TRAK İ Renewable Energies Ltd

Turkey – Greece Bulgaria – Romania – Iran g g gg g •g •g •g • • •I • • • •gg • • • • • •g g II g g i ile i ğ birli İş www.pmss.co.uk PMSS -PMSS Ltd ManagementSupport Project Services Wind Energy Wind

RÜZGAR ENERJİSİ RÜZGAR II ServicesEngineering and Consultancy on in cooperation with with cooperation in

I g g g

g g ggg g

• •g • g • • g •gg • • g •gg • g • •I • g • • • ggg • • • • g

g gg g g g g g g g • • •g • • • • ggg • • ggg • • g • • • • g • g • g • II

I g g • gg g • • • g • •g • g • • g • • g • Ig • • g • • g I

g g g gg g g ggg g g g g •g g • gI • g • g • • g • • g • g • g • • gg g • • I • g • I • • • g • gI I

gg g gggg g g g g gg g g g g g g

g

I • • • • • g • • • II • • g • • g • • g • • g • • g • g • g

gg ggggI gg g g g g gg g g ggg ggg •I • •ggI g g • • gI • g g • • g • • gg • • • g • Ig • • g

gg g gg gg gI I g g I •gII gI • gg Ig • g • g • g • g •gI • • Ig • g • • • • g • g • I • gg • g • • • g • g •

g ggg gg g g gg • • • • ggg • g •Ig • g • • •I • g • ggg • • • g • g g • • g • g Ig g • g • • • g • • g • g • g • g • g • • I

I

g gg g g g gg g g g •ggg g • gg gg • • • • gg • g • • g • g • g • gg • g • • g I g g • g ggg g . in Izmitin -Zone Industrial Turkey Turbines

RÜZGAR TÜRBİNİ RÜZGAR II UII Refurbished & new Sales Wind REFURBISHMENT& FACILITY

gg g g g I g II gg ggg g g g I

g g g GÜNEŞ ENERJİSİ UU

Engineering Services and Applications Solar Energy (PV – Solar Thermic)

in cooperation with

İş birli ği ile I II

• g • gg • g • g •g •g •g • • •g • • g •g •g •g •g •g g • gg

g g g •g • •

• •

• •g

• g •gg

• • •ggg • g

• g • • • g

• g g

uu

I I

II

Ana şebekeden ba ğımsız olarak rüzgar ve güne şten tam yararlanma esasına dayanır. Ortama göre kontrol edilen akıllı sistem sayesinde üretilen elektrik enerjisi depolanır. Yol ve kent aydınlatmaları için idealdir.

Enerji tasarrufu sunması, kirlili ği azaltması, ye şil ve çevre dostu olması ile gelece ğin aydınlatma modelidir.

Rüzgar-güne ş kombinasyonu gece ve gündüz depolama olana ğı, geni ş uygulama alanı olması avantajlarıdır. Di ğer enerji türlerine göre % 20 verimlidir.

İlk yatırım bedeli rüzgar-güne ş hibrid sistem için klasik olana göre % 13 daha pahalıdır. Fakat, bakım giderleri klasik sisteme göre sadece % 60 oranındadır, ve ayrıca i şletme gideri de bulunmaz. Çevreyi kirletmez, enerji tasarrufu sa ğlar. Elektrik faturası yok. Kendi elektri ğini üretir, i şletme gideri yoktur. Bakım yok kolay yapım-montaj, duraylı performans, kolay i şletme avantajları sunar. Kaynak de ğişimi, balast-triger de ğişimi, kontaktör, kesici de ğişimi, kesme-kontrol cihaz de ğişimi, kablo de ğişimi, küçük aksesuarlar yoktur

Fotovoltaik (PV) güne ş panellerinin ve küçük rüzgar türbinlerinin iklim ko şullarına göre bireysel olarak elektrik enerjisi üretimi de ğişir. Bu yüzden tek ba şlarına çok zengin bir enerji üretim kayna ğı olmayabildikleri durumlar mevcuttur . Sistemleri birle ştirme (rüzgar ve güne ş) daha çok elektrik enerjisi üretiminde etkilidir. Bu çözüme "Hibrid sistem" denir.

"H İBR İD" elektrik sistemi rüzgar veya fotovoltaik güne ş teknolojilerini birle ştirir ya da tek sistem üzerinden kullanarak pek çok avantaj sunar. Güne ş ışınlarının en kuvvetli ve parlak oldu ğu yaz aylarında rüzgar hızı dü şüktür. Daha az güne ş enerjisinin bulundu ğu kı ş aylarında ise rüzgar hızı yüksektir. Rüzgar ve güne ş enerjisi sistemlerinde verimli enerji üretimi, günün ve yılın de ğişik zamanlarında farklılık gösterir. Di ğer bir de ğişle rüzgar hızının yetersiz veya verimsiz oldu ğu günlerde alternatif olarak güne ş enerjisinden istifade edilebilir. Böylece sistemde enerji üretiminin devamlılı ğı sa ğlanmı ş olur.

Rüzgar ve Güne ş enerji sistemlerinde kullanılan bile şenler (Pil, İnverter, kontrol ve güvenlik birimleri gibi temel bile şenler) aynıdır. Bu yüzden kolaylıkla kurulabilecek olan bir Hibrid sistem kullanımı sayesinde yıl boyunca yeterli enerji sa ğlanacaktır REFERANS L İSTES İ

REFERENCES g g

g

Türkiye’deki Proje Referanslarımız

References in Turkey

• Bodrum (Mugla) Wind Park – 15 MW (project development for NATIONAL Ltd - UK ) • Datca (Mugla) Wind Park – 30 MW project development (for NATIONAL WIND POWER Ltd - UK ) • Didim (Aydin) Wind Park – 40 MW (project development for NATIONAL WIND POWER Ltd - UK ) • Emiralem (Izmir) Wind Park – 30 MW (project development for NATIONAL WIND POWER Ltd - UK ) • Kumbag (Tekirdag) Wind Park – 30 MW (project development for NATIONAL WIND POWER Ltd - UK ) • Gokceada-I (Canakkale) Wind Park – 300 MW (project development for NATIONAL WIND POWER Ltd - UK ) • Gokceada-II (Canakkale) Wind Park – 100 MW (project development for NATIONAL WIND POWER Ltd - UK )

• EIA report of 20 wind parks for IBERDROLA Turkey (DAS Renewable Energy Inv.)

• Izmir Landfill Gasification Plant – 4 MW (Consultancy & Engineering services for TOMI SA – Greece • Izmir Waste Water Treatment Gasificat ion Plant – 5MW (Consultancy & Engineering services for TOMI SA – Greece • Afyon City – Domestic Waste to Power Project – 15 MW (project development with HOWARD Industries) • Aliaga Industrial Waste to Power Project – 20 MW (own investment with IES-California pyroliss technology)

• Zonguldak Power Plant – 302 MW (EIA Report and site projects for HANJUNG Korea & MADENCILtd )

• Izmir PV project– 150 kW • Antalya PV project – 150 kW

IRAN WIND PROJECTS We are giving consultancy and engineering services to Iran’s pioneer 4 wind parks ( 50 MW + 50 MW + 100 MW + 100 MW) Yunanistan ‘daki RES Proje Referanslarımız Some References in Greece

(EVROENERGY SA– DEUTSCHE BANK, ENDESA, MITILENEOS & VOULGARAKIS MEPE) • Plaka (Alexandrapoulis) Wind Park – 3 MW • Mikrovouni (Xhathi) Wind Park - 30 MW • Alexandroupolis Offshore Wind Park – 120 MW • Spartakos-Meletios (Xanthi) Wind Park - 40 MW • Kerasies (Prosotsani-Drama) Wind Park - 42 MW • Almira Imeros (Xilagani, Rodopi) Wind Park - 40 MW • Mavro Isoma (Topeiros, Xanthi) Wind Park - 26 MW • Chionovouni (Nikiforos, Drama) Wind Park - 40 MW • Eleutheriadis ( Xiropotamos, Drama) Wind Park – 34 MW • Agia Kyriaki (Thassos, Kavala) Wind Park - 15.6 MW • Ntopis (Larisa, Fthiotida) Wind Park – 40 MW • Mellia-Kastro-Grivas (Siatista) Wind Park – 40 MW • Menikio (Drama ) Wind Park – 22 MW PV PROJECTS

Proje Adı Yeri Ülke MW Kipi Kinotitas Kavala Yunanistan 0.5 Vigla Mochos Kreta - Malia “ 1 Palouki Kafasi Magnesia- Skopelos “ 0.5 Agia Kiriaki Kavala - Thassos “ 4 Ipsoma Iroon Kavala - Filippi “ 2 Paliouri Chalkidiki - Sithonia “ 0.7 Monastiraki Alexandroupoli “ 0.15 Rachoula Plakas Alexandroupoli “ 0.1 Paliouri Chalkidiki - Sithonia “ 0.7 Agios Andreas Kreta - Sitia “ 0.1 Ionia Ionia Bulgaria 5 Ionia Ionia “ 47 Vaskova Vaskova “ 17 g g

-Altahullion - I -Novar Wind Farm -Arklow Offshore Wind Farm -Arnish Moor Wind Farm -Owenreagh -Barrow Offshore Wind Farm -Aundewadi Wind Farm -Pentland Road -Burbo Offshore Wind Farm -Baba Budangiri Hills -Rothisholm Wind Farm - -Ballywater Wind Farm -Royd Moor -Cromer Offshore Wind Farm -Beinn an Tuirc -Sigurd Wind Farm -Gunfleet Sands II Offshore Wind Farm -Beinn Tharsuinn -Sixpenny Wood -Havsul Offshore Wind Farm -Belmore -Slieve Divina -Horns Rev Offshore Wind Farm -Bessy Bell -Slieve Divina II -Sheringham Shoal Offshore Wind Farm -Bessy Bell Extension -Slieve Kirk -Shell Flats Offshore Wind Farm -Bickham Moor -Slieve Rushen Wind Farm -Teesside Offshore Wind Farm -Bin Mountain -Todmorden Moor -Thanet Offshore Wind Farm -Black Law B -Tullynageer Wind Farm -Humber Gateway Offshore Wind Farm -Burton Wold Wind Farm -Westmill Wind Farm -Kentish Flats Offshore Wind Farm -Callagheen Extension -Windy Standard -Lynn and Inner Dowsing Offshore Wind Farm -Callagheen Wind Farm -Wolf Bog Wind Farm - Offshore Wind Farm -Carno A & B -Mynnyd Gorddu -Nysted Offshore Wind Farm -Causeymire Wind Farm -Kirkby Moor -Ormonde Offshore Wind Farm -Coldham Wind Farm -Kolgoan & Chikli -Robin Rigg Offshore Wind Farm -Corneen Wind Farm -Lendrum’s Bridge Wind -Rødsand Offshore Wind Farm -Dyffryn Brodyn Wind Farm Farm –I -Utgrunden Offshore Wind Farm - -Milane Hill Wind Farm -Walney Offshore Wind Farm -Four Burrows Wind Farm -Moel Maelogen Wind Farm -West Duddon Offshore Wind Farm -Fynnon Oer -Molly Mountain Wind Farm -Westermost Rough Offshore Wind Farm -Griffin Forrest -Mountain Lodge Wind Farm TRAK İ Renewable Energies Ltd Web. www.traki-res.com ; E-mail: [email protected]

1728 Sk. (Kilise Soka ğı), No: 24, D: 2 , Karsiyaka – İZM İR Tel. +90(232) 3690702 ; Fax. +90(232) 7122540 ; GSM: +90(554) 8846795 Mr. Suleyman Kocbas (M.Sc.- Geology Engineer)

Perpa Ticaret Merkezi, A Blok, Kat: 7, D:893 , Okmeydanı, işli - 34384 İSTANBUL Tel. +90(212) 3206770 ; Fax. +90(212) 3200455 ; GSM: +90(542) 3447940 Mr. Ozden Karaca (Civil Engineer)

Leof. Dimokratias 239, Alexandrapoulis 68100 GREECE Tel. +30(695) 6273233 ; Fax. +30(255) 1084937 Mr. Giorgios Voulgarakis (Air Craft Engineer)