Request for Proposal

Water Supply to the Hamlet of Cherry Grove Feasibility Study 2020

PREPARED BY:

INFRASTRUCTURE SERVICES MUNICIPAL DISTRICT OF NO.87 61330 RR 455 Bag 1010 BONNYVILLE, , T9N 2J7 DATE: July 2, 2020

PAGE 1 OF 21

Water Supply to the Hamlet of Cherry Grove Feasibility Study 2020 Request for Proposal (RFP) Key Dates

July 3, 2020 M.D. issues RFP documents

July 31, 2020 RFP Closing Date

August 17, 2020 Notify Successful Proponent

August 19, 2020 Contract (for Engineering Services) Start Date

November 15, 2020 Engineering Assessment and Feasibility Report Complete

December 15, 2020 Final Report Submission.

PAGE 2 OF 21

Table of Contents

1. INSTRUCTIONS TO PROPONENTS ...... 4 1.1 INTRODUCTION ...... 4 1.2 OFFER AND ACCEPTANCE PERIOD ...... 4 1.3 DEFINITIONS ...... 4 1.4 PRE-PROPOSAL MEETING ...... 5 1.5 INQUIRIES ...... 5 1.6 CLOSING DATE AND TIME ...... 5 1.7 SUBMISSION OF PROPOSALS ...... 6 1.8 EXCEPTIONS ...... 7 1.9 RESERVATION ...... 7 1.10 FREEDOM OF INFORMATION AND PROTECTION OF PRIVACY ACT ...... 8 1.11 CONFLICT OF INTEREST ...... 8 1.12 GOVERNING LAW ...... 8 1.13 SUB-CONTRACTING ...... 8 1.14 HEALTH AND SAFETY ...... 8 2. PROJECT INFORMATION ...... 10 2.1 PROJECT BACKGROUND ...... 10 2.2 PROJECT LOCATION ...... 10 2.3 SCOPE OF WORK ...... 11 2.4 PROJECT TIMELINE ...... 12 3. PROPOSAL EVALUATION PROCESS ...... 13 3.1 SCREENING ...... 13 3.2 EVALUATION PROCESS ...... 13 3.3 AWARD STRATEGY ...... 13 3.4 PROPONENT DEBRIEFING ...... 13 4. PROPONENT RESPONSE INSTRUCTIONS ...... 14 4.1 INTRODUCTION ...... 14 4.2 PROPOSAL ORGANIZATION ...... 14 4.3 COVER PAGE ...... 15 4.4 EXPERIENCE ...... 15 4.4.1 Team Member Profiles ...... 15 4.4.2 List of Similar Projects ...... 15 4.5 SERVICE ...... 15 4.5.1 Project Understanding ...... 15 4.5.2 Approach and Methodology ...... 15 4.5.3 Project Schedule ...... 15 4.5.4 Project Management ...... 15 4.5.5 Risk Management ...... 16 4.6 PRICING ...... 16 4.6.1 Fees for Services ...... 16 4.7 ADDITIONAL FEATURES / VALUE ADDED ...... 16

5. Annex A – Proposal CONSENT Form……………………………………………………………...... 16 6. Annex B – Additional Documents………………………………………………………………………………..…18 7. Annex C - Maps..……………………………………………………………………………………………………………….18

PAGE 3 OF 21

Water Supply to the Hamlet of Cherry Grove Feasibility Study 2020 (RFP) 1. INSTRUCTIONS TO PROPONENTS

1.1 Introduction The objective of this RFP is to solicit Proposals from qualified engineering firms to provide engineering services to determine the feasibility of providing potable water supply to the hamlet of Cherry Grove and the surrounding subdivisions. The study will determine the best supply source, location and route in the most cost-effective manner from existing water infrastructure in the vicinity (see maps attached)

The Municipal District of Bonnyville No. 87 (M.D.) is a municipal district in Alberta’s North East Region. The project area is located at S ½- 15-62-1-W4, within the Municipal District of Bonnyville No. 87, approximately 9 km southeast of the City of Cold Lake along Highway 55.

All proposals received will be subject to all terms and conditions contained in the RFP. The Proponent shall inspect the subject area, make all inquiries and investigations necessary for the preparation and submission of their proposal, and shall be deemed to have made same prior to submitting the Proposal response.

The M.D. will not be responsible for any costs incurred by a Proponent in preparing and submitting a Proposal. The M.D. accepts no liability of any kind to a Proponent unless and until the Proposal is accepted by the M.D.

1.2 Offer and Acceptance Period

A response to the RFP shall be deemed to be an offer to contract with the M.D. based upon the terms, conditions and specifications contained in this RFP. Proposals shall constitute offers which are irrevocable for a period of sixty (60) days after the RFP’s Closing Date and Time. If in the M.D.’s sole opinion, a Proponent’s Proposal does not meet these requirements, the M.D. may reject the Proposal.

1.3 Definitions

Terms used in this RFP have the meaning set out below unless otherwise indicated. “Agreement” means a written document between the M.D. and the Proponent(s) to perform the tasks, duties, and responsibilities, as described in this RFP. “Alberta Time” means Mountain Standard Time or Mountain Daylight Saving Time as provided for in the Daylight-Saving Time Act of Alberta. “Contract Administrator” means the M.D.'s representative responsible for the day-to-day administration of the contract. The Contract Administrator is the Proponent's primary M.D. contact for all matters relating to the contract and service delivery. “Must” means a requirement that is to be met in a substantially unaltered form for a Proponent’s Proposal to be considered.

PAGE 4 OF 21

“Primary Contact” means the individual a Proponent (that has submitted a Proposal), designates to represent the Proponent during the competitive process associated with this RFP. There can be only one (1) Primary Contact. “Proponent” means the firm or individual who has obtained a copy of this RFP. “Proposal” means the Proponent’s response to this RFP. “Services” means everything done or performed by or through the Proponent that is within the scope of the RFP, including preparation and submission of any deliverables required by the Agreement.

1.4 Pre-Proposal Meeting

There will be no Pre-Proposal site meeting.

1.5 Inquiries

All inquiries shall be sent to the M.D. personnel listed below by email only. Do not contact any other M.D. employees or Proponents regarding any aspect of this RFP process, procedural or technical. When submitting an inquiry, identify your organization name, address, telephone and e-mail address, as well as “Water Supply to the Hamlet of Cherry Grove Feasibility Study 2020”. Attention: Bryan Bespalko Manager of Infrastructure and Utilities Municipal District of Bonnyville E-mail: [email protected]

Proponents are strongly encouraged to submit inquiries as early as possible but not later than July 23, 2020. All questions and inquires will be responded to as an Addendum to the RFP. The last addendum to the RFP will be issued on July 24, 2020.

1.6 Closing Date and Time

The Closing Date and Time for this RFP is July 31, 2020 at 2:00:01 p.m. Mountain Standard Time. The Closing Date and Time may be amended at the sole discretion of the M.D. For RFP closing purposes the official time of receipt of Proposals shall be as determined by front reception used to date and time stamp Proposals upon submission to M.D. Failure to clearly identify Proposals (as outlined in Section 1.9 – Submission of Proposals), being delivered to the M.D. Infrastructure Services Department, Front Reception just prior to the Closing Time, and/or Proposals not being delivered directly to front reception, may result in delays in date and time stamping of Proposals. Proposals that are date and time stamped after the Closing Date and Time will not be evaluated and will be returned unopened.

PAGE 5 OF 21

1.7 Submission of Proposals

The Proponent shall submit one (1) original, one (1) copy, and one (1) digital copy on a memory stick of its Proposal, in a sealed package clearly marked and identified as follows:

RFP: Request for Proposal

Water Supply to the Hamlet of Cherry Grove Feasibility Study 2020

CLOSING DATE: July 31, 2020

CLOSING TIME: 2:00:01 p.m. Mountain Standard Time

ADDRESSED TO: Abid Malik, P Eng. General Manager of Infrastructure Services 61330 RR 455 Bag 1010 Bonnyville, AB, T9N

FROM: (Proponent’s Name)

The above information should appear on the outside of all packages or boxes containing the Proponent’s Quote. If multiple packages or boxes are being submitted, clearly indicate the number, e.g., 1 of 3, 2 of 3, etc. Due to the circumstances related to the COVID-19, the Municipal District of Bonnyville No. 87 (M.D.) only accepts courier delivery for the submission of tenders. As the M.D. office located at 61330 Range Road 455 is currently closed to visitors, the M.D. has a drop box by the office front door for courier deliveries. The Bidder is advised to coordinate the delivery with the courier company and call the M.D. reception at (780) 826-3951 for pickup. It is the Bidder’s responsibility to make sure their submission is received by the M.D. on or before the tender closing date and time. Late submissions will be disqualified. • Faxed or electronically submitted Proposals will not be accepted; • Proposals submitted in the name of an incorporated company shall be signed in the name of the company by a duly authorized representative of the company; • Proposals received after the Closing Date and Time will not be evaluated and will be returned unopened; • Delivery service disruptions will not be acceptable conditions for late Proposal submissions; • At any time prior to the RFP Closing Date and Time, a Proponent may withdraw its Proposal. No Proposal shall be altered, amended, or withdrawn after the Closing Date and Time unless the Proponent is requested to do so by the M.D.; • There will be no public opening of Proposals;

PAGE 6 OF 21

• Persons or firms submitting Proposals shall be actively engaged in the line of work required by the RFP and shall be able to refer to work of a similar character performed by them; and, they must maintain a physical office in Alberta for the entire contract period. • The M.D. will retain for its records all copies of Proponents’ Proposals and related documents.

1.8 Exceptions

For the Proponent to be considered for possible exemption from the application of any of the terms and conditions or specifications contained in the RFP, the M.D. requests the Proponent’s Proposal specifically address the term, condition, or specification in question by referring to the corresponding RFP page number and paragraph containing the term, condition, or specification and, if applicable, providing proposed revised wording. The evaluation team will determine the acceptability of any proposed exemption. The extent of any proposed exemption(s) may be a factor in whether the M.D. will accept or reject a Proponent’s Proposal. Prior to the submission of its Proposal, the Proponent is strongly encouraged to use the Inquiries process outlined in Section 1.5 – Inquiries to obtain clarification from the M.D. as to the acceptability of any proposed exception(s).

1.9 Reservation

Notwithstanding anything to the contrary herein, the M.D. reserves the right in its sole discretion to; • Accept or reject any or all Proposals. The lowest priced Proposal need not be accepted; • Accept or reject any Proposal that exceeds the M.D.’s allocated project budget; • Disqualify a Proponent in the event that, in the sole discretion of the M.D., its Proposal does not contain sufficient information to permit a thorough analysis; • Verify the validity of the information supplied and to reject any Proposal where the contents appear to be incorrect or inaccurate in the M.D.’s estimation; • Accept Proposal in whole or in part; • Accept a non-compliant Proposal; • Accept or reject any Proposal where the M.D. believes the M.D. staffing levels required to implement and maintain a Proponent’s proposed solution are unacceptable; • In the event that: • The majority of the Proposals exceed the M.D.’s allocated budget for this RFP; • Financial circumstances of the M.D. change; • Political, economic, or technical conditions change; • Any other event which was unforeseen occurs and is beyond the control of the M.D.; or, • Less than three (3) qualified Proponents submit Proposals.

PAGE 7 OF 21

The M.D reserves the right, in its sole discretion, to cancel this RFP without award or compensation to Proponents, their officers, directors, employees, or agents.

1.10 Freedom of Information and Protection of Privacy Act While the Freedom of Information and Protection of Privacy Act allows persons a right of access to records in the M.D.’s custody or control, it also prohibits the M.D. from disclosing personal information about an individual in certain circumstances, or business information, if disclosure could reasonably be expected to cause harm as outlined in the Act. Because of the complexity of this Act, Proponents must consider the potential that any information that is provided to the M.D. may be disclosed to a third party. All information in the possession or control of the M.D., including any information provided, obtained or under the control of the M.D. under this competitive process, is subject to the Freedom of Information and Protection of Privacy Act. Should the M.D. receive a request for any records that are under the control of the M.D. and in the Proponent’s custody, the Proponent must provide the records, at the Proponent’s expense to the M.D. Assessment criteria and allocation formulas for this competitive process are public information. Information regarding individual assessments is considered confidential and may be provided, upon request, to the party to whom it relates. Third parties will only be provided information in accordance with the Freedom of Information and Protection of Privacy Act. 1.11 Conflict of Interest Proponents must fully disclose, in writing to the M.D. on or before the Closing Date and Time of this RFP, the circumstances of any potential conflict of interest or what could be perceived as a possible conflict of interest if the Proponent were to become a contracting party pursuant to this RFP. The M.D. shall review any submissions by Proponents under this provision and may reject any Proposals where, in the sole opinion of M.D., the Proponent could be in a conflict of interest or could be perceived to be in a possible conflict of interest position if the Proponent were to become a contracting party pursuant to this RFP. 1.12 Governing Law This RFP shall be governed by the laws of the Province of Alberta, and the forum for all disputes shall be the Courts of the Province of Alberta. 1.13 Sub-Contracting Proponents retain the ability to subcontract work that is beyond their scope/ capability; however, they still remain the “Prime” Contractor. The prime contractor is overall responsible for the quality of work completed and must ensure all safety regulations and applicable codes are followed. Any extra costs associated with sub-contracting that were not identified in the accepted proposal remain the responsibility of the proponent. 1.14 Health and Safety Upon successful award, the Proponent must provide the Municipal District of Bonnyville with the following for review: • COR. • Company Safety Manual. • Tailgate Meeting/Hazard Assessment Forms.

PAGE 8 OF 21

• Emergency Response Plan for Worksite. • Proof of Insurance.

PAGE 9 OF 21

2. PROJECT INFORMATION

2.1 Project Background The hamlet of Cherry Grove consists of over 100 residences within the geographical boundary of the hamlet. Between the City of Cold Lake and Cherry Gove there are a number of other subdivisions and individual residences that could potentially benefit from this project. It is one of the priorities of the M.D. Strategic Plan to service this area with a potable water supply. An Area Structure Plan has been developed for Cherry Grove and is attached in ANNEX B. A 250mm potable waterline, connected to the City of Cold Lake water distribution system, is currently servicing the community of Ardmore and is a potential connection point for a supply line to Cherry Grove. This alignment is shown in ANNEX C. The Bonnyville Regional Water Services Commission (BRWSC) operates a 600mm potable water regional transmission line that is also located in close proximity (12 Km) to allow for a connection to supply water to Cherry Grove. This alignment is shown in ANNEX C. The supply of water from either of these locations may allow for many other rural connections along the alignment to Cherry Grove. These additional connections are to be considered when performing the study including the option of supplying water from CLRUSC (Cold Lake Regional Utility Services Commission).

2.2 Project Location – Portions of the South ½ of 15 and North ½ of 10 – 62 – 1 – W4 and portions of the Southwest of 16 – 62 – 1 – W4 in the Municipal District of Bonnyville

Hamlet of Cherry Grove PAGE 10 OF 21

2.3 Scope of Work

Services that are required (but not limited to) are as follows:

1. Undertake a review of issues and concerns raised in regard to existing systems: a. Current Water supply options for residents and concerns i. reliability ii. water quality issues (wells/cisterns) iii. costs to residents b. Risks 2. Review the 2009 report (specifically Sections 4 & 5) regarding the servicing of Cherry Grove, Elizabeth Metis Settlement and Frog Lake with Regional water. 3. Establish Design Criteria a. Current and future populations of study/catchment area (including those who may use water from a truckfill) b. Water consumption c. Design Flow i. peak flow ii. determining if fire flow provisioning will be a requirement d. Maintenance of chlorine residuals (resident time) in pipelines (chlorination vs chloramination) 4. Identify and Assess Water Supply Options a. Bonnyville Water Commission (chloraminated water) b. City of Cold Lake (chlorinated water) c. CLRUSC (chlorinated water) 5. Assess distribution/servicing requirements in subdivisions and hamlet a. Servicing existing resident discussion (distribution system and trickle fil options) b. Water metering c. Truckfill location(s) to serve the study area

6. The assessment of the options to include: a. Cost analysis of options i. Capital Cost

PAGE 11 OF 21

ii. Engineering iii. Contingencies (based on conceptual level estimates) b. A discussion of various Regulatory approval requirements 7. A discussion of Grant funding options in generalized terms. These will assist in setting up the next phase of the study after September 2020 as discuss in deliverable item #3 above. 8. Identification of a Project team and Fee Schedule a. A project team and their hourly fee must be identified that will liaise with the M.D. throughout the entire life of the project. Once created and approved, no substitutions can be made without the written consent of the M.D. b. Project team shall identify a senior single individual who will act as the primary contact for all matters identified in the scope of work for the duration of the contract.

2.4 Project Timeline

The critical timeline for this project is as follows:

July 3, 2020 M.D. issues RFP documents

July 31, 2020 RFP Closing Date

August 17, 2020 Notify Successful Proponent

August 19, 2020 Contract (for Engineering Services) Start Date

November 15, 2020 Engineering Assessment and Feasibility Report Complete

December 15, 2020 Final Report Submission.

PAGE 12 OF 21

3. PROPOSAL EVALUATION PROCESS

3.1 Screening

Upon receipt of the Proposals on June 5, 2020, an evaluation team will screen each Proposal to ensure the Proponent’s compliance with the requirements of this RFP. After the Proposal has passed the initial screening, the evaluation team will then undertake a detailed analysis of the Proponent’s Proposal.

3.2 Evaluation Process

The main areas of consideration in the evaluation process are:

• 10% - Understanding of the project;

• 15% - Ability to meet the service requirements identified in para 2.3;

• 5% - RFP Submission quality and clarity;

• 15% - Project team relevant experience;

• 10% - Similar projects completed (on time and on budget);

• 10% - Proposed project schedule;

• 30% - Cost

• 5% -Innovation.

Incomplete Proposals or Proposals that fail to follow the format outlined in Para 4.2 may be eliminated without further evaluation. At any time during the evaluation process, the M.D. may request written clarification concerning any aspect of a Proponent’s Proposal. If the M.D. is not satisfied as to the reliability of any proposed solution, the Proposal may be rejected, at the sole discretion of the M.D.

3.3 Award Strategy

The successful Proponent(s) will be notified as soon as possible after acceptance of its Proposal. Selection of a successful Proponent(s) does not obligate the M.D. to negotiate or execute an Agreement. Awards shall be made on Proposals that give the greatest value based on the evaluation.

3.4 Proponent Debriefing

The M.D. will not be providing proposal debriefings to unsuccessful Proponents who submitted a response to this RFP.

PAGE 13 OF 21

4. PROPONENT RESPONSE INSTRUCTIONS

4.1 Introduction

This Section outlines the information the M.D. requests the Proponent to provide in its Proposal. Failure to provide all the information may result in disqualification from the competitive process. The Proponent is advised to confirm that its Proposal clearly addresses all requirements defined as a “Must.” See Section 1.4 – Definitions for additional information.

4.2 Proposal Organization

The M.D. requests the Proponent’s Proposal be organized as outlined below. This will facilitate the M.D.’s evaluation. The total length of the Proposal shall not be more than ten (10) pages, excluding Appendices, Cover Page and Table of Contents. If the Proponent wishes to include additional information on any point that is somewhat voluminous or that is not directly relevant to the specific situation described in this RFP, that information should be placed in the section entitled “Additional Features” and referenced in the main body of the Proposal. Cover Page Table of Contents 1.0 – Experience 1.1 – Team Member Profiles 1.2 – Similar Projects Completed 2.0 – Services 2.1 – Project Understanding 2.2 – Approach and Methodology 2.3 – Project Schedule 2.4 – Project Management 2.5 – Risk Management 3.0 – Pricing 3.1 – Fee for Services 4.0 – Additional Features / Value Added Annex A – Consent Form (Completed and signed) Annex B – Crane Lake Area Structure Plan Annex C – Photos

PAGE 14 OF 21

4.3 Cover Page

The M.D. requests the cover page be completed with: • The name of this RFP; • The name of the Proponent; • The Proponent’s address, telephone and fax numbers, name of the Proponent’s Primary Contact for this competitive process, and Primary Contact’s e-mail address; • The date of Proposal submission; • Include the following statement: “It is the intent of [Proponent’s legal name] to enter into a formal Agreement with the M.D. based on the requirements of this RFP.” Modifying the above wording may result in disqualification from this competitive process; and • The signature of a duly authorized representative of the company (indicate name and title).

4.4 Experience

4.4.1 Team Member Profiles Summary description of relevant experience and capability of each team member, including sub- consultants, and their role and responsibility during the project (limit one page/member). The relevant experience should be limited to work on projects of similar size and scope.

4.4.2 List of Similar Projects Brief summary of similar projects completed.

4.5 Service

4.5.1 Project Understanding Proponents are required to demonstrate their understanding of the project scope and requirements. Briefly outline the key issues as the Proponent understands them.

4.5.2 Approach and Methodology Describe the capabilities in terms of methods, approach, and tools the Proponent intends to deploy in fulfilling project scope and requirements.

4.5.3 Project Schedule Present your high-level schedule including 1) key dates for all deliverables; 2) M.D. and the Proponent resource assignments (i.e., who is doing what); and 3) percentage of available time the Proponent’s resources are assigned to this project. Comment on your strategy to facilitate a quick start to the project.

4.5.4 Project Management Describe how your Project Management methodology will ensure completion of the project within the required timeline and how costs will be controlled.

PAGE 15 OF 21

4.5.5 Risk Management Identify the potential risks involved in this project. Present your approach to managing and mitigating any risks. Identify any risk sharing opportunities the Proponent can offer to consider how risk is shared as well as opportunity for reward. Any risk sharing opportunities may be negotiated with the successful Proponent.

4.6 Pricing

4.6.1 Fees for Services The proponent shall submit a list of fees and expenses that will be incurred for the project for each schedule of work. Describe the fees in detail identifying when/how fees are applied. In addition, using the proposed fees, provide estimated hourly quantities, and an estimate total value for this project. Any fees not identified in the Proposal will be the responsibility of the Proponent. For cost comparison a summary of fees for each task must be included in the proposal submission.

4.7 Additional Features / Value-Added

In addition to the categories identified in this section, the Proponent is encouraged to identify any additional features or value-added components of its Proposal that could be of benefit to the M.D. Only those aspects deemed to be of benefit to the M.D. may be considered in the evaluation.

PAGE 16 OF 21

5. ANNEX A – PROPOSAL CONSENT FORM

Proponents are requested to sign and return this form with their Proposal. Enclosed is our Proposal submitted in response to RFP- Water Supply to the Hamlet of Cherry Grove Feasibility Study 2020. The Proponent consents, and has obtained written consent of any individuals identified in the Proposal, to the use of the information in the Proposal by the M.D. or its agents to enable the M.D. to evaluate the Proposal and use this information for other program purposes of the M.D.

Proponent Name:

Contact Name:

Proponents Billing Address:

Proponents Fax Number:

Proponents Email Address:

Number of Attachments (Detailed information if required) ______

( ) Proponent Name Telephone Date

Authorized Signature (Print Name) Title

PAGE 17 OF 21

6. ANNEX B – ADDITIONAL DOCUMENTS

1. Area Structure Plan Map 2. Area Structure Plan 3. 2009 Regional Water Supply Functional Plan and Feasibility Study

PAGE 18 OF 21

PAGE 19 OF 21

AECOM

Cold Lake Regional Utility Services Commission Regional Water Supply Functional Plan and Feasibility Study

Cold Lake Regional Utility Services Commission Regional Water Supply Functional Plan and Feasibility Study

Prepared by: AECOM Ltd. 17007 107 Avenue , AB T5S 1G3 T 780.486.7000 F 780.486.7070 www.aecom.com

Job No. 0089-077-00-4.6.1

March 2009

AECOM

AECOM 17007 107th Avenue, Edmonton, AB, Canada T5S 1G3 T 780.486.7000- F 780.486.7070 www.aecom.com

March 2, 2009 Project Number: 0089-077-00-4.6.1

Carry Grant Operations Manager Public Works Department City of Cold Lake 1515 16 Street Cold Lake AB T9M 2E4

Dear Mr. Grant:

Re: Cold Lake Regional Utility Services Commission Regional Water Supply Functional Plan and Feasibility Study Final Report

AECOM is pleased to submit the final report of the Cold Lake Regional Utility Services Commission Regional Water Supply Functional Plan and Feasibility Study. We have incorporated comments received through review of the draft reports.

If you have any questions or require any further information please call.

Sincerely, AECOM Canada Ltd.

Ahtesham Shirazi, M.Eng., P.Eng. [email protected]

/ksi Encl.

(APT2a-0089-077·00-F'""1·090227 doc)

Statement of Qualifications and Limitations

© 2009 AECOM CANADA LTD. OR CLIENT (IF COPYRIGHT ASSIGNED TO CLIENT). ALL RIGHTS RESERVED. THIS DOCUMENT IS PROTECTED BY COPYRIGHT AND TRADE SECRET LAW AND MAY NOT BE REPRODUCED IN ANY MANNER, EXCEPT BY CLIENT FOR ITS OWN USE, OR WITH THE WRITTEN PERMISSION OF AECOM CANADA LTD. OR CLIENT (IF COPYRIGHT ASSIGNED TO CLIENT).

The attached Report (the “Report”) has been prepared by AECOM Canada Ltd. (“Consultant”) for the benefit of the client (“Client”) in accordance with the agreement between Consultant and Client, including the scope of work detailed therein (the “Agreement”).

The information, data, recommendations and conclusions contained in the Report:

• are subject to the budgetary, time, scope, and other constraints and limitations in the Agreement and the qualifications contained in the Report (the “Limitations”); • represent Consultants’ professional judgement in light of the Limitations and industry standards for the preparation of similar reports; • may be based on information provided to Consultant which has not been independently verified; • have not been updated since the date of issuance of the Report and their accuracy is limited to the time period and circumstances in which they were collected, processed, made or issued; • must be read as a whole and sections thereof should not be read out of such context; • were prepared for the specific purposes described in the Report and the Agreement; • in the case of subsurface, environmental or geotechnical conditions, may be based on limited testing and on the assumption that such conditions are uniform and not variable either geographically or over time.

Unless expressly stated to the contrary in the Report or the Agreement, Consultant:

• shall not be responsible for any events or circumstances that may have occurred since the date on which the Report was prepared or for any inaccuracies contained in information that was provided to Consultant; • makes no representations whatsoever with respect to the Report or any part thereof, other than that the Report represents Consultant’s professional judgement as described above, and is intended only for the specific purpose described in the Report and the Agreement; • in the case of subsurface, environmental or geotechnical conditions, is not responsible for variability in such conditions geographically or over time.

Except as required by law or otherwise agreed by Consultant and Client, the Report:

• is to be treated as confidential; • may not be used or relied upon by third parties.

Any use of this Report is subject to this Statement of Qualifications and Limitations. Any damages arising from improper use of the Report or parts thereof shall be borne by the party making such use.

This Statement of Qualifications and Limitations is attached to and forms part of the Report.

THIS DOCUMENTATION IS SUPPLIED TO CLIENT BY CONSULTANT AND CONSTITUTES CONFIDENTIAL TRADE SECRETS, OR COMMERCIAL, FINANCIAL, SCIENTIFIC, OR TECHNICAL INFORMATION. THIS DOCUMENTATION IS SUBMITTED TO CLIENT IN CONFIDENCE. IT HAS SIGNIFICANT ECONOMIC VALUE TO CONSULTANT AND ITS DISCLOSURE, WITHOUT THE EXPRESS CONSENT OF CONSULTANT, COULD REASONABLY BE EXPECTED TO LEAD TO SIGNIFICANT AND UNDUE FINANCIAL AND OTHER HARM TO CONSULTANT, INCLUDING HARM TO CONSULTANT’S COMPETITIVE AND NEGOTIATING POSITIONS, AND UNDUE FINANCIAL GAIN TO ONE OR MORE THIRD PARTIES.

RPT2-0089-077-00-FINAL-090227.DOC COLD LAKE REGIONAL UTILITY SERVICES COMMISSION REGIONAL WATER SUPPLY FUNCTIONAL PLAN & FEASIBILITY STUDY AECOM

Revision Log

Revision # Revised By Date Issue / Revision Description

0 March 2008 Draft

1 April 2008 Draft #2

2 March 2009 Final

RPT2-0089-077-00-FINAL-090227.DOC COLD LAKE REGIONAL UTILITY SERVICES COMMISSION REGIONAL WATER SUPPLY FUNCTIONAL PLAN & FEASIBILITY STUDY AECOM

Signature Page Report Prepared By: ¦ Report Reviewed By:

Kristin St. Louis, P.En .

PERMIT TO PRACTICE AECOM CANADA LTD. ,•,:MJ#t----=· -:·•")' -· ML.r?t-. ?•,?,,:- ,L_2c....1--=o'-'i'----- PERMIT NUMBER: P10450 .:. s1:i!:"'"·1··."i .;....o...-r/,"":<"":';:c;r-..J -hi'· ...... ,.y t--·in?--.:-,..s,

Gr\, >?;i::::·) r_ f .. ur-J G::urïj!)·._i?:? :.,Jp• :,1.

RPT2-0089-077-00-FINAL-090227. DOC COLD LAKE REGIONAL UTILITY SERVICES COMMISSION REGIONAL WATER SUPPLY FUNCTIONAL PLAN & FEASIBILITY STUDY

Table of Contents

Executive Summary...... v

1.0 Introduction ...... 1 1.1 Background ...... 1 1.2 Scope of Work...... 1

2.0 Stakeholder Consultation and Workshops ...... 4 2.1 Project Meetings and Workshops ...... 4 2.2 Public Consultation ...... 5

3.0 Study Data ...... 7 3.1 General ...... 7 3.2 Study Area ...... 7 3.3 Land Use...... 7 3.4 Existing Reports...... 7 3.5 Orthophotographs and Contour Maps ...... 8 3.6 As-built Data...... 8 3.7 Pump Data ...... 8 3.8 Flow Data ...... 8 3.9 Water Diversion...... 9 3.10 Field Reconnaissance...... 9

4.0 Growth Scenarios ...... 11 4.1 Purpose...... 11 4.2 Growth Scenarios...... 11 4.2.1 Process ...... 11 4.2.2 Data Challenges...... 11 4.3 Analysis...... 12 4.3.1 Long Term Historical Population...... 12 4.3.2 Short-Term Historical Population ...... 14 4.4 Population Planning Targets...... 15

5.0 Water Servicing ...... 16 5.1 General ...... 16 5.2 Design Criteria ...... 16 5.2.1 Pressure and Flow Requirements...... 16 5.3 Water Supply...... 16 5.3.1 Water Consumption Rates...... 16 5.3.2 Storage...... 20 5.4 Existing System Description ...... 20 5.5 Existing System Assessment...... 22 5.5.1 Model Development ...... 22 5.5.2 System Modelling and Assessment ...... 22 5.6 Water Servicing Concept ...... 22 5.6.1 Development of Alternatives ...... 22 5.6.2 Alternative 1 ...... 23 5.6.3 Alternative 1a ...... 25 5.6.4 Alternative 2 ...... 28 5.6.5 Alternative 3 ...... 30

RPT2-0089-077-00-FINAL-090227.DOC TABLE OF CONTENTS i COLD LAKE REGIONAL UTILITY SERVICES COMMISSION REGIONAL WATER SUPPLY FUNCTIONAL PLAN & FEASIBILITY STUDY

5.6.6 Cost Estimate Summary ...... 32 5.7 Evaluation of Alternatives ...... 33 5.8 Recommended Water Servicing Alternative ...... 34 5.9 Conceptual Design of Preferred Alternative ...... 34 5.9.1 Growth Projections...... 34 5.9.2 Recommended Design...... 36 5.9.3 Stage 1 Design...... 40

6.0 Water Treatment...... 59 6.1 General ...... 59 6.2 Design Criteria ...... 59 6.3 Existing System Description ...... 59 6.4 Installed Membranes...... 60 6.5 Water Treatment Concepts...... 60 6.5.1 Initial Pumping and Piping Modifications ...... 61 6.5.2 Long Term Alternative 1...... 61 6.5.3 Long Term Alternative 2(a) ...... 61 6.5.4 Long Term Alternative 2(b) ...... 62 6.5.5 Redundancy ...... 63 6.6 Conceptual Cost Estimates...... 63 6.6.1 Operations and Maintenance Costs...... 63 6.6.2 Capital Costs...... 63 6.7 Evaluation of Alternatives ...... 64 6.8 Recommended Water Treatment Alternative ...... 65 6.9 Conceptual Design of Preferred Alternative ...... 65 6.9.1 Design for 2012...... 66 6.9.2 Design for 2032...... 66

7.0 Cost Estimate and Implementation Plan ...... 73 7.1 Cost Estimates...... 73 7.2 Implementation Plan ...... 75

8.0 Utility Governance Model...... 76 8.1 General ...... 76 8.2 Existing CLRUSC Members...... 76 8.3 Recommended Governance Structure ...... 76 8.4 Implementation Plan ...... 77

9.0 Conclusions and Recommendations...... 78 9.1 Growth Scenarios...... 78 9.2 Water Servicing...... 78 9.3 Water Treatment ...... 79 9.4 Cost Estimates and Implementation Plan...... 79 9.5 Utility Governance Model...... 80

List of Appendices Appendix A Scope of Work Appendix B Workshop and Meeting Minutes Appendix C Pump Curves Appendix D Preliminary Cost Estimates Appendix E Utility Governance Model

RPT2-0089-077-00-FINAL-090227.DOC TABLE OF CONTENTS ii COLD LAKE REGIONAL UTILITY SERVICES COMMISSION REGIONAL WATER SUPPLY FUNCTIONAL PLAN & FEASIBILITY STUDY

List of Tables Table ES.1: Water Transmission System Cost Estimate Summary ...... vi Table ES.2: Cost Estimate Summary ...... vii Table ES.3: Cost Sharing Summary ...... vii Table 4.1: Historical Population Growth 1966 – 2005 ...... 13 Table 4.2: Target Populations...... 15 Table 5.1: Water Consumption Rates (ADD) – Municipal Standards...... 17 Table 5.2: Actual and Projected Water Demands...... 18 Table 5.3: Pump Curves ...... 21 Table 5.4: Existing System Maximum Day Demand Modelled Results...... 22 Table 5.5: Alternative 1 – Maximum Day Demand Modelled Results ...... 24 Table 5.6: Alternative 1 – Staging...... 24 Table 5.7: Alternative 1 – Cost Estimates...... 25 Table 5.8: Alternative 1a – Maximum Day Demand Modelled Results ...... 26 Table 5.9: Alternative 1a – Staging...... 27 Table 5.10: Alternative 1a – Cost Estimates...... 27 Table 5.11: Alternative 2 – Maximum Day Demand Modelled Results ...... 28 Table 5.12: Alternative 2 – Staging...... 29 Table 5.13: Alternative 2 – Cost Estimates...... 30 Table 5.14: Alternative 3 – Maximum Day Demand Modelled Results ...... 31 Table 5.15: Alternative 3 – Staging...... 31 Table 5.16: Alternative 3 – Cost Estimates...... 32 Table 5.17: Water Transmission System Cost Estimate Summary...... 33 Table 5.18: Alternative Advantages/Disadvantages ...... 33 Table 5.19: Actual and Projected Water Consumption Rates ...... 35 Table 5.20: Recommended Alternative – Maximum Day Demand Modelled Results...... 36 Table 5.21: Recommended Alternative – Staging ...... 37 Table 5.22: Recommended Alternative – Cost Estimates ...... 38 Table 5.23: Recommended Alternative Stage 1 Cost Estimates...... 41 Table 6.1: Water Treatment Design Criteria ...... 59 Table 6.2: Water Transmission System Cost Estimate Summary...... 63 Table 6.3: Comparison of Upgrading Options...... 64 Table 7.1: Cost Estimate Summary ...... 73 Table 7.2: Stage 1 Cost Estimate Summary...... 73 Table 7.3: Per Capita Cost Sharing ...... 74 Table 9.1: Water Transmission System Cost Estimate Summary...... 79 Table 9.2: Cost Sharing Summary...... 80

List of Figures Figure ES.1 - Future Transmission System Recommended Alternative ...... ix Figure ES.2 – Future Transmission System Stage 1 Recommended Alternative...... x Figure 3.1 – Existing and Expansion Communities ...... 10 Figure 5.1 – Existing Water Transmission System ...... 42 Figure 5.2 – Future Transmission System Alternative 1...... 43 Figure 5.3 – Future Transmission System Cold Lake Supply Alternative 1 ...... 44 Figure 5.4 – Future Transmission System Alternative 1a...... 45 Figure 5.5 – Future Transmission System Cold Lake Supply Alternative 1a ...... 46 Figure 5.6 – Future Transmission System Alternative 2...... 47 Figure 5.7 – Future Transmission System Cold Lake Supply Alternative 2 ...... 48 Figure 5.8 – Future Transmission System Alternative 3...... 49

RPT2-0089-077-00-FINAL-090227.DOC TABLE OF CONTENTS iii COLD LAKE REGIONAL UTILITY SERVICES COMMISSION REGIONAL WATER SUPPLY FUNCTIONAL PLAN & FEASIBILITY STUDY

Figure 5.9 – Future Transmission System Cold Lake Supply Alternative 3 ...... 50 Figure 5.10 – Future Transmission System Pipe Flow Rates Alternative 1 ...... 51 Figure 5.11 – Future Transmission System Pipe Flow Rates Alternative 1a ...... 52 Figure 5.12 – Future Transmission System Pipe Flow Rates Alternative 2 ...... 53 Figure 5.13 – Future Transmission System Pipe Flow Rates Alternative 3 ...... 54 Figure 5.14 – Future Transmission System Recommended Alternative ...... 55 Figure 5.15 – Future Transmission System Cold Lake Supply Recommended Alternative...... 56 Figure 5.16 – Future Transmission System Pipe Flow Rates Recommended Alternative...... 57 Figure 5.17 – Future Transmission System Recommended Alternative Stage 1...... 58 Figure 6.1 – Water Treatment Plant Site Plan ...... 67 Figure 6.2 – Water Treatment Plant Existing Intermediate Level Plan...... 68 Figure 6.3 – Water Treatment Plant Intermediate Floor Plan Year 2012 ...... 69 Figure 6.4 – Water Treatment Plant Intermediate Floor Plan Year 2032 ...... 70 Figure 6.5 – Water Treatment Plant Transfer Pumps Schematic 2012...... 71 Figure 6.6 – Water Treatment Plant Transfer Pumps Schematic 2032...... 72

RPT2-0089-077-00-FINAL-090227.DOC TABLE OF CONTENTS iv COLD LAKE REGIONAL UTILITY SERVICES COMMISSION REGIONAL WATER SUPPLY FUNCTIONAL PLAN & FEASIBILITY STUDY

Executive Summary

The Cold Lake Regional Utility Services Commission (CLRUSC) presently provides water to the City of Cold Lake, 4 Wing Cold Lake, , and the Hamlets of Ardmore and Fort Kent. The CLRUSC is interested in examining opportunities to expand the regional system to service additional municipalities including Cold Lake IR 149B, Hamlet of , Hamlet of Cherry Grove, Elizabeth Métis Settlement, Town of Bonnyville, Village of Glendon, Hamlet of Therien, Kehiwin IR 123, and areas south of Moose Lake including the Summer Villages of and Pelican Narrows. In order to facilitate discussions, the need for a Regional Water Supply Functional Plan and Feasibility Study has been identified.

Growth Scenarios

The population projections developed have been based on historical population trends, current populations and economic activity. These population projections impact the timing of system improvements and should be reviewed on a regular basis. 5 year and 25 year population targets were developed. The planning targets represent more than a doubling of the regional population by 2032, from the current population of around 25,000 to over 50,000.

Water Servicing

The existing system was analyzed based on the existing water consumption data. It is recommended that the future system be designed for a composite water consumption rate of 375 L/capita/day (average day demand) to correspond with the provincial average. The transmission system was sized for two times the average day demand.

For each alternative, it is recommended that the CLRUSC system be separated from the City of Cold Lake distribution system where possible. It is recommended that the First Nation communities Cold Lake IR 149A and Cold Lake IR 149B be supplied from the Cold Lake North distribution system.

It was assumed that all expansion communities would be serviced by 2012. For all of the alternative water servicing concepts, it is proposed that there be a dedicated fill line from the Water Treatment Plant to a new CLRUSC reservoir/pump station located in Cold Lake North. This pump station will supply all of the regional customers, and a 1500 m3 reservoir will be required.

Four water servicing alternatives were developed. Alternative 1 includes upgrading the existing transmission main from Cold Lake to Fort Kent and extending the main to Bonnyville. From Bonnyville the pipes extend west to service the Moose Lake area, Kehiwin IR 123, Glendon and Therien. For each alternative, the servicing to areas west of Bonnyville is the same. The total length of pipe required is 147 km, and 2 booster stations are required.

Alternative 1a includes the same servicing concept as Alternative 1, with an additional connection from Cold Lake to La Corey for looping. The total length of pipe required is 183 km, and 2 booster stations are required.

RPT2-0089-077-00-FINAL-090227.DOC EXECUTIVE SUMMARY v COLD LAKE REGIONAL UTILITY SERVICES COMMISSION REGIONAL WATER SUPPLY FUNCTIONAL PLAN & FEASIBILITY STUDY AECOM

Alternative 2 includes the installation of a new transmission main from Cold Lake west to La Corey, then south to Bonnyville. The total length of pipe required is 150 km, and 2 booster stations are required.

Alternative 3 includes the installation of a new transmission main south from Cold Lake to Cherry Grove and the Elizabeth Métis Settlement, then west to Bonnyville. The total length of pipe required is 165 km, and 3 booster stations are required.

Present worth costs were determined for each of the alternatives, including both capital costs and operation and maintenance costs for the 25 year study period. The cost estimates include 35% for contingencies and 10% for engineering and overhead, and are summarized in Table ES.1.

Table ES.1: Water Transmission System Cost Estimate Summary

Alternative Present Worth Capital Present Worth O&M Total Present Worth Alternative 1 $102,402,000 $29,716,000 $132,118,000 Alternative 1a $107,416,000 $29,716,000 $137,132,000 Alternative 2 $112,577,000 $29,455,000 $142,032,000 Alternative 3 $134,823,000 $36,547,000 $171,370,000

Alternative 1 is the recommended water servicing concept since it is the most cost effective alternative. In addition, Alternative 1 is the preference of the steering committee. Following submission of the draft report, Alberta Transportation indicated that the maximum annual growth rate should be 2.5%. Therefore, the water demands were adjusted accordingly, and refinements were considered to the Alternative 1 design to determine the most cost effective solution.

The recommended water servicing design includes a 500 mm diameter transmission main from Cold Lake North to Bonnyville, twinning the existing pipes through Ardmore and Fort Kent. Due to the reduced flow rates, only 1,000 m3 of storage is required at Cold Lake South, and the proposed pump station in Cold Lake South was eliminated. The total present worth cost for the recommended alternative (refined Alternative 1) is $119,467,000. The recommended alternative is illustrated in Figure ES.1.

Water Treatment

Demands are expected to exceed the existing plant capacity (22 ML/d) by 2010, and a third membrane train (with a capacity of 13.7 ML/d) should be installed at that time. With its installation, projected 2012 demands (21.8 ML/d) will be easily met.

For long-term servicing, two alternatives were considered. Alternative 1 involves filling out the existing tankage and modifying the remaining tanks to accommodate 2032 demands. Alternative 2 involves the construction of a new treatment plant on the same site as the future CLRUSC pump station and reservoir in Cold Lake North. The existing water treatment plant would be used as a pumphouse and raw water reservoir.

Although it may be ultimately necessary to build a new facility or construct a major addition to the existing plant, these upgrades are not necessary until flows beyond those projected in 2032 are experienced. Therefore, Alternative 1 is recommended.

RPT2-0089-077-00-FINAL-090227.DOC EXECUTIVE SUMMARY vi COLD LAKE REGIONAL UTILITY SERVICES COMMISSION REGIONAL WATER SUPPLY FUNCTIONAL PLAN & FEASIBILITY STUDY AECOM

Retrofitting the first and second existing membrane tanks and replacement of the existing membranes with new higher density membranes (with a capacity of 13.7 ML/d) will have to be completed by 2030 and 2034, respectively, in order to meet the projected maximum day demand in 2032 (37.2 ML/d). Modifications to the transfer pumping will have to occur before the addition of the third membrane train, and the addition of a building expansion will be necessary as demands increase. Depending on the supply pressure needed from the water treatment plant, the building expansion and additional transfer pumps may need to occur as early as 2019 (550 kPa) and as late as 2030 (350 kPa).

Cost Estimates and Implementation Plan

The cost estimates for the recommended alternatives, refined water servicing Alternative 1 and water treatment Alternative 1, are summarized in Table ES.2.

Table ES.2: Cost Estimate Summary

Total Capital Present Worth Alternative Cost Present Worth Capital O&M Total Present Worth Water Servicing $116,692,000 $93,904,000 $25,563,000 $119,467,000 (Alternative 1-Refined) Water Treatment $9,676,000 $5,270,000 $13,405,000 $18,675,000 (Alternative 1) TOTAL $126,368,000 $99,174,000 $38,968,000 $138,142,000

Per capita costs were developed for each of the communities, based on the estimated capital costs. The costs were split between communities based on a percentage of total flow through the pump or transmission main, and were based on recommended alternative. Also, the costs were allocated based on the assumption that the excess capacity in the existing system will be utilized by the communities currently serviced by the CLRUSC through 2012. Therefore, the costs for 2012 were allocated to only the expansion communities. Table ES.3 summarizes the estimated cost per person to service each of the communities.

Table ES.3: Cost Sharing Summary

Location Total Capital Cost 2032 Servicing Population Per Capita Cost 4 Wing Cold Lake $1,861,037 4,800 $390 City of Cold Lake $5,666,459 22,200 $260 Cold Lake IR 149 $718,492 1,500 $480 Cold Lake IR 149A $21,198 140 $160 Cold Lake IR 149B $122,852 360 $350 Elizabeth Métis Settlement $14,365,355 1,000 $14,370 Hamlet of Ardmore $1,412,887 500 $2,830 Hamlet of Cherry Grove $2,144,424 500 $4,290 Hamlet of Fort Kent $1,387,885 300 $4,630 Hamlet of La Corey $10,736,432 200 $53,690 Hamlet of Therien $6,032,003 200 $30,170 Kehiwin IR 149 $16,492,024 2,000 $8,250 Summer Villages $5,763,350 1,200 $4,810 Moose Lake Area $6,173,620 1,300 $4,750

RPT2-0089-077-00-FINAL-090227.DOC EXECUTIVE SUMMARY vii COLD LAKE REGIONAL UTILITY SERVICES COMMISSION REGIONAL WATER SUPPLY FUNCTIONAL PLAN & FEASIBILITY STUDY

Location Total Capital Cost 2032 Servicing Population Per Capita Cost Town of Bonnyville $39,226,764 11,200 $3,510 Village of Glendon $14,243,218 900 $15,830

As indicated in Table ES.2, the per capita service costs range from $160 to $53,690. As a result, it may not be economically feasible to service some of the communities with high per capita cost.

Stage 1 of the regional system expansion involves the addition of the Town of Bonnyville. To service the Town, the construction of the 500 mm diameter transmission main would be required, as well as the new CLRUSC pump station and reservoir, located in Cold Lake North. The proposed booster station along Highway 28 will not be required at this time. For water servicing, the capital cost for Stage 1 of the recommended alternative is $61,204,000. To service Stage 1 development from the water treatment plant, the upgrades recommended for 2012 would be required. For water treatment, the capital cost for Stage 1 of Alternative 2 is $3,228,000. The total capital cost for Stage 1 is $64,432,000. Stage 1 development is illustrated in Figure ES.2.

Utility Governance Model

The current CLRUSC is comprised of a total of seven board members from the City of Cold Lake, 4 Wing Cold Lake, Cold Lake IR 149 and the MD of Bonnyville.

The CLRUSC determines the conditions under which membership might be extended; there are some issues identified by existing CLRUSC members that would need to be addressed prior to expansion. As a first step in moving forward with the regional water system expansion, the CLRUSC needs to first consider the steps that would be taken and which communities would be serviced during Stage 1 of the expansion.

For Stage 1, it is recommended that the board remain at seven members, with two positions given to the Town of Bonnyville. For the ultimate expansion, it is recommended that the board be expanded to eleven members, with one position given to each additional community. For decision making processes, it is recommended that a one-member, one-vote model be used; however, for financial decisions the board will have the option to undertake a population weighted voting process.

RPT2-0089-077-00-FINAL-090227.DOC EXECUTIVE SUMMARY viii COLD LAKE REGIONAL UTILITY SERVICES COMMISSION REGIONAL WATER SUPPLY FUNCTIONAL PLAN & FEASIBILITY STUDY 6 LEGEND COLD STUDY AREA COLD LAKE WATER 200 EXISTING PIPE {mm) TREATMENT PLANT 300 PROPOSED PIPE {mm) ---? RESERVOIR/PUMP STATION IQ! !:::!w FUTURE BOOSTER STATION en m • WATER TREATMENT PLANT • METER VAULT

.. J • COLD LAKE SOUTH, WEST--RE,SERVOIR 0089-077-00_00-P-F001_RA.dwg Saved By: chaob 0089-077-00_00-P-F001_RA.dwg By: Saved

m SCALE 1:250000 0 A

Cold Lake Regional Utility Services Commission Regional Water Supply Functional Plan & Feasibility Study ISS/REV: UMA FILENAME: THIS DOCUMENT IS PROTECTED BY COPYRIGHT LAW AND MAY NOT BE USED, REPRODUCED OR MODIFIED IN ANY MANNER OR FOR ANY PURPOSE EXCEPT WITH THE WRITTEN PERMISSION OF UMA ENGINEERING LTD. DOING BUSINESS AS AECOM ("AECOM") TO PARTY OR A ("AECOM") BUSINESS AS AECOM DOING LTD. ENGINEERING OF UMA PERMISSION WRITTEN THE EXCEPT WITH ANY PURPOSE ANY MANNER OR FOR OR IN USED, MODIFIED REPRODUCED LAW AND MAY COPYRIGHT NOT BE PROTECTED BY DOCUMENT THIS IS WHICH ITS COPYRIGHT HAS BEEN ASSIGNED. AECOM ACCEPTS NO RESPONSIBILITY, AND DENIES ANY LIABILITY WHATSOEVER, TO ANY PARTY THAT USES, REPRODUCES, MODIFIES, OR RELIES ON THIS DOCUMENT WITHOUT CONSENT. WRITTEN EXPRESS AECOM'S Future Transmission System AECOM Recommended Alternative Figure ES.1 COLD LAKE WATER TREATMENT PLANT

!:::!w en m

LEGEND STUDY AREA 200 ,') EXISTING PIPE (mm) 300 PROPOSED PIPE (mm) D RESERVOIR/PUMP STATION • WATER TREATMENT PLANT • METER VAULT 0089-077-00_00-P-F002_RA.dwg Saved By: chaob 0089-077-00_00-P-F002_RA.dwg By: Saved

m SCALE 1:125000 0L:FL::::J1250 2500 A

Cold Lake Regional Utility Services Commission Regional Water Supply Functional Plan & Feasibility Study ISS/REV: UMA FILENAME: THIS DOCUMENT IS PROTECTED BY COPYRIGHT LAW AND MAY NOT BE USED, REPRODUCED OR MODIFIED IN ANY MANNER OR FOR ANY PURPOSE EXCEPT WITH THE WRITTEN PERMISSION OF UMA ENGINEERING LTD. DOING BUSINESS AS AECOM ("AECOM") TO PARTY OR A ("AECOM") BUSINESS AS AECOM DOING LTD. ENGINEERING OF UMA PERMISSION WRITTEN THE EXCEPT WITH ANY PURPOSE ANY MANNER OR FOR OR IN USED, MODIFIED REPRODUCED LAW AND MAY COPYRIGHT NOT BE PROTECTED BY DOCUMENT THIS IS WHICH ITS COPYRIGHT HAS BEEN ASSIGNED. AECOM ACCEPTS NO RESPONSIBILITY, AND DENIES ANY LIABILITY WHATSOEVER, TO ANY PARTY THAT USES, REPRODUCES, MODIFIES, OR RELIES ON THIS DOCUMENT WITHOUT CONSENT. WRITTEN EXPRESS AECOM'S Future Transmission System Stage 1 AECOM Recommended Alternative Figure ES.2

1.0 Introduction

1.1 Background

The Cold Lake Regional Utility Services Commission (CLRUSC) presently provides water to the City of Cold Lake, 4 Wing Cold Lake, Cold Lake First Nations (Cold Lake IR 149 and IR 149A), and the Hamlets of Ardmore and Fort Kent. The water supply is provided by the Cold Lake Water Treatment Plant, which draws water from Cold Lake. The Town of Bonnyville is currently supplied by the Bonnyville Water Treatment Plant, which draws water from Moose Lake. The Town of Bonnyville Water Treatment Plant is aging and requires significant upgrades. However, there are water quality challenges with the water from Moose Lake, and alternative water sources were considered, including a supply from Cold Lake.

The CLRUSC is examining opportunities to expand the regional system to service additional municipalities including Cold Lake IR 149B, Hamlet of La Corey, Hamlet of Cherry Grove, Elizabeth Métis Settlement, Town of Bonnyville, Village of Glendon, Hamlet of Therien, Kehiwin IR 123, and areas south of Moose Lake including the Summer Villages of Bonnyville Beach and Pelican Narrows. In order to facilitate discussions, the need for a Regional Water Supply Functional Plan and Feasibility Study has been identified.

1.2 Scope of Work

The study was carried out under the direction of a steering committee comprised of a representative from each of the member municipalities: City of Cold Lake, 4 Wing Cold Lake, Cold Lake First Nations, M.D. of Bonnyville, Town of Bonnyville, and Village of Glendon. In addition, representatives from Indian and Northern Affairs Canada (INAC), Alberta Infrastructure and Transportation, and Alberta Environment were part of the steering committee, as well as the UMA/AECOM project team. A series of workshops were held with the steering committee to update the committee on the status of the study, to identify issues, to review alternatives and to reach a consensus at key stages.

The first phase of the study involved resolving planning issues by examining factors such as population trends and relevant growth documents to help determine population projections and identify possible growth scenarios.

Once the results of the planning portion of the study were known, examination of water servicing and water treatment alternatives commenced. Water servicing alternatives were examined for the entire service area, including both existing and expansion communities.

The third phase of the project involved a review of the existing governance structure and evaluation of alternative governance structures.

RPT2-0089-077-00-FINAL-090227.DOC INTRODUCTION 1 COLD LAKE REGIONAL UTILITY SERVICES COMMISSION REGIONAL WATER SUPPLY FUNCTIONAL PLAN & FEASIBILITY STUDY

The scope of work is included in Appendix A and includes the following:

Growth Scenarios

The purpose of the growth scenarios was to define planning targets for each municipality and community in the region to be used as the basis for projecting infrastructure needs and to ensure the planning targets are credible and defensible, given the potential magnitude of infrastructure investment. The definition of the growth scenarios was undertaken through the following process:

• Review of historical population trends for each municipality/community within and potentially within the service area, as well as for the region going back at least 25 years. • Identification of past trends both short term and long term and the factors which have affected population and non-residential growth in the past. • Establishment of a 2006 base population based on the most recent population census and recent trends. • Projection of 2006 population forward to the year 2032. • Review of existing plans, analyses and projections for each municipality/community and the overall region – i.e. what existing population targets have been used for purposes of land use (Municipal Development Plan), transportation (Transportation Master Plan) or infrastructure planning by the municipality/community or the regional infrastructure commissions. • Reconciliation of projections and existing targets and relate to the share of regional growth projections to ensure compatibility. • Establishment of approximate 2012 and 2032 planning targets. • Development of growth rates for the non-residential areas. • Review of planning targets with municipal planning representatives in a workshop session and obtain consensus.

Water Servicing

The purpose of the water transmission system assessment was to evaluate the existing water transmission system performance under the existing and future conditions and identify the available capacity to service the study area. The water transmission system assessment was undertaken through the following process:

• Review of the existing service area and expansion area. • Collection and review of all relevant data including as-built plans of existing water transmission mains, pumping facilities, flow monitoring data, and all available water consumption data. • Development of a system model of the existing water transmission system utilizing WaterCAD. The model includes the main transmission system and pump stations only. • Utilization of available monitoring data to calibrate the system model. • Site investigation of major components of the water transmission system within the study area including pump stations. • Review of the performance of the transmission system with operation and maintenance personnel to identify any problem areas including areas of low or high pressure.

RPT2-0089-077-00-FINAL-090227.DOC INTRODUCTION 2 COLD LAKE REGIONAL UTILITY SERVICES COMMISSION REGIONAL WATER SUPPLY FUNCTIONAL PLAN & FEASIBILITY STUDY

• Identification of present and future water demands based on the growth scenarios identified during the planning process. • Assessment of the existing transmission system in terms of capacity to meet existing and projected water demands for the existing and expanded service area. • Development of alternative servicing concepts to address existing and future demands including system upgrades to transmission mains and pump stations. • Evaluation of alternatives based on evaluation criteria and a preferred alternative identified. • A conceptual design of the preferred alternative will be prepared. • Development of cost estimates and an implementation plan for the recommended servicing concept.

Water Treatment

The Cold Lake Water Treatment Plant was evaluated to determine the required upgrading and/or expansion to meet the needs for the regional water supply. A plan for upgrades was developed through the assessment to meet the short term and long term targets of 2012 and 2032. The water treatment plant assessment was undertaken through the following process:

• Collection and evaluation of historical raw water quality data. • Inventory of all infrastructure that is part of the water treatment plant, including: intake, pipelines, pumps, unit processes, disinfection capacity, potable water storage and fire storage. • Collection and review of all past feasibility studies and design reports. • Analysis and interpretation of the source water and water treatment plant. • Development of upgrading and/or expansion alternative(s) for short and long term targets. • A conceptual design of the recommended upgrading and/or expansion plan was prepared. • Development of cost estimates and an implementation plan for the recommended water treatment alternative.

Utility Governance Model

The current governance structure of the CLRUSC will be reviewed, alternative governance structures were evaluated, and an implementation plan will be developed to convert the Commission into a new governance structure, through the following process:

• Collection and review of all information regarding the current CLRUSC governance structure and operation. • Determination of what the needs of the existing and potential members are and the current strengths and shortcomings of the current governance structure. • Review of the costs and benefits associated with the creation of a regional system. • Development and evaluation of alternative governance structures. • Development of a recommended structure including governance roles, decision making, contributions/benefits accruing to each member. • Development of an implementation plan.

RPT2-0089-077-00-FINAL-090227.DOC INTRODUCTION 3 COLD LAKE REGIONAL UTILITY SERVICES COMMISSION REGIONAL WATER SUPPLY FUNCTIONAL PLAN & FEASIBILITY STUDY

2.0 Stakeholder Consultation and Workshops

2.1 Project Meetings and Workshops

Four workshops and several meetings were held over the course of the study and are summarized below. The meeting minutes are included in Appendix B.

November 1, 2006 Project Kick-off Meeting

• The project scope was reviewed. • A tentative steering committee was developed. • The tentative project schedule was reviewed.

December 4, 2006 Workshop 1

• The project objective was reviewed and the study area was finalized. • The scope of work was reviewed and discussed with the steering committee. • The tentative project schedule was reviewed with the steering committee.

January 31, 2007 Workshop 2

• Both long and short term population trends for the study area were reviewed. • The 2006 population estimates were finalized. • Growth rates, rate rationale and 2032 population projections were reviewed. • Study area was proposed to be revised to include the Kehiwin IR 123, the area surrounding Moose Lake, and the Hamlet of Therien.

March 21, 2007 Field Investigation

• Components of the existing Cold Lake Regional Utility Services Commission infrastructure system were reviewed, including the Cold Lake Water Treatment Plant, Cold Lake South west reservoir and Cold Lake South east reservoir. • The system operation and performance were discussed with operators.

June 28, 2007 Workshop 3

• Water consumption rates for existing and future development scenarios were reviewed. • 2012 and 2032 population projections for the additional communities of Kehiwin First Nations, the Moose Lake area, and the Hamlet of Therien were reviewed. • Alternative water servicing concepts were presented. • Alternative water treatment plant expansion/upgrading concepts were presented.

RPT2-0089-077-00-FINAL-090227.DOC STAKEHOLDER CONSULTATION AND WORKSHOPS 4 COLD LAKE REGIONAL UTILITY SERVICES COMMISSION REGIONAL WATER SUPPLY FUNCTIONAL PLAN & FEASIBILITY STUDY

• The preferred water servicing concept and water treatment plant expansion/upgrading concept were identified.

February 14, 2008 Stakeholder Workshop

• The preferred water servicing concept and water treatment plant upgrading concept were reviewed. • Alternative governance models were reviewed. • Issues and concerns regarding governance were identified.

June 6, 2008 Meeting with Alberta Transportation and Alberta Environment

• The comments from the draft report were discussed. • Alberta Transportation indicated that overall growth projections should not exceed 2.5% per annum. • Alternative 1 meets Alberta Environments objectives under the Water for Life Strategy. • The existing water diversion license is valid at this time.

October 27, 2008 Meeting with CLRUSC

• Alternative pipe alignments were discussed. • Costs for land acquisition should be considered. • The communities to be included in Stage 1 development were discussed. • The population around Moose Lake should be separated between the Summer Villages and the MD of Bonnyville.

November 7, 2008 Meeting with Alberta Transportation and Alberta Environment

• Providing servicing to La Corey is not currently a priority for Alberta Transportation. • Providing servicing to the Village of Glendon will be considered as the second stage. • Alberta Transportation no longer pays to oversize infrastructure to service potential future communities. • The population around Moose Lake should be separated between the Summer Villages and the MD of Bonnyville.

2.2 Public Consultation

Two open houses were held following submission of the draft report to confirm and engage area residents. The locations of these open houses were selected in consultation with the steering committee. On July 7, 2008, an open house was held in the City of Cold Lake, and on July 8, 2008 an open house was held in the Town of Bonnyville.

The open houses provided an opportunity for the public to learn about the project, ask questions of the consultants and representatives from the municipalities, and voice any concerns they may have in an informal, casual setting. The open houses were an informal, drop-in style event. Display panels were arranged on free standing easels for viewing. Light refreshments of coffee, cookies and donuts were provided to attendees. Attendees were encouraged to fill out an evaluation form.

RPT2-0089-077-00-FINAL-090227.DOC STAKEHOLDER CONSULTATION AND WORKSHOPS 5 COLD LAKE REGIONAL UTILITY SERVICES COMMISSION REGIONAL WATER SUPPLY FUNCTIONAL PLAN & FEASIBILITY STUDY

Four attendees signed in at the Cold Lake Open House, and twelve attendees signed in at the Bonnyville Open House. Eight evaluation forms were completed and returned during the open houses. The evaluation form contained five questions designed to gauge attendees’ impressions of the open house materials, representatives, and to capture any additional thoughts about the project. The general feedback on the project was positive and no major concerns were identified. Four additional comments were received at the Bonnyville Open House and are noted below. Minor editing for spelling and word usage was applied to the comments. Contact information where provided by a respondent was removed from the comments below. None of the respondents requested additional information or follow up from project managers.

Additional Comments:

1. Good to see happening.

2. The sooner the better, this is a good idea.

3. Very informative.

4. I will be very happy when we get Cold Lake water.

RPT2-0089-077-00-FINAL-090227.DOC STAKEHOLDER CONSULTATION AND WORKSHOPS 6 COLD LAKE REGIONAL UTILITY SERVICES COMMISSION REGIONAL WATER SUPPLY FUNCTIONAL PLAN & FEASIBILITY STUDY

3.0 Study Data

3.1 General

This section outlines the information collected for the assessment of the water transmission system and water treatment plant. The boundaries of the study area were defined and encompass areas south and west of Cold Lake. Land use data was examined, and existing reports were reviewed and all relevant data incorporated into the study. The data collected includes:

• Previous reports, studies and investigations carried out in the area • Orthophotographs and contour maps • Design drawings, as-built plans, and surveyed invert information for the water transmission system and water treatment plant • Pump curves and pump operation philosophies • Flow data including hydrant tests and water consumption data • Water licenses and diversion files.

3.2 Study Area

The study area includes all existing and proposed expansion communities, and is shown on Figure 3.1. The currently serviced communities include: City of Cold Lake including 4 Wing Cold Lake, Cold Lake IR 149 and 149A, Hamlet of Ardmore, and Hamlet of Fort Kent. The proposed expansion communities include: Cold Lake IR 149B, Town of Bonnyville, Village of Glendon, Hamlet of La Corey, Hamlet of Cherry Grove, Hamlet of Therien, Elizabeth Métis Settlement, Kehiwin IR 123, and the areas surrounding Moose Lake including the Summer Villages of Bonnyville Beach and Pelican Narrows.

In addition to several small lakes and rivers, the Beaver River runs through the study area.

3.3 Land Use

The land use in the existing and proposed expansion communities is comprised of various forms of residential development, as well as commercial areas, industrial areas, and institutional areas.

3.4 Existing Reports

The following reports were reviewed and the relevant data incorporated into this study.

• Town of Bonnyville Water Quality Study, Reid Crowther and Partners, October 2000 • Municipal District of Bonnyville #87 Ardmore/Fort Kent Reservoir and Pumphouse Contract Documents, Associated Engineering, July 2001 • Municipal District of Bonnyville #87 Ardmore/Fort Kent Water Supply Pipeline Contract Documents, Associated Engineering, August 2001 • Bonnyville Water Treatment Plant THM Reduction Study, Associated Engineering, November 2002 • Municipal District of Bonnyville #87 Water and Sewer Service Policy, November 2002

RPT2-0089-077-00-FINAL-090227.DOC STUDY DATA 7 COLD LAKE REGIONAL UTILITY SERVICES COMMISSION REGIONAL WATER SUPPLY FUNCTIONAL PLAN & FEASIBILITY STUDY

• City of Cold Lake Municipal Engineering Servicing Standards and Standard Construction Specifications, 2003 • Water for Life Alberta’s Strategy for Sustainability, Alberta Government, 2003 • Water Plant Assessment Bonnyville Water Treatment Plant, EPCOR, April 2004 • Town of Bonnyville Municipal Development Plan Bylaw 1261-05, Urban Systems, May 2005 • Bonnyville Water Treatment Plan Review, Urban Systems, September 2006 • Regional Water Supply Functional Plan & Feasibility Study Population Growth and Demand Calculation for the Town of Bonnyville Memorandum, Urban Systems, November 10, 2006 • Water Conservation and Allocation Policy for Oilfield Injection, Alberta Government, 2006 • City of Cold Lake Water Distribution System Modelling and Assessment draft report, UMA Engineering, October 2007

3.5 Orthophotographs and Contour Maps

Contours and spot elevations were available for the City of Cold Lake. NTS maps were used to approximate the elevations at the supply points, as well as to identify high and low elevations along the proposed water transmission main routes.

3.6 As-built Data

The City of Cold Lake provided as-built data for the existing transmission mains to 4 Wing Cold Lake, Cold Lake IR 149, and the Ardmore/Fort Kent transmission main. The City of Cold Lake also provided drawings of the Cold Lake Water Treatment Plant, existing reservoirs/pump stations, and local distribution system. The Town of Bonnyville provided as-built data for the Bonnyville Water Treatment Plant, as well as the existing reservoirs/pump stations and local distribution system. The Village of Glendon provided design drawings for the Glendon Water Treatment Plant and reservoir.

3.7 Pump Data

Pump data was collected for the pumps within the City of Cold Lake, including the pumps at the water treatment plant and the three pump stations. The pump design points were obtained during the field investigation. Pump curves were obtained from the pump suppliers if available. Pump curves that were not available from the suppliers were generated based on the design point of the pump. The pump curves provided by the suppliers are included in Appendix C.

The pumping philosophy and operating pressures of the existing system were provided by the City of Cold Lake.

3.8 Flow Data

Water consumption data was available for the City of Cold Lake, 4 Wing Cold Lake, Hamlet of Ardmore, Hamlet of Fort Kent, Town of Bonnyville, Village of Glendon, and Cold Lake IR 149. Water demands from the truck fill stations at Cold Lake North, Ardmore, Fort Kent and Bonnyville were also provided.

RPT2-0089-077-00-FINAL-090227.DOC STUDY DATA 8 COLD LAKE REGIONAL UTILITY SERVICES COMMISSION REGIONAL WATER SUPPLY FUNCTIONAL PLAN & FEASIBILITY STUDY

3.9 Water Diversion

Water diversion files for Cold Lake were provided by Alberta Environment. The diversion files indicate the municipality/company licensed to draw water from Cold Lake, the location of the diversion, and activity for which the water is drawn. For each license, the quantities of water drawn from and returned to Cold Lake are indicated.

The Alberta Environment water licenses for the City of Cold Lake and the Town of Bonnyville were also provided.

3.10 Field Reconnaissance

UMA/AECOM conducted a site investigation of the major components of the water supply and distribution system including the Cold Lake Water Treatment Plant and three reservoirs/pump stations in Cold Lake. Field investigations of the pump stations were undertaken to ensure an understanding of the pump operation philosophy and layout. This physical information was utilized in the WaterCAD model. Discussion with operators was used to gather local insight to the system, and identify any problem areas.

RPT2-0089-077-00-FINAL-090227.DOC STUDY DATA 9 COLD LAKE REGIONAL UTILITY SERVICES COMMISSION REGIONAL WATER SUPPLY FUNCTIONAL PLAN & FEASIBILITY STUDY Ê-:::::::::::::::::::;::::;::;;;;;;:-;:;:;::=;=:;:;;;;:;;=.:;?;:;?;;c;;:=r:;;;:;.:r.:;:;;:ir?i?:i;.l=-?=-""?;:::..???;.,?;_?W:?;,?;;;:,.;,?3??rr7'i=?i:2??niw.??r??ç?,=-; ? ... ;;; -=--=------?6------7 ... LEGEND >< COLD E E STUDY AREA ?R! - COMMUNITIES CURRENTLY ?I(_ SERVICED BY THE COLD >< 0 LAKE RUSC . w - O - EXPANSION COMMUNITIES ëiiN m • WATER TREATMENT PLANT 0089-077-00_03-CWF301_RA.dwg Saved By: chaob 0089-077-00_03-CWF301_RA.dwg By: Saved

L.Fl::::::::J m SCALE 1:250000 0 2500 5000 A

City of Cold Lake Regional Water Supply Functional Plan & Feasibility Study ISS/REV: UMA FILENAME: OR TO A PARTY AECOM ("AECOM") BUSINESS DOING AS LTD. OF ENGINEERING UMA PERMISSION WRITTEN OR ANY THE EXCEPT WITH PURPOSE IN ANY MANNER FOR REPRODUCED OR MODIFIED BE USED, LAW AND COPYRIGHT MAY NOT PROTECTED IS DOCUMENT BY THIS WHICH ITS COPYRIGHT HAS BEEN ASSIGNED. AECOM ACCEPTS NO RESPONSIBILITY, AND DENIES ANY LIABILITY WHATSOEVER, TO ANY PARTY THAT USES, REPRODUCES, MODIFIES, OR RELIES ON THIS DOCUMENT WITHOUT CONSENT. WRITTEN EXPRESS AECOM'S

AECOM Existing and Expansion Communities Figure 3.1

4.0 Growth Scenarios

4.1 Purpose

The purpose of developing growth scenarios was simply to address the question of how many people to plan for within the regional system. Utility needs are fundamentally influenced by the size and location of the population they are intended to serve and by the patterns of water consumption.

Growth scenarios for the communities within the study area were developed with population targets established for 2012 (projected 5 years from 2007) and for 2032 (projected 25 years from 2007).

4.2 Growth Scenarios

4.2.1 Process

The process of developing these growth scenarios involved a number of sequential steps as follows:

• Acquisition and review of historical population trends for each community; • Consideration of growth prospects for each community, based on past trends, location, economic development prospects and demographic factors and selection of three growth rates for projections – a low, medium and high projection; • Establishment of 2007 baseline populations for area communities; • Forward projections for low medium and high growth rates to the year 2032 to determine a range of population targets; • Discussion with the steering committee to select the most appropriate population targets based on both historical trends and prospects for future development.

The growth scenarios and population targets thus represent a convergence of technical analysis and informed judgement by the consultants and steering committee.

The term ‘population target’ is less deterministic than ‘population projection’. The population target represents a threshold population, which requires regular monitoring to estimate the timing for the attainment of the target. An increase in growth and development could advance the achievement of the target. Conversely, a decrease in growth could prolong achieving the target, hence the need for regular monitoring.

4.2.2 Data Challenges

A number of challenges were experienced in the collection, analysis and comparability of data.

First, several databases were used, including , Alberta Municipal Affairs and Housing and Indian and Northern Affairs Canada (INAC). In addition, two larger communities have recently conducted their own municipal censuses. Inconsistencies and varying time periods between databases were reconciled to the extent possible, based on the consultants’ experience of the accuracy and applicability of data.

RPT2-0089-077-00-FINAL-090227.DOC GROWTH SCENARIOS 11 COLD LAKE REGIONAL UTILITY SERVICES COMMISSION REGIONAL WATER SUPPLY FUNCTIONAL PLAN & FEASIBILITY STUDY

The City of Cold Lake was formed in 2001 to combine the former Town of Grand Centre, the former Town of Cold Lake and 4 Wing Cold Lake (Department of National Defence). Statistical reporting has not been consistent over time as Statistics Canada data for 4 Wing Cold Lake was limited prior to the merger.

Population statistics for the Cold Lake First Nation reserves are available annually from the Indian and Northern Affairs Canada database for the entire population of the Nation. The database also provides a break down between on- and off-reserve populations. However, there is no break down of on-reserve population between the three reserves. However, this break down is available from Statistics Canada as Reserve 149 with 75%, Reserve 149A with 7% and 149B with 18% of total population. Thus the final population estimates combined data from two sources to best reflect the population for the three communities.

Population statistics were limited for smaller centres in the study area such as the Hamlets of Ardmore, Fort Kent, La Corey, Therien, Cherry Grove and the Elizabeth Métis Settlement. Except for the Elizabeth Settlement, these hamlets are within the Municipal District of Bonnyville. Population reporting is inconsistent. Estimates of population and population change were informed by discussions with the M.D. of Bonnyville and an analysis of the overall population trends within the Municipal District.

The population of the area around Moose Lake posed a particular challenge. Some assumptions were made about the percentage of seasonal and permanent population, the build-out of unoccupied lots and the potential build-out of currently non-developed land. These assumptions were based on a count of subdivided lots and a count of lots occupied by a residence. Data for the permanent population of incorporated villages was available from Statistics Canada, and was compared with the number of residences for these villages. A variety of sources were used to make the projections and it is felt that these represent the best estimates available under the circumstances.

The region, typical of resource based communities elsewhere, has a ‘shadow population’ representing temporary workers housed in work camps, motels and other accommodation. The size and significance of this portion of the population is generally very difficult to estimate, especially when it is dispersed throughout the region.

Finally, the initial projections were made in early 2007, prior to the release of 2006 census data. The 2006 data, released in May of 2006, was used to check the validity of the 2006 estimates and any required adjustments were made accordingly.

4.3 Analysis

4.3.1 Long Term Historical Population

Historical population data from 1966 to 2001 were collected for the Cities, Towns, Hamlets, First Nations and Métis Settlement within the study area. This data provides perspective on long term population trends as a first step toward identifying future population targets (Table 4.1).

RPT2-0089-077-00-FINAL-090227.DOC GROWTH SCENARIOS 12 COLD LAKE REGIONAL UTILITY SERVICES COMMISSION REGIONAL WATER SUPPLY FUNCTIONAL PLAN & FEASIBILITY STUDY AECOM

Table 4.1: Historical Population Growth 1966 – 2005

Community/Municipality 1966 1971 1976 1981 1986 1991 1996 2001 2002 2005 City of Cold Lake 11,520 11,595 Town of Cold Lake 1,289 1,309 1,314 2,058 3,059 3,878 4,089 Town of Grand Centre 1,731 2,088 2,166 3,146 3,655 3,877 4,176 Town of Bonnyville 2,237 2,587 2,589 4,381 5,575 5,132 5,100 5,709 5,896 Cold Lake First Nation 623 646 692 789 939 1,105 Cold Lake IR 149 408 542 439 Cold Lake IR 149A 40 48 39 Cold Lake IR 149B 105 93 110 Elizabeth Métis Settlement 484 551 596 Village of Glendon 350 354 354 430 480 403 418 459 M.D. of Bonnyville 10,979 10,935 10,850 9,319 10,384 17,506 17,352 9,473 Hamlet of Ardmore 244 239 272 Hamlet of Fort Kent 165 163 163 Hamlet of La Corey Hamlet of Cherry Grove

Sources: Statistics Canada: (City of Cold Lake 2001); (Town of Cold Lake 1966-1991); (Town of Grand Centre 1966 -1991); (Town of Bonnyville 1966 – 2001); (M.D of Bonnyville 1966 – 2001); (Hamlet of Ardmore 1991 – 2001); (Hamlet of Fort Kent 1991 – 2001); (Elizabeth Métis Settlement 1991 – 2001); INAC: (Cold Lake First Nation 1976 – 2001); Municipal Census: (City of Cold Lake 2002), (Town of Bonnyville 2005)

RPT2-0089-077-00-FINAL-090227.DOC GROWTH SCENARIOS 13 COLD LAKE REGIONAL UTILITY SERVICES COMMISSION REGIONAL WATER SUPPLY FUNCTIONAL PLAN & FEASIBILITY STUDY

The data was analyzed to show (1) the overall percentage population change in the 25 year period between 1976 and 2001 and (2) the annual percentage rate of change in the 25 year period. Although the population data goes back to 1966, the 25 year interval was chosen to correspond to the same time period for future targets. In addition, the formation of the City of Cold Lake by combining three former towns lessens the degree of comparability between 1966 and later inter-census data.

The population data shows that all communities showed positive growth during the 25 year period.

The Town of Bonnyville showed over a 25 year period from 1976 to 2001 a positive increase in population of 3.20% (2589 to 5709 people). The City of Cold Lake (Town of Cold Lake and Town of Grand Centre) (1976 to 1996) shows a significant increase with an annual growth rate of 4.40% (3420 to 8265 people) over a 20 year period. Cold Lake First Nation on-reserve population over a 30 year period (1976 to 2006) has had a population increase at 2.1% annually from 623 to 1219. The future population could be influenced by a return of off-reserve population to the home communities, and by development of the reserve adjacent to the City of Cold Lake.

The Village of Glendon with its small population in 2001 of 459 people has increased by 1% annually over 25 years (from 1976 to 2001). Future population will reflect the level of resource development in the area. Similarly, the smaller hamlets, although growth may have been modest, may grow substantially in response to resource development within the area and to the amenity of a consistent water supply.

4.3.2 Short-Term Historical Population

The next step in the analysis was to look at short-term population changes between 1991 and 2001, and also since 2001 where municipal census data were available.

It is evident that the rate of population growth has been increasing steadily during the 1990s and early part of this century. Incorporated in 1996 through amalgamation of the former towns of Grand Centre, Cold Lake and Canadian Forces Base 4 Wing, Cold Lake became a city in 2000. The three main industries in the area are military, oil and gas industry and tourism. Since 2001, strong economic growth and a corresponding increase in development have occurred in most centres in the study area.

The pace of population growth slowed in the early 1990s and early in the 2000s. The Town of Bonnyville had a growth rate of 2.30% between 1996 and 2001 and decreased to 0.8% between 2001 and 2005. This trend is also reflected in the City of Cold Lake where the annual growth rate decreased from 1.30% between 1991 and 1996 to 0.70% between 2001 and 2002 (Municipal Census). However, these are not necessarily the basis for long-term projections, as they reflect conditions within the province. The vigorous growth rates experienced in the province last three to four years have been well documented in various reports and the media.

The Cold Lake First Nation annual growth percentage decreased from 2.60 over a 15 years period from 1991 to 2006 to 1.20% for a 5 year period between 2001 and 2006, while the Village of Glendon’s annual growth percentage increased to 1.90% over the 5 years from 1996 to 2001.

The analysis of population for smaller centres was hampered by the lack of population data as indicated in Section 4.2.2. However, best estimates of 2006 populations were made based on available data and informed judgment relating to the growth prospects for these places.

RPT2-0089-077-00-FINAL-090227.DOC GROWTH SCENARIOS 14 COLD LAKE REGIONAL UTILITY SERVICES COMMISSION REGIONAL WATER SUPPLY FUNCTIONAL PLAN & FEASIBILITY STUDY AECOM

4.4 Population Planning Targets

The long and short term population data were used to inform the determination of long term population targets as described in the previous sections. Table 4.2 shows 5 year and 25 year population targets for the currently serviced and proposed expansion communities. The target populations provide the best estimate for the short term and long term growth in the centres within the study area.

Table 4.2: Target Populations

2006 2007 2012 2032 Census 5 Year 25 Year Community/Municipality (Stats Can) Estimate Target Target City of Cold Lake 11,991 12,720 15,000 27,000 Town of Bonnyville 5,832 6,014 8,000 15,000 Cold Lake First Nation Cold Lake IR 149 438 914 1,050 1,500 Cold Lake IR 149A 49 85 100 140 Cold Lake IR 149B 105 220 250 360 Kehiwin First Nation 1,007 1,037 1,200 2,000 Elizabeth Métis Settlement 600 700 1,000 Village of Glendon 421 500 700 1,200 M.D. of Bonnyville 10,194 Hamlet of Ardmore 277 300 500 Hamlet of Fort Kent 166 175 300 Hamlet of La Corey 75 100 200 Hamlet of Cherry Grove 200 300 500 Hamlet of Therien 75 100 200 Moose Lake Area 1,500 1,700 2,500 Included in Included in Included in S.V. of Pelican Narrows 141 (permanent) Moose Lake Moose Lake Moose Lake Included in Included in Included in S.V. of Bonnyville Beach 97 (permanent) Moose Lake Moose Lake Moose Lake TOTAL - 24,383 29,675 52,400

The planning targets represent more than a doubling of the regional population, from the current population around 25,000 to somewhat over 50,000 population.

Following the June 6, 2008 meeting with Alberta Transportation and Alberta Environment, the maximum overall annual growth projection for any community was adjusted to 2.5%. As a result, the population targets Town of Bonnyville and the Village of Glendon were reduced. For the Town of Bonnyville, the population targets for 2012 and 2032 were reduced to 6,800 and 11,200 from 8,000 and 15,000 respectively. For the Village of Glendon, the population targets for 2012 and 2032 were reduced to 550 and 900 from 700 and 1,200 respectively.

RPT2-0089-077-00-FINAL-090227.DOC GROWTH SCENARIOS 15 COLD LAKE REGIONAL UTILITY SERVICES COMMISSION REGIONAL WATER SUPPLY FUNCTIONAL PLAN & FEASIBILITY STUDY

5.0 Water Servicing

5.1 General

This section discusses the design criteria, development of the model, and modelling and assessment of the existing water transmission system for the existing service area and expansion communities. Alternative servicing concepts were identified for the future development of the currently serviced areas and the expansion communities.

Proposed pump and pipe upgrades were identified to ensure that the design criteria were met for the current and future demand requirements. Costs were generated for the alternative servicing concepts for the short and long term development scenarios.

5.2 Design Criteria

5.2.1 Pressure and Flow Requirements

The design criteria used in this study are as follows:

• Minimum pressure in the transmission main 140 kPa (20 psi) • Maximum pressure in the transmission main (AC/PVC/PE) 700 kPa (100 psi) • Maximum pressure in the transmission main (Steel) 1100 kPa (160 psi) • Minimum pressure at the fill valve at the reservoir 70 kPa (10 psi) • Maximum flow velocity 2.5 m/s (8.2 ft/s) • Hazen-Williams “C” value (AC) 100 • Hazen-Williams “C” value (PVC/PE/Steel) 120

5.3 Water Supply

The Cold Lake Regional Utility Services Commission (CLRUSC) supplies water from the Cold Lake Water Treatment Plant to the regional customers. The Water Treatment Plant draws from Cold Lake and is capable of supplying 22 ML/day. It was assumed that the Water Treatment Plant is productive for 20 hours per day. Therefore, the supply line from the Water Treatment Plant was sized to convey the 24 hour demand in a 20 hour period; corresponding to a peaking factor of 1.2. Details of the Cold Lake Water Treatment Plant are provided in Section 6.

5.3.1 Water Consumption Rates

Existing water consumption data was available for the City of Cold Lake, 4 Wing Cold Lake, Cold Lake IR 149, Ardmore and Fort Kent. Data was also available for the Town of Bonnyville and the Village of Glendon. For communities with truck fill stations, the bulk water demands were separated from the consumption data to obtain a more accurate representation of the existing per capita demands. The existing system was analyzed based on the existing water consumption rates.

RPT2-0089-077-00-FINAL-090227.DOC WATER SERVICING 16 COLD LAKE REGIONAL UTILITY SERVICES COMMISSION REGIONAL WATER SUPPLY FUNCTIONAL PLAN & FEASIBILITY STUDY AECOM

In determining the design water consumption rates, existing water demands as well as the servicing standards were taken into consideration. The water consumption rates for each respective City, Town and County, as specified in the available servicing standards summarized in Table 5.1. Water consumption rates for the commercial, institutional and industrial areas are not specified in any of the servicing standards.

Table 5.1: Water Consumption Rates (ADD) – Municipal Standards

Per Capita Consumption Community / Municipality (L/d/person) City of Cold Lake 350 Town of Bonnyville 500 M.D. of Bonnyville 500 INAC 180

As indicated in Table 5.1, the servicing standards range from 180 L/capita/day to 500 L/capita/day for average day demand.

The provincial average for average daily water consumption is between 375 L/capita/day and 400 L/capita/day. For the future scenarios, a composite rate of 375 L/capita/day was applied to all communities. Although several communities are currently consuming at a rate greater than 375 L/capita/day, through water conservation measures and public education the water consumption rates can be reduced in the future.

For each of the communities, the average day demand (ADD) and maximum day demand (MDD) were identified. Since daily consumption data was not available, the maximum day demand was calculated as two times the average day demand. Available water consumption data from previous years was analyzed to determine the actual per capita water consumption rates for each community. The actual per capita water consumption data was compared to the servicing standards, to determine if the standards are appropriate.

Although the City of Cold Lake includes 4 Wing Cold Lake, the water consumption rates were analyzed separately due to the differences in land use and projected growth.

Actual 2006 water consumption rates and projected water demands for each municipality for the years 2012 and 2032 are summarized in Table 5.2.

RPT2-0089-077-00-FINAL-090227.DOC WATER SERVICING 17 COLD LAKE REGIONAL UTILITY SERVICES COMMISSION REGIONAL WATER SUPPLY FUNCTIONAL PLAN & FEASIBILITY STUDY AECOM

Table 5.2: Actual and Projected Water Demands

Actual Projected Year 2006 2007 2012 2032 Population 2,800 2,800 2,800 4,800 4 Wing Cold Lake ADD (L/c/d) 660.5 375 375 375 ADD (L/s) 21.41 12.15 12.15 20.83 Population 277 281 300 500 ADD (L/c/d) 377.2 375 375 375 Hamlet of Ardmore ADD (L/s) 1.21 1.22 1.30 2.17 Truck Fill (L/s) 0.72 0.73 0.78 1.30 Total (L/s) 1.93 1.95 2.08 3.47 Population 9,191 9,635 12,200 22,200 ADD (L/c/d) 471 375 375 375 City of Cold Lake ADD (L/s) 50.10 41.82 52.95 96.35 Truck Fill (L/s) 0.58 0.61 0.77 1.40 Total (L/s) 50.69 42.43 53.72 97.76 Population - - 300 500 Hamlet of Cherry Grove ADD (L/c/d) - - 375 375 ADD (L/s) - - 1.30 2.17 Population 914 935 1,050 1,500 Cold Lake IR 149 ADD (L/c/d) 163.7 375 375 375 ADD (L/s) 1.73 4.06 4.56 6.51 Population 85 87 98 140 Cold Lake IR 149A ADD (L/c/d) - 375 375 375 ADD (L/s) - 0.38 0.43 0.61 Population 220 225 252 360 Cold Lake IR 149B ADD (L/c/d) - 375 375 375 ADD (L/s) - 0.98 1.09 1.56 Population 600 616 700 1,000 Elizabeth Métis Settlement ADD (L/c/d) - 375 375 375 ADD (L/s) - 2.67 3.04 4.34 Population 166 167 175 300 ADD (L/c/d) 399.2 375 375 375 Hamlet of Fort Kent ADD (L/s) 0.77 0.73 0.76 1.30 Truck Fill (L/s) 0.74 0.75 0.78 1.34 Total (L/s) 1.51 1.47 1.54 2.64 Population 500 529 700 1,200 Village of Glendon ADD (L/c/d) 584.8 375 375 375 ADD (L/s) 3.38 2.30 3.04 5.21 Population 1,007 1,037 1,200 2,000 Kehiwin IR 123 ADD (L/c/d) - 375 375 375 ADD (L/s) - 4.50 5.21 8.68 Population - - 100 200 Hamlet of La Corey ADD (L/c/d) - - 375 375 ADD (L/s) - - 0.43 0.87 Population 1,500 1,532 1,700 2,500 Moose Lake Area ADD (L/c/d) - 375 375 375 ADD (L/s) - 6.65 7.38 10.85

RPT2-0089-077-00-FINAL-090227.DOC WATER SERVICING 18 COLD LAKE REGIONAL UTILITY SERVICES COMMISSION REGIONAL WATER SUPPLY FUNCTIONAL PLAN & FEASIBILITY STUDY AECOM

Actual Projected Year 2006 2007 2012 2032 Population - - 100 200 Hamlet of Therien ADD (L/c/d) - - 375 375 ADD (L/s) - - 0.43 0.87 Population 6,014 6,307 8,000 15,000 ADD (L/c/d) 407 375 375 375 Town of Bonnyville ADD (L/s) 28.33 27.37 34.72 65.10 Truck Fill (L/s) 0.73 0.76 0.97 1.82 Total (L/s) 29.06 28.14 35.69 66.92 Assumption and Notes: 1. Growth projections were based on the information provided in Section 4 of this report. 2. Actual consumption data was provided by the respective municipalities. 3. The growth rate for truck fill stations was assumed to be the same as population growth.

For the City of Cold Lake, the composite average day demand was calculated to be approximately 471 L/capita/day, including both residential and non-residential demands. The Cold Lake Engineering Standards state that the per capita design consumption should be 350 L/capita/day for average day demand. The actual average day demand may be higher than the standards due to the non-residential demands. It should be noted that Cold Lake North has a much higher per capita consumption rate than Cold Lake South (530 L/c/d compared to 400 L/c/d). This is likely due to the differences in the current water billing systems between Cold Lake North and Cold Lake South.

For 4 Wing Cold Lake, based on the current population and the water consumption data, the average day demand for 4 Wing is approximately 661 L/capita/day. The high water consumption rate for 4 Wing Cold Lake is partially due to an influx of people for 6 to 8 weeks during the Maple Flag Operations.

For the Village of Glendon, the composite average day demand was calculated to be approximately 585 L/capita/day, including both residential and non-residential demands. The engineering standards for the M.D. of Bonnyville state that a per capita consumption rate of 500 L/capita/day be used for average day demand.

For the projected 2012 development scenario, the total population is estimated to be 29,675, with an average day demand of approximately 132 L/s. For the projected 2032 development scenario, the total population is estimated to be 52,400, with an average day demand of approximately 233 L/s. The water servicing system will be designed to supply maximum day demand, which was assumed to be 2.0 times the average day demand.

Water Act licences for Cold Lake and Bonnyville were reviewed and compared to existing and projected demands. In Alberta, there is a “first in time, first in right” policy for granting and administering water allocations; however, water allocations will be transferable to ensure societal demands and needs can be met.

RPT2-0089-077-00-FINAL-090227.DOC WATER SERVICING 19 COLD LAKE REGIONAL UTILITY SERVICES COMMISSION REGIONAL WATER SUPPLY FUNCTIONAL PLAN & FEASIBILITY STUDY

5.3.2 Storage

The storage reservoirs at the supply points were not included in this study as the storage requirements depend on various criteria and may be different for each community. The storage reservoirs will be the responsibilities of each municipality. Some of the key criteria are as follows:

• Operational storage requirements are generally based on the day to day and seasonal needs (makeup storage may depend on 5 or 7 days) • Fire storage • Level of service • Peaking factors (varies from 3 to 4 times ADD for peak hour demand).

It is recommended that the City of Cold Lake storage reservoirs be sized based on the Alberta Environment storage requirement. As per the 2006 Alberta Environment Standards and Guidelines for Municipal Waterworks, Wastewater & Storm Drainage Systems, the storage requirements include fire storage, equalization storage (25% MDD) and emergency storage (15% ADD) if the treatment plant is capable of supplying at the maximum day demand.

However, it is recommended that all other regional customers design their storage reservoirs with two average days’ storage plus fire storage. Design of two average days’ storage helps to collectively manage the high 5 day draw rates in the system. This storage recommendation also provides redundancy in the system in case of a disruption to the supply main.

5.4 Existing System Description

All areas currently serviced by the Cold Lake Regional Utility Services Commission are supplied by the Cold Lake Water Treatment Plant. The Cold Lake Water Treatment Plant draws raw water from Cold Lake. There is a dedicated fill line from the Cold Lake Water Treatment Plant to a meter vault located at 4 Wing Cold Lake, where the transmission mains to Cold Lake IR 149, Cold Lake South and 4 Wing Cold Lake branch off. The Cold Lake South transmission main fills the west reservoir in Cold Lake South (Building 7), which fills the east reservoir at night (Building 10). The west pump station operates at night and the east pump station operates during the day to pressurize the distribution system. The transmission main to Ardmore and Fort Kent is fed from the Cold Lake South water distribution system. There is also a dedicated supply line from the Cold Lake Water Treatment Plant to the Cold Lake North reservoir (Building 5). Cold Lake IR 149A is currently serviced as part of the Cold Lake North distribution system.

The existing water transmission system is illustrated in Figure 5.1.

There are three reservoirs in Cold Lake; one in Cold Lake North and two in Cold Lake South. There are also reservoirs in Fort Kent, Ardmore, 4 Wing Cold Lake, and Cold Lake IR 149, at the supply points.

There are no booster stations or pressure reducing valves (PRVs) along the transmission system. There is a water meter along the transmission main feeding 4 Wing Cold Lake, to meter the supply to 4 Wing Cold Lake, Cold Lake IR 149, and Cold Lake South, including Ardmore and Fort Kent. There are also water meters at the supply points to the Fort Kent and Ardmore reservoirs.

RPT2-0089-077-00-FINAL-090227.DOC WATER SERVICING 20 COLD LAKE REGIONAL UTILITY SERVICES COMMISSION REGIONAL WATER SUPPLY FUNCTIONAL PLAN & FEASIBILITY STUDY AECOM

The dedicated transmission main from the Cold Lake Water Treatment Plant to Cold Lake North is 500 mm in diameter. The transmission main from the Cold Lake Water Treatment Plant to 4 Wing Cold Lake is a twinned line (400 mm and 300 mm diameters). The transmission main from 4 Wing Cold Lake to Cold Lake South is a twinned line with 150 mm and 250 mm diameters. The transmission main to Ardmore is 250 mm in diameter. There is an abandoned water treatment plant between Ardmore and Fort Kent. From Ardmore to the old water treatment plant, the transmission main is 150 mm in diameter, which reduces to a 100 mm diameter transmission main that continues to Fort Kent. The supply line to Cold Lake IR 149 from the meter vault is 150 mm in diameter.

The transmission mains to the meter vault and the main to 4 Wing Cold Lake are all polyvinyl chloride (PVC). The transmission main from the meter vault to Cold Lake South is polyethylene (PE). The Ardmore/Fort Kent transmission main is mainly PVC pipe. For structural purposes and trenchless installation, the material of the transmission main is high density polyethylene (HDPE) at the creek and river crossings. The transmission main to Cold Lake IR 149 is mainly asbestos cement with sections of carbon steel pipe.

In addition to the local distribution systems in Ardmore and Fort Kent, both communities have truck fill stations. Cold Lake North also has a truck fill station, located at the reservoir site (Building 5).

The existing pump design capacities of the pumps that are currently part of the regional system are summarized in Table 5.3, and the available pump curves are included in Appendix C.

Table 5.3: Pump Curves

Pump Location Pump Number Design Flow (L/s) Head (m) Supply to 4 Wing / Cold 225 L/s (3566 USGM) 35 m (115 ft) Cold Lake Lake South 225 L/s (3566 USGM) 35 m (115 ft) Water Treatment Plant Supply to Cold Lake North 50 HP 50 HP HLP 7601 27 L/s (428 USGM) 72 m (236 ft) Building 7 HLP 7603 55 L/s (872 USGM) 72 m (236 ft) (Cold Lake South HLP 7605 55 L/s (872 USGM) 72 m (236 ft) West Reservoir) Fire Booster Pump 189 L/s (2996 USGM) 64 m (210 ft) Building 10 (Cold Lake South HLP 10603 167 L/s (2647 USGM) 32 m (105 ft) East Reservoir) Fire Booster Pump 371 L/s (5880 USGM) 27 m (89 ft)

The Cold Lake Water Treatment Plant supplies water at a pressure of 350 kPa to the 4 Wing supply line and the Cold Lake North reservoir. The 300 mm and 400 mm diameter 4 Wing supply lines are fed from the 300 mm and 350 mm diameter headers in the water treatment plant, respectively. The west reservoir in Cold Lake South operates at a pressure of 625 kPa to pressurize the Cold Lake South distribution system and the Ardmore/Fort Kent transmission main at night. Due to the high elevation, the east reservoir in Cold Lake South operates at a pressure of 425 kPa to pressurize the Cold Lake South distribution system and the Ardmore/Fort Kent transmission main during the day.

RPT2-0089-077-00-FINAL-090227.DOC WATER SERVICING 21 COLD LAKE REGIONAL UTILITY SERVICES COMMISSION REGIONAL WATER SUPPLY FUNCTIONAL PLAN & FEASIBILITY STUDY AECOM

5.5 Existing System Assessment

5.5.1 Model Development

The existing water transmission system for the service area was modelled using the WaterCAD version 6.5 program developed by Haestad Methods Inc. This program is a steady state as well as extended period simulation program. The software used pull-down menus for data entering and editing along with the AutoCAD based graphical interface. The software allows review of the simulation results graphically on the screen; the graphical results can also be plotted.

The program requires physical details of the existing transmission system to represent the system through pipes and junction nodes such as pipe diameters, lengths, roughness coefficients, water consumption demands, and ground elevations.

As the model spans a 25 year period, it is reasonable to conclude that the pipe roughness coefficient will increase. Information was not available to calibrate the regional model. Subsequently, roughness coefficients of 120 for PVC and steel pipes and 100 for asbestos cement pipes were used for the study, as indicated in Section 5.2.1.

5.5.2 System Modelling and Assessment

The existing transmission system was analyzed for maximum day demand. The simulated pressures at the existing supply points, as well as at key points in the system, are summarized in Table 5.4.

Table 5.4: Existing System Maximum Day Demand Modelled Results

Location Elevation (m) Modelled Pressure (kPa) Cold Lake Building 5 Reservoir 530 420 Cold Lake Meter Vault 530 369 4 Wing Cold Lake Reservoir 542 249 Cold Lake Building 7 Reservoir 530 317 Beaver River Crossing 495 962 Ardmore Reservoir 556 345 Fort Kent Reservoir 550 310 Cold Lake IR 149 Reservoir 538 248

As indicated in Table 5.4, the modelled pressure at the Beaver River crossing during maximum day demand is 962 kPa. The section of pipe crossing under the river is HDPE DR 9, which has a maximum pressure rating of approximately 1380 kPa (200 psi).

5.6 Water Servicing Concept

5.6.1 Development of Alternatives

For each alternative, it is recommended that the Commission system be separated from the City of Cold Lake distribution system where possible.

RPT2-0089-077-00-FINAL-090227.DOC WATER SERVICING 22 COLD LAKE REGIONAL UTILITY SERVICES COMMISSION REGIONAL WATER SUPPLY FUNCTIONAL PLAN & FEASIBILITY STUDY

It is recommended that there be a dedicated fill line from the Water Treatment Plant to a new CLRUSC reservoir and pump station located west of the Cold Lake North reservoir (Building 5). It is recommended that the existing 500 mm fill line to Cold Lake North continue to be used as a dedicated fill line to Cold Lake North, and the 300 mm and 400 mm diameter transmission mains to the meter vault be disconnected and tied in to the new reservoir. The new CLRUSC pump station / reservoir will be the supply source for all of the regional customers, excluding Cold Lake North.

As described further in Section 6, modifications will be required to the transfer pumps at the Cold Lake Water Treatment Plant to allow for expansion.

It is recommended that Cold Lake IR 149A continue to be supplied from the Cold Lake North water distribution system. It is also recommended that Cold Lake IR 149B be supplied from the Cold Lake North water distribution system due to the close proximity of the existing water distribution system to Cold Lake IR 149B. Since these communities are proposed to be serviced by the local distribution system, not the regional line, the pressures at the distribution points were not modelled as part of this study. However, the pressures should be supplied through the distribution system at a minimum of 140 kPa.

The general philosophy for pipe upgrades used in this study was to size the pipes for the year 2032. It was assumed that all communities will be serviced by 2012. Initially, three water servicing alternatives were developed. Following Workshop 3, Alternative 1 was revised to include a small diameter main from Cold Lake to La Corey, creating Alternative 1a. All alternatives consider servicing all of the communities included in the study

5.6.2 Alternative 1

Alternative 1 involves twinning the existing Ardmore/Fort Kent transmission main, and extending the transmission main to Bonnyville. From Bonnyville, the transmission main will split north to service La Corey, and west to service the Moose Lake area. From Moose Lake, the west transmission main will split again, and continue south to service Kehiwin IR 123 and west to service Glendon and Therien. A separate transmission main will be installed from Cold Lake to Cherry Grove and the Elizabeth Métis Settlement. A CLRUSC pump station will be required in Cold Lake South, adjacent to the existing west reservoir and pump station (Building 7). Two booster stations will be required; one at Fort Kent, and one south of Moose Lake. The existing 150 mm diameter main to Cold Lake IR 149 is adequate to supply the 2032 demands and will therefore not require upgrades. However, it is recommended that the existing main be tied into the CLRUSC pump station in Cold Lake South. Figure 5.2 illustrates the servicing concept for the entire region. Figure 5.3 illustrates the servicing concept for the Cold Lake area.

The Alternative 1 water servicing concept was simulated for the maximum day demand condition. The simulated pressures at the supply points to each community are summarized in Table 5.5.

RPT2-0089-077-00-FINAL-090227.DOC WATER SERVICING 23 COLD LAKE REGIONAL UTILITY SERVICES COMMISSION REGIONAL WATER SUPPLY FUNCTIONAL PLAN & FEASIBILITY STUDY AECOM

Table 5.5: Alternative 1 – Maximum Day Demand Modelled Results

Modelled Pressure (kPa) Location 2012 2032 4 Wing Cold Lake 446 268 City of Cold Lake-North 374 223 City of Cold Lake-South 509 268 Cold Lake IR 149 444 232 Elizabeth Métis Settlement 300 173 Hamlet of Ardmore 384 173 Hamlet of Cherry Grove 570 485 Hamlet of Fort Kent 419 161 Hamlet of La Corey 645 571 Hamlet of Therien 279 151 Kehiwin IR 123 617 454 Summer Village of Bonnyville Beach 596 421 Summer Village of Pelican Narrows 585 406 Town of Bonnyville 680 623 Village of Glendon 360 239

Detailed staging of the required components of the water servicing system is outlined in Table 5.6. Since it was assumed that all communities will be serviced by 2012, all of the pipe lengths are required by 2012. As summarized in Table 5.6, Alternative 1 requires approximately 147 km of pipe, ranging in diameter from 150 mm to 600 mm.

Table 5.6: Alternative 1 – Staging

I I I . New Pumps (HP) Location Pump(s) New Station 2012 2032 Water Treatment Plant 3 - no - 0 300 Booster - Cold Lake North/Reservoir 3 yes 600 300 Stations / Cold Lake South 3 yes 300 150 Pump Fort Kent 3 yes 300 150 Stations Moose Lake 2 yes 100 0 Installation Length Installed (m) Pipe Diameter (mm) Material Method 2012 2032 150 PVC open cut 27,700 0 150 HDPE trenchless 1,000 0 200 PVC open cut 54,700 0 200 HDPE trenchless 2,000 0 250 PVC open cut 3,600 0 Pipe 300 PVC open cut 10,700 0 Installation 400 PVC open cut 6,200 0 500 PVC open cut 17,700 0 500 HDPE trenchless 1,000 0 600 PVC open cut 22,300 0 TOTAL 146,900 0

RPT2-0089-077-00-FINAL-090227.DOC WATER SERVICING 24 COLD LAKE REGIONAL UTILITY SERVICES COMMISSION REGIONAL WATER SUPPLY FUNCTIONAL PLAN & FEASIBILITY STUDY AECOM

Based on the proposed staging of the required pumps and pipes, present worth costs were calculated for Alternative 1, including capital costs and operation and maintenance costs, and are summarized in Table 5.7. The cost estimates include 35% for contingencies and 10% for engineering and overhead. The cost estimates do not include the cost of land acquisition. Preliminary cost estimates are included in Appendix D.

Table 5.7: Alternative 1 – Cost Estimates

I I I I

Present Worth Yearly Present Worth Present Worth Total Present Location Capital Cost Maintenance Operation O&M Cost Worth . . Water Treatment . $385,000 $ - $ - $ - $385,000 Plant Booster Cold Lake North/ Stations / $4,761,000 $324,000 $235,260 $6,248,000 $11,009,000 Reservoir Pump Cold Lake South $2,070,000 $137,000 $117,630 $2,845,000 $4,915,000 Stations Fort Kent $2,070,000 $137,000 $117,630 $2,845,000 $4,915,000 Bonnyville Beach $563,000 $46,000 $39,210 $952,000 $1,515,000 Description 150 $8,453,000 $138,000 $1,542,000 $9,995,000 150 $2,747,000 $45,000 $503,000 $3,250,000 200 $20,030,000 $325,000 $3,631,000 $23,661,000 200 $5,615,000 $92,000 $1,028,000 $6,643,000 Pipe 250 $1,539,000 $25,000 $280,000 $1,819,000 Installation 300 $5,355,000 $87,000 $972,000 $6,327,000 400 $4,920,000 $80,000 $894,000 $5,814,000 500 $15,124,000 $246,000 $2,748,000 $17,872,000 500 $4,273,000 $70,000 $782,000 $5,055,000 600 $24,497,000 $398,000 $4,446,000 $28,943,000 TOTAL $132,118,000

As indicated in Table 5.7, the total present worth cost of the pumps and pipes required for Alternative 1 is $132,118,000. This cost does not include the water treatment plant upgrades, which are included in Section 6.

5.6.3 Alternative 1a

Alternative 1a involves twinning the existing Ardmore/Fort Kent transmission main, and extending the transmission main to Bonnyville. From Bonnyville, the transmission main will split north to service La Corey, and west to service the Moose Lake area. The west transmission main will split again, and continue south to service Kehiwin IR 123 and west to service Glendon and Therien. A small diameter main from Cold Lake to La Corey will also be installed to provide a loop in the system. A separate transmission main will be installed from Cold Lake to Cherry Grove and the Elizabeth Métis Settlement. A CLRUSC pump station will be required in Cold Lake South, adjacent to the existing west reservoir and pump station (Building 7). Two booster stations will be required; one at Fort Kent, and south of Moose Lake.

RPT2-0089-077-00-FINAL-090227.DOC WATER SERVICING 25 COLD LAKE REGIONAL UTILITY SERVICES COMMISSION REGIONAL WATER SUPPLY FUNCTIONAL PLAN & FEASIBILITY STUDY AECOM

The existing 150 mm main to Cold Lake IR 149 is adequate to supply the 2032 demands; however, it is recommended that the existing main be tied into the proposed CLRUSC pump station in Cold Lake South. Figure 5.4 illustrates the servicing concept for the entire region and Figure 5.5 illustrates the servicing concept for the Cold Lake area.

The Alternative 1a water servicing concept was simulated for the maximum day demand condition. The simulated pressures at the supply points to each community are summarized in Table 5.8.

Table 5.8: Alternative 1a – Maximum Day Demand Modelled Results

Modelled Pressure (kPa) Location 2012 2032 4 Wing Cold Lake 447 268 City of Cold Lake-North 374 223 City of Cold Lake-South 509 268 Cold Lake IR 149 444 232 Elizabeth Métis Settlement 300 173 Hamlet of Ardmore 379 167 Hamlet of Cherry Grove 570 484 Hamlet of Fort Kent 412 153 Hamlet of La Corey 564 499 Hamlet of Therien 279 151 Kehiwin IR 123 617 454 Summer Village of Bonnyville Beach 594 419 Summer Village of Pelican Narrows 583 404 Town of Bonnyville 679 621 Village of Glendon 360 239

Detailed staging of the required components of the water servicing system is outlined in Table 5.9. Since the additional loop from Cold Lake to La Corey is not required hydraulically, but for redundancy in the system, it was assumed to be part of only the ultimate system. As summarized in Table 5.9, Alternative 1a requires approximately 183 km of pipe, ranging in diameter from 150 mm to 600 mm.

RPT2-0089-077-00-FINAL-090227.DOC WATER SERVICING 26 COLD LAKE REGIONAL UTILITY SERVICES COMMISSION REGIONAL WATER SUPPLY FUNCTIONAL PLAN & FEASIBILITY STUDY AECOM

Table 5.9: Alternative 1a – Staging

! I I I

Pumps (HP) New Location Pump(s) New Station 2012 2032 Water Treatment Plant 3 no 0 300 Booster Cold Lake North/Reservoir 3 yes 600 300 Stations / Cold Lake South 3 yes 300 150 Pump Fort Kent 3 yes 300 150 Stations Bonnyville Beach 2 yes 100 0 I I I Installation Length Installed (m)

Pipe Diameter (mm) Material Method 2012 2032 - - " . 150 PVC open cut 27,700 36,000 150 HDPE trenchless 1,000 0 200 PVC open cut 54,700 0 200 HDPE trenchless 2,000 0 -- 250 PVC open cut 3,600 0 Pipe 300 PVC open cut 10,700 0 Installation 400 PVC open cut 6,200 0 500 PVC open cut 17,700 0 500 HDPE trenchless 1,000 0 600 PVC open cut 22,300 0 TOTAL 146,900 36,000 Based on the proposed staging shown in Table 5.9, present worth costs were calculated for Alternative 1a, including capital costs and operation and maintenance costs, and are summarized in Table 5.10. The cost estimates include 35% for contingencies and 10% for engineering and overhead. The cost estimates do not include the cost of land acquisition. Preliminary cost estimates are included in Appendix D.

Table 5.10: Alternative 1a – Cost Estimates

I I I

Present Worth Yearly Present Worth Present Worth Total Present Location Capital Cost Maintenance Operation O&M Cost Worth Water Treatment $385,000 $ - $ - $ - $385,000 Plant Booster Cold Lake Stations / $4,761,000 $324,000 $235,260 $6,248,000 $11,009,000 -- North/Reservoir Pump Cold Lake South $2,070,000 $137,000 $117,630 $2,845,000 $4,915,000 Stations Fort Kent $2,070,000 $137,000 $117,630 $2,845,000 $4,915,000 Moose Lake $563,000 $46,000 $39,210 $952,000 $1,515,000 Description 150 $13,467,000 $138,000 $1,542,000 $15,009,000 150 $2,747,000 $45,000 $503,000 $ 3,250,000 200 $20,030,000 $325,000 $3,631,000 $23,661,000 200 $5,615,000 $92,000 $1,028,000 $ 6,643,000 Pipe 250 $1,539,000 $ 25,000 $280,000 $ 1,819,000 Installation 300 $5,355,000 $87,000 $972,000 $ 6,327,000 400 $4,920,000 $80,000 $894,000 $ 5,814,000 500 $15,124,000 $246,000 $2,748,000 $17,872,000 500 $4,273,000 $70,000 $782,000 $ 5,055,000 600 $24,497,000 $398,000 $4,446,000 $28,943,000 TOTAL $137,132,000

RPT2-0089-077-00-FINAL-090227.DOC WATER SERVICING 27 COLD LAKE REGIONAL UTILITY SERVICES COMMISSION REGIONAL WATER SUPPLY FUNCTIONAL PLAN & FEASIBILITY STUDY AECOM

As indicated in Table 5.10, the total present worth costs of the pumps and pipes required for Alternative 1a is $137,132,000, and does not include the upgrade costs for the Cold Lake water treatment plant.

5.6.4 Alternative 2

Alternative 2 involves the installation of a new transmission main west from Cold Lake to La Corey. From La Corey, the transmission main will continue south to supply Bonnyville. From Bonnyville, the servicing for the Moose Lake area, Kehiwin IR 123, Glendon and Therien will be the same as in Alternative 1. A separate transmission main will be installed from Cold Lake to Cherry Grove and the Elizabeth Métis Settlement. Additional pumping will be required in Cold Lake South. Since the pumping requirements at this location are low for Alternative 2, the required pumps may be able to be added into the existing pump station at Building 7. Two booster stations will be required; one along Highway 55 near Edward Lake, and one south of the Summer Village of Bonnyville Beach. The existing transmission main to Ardmore and Fort Kent is adequate to supply the 2032 demands; however, to provide a loop in the system a small diameter main is proposed between Bonnyville and Fort Kent. The existing 150 mm main to Cold Lake IR 149 is adequate to supply the 2032 demands; however, it is recommended that the existing main be tied into the new pumps in Cold Lake South. Figure 5.6 illustrates the servicing concept for the entire region. Figure 5.7 illustrates the servicing concept for the Cold Lake area.

The Alternative 2 water servicing concept was simulated for the maximum day demand condition. The simulated pressures at the supply points to each community are summarized in Table 5.11.

Table 5.11: Alternative 2 – Maximum Day Demand Modelled Results

Modelled Pressure (kPa) Location 2012 2032 4 Wing Cold Lake 521 414 City of Cold Lake-North 402 353 City of Cold Lake-South 549 290 Cold Lake IR 149 443 223 Elizabeth Métis Settlement 298 165 Hamlet of Ardmore 472 424 Hamlet of Cherry Grove 568 476 Hamlet of Fort Kent 523 421 Hamlet of La Corey 666 588 Hamlet of Therien 256 179 Kehiwin IR 123 550 359 Summer Village of Bonnyville Beach 591 345 Summer Village of Pelican Narrows 580 330 Town of Bonnyville 640 464 Village of Glendon 337 266

RPT2-0089-077-00-FINAL-090227.DOC WATER SERVICING 28 COLD LAKE REGIONAL UTILITY SERVICES COMMISSION REGIONAL WATER SUPPLY FUNCTIONAL PLAN & FEASIBILITY STUDY AECOM

Detailed staging of the required components of the water servicing system is outlined in Table 5.12. Since the additional loop from Bonnyville to Fort Kent is not required hydraulically, but for redundancy in the system, it was assumed to be part of only the ultimate system. As summarized in Table 5.12, Alternative 2 requires approximately 150 km of pipe, ranging in diameter from 150 mm to 600 mm.

Table 5.12: Alternative 2 – Staging

L______J------'____jNew Pumps (HP) Location Pump(s) New Station 2012 2032 Water Treatment Plant 3 no 0 300 Booster Cold Lake North/Reservoir 3 yes 600 300 Stations / Cold Lake South 2 yes 100 0 Pump Highway 55 3 yes 300 150 Stations -- Bonnyville Beach 2 yes 100 0 Installation Length Installed (m)

Pipe Diameter (mm) Material Method 2012 2032 150 PVC open cut 9,600 11,100 200 PVC open cut 38,300 0 200 HDPE trenchless 1,000 0 250 PVC open cut 22,200 0 250 HDPE trenchless 1,000 0 Pipe 300 PVC open cut 3,400 0 Installation 350 PVC open cut 7,500 0 500 PVC open cut 100 0 600 PVC open cut 54,300 0 600 HDPE trenchless 1,000 0 TOTAL 138,400 11,100 Based on the proposed staging of the required pumps and pipes, present worth costs were calculated for Alternative 2, including capital costs and operation and maintenance costs, and are summarized in Table 5.13. The cost estimates include 35% for contingencies and 10% for engineering and overhead. The cost estimates do not include the cost of land acquisition. Preliminary cost estimates are included in Appendix D.

RPT2-0089-077-00-FINAL-090227.DOC WATER SERVICING 29 COLD LAKE REGIONAL UTILITY SERVICES COMMISSION REGIONAL WATER SUPPLY FUNCTIONAL PLAN & FEASIBILITY STUDY AECOM

Table 5.13: Alternative 2 – Cost Estimates

Present Worth Yearly Present Worth Present Worth Total Present Location Capital Cost Maintenance Operation O&M Cost Worth Water Treatment $385,000 $ - $ - $ - $385,000 Plant Booster Cold Lake Stations / $4,761,000 $324,000 $235,260 $6,248,000 $11,009,000 North/Reservoir Pump Cold Lake South $282,000 $23,000 $39,210 $695,000 $977,000 Stations Highway 55 $2,070,000 $137,000 $117,630 $2,845,000 $4,915,000 Bonnyville Beach $563,000 $46,000 $39,210 $952,000 $1,515,000 Description 150 $4,476,000 $48,000 $537,000 $5,013,000 200 $14,025,000 $228,000 $2,547,000 $16,572,000 200 $2,808,000 $46,000 $514,000 $3,322,000 250 $9,485,000 $154,000 $1,721,000 $11,206,000 Pipe 250 $3,052,000 $50,000 $559,000 $3,611,000 Installation 300 $1,703,000 $28,000 $313,000 $2,016,000 350 $4,349,000 $71,000 $794,000 $5,143,000 500 $86,000 $2,000 $23,000 $109,000 600 $59,649,000 $968,000 $10,813,000 $70,462,000 600 $4,883,000 $80,000 $894,000 $5,777,000 TOTAL $142,032,000

As indicated in Table 5.13, the total present worth of the pumps and pipes required for Alternative 2 is $142,032,000, and does not include the upgrade costs for the Cold Lake water treatment plant.

5.6.5 Alternative 3

Alternative 3 involves the installation of a new transmission main to Cherry Grove, which will continue south to the Elizabeth Métis Settlement, and west to Bonnyville. From Bonnyville, the water main will split north to service La Corey, and west to service the Moose Lake area. The servicing for the Moose Lake area, Kehiwin IR 123, Glendon and Therien will be the same as in Alternative 1. A CLRUSC pump station will be required in Cold Lake South, adjacent to the existing west reservoir and pump station (Building 7). Three booster stations will be required; one north of the Elizabeth Métis Settlement, one west of Bonnyville, and one south of Moose Lake. The existing transmission mains to Fort Kent and to Cold Lake IR 149 are adequate to supply the 2032 demands. However, it is recommended that a small diameter main be installed between Bonnyville and Fort Kent to provide a loop in the system. Figure 5.8 illustrates the servicing concept for the entire region. Figure 5.9 illustrates the servicing concept for the Cold Lake area.

RPT2-0089-077-00-FINAL-090227.DOC WATER SERVICING 30 COLD LAKE REGIONAL UTILITY SERVICES COMMISSION REGIONAL WATER SUPPLY FUNCTIONAL PLAN & FEASIBILITY STUDY AECOM

The Alternative 3 water servicing concept was simulated for the maximum day demand condition. The simulated pressures at the supply points to each community are summarized in Table 5.14.

Table 5.14: Alternative 3 – Maximum Day Demand Modelled Results

Modelled Pressure (kPa) Location 2012 2032 4 Wing Cold Lake 392 278 City of Cold Lake-North 323 221 City of Cold Lake-South 442 242 Cold Lake IR 149 393 229 Elizabeth Métis Settlement 426 225 Hamlet of Ardmore 435 410 Hamlet of Cherry Grove 545 518 Hamlet of Fort Kent 517 399 Hamlet of La Corey 615 374 Hamlet of Therien 279 152 Kehiwin IR 123 617 456 Summer Village of Bonnyville Beach 606 485 Summer Village of Pelican Narrows 620 534 Town of Bonnyville 646 409 Village of Glendon 360 240

Detailed staging of the required components of the water servicing system is outlined in Table 5.15. Since the additional loop from Bonnyville to Fort Kent is not required hydraulically, but for redundancy in the system, it was assumed to be part of only the ultimate system. As summarized in Table 5.15, Alternative 3 requires approximately 165 km of pipe, ranging in diameter from 150 mm to 600 mm.

Table 5.15: Alternative 3 – Staging

I ' I New Pumps (HP) -?1 Location Pump(s) New Station 2012 2032 Water Treatment Plant 3 no 0 300 Booster Cold Lake North/Reservoir 3 yes 600 300 Stations / Cold Lake South 3 yes 300 150 Pump Elizabeth Métis Settlement 3 yes 300 150 Stations Bonnyville 2 yes 150 75 Moose Lake 2 yes 100 0 Installation Length Installed (m)

Pipe Diameter (mm) Material Method 2012 2032 150 PVC open cut 9,600 11,100 200 PVC open cut 47,500 0 200 HDPE trenchless 2,000 0 250 PVC open cut 6,900 0 Pipe 300 PVC open cut 7,500 0 Installation 400 PVC open cut 6,200 0 500 PVC open cut 100 0 600 PVC open cut 72,700 0 600 HDPE trenchless 1,000 0 TOTAL 153,500 11,100

RPT2-0089-077-00-FINAL-090227.DOC WATER SERVICING 31 COLD LAKE REGIONAL UTILITY SERVICES COMMISSION REGIONAL WATER SUPPLY FUNCTIONAL PLAN & FEASIBILITY STUDY AECOM

Based on the proposed staging shown in Table 5.15, present worth costs were calculated for Alternative 3, including capital costs and operation and maintenance costs, and are summarized in Table 5.16. The cost estimates include 35% for contingencies and 10% for engineering and overhead. The cost estimates do not include the cost of land acquisition. Preliminary cost estimates are included in Appendix D.

Table 5.16: Alternative 3 – Cost Estimates

J

Yearly Present Worth l__JPresent Worth Present Worth Total Present Location Capital Cost Maintenance Operation O&M Cost Worth Water Treatment Plant $385,000 $ - $ - __$ - $385,000 Cold Lake __ ------$4,761,000 $324,000 $235,260 $6,248,000 $11,009,000 Booster North/Reservoir Stations / Cold Lake South $2,070,000 $ 137,000 $117,630 $2,845,000 $4,915,000 Pump Elizabeth Métis $2,070,000 $137,000 $117,630 $2,845,000 $4,915,000 Stations Settlement Bonnyville $1,035,000 $69,000 $58,820 $1,428,000 $2,463,000 Moose Lake $563,000 $46,000 $39,210 $952,000 $1,515,000 Description 150 $4,476,000 $48,000 $536,000 $5,012,000 200 $17,394,000 $283,000 $3,161,000 $20,555,000 200 $5,615,000 $92,000 $1,028,000 $6,643,000 250 $2,949,000 $48,000 $536,000 $3,485,000 Pipe 300 $3,754,000 $61,000 $681,000 $4,435,000 Installation 400 $4,920,000 $80,000 $894,000 $5,814,000 500 $86,000 $2,000 $22,000 $108,000 600 $79,862,000 $1,296,000 $14,477,000 $94,339,000 600 $4,883,000 $80,000 $894,000 $5,777,000 TOTAL $171,370,000

As indicated in Table 5.16, the total present worth of the pumps and pipes required for Alternative 3 is $171,370,000, and does not include the upgrade costs for the Cold Lake water treatment plant.

Figures 5.10 to 5.13 summarize the ultimate flow rates and velocities, for the year 2032, in individual pipes for each of the alternative servicing concepts.

5.6.6 Cost Estimate Summary

The cost estimates are presented in present worth dollars and include both transmission mains and pumps. The pump costs are based on a per horsepower capital cost of $2300, with a minimum cost of $24,000. Where a new pump station will be required, a pump cost of $4600 per horsepower was used to account for the cost of the building. A unit cost of $0.12/kW was used to determine the operational cost of the pump, with the maintenance cost based on a 15-year pump and 25-year enclosure life expectancy. The present worth was calculated based on an inflation rate of 2% and an interest rate of 6%. Pipe life expectancy of 75 years was used and the operation costs were assumed to be included in the rates.

Table 5.17 summarizes the present worth cost estimates for each of the alternatives, including capital costs and operation and maintenance (O&M) costs. The costs do not include the water treatment costs. Preliminary cost estimates are detailed in Tables D.1 to D.4 in Appendix D.

RPT2-0089-077-00-FINAL-090227.DOC WATER SERVICING 32 COLD LAKE REGIONAL UTILITY SERVICES COMMISSION REGIONAL WATER SUPPLY FUNCTIONAL PLAN & FEASIBILITY STUDY AECOM

Table 5.17: Water Transmission System Cost Estimate Summary

Alternative Present Worth Capital Present Worth O&M Total Present Worth Alternative 1 $102,402,000 $29,716,000 $132,118,000 Alternative 1a $107,416,000 $29,716,000 $137,132,000 Alternative 2 $112,577,000 $29,455,000 $142,032,000 Alternative 3 $134,823,000 $36,547,000 $171,370,000

As indicated in Table 5.17, there is less than 10% difference between the total present worth of Alternatives 1, 1a and 2. However, the present worth costs for Alternative 3 are approximately 30% higher than Alternative 1.

5.7 Evaluation of Alternatives

Alternatives were evaluated based on the following criteria:

• Technical feasibility • Environmental impact • Ease of operation and maintenance • Ease of implementation • Stakeholder acceptability • Utilization of existing infrastructure • Staging flexibility • Land/easement availability • Annual operation and maintenance costs • Life cycle costs • Total capital cost

All of the proposed servicing concepts meet the design requirements; however, the alternatives provide various levels of service to the municipalities. The advantages and disadvantages of the alternatives are summarized in Table 5.18.

Table 5.18: Alternative Advantages/Disadvantages

Alternative Advantages Disadvantages Alternative 1 y Least expensive alternative y No opportunity for redundancy in the y Higher flexibility for staging system y Utilizes the existing transmission mains y Higher pumping requirements than y Utilizes existing easements Alternative 2 Alternative 1a y Higher flexibility for staging y Requires the longest lengths of pipe y Utilizes the existing transmission mains compared to the alternate concepts y Provides redundancy in the system y Additional easement requirements compared to Alternative 1

RPT2-0089-077-00-FINAL-090227.DOC WATER SERVICING 33 COLD LAKE REGIONAL UTILITY SERVICES COMMISSION REGIONAL WATER SUPPLY FUNCTIONAL PLAN & FEASIBILITY STUDY AECOM

Alternative Advantages Disadvantages Alternative 2 y Second supply line can be looped for y Additional 15 km of 600 mm diameter pipe redundancy required compared to Alternative 1 y Utilizes the existing transmission mains y Additional easement requirements y Lower pumping requirements compared to Alternative 1 y Provides the opportunity for additional development areas y Lowest annual operation and maintenance costs Alternative 3 y Second supply line can be looped for y Additional 33 km of 600 mm diameter pipe redundancy required compared to Alternative 1 y Utilizes the existing transmission mains y Additional easement requirements y Provides the opportunity for additional compared to Alternative 1 development areas y Higher pumping requirements y Additional booster station required y Most expensive alternative

5.8 Recommended Water Servicing Alternative

All alternatives meet the necessary requirements for future development conditions within the study area. Alternative 1 is the recommended water servicing concept since it is the most cost effective solution. In addition, Alternative 1 is the preference of the steering committee.

5.9 Conceptual Design of Preferred Alternative

5.9.1 Growth Projections

The population targets detailed in Section 4 were determined through analysis of historical data and discussions with the steering committee. Subsequently, Alberta Transportation indicated that an annual growth rate of 2.5% should not be exceeded in the design of regional systems.

For ultimate development, the communities affected by the limiting growth rate are the Town of Bonnyville and the Village of Glendon. For the Town of Bonnyville, the original population targets were 8,000 and 15,000 people for the years 2012 and 2032, respectively. A 2.5% annual growth rate corresponds to population targets of 6,800 and 11,200 people for the years 2012 and 2032. Based on discussions with the Town of Bonnyville, the Town is supportive of reducing the growth projections. For the Village of Glendon, the original population targets were 700 and 1,200 people for the years 2012 and 2032, respectively. A 2.5% annual growth rate corresponds to population targets of 550 and 900 people for the years 2012 and 2032. The maximum day demand rates were adjusted accordingly. Table 5.19 indicates the actual and projected water consumption rates for municipalities.

RPT2-0089-077-00-FINAL-090227.DOC WATER SERVICING 34 COLD LAKE REGIONAL UTILITY SERVICES COMMISSION REGIONAL WATER SUPPLY FUNCTIONAL PLAN & FEASIBILITY STUDY AECOM

Table 5.19: Actual and Projected Water Consumption Rates

Actual Projected Year 2006 2007 2012 2032 Population 2,800 2,800 2,800 4,800 4 Wing Cold Lake ADD (L/c/d) 660.5 375 375 375 ADD (L/s) 21.41 12.15 12.15 20.83 Population 277 281 300 500 ADD (L/c/d) 377.2 375 375 375 Hamlet of Ardmore ADD (L/s) 1.21 1.22 1.30 2.17 Truck Fill (L/s) 0.72 0.73 0.78 1.30 Total (L/s) 1.93 1.95 2.08 3.47 Population 9,191 9,635 12,200 22,200 ADD (L/c/d) 471 375 375 375 City of Cold Lake ADD (L/s) 50.10 41.82 52.95 96.35 Truck Fill (L/s) 0.58 0.61 0.77 1.40 Total (L/s) 50.69 42.43 53.72 97.76 Population - - 300 500 Hamlet of Cherry Grove ADD (L/c/d) - - 375 375 ADD (L/s) - - 1.30 2.17 Population 914 935 1,050 1,500 Cold Lake IR 149 ADD (L/c/d) 163.7 375 375 375 ADD (L/s) 1.73 4.06 4.56 6.51 Population 85 87 98 140 Cold Lake IR 149A ADD (L/c/d) - 375 375 375 ADD (L/s) - 0.38 0.43 0.61 Population 220 225 252 360 Cold Lake IR 149B ADD (L/c/d) - 375 375 375 ADD (L/s) - 0.98 1.09 1.56 Population 600 616 700 1,000 Elizabeth Métis Settlement ADD (L/c/d) - 375 375 375 ADD (L/s) - 2.67 3.04 4.34 Population 166 167 175 300 ADD (L/c/d) 399.2 375 375 375 Hamlet of Fort Kent ADD (L/s) 0.77 0.73 0.76 1.30 Truck Fill (L/s) 0.74 0.75 0.78 1.34 Total (L/s) 1.51 1.47 1.54 2.64 Population 500 508 550 900 Village of Glendon ADD (L/c/d) 584.8 375 375 375 ADD (L/s) 3.38 2.20 2.39 3.91 Population 1,007 1,037 1,200 2,000 Kehiwin IR 123 ADD (L/c/d) - 375 375 375 ADD (L/s) - 4.50 5.21 8.68 Population - - 100 200 Hamlet of La Corey ADD (L/c/d) - - 375 375 ADD (L/s) - - 0.43 0.87 Population - 726 850 1,300 Moose Lake Area ADD (L/c/d) - 375 375 375 ADD (L/s) - 3.15 3.69 5.64

RPT2-0089-077-00-FINAL-090227.DOC WATER SERVICING 35 COLD LAKE REGIONAL UTILITY SERVICES COMMISSION REGIONAL WATER SUPPLY FUNCTIONAL PLAN & FEASIBILITY STUDY AECOM

Actual Projected Year 2006 2007 2012 2032 Population - 806 850 1,200 Summer Villages ADD (L/c/d) - 375 375 375 ADD (L/s) - 3.50 3.69 5.21 Population - - 100 200 Hamlet of Therien ADD (L/c/d) - - 375 375 ADD (L/s) - - 0.43 0.87 Population 6,014 6,138 6,800 11,200 ADD (L/c/d) 407 375 375 375 Town of Bonnyville ADD (L/s) 28.33 26.64 29.51 48.61 Truck Fill (L/s) 0.73 0.74 0.82 1.36 Total (L/s) 29.06 27.39 30.34 49.97

The average day demand for the Town of Bonnyville for 2012 and 2032 is approximately 30 L/s and 50 L/s, reduced from 36 L/s and 67 L/s in the April 2008 draft report, respectively. The average day demand for the Village of Glendon for 2012 and 2032 is approximately 2.4 L/s and 3.9 L/s, reduced from 3.0 L/s and 5.2 L/s.

5.9.2 Recommended Design

As mentioned in Section 5.8, Alternative 1 is the recommended design. Refinements were considered to the Alternative 1 design to determine the most cost effective solution. Initially a 400 mm diameter transmission main was proposed to replace the existing 300 mm diameter transmission main from Cold Lake North to Cold Lake South and twin the existing 400 mm diameter transmission main. The twin 400 mm diameter transmission mains were proposed to feed into the new CLRUSC pump station in Cold Lake South, which is required for the ultimate system to boost the pressure along the transmission mains to Bonnyville, Cold Lake IR 149, and Cherry Grove. For Stage 1 development, a 500 mm diameter transmission main was considered to twin the existing 400 mm diameter transmission main, which eliminates the need for the new CLRUSC pump station in Cold Lake South. The 500 mm diameter transmission main with the elimination of the pump station is a more cost effective solution than the initially proposed Alternative 1. However, it should be noted that ultimately a booster station will be required along the existing transmission main to Cold Lake IR 149, and an additional booster station will be required south of Moose Lake. In addition, if Cherry Grove and the Elizabeth Métis Settlement become part of the regional system, a booster station will be required along that transmission main.

The recommended alternative was simulated for the maximum day demand condition, based on the projected flow rates in Table 5.19. The simulated pressures at the supply points to each community are summarized in Table 5.20.

Table 5.20: Recommended Alternative – Maximum Day Demand Modelled Results

Modelled Pressure (kPa) Location 2012 2032 4 Wing Cold Lake 501 374 City of Cold Lake-North 425 370 City of Cold Lake-South 592 417 Cold Lake IR 149 281 156 Elizabeth Métis Settlement 148 151

RPT2-0089-077-00-FINAL-090227.DOC WATER SERVICING 36 COLD LAKE REGIONAL UTILITY SERVICES COMMISSION REGIONAL WATER SUPPLY FUNCTIONAL PLAN & FEASIBILITY STUDY AECOM

Modelled Pressure (kPa) Location 2012 2032 Hamlet of Ardmore 541 523 Hamlet of Cherry Grove 418 173 Hamlet of Fort Kent 554 467 Hamlet of La Corey 470 282 Hamlet of Therien 238 166 Kehiwin IR 123 347 148 Summer Village of Bonnyville Beach 683 660 Summer Village of Pelican Narrows 670 640 Town of Bonnyville 506 334 Village of Glendon 319 253

Detailed staging of the required components of the water servicing system is outlined in Table 5.21. Since it was assumed that all communities will be serviced by 2012, all of the pipe lengths are required by 2012. As summarized in Table 5.21, the recommended Alternative requires approximately 144 km of pipe, ranging in diameter from 150 mm to 500 mm.

Table 5.21: Recommended Alternative – Staging

New Pumps (HP) Location Pump(s) New Station 2012 2032 Water Treatment Plant 3 no 0 300 Cold Lake North/Reservoir 3 yes 600 300 Booster Ardmore 3 yes 300 150 Stations / Pelican Narrows 2 yes 100 0 Pump Moose Lake 2 yes 100 0 Stations Elizabeth 2 yes 0 20 Cold Lake IR 149 2 yes 0 40 Installation Length Installed (m) Pipe Diameter (mm) Material Method 2012 2032 150 PVC open cut 27,700 0 150 HDPE trenchless 1,000 0 200 PVC open cut 54,700 0 Pipe 200 HDPE trenchless 2,000 0 Installation 300 PVC open cut 14,400 0 500 PVC open cut 43,400 0 500 HDPE trenchless 1,000 0 TOTAL - - 144,200 0

Based on the proposed staging of the required pumps and pipes, present worth costs were calculated for the recommended Alternative, including capital costs and operation and maintenance costs, and are summarized in Table 5.22. The cost estimates include 35% for contingencies and 10% for engineering and overhead. The cost estimates do not include the cost of land acquisition. Preliminary cost estimates are included in Table D.5 in Appendix D.

RPT2-0089-077-00-FINAL-090227.DOC WATER SERVICING 37 COLD LAKE REGIONAL UTILITY SERVICES COMMISSION REGIONAL WATER SUPPLY FUNCTIONAL PLAN & FEASIBILITY STUDY AECOM

Table 5.22: Recommended Alternative – Cost Estimates

Present Worth Yearly Present Worth Present Worth Total Present Location Capital Cost Maintenance Operation O&M Cost Worth Water Treatment $385,000 $- $ - $ - $385,000 Plant Cold Lake $4,761,000 $324,000 $235,260 $ 6,248,000 $11,009,000 Booster North/Reservoir Stations / Ardmore $2,070,000 $137,000 $117,630 $2,845,000 $4,915,000 Pump Pelican Narrows $563,000 $46,000 $39,210 $ - $563,000 Stations Moose Lake $563,000 $46,000 $39,210 $952,000 $1,515,000 Elizabeth $52,000 $ - $ - $- $52,000 Cold Lake IR 149 $103,000 $ - $ - $ - $103,000 Description 150 $8,453,000 $138,000 $1,542,000 $9,995,000 150 $2,747,000 $45,000 $503,000 $3,250,000 200 $20,030,000 $325,000 $3,631,000 $23,661,000 Pipe 200 $5,615,000 $92,000 $1,028,000 $6,643,000 Installation 300 $7,207,000 $117,000 $1,307,000 $8,514,000 500 $37,082,000 $602,000 $6,725,000 $43,807,000 500 $4,273,000 $70,000 $782,000 $5,055,000 TOTAL $119,467,000

As indicated in Table 5.22, the total present worth of the pumps and pipes required for the recommended alternative is $119,467,000, which does not include the upgrade costs for the Cold Lake water treatment plant.

Servicing the Town of Bonnyville with a 500 mm diameter transmission main has the lowest capital costs since the additional pumping costs are greater than the incremental pipe cost when evaluating servicing only the Town of Bonnyville as well as servicing all communities. A 500 mm diameter transmission main will support the entire regional system.

The diameters of the proposed transmission mains for the recommended alternative are shown in Figures 5.14 and 5.15. The alignment of the proposed 500 mm diameter transmission main will be from the new CLRUSC pump station south through Cold Lake South, then southwest to Ardmore, Fort Kent and Bonnyville. The water main from Cold Lake to Bonnyville should be located along the rail line where possible. From Bonnyville, the transmission main will split north to service La Corey and west to service the remaining communities. The west transmission main will follow the shore of Moose Lake to Highway 28. At Highway 28, the transmission main will split to service Kehiwin IR 123 and Glendon. The transmission main south to Kehiwin will be located along Highway 28. The water main west to Glendon should be located such that the number of water crossings is minimized. From Cold Lake South, the proposed water main to Cherry Grove and the Elizabeth Métis Settlement should follow Highway 53 to Cherry Grove, then south to the Elizabeth Métis Settlement. As the existing pipes should be in good condition, it is recommended that the pipes be utilized where possible.

As mentioned in Section 5.6.1, it is recommended that the 300 mm and 400 mm diameter transmission mains to the meter vault be disconnected and tied into the new reservoir in Cold Lake North with a 500 mm diameter pipe. The new CLRUSC pump station will be the supply source for all of the regional customers, excluding Cold Lake North and the Cold Lake First Nations (Cold Lake IR 149A and 149B).

RPT2-0089-077-00-FINAL-090227.DOC WATER SERVICING 38 COLD LAKE REGIONAL UTILITY SERVICES COMMISSION REGIONAL WATER SUPPLY FUNCTIONAL PLAN & FEASIBILITY STUDY

Cold Lake North and the Cold Lake First Nations (Cold Lake IR 149A and 149B) will continue to be serviced from an existing 500 mm diameter supply line to the Cold Lake North reservoir.

There are several river and creek crossing necessary for Alternative 1. The 500 mm diameter main will cross under the Beaver River along Highway 28, between Cold Lake and Ardmore. The 150 mm diameter main between Bonnyville and La Corey and the 200 mm diameter main between Cherry Grove and the Elizabeth Métis Settlement will also cross under the Beaver River. Depending on the location of the supply point to the Elizabeth Métis Settlement the transmission main may also cross under the Redspring Creek.

The 250 mm diameter main to Glendon will cross under the Thinlake River, west of Moose Lake. The proposed transmission mains will also cross several small unnamed creeks in the area.

Alternative 1 requires a new CLRUSC pump station in Cold Lake North, as well as additional transfer pumping at the water treatment plant. At the water treatment plant, larger transfer pumps will be required. If the existing 500 mm diameter dedicated fill line to Cold Lake North is not tied in to the regional system, the transfer pumps at the water treatment plant should be operated at a pressure of approximately 550 kPa by 2032. However, if the 500 mm fill line is tied into the regional system, and acts as a third supply line to the new CLRUSC pump station, the pump head required can be reduced to a pressure of 350 kPa. At the proposed CLRUSC pump station in Cold Lake North, three pumps (300 HP each) are recommended to be installed, with an operating pressure of 700 kPa.

In addition, five booster stations are required. The first booster station will need to be located along Highway 28, east of Ardmore. The elevation of this booster station should be at approximately 540 m. It is recommended that three booster pumps (150 HP each) be installed and operated at a pressure of 700 kPa.

The second booster station will need to be located along the proposed 300 mm diameter main, east of the connection to Pelican Narrows. The elevation of this booster station should be no higher than 549 m. It is recommended that two 50HP booster pumps be installed and operated at a pressure of 700 kPa.

The third booster station will need to be located south of Moose Lake. The elevation of this booster station should be no higher than 597 m, so that the pressure on the suction side of the booster station does not drop below the minimum requirement of 140 kPa. Two 50 HP pumps are proposed for this booster station, with an operating pressure of 400 kPa.

A booster station will also be required along the existing 150 mm diameter transmission main to the Cold Lake IR 149. This booster station should be located south of Highway 28, and is only required by the 2032 development condition. Two 20 HP pumps are proposed for this booster station, with an operating pressure of 500 kPa.

A booster station will also be required along the proposed 200 mm diameter main to the Elizabeth Métis Settlement. The booster station should be located south of the proposed Beaver River crossing, at an elevation of approximately 535 m. It is recommended that two 10 HP booster pumps be installed and operated at a pressure of 450 kPa.

RPT2-0089-077-00-FINAL-090227.DOC WATER SERVICING 39 COLD LAKE REGIONAL UTILITY SERVICES COMMISSION REGIONAL WATER SUPPLY FUNCTIONAL PLAN & FEASIBILITY STUDY

At Cold Lake North, a 1,000 m3 CLRUSC reservoir will be required. Since the supply from the water treatment plant will be provided in a 20 hour period to Cold Lake North, the reservoir will store the excess supply until there is demand in the system. Although the new CLRUSC reservoir was priced as a separate reservoir, depending on the location of the new reservoir the additional storage can be combined with the Cold Lake North reservoir. The Cold Lake North reservoir also requires expansion to adequately supply the City of Cold Lake, as indicated in the City of Cold Lake Water Distribution System Modelling and Assessment draft report, UMA, 2007.

Chlorine booster stations will not be required along the regional system. Each municipality will be responsible for testing the chlorine residual levels prior to distributing the water. There are no additional regional truck fills proposed at this time, as it may impact the pressure in the transmission main during operation. However, if truck fill stations are proposed then a separate reservoir and pump station will be required. These truck fill reservoirs can be filled from the transmission mains.

Figure 5.16 summarizes the ultimate flow rates and velocities, for the year 2032, in individual pipes for the recommended alterative.

5.9.3 Stage 1 Design

Stage 1 of the regional water supply system involves completion of the transmission main from Cold Lake to the Town of Bonnyville. To supply water to Bonnyville, the 500 mm diameter transmission main would need to be installed. The proposed booster station along Highway 28 would not be required at this time. However, once additional communities are added to the system the booster station will be required.

It is recommended that the proposed CLRUSC reservoir and pump station in Cold Lake North be constructed to supply the regional customers.

The infrastructure required for Stage 1 development of the recommended alternative includes a new CLRUSC pump station and reservoir located in Cold Lake North complete with 500 mm diameter transmission mains to connect the new pump station/reservoir to the existing transmission system, a 500 mm diameter transmission main to Cold Lake South, a 500 mm diameter transmission main to Bonnyville, and upgrades to the Cold Lake water treatment plant.

This reservoir will be supplied from the Cold Lake Water Treatment Plant through the twin 300 mm and 400 mm diameter transmission mains. A schematic of the stage 1 transmission system is indicated in Figure 5.17.

RPT2-0089-077-00-FINAL-090227.DOC WATER SERVICING 40 COLD LAKE REGIONAL UTILITY SERVICES COMMISSION REGIONAL WATER SUPPLY FUNCTIONAL PLAN & FEASIBILITY STUDY AECOM

The capital costs for Stage 1 development are summarized in Table 5.23. The cost estimates include 35% for contingencies and 10% for engineering.

Table 5.23: Recommended Alternative Stage 1 Cost Estimates

Item Description Capital Cost 500 mm diameter connections to and from new CLRUSC pump $208,000 station 500 mm diameter connection from Cold Lake North to Cold Lake Pipe Installation $6,445,000 South 500 mm diameter transmission main to Bonnyville $46,467,000 (includes necessary river crossings) Pump Station / Reservoir New CLRUSC pump station and reservoir in Cold Lake North $4,856,000 Water Treatment $3,228,000 TOTAL $61,204,000

RPT2-0089-077-00-FINAL-090227.DOC WATER SERVICING 41 COLD LAKE REGIONAL UTILITY SERVICES COMMISSION REGIONAL WATER SUPPLY FUNCTIONAL PLAN & FEASIBILITY STUDY f fl ->C LEGEND - Q STUDY AREA 200 ? - EXISTING PIPE (mm) >C . ? RESERVOIR/PUMP STATION -m - - - WATER TREATMENT PLANT ID • • METER VAULT 0089-077-00_03-CWF501_RA.dwg Saved By: chaob 0089-077-00_03-CWF501_RA.dwg By: Saved ABANDONED WATER TREATMENT PLANT m SCALE 1:100000 0L::FL:::J A - -City of Cold Lake Regional Water Supply Functional Plan & Feasibility Study ISS/REV: UMA FILENAME: THIS DOCUMENT IS PROTECTED BY COPYRIGHT LAW AND MAY NOT BE USED, REPRODUCED OR MODIFIED IN ANY MANNER OR FOR ANY PURPOSE EXCEPT WITH THE WRITTEN PERMISSION OF UMA ENGINEERING LTD. DOING BUSINESS AS AECOM ("AECOM") TO OR A PARTY ("AECOM") BUSINESS AS AECOM DOING LTD. OF ENGINEERING UMA PERMISSION WRITTEN ANY THE ANY EXCEPT WITH PURPOSE MANNER REPRODUCED OR FOR OR IN USED, LAW AND COPYRIGHT MODIFIED MAY NOT PROTECTED BE DOCUMENT BY THIS IS WHICH ITS COPYRIGHT HAS BEEN ASSIGNED. AECOM ACCEPTS NO RESPONSIBILITY, AND DENIES ANY LIABILITY WHATSOEVER, TO ANY PARTY THAT USES, REPRODUCES, MODIFIES, OR RELIES ON THIS DOCUMENT WITHOUT CONSENT. WRITTEN EXPRESS AECOM'S

AECOM Existing Water Transmission System Figure 5.1 6 LEGEND COLD STUDY AREA COLD LAKEWATE 200- EXISTING PIPE (mm) TREATMENT PLAI 300 PROPOSED PIPE (mm) - ? - RESERVOIR/PUMP STATION K:il FUTURE BOOSTER STATION en? CD • WATER TREATMENT PLANT • METER VAULT

4 WING COLD LAKE RESERVOIR • FUTURE c?usc PUMP STATION J • COLD LAKE SOUTH, WEST--RE,SERYOIR 0089-077-00_03-CWF502_RA.dwg Saved By: chaob 0089-077-00_03-CWF502_RA.dwg By: Saved

m SCALE 1:250000 0 A

City of Cold Lake Regional Water Supply Functional Plan & Feasibility Study ISS/REV: UMA FILENAME: THIS DOCUMENT IS PROTECTED BY COPYRIGHT LAW AND MAY NOT BE USED, REPRODUCED OR MODIFIED IN ANY MANNER OR FOR ANY PURPOSE EXCEPT WITH THE WRITTEN PERMISSION OF UMA ENGINEERING LTD. DOING BUSINESS AS AECOM ("AECOM") TO PARTY OR A ("AECOM") BUSINESS AS AECOM DOING LTD. ENGINEERING OF UMA PERMISSION WRITTEN THE EXCEPT WITH ANY PURPOSE ANY MANNER OR FOR OR IN USED, MODIFIED REPRODUCED LAW AND MAY COPYRIGHT NOT BE PROTECTED BY DOCUMENT THIS IS WHICH ITS COPYRIGHT HAS BEEN ASSIGNED. AECOM ACCEPTS NO RESPONSIBILITY, AND DENIES ANY LIABILITY WHATSOEVER, TO ANY PARTY THAT USES, REPRODUCES, MODIFIES, OR RELIES ON THIS DOCUMENT WITHOUT CONSENT. WRITTEN EXPRESS AECOM'S Future Transmission System AECOM Alternative 1 Figure 5.2 l LEGEND i)( l STUDY AREA & 200 - EXISTING PIPE (mm) 300 ? PROPOSED PIPE (mm) )( ...... - ? - RESERVOIR/PUMP STATION ? (I) WATER TREATMENT PLANT ID ? • ' • METER VAULT NORTH RESERVOIR (BUILDING 5) NOTE COLD LAKE IR 149AAND 1498 WILL BE SUPPLIED FROM THE COLD LAKE NORTH DISTRIBUTION SYSTEM.

FUTURE CLRUSC PUMP STATION

1....%--L.J?r -!alb•\_

COLD LAKE SOUTH WEST RESERVOIR (BUILDING 7) 0089-077-00_03-CWF503_RA.dwg Saved By: chaob 0089-077-00_03-CWF503_RA.dwg By: Saved

NOTE: TRANSMISSION MAINS TO ARDMORE AND COLD LAKE IR 149 m SCALE 1:50000 0 A WILL NOT BE CONNECTED AT THIS LOCATION City of Cold Lake Regional Water Supply Functional Plan & Feasibility Study ISS/REV: UMA FILENAME: THIS DOCUMENT IS PROTECTED BY COPYRIGHT LAW AND MAY NOT BE USED, REPRODUCED OR MODIFIED IN ANY MANNER OR FOR ANY PURPOSE EXCEPT WITH THE WRITTEN PERMISSION OF UMA ENGINEERING LTD. DOING BUSINESS AS AECOM ("AECOM") TO OR A PARTY ("AECOM") BUSINESS AS AECOM DOING LTD. ENGINEERING OF UMA PERMISSION WRITTEN THE EXCEPT WITH PURPOSE ANY MANNER ANY OR FOR OR IN USED, MODIFIED REPRODUCED LAW AND MAY COPYRIGHT NOT BE PROTECTED BY DOCUMENT THIS IS WHICH ITS COPYRIGHT HAS BEEN ASSIGNED. AECOM ACCEPTS NO RESPONSIBILITY, AND DENIES ANY LIABILITY WHATSOEVER, TO ANY PARTY THAT USES, REPRODUCES, MODIFIES, OR RELIES ON THIS DOCUMENT WITHOUT CONSENT. WRITTEN EXPRESS AECOM'S Future Transmission System Cold Lake Supply Alternative 1 Figure 5.3 6 LEGEND COLD STUDY AREA

COLD LAKEWATE 200- EXISTING PIPE (mm) TREATMENT PLAI 300 PROPOSED PIPE (mm) - - RESERVOIR/PUMP STATION ? IQ) en? FUTURE BOOSTER STATION CD • WATER TREATMENT PLANT • METER VAULT

4 WING COLD LAKE RESERVOIR • FUTURE c?usc PUMP STATION J • COLD LAKE SOUTH WEST--R?S'ERVOIR 0089-077-00_03-CWF504_RA.dwg Saved By: chaob 0089-077-00_03-CWF504_RA.dwg By: Saved

L.Fl.::::::::J m SCALE 1:250000 0 2500 5000 A

City of Cold Lake Regional Water Supply Functional Plan & Feasibility Study ISS/REV: UMA FILENAME: THIS DOCUMENT IS PROTECTED BY COPYRIGHT LAW AND MAY NOT BE USED, REPRODUCED OR MODIFIED IN ANY MANNER OR FOR ANY PURPOSE EXCEPT WITH THE WRITTEN PERMISSION OF UMA ENGINEERING LTD. DOING BUSINESS AS AECOM ("AECOM") TO PARTY OR A ("AECOM") BUSINESS AS AECOM DOING LTD. ENGINEERING OF UMA PERMISSION WRITTEN THE EXCEPT WITH ANY PURPOSE ANY MANNER OR FOR OR IN USED, MODIFIED REPRODUCED LAW AND MAY COPYRIGHT NOT BE PROTECTED BY DOCUMENT THIS IS WHICH ITS COPYRIGHT HAS BEEN ASSIGNED. AECOM ACCEPTS NO RESPONSIBILITY, AND DENIES ANY LIABILITY WHATSOEVER, TO ANY PARTY THAT USES, REPRODUCES, MODIFIES, OR RELIES ON THIS DOCUMENT WITHOUT CONSENT. WRITTEN EXPRESS AECOM'S Future Transmission System AECOM Alternative 1a Figure 5.4 1r------::::-:::.::.:;..,::,.::...::,.::,.::...:-_::..::...::-::::-:.-:.-:.-:.-:.-:.-:.-:.;.-:.-:.-:..--:-==?:.--""'.',-:,- ----_--- ...-....---.... _------­LEGEND i)( STUDYAREA I 200 - EXISTING PIPE (mm) ,._ 300 .... PROPOSED PIPE (mm) )( ...... - ? - RESERVOIR/PUMP STATION • WATER TREATMENT PLANT • METERVAULT

NOTE COLD LAKE IR 149AAND 149B WILL BE SUPPi.JED FROM THE COI.D LAKE NORTH DISTRIBUTION SYSTEM. 0089-077-00_03-CWF505_RA.dwg Saved By: chaob 0089-077-00_03-CWF505_RA.dwg By: Saved '-NOTE: TRANSMISSION MAINS TO ARDMORE AND COLD LAKER 141 LFl:=.J m SCALE 1:50000 WILL 0 A NOT BE CONNECTED AT THIS LOCATION - - City of Cold Lake Regional Water Supply Functional Plan & Feasibility Study ISS/REV: UMA FILENAME: THIS DOCUMENT IS PROTECTED BY COPYRIGHT LAW AND MAY NOT BE USED, REPRODUCED OR MODIFIED IN ANY MANNER OR FOR ANY PURPOSE EXCEPT WITH THE WRITTEN PERMISSION OF UMA ENGINEERING LTD. DOING BUSINESS AS AECOM ("AECOM") TO OR A PARTY ("AECOM") BUSINESS AS AECOM DOING LTD. ENGINEERING OF UMA PERMISSION WRITTEN THE EXCEPT WITH PURPOSE ANY MANNER ANY OR FOR OR IN USED, MODIFIED REPRODUCED LAW AND MAY COPYRIGHT NOT BE PROTECTED BY DOCUMENT THIS IS WHICH ITS COPYRIGHT HAS BEEN ASSIGNED. AECOM ACCEPTS NO RESPONSIBILITY, AND DENIES ANY LIABILITY WHATSOEVER, TO ANY PARTY THAT USES, REPRODUCES, MODIFIES, OR RELIES ON THIS DOCUMENT WITHOUT CONSENT. WRITTEN EXPRESS AECOM'S Future Transmission System AECOM Cold Lake Supply Alternative 1a Figure 5.5 -?------.,,_--,.,-"T'-..,...-..,..,-;:-?-...,.-..,,.,,- 1r:;;;:;.?-=;;.;?(;-;i:;;-.;-???;-?;;:;-;-;=?(;?????=--;::.;;::=;==;:=.;?------?-----<::J;--::J-;;-'J!if.-?-?-;:.;---?...... 6 ? --""".'--,....-..._------LEGEND >< COLD E ? STUDY AREA ? COLD LAKE WATI 200- EXISTING PIPE (mm) TREATMENT PLAI ?:: 300 >< PROPOSED PIPE (mm) . - - D - RESERVOIR/PUMP STATION - IQ) en? FUTURE BOOSTER STATION CD • WATER TREATMENT PLANT • METER VAULT

...... 0 I § a. 0089-077-00_03-CWF506_RA.dwg Saved By: chaob 0089-077-00_03-CWF506_RA.dwg By: Saved

LFl.::::::::J m SCALE 1:250000 0 2500 5000 A

City of Cold Lake Regional Water Supply Functional Plan & Feasibility Study ISS/REV: UMA FILENAME: THIS DOCUMENT IS PROTECTED BY COPYRIGHT LAW AND MAY NOT BE USED, REPRODUCED OR MODIFIED IN ANY MANNER OR FOR ANY PURPOSE EXCEPT WITH THE WRITTEN PERMISSION OF UMA ENGINEERING LTD. DOING BUSINESS AS AECOM ("AECOM") TO PARTY OR A ("AECOM") BUSINESS AS AECOM DOING LTD. ENGINEERING OF UMA PERMISSION WRITTEN THE EXCEPT WITH ANY PURPOSE ANY MANNER OR FOR OR IN USED, MODIFIED REPRODUCED LAW AND MAY COPYRIGHT NOT BE PROTECTED BY DOCUMENT THIS IS WHICH ITS COPYRIGHT HAS BEEN ASSIGNED. AECOM ACCEPTS NO RESPONSIBILITY, AND DENIES ANY LIABILITY WHATSOEVER, TO ANY PARTY THAT USES, REPRODUCES, MODIFIES, OR RELIES ON THIS DOCUMENT WITHOUT CONSENT. WRITTEN EXPRESS AECOM'S Future Transmission System AECOM Alternative 2 Figure 5.6 ÊE OC? ;;; ..,. LEGEND >< E E STUDY AREA ""'. ....a, 200 £:!. - EXISTING PIPE (mm) 300 ? PROPOSED PIPE (mm) ?>< . ? ? RESERVOIR/PUMP STATION t:,!w? - - en WATER TREATMENT PLANT ai • ? METER VAULT •

COLD LAKE NORTH RESERVOIR NOTE (BUILDING 5) COLD LAKE IR 149A AND 149B WILL BE SUPPLIED FROM THE COLD LAKE FUTURE CLRUSC NORTH DISTRIBUTION SYSTEM. RESERVOIR/ PUMP STATION

FUTURE CLRUSC PUMP STATION

"Y",l;"''nor \_COLDLAKE

..,,.._ --u..a. SOUTH WEST RESERVOIR __ (BUILDING 7)

0089-077-00_03-CWF507_RA.dwg Saved By: chaob 0089-077-00_03-CWF507_RA.dwg By: Saved ? ? NOTE: TRANSMISSION MAINS TO L:Fl::::::::J m SCALE 1:50000 a..I ARDMORE AND FORT KENT WILL 0 A .... 0CJ NOT BE CONNECTED AT THIS LOCATION - City of Cold Lake ...0 i Regional Water Supply Functional Plan & Feasibility Study ISS/REV: UMA FILENAME: THIS DOCUMENT IS PROTECTED BY COPYRIGHT LAW AND MAY NOT BE USED, REPRODUCED OR MODIFIED IN ANY MANNER OR FOR ANY PURPOSE EXCEPT WITH THE WRITTEN PERMISSION OF UMA ENGINEERING LTD. DOING BUSINESS AS AECOM ("AECOM") TO OR A PARTY AS BUSINESS AECOM ("AECOM") DOING LTD. ENGINEERING OF UMA WRITTEN PERMISSION THE WITH EXCEPT PURPOSE MANNER ANY OR FOR IN ANY USED, REPRODUCED OR MODIFIED AND LAW MAY NOT BE PROTECTED BY COPYRIGHT DOCUMENT IS THIS WHICH ITS COPYRIGHT HAS BEEN ASSIGNED. AECOM ACCEPTS NO RESPONSIBILITY, AND DENIES ANY LIABILITY WHATSOEVER, TO ANY PARTY THAT USES, REPRODUCES, MODIFIES, OR RELIES ON THIS DOCUMENT WITHOUT CONSENT. WRITTEN EXPRESS AECOM'S ! Future Transmission System AECOM Cold Lake Supply Alternative 2 Figure 5.7 Î 6 LEGEND i>< COLD STUDY AREA l COLD LAKE WATE 200- EXISTING PIPE (mm) TREATMENT PLAI !::: 300 PROPOSED PIPE (mm) >< ..... RESERVOIR/PUMP STATION .... - ? - IQI FUTURE BOOSTER STATION • WATER TREATMENT PLANT • METER VAULT

I FUTURE CtRUSC ,P???lSTATIO? COLD LAKE SOUTH WEST R?SERVOIR 0089-077-00_03-CWF508_RA.dwg Saved By: chaob 0089-077-00_03-CWF508_RA.dwg By: Saved

LFl.::::::::J m SCALE 1:250000 0 2500 5000 A

City of Cold Lake Regional Water Supply Functional Plan & Feasibility Study ISS/REV: UMA FILENAME: THIS DOCUMENT IS PROTECTED BY COPYRIGHT LAW AND MAY NOT BE USED, REPRODUCED OR MODIFIED IN ANY MANNER OR FOR ANY PURPOSE EXCEPT WITH THE WRITTEN PERMISSION OF UMA ENGINEERING LTD. DOING BUSINESS AS AECOM ("AECOM") TO PARTY OR A ("AECOM") BUSINESS AS AECOM DOING LTD. ENGINEERING OF UMA PERMISSION WRITTEN THE EXCEPT WITH ANY PURPOSE ANY MANNER OR FOR OR IN USED, MODIFIED REPRODUCED LAW AND MAY COPYRIGHT NOT BE PROTECTED BY DOCUMENT THIS IS WHICH ITS COPYRIGHT HAS BEEN ASSIGNED. AECOM ACCEPTS NO RESPONSIBILITY, AND DENIES ANY LIABILITY WHATSOEVER, TO ANY PARTY THAT USES, REPRODUCES, MODIFIES, OR RELIES ON THIS DOCUMENT WITHOUT CONSENT. WRITTEN EXPRESS AECOM'S Future Transmission System AECOM Alternative 3 Figure 5.8 ÊE OC? ;;; ..,. LEGEND >< E E STUDY AREA ""'. ....a, 200 £:!. - EXISTING PIPE (mm) 300 ? PROPOSED PIPE (mm) ?>< . ? ? RESERVOIR/PUMP STATION t:,!w? - - en WATER TREATMENT PLANT ai • ? METER VAULT •

COLD LAKE NORTH RESERVOIR NOTE (BUILDING 5) COLD LAKE IR 149A AND 149B WILL BE SUPPLIED FROM THE COLD FUTURE CLRUSC LAKE NORTH DISTRIBUTION RESERVOIR/ SYSTEM. PUMP STATION

FUTURE CLRUSC PUMP STATION 0089-077-00_03-CWF509_RA.dwg Saved By: chaob 0089-077-00_03-CWF509_RA.dwg By: Saved

NOTE: TRANSMISSION MAINS TO m SCALE 1:50000 ARDMORE AND COLD LAKE IR 149 0 500 1000 A WILL NOT BE CONNECTED AT THIS LOCATION City of Cold Lake Regional Water Supply Functional Plan & Feasibility Study ISS/REV: UMA FILENAME: THIS DOCUMENT IS PROTECTED BY COPYRIGHT LAW AND MAY NOT BE USED, REPRODUCED OR MODIFIED IN ANY MANNER OR FOR ANY PURPOSE EXCEPT WITH THE WRITTEN PERMISSION OF UMA ENGINEERING LTD. DOING BUSINESS AS AECOM ("AECOM") TO OR A PARTY AS BUSINESS AECOM ("AECOM") DOING LTD. ENGINEERING OF UMA WRITTEN PERMISSION THE WITH EXCEPT PURPOSE MANNER ANY OR FOR IN ANY USED, REPRODUCED OR MODIFIED AND LAW MAY NOT BE PROTECTED BY COPYRIGHT DOCUMENT IS THIS WHICH ITS COPYRIGHT HAS BEEN ASSIGNED. AECOM ACCEPTS NO RESPONSIBILITY, AND DENIES ANY LIABILITY WHATSOEVER, TO ANY PARTY THAT USES, REPRODUCES, MODIFIES, OR RELIES ON THIS DOCUMENT WITHOUT CONSENT. WRITTEN EXPRESS AECOM'S Future Transmission System AECOM Cold Lake Supply Alternative 3 Figure 5.9 LEGEND

STUDY AREA 1.7 {0,10) COLD LAKEWATE - EXISTING PIPE c/w FLOW (Us) TREATMENT PLAI AND VELOCITY (mis) 1.7 (0.10} PROPOSED PIPE c/w FLOW (Lls) - - AND VELOCITY (mis) ? RESERVOIR/PUMP STATION IOI FUTURE BOOSTER STATION • WATER TREATMENT PLANT • METER VAULT

4 WING COLD LAKE RESERVOIR I NOTE FUTURE CtRUSC STATIO? ,P???l FLOW RATE IS 2.0xADD COLD LAKE SOUTH WEST ?SERVOIR FOR 2032 AND VELOCITY IS SHOWN IN BRACKETS l I I I 0089-077-00_03-CWF510_RA.dwg Saved By: chaob 0089-077-00_03-CWF510_RA.dwg By: Saved

m SCALE 1:250000 0LFL:::J2800 8000 A

City of Cold Lake Regional Water Supply Functional Plan & Feasibility Study ISS/REV: UMA FILENAME: THIS DOCUMENT IS PROTECTED BY COPYRIGHT LAW AND MAY NOT BE USED, REPRODUCED OR MODIFIED IN ANY MANNER OR FOR ANY PURPOSE EXCEPT WITH THE WRITTEN PERMISSION OF UMA ENGINEERING LTD. DOING BUSINESS AS AECOM ("AECOM") TO OR A PARTY ("AECOM") BUSINESS AS AECOM DOING LTD. ENGINEERING OF UMA PERMISSION WRITTEN THE EXCEPT WITH PURPOSE MANNER ANY OR FOR ANY IN USED, REPRODUCED OR MODIFIED LAW AND MAY NOT BE PROTECTED BY DOCUMENT COPYRIGHT THIS IS WHICH ITS COPYRIGHT HAS BEEN ASSIGNED. AECOM ACCEPTS NO RESPONSIBILITY, AND DENIES ANY LIABILITY WHATSOEVER, TO ANY PARTY THAT USES, REPRODUCES, MODIFIES, OR RELIES ON THIS DOCUMENT WITHOUT CONSENT. WRITTEN EXPRESS AECOM'S Future Transmission System AECOM Pipe Flow Rates Alternative 1 Figure 5.10 i 6 ij LEGEND >< COLD E ? STUDY AREA 1.710.101 lS COLD LAKEWATE - EXISTING PIPE c/w FLOW (Us) TREATMENT PLAI f: AND VELOCITY (mis) >< 1.710.101 PROPOSED PIPE c/w FLOW (Us) . - - AND VELOCITY (mis) - - ? RESERVOIR/PUMP STATION IQI FUTURE BOOSTER STATION • WATER TREATMENT PLANT • METER VAULT

I NOTE FUTURE CtRUSC STATIO? ,P???l FLOW RATE IS 2.0xADD COLD LAKE SOUTH WEST R??ERVOIR FOR 2032 AND VELOCITY IS SHOWN IN BRACKETS li I I 0089-077-00_03-CWF511_RA.dwg Saved By: chaob 0089-077-00_03-CWF511_RA.dwg By: Saved

m SCALE 1:250000 A 0L.FL::::J2500 5000 City of Cold Lake Regional Water Supply Functional Plan & Feasibility Study ISS/REV: UMA FILENAME: THIS DOCUMENT IS PROTECTED BY COPYRIGHT LAW AND MAY NOT BE USED, REPRODUCED OR MODIFIED IN ANY MANNER OR FOR ANY PURPOSE EXCEPT WITH THE WRITTEN PERMISSION OF UMA ENGINEERING LTD. DOING BUSINESS AS AECOM ("AECOM") TO OR A PARTY ("AECOM") BUSINESS AS AECOM DOING LTD. ENGINEERING OF UMA PERMISSION WRITTEN THE EXCEPT WITH PURPOSE MANNER ANY OR FOR ANY IN USED, REPRODUCED OR MODIFIED LAW AND MAY NOT BE PROTECTED BY DOCUMENT COPYRIGHT THIS IS WHICH ITS COPYRIGHT HAS BEEN ASSIGNED. AECOM ACCEPTS NO RESPONSIBILITY, AND DENIES ANY LIABILITY WHATSOEVER, TO ANY PARTY THAT USES, REPRODUCES, MODIFIES, OR RELIES ON THIS DOCUMENT WITHOUT CONSENT. WRITTEN EXPRESS AECOM'S Future Transmission System AECOM Pipe Flow Rates Alternative 1a Figure 5.11 i 6 ij LEGEND >< COLD E ? STUDY AREA lS COLD LAKE WATI 1.qo.101- EXISTING PIPE c/w FLOW (Us) f: TREATMENT PLAI AND VELOCITY (mis) >< 1.7 (0.10} PROPOSED PIPE c/w FLOW (Us) . - - AND VELOCITY (mis) - - ? RESERVOIR/PUMP STATION IQ) FUTURE BOOSTER STATION • WATER TREATMENT PLANT • METER VAULT

I NOTE FUTUR? CtRUSC STATIO? ,P???l FLOW RATE IS 2.0xADD COLD LAKE SOUTH WEST RE,SERVOIR FOR 2032 AND VELOCITY IS SHOWN IN BRACKETS 0089-077-00_03-CWF512_RA.dwg Saved By: chaob 0089-077-00_03-CWF512_RA.dwg By: Saved

m SCALE 1:250000 0LFL:::J2500 5000 A

City of Cold Lake Regional Water Supply Functional Plan & Feasibility Study ISS/REV: UMA FILENAME: THIS DOCUMENT IS PROTECTED BY COPYRIGHT LAW AND MAY NOT BE USED, REPRODUCED OR MODIFIED IN ANY MANNER OR FOR ANY PURPOSE EXCEPT WITH THE WRITTEN PERMISSION OF UMA ENGINEERING LTD. DOING BUSINESS AS AECOM ("AECOM") TO OR A PARTY ("AECOM") BUSINESS AS AECOM DOING LTD. ENGINEERING OF UMA PERMISSION WRITTEN THE EXCEPT WITH PURPOSE MANNER ANY OR FOR ANY IN USED, REPRODUCED OR MODIFIED LAW AND MAY NOT BE PROTECTED BY DOCUMENT COPYRIGHT THIS IS WHICH ITS COPYRIGHT HAS BEEN ASSIGNED. AECOM ACCEPTS NO RESPONSIBILITY, AND DENIES ANY LIABILITY WHATSOEVER, TO ANY PARTY THAT USES, REPRODUCES, MODIFIES, OR RELIES ON THIS DOCUMENT WITHOUT CONSENT. WRITTEN EXPRESS AECOM'S Future Transmission System AECOM Pipe Flow Rates Alternative 2 Figure 5.12 i 6 ij LEGEND >< COLD E ? STUDY AREA 1.7 (0.10) lS COLD LAKE WATE EXISTING PIPE c/w FLOW (Us) TREATMENT PLAI f: AND VELOCITY (mis) >< 1.7 (0.10) PROPOSED PIPE c/w FLOW (Lls) . --- AND VELOCITY (mis) - - ? RESERVOIR/PUMP STATION IOI FUTURE BOOSTER STATION • WATER TREATMENT PLANT • METER VAULT

I NOTE FUTURE CtRUSC STATIO? ,P???l FLOW RATE IS 2.0xADD COLD LAKE SOUTH WEST ?SERVOIR FOR 2032 AND VELOCITY IS SHOWN IN BRACKETS 0089-077-00_03-CWF513_RA.dwg Saved By: chaob 0089-077-00_03-CWF513_RA.dwg By: Saved

m SCALE 1:250000 0LFL:::J2500 5000 A

City of Cold Lake Regional Water Supply Functional Plan & Feasibility Study ISS/REV: UMA FILENAME: THIS DOCUMENT IS PROTECTED BY COPYRIGHT LAW AND MAY NOT BE USED, REPRODUCED OR MODIFIED IN ANY MANNER OR FOR ANY PURPOSE EXCEPT WITH THE WRITTEN PERMISSION OF UMA ENGINEERING LTD. DOING BUSINESS AS AECOM ("AECOM") TO OR A PARTY ("AECOM") BUSINESS AS AECOM DOING LTD. ENGINEERING OF UMA PERMISSION WRITTEN THE EXCEPT WITH PURPOSE MANNER ANY OR FOR ANY IN USED, REPRODUCED OR MODIFIED LAW AND MAY NOT BE PROTECTED BY DOCUMENT COPYRIGHT THIS IS WHICH ITS COPYRIGHT HAS BEEN ASSIGNED. AECOM ACCEPTS NO RESPONSIBILITY, AND DENIES ANY LIABILITY WHATSOEVER, TO ANY PARTY THAT USES, REPRODUCES, MODIFIES, OR RELIES ON THIS DOCUMENT WITHOUT CONSENT. WRITTEN EXPRESS AECOM'S Future Transmission System AECOM Pipe Flow Rates Alternative 3 Figure 5.13 6 LEGEND COLD STUDY AREA COLD LAKE WATER 200 EXISTING PIPE (mm) TREATMENT PLANT 300 PROPOSED PIPE (mm) ? RESERVOIR/PUMP STATION IQ! !:::!w FUTURE BOOSTER STATION en m • WATER TREATMENT PLANT • METER VAULT

.. J • COLD LAKE SOUTH, WEST--RE,SERVOIR 0089-077-00_03-CWF514_RA.dwg Saved By: chaob 0089-077-00_03-CWF514_RA.dwg By: Saved

L:::F=L:::J m SCALE 1:250000 0 2500 5000 A

City of Cold Lake Regional Water Supply Functional Plan & Feasibility Study ISS/REV: UMA FILENAME: THIS DOCUMENT IS PROTECTED BY COPYRIGHT LAW AND MAY NOT BE USED, REPRODUCED OR MODIFIED IN ANY MANNER OR FOR ANY PURPOSE EXCEPT WITH THE WRITTEN PERMISSION OF UMA ENGINEERING LTD. DOING BUSINESS AS AECOM ("AECOM") TO PARTY OR A ("AECOM") BUSINESS AS AECOM DOING LTD. ENGINEERING OF UMA PERMISSION WRITTEN THE EXCEPT WITH ANY PURPOSE ANY MANNER OR FOR OR IN USED, MODIFIED REPRODUCED LAW AND MAY COPYRIGHT NOT BE PROTECTED BY DOCUMENT THIS IS WHICH ITS COPYRIGHT HAS BEEN ASSIGNED. AECOM ACCEPTS NO RESPONSIBILITY, AND DENIES ANY LIABILITY WHATSOEVER, TO ANY PARTY THAT USES, REPRODUCES, MODIFIES, OR RELIES ON THIS DOCUMENT WITHOUT CONSENT. WRITTEN EXPRESS AECOM'S Future Transmission System AECOM Recommended Alternative Figure 5.14 ÊE «! ;;; LEGEND ...>< E E STUDY AREA "": a, 200 .... - EXISTING PIPE (mm) ? 300 ? PROPOSED PIPE (mm) ?>< :r . D RESERVOIR/PUMP STATION ?t:::!w - - [Q) en FUTURE BOOSTER STATION ai • WATER TREATMENT PLANT ' • METER VAULT NORTH RESERVOIR (BUILDING 5) NOTE COLD LAKE IR 149AAND 149B WILL BE SUPPLIED FROM THE COLD LAKE NORTH DISTRIBUTION SYSTEM. 0089-077-00_03-CWF515_RA.dwg Saved By: chaob 0089-077-00_03-CWF515_RA.dwg By: Saved

NOTE: TRANSMISSION MAINS TO ARDMORE m SCALE 1:50000 0 500 1000 A 9 AND COLD LAKE IR 149 WILL NOT BE CJ0 CONNECTED AT THIS LOCATION City of Cold Lake e Regional Water Supply Functional Plan & Feasibility Study

ISS/REV: UMA FILENAME: i THIS DOCUMENT IS PROTECTED BY COPYRIGHT LAW AND MAY NOT BE USED, REPRODUCED OR MODIFIED IN ANY MANNER OR FOR ANY PURPOSE EXCEPT WITH THE WRITTEN PERMISSION OF UMA ENGINEERING LTD. DOING BUSINESS AS AECOM ("AECOM") TO OR A PARTY ("AECOM") BUSINESS AS AECOM DOING LTD. ENGINEERING OF UMA PERMISSION WRITTEN THE EXCEPT WITH PURPOSE ANY MANNER ANY OR FOR OR IN USED, MODIFIED REPRODUCED LAW AND MAY COPYRIGHT NOT BE PROTECTED BY DOCUMENT THIS IS WHICH ITS COPYRIGHT HAS BEEN ASSIGNED. AECOM ACCEPTS NO RESPONSIBILITY, AND DENIES ANY LIABILITY WHATSOEVER, TO ANY PARTY THAT USES, REPRODUCES, MODIFIES, OR RELIES ON THIS DOCUMENT WITHOUT CONSENT. WRITTEN EXPRESS AECOM'S Future Transmission System AECOM Cold Lake Supply Recommended Alternative ? Figure 5.15 jr--;!"-\Î?_,-:-ï-?---lï-lil:?!!-?-r,-"1_-:::_:,_,,:i_!l')_l-_t"_t"_l?---"tl?----"'t-=-,..-'.?-"\:-l'"'?"1-t"-_-_-T-?-•-,:-?-?-"l'-.,.-?-""1-..,..-_-_-t.,_.--.,..-?- .. ...-F-"'r_""_""_-'_l"'_""'_""_l:!,_?---?------6------.;; LEGEND ..,. >< COLD E E STUDY AREA ""'. 1.7 (0.10) COLD LAKE WATER - EXISTING PIPE c/w FLOW (Us) ? TREATMENT PLANT ? AND VELOCITY (mis) ?>< 1.7 (0.10} PROPOSED PIPE c/w FLOW (Us) . - - AND VELOCITY (mis) ? ? RESERVOIR/PUMP STATION IQ) FUTURE BOOSTER STATION • WATER TREATMENT PLANT • METER VAULT

4 WING COLD LAKE RESERVOIR I NOTE

FUTURE CtRUSC ,PUM? STATION , ? • ? FLOW RATE IS 2.0xADD COLD LAKE SOUTH WEST ?SERVOIR I' FOR 2032 AND VELOCITY I B,£Ave.,r'!!i;R;,i,i?.,-.. IS SHOWN IN BRACKETS l I I I n_ 0089-077-00_03-CWF516_RA.dwg Saved By: chaob 0089-077-00_03-CWF516_RA.dwg By: Saved

m SCALE 1:250000 0LFL::.J2500 5000 A

City of Cold Lake Regional Water Supply Functional Plan & Feasibility Study ISS/REV: UMA FILENAME: THIS DOCUMENT IS PROTECTED BY COPYRIGHT LAW AND MAY NOT BE USED, REPRODUCED OR MODIFIED IN ANY MANNER OR FOR ANY PURPOSE EXCEPT WITH THE WRITTEN PERMISSION OF UMA ENGINEERING LTD. DOING BUSINESS AS AECOM ("AECOM") TO OR A PARTY ("AECOM") BUSINESS AS AECOM DOING LTD. ENGINEERING OF UMA PERMISSION WRITTEN THE EXCEPT WITH PURPOSE MANNER ANY OR FOR ANY IN USED, REPRODUCED OR MODIFIED LAW AND MAY NOT BE PROTECTED BY DOCUMENT COPYRIGHT THIS IS WHICH ITS COPYRIGHT HAS BEEN ASSIGNED. AECOM ACCEPTS NO RESPONSIBILITY, AND DENIES ANY LIABILITY WHATSOEVER, TO ANY PARTY THAT USES, REPRODUCES, MODIFIES, OR RELIES ON THIS DOCUMENT WITHOUT CONSENT. WRITTEN EXPRESS AECOM'S Future Transmission System AECOM Pipe Flow Recommended Alternative Figure 5.16 COLD LAKE WATER TREATMENT PLANT

!:::!w en m

LEGEND STUDY AREA 200 ,') EXISTING PIPE (mm) 300 PROPOSED PIPE (mm) D RESERVOIR/PUMP STATION • WATER TREATMENT PLANT • METER VAULT 0089-077-00_03-CWF517_RA.dwg Saved By: chaob 0089-077-00_03-CWF517_RA.dwg By: Saved

m SCALE 1:125000 0L:FL::::J1250 2500 A

City of Cold Lake Regional Water Supply Functional Plan & Feasibility Study ISS/REV: UMA FILENAME: THIS DOCUMENT IS PROTECTED BY COPYRIGHT LAW AND MAY NOT BE USED, REPRODUCED OR MODIFIED IN ANY MANNER OR FOR ANY PURPOSE EXCEPT WITH THE WRITTEN PERMISSION OF UMA ENGINEERING LTD. DOING BUSINESS AS AECOM ("AECOM") TO PARTY OR A ("AECOM") BUSINESS AS AECOM DOING LTD. ENGINEERING OF UMA PERMISSION WRITTEN THE EXCEPT WITH ANY PURPOSE ANY MANNER OR FOR OR IN USED, MODIFIED REPRODUCED LAW AND MAY COPYRIGHT NOT BE PROTECTED BY DOCUMENT THIS IS WHICH ITS COPYRIGHT HAS BEEN ASSIGNED. AECOM ACCEPTS NO RESPONSIBILITY, AND DENIES ANY LIABILITY WHATSOEVER, TO ANY PARTY THAT USES, REPRODUCES, MODIFIES, OR RELIES ON THIS DOCUMENT WITHOUT CONSENT. WRITTEN EXPRESS AECOM'S Future Transmission System Stage 1 AECOM Recommended Alternative Figure 5.17 AECOM

6.0 Water Treatment

6.1 General

This section discusses the existing water treatment system as well as the design criteria and options for plant expansion through the year 2032. Conceptual cost estimates are presented for the different alternatives and a preferred expansion option is recommended.

6.2 Design Criteria

Projected water demand is based on the population growth for the region and has been evaluated for a 5 year (2012) and 25 year (2032) population growth horizon. As detailed in Table 6.1, the ADD in year 2032 is projected to be approximately 19 ML/d. Applying a peaking factor of 2, the corresponding MDD was projected to be approximately 37 ML/d.

Table 6.1: Water Treatment Design Criteria

Average Day Demand Maximum Day Demand** Year ML/d L/s ML/d L/s 2006 9.50 110 18.9 219 2012* 10.9 126 21.8 252 2032* 18.6 215 37.2 430 * Based on a demand of 375 L/person/day ** Based on a peaking factor of 2

Water demands were determined using the aggregate demand from the serviced communities as described in Section 5. Demands in 2006 are based on existing water usage where projected demands of 2012 and 2032 assume a per capita water demand of 375 L/s.

6.3 Existing System Description

The Cold Lake Water Treatment Plant was upgraded in 2004 with immersed membrane modules supplied by GE Zenon. Prior to 2004, the existing water treatment plant consisted of sand filtration and chlorination. Two membrane trains of five cassettes were installed with provisional tankage for a third train. The treatment plant upgrade provided a production capacity of 22 ML/d. The addition of the third train of the same membranes would increase production by 11 ML/d. The site plan and existing layout of the existing treatment facility are shown in Figure 6.1 and Figure 6.2, respectively.

Permeate is collected in a 400 mm header feeding a clearwell located under the treatment plant. Backwash water (treated) is drawn from two pumps on the west end of the clearwell. Two separate distribution systems draw from the clearwell, a 500 mm line with two pumps feeding the Cold Lake North Reservoir, and 300 mm and 400 mm distribution lines with two pumps supplying 4 Wing Cold Lake and other reservoirs downstream of the Cold Lake meter vault.

The City is serviced by water pumped out of the Cold Lake North Reservoir, and the Cold Lake Southeast and Southwest Reservoirs (downstream of the Cold Lake meter vault).

RPT2-0089-077-00-FINAL-090227.DOC WATER TREATMENT 59 COLD LAKE REGIONAL UTILITY SERVICES COMMISSION REGIONAL WATER SUPPLY FUNCTIONAL PLAN & FEASIBILITY STUDY

6.4 Installed Membranes

The existing membrane trains consists of five cassettes, each made up of 81 modules. Every module contains over 37 m2 of membrane fibre surface area. Each membrane tank was designed to accommodate 6 cassettes so that in the event that 5 cassettes could not provide the designed output of 11 ML/d, a sixth cassette could be added. The design intent was not to provide an additional cassette worth of capacity and as such, the associated equipment may be undersized for flows beyond 11 ML/d per train. An allowance was built into the system in order to account for cleaning time (regular, maintenance, and clean in place) and integrity testing, while still providing 11 ML/d.

The City of Cold Lake has a ten year contract with GE Zenon initialized in September, 2004. Under the terms of the contract, modules can be replaced at a unit cost of $700. 810 modules were provided at the beginning of the contract.

The existing membrane trains are denoted Version 2 by GE Zenon, and Version 3 membranes are now available. Version 3 trains offer the advantage of a greater membrane fibre packing density and therefore greater water production. A 5 cassette, 81 module train of Version 3 membranes would provide 13.7 ML/d (accounting for downtime related to cleaning and integrity testing), compared to the 11 ML/d available with the Version 2 membranes. Three trains of 5 cassette Version 3 membranes would produce 41 ML/d versus the 33 ML/d available with the equivalent Version 2 membranes.

Version 3 membrane trains are of a different configuration than Version 2 membranes and it is not possible to install Version 3 membrane modules into a Version 2 frame. In order to retrofit existing Version 2 membranes, the entire cassette would have to be removed.

6.5 Water Treatment Concepts

There are a number of challenges with the existing treatment system that need to be considered when looking at long term options for the facility. In particular:

• the plant is approaching its design capacity of 254 L/s (22 ML/d), likely exceeding it by 2010, and • there is limited space within the existing structure for additional equipment, including the permeate pump and associated piping for the third membrane train.

Two water treatment alternatives were conceptually planned to provide capacity through the year 2032 and address the water treatment concerns of the current facility. Long term plant capacity can be addressed after the distribution changes and the construction of the recommended regional pumphouse. Capacity can be addressed in one of two ways, described as Long Term Alternative 1 and 2 in the subsequent sections.

The first would involve filling out the existing tankage with higher production membranes. In order to accommodate 2032 flows and the associated equipment in this scenario, a small expansion would be necessary to house the transfer pumps. The second alternative would involve the construction of a new facility adjacent to the regional reservoir. The new water treatment plant would use the existing facility as a raw water pumphouse.

RPT2-0089-077-00-FINAL-090227.DOC WATER TREATMENT 60 COLD LAKE REGIONAL UTILITY SERVICES COMMISSION REGIONAL WATER SUPPLY FUNCTIONAL PLAN & FEASIBILITY STUDY

6.5.1 Initial Pumping and Piping Modifications

Before long term expansion is considered, there are short term modifications to the existing system that are necessary as part of the regional planning recommended in Section 5 that have implications on the transfer piping leaving the water treatment plant.

As part of regionalization, a new pumphouse and reservoir are recommended. The existing 4 Wing distribution lines would be redirected to the new reservoir with treated water metered to 4 Wing, the Cold Lake reservoirs, and various other communities from the new reservoir.

6.5.2 Long Term Alternative 1

The first alternative involves filling out the existing tankage and modifying the remaining trains to accommodate 2032 demands. As the plant is approaching its existing capacity, the addition of a third membrane train and its associated equipment will be necessary by 2012. Space in the existing treatment plant is limited, and the fire pump will have to be removed in the first phase to make room for the third permeate pump. Fire flow capacity can then be provided at the future regional pumphouse.

The addition of a third membrane train (Version 3) would provide a plant capacity of approximately 36 ML/d, sufficient to meet projected demands to 2030. As long as the equipment for the third train is in place, all of the membrane modules do not need to be installed in 2012 and additional capacity can be installed as required into the third membrane frame.

Additional demand can be made up before that time by installing higher capacity trains in place of the existing trains. However, as the permeate pumps and piping were designed for 11 ML/d, the existing membrane equipment (pumps and piping) may have to be replaced if a retrofit were to occur.

In conjunction with the capacity expansion, the transfer pumping would have to be upgraded to provide the necessary capacity for flows through 2032. As there is limited space within the existing building, a small addition would have to be built with an associated pumpwell off of the northwest wall. Three new transfer pumps would be installed and connected to distribution piping in the existing facility. As part of the initial piping modifications, the distribution piping would be sized and oriented to allow the future pumping addition.

It will be difficult to accommodate flows beyond 2032 in the existing facility as there would be limited further expansion capability. In order to increase capacity, another building addition would be necessary (towards Cold Lake), or a new treatment plant would have to be built. An analysis of these options is not part of the scope of the present project and should be undertaken when appropriate. However, allowances for a building expansion towards the lake would be prudent as part of the present expansion if Alternative 1 were to be pursued.

6.5.3 Long Term Alternative 2(a)

The second alternative would see a new water treatment plant constructed on the same site as the future regional pumphouse and reservoir. The new facility would be designed to accommodate flows through 2032 and beyond using the same general design as the existing water treatment plant, but with more space for the existing equipment and provisions for expansion beyond 2032.

RPT2-0089-077-00-FINAL-090227.DOC WATER TREATMENT 61 COLD LAKE REGIONAL UTILITY SERVICES COMMISSION REGIONAL WATER SUPPLY FUNCTIONAL PLAN & FEASIBILITY STUDY

If a new water treatment plant were built, the existing plant would serve as a pumphouse and raw water reservoir. Raw water would be pumped to the water treatment plant using the new lines to the recommended reservoir beside the Cold Lake North Reservoir. The water treatment facility would be tied into both the regional reservoir and the Cold Lake North Reservoir.

The treatment plant would be designed for a capacity of 40 ML/d using the same configuration and tankage as the existing plant, with provisions made to expand the plant further. Existing pumps and water treatment equipment (including membrane cassettes) would be transferred to the new facility were possible.

The timing of construction of the new treatment plant needs to be carefully considered as the City must meet the MDD during construction and commissioning. If demands allow, the option exists to build a new treatment plant before the addition of the third train. As the existing capacity will likely be reached by 2012, a new facility would have to be online by that time if additional capacity is not added to the existing treatment plant.

This timing would negate the need to upgrade the existing water treatment plant to meet short term demand only to have to abandon it in the future. Furthermore, it would allow the phased relocation of the existing membrane equipment. A new membrane train would be installed in the new water treatment plant, allowing each of the existing trains to be transferred one at a time while maintaining adequate treatment capacity.

6.5.4 Long Term Alternative 2(b)

A variation of the second alternative involves modified timing, as it may not be possible to construct a new water treatment plant before the addition of membranes is necessary. Construction would be deferred until after additional membranes are put in place. Capacity could be installed in one of two ways, with a third membrane train, or the addition of modules in the existing two trains.

If incremental capacity is added to the existing system, construction of a new treatment plant could be delayed to the point when demand exceeds the additional installed capacity. This will involve the addition of a sixth cassette in one or both of the existing tanks. The cassettes would operate with lower production (fewer modules) than the existing cassettes while fitting within the limits of the existing pumping and other equipment. In order to pursue this option, the capacity of the permeate pumps and piping of each train will have to be evaluated.

If a full treatment train is put in place in the short term, construction of a new water treatment plant could be delayed until the capacity of the transfer pumps is reached. At that time, and if Alternative 1 is not explored, a new water treatment plant will be necessary. However, to maintain sufficient water supply, a fourth membrane train may have to be installed in the new treatment plant so that the existing trains can be transferred without compromising the ability to provide MDD flows.

RPT2-0089-077-00-FINAL-090227.DOC WATER TREATMENT 62 COLD LAKE REGIONAL UTILITY SERVICES COMMISSION REGIONAL WATER SUPPLY FUNCTIONAL PLAN & FEASIBILITY STUDY AECOM

6.5.5 Redundancy

In both alternatives, the upgrading concepts are planned so that there is one redundant transfer pump and the ability to achieve MDD with full membrane treatment capacity. If a membrane train is out of service, potentially due to a permeate pump failure, the water treatment plant will be capable of achieving ADD production (at a minimum). Rather than providing a redundant membrane train, it would be more cost effective to have spare equipment available so that any service disruption can be dealt with quickly.

After the installation of a third membrane train, the water treatment plant will have close to a fully redundant train, depending on how many modules are placed in the train. As demand grows, this redundancy will be reduced until 2030, when it is projected that the MDD capacity will be reached. It may be possible to temporarily push the membranes in service to operate at a higher flux to meet demands. However, operating at a higher flux will result in a faster rate of fouling and may require more frequent cleaning.

6.6 Conceptual Cost Estimates

6.6.1 Operations and Maintenance Costs

Operations and maintenance costs associated with the water treatment plant include utility and chemical costs, membrane, mechanical, and instrumentation maintenance, operations labour, and indirect costs (including insurance, overhead, water quality testing, and vehicles). Ultimately, these will not differ between options as the chemical, power, and maintenance costs will be proportional to the amount of water produced. However, in order to provide life cycle costs of the two alternatives, the operations and maintenance costs are considered. Including utilities, chemicals, maintenance, labour, and overhead, the operations and maintenance costs were estimated to be $1,200,000 per year ($800,000 operations and $400,000 maintenance).

6.6.2 Capital Costs

Table 6.2 summarizes the present worth cost estimates for each of the alternatives, including capital costs but excluding operation and maintenance (O&M) costs. As the operations and maintenance costs of both options are assumed to be equal, they have no impact in an overall cost comparison. Preliminary cost estimates are detailed in Appendix D.

Table 6.2: Water Transmission System Cost Estimate Summary

Alternative Present Worth Capital Present Worth O&M Total Present Worth Alternative 1 $5,270,000 $ - $5,270,000 Alternative 2 $8,258,000 $ - $8,258,000 Notes: 1. Costs based on upgrades taking place in 2012 and 2030 2. Present worth values calculated using a discounting factor of 4% 3. O&M costs not considered as they are equal in both cases

RPT2-0089-077-00-FINAL-090227.DOC WATER TREATMENT 63 COLD LAKE REGIONAL UTILITY SERVICES COMMISSION REGIONAL WATER SUPPLY FUNCTIONAL PLAN & FEASIBILITY STUDY AECOM

The cost estimates are presented in present worth dollars and include the addition of three new 13.7 ML membrane treatment trains (one in 2012 and two more in 2030). Alternative 1 costs include the initial piping and pumping modifications, and the installation of one membrane train in 2012, followed by a building addition, new transfer pumps, and two membrane trains in 2030. It should be noted that the building addition and the new transfer pumps may be necessary before 2030.

The Alternative 2 estimate considers the immediate construction of a new facility (Alternative 2a), transfer pumping to the new reservoir and the Cold Lake North Reservoir, and new chemical addition equipment. For both alternatives, the plant capacity will be approximately 41 ML/d, providing enough production to meet the projected demands of 2032.

The costs per membrane train, at approximately $1,750,000 each, include all of the associated equipment (pumps and piping) and constitute the majority of the costs of both alternatives. Without the replacement of the second and third membrane trains after 2030, the costs of Alternative 1 and Alternative 2 come to $3,197,000 and $6,186,000, respectively.

It may be possible to significantly reduce the costs of the second alternative if membrane equipment could be transferred to the new water treatment plant (without service disruption). However, these potential cost savings may be negated by having to replace the trains for other reasons beyond 2030, when the retrofits of the two existing trains of Alternative 1 will take place.

6.7 Evaluation of Alternatives

The first alternative offers the advantages of being able to use the existing facility without the disruption of constructing and costs of a new facility. Furthermore, after the installation of the third membrane treatment train, the treatment plant would have the membrane capacity to meet the regional projected MDD to 2030. Before that time, demand projections and membrane treatment technology can be reassessed, ensuring the best option is selected. The advantages and disadvantages of the two development options are presented in Table 6.3.

Table 6.3: Comparison of Upgrading Options

• Alternative 1 Alternative 2 y Use existing facility and tankage y Eliminate space limitations y Lower cost y Better site conditions y Only have to install one membrane train before y Provide better plant layout and access to 2030 equipment

Advantages y Ability to reassess flows before major expansion y Have room for expansion beyond 2032 y Reduced environmental impact y Reduced pumping costs y Poor mobility around existing and future equipment y Have to convert a relatively newly refurnished plant not addressed to a raw water pumphouse y Further expansion beyond 2032 difficult and may y May have to purchase 4th membrane train before it ultimately have to build a new facility is actually necessary y Timing may pose a challenge Disadvantages y Higher cost

RPT2-0089-077-00-FINAL-090227.DOC WATER TREATMENT 64 COLD LAKE REGIONAL UTILITY SERVICES COMMISSION REGIONAL WATER SUPPLY FUNCTIONAL PLAN & FEASIBILITY STUDY

The disadvantage of the first alternative is the expense involved in replacing the existing membrane trains within the current tanks, necessary beyond the projected demands of 2030. The production increase of replacing an existing train with one of higher fiber density is far less than if a new train was simply added in a fourth tank. The limited cost savings to do this make it difficult to justify retrofitting the existing membrane tanks. However, the membrane trains will be over 20 years old and the equipment may have to be replaced regardless of the selected upgrading option.

The primary advantage of Alternative 2 is the elimination of space concerns at the existing sites, while providing space for expansion beyond 2032. It would also reduce pumping costs as the transfer pump expansion in 2032 would not be necessary.

6.8 Recommended Water Treatment Alternative

The two options available to the Commission involve either constructing a new water treatment plant or extending the life of the existing facility through membrane and transfer pumping upgrades. Both alternatives meet the necessary requirements for the future development conditions within the study area.

Although it may be ultimately necessary to build a new facility or construct a major addition to the existing plant, these upgrades are not necessary until flows beyond those projected in 2032 are experienced and are therefore not recommended at this time. With the addition of a membrane train and associated equipment capable of supplying a flow of 13.7 ML/d, the plant is capable of meeting the MDD until 2030. Beyond that time, it will be necessary to replace both existing trains with higher density membranes (or expand the treatment plant).

Due to the cost savings over the planning horizon and the ability to use the existing facility and equipment, Alternative 1 is the recommended water treatment concept. Implementing Alternative 1 gives the Commission the greatest long term flexibility, provides the potential for cost savings over the long term, and satisfies the short and mid-term demands at a lower cost than Alternative 2. It also allows the Commission the ability to re-evaluate the water demands and the available treatment alternatives before a major plant expansion is undertaken.

6.9 Conceptual Design of Preferred Alternative

Demands are expected to exceed the existing plant capacity by 2012, and the installation of a third membrane train (with a capacity of 13.7 ML/d) is recommended at that time. With its installation, projected 2012 demands will be easily met. Retrofitting the existing membrane tanks will have to be completed by 2030.

Modifications to the transfer pumping and the addition of a building expansion will be necessary as demands increase. Depending on the supply pressure needed from the water treatment plant, the building expansion and additional transfer pumps may need to occur as early as 2019 (550 kPa) and as late as 2030 (350 kPa).

The proceeding sections outline the conceptual design of the preferred alternative for 2012 and 2032. Design changes for 2012 and 2032 are shown on Figure 6.3 and Figure 6.4, respectively.

RPT2-0089-077-00-FINAL-090227.DOC WATER TREATMENT 65 COLD LAKE REGIONAL UTILITY SERVICES COMMISSION REGIONAL WATER SUPPLY FUNCTIONAL PLAN & FEASIBILITY STUDY

6.9.1 Design for 2012

Although the building addition and new transfer pumps are not necessary for demands through 2012, piping and pumping modifications would have to take place to accommodate their future addition (and to provide sufficient pumping through 2032). These should be done at the same time as the installation of the third membrane train and removal of the fire pump, and after the recommended construction of the new regional pumphouse and associated fill lines. The upgrading sequencing for the preferred alternative includes:

1. The removal of the fire pump and installation of the third membrane train, associated piping and permeate pump.

2. The addition of a 600 mm header to connect to the future transfer pumps located in the building expansion (requiring modification to the existing 500 mm header).

Note: While work is being done on the 500 mm header, the existing transfer pumps on the 350 mm line will act as the fill pumps to the regional pumphouse.

3. A new transfer pump would then be installed on the modified 500 mm line and used to fill the new pumphouse so that the existing transfer pumps on the 500 mm line can be removed.

4. Once the new transfer pump is online on the 500 mm header and the others are removed, the existing 4 Wing transfer pumps would be relocated to the 500 mm header.

Removal of the 4 Wing transfer pumps on the 350 mm line in addition to the removal of the fire pump would provide the necessary space for the permeate pump of the third membrane train while accommodating the transfer pumping through 2032. The 2012 transfer pump schematic is shown in Figure 6.5.

6.9.2 Design for 2032

New transfer pumps will be necessary for 2032 flows sometime after the installation of the third membrane train as demands require (to maintain the ability to operate with one pump out of service). As there is limited space in the existing facility, an addition will be constructed to house three new transfer pumps and a pumpwell. The new transfer pumps will be tied into the 600 mm header put in place during the 2012 piping modifications. The 2032 transfer pump schematic is shown in Figure 6.6

Additional membrane capacity will be necessary by 2030, accomplished by replacing one of the existing trains with higher capacity equipment. If 13.7 ML/d replaces one of the existing trains in 2030, the same will have to be done to the other existing train in 2034.

RPT2-0089-077-00-FINAL-090227.DOC WATER TREATMENT 66 COLD LAKE REGIONAL UTILITY SERVICES COMMISSION REGIONAL WATER SUPPLY FUNCTIONAL PLAN & FEASIBILITY STUDY 0089-077-00_00-P-F601_RA.dwg Saved By: chaob 0089-077-00_00-P-F601_RA.dwg By: Saved

m SCALE 1:500 A

Cold Lake Regional Utility Services Commission Regional Water Supply Functional Plan & Feasibility Study ISS/REV: UMA FILENAME: THIS DOCUMENT IS PROTECTED BY COPYRIGHT LAW AND MAY NOT BE USED, REPRODUCED OR MODIFIED IN ANY MANNER OR FOR ANY PURPOSE EXCEPT WITH THE WRITTEN PERMISSION OF UMA ENGINEERING LTD. DOING BUSINESS AS AECOM ("AECOM") TO PARTY OR A ("AECOM") BUSINESS AS AECOM DOING LTD. ENGINEERING OF UMA WRITTEN PERMISSION THE EXCEPT WITH PURPOSE MANNER ANY OR FOR ANY IN USED, REPRODUCED OR MODIFIED LAW AND MAY NOT BE PROTECTED BY DOCUMENT COPYRIGHT THIS IS WHICH ITS COPYRIGHT HAS BEEN ASSIGNED. AECOM ACCEPTS NO RESPONSIBILITY, AND DENIES ANY LIABILITY WHATSOEVER, TO ANY PARTY THAT USES, REPRODUCES, MODIFIES, OR RELIES ON THIS DOCUMENT WITHOUT CONSENT. WRITTEN EXPRESS AECOM'S

Water Treatment Plant Site Plan Figure 6.1 0089-077-00_00-P-F602_RA.dwg Saved By: chaob 0089-077-00_00-P-F602_RA.dwg By: Saved mm SCALE 1:150 0 A

Cold Lake Regional Utility Services Commission Regional Water Supply Functional Plan & Feasibility Study ISS/REV: UMA FILENAME: THIS DOCUMENT IS PROTECTED BY COPYRIGHT LAW AND MAY NOT BE USED, REPRODUCED OR MODIFIED IN ANY MANNER OR FOR ANY PURPOSE EXCEPT WITH THE WRITTEN PERMISSION OF UMA ENGINEERING LTD. DOING BUSINESS AS AECOM ("AECOM") TO PARTY OR A ("AECOM") BUSINESS AS AECOM DOING LTD. ENGINEERING OF UMA WRITTEN PERMISSION THE EXCEPT WITH PURPOSE MANNER ANY OR FOR ANY IN USED, REPRODUCED OR MODIFIED LAW AND MAY NOT BE PROTECTED BY DOCUMENT COPYRIGHT THIS IS WHICH ITS COPYRIGHT HAS BEEN ASSIGNED. AECOM ACCEPTS NO RESPONSIBILITY, AND DENIES ANY LIABILITY WHATSOEVER, TO ANY PARTY THAT USES, REPRODUCES, MODIFIES, OR RELIES ON THIS DOCUMENT WITHOUT CONSENT. WRITTEN EXPRESS AECOM'S Water Treatment Plant Existing Intermediate Level Plan Figure 6.2 0089-077-00_00-P-F603_RA.dwg Saved By: chaob 0089-077-00_00-P-F603_RA.dwg By: Saved mm SCALE 1:150 0 A

Cold Lake Regional Utility Services Commission Regional Water Supply Functional Plan & Feasibility Study ISS/REV: UMA FILENAME: THIS DOCUMENT IS PROTECTED BY COPYRIGHT LAW AND MAY NOT BE USED, REPRODUCED OR MODIFIED IN ANY MANNER OR FOR ANY PURPOSE EXCEPT WITH THE WRITTEN PERMISSION OF UMA ENGINEERING LTD. DOING BUSINESS AS AECOM ("AECOM") TO OR A PARTY ("AECOM") BUSINESS AS AECOM DOING LTD. ENGINEERING OF UMA PERMISSION WRITTEN THE EXCEPT WITH PURPOSE MANNER ANY OR FOR ANY IN USED, REPRODUCED OR MODIFIED LAW AND MAY NOT BE PROTECTED BY DOCUMENT COPYRIGHT THIS IS WHICH ITS COPYRIGHT HAS BEEN ASSIGNED. AECOM ACCEPTS NO RESPONSIBILITY, AND DENIES ANY LIABILITY WHATSOEVER, TO ANY PARTY THAT USES, REPRODUCES, MODIFIES, OR RELIES ON THIS DOCUMENT WITHOUT CONSENT. WRITTEN EXPRESS AECOM'S Water Treatment Plant Intermediate Floor Plan Year 2012 Figure 6.3 0089-077-00_00-P-F604_RA.dwg Saved By: chaob 0089-077-00_00-P-F604_RA.dwg By: Saved mm SCALE 1:150 A

Cold Lake Regional Utility Services Commission Regional Water Supply Functional Plan & Feasibility Study ISS/REV: UMA FILENAME: THIS DOCUMENT IS PROTECTED BY COPYRIGHT LAW AND MAY NOT BE USED, REPRODUCED OR MODIFIED IN ANY MANNER OR FOR ANY PURPOSE EXCEPT WITH THE WRITTEN PERMISSION OF UMA ENGINEERING LTD. DOING BUSINESS AS AECOM ("AECOM") TO OR A PARTY ("AECOM") BUSINESS AS AECOM DOING LTD. ENGINEERING OF UMA PERMISSION WRITTEN THE EXCEPT WITH PURPOSE MANNER ANY OR FOR ANY IN USED, REPRODUCED OR MODIFIED LAW AND MAY NOT BE PROTECTED BY DOCUMENT COPYRIGHT THIS IS WHICH ITS COPYRIGHT HAS BEEN ASSIGNED. AECOM ACCEPTS NO RESPONSIBILITY, AND DENIES ANY LIABILITY WHATSOEVER, TO ANY PARTY THAT USES, REPRODUCES, MODIFIES, OR RELIES ON THIS DOCUMENT WITHOUT CONSENT. WRITTEN EXPRESS AECOM'S Water Treatment Plant Intermediate Flood Plan Year 2032 Figure 6.4 M

M 0089-077-00_00-P-F605_RA.dwg Saved By: chaob 0089-077-00_00-P-F605_RA.dwg By: Saved A

Cold Lake Regional Utility Services Commission Regional Water Supply Functional Plan & Feasibility Study ISS/REV: UMA FILENAME: THIS DOCUMENT IS PROTECTED BY COPYRIGHT LAW AND MAY NOT BE USED, REPRODUCED OR MODIFIED IN ANY MANNER OR FOR ANY PURPOSE EXCEPT WITH THE WRITTEN PERMISSION OF UMA ENGINEERING LTD. DOING BUSINESS AS AECOM ("AECOM") TO OR A PARTY ("AECOM") BUSINESS AS AECOM DOING LTD. ENGINEERING OF UMA PERMISSION WRITTEN THE EXCEPT WITH PURPOSE MANNER ANY OR FOR ANY IN USED, REPRODUCED OR MODIFIED LAW AND MAY NOT BE PROTECTED BY DOCUMENT COPYRIGHT THIS IS WHICH ITS COPYRIGHT HAS BEEN ASSIGNED. AECOM ACCEPTS NO RESPONSIBILITY, AND DENIES ANY LIABILITY WHATSOEVER, TO ANY PARTY THAT USES, REPRODUCES, MODIFIES, OR RELIES ON THIS DOCUMENT WITHOUT CONSENT. WRITTEN EXPRESS AECOM'S Water Treatment Plant Site Plan Transfer Pump Schematic 2012 Figure 6.5 M

M 0089-077-00_00-P-F606_RA.dwg Saved By: chaob 0089-077-00_00-P-F606_RA.dwg By: Saved A

Cold Lake Regional Utility Services Commission Regional Water Supply Functional Plan & Feasibility Study ISS/REV: UMA FILENAME: THIS DOCUMENT IS PROTECTED BY COPYRIGHT LAW AND MAY NOT BE USED, REPRODUCED OR MODIFIED IN ANY MANNER OR FOR ANY PURPOSE EXCEPT WITH THE WRITTEN PERMISSION OF UMA ENGINEERING LTD. DOING BUSINESS AS AECOM ("AECOM") TO OR A PARTY ("AECOM") BUSINESS AS AECOM DOING LTD. ENGINEERING OF UMA PERMISSION WRITTEN THE EXCEPT WITH PURPOSE MANNER ANY OR FOR ANY IN USED, REPRODUCED OR MODIFIED LAW AND MAY NOT BE PROTECTED BY DOCUMENT COPYRIGHT THIS IS WHICH ITS COPYRIGHT HAS BEEN ASSIGNED. AECOM ACCEPTS NO RESPONSIBILITY, AND DENIES ANY LIABILITY WHATSOEVER, TO ANY PARTY THAT USES, REPRODUCES, MODIFIES, OR RELIES ON THIS DOCUMENT WITHOUT CONSENT. WRITTEN EXPRESS AECOM'S Water Treatment Plant Transfer Pumps Schematic 2032 Figure 6.6 AECOM

7.0 Cost Estimate and Implementation Plan

7.1 Cost Estimates

The cost estimates for the recommended servicing concept is summarized in Table 7.1. The costs for the refined water servicing Alternative 1 and water treatment Alternative 1 are included.

Table 7.1: Cost Estimate Summary

Alternative Present Worth Capital Present Worth O&M Total Present Worth Water Servicing (Alternative $93,904,000 $25,563,000 $119,467,000 1 Refined) Water Treatment $5,270,000 $13,405,000 $18,675,000 (Alternative 1) TOTAL $99,174,000 $38,968,000 $138,142,000

The costs for the proposed Stage 1 system are summarized in Table 7.2.

Table 7.2: Stage 1 Cost Estimate Summary

Capital Cost ($) Development Water Servicing Water Treatment Total Stage 1 $61,204,000 $3,228,000 $64,432,000 Table----- 7.3 summarizes the estimated cost per person to service each of the expansion communities. Per capita cost sharing was based on the cost estimates for the recommended servicing concept. The costs are based on the capital costs, not present worth costs, and do not include tie-in or storage costs for the individual municipalities. Costs were split between communities based on a percentage of total flow through the pump or transmission main.

Since the existing system is adequate to service the existing communities through 2012, costs for 2012 were allocated to only the expansion communities. However, the 2032 costs were allocated between both the existing and expansion communities based on the flow percentages.

The breakdown of the cost allocation is summarized in Tables D.6 to D.12 in Appendix D.

The costs for Cold Lake IR 149A and IR 149B do not include the tie-in to the Cold Lake North distribution ----system.

RPT2-0089-077-00-FINAL-090227.DOC COST ESTIMATE AND IMPLEMENTATION PLAN 73 COLD LAKE REGIONAL UTILITY SERVICES COMMISSION REGIONAL WATER SUPPLY FUNCTIONAL PLAN & FEASIBILITY STUDY AECOM

Table 7.3: Per Capita Cost Sharing

Water 2032 Cost per Treatment Servicing Serviced Location Pipe Cost Pump Cost Plant Total Population Capita 4 Wing Cold Lake $765,984 $470,342 $624,711 $1,861,037 4,800 $390 City of Cold Lake $2,269,293 $465,957 $2,931,209 $5,666,459 22,200 $260 Cold Lake IR 149 $239,338 $283,961 $195,194 $718,492 1,500 $480 Cold Lake IR 149A $0 $2,907 $18,290 $21,198 140 $160 Cold Lake IR 149B $0 $7,459 $115,393 $122,852 360 $350 Elizabeth Métis $13,381,019 $664,122 $320,214 $14,365,355 1,000 $14,370 Settlement Hamlet of Ardmore $1,101,134 $207,709 $104,044 $1,412,887 500 $2,830 Hamlet of Cherry Grove $1,824,155 $173,919 $146,351 $2,144,424 500 $4,290 Hamlet of Fort Kent $1,152,450 $156,278 $79,157 $1,387,885 300 $4,630 Hamlet of La Corey $10,592,825 $90,321 $53,285 $10,736,432 200 $53,690 Hamlet of Therien $5,776,557 $202,160 $53,285 $6,032,003 200 $30,170 Kehiwin IR 149 $14,807,561 $1,098,434 $586,029 $16,492,024 2,000 $8,250 Summer Villages $4,631,432 $744,975 $386,943 $5,763,350 1,200 $4,810 Moose Lake Area $5,013,678 $760,106 $399,836 $6,173,620 1,300 $4,750 Town of Bonnyville $29,455,058 $6,376,324 $3,395,382 $39,226,764 11,200 $3,510 Village of Glendon $12,896,515 $1,080,025 $266,678 $14,243,218 900 $15,830 TOTAL $103,907,000 $12,785,000 $9,676,000 $126,368,000 48,300 $2,6161 1. Average cost per serviced capita.

As indicated in Table 7.3, the per capita service costs range from $160 to $53,690; as a result it may not be economically feasible to service some of the communities with a high per capita cost.

The allocated costs were used in the development of the utility governance model, completed by CORVUS Business Advisors. The report detailing the evaluation of the current governance structure as well as alternative governance structures is included in Appendix E. At the time of the development of the utility governance model, Alternative 2 was the preferred water servicing alternative. Therefore; the costs indicated in Appendix E are based on the costs for Alternative 2. However, this will not have a significant impact on the recommended governance model.

As part of the Alberta Water for Life Strategy, Alberta Infrastructure will fund a percentage of the capital costs for regional water supply systems. Based on the project eligibility and funding levels for new pipelines and treatment upgrades from the AMWWP Regional Systems Initiative and Water Strategy Initiative, the following funding percentages may be applicable:

• Pipelines for new regional systems (water or wastewater) are funded up to 90%. • Pipeline capacity for future extensions to the pipeline to additional regional customers may be requested by the Province and would receive up to 100% funding. • Upgrades required for new customers at a commission-owned plant would be funded up to 100%.

Upon review of the regional concept, Alberta Infrastructure will confirm the funding percentages. It is important to note that funding percentages are impacted by population projections and water consumption rates, and funding levels are very specific to each individual case.

RPT2-0089-077-00-FINAL-090227.DOC COST ESTIMATE AND IMPLEMENTATION PLAN 74 COLD LAKE REGIONAL UTILITY SERVICES COMMISSION REGIONAL WATER SUPPLY FUNCTIONAL PLAN & FEASIBILITY STUDY

7.2 Implementation Plan

The first stage of the project is to complete the supply line to Bonnyville, due to the aging condition of the existing Bonnyville water treatment plant. For the first development stage, the booster station along Highway 28 will not be required. However, once the additional communities are connected to the system the booster station will be required.

It was assumed that all of the expansion communities would be serviced by 2012; therefore, the majority of the proposed pipes are required by 2012.

For the recommended water servicing alternative, some of the proposed pumps can be installed in stages. The required pump upgrades at the Cold Lake Water Treatment Plant are not required until 2032. At the proposed CLRUSC pump station in Cold Lake North, two pumps are required by 2012; however, the third pump is not required until 2032. The proposed booster stations for Cold Lake IR 149 and the Elizabeth Métis Settlement are not required until the 2032 development condition. The detailed staging for the recommended alternative is indicated in Table 5.21 in Section 5.9.2.

If Frog Lake is included as a future expansion community, the proposed 200 mm diameter transmission main from Cold Lake to the Elizabeth Métis Settlement would need to be upgraded to a 250 mm diameter main, and the pumping at the booster station would need to be increased.

Each creek crossing must be in compliance with the requirements of the Code of Practice for Pipeline Crossings under the Water Act.

RPT2-0089-077-00-FINAL-090227.DOC COST ESTIMATE AND IMPLEMENTATION PLAN 75 COLD LAKE REGIONAL UTILITY SERVICES COMMISSION REGIONAL WATER SUPPLY FUNCTIONAL PLAN & FEASIBILITY STUDY

8.0 Utility Governance Model

8.1 General

An evaluation of the current governance structure of the Cold Lake Regional Utility Services Commission (CLRUSC) was undertaken by CORVUS Business Advisors. In addition, alternative governance structures were examined for the potential expansion of the CLRUSC. The intention of this review is to provide the CLRUSC with:

• An understanding of the governance dynamics associated with potential expansion of CLRUSC membership as a result of regional system expansion; and • A recommended governance structure / workings of the CLRUSC Board and implementation path to bring about recommended governance changes, should the CLRUSC wish to pursue a regional system expansion.

8.2 Existing CLRUSC Members

The current CLRUSC is comprised of seven board members:

• City of Cold Lake (4 members) • 4 Wing Cold Lake (1 member) • Cold Lake IR 149 (1 member) • M.D. of Bonnyville (1 member)

The regional water system expansion presents significant opportunities and issues to existing CLRUSC members. The CLRUSC determines the conditions under which membership might be extended; therefore, the CLRUSC must be fully satisfied with the conditions under which they are prepared to extend services and under which they are willing to allow new member communities onto the CLRUSC board. Some of the issues identified by the existing CLRUSC members that would need to be addressed are summarized below:

• Environmental impact of regional expansion • Financial impact on existing CLRUSC member communities • Clear understanding of grant support • Commitment from new members on capital requirements • Future control and decision making.

8.3 Recommended Governance Structure

As a first step in moving forward with the regional water system expansion, the CLRUSC needs to first consider the steps that would be taken and which communities should be serviced in the first stage of expansion. From a practical and near-future perspective, it is likely that only one new member community has the potential to participate in the water system expansion and become a member of the CLRUSC; the Town of Bonnyville. The participation of the Town of Bonnyville is critical if the regional water expansion is to proceed. With the expansion of the Hamlet of La Corey, consideration of receiving water services

RPT2-0089-077-00-FINAL-090227.DOC UTILITY GOVERNANCE MODEL 76 COLD LAKE REGIONAL UTILITY SERVICES COMMISSION REGIONAL WATER SUPPLY FUNCTIONAL PLAN & FEASIBILITY STUDY

from the CLRUSC should be deferred until the initial service to the Town of Bonnyville has been constructed.

For the first stage of expansion, it is recommended that the board remain at seven members with two of the current positions from the City of Cold Lake shifted to the Town of Bonnyville, such that both the City and the Town have two members. At the time of ultimate expansion, it is recommended that the board be expanded to include eleven members, with one additional position given to the following communities: the Village of Glendon, the Summer Village of Bonnyville Beach, the Summer Village of Pelican Narrows, and the Elizabeth Métis Settlement.

With regards to future decision-making, the model currently used by the Greater Vancouver Regional District (GVRD) is workable for the expanded CLRUSC. GVRD decision-making is usually made using a one-member, one-vote model (consensus approach). However, for any financial decisions a member can motion for a weighted decision. If the motion is seconded, a weighted decision voting process in undertaken. For the CLRUSC, it is recommended that the weighted vote be based upon population.

8.4 Implementation Plan

There are various actions that need to be undertaken before the regional system expansion can move forward and the CLRUSC can consider any governance or membership changes. A summary of the implementation tasks is provided below:

• Create a regional system forum • Create a Chief Administrative Officer position • Environmental impact study of Cold Lake • Staging plan for Stage 1 construction • Grant information • Province carry oversizing costs • Make decision on moving forward with Stage 1 • Obtain financial commitment of Stage 1 participants • Obtain approval from the Minister to extend CLRUSC debt limits (optional) • Request changes to regulation for amended CLRUSC structure and roll over of Stage 1 assets into the CLRUSC • Draft CLRUSC bylaws governing voting, quorum, etc.

The complete report on the utility governance model is provided in Appendix E.

RPT2-0089-077-00-FINAL-090227.DOC UTILITY GOVERNANCE MODEL 77 COLD LAKE REGIONAL UTILITY SERVICES COMMISSION REGIONAL WATER SUPPLY FUNCTIONAL PLAN & FEASIBILITY STUDY

9.0 Conclusions and Recommendations

9.1 Growth Scenarios

• The population projections developed have been based on historical population trends, current populations and economic activity. These population projections impact the timing of system improvements and should be reviewed on a regular basis. • 5 year and 25 year population targets were developed. • The planning targets represent more than a doubling of the regional population by 2032, from the current population of around 25,000 to over 50,000.

9.2 Water Servicing

• The existing system was analyzed based on the existing water consumption data. • It is recommended that the future system be designed for a composite water consumption rate of 375 L/capita/day (average day demand) to correspond with the provincial average. • The transmission system was sized for two times the average day demand. • For each alternative, it is recommended that the CLRUSC system be separated from the City of Cold Lake distribution system where possible. However, it is recommended that Cold Lake IR 149A and Cold Lake IR 149B be supplied from the Cold Lake North distribution system. • It was assumed that all expansion communities would be serviced by 2012. • For all of the alternative water servicing concepts, it is proposed that there be a dedicated fill line from the Water Treatment Plant to a new CLRUSC reservoir/pump station located in Cold Lake North. A 1500 m3 reservoir will be required. This pump station will supply all of the regional customers, with the exception of Cold Lake North which has a dedicated fill line from the Water Treatment Plant. • Four water servicing alternatives were developed. For each alternative, the servicing to areas west of Bonnyville is the same. • Alternative 1 includes upgrading the existing transmission main from Cold Lake to Fort Kent and extending the main to Bonnyville. The total length of pipe required is 147 km, and 2 booster stations are required. • Alternative 1a includes the same servicing concept as Alternative 1, with an additional connection from Cold Lake to La Corey. The total length of pipe required is 183 km, and 2 booster stations are required. • Alternative 2 includes the installation of a new transmission main from Cold Lake west to La Corey, then south to Bonnyville. The total length of pipe required is 150 km, and 2 booster stations are required. • Alternative 3 includes the installation of a new transmission main from Cold Lake south to the Elizabeth Métis Settlement, then west to Bonnyville. The total length of pipe required is 165 km, and 3 booster stations are required. • Present worth costs were determined for each of the alternatives, including both capital costs and operation and maintenance costs. The cost estimates include 35% for contingencies and 10% for engineering and overhead, and are summarized in Table 9.1.

RPT2-0089-077-00-FINAL-090227.DOC CONCLUSIONS AND RECOMMENDATIONS 78 COLD LAKE REGIONAL UTILITY SERVICES COMMISSION REGIONAL WATER SUPPLY FUNCTIONAL PLAN & FEASIBILITY STUDY AECOM

Table 9.1: Water Transmission System Cost Estimate Summary

Alternative Present Worth Capital Present Worth O&M Total Present Worth Alternative 1 $102,402,000 $29,716,000 $132,118,000 Alternative 1a $107,416,000 $29,716,000 $137,132,000 Alternative 2 $112,577,000 $29,455,000 $142,032,000 Alternative 3 $134,823,000 $36,547,000 $171,370,000

• Alternative 1 is the recommended water servicing concept since it is the most cost effective alternative. • The initial population targets were determined through analysis of historical data and discussions with the steering committee. Subsequently, Alberta Transportation indicated that an annual growth rate of 2.5% should not be exceeded in the design of regional systems. Therefore, the population projections for the Town of Bonnyville and the Village of Glendon were reduced to 2.5% annual growth and the flow rates were adjusted accordingly. • Refinements were considered for the Alternative 1 design, to account for the reduced flow rates and to provide the most cost effective alternative. The proposed 600 mm diameter transmission main was reduced to 500 mm diameter, and the proposed pump station in Cold Lake South was eliminated. However, additional booster stations are required. • The total capital cost and present worth costs for the recommended alternative are $116,692,000 and $119,467,000, respectively.

9.3 Water Treatment

• Demands are expected to exceed the existing plant capacity (22 ML/d) by 2010, and a third membrane train (with a capacity of 13.7 ML/d) should be installed at that time. With its installation, projected 2012 demands (21.8 ML/d) will be easily met. • For long-term servicing, two alternatives were considered. Alternative 1 involves filling out the existing tankage and modifying the remaining tanks to accommodate 2032 demands. • Alternative 2 involves the construction of a new treatment plant on the same site as the future CLRUSC pump station and reservoir in Cold Lake North. The existing water treatment plant would be used as a pumphouse and raw water reservoir. • Although it may be ultimately necessary to build a new facility or construct a major addition to the existing plant, these upgrades are not necessary until flows beyond those projected in 2032 are experienced. Therefore, Alternative 1 is recommended. • Retrofitting the first and second existing membrane tanks and replacement of the existing membranes with new higher density membranes (with a capacity of 13.7 ML/d) will have to be completed by 2030 and 2034, respectively, in order to meet the projected maximum day demand in 2032 (37.2 ML/d). • Modifications to the distribution pumping and the addition of a building expansion will be necessary before any new capacity is added above the third membrane train.

9.4 Cost Estimates and Implementation Plan

• For the recommended alternatives, refined water servicing Alternative 1 and water treatment Alternative 1, the total capital cost is $126,368,000, and the total present worth cost, including operation and maintenance, is $138,142,000.

RPT2-0089-077-00-FINAL-090227.DOC CONCLUSIONS AND RECOMMENDATIONS 79 COLD LAKE REGIONAL UTILITY SERVICES COMMISSION REGIONAL WATER SUPPLY FUNCTIONAL PLAN & FEASIBILITY STUDY AECOM

• Per capita costs were developed for each of the communities, based on the estimated capital costs. The costs were split between communities based on a percentage of total flow through the pump or transmission main, and were based on recommended alternatives. • Table 9.2 summarizes the estimated cost per person to service each of the communities. Table 9.2: Cost Sharing Summary

Location Total Capital Cost 2032 Servicing Population Per Capita Cost 4 Wing Cold Lake $1,861,037 4,800 $390 City of Cold Lake $5,666,459 22,200 $260 Cold Lake IR 149 $718,492 1,500 $480 Cold Lake IR 149A $21,198 140 $160 Cold Lake IR 149B $122,852 360 $350 Elizabeth Métis Settlement $14,365,355 1,000 $14,370 Hamlet of Ardmore $1,412,887 500 $2,830 Hamlet of Cherry Grove $2,144,424 500 $4,290 Hamlet of Fort Kent $1,387,885 300 $4,630 Hamlet of La Corey $10,736,432 200 $53,690 Hamlet of Therien $6,032,003 200 $30,170 Kehiwin IR 149 $16,492,024 2,000 $8,250 Summer Villages $5,763,350 1,200 $4,810 Moose Lake Area $6,173,620 1,300 $4,750 Town of Bonnyville $39,226,764 11,200 $3,510 Village of Glendon $14,243,218 900 $15,830

• It may not be economically feasible to service some of the communities that have high per capita costs. • Stage 1 of the regional system expansion involves the addition of the Town of Bonnyville. To service the Town, the construction of the 500 mm diameter transmission main would be required, as well as the new CLRUSC pump station and reservoir, and the water treatment plant upgrades recommended for 2012. The capital cost for Stage 1 is $64,432,000, including both water servicing and water treatment.

9.5 Utility Governance Model

• The current CLRUSC is comprised of seven board members. • The CLRUSC determines the conditions under which membership might be extended; there are some issues identified by existing CLRUSC members that would need to be addresses prior to expansion. • As a first step in moving forward with the regional water system expansion, the CLRUSC needs to first consider the steps that would be taken and which communities would be serviced during Stage 1 of the expansion. • For Stage 1, it is recommended that the board remain at seven members, with two positions given to the Town of Bonnyville. For the ultimate expansion, it is recommended that the board be expanded to eleven members, with one position given to each additional community. • For decision making processes, it is recommended that a one-member, one-vote model be used; however, for financial decisions the board will have the option to undertake a population weighted voting process.

RPT2-0089-077-00-FINAL-090227.DOC CONCLUSIONS AND RECOMMENDATIONS 80 COLD LAKE REGIONAL UTILITY SERVICES COMMISSION REGIONAL WATER SUPPLY FUNCTIONAL PLAN & FEASIBILITY STUDY

7. ANNEX C – MAPS

See 4 Maps Attached: Map 1 – Service Area

Map 2 – Waterline Alignment

PAGE 20 OF 21

Map 3 – Potential Subdivision Connections Along the Route to Cherry Grove

Map 4 – Infrastructure Locations

PAGE 21 OF 21