CONSOLIDATED CPES 2016 3Rd Quarter.Xlsx
Total Page:16
File Type:pdf, Size:1020Kb
DPWH CONSOLIDATED CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS) 3rd Quarter CY 2016 CATEGORY PROJECT CONTRACT DATE WMS MTL TIME FAC ESH RDR FINAL RATING/ No. of No. of NAME OF LICENSE DATE of NO. of *IMPL. FUNDING SLIPPA CPES VISIT L/F AMOUNT DUR STATUS QUALITATIVE REMARKS Project Contractor CONSTRUCTOR NO. PCAB ARC TYPE NAME LOCATION EVALUATION VISIT AGENCY SOURCE STARTED COMPGE (%) 0.40/0.50 0.30/0.20 0.15/0.30 0.030 0.070 0.050 RATING (Php, M) (C.D.) DESCRIPTION Construction of School Building, Brgy. Caranan, Pasacao, Camarines Sur 93% 1 1 301 ENGINEERS 38364 L B SB GB Brgy. Caranan, Pasacao, 8/25/2016 1st/Final LF 1.937 90 3/17/2015 6/14/2015 1.53% C 0.497 0.133 0.300 0.000 0.000 0.000 93.00 AHD Camarines Sur 1st DEO Camarines Sur Very Satisfactory National Road Network Services: Various Projects under Asset Preservation of National Buguias and Kapangan, BENGUET 2ND 2 2 ALCEL CONSTRUCTION 15129 L A MB GE 8/24/2016 First LF 26.335 222 3/9/2016 10/16/2016 -4.49% OG 0.334 0.300 0.105 0.030 0.051 0.033 85.30 - DEL Roads within DPWH - Benguet Benguet DEO 2nd, Buguias and Kapangan, Benguet Local Infrastructure Program - Construction/ Improvement of 6 JEWELS Draiange Facilitites Brgy. Calicanto, Batangas 91.2% 3 3 34737 L D SB GE 9/21/2016 1st/Final Batangas 2nd LF 1.880 56 3/27/2016 5/21/2016 0.00% C 0.479 0.133 0.300 0.000 0.000 0.000 91.20 ONS CONSTRUCTION City Very Satisfactory Construction/Rehabilitation of JJA CONSTRUCTION APAYAO 1ST 4 4 22676 L A MA GE Nabuangan Flood Control, Nabuangan, Apayao 8/29/2016 First LF 36.438 405 3/29/2016 5/7/2017 17.15% OG 0.325 0.240 0.150 0.030 0.056 0.050 85.10 - AHD AND SUPPLY DEO Nabuangan, Apayao Road Upgrading (Gravel to Paved) Based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standard (HDM-4 Project BENGUET 1ST 5 5 3K ROCK ENGINEERING 27908 L A MB GE Tuba, Benguet 8/23/2016 First LF 33.303 195 2/16/2016 8/28/2016 1.28% OG 0.339 0.240 0.150 0.020 0.051 0.050 85.00 - AHD Analysis) Asin Km. 8 - Naglisan - DEO San Pascual, Tuba, Benguet-La Union Road, K0273+707 to K0273+728, K0273+790 to K0274+ Paving of Shoulder with Drainage and Slope Protection, Calapan North Road (CNR) San Teodoro, Oriental Mindoro 91.3% 6 6 876 CONSTRUCTION 24224 L D B GE 8/26/2016 Final LF 1.293 75 1/27/2016 4/10/2016 0.00% C 0.455 0.158 0.300 0.000 0.000 0.000 91.30 ONS Mindoro Oriental DEO Very Satisfactory EDISON DEVELOPMENT Road Upgrading (Unpaved to & Paved) Based on Gravel Road CONSTRUCTION/THOM Strategies, Traffic Benchmarks AS R. UY APAYAO 1ST 7 7 JV-15-820 L AAA LB GE for Upgrading to Paved Road Kabugao, Apayao 8/29/2016 First LF 16.934 210 2/12/2016 9/8/2016 1.33% OG 0.323 0.240 0.150 0.030 0.056 0.050 84.90 - AHD CONSTRUCTION Standards (HDM-4 Project DEO DEVELOPMENT Analysis), Conner - Kabugao CORPORATION JOINT Road, Kabugao, Apayao VENTURE Rehabilitation of Multi-Purpose Building, Barangay Manalungon, Negros 8G CONSTRUCTION AND Sta. Catalina, Negros 86.9% 8 8 35783 L B SB GB 8/24/2016 1st/Final Oriental 3rd LF 1.940 180 2/2/2016 7/30/2016 0.00% C 0.436 0.133 0.300 0.000 0.000 0.000 86.90 ONS GENERAL SERVICES Oriental 3rd LD DEO Satisfactory Network Development-Off F.B. BANTALES Carriageway Improvement ENGINEERING including Drainage Tertiary BENGUET 2ND 9 9 CONSTRUCTION/SISSI- JV-15-936 L B MA GE Mankayan, Benguet 8/24/2016 First LF 33.679 205 2/8/2016 8/30/2016 0.00% OG 0.414 0.133 0.300 0.000 0.000 0.000 84.70 - ONS Road, Abatan - Mankayan - DEO IT CONSTRUCTION Cervantes Road, K0334+000 to JOINT VENTURE K0337+814, Guinaoang, Mankayan, Benguet Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Slide, Pico - Lamtang, K0257+646 to F.B. BANTALES K0258+260; K0258+696 to BENGUET 1ST 10 10 ENGINEERING 31045 L B MA GE La Trinidad, Benguet 8/22/2016 First LF 31.534 205 2/25/2016 9/16/2016 0.50% OG 0.327 0.239 0.150 0.030 0.047 0.050 84.30 - AHD K0259+000; K0261+626 to DEO CONSTRUCTION K0261+1001; K0261+1650 to K0261+1700; K0261+1790 to K0261+1933, La Trinidad, Benguet Upgrading of Delgado St. A. D. PENDON K0001+(-402)-K0001+(-100), CONSTRUCTION 71.3% 11 11 3466 L A MB GE K0001+(-100)-K0001+080, Iloilo Iloilo City 9/1/2016 1st/Final ILOILO DEO LF 22.611 22.610731 3/26/1900 4/16/1900 0.00% C 0.275 0.300 0.050 0.030 0.058 0.000 71.30 ONS (Formerly: A. D. P. Poor City Construction & Supply) Construction of Flood Control Wall along Agbalili River, Altavas, Aklan 77.9% 12 12 A. M. P. CONSTRUCTION 16574 L B MA GE Altavas, Aklan 8/28/2016 1st/Final AKLAN DEO LF 34.428 34.428355 12/14/1900 1/16/1901 0.00% C 0.388 0.300 0.003 0.030 0.058 0.000 77.90 ONS Unsatisfactory Construction/Improvement of Access Roads leading to E.T. LATAWAN Airports, Seapots and Declared MT. CONSTRUCTION/CHUW Tourism Destinations, Balili - Bontoc and Sagada, Mt. 13 13 JV-15-1285 L B MA GE 8/24/2016 First PROVINCE LF 34.446 180 4/21/2016 10/17/2016 -3.86% OG 0.372 0.240 0.111 0.030 0.051 0.033 83.70 - DEL ARCHO CONSTRUCTION Suyo - Sagada Road leading to Province DEO JOINT VENTURE Sagada Caves, Rice Terraces and Waterfalls, Bontoc and Sagada, Mt. Province Road Concreting, Bato to Likate A. Y. U. ENGINEERING Davao City 88.3% 14 14 25632 L B MA GE Road, Brgy. Bato and Kilate, Toril, Davao City 9/2/2016 Final LF 9.800 105 4/14/2016 7/27/2016 0.00% C 0.483 0.133 0.300 0.000 0.000 0.000 91.60 ONS AND CONSTRUCTION 2nd DEO Toril, Davao City Satisfactory A.C. RIVERO Construction of River Control, DEVELOPMENT Brgy. Calico-an, Borongan City, Borongan City, Eastern Eastern Samar 84.8% 15 15 CORPORATION 1 L A MA GE Eastern Samar 8/30/2016 1st/Final LF 9.794 95 2/10/2016 5/14/2016 0.00% C 0.415 0.133 0.300 0.000 0.000 0.000 84.80 ONS Samar DEO (Formerly: A.C. Rivero Satisfactory Construction) Construction/Maintenance of Flood Mitigation Structures and R.S. SEPIAN Drainage System, BAGUIO CITY 16 16 CONSTRUCTION AND 20519 L A MA GE Construction/Rehabilitation of Baguio City 8/30/2016 First LF 46.929 200 4/25/2016 11/10/2016 -4.88% OG 0.322 0.300 0.101 0.030 0.040 0.033 82.60 - DEL DEO TRUCKING Flood Mitigation Structures/Draiange System along Crystal Cave to Asin Flood Control, Baguio City Rehabilitation/Reconstruction of National Roads with Slips, Slope JOMARCANN GENERAL Collapse & Landslide along BENGUET 1ST 17 17 30599 L A MA GE Itogon, Benguet 8/23/2016 First LF 47.994 214 2/4/2016 9/4/2016 1.06% OG 0.304 0.239 0.150 0.030 0.045 0.050 81.80 - AHD CONSTRUCTION Baguio - Itogon Road, DEO K0261+260 to K0261+460, Itogon, Benguet Consolidated on July 14, 2017 CPES Reports 3rd quarter 2016 Page 1 of 23 DPWH CONSOLIDATED CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS) 3rd Quarter CY 2016 CATEGORY PROJECT CONTRACT DATE WMS MTL TIME FAC ESH RDR FINAL RATING/ No. of No. of NAME OF LICENSE DATE of NO. of *IMPL. FUNDING SLIPPA CPES VISIT L/F AMOUNT DUR STATUS QUALITATIVE REMARKS Project Contractor CONSTRUCTOR NO. PCAB ARC TYPE NAME LOCATION EVALUATION VISIT AGENCY SOURCE STARTED COMPGE (%) 0.40/0.50 0.30/0.20 0.15/0.30 0.030 0.070 0.050 RATING (Php, M) (C.D.) DESCRIPTION Network Development: Off- F.B. BANTALES Carriageway Improvement ENGINEERING along National Secondary Road, CONSTRUCTION/E.K.C. Atok and Buguias, BENGUET 2ND 18 18 JV-15-937 L B MA GE Baguio - Bontoc Road, 8/23/2016 First LF 47.705 209 2/9/2016 9/4/2016 -0.06% OG 0.305 0.240 0.144 0.030 0.056 0.033 80.80 - DEL CONSTRUCTION AND K0266+000 to K0270+541 and Benguet DEO AGGREGATES JOINT K0319+000 to K0319+672, VENTURE Tublay, Atok and Buguias, Benguet Replacement of Permanent A.C. RIVERO Weak Bridge, Ramon DEVELOPMENT Zamboanga Magsaysay Bridge (B00469MN) Ramon Magsaysay, 88.074% 19 19 CORPORATION 5122 L A MB GE 8/30/2016 Final del Sur 1st LF 29.101 290 5/11/2015 2/24/2016 0.00% C 0.467 0.133 0.300 0.000 0.000 0.000 90.00 ONS Along Jct. Switch-Jct. Monte Zamboanga del Sur (Formerly: A.C. Rivero DEO Satisfactory Alegre Road Construction) Rehabilitation/Reconstruction of National Road with Slips, Slope Collapse and Landslide along APAYAO 1ST 20 20 E.B.J.R.