STATE ELECTRICITY BOARD LIMITED (Incorporated under the Indian Companies Act, 1956) CIN:U40100KL2011SGC027424 Reg. Office: Vydyuthi Bhavanam, Pattom, – 695 004 Website: www.kseb.in Vydyuthi Bhavanam, Pattom, Thiruvananthapuram – 695 004, Keralam Phone: +91 471 2514685, 2514331, E-mail:[email protected]

ABSTRACT

Formation of new sub Centres attached to Electrical Section offices – Sanctioned – Orders issued.

CORPORATE OFFICE (SBU-D) Office Order No.179 /2021 [D(D&IT)/D6-AE2/New Office/2020-21/0001] dated, Tvpm 06.02.2021

Read: 1. Letter No. CE(DC)/GB/Sub Engineer office/2020-2021/2930 dated 16.01.2021 of the Chief Engineer Distribution - Central, Ernakulam. 2. Letter No. CE(DN)/GB 1/New Section- Vannmada/2020-2021/1785 dated 06.01.2021 of the Chief Engineer Distribution- North, Kozhikode. 3. Letter No.ECT/ EB/ new Office/20-21/90 dated 05.05.2020 of the Deputy Chief Engineer, Electrical Circle, . 4. Various requests / representations received.

ORDER

Several requests and proposals have been received from the elected representatives, LSG Institutions and general public for bifurcating the existing Electrical Sections or for creation of new Sections extracting certain areas / consumers from some of the adjoining Electrical Sections or to start new Sub Engineer Offices/ Overseer office to effectively handle the supply failure issues within the time frames fixed as per Standards of Performance published by the Hon’ble KSERC. The service expectancy of the consumers also has increased and it is often found difficult to cater to consumer requirements if the Section offices have very high consumer strength and / or vast area.

Having examined the matter in detail, considering the vast area, terrain, difficulty in maintaining electrical infrastructure and resolving interruption issues, the Director (Distribution, IT & HRM) proposed to form Sub Centres, as detailed below. a) Sub centre at Kuttikkattoor under Electrical Section, Kovoor under Electrical Division Kozhikode. b) Sub centre at under Electrical Section, . under Electrical Division . c) Sub centre at Kottappuram under Electrical Section, Sreekrishnapuram. under Electrical Division . d) Sub centre at Mankulam under Electrical Section, Chithirapuram, under Electrical Division Adimaly. e) Sub centre at Muzhupilangadu under Electrical Section, Dharmadam under Electrical Division . f) Sub centre at Pooppara under Electrical Section, Rajakumari, under Electrical Division Adimaly. g) Sub centre at under Electrical Section, , under Electrical Division Payyannur. h) Sub centre at Thankamony under Electrical Section, Painavu, under Electrical Division Kattappana. i) Sub centre at Thannithode under Electrical Section, Konni, under Electrical Division Pathanamthitta. j) Sub centre at RVP Pudur under Electrical Section, Velanthavalam, under Electrical Division Chittur. k) Sub centre at under Electrical Section, , under Electrical Division .

At these Sub Centres, a Breakdown Unit will function in a building provided free of rent by the concerned local body, with staff pattern as per table below and with vehicle and CUG facility to resolve the prolonged power interruption issues.

Category Staff pattern

Overseer 1

Lineman 2

Electricity Worker 1

The matter was placed before the Chairman and Managing Director for a decision.

Having considered the recommendation of the Director (Distribution, IT & HRM), the Chairman and Managing Director accorded sanction for the functioning of Sub Centres, in buildings provided free of rent by the concerned local bodies, with vehicle and CUG facility to resolve the prolonged power interruption issues under the Electrical Sections as detailed above.

Further resolved to authorize the Chief Engineer (HRM) to fill the vacancies as per table above, in the newly formed Sub Centres through deployment, after observing the formalities.

Further resolved to authorize the concerned Deputy Chief Engineer of Electrical Circles, to hire vehicle for use in the newly formed Sub Centres and to re-fix the monthly ceiling for the hired vehicle in the Parent Section accordingly.

Further resolved to provide a CUG SIM with outgoing facility to the newly formed Sub Centres to contact consumers, offices and higher officers.

Orders are issued accordingly. By Order of the Chairman and Managing Director (Sd/-) SUPRIYA N. NAIR Deputy Secretary (Administration) - in charge of Secretary (Administration)

To: 1. The Chief Engineers (Distribution) 2. The Chief Engineer (HRM) 3. The Chief Engineer (IT & CR) 4. The Deputy Chief Engineer, of all Electrical Circle, Kozhikode/ / Shoranur/ Thodupuzha/ / / Pathanamthitta/ / Irinjalakkuda 5. Deputy Chief Engineer, System Operation Circle, Thiruvananthapuram. 6. The Executive Engineer, Electrical Division, Kozhikode/ Wadakkancherry/ Shoranur/ Adimaly/ Thalassery/ Payyannur/ Kattappana/ Pathanamthitta/ Chittur/ Chalakudy

Copy to: Chief Vigilance Officer/ Legal Advisor & Disciplinary Enquiry Officer/ Chief Internal Auditor/ Financial Advisor/ Chief Public Relations Officer The TA to Chairman & Managing Director The TA to Director (Distribution, IT&HRM / Transmission& System Operation, Generation-Electrical & Supply Chain Management / Generation-Civil/Planning, REES &Safety) The RCAO/The RAO/The LLO The PA to Director (Finance) /CA to Secretary (Administration)/Company Secretary The Fair Copy Superintendent/ Library/Stock File.

Forwarded / By Order

Assistant Engineer