Circle Thane District Thane

Total Page:16

File Type:pdf, Size:1020Kb

Circle Thane District Thane Circle Thane No. of Expected visit Expected Facility to be No.of visit in Name of District/ Name of Facility Planned to be Visited in that Name of Post Date @ month visited in 1 Visit Month Block visit with Number Murbad 03-05-2017 Rh Murbad,phc Kishore,Phc Mhasa Mahad 05-05-2017 Phc Birwadi,Sc Dahiwad 3 DHO /CS Office, 1 PHC Ambernath 11-05-2017 Phc Badlapur, Rh Badlapur & 2 SC Circle Program Or 7 7 Bhiwandi 16-05-2017 Phc Chimbipada,Sc Katai,SDh Bhiwandi Manager 1 RH/SDH, 1 FRU & 1 DP PHC Talsari 17-05-2017 Rh Talsari,Phc Amangaon Palghar 23-05-2017 Phc Edwan,Sc Agarwadi Wada 25-05-2017 Phc Gorhe,Sc Galtare Murbad 03-05-2017 Rh Murbad,phc Kishore,Phc Mhasa Mahad 05-05-2017 Phc Birwadi,Sc Dahiwad Ambernath 11-05-2017 Phc Badlapur, Rh Badlapur Bhiwandi 16-05-2017 Phc Chimbipada,Sc Katai,SDh Bhiwandi 1 PHC/ 3 SC / 1 RH / 1 Circle M&E Officer 9 9 Talsari 17-05-2017 Rh Talsari,Phc Amangaon FRU / 1 DP PHC Palghar 23-05-2017 Phc Edwan,Sc Agarwadi Wada 25-05-2017 Phc Gorhe,Sc Galtare Shahapur 30-05-2017 phc Tembha,Sdh Shahapur Khalapur 31-05-2017 phc Lohop,Sc Nigde District Thane Bhiwandi 03-05-2017 Padagha, Kon, Divaanjur Ambernath 04-05-2017 Chon, Wangani, Sonawala Murbad 05-05-2017 Tulai, Saralgaon Bhiwandi 06-05-2017 Dhamangaon, Angaon Shahapur 09-05-2017 Vashind, Aajde, Piwali,Pathak Bhiwandi 11-05-2017 Pimpalghar, Kon DHO 9 9 12 Kalyan 12-05-2017 Ajide, Manpada Murbad 16-05-2017 Dhasai, Vaishakhare Murbad 17-05-2017 Devape Bhiwandi 18-05-2017 Dhamangaon, Angaon Shahapur 19-05-2017 Tembha, Kasara, dolkhamb Ambernath 20-05-2017 Sonawala, Wangani No. of Expected visit Expected Facility to be No.of visit in Name of District/ Name of Facility Planned to be Visited in that Name of Post Date @ month visited in 1 Visit Month Block visit with Number Bhiwandi 09-05-2017 SDH Bhiwandi Kalyan 11-05-2017 RH Goveli Ulhasnagar 12-05-2017 WH, CH Murbad 16-05-2017 RH Murbad CS 6 6 8 Shahapur 17-05-2017 SDH Shahapur Ambernath 18-05-2017 Badalapur, Ambernath MCL, Shahapur 19-05-2017 RH Kharadi Murbad 20-05-2017 RH Tokawade Bhiwandi 09-05-2017 SDH Bhiwandi Kalyan 11-05-2017 RH Goveli Ulhasnagar 12-05-2017 WH, CH Murbad 16-05-2017 RH Murbad ACS 6 6 8 Shahapur 17-05-2017 SDH Shahapur Ambernath 18-05-2017 Badalapur, Ambernath MCL, Shahapur 19-05-2017 RH Kharadi Murbad 20-05-2017 RH Tokawade Shahapur 04-05-2017 Padagha, Kon, Divaanjur Murbad 05-05-2017 Chon, Wangani, Sonawala Bhiwandi 06-05-2017 Tulai, Saralgaon Kalyan 09-05-2017 Dhamangaon, Angaon Bhiwandi 11-05-2017 Vashind, Aajde, Piwali,Pathak DRCHO 9 9 10 Murbad 12-05-2017 Pimpalghar, Kon Murbad 16-05-2017 Ajide, Manpada Bhiwandi 17-05-2017 Dhasai, Vaishakhare Shahapur 18-05-2017 Devape Bhiwandi 19-05-2017 Dhamangaon, Angaon Kinhvali, Shenava, Takipathar Bhiwandi 04-05-2017 Ambernath 05-05-2017 Saragaon, Dhasai, Shiroshi,moroshi Murbad 06-05-2017 Dabhad, Vajreshwari, kunda Pathak D.P.M 9 9 10 No. of Expected visit Expected Facility to be No.of visit in Name of District/ Name of Facility Planned to be Visited in that Name of Post Date @ month visited in 1 Visit Month Block visit with Number Bhiwandi 09-05-2017 Khadavali, Dahagaon Shahapur 11-05-2017 Divaanjur, Padgha, kon D.P.M 9 9 10 Bhiwandi 12-05-2017 Kishor, Mhasa , Narivali Kalyan 16-05-2017 Tulai, Shivale Murbad 17-05-2017 chimbipada ,Kharbav Murbad 18-05-2017 Vashind, Aajde, Piwali,Pathak Bhiwandi 19-05-2017 Dhamangaon, Angaon Bhiwandi 03-05-2017 Padagha, Kon, Divaanjur Ambernath 04-05-2017 Chon, Wangani, Sonawala Murbad 05-05-2017 Tulai, Saralgaon Bhiwandi 06-05-2017 Dhamangaon, Angaon Shahapur 09-05-2017 Vashind, Aajde, Piwali,Pathak D. M & E officer 9 9 10 Bhiwandi 11-05-2017 Pimpalghar, Kon Kalyan 12-05-2017 Ajide, Manpada Murbad 16-05-2017 Dhasai, Vaishakhare Murbad 17-05-2017 Moroshi, rh Murbad Bhiwandi 18-05-2017 Dhamangaon, Angaon Bhiwandi 03-05-2017 Padagha, Kon, Divaanjur Ambernath 04-05-2017 Chon, Wangani, Sonawala Murbad 05-05-2017 Tulai, Saralgaon Bhiwandi 06-05-2017 Dhamangaon, Angaon Dam 9 9 9 Shahapur 09-05-2017 Vashind, Aajde, Piwali,Pathak Bhiwandi 11-05-2017 Pimpalghar, Kon Kalyan 12-05-2017 Ajide, Manpada Murbad 16-05-2017 Dhasai, Vaishakhare Murbad 17-05-2017 Devape. Shiroshi, moroshi Bhiwandi 03-05-2017 Padagha, Kon, Divaanjur Ambernath 04-05-2017 Chon, Wangani, Sonawala Murbad 05-05-2017 Tulai, Saralgaon Asha Co ordinator 9 9 9 No. of Expected visit Expected Facility to be No.of visit in Name of District/ Name of Facility Planned to be Visited in that Name of Post Date @ month visited in 1 Visit Month Block visit with Number Bhiwandi 06-05-2017 Dhamangaon, Angaon Asha Co ordinator 9 9 9 Shahapur 09-05-2017 Vashind, Aajde, Piwali,Pathak Bhiwandi 11-05-2017 Pimpalghar, Kon Kalyan 12-05-2017 Ajide, Manpada, Murbad 16-05-2017 Dhasai, Vaishakhare Murbad 17-05-2017 Shiroshi, moroshi Shahapur 04-05-2017 Padagha, Kon, Divaanjur Murbad 05-05-2017 Chon, Wangani, Sonawala Bhiwandi 06-05-2017 Tulai, Saralgaon Kalyan 09-05-2017 Dhamangaon, Angaon IPHS Co-ordinator 9 9 9 Bhiwandi 11-05-2017 Vashind, Aajde, Piwali,Pathak Murbad 12-05-2017 Pimpalghar, Kon Murbad 16-05-2017 Ajide, Manpada Bhiwandi 17-05-2017 Dhasai, Vaishakhare Shahapur 18-05-2017 RH Khardi, SDH Shahapur Shahapur 04-05-2017 Padagha, Kon, Divaanjur Murbad 05-05-2017 Chon, Wangani, Sonawala Bhiwandi 06-05-2017 Tulai, Saralgaon Kalyan 09-05-2017 Dhamangaon, Angaon RKS Co-ordinator 9 9 9 Bhiwandi 11-05-2017 Vashind, Aajde, Piwali,Pathak Murbad 12-05-2017 Pimpalghar, Kon Murbad 16-05-2017 rh Goveli Bhiwandi 17-05-2017 Dhasai, Vaishakhare Shahapur 18-05-2017 RH Khardi, SDH Shahapur Shahapur 06-05-2017 PHC Kasara Shahapur 09-05-2017 PHC Kinhvali Bhiwandi 11-05-2017 PHC Vajreshwari Bhiwandi 12-05-2017 PHC Vajreshwari Bhiwandi 16-05-2017 PHC Vajreshwari Deputy Er 9 9 13 No. of Expected visit Expected Facility to be No.of visit in Name of District/ Name of Facility Planned to be Visited in that Name of Post Date @ month visited in 1 Visit Month Block visit with Number Bhiwandi 17-05-2017 PHC Vajreshwari Deputy Er 9 9 13 Shahapur 18-05-2017 PHC Kasara Shahapur 19-05-2017 PHC Kinhvali Shahapur 20-05-2017 PHC Kasara Shahapur 23-05-2017 PHC Kasara Shahapur 24-05-2017 PHC Kinhvali Shahapur 25-05-2017 PHC Kinhvali Bhiwandi 27-05-2017 PHC Vajreshwari Shahapur 06-05-2017 Phc Kasara Shahapur 09-05-2017 Phc Kasara Shahapur 11-05-2017 Phc Kasara Shahapur 12-05-2017 Phc Kasara Shahapur 16-05-2017 Phc Kasara Shahapur 17-05-2017 Phc Kinhvali Junior Engineer 11 12 (S.V.Rasal) Shahapur 18-05-2017 Phc Kinhvali Shahapur 19-05-2017 Phc Kinhvali Shahapur 20-05-2017 Phc Kinhvali Shahapur 23-05-2017 Phc Kinhvali Shahapur 24-05-2017 Phc Kinhvali Shahapur 25-05-2017 Phc Kinhvali Thane 03-05-2017 Phc Vajreshwari Thane 04-05-2017 Phc Vajreshwari Thane 05-05-2017 Phc Vajreshwari Thane 06-05-2017 Phc Vajreshwari Thane 09-05-2017 Phc Vajreshwari Thane 11-05-2017 Phc Vajreshwari Thane 12-05-2017 Phc Vajreshwari Thane 16-05-2017 Phc Vajreshwari Junior Engineer 11 11 18 (S.R.Kadam) No. of Expected visit Expected Facility to be No.of visit in Name of District/ Name of Facility Planned to be Visited in that Name of Post Date @ month visited in 1 Visit Month Block visit with Number Thane 17-05-2017 Phc Vajreshwari Junior Engineer 11 11 18 (S.R.Kadam) Thane 18-05-2017 Phc Vajreshwari Thane 19-05-2017 Phc Vajreshwari Thane 20-05-2017 Phc Vajreshwari Thane 23-05-2017 Phc Vajreshwari Thane 24-05-2017 Phc Vajreshwari Thane 25-05-2017 Phc Vajreshwari Thane 26-05-2017 Phc Vajreshwari Thane 30-05-2017 Phc Vajreshwari Thane 31-05-2017 Phc Vajreshwari District Raigad pen 03-05-2017 THO Office Pen PHC Washi Roha 06-05-2017 THO office Roha PHC Ambewadi SDH Roha Mangaon 11-05-2017 THO office Uran PHCKoproli RH Uran Mahad 12-05-2017 TPHC Birwadi & Dasgoan RH Mahad 3 DHO /CS Office, 1 PHC & 2 SC Panvel 13-05-2017 THO office Panvel PHC Ajiwali PHC Apta District Programme Or Manager (Dr. Nilesh 7 10 1 RH/SDH, 1 FRU & 1 Kokare) SDH Mangaon PHC Nizampur THO office DP PHC Mangaon 18-05-2017 Mangaon Khalapur 20-05-2017 RH Chowk PHC khalapur & THO Office Khalapur Karjat 23-05-2017 THO Karjat SDH Karjat, PHC Kalamb Shrivardhan 25-05-2017 SDH Shriwardhan PHC Walwati Murud 30-05-2017 RH Murud THO Office Murud Roha 03-05-2017 PHC kokban Murud 04-05-2017 PHC Borlimandla Alibag 06-05-2017 PHC Dhokwade Sc Awas Karjat 11-05-2017 SDH Karjat PHC Kalamb Kandas 3 DHO /CS Office, 1 PHC & 2 SC District Accounts Or Manager (Mr. Santosh 7 9 Mahad 16-05-2017 Rh mahad PHC Pachad Sc upper tudil 1 RH/SDH, 1 FRU & 1 R.Patil) DP PHC Poladpur 18-05-2017 RH Poladpur PHC Palchil 3 DHO /CS Office, 1 PHC & 2 SC District Accounts Or Manager (Mr. Santosh 7 9 1 RH/SDH, 1 FRU & 1 R.Patil) No. of Expected visit ExpectedDP Facility PHC to be No.of visit in Name of District/ Name of Facility Planned to be Visited in that Name of Post Date @ month visited in 1 Visit Month Block visit with Number SDH Shriwardhan PHC Walwati PHC Shrivardhan 20-05-2017 Borlipanchatan Khalapur 25-05-2017 PHC Khalapur RH Chowk Panvel 26-05-2017 PHC Apta PHC Nere Sudhagad 06-05-2017 THO Office Pali PHC Pali Uran 11-05-2017 RH Uran Tho Office Uran PHC Koproli Mangaon 13-05-2017 SDH Mangaon PHC Sai THO office Mangaon Khalapur 18-05-2017 Tho office Khalaour, RH Chouk 3 DHO /CS Office, 1 PHC & 2 SC District M& E Officer Or 7 9 Mahad 20-05-2017 RH Mahad THO Office PHC Birwadi (Mrs.
Recommended publications
  • MAHARASHTRA Not Mention PN-34
    SL Name of Company/Person Address Telephone No City/Tow Ratnagiri 1 SHRI MOHAMMED AYUB KADWAI SANGAMESHWAR SANGAM A MULLA SHWAR 2 SHRI PRAFULLA H 2232, NR SAI MANDIR RATNAGI NACHANKAR PARTAVANE RATNAGIRI RI 3 SHRI ALI ISMAIL SOLKAR 124, ISMAIL MANZIL KARLA BARAGHAR KARLA RATNAGI 4 SHRI DILIP S JADHAV VERVALI BDK LANJA LANJA 5 SHRI RAVINDRA S MALGUND RATNAGIRI MALGUN CHITALE D 6 SHRI SAMEER S NARKAR SATVALI LANJA LANJA 7 SHRI. S V DESHMUKH BAZARPETH LANJA LANJA 8 SHRI RAJESH T NAIK HATKHAMBA RATNAGIRI HATKHA MBA 9 SHRI MANESH N KONDAYE RAJAPUR RAJAPUR 10 SHRI BHARAT S JADHAV DHAULAVALI RAJAPUR RAJAPUR 11 SHRI RAJESH M ADAKE PHANSOP RATNAGIRI RATNAGI 12 SAU FARIDA R KAZI 2050, RAJAPURKAR COLONY RATNAGI UDYAMNAGAR RATNAGIRI RI 13 SHRI S D PENDASE & SHRI DHAMANI SANGAM M M SANGAM SANGAMESHWAR EHSWAR 14 SHRI ABDULLA Y 418, RAJIWADA RATNAGIRI RATNAGI TANDEL RI 15 SHRI PRAKASH D SANGAMESHWAR SANGAM KOLWANKAR RATNAGIRI EHSWAR 16 SHRI SAGAR A PATIL DEVALE RATNAGIRI SANGAM ESHWAR 17 SHRI VIKAS V NARKAR AGARWADI LANJA LANJA 18 SHRI KISHOR S PAWAR NANAR RAJAPUR RAJAPUR 19 SHRI ANANT T MAVALANGE PAWAS PAWAS 20 SHRI DILWAR P GODAD 4110, PATHANWADI KILLA RATNAGI RATNAGIRI RI 21 SHRI JAYENDRA M DEVRUKH RATNAGIRI DEVRUK MANGALE H 22 SHRI MANSOOR A KAZI HALIMA MANZIL RAJAPUR MADILWADA RAJAPUR RATNAGI 23 SHRI SIKANDAR Y BEG KONDIVARE SANGAM SANGAMESHWAR ESHWAR 24 SHRI NIZAM MOHD KARLA RATNAGIRI RATNAGI 25 SMT KOMAL K CHAVAN BHAMBED LANJA LANJA 26 SHRI AKBAR K KALAMBASTE KASBA SANGAM DASURKAR ESHWAR 27 SHRI ILYAS MOHD FAKIR GUMBAD SAITVADA RATNAGI 28 SHRI
    [Show full text]
  • List of New Construction Works Under NRHM (2008-2009)
    1 List of New Construction Works under NRHM (2008-2009) Sub Centre Financial Progress Physical Progress Amount If Completed Sr No District Block Name of Sub Centre Date/Month of Work Sanctioned Expenditure (Rs. Name of Execution agency If not completed Tentative date of Sanctioned (Rs. In Date/Month of Work In Lakhs) Stage of Progress completion Lakhs) Completion 1 Kalyan Manivali 20.09.2008 8.75 8.52 IDW Apr-10 2 Kalyan Shirdhon Vadavali 04.10.2008 8.80 8.61 IDW Nov-09 3 Kalyan Golivali 07.08.2008 8.74 7.98 IDW Nov-09 4 Thane Ambernath Bohnoli 04.10.2008 10.36 9.72 IDW Apr-10 5 Bhiwandi Hiwali 08.10.2008 7.98 6.93 IDW Mar-09 6 Bhiwandi Khaling 08.10.2008 7.98 6.78 IDW Mar-09 7 Vasai Kaular 04.10.2008 11.94 11.54 IDW Jan-11 8 Karjat Kondivade 6/11/2008 13.61 12.45 IDW 28/02/2011 9 Khalapur Mohapada 6/11/2008 13.61 12.61 IDW 31/03/2011 10 Khalapur Bid Khurd 6/11/2008 13.61 11.31 IDW 17/03/2011 11 Khalapur Kalote 6/11/2008 13.61 12.12 IDW 29/03/2011 12 Mahad Kumbhe Shivthar 6/11/2008 13.61 12.75 IDW 11/12/2010 13 Mangaon Lonere 19/11/2008 13.61 11.39 IDW 17/06/2011 14 Mangaon Pansai 6/11/2008 13.61 11.99 IDW 31/03/2011 15 Mangaon Amdoshi 6/11/2008 13.61 11.81 IDW 29/03/2011 16 Panvel Gulsunde 6/11/2008 13.61 12.57 IDW 20/02/2010 17 Panvel Asudgaon 6/11/2008 13.61 12.35 IDW 28/08/2011 18 Panvel Rohinjan 6/11/2008 13.61 12.33 IDW 28/03/2011 19 RAIGAD Roha Virzoli 6/11/2008 13.61 11.36 IDW 20/03/2010 20 Roha Nahave 6/11/2008 13.61 11.70 IDW 31/03/2011 21 Roha Wali 6/11/2008 13.61 12.74 IDW 31/03/2011 22 Roha Ainghar 6/11/2008 13.61 11.75 IDW
    [Show full text]
  • Report of the Comptroller and Auditor General of India on State Finances for the Year Ended March 2012
    Report of the Comptroller and Auditor General of India on State Finances for the year ended March 2012 Government of Maharashtra Table of Contents Table of Contents Paragraph Page Preface vii Executive Summary ix CHAPTER I - FINANCES OF THE STATE GOVERNMENT Introduction 1.1 1 Resources of the State 1.2 4 Revenue Receipts 1.3 7 Application of Resources 1.4 13 Quality of expenditure 1.5 25 Analysis of Government Expenditure and Investments 1.6 30 Assets and Liabilities 1.7 38 Debt Sustainability 1.8 43 Fiscal Imbalances 1.9 45 Conclusion 1.10 50 Recommendations 1.11 52 CHAPTER II - FINANCIAL MANAGEMENT AND BUDGETARY CONTROL Introduction 2.1 55 Summary of Appropriation Accounts 2.2 56 Financial Accountability and Budget management 2.3 57 Outcome of Review of selected Grants 2.4 66 Audit of Budgetary Process Planning Department 2.5 77 Advances from Contingency Fund 2.6 88 Outcome of Analysis of Budgetary Assumptions 2.7 88 Conclusion 2.8 90 Recommendations 2.9 90 CHAPTER III - FINANCIAL REPORTING 'HOD\LQIXUQLVKLQJ8WLOLVDWLRQ&HUWL¿FDWHV Non-submission/delay in submission of accounts by Grantee institutions 3.2 91 Delay in submission of Accounts/Audit Reports of Autonomous Bodies 3.3 92 'HOD\LQ¿QDOLVDWLRQRIproforma accounts by Departmentally managed Commercial Undertakings 3.4 93 Misappropriations, losses, defalcations etc. 3.5 93 Transfer of Funds to Personal Deposit Accounts 3.6 94 Functioning of Treasuries 3.7 97 Opaqueness in Government Accounts 3.8 97 Reconciliation of Receipts and Expenditure 3.9 99 Pendency in submission of Detailed Contingent bills against Abstract Contingent bills 3.10 99 Conclusion 3.11 100 Recommendations 3.12 100 Audit Report (State Finances) for the year ended 31 March 2012 iii Table of Contents Reference No.
    [Show full text]
  • Bpc(Maharashtra) (Times of India).Xlsx
    Notice for appointment of Regular / Rural Retail Outlet Dealerships BPCL proposes to appoint Retail Outlet dealers in Maharashtra as per following details : Sl. No Name of location Revenue District Type of RO Estimated Category Type of Minimum Dimension (in Finance to be arranged by the applicant Mode of Fixed Fee / Security monthly Site* M.)/Area of the site (in Sq. M.). * (Rs in Lakhs) Selection Minimum Bid Deposit Sales amount Potential # 1 2 3 4 5 6 7 8 9a 9b 10 11 12 Regular / Rural MS+HSD in SC/ SC CC1/ SC CC- CC/DC/C Frontage Depth Area Estimated working Estimated fund required Draw of Rs in Lakhs Rs in Lakhs Kls 2/ SC PH/ ST/ ST CC- FS capital requirement for development of Lots / 1/ ST CC-2/ ST PH/ for operation of RO infrastructure at RO Bidding OBC/ OBC CC-1/ OBC CC-2/ OBC PH/ OPEN/ OPEN CC-1/ OPEN CC-2/ OPEN PH From Aastha Hospital to Jalna APMC on New Mondha road, within Municipal Draw of 1 Limits JALNA RURAL 33 ST CFS 30 25 750 0 0 Lots 0 2 Draw of 2 VIllage jamgaon taluka parner AHMEDNAGAR RURAL 25 ST CFS 30 25 750 0 0 Lots 0 2 VILLAGE KOMBHALI,TALUKA KARJAT(NOT Draw of 3 ON NH/SH) AHMEDNAGAR RURAL 25 SC CFS 30 25 750 0 0 Lots 0 2 Village Ambhai, Tal - Sillod Other than Draw of 4 NH/SH AURANGABAD RURAL 25 ST CFS 30 25 750 0 0 Lots 0 2 ON MAHALUNGE - NANDE ROAD, MAHALUNGE GRAM PANCHYAT, TAL: Draw of 5 MULSHI PUNE RURAL 300 SC CFS 30 25 750 0 0 Lots 0 2 ON 1.1 NEW DP ROAD (30 M WIDE), Draw of 6 VILLAGE: DEHU, TAL: HAVELI PUNE RURAL 140 SC CFS 30 25 750 0 0 Lots 0 2 VILLAGE- RAJEGAON, TALUKA: DAUND Draw of 7 ON BHIGWAN-MALTHAN
    [Show full text]
  • Umri District: Nanded Bhokar
    Village Map Taluka: Umri District: Nanded Bhokar Karla Mudkhed Shivangaon Dholumri Kalgaon µ 2 1 0 2 4 6 Sawargaon (Dakshin) Shirur Palasgaon km Turati Aswaldari Sindhi Mokhandi (Jagir) Durganagar Fulsingnagar Jirona Ishwarnagar Location Index Somthana P.U. Shelgaon Bothi Bitnal Sawargaon (kala) Vasantnagar District Index Ganipur Nandurbar Jamgaon Bhandara Dhule Amravati Nagpur Gondiya Hunda (patti ganga) Gortha Jalgaon UMRI Hunda patti umari Akola Wardha !( Buldana Mandala Nashik Washim Chandrapur Ramkhadak Yavatmal Hiradgaon Kudla Peth Umri (M Cl) Palghar Aurangabad Hunda Tanda Hangiranga Waghala Jalna Hingoli Gadchiroli Thane Ahmednagar Parbhani Telangana State Mumbai Suburban Nanded Mumbai Bid Bolsa Raigarh Pune Abdulapur Latur Bidar Osmanabad Ilegaon P. G. Dilawarpur Satara Solapur Chinchala patti umri Talegaon Dhanora Bk. Ratnagiri Sangli Bhayegaon Manur Maharashtra State Kolhapur Amdapur Sindhudurg Rahati Kh. Dharwad Ijjatgaon Nagthana Kh. Nagthana Bk. Bolsa Kh Bolsa Bk Miyadadpur Taluka Index Mahoor Kinwat Beldara Nimtek Balegaon Hadgaon Himayatnagar Karkala Ardhapur Hatni Bhokar NandedMudkhed Borjuni Loha Umri Mahati Golegaon Waghalwada Dharmabad Naigaon (Khairgaon) Kandhar Biloli Endala Bijegaon Legend Dharmabad Kaudgaon Mukhed Deglur !( Taluka Head Quarter Naigaon (Khairgaon) Railway Hassa District: Nanded Singnapur National Highway Kawalguda Bk. State Highway Village maps from Land Record Department, GoM. Kawalguda kh. Data Source: State Boundary Waterbody/River from Satellite Imagery. District Boundary Generated By: Taluka Boundary Maharashtra Remote Sensing Applications Centre Village Boundary Autonomous Body of Planning Department, Government of Maharashtra, VNIT Campus, Biloli Waterbody/River South Am bazari Road, Nagpur 440 010.
    [Show full text]
  • Government of India Ministry of Human Resource Development Department of School Education and Literacy Minutes of the Meeting Of
    ` Government of India Ministry of Human Resource Development Department of School Education and Literacy Minutes of the meeting of the Project Approval Board held on 20th May 2019 to consider the Annual Work Plan & Budget (AWP&B) 2019-20 of Samagra Shiksha for the State of Maharashtra 1. Introduction The meeting of the Project Approval Board for considering the Annual Work Plan and Budget (AWP&B) 2019-20 for SAMAGRA SHIKSHA for the State of Maharashtra was held on 20th May 2019. The list of participants who attended the meeting is attached at Annexure-I. 2. Initiatives of the State Ms. Rina Ray, Secretary (SE&L) invited Maharashtra to give a presentation on school education in the State. Ms. Vandana Krishna Additional Chief Secretary (Maharashtra), gave a presentation which included the following major points: a) The online recruitment system called PAVITRA is introduced by the Government of Maharashtra in order to provide transparent recruitment process. Around 4800 primary teachers and 7200 subject teachers are expected to be appointed before commencing this educational year. Transfers of teachers are also online. b) State has undertaken a massive exercise of absorption of surplus teachers at division as well as state level. The State could absorb 890 out of 1221 surplus teachers at Primary level and 2094 out of 3254 teachers at secondary level. c) Kumathe Beat Model in Satara district is popular in the state where 40 schools have been covered for child friendly and joyful learning with no textbooks .Teachers have developed learning material to suit children’s needs. d) Pune ZP has piloted “One Book One Note Book” by combining all subjects’ textbooks of Class IV to Class VII into one common textbook, and dividing it into monthly sections.
    [Show full text]
  • List of Candidates
    List of Candidates Sr.No NAME OF CANDIDATE MARKS OBTAINRD SET/NET ADDRESS SUBJECT B.Pharm. CATEGORY SC 1 SHRI BHUKTARE SANJAY GANPATHRAO 908 GATE AT SNGVAI (B) 1300 POST THORDA (B) 69.85 TQ & DIST NANDED List of Candidates Sr.No NAME OF CANDIDATE MARKS OBTAINRD SET/NET ADDRESS SUBJECT Bio Technology CATEGORY SC 1 SHRI SUTAR VIJAYAKUMAR BHANYDASRAO NET AT. B.K. SUTAR, AMBEDKAR CHAUK, NEAR VAISHALI BAUDDHAVIHAR, BAUDDHNAGAR LATUR. TQ.DIST. LAUTR. 2 SHRI TIGOTE DHANANJAY DASHARATH 805 NET AT POST KUMATHA(BK) 1200 TQ AHEMEDPUR 67.08 DIST LATUR 3 SHRI DHOLE NAGESH ARJUNRAO 1423 PH.D SUMEDH NAGAR, POST TARODA 2400 TARODA(KD), PURNA ROAD, 59.29 NANDED. List of Candidates Sr.No NAME OF CANDIDATE MARKS OBTAINRD SET/NET ADDRESS SUBJECT BIOCHEMISTRY CATEGORY SC 1 SHRI ADHAV SANTOSH KACHRU 872 NET AT ZARI , POST VISHNUPURI 1200 TQ. LOHA 72.67 DIST NANDED List of Candidates Sr.No NAME OF CANDIDATE MARKS OBTAINRD SET/NET ADDRESS SUBJECT Botany CATEGORY NT1 1 SHRI UMATE SATISH KESHAVRAO 941 SET C-60, KABRA NAGAR 1200 NANDED- 431602 78.42 SUBJECT Botany CATEGORY OBC 1 SHRI THORAT RAJKUMAR HANUMANRAO 842 SET AMRUTESHWAR NAGAR 1300 PH.D BEHIND YOGESHWARI COLLEGE, AMBAJOGAI 64.77 TQ. AMBAJOGAI DIST BEED - 431517 SUBJECT Botany CATEGORY SC 1 SHRI GACCHE RAJU NIWARTTI 760 SET AT SAYAL, POST MARLAK (B) 1000 TAL & DIST NANDED 76.00 2 SHRI SARTAPE HARSHDEEP BUDDHAJI 910 SET AT. POST. MALHIVARA 1200 NET TQ & DIST. HINGOLI - 431513 75.83 3 SHRI RAIBHOLE UDDHAV KISHANRAO 565 PH.D V.G.Iondhle,Railway Driver 1000 Railway Colony H.No.101/1 Purna 56.50 dist.Parbhani.
    [Show full text]
  • Yashwant Rao Chavan Maharashtra Open University HEI Profile & Administrative Information
    Yashwant Rao Chavan Maharashtra Open University HEI Profile & Administrative Information : HEI Basic Information : Registration ID: HEI-P-U-0335 Name of the HEI: Yashwant Rao Chavan Maharashtra Open Institution Type: University State Open Year of Establishment: Jul 1989 Mode of Education: City: Nashik District: Nashik Single Mode Address_1: Dnyngangotri, Near Gangapur Dam, Govardhan, Address_2: Nashik, Maharashtra, INDIA Pin Code: 422203 Email: [email protected] Telephone: 02532230228 Fax: 02532231205 State: MAHARASHTRA Official Website of HEI: Official website for Open & Distance Learning: https://ycmou.ac.in/ https://ycmou.ac.in/ HEI Authorities Vice Chancellor Name of the Vice Chancellor: Prof.E.Vayunandan Vice Chancellor Email: Vice Chancellor Mobile: [email protected] 9403774888 Phone (Office): Phone (Residence): Highest Education Qualification: Ph.D Public Adm Experience: 33 Years 02532230228 02532230048 Registrar Name of the Registrar: Dr Dinesh Bhonde Registrar Email: [email protected] Registrar Mobile: 9423983006 Phone (Office): 02532230229 Phone (Residence): 02532230229 Highest Education Qualification: Ph.D Civil engg Experience: 36 years CIQA Whether Center for Internal Quality Assurance (CIQA) is establised or not : Yes School of Studies Name of Head of School of Highest Education Date of Appointment Srno Name of School of Studies studies Designation Mobile No Qualification Joining Letter 1 School of Computer Science Dr.Pramod Khandare Associate 9403774524 Ph.D 29-02-1992 View
    [Show full text]
  • 39Th Week, 2011
    DISEASE ALERTS/OUTBREAKS REPORTED AND RESPONDED TO BY STATES/UTs THROUGH INTEGRATED DISEASE SURVEILLANCE PROJECT (IDSP) th nd 39 week (ending 2 October) 2011 District wise disease alerts/outbreaks reported in the 39th week, 2011 REPORTING STATUS OF STATES/UTs No. of States /UTs submitted outbreak report 23 (including NIL report) No. of States/ UTs submitted “NIL” outbreak report 10 INTEGRATED DISEASE SURVEILLANCE PROJECT, NATIONAL CENTRE FOR DISEASE CONTROL, DELHI Tel No. 23913148, Fax No. 23922677; www.idsp.nic.in Sl. Name of Name of Disease/ Illness No. of Date of Date of Current Comments/ Action taken No. State/UT District cases/ start of reporting Status deaths outbreak Cases of diarrhoea reported from Village Khalihamari, SC Amoni, BPHC Samaguri. PHC Medical Officer visited and investigated the outbreak. 2 patients i Acute died at home. 4 patients referred to Nagaon BPHC for treatment. Three water Under Nagaon Diarrhoeal 8 / 2 22.09.11 27.09.11 samples collected by H S strip; result is awaited. 3 stool samples collected and surveillance 2 Disease sent to Golaghat District priority lab under IDSP found negative for cholera culture. Active survey done to find new cases. Health education given regarding hygiene and sanitation. Cases with symptoms of headache, vomiting, fever and pain abdomen reported from Village Ajokha, SC Hankhati, BPHC Kakopather, MPHC Dholla after consumption of local wine with some traditional food in Tiplang in Arunachal Under Pradesh. 4 patients died at their home. 13 patients admitted at Kakopathar PHC Tinsukia ii Food Poisoning 17 / 4 21.09.11 26.09.11 surveillance for treatment have improved.
    [Show full text]
  • DISTRICT NANDED MAHARASHTRA 4Th March 1994
    DISTRICT NANDED MAHARASHTRA 4th March 1994 NIEPA DC D08263 li b r a r y & DOCUiVid ' ' , i ; -.-jli ■]:. h ! Hi. Natio lnsi;icu*e cf h.cucationuj P'fliinMiij at;(i Administration. T' ri Aurobindo Marg, U*e........... \ A ND IS"T AREA: 10502 Sq.Km. POPULATION: Male: 1 1.97 .007 Female: ll,32,-!;86 TOTAL 23,29.493 PERCENTAGE OF LITERACY Male: 51.89% Female: 24.96% TOTAL 38.81% : PR03ECT, DOCUMENT OUTLINE 1 INTRODUCTION 1 2 SITUATIONAL ANALYSIS 6 2.1 Demographic & Educational Profile 6 2.2 Educational Profile 2 5 2.3 Pre-Primary Education 53 2 A Approaches in Primary Education 5^ 2.5 Back-up programme 56 2.6 Management of Primary Education 5 7 2.7 Special Trible Sub-Plan - KINWAT 60 3 PROBLEMS & ISSUES IN PRIMARY EDUCATION 72 3.1 General 7 2 3.2 The problems of accessebility 7 3 3.3 The problems of retention 7^ Infrastructural and other problems 7^f GOALS, TARGETS STRATEGIES & INTERVENTIONS 76 ^.1 Project goals 76 ^.2 Project Objectives 77 ^.3 Process of project preparation 78 Rationale behind selection of the district 81 The project 82 ^.6 Teacher efforts 87 ^.7 Retention 88 ^.8 Creating conducive eviornment 90 Achievement 91 ^.10 Special efforts 95 (2) 5. PROGRAMMES & ACTIVITIES 97 3.1 Introduction 97 5.2 Pre-School Education 97 5.3 Primary Schools 99 5.^ Incentives and facilities to the students 105 5.5 Girls Education & Woman empovernment 109 Pre-Project Cost 118 6. PROJECT COST 122 6.1 Introduction 122 6.2 Access 122 6.3 Retention 127 6 A Quality Improvement 131 6.5 Summery of project cost 136 7.
    [Show full text]
  • Government of Maharashtra
    REPORT OF THE COMPTROLLER AND AUDITOR GENERAL OF INDIA FOR THE YEAR ENDED 31 MARCH 2009 (CIVIL) GOVERNMENT OF MAHARASHTRA REPORT OF THE COMPTROLLER AND AUDITOR GENERAL OF INDIA FOR THE YEAR ENDED 31 MARCH 2009 (CIVIL) GOVERNMENT OF MAHARASHTRA www.cag.gov.in TABLE OF CONTENTS Reference Paragraph Page No. Preface CHAPTER I INTRODUCTION About this Report 1.1 1 Auditee profile 1.2 1 Authority for audit 1.3 2 Planning and conduct of audit 1.4 2 Organisational structure of the offices of the Principal 1.5 3 Accountant General (Audit)-I, Mumbai and the Accountant General (Audit)-II, Nagpur Significant audit observations 1.6 4 Budget and expenditure controls 1. 7 7 Response of the departments to draft paragraphs 1.8 8 CHAPTER II PERFORMANCE REVIEWS Public Health Department National Rural Health Mission 2.1 9 School Education and Sports Department Development of Sports in Maharashtra 2.2 34 Rural Development and Panchayat Raj Department Working of District Rural Development Agencies 2.3 60 (DRDAs)in Maharashtra Rural Development and Water Conservation Department 2.4 80 Minor Irrigation (Local Sector) Projects Home Department Computerisation in Police Department 2.5 94 Audit Report (Civil) for the year ended 31 March 2009 CHAPTER III Reference AUDIT OF TRANSACTIONS Paragraph Page No. Fraudulent drawal/misappropriation/ 3.1 embezzlement/losses Public Health Department. Fraudulent payment of medical reimbursement claims 3.1.1 109 Excess payment/overpayment/wasteful/infructuous 3.2 expenditure General Administration Department Overpayment of incentive
    [Show full text]
  • Final List of Contesting Candidates
    GENERAL ELECTION TO MAHARASHTRA STATE LEGISLATIVE ASSEMBLY-2014 List of Contesting Candidates MAHARSHTRA STATE DATE OF POLL 15TH OCTOBER 2014 Sr. No. Name Of Candidate Address Of Candidate Party Affiliation Symbol Allottted 1-Akkalkuwa (ST) 1 Aamshya Fulji Padavi At- Koylivihir, Post - British Ankushvihir Tal- Akkalkuwa Shivsena Bow And Arrow Dist- Nandurbar 2 Paradake Vijaysing Rupsing At June Dhadgaon, Post- Dhadgaon Tal- Akrani Dist- Nationalist Congress Party Clock Nandurbar 3 Padavi Adv. K.C. At Asali, Post Talai, Tal- Akkalkuwa Dist- Nandurbar Indian National Congress Hand 4 Padavi Nagesh Dilwarsing At Post Vanyavihir, Tal - Akkalkuwa Dist- Nandurbar Bharatiya Janata Party Lotus 5 Mamata Ravindra Valavi At Post Mundalvad, Tal- Akrani Dist- Nandurbar Maharashtra Navnirman Sena Railway Engine 6 Adv. Ranjit Jugla Padavi At Danel, Post- Bhagdari Tal- Akkalkuwa Dist- Bahujan Mukti Party Cot Nandurbar 7 Padavi Narendrasing Bhagatsing At- Sorapada, Post- Akkalkuwa Tal- Akkalkuwa, Dist - Independent Cup And Saucer Nandurbar 8 Padavi Madhukar Shamsing At- Khatwani, Post- British Ankushvihir Tal- Akkalkuwa, Independent Slate Dist- Nandurbar 9 Madan Jahangir Padavi At Post- Jamana, Tal- Akkalkuwa, Dist- Nandurbar Independent Table 2-Sahada (ST) 1 Kisan Runjya Pawar Balaji, 35-Bramhastrushti Colony, Juna Mohida Road, Maharashtra Navnirman Sena Railway Engine Post Shahada, Tal. Shahada, Dist.Nandurbar Shahada 2 Gavit Rajendrakumar Krushnarao Plot No.5, Pratap Nagar, Taloda, Tal.Taloda Nationalist Congress Party Clock Dist.Nandurbar Taloda 3 Naik Suresh Sumersing At.Post Chikhali Digar Tal.Shahada Dist.Nandurbar Shivsena Bow And Arrow Chikhali Digar 4 Padmakar Vijaysing Valvi At.Post Modalpada, Tal.Taloda Dist.Nandurbar Indian National Congress Hand Modalpada 5 Padvi Udesing Kocharu At.Somaval Bk, Post.Nalgavhan, Tal.Taloda, Bharatiya Janata Party Lotus Dist.Nandurbar At.Somaval Bk Post.Nalgavhan 6 Padvi Savitri Magan At Post.
    [Show full text]