MARBURY WARD

Site Ref Address/Location Yield Yield Site Area (ha) Total Potential Total

MAR0001 Old Road / New Road (land at), Anderton 0.63 13 MAR0002 Daisy Bank Lane/Scot Hill (land at), Anderton 0.66 21 MAR0003 Weaver Navigation / Road (land at), Barnton 0.97 31 MAR0004 Cross Street (land at), Marston 3.79 106 MAR0005 Urban village, Chapel Street, Wincham 43.08 1131 MAR0006 Chapel Street (land at), Wincham 11.53 303 MAR0007 Stubbs Lane (land at), (Lostock Triangle) 4.37 160 MAR0008 Foggs Farm, Stockley Lane, Antrobus, 0.029 2 MAR0009 Tunnel Road (land and buildings at no. 7), Barnton 0.4 13 MAR0010 The Homestead, Linnards Lane, Wincham, Northwich CW9 6ED 0.2 5 MAR0012 Ashwood Tree Farm (land at), Reed Lane, Antrobus, Northwich 0.101 2 MAR0013 105 Runcorn Road (Christian Community Ministries), Barnton, Northwich 0.016 1 MAR0014 107 Runcorn Road (land adjacent), Barnton, Northwich 0.05 4 MAR0015 159 Runcorn Road, Barnton, Northwich CW8 4HR 0.03 2 MAR0017 Barnton Scout Group, Church Road, Barnton 0.04 3 MAR0018 Royal British Legion (land to rear), Meadow Crive, Barnton, Northwich 0.39 12 MAR0019 Sheperds View, Church Road, Barnton, Northwich 0.026 1 MAR0020 14 Station Road (land to the rear), Lostock Gralam, Northwich 0.06 1 MAR0021 Horton Heath Lodge, Shutley Lane, 0 1 MAR0023 Brook House Farm, Cogshall Lane, , Northwich 0 1 MAR0035 Timber Yard and adjacent land, Townfield Lane, Barnton 0.17 8 TOTAL = 66.542 1821

Cheshire West and SHLAA: 2010 Schedule of sites

Site Details Site Ref: MAR0001 Address/ Old Road / New Road (land at), Anderton Planning Status Full Permission Location Site Area (Ha) 0.63 Ward Marbury Source: Housing Monitor Potential Yield 13 Ownership Walkers Coaches NLUD Site. Density (per Ha) 35

Site Summary Key Site Characteristics Site Type Previously Developed In use as coach depot. Site is screened by trees.

Constraints to delivery Measures to overcome constraints Existing use Relocation of existing use

Assessment Suitability PDL site in established residential area Suitable? Yes

Availability Site owners looking to redevelop site Available? Yes

Achievability Outline planning application approved, indicative plan for 13 houses. Achievable? Yes Is site deliverable within 5 years? Yes Estimated delivery timeframe Within 5 years Supply years 1 ‐5 13 Supply years 6 ‐10 0 Supply years 11 ‐15 0 Supply years 16 ‐17 0

Conclusion Site has secured outline permission and could be expected to deliver housing within 5 years subject to approval of reserved matters.

Crown Copyright 2010 ‐ 100049046 Site Details Site Ref: MAR0002 Address/ Daisy Bank Lane/Scot Hill (land at), Anderton Planning Status Full Permission Location Site Area (Ha) 0.66 Ward Marbury Source: Historic SHLAA Potential Yield 21 Ownership NLUD Site Density (per Ha) 35

Site Summary Key Site Characteristics Site Type Previously Developed Part of site appears vacant, part in use as farm shop and garden centre. Site adjacent to industrial / storage units. Previous application for residential development on part of site.

Constraints to delivery Measures to overcome constraints Existing use / buildings on site Relocation of existing use / removal of buildings

Assessment Suitability PDL site within urban area Suitable? Yes

Availability In use Available? No

Achievability No plans to develop Achievable? No Is site deliverable within 5 years? No Estimated delivery timeframe 6 to 10 years Supply years 1 ‐5 0 Supply years 6 ‐10 21 Supply years 11 ‐15 0 Supply years 16 ‐17 0

Conclusion Some existing uses on site and possible ownership problems could delay the ability of the site to deliver housing. More likely to be a medium term prospect.

Crown Copyright 2010 ‐ 100049046 Site Details Site Ref: MAR0003 Address/ Weaver Navigation / Runcorn Road (land at), Barnton Planning Status Allocated Site Location Site Area (Ha) 0.97 Ward Marbury Source: Historic SHLAA Potential Yield 31 Ownership NLUD Site 63500115 Density (per Ha) 35

Site Summary Key Site Characteristics Site Type Greenfield Vacant previously developed land but now appearance suggests greenfield site. Adjacent to

Constraints to delivery Measures to overcome constraints Majority of site is Flood Zone 2 Flood Mitigation

Assessment Suitability Vacant site in urban area Suitable? Yes

Availability Vacant site Available? Yes

Achievability No plans to develop site Achievable? No Is site deliverable within 5 years? No Estimated delivery timeframe 6 to 10 years Supply years 1 ‐5 0 Supply years 6 ‐10 31 Supply years 11 ‐15 0 Supply years 16 ‐17 0

Conclusion No expectation that site will come forward in the short term.

Crown Copyright 2010 ‐ 100049046 Site Details Site Ref: MAR0004 Address/ Cross Street (land at), Marston Planning Status None/Other Location Site Area (Ha) 3.79 Ward Marbury Source: Historic SHLAA Potential Yield 106 Ownership Density (per Ha) 35

Site Summary Key Site Characteristics Site Type Greenfield Large, predominantly greenfield site. Former omission site in Local Plan. Adjacent to caravan / mobile home park to south and residential properties to the north west. Canal runs along north eastern boundary.Within Conservation Area.

Constraints to delivery Measures to overcome constraints Conservation area / adj. to ancient monument high quality development.

Assessment Suitability Within settlement / residential area. Local Plan ommision site. Suitable? Yes

Availability Vacant site Available? Yes

Achievability No plans for development Achievable? No Is site deliverable within 5 years? No Estimated delivery timeframe 6 to 10 years Supply years 1 ‐5 0 Supply years 6 ‐10 106 Supply years 11 ‐15 0 Supply years 16 ‐17 0

Conclusion Site has potential to deliver housing but as yet no plans, hence a medium term prospect.

Crown Copyright 2010 ‐ 100049046 Site Details Site Ref: MAR0005 Address/ Wincham Urban village, Chapel Street, Wincham Planning Status None/Other Location Site Area (Ha) 43.08 Ward Marbury Source: Call for Sites Potential Yield 1131 Ownership Various ‐ Wincham Constortium. Partly INEOS Enterprises Density (per Ha) 35

Site Summary Key Site Characteristics Site Type Previously Developed Large site in variety of uses and ownerships including storage / football / industrial. Under utilised site. Opportunity for residential led mixed use development. Chlorine storage affects area

Constraints to delivery Measures to overcome constraints Chlorine storage / pipeline issues. Mitigation against chlorine storage issues.

Assessment Suitability Site currently under utilised Suitable? Yes

Availability Site in current use but aspirations to redevelop Available? No

Achievability No plans yet confirmed for redevelopment of site. Consortium working on proposals for Achievable? urban village No Is site deliverable within 5 years? No Estimated delivery timeframe 6 to 10 years Supply years 1 ‐5 0 Supply years 6 ‐10 500 Supply years 11 ‐15 500 Supply years 16 ‐17 131

Conclusion Site is an ongoing aspiration to bring forward for a residential led urban village. Medium to long term prospect.

Crown Copyright 2010 ‐ 100049046 Site Details Site Ref: MAR0006 Address/ Chapel Street (land at), Wincham Planning Status None/Other Location Site Area (Ha) 11.53 Ward Marbury Source: Historic SHLAA Potential Yield 303 Ownership Various ‐ including Trouw Nutrition / Part West and Density (per Ha) 35

Site Summary Key Site Characteristics Site Type Previously Developed Industrial uses in current use. Canal passes through site. Area to east of canal is industrial in nature.

Constraints to delivery Measures to overcome constraints Existing uses / neighbouring uses Vacation of existing use / mitigation

Assessment Suitability Industrial area and surrounding industrial uses to east of site Suitable? Yes

Availability In current use Available? No

Achievability No plans to develop site. Achievable? No Is site deliverable within 5 years? No Estimated delivery timeframe 11 to 15 years Supply years 1 ‐5 0 Supply years 6 ‐10 0 Supply years 11 ‐15 303 Supply years 16 ‐17 0

Conclusion Long term prospect. Site currently in multiple ownerships and uses which would have to vacate site before any prospect of residential development coming forward.

Crown Copyright 2010 ‐ 100049046 Site Details Site Ref: MAR0007 Address/ Stubbs Lane (land at), Lostock Gralam (Lostock Triangle) Planning Status Awaiting Decision Location Site Area (Ha) 4.37 Ward Marbury Source: Historic SHLAA Potential Yield 160 Ownership Marshall CDP Density (per Ha) 35

Site Summary Key Site Characteristics Site Type Greenfield Vacant portion of employment allocation on edge of settlement. Access is already established and Phase 1 of Business Park development completed to north west of site. Residential development to south and west of site. Outline application submitted. Constraints to delivery Measures to overcome constraints Employment allocation Policy review, justify alternative use

Assessment Suitability Ready to develop site although allocated for employment / office development Suitable? Yes

Availability Site is ready to develop Available? Yes

Achievability Outline application for residential development submitted August 2010 Achievable? Yes Is site deliverable within 5 years? Yes Estimated delivery timeframe Within 5 years Supply years 1 ‐5 150 Supply years 6 ‐10 10 Supply years 11 ‐15 0 Supply years 16 ‐17 0

Conclusion Housing development being promoted for site by landowner. If approved and reserved matters also approved there is reasonable prospect that this site could deliver housing within 5 years.

Crown Copyright 2010 ‐ 100049046 Site Details Site Ref: MAR0008 Address/ Foggs Farm, Stockley Lane, Antrobus, Northwich Planning Status Full Permission Location Site Area (Ha) 0.029 Ward Marbury Source: Housing Monitor Potential Yield 2 Ownership Density (per Ha) 2

Site Summary Key Site Characteristics Site Type Greenfield Agricultural barns

Constraints to delivery Measures to overcome constraints

Assessment Suitability Reuse of rural buildings Suitable? Yes

Availability Vacant barns Available? Yes

Achievability Permission granted for residential development Achievable? Yes Is site deliverable within 5 years? Yes Estimated delivery timeframe Within 5 years Supply years 1 ‐5 2 Supply years 6 ‐10 0 Supply years 11 ‐15 0 Supply years 16 ‐17 0

Conclusion

Crown Copyright 2010 ‐ 100049046 Site Details Site Ref: MAR0009 Address/ Tunnel Road (land and buildings at no. 7), Barnton Planning Status Awaiting S106 Location Site Area (Ha) 0.4 Ward Marbury Source: Housing Monitor Potential Yield 13 Ownership Density (per Ha) 13

Site Summary Key Site Characteristics Site Type Previously Developed Part off site is car garage / workshop. Part largely vacant. Access via narrow track.

Constraints to delivery Measures to overcome constraints

Assessment Suitability Residential area, paritally previously developed Suitable? Yes

Availability Majority of site, inc application site is vacant Available? Yes

Achievability Permission granted for residential development Achievable? Yes Is site deliverable within 5 years? Yes Estimated delivery timeframe Within 5 years Supply years 1 ‐5 13 Supply years 6 ‐10 0 Supply years 11 ‐15 0 Supply years 16 ‐17 0

Conclusion

Crown Copyright 2010 ‐ 100049046 Site Details Site Ref: MAR0010 Address/ The Homestead, Linnards Lane, Wincham, Northwich CW9 Planning Status Outline Permission Location 6ED Site Area (Ha) 0.2 Ward Marbury Source: Housing Monitor Potential Yield 5 Ownership Density (per Ha) 5

Site Summary Key Site Characteristics Site Type Previously Developed Residential use

Constraints to delivery Measures to overcome constraints

Assessment Suitability Large residential site Suitable? Yes

Availability Vacant dwelling and land Available? Yes

Achievability Permission granted for residential development Achievable? Yes Is site deliverable within 5 years? Yes Estimated delivery timeframe Within 5 years Supply years 1 ‐5 5 Supply years 6 ‐10 0 Supply years 11 ‐15 0 Supply years 16 ‐17 0

Conclusion

Crown Copyright 2010 ‐ 100049046 Site Details Site Ref: MAR0012 Address/ Ashwood Tree Farm (land at), Reed Lane, Antrobus, Planning Status Awaiting S106 Location Northwich Site Area (Ha) 0.101 Ward Marbury Source: Housing Monitor Potential Yield 1 Ownership Density (per Ha) 1

Site Summary Key Site Characteristics Site Type Greenfield Agriculture

Constraints to delivery Measures to overcome constraints

Assessment Suitability Key workers dwelling Suitable? Yes

Availability Agricultural land Available? Yes

Achievability Permission granted for residential development Achievable? Yes Is site deliverable within 5 years? Yes Estimated delivery timeframe Within 5 years Supply years 1 ‐5 1 Supply years 6 ‐10 0 Supply years 11 ‐15 0 Supply years 16 ‐17 0

Conclusion

Crown Copyright 2010 ‐ 100049046 Site Details Site Ref: MAR0013 Address/ 105 Runcorn Road (Christian Community Ministries), Planning Status Awaiting S106 Location Barnton, Northwich CW8 4EX Site Area (Ha) 0.016 Ward Marbury Source: Housing Monitor Potential Yield 1 Ownership Density (per Ha) 1

Site Summary Key Site Characteristics Site Type Previously Developed Retail units

Constraints to delivery Measures to overcome constraints

Assessment Suitability Change of use Suitable? Yes

Availability Vacant Available? Yes

Achievability Permission granted for residential development Achievable? Yes Is site deliverable within 5 years? Yes Estimated delivery timeframe Within 5 years Supply years 1 ‐5 1 Supply years 6 ‐10 0 Supply years 11 ‐15 0 Supply years 16 ‐17 0

Conclusion

Crown Copyright 2010 ‐ 100049046 Site Details Site Ref: MAR0014 Address/ 107 Runcorn Road (land adjacent), Barnton, Northwich Planning Status Full Permission Location Site Area (Ha) 0.05 Ward Marbury Source: Housing Monitor Potential Yield 4 Ownership Density (per Ha) 60

Site Summary Key Site Characteristics Site Type Previously Developed Infill plot

Constraints to delivery Measures to overcome constraints

Assessment Suitability Infill plot Suitable? Yes

Availability Site is currently vacant Available? Yes

Achievability Permission granted for residential development Achievable? Yes Is site deliverable within 5 years? Yes Estimated delivery timeframe Within 5 years Supply years 1 ‐5 4 Supply years 6 ‐10 0 Supply years 11 ‐15 0 Supply years 16 ‐17 0

Conclusion

Crown Copyright 2010 ‐ 100049046 Site Details Site Ref: MAR0015 Address/ 159 Runcorn Road, Barnton, Northwich CW8 4HR Planning Status Full Permission Location Site Area (Ha) 0.03 Ward Marbury Source: Housing Monitor Potential Yield 2 Ownership Density (per Ha) 2

Site Summary Key Site Characteristics Site Type Previously Developed Ground floor shop

Constraints to delivery Measures to overcome constraints

Assessment Suitability Change of use Suitable? Yes

Availability Vacant unit Available? Yes

Achievability Permission granted for residential development Achievable? Yes Is site deliverable within 5 years? Yes Estimated delivery timeframe Within 5 years Supply years 1 ‐5 2 Supply years 6 ‐10 0 Supply years 11 ‐15 0 Supply years 16 ‐17 0

Conclusion

Crown Copyright 2010 ‐ 100049046 Site Details Site Ref: MAR0017 Address/ Barnton Scout Group, Church Road, Barnton Planning Status Full Permission Location Site Area (Ha) 0.04 Ward Marbury Source: Housing Monitor Potential Yield 3 Ownership Density (per Ha) 3

Site Summary Key Site Characteristics Site Type Previously Developed Site of Scout Hut

Constraints to delivery Measures to overcome constraints

Assessment Suitability Relocation of Scout Hut required Suitable? Yes

Availability Vacant Available? Yes

Achievability Permission granted for residential development Achievable? Yes Is site deliverable within 5 years? Yes Estimated delivery timeframe Within 5 years Supply years 1 ‐5 3 Supply years 6 ‐10 0 Supply years 11 ‐15 0 Supply years 16 ‐17 0

Conclusion

Crown Copyright 2010 ‐ 100049046 Site Details Site Ref: MAR0018 Address/ Royal British Legion (land to rear), Meadow Crive, Barnton, Planning Status Full Permission Location Northwich CW8 4PH Site Area (Ha) 0.39 Ward Marbury Source: Housing Monitor Potential Yield 12 Ownership Density (per Ha) 12

Site Summary Key Site Characteristics Site Type Previously Developed Former Royal British Legion site

Constraints to delivery Measures to overcome constraints

Assessment Suitability Redevelopment of site Suitable? Yes

Availability Application for redevelopment submitted and granted Available? Yes

Achievability Permission granted for residential development Achievable? Yes Is site deliverable within 5 years? Yes Estimated delivery timeframe Within 5 years Supply years 1 ‐5 12 Supply years 6 ‐10 0 Supply years 11 ‐15 0 Supply years 16 ‐17 0

Conclusion

Crown Copyright 2010 ‐ 100049046 Site Details Site Ref: MAR0019 Address/ Sheperds View, Church Road, Barnton, Northwich Planning Status Full Permission Location Site Area (Ha) 0.026 Ward Marbury Source: Housing Monitor Potential Yield 1 Ownership Density (per Ha) 1

Site Summary Key Site Characteristics Site Type Greenfield Garden land

Constraints to delivery Measures to overcome constraints

Assessment Suitability Unused garden land Suitable? Yes

Availability Vacant land Available? Yes

Achievability Permission granted for residential development Achievable? Yes Is site deliverable within 5 years? Yes Estimated delivery timeframe Within 5 years Supply years 1 ‐5 1 Supply years 6 ‐10 0 Supply years 11 ‐15 0 Supply years 16 ‐17 0

Conclusion

Crown Copyright 2010 ‐ 100049046 Site Details Site Ref: MAR0020 Address/ 14 Station Road (land to the rear), Lostock Gralam, Northwich Planning Status Full Permission Location Site Area (Ha) 0.06 Ward Marbury Source: Housing Monitor Potential Yield 1 Ownership Density (per Ha) 17

Site Summary Key Site Characteristics Site Type Previously Developed Vacant land and building to rear of properties

Constraints to delivery Measures to overcome constraints

Assessment Suitability Disused land Suitable? Yes

Availability Vacant Available? Yes

Achievability Permission granted for residential development Achievable? Yes Is site deliverable within 5 years? Yes Estimated delivery timeframe Within 5 years Supply years 1 ‐5 1 Supply years 6 ‐10 0 Supply years 11 ‐15 0 Supply years 16 ‐17 0

Conclusion

Crown Copyright 2010 ‐ 100049046 Site Details Site Ref: MAR0021 Address/ Horton Heath Lodge, Shutley Lane, Little Leigh Planning Status Full Permission Location Site Area (Ha) 0 Ward Marbury Source: Housing Monitor Potential Yield 1 Ownership Density (per Ha) 1

Site Summary Key Site Characteristics Site Type Greenfield Agricultural land

Constraints to delivery Measures to overcome constraints

Assessment Suitability Agricultrual workers dwelling Suitable? Yes

Availability Unused land Available? Yes

Achievability Permission granted for residential development Achievable? Yes Is site deliverable within 5 years? Yes Estimated delivery timeframe Within 5 years Supply years 1 ‐5 1 Supply years 6 ‐10 0 Supply years 11 ‐15 0 Supply years 16 ‐17 0

Conclusion

Crown Copyright 2010 ‐ 100049046 Site Details Site Ref: MAR0023 Address/ Brook House Farm, Cogshall Lane, Comberbach, Northwich Planning Status Full Permission Location Site Area (Ha) 0 Ward Marbury Source: Housing Monitor Potential Yield 1 Ownership Density (per Ha) 1

Site Summary Key Site Characteristics Site Type Greenfield Agricultural land

Constraints to delivery Measures to overcome constraints

Assessment Suitability Agricultural workers dwelling Suitable? Yes

Availability Land is unused Available? Yes

Achievability Permission granted for residential development Achievable? Yes Is site deliverable within 5 years? Yes Estimated delivery timeframe Within 5 years Supply years 1 ‐5 1 Supply years 6 ‐10 0 Supply years 11 ‐15 0 Supply years 16 ‐17 0

Conclusion

Crown Copyright 2010 ‐ 100049046 Site Details Site Ref: MAR0035 Address/ Timber Yard and adjacent land, Townfield Lane, Barnton Planning Status Full Permission Location Site Area (Ha) 0.17 Ward Marbury Source: Housing Monitor Potential Yield 8 Ownership Density (per Ha) 8

Site Summary Key Site Characteristics Site Type Previously Developed Vacant site. Some mature/semimature trees and vegetation on periphery.

Constraints to delivery Measures to overcome constraints

Assessment Suitability residential area, previously developed Suitable? Yes

Availability Vacant site Available? Yes

Achievability Permission granted for residential development Achievable? Yes Is site deliverable within 5 years? Yes Estimated delivery timeframe Within 5 years Supply years 1 ‐5 8 Supply years 6 ‐10 Supply years 11 ‐15 Supply years 16 ‐17

Conclusion