Ocean Lifespaces India Private Limited Completed Project Details

Total Page:16

File Type:pdf, Size:1020Kb

Ocean Lifespaces India Private Limited Completed Project Details Ocean Lifespaces India Private Limited Completed Project Details Year of Project Nature of Work Status Location Area in SFT Period Value in Crores Execution 1996-97 IDBI atm, Ambattur Chennai Interior & Allied works Completed Chennai 4 days 0.2 1996-97 Port trust , chennai Interior & Allied works Completed Chennai 0.4 1999-00 Edapter Interior & Allied works Completed Secundrabad 1.05 2000-01 UTI Bank, Madipakkam Interior & Allied works Completed Chennai 0.35 2000-01 UTI Bank, Rajaji Salai Interior & Allied works Completed Chennai 0.23 2000-01 UTI Bank, T. Nagar Interior & Allied works Completed Chennai 0.08 2000-01 UTI Bank, Shastri Bhavan Interior & Allied works Completed Chennai 0.2 2000-01 UTI Bank, Sivakasi Interior & Allied works Completed Chennai 0.4 2000-01 UTI Bank, Tuticorin Interior & Allied works Completed Chennai 0.35 2001-02 UTI Bank, Erode Interior & Allied works Completed Chennai 0.3 2001-02 UTI Bank, Coimbatore Interior & Allied works Completed Chennai 0.6 2001-02 UTI Bank, Salem Interior & Allied works Completed Chennai 0.4 2001-02 UTI Bank, Sathyamangalam Interior & Allied works Completed Chennai 0.3 2001-02 UTI Bank, Coimbatore SRAC Interior & Allied works Completed Chennai 0.13 2001-02 UTI Bank, Karur Interior & Allied works Completed Chennai 0.25 2001-02 UTI Bank, Hasan Interior & Allied works Completed Karnataka 0.35 2001-02 UTI Bank, Banasankari Interior & Allied works Completed Karnataka 0.35 2001-02 UTI Bank, Hubli Interior & Allied works Completed Karnataka 0.13 2001-02 UTI Bank, Cochin Interior & Allied works Completed Cochin 0.5 2001-02 UTI Bank, Willington Island (Cochin) Interior & Allied works Completed Cochin 0.25 2001-02 UTI Bank, Rajaji Road, (Regional Asset Centre) Interior & Allied works Completed Cochin 0.35 Karnataka State Industrial investment & Development Corporation 2001-02 Interior & Allied works Completed Bangalore 0.42 Limited 2003-04 Indian Overseas Bank Civil & Interior &Renovation Completed Chennai 4 months 0.41 2004-05 Asian Paints Interior Works Completed Chennai 1 month 0.44 2005-06 I flex Solutions Turnkey works Completed Chennai 3 months 1.49 2002-03 Buharia Towers Interior & Granite Works Completed Chennai 0.15 2003-04 Caterpillar India Pvt Ltd Interior & Allied works Completed Chennai 3.07 2005-06 Ascendas it Park India Pvt ltd Interior & Allied works Completed Chennai 4.05 Standard Chartered Bank Interior & Allied works Completed Chennai 1.1 2003-04 Visiteon Powertrain control systems india Pvt Ltd Interior & Allied works Completed Chennai 0.7 2003-04 Sundaram Finance Limited, Pattulos Road Interior & Allied works Completed Chennai 0.55 2003-04 Sundaram Finance Limited, Coimbatore Interior & Allied works Completed Chennai 0.2 2003-04 Sundaram Finance Limited Interior & Allied works Completed Hyderabad 0.35 2003-04 Sundaram Home Finance Interior & Allied works Completed Coimbatore 0.22 2003-04 Sundaram Home Finance Interior & Allied works Completed Trichy 0.18 2003-04 Sundaram Home Finance, Chromepet Interior & Allied works Completed Chennai 0.2 Year of Project Nature of Work Status Location Area in SFT Period Value in Crores Execution 2003-04 Sundaram Home Finance Interior & Allied works Completed Madurai 0.22 2003-04 Sundaram Home Finance, T. Nagar Interior & Allied works Completed Chennai 0.16 2003-04 Sundaram Towers, Corporate office Granite works Completed Chennai 0.55 2005-06 Axis bank Interior Works Completed Chennai 60,000 4 Months 5.00 2006-07 UTI Interior Works Completed Nalgonda 0.30 2006-07 Caterpillar (India) Pvt. Ltd Turnkey Works Completed Chennai 1,00,000 2 Months 4.00 2006-07 Maples – ESM, Chennai Interior Works Completed Chennai 30,000 1 Month 2.50 2006-07 Sutherland Global Services Pvt Ltd, Cochin Interior Works Completed Cochin 50,000 2 Months 2.00 2006-07 Cognizant Technology Solutions (India) Pvt. Ltd Design & Build Works Completed Cochin 50,000 2 Months 5.00 2006-07 @ Road Software solutions. Interior Works Completed Chennai 75,000 2 Months 1.50 2006-07 Ajuba Interior Works Completed Chennai 45,000 2 Months 1.50 2007-08 I Flex Interior Works Completed Chennai 1,25,000 3 Months 3.00 2007-08 Ford Business Services Centre, Interior Works Completed Chennai 90,000 2 Months 2.00 2007-08 Cognizant Technology Solutions (India) Pvt. Ltd Design & Build Works Completed Chennai 2,15,000 4 Months 21.00 2007-08 Thomson Reuters, Chennai Design & Build Works Completed Chennai 75,000 5 Months 13.00 2007-08 Sun Direct TV (DTH), Chennai Interior Works Completed Chennai 65,000 6 Months 10.00 2007-08 ABN AMRO Central Enterprises Ltd. Interior Works Completed Chennai 1,25,000 3 Months 7.25 2007-08 ABN AMRO Central Enterprises Ltd. Interior Works Completed Chennai 75,000 2 Months 4.00 2007-08 Fidelity Interior Works Completed Chennai 60,000 1 Month 1.00 2007-08 Premedia Global. Interior Works Completed Chennai 15,000 2 Months 1.00 2007-08 Sutherland Global Services Pvt Ltd, Chennai Interior Works Completed Chennai 70,000 2 Months 3.00 2007-08 Flextronics Interior Works Completed Chennai 20,000 2 Months 1.00 2007-08 Thomson Scientific Turnkey Works Completed Chennai 25,000 2 Months 5.00 2007-08 TATA Consultancy Services Ltd Turnkey Works Completed Chennai 2,50,000 6 Months 13.00 2007-08 Royal Sundaram Alliance Insurance Co. Ltd. Interior Works Completed Chennai 5,000 1 Month 1.00 2008-09 Logica Pvt Ltd Turnkey Works Completed Chennai 2,00,000 4 Months 11.00 2008-09 Ford Business Services Centre, Coimbatore Turnkey Works Completed Coimbatore 86,750 2 Months 7.50 2008-09 IBM , Bangalore Design & Build Works Completed Bangalore 55,000 1.5 Months 7.00 2008-09 Hewlet Packard Interior Works Completed Chennai 3,10,000 4 Months 12.00 2008-09 Elsevier, Ascendas Interior Works Completed Chennai 30,000 2 Months 2.50 2008-09 Mafoi, Chennai Interior Works Completed Chennai 30,000 2 Months 2.00 2008-09 Caterpillar Design & Build Works Completed Chennai 15,000 1 Month 2.00 2008-09 Idea Cellular Ltd Interior Works Completed Chennai 11,000 2 Months 1.50 2008-09 DBS Bank Interior Works Completed Chennai 18,000 2 Months 1.50 2008-09 Caterpillar Design & Build Works Completed Chennai 1,25,000 2 Months 3.00 2008-09 elsevier, Ascendas Interior Works Completed Chennai 35,000 3 Months 3.00 2009-10 PayPal India Pvt. Ltd (E Bay) Turnkey Works Completed Chennai 3,00,000 3 Months 40.00 2009-10 Mahindra & Mahindra Reaserch Centre Interior Works Completed Chennai 5,50,000 6 Months 70.00 2009-10 Inautix Technologies, 6th Floor Interior Works Completed Chennai 75,000 2 Months 5.00 Year of Project Nature of Work Status Location Area in SFT Period Value in Crores Execution 2009-10 Invensys, Chennai Interior Works Completed Chennai 4,500 1.5 Months 3.25 2009-10 RBS, Chennai Interior Works Completed Chennai 80,000 2 Months 3.00 2009-10 Franklin Templeton, Chennai Interior Works Completed Chennai 35,000 1.5 Months 2.50 2009-10 Ford India Private Limited Interior Works Completed Chennai 10,000 1 Month 0.50 2009-10 Rattha's Tek maedows Interior Works Completed Chennai 35,000 1 Month 3.00 2009-10 Laserwords Interior Works Completed Chennai 15,000 1 Month 1.00 2009-10 Daimler Turnkey works Completed Chennai 15,000 1 Month 1.00 2009-10 Spaarcc Turnkey works Completed Chennai 10,000 1 Month 1.00 2009-10 Everonn Interior Works Completed Chennai 30,000 1 Month 1.50 2009-10 L&T Interior Works Completed Chennai 10,000 2 Months 2.00 2010-11 Firstsource Solutions Ltd Design & Build Works Completed Bangalore 1,70,000 1.5 Months 17.50 2010-11 Cisco Interior Works Completed Chennai 20,000 1 Month 1.50 2010-11 Info Park Interior Works Completed Cochin 3,00,000 5 Months 11.00 2010-11 TATA Consultancy Services Interior Works Completed Chennai 1,00,000 6 Months 10.25 2010-11 Mott Macdonald, Chennai Interior Works Completed Chennai 30,000 1.5 Months 2.00 2010-11 ABCO, Chennai Interior Works Completed Chennai 30,000 3 Months 2.00 2010-11 Collasys – Technosoft - Chennai, Phase I Interior Works Completed Chennai 11,000 1 Month 1.00 2011-12 Renault Nissan Technology & Business Centre India Private Limited Turnkey Works Completed Chennai 2,00,000 1.5 Months 22.00 2011-12 HSBC Turnkey Works Completed Chennai 2,00,000 3 Months 15.00 2011-12 Australian Consulate Turnkey Works Completed Chennai 17,000 5 Months 10.00 2011-12 Deutsche Bank Turnkey Works Completed Bangalore 30,000 2 Months 7.00 2011-12 Ford India Pvt. Ltd.1B Turnkey Works Completed Chennai 30,000 2 Months 5.00 2011-12 TCS e Serve Turnkey Works Completed Chennai 30,000 1 Month 4.00 2011-12 Depuy - A Johnson & Johnson Medical Company Turnkey Works Completed Chennai 30,000 3 Months 3.50 2011-12 TWG – TRIL, Chennai Turnkey Works Completed Chennai 30,000 2 Months 3.50 2011-12 RAMANIYAM MARVEL, CHENNAI Civil Construction Works Completed Chennai 1,80,000 24 Months 35.00 2011-12 Daimler - Bharat Benz Interior Works Completed Chennai 3,00,000 6 Months 48.00 2011-12 Nokia Co-operate Functions Consolidations Interior Works Completed Chennai 75,000 3 Months 7.00 2011-12 Foster Wheeler Interior Works Completed Chennai 1,00,000 2 Months 6.00 2011-12 Caterpillar India Ltd, Chennai Interior Works Completed Chennai 1,10,000 3 Months 6.00 2011-12 Mindtree Interior Works Completed Chennai 65,000 2 Months 5.00 2011-12 TAFE Ltd, Chennai Interior Works Completed Chennai 20,000 2 Months 3.50 2011-12 TATA Communications, Chennai Interior Works Completed Chennai 30,000 1.5 Months 3.00 2011-12 Convert Team, Chennai Interior Works Completed Chennai 60,000 2 Months 3.00 2011-12 MTS, Chennai Interior Works Completed Chennai 20,000 2 Months 2.50 2011-12 Prodapt Solutions, Chennai Interior Works Completed Chennai 30,000 2 Months 2.00 2011-12 SPI Global Technologies, DLF, Phase I, Chennai Interior Works Completed Chennai 15,000 2 Months 2.00 2012-13 Robert Bosch Engineering & Business Solutions Ltd.
Recommended publications
  • Tidel Park Coimbatore Limited
    TIDEL PARK COIMBATORE LIMITED ELCOSEZ, Villankurichi Road, Civil Aerodrome Post, Coimbatore - 641 014, Tamil Nadu. 0422-2513604 I [email protected] I www.tidelcbe.com Notification No. HR/2/2020 Date: 17.09.2020 RECRUITMENT NOTIFICATION FOR THE POST OF CHIEF FINANCIAL OFFICER TIDEL Park Coimbatore Ltd. (TPCL) is in the business of leasing out plug and play IT infrastructure in the SEZ format. TPCL was established in the year 2010. TPCL does not fall under the definition of ‘Government Company’ as per section 2(45) of Companies Act 2013. TPCL is a joint venture of TIDEL Park Ltd, TIDCO, ELCOT and STPI. 2. TPCL is looking for a dynamic and high-performing professional for the post of Chief Financial Officer (CFO). The position will be on a fixed term contract basis, renewable every year based on the satisfactory performance of the candidate for upto three years, extendable for further period as decided by the Board of Directors. Interested professionals may submit their applications through email ([email protected]) mode only from 17.09.2020 10 am to 01.10.2020 5 pm through the website www.tidelcbe.com. S. No. of Position Location Compensation No. Posts 1 Chief One Coimbatore A net CTC of Rs. 12 Lakhs to Rs. 14 Financial lakhs per annum (negotiable) Officer depending on the experience and qualification. (TDS and other statutory deductions, as applicable) 3. AGE (AS ON 15.09.2020) Minimum age: 30 years; Maximum age: 45 years, as on 15.09.2020 1 of 12 4. SKILLS & EXPERIENCE: Educational Chartered Accountant / Chartered Financial Analyst / Full-time Qualification MBA or equivalent in Finance.
    [Show full text]
  • Speaker Profile
    Mr Sanjay Jayavarthanavelu Chairman, CII, Southern Region & SPEAKER Chairman and Managing Director PROFILE LMW Mr Sanjay Jayavarthanavelu, an MBA from Philadelphia University, USA, is the Chairman and Managing Director of Lakshmi Machine Works (LMW) Ltd, Coimbatore. LMW is one among the three leading Textile Machinery Manufacturers in the world, manufacturing the complete range textile spinning machinery. Mr Sanjay Jayavarthanavelu is a Trustee of the G.Kuppuswamy Naidu Charity Trust which runs a 600 bedded multi-specialty hospital, a higher secondary school and a feeder school in Coimbatore and an Arts College at Kovilpatti in Tamil Nadu. He is a Trustee of GKD Charity Trust, which runs a Management Study College (DJ Academy for Managerial Excellence & DJ Academy of Design) and an Industrial Training Institute (GKD Institute for Technological Resources). He is the Chairman and Managing Trustee of the Coimbatore Masonic Charity Trust which runs a children’s hospital and a working women’s hostel. www.ciiconnect.org Mr Suresh Raman Chairman, CII Connect SPEAKER Vice President & Regional Head PROFILE Tata Consultancy Services, Chennai Mr Suresh, as Vice President and Regional He has been associated with many large Head for Tata Consultancy Services (TCS), successful wins of about $3 Billion; as well Chennai, manages its largest delivery centre, as incubated and built several strategic with about 70,000 associates. accounts that have grown to generate $ 100 to $ 200 million per annum businesses. In his current role, his focus areas are to Having earlier spent a decade as a provide right experience for customers and Management Consultant within TCS as associates; facilitate talent transformation well as briefly with PriceWaterhouse, he into digital technologies; promoting had played an advisory role to MNCs as diversity; provide agile and sustainable well as to Governments.
    [Show full text]
  • CII Southern Region Industry and Economic Update
    CII SR Quarterly Update CII Southern Region Industry and Economic Update IT & IT-Enabled Services Industry October-December 2009 IT and IT-Enabled Services 1 CII SR Quarterly Update TABLE OF CONTENTS RECENT DEVELOPMENTS .............................................................................................................. 3 IT AND ITES INDUSTRY IN INDIA ................................................................................................................. 3 IT AND ITES– MAJOR SEGMENTS ............................................................................................................... 5 IT EXPORTS .......................................................................................................................................... 13 IT REVENUES SHOW LOW REVENUE GROWTH IN Q2FY2010 ........................................................................ 14 ITES INDUSTRY REPORTS AVERAGE REVENUE AND EARNINGS GROWTH DURING Q2FY2010 ................................ 14 SOUTHERN REGION ................................................................................................................................ 15 STATE LEVEL ANALYSIS ............................................................................................................... 16 KARNATAKA .......................................................................................................................................... 16 TAMIL NADU .......................................................................................................................................
    [Show full text]
  • Tidel Park Limited
    TIDEL PARK LIMITED No.4, Rajiv Gandhi Salai, Taramani, Chennai - 600 113, Tamil Nadu, India +91 44 2254 [email protected] I www.tidelpark.com Notification No. HR/1/2021 Date: 03.02.2021 RECRUITMENT NOTIFICATION FOR THE POST OF COMPANY SECRETARY TIDEL Park Ltd. (TIDEL) is in the business of leasing out plug and play infrastructure for IT and manufacturing industries.TIDEL was established in the year 2000 as a joint venture of TIDCO, ELCOT, STPI and other partners. TIDELdoes not fall under the definition of ‘Government Company’ as per section 2(45) of Companies Act 2013. TIDEL also has many other JVs and projects like TNRDC (the company that built OMR and ECR), TIDEL Park Coimbatore Limited, AEROHUB Sriperumbudur, IT Park at Pattabiram, etc., to name a few. 2. TIDEL is looking for a dynamic and high-performing professional for the post of Company Secretary (CS). The position will be on a fixed term contract basis, renewable every year based on the satisfactory performance of the candidate for upto three yearsand extendable for further period as decided by the Board of Directors. Interested professionals may submit their applications through online mode only from 04.02.2021 10 am to 14.02.2021 5pm through the website www.tidelpark.com. No. of S. No. Position Location Compensation Posts 1 Company One Chennai A net CTC of upto Rs.9 Lakhs (negotiable) per Secretary annum depending on the experience and - II qualification. (TDS and other statutory deductions, as applicable) 3. AGE(AS ON01.02.2021) 1 of 12 Minimum age: 30 years; Maximum age: 45 years, as on 01.02.2021 4.
    [Show full text]
  • Regd. Office: No.4, Rajiv Gandhi Salai Taramani, Chennai – 600 113
    TIDEL PARK COIMBATORE LTD Regd. Office: No.4, Rajiv Gandhi Salai Taramani, Chennai – 600 113. India APPLICATION FORM (For Leasing of IT / ITES Space) IT Park Location: ELCOT-SEZ IT/ITES Villankurichi Aerodrome Post Coimbatore – 641 014. 1.0 PARTICULARS OF APPLICANT Name of Company / Firm Name of the Authorised person Designation Address of Company / Firm Telephone Number Mobile Fax Email Website URL Relevant Information, Local contact address and telephone number may be given in the case of a foreign firm or a company. 2.0 Layout Plan : The Layout Plan for the commercial area (enclosed) is tentative and subject to change of size, area, location based on nature of activities, availabilities, technical and administrative requirements, etc., at the time of allotment by TIDEL Park Coimbatore Limited (TPCL). 3.0 SPACE REQUIREMENTS ( sq. ft) : ______________ Sq.ft. (Super built-up area) Floor Preference : Ground / 1st / 2nd / 3rd / 4th Floors 4.0 Expected date of occupation - - - (DD / MM / YYYY) 5.0 Please specify the proposed usage / activities: Approved Upgrade of software Computer-related services Technical Service Centre CAD/CAM/CAE Support IT Product Demonstration Data processing E-Commerce IT raining Data Warehousing Computer Systems Design Computer System Integration Communication Equipment Design Office Automation & Equipment Design Back office for banks/financial institutes R & D Laboratory (IT related) E-Mail/Internet/Intranet/Extranet On Specific Approval System Customizing Centre Publishing (with printing) Communication Service Prototype Making Project Planning & Management Audio / Video product Design Merchatronics Components Design & Development Engineering Design & Development Centre Equipment & component Applications Engineering Electronic Workshop-Repair System Integration of Data Comn.
    [Show full text]
  • List of EOU SEZ Units and Developers
    S.No. Zone Category Name of unit Unit address E-mail ID 1 MEPZ SEZ Godrej & Boyce Mfg. Co. Plot D-3, Phase-II, MEPZ, [email protected] Ltd. (Formerly Mercury Tambaram, Chennai-45 [email protected] Manufacturing Co. Ltd.) [email protected] 2 MEPZ SEZ Linea Fashions (I) Pvt Ltd PLOT NO.AP10 2ND CROSS [email protected] ROAD MAHINDRA WORLD CITY,NATHAM SUB POST OFFICECHENGALPET KANCHEPURAM DIS,,CHENGALPET-603002 3 MEPZ SEZ Pradeep Stainless India Pvt. Plot C-3, Phase II, MEPZ-SEZ, [email protected] Ltd. (formerly Pradeep Tambaram, Chennai-45 International.) 4 MEPZ SEZ Igarashi Motors India Ltd. B 12 to B 15, Phase II, MEPZ- [email protected] (formerly CG Igarshi SEZ, Chennai-600045 [email protected] Motors Ltd.) [email protected] [email protected] 5 MEPZ SEZ Classic Linens International SDF III, Shed No. 13, 14 & 17, [email protected] Pvt Ltd MEPZ, Chennai-45 [email protected] 6 MEPZ SEZ Switching Technologies B9, B10 & C1, MEPZ-SEZ, [email protected] Gunther Ltd. Kadappery, Tambaram, Chennai-600045 7 MEPZ SEZ Avalon Technologies Pvt. Unit No. 5, 6, 52 & 53, SDF II, [email protected] Ltd. Unit No. 15 & 16, SDF III, [email protected] MEPZ, Tambaram, Chennai - [email protected] 600045 8 MEPZ SEZ Cephas Medicals Pvt. Ltd. B-13, MEPZ-SEZ, Tambaram, [email protected] Chennai-600045 9 MEPZ SEZ Super Auto Forge Pvt. Ltd. AC 12 & 13, SIDCO Industrial [email protected] (Formerly Super Auto Forge Estate, Thirumudivakkam, Ltd) Chennai-600044 10 MEPZ SEZ Tata International Ltd.
    [Show full text]
  • List of EOU SEZ Units and Developers
    S.No. Zone Category Name of unit Unit address Managing E-mail Services E-mail ID Director/Director 1 MEPZ Developer Gateway Office Parks Pvt No. 16, GST Road, Mr. M. Murali [email protected] Multi Product [email protected] Ltd Perungalathur Village (FormerlyShriram chennai- 600 063 Properties & Infrastructure Pvt. Ltd.) 2 MEPZ Developer Coimbatore Hitech 365, " KGISL CAPMUS", Dr. B. Ashok [email protected] Electronic [email protected] Infrastructure Pvt. Ltd. thudiyalur Road, Hardware/IT/ [email protected] Saravampatty Post, IEES Coimbatore- 641 035 3 MEPZ Developer Syntel International Pvt. SIPCOT IT Park, Navalur ( Mr. Rakesh Khanna [email protected] Electronic [email protected] Ltd. P0) Sirv seri - 603103 Hardware/IT/ Kancheepuram Dsit. IEES Tamil Nadu 4 MEPZ Developer IG3 Infra Limited Thoraipakkam - Mr. Unnamali [email protected] Electronic [email protected] (formerly Indian Green Pallavaram 200 Feet Thiagarajan Hardware/IT/ Grid Group Limited) Road Thoraipakkam, IEES (Formerly ETL Chennai - 600 096 Infrastructrue Services 5 MEPZ Developer Hexaware Technologies Plot # H5 SIPCOT IT Park Mr. K. Baala [email protected] Electronic [email protected] Ltd. Navalur Post Siruseri Sundaram [email protected] Hardware/IT/ [email protected] Kanchipuram Dist. IEES 6 MEPZ Developer DLF Info City Chennai Ltd. 1/124, Shivaji Garden, Mr. Sriram Khattar [email protected] Electronic [email protected] (Formerly DLF Home Mount Poonamalee Hardware/IT/ [email protected] Developers Ltd.) Road, Moonlight Stop, IEES Nandam Pakkam Post Ramapuram, Chennai- 600089 7 MEPZ Developer Cognizant Technology Plot no.: H4, SIPCOT IT Mr. R. [email protected] Electronic [email protected] Solutions India Pvt.
    [Show full text]
  • No.4, Rajiv Gandhi Salai Taramani, Chennai – 600 113
    TIDEL PARK COIMBATORE LTD. Regd. Office: No.4, Rajiv Gandhi Salai Taramani, Chennai – 600 113 Site: ELCOSEZ, Aerodrome Post Coimbatore – 641 014 Contact Ph: 0422-2513604 Fax: 0422-2513609 Web: www.tidelcbe.com Mail: [email protected] APPLICATION FORM [FOR LEASING OF READY TO OCCUPY SME SPACE (IT / ITES)] IT Park Location: ELCOSEZ Civil Aerodrome Post Coimbatore – 641 014 1.0 PARTICULARS OF APPLICANT Name of Applicant Name of the Authorised person Designation Address of Company / Firm Telephone Number Mobile Fax Email Website URL PAN No. GST & TIN No. Relevant Information, Local contact address and telephone number may be given in the case of a foreign firm or a company. 2. SPACE REQUIREMENTS ( sq. ft) : ______________ Sq.ft. (Super built-up area) 3. Module Preference : ______________ 4. Please specify the proposed usage / activities: Approved Upgrade of software Computer-related Technical Service Centre services CAD/CAM/CAE IT Product Data processing Support Demonstration E-Commerce IT Training Data Warehousing Computer Systems Computer System Communication Design Integration Equipment Design Office Automation Back office for R & D Laboratory (IT and Equipment banks/financial institutes related) Design E-Mail/Internet/Intranet/Extranet SPECIFIC APPROVAL System Customizing Publishing (with Communication Service Centre printing) Prototype Making Project Planning & Management Audio / Video product Design Engineering Design & Equipment & component Applications Engineering Development Centre Merchatronics Components Design & Development Electronic Workshop-Repair System Integration of Data Comn. Equipment- Consultancy Services 6. Lease Period (Please indicate) : 7. Token Advance amount payable : Rs. _______________ along with application form (10 months rent) 8. UTILITIES SERVICE REQUIREMENTS (i) Electricity (estimated) a. Average Daily energy Consumption (kWh) b.
    [Show full text]
  • Coimbatore Underground Sewerage System
    Initial Environmental Examination Document Stage: Draft Project Number: 49107-004 May 2018 IND: Tamil Nadu Urban Flagship Investment Program – Coimbatore Underground Sewerage System Prepared by Tamil Nadu Water Supply and Drainage Board on behalf of Coimbatore City Municipal Corporation of the Government of Tamil Nadu for the Asian Development Bank. CURRENCY EQUIVALENTS (as of 11 May 2018) Currency Unit – Indian rupee (₹) ₹1.00 – $0.015 $1.00 = ₹67.09 ABBREVIATIONS ADB – Asian Development Bank CCMC – Coimbatore City Municipal Corporation CMA – Commissionerate of Municipal Administration CMSC – construction management and supervision consultant CPCB – Central Pollution Control Board CTE – consent to establish CTO – consent to operate DWC – double wall corrugated EAC – expert appraisal committee EHS – environmental, health and safety EIA – environmental impact assessment EMP – environmental management plan GOTN – Government of Tamil Nadu IEE – initial environmental examination MOEFCC – Ministry of Environment, Forest and Climate Change NOC – no objection certificate OHS – occupational health and safety O&M – operation and maintenance PIU – program implementation unit PMU – program management unit SPS – Safeguard Policy Statement SIDCO Small Industries Development Corporation STP – sewage treatment plant TNPCB – Tamil Nadu Pollution Control Board TNUFIP – Tamil Nadu Urban Flagship Investment Program TNUIFSL – Tamil Nadu Urban Infrastructure Financial Services Limited TWADB – Tamil Nadu Water and Drainage Board WHO – World Health Organization WEIGHTS AND MEASURES C degree Celsius km kilometer kW kilowatt lpcd liter per capita per day m meter mbgl meter below ground level μS/cm microsiemens per centimeter MLD million liter per day mm millimeter km2 square kilometer NOTE In this report, "$" refers to United States dollars. This initial environmental examination is a document of the borrower.
    [Show full text]
  • 03 Competitive Cities
    Competitive Cities Knowledge Base Appendices to Six Case Studies of Economically Successful Cities The World Bank 2015 1 Contents Case Study 1: Bucaramanga, Colombia.......................................................................................... 4 Case Study 2: Coimbatore, India .................................................................................................. 56 Case Study 3: Kigali Rwanda ..................................................................................................... 113 Case Study 4: Gaziantep, Turkey................................................................................................ 140 Case Study 5: Changsha, China .................................................................................................. 211 Case Study 6: Tangier, Morocco ................................................................................................ 253 2 Disclaimer: The case studies in this series are focused solely on what specific cities did well that subsequently contributed to high rates of economic growth during a particular period. These case studies should not be mistaken for investment climate reports, as the constraints, problems and flaws of cities are not covered. Studies should also not be considered an exhaustive list of all of the factors that contributed to growth in a city; because while some external or national level factors are highlighted, the studies were not intended to document or list every contributing factor. The studies focus on the local economic development
    [Show full text]
  • Industries Department
    INDUSTRIES DEPARTMENT MAJOR INDUSTRIES POLICY NOTE 2020 – 2021 DEMAND NO.27 M.C. SAMPATH MINISTER FOR INDUSTRIES © Government of Tamil Nadu 2020 INDUSTRIES DEPARTMENT MAJOR INDUSTRIES Policy Note 2020 – 2021 CONTENTS Sl. Title Pages No. Introduction 1-14 1. Guidance 15-44 2. State Industries Promotion 45-60 Corporation of Tamil Nadu Limited 3. Tamil Nadu Industrial 61-86 Development Corporation Limited 4. Tamil Nadu Industrial Investment 87-108 Corporation Limited 5. Tamil Nadu Newsprint and Papers 109-120 Limited 6. Tamil Nadu Cements Corporation 121-130 Limited 7. Tamil Nadu Salt Corporation 131-140 Limited 8. Department of Sugar 141-151 INDUSTRIES DEPARTMENT MAJOR INDUSTRIES POLICY NOTE 2020-2021 INTRODUCTION Tamil Nadu is one of the most progressive and industrialized states in the country. It is at the forefront of India’s economic development and its manufacturing sector is one of the principal engines that drive the national vision of becoming a USD 5 trillion economy by 2024. It is the second largest state economy in the country, which contributes 8.4% of India’s GDP. Tamil Nadu economy has registered an impressive growth of 8.17% during 2018-2019 and is continuing to maintain its growth momentum amidst national and global economic slowdown. The secondary sector contributes 32.4% and manufacturing contributes 21% to the State’s economy. 1 Tami Nadu takes pride in its longindustrial and commercial heritage.Literary,archaeological and numismatic sources confirm that the ancient Tamil Nadu region had thriving commercial relations with ancient Rome, China and Egypt. Over the centuries, our international trade links extended to the whole of South East Asia.
    [Show full text]
  • Terms of Allotment
    TIDEL PARK COIMBATORE LTD. Regd. Office: No.4, Rajiv Gandhi Salai Taramani, Chennai – 600 113 IT Park: ELCOSEZ, Aerodrome Post Coimbatore – 641 014 Contact Ph: 0422-2513604 Fax: 0422-2513609 Web: www.tidelparkcoimbatore.in Mail: [email protected] TERMS FOR ALLOTMENT OF FOOD OUTLETS IN FOOD COURT (SOUTH) 1. Warm Shell The facility is offered as warm shell in ‘as is where is’ condition, where the operator has to carry out fit out works and establish complete facilities by modifying the warm shell handed over to them to suit his business plan with kitchen, store, work area, servicing counter, utensil washing, utensils, services etc. as per their requirements at their cost. TPCL’s scope is limited to provide utility and services up to the battery limit of the food outlet. 2. Lease Term 3 or 5 Years Lease 3. Rent Rs. 20/- per Sq.Ft. per Month on Super Built-up Area [Annual Escalation - 10%] 4. Operation & Maintenance Rs.6.08 per sq.ft. per month on Super Built-up Area Charges (presently -2015-16) - [Annual escalation :: 5%] 5. Water Charges Rs.0.30 per litre or such other higher rate fixed by TPCL as per commercial rate specifically levied on actual consumption subject to revision from time to time. 6. Electricity and Air- To be paid to TPCL as per actual consumption along conditioning with applicable taxes levied by Government by time to time. For Common dining area the energy cost will be charged in proportion to the area leased. Indicative rate is Rs 9.50/- (per unit of electrical energy consumed).
    [Show full text]