Ashfield and Mansfield Trails East.Pdf

Total Page:16

File Type:pdf, Size:1020Kb

Ashfield and Mansfield Trails East.Pdf t 6 These trails link Kingsmill Reservoir to National to Sheffield Cycle Route 6, east of Rainworth, a distance of 1 some 6 ⁄2 miles. From Kingsmill, the route Worksop follows a bridleway through new industrial Ashfield and Mansfield Trails (East) estates and Sheepridge Road via Bleak Hills. Cresswell Multi-User Routes At Sheepridge Road, the route runs alongside the River Maun through a Local Nature Reserve . 3 1 and passing under the old stone railway viaduct Bolsover 7 9 1 0 and then through Quarry Lane park beside the 0 0 1 old mill ponds. Oy West e v r u S Edwinstowe e c Crossing Nottingham Road, the route then takes n a n d in Fisher Lane park before emerging onto a short r O on-road section on Littleworth Road. 1 1 Mansfield 0 2 s t h g i Although there is a steep incline in Fisher Lane Sutton in r e s Park, once north of Windsor Road the route has a Ashfield East b Kirkby in a t more gentle gradients, largely following a a d Ashfield 6 d n disused railway line to Rainworth and beyond to a t h g NCR 6, with signed road crossings. Another i r y p short section of on-road route takes the user o c n from The Avenues Rainworth, along Southwell w o r C Road, to the link to NCR 6 and Sherwood Pines. Hucknall © This information can be made available upon ) a ( request in alternative formats and languages. 6 4 8 6 / R & E / For more information on 1 1 . 2 cycling and recreational routes, see 0 P & www.nottinghamshire.gov.uk/home/leisure/l-cycling D W nottinghamshire.gov.uk E [email protected] T 08449 80 80 80 Supported by: Environment and Resources, Trent Bridge House, Fox Road, West Bridgford, Nottingham NG2 6BJ nottinghamshire @nottscc The Mansfield Way The Timberland Trail At Racecourse Road, the trail joins The Mansfield Starting at Kingsmill Reservoir, the Timberland Trail Parts of the trail are particularly important for Way and traces the route of the Mansfield- runs around the southern edge of Mansfield Town their wildlife and habitat value; much of the route Southwell railway to Rainworth. A small hamlet centre, joining the Mansfield Way at Racecourse between Rainworth and Mansfield has been until the 1870’s,when the Road. designated as a Site of Importance for Nature line was opened, Rainworth expanded with the Conservation (SINC) and the section development of Rufford Colliery, but the closure of Occupied since Roman times, Mansfield’s immediately east of Oak Tree Lane is on the the pit in 1993 has seen the town’s prosperity prosperity was fuelled by the industrialisation of National Heathland Register. decrease. coal mining in nearby villages, and the building of a local railway network. The River Maun also Characterised by heather and gorse, with Sherwood Pines Forest Park, 3300 acres owned provided energy for textile and hosiery mills; the associated birch and pine trees, lowland heath by the Forest Commission, is billed as the largest old mill ponds can still be seen in Quarry Lane supports breeding populations of rare birds such tract of publicly open Forest in the country and has Park and the trail runs alongside the Maun through as the nightjar and woodlark, native reptiles eg. many graded biking and walking trails, and other Titchfield Park. adders and slow worms and rare insects and activities. Planted on former heathland, there is an spiders. increasing proportion of broad-leaved tree species The trail joins the line of the former Mansfield - amongst the commercial pine. Southwell railway line at Fisher Lane Park. trails Key The Timberland Trail The Mansfield Way The Skegby Trail National Cycle Route 6 ••••• Public Bridleway ••••• On Road Parking Visitor Centre Sherwood Hazard Pines Junction of Mansfield Way and Trail runs through Timberland Trail Titchfield Park (Racecourse Lane) Entrance to •••• •• Quarry Lane •• Busy road crossing •• Take care crossing Nature Reserve (Oak Tree Lane) railway line Trail runs through • Fisher Lane Park • • • • • •• Busy road crossing • •• • • • • • • Busy road crossing • (Sheepridge Road) • • • • • • • • • • • • • • • • • • • • • • • (MARR) • • • • • • • • • • • • • • ••• • •• Route follows • Busy road crossing First Avenue to Busy road crossing (Hamilton Way) Kirklington Road (Hermitage Road) ••••••••••••••••••••••••••••••• sseeee lleafleteaflet Follow signs to AAshfieldshfield aandnd Sherwood Pines to join MMansfieldansfield National Cycle Route 6 Trrailsails ((west)west) forfor onwardonward rroutesoutes © Crown copyright and database rights 2011 Ordnance Survey 100019713. Approximate scale: 1:25000.
Recommended publications
  • Nottinghamshire's Sustainable Community Strategy
    Nottinghamshire’s Sustainable Community Strategy the nottinghamshire partnership all together better 2010-2020 Contents 1 Foreword 5 2 Introduction 7 3 Nottinghamshire - our vision for 2020 9 4 How we put this strategy together What is this document based on? 11 How this document links with other important documents 11 Our evidence base 12 5 Nottinghamshire - the timeline 13 6 Nottinghamshire today 15 7 Key background issues 17 8 Nottinghamshire’s economy - recession and recovery 19 9 Key strategic challenges 21 10 Our priorities for the future A greener Nottinghamshire 23 A place where Nottinghamshire’s children achieve their full potential 27 A safer Nottinghamshire 33 Health and well-being for all 37 A more prosperous Nottinghamshire 43 Making Nottinghamshire’s communities stronger 47 11 Borough/District community strategies 51 12 Next steps and contacts 57 Nottinghamshire’s Sustainable Community Strategy 2010-2020 l p.3 Appendices I The Nottinghamshire Partnership 59 II Underpinning principles 61 III Our evidence base 63 IV Consultation 65 V Nottinghamshire - the timeline 67 VI Borough/District chapters Ashfield 69 Bassetlaw 74 Broxtowe 79 Gedling 83 Mansfield 87 Newark and Sherwood 92 Rushcliffe 94 VII Case studies 99 VIII Other relevant strategies and action plans 105 IX Performance management - how will we know that we have achieved our targets? 107 X List of acronyms 109 XI Glossary of terms 111 XII Equality impact assessment 117 p.4 l Nottinghamshire’s Sustainable Community Strategy 2010-2020 1 l Foreword This document, the second community strategy for Nottinghamshire, outlines the key priorities for the county over the next ten years.
    [Show full text]
  • Manor Estate, Mansfield Woodhouse) Gating Order 2008
    NOTICE OF INTENTION TO MAKE A GATING ORDER SECTION 129A HIGHWAYS ACT 1980 The Nottinghamshire County Council (Manor Estate, Mansfield Woodhouse) Gating Order 2008 NOTICE IS HEREBY GIVEN that the Nottinghamshire County Council proposes to make an Order under Section 129A (1) of the Highways Act 1980 (for the purposes of reducing crime and antisocial behaviour) the effects of which in respect of highways at Mansfield Woodhouse in the District of Mansfield will be:- All pedestrians, equestrians and vehicles, other than those specified in the Order, will be prohibited from using the alleyways below at Mansfield Woodhouse (“the Highways”). The Highways are also shown by bold black lines on the attached plans. The prohibition will apply at all times. The Order will exempt from the prohibition, any person who lives in premises adjoining the Highways, emergency services personnel, statutory undertakers and utility providers. Alternative routes for pedestrians, equestrians and vehicles are available by using the following nearby roads:- Park Hall Road; Worcester Avenue; Hereford Avenue; Tewkesbury Avenue; Ley Lane; Kingsley Avenue; Riverside Way; Riverside Close. These roads are shown on the Order plan. A draft of the proposed Order is set out in the Schedule to this notice. A copy of the Council’s statement of reasons for making the Order, a plan and other associated papers are available for inspection at:- i. The Nottinghamshire County Council, County Hall, West Bridgford, Nottingham NG2 7QP. ii. The Library, Church Street, Mansfield Woodhouse, Mansfield, Nottinghamshire NG19 8AH. A copy of this notice can be viewed by visiting the Council’s website at www.nottinghamshire.gov.uk/gatingordermanor Written objections (stating grounds and quoting ref.
    [Show full text]
  • Mansfield Residential Brochure.Q:Layout 1
    FOR SALE Partially completed residential development New Park Lane, The Ridge, Mansfield, Nottinghamshire NG18 2AT New Park Lane, The Ridge, Mansfield, Nottinghamshire NG18 2AT • Partially completed, freehold residential development site • 2.94 acres (1.19 hectares) in a sought after area of Mansfield • To provide a mix of 2, 3, 4 and 5 bedroom houses • Includes planning consent for 18 x two bedroom apartments • A mix of land, shell condition units, the former Manor House and show home • Parkland setting within the grounds of a former Victorian manor house • Potential to vary the existing planning consent and S106 Agreement Introduction A rare opportunity to acquire a partially completed residential development site in a sought after suburb of Mansfield. The subject site comprises the second phase of a development of 23 executive 2,3,4 & 5 bedroom houses and 18 x 2 Bedroom luxury apartments within a secure gated development with the exception of Plots 41-43 which are situated on Carlton Street. The first phase of 11 houses has been completed and the units sold off. We are instructed by the developer to manage the sale of Plots 2,13,14,15-38,40 and 41-43 inclusive which are at varying stages of completion comprising a mix of land, shell condition units, the former Manor House (conversion) and show home. New Park Lane, The Ridge, Mansfield, Nottinghamshire NG18 2AT SHEFFIELD ROTHERHAM A61 M1 Location A60 C H WOODHOU E A60 S T E The main site is accessed via a gated entrance to the R F I E end of The Park, a tree lined residential road situated L D CHESTERFIELD R SE O J29 on the northern outskirts of Mansfield town centre A ROA RAVENS D DA A1 LE A617 NE RO in a parkland setting.
    [Show full text]
  • Nottinghamshire, Mansfield & Nottingham Trades Union Council
    TUC Nottinghamshire, Nottin Mansfield & Nottingham g ham Trades Union Council Mansfield The Notts. Unemployed Workers Centre 5 Beech Ave. Mansfield Notts. NG18 1EY ` for directions please see www.nuwc.org.uk and go on the red link to 'find us' Nottinghamshire Secretary: Richard Buckwell (01623) 457580 Email; [email protected] Visit http://nottstradescouncil.blogspot.com for latest info Ofcom Riverside House 2a Southwark Bridge Road London SE1 9HA 10th October 2008 Dear Ofcom, Plans to cut the regional news in the East Midlands. I am writing on behalf of the Notts., Nottingham and Mansfield Trades Council over plans to cut the regional news in the East Midlands. We are deeply concerned over the proposal and by the impact this will have on the coverage of local news for this region. We believe the decision to axe the Central News programme in this area is a retrograde step. The East Midlands will only have a six-minute pre-recorded segment in a programme which will be dominated by items about the West. We recognise that ITV is undergoing financial difficulties, which is blamed on a reduction in the advertising revenue. ITV has argued that by reducing its regions from 17 to 9 this will save the company 40 million pounds. But the redrawing of this map will result in a loss in identity for this region: a region which came about following a vociferous campaign in the 1970’s by local M.P.’s. Already this region has experienced significant cutbacks before last week’s announcement. Four and a half years ago, the Lenton Lane studio was closed with the loss of two hundred jobs.
    [Show full text]
  • Draft Recommendations on the Future Electoral Arrangements for Newark & Sherwood in Nottinghamshire
    Draft recommendations on the future electoral arrangements for Newark & Sherwood in Nottinghamshire Further electoral review December 2005 Translations and other formats For information on obtaining this publication in another language or in a large-print or Braille version please contact The Boundary Committee for England: Tel: 020 7271 0500 Email: [email protected] The mapping in this report is reproduced from OS mapping by The Electoral Commission with the permission of the Controller of Her Majesty’s Stationery Office, © Crown Copyright. Unauthorised reproduction infringes Crown Copyright and may lead to prosecution or civil proceedings. Licence Number: GD 03114G 2 Contents Page What is The Boundary Committee for England? 5 Executive summary 7 1 Introduction 15 2 Current electoral arrangements 19 3 Submissions received 23 4 Analysis and draft recommendations 25 Electorate figures 26 Council size 26 Electoral equality 27 General analysis 28 Warding arrangements 28 a Clipstone, Edwinstowe and Ollerton wards 29 b Bilsthorpe, Blidworth, Farnsfield and Rainworth wards 30 c Boughton, Caunton and Sutton-on-Trent wards 32 d Collingham & Meering, Muskham and Winthorpe wards 32 e Newark-on-Trent (five wards) 33 f Southwell town (three wards) 35 g Balderton North, Balderton West and Farndon wards 36 h Lowdham and Trent wards 38 Conclusions 39 Parish electoral arrangements 39 5 What happens next? 43 6 Mapping 45 Appendices A Glossary and abbreviations 47 B Code of practice on written consultation 51 3 4 What is The Boundary Committee for England? The Boundary Committee for England is a committee of The Electoral Commission, an independent body set up by Parliament under the Political Parties, Elections and Referendums Act 2000.
    [Show full text]
  • Park Royal Transport Strategy LOCAL PLAN SUPPORTING STUDY
    Park Royal Transport Strategy LOCAL PLAN SUPPORTING STUDY 2017 34. Park Royal Transport Strategy Document Title Park Royal Transport Strategy Lead Author Steer Davies Gleave Purpose of the Study Strategic assessment of the existing transport provision in Park Royal, the impact of the planned future growth and identification of the transport interventions required to mitigate those impacts. Key outputs • A review of the existing performance of transport modes in Park Royal • Analysis of future demand in Park Royal and its impact on the transport modes • Identification of six packages of interventions required to improve existing performance and to mitigate the impact of future demand on transport modes. Key recommendations Emerging recommendations include providing transport networks that enhance the communities they serve and help local business to operate and grow sustainably, both now and in the future. Relations to other Emerging recommendations include providing transport networks that enhance the communities they serve and help studies local business to operate and grow sustainably, both now and in the future. Relevant Local Plan • Policy SP6 (Places and Destinations) and Policy SP7 (Connecting People and Places) Policies and Chapters • Place policies P4 (Park Royal West), P5 (Old Park Royal), P6 (Park Royal Centre), P7 (North Acton and Acton Wells), P8 (Old Oak Lane and Old Oak Common Lane) and P9 (Channel Gate) • All transport chapter policies Park Royal Transport Strategy Final Report January 2016 TfL and OPDC Our ref: 22857301 Client ref: Task 15 Current public realm in centre of Park Royal Prepared by: Prepared for: Park Royal Transport Strategy Steer Davies Gleave TfL and OPDC Final Report 28-32 Upper Ground Windsor House / Union Street - London January 2016 London SE1 9PD +44 20 7910 5000 TfL and OPDC www.steerdaviesgleave.com Our ref: 22857301 Client ref: Task 15 Steer Davies Gleave has prepared this material for TfL and OPDC.
    [Show full text]
  • 2839-18 Redacted Response
    Our Ref: 2839.18 1 May 2018 Dear Re: Request under the Freedom of Information Act 2000 (FOIA) Thank you for your request for information, which was received by the Nottinghamshire Office of the Police and Crime Commissioner on 5 April 2018. INFORMATION REQUESTED Please provide the register of premises or land owned by, or occupied for the purposes of, the office of Police and Crime Commissioner, and the functions of their force, for the financial year 2017/18. Entries listed should be broken down by local policing directorate (or borough), and indicate whether it is: Police building Other building/land Neighbourhood office Other RESPONSE Under S 1 (1) (a) of the Freedom of Information Act 2000 (FOIA), I can confirm that the Nottinghamshire Office of the Police and Crime Commissioner does hold the information you have requested. Please see attached document that answers your questions. I would like to take this opportunity to thank you for your interest in the Nottinghamshire Office of the Police and Crime Commissioner. Should you have any further enquiries concerning this matter, please write or contact the Freedom of Information Officer on telephone number 0115 8445998 or e-mail [email protected]. The Nottinghamshire Office of the Police and Crime Commissioner Arnot Hill House, Arnot Hill Park, Arnold, Nottingham NG5 6LU T 0115 844 5998 F 0115 844 5081 E nopcc@nottingh amshire.pnn.police.uk W www.nottinghamshire.pcc.police.uk Yours sincerely Lisa Gilmour Business Support Manager Nottinghamshire Office of the Police
    [Show full text]
  • 450 Retford - Mansfield - NOTTINGHAM - LONDON 20 June 2016
    450 Retford - Mansfield - NOTTINGHAM - LONDON 20 June 2016 Days of Operation NSSu SSu NSSu SSu NSSu SSu D D D D D FSu D D Su Bank Holiday arrangements 1 2 1 2 1 2 3 5 5 4 Retford, Bus Station 09:55 Worksop, Bus Stn, Newcastle St 10:15 Warsop, o/s Oak Garage 10:25 Mansfield, Bus Station, Quaker Way 07:25 07:55 09:20 10:50 Mansfield, Bus Lay-by o/s Portland Training College 07:30 08:00 09:25 10:55 Ravenshead, Nottingham Rd, opp Newstead Abbey Gates 07:35 08:05 09:30 11:00 Nottingham (North), Mansfield Road, o/s Sherwood Café 07:55 08:20 09:45 11:15 Nottingham, Broad Marsh Bus Station a. 08:15 08:30 10:00 11:30 Nottingham, Broad Marsh Bus Station d. 05:20 06:05 07:00 07:45 08:30 08:45 10:15 11:45 13:15 14:45 16:15 17:00 18:00 19:45 20:30 Milton Keynes Coachway, M1 junction 14 06:55 07:40 - - - - - 13:25 - 16:25 - - 19:40 - - London (Golders Green), Bus Stn 08:20 08:40 09:55 10:10 - - 12:45 - 15:45 - 18:55 - - 22:10 - London (Finchley Rd), opp Tube Stn, Stop CH s 08:35 08:45 - - - - - 14:25 - 17:30 - - 20:35 - - London (Marylebone), Baker Street, Stop A s 08:50 08:55 - - - - - - - - - - - - - London (Marble Arch), Park Lane, near Green Street s 09:00 09:05 10:35 10:35 11:35 11:35 13:20 14:50 16:25 18:00 19:35 20:05 21:05 22:40 23:10 LONDON, Victoria Coach Stn, Arrivals Hall 09:20 09:20 10:50 10:50 11:50 11:50 13:35 15:05 16:40 18:15 19:50 20:20 21:20 22:50 23:20 Days of Operation D D NF F NF F SSu M-Th F Su SSu NSSu SSu NSSu D D FSu D Bank Holiday arrangements 6 7 6 7 2 8 7 4 2 1 2 1 3 5 LONDON, Victoria Coach Stn, Departure Hall 08:30 10:30
    [Show full text]
  • Dacorum Borough Green Infrastructure Plan - Final Report
    DACORUM BOROUGH GREEN INFRASTRUCTURE PLAN - FINAL REPORT Prepared for Dacorum Borough Council by Land Use Consultants March 2011 www.landuse.co.uk LUC SERVICES Environmental Planning Landscape Design Landscape Management Masterplanning Landscape Planning Ecology Environmental Assessment Rural Futures Digital Design Urban Regeneration Urban Design 43 Chalton Street 14 Great George Street 37 Otago Street 28 Stafford Street London NW1 1JD Bristol BS1 5RH Glasgow G12 8JJ Edinburgh EH3 7BD Tel: 020 7383 5784 Tel: 0117 929 1997 Tel: 0141 334 9595 Tel: 0131 202 1616 Fax: 020 7383 4798 Fax: 0117 929 1998 Fax: 0141 334 7789 [email protected] [email protected] [email protected] [email protected] DOCUMENT CONTROL SHEET Version Issued by: Approved by: Andrew Tempany Kate Ahern Senior Landscape FINAL Principal-in-Charge Architect 24th March 2011 24th March 2011 CONTENTS 1 INTRODUCTION ...................................................................................................................................................................... 1 What is green infrastructure?..................................................................................................................................................................................................... 2 Benefits and relevance of the green infrastructure approach to Dacorum ..................................................................................................................................... 3 The green infrastructure planning process – a summary..............................................................................................................................................................
    [Show full text]
  • Report on Core Areas of Work
    Formatted APPENDIX A - REPORT ON CORE AREAS OF WORK Carriageway Resurfacing Programme 1. Luton‟s highway network is an essential communication link that serves almost everyone everyday of the week and for a wide variety of reasons from simply visiting friends and relatives to vital business deliveries. Roads are an extremely valuable asset and in Luton their Gross Replacement Value is currently £470.25m. 2. In 2011/12 we delivered 33 resurfacing schemes and spent c. £1,500,000 of capital and revenue funding. However, with another severe winter in 2010/11 many roads had deteriorated further with the long period of freeze/thaw leading to the accelerated break- up of carriageway surfaces, with extensive cracking, crazing and potholes. 3. In addition in March 2011 the Department for Transport allocated £248,006 of Winter Pothole Funding to LBC following severe winter weather. This was used for large area road patching with over 28 roads treated. 4. Weather predictions for future years indicate an increasing trend for more exceptional weather conditions resulting in further pressure on already reducing maintenance budgets. Highway maintenance is increasingly a matter of managing the deterioration of assets. 5. The classified road (A, B & C roads) network is assessed annually using nationally developed criteria and the unclassified network is assessed every two years. Figures supplied to government show that we are currently only spending half of what would be required to maintain Luton‟s roads in their current condition. 361 resurfacing schemes have been identified following carriageway condition surveys of the road network. 6. Based upon results of the assessments, and referrals from area Highway Inspectors, Highway Services has developed a programme of work for carriageways which need immediate and significant improvement.
    [Show full text]
  • Newark and Sherwood District Council Community Plan 2020-2023 Serving People, Improving Lives
    Newark and Sherwood District Council Community Plan 2020-2023 Serving People, Improving Lives (Updated in September 2020) Contents page Introduction Our community plan (2020 - 2023) has been re-examined to take into account the changing landscape of our district post covid-19. We have seen how our sense of togetherness and community spirit has defined the district and we want to continue to support this. We have also Introduction 3 recognised the economic impacts that have resulted from the global pandemic. We have committed to an ambitious programme of activity to engage in recovery which will strengthen our district. Our district 4 Our plan sets out the Council’s objectives over the next three years, building on previous published plans for the same time period. Our plan ensures the district continues to be a place where people choose to live, work, invest and spend their recreational time. The plan seeks to maintain many of the Council’s objectives that you told us were important in previous resident How the Council works 5 consultation exercises, such as continuing with the high standard of cleanliness and appearance of the local environment. Enhancing and protecting our natural environment also features in our plan acknowledging the Council ‘s declaration of a Climate Emergency in July 2019. Our funding 6 We acknowledge that we cannot deliver all of the elements of the community plan alone. We will continue to play a key role in strengthening our partnerships with residents, businesses, agencies and other organisations in the public sector to ensure that we full fil our objectives Our vision 7 within our community plan.
    [Show full text]
  • Sustainability Appraisal for Northampton Local Plan Part 2 Appendices
    Northampton Borough Council Sustainability Appraisal for Northampton Local Plan Part 2 Appendices Final report Prepared by LUC June 2020 Northampton Borough Council Sustainability Appraisal for Northampton Local Plan Part 2 Appendices Version Status Prepared Checked Approved Date 1. DRAFT FOR CLIENT REVIEW – J. Pearson J. Pearson QA to be 18.05.2020 NOT FOR ISSUE (Updated as a completed in S. Temple result of new/revised site parallel with allocations and policies since N. Collins client review, Proposed Submission Round 1) prior to E. Hynes consultation L. Meldrum E. Lendak C. Green 2. PROPOSED SUBMISSION J. Pearson J. Pearson J. Owen 16.06.2020 ROUND 2 - Final S. Temple E. Lendak C. Green Bristol Land Use Consultants Ltd Landscape Design Edinburgh Registered in England Strategic Planning & Assessment Glasgow Registered number 2549296 Development Planning Lancaster Registered office: Urban Design & Masterplanning London 250 Waterloo Road Environmental Impact Assessment Manchester London SE1 8RD Landscape Planning & Assessment Landscape Management landuse.co.uk 100% recycled paper Ecology Historic Environment GIS & Visualisation Contents SA for Northampton Local Plan Part 2 (Proposed Submission Rnd 2) June 2020 Contents Table C.3: Responses to consultation comments on September 2017 SA of Local Plan Part 2 Site Options paper C-19 Appendix A Table C.4: Regulation 19 Round 1 Consultation Review of other relevant policies, plans, Responses Relating to the Sustainability Appraisal C-25 and programmes A-1 Table E.1: Assessment criteria for
    [Show full text]