Regional Trails and Greenways
Total Page:16
File Type:pdf, Size:1020Kb
Summer / 2014 If you have a disability and need accommodations, call 503-220-2781, or call Metro’s TDD line at 503-797-1804. If you require a sign language interpreter, call at least 48 hours in advance. Activities marked with this symbol are wheelchair accessible: REGIONAL TRAILS If you picnic at Blue Lake or take your kids to the Oregon Bus and MAX information Zoo, enjoy symphonies at the Schnitz or auto shows at the 503-238-RIDE (7433) or trimet.org convention center, put out your trash or ride your bike – we’ve already crossed paths. AND GREENWAYS So, hello. We’re Metro – nice to meet you. Stay in touch with news, stories and things to do. oregonmetro.gov/connect Metro Council President Tom Hughes Metro Councilors Shirley Craddick, District 1 Carlotta Collette, District 2 Craig Dirksen, District 3 Kathryn Harrington, District 4 Sam Chase, District 5 Bob Stacey, District 6 Auditor Suzanne Flynn General information Metro Regional Trails Program oregonmetro.gov/regional-trails-and-greenways-system A few of our many active partners: National organizations American Trails AmericanTrails.org National Parks Service: Rivers, Trails & Conservation Assistance Program nps.gov/RTCA Rails to Trails Conservancy railstotrails.org In the region 40-Mile Loop Land Trust 40mileloop.org Bicycle Transportation Alliance btaoregon.org North Clackamas Parks and Recreation District ncprd.com npGREENWAY npgreenway.org Oregon Department of Transportation oregon.gov/ODOT/TD/AT Oregon State Parks oregon.gov/OPRD Portland Parks and Recreation portlandoregon.gov/parks SW Trails PDX swtrails.org The Intertwine Alliance theintertwine.org Tualatin Hills Park & Recreation District thprd.org A VISION FOR CONNECTING NEIGHBORHOODS TO NATURE Regional trails and greenways From the quiet beauty of Troutdale’s earthen Beaver Creek Trail to the hustle and bustle of Portland’s Vera Katz Eastbank Esplanade, regional trails are Funding for trail projects like us—they come in all shapes and sizes. Regional trail and greenway projects can take years to In addition to paying for trail construction projects, funds grow from concept to reality. They are often quite complex, from Metro’s 1995 and 2006 bond measures supported the involving many land owners and the help of hundreds – or acquisition of a number of trail easements and water trail thousands – of citizens. Determining a workable alignment, access points. Local cities and park districts have also used Trails are designed to serve a variety of functions. Some, securing the trail right-of-way and fi nding the resources for local funds to acquire, plan for and build new trail segments like the I-205 Trail, are well suited for bike commuters seeking trail design and construction all take time, energy and money. throughout the region. a fast route. Others, like the Wildwood Trail, off er recreational Metro envisions a system hikers the opportunity to wind their way through lush forests. of trails and greenways Regional trails are typically built in phases as funding For each project, diff erent strategies are used. Pieces of trails The Sandy River Water Trail allows visitors to experience becomes available and trail corridors are secured. Some are built, gaps are fi lled, key acquisitions are made and local scenic basalt canyons and rare old growth forest from a spanning the 25-city, three- projects have received big boosts from special dedicated landowners agree to participate. Each step moves us along raft or kayak, while the Tualatin River Greenway provides county region and beyond. funding sources – such as Metro’s two natural areas bond the path to our goal of a regional trail network linking our opportunities to stroll beneath circling red-tailed hawks measures, passed by voters in 1995 and 2006. Other projects communities to nature and to each other. or fl oat past great blue herons standing regally along are built one section at a time, a new stretch of asphalt added the riverbank. year after year after year. When originally conceived over 100 years ago by noted The popularity of outdoor recreation activities such as landscape architects John Charles Olmsted and Frederick Law State and federal sources of support have been instrumental walking, running, bicycling, skateboarding, paddling and Olmsted, Jr., Portland’s trail system was envisioned to be 40 in planning and building the regional trails system. In 2005, wildlife observation– as well as the growth in bicycling and miles long, circling the city and linking public parks (see page the Safe, Accountable, Flexible, Effi cient Transportation walking for transportation–has increased the need for quality 13). The Portland metropolitan area has grown a lot since Equity Act: A Legacy for Users (SAFETEA-LU) authorized regional trails. Park and recreation providers, local cities and then. Today, Metro envisions a system of trails and greenways federal transportation dollars for trail projects. In recent citizens have teamed up in an ambitious eff ort to establish spanning the 25-city, three-county region and beyond. Plans years, a number of regional trail projects have been funded a network of trails linking parks and natural areas to local call for a 1,000-mile network of regional trails. As of 2014, though the Metropolitan Transportation Improvement communities and other area attractions. about 35% percent of those trails are complete. Program, which disburses federal and state transportation money in the Portland metropolitan region. 1 14 PORTLAND W i l l a m e t t e R i v e r RegionalSALEM trails CORVALLIS and greenways C ol r umbia Rive S W a n i l d l y a R m TROUTDALE iv e er t t PORTLAND e R i v v e e r r Jo hnson Creek Willamette 40-Mile River Greenway Loop At 187 linear miles, the Willamette is Oregon’s longest river. After a visit to the region in 1903, pioneer landscape It drains nearly 11,500 square miles and provides essential architects John Charles Olmsted and Frederick Law Olmsted, benefi ts to the economy, environment and people of the Jr. proposed a comprehensive system of parks and natural state. The backbone of Governor Tom McCall’s (1967-75) areas connected by parkways and boulevards. Terwilliger, vision for Oregon was a revitalized Willamette River with a Sellwood and North Willamette boulevards in Portland public greenway on its banks. The Willamette River Greenway are each part of that original plan. The Olmsteds’ idea was WHAT MAKES A TRAIL REGIONAL? encompasses existing and planned access along the lower revived in 1982 and named the 40-Mile Loop, honoring the Regional trails diff er from local trails in that they are usually 40 miles – and most urbanized stretch – of the river, and original concept’s proposed length. Since then, trail planners larger in scope – crossing neighborhood lines and linking is one of Oregon’s 19 statewide planning goals. When and advocates have updated the plan to meet the needs of a cities, counties and even states. As excellent places for completed, it will include increased opportunities for river much larger metropolitan area and population. Plans for the hikers, walkers, runners, cyclists, and paddlers to exercise access and recreation, and new routes to schools, parks and 40-Mile Loop now include all of Multnomah County. When and experience nature, regional trails are destinations unto commercial areas. it is completed, it will connect more than 30 parks along the themselves – but they also take us from the places we live to Columbia, Sandy and Willamette rivers, Johnson Creek and the places we learn, work, shop and play. the Tualatin Mountains in a continuous 140-mile loop. The section from the Sandy River to the Springwater Trail is the Regional trails are typically separated from roads. GREENWAYS last major gap in the 40-Mile Loop. Their off -street nature make trails more pleasant for Greenways are linear natural spaces that follow creeks recreational users by reducing interactions with vehicular and rivers. Some greenways provide public access with traffi c, which also make them quicker routes for pedestrian environmentally compatible trails, viewpoints or watercraft and bike commuters. launch sites. Other greenways prioritize wildlife habitat protection and do not allow any public access. For more information about these greenways, visit the Metro website at: oregonmetro.gov/trails 13 2 CAZADERO TRAIL (NEAR COMPLETION) 9 Running from Boring through North Fork Deep Creek Canyon, this multi-use “rail to trail” parallels Highway 224. Once completed, cyclists, pedestrians and equestrians will be able to travel more than 30 miles off-street from the Springwater Trail in Downtown Portland to Estacada. 20 miles CLACKAMAS RIVER GREENWAY 10 People can experience the Clackamas River Greenway at a number of parks including Barton Park and Milo McIver State Park. The greenway also features a beautiful paved trail along the banks of the lower Clackamas River, with Existing trails a bridge connecting Gladstone to Oregon City. 15 miles Existing trails are complete or near completion and open to COLUMBIA SLOUGH TRAIL the public (as of July 2014). They connect neighborhoods, 11 (NEAR COMPLETION) schools, parks and jobs; provide access to nature; and present From Kelley Point Park at the confluence of the Willamette opportunities to hike, bike, walk, run and roll. For more On-street and Columbia rivers, this trail runs east along the Columbia information about these trails, visit the Metro web site at: connections Water trails Slough to Blue Lake Regional Park. Many stretches of the trail oregonmetro.gov/trails run atop a levee on the north side of the slough. West of I-205, Ideally, all trails would be completely separate from motorized Water trails are waterway segments designated for non- the trail is paved and open to bicyclists. East of I-205, the trail BANKS-VERNONIA TRAIL traffi c, but a number of trails start and stop at streets.