Details of district wise substations for RE integration as on February-2021 (Revised) Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. In acse of line bay issue at a specified substation, developer has to select nearby substation from the list. (6) Total maximum capacity for respective EHV substation (specifically in aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

Sr. Name fo Tentative feasible Name of EHV Name of Taluka Name of Substation RE integration (in Remark No. District MW) Source S/S South 1 Bharuch Valiya 132/66KV Valia 50-70 2 Bharuch Valiya 66KV Daheli 40-50 3 Bharuch 66KV Netrang 4 Bharuch Netrang 66KV Datt Nagar 5 Bharuch Netrang 66KV Petiya 6 Bharuch Netrang 66KV Bitada 132 KV -- 7 Bharuch Netrang 66KV Mauza (Chasvad) Valia 10-15 8 Narmada Dediapada 66KV Dediapada 9 Narmada Dediapada 66KV Saddapani 10 Narmada Dediapada 66KV Chikda 11 Umargam 66KV Chimipatal (Satvan) 12 Narmada Dediapada 66KV Bal (Mozda) 13 Bharuch Ankleshwar 132/66KV Ankleshwar 50-70 14 Bharuch Ankleshwar 66KV Ankleshwar GIDC-A 50-70 15 Bharuch Ankleshwar 66KV Ankleshwar GIDC-B 132 KV 16 Bharuch Ankleshwar 66KV Ankleshwar (Urban) -- Ankleshwar 17 Bharuch Hansot 66KV Hansot 50-70 18 Bharuch Ankleshwar 66KV Panoli GIDC 19 Bharuch Ankleshwer 66KV Samor (Kosmadi) 30-40 20 Atul 220/132/66KV Atul 50-70 21 Valsad Dharampur 66KV Dharampur 22 66KV Jamanpada (Toranvera 23 Valsad Dharampur 66KV Nani Vahiyal 24 Valsad Dharampur 66KV Tiskari Talat 25 Valsad Valsad 66KV Velvachh 30-40 26 Valsad Valsad 66KV Atak Pardi (Valsad) 220 KV -- 27 Valsad Dharampur 66KV Piprol Atul 28 Valsad Valsad 66KV Valandi (Navera) 29 Valsad Valsad 66KV Magod (Meh) 30 Valsad Valsad 66KV Gundalav GIDC 31 Valsad Pardi 66KV Khadki Dungri 30-40 32 Valsad Pardi 66KV Kolak 33 Valsad Valsad 66KV Valsad City 30-40 34 Valsad Umargam 220/66KV Bhilad 50-70 35 Valsad Umargam 66KV Umargam 36 Valsad Umargam 66KV Sarigam GIDC 37 Valsad Umargam 66KV Manekpore (Manda) 220 KV 30-40 -- 38 Valsad Umargam 66KV Sanjan Bhilad 39 Valsad Umargam 66KV Vangam(Umargam-II) 40 Valsad Umargam 66KV Palgam 41 Valsad Umargam 66KV Bhilad 30-40

D:\E_Drive\RE\Web-site-Update\Feb-21\RE-Integration-66KV-Feb21-Rev-17062021.xlsx 1/33 Details of district wise substations for RE integration as on February-2021 (Revised) Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. In acse of line bay issue at a specified substation, developer has to select nearby substation from the list. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

Sr. Name fo Tentative feasible Name of EHV Name of Taluka Name of Substation RE integration (in Remark No. District MW) Source S/S South Gujarat 42 Navsari Chikhli 220/66KV Chikhli (Ambheta) 50-70 43 Dang Vaghai 66KV 44 Dang Ahwa 66KV Ahwa 45 Dang Ahwa 66KV Saputara 46 Navsari Chikhli 66KV Tankal 47 Navsari Chikhli 66KV Butlav 48 Navsari Chikhli 66KV Limzar 49 Navsari 66KV Pratapnagar (Doldha) 30-40 50 Navsari Vansda 66KV Vansda 51 Navsari Vansda 66KV Lachhakdi 52 Navsari Vansda 66KV Ankalachh 53 Navsari Tapi 66KV Chunavadi 54 Navsari Vansda 66KV Vangan 220 KV 55 Navsari Vansda 66 KV Mahuwas (Kevadi) -- Chikhli 56 Navsari Chikhli 66KV Chikhli 57 Navsari Khergam 66KV Khergam 58 Navsari Chikhli 66KV Fadvel (Matwad) 59 Navsari Chikhli 66KV Rankuwa (Manekpor) 60 Navsari Chikhli 66KV Rumla (Amadhra) 30-40 61 Navsari Chikhli 66KV Sadadvel 62 Navsari Chikhli 66KV Godthal 63 Navsari Chikhli 66KV Anaval 64 Surat Mahuva 66KV Vaheval 65 Navsari Vansda 66KV Bhinar 66 Valsad Valsad 66KV Dungri (Valsad) 67 Valsad Valsad 66KV Untadi(Malvan Bigri) 30-40 68 Navsari Chikhli 66KV Balwada (Wagaldhara) 69 Surat 220/66KV Ichhapore 50-70 70 Surat 66KV Olpad 71 Surat Olpad 66KV Saroli 72 Surat Olpad 66KV Karamla (Varod) 50-60 73 Surat Choryasi 66KV Pala 74 Surat Surat City 66KV Adajan 220 KV 75 Surat Choryasi 66KV SVNIT -- 30-40 Icchapore 76 Surat Choryasi 66KV Gujarat Hira Bourse 77 Surat Choryasi 66KV Pal 78 Surat Choryasi 66KV ( Pal-2) 30-40 79 Surat Choryasi 66KV 80 Surat Choryasi 66KV (Amroli) 30-40 81 Surat Choryasi 66KV Ichhapore 30-40

D:\E_Drive\RE\Web-site-Update\Feb-21\RE-Integration-66KV-Feb21-Rev-17062021.xlsx 2/33 Details of district wise substations for RE integration as on February-2021 (Revised) Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. In acse of line bay issue at a specified substation, developer has to select nearby substation from the list. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

Sr. Name fo Tentative feasible Name of EHV Name of Taluka Name of Substation RE integration (in Remark No. District MW) Source S/S South Gujarat 82 Surat Mandvi 220/66KV Kim 50-70 83 Surat 66KV Kamrej 30-40 84 Surat Kamrej 66KV Velanja 30-40 85 Surat Kamrej 66KV Karjan 50-70 86 Surat Mangrol 66KV Pipodara 40-50 87 Surat Mangrol 66KV Pipodara-II 40-50 88 Surat Mandvi 66KV Karanj 30-40 220 KV 89 Surat Mandvi 66KV Areth (Nogama) -- Kim 90 Surat Mangrol 66KV Fair deal Text Park 30-40 91 Surat Mandvi 66KV Umarkhadi (Maldha) 92 Surat Mangrol 66KV Vankal 15-20 93 Surat Mangrol 66KV 94 Surat Mangrol 66KV Mosali (Mangrol) 95 Surat Mangrol 66KV Palod (Kim) 30-40 96 Surat Mangrol 66KV Palod-2 30-40 97 Surat Surat City 66KV Mota Varachha 50-70 220 KV -- 98 Surat Choryasi 66KV Tapi 50-70 Utran 99 Surat Choryasi 132/66KV 50-70 100 Surat Choryasi 66KV Govalak (Udhana-B) 30-40 132 KV 101 Surat Choryasi 66KV Bhagwati -- Bhestan 102 Surat Choryasi 66KV Bhestan-B 30-40 103 Surat Choryasi 66KV Bhestan() 104 Surat 220/66KV Mota (Bardoli) 50-70 105 Surat Bardoli 66KV Bardoli 106 Surat Bardoli 66KV (Bardoli) 107 Surat Bardoli 66KV Afva(Dungar) 108 Surat Mahuva 66KV Bamaniya 30-40 109 Surat Mahuva 66KV Singod 110 Surat Mahuva 66KV Gopla (Kharvan) 111 Surat Mahuva 66KV Mahuva 112 Surat Bardoli 66KV 220 KV 113 Surat Bardoli 66KV Madhi 30-40 Mota -- 114 Surat Mandvi 66KV Mandvi (Bardoli) 115 Surat Bardoli 66KV Mota 30-40 116 Surat Kamrej 66KV Parab (Mankna) 50-70 117 Tapi Vyara 66KV Vyara 118 Tapi Vyara 66KV Borakhadi 119 Tapi Valod 66KV Degama (Bajipura) 120 Tapi Vyara 66KV Rupwada 30-40 121 Tapi Vyara 66KV Chikhalvav 122 Tapi Vyara 66KV Magarkui 123 Tapi Vyara 66KV Vyara-2

D:\E_Drive\RE\Web-site-Update\Feb-21\RE-Integration-66KV-Feb21-Rev-17062021.xlsx 3/33 Details of district wise substations for RE integration as on February-2021 (Revised) Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. In acse of line bay issue at a specified substation, developer has to select nearby substation from the list. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

Sr. Name fo Tentative feasible Name of EHV Name of Taluka Name of Substation RE integration (in Remark No. District MW) Source S/S South Gujarat 124 Surat Kamrej 66KV Sampura 30-40 125 Surat Mandvi 66KV Kasal 126 Tapi Valod 66KV Bhimpor (Kanjod) 127 Surat Bardoli 66KV Manekpore 128 Tapi Valod 66KV Valod 129 Tapi Vyara 66KV Kelkui 130 Tapi Dolvan 66KV Kalkwa 220 KV 131 Tapi Valod 66KV Virpor (Pathakwadi) Mota -- 132 Tapi Valod 66KV Karanjkhed 25-30 (Bardoli) 133 Tapi Dolvan 66KV Pathakvadi 134 Tapi Vyara 66KV Dolvan 135 Tapi Songadh 66KV Jesingpura 136 Tapi Vyara 66KV Galkuva 137 Tapi Vyara 66KV Kapadvan 138 Tapi Vyara 66KV Mangaliya (Chimer) 139 Tapi Vyara 66KV Kalakva 140 Navsari Navsari 220/66KV Navsari 50-70 141 Navsari 66KV Billimora 142 Navsari Gandevi 66KV Gandevi 143 Navsari Gandevi 66KV 30-40 144 Navsari 66KV Sultanpur(Dandi) 145 Navsari Gandevi 66 KV Chhapar (Kotha) 220 KV -- 146 Navsari Jalalpore 66KV Eroo Navsari 147 Navsari Navsari 66KV Chhapra (Navsari -B) 30-40 148 Navsari Jalalpore 66KV Dandi 149 Navsari Navsari 66KV Navsari city 30-40 150 Navsari Jalalpore 66KV 30-40 151 Navsari Navsari 66KV Vesma 10-15 152 Surat Choryasi 220/66KV Sachin (Talangpore) 50-70 153 Surat Choryasi 66KV Sachin -B 154 Surat Choryasi 66KV Vanz (Susml) 155 Surat Palsana 66KV Erthan (Lingad) 30-40 156 Surat Choryasi 66KV Kharvasa 157 Surat Palsana 66KV GETP 220 KV 158 Navsari Jalalpore 66KV Mangrol 20-25 Sachin -- 159 Surat Choryasi 66KV Khajod (Magadalla) (Talangpor 160 Surat Choryasi 66KV Jiyav (Bamroli) 30-40 e) 161 Surat Choryasi 66KV Vadod 162 Surat Choryasi 66KV Vesu 163 Surat Choryasi 66KV Bhimrad (Sarsana) 40-50 164 Surat Choryasi 66KV Vesu-2 (Magdalla) 165 Surat Choryasi 66KV Dumas

D:\E_Drive\RE\Web-site-Update\Feb-21\RE-Integration-66KV-Feb21-Rev-17062021.xlsx 4/33 Details of district wise substations for RE integration as on February-2021 (Revised) Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. In acse of line bay issue at a specified substation, developer has to select nearby substation from the list. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

Sr. Name fo Tentative feasible Name of EHV Name of Taluka Name of Substation RE integration (in Remark No. District MW) Source S/S South Gujarat 166 Surat Choryasi 66KV Pandesara 30-40 220 KV 167 Surat Choryasi 66KV Jiav (Pandesara-II) Sachin 168 Surat Choryasi 66KV Sachin -A -- (Talangpor 169 Surat Choryasi 66KV Sachin-D 30-40 e) 170 Surat Choryasi 66KV Sachin ‘C 171 Surat Choryasi 220/66KV Popada 50-70 220 KV 172 Surat Choryasi 66KV SUSM-1 -- 30-40 Popda 173 Surat Choryasi 66KV Bhatia 174 Bharuch Wagra 220/66KV Rahiyad 50-70 220 KV 175 Bharuch Wagra 66KV Samatpore (Sambheti) 50-70 Suva -- 176 Bharuch Wagra 66KV Galenda 50-70 (Rahiyad) 177 Bharuch Wagra 66KV Suva 30-40 178 Bharuch Wagra 220/66KV Dahej 50-70 179 Bharuch Wagra 66KV Dahej 180 Bharuch Wagra 66KV Luna 220 KV -- 181 Bharuch Wagra 66KV Vadadala (Dahej) 30-40 Dahej 182 Bharuch Wagra 66KV Jolva 183 Bharuch Wagra 66KV Bhesali 184 Valsad Vapi 220/66KV Vapi 50-70 185 Valsad Dharampur 66KV Motaponda (Kakadkopar) 186 Valsad Pardi 66KV Paria 187 Valsad Pardi 66KV Chival (Dhagadmal) 188 Valsad Kaparada 66KV Panas (Amdha) 189 Valsad Pardi 66KV Nimkhal 190 Valsad Pardi 66KV Kherlav 30-40 191 Valsad Vapi 66KV Kocharava(Rata Koparali) 192 Valsad Pardi 66KV Ambach (Balda) 193 Valsad Kaparada 66KV Kaparada 194 Valsad Kaparada 66KV Astol 220 KV 195 Valsad Kaparada 66KV Sutharpada -- Vapi 196 Valsad Kaparada 66KV Shahuda 197 Valsad Umargam 66KV Damanganga GIDC 198 Valsad Umargam 66KV Karembele (Nahuli) 40-50 199 Valsad Vapi 66KV Chandor 200 Valsad Vapi 66KV GIDC -Vapi 30-40 201 Valsad Vapi 66KV GIDC Vapi -III rd. Ph. 202 Valsad Vapi 66KV Dungra 30-40 203 Valsad Vapi 66KV GIDC Vapi - IV th Ph. 204 Valsad Vapi 66KV GIDC -Vapi Ph.-II 30-40 205 Valsad Vapi 66KV Morai 30-40 206 Valsad Vapi 66KV Morai-2

D:\E_Drive\RE\Web-site-Update\Feb-21\RE-Integration-66KV-Feb21-Rev-17062021.xlsx 5/33 Details of district wise substations for RE integration as on February-2021 (Revised) Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. In acse of line bay issue at a specified substation, developer has to select nearby substation from the list. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

Sr. Name fo Tentative feasible Name of EHV Name of Taluka Name of Substation RE integration (in Remark No. District MW) Source S/S South Gujarat 207 Surat Mangrol 400/220/66KV 50-70 208 Bharuch Ankleshwar 66KV Panoli GIDC-2 50-70 209 Surat Mangrol 66KV Dinod 30-40 400 KV -- 210 Surat Mangrol 66KV Kosamba Kosamba 211 Surat Mangrol 66KV Kosamba-2 30-40 212 Surat Mangrol 66KV Kharach () 213 Surat Kamrej 220/66KV Vav 50-70 214 Surat Kamrej 66KV Kosmada 40-50 215 Surat Choryasi 66KV 216 Surat Palsana 66KV 217 Surat Palsana 66KV Palsana 218 Surat Palsana 66KV Tatithaiya 30-40 219 Surat Palsana 66KV Jolva 220 Surat Choryasi 66KV Punakumbharia 220 KV -- 221 Surat Kamrej 66KV Laskan Vav 30-40 222 Surat Kamrej 66KV Laskana -2 223 Surat Kamrej 66KV Vav 30-40 224 Surat Olpad 66KV Sivan (Sayan west) 30-40 225 Surat Olpad 66KV Delad 226 Surat Palsana 66KV Niyol (Kadodara-2) 30-40 227 Surat Choryasi 66KV Deladva 228 Surat Choryasi 66KV Sarthana 30-40 229 Bharuch Wagra 220/66KV Wagra 50-70 230 Bharuch Wagra 66KV Vilayat 220 KV 30-40 -- 231 Bharuch Bharuch 66KV Kukarwada Wagra 232 Bharuch Bharuch 66KV Sayakha 30-40 233 Tapi Songadh 66KV Borda 234 Tapi Songadh 66KV Bhogvad 30-40 235 Tapi Kukarmunda 66KV Bhorikuva 236 Tapi Songadh 66KV Sagbara 237 Tapi Nizar 66KV Nizar 238 Tapi Nizar 66KV Kelani (Kukarmunda) 239 Tapi Kukarmunda 66KV Hathoda (Tapi) 240 Tapi Nizar 66KV Higni Digar (Pankhala/Piplod/Dumkhal) 30-40 220 KV 241 Tapi Nizar 66KV Balda/Nimbhora -- Ukai Hydro 242 Tapi Uchchhal 66KV Rumkitalav 243 Tapi Uchchhal 66KV Uchchhal 244 Tapi Uchchhal 66KV Vadpada(Naranpur) 245 Tapi Songadh 66KV Chikhali Bheshrot (Khodtalav) 246 Tapi Vyara 66KV Unchamala 247 Tapi Songadh 66KV Vadi Bhesrot 30-40 248 Tapi Songadh 66KV Waghnera 249 Tapi Songadh 66KV Sisor (Panchpipla) D:\E_Drive\RE\Web-site-Update\Feb-21\RE-Integration-66KV-Feb21-Rev-17062021.xlsx 6/33 Details of district wise substations for RE integration as on February-2021 (Revised) Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. In acse of line bay issue at a specified substation, developer has to select nearby substation from the list. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

Sr. Name fo Tentative feasible Name of EHV Name of Taluka Name of Substation RE integration (in Remark No. District MW) Source S/S South Gujarat 250 Tapi Songadh 66KV Ukai 251 Tapi Songadh 66KV Songadh 252 Tapi Songadh 66KV Kavla 253 Tapi Songadh 66KV Kumkuva 254 Tapi Songadh 66KV Jamkhadi (Hindala) 220 KV 30-40 -- 255 Tapi Songadh 66KV Vadpada P Umarda Ukai Hydro 256 Tapi Songadh 66KV Taparwada (Borpada) 257 Tapi Songadh 66KV Vadpada (Tokarva) 258 Dang Ahwa 66KV Malangdev 259 Dang Subir 66KV Subir 220KV 260 Tapi Vyara 220/66 KV Virpore / Virpur 50-70 -- Virpore

D:\E_Drive\RE\Web-site-Update\Feb-21\RE-Integration-66KV-Feb21-Rev-17062021.xlsx 7/33 Details of district wise substations for RE integration as on February-2021 (Revised) Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. In acse of line bay issue at a specified substation, developer has to select nearby substation from the list. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

Sr. Name fo Tentative feasible Name of EHV Name of Taluka Name of Substation RE integration (in Remark No. District MW) Source S/S Central Gujarat 1 Chhota Udaipur Chhotaudepur 132/66KV Chhota Udepur (Vasedi) 50-70 2 Chhota Udaipur Chhotaudepur 132/66 KV Zoz 40-50 3 Chhota Udaipur Chhotaudepur 66KV Vanar 30-40 4 Chhota Udaipur 66KV Bodeli 5 Chhota Udaipur Bodeli 66KV Patiya (Ranbhun) 132 KV 6 Chhota Udaipur Bodeli 66KV Uchapan Chhota -- 7 Chhota Udaipur Bodeli 66KV Kharedivav 30-40 Udepur 8 Chhota Udaipur Pavi-Jetpur 66KV Vadoth (Vasedi) 9 Chhota Udaipur Pavi-Jetpur 66KV Pavi-Jetpur 10 Chhota Udaipur Pavi-Jetpur 66KV Dev Mori (Rangli chokdi) 11 Chhota Udaipur Chhotaudepur 66KV Lehvant (Rangpur Sadli) 30-40 12 Chhota Udaipur Chhotaudepur 66KV Judavant 13 Chhota Udaipur Kawant 220/66KV Kawant 50-70 14 Chhota Udaipur Kawant 66KV Bhekhadiya (Bhaka) 15 Chhota Udaipur Naswadi 66KV Sengpur (Khanda) 30-40 220 KV 16 Chhota Udaipur Naswadi 66KV Ratanpur -- Kawant 17 Chhota Udaipur Naswadi 66KV Vaghach (Gadhboriyad) 18 Chhota Udaipur Kawant 66KV Panvad 30-40 19 Chhota Udaipur Kawant 66KV Rendi (Manka) 20 Dahod Dahod 132/66KV Dahod 50-70 21 Dahod Dahod 66KV Kharedi (Chhapri) 22 Dahod Dahod 66KV Kharod (Chhapari) 30-40 132 KV 23 Dahod Dahod 66KV Kathala -- Dahod 24 Dahod Dahod 66KV Navagam 25 Dahod 66KV Garbada (Nalvai) 30-40 26 Dahod Garbada 66KV Vajelav (Jesavada) 27 Dahod Zalod 220/66 KV Rupakheda 50-70 220 KV 28 Dahod Zalod 66KV Karath (Limdi) Rupakheda -- 29 Dahod Zalod 66KV Zalod 30-40 (Zalod) 30 Dahod Zalod 66KV Gultora 31 Dahod Limkheda 132/66KV Limkheda 40-50 32 Dahod Devgadh Bariya 66KV Devgadh-Baria 33 Dahod Devgadh Bariya 66KV Piplod 30-40 132 KV 34 Dahod Devgadh Bariya 66KV Keliya (Jambusar) -- Limkheda 35 Dahod Devgadh Bariya 66KV Dabhwa (Fangiya) 36 Dahod Dhanpur 66KV Singavali (Pipero) 30-40 37 Dahod Limkheda 66KV Limkheda 30-40 38 Savli 132/66KV Manjusar 50-70 39 Vadodara Desar 66KV Desar 132 KV 40 Vadodara Savli 66KV Savli -- 30-40 Manjusar 41 Vadodara Savli 66KV Tundav 42 Vadodara Savli 66KV Alindra(Manjusar)

D:\E_Drive\RE\Web-site-Update\Feb-21\RE-Integration-66KV-Feb21-Rev-17062021.xlsx 8/33 Details of district wise substations for RE integration as on February-2021 (Revised) Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. In acse of line bay issue at a specified substation, developer has to select nearby substation from the list. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

Sr. Name fo Tentative feasible Name of EHV Name of Taluka Name of Substation RE integration (in Remark No. District MW) Source S/S Central Gujarat 43 Vadodara Vadodara 220/132/66KV Gotri 50-70 44 Vadodara Padra 66KV Samiyala (Tandalja) 45 Vadodara Padra 66KV Padra 50-70 46 Vadodara Padra 66KV Mahuvad 47 Vadodara Vadodara 66KV Bhayli 50-70 48 Vadodara Vadodara 66KV Koyali 50-70 132 KV 49 Vadodara Vadodara 66KV Sherkhi -- Gotri 50 Vadodara Vadodara 66KV Vasana 50-70 51 Vadodara Vadodara City 66KV Vidhyutnagar 52 Vadodara Vadodara City 66KV Atladra 50-70 53 Vadodara Vadodara 66KV Gotri-B 54 Vadodara Vadodara City 66KV Subhanpura 30-40 55 Vadodara Vadodara City 66KV 56 Kheda Mehemdabad 132/66KV Mahemdabad 50-70 57 Kheda Kheda 66KV Kheda 58 Kheda Kheda 66KV Matar 59 Kheda Kheda 66KV Samadra 20-25 60 Kheda Matar 66KV Traj 61 Kheda Matar 66KV Limbasi 132 KV 62 Kheda Vaso 66KV Vaso Mahemdab -- 63 Kheda Mehemdabad 66 KV Wathwadi 30-40 ad 64 Kheda 66KV Jinjar 65 Kheda Mehmedabad 66KV Haldarwas 66 Kheda Mehmedabad 66KV Varsola (Devki Vansol/Vamali) 67 Kheda Mahutha 66KV Shehri (Alina) 30-40 68 Kheda Mahutha 66KV Ruppura 69 Kheda Mahutha 66KV Mahudha 70 Kheda Nadiad 132/66KV Nadiad 50-70 71 Anand Anand 66KV Samarkha 72 Kheda Galteshwar 66KV Vadad 132 KV -- 73 Kheda Nadiad 66KV Chaklasi 30-40 Nadiad 74 Kheda Nadiad 66KV Malarpura (Chaklasi Party) 75 Kheda Nadiad 66KV Palaiya 76 Kheda Nadiad 66KV Kamla (Nadiad City) 30-40 132 KV 77 Kheda Nadiad 66KV Dabhan -- Nadiad 78 Kheda Mehemdabad 66KV Sandhana 30-40 79 Vadodara Vadodara 132/66KV Nandesari 50-70 80 Vadodara Savli 66KV Rania (Moxi) GIDC 81 Vadodara Vadodara 66KV Nandesari-I 30-40 132 KV -- 82 Vadodara Savli 66KV Poicha Nandesari 83 Vadodara Vadodara 66KV Nandesari-III 50-60 84 Vadodara Vadodara 66KV Ranoli GIDC 30-40

D:\E_Drive\RE\Web-site-Update\Feb-21\RE-Integration-66KV-Feb21-Rev-17062021.xlsx 9/33 Details of district wise substations for RE integration as on February-2021 (Revised) Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. In acse of line bay issue at a specified substation, developer has to select nearby substation from the list. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

Sr. Name fo Tentative feasible Name of EHV Name of Taluka Name of Substation RE integration (in Remark No. District MW) Source S/S Central Gujarat 85 Anand Anand 132/66KV Ode 50-70 86 Anand Anand 66KV Vasad 30-40 87 Anand Anand 66KV Sarsa 88 Anand Umreth 66KV Sureli 30-40 132 KV 89 Kheda 66KV Nesh -- Ode 90 Kheda Thasara 66KV Thasra 91 Anand Anand 66KV Bhalej 30-40 92 Anand Umreth 66KV Umreth 93 Kheda Thasara 66KV Rakhiyal 94 Dascroi 132/66KV Narol 50-70 95 Ahmedabad Dascroi 66KV Jetalpur 132 KV 96 Ahmedabad Dascroi 66KV Paldi Kankaj 30-40 -- Narol 97 Ahmedabad Dascroi 66 KV Navagam 98 Ahmedabad Dascroi 66KV Lambha (Kamod) 15-20 99 Ahmedabad Dascroi 220/66KV Barejadi 50-70 100 Kheda Kheda 66KV Bidaj (Vanch) 30-40 101 Ahmedabad Dascroi 66KV Vinjol (Gatrad) 102 Ahmedabad Dascroi 66KV Bhuvaldi 103 Ahmedabad Dascroi 66KV Bilasiya 220 KV -- 104 Ahmedabad Dascroi 66KV Vehlal Barejadi 30-40 105 Ahmedabad Dascroi 66KV Kanbha 106 Ahmedabad Dascroi 66KV Hirapur 107 Ahmedabad Dascroi 66KV Dhamatwan 108 Ahmedabad Dascroi 66 KV Nenpur 109 Mehsana Kadi 400/220/66KV Vadavi 50-70 110 Ahmedabad Ahmedabad 66KV Sarkhej (Shela) 400 KV 111 Ahmedabad Dascroi 66KV Bopal 40-50 Vadavi 112 Ahmedabad Dascroi 66KV Science City 113 Ahmedabad Dascroi 66KV Bhadaj 114 Ahmedabad Ahmedabad 132/66KV Sabarmati 50-70 -- 115 Gandhinagar 66KV Adalaj 30-40 116 Gandhinagar Gandhinagar 66KV Sargasan 132 KV 117 Ahmedabad Ahmedabad City 66KV Traghad Sabarmati 118 Ahmedabad Dascroi 66KV Khoraj (shaligram) 30-40 119 Ahmedabad Dascroi 66 KV Goderej City 120 Narmada Tilakwada 132/66KV Tilakwada 50-70 121 Chhota Udaipur Bodeli 66KV Chalamali (Vanadha) 122 Chhota Udaipur Bodeli 66KV Koshindra 30-40 132 KV -- 123 Chhota Udaipur Naswadi 66KV Naswadi Tilakwada 124 Narmada Tilakwada 66KV Soikuva 40-50 125 Narmada Tilakwada 66KV Namalpur

D:\E_Drive\RE\Web-site-Update\Feb-21\RE-Integration-66KV-Feb21-Rev-17062021.xlsx 10/33 Details of district wise substations for RE integration as on February-2021 (Revised) Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. In acse of line bay issue at a specified substation, developer has to select nearby substation from the list. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

Sr. Name fo Tentative feasible Name of EHV Name of Taluka Name of Substation RE integration (in Remark No. District MW) Source S/S Central Gujarat 126 Narmada Nandod 66KV Navagam 127 Narmada Nandod 66KV Amadla (Nandod) 50-70 128 Narmada Tilakwada 66KV Katkoi 129 Narmada Nandod 66KV Garudeshwar (Devaliya) 132 KV -- 130 Narmada Tilakwada 66KV Limpura (Utavdi) 30-40 Tilakwada 131 Vadodara 66KV Chandod 132 Vadodara Dabhoi 66KV Pisai (Sathod) 20-40 133 Vadodara Sinor 66KV Simli (Segwa) 134 Bharuch Zagadiya 220/132/66KV Achhalia 50-70 135 Bharuch Zagadiya 66KV Rajpardi 136 Bharuch Zagadiya 66KV Zagadia 30-40 137 Bharuch Zagadiya 66KV Bhalod (Govali) 138 Bharuch Zagadiya 66KV Panetha 30-40 139 Narmada Nandod 66KV Rajpipla 220 KV 140 Narmada Nandod 66KV Mota Raipura (Gopalpura) -- Achhalia 141 Narmada Nandod 66 KV Anijara (Lachhras) 25-30 142 Narmada Nandod 66KV Bhacharwada 143 Narmada Nandod 66 KV Amletha 144 Narmada Nandod 66KV Pratapnagar (Umalla) 145 Narmada Nandod 66 KV Rajuwadiya 50-70 146 Narmada Nandod 66KV Ori 147 Ahmedabad Sanand 220/66 KV Bhat 50-70 148 Ahmedabad Sanand 400/220/66 KV Chharodi 50-70 149 Ahmedabad Sanand 66KV Vinchhiya (Mankol) 40-50 150 Ahmedabad Dascroi 66KV Bhat (Bavla) 30-40 151 Ahmedabad Sanand 66KV Changodar 152 Ahmedabad Sanand 66KV Sanathal 220 KV 153 Ahmedabad Dascroi 66KV Visalpur -- Bhat 154 Ahmedabad Sanand 66KV Chharodi 155 Ahmedabad Viramgam 66KV Thuleta 30-40 156 Ahmedabad Sanand 66KV Madhavnagar 157 Ahmedabad Sanand 66 KV Shella 158 Ahmedabad Sanand 66 KV Ambali 159 Ahmedabad Sanand 66KV Sanand GIDC 160 Panchmahal Halol 220/66KV Chandrapura 50-70 161 Panchmahal Ghoghamba 66KV Ghoghamba 162 Panchmahal Ghoghamba 66KV Simaliya (Rinchhvani) 220 KV 163 Panchmahal Halol 66KV Shivrajpur Chandrapu -- 164 Panchmahal Ghoghamba 66KV Ranjitnagar 30-40 ra 165 Panchmahal Ghoghamba 66KV Kantu (Bor) 166 Panchmahal Halol 66KV GIDC Halol B 167 Panchmahal Halol 66KV Tarkhanda (Panchdevla)

D:\E_Drive\RE\Web-site-Update\Feb-21\RE-Integration-66KV-Feb21-Rev-17062021.xlsx 11/33 Details of district wise substations for RE integration as on February-2021 (Revised) Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. In acse of line bay issue at a specified substation, developer has to select nearby substation from the list. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

Sr. Name fo Tentative feasible Name of EHV Name of Taluka Name of Substation RE integration (in Remark No. District MW) Source S/S Central Gujarat 168 Panchmahal Halol 66KV GIDC - Halol 30-40 169 Panchmahal Kalol 66KV Madhwas 30-40 220 KV 170 Vadodara Savli 66KV Ankaliya (Nharpura) Chandrapu -- 171 Panchmahal Halol 66KV Baska 30-40 ra 172 Panchmahal Halol 66KV KhaKharia 173 Panchmahal Godhra 220/132/66KV Godhra 50-70 174 Panchmahal Kalol 66KV Vejalpur 175 Panchmahal Kalol 66KV Kalol 30-40 176 Panchmahal Kalol 66KV Bhukhi (Gangadiya) 177 Panchmahal Kalol 66 KV Bhadroli Khurd 178 Panchmahal Godhra 66KV Lilesara 30-40 179 Panchmahal Godhra 66KV Santroad 180 Panchmahal Morvahadaf 66KV Rajayata 181 Panchmahal Morvahadaf 66KV Chandpur 30-40 220 KV -- 182 Panchmahal Morvahadaf 66KV Mota Amalia Godhra 183 Panchmahal Godhra 66KV Jafrabad (Govindi) 184 Panchmahal Godhra 66KV Timba 185 Panchmahal Godhra 66KV Tuva(kankanapur) 20-25 186 Panchmahal Morvahadaf 66KV Gokulpur (Morwa Raina) 187 Panchmahal 66KV Shehera 188 Panchmahal Shehra 66KV Nandarva 30-40 189 Panchmahal Shehra 66KV Panam Dam 190 Panchmahal Shehra 66KV Padardi 191 Vadodara Vadodara 220/132/66KV Jambuva 50-70 192 Vadodara Dabhoi 66KV Dabhoi 193 Chhota Udaipur Sankheda 66KV Sankheda 10-15 194 Chhota Udaipur Sankheda 66KV Rampura 195 Chhota Udaipur Sankheda 66KV Bhatpur 196 Vadodara Vadodara 66KV Indrapuri 220 KV 50-70 -- 197 Vadodara Vadodara City 66KV Waghodia Road Jambuva 198 Vadodara Vadodara 66KV Gajrawadi 30-40 199 Vadodara Vadodara City 66KV Motibaug 200 Vadodara Vadodara City 66KV Tarsali 201 Vadodara Vadodara City 66KV Makarpura-GIDC-B 50-70 202 Vadodara Vadodara City 66KV Makarpura GIDC-A 203 Vadodara Waghodiya 220/66KV Waghodia 50-70 220 KV Waghodia -- 204 Vadodara Padra 220/66KV Gavasad 50-70 205 Bharuch Jambusar 66KV Sarod (Hamodpore-Kanthariya) 40-50 220 KV 206 Vadodara Padra 66KV Karkhadi -- Gavasad 207 Vadodara Padra 66KV Gavasad 50-70 208 Vadodara Padra 66KV Mobha

D:\E_Drive\RE\Web-site-Update\Feb-21\RE-Integration-66KV-Feb21-Rev-17062021.xlsx 12/33 Details of district wise substations for RE integration as on February-2021 (Revised) Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. In acse of line bay issue at a specified substation, developer has to select nearby substation from the list. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

Sr. Name fo Tentative feasible Name of EHV Name of Taluka Name of Substation RE integration (in Remark No. District MW) Source S/S Central Gujarat 209 Bharuch Zagadiya 220/66KV Jhagadia 50-70 220 KV 210 Bharuch Zagadiya 66KV Randedi 50-70 -- Jhagadia 211 Bharuch Zagadiya 66KV Dadheda (Zagadia GIDC) 30-40 212 Bharuch Bharuch 132/66KV Bharuch 50-70 132 KV Bharuch -- 213 Bharuch Bharuch 220/132/66KV Haldarwa 50-70 214 Bharuch Amod 66KV Samni (Kurchan) 15-20 215 Bharuch Wagra 66KV Muller 216 Bharuch Bharuch 66KV Palej 40-50 217 Bharuch Bharuch 66KV Zanor (Nabipur) 20-25 218 Bharuch Bharuch 66KV Bharuch -B 220 KV 219 Bharuch Bharuch 66KV Bori (Hingala) -- 25-30 Haldarwa 220 Bharuch Wagra 66KV Wagra 221 Bharuch Bharuch 66KV Panchbatti 222 Bharuch Bharuch 66KV Kadod 30-40 223 Bharuch Bharuch 66KV Haldarva 30-40 224 Vadodara Karjan 66KV Rarod (Nareshwar) 20-25 225 Vadodara Karjan 66KV Saring 226 Kheda Kapadvanj 220/66KV Kapadwanj 50-70 227 Kheda Kapadvanj 66KV Kapadwanj GIDC 30-40 228 Kheda Kapadvanj 66KV Nirmali 229 Kheda Kapadvanj 66KV Attarsumba 25-30 230 Kheda Kapadvanj 66KV Hamirpura (Bhailakui) 231 Kheda Kapadvanj 66KV Torna 232 Kheda Kathalal 66KV Aral 30-40 233 Kheda Kathlal 66KV Chhipadi (Khalal) 234 Kheda Kathlal 66KV Kathlal 220 KV 235 Kheda Mahmedabad 66KV Aklacha 30-40 -- Kapadwanj 236 Kheda Kathlal 66KV Abhripur (Bharkunda) 237 Kheda Kathlal 66KV Anara 238 Kheda Thasra 66KV Mor Aambli 40-50 239 Kheda Thasra 66KV Chetarsumba 240 Mahisagar Balasinor 66KV Jorapura 241 Mahisagar Balasinor 66KV Relia 242 Kheda Galteshwar 66KV Sevalia 10-15 243 Kheda Balasinor 66KV Rozva 244 Mahisagar Balasinor 66KV Balasinor 245 Ahmedabad Dascroi 220/66KV Khanpur 50-70 220 KV 246 Ahmedabad Dascroi 66KV Kuha -- 30-40 Khanpur 247 Ahmedabad Dascroi 66 KV Bahiyal 248 Anand Anand 220/66KV Mogar 50-70 220 KV Mogar --

D:\E_Drive\RE\Web-site-Update\Feb-21\RE-Integration-66KV-Feb21-Rev-17062021.xlsx 13/33 Details of district wise substations for RE integration as on February-2021 (Revised) Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. In acse of line bay issue at a specified substation, developer has to select nearby substation from the list. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

Sr. Name fo Tentative feasible Name of EHV Name of Taluka Name of Substation RE integration (in Remark No. District MW) Source S/S Central Gujarat 249 Bharuch Amod 66KV Sarbhan 220 KV 250 Bharuch Amod 66KV Ochhan (Telod -Ikhar) 10-15 -- Amod 251 Vadodara Karjan 66KV Handod 252 Vadodara Karjan 220/66KV Karjan 50-70 253 Vadodara Dabhoi 66KV Karvan (Kayavarohan) 254 Vadodara Karjan 66KV Simali 20-25 220 KV 255 Vadodara Sinor 66KV Sadhali -- Karjan 256 Vadodara Sinor 66KV Sinor 257 Vadodara Karjan 66KV Kashipura (Ramangamdi) 30-40 258 Vadodara Karjan 66KV Lakodara 30-40 259 Anand Anand 220/66KV Karamsad 50-70 260 Anand Anand 66KV Anand 261 Anand Anand 66KV Gopalpura 30-40 262 Anand Anand 66KV Anand Agri. University 263 Anand Anand 66KV Boriavi (Jol) 264 Anand Anand 66KV V.V. Nagar 30-40 265 Anand Anand 66KV Vithal Udyognagar 266 Anand Petlad 66KV Mahelav 267 Anand Petlad 66KV Changa 30-40 268 Kheda Nadiad 66KV Uttarsanda 269 Kheda Nadiad 66KV Akhdol 270 Anand Anand 66KV Karamsad 30-40 220 KV 271 Anand Anklav 66KV Anklav Karamsad / -- 272 Anand Anklav 66KV Bhetasi 220 KV 273 Anand Anklav 66KV Navakhal (Khedasa) Mogar 274 Anand Borsad 66KV Borsad 30-40 275 Anand Borsad 66KV Shinglav 276 Anand Anand 66KV Navli 277 Anand Anklav 66KV Khadol (Haldari) 278 Anand Borsad 66KV Ras 279 Anand Petlad 66KV Sundarna 30-40 280 Anand Petlad 66KV Virsad 281 Anand Petlad 66KV Nar 282 Anand Cambay 66KV Timba 30-40 283 Anand Petlad 66KV Petlad 284 Anand Sojitra 66KV Kasor 30-40

D:\E_Drive\RE\Web-site-Update\Feb-21\RE-Integration-66KV-Feb21-Rev-17062021.xlsx 14/33 Details of district wise substations for RE integration as on February-2021 (Revised) Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. In acse of line bay issue at a specified substation, developer has to select nearby substation from the list. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

Sr. Name fo Tentative feasible Name of EHV Name of Taluka Name of Substation RE integration (in Remark No. District MW) Source S/S Central Gujarat 285 Ahmedabad Ahmedabad 220/132/66KV Ranasan 50-70 286 Ahmedabad Ahmedabad 66KV Naroda 287 Ahmedabad Ahmedabad 66KV Odhav 30-40 220 KV 288 Ahmedabad Ahmedabad 66KV Kathvada -- Ranasan 289 Gandhinagar Gandhinagar 66KV Muthia 30-40 290 Ahmedabad Dascroi 66KV Chandkheda 30-40 291 Ahmedabad Dascroi 66 KV Bhat 292 Vadodara Waghodiya 400/220/66KV Asoj 50-70 293 Vadodara Vadodara 132/66KV Fertilizarnagar 50-70 294 Vadodara Savli 66KV Khakhariya 30-40 295 Vadodara Savli 66KV Pratapnagar (Godampura) 296 Vadodara Waghodiya 66KV Asoj (Paldi) 400 KV 297 Vadodara Waghodiya 66KV Vyankatpura -- Asoj 298 Vadodara Waghodiya 66KV Jarod 30-40 299 Vadodara Vadodara 66KV Amaliyara 300 Vadodara Vadodara City 66KV Chhani-A 301 Vadodara Vadodara City 66KV Chhani -B 302 Vadodara Vadodara City 66KV Sama 303 Mahisagar Lunawada 220/66KV Savdasna Muvada 50-70 304 Mahisagar Lunawada 66KV Lunawada 305 Mahisagar Santrampur 66KV Movasa 306 Mahisagar Lunawada 66KV Kothamba 307 Mahisagar Lunawada 66KV Ved(vardhadari) 30-40 308 Mahisagar Santrampur 66KV Santrampur 309 Mahisagar Santrampur 66KV Valakhedi (Gothib)Vaneda 310 Dahod 66KV Lakhanpur 311 Dahod Fatepura 66KV Sarasva 312 Mahisagar Kadana 66KV Ditvas 313 Mahisagar Khanpur 66KV Bakor (Lavana) 30-40 220 KV 314 Mahisagar Khanpur 66KV Motakhanpur Savdasna -- 315 Mahisagar Virpur 66KV Virpur Mauda 316 Mahisagar Lunawada 66KV Sadhakpur (Dhamod) 317 Mahisagar Balasinor 66KV Pandava (Parbia) 20-25 318 Mahisagar Lunawada 66KV Limbadiya 319 Mahisagar Virpur 66KV Salaiya 320 Mahisagar Virpur 66KV Debhari 321 Mahisagar Lunawada 66KV Budhajina Tekra 30-40 322 Aravalli Malpur 66KV Helodar 30-40 323 Mahisagar Santrampur 66KV Limda Muvadi (Moti Sarsan) 324 Mahisagar Santrampur 66KV Mora 25-30 325 Mahisagar Santrampur 66KV Malvan

D:\E_Drive\RE\Web-site-Update\Feb-21\RE-Integration-66KV-Feb21-Rev-17062021.xlsx 15/33 Details of district wise substations for RE integration as on February-2021 (Revised) Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. In acse of line bay issue at a specified substation, developer has to select nearby substation from the list. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

Sr. Name fo Tentative feasible Name of EHV Name of Taluka Name of Substation RE integration (in Remark No. District MW) Source S/S Central Gujarat 326 Ahmedabad Bavla 220/66KV Salejada 50-70 327 Ahmedabad Bavla 220/66KV Bagodara 50-70 328 Ahmedabad Bavla 66KV Juval rupavati 329 Ahmedabad Bavla 66KV Kerala 25-30 330 Ahmedabad Sanand 66KV Zamp 331 Ahmedabad Sanand 66KV Daduka (Rethal) Maximum 50-70 332 Ahmedabad Bavla 66KV Bavla MW RE 333 Ahmedabad Sanand 66KV Nani Devti injection 334 Ahmedabad Sanand 66KV Rajoda feasible 335 Ahmedabad Sanand 66KV Moraiya 336 Ahmedabad Sanand 66KV Vendor Park 25-30 337 Ahmedabad Sanand 66KV Bol-2(GIDC) 338 Ahmedabad Sanand 66KV Sanand-2 220 KV 339 Ahmedabad Bavla 66KV Bol-1(GIDC) Salejada 340 Ahmedabad Bavla 66KV Kalyangadh 341 Ahmedabad Dholka 66KV Dholka City 30-40 342 Ahmedabad Dholka 66KV Koth 343 Ahmedabad Dholka 66KV Raipur 344 Ahmedabad Dholka 66KV Simej 30-40 Maximum 50-70 345 Ahmedabad Dholka 66KV Walthera MW RE 346 Ahmedabad Dholka 66KV Ingoli road injection 347 Ahmedabad Dholka 66KV Dholka GIDC feasible 348 Ahmedabad Dholka 66KV Pisawada 30-40 349 Ahmedabad Dholka 66 KV Shetra 350 Ahmedabad Dholka 66KV Chandisar (Keliya Vasna) 30-40 351 Kheda Nadiad 66KV Navagam (Nyka) 30-40 352 Vadodara Waghodiya 220/66KV Vyankatpura 40-50 353 Panchmahal Halol 66KV Madar (Koprej) 30-40 220 KV 354 Vadodara Waghodiya 66KV Rustampura 30-40 Vyankatpur -- 355 Chhota Udaipur Bodeli 66KV Surya a 356 Vadodara Vadodara 66KV Khatamba 40-50 357 Vadodara Vadodara City 66KV Harni

D:\E_Drive\RE\Web-site-Update\Feb-21\RE-Integration-66KV-Feb21-Rev-17062021.xlsx 16/33 Details of district wise substations for RE integration as on February-2021 (Revised) Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. In acse of line bay issue at a specified substation, developer has to select nearby substation from the list. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

Sr. Name fo Tentative feasible Name of EHV Name of Taluka Name of Substation RE integration (in Remark No. District MW) Source S/S North Gujarat 1 Ahmedabad Viramgam 220/66KV Viramgam 40-50 Maximum 70- 2 Ahmedabad Viramgam 66KV Jakhawada 15-20 220 KV 100 MW RE 3 Ahmedabad Sanand 66KV Chharodi Viramgam injection 15-20 4 Ahmedabad Viramgam 66KV Thuleta feasible 5 Gandhinagar Gandhinagar 132/66KV Chiloda 50-70 6 Gandhinagar Gandhinagar 66KV Unava 7 Gandhinagar Dehgam 66KV Sadra 8 Gandhinagar Mansa 66KV Pethapur 30-40 132 KV -- 9 Sabarkantha Prantij 66KV Kamalpur Chiloda 10 Gandhinagar Mansa 66KV Manekpur (Grambharti) 11 Gandhinagar Gandhinagar 66KV Shahpur 10-15 12 Gandhinagar Gandhinagar 66KV Dabhoda 30-40 13 Banaskantha 132/66KV Deesa 50-70 14 Banaskantha Deesa 66KV 15 Banaskantha Deesa 66KV Lorwada 30-40 16 Banaskantha Deesa 66KV Balodhar 132 KV -- 17 Banaskantha 66KV Manekpura Deesa Deesa 30-40 18 Banaskantha 66KV Juna Deesa 19 Banaskantha 66KV Ranpur Deesa 30-40 20 Banaskantha 66KV Kant 21 Patan Patan 132/66KV Patan 40-50 22 Patan Patan 66KV Kamliwada 30-40 132 KV -- 23 Patan Saraswati 66KV Kansa Patan 10-15 24 Patan Shihori 66KV Anganwada 25 Patan Sidhpur 132/66KV Siddhpur 50-70 26 Banaskantha 66KV Basu 30-40 27 Banaskantha Vadgam 66KV Kakoshi 28 Banaskantha Vadgam 66KV 30-40 132 KV 29 Mehsana Unjha 66KV Kahoda 30-40 -- Siddhpur 30 Patan Sidhpur 6KV Khali 30-40 31 Patan Unjha / Mehsana 66KV Tundav 32 Patan Sidhpur 66KV Mudana 10-15 33 Patan Sidhpur 66KV Sujanpur 34 Sabarkantha Prantij 132/66KV Talod 50-70 35 Sabarkantha Prantij 66KV Prantij 36 Sabarkantha Prantij 66KV Talod GIDC 30-40 132 KV 37 Sabarkantha Prantij 66KV D'Muvadi -- Talod 38 Sabarkantha Prantij 66KV Tajpur 39 Sabarkantha Talod 66KV Ujediya 15-20 40 Sabarkantha Talod 66KV Harsol 30-40

D:\E_Drive\RE\Web-site-Update\Feb-21\RE-Integration-66KV-Feb21-Rev-17062021.xlsx 17/33 Details of district wise substations for RE integration as on February-2021 (Revised) Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. In acse of line bay issue at a specified substation, developer has to select nearby substation from the list. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

Sr. Name fo Tentative feasible Name of EHV Name of Taluka Name of Substation RE integration (in Remark No. District MW) Source S/S North Gujarat 41 Banaskantha Lakhani 220/66KV Agathala 50-70 42 Banaskantha 66KV Rantila 43 Banaskantha Lakhni, Deodar66KV Lakhani 15-20 -- 44 Banaskantha 66KV Agathala 45 Banaskantha 66KV Soni Deodar, Lakhani 30-40 46 Banaskantha 66KV Shergadh 220 KV 47 Banaskantha 66KV Kotda (D) Lakhani 30-40 Agathala 48 Banaskantha 66KV Chekara 49 Banaskantha Lakhani 66KV Motakapra 50 Banaskantha Deesa 66KV Rampura Dama 30-40 -- 51 Banaskantha Deesa 66KV Nesda 52 Banaskantha Deodar 66KV Jalota 20-25 53 Banaskantha 66KV Taruva 30-40 54 Sabarkantha Himmatnagar 220/66KV Agiyol 50-70 55 Sabarkantha Himmatnagar 66KV Dedhrota 56 Sabarkantha Himmatnagar 66KV Munpur 20-25 57 Sabarkantha Himmatnagar 66KV Hansalpur 58 Sabarkantha Himmatnagar 66KV Kali Dungar 59 Sabarkantha Himmatnagar 66KV Chandrani 15-20 60 Sabarkantha Himmatnagar 66KV Moti Demai 61 Sabarkantha Himmatnagar 66KV Kaniyol 62 Sabarkantha Prantij 66KV Amodara 20-25 63 Sabarkantha Himmatnagar 66KV Sonasan 220 KV -- 64 Sabarkantha Himmatnagar 66KV Hajipur Agiyol 30-40 65 Sabarkantha Himmatnagar 66KV Dalpur 66 Sabarkantha Himmatnagar 66KV Himmatnagar-1 67 Sabarkantha Himmatnagar 66KV Parabda 20-25 68 Sabarkantha Himmatnagar 66KV Gadhoda 69 Sabarkantha Himmatnagar 66KV Nikoda 20-25 70 Sabarkantha Himmatnagar 66KV Gadhi 71 Sabarkantha Himmatnagar 66KV Gambhoi 72 Sabarkantha Himmatnagar 66KV Rupal 20-25 73 Sabarkantha Himmatnagar 66KV Himmatnagar-2 74 Patan Bechraji / Mehsana 220/66KV Bechraji 50-70 220 KV 75 Patan Chanasma 66KV Maniyari -- 10-15 Becharaji 76 Patan Bechraji / Mehsana 66KV Modhera 77 Gandhinagar Kalol 220/66KV Chhatral 50-70 78 Gandhinagar Kalol 66KV Pansar 30-40 79 Gandhinagar Kalol 66KV Chhatral GIDC 220 KV -- 80 Gandhinagar Kalol 66KV Borisana Chhatral 30-40 81 Gandhinagar Kalol 66KV Vadsar 82 Gandhinagar Kalol 66KV Kalol 30-40

D:\E_Drive\RE\Web-site-Update\Feb-21\RE-Integration-66KV-Feb21-Rev-17062021.xlsx 18/33 Details of district wise substations for RE integration as on February-2021 (Revised) Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. In acse of line bay issue at a specified substation, developer has to select nearby substation from the list. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

Sr. Name fo Tentative feasible Name of EHV Name of Taluka Name of Substation RE integration (in Remark No. District MW) Source S/S North Gujarat 83 Gandhinagar Kalol 66KV Dhanot 30-40 84 Mehsana Kalol 66KV Karannagar 85 Mehsana Kadi 66KV Khavad 86 Mehsana Kadi 66KV Sadra 30-40 220 KV -- 87 Mehsana Kadi 66KV Rangpurda (Nanikadi) Chhatral 88 Mehsana Kadi 66KV Nandasan 89 Mehsana Kadi 66KV Indrad (Ratnamani) 30-40 90 Mehsana Kadi 66KV Rajpur 91 Aravali Bhiloda 220/66KV Bhutiya 50-70 92 Aravali 66KV Bhiloda 93 Aravali 66KV Ubsal 94 Aravali 66KV Torada -- 95 Aravali Bhiloda, Vijaynagar66KV Bhiloda 30-40 96 Aravali 66KV Vijaynagar 97 Aravali 66KV Pal 98 Aravali 66KV Dantod 99 Aravali Bhiloda 66KV (Palla) 100 Aravali Bhiloda 66KV Bhetali (Mehru) 220 KV 10-15 101 Aravali Bhiloda 66KV Vankaner Bhutiya 102 Aravali Bhiloda 66KV Kheradi 103 Sabarkantha Khedbrahma 66KV Tandaliya 10-15 104 Sabarkantha 66KV Kundala Vijaynagar, Vadali 30-40 -- 105 Sabarkantha 66KV Choriwad 106 Sabarkantha 66KV Chitroda Idar 30-40 107 Sabarkantha 66KV Badoli 108 Sabarkantha Idar 132/66KV Idar 50-70 109 Sabarkantha 66KV Sudarpur Idar 15-20 110 Sabarkantha 66KV Lai Ranasan 111 Aravali Bayad, Dhansura 220/66 KV Dhansura 50-70 112 Aravali Bayad, Dhansura 66KV Ambaliyara 113 Kheda Kapadvanj 66KV Vyas Vasna 10-15 114 Aravali Bayad, Dhansura 66KV Akrund() 115 Aravali Bayad 66KV Demai 116 Aravali Bayad 66KV Bayad 20-25 220 KV -- 117 Aravali Bayad 66KV Sangal (Vasnirel) Dhansura 118 Aravali Dhansura 66KV Vadagam 30-40 119 Aravali Bayad 66KV Untarada 30-40 120 Aravali Talod 66KV Rozad 121 Sabarkantha 66KV Punsari Talod 15-20 122 Sabarkantha 66KV Bayal

D:\E_Drive\RE\Web-site-Update\Feb-21\RE-Integration-66KV-Feb21-Rev-17062021.xlsx 19/33 Details of district wise substations for RE integration as on February-2021 (Revised) Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. In acse of line bay issue at a specified substation, developer has to select nearby substation from the list. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

Sr. Name fo Tentative feasible Name of EHV Name of Taluka Name of Substation RE integration (in Remark No. District MW) Source S/S North Gujarat 123 Gandhinagar Gandhinagar 220/66KV Jamla 50-70 124 Gandhinagar Gandhinagar 66KV Randheja 30-40 125 Gandhinagar Gandhinagar 66KV Moti Adrej 126 Gandhinagar Kalol 66KV Soja - II 127 Gandhinagar Kalol 66KV Nardipur 20-25 128 Mehsana Kadi 66KV Karjisan 220 KV 129 Gandhinagar Kalol 66KV Veda -- Jamla 130 Gandhinagar Kalol 66KV Itla 30-40 131 Mehsana Gozariya 66KV Gozaria 132 Mehsana Gozariya 66KV Gozariya-2 133 Mehsana Gozariya 66KV Boru 30-40 134 Mehsana Gozariya 66KV Charada 135 Mehsana Gozariya 66KV Kharna 136 Aravali Modasa 220/66KV Faredi 50-70 137 Aravali Malpur, Meghraj 66KV Malpur 138 Aravali Malpur, Meghraj 66KV Limbodara 15-20 139 Aravali Malpur, Meghraj 66 KV Ramgadhi 140 Aravali Malpur, Meghraj 66KV Dugarwada (Kolikhad) 141 Aravali Modasa 66KV Modasa 142 Sabarkantha Himmatnagar 66KV Raygadh 20-25 143 Aravali Modasa 66KV Medhasan 220 KV -- 144 Aravali Meghraj 66KV Meghraj Faredi 145 Aravali Meghraj 66KV Relawada 146 Aravali Meghraj 66KV Panchal 147 Aravali Meghraj 66KV Kasana 15-20 148 Aravali Meghraj 66KV Waghpur 149 Aravali Meghraj 66KV Rajpur (Ramghadi) 150 Aravali Meghraj 66KV Navagam (isari) Kantalu 151 Aravali Meghraj 66KV Lakshmanpura (Lusadiya) 152 Gandhinagar Dehgam 66KV Rakhiyal 30-40 153 Gandhinagar Dehgam 66KV Halisa 154 Gandhinagar Dehgam 66KV Khanpur (Lihoda) 25-30 155 Gandhinagar Gandhinagar 66KV Chhala 156 Gandhinagar Dehgam 66KV Dehgam 30-40 157 Gandhinagar Dehgam 66KV Kadadar(Zak) 220 KV -- 158 Gandhinagar Dehgam 66KV Chiskari Khanpur 159 Gandhinagar Dehgam 66KV Mirapur 30-40 160 Kheda Kathlal 66KV Apruji 161 Gandhinagar Gandhinagar 66KV Kadjodra 30-40 162 Gandhinagar Gandhinagar 66KV Bahial 30-40 163 Gandhinagar Gandhinagar 66KV Kudasana(Koba)

D:\E_Drive\RE\Web-site-Update\Feb-21\RE-Integration-66KV-Feb21-Rev-17062021.xlsx 20/33 Details of district wise substations for RE integration as on February-2021 (Revised) Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. In acse of line bay issue at a specified substation, developer has to select nearby substation from the list. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

Sr. Name fo Tentative feasible Name of EHV Name of Taluka Name of Substation RE integration (in Remark No. District MW) Source S/S North Gujarat 164 Banaskantha Deesa 220/66KV Jangral 50-70 165 Banaskantha Deesa 66KV Sadarpur 166 Banaskantha Deesa 66KV Samau 20-25 167 Banaskantha Deesa 66KV Bhatsan 168 Banaskantha Deesa 66KV Rasana 169 Banaskantha Deesa 66KV Aseda 30-40 170 Banaskantha Deesa 66KV Samdhi 171 Banaskantha 66KV Sampra 220 KV -- 172 Banaskantha Sihori 66KV Umbari 30-40 Jangral 173 Banaskantha Sihori 66KV Kamboi 174 Banaskantha 66KV Gadh 30-40 175 Patan Sarasvati 66KV Mesar 10-15 176 Patan Sarasvati 66KV Dharusana 30-40 177 Patan Saraswati 66KV Jangral 30-40 178 Patan Saraswati 66KV Kimbuva 15-20 179 Patan Sidhpur 66KV Kalyana 30-40 180 Mehsana Mehsana 220/132/66KV Mehsana 50-70 181 Patan Chanasma 66 KV Dhinoj 20-25 182 Mehsana Becharji 66KV Motap 183 Mehsana Mehsana 66KV Palavasna 30-40 184 Mehsana Mehsana 66KV Nagalpur (Mehsana-II) 220 KV -- 185 Mehsana Visnagar 66KV Basna Mehsana 186 Mehsana Visnagar 66KV Udalpur 15-20 187 Mehsana Visnagar 66 KV Kherva 188 Mehsana Visnagar 66KV Bhandu 30-40 189 Mehsana Visnagar 66KV Valam 190 Mehsana Visnagar 132/66KV Visnagar 50-70 191 Mehsana Visnagar 66KV Bhalak (Transwad) 30-40 132 KV -- 192 Mehsana Visnagar 66KV Gothwa 30-40 Visnagar 193 Mehsana Visnagar 66KV Kamana 30-40 194 Mehsana Kheralu 220/66KV Kheralu 50-70 195 Mehsana Kheralu 66KV Sakari 196 Banaskantha Vadgam 66KV Moriya 197 Banaskantha Vadgam 66KV Sukhpura 20-25 198 Banaskantha Vadgam 66KV Panchada 199 Banaskantha Vadgam 66KV Kodram 220 KV -- 200 Banaskantha Danta 66KV Kheralu 201 Banaskantha Danta 66KV Gorad 202 Banaskantha Danta 66KV Kuvarsi 20-25 203 Banaskantha Danta 66KV Solsanda 204 Mehsana Satlasana 66KV Dharoi 205 Banaskantha Danta 66KV Satalsana

D:\E_Drive\RE\Web-site-Update\Feb-21\RE-Integration-66KV-Feb21-Rev-17062021.xlsx 21/33 Details of district wise substations for RE integration as on February-2021 (Revised) Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. In acse of line bay issue at a specified substation, developer has to select nearby substation from the list. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

Sr. Name fo Tentative feasible Name of EHV Name of Taluka Name of Substation RE integration (in Remark No. District MW) Source S/S North Gujarat 206 Mehsana Kheralu 66KV Kheralu 30-40 207 Mehsana Kheralu 66KV Mandali 25-30 208 Mehsana Unjha 66KV Dasaj 209 Mehsana Kheralu 66KV Varetha 210 Mehsana Satlasana 66KV Sudasana (Umari) 10-15 211 Palanpur Satlasana 66KV Motasada 212 Mehsana Satlasana 66KV Otalpur 213 Mehsana Unjha 66KV Unjha 220 KV -- 214 Mehsana Unjha 66KV Karali Kheralu 20-25 215 Mehsana Visnagar 66KV Umta 216 Mehsana Visnagar 66 KV Thalota 217 Mehsana Vadnagar 66KV Vadnagar 218 Mehsana Vadnagar 66KV Undhai (Pipaldhar) 219 Mehsana Vijapur 66KV Jantral 10-15 220 Mehsana Vijapur 66KV Sundarpur 221 Mehsana Vijapur 66KV Ladol 222 Mehsana Jotana 220/66 KV Mitha 50-70 223 Mehsana Mehsana 66KV Asjol 15-20 224 Mehsana Mehsana 66KV Balol 25-30 225 Mehsana Jotana 66KV Mitha 30-40 226 Mehsana Jotana 66KV Suraj 227 Mehsana Jotana 66KV Kasalpur (Jotana) 220 KV 10-15 -- 228 Mehsana Jotana 66KV Mudarda Mitha 229 Mehsana Detroi / Ahmedabad 66KV Katosan 230 Mehsana Mehsana 66KV Langhnaj 231 Mehsana Mehsana 66KV Linch 30-40 232 Mehsana Mehsana 66KV Mandali 233 Mehsana Mehsana 66KV Akhaj 234 Patan Radhanpur 220/66KV Radhanpur 50-70 220 KV 235 Patan Radhanpur 66KV Bhandhvad (Dev) -- 8-10 Radhanpur 236 Patan Kankrej 66KV Jakhel 237 Banaskantha Palanpur 220/66KV Palanpur 50-70 238 Banaskantha 66KV Amirgadh 239 Banaskantha Amirgadh 66KV Iqbagadh 30-40 240 Banaskantha Amirgadh 66KV Juni Sarotri (Balundra) 241 Banaskantha Amirgadh 66KV Hebatpur 220 KV -- 242 Banaskantha Amirgadh 66KV Bhayala Palanpur 243 Banaskantha Amirgadh 66KV 244 Banaskantha Amirgadh 66KV Malan 30-40 245 Banaskantha Amirgadh 66KV Vasan 246 Banaskantha Amirgadh 66KV Palanpur-2

D:\E_Drive\RE\Web-site-Update\Feb-21\RE-Integration-66KV-Feb21-Rev-17062021.xlsx 22/33 Details of district wise substations for RE integration as on February-2021 (Revised) Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. In acse of line bay issue at a specified substation, developer has to select nearby substation from the list. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

Sr. Name fo Tentative feasible Name of EHV Name of Taluka Name of Substation RE integration (in Remark No. District MW) Source S/S North Gujarat 247 Banaskantha Vadgam, Danta 66KV Jalotra 248 Banaskantha Vadgam, Danta 66KV Danta 30-40 249 Banaskantha Vadgam, Danta 66KV Gangva 250 Banaskantha Vadgam, Danta 66KV Gidasan 251 Banaskantha Vadgam, Danta 66KV Vadgam 25-30 252 Banaskantha Vadgam, Danta 66KV Pilucha 253 Banaskantha Vadgam, Palanpur 66KV 220 KV 254 Banaskantha Vadgam, Palanpur 66KV Lalwada 25-30 -- Palanpur 255 Banaskantha Vadgam, Palanpur 66KV Gadalwada 256 Banaskantha Dantiwada, 66KV Bhakar 30-40 257 Banaskantha Dantiwada, 66KV Chandisar 258 Banaskantha Dantiwada, 66KV Dantiwada 259 Banaskantha Palanpur 66KV Rajpur (Pakhanva) 20-25 260 Banaskantha Dantiwada, 66KV Bhutedi 261 Banaskantha Palanpur 66KV Palanpur-1 30-40 262 Patan Sankhari 220/66KV Sankhari 50-70 263 Patan Sankhari 400/220/66KV Veloda (Sankhari) 50-70 264 Patan Chanasma 66KV Chanasma 265 Patan Chanasma 66KV Kamboi 8-10 220 KV 266 Patan Chanasma 66KV Ziliya (Keshani) -- Sankhari 267 Patan Patan 66KV Balisana 268 Patan Patan 66KV Manud 15-20 269 Patan Patan 66KV Norta (Mandotri) 270 Patan Unjha / Mehsana 66KV Unava 271 Banaskantha Tharad 220/66KV Tharad 50-70 272 Banaskantha 66KV Runi 273 Banaskantha 66KV Rampura 274 Banaskantha Bhabar, Vav66KV Tithgam 10-15 275 Banaskantha 66KV Balodhan 276 Banaskantha 66Kv Bhabar 277 Banaskantha 66KV Kotarwada 278 Banaskantha 66KV Makhanu 220 KV 279 Banaskantha 66KV Mera -- Deodar, Tharad 10-15 Tharad 280 Banaskantha 66KV Chalva 281 Banaskantha 66KV Jetda 282 Banaskantha 66KV Del 283 Banaskantha 66KV Ghodasar 284 Banaskantha 66KV Asodar Tharad 20-25 285 Banaskantha 66KV Rah 286 Banaskantha 66KV Pathamda 287 Banaskantha Tharad 66KV Tadav 8-10

D:\E_Drive\RE\Web-site-Update\Feb-21\RE-Integration-66KV-Feb21-Rev-17062021.xlsx 23/33 Details of district wise substations for RE integration as on February-2021 (Revised) Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. In acse of line bay issue at a specified substation, developer has to select nearby substation from the list. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

Sr. Name fo Tentative feasible Name of EHV Name of Taluka Name of Substation RE integration (in Remark No. District MW) Source S/S North Gujarat 288 Banaskantha 66KV Piluda 289 Banaskantha 66KV Dedarada 220 KV Tharad 8-10 -- 290 Banaskantha 66KV Dudhva Tharad 291 Banaskantha 66KV Tharad 292 Banaskantha 220/66KV Thavar 50-70 293 Banaskantha Dhanera 66KV Dhanera 294 Banaskantha Dhanera 66KV Voda 20-25 295 Banaskantha Dhanera 66KV Samarvada 296 Banaskantha 66KV Jadiyali Lakhani 30-40 297 Banaskantha 66KV Nandala 298 Banaskantha Dhanera 66KV Dhakha 30-40 299 Banaskantha Tharad 66KV Duva 220 KV 300 Banaskantha Dhanera 66KV Jadia Thavar -- 301 Banaskantha Dhanera 66KV Bhatib 15-20 (Dhanera) 302 Banaskantha Dhanera 66KV Dharnodhar 303 Banaskantha Dhanera 66KV Kuvarala 304 Banaskantha Dhanera 66KV Lavara 30-40 305 Banaskantha Dhanera 66KV Nanuda 306 Banaskantha Dhanera 66KV Malotra 307 Banaskantha Dhanera 66KV Siya 8-10 308 Banaskantha Deesa 66KV Nanameda 309 Banaskantha Dhanera 66KV Vaktapura 310 Banaskantha Deodar 66KV Jasanvada (Khandosan) 25-30 311 Banaskantha Kankrej 66KV Terwada 312 Banaskantha Kankrej 66KV Jalmor 313 Banaskantha Sihori 66KV Sihori 15-20 314 Banaskantha Sihori 66KV Padardi 315 Banaskantha Sihori 66KV Dugrasan 20-25 316 Banaskantha Sihori 66KV Thara 317 Banaskantha Mera 66KV Mera 318 Banaskantha Mera 66KV Mitha 25-30 319 Banaskantha Mera 66KV Vadiya 220 KV -- 320 Banaskantha Deodar 66KV Vakha Deodar 321 Banaskantha Deodar 66KV Ravel 10-15 322 Banaskantha Deodar 66KV Chamanpura 323 Banaskantha Kankrej 66KV Khimana 324 Banaskantha Deesa 66KV Ramvas 15-20 325 Banaskantha Deodar 66KV Khoda 326 Banaskantha Deodar 66KV Mithipaldi 327 Banaskantha Deodar 66KV Duchakwada 20-25 328 Banaskantha Deodar 66KV Vatam 329 Banaskantha Deodar 66KV Kotda (F)

D:\E_Drive\RE\Web-site-Update\Feb-21\RE-Integration-66KV-Feb21-Rev-17062021.xlsx 24/33 Details of district wise substations for RE integration as on February-2021 (Revised) Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. In acse of line bay issue at a specified substation, developer has to select nearby substation from the list. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

Sr. Name fo Tentative feasible Name of EHV Name of Taluka Name of Substation RE integration (in Remark No. District MW) Source S/S North Gujarat 330 Banaskantha Deodar 220/66KV Deodar 50-70 331 Banaskantha Deodar 66KV Deodar 30-40 220 KV 332 Banaskantha Deodar 66KV Raiya -- Deodar 333 Banaskantha Kankrej 66KV Kuvarva 5-25 334 Banaskantha Kankrej 66KV Arniwada 335 Banaskantha Deesa 400/220/66KV Zerda 50-70 336 Banaskantha Dantiwada 66KV Jegol 337 Banaskantha Dantiwada 66KV Ganguvada 10-15 338 Banaskantha Dantiwada 66KV Panthwada 339 Banaskantha Deesa 66KV Vithodar 340 Banaskantha Lakhani 66KV Devsari 341 Banaskantha Lakhani 66KV Pechhdal 10-15 342 Banaskantha Deesa 66KV Nagfana 343 Banaskantha Deesa 66KV 30-40 400 KV 344 Banaskantha Deesa 66KV Ramun Kansari -- 10-15 345 Banaskantha Deesa 66KV Sherpura (Zerda) 346 Banaskantha Deesa 66KV Zerda 347 Banaskantha Dhanera 66KV Bhatram 10-15 348 Banaskantha Deesa 66KV Khimat 349 Banaskantha Deesa 66KV Dama 30-40 350 Banaskantha Deesa 66KV Samsherpura 351 Banaskantha Deesa 66KV Gadha 352 Banaskantha Dantiwada 66KV Bhadli Kotha 30-40 353 Banaskantha Deesa 66KV 354 Gandhinagar 66KV Mansa Mansa 30-40 355 Gandhinagar 66KV Lodra 356 Mehsana Mansa 66 KV Vihar 357 Mehsana Visnagar 66KV Kada 30-40 358 Sabarkantha 66KV Mau Idar 359 Sabarkantha 66KV Vasai 360 Mehsana Vijapur 220/66KV Vijapur 50-70 220 KV 361 Mehsana Vijapur 66KV Pilwai (Veda) 20-25 -- Vijapur 362 Mehsana 66KV Malosan 363 Mehsana Vijapur66KV Tatosan 15-20 364 Mehsana 66KV Vadasan 365 Mehsana Vijapur 66KV Ranasan 366 Mehsana Vijapur 66KV Sanghpur 20-25 367 Mehsana Himmatnagar 66KV Derol 368 Mehsana Vijapur 66KV Hirpura

D:\E_Drive\RE\Web-site-Update\Feb-21\RE-Integration-66KV-Feb21-Rev-17062021.xlsx 25/33 Details of district wise substations for RE integration as on February-2021 (Revised) Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. In acse of line bay issue at a specified substation, developer has to select nearby substation from the list. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

Sr. Name fo Tentative feasible Name of EHV Name of Taluka Name of Substation RE integration (in Remark No. District MW) Source S/S North Gujarat 369 Gandhinagar Kalol 66KV Moti Bhoyan 30-40 370 Gandhinagar Kalol 66KV Khatraj 30-40 371 Gandhinagar Kalol 66KV Santej 372 Mehsana Kadi 66KV Kadi 30-40 400 KV 373 Mehsana Kadi 66KV Laxmipura -- Vadavi 374 Ahmedabad Detroj 66KV Katosan 30-40 375 Mehsana Kadi 66KV Meda Adraj 376 Mehsana Kadi 66KV Meda 30-50 377 Mehsana Kadi 66KV Thol

D:\E_Drive\RE\Web-site-Update\Feb-21\RE-Integration-66KV-Feb21-Rev-17062021.xlsx 26/33 Details of district wise substations for RE integration as on February-2021 (Revised) Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. In acse of line bay issue at a specified substation, developer has to select nearby substation from the list. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

Sr. Name fo Tentative feasible Name of EHV Name of Taluka Name of Substation RE integration (in Remark No. District MW) Source S/S Saurashtra 1 Junagadh Junagadh 132/66KV Junagadh 40-50 Maximum 40-50 132 KV 2 Junagadh Junagadh 66KV Bilkha MW RE 20-25 Junagadh 3 Junagadh Bhesan 66KV Chhodvadi injection 4 Jamnagar Jamnagar 132/66KV Naghedi 40-50 5 Jamnagar Jamnagar 66KV Dhichada 30-40 6 Jamnagar Jamnagar 66KV Shapar (Baid) 30-40 Maximum 40-50 7 Jamnagar Jamnagar 66KV Lakha Baval 132 KV MW RE 8 Jamnagar Jamnagar 66KV Lal Bangalow Naghedi injection 9 Jamnagar Jamnagar 66KV Bedeshwar 20-30 feasible 10 Jamnagar Jamnagar 66KV Saatrasta 11 Jamnagar Jamnagar 66KV Hapa GIDC 12 Jamnagar Jamnagar 66KV Jamnagar-C 30-40 Devbhumi 13 Jam-Khambhaliya 66KV Vadinar 30-40 132 KV Sikka -- 14 Gir Somnath 132/66KV Talaja 40-50 15 Gir Somnath Veraval 66KV Veraval Maximum 40-50 16 Gir Somnath Veraval 66KV Moraj 132 KV MW RE 17 Gir Somnath Veraval 66KV Adri 30-40 Talaja injection 18 Gir Somnath Talala 66KV Jepur feasible 19 Gir Somnath Veraval 66KV Ghusia 20 Rajkot 132/66KV Vikram 40-50 21 Rajkot Rajkot 66KV Punitnagar (Rajkot-B) 22 Rajkot Rajkot 66KV Mavdi Rd. (Rajkot) 23 Rajkot Rajkot 66KV Shastri medan 30-40 24 Rajkot Rajkot 66KV Laxminagar 25 Rajkot Rajkot 66KV Mota Mava 26 Rajkot Rajkot 66KV Khokhadad Maximum 40-50 27 Rajkot Rajkot 66KV Tramba 132 KV MW RE 28 Rajkot Rajkot 66KV Kherdi Vikram injection 29 Rajkot Rajkot 66KV Faldang 10-15 feasible 30 Rajkot Rajkot 66KV Magharvada 31 Rajkot Rajkot 66KV Hadmatiya (Golida) 32 Rajkot Rajkot 66KV Raj Samadhiyala 33 Rajkot Rajkot 66KV Punitnagar-II 30-40 34 Rajkot Rajkot 66KV Kotharia 30-40 35 Rajkot Rajkot 66KV Nilkanth 36 Rajkot Kotda-sangdi 132/66 KV Padavala 50-70 Maximum 50-70 37 Rajkot Kotda-sangdi 66KV Piplana 30-40 132 KV MW RE 38 Rajkot Kotda-sangdi 66KV Kotda (S) Padavala injection 39 Rajkot Kotda-sangdi 66KV Sarvoday 50-70 40 Rajkot Kotda-sangdi 66KV Veraval (Rajkot) feasible

D:\E_Drive\RE\Web-site-Update\Feb-21\RE-Integration-66KV-Feb21-Rev-17062021.xlsx 27/33 Details of district wise substations for RE integration as on February-2021 (Revised) Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. In acse of line bay issue at a specified substation, developer has to select nearby substation from the list. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

Sr. Name fo Tentative feasible Name of EHV Name of Taluka Name of Substation RE integration (in Remark No. District MW) Source S/S Saurashtra 41 Bhavnagar Mahuva 220/66KV Otha (Mahuva) 50-70 42 Bhavnagar Mahuva 66KV Kalsar 43 Bhavnagar Talaja 66KV Datha 15-35 Maximum 50-70 220 KV 44 Bhavnagar Talaja 66KV Pithalpur MW RE Mahuva 45 Bhavnagar Mahuva 66KV Dudhal-2 injection (Otha) 46 Bhavnagar Mahuva 66KV Nana Asrana feasible 5-10 47 Bhavnagar Mahuva 66KV Khuntvada 48 Bhavnagar Mahuva 66KV Bila 49 Gir Somnath Girgadhada 220/66KV 50-70 50 Gir Somnath Una 66 KV Dandi 25-30 51 Gir Somnath Girgadhada 66KV Dhokadva 52 Gir Somnath Girgadhada 66KV 30-40 53 Gir Somnath Girgadhada 66KV Rabarika Maximum 50-70 54 Gir Somnath Girgadhada 66 KV Navaugla 220 KV MW RE 55 Gir Somnath Una 66KV Una Dhokadava injection 56 Gir Somnath Una 66KV Delwada 30-40 feasible 57 Gir Somnath Una 66KV Tad (Paldi) 58 Gir Somnath Girgadhada 66KV Bodidar 10-15 59 Gir Somnath Kodinar 66KV Adpokar/ Mitiyaz 60 Gir Somnath Una 66KV Vajadi 20-25 61 Jamnagar Jamnagar 220/66KV Jamnagar 50-70 62 Jamnagar Jamnagar 66KV Aliabada 63 Jamnagar Jamnagar 66KV Jamvanthali 10-15 Maximum 50-70 64 Jamnagar Jamnagar 66KV Hamapar 220 KV MW RE 65 Jamnagar Jamnagar 66KV Jamnagar-B Jamnagar injection 66 Jamnagar Jamnagar 66KV Chella 25-30 feasible 67 Jamnagar Jamnagar 66KV Morkanda 68 Jamnagar Lalpur 66KV Rajhans (GIDC Ph-III) 30-40 69 Rajkot Gondal 220/66 KV Gondal 50-70 70 Rajkot Gondal 66KV Movia 10-15 71 Rajkot Kotda-sangdi 66KV Satapar (J) 72 Rajkot Gondal 66KV Shrinathgadh Maximum 50-70 73 Rajkot Gondal 66KV Vasavad 20-25 220 KV MW RE 74 Rajkot Jasdan 66KV Sanathali Gondal injection 75 Rajkot Gondal 66KV Jamvadi feasible 10-15 76 Rajkot Jetpur 66KV Umrali 77 Rajkot Gondal 66KV Gondal-2 40-50 78 Rajkot Gondal 66KV Gomta 25-30

D:\E_Drive\RE\Web-site-Update\Feb-21\RE-Integration-66KV-Feb21-Rev-17062021.xlsx 28/33 Details of district wise substations for RE integration as on February-2021 (Revised) Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. In acse of line bay issue at a specified substation, developer has to select nearby substation from the list. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

Sr. Name fo Tentative feasible Name of EHV Name of Taluka Name of Substation RE integration (in Remark No. District MW) Source S/S Saurashtra 79 Rajkot Kotda-sangdi 220/66KV Kangasiyali 50-70 80 Rajkot Kotda-sangdi 66KV Shapar Maximum 50- 81 Rajkot Kotda-sangdi 66KV Siddheshwar (Shapar-II) 50-70 220 KV 100 MW RE 82 Rajkot Kotda-sangdi 66KV Hirni Kangashiya injection 83 Rajkot Rajkot 66KV Vavdi li 30-35 feasible 84 Rajkot Rajkot 66KV Kothariya (Solvant) 85 Rajkot Rajkot 66KV Khambha 40-50 86 Junagadh Keshod 220/66KV Keshod 50-70 87 Junagadh Keshod 66KV Keshod 30-35 88 Junagadh Mendarda 66KV Patrama (Khalipipli) 89 Junagadh Keshod 66KV Sondarada 10-15 90 Junagadh Keshod 66KV Ajab 91 Junagadh Keshod 66KV Koylana 92 Junagadh Maliya Hatina 66KV Vadala (Dharampur) 10-15 93 Junagadh Maliya Hatina 66KV Amrapar 94 Junagadh Keshod 66 KV Bhat Simroli Maximum 50-70 95 Junagadh Keshod 66 KV Moti Ghasri 20-25 220 KV MW RE 96 Junagadh Mangrol 66 KV Mangrol Keshod injection 97 Junagadh Keshod 66 KV Khirsara 30-35 feasible 98 Junagadh Keshod 66 KV Ishara 99 Junagadh Maliya Hatina 66KV Malia (Hatina) 100 Junagadh Maliya Hatina 66 KV Kadaya 5-10 101 Junagadh Maliya Hatina 66KV Chorwad (Gadu) 102 Junagadh Maliya Hatina 66KV Chuldi 103 Junagadh Maliya Hatina 66KV Mendarda 15-20 104 Junagadh Maliya Hatina 66KV Nani Khodiyar 105 Junagadh Mangrol 66KV Chotli Vidi 30-35 106 Junagadh Maliya Hatina 66KV Budhecha 107 Rajkot Rajkot 220/66KV Nyara 50-70 108 Rajkot Lodhika 66KV Metoda 109 Rajkot Lodhika 66KV Metoda GIDC-II 25-30 110 Rajkot Lodhika 66KV Central Metoda GIDC Maximum 50- 111 Rajkot Lodhika 66KV Khirsara 220 KV 100 MW RE 112 Rajkot Paddhari 66KV PadadhriI Nyara injection 113 Rajkot Paddhari 66KV Sarapdad feasible 114 Rajkot Paddhari 66KV Targhadi 25-30 115 Rajkot Paddhari 66KV Mota Khijadia 116 Rajkot Paddhari 66KV Nyara

D:\E_Drive\RE\Web-site-Update\Feb-21\RE-Integration-66KV-Feb21-Rev-17062021.xlsx 29/33 Details of district wise substations for RE integration as on February-2021 (Revised) Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. In acse of line bay issue at a specified substation, developer has to select nearby substation from the list. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

Sr. Name fo Tentative feasible Name of EHV Name of Taluka Name of Substation RE integration (in Remark No. District MW) Source S/S Saurashtra 117 Rajkot Rajkot 66KV Ghanteshwar (Rajkot-D) 220 KV 118 Rajkot Rajkot city 66KV University Rd. 50-70 As above Nyara 119 Rajkot Rajkot 66KV Raiyadher 120 Junagadh Vanthali 220/132/66KV Shapur 50-70 121 Junagadh Bhesan 66KV Mendpara 122 Junagadh Junagadh City 66KV Junagadh (GIDC) 123 Junagadh Junagadh City 66KV Zanzarda (JU. City) 20-25 124 Junagadh Junagadh 66KV Choki 125 Junagadh Junagadh 66KV Majevadi Maximum 50-70 126 Junagadh Mendarda 66KV Arniyana 220 KV MW RE 127 Junagadh Vanthali 66KV Mahobatpur (Navagam) 15-20 Shapur injection 128 Junagadh Vanthali 66KV Vadala 129 Junagadh Manavadar 66KV Katakpara 30-40 feasible 130 Junagadh Keshod 66KV Raningpara 30-40 131 Junagadh Vanthali 66KV Shapur 25-30 132 Junagadh Vanthali 66KV Kanza 133 Junagadh Vanthali 66KV Agatrai 20-25 134 Junagadh Vanthali 66KV Bamanasa 135 Gir Somnath Kodinar 220/66KV Timbdi 50-70 136 Gir Somnath Sutrapada 66KV Moradiya 30-40 137 Gir Somnath Kodinar 66KV Sindhaj 10-15 138 Gir Somnath Kodinar 66KV Aranej 139 Gir Somnath Sutrapada 66KV Lodhwa (Singsar) 140 Gir Somnath Sutrapada 66 KV Gorakhmadi 30-40 141 Gir Somnath Sutrapada 66KV Prashnavada 142 Gir Somnath Sutrapada 66KV Kanjotar(Barda) 143 Gir Somnath Sutrapada 66KV Singasar 30-40 144 Gir Somnath Sutrapada 66KV Sutrapada 145 Gir Somnath Veraval 66KV Veraval (GIDC) 50-70 146 Gir Somnath Veraval 66KV (GIS) Maximum 50-70 147 Gir Somnath Veraval 66KV 220 KV MW RE 148 Gir Somnath Kodinar 66 KV Kodinar 30-40 Timbdi injection 149 Gir Somnath Kodinar 66 KV Devli feasible 150 Gir Somnath Kodinar 66 KV Jantrakhadi 20-25 151 Gir Somnath Kodinar 66 KV Advi 152 Gir Somnath Veraval 66KV Bhetali 20-25 153 Gir Somnath Talala 66KV Amblash 154 Gir Somnath Talala 66KV Raydi 30-40 155 Gir Somnath Talala 66KV Ankolwadi 156 Gir Somnath Talala 66KV Dhava 15-20 157 Gir Somnath Talala 66KV Jasadhar 158 Gir Somnath Sutrapada 66KV Pranchi 159 Gir Somnath Kodinar 66KV Ghantwad 30-40 160 Gir Somnath Kodinar 66KV Alidar

D:\E_Drive\RE\Web-site-Update\Feb-21\RE-Integration-66KV-Feb21-Rev-17062021.xlsx 30/33 Details of district wise substations for RE integration as on February-2021 (Revised) Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. In acse of line bay issue at a specified substation, developer has to select nearby substation from the list. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

Sr. Name fo Tentative feasible Name of EHV Name of Taluka Name of Substation RE integration (in Remark No. District MW) Source S/S Saurashtra 161 Bhavanagar Bhavnagar 220/66KV Vartej 50-70 162 Bhavanagar Bhavnagar 66KV Bandar Road 30-40 163 Bhavanagar Bhavnagar 66Kv Sardarnagar 164 Bhavanagar Bhavnagar 66KV Sidsar 165 Bhavanagar Ghogha 66KV Mamsa-2 166 Bhavanagar Bhavnagar 66KV Bhumbhali 10-15 167 Bhavanagar Bhavnagar 66KV Bhadi 168 Bhavanagar Ghogha 66KV Nathugadh Bhavnagar 169 Bhavanagar 66KV Bhavnagar Maximum 50-70 170 Bhavanagar Bhavnagar 66KV Valketgate 30-40 220 KV MW RE 171 Bhavanagar Bhavnagar 66KV Vartej-II (Chitra) Vartej injection 172 Bhavanagar Bhavnagar 66KV Nari Road feasible 173 Bhavanagar Bhavnagar 66KV Desainagar 30-35 174 Bhavanagar Ghogha 66KV Kharakdi (Samdhiyara) 175 Bhavanagar Shihor 66KV Songadh 20-25 176 Bhavanagar Shihor 66KV Sar 177 Bhavanagar Bhavnagar 66KV Navagam (Kardej) 178 Bhavanagar Shihor 66KV Shihor 30-40 179 Bhavanagar Shihor 66KV Sihor-2 180 Bhavanagar Shihor 66KV Nesda 15-20 181 Bhavanagar Shihor 66KV Ghanghali 182 Bhavanagar Palitana 220/66KV Sagapara (Palitana) 50-70 183 Bhavanagar Bhavnagar 66KV Tana 184 Bhavanagar Ghogha 66KV Dihor Bhavnagar 185 Bhavanagar 66KV Trapaj Maximum 50-70 186 Bhavnagar Talaja 66KV Mannar 220 KV MW RE 187 Bhavnagar Ghogha 66KV Navagam (Kukad) 10-15 Sagapara injection 188 Bhavnagar Talaja 66KV Talaja feasible 189 Bhavnagar Talaja 66KV Pasvi 190 Bhavnagar Talaja 66KV Devalia 191 Bhavanagar Ghogha 66KV Timana 192 Bhavanagar Bhavnagar 66KV Godidhal 8-10 193 Junagadh Visavadar 220/66KV Visavadar 50-70 194 Junagadh Visavadar 66KV Dhebar 195 Junagadh Visavadar 66KV Bhalgam 15-20 196 Junagadh Visavadar 66KV Navihaliyad Maximum 50-70 197 Junagadh Bhesan 66KV Junidhari Gundali (TadkaPipliya) 220 KV MW RE 198 Junagadh Bhesan 66KV Chuda Visavadar injection 199 Junagadh Bhesan 66KV feasible 200 Junagadh Bhesan 66KV Chanaka 10-15 201 Junagadh Bhesan 66KV Ishwariya 202 Junagadh Bhesan 66KV Bhesan 203 Junagadh Visavadar 66KV Mota Kotda D:\E_Drive\RE\Web-site-Update\Feb-21\RE-Integration-66KV-Feb21-Rev-17062021.xlsx 31/33 Details of district wise substations for RE integration as on February-2021 (Revised) Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. In acse of line bay issue at a specified substation, developer has to select nearby substation from the list. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

Sr. Name fo Tentative feasible Name of EHV Name of Taluka Name of Substation RE integration (in Remark No. District MW) Source S/S Saurashtra 204 Junagadh Visavadar 66KV Ratang (Magharadi) 205 Junagadh Mendarda 66KV Itali 15-20 206 Junagadh Visavadar 66KV Baradia Maximum 50-70 207 Junagadh Visavadar 66KV Khambhaliya (Ozat) 30-40 220 KV MW RE 208 Junagadh Visavadar 66KV Govindpara (Jetalvad) 30-40 Visavadar injection 209 Junagadh Visavadar 66KV Moti Monpari 20-25 feasible 210 Junagadh Visavadar 66KV Kankchiyala 8-10 211 Junagadh Visavadar 66KV Bhutdi 212 Amreli Savarkundla 66 KV Badhada 213 Amreli Khambha 66 KV Mota Samadhiyala 8-10 214 Amreli Dhari 66 KV Devla 215 Amreli Dhari 66KV Chalala Maximum 40-50 8-10 220 KV 216 Amreli Dhari 66KV Hudali MW RE Savarkundl 217 Amreli Savarkundla 66KV Ambardi 20-25 injection a 218 Amreli Amreli 66KV Savarkundla 30-40 feasible 219 Amreli Amreli 220/66KV Savarkundla 50-70 220 Amreli Savarkundla 66KV Hathsani 25-30 221 Amreli Dhari 66KV Nagadhra 222 Amreli Amreli 400/220/66KV Amreli 50-70 223 Amreli Amreli 66KV Mota Ankadiya (Limbadia) 20-25 Maximum 50-70 224 Amreli Amreli 66KV Amreli - A 400 KV MW RE 225 Amreli Amreli 66KV Amreli - B Amreli injection 8-10 226 Amreli Amreli 66KV Jaliya feasible 227 Amreli Amreli 66KV Gavadka (Amreli-C)

D:\E_Drive\RE\Web-site-Update\Feb-21\RE-Integration-66KV-Feb21-Rev-17062021.xlsx 32/33 Details of district wise substations for RE integration as on February-2021 (Revised) Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. In acse of line bay issue at a specified substation, developer has to select nearby substation from the list. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

Sr. Name fo Tentative feasible Name of EHV Name of Taluka Name of Substation RE integration (in Remark No. District MW) Source S/S Saurashtra 228 Rajkot Jetpur 400/220/66KV Jetpur 50-70 229 Amreli Kunka-vav 66KV Vadiya 230 Amreli Kunka-vav 66KV Amrapar 8-10 231 Amreli Kunka-vav 66KV Nava Ujala (Kajuri Pipaliya) 232 Amreli Kunka-vav 66KV Tori 233 Rajkot Dhoraji 66 KV Moti Parabdi (Toraniya) 25-30 234 Rajkot Jetpur 66KV Jetpur-A 20-25 235 Rajkot Jetpur 66KV Dhoraji Bypass 20-25 236 Rajkot Jetpur 66KV Mandlikpur 237 Rajkot Jetpur 66KV Jetalsar 10-15 238 Rajkot Jetpur 66KV Arab Timbadi Maximum 50-70 239 Rajkot Gondal 66KV Lilakha 400 KV MW RE 240 Junagadh Jetpur 66KV Virpur Jetpur injection 241 Amreli Jetpur 66KV Amarnagar feasible 242 Rajkot Gondal 66KV Sultanpur 25-30 243 Rajkot Gondal 66KV Derdi (K) 244 Rajkot Kunka-vav 66KV Ranuja 245 Amreli Babra 66KV Mota Devadiya 246 Rajkot Jetpur 66KV Devki Galol 247 Junagadh Bhesan 66KV Khambhaliya (Mandva) 8-10 248 Amreli Kunka-vav 66KV Hanuman Khijadiya 249 Rajkot Jetpur 66KV Jetpur-B 250 Rajkot Jetpur 66KV Jetpur (Dhareshwar) 25-30 251 Rajkot Jetpur 66 KV Amrapar (Reshamadi Galol) 25-30 252 Rajkot Rajkot 400/220/66KV Hadala 50-70 253 Rajkot Rajkot 66KV Navagam (Rajkot - F) 30-40 Maximum 50-70 254 Rajkot Rajkot 66KV Vijaynagar (Hadala) 30-35 400 KV MW RE 255 Rajkot Rajkot 66KV Aji Dahisarda 30-40 Hadala injection 256 Rajkot Rajkot 66KV Kagdadi 30-40 feasible 257 Rajkot Rajkot 66KV Popatpara 30-40