Expansion Made Easy with Adsorption Clarifier® California WTP Retrofits Existing Concrete Basins

Total Page:16

File Type:pdf, Size:1020Kb

Expansion Made Easy with Adsorption Clarifier® California WTP Retrofits Existing Concrete Basins Expansion Made Easy With Adsorption Clarifier® California WTP Retrofits Existing Concrete Basins CASE STUDY Location: El Dorado Hills, California Recommended Solution Owner: El Dorado Hills Irrigation District The solution to EID’s capacity vs. space dilemma came by way of Problem innovative thinking on the part of our Holding water rights that date back engineering experts, who suggested to California’s Gold Rush days, the converting unused concrete basins El Dorado Hills Irrigation District at the plant into a concrete version ® (EID) currently serves approximately of Adsorption Clarifier units and 128,000 residents in California’s concrete media filters. El Dorado County. This historic organization owns and operates The Adsorption Clarifier is a high-rate several water and wastewater clarification system that can be used treatment plants in the county, as a stand-alone pretreatment clarifier including the El Dorado Hills Water to filters or within a packaged system Like the tank version pictured, the concrete Treatment Plant (WTP), which treats such as the Trident. With a standard version of WesTech’s Adsorption Clarifier surface water pumped from Folsom hydraulic loading rate of 10 gpm/ provides clarification and flocculation. 2 Lake. The plant has undergone many ft (24 m/h), the Adsorption Clarifier changes over the years to meet a is designed to replace pretreatment as opposed to a settleable floc. A steadily increasing population. For equipment such as solids contact units retention screen atop the unit prevents example, in 1993, the plant installed or flocculation and settling equipment. media loss. two Trident® package water treatment The advantage of this system is a plants, which replaced equipment smaller footprint, lower profile, and a The Adsorption Clarifier achieves originally installed in 1960. Pleased cost savings to the owner. significant solids removal – typically with the operation of the Trident 70-90 percent of inlet water turbidity. technology, the plant installed The Adsorption Clarifier uses buoyant It does not require mechanical sludge another two units in 1995. media in an upflow system design. removal. Solids collected within The water travels upward through the the buoyant media are removed via When demand increased further, media and the floc that is produced is flushing, which consists of air scouring the plant had no available space for captured within the void spaces of the to expand the buoyant media and additional Trident units. The need to media and adsorbed onto the media. allow void spaces to increase, double the plant’s capacity from 8 to This process, which is called “contact 16 MGD (30-60 Ml/d), coupled with flocculation,” replaces conventional the lack of space, posed a significant flocculation and clarification. The goal challenge for EID. is to produce a “microfloc” that is removed in the buoyant media, combined with a raw water wash to Results flush the collected solids out of the Using the existing basins and the media. The waste is collected in a Adsorption Clarifier process allowed wash trough and directed to waste. the plant to double its capacity The second stage of the plant’s system without making major modifications included converting another concrete to the facility or purchasing additional basin into gravity filters containing land for new equipment. According mixed media (also referred to as to EID’s data (see the chart), the new multimedia or tri-media). The hydraulic systems produce effluent turbidity at or below 0.03 NTU and greater loading rate of the filter section is than 3 log removal of 5-15 micron- 5 gpm/ft2 (12 m/h). In general, this process has demonstrated the ability sized particles. to achieve filter effluent turbidity of < The plant operators continue to 0.1 NTU in full-scale applications, with be very pleased with the performance many plants – including the El Dorado of the original Trident systems and Hills plant – achieving effluent turbidity the Adsorption Clarifiers. Bill in the range of 0.02 to 0.05 NTU. Peterson, the plant’s chief operator, prefers this technology over Combined, the two processes Adsorption Clarifiers use buoyant media have demonstrated the ability to in an upflow system design. conventional treatment. achieve 99.9 percent turbidity removal with 3 log removal of 5-15 micron- sized particles. EID data show turbidity below 0.03 NTU and greater than 3 log removal of 5-15 micron-sized particles. Surface water is pumped to the plant from Folsom Lake. © WesTech Engineering, LLC 2021 Tel: 801.265.1000 | westech-inc.com .
Recommended publications
  • Water Treatment and Reverse Osmosis Systems
    Pure Aqua, Inc.® Water© 2012 TreatmentPure Aqua ,and Inc. ReverseAll Right sOsmosis Reserve dSystems. Worldwide Experience Superior Technology About the Company Pure Aqua is a company with a strong philosophy and drive to develop and apply solutions to the world’s water treatment challenges. We believe that both our technology and experience will help resolve the growing shortage of clean water worldwide. Capabilities and Expertise As an ISO 9001:2008 certified company with over a decade of experience, Pure Aqua has secured its position as a leading manufacturer of reverse osmosis systems worldwide. Goals and Motivations Our goal is to provide environmentally sustainable systems and equipment that produce high quality water. We provide packaged systems and technical support for water treatment plants, industrial wastewater reuse, and brackish and seawater reverse osmosis plants. Having strong working relationships with Thus, we ensure our technological our suppliers gives us the capability to contribution to water preservation by provide cost effective and competitive supplying the means and making it highly water and wastewater treatment systems accessible. for a wide range of applications. Seawater Reverse Osmosis Systems System Overview Designed to convert seawater to potable water, desalination systems use high quality reverse osmosis seawater membranes. The process separates dissolved salts by only allowing pure water to pass through the membrane fabric. System Capacities Pure Aqua desalination systems are designed to provide high
    [Show full text]
  • Package Plants Arrive on Site Virtually Ready to Operate and Built to Minimize the Day-To-Day Attention Required to Operate the Equipment
    A NATIONAL DRINKING WATER CLEARINGHOUSE FACT SHEET Package Plants Summary Small water treatment systems often find it difficult to comply with the U.S. Environmental Protection Agency (EPA) regulations. Small communities often face financial problems in purchas- ing and maintaining conventional treatment systems. Their problem is further complicated if they do not have the services of a full-time, trained operator. The Surface Water Treatment Rule (SWTR) requirements have greatly increased interest in the possible use of package plants in many areas of the country. Package plants can also be applied to treat contaminants such as iron and manganese in groundwater via oxidation and filtration. ○○○○○○○○○○ Package Plants: Alternative to Conventional Treatment What is a package plant? How To Select a Package Plant Package technology offers an alternative to Package plant systems are most appropriate for in-ground conventional treatment technology. plant sizes that treat from 25,000 to 6,000,000 They are not altogether different from other gallons per day (GPD) (94.6 to 22,710 cubic treatment processes although several package ○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○○ meters per day). Influent water quality is the plant models contain innovative treatment most important consideration in determining elements, such as adsorptive clarifiers. The the suitability of a package plant application. primary distinction, however, between package Complete influent water quality records need plants and custom-designed plants is that to be examined to establish turbidity levels, package plants are treatment units assembled seasonal temperature fluctuations, and color in a factory, skid mounted, and transported level expectations. Both high turbidity and color to the site. may require coagulant dosages beyond many package plants design specifications.
    [Show full text]
  • Safe Use of Wastewater in Agriculture: Good Practice Examples
    SAFE USE OF WASTEWATER IN AGRICULTURE: GOOD PRACTICE EXAMPLES Hiroshan Hettiarachchi Reza Ardakanian, Editors SAFE USE OF WASTEWATER IN AGRICULTURE: GOOD PRACTICE EXAMPLES Hiroshan Hettiarachchi Reza Ardakanian, Editors PREFACE Population growth, rapid urbanisation, more water intense consumption patterns and climate change are intensifying the pressure on freshwater resources. The increasing scarcity of water, combined with other factors such as energy and fertilizers, is driving millions of farmers and other entrepreneurs to make use of wastewater. Wastewater reuse is an excellent example that naturally explains the importance of integrated management of water, soil and waste, which we define as the Nexus While the information in this book are generally believed to be true and accurate at the approach. The process begins in the waste sector, but the selection of date of publication, the editors and the publisher cannot accept any legal responsibility for the correct management model can make it relevant and important to any errors or omissions that may be made. The publisher makes no warranty, expressed or the water and soil as well. Over 20 million hectares of land are currently implied, with respect to the material contained herein. known to be irrigated with wastewater. This is interesting, but the The opinions expressed in this book are those of the Case Authors. Their inclusion in this alarming fact is that a greater percentage of this practice is not based book does not imply endorsement by the United Nations University. on any scientific criterion that ensures the “safe use” of wastewater. In order to address the technical, institutional, and policy challenges of safe water reuse, developing countries and countries in transition need clear institutional arrangements and more skilled human resources, United Nations University Institute for Integrated with a sound understanding of the opportunities and potential risks of Management of Material Fluxes and of Resources wastewater use.
    [Show full text]
  • Sedimentation and Clarification Sedimentation Is the Next Step in Conventional Filtration Plants
    Sedimentation and Clarification Sedimentation is the next step in conventional filtration plants. (Direct filtration plants omit this step.) The purpose of sedimentation is to enhance the filtration process by removing particulates. Sedimentation is the process by which suspended particles are removed from the water by means of gravity or separation. In the sedimentation process, the water passes through a relatively quiet and still basin. In these conditions, the floc particles settle to the bottom of the basin, while “clear” water passes out of the basin over an effluent baffle or weir. Figure 7-5 illustrates a typical rectangular sedimentation basin. The solids collect on the basin bottom and are removed by a mechanical “sludge collection” device. As shown in Figure 7-6, the sludge collection device scrapes the solids (sludge) to a collection point within the basin from which it is pumped to disposal or to a sludge treatment process. Sedimentation involves one or more basins, called “clarifiers.” Clarifiers are relatively large open tanks that are either circular or rectangular in shape. In properly designed clarifiers, the velocity of the water is reduced so that gravity is the predominant force acting on the water/solids suspension. The key factor in this process is speed. The rate at which a floc particle drops out of the water has to be faster than the rate at which the water flows from the tank’s inlet or slow mix end to its outlet or filtration end. The difference in specific gravity between the water and the particles causes the particles to settle to the bottom of the basin.
    [Show full text]
  • Troubleshooting Activated Sludge Processes Introduction
    Troubleshooting Activated Sludge Processes Introduction Excess Foam High Effluent Suspended Solids High Effluent Soluble BOD or Ammonia Low effluent pH Introduction Review of the literature shows that the activated sludge process has experienced operational problems since its inception. Although they did not experience settling problems with their activated sludge, Ardern and Lockett (Ardern and Lockett, 1914a) did note increased turbidity and reduced nitrification with reduced temperatures. By the early 1920s continuous-flow systems were having to deal with the scourge of activated sludge, bulking (Ardem and Lockett, 1914b, Martin 1927) and effluent suspended solids problems. Martin (1927) also describes effluent quality problems due to toxic and/or high-organic- strength industrial wastes. Oxygen demanding materials would bleedthrough the process. More recently, Jenkins, Richard and Daigger (1993) discussed severe foaming problems in activated sludge systems. Experience shows that controlling the activated sludge process is still difficult for many plants in the United States. However, improved process control can be obtained by systematically looking at the problems and their potential causes. Once the cause is defined, control actions can be initiated to eliminate the problem. Problems associated with the activated sludge process can usually be related to four conditions (Schuyler, 1995). Any of these can occur by themselves or with any of the other conditions. The first is foam. So much foam can accumulate that it becomes a safety problem by spilling out onto walkways. It becomes a regulatory problem as it spills from clarifier surfaces into the effluent. The second, high effluent suspended solids, can be caused by many things. It is the most common problem found in activated sludge systems.
    [Show full text]
  • The Activated Sludge Process Part 1 Revised July 2014
    Wastewater Treatment Plant Operator Certification Training Module 15: The Activated Sludge Process Part 1 Revised July 2014 This course includes content developed by the Pennsylvania Department of Environmental Protection (Pa. DEP) in cooperation with the following contractors, subcontractors, or grantees: The Pennsylvania State Association of Township Supervisors (PSATS) Gannett Fleming, Inc. Dering Consulting Group Penn State Harrisburg Environmental Training Center MODULE 15: THE ACTIVATED SLUDGE PROCESS - PART 1 Topical Outline Unit 1 – General Description of the Activated Sludge Process I. Definitions A. Activated Sludge B. Activated Sludge Process II. The Activated Sludge Process Description A. Organisms B. Secondary Clarification C. Activated Sludge Process Control III. Activated Sludge Plants A. Types of Plants B. Factors that Upset Plant Operation IV. Unit Review V. References Unit 2 – Aeration I. Purpose of Aeration II. Aeration Methods A. Mechanical B. Diffused III. Aeration Systems A. Mechanical Aeration Systems B. Diffused Aeration Systems Bureau of Safe Drinking Water, Department of Environmental Protection Wastewater Treatment Plant Operator Training i MODULE 15: THE ACTIVATED SLUDGE PROCESS - PART 1 IV. Safety Procedures A. Aeration Tanks and Clarifiers B. Surface Aerators C. Air Filters D. Blowers E. Air Distribution System F. Air Headers and Diffusers V. Review VI. References Unit 3 – New Plant Start-Up Procedures I. Purpose of Plant and Equipment Review A. Document Familiarization B. Equipment Familiarization II. Equipment and Structures Check A. Flow Control Gates and Valves B. Piping and Channels C. Weirs D. Froth Control System E. Air System F. Secondary Clarifier III. Process Start-Up A. Process Units B. Process Control IV. Unit Review V.
    [Show full text]
  • Clarifier Optimization; Does Your Clarifier Look Like This Or This?
    Clarifier Optimization; Does your clarifier look like this or this? WHAT DO I NEED TO DOTO OPERATE IT EFFECTIVELY? The purpose of the clarifier is two-fold. One is to thicken the solids and then settle them out. The second is to produce a clear effluent off the settled solids. Clarifiers in activated sludge systems must be designed not only for hydraulic overflow rates, but also for solids loading rates. This is because both clarification and thickening are needed in activated sludge clarifiers. At higher mixed liquor suspended solids (MLSS) values (i.e., more than 3000 mg/l), the ability of the clarifier to thicken solids becomes more important, and the solids loading rate becomes critical. Keep in mind that a major portion of the bacteria is returned to the front of the plant. They do not stop growing in the clarifier. Many people cause most of the growth of filaments in the clarifier or create conditions that promote the growth of filaments by holding solids too long in the clarifier. There are numerous control options that plants use to run their clarifier more efficiently. Monitor the flow through the secondary clarifier. Flow rates greater than the design overflow rate may result in an increase in the effluent solids content. This picture shows hydraulic overloading in a clarifier. Monitor the influent and effluent suspended solids concentration to determine percent solids removal efficiency. An influent solids loading rate (dry pounds or tons of solids/sq. ft. /hour or day) greater than the design rate can result in a decrease in the solids removal efficiency.
    [Show full text]
  • Glossary: Wastewater Treatment and Collection System Terms
    Glossary September 2011 Wastewater Treatment Collection System &Terms Minnesota Pollution Control Agency 520 Lafayette Road North St. Paul, Minnesota 55155-4194 wq-wwtp8-20 Contents Wastewater Treatment and Collection System Terms A ........... 3-6 G ...... 24-25 M ..... 29-31 S ........ 42-51 B ........... 7-9 H ....... 26-27 N ....... 32-33 T ........ 52-54 C ....... 10-15 I ......... 27-28 O ...... 33-35 U ............ 54 D ....... 15-19 J ............. 28 P ....... 35-40 V ....... 55-56 E ........ 19-21 K ............ 28 Q ............ 40 W ...... 56-57 F ........ 21-24 L ............. 29 R ....... 40-42 Z ............. 57 Acknowledgement Special thanks to Ken Kerri at California State University, Sacramento, for use of the glossary that appears in his self-study training courses, “Operation and Maintenance of Wastewater Collection Systems” and “Operation of Wastewater Treatment Plants.” A special acknowledgement to the Water Environment Federation for the use of their wastewater glossary for some of the definitions in this manual. Contributors Kay Curtin Steve Duerre Gene Erickson Editing and Graphic Design Nancy Ellefson This document was printed on 30 percent post-consumer recycled paper manufactured without the use of elemental chlorine. 2 Minnesota Pollution Control Agency | All rights reserved. Wastewater Treatment and Collection System Terms A absorption The taking up of one substance into the body of another by chemical or molecular action after the adsorbtion process. accuracy In physical measurements, it is the degree of agreement between the quantity measured and the actual quantity. It should not be confused with ‘precision,’ which denotes the reproducibility of the measurement. acid A substance that yields hydrogen ions when dissolved in water resulting in a pH of less than 7; it can react with bases and certain metals to form salts.
    [Show full text]
  • Low Pressure Reverse Osmosis Water Treatment Plant
    Low Pressure Reverse Osmosis Water Treatment Plant Western Springs Water Department 614 Hillgrove Avenue Western Springs IL 60558 Monthly Progress Report #2 December 2011 A January 1, 2012 Mr. Mathew Supert Acting Director of Municipal Services Village of Western Springs 740 Hillgrove Avenue Western Springs, IL 60558 Subject: Village of Western Springs Low Pressure Reverse Osmosis Water Treatment Plant Monthly Construction Progress Report No. 2 Dear Mr. Supert: We herewith submit our Progress Report No. 2 for the construction of the Low Pressure Reverse Osmosis Water Treatment Plant for the Village of Western Springs covering the one month period from December 1, 2011 through December 31, 2011. 1. Overview and Status of the Work The Low Pressure Reverse Osmosis Water Treatment Plant for the Village of Western Springs project consists of the demolition of the existing water treatment process and installation of a Low Pressure Reverse Osmosis (LPRO) Water Treatment Plant. This includes the demolition of mechanical and electrical equipment, piping, HVAC, roofs, walls, floors, etc. It also includes the installation of roofs, walls, floors, pumps, piping, electrical equipment, chemical tanks, an iron removal system and a LPRO membrane filtration system. In the past month, Joseph J. Henderson & Son, Inc. has; Finished the demolition of the Raw Water Treatment Room. Installed the structural steel for the 1st floor of the Raw Water Treatment Room. Removed the roofs from the Clarifier and East Filter Rooms. Demolished and removed the Clarifier and East Filter. Began demolishing and removing the fillet concrete in the Clarifier. Cut the door opening from the Raw Water Treatment Room to the Basement.
    [Show full text]
  • Agricultural Use of Treated Wastewater: the Need for a Paradigm Shift in Sanitation and Treatment
    Wastewater Re-use and Groundwater Quality (Proceedings of symposium HS04 held duriim IUGG2003 al Sapporo. July 2003). IAI IS Publ. 285. 2004." 5 Agricultural use of treated wastewater: the need for a paradigm shift in sanitation and treatment JULES B. VAN LIER Subdepartment of Environmental Technology, Wageningen University, PO Box 8129, 6700 EV Wageningen, The Netherlands [email protected] FRANS P. HUIBERS Irrigation and Water Engineering Group, Wageningen University, Nienwe Kanaal If 6709 PA Wageningen, The Netherlands Abstract Shortages in irrigation water in and around urban areas call for alter­ native sources, particularly in the (sub)tropical zones. Domestic sewage represents such an alternative source and its nutritional value has been known by farmers for a long time. In many situations even raw (diluted) domestic sewage is used for agricultural purposes, especially in those areas that cannot afford extensive sewerage and treatment systems. However, discharge or re­ use of non-treated effluents gives rise to serious environmental problems, including threats to human health. Whenever agricultural use of urban effluents is considered, an integrated approach should be pursued, taking into account the agricultural requirements as well as the possible technological solutions for cost-effective sanitation and treataient. Such an integrated set-up questions the existing paradigms in sanitation and treatment and will call for a more decentralized approach, minimizing the requirements for large-scale infra-structural investments, such as sewerage systems. Also, with respect to the available treatment techniques, economic sustainability is often disregar­ ded in making the final choices. Amongst the available compact technologies for wastewater treatment, the anaerobic (pre-)treatment is seen as an appropriate technology, but so far, its potential has hardly been utilized.
    [Show full text]
  • Evaluation of Double Perforated Baffles Installed in Rectangular Secondary Clarifiers
    Article Evaluation of Double Perforated Baffles Installed in Rectangular Secondary Clarifiers Byonghi Lee Department of Environmental Energy Engineering, Kyonggi University, Suwon 16227, Korea; [email protected]; Tel.: +82-31-249-9737 Academic Editor: Andreas N. Angelakis Received: 1 May 2017; Accepted: 6 June 2017; Published: 7 June 2017 Abstract: Double perforated baffles in rectangular secondary clarifiers were studied to determine whether they contribute to producing high-quality effluents. The Computational Fluid Dynamics (CFD) simulations indicated that bio-flocculation occurred at the front of the baffle and the longitudinal movement of the settled sludge was hampered whenever the clarifier had high inflow. Simulation results showed that the rectangular clarifier with the double perforated baffle produced an effluent with lower suspended solid (SS) concentrations than the effluent from the clarifier without the baffle. To verify the simulation results, a double perforated baffle was installed in two of the 48 rectangular clarifiers in a 300,000 m3/d-capacity wastewater treatment plant. To study the effect of the baffle on solid removal, the effluent turbidity of the clarifier with and without the double perforated baffle was measured simultaneously. Experimental data showed that the double perforated baffle played a significant role in reducing effluent turbidity. The effluent turbidity reduction ratio with the baffle decreased when the Sludge Volume Index (SVI) of the Mixed Liquor Suspended Solids (MLSS) was below 100 mL/g. The overall average reduction ratio was 24.3% for SVI < 100 mL/g and 45.1% for SVI > 100 mL/g. The results of this study suggest that double perforated baffles must be installed in secondary rectangular clarifiers to produce high-quality effluent regardless of the operational conditions.
    [Show full text]
  • Chapter 3 Primary Treatment
    1 CHAPTER 3 2 PRIMARY TREATMENT 3 4 Learning Objectives 5 6 This chapter covers the major concepts associated with primary treatment. By the end of 7 this chapter, a student should be able to: 8 • Define the objective of the primary treatment process; 9 • Distinguish between primary sedimentation tanks and secondary clarifiers; 10 • Identify the basic principle underlying the primary treatment process; 11 • Describe the components of primary sedimentation tanks including inlet and 12 outlet structures; 13 • Explain the main considerations for sludge and scum removal and disposal; 14 • List the factors that affect primary sedimentation tank efficiency; 15 • Describe the key elements of process control and testing as these relate to the 16 operation of the primary sedimentation tank; 17 • Outline the key troubleshooting and maintenance concerns related to primary 18 treatment; and 19 • Identify the specific safety concerns associated with the primary sedimentation 20 process. 21 22 23 Introduction 24 25 26 27 Sewers are designed to provide a wastewater velocity of at least 0.6 m/s (2.0 ft/sec). 28 Because the wastewater in collection systems moves relatively fast, the solids stay in 29 suspension. When wastewater enters a treatment plant, it first passes through a bar screen 30 which removes the larger solids, or through a grinder or comminutor, which reduces the size of 31 the larger particles. After screening or grinding, the wastewater flows to a grit chamber where 32 heavier undesirable solids are removed. The velocity of the wastewater to this point has kept 33 these solids in suspension. In the grit tank, the speed of the wastewater is reduced to about 0.3 34 m/s (1.0 ft/sec).
    [Show full text]