should area not exceeding half the floor area of the room or 60 m2, whichever is less. achieve a fire resistance of at least 60 minutes, as specified in Table 23 of BS 9999. 4.1.3 Should any thermoplastic materials, which do not achieve the performance given in Table 5, proposed in the 4.5.2 Elements of structure that only support a roof do not generally require fire resistance. Structure is considered to construction (e.g. windows, roof-lights and lighting diffusers only) these should comply with the recommendations support more than only a roof if it supports a load other than the roof itself (e.g. rooftop plant) or is essential to of Section 34 of BS 9999. the stability of a compartment or other fire-resisting wall (internal or external). Photovoltaic (PV) cells on the roof Table 5 – Surface spread of flame requirements are not considered to constitute plant in this context. Location National (UK) Class European Class 4.6 Compartmentation and fire-resisting construction 4.6.1 Performance requirements for fire resisting separations are documented in Table 6. The fire safety mark-ups Small rooms ≤ 30 m² Class 3 D-s3, d2 presented in Appendix A denote the minimum fire-resistance requirements for various fire separating elements Other rooms Class 1 C-s3, d2 and enclosures. The identification of the structural, secondary structure, and load bearing elements should be sought from the structural consultant and the appropriate fire-resistance noted in Table 6 should be applied. Circulation spaces Class 0 B-s3, d2 4.6.2 Table 28 of BS 9999 imposes a limit of 2,000 m2 for the maximum area of any floor in a building with an uppermost storey of less than 18 m and a B3 risk profile, which is the most onerous in this case. This limit is not exceeded for this building, therefore the entire building will be enclosed in a single fire compartment.

TX 130063 (Issue 1) Page 12 of 29 Fire Safety Strategy Report February 2019 Kettering Science Academy

4.6.3 As part of the design provisions in support of means of escape and fire-fighting operations, the north and south of the cupboards, the restrictive safe zones and positioning limitations in relation to room circulation paths and stairs will be designed as lobby protected stairs, to be enclosed in 30-minute fire resisting construction including escape routes, the substances and processes used, and the risks associated with fume cupboard accidents or lobby separation achieving 30-minute fire resistance rating on all levels. extraction system failures, rooms containing fume cupboards will be designated as low-hazard ancillary rooms. Table 6 – Minimum fire resistance periods for structural and-separating elements (in minutes) 4.7.2 As previously noted, all rooms and spaces (risers) that have the potential for a fast fire growth rate will be designated as places of higher fire hazard and will be enclosed within fire-resisting construction to isolate their risk. Elements requiring fire-separation Fire resistance Exposure Fire doors 4.7.3 Accordingly, the following areas have been designated as low hazard ancillary rooms and/or places of higher fire Structural frame, beam or column 60 L Exposed faces N/A hazard: stores of any kind, kitchen, changing rooms, ICT hub, server, class resource, prep areas, any room with a fume cupboard, and all service risers. Protected stair lobbies 30 L/Int/Ins From each side FD30S 4.7.4 All plant rooms have been designated as high-hazard ancillary accommodation. Subdivision of a corridor 30 L/Int/Ins From each side FD30S 4.7.5 If applicable, any areas fitted with gas supplies should follow the advice given in Gas Engineers publication “UP11 Gas installations for educational establishments”. Each such area should be fitted with a lockable isolating valve to Protection of dead-end corridors 30 L/Int/Ins From each side FD30S enable gas supplies to gas taps on benches to be shut off at the end of the day. Where fume cupboards are provided Protected lift and service shafts 30 L/Ins/Int From each side FD30 these should have a powered extract system and fire resisting ductwork to extract hot smoke in case a fire occurs within them. Low hazard ancillary accommodation (as per Table 29 of BS 9999) – e.g. stores, PE stores, 30 L/Ins/Int From each side FD30 4.8 Automatic fire barriers kitchen, labs, low-voltage electrical rooms 4.8.1 The kitchen area will not include food preparation and therefore is not considered as high risk. However, in order to enable flexibility in use in the future, it is recommended to include fire separation around the potentially high Higher hazard ancillary accommodation (as per risk food preparation area. Therefore, any openings between the kitchen and the dining hall which are intended Table 29 of BS 9999) – e.g. plant rooms, 60 L/Ins/Int From each side FD60 for servery use should be provided with fire shutters, rated to 60 minutes fire resistance rating (integrity only). electrical intake rooms There is not expected to be any fire load close-up to the opening as it is used as transient space in typical use so Notes: fire spread through the shutter via radiation is unlikely. Therefore, integrity-only is considered to be sufficient for the fire shutters. In the event of a fire within the kitchen, the shutters should descend and restrict the spread of Loadbearing, Integrity, Insulation in accordance with BS 476 parts 21 [54] & 22 [55]. The “L” rating only applies fire, thus maintaining the fire resisting separation of the kitchen. to loadbearing elements. “S” within the fire doors column denotes the inclusion of cold smoke seals on the fire doors. 4.8.2 Additional local FR30 construction has been proposed to enable occupants to avoid escape within 4.5m of the void edge as presented on the mark-ups, in Appendix A. The lift shaft opens into the base of the void and also into the Fire doors for ancillary accommodation and riser shafts also require cold smoke seals if located if they open into corridor which forms a secondary means of escape for occupants having to escape within 4.5m of the void edge. a dead-end corridor (see Section 3.4.6), protected escape route and are located on a compartment line or line of cross-corridor separation as shown by the mark-ups in Appendix A. In order to mitigate this condition, an FR30 minutes (integrity only) fire and smoke shutter is proposed within the lift aperture on the ground floor level.

4.6.4 As floors are not required to be compartment floors these may contain floor voids. One key architectural feature 4.8.3 Automatic shutter barriers should be tested or classified in accordance with BS 476-22 or BS EN 13501-2 [34]. in this building is the central void spanning all floors which includes the western accommodation stair. However, 4.8.4 The 30-minute fire and smoke curtains will be specified in accordance with BS 8524-1 [29] and designed, installed solid areas of floor will otherwise be fire-resisting to meet the standard documented in Table 6 for supporting and maintained in accordance with BS 8524-2 [30]. Detailed performance criteria will be confirmed as the design means of escape from the upper floors. Sealing of penetrations within these floors is not required unless the floor progresses. forms part of a protected escape route. 4.9 Robust construction 4.6.5 In order to provide a protected lobby for the northern and southern stairs, 30-minute fire resisting construction 4.9.1 By the nature of the activities that go on within a school, the elements of construction making up the school should including integrity and insulation should be provided. At the moment, the design includes glazing in such partitions be able to withstand more abuse than those incorporated in the normal built environment. Accordingly: which should be also fire rated to achieve the same performance.  All glass should meet the requirements of BS 6262-4 [35], BS 6180 [36] (if used in a barrier), and BS 5234 (if 4.6.6 It is proposed to enclose and isolate areas of increased fire growth rate with a minimum of FR30 minutes rating used in a partition; construction thereby protecting the escape routes and other areas on that level from the higher risk. Plant rooms, the kitchen and the kitchen refuse store will be enclosed in FR60 minutes construction in order to mitigate the  All glass used in the construction of fire walls should be rated B or C in accordance with BS 6206 [37] & BE EN proportionally higher risk. 12600 [38], dependent on location and pane size; 4.7 Low- and high-hazard ancillary rooms  All fire separating walls should, as well as providing the rating noted above, be rated at least heavy duty (HD) 4.7.1 If applicable, the use of mobile fume cupboards should comply with the recommendations of CLEAPSS G9 “Fume when evaluated by BS 5234-2 [39] and should be installed in accordance with BS 5234-1 [40]; cupboards in schools. Revision of DfEE BB 88” [32] and BS EN 14175-2 “Fume cupboards. Safety and performance  Fire-resisting timber door assemblies should achieve a performance rating of Severe Duty (SD) in accordance requirements” [33]. This applies to both re-circulatory filtration and ducted fume cupboards. Due to the mobility with DD 171 [41]; and

TX 130063 (Issue 1) Page 13 of 29 Fire Safety Strategy Report February 2019 Kettering Science Academy

 Door hardware will be essential or non-essential depending on door function and fittings, as per BS 8214 [42]. 4.11.4 Cavity barriers should be within the external wall cavity, positioned to align with the internal fire-resisting walls and floors, unless constructed in accordance with Figure 36 of BS 9999. Cavity barriers should also be installed to seal 4.10 Fire-stopping and penetrations through fire-resisting construction around any openings (windows or doors) in the external wall. Cavity barriers provided around an opening may be 4.10.1 Fire-stopping should be provided at the junction of fire-separating walls and external walls to maintain the fire formed of: resistance period of fire-separating walls (see Figure 4), and thereby prevent a fire from travelling around the junction and into the neighbouring space.  Steel at least 0.5mm thick or timber at least 38mm thick; 4.10.2 To maintain the fire resistance of separating construction, any pipe penetrations through lines of fire-resisting  Polythene-sleeved mineral wool, or mineral wool slab under compression when installed cavity; or separation should be fire-stopped in accordance with one of the following methods set out by Clause 32.5.14 of  Calcium silicate, cement-based or gypsum-based boards at least 12mm thick. BS 9999, unless located within a protected shaft:

 For pipes of any diameter, a proprietary seal, which has been shown by test to meet the fire-resistance rating of the wall, floor, or cavity barrier for the penetration circumstance; and

 For pipes with a restricted diameter, fire-stopping should be provided around the pipe keeping the opening as small as possible. The nominal interior diameter of the pipe should not be more than the relevant dimensions given in Table 31 of BS 9999. Figure 4 is provided to assist in the interpretation of Table 31 of BS 9999. 4.10.3 All pipes, ductwork and services passing through fire-resisting separations should be either enclosed in fire- resisting construction (i.e. shafts) of matching fire resistance or provided with fire dampers of matching fire resistance. Certain small-diameter pipes require only fire-stopping around the pipe, dependent on pipe material and the type of fire-resisting barrier penetrated. 4.10.4 Where ducts cross fire-resisting construction enclosing a protected escape route (e.g. protected stair, protected corridor, protected lobby or a corridor sub-division), fire dampers on fusible links are not sufficient. Either combined fire-and-smoke dampers activated upon smoke detection (ES-type dampers) are provided, or the duct should be fire-resisting/enclosed within fire-resisting construction throughout its length while traversing the protected escape route. As such, all ductwork penetrating the protected stair enclosures, fire separation lines and protected lobbies / corridors should be provided with ES-type dampers. 4.10.5 Dampers should not be used if the duct used for extract is serving a kitchen area. Such ductwork should be fire- resisting or fully within a fire-resisting enclosure to the point of termination outside of the kitchen enclosure. Additional guidance is provided in BESA TR19 “Guide to good practice – Internal cleanliness of ventilation systems”. 4.11 Concealed Spaces

4.11.1 Cavity barriers are provided to prevent the rapid spread of unseen fire or smoke in voids, and to prevent the spread Figure 4 – Fire stopping expectations of fire around compartmentation via voids.

4.11.2 Concealed cavities (e.g. voids in partition walls, roof voids, void between suspended ceilings and the soffit of the floor above) require cavity barriers to sub-divide them, unless subject to the exceptions outlined in Clause 33.2 Items (a) to (g) of BS 9999. 4.11.3 Cavity barriers should achieve 30 minutes integrity (E) fire resistance and 15 minutes insulation (I) fire resistance. They should be located as follows:

 In general, cavity barriers should be at 20 m centres in cavities with exclusively Class 0 or 1 linings. For other linings, the spacing between cavity barriers should be reduced to 10 m; and

 Above walls enclosing protected escape routes, where the wall does not continue to the level of the soffit or roof above.

TX 130063 (Issue 1) Page 14 of 29 Fire Safety Strategy Report February 2019 Kettering Science Academy

5. EXTERNAL FIRE SPREAD

The Building Regulations requirement B4 states: 5.3.6 It is critical that school management including any prospective insurers are made aware of the fact that fire spread in between the two buildings is possible from a property protection / business continuity / insurance point of view. “(1) The external walls of the building shall adequately resist the spread of fire over the walls and from one building to another, having regard to the height, use and position of the building. Should any party not agree with the potential loss of both buildings in a fire scenario, then options could be investigated to mitigate fire spread, however this are likely to be highly onerous. (2) The roof of the building shall adequately resist the spread of fire over the roof and from one building to another, having regard to the use and position of the building.” 5.3.7 The design team are to confirm the actual boundary distances towards the east (site boundary) and north (middle of the adjoining road) in order finalise the analysis and estimate the required mitigation on those facades. 5.1 External surfaces of walls 5.1.1 Façade linings should conform to Clause 35.5 and Figure 47 of BS 9999. Table 7 – Limitations on roof coverings 5.1.2 As the building includes areas of out-of-hours community use, with a risk profile of B2/B3, is less than 18 m in Designation of roof covering height and more than 1 m from all boundaries, façade linings for the fire compartment containing these areas Distance from relevant should comply with the requirements in Figure 47c) of BS 9999. boundary AA, AB, or AC -National BA, BB, or BC – National CA, CB or CC – National 5.1.3 BS 9999 recommends that façade linings up to 10 m above ground level and up to 10 m above a roof or parts of BROOF(t4) - European CROOF(t4) - European DROOF(t4) - European the building to which the public have access should achieve Class 0 (national class) or Class B-s3, d2 or better Less than 6m    (European class). Profiled or flat steel sheet at least 0.5 mm thick with an organic coating of no more than 0.2 mm thickness is also acceptable. At least 6m    5.2 Roof coverings At least 12m    5.2.1 Roof coverings should conform to the prescriptive recommendations of Clause 35.4 of BS 9999 when tested in accordance with BS 476-3 [43], as summarised in Table 7. Where any plastic or thermoplastic materials are used At least 20m    for rooflights, these are to conform to the provisions of BS 9999. Recommendations given in this table are not exhaustive as dispensations are provided in BS 9999, including for 5.3 Space separation and unprotected façade areas rooflights. 5.3.1 In order to investigate the risk of fire spread to / from neighbouring properties / buildings via radiation, analysis Table 8 - Boundary distance requirements for 100% unprotected façade has been undertaken in accordance with the calculation process outlined in BR 187 [44], to determine the boundary distance separation required for 0% unprotected façade. The results are presented in Table 8. Elevation Height Width Radiation Boundary distance Actual boundary intensity for 100% distance 5.3.2 It can be observed that for this site, fire spread is possible towards the existing building across the notional (m) (m) unprotected façade boundaries. These notional boundaries have been introduced retrospectively on the larger school site, after the (kW/m²) (m) existing main school building had been already built. As a consequence, the new site boundaries represent notional (m) boundaries in accordance with Section 35.1.2 of BS 9999. Trenton Fire have not received any information up to this point to indicate that the proposed building extension on the same site was taken into consideration by the South 11.5 30 84 11.9 3 design team for the existing building. Therefore, it is also possible that a fire scenario within the existing main West 11.5 30.9 84 12.1 3 building to result in fire spread towards the new proposed building. North 11.5 30 84 11.9 TBC 5.3.3 In order to mitigate this condition with respect to life safety of occupants, the fire detection and alarm systems should be interlinked and include a robust, wired connection so that detection anywhere within the two buildings East 11.5 30.9 84 12.1 TBC results in an immediate alarm in both buildings. Furthermore, the disabled refuge EVC systems and supporting management procedures should be interconnected to cover both buildings at the same time. Overall, the two Notes: buildings will end up being operated as a single larger building. Further detail is presented in Section 3. The radiation intensity of 84 kW/m² has been selected for the entire façade radiator which is the governing 5.3.4 In order to mitigate this condition with respect to life safety of firefighters, the local fire and rescue service should value for most of the areas. Even if some rooms could locally employ 168 kW/m², these are limited in size and separated by FR construction from the rest of the building. This is considered conservative as the entire be consulted with respect to this departure to ensure that they are satisfied with the design overall, taking into façade is not likely to be engulfed in a full compartment fire. Furthermore, the combustibles within the account that the building incorporates 6m separation from the existing building and also incorporates higher risk areas are more akin to school / office accommodation. enhancements with respect to provisions for firefighting as presented in Section 6. The actual boundary distance towards the south and west have been confirmed by the design team as 5.3.5 However, Trenton Fire recommend that fire rated façade system be employed towards the south and the west in measured up to the notional boundary halfway towards the existing building. order to prevent fire spread. A detailed analysis on the actual required mitigation can be performed at a later stage The actual boundary distance towards the east and north have to be confirmed by the design team in order to in coordination with the design team. finalise the analysis and inform on the mitigation required on the associated elevations.

TX 130063 (Issue 1) Page 15 of 29 Fire Safety Strategy Report February 2019 Kettering Science Academy

6. ACCESS AND FACILITIES FOR THE FIRE AND RESCUE SERVICE

The Building Regulations requirement B5 states: inlet. If no existing compliant hydrants are available, additional hydrants should be provided within 90m of the dry riser inlet. “(1) The building shall be designed and constructed so as to provide reasonable facilities to assist fire fighters in the protection of life. 6.4.2 All water supplies should be designed and installed in accordance with BS 9990 [44]. (2) Reasonable provision shall be made within the site of the building to enable fire appliances to gain access to the 6.4.3 Where there is insufficient flow and/or pressure available from an existing hydrant, the water supply for the fire building.” service should comprise one or a combination of the following:

6.1 Means of notifying the fire and rescue service  A private fire main with hydrants no more than 90 m from the building, and no more than 90 m apart; 6.1.1 In the event of a fire, the fire and rescue service will be notified by a member of staff. During operational hours the  A charged static water tank providing a minimum capacity of 45,000 litres; fire and rescue service will be met by a member of staff upon arrival on site. The proposed detection and alarm system could also be provided with a ‘Redcare’ or equivalent connection thus addressing an out-of-hours fire,  A spring, river, canal or pond capable of providing or storing at least 45,000 litres of water at all times of the subject to discussion with the local fire and rescue service. year, to which access, space and hard standing are available for a pumping appliance; or 6.1.2 The location of the fire alarm panel will be within the protected enclosure of the northern stair on the ground floor  Any other means of providing a water supply for fire-fighting operations considered appropriate by the local Fire Authority. level, which would easily serve both of the fire and rescue service and building management in their operations. Table 9 – Pump-type firefighting appliance access requirements (BS 9999) 6.2 Vehicle access to and around the site 6.2.1 The completed building will have a total floor area of between approximately 2,880m² and as such, Table 19 of Minimum access route specification Dimension BS 9999 recommends that fire and rescue service access is provided to at least 15% of the perimeter in buildings of this size and which are not fitted with fire mains. The proposed building will have 25% perimeter access and also Width between kerbs 3.7 m be provided with a fire main, which is in excess of the minimum requirements. Width between gateways 3.1 m 6.2.2 In order to substantiate perimeter access as an enhancement, it is proposed to add access points within the site fencing separating the street, in proximity to the north-western corner of the building. Turning circle between kerbs 16.8 m

6.2.3 The fire and rescue service vehicle access to and around the building will be via Deeble road as presented in Figure Turning circle between walls 19.2 m 5, which will enable a pump appliance to be located within 18m and line of sight of the entrance to the protected northern stair and the dry riser inlet. Clearance height 3.7 m

6.2.4 Any secured gates providing access to the building elevations noted above should either be unlocked before the Carrying capacity 12.5 tonnes fire and rescue service arrive on site, or be quickly and easily openable by fire and rescue service personnel. 6.2.5 It should be ensured that either turning facilities or suitable vehicle circulation routes are provided on the main road (Deeble road) so that vehicles are not required to reverse for a distance greater than 20 m. Moreover, the road and all other vehicle access routes should comply with the requirements presented in Table 9, as a minimum. The local fire and rescue service may have different requirements than those noted in Table 9 – it should be confirmed that the access provided is suitable for their fleet of vehicles. 6.3 Firefighting facilities provided within the development 6.3.1 As the building does not include any floors in excess of 7.5m above ground floor level, no firefighting shafts are proposed. Fire and rescue service operations will be via the two protected stairs instead. 6.3.2 Primary access to the building will be via the northern protected stair which also includes the dry riser. Each full landing of the stair will include a dry riser outlet from where the firefighters can conduct operations and reach any area of each floorplate within 45m along a route suitable for laying hose. 6.3.3 In order to facilitate fire-fighting, it is also recommended that a premises information box is also located near the main fire alarm panel. 6.4 Water supplies 6.4.1 Hydrants should be provided to within 90 m of the accessible perimeter of the building, and within 90 m from the Figure 5 – Indicative FRS access routes dry riser inlets for the north stair. The local fire and rescue service should be consulted with respect to the availability of hydrants on / near the site. The existing hydrants should be located within 90m from the dry riser

TX 130063 (Issue 1) Page 16 of 29 Fire Safety Strategy Report February 2019 Kettering Science Academy

Life-safety power supplies Table 10 – Fire extinguisher types and application guidance 6.4.4 Life-safety power supplies are necessary for the emergency lighting, illuminated signage, fire detection and alarm, Medium Colour code Application Do NOT use for and the automatic fire barriers. These should be provided with a minimum standby power supply through either a battery, a UPS, or a diesel-generator. Water White Class A fires Liquid, electrical, metal or cooking fires 6.4.5 It is expected that the life-safety systems mentioned above will be provided with back-up power through provision of suitable internal or external batteries. Powder Blue Class A, B or C fires Metal or cooking fires

6.4.6 Life-safety power supplies should be provided and protected in accordance with BS 8519 [46], or in accordance Foam Cream Class A or B fires Electrical*, metal or cooking fires with the relevant standard for the life-safety system. CO2 Black Class B fires Metal or cooking fires 6.5 First-aid firefighting 6.5.1 First-aid firefighting provisions should be assessed and provided as part of the Fire Risk Assessment, including * AFFF Foam extinguishers may be used for electrical fires up to 35 kV (dielectric test) and where operated consideration for the day-to-day management of the provisions. from a distance of at least 1 m. 6.5.2 Portable extinguishers should comply with BS EN 3-7 [47] and BS EN 3-10 [48], to be inspected and maintained in

accordance with BS 5306-3 [49].

6.5.3 Where practical, fire extinguishers are to be securely hung on wall brackets. Where this is impractical, extinguishers

are to be placed on a suitable base plate (not on the floor). To assist in lifting, the carrying handle of larger, heavier extinguishers should be approximately 1m from the floor, but smaller, lighter extinguishers may be mounted at a higher level. 6.5.4 Fire blanket containers to be positioned to allow the blanket to be withdrawn quickly and easily. In this respect, the base of the container should be positioned not less than 1.5m from floor level. Fire blankets are to be located in the vicinity of the fire hazard they are to be used on, but in a position that can be safely accessed in the event of a fire e.g. on the escape route. 6.5.5 In general, fire points should be located at all storey exits, within specific areas presenting a significant fire risk and to ensure coverage of at least one fire point for every 200m2 of floor area. The type and size of extinguisher(s) at each fire point should be chosen in accordance with the guidance in BS 5306-8 [50]. 6.5.6 The type and size of extinguisher(s) at each fire point will be chosen in accordance with the guidance given in BS 5306 [27], as summarised by Table 10 and the classification of fire fuel hazards summarised as follows:

 Class A – fires involving solid materials, usually of an organic nature (general hazards);

 Class B – fires involving liquid or liquefiable solids (such as liquid fuels, lubricants, paints, etc.);  Class C – fires involving gasses;  Class D – fire involving metals; and

 Class F – fires involving cooking media (vegetable or animal oils or fats). 6.5.7 Fire blankets are typically provided for extinguishing cooking fires. Should suitable extinguishers for cooking or metal fires be required, it would be recommended that advice from a specialist be sought.

TX 130063 (Issue 1) Page 17 of 29 Fire Safety Strategy Report February 2019 Kettering Science Academy

7. FIRE SAFETY MANAGEMENT

7.1 Overview 7.3.2 In workplaces, the responsible person is the employer. In other cases, the owner or person in control of the 7.1.1 Management procedures have a pivotal role to play in fire prevention, control and evacuation of occupants should premises is the responsible person. a fire incident occur. Within domestic dwellings, this management is the responsibility of tenants, supported by 7.3.3 Under the Order, the ‘responsible person’ must implement a fire management plan, including the undertaking of the building fire safety design and handover of fire safety information. In all other areas, the Regulatory Reform regular fire risk assessments. The assessment should be reviewed regularly and reassessed if the use of the building (Fire Safety) Order 2005 (FSO) places legal obligations on management. has been varied or a material alteration has been made. The significant findings must be recorded, along with the 7.1.2 This section is intended to introduce the FSO, its obligations and provide initial guidance in fulfilling these duties. measures taken to address the risks identified. A competent person should carry out the fire risk assessment. It is the responsibility of the landlords/ building management to ensure that all fire safety systems within the 7.3.4 The act also extends the duties and obligations of the responsible person to anyone who has any extent of control common areas are tested and maintained to ensure their continuous effectiveness. The landlords/ building over the premises. Some examples include a branch manager, building supervisor, the facilities management management need to be aware of all fire safety features provided and their purpose. company and the head teacher of a school. 7.1.3 This fire strategy is based on the assumption that there will be appropriate fire safety management of the premises 7.4 General responsibilities of the Fire Safety Manager when in use, including during community use. 7.4.1 Management of fire safety must be integrated with all other management systems. If this management is lacking, 7.1.4 The responsible person(s) for the premises should ensure that all fire safety arrangements being maintained are then there is a danger that all the other areas such as security measures and alarm systems will be ineffective. To accounted for as part of their fire risk assessment(s). ensure there is no doubt as to where the responsibility for fire safety rests, and to enable consistency of approach, it is important that each establishment appoints a designated Fire Safety Manager. This should be a senior 7.1.5 The remainder of this section provides guidance regarding management issues identified during the strategic appointment preferably at Head or Deputy-Head level. It may be possible to appoint a professional to take on this development of the fire safety strategy for this building. This may be utilised to inform the ongoing fire risk role but that will depend on the size of the premises, costs, etc. assessment for the building, which should monitor the degree to which these items are being upheld in practice. 7.4.2 The appointed person should have the necessary authority and powers of sanction to ensure that standards of fire 7.1.6 It is important that management are aware of their responsibilities detailed in this document and agree that they safety are maintained. The main duties of the Fire Safety Manager include: are sufficiently capable of adequately performing them. Effective arrangements should be put in place to manage all aspects of fire safety in the premises and the details of those arrangements need to be recorded, e.g. within a  Managing the building to minimise the incidence of fire (fire prevention); e.g. good housekeeping and fire safety management plan. security; 7.1.7 In accordance with BS 9999, there are two management system levels. One of which should be implemented and  Producing and updating the Emergency Fire Plan; are summarised in Table 13.  Being aware of all of the fire safety features provided and their purpose; Table 11 – Management Levels  Being aware of any particular risks on the premises; Management Level Robustness Minimum assurance Conformity  Being aware of their responsibilities towards disabled people; system type  Being in attendance on the premises whenever members of the public are present or when the building is Conformity with a management occupied. It is acceptable for a competent person other than the fire safety manager to be in attendance at 1 Enhanced Best Practice High level of assurance level such as PAS 7 such times, provided that this person has been delegated in writing and that cover is not interrupted;

Adequate level of Conformity with requirements  Liaising with the fire authority, the licensing authority and other relevant enforcing authorities; 2 Adequate Good Practice assurance of legislation  Ensuring that all necessary and appropriate communication systems are in place to deal with any fire incident;

7.2 Fire safety management documentation  Monitoring the adequacy and ensuring the regular maintenance of fire-fighting equipment; 7.2.1 Under Regulation 38 of the Building Regulations, this fire safety strategy report should form part of the information  Ensuring fire escape routes and fire exits are kept unobstructed and doors operate correctly; handed over to the management company to enable them to enact fire safety management in the building.  Ensuring that fire detection and protection systems are maintained, tested and proper records are kept; and 7.2.2 It is recommended that adequate premises information for the fire and rescue service is provided on site in a suitable manner, e.g. premises information box or similar. Further guidance relating to the format of this  Dealing with individuals who sabotage or tamper with safety systems, ignore smoking policy or block exits. information can be obtained from the London Fire Brigade Fire Safety Team or in Annex O of BS 9999. 7.5 Specific fire safety management requirements 7.3 Regulatory Reform (Fire Safety) Order 2005 7.5.1 Good housekeeping is required to ensure that the effectiveness of the fire safety provisions is maintained. This 7.3.1 The Fire Safety Order came into effect in October 2006 and applies to all non-domestic premises in England and includes the adequate provision for the disposal of waste and / or rubbish. Where appropriate, these facilities will Wales, including the common parts of blocks of flats or houses in multiple occupation. The ‘responsible person' be emptied daily, and the rubbish stored in a suitable area outside the building. Maintenance procedures will be has a duty to make the premises safe and must undertake regular fire risk assessments. It is the responsible person developed to ensure that all equipment and services are able to operate effectively. Maintenance staff will be who will be held accountable under the new legislation for any breaches in fire safety. trained in the importance of the fire safety systems and planned maintenance programmes developed.

TX 130063 (Issue 1) Page 18 of 29 Fire Safety Strategy Report February 2019 Kettering Science Academy

7.5.2 It is recommended that all held-open doors should be programmed to release overnight to reduce the risk of these distorting. They should also be checked regularly to ensure they close correctly on activation of the fire alarm. 7.5.3 Service risers and storage cupboards, being fire doors that are not provided with automatic closing devices, are to be kept locked shut whenever these are not in use. 7.5.4 Escape routes should generally have wall and ceiling linings achieving a Class 0 surface spread of flame standard, apart from permitted exceptions noted in this report. These finishes must be maintained for the life of the building and manufacturer’s guidelines should be followed with respect to maintenance and replacement of their products. Display features or items such as posters, artwork pieces, etc. may be included with appropriate consideration, justification and on-going control. 7.5.5 Management should ensure that any maintenance personnel working in the roof areas are fully briefed with regards to the evacuation procedures in case of fire, and are fully able to navigate all the roof escape routes, including the access hatches, unaided. 7.5.6 Management should ensure that the security strategy for the school allows for the deactivation of magnetic locks in the event of an out-of-hours fire. In the event of an out-of-hours fire, member of the public should be allowed to evacuate via the same routes that would be available during school use. 7.5.7 Disabled persons should be briefed into the evacuation / refuge procedures for the school. Accompanying staff should also be aware of the procedures such that they may assist if required. The school are to develop procedures for the evacuation of disabled persons. These should not rely on the fire and rescue service for assistance. Disabled persons include those with mobility, sensory or cognitive impairments. 7.5.8 Suitable assembly points should be identified that are remote from the access routes used by the fire and rescue service. 7.5.9 Security gates should not restrict egress away from the building to assembly points. If these are to be provided with lock and keys, staff should be in possession of the keys to the gates, such that they may open the gates to permit further escape away from the building. Staff should all be aware of their responsibilities with respect to evacuation of pupils within a fire scenario, including non-teaching staff.

TX 130063 (Issue 1) Page 19 of 29 Fire Safety Strategy Report February 2019 Kettering Science Academy

8. DESIGNER’S ASSESSMENT FOR FIRE SAFETY DURING CONSTRUCTION

8.1 Introduction 8.1.1 The Construction (Design and Management) Regulations 2015 (CDM 2015) [1] sets out what designers are required to consider to protect those involved in the construction or ongoing use of a project. As part of this legislation, designers are required to provide consideration of specific challenges presented by their design, and to remove, reduce or consider how risk would be suitably managed, whilst this can influence the design of the building. 8.1.2 The Fire Protection Association (JCOP [2]) and the Health and Safety Executive (HSE) (HSG168 [3]) issue guidance on identifying and managing fire precautions during construction works, which should be consulted by the principle contractor or their specialist advisor when developing their construction fire safety plan. This guidance is also utilised within this designer’s risk assessment. 8.1.3 Ultimately, the provision of a suitable degree of fire safety within the construction site will be the responsibility of the principle contractor, supported by their fire safety specialist (where appointed). This section provides initial consideration of solutions which may provide a suitable degree of fire safety during construction within the constraints of the permanent design. 8.1.4 This section is not intended to be exhaustive or to provide comprehensive solutions. The intention of this section is to outline possible fire safety solutions to demonstrate that an adequate level of fire safety during construction is viable, and how this may be achieved. The principle contractor may utilise and develop the following proposals, or implement alternative solutions where considered preferable and providing a suitable degree of fire safety. 8.2 Key fire safety challenges 8.2.1 Developing educational buildings on a larger existing site presents certain challenges during the construction period for fire safety. These may include:

 Ensuring that means of escape from the existing areas are not adversely affected;  Ensuring that fire and rescue service provisions for the existing areas are being maintained;

 Limiting possible fire spread in between the construction site and the existing neighbouring buildings. 8.3 Possible suitable construction solution 8.3.1 It is expected that a full construction phase fire safety strategy be developed to be implemented on site during construction. This strategy should include an assessment on the likely impact of the site on the existing areas and ensure that adequate mitigation is proposed. It is expected that procedures will be employed to evacuate both the construction site and the neighbouring school building in a fire scenario on either side of the hoarding line. 8.3.2 With respect to means of escape of operatives on site, to meet the recommendations of JCOP and HSG168, at least one protected stair should be provided from the building, assuming that temporary access will be provided throughout the building to enable access to all haki stairs and internal stairs. It would be recommended that the proposed stair cores be utilised for this purpose, including suitable security / safety provisions to separate occupied areas from the construction areas. Enclosure of these stairs during construction would require that any penetrations into the core are temporarily fire-stopped, until such time that the permanent fire-stopping is installed. Temporary self-closing fire doors should also be provided to each protected core, and these should achieve a rating of FD30S or better. 8.3.3 It would be recommended that haki stairs remain in place until such time that the proposed stairs can be safely utilised and are available for beneficial use. Any early removal of the haki stairs should be subject to conducting a fire risk assessment and implementing suitable alternative control measures. 8.3.4 Control measures such as no storage zones, designated storage areas and policies for the daily removal of waste are recommended to assist with the prevention of combustibles accumulating in escape routes.

TX 130063 (Issue 1) Page 20 of 29 Fire Safety Strategy Report February 2019 Kettering Science Academy

9. REFERENCES

[18] BSI, “BS EN 1634-3:2004 Fire resistance and smoke control tests for door and shutter assemblies, openable windows and elements of building hardware. Smoke control test for door and shutter assemblies,” British [1] BSI, “BS 9999:2017 Code of practice for fire safety in the design, management and use of buildings,” British Standards Institution, London, 2004. Standards Institute, London, 2017. [19] BSI, “BS 5266-1:2011 Emergency lighting - Part 1: Code of practice for the emergency lighting of premises,” British [2] FPA, “Fire prevention on construction sites (9th edition),” Fire Protection Association, Moreton in Marsh, 2015. Standards Institution, London, 2011. [3] HSE, “Construction (design and management) regulations 2015 (CDM 2015) - Impact assessment,” Health and [20] BSI, “BS EN 1838:1999 Lighting applications. Emergency lighting,” British Standards Institution, London, 1999. Safety Assessment, London, 2015. [21] BSI, “BS EN 60598-2-22:1999 Luminaires - Part 2-22: Particular requirements - Luminaires for emergency lighting,” [4] BSI, “PD 7974-0:2002 Application of fire safety engineering principles to the design of buildings. Guide to design British Standards Institution, London, 1999. framework and fire safety engineering procedures,” British Standards Institution, London, 2002. [22] BSI, “BS 5499-4:2013 Safety signs. Code of practice for escape route signing,” British Standards Institution, [5] BSI, “BS 5839-1:2013 Fire detection and fire alarm systems for buildings - Part 1: Code of practice for design, London, 2013. installation, commisioning and maintenance of systems in non-domestic premises,” British Standards Institution, London, 2013. [23] BSI, “BS 7671:2008+A3:2015. Requirements for electrical installations. IET Wiring Regulations. Seventeenth edition (+A3:2015),” British Standards Institution, London, 2008. [6] DCLG, “Approved Document M: Volume 2 - Buildings other than dwellings,” NBS for the Department for Communities and Local Government, London, 2015. [24] BSI, “BS ISO 3864-1:2011 Graphical symbols. Safety colours and safety signs. Design principles for safety signs and safety markings,” British Standards Institution, London, 2011. [7] DCSF, “Building Bulletin 77, Designing for pupils with special educational needs and disabilities in schools,” RIBA Enterprises on behalf of the Department for Childern, Schools and Families, London, 2005. [25] BSI, “BS 5499-4:2013 Safety signs. Code of practice for escape route signing,” British Standards Institution, London, 2013. [8] DCLG, “BB 102:2012 Designing for disabled childern and childern with special educational needs,” RIBA Enterprises on behalf of the Department for Childern, Schools and Families, London, 2012. [26] BSI, “BS 5499-10:2014 Guidance for the selection and use of safety signs and fire safety notices,” British Standards Institution, London, 2014. [9] DCSF, “Building Bulletin 99, Building framework for primary schools,” RIBA Enterprises on behalf of the Department for Childern, Schools and Families, London, 2014. [27] HSE, “Safety signs and signals. The Health and Safety (Safety Signs and Signals) Regulations 1996. Guidance on Regulations,” The Stationary Office, Norwich, 2015. [10] DCLG, “Approved Document K - Protection from falling, collision and impact,” NBS for the Department for Communities and Local Government, London, 2010. [28] BSI, “BS 5499-1:2002. Graphical symbols and signs - Safety signs, including fire safety signs. Specification for geometric shapes, colours and layout,” British Standards Institution, London, 2002. [11] BSI, “BS 8300:2009+A1:2010 Design of buildings and their approaches to meet the needs of disabled people. Codes of practice,” British Standards Institution, London, 2010. [29] BSI, “BS 476-21:1987 Fire tests on building materials and structures. - Part 21: Methods for determination of the fire resistance of loadbearing elements of construction (incorporating corrigendum No. 1),” British Standards [12] BSI, BS 5839-9:2011 Fire detection and fire alarm systems for buildings. Part 9: Code of practice for the design, Institute, London, 1987. installation, commissioning and maintenance of emergency voice communication systems, London: British Standards Institution, 2011. [30] BSI, “BS 476-22:1987 Fire tests on building materials and structures. - Part 22: Methods for determination of the fire resistance of non-loadbearing elements of construction,” British Standards Institution, London, 1987. [13] BSI, “BS EN 1125:2008 Building hardware. Panic exit devices operated by a horizontal bar, for use on escape routes. Requirements and test methods,” British Standards Institution, London, 2008. [31] BSI, “BS EN 14175-2:2003 Fume cupboards. Safety and performance requirements,” British Standards Institution, London, 2003. [14] BSI, “BS EN 54-11:2001+A1:2006 Fire detection and fire alarm systems - Part 11: Manual call points,” British Standards Institute, 2006. [32] CLEAPSS, “G9:2006 Fume cupboards in schools - Revision of DfEE BB 88,” Consortium of Local Education Authorities for the Provision of Science Services, Lonodn, 2006. [15] BSI, “BS 476-22:1987 Fire tests on building materials and structures. Methods for determination of the fire resistance of non-loadbearing elements of construction,” British Standards Institution, London, 1987. [33] BSI, “BE EN 13501-2:2016 Fire classification of construction products and building elements. Classification using data from fire resistances tests, excluding ventilation services,” British Standards Institution, London, 2016. [16] BSI, “BS EN 1634-2:2008 Fire resistance and smoke control tests for door, shutter and openable window assemblies and elements of building hardware. Fire resistance characterisation tests for elements of building [34] BSI, “BS 6262-4:2005 Glazing for buildings. Code of practice for safety related to human impact,” British Standards hardware,” British Standards Institution, London, 2008. Institution, London, 2005.

[17] BSI, “BS 476-31.1:1983 Fire tests on building materials and structures. Methods for measuring smoke penetration [35] BSI, “BS 6180:2011 Barriers in and about buildings. Code of practice,” British Standards Institution, London, 2011. through doorsets and shutter assemblies. Method of measurement under ambient temperature conditions.,” British Standards Institution, London, 1983.

TX 130063 (Issue 1) Page 21 of 29 Fire Safety Strategy Report February 2019 Kettering Science Academy

[36] BSI, “BS 6206:1981 Specification for impact performance requirements for flat safety glass and safety plastics for use in buildings (Partially replaced by BS EN 12600:2002),” British Standards Institution, London, 1981.

[37] BSI, “BS EN 12600:2002 Glass in building. Pendulum test. Impact test method and classification for flat glass,” British Standards Institution, London, 2002.

[38] BSI, “BS 5234-2:1992 Partitions (including matching linings). Specification for performance requirements for strength and robustness including methods of test,” British Standards Institution, London, 1992.

[39] BSI, “BS 5234-1:1992 Partitions (including matching linings). Code of practive for design and installation,” British Standards Institution, London, 1992.

[40] BSI, “DD 171:1987 Guide to specifying performance requirements for hinged r pivoted doors (including test methods) (Withdrawn 2012),” British Standards Institution, London, 1987.

[41] BSI, “BS 8214:2016 Timber-based fire door assemblies. Code of practice,” British Standards Institution, London, 2016.

[42] BSI, “BS 476-3:2004 Fire tests on building materials and structures. Classification and method of test for external fire exposure to roofs,” British Standards Institution, London, 2004.

[43] BRE, “BR 187, External fire spread - Building separation and boundary distances,” IHS BRE Press, Bracknell, 2014.

[44] BSI, “BS 9990:2015 Non-automatic fire-fighting systems in buildings - Code of practice,” British Standards Institution, London, 2015.

[45] BSI, “BS 8519:2010 Selection and installation of fire-resistant power and control cable systems for life safety and fire-fighting applications - Code of practice,” British Standards Institution, London, 2010.

[46] BSI, “BS EN 3.-7:2004+A1:2007. Portable fire extinguishers. Characteristics, performance requirements and test methods,” Bristish Standards Institution, London, 2004.

[47] BSI, “BS EN 3-10:2009. Portable fire extinguishers. Provisions for evaluating the conformity of a portable fire extinguisher to BS EN 3-7,” British Standards Institution, London, 2009.

[48] BSI, “BS 5306-3:2017 Fire extinguishing installations and equipment on premises. Commissioning and maintenance of portable fire extinguishers. Code of practice,” British Standards Institute, London, 2017.

[49] BSI, “BS 5306-8:2012 Fire extinguisher installations and equipment on premises. Selection and positioning of portable fire extinguishers. Code of practice,” British Standards Institution, London, 2012.

[50] BSI, “BS 5306-8:2012 Fire extinguisher installations and equipment on premises. Selection and positioning of portable fire extinguishers. Code of practice,” British Standards Institution, London, 2012.

[51] HSE, “HSG168 Fire safety in construction (2nd edition),” Health and Safety Executive, London, 2010.

[52] BSI, “BS 8524-1:2013 Active fire curtain barrier assemblies - Part 1: Specification,” British Standards Institution, London, 2013.

[53] BSI, “BS 8524-2:2013 Active fire curtain barrier assemblies - Part 2: Code of practice for application , installation and maintenance,” British Standards Institution, London, 2013.

TX 130063 (Issue 1) Page 22 of 29 Fire Safety Strategy Report February 2019 Kettering Science Academy

APPENDIX A – FIRE SAFETY MARK-UPS

TX 130063 (Issue 1) Page 23 of 29 Fire Safety Strategy Report February 2019 Kettering Science Academy NO DIMENSIONS TO BE SCALED FROM THIS DRAWING

CDM - RESIDUAL HAZARDS The following are considered to be significant risks relevant to this drawing, which could not be fully mitigated or removed through design: These areas should include 4 These areas should include 3 inner room design. 9015 inner room design. 9015

A B C D E F North Elevation 7450 7450 3640 3140 7690

D C

A A

5 5 B B WC 2.40 m² East Elevation C/O: 1,600 mm West Elevation 12 3 10 Cap: 459 WC D C Conference Room Interview Room Premises Store Staff Work Prep 2.40 m² 20.78 m² 12.07 m² 12.07 m² 20.78 m² B2 B2 B3 B2 WC South Elevation 2.40 m² 7690 7690 Library Store ICT Store A dry riser inlet should be provided within 18m and Stair 2 8.04 m² 8.04 m² WC 45.38 m² line of sight from the pump appliance access route. 2.40 m² B3 B3 All final exits from this level, including those which represent the final 1 3 The stair and the lobby serving the stair should be kept as exit from a stair, should include accessible escape routes for disabled 9015 Deputy Office Equipment Store Furniture Store fire sterile with no combustibles being proposed within. 10.07 m² 5.07 m² 10.07 m² occupants up to a designated assembly point, otherwise additional AWC Circulation 5.28 m² refuge locations would be required. These escape routes should be B2 B3 B3 4.70 m² No Exit A dry riser outlet should be provided within suitable for the use of a disabled occupant. This is likely to impact on this protected stair on each full landing. landscaping design. Additionally, in order to avoid having protected 4 20 4 C/O: 850 mm In order to enable escape in front of the lift shaft corridor on the above façade as a consequence of maintaining disabled escape routes, the C/O: 1,800 mm Cap: 60 Library ground floors, a FR30 minutes fire and smoke shutter is proposed. The 36.84 m² perimeter of the building should include a 2m wide accessible route. Cap: 300 C/O: 1,600 mm lift would stop at first floor upon activation of the alarm. This would require the disabled occupants having a choice of two B3 Cap: 266 direction of escape on this level, once outside the building. The stair and the lobby serving the stair should be kept as fire sterile with no combustibles being proposed within. Lockers and storage of combustibles should not be located in close proximity of the two main exits from the central Dining / Common room. In order to enable this area to 7450 7450 Lockers include lockers, the lockers and waste bins should be of 2.13 m² materials of limited combustibility and include sloped tops 15 to prevent storage of combustibles. ICT (Resource) 30.20 m² W.0.16 Tray Racks & Food Waste Bins The kitchen area will not include food preparation B3 and therefore is not considered as high risk. However, in order to enable flexibility in use in the 160 future, it is recommended to include fire separation 3 Stair 1 Dining Area Common Room Circulation 3 S09 13.05 m² 100.03 m² 66.18 m² 158.19 m² 621-2-315 around the potentially high risk food preparation B2 GLAZED DOOR WITHIN C/Warea. Therefore, a FR60 minutes fire and smoke shutter is proposed. Robust management procedures should be in place to ensure the area W.0.17 Tray Racks & Food Waste Bins D.E.SCI.22A directly underneath the shutter is kept free of obstruction. 2 9015 Lockers 40 Any canopy or connection to the existing building 2.13 m² 7450 7450 TYPE 5A TYPE

621-3-351 Study Area TIMBER DOOR TIMBER should be non-combustible in order to ensure that it Lift 74.42 m² does not 1-3-351 form a medium that facilitates fire spread. 2.93 m² 2 TYPE 6A TYPE

6 B3 TIMBER DOOR TIMBER SCI.0.1890m2 D.0.T.45A W.0.18 C/O: 1,600 mm C/O: 1,800 mm Cap: 266 Cap: 300 D.0.SCI.18A 5500 C/O: 850 mm Cap: 60 5500 2 2 D.0.SCI.19B Riser (E) D.0.SCI.19A 1.00 m² TX 130063 No Exit Cleaner Circulation W.0.19 3.09 m² Riser (M) 5.28 m² AWC A3 1.00 m² Project: Kettering Science Academy Kitchen Cleaner 4.60 m² Kitchen Servery 4.37 m² Title: Fire Safety Mark-ups 22.21 m² A3 B3 Stair 3 Revision: V2.0 Scale: As shown Entrance Lobby 32.08 m² 27.18 m² 7690 7690 A3 1-3-350 Tank Room 4 27.49 m² TYPE 1A TYPE Prepared by: Alexandru Dragan Date: 11/02/19 621-3-350 TYPE 1A TYPE

TIMBER DOOR TIMBER Kitchen WC/Change 62 TIMBER DOOR TIMBER 60m2 5.04 m² 4 Small Group Room Roller Shutter over counter A3 Plant Room 14.07 m² Checked by: Codrin Florescu Date:SCI.0.1911/02/19 13.03 m² W.0.20 Small Group Room 14.07 m² B2 210m2 10 A3 Trenton Fire - Mark-up Legend Kitchen Kitchen Refuse Store B2 15.85 m² 6.16 m² C/O: 1,600 mm A3 A3 Cap: 459 1 1 60 minutes fire resistance SCI.0.22 W.0.21 30 minutes fire resistance

60 minutes fire rated fire and smoke shutter 7450 7450 3640 3140 7690 1-3-350 External Glazed Canopy 62

TIMBER DOOR TIMBER over linking footpath

TYPE 1A TYPE 30 minutes fire rated fire and smoke shutter 621-3-350 TIMBER DOOR TIMBER 60m2 A B TYPE E C D E F FD60SHANDED 1A TYPE Fire door SCI.0.20 6m minimum 6m offset 621-2-320 W.0.22 These areas shouldSECURITY include RATED inner SOLID room DOOR design. Please define the use of these areas. These areas should include inner room design. P01 PLANNING APPLICATION 11.02.19 DLB RJT FD30S Fire door Revision Date Drn Chk total FD30 Fire door Localised lightly refurbished areas are beyond This document references the following files:- D.0.SCI.20A 5500 W.0.23 W.0.24 W.0.25 the scope W.0.26of this review.D.E.STA.9A It has been assumedW.0.27 W.0.28 Reference Name Status Revision BRO046-XX-ZZ-M3-A-0001 S0 P01.1 stair FD60 Fire door that the existing condition has been retained such that the new condition created therein is 17m2 Proposed fire main inlet 2m2 D.0.T.50A no less satisfactory. These areas have not T.0.49 WC WC AWC D.0.T.49A T.0.50 been reviewed with respect to compliance with Client Proposed fire main outlet 4m2 2.40 m² 2.40 m² 4.40 m² 2m2T.0.48 mai 1 parts B1 to B5. Brooke Weston Trust SCI.0.2111m2 Kettering Science Academy TYPE 2 TYPE Escape route D.0.T.48A D.0.T.51A 621-3-350 TIMBER DOOR TIMBER total Project EscapeD.0.SCI.21A route 2m2T.0.47 T.0.51 D.0.T.47A 2m2 KSA New Block D.0.T.52A 55m2 stair Final exit 2m2 T.0.52 Cleaner Lockers Circulation T.0.46 2m2 2.22 m² 3.08 m² 28.04 m² 55m2 38m2 54m2 Drawing Title D.0.RIS.12A D.0.T.46A D.0.T.53A Plan-GA-L0(Ground) CIR.0.13 Disabled RIS.12refuge including EVC T.0.53 General Arrangement Plan 2m2 Ground Floor D.0.CIR.13A D.0.CIR.13B D.0.RIS.11A D.0.RIS.10A Suitability Status Notes: RIS.11 TYPE 29 RIS.10 S2 - Suitable for Information 621-3-356The fire safety strategy developed up toT.0.54 4m2this stage is4m2 WC WCEHB.0.12AWC EHB.0.13 3m2 EHB.0.14 GLAZED DOORS WITHIN C/W D.0.T.54A D.0.EHB.12A2.40 m² 2.40 m² 4.40 m² D.0.EHB.13A D.0.EHB.14A Job No. Scale Size Rev still at high level only and subject to coordination withD.0.EHB.11A T.0.55 180799 As indicated @ A1 P01 the design team and agreement with building control Drawing Number 227m2 including their statutory consultation with the localEHB.0.11 fire TYPE 1 TYPE 1 D.0.T.55A ------and rescue service. D.0.CIR.14A 621-3-350 621-3-350 BRO046 PEV 01 00 DR A 9010 TYPE 48 TIMBER DOOR TIMBER DOOR Client Code Originator Zone Level Type Role Number 621-3-360 Unless otherwise shown, all fire safety provisions N should be as per the fire safety strategy report, BS 9999 and the documents referenced therein. 0m 2m 4m 6m 8m 10m D.0.RPL.04D 2m2T.0.80 total VISUAL SCALE 1:100 @ A1 T 0345 045 0050 www.pickeverard.co.uk 1 00(Ground) Proposed General Arrangement Plan This drawing is issued for the sole and exclusive use of the intended recipient and is 621-2-315 9010 1 : 100 621-3-356 subject to copyright in favour of Pick Everard. Pick Everard does not accept any responsibility or liability whatsoever for its use by a person other than the intended recipient. GLAZED DOOR WITHIN C/W DOOR WITHIN GLAZED GLAZED DOORS WITHIN C/W DOORS WITHIN GLAZED NO DIMENSIONS TO BE SCALED FROM THIS DRAWING

CDM - RESIDUAL HAZARDS The following are considered to be significant risks relevant to this drawing, which could not be fully mitigated or removed through design:

4 3 9015 9015

A B C D E F North Elevation 7450 7450 3640 3140 7690

D C

A A

S/W: 1,300mm 5 Cap: 325 5 B B WC 2.40 m² East Elevation West Elevation

WC D C 2.40 m² 28 28 WC 28 South Elevation 2.40 m² General Classroom General Classroom General Classroom 7690 55.19 m² 55.19 m² 57.00 m² 7690 A2 A2 WC Stair 2 A2 2.40 m² 20.79 m² 1 9015

AWC 4.70 m² C/O: 1,050 mm C/O: 850 mm Cap: 291 Cap: 60 4 4 C/O: 850 mm C/O: 1,050 mm Circulation Cap: 60 12.32Cap: m² 291

The stair and the lobby serving the stair should be kept as fire sterile with no combustibles being proposed within. Riser (M) 28 0.25 m² 3 A dry riser outlet should be provided within General Classroom 7450 Deputy Office ICT Hub 55.19 m² 7450 this protected stair on each full landing. 10.25 m² 10.88 m² A2 A disabled refuge is required, including an A2 A3 emergency voice communication system. C/O: 1,050 mm In order to mitigate escape past the central void from north-western classroom, Cap: 291 an additional escape door should be provided which should enable occupants to escape through adjoining classroom. The escape route should be 3 Circulation Stair 1 Class Resource 3 maintained as available at all times using special management provisions. 68.85 m² 12.69 m² 20.25 m² A3 The partition to these classrooms should achieve FR30 minutes integrity and insulation in support of lobby protection to the stairs.

A3 These doors should swing in both directions. Central Resources In order to mitigate escape past the central void from south-western classroom, 2 17.86 m² 28 an additional escape door should be provided which should enable occupants 9015 General Classroom to escape through adjoining classroom. The escape route should be 7450 55.19 m² 7450 maintained as available at all times using special management provisions. Riser (M) Circulation Lift 28.66 m² 0.31 m² 3.12 m² A2 A disabled refuge is required, including an emergency voice communication system. C/O: 1,050 mm The stair and the lobby serving the stair should be kept as Circulation C/O: 850 mm Cap:13.13 m²291 fire sterile with no combustibles being proposed within. Cap: 60 2 2 C/O: 850 mm Riser (E) C/O: 1,050 mm TX 130063 1.00 m² Cap: 291 Cap: 60

Riser (M) Project: Kettering Science Academy 1.00 m² Title: Fire Safety Mark-ups 28 28 Stair 3 28 Revision: V2.0 Scale: As shown 20.79 m² ICT Classroom ICT Classroom General Classroom Prepared by: Alexandru Dragan Date: 11/02/19 7690 68.93 m² 66.33 m² 57.00 m² 7690 Checked by: Codrin Florescu Date: 11/02/19 A2 A2 A2

Trenton Fire - Mark-up Legend

S/W: 1,300mm 1 Cap: 325 1 60 minutes fire resistance

30 minutes fire resistance

60 minutes fire rated fire and smoke shutter 7450 7450 3640 3140 7690 30 minutes fire rated fire and smoke shutter A B C D E F FD60S Fire door External Glazed Canopy P01 PLANNING APPLICATION 11.02.19 DLB RJT Roof Line FD30S Fire door Revision Date Drn Chk FD30 Fire door This document references the following files:- Reference Name Status Revision FD60 Fire door BRO046-XX-ZZ-M3-A-0001 S0 P01.1

Proposed fire main inlet

Client Proposed fire main outlet Brooke Weston Trust Escape route Kettering Science Academy Project Escape route KSA New Block Final exit EXISTING BUILDING Drawing Title Plan-GA-L1(First) Disabled refuge including EVC General Arrangement Plan First Floor Suitability Status Notes: S2 - Suitable for Information The fire safety strategy developed up to this stage is Job No. Scale Size Rev still at high level only and subject to coordination with 180799 As indicated @ A1 P01 the design team and agreement with building control Drawing Number including their statutory consultation with the local fire ------and rescue service. BRO046 PEV 01 01 DR A 9011 Client Code Originator Zone Level Type Role Number Unless otherwise shown, all fire safety provisions N should be as per the fire safety strategy report, BS 9999 and the documents referenced therein. 0m 2m 4m 6m 8m 10m

VISUAL SCALE 1:100 @ A1 1 01(First) Proposed General Arrangement Plan T 0345 045 0050 www.pickeverard.co.uk This drawing is issued for the sole and exclusive use of the intended recipient and is 9011 1 : 100 subject to copyright in favour of Pick Everard. Pick Everard does not accept any responsibility or liability whatsoever for its use by a person other than the intended recipient. NO DIMENSIONS TO BE SCALED FROM THIS DRAWING

CDM - RESIDUAL HAZARDS The following are considered to be significant risks relevant to this drawing, which could not be fully mitigated or removed through design:

4 3 9015 9015

A B C D E F North Elevation 7450 7450 3640 3140 7690

D C

A A

S/W: 1,300mm 5 Cap: 325 5 B B WC

2.40 m² East Elevation West Elevation

WC D C 2.40 m² 56 28 WC South Elevation Lecture Theatre 2.40 m² General Classroom 111.44 m² 7690 57.00 m² 7690 A2 WC Stair 2 A2 2.40 m² 20.10 m² 1 9015

C/O: 850 mm C/O: As shown AWC 4.70 m² C/O: 1,050 mm C/O: 850 mm Cap: 60 Cap: 60 Cap: 291 Cap: 60 4 4 C/O: 850 mm C/O: 1,050 mm Cap: 60 Cap: 291 The stair and the lobby serving the stair should be kept as fire sterile with no combustibles being proposed within. A disabled refuge is required, including an Riser (M) 4 emergency voice communication system. 0.25 m² 28 Small Group Room Cleaner

7450 Circulation General Classroom 7450 A dry riser outlet should be provided within 14.16 m² 5.58 m² 38.64 m² 55.19 m² this protected stair on each full landing. A2 A3 A2 Please consider the proposal to add an access hatch for the roof for maintenance staff within the protected stair at this location. C/O: 1,050 mm Cap: 291 The partition to these classrooms should achieve FR30 minutes integrity and insulation in support of lobby protection to the stairs. 3 Circulation Stair 1 3 These doors should swing in both directions. 69.01 m² 12.90 m² Plant Room Please define the plant proposed within this area. 40.57 m² Access for the roof through the plant room is not permitted. A3 Please consider the proposal to relocate within the stairs. UP In order to mitigate escape past the central void from classroom 02-019, an 2 28 additional escape door should be provided which should enable occupants to 9015 General Classroom escape through classroom 02-018. The escape route should be maintained as 7450 55.19 m² 7450 available at all times using special management provisions. Riser (M) 0.23 m² Lift 3.05 m² A2 A disabled refuge is required, including an emergency voice communication system.

C/O: 1,050 mm The stair and the lobby serving the stair should be kept as Cap: 291 C/O: 850 mm fire sterile with no combustibles being proposed within. Cap: 60 2 2 TX 130063 Riser (E) C/O: 1,050 mm C/O: 850 mm 1.00 m² Cap: 291 Cap: 60

Riser (M) Project: Kettering Science Academy 1.00 m² Title: Fire Safety Mark-ups Revision: V2.0 Scale: As shown 28 28 Stair 3 28 20.10 m² General Classroom General Classroom Class Resource General Classroom Prepared by: Alexandru Dragan Date: 11/02/19 7690 55.19 m² 55.19 m² 23.83 m² 57.00 m² 7690 Checked by: Codrin Florescu Date: 11/02/19 A2 A2 A2 A2

Trenton Fire - Mark-up Legend

S/W: 1,300mm 1 Cap: 325 1 60 minutes fire resistance

30 minutes fire resistance

60 minutes fire rated fire and smoke shutter 7450 7450 3640 3140 7690 30 minutes fire rated fire and smoke shutter

FD60S Fire door A B C D E F P01 PLANNING APPLICATION 11.02.19 DLB RJT FD30S Fire door Revision Date Drn Chk FD30 Fire door This document references the following files:- Reference Name Status Revision FD60 Fire door BRO046-XX-ZZ-M3-A-0001 S0 P01.1

Proposed fire main inlet

Client Proposed fire main outlet Brooke Weston Trust Escape route Kettering Science Academy Project Escape route KSA New Block Final exit Drawing Title Plan-GA-L2(Second) Disabled refuge including EVC General Arrangement Plan Second Floor Suitability Status Notes: S2 - Suitable for Information The fire safety strategy developed up to this stage is Job No. Scale Size Rev still at high level only and subject to coordination with 180799 As indicated @ A1 P01 the design team and agreement with building control Drawing Number including their statutory consultation with the local fire ------and rescue service. BRO046 PEV 01 02 DR A 9012 Client Code Originator Zone Level Type Role Number Unless otherwise shown, all fire safety provisions N should be as per the fire safety strategy report, BS 9999 and the documents referenced therein. 0m 2m 4m 6m 8m 10m

VISUAL SCALE 1:100 @ A1 1 02(Second) Proposed General Arrangement Plan T 0345 045 0050 www.pickeverard.co.uk This drawing is issued for the sole and exclusive use of the intended recipient and is 9012 1 : 100 subject to copyright in favour of Pick Everard. Pick Everard does not accept any responsibility or liability whatsoever for its use by a person other than the intended recipient. NO DIMENSIONS TO BE SCALED FROM THIS DRAWING

CDM - RESIDUAL HAZARDS The following are considered to be significant risks relevant to this drawing, which could not be fully mitigated or removed through design:

4 3 9015 9015 North Elevation A B C D E F

D C

A A

5 5 B B East Elevation Direction of Fall West Elevation (0.2 degrees) D C

South Elevation

1 9015

Louvred Screen 4 4

Modular Rooflights (above Circulation)

Special limitations apply

for rooflights as per Plant AHU Section 34 of BS 9999.

Modular Rooflight Modular Rooflight (above Atrium) (above Atrium)

3 3

Access for the roof through the plant room is not permitted. Please consider the proposal to relocate within the north stair.

2

9015 AccessHatch Modular Rooflight Modular Rooflight (above Atrium) (above Atrium) Lift Well Over-run

2 2 TX 130063 Modular Rooflights (above Circulation) Project: Kettering Science Academy Title: Fire Safety Mark-ups Revision: V2.0 Scale: As shown Prepared by: Alexandru Dragan Date: 11/02/19 Checked by: Codrin Florescu Date: 11/02/19

Trenton Fire - Mark-up Legend

1 1 60 minutes fire resistance

30 minutes fire resistance

60 minutes fire rated fire and smoke shutter 30 minutes fire rated fire and smoke shutter A B C D E F FD60S Fire door P01 PLANNING APPLICATION 11.02.19 DLB RJT FD30S Fire door Revision Date Drn Chk FD30 Fire door This document references the following files:- Reference Name Status Revision FD60 Fire door BRO046-XX-ZZ-M3-A-0001 S0 P01.1

Proposed fire main inlet

Client Proposed fire main outlet Brooke Weston Trust Escape route Kettering Science Academy Project Escape route KSA New Block Final exit Drawing Title Plan-GA-L3(Roof) Disabled refuge including EVC General Arrangement Plan Roof Plan Suitability Status Notes: S2 - Suitable for Information The fire safety strategy developed up to this stage is Job No. Scale Size Rev still at high level only and subject to coordination with 180799 As indicated @ A1 P01 the design team and agreement with building control Drawing Number including their statutory consultation with the local fire ------and rescue service. BRO046 PEV 01 RF DR A 9013 Client Code Originator Zone Level Type Role Number Unless otherwise shown, all fire safety provisions N should be as per the fire safety strategy report, BS 9999 and the documents referenced therein. 0m 2m 4m 6m 8m 10m

VISUAL SCALE 1:100 @ A1 1 03(Roof) Proposed General Arrangement Plan T 0345 045 0050 www.pickeverard.co.uk This drawing is issued for the sole and exclusive use of the intended recipient and is 9013 1 : 100 subject to copyright in favour of Pick Everard. Pick Everard does not accept any responsibility or liability whatsoever for its use by a person other than the intended recipient. NO DIMENSIONS TO BE SCALED FROM THIS DRAWING

CDM - RESIDUAL HAZARDS The following are considered to be significant risks relevant to this drawing, which could not be fully mitigated or removed through design: Retaining Wall due to proposed change in levels. Refer to Civils information for details. 63 Allow for suitable handrailing to top of retaining wall Shelter .4m Existing hedgerow to be adjusted to suit proposed external layout. Access for fire and rescue service personnel. Note: additional planting may be required Subject to Approval Allow to create pathways as Maintainence Access 2m wide perimeter maintainence only Existing fenceline to be retained Refer to Civils information for proposed indicated, for refuse access. fence and gate pathway. or similar approved. levels to rear of new block Finish to match existing. 2 Refer to Civils information for details Area = 16m approx. 1800 W ht W ht 2.6M 62.98 66.66 66.39 65.81 65.12 64.46 63.91 2.6M 63.45

66.15 6 3 . 17 62.49 2000

6 2 .6 .6 2 0 6 6 .4 6 6 2000 2500 66.61

66.39 2000 Existing Grass Area

63.91

2

4 t . 1 n

4 2 . e

6 f 6 6 o Allow to blend new pathway with m Existing Grass Area p k existing perimeter pathway o n T a b 62.4 m Top of embankment to be adjusted to suit E 66.44 proposed new school block. Allow to blend top of embankment line with existing. Refer to Civils information for details

65.42 63.83 6

66.38 66.36 5 4 2

6 62.31 Proposed Site Plan (Additional Works) .

3 9

1

3

4

.

. 1 . 1 : 1000

3 2 9002

2

6

6

6 Allow to blend new tarmacadam finish Existing Steps and handrailing to field to

with existing perimeter pathway. 3535 be retained and new block pathway to be Refer to Civils information for details extended / adjusted to meet up with steps

7 6343 4

8 5

1

.

.

3

.

5

3

2

6 66.46 6

66.41 65.91 6 Note:

6

6

. 4 63.38 .2 Subject to Fire Consulatant Review. 6 64.78 62

Refer to Civil Engineer's Information for Finished Floor Level.

Proposed FFL = +66.300 64.43 6 2 . 0 2 Ownership Boundary Extent of Proposed Proposed fire and rescue service vehicle Works (external) 6 access route via the main road (Deeble

4 B

.

o 62.09

6

Road) to be within 18m and line of sight of t

6

t

o

the entrance to the northern protected stair m

All final exits, including those which represent the final exit from a stair, should include accessible escape routes for core and the dry riser inlet valve. o f 6 2 disabled occupants up to a designated assembly point, otherwise additional refuge locations would be required. E .0

m

These escape routes should be suitable for the use of a disabled occupant. This is likely to impact on landscaping It has been assumed that the school site b

a The boundary distance from the building design. Additionally, in order to avoid having protected fa ade as a consequence of maintaining disabled escape boundary is in excess of 50m on this n ç k fa ade up to the middle of the road is routes, the entire perimeter of the building should include a 2m wide accessible route. This would result in the side of the building and that no other m ç e

n

required for external fire spread calculations. disabled occupant having a choice of two direction of escape on this level, once outside the building. buildings are existing or proposed within. t These boundaries have been introduced retrospectively on the larger site, after the existing main school building was already built. As a consequence, the new site boundary represents a notional boundary as per section 35.1.2 of BS 9999, which was not taken into consideration by the design of the existing building. Therefore, there is potential for a fire scenario within the existing main building toExisting result Grass in fire Area spread towards Existing Grass Area

the new proposed building. Embankment Top of

5

In order to mitigate this condition with respect to life safety, the fire detection and alarm systems should be interlinked and include a robust, wired connection so that detection anywhere within the two buildings 8 . 64.20 1 TX 130063 results in an immediate alarm in both buildings. Furthermore, the disabled refuge EVC systems and supporting management procedures should be interconnected to cover both buildings at the same time. 6 It is critical that school management including any prospective insurers are made aware of the fact that fire spread in between the two buildings is possible from a property protection / business continuity / insurance 6.33 m point of view. Should any party not agree with the potential loss of both buildings in a fire scenario, then options could be investigated to mitigate fire spread, however this are likely to be highly onerous. Project: Kettering Science Academy Title: Fire Safety Mark-ups ExistingBuilding

6

6 Revision: V2.0 Scale: As shown

.

4 6 Prepared by: Alexandru Dragan Date: 11/02/19 Checked by: Codrin Florescu Date: 11/02/19

2000 61.89 P01 First Issue 06.02.19 JHU RJT Revision Date Drn Chk

This document references the following files:- 6338 Reference Name Status Revision BRO046-XX-ZZ-M3-A-0001 S0 P01.1

6

1

. 2000

7

7 61 .8 Dashed line denotes proposed link canopy Client between new and existing buildings 6087 6116 63.98 Brooke Weston Trust 6.08 m Kettering Science Academy

0 Project 2

.

66.42 6 Top of embankment to be adjusted to suit KSA New Block 6 proposed new school block. Allow to blend top of embankment line with existing. 66.45 66.43 66.44 66.44 66.45 Refer to Civils information for details Drawing Title F: Plan-Proposed Site 74.70 THL Allow to blend new tarmacadam finish Proposed Site Plan 66.45 with existing perimeter pathway. Refer to Civils information for details Suitability Status Existing Building S2 - Suitable for Information Job No. Scale Size Rev 61.73

6 180799 As indicated @ A1 P01

5

6

4

.

. Drawing Number 3

6

6

9 PCCT 63.89 1

6 66.36 .

6

7 BRO046 ------PEV 00 ZZ DR A 9002

6

6 Client Code Originator Zone Level Type Role Number

Refer to GA Plan for works to Existing . 2 N Building to create new access route 4

0m 2m 4m 6m 8m 10m

VISUAL SCALE 1:100 @ A1 T 0345 045 0050 www.pickeverard.co.uk 1 Proposed Site Plan This drawing is issued for the sole and exclusive use of the intended recipient and is subject to copyright in favour of Pick Everard. Pick Everard does not accept any 9002 1 : 100 responsibility or liability whatsoever for its use by a person other than the intended recipient.

www.trentonfire.co.uk t +44 (0)1869 366 545 e [email protected]

Trenton Fire Trenton Fire Murdock House LGF 30 Murdock Road 3-11 Eyre Street Hill Bicester London Oxfordshire EC1R 5ET OX26 4PP

Registered Office: Murdock House, 30 Murdock Road, Bicester, Oxfordshire OX26 4PP UK Company Registration Number: 6336226.