11,605 0 11,605 Lanao Lake

Total Page:16

File Type:pdf, Size:1020Kb

11,605 0 11,605 Lanao Lake protectioncluster ARMED FORCES OF THE PHILIPPINES AFP VS. PROISIS MILITANTS P H I L I P P I N E S IN TUBARAN AND PAGAYAWAN, LANAO DEL SUR AS OF 20 JUNE 2018 PANTAO FOR EXTERNAL CIRCULATION PANTAR KAPAI RAGAT PIAGAPO SAGUIARAN KEY FIGURES MARAWI TAGOLOAN II MAGSAYSAY CITY DITSAAN-RAMAIN BUBONG I 11,605 TUBOD Total number of displaced persons (2,325 families) TANGCAL BAROY MUNAI MARANTAO 0 BUADIPOSO-BUNTONG LALA Number of persons who have returned (0 families) 11,605 MULONDO Number of presently displaced persons SALVADOR BALINDONG ! (2,325 families) (WATU) TUGAYA LANAO TARAKA MAGUING KAPATAGAN BREAKDOWN OF PRESENTLY DISPLACED MADALUM LAKE PERSONS PER EVACUATION CENTER MADAMBA TAMPARAN BACOLOD-KALAWI Tubaran ES 855 (BACOLOD Tubaran NHS 455 GRANDE) Tangcal 440 multi-purpose hallSAPAD POONA Toril 255 BAYABAO Mahad Binidayan 250 NUNUNGAN (GATA) Tangcal Madrasah 185 DISPLACED LOCATION Birthing Center 140 PUALAS BDA Bldg 3,045 MASIU 125 26% IDPs staying inside Market 115 evacuation centers 920 Datu Aleem Balindong 105 ! 74% Memorial NHS 8,560 GANASSI Tennis Court 70 Home-based IDPs LUMBAYANAGUE Ambari PS 50 1,775 PAGAYAWAN 1,750 LUMBATAN LEGENDSULTAN NAGA 45 DIMAPORO LUMBA-BAYABAO CALANOGAS BINIDAYAN Conflict area Municipal boundary (MAGUING) Aected area Road 5,055 BAYANG Inland water Evacuation center LUMBACA-UNAYAN TUBARAN Displaced persons Presently displaced persons 2,935 3,615 SULTAN LOCATION MAP GUMANDER 6,550 MISAMIS ORIENTAL LANAO BUTIG DEL NORTE LANAO LAKE 565 LANAO DEL SUR NORTH COTABATO MAGUINDANAO MAROGONG MALABANG Scale 1:267,760 0 1.5 3 BULD6ON Kilometers BALABAGAN ALAMADA SOURCES: Protection Cluster Mindanao CREATION DATE: 21 JUNE 2018 FEEDBACK: [email protected] DISCLAIMER: The boundaries and names shown and the designations used on this map do not imply official endorsement or acceptance by the United Nations. Data presented by UNHCR is based on internal reporting and various official data sources (DSWD, NDRRMC and etc.)..
Recommended publications
  • Quarterly Report
    MARAWI RESPONSE PROJECT (MRP) Quarterly Report FY 2020 3rd Quarter – April 1, 2020 to June 30, 2020 Submission Date: July 31, 2020 Cooperative Agreement Number: 72049218CA000007 Activity Start Date and End Date: August 29, 2018 – August 28, 2021 Submitted by: Plan International USA, Inc. This document was produced for review by the United States Agency for International Development Philippine Mission (USAID/Philippines). PROJECT PROFILE USAID/PHILIPPINES Program: MARAWI RESPONSE PROJECT (MRP) Activity Start Date and August 29, 2018 – August 28, 2021 End Date: Name of Prime Plan USA International Inc. Implementing Partner: Cooperative Agreement 72049218CA00007 Number: Names of Ecosystems Work for Essential Benefits (ECOWEB) Subcontractors/Sub Maranao People Development Center, Inc. (MARADECA) awardees: IMPL Project (IMPL) Major Counterpart Organizations Geographic Coverage Lanao del Sur, Marawi City, Lanao del Norte & Iligan City (cities and or countries) Reporting Period: April 1, 2020 to June 30, 2020 2 CONTENTS PROJECT PROFILE .................................................................................................................................... 2 CONTENTS ............................................................................................................................................... 3 ACRONYMS ............................................................................................................................................. 4 1. EXECUTIVE SUMMARY ....................................................................................................................
    [Show full text]
  • Oil Palm Expansion in the Philippines Analysis of Land Rights, Environment and Food Security Issues5
    Oil Palm Expansion in South East Asia: trends and implications for local communities and indigenous peoples 4. Oil palm expansion in the Philippines Analysis of land rights, environment and food security issues5 Jo Villanueva Introduction In recent years, the unprecedented and rapid expansion of oil palm plantations in Southeast Asia, particularly in Malaysia and Indonesia, has spurred considerable concern in the light of its adverse impact on the environment, biodiversity, global warming, 5 This study has also been published as a chapter in “Oil Palm Expansion in South East Asia: Trends and Implications for Local Communities and Indigenous Peoples. (FPP & SawitWatch 2011). Oil Palm Expansion in South East Asia: trends and implications for local communities and indigenous peoples the displacement of local (and indigenous) communities, the erosion of traditional livelihoods, and the undermining of indigenous peoples and workers‟ rights. In Indonesia, oil palm expansion has contributed to deforestation, peat degradation, loss of biodiversity, ravaging forest fires and a wide range of unresolved social conflicts. In Sarawak, Malaysia, the impact of oil palm includes loss and destruction of forest resources, unequal profit-sharing, water pollution and soil nutrient depletion. In the midst of the increasing profitability of palm oil in the world market, the versatility of its by- products and its potential as a source of biomass in the food and manufacturing industry, a raging debate has ensued between and amongst civil society and industry members over whether palm oil is a necessary evil or whether the costs of this industry on lives, land and environment far outweigh its worth. Although considered a fledgling industry in the Philippine agribusiness sector and while its size is certainly small compared to the millions of hectares of oil palm plantations in Malaysia and Indonesia, the Philippines has been cultivating and processing palm oil for the past three decades.
    [Show full text]
  • Quarterly Report
    MARAWI RESPONSE PROJECT (MRP) Quarterly Report FY 2020 1st Quarter – October 1, 2019 to December 31, 2019 Submission Date: January 31, 2020 Cooperative Agreement Number: 72049218CA00007 Activity Start Date and End Date: August 29, 2018 – August 28, 2021 Submitted by: Plan International USA, Inc. This document was produced for review by the United States Agency for International Development Philippine Mission (USAID/Philippines). 1 PROJECT PROFILE Program: USAID/PHILIPPINES MARAWI RESPONSE PROJECT (MRP) Activity Start Date and End August 29, 2018 – August 28, 2021 Date: Name of Prime Plan USA International Inc. Implementing Partner: Cooperative Agreement 72049218CA00007 Number: Names of Subcontractors/ Ecosystems Work for Essential Benefits (ECOWEB) and Sub-awardees: Maranao People Development Center, Inc. (MARADECA) Major Counterpart Organizations Geographic Coverage Lanao del Sur, Marawi City, Lanao del Norte and Iligan City (cities and or countries) Reporting Period: October 1, 2019 to December 31, 2019 2 CONTENTS PROJECT PROFILE .......................................................................................................... 2 CONTENTS ...................................................................................................................... 3 ACRONYMS ...................................................................................................................... 4 1. EXECUTIVE SUMMARY .......................................................................................... 5 2. PROJECT OVERVIEW .............................................................................................
    [Show full text]
  • Post-Marawi Lessons from Detained Extremists in the Philippines
    POST-MARAWI LESSONS FROM DETAINED EXTREMISTS IN THE PHILIPPINES 27 NOVEMBER 2017 IPAC Report No. 41 CONTENTS I. Introduction ...............................................................................................1 II. The Davao Suspects ....................................................................................2 III. Radicalisation and Recruitment ...............................................................2 A. Fakhrudin Dilangalen’s Recruits ........................................................3 B. T.J. Macabalang’s Recruits..................................................................3 C. What to Watch For Now.....................................................................4 IV. Membership and Training ..... .................................................................5 A. AKP Training in Butril, Palimbang, Sultan Kudarat province .....6 B. Training shifts to Butig, Lanao del Sur, December 2015 ................7 V. Financing .....................................................................................................8 VI. The Dire State of the Criminal Justice System ........................................9 VII. Conclusions ...............................................................................................10 Post-Marawi Lessons from Detained Extremists in the Philippines ©2017 IPAC 1 I. INTRODUCTION Information from the suspects in the September 2016 Davao bombing sheds important light on the radicalization and recruitment processes that led a pro-ISIS coalition to take over the
    [Show full text]
  • Doj Reso Maute Doctor
    --I' ·,- Republika ng Pilipinas KAGAWARAN NG KATARUNGAN Department of Justice Manila GABRIEL TOMATAO PERMITIS, Complainant, • versus- NPS RXIV-04-INV-16H-00179 For: Kidnapping OMINTA ROMATO MAUTE, et al., Respondents. x---------------------------------------------- ALFREDO SARSALEJO CANO-OS, Complainant, • versus- NPS RXIV-04-INV-16H-00180 For: Kidnapping ABDULAH ROMATO MAUTE, et al., Respondents. x------------------------------ ---- ------------ ESPERANZA PERMITIS JANUBAS, Complainant. - versus- NPS RXIV-04-INV-16H-00181 For: Murder (2 counts) ABDULAH ROMATO MAUTE, et al., Respondents. x---------------------------------------------- ADONIS ANTIPISTO MENDEZ, Complainant, - versus- NPS RXIV-04-INV-16H-00182 For: Kidnapping 1 Scanned by CamScanner ' I ... ABDULAH ROMATO MAUTE, et al., Respondents. x---------------------------------------------- JULITO PERMITIS JANUBAS, Complainant, - vensus- NPS RXIV-04-INV-16H-00183 For: Kidnapping ABDULAH ROMA TO MAUTE, et al., Respondents. x---------------------------------------------- JOINT RESOLUTION This resolves jointly the supplemental complaints filed by Tomatao Pennitis, Alfredo Sarsalejo Cano-os, Esperanza ""'"'"rmn• Janubas, Adonis Antipisto Mendez and Julito Permitis 00 against the second (2 ) set of respondents, namely, Abu Akmad, Mimbantas @ Zakaria, Alihasan Panolong @ Abu Amar, F Dilangalin @ Abu Said, Osoph Hadji Nasif, Hafts Maute, An~an Alawiya Dimapi, Abang Samsoden Ragaolan, Abdul Malik, Khalil @ Omar Khalil@ Umair Pacora Khalil, Jamil B. Amir, Hata Lantud, Abu Apghan, Eyemen Alonto,
    [Show full text]
  • Philippines: Marawi Armed-Conflict 3W (As of 18 April 2018)
    Philippines: Marawi Armed-Conflict 3W (as of 18 April 2018) CITY OF Misamis Number of Activities by Status, Cluster & Number of Agencies EL SALVADOR Oriental 138 7,082 ALUBIJID Agencies Activities INITAO Number of CAGAYAN DE CLUSTER Ongoing Planned Completed OPOL ORO CITY (Capital) organizations NAAWAN Number of activities by Municipality/City 1-10 11-50 51-100 101-500 501-1,256 P Cash 12 27 69 10 CCCM 0 0 ILIGAN CITY 571 3 Misamis LINAMON Occidental BACOLOD Coord. 1 0 14 3 KAUSWAGAN TAGOLOAN MATUNGAO MAIGO BALOI POONA KOLAMBUGAN PANTAR TAGOLOAN II Bukidnon PIAGAPO Educ. 32 32 236 11 KAPAI Lanao del Norte PANTAO SAGUIARAN TANGCAL RAGAT MUNAI MARAWI MAGSAYSAY DITSAAN- CITY BUBONG PIAGAPO RAMAIN TUBOD FSAL 23 27 571 53 MARANTAO LALA BUADIPOSO- BAROY BUNTONG MADALUM BALINDONG SALVADOR MULONDO MAGUING TUGAYA TARAKA Health 79 20 537 KAPATAGAN 30 MADAMBA BACOLOD- Lanao TAMPARAN KALAWI SAPAD Lake POONA BAYABAO GANASSI PUALAS BINIDAYAN LUMBACA- Logistics 0 0 3 1 NUNUNGAN MASIU LUMBA-BAYABAO SULTAN NAGA DIMAPORO BAYANG UNAYAN PAGAYAWAN LUMBAYANAGUE BUMBARAN TUBARAN Multi- CALANOGAS LUMBATAN cluster 7 1 146 32 SULTAN PICONG (SULTAN GUMANDER) BUTIG DUMALONDONG WAO MAROGONG Non-Food Items 1 0 221 MALABANG 36 BALABAGAN Nutrition 82 209 519 15 KAPATAGAN Protection 61 37 1,538 37 Maguindanao Shelter 4 4 99 North Cotabato 7 WASH 177 45 1,510 32 COTABATO CITY TOTAL 640 402 6,034 The boundaries, names shown and the designations used on this map do not imply official endorsement or acceptance by the United Nations Creation date: 18 April 2018 Sources: PSA
    [Show full text]
  • Emindanao Library an Annotated Bibliography (Preliminary Edition)
    eMindanao Library An Annotated Bibliography (Preliminary Edition) Published online by Center for Philippine Studies University of Hawai’i at Mānoa Honolulu, Hawaii July 25, 2014 TABLE OF CONTENTS Preface iii I. Articles/Books 1 II. Bibliographies 236 III. Videos/Images 240 IV. Websites 242 V. Others (Interviews/biographies/dictionaries) 248 PREFACE This project is part of eMindanao Library, an electronic, digitized collection of materials being established by the Center for Philippine Studies, University of Hawai’i at Mānoa. At present, this annotated bibliography is a work in progress envisioned to be published online in full, with its own internal search mechanism. The list is drawn from web-based resources, mostly articles and a few books that are available or published on the internet. Some of them are born-digital with no known analog equivalent. Later, the bibliography will include printed materials such as books and journal articles, and other textual materials, images and audio-visual items. eMindanao will play host as a depository of such materials in digital form in a dedicated website. Please note that some resources listed here may have links that are “broken” at the time users search for them online. They may have been discontinued for some reason, hence are not accessible any longer. Materials are broadly categorized into the following: Articles/Books Bibliographies Videos/Images Websites, and Others (Interviews/ Biographies/ Dictionaries) Updated: July 25, 2014 Notes: This annotated bibliography has been originally published at http://www.hawaii.edu/cps/emindanao.html, and re-posted at http://www.emindanao.com. All Rights Reserved. For comments and feedbacks, write to: Center for Philippine Studies University of Hawai’i at Mānoa 1890 East-West Road, Moore 416 Honolulu, Hawaii 96822 Email: [email protected] Phone: (808) 956-6086 Fax: (808) 956-2682 Suggested format for citation of this resource: Center for Philippine Studies, University of Hawai’i at Mānoa.
    [Show full text]
  • Rice Suitability Map Province of Lanao Del
    123°50' 124°0' 124°10' 124°20' 124°30' 124°40' 124°50' 8°20' 8°20' Province of Misamis Oriental R E P U B L I C O F T H E P H I L I P P I N E S D E P A R T M E N T O F A G R I C U LT U R E BUREAU OF SOIL S AND WATER M ANAGEMENT I l i g a n B a y Elliptical Road Cor. Visayas Ave., Diliman, Quezon City RICE SUITABILITY MAP ( Key Rice Areas ) PROVINCE OF LANAO DEL SUR ° SCALE 1:135,000 8°10' 0 1 2 3 4 5 6 7 8 9 8°10' Province of Lanao del Norte Kilometers Projection : Transverse Mercator Datum : Luzon 1911 LEGEND DISCLAIMER : All political boundaries are not authoritative SUITABILITY LIMITING FACTORS AREA DESCRIPTION RATING Moderate Marginal Severe ha % S1 Highly Suitable - - - 544 2.14 S2d d - - 3,710 14.60 S2d S2df S2df d,f - - 10,445 41.10 S2df S2dxf Kapai S2d S2dx d,x - - 897 3.53 S2df S2d S2dxf Moderately Suitable d,x,f - - 1,905 7.50 S2f f - - 1,058 4.16 S2d S2x x - - 1,072 4.22 S2df S2xf x,f - - 3,837 15.10 Saguiaran S3x d x - 467 1.84 Marginally Suitable S2df S3x d,f x - 1,478 5.81 TOTAL. 25,414 100.00 Province of Bukidnon S2df MARAWI S2dx 8°0' Note: Piagapo Highly Suitable (S1) - with none to slight limitations for any given use.
    [Show full text]
  • Marawi Rebuilding from Ashes to a City of Faith, Hope and Peace
    MARAWI REBUILDING FROM ASHES TO A CITY OF FAITH, HOPE AND PEACE MARAWI REBUILDING FROM ASHES TO A CITY OF FAITH, HOPE AND PEACE 1 Marawi: Rebuilding from Ashes to a City of Faith, Hope, and Peace Listening Methodology Development: Soth Plai Ngarm Listening Project Implementation (Training, Processing) Team: Betchak Padilla Mary Schletzbaum Writer/Editor: Tengku Shahpur Cover photo & Inside Photos: Acram Latiph, Field researchers (Listeners) Lay-out: Boonruang Song-Ngam Copy Editor: Lakshmi Jacota Publisher: Centre for Peace and Conflict Studies Funding: Department of Foreign Affairs and Trade (DFAT) ISBN: 2 Acknowledgements The Centre for Peace and Conflict Studies (CPCS) is grateful to Dansalan College, Mindanao State University and Institute Bangsamoro Studies who have provided invaluable assistance throughout the project. We could not have done this without you. We are especially grateful to all the individuals who volunteered to be listeners. We appreciate the time, energy, enthusiasm and empathy that you demonstrated throughout the process, and your willingness to travel to remote areas. We are especially grateful for the courage you displayed by revisiting the areas where the siege took place and speaking to survivors. Thank you. We would also like to express our heartfelt gratitude to the survivors of the siege who were willing to share their experiences, knowledge and hopes for the future. Thank you for your candor, bravery, and strength and for entrusting us with your voices. Lastly, we would like to thank the Department of Foreign
    [Show full text]
  • Solicitation Document
    REQUEST FOR PROPOSAL (RFP) MEDIA PRODUCTION FIRM FOR THE DOCUMENTATION OF THE EMPOWER PH AND EMPOWER BARMM INITIATIVES DATE: April 20, 2021 REFERENCE: RFQ-040-PHL-2021 Dear Sir / Madam: We kindly request you to submit your Proposal for the Services of a Media Production Firm for the Documentation of UNDP’s project – EMPOWER PH and EMPOWER BARMM Initiatives. Please be guided by the form attached hereto as Annex 2, in preparing your Proposal. Proposals may be submitted on or before Thursday, April 29, 2021, COB Manila Philippines, via email to the address below: UNDP Philippines Procurement Unit Email: [email protected] Your Proposal must be expressed in the English, and valid for a minimum period of 90 days. In the course of preparing your Proposal, it shall remain your responsibility to ensure that it reaches the address above on or before the deadline. Proposals that are received by UNDP after the deadline indicated above, for whatever reason, shall not be considered for evaluation. If you are submitting your Proposal by email, kindly ensure that they are signed and in the .pdf format, and free from any virus or corrupted files. Services proposed shall be reviewed and evaluated based on completeness and compliance of the Proposal and responsiveness with the requirements of the RFP and all other annexes providing details of UNDP requirements. The Proposal that complies with all of the requirements, meets all the evaluation criteria and offers the best value for money shall be selected and awarded the contract. Any offer that does not meet the requirements shall be rejected.
    [Show full text]
  • DSWD DROMIC Report #1 on the Armed Conflict in Lanao Del Sur As of 22 June 2018, 1AM
    DSWD DROMIC Report #1 on the Armed Conflict in Lanao del Sur as of 22 June 2018, 1AM SUMMARY On 16 June 2018, at around 10:00PM, Armed conflict incident transpired in Tubaran, Lanao del Sur B between the Armed Forces of the Philippines (AFP) and alleged “ISIS group. This resulted in the massive evacuation of affected families. 1. Status of Affected Families/ Persons 3,121 families or 14,873 persons were affected by the armed conflict (see Table 1). Table 1. Affected Families/ Persons NUMBER OF AFFECTED REGION / PROVINCE / MUNICIPALITY Barangays Families Persons GRAND TOTAL 19 3,121 14,873 ARMM 19 3,121 14,873 Lanao del Sur B 19 3,121 14,873 Tubaran 10 1,816 8,614 Pagayawan 7 1,258 6,134 Calanugas 1 15 45 Marogong 1 32 80 Source: DSWD-Field Office XII 2. Status of Displaced Families/Individuals Inside Evacuation Center 739 families or 3,532 persons are currently staying in 17 evacuation centers (see Table 2). Table 2. Displaced Families / Persons Inside Evacuation Centers NUMBER OF NUMBER OF SERVED EVACUATION INSIDE ECs REGION / PROVINCE / CENTERS MUNICIPALITY (ECs) Families Persons CUM NOW CUM NOW CUM NOW GRAND TOTAL 17 17 739 739 3,532 3,532 ARMM 17 17 739 739 3,532 3,532 Lanao del Sur B 17 17 739 739 3,532 3,532 Tubaran 4 4 439 439 2,200 2,200 Pagayawan 5 5 117 117 615 615 Binidayan 3 3 74 74 378 378 Page 1 of 3|DSWD DROMIC Report #1 on the Armed Conflict in Lanao del Sur as of June 22, 2018, 1AM NUMBER OF NUMBER OF SERVED EVACUATION INSIDE ECs REGION / PROVINCE / CENTERS MUNICIPALITY (ECs) Families Persons CUM NOW CUM NOW CUM NOW Ganassi 4 4 98 98 283 283 Madamba 1 1 11 11 56 56 Source: DSWD-Field Office XII Outside Evacuation Center 2,382 families or 11,341 persons are temporarily staying with relatives (see Table 3).
    [Show full text]
  • Series 200Rqllo\,.O1
    fliT· 13- PPIAJH Republic of the Philippines 4-/o-pJ DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS OFFICE OF THE SECRETARY Manila ~APR 102001 DEPARTMENT ORDER No. 67 Series 200r qllO\,.o1 SUBJECT Upgrading the Marawi Sub-District Engineering Office Into A Regular Engineering District As authorized under Republic Act No. 8999 and pursuant to Sections 6 and 25 of Executive Order No. 124 dated 30 January 1987, the Marawi Sub-District Engineering Office is hereby upgraded into a regular engineering district to be known as the Lanao del Sur First Engineering District which shall have jurisdiction over all national infrastructure projects and facilities within Marawi City and the First Congressional District of Lanao del Sur which are funded under the General Appropriations Act (GAA), and for which the funds are released to the DPWH. Said engineering district shall have jurisdiction over the following municipalities and city of the First Congressional District of Lanao del Sur: 1. Buadiposo-Buntong 10. Piagapo 2. Bubong 11. Poona-Bayabao 3. Bumbaran 12. Ditsaan-Ramain 4. Kapai 13. Saguiaran 5. Lumba-Bayabao 14. Tagoloan 6. Maguing 15. Tamparan 7. Marantao 16. Taraka 8. Masiu 17. Wao 9. Molundo 18. Marawi City Personnel of the Lanao del Sur First Engineering District shall be made up of the employees of the Marawi Sub-District Engineering Office, pending approval of the Organization, Staffing and Classification Action Summary (OS CAS) and the plantilla of personnel of the Lanao del Sur First Engineering Office. The Regional Director is hereby authorized to issue the needed complementary directive to implement this Order.
    [Show full text]