FORM 1 1 of 9

FORM -1

(I) Basic Information

Sl. No. Item Details 1 Name of the project/s Sunrise Orchard 2 Sl.No. in the schedule Project Activity 8 (a) “Building & Construction Project” 3 Proposed capacity/area/length/tonnage to Three G+14 storied Towers, one three storied club be handled /command area/ lease area / building and one five storied retail block, consisting number of wells to be drilled 224 flats, 18 shops, 10 office, 6 Guest rooms, 3 restaurants, 50 covered and 173 open car parks, of total built up area 2,85,012.74 Sqft (26,478.33 Sqm) has been proposed to be constructed at L. R. Dag Nos. 27 to 31 and 37 to 42, J.L. No. 36, Mouza: Baikunthapur, P.S. , Dist. South Parganas, over a land measuring 2.69 acre 10876.25 Sqm), owned by Panchashree Dealer Private Limited and other 27 Companies. 4 New/Expansion/Modernization NEW 5 Existing Capacity / Area etc. NA 6 Category of Project i.e. ‘A” or ‘B’ Category “B2” 7 Does it attract the general condition? If yes, No please specify 8 Does it attract the specific condition? If yes, No please specify. 9 Location Plot / Survey / Khasra No. L. R. Dag Nos. 27 to 31 and 37 to 42, J.L. No. 36, P.S. Baruipur, Dist. . Village Baikunthapur Tehsil NA District 24 Parganas (South) State 10 Nearest railway station / airport along with Baruipur Rly. Station – 3 ½ Kms distant in kms. Airport (NSCBIA) – 40 Kms 11 Nearest Town, District Headquarters The Project is located in the Southern suburb of alongwith distance in kms. . , about 4 Km from Baruipur town. South 24 Parganas Zilla Parishad, , Kolkata 700027 is 20 Km from site. 12 Village Panchayats Zilla Parishad, The project is under : South 24 Parganas Zilla Municipal Corporation, Local body Parishad, New Administrative Building, Alipore, (complete postal addresses with telephone Kolkata 700027 nos. to be given) 13 Name of the applicant M/S Sureka Isha Zion Developers Pvt. Ltd.(SIZPL) 14 Registered Address 3/1 Dr. U. N. Brahmachari Street, Kolkata 700 017 15 Address for correspondence 3/1 Dr. U. N. Brahmachari Street, Kolkata 700 017 Name Mr. Sajal Kumar Bose Designation (Owner/Partner/CEO) Vice President (Projects) Address 3/1 Dr. U. N. Brahmachari Street, Kolkata 17 Pin Code 700 017 E-Mail [email protected] Telephone No. 033 2287 1221/4 Fax No. 033 2287-3904

PROJECT: SUNRISE ORCHARD, DAG 27 & others, J.L. 36, P.S. BARUIPUR, DIST. 24 PGNS (S) FORM 1 2 of 9

16 Details of Alternative sites examined, if any. The site is owned by M/s Panchashree Dealer Pvt. Location of these sites should be shown on Ltd. & 27 other companies. They have given the a topo sheet development right to SIZPL to construct a Residential complex named “SUNRISE ORCHARD” at the said premises vide Development agreement dtd 27.12.2013. Accordingly SIZPL are developing the said residential complex at this site suiting the location. 17 Interlinked Projects NA 18 Whether separate application of interlinked NA Project has been submitted 19 If yes, date of submission NA 20 If no, reason NA 21 Whether the proposal involves approval / clearance under: if yes, details of the same and their status to be given. (a) The Forest (Conservation) Act, 1980? NO (b) The Wildlife (Protection) Act 1972? (c) The C.R.Z. Notification, 1991? 22 Whether there is any Government Order / WB Municipal rules Policy relevant / relating to the site? 23 Forest land involved (hectares) NO 24 Whether there is any litigation pending NO against the project and/or land in which the project is propose to be set up? (a) Name of the Court (b) Case No. (c) Orders / directions of the Court, if any and its relevance with the proposed project.

(ii) Activity

1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Sl.No. Information/Checklist confirmation Yes Details thereof (with approximate / quantities /rates, wherever possible) with No source of information data 1.1 Permanent or temporary change in land use, No There is no permanent or temporary change land cover or topography including increase in land use. Baruipur is a residential area. in intensity of land use (with respect to The proposed project is also a residential local land use plan) complex close to Baruipur town. 1.2 Clearance of existing land, vegetation and Yes Site clearing & cleaning some shrubs. buildings? 1.3 Creation of new land uses? No Total land of about 2.69 acres (10876.25 Sqm) of the project has been acquired by the landowners and there is no creation of new landuse. 1.4 Pre-construction investigations e.g. bore Yes Soil test report is enclosed marked houses, soil testing? ANNEXURE T-13 1.5 Construction works? Yes A residential Complex named SUNRISE ORCHARD, consisting of 224 flats, 18 shops, 10 offices, 6 guest rooms, 3 restaurants, 50 covered and 173 open car parks 1.6 Demolition works? No Vacant Land 1.7 Temporary sites used for construction works Yes Temporary labour quarters & godowns. or housing of construction workers?

PROJECT: SUNRISE ORCHARD, DAG 27 & others, J.L. 36, P.S. BARUIPUR, DIST. 24 PGNS (S) FORM 1 3 of 9

1.8 Above ground buildings, structures or Yes Excavated earth from foundation work will be earthworks including linear structures, cut reused in backfilling. Top soil will be and fill or excavations preserved & will be reused in landscaping. 1.9 Underground works including mining or No Not applicable tunneling? 1.10 Reclamation works? No Not applicable 1.11 Dredging? No Not applicable 1.12 Offshore structures? No Not applicable 1.13 Production and manufacturing processes? No Not applicable 1.14 Facilities for storage of goods or materials? Yes Temporary godown will be made for storage of construction materials. 1.15 Facilities for treatment or disposal of solid Yes Solid Waste mainly domestic garbage will be waste or liquid effluents? segregated at source and finally disposed off as per MSW (M&H) Rules 2000 Liquid Effluent will be partly reused & the excess will be discharged into the nearby canal after treatment in STP. 1.16 Facilities for long term housing of operational No Not applicable workers? 1.17 New road, rail or sea traffic during No Not applicable construction or operation? 1.18 New road, rail, air waterborne or other No Not applicable transport infrastructure including new or altered routes and stations, ports, airports 1.19 Closure or diversion of existing transport No Not applicable routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission lines or No Not applicable pipelines? 1.21 Impoundment, damming, culverting, No Not applicable realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No Not applicable 1.23 Abstraction or transfers of water form ground No Ground water abstraction permission has or surface waters? been obtained from competent authority for 150 KLD. 1.24 Changes in water bodies or the land surface Yes Within the premises there will be internal affecting drainage or run-off? house drains, connected to outside drainage, which will not affect any water bodies or land surface. 1.25 Transport of personnel or materials for Yes Construction material will be procured from construction, operation or decommissioning? local suppliers. 1.26 Long-term dismantling or decommissioning No Not applicable or restoration works? 1.27 Ongoing activity during decommissioning No Not applicable which could have an impact on the environment? 1.28 Influx of people to an area in either Yes Influx of about 400 construction workers will temporarily or permanently? be temporary in nature. After construction there will be about 1120 permanent residents, 106 for commercial & club within the residential complex. This development will have positive impact on economy. 1.29 Introduction of alien species? No Not applicable 1.30 Loss of native species or genetic diversity? No Not applicable 1.31 Any other actions? No Not applicable

PROJECT: SUNRISE ORCHARD, DAG 27 & others, J.L. 36, P.S. BARUIPUR, DIST. 24 PGNS (S) FORM 1 4 of 9

2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):

Sl.No. Information/checklist confirmation Yes Details thereof (with approximate / No quantities /rates, wherever possible) with source of information data 2.1 Land especially undeveloped or agricultural No Fallow land within urban area land (ha) 2.2 Water (expected source & competing Yes Gross demand is 195 KLD Net Demand is 71 users) unit: KLD KLD after reuse of 124 KLD of treated water. 2.3 Minerals (MT) No Not applicable 2.4 Construction material – stone, aggregates, Yes i) Brick 28,00,000 pcs sand / soil (expected source – MT) ii) Cement 5,500 mt iii) Steel 1,350 mt iv) Sand 11,000 cum v) Stone chips 12,000 cum Material will be supplied by the nearby local agencies 2.5 Forests and timber (source – MT) Yes Timber will be supplied by the nearby local agencies 2.6 Energy including electricity and fuels Yes Electricity will be supplied by WBSEDCL (source, competing users) Unit: fuel (MT), Power requirement: energy (MW) For residential 1100 KVA Back up power for common areas: 1 No. 315 & 1 No. 380 KVA D.G Sets Fuel required for DG sets will be around 300 litre/hr (when in use) 2.7 Any other natural resources (use appropriate No Not applicable standard units)

3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health.

Sl.No. Information/Checklist confirmation Yes Details thereof (with approximate / No quantities/rates, wherever possible) with source of information data 3.1 Use of substances or materials, which are No Not applicable hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies) 3.2 Changes in occurrence of disease or affect No Not applicable disease vectors (e.g. insect or water borne diseases) 3.3 Affect the welfare of people e.g. by changing Yes New construction creates direct & indirect living conditions? employment thereby help economic growth & improve living condition. 3.4 Vulnerable groups of people who could be No Not applicable affected by the project e.g. hospital patients, children, the elderly etc., 3.5 Any other causes No Not applicable

PROJECT: SUNRISE ORCHARD, DAG 27 & others, J.L. 36, P.S. BARUIPUR, DIST. 24 PGNS (S) FORM 1 5 of 9

4. Production of solid wastes during construction or operation or decommissioning (MT/month)

Sl.No. Information/Checklist confirmation Yes Details thereof (with approximate / No quantities/rates, wherever possible) with source of information data 4.1 Spoil, overburden or mine wastes No Not applicable 4.2 Municipal waste (domestic and or Yes 475 kg per day domestic solid waste commercial wastes) (garbage) 4.3 Hazardous wastes (as per Hazardous Yes Used lube oil from DG sets about 125 litre Waste Management Rules) per year 4.4 Other industrial process wastes No Not applicable 4.5 Surplus product No Not applicable 4.6 Sewage sludge or other sludge from effluent No 3 – 4 Kg of spent sludge in dry form will be treatment taken out every month and will be used as organic manure in the landscaped area. 4.7 Construction or demolition wastes Yes Will be mostly reused 4.8 Redundant machinery or equipment No Not applicable 4.9 Contaminated soils or other materials No Not applicable 4.10 Agricultural wastes No Not applicable 4.11 Other solid wastes No Not applicable

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)

Sl.No. Information/Checklist confirmation Yes Details thereof (with approximate / No quantities/rates, wherever possible) with source of information data 5.1 Emissions from combustion of fossil fuels Yes Emission from DG sets. The emission will be from stationary or mobile sources discharged 5.5 m above the roof of the D.G House as per norms. 5.2 Emissions from production processes No Not applicable 5.3 Emissions from materials handling including Yes Fugitive dust will be generated from the storage or transport material handling areas. Water sprinkling arrangement will be made to minimise the dust generation. 5.4 Emissions from construction activities Yes Fugitive dust & emission from DG sets including plant and equipment running during power cut. 5.5 Dust or odours from handling of materials Yes Treated sewage (excess if any) will be including construction materials, sewage discharged in to nearby canal. Dust from and waste handling of materials like sand, stone chips will be minimized by sprinkling of water over it & use screen during construction. 5.6 Emissions from incineration of waste No Not applicable 5.7 Emissions from burning of waste in open air No Not applicable (e.g. slash materials, construction debris) 5.8 Emissions from any other sources No Not applicable

PROJECT: SUNRISE ORCHARD, DAG 27 & others, J.L. 36, P.S. BARUIPUR, DIST. 24 PGNS (S) FORM 1 6 of 9

6. Generation of Noise and Vibration, and Emissions of Light and Heat:

Sl.No. Information/Checklist confirmation Yes Details thereof (with approximate / No quantities/rates, wherever possible) with source of information data with source of information data 6.1 From operation of equipment e.g. engines, Yes (i) Possible source is from DG sets. DG sets ventilation plant, crushers will have acoustic enclosure as per norms. (ii) From piling machines. But the vibration and noise will be confined within the premises. 6.2 From industrial or similar processes No Not applicable 6.3 From construction or demolition Yes Some noise will be generated from construction activity but these are confined within the project site & within specified hours only. 6.4 From blasting or piling No Since there are no driven piles, noise level will be significantly low. 6.5 From construction or operational traffic Yes Some noise will be generated from construction activity & traffic movement, but these are confined within the project site & within specified hours only. 6.6 From lighting or cooling systems No Not applicable 6.7 From any other sources No Not applicable

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:

Sl.No. Information/Checklist confirmation Yes Details thereof (with approximate / quantities/rates, wherever possible) with No source of information data 7.1 From handling, storage, use or spillage of No Lube oil waste will be directly transported out hazardous materials by authorized agencies. 7.2 From discharge of sewage or other effluents Yes Excess treated effluent will be discharged to water or the land (expected mode and into the nearby canal. place of discharge) 7.3 By deposition of pollutants emitted to air into No Not applicable the land or into water 7.4 From any other sources No Not applicable 7.5 Is there a risk of long term build up of No Not applicable pollutants in the environment from these sources?

8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment

Sl.No. Information/Checklist confirmation Yes Details thereof (with approximate / quantities/rates, wherever possible) with No source of information data 8.1 From explosions, spillages, fires etc from No Not applicable storage, handling, use or production of hazardous substances 8.2 From any other causes No Not applicable

PROJECT: SUNRISE ORCHARD, DAG 27 & others, J.L. 36, P.S. BARUIPUR, DIST. 24 PGNS (S) FORM 1 7 of 9

8.3 Could the project be affected by natural Yes The site is not a flood prone area. disasters causing environmental damage During structural design the seismic load has (e.g. floods, earthquakes, landslides, cloud been considered as per NBC norms to burst etc)? prevent damage due to earthquake.

9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality

Sl. Information/Checklist confirmation Yes Details thereof (with approximate No. / quantities/rates, wherever possible) with No source of information data 9.1 Lead to development of supporting utilities, ancillary development or development stimulated by the project which could have impact on the environment e.g.:

• Supporting infrastructure (roads, power Yes The project site is close to Baruipur Town. It supply, waste or waste water treatment, etc.) is a fast developing urban area of Southern Suburb of Kolkata. It is having 500 ft (150 m) frontage on 60’ (18 m) wide Southern Bypass Road connecting Kamalgazi to Baruipur. For other infrastructure facilities please refer to ANNEXURE G2. During operation phase the gross water demand will be about 195 KLD, including domestic, landscaping, etc. About 138 KLD of wastewater will be generated from this housing complex, which will be tearted in STP & recycled to the extent of 124 KLD. The excess will be discharged into the nearby canal after treatment.

• housing development Yes This is a planned housing complex which will provide better living condition and help local area development.

• extractive industries No Not applicable

• supply industries No Not applicable

• other No Not applicable

9.2 Lead to after-use of the site, which could No Not applicable have an impact on the environment 9.3 Set a precedent for later developments No Not applicable 9.4 Have cumulative effects due to proximity to Yes Other housing complex coming up in the other existing or planned projects with vicinity will also help local area development. similar effects

PROJECT: SUNRISE ORCHARD, DAG 27 & others, J.L. 36, P.S. BARUIPUR, DIST. 24 PGNS (S) FORM 1 8 of 9

(I) Environmental Sensitivity

Sl.No. Areas Name/ Aerial distance (within 15 km.) Identity Proposed project location boundary 1 Areas protected under international No Not applicable conventions, national or local legislation for their ecological, landscape, cultural or other related value 2 Areas which are important or sensitive for East Kolkata 25 km ecological reasons - Wetlands, watercourses or Wetlands other water bodies, coastal zone, biospheres, mountains, forests 3 Areas used by protected, important or sensitive Rabindra 20 km species of flora or fauna for breeding, nesting, Sarovar foraging, resting, over wintering, migration Alipore Zoo 25 km 4 Inland, coastal, marine or underground waters No Not applicable 5 State, National boundaries No Not applicable 6 Routes or facilities used by the public for - ½ Km access to recreation or other tourist, pilgrim NS Road areas Southern 0 Km bypass extension 7 Defence installations Fort Williams 30 km

8 Densely populated or built-up area Baruipur 4 Km 9 Areas occupied by sensitive man-made land Yes Baruipur Hospital 5 Km uses (hospitals, schools, places of worship, Holi Cross school 2 Km community facilities) Rajpur Auditorium 4 Km Jagannnath Mandir ½ Km 10 Areas containing important, high quality or No Not applicable scarce resources (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) 11 Areas already subjected to pollution or No Not applicable environmental damage. (those where existing legal environmental standards are exceeded) 12 Areas susceptible to natural hazard which No Not applicable could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions)

PROJECT: SUNRISE ORCHARD, DAG 27 & others, J.L. 36, P.S. BARUIPUR, DIST. 24 PGNS (S) FORM 1 9 of 9

(IV). Proposed Terms of Reference for EIA studies - EIA study not carried out.

I hereby give an understanding that the data and information given in the application and enclosures are true to the best of my knowledge and belief and I am aware that if any part of the data and information submitted is found to be false or misleading at any stage, the project will be rejected and clearance given, if any, to the project will be revoked at our risk and cost.

Date:

Place: Kolkata

Signature of the applicant With Name and full address (Project Proponent / Authorized Signatory)

NOTE : 1. The projects involving clearance under Coastal Regulation Zone Notification , 1991 shall submit with the application a C.R.Z. map duly demarcated by one of the authorized agencies, showing the project activities, w.r.t. C.R.Z. (at the stage of TOR) and the recommendations of the State Coastal Zone Management Authority (at the stage of EC). Simultaneous action shall also be taken to obtain the requisite clearance under the provisions of the C.R.Z. Notification, 1991 for the activities to be located in the CRZ. 2. The projects to be located within 10 km of the National Parks, Sanctuaries, Biosphere Reserves, Migratory Corridors of Wild Animals, the project proponent shall submit the map duly authenticated by Chief Wildlife Warden showing these features viis-a-vis the project location and the recommendations or comments of the Chief Wildlife Warden thereon (at the stage of EC)”. 3. All correspondence with the Ministry of Environment & Forests including submission of application for TOR/Environmental Clearance, subsequent clarifications, as may be required from time to time, participation in the EAC Meeting on behalf of the project proponent shall be made by the authorized signatory only. The authorized signatory should also submit a document in support of his claim of being an authorized signatory for the specific project”.

PROJECT: SUNRISE ORCHARD, DAG 27 & others, J.L. 36, P.S. BARUIPUR, DIST. 24 PGNS (S)