Last updated: 1 March 2020

Railway-related Facilities under Settlement Monitoring within Railway Protection Areas

The MTR Corporation will upload latest information when there are changes in the railway-related facilities under settlement monitoring, updates in the settlement limit for suspension or when the latest settlement level exceeds the limit for suspension.

Total number of facilities currently under settlement monitoring: 48

Number of facilities where settlement monitoring has ceased since last announcement on 1 February 2020: 0

Number of newly-added facilities under settlement monitoring since last announcement on 1 February 2020: 5

Number of facilities under settlement monitoring with relevant works currently suspended: 2

Settlement Latest Project Responsible Nearby MTR Limit for Code Project Project Type Settlement Nature Party Station/Railway Facilities Suspension Level (mm)# (mm) Kwun Tong Line Architectural Building Public 2 East Kowloon Cultural Centre Services Kowloon Bay Station 20 +5 project works Department Civil Engineering Public 4 Tseung Kwan O – Lam Tin Tunnel Civil works and Development Near Lam Tin Station 20 +6 works Department Private Ho Man Tin Station Package 1 Building 6* project (Note 1) Ho Man Tin Station 20 -24 property development project works Settlement Latest Project Responsible Nearby MTR Limit for Code Project Project Type Settlement Nature Party Station/Railway Facilities Suspension Level (mm)# (mm) Private Property development project at Building 7 project (Note 1) Near Choi Hung Station 20 -2 No.35 Clear Water Bay Road project works Private Sports Hall redevelopment of the Building Between Shek Kip Mei and 70 project (Note 1) 20 +2 City University of Hong Kong project Kowloon Tong stations works Tsuen Wan Line Public Housing Development at Underground water mains Building Public Hong Kong 91 North West Kowloon Reclamation near Cheung Sha Wan 20 -5 project works Housing Authority Site 1 (East) Station Island Line Private Redevelopment project at No. 2 Building Between Central and 18 project (Note 1) 20 -1 Murray Road project Admiralty stations works Private Redevelopment project at No.2 Building Between Central and 19 project (Note 1) 20 0 Murray Road project Admiralty stations works Private Redevelopment project at No. Building Between Wan Chai and 74 project (Note 1) 20 0 369-371 Hennessy Road project Causeway Bay stations works Private Redevelopment project at No. 2 Building Between Tai Koo and Sai 76 project (Note 1) 20 +2 Tai Cheong Street project Wan Ho stations works Redevelopment project at No. 46- Private 56 Queen’s Road East, No. 2-12 Building Between Admiralty and 90 project (Note 1) 20 -1 Anton Street and No. 1-11 Landale project Wan Chai stations works Street Settlement Latest Project Responsible Nearby MTR Limit for Code Project Project Type Settlement Nature Party Station/Railway Facilities Suspension Level (mm)# (mm) South Island Line Private Property development project on Building Ventilation building near 21 project (Note 1) 20 -2 Lee Nam Road, Ap Lei Chau project Lee Wing Street works Wong Chuk Hang Station Package Building Private 66 (Note 1) Wong Chuk Hang Depot 20 -4 1 property development project project works Private Wong Chuk Hang Station Package Building 67 project (Note 1) Wong Chuk Hang Depot 20 -1 2 property development project works

Private Wong Chuk Hang Station Wong Chuk Hang Station Package Building 89 project (Note 1) and Wong Chuk Hang 20 -1 3 property development project works Depot

Tseung Kwan O Line Private LOHAS Park Package 10 property Building Near Tseung Kwan O 24 project (Note 1) 20 +3 development project Depot works Civil Engineering Between Tiu King Leng Footbridge of Tseung Kwan O – Public 75 Civil works and Development and Tseung Kwan O 20 +2 Lam Tin Tunnel works Department stations Private LOHAS Park Package 8 property Building Near Tseung Kwan O 77 project (Note 1) 20 -4 development project Depot works Private Building 78 Works at Tseung Kwan O Depot project (Note 1) Tseung Kwan O Depot 20 +4 project works Settlement Latest Project Responsible Nearby MTR Limit for Code Project Project Type Settlement Nature Party Station/Railway Facilities Suspension Level (mm)# (mm) Civil Engineering Public Near Tseung Kwan O 79 Cross Bay Link, Tseung Kwan O Civil works and Development 20 -2 works Depot Department Tung Chung Line, Airport Express and Disneyland Resort Line Private West Kowloon Cultural District – Building 28 project (Note 1) Near Kowloon Station 20 -13 Lyric Theatre Complex project works Private Hong Kong International Airport Building Between Airport and 29 project (Note 1) 20 -8 Three-runway System project AsiaWorld-Expo stations works Civil Engineering Public Between Siu Ho Wan and 30 Tung Chung New Town Extension Civil works and Development 20 -7 works Tung Chung Station Department Public Highways Between Kowloon and 73 Central Kowloon Route Civil works 20 -13 works Department Olympic stations Private Airport Authority Office Tower Building Between Airport and 87 project (Note 1) 20 -1 Development project AsiaWorld-Expo stations works East Rail Line Private Building 37 Lo Wu Station improvement works project (Note 1) Lo Wu Station 20 -9 project works^ Private Tai Wai Station property Building 38 project (Note 1) Tai Wai Station 40 -31 development project works Barrier-free access facilities at Public Highways Between Tai Wo and 82 Civil works 20 -2 footbridge works Department Fanling stations Settlement Latest Project Responsible Nearby MTR Limit for Code Project Project Type Settlement Nature Party Station/Railway Facilities Suspension Level (mm)# (mm) Private Building 88 Lo Wu Station improvement works project (Note 1) Lo Wu Station 20 -2 project works^ West Rail Line Private Between Kam Sheung Yuen Long Station viaduct column Building 45 project (Note 1) Road and Yuen Long 20 -13 improvement works project works stations Private Property development project – Building -13 53* project (Note 1) Near Yuen Long Station 20 Grand YOHO project (Note 2) works Private Yuen Long Station property Building 56 project (Note 1) Yuen Long Station 20 -3 development project works West Kowloon Cultural District - Private 65 Xiqu Centre Subway to Austin Civil works project (Note 1) Near Austin Station 20 -3 Station works Private Industrial development project on Building Between Mei Foo and 69 project (Note 1) 20 -4 Wing Kei Road, Kwai Chung project Tsuen Wan West stations works Private Between Kam Sheung Building 72 Commercial project near Au Tau project (Note 1) Road and Yuen Long 20 -2 project works stations Private Kam Sheung Road Station Package Building Near Kam Sheung Road 83 project (Note 1) 20 -3 1 Property Development project Station works Settlement Latest Project Responsible Nearby MTR Limit for Code Project Project Type Settlement Nature Party Station/Railway Facilities Suspension Level (mm)# (mm) Private Mariners' Club Redevelopment Building 85 project (Note 1) East Tsim Sha Tsui Station 20 0 Project project works

Civil Engineering Sewerage works of development Public Near Kam Sheung Road 92 Civil works and Development 20 -1 at Kam tin South, Yuen Long works Station Department Tuen Ma Line Phase 1 Private Kai Tak Area 1F Site 2 Building 93 project (Note 1) Kai Tak Station 20 -11 development project project works

Private Kai Tak Area 1F Site 1 Building 94 project (Note 1) Kai Tak Station 20 -9 development project project works

Private Kai Tak Area 1E Site 2 Building Between Kai Tak and 95 project (Note 1) 20 -11 development project project Diamond Hill stations works

Subsidised sales flats development Building Public Hong Kong Diamond Station and 96 at Diamond Hill Comprehensive 20 -10 project works Housing Authority adjacent section Development Area Light Rail Private Yuen Long Station property Building Near Light Rail Yuen Long 61 project (Note 1) 20 -4 development project Stop works Settlement Latest Project Responsible Nearby MTR Limit for Code Project Project Type Settlement Nature Party Station/Railway Facilities Suspension Level (mm)# (mm) Private property Building 62 project (Note 1) Light Rail Tin Wing Stop 150 -83 development project works Private Property development project at Building Near Light Rail 64 project (Note 1) 20 -19 Tuen Mun Swimming Pool Stop project Swimming Pool Stop works Lift near subway of Public Highways Near Light Rail Hung Shui 71 Civil works 20 -2 Road - works Department Kiu Stop Between Light Rail Tuen Water mains works in Tuen Mun Public Water Services 80 Civil works Mun Ferry Pier Stop and 20 -3 District works Department Melody Garden Stop Between Light Rail Water mains works in Tuen Mun Public Water Services 86 Civil works Butterfly Stop and Light 20 -4 District works Department Rail Depot Stop

# The figure in each item represents the maximum movement among monitoring points as at 1 March 2020. “+” and “-“ represent raised and settled levels respectively. The figures are based on the MTR Corporation’s records.

* Relevant works were temporarily suspended.

^ Station improvement works

Note 1: The private project works concerned are subject to the regulation of the Buildings Department in accordance with the Buildings Ordinance.

Note 2: Relevant construction works were suspended during the second half of 2013 due to the settlement extent reaching its settlement limit. Preventive underpinning works for nearby railway facility are currently in progress.