STATE INFORMATION COMMISSION (Under Right to Information Act, 2005) Samachara Hakku Bhavan, D.No.5-4-399, ‘4’ Storied Commercial Complex, Housing Board Building, Mojam Jahi Market, – 500 001. Phone Nos: 040-24740107 (o); 040-24740592(f)

Appeal No.11410 /CIC/2018 Dated: 5-8-2019

Appellant : Sri Kishorre Naik.G, District

Respondent : 1. The Public Information Officer (U/RTI Act, 2005) / The Deputy Executive Engineer, TDWSP (Telangana Drinking Water Supply Project) Sub-Division, Nirmal, Nirmal District

2. The Public Information Officer (U/RTI Act, 2005) / The Executive Engineer, Mission Bhagiratha Grid Division Nirmal, Nirmal District

The Appellate Authority (U/RTI Act, 2005) / O/o. the Superintending Engineer, RWS&S Circle, .

O R D E R

Sri Kishorre Naik.G, Nirmal District has filed 2nd appeal dated Nil which was received by this Commission on 07-08-2018 for not getting the information sought by him from the PIO / The Deputy Executive Engineer, TDWSP (Telangana Drinking Water Supply Project) Sub-Division, Nirmal, Nirmal District PIO / The Executive Engineer, Mission Bhagiratha Grid Division Nirmal, Nirmal District and 1st Appellate Authority / O/o. the Superintending Engineer, RWS&S Circle, Adilabad.

The brief facts of the case as per the appeal and other records received along with it are that the appellant herein filed an application dated 30-12-2017 before the PIO requesting to furnish the information under Sec.6(1) of the RTI Act, 2005, on the following points mentioned in his application: TSIC

Note: This is system generated copy and no signature is required.

TSIC The Public Information Officer / The Executive Engineer, Mission Bhagiratha Grid Division Nirmal, Nirmal District, Vide Letter No.A1/RTIACT/2005, Dated 03-01-2018, has transferred to the PIO / The Deputy Executive Engineer, TDWSP (Telangana Drinking Water Supply Project) Sub- Division, Nirmal, Nirmal District, to submit the information point wise as requested by the appellant within one week,

Since the appellant did not receive the information from the Public Information Officer, he filed 1st appeal dated 28-02-2018 before the 1st Appellate Authority requesting him to furnish the information sought by him u/s 19(1) of the RTI Act, 2005.

The 1st Appellate Authority / O/o. the Superintending Engineer, RWS&S Circle, Adilabad, Vide Memo No. A2/RTI/2017, Dated 29-03-2018, has instructed the PIO / The Executive Engineer, Mission Bhagiratha Grid Division Nirmal, Nirmal District, to furnish the information directly to the appellant, immediately with in stipulated time.

As the appellant did not get the information from the Public Information Officer / 1st Appellate Authority even after 30 days of filing his 1st appeal, he preferred this 2nd appeal before this Commission requesting to take action against the PIO and 1st Appellate Authority for not furnishing information sought by him and also to arrange to furnish the information sought by him u/s 19(3) of the RTI Act, 2005.

Note: This is system generated copy and no signature is required. The 2nd appeal was taken on file and notices were issued to both the parties for hearing on 5-8-2019.

On 5-8-2019 the case is called. The appellant is absent. The Public Information Officers (1) Dy. Executive Engineer, TDWSP Sub-Division, Nirmal and (2) Executive Engineer, Mission Bhagiratha Grid Division, Nirmal are present.

The Public Information Officer, Executive Engineer, MB Grid Division submitted that information sought was furnished to the appellant through letter dated 08.08.2018.

Since information is furnished, the appeal is closed.

Dr. Raja Sadaram Soma Chief Information Commissioner

Authenticated by:

Assistant Registrar Copy to: IT Section/SF

TSIC

Note: This is system generated copy and no signature is required.