Division 07 DRAFT STIP 2015 -2025 PROJECTS PROGRAMMED TO BEGIN CONSTRUCTION OR REMAINING FUNDING FOR PROJECTS ALREADY UNDER CONSTRUCTION Transition State Transportation Improvement Program (Construction Schedules) Developmental Program (Construction Schedules) Construction FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 Unfunded AV-5708 U-5306C AV-5707 U-5549 AV-5711 AV-5718 AV-5701 AV-5715 B-5713 B-5715 B-5721 B-4956 B-5719 R-2577B TRIAD US 220 (BATTLEGROUND VARIOUS PIEDMONT TRIAD PIEDMONT TRIAD PIEDMONT TRIAD PIEDMONT TRIAD WILLOW ROAD SR 2351 (WITTY ROAD) SR 2177 (DAN VALLEY SR 1105 (EAST STEEPLE SR 1527 (RIVER BEND US 158 INTERNATIONAL AIRPORT AVENUE) INTERNATIONAL AIRPORT INTERNATIONAL AIRPORT INTERNATIONAL AIRPORT INTERNATIONAL AIRPORT INTERNATIONAL AIRPORT ROAD) CHASE ROAD) ROAD) (GSO) (GSO) (GSO) (GSO) (GSO) (GSO) B-4803 U-5532 B-4959 B-4807 B-4624 B-5355 EB-5716 B-5714 B-5720 B-5727 B-4958 B-5722 R-2577C SR 1925 (WORSHAM MILL VARIOUS SR 2719 (HIGH ROCK ROAD) SR 2426 (CUNNINGHAM SR 1929 (ESTES ROAD) SR 1902 (DIBRELL ROAD) HOLDEN ROAD SR 1523 (DEEP RIVER SR 1336 (HALLS MILL ROAD) SR 1154 (TUCKER STREET) SR 2128 (BUNCH ROAD) SR 1169 (ISLAND DRIVE) US 158 ROAD) MILL ROAD) ROAD) B-4953 W-5142 B-5239 B-4961 B-4802 B-5356 EB-5717 B-5716 B-5723 B-5728 B-5718 B-5730 U-2524F SR 1912 (DICKEY MILL US 220 NC 87 SR 3051 (KNOX ROAD) SR 1002 (SCALESVILLE I-40 / BUSINESS 85 / US 29 / EAST LINDSAY STREET SR 1138 (LINDSEY BRIDGE SR 1158 (JACKSON LAKE NC 87 PATTON AVENUE US 29 / US 70 / BUSINESS 85 FUTURE I‐840 ROAD) ROAD) US 70 / US 220 ROAD) ROAD) NB B-4960 W-5143 B-5341 B-4964 B-4805 B-5357 I-5711 B-5717 B-5724 B-5731 B-5729 U-2412A U-2525D SR 3058 (JUDGE ADAMS SR 1004 (EFLAND- CEDAR SR 1767 (MAYFIELD ROAD) SR 2600 (MIZPAH CHURCH SR 2406 (IRON WORKS SR 2715 (HAMPTON ROAD) I-40 / I-85 SR 4240 (EAST LEE STREET - SR 3314 (WILEY LEWIS SR 2109 (EVERFIELD ROAD) NC 700 SR 1486 (GREENSBORO RD) FUTURE I‐840 ROAD) GROVE ROAD) ROAD) ROAD) WESTBOUND) ROAD) / SR 4121 (HIGH POINT RD)

B-5119 W-5305 B-5342 B-5345 B-4962 EB-5712 I-5712 U-5023 B-5725 B-5735 B-5732 U-3109A I-40 / BUSINESS 85 NC 62; SR 1129 SR 1148 (ANTHONY ROAD) SR 2136 (FLEMING ROAD) US 70 BYPASS LOVETT STREET I-40 / US 421 VARIOUS SR 1710 (GRIERS CHURCH SR 1936 (STONE STREET SR 2526 (SUMMIT AVENUE) NC 119 (WESTBOUND) (GROOMETOWN ROAD) ROAD) EXTENSION) B-5736 B-5343 B-5553 B-5346 EB-5714 I-5836 U-5754 B-5726 U-5845 B-5733 U-3109B NC 61 US 311 / NC 770 BALLINGER ROAD SR 1529 (DURHAM STREET) LEES CHAPEL ROAD I-40 / I-85 US 29 / US 70 / US 220 SR 1001 (NORTH CHURCH SR 1009 (SOUTH CHURTON SR 1010 (EAST FRANKLIN NC 119 (O'HENRY BOULEVARD) STREET) STREET) STREET) BD-5107 B-5344 C-5179 B-5347 I-5811 I-5852 U-5844 EB-5721 U-5853 B-5734 U-3400B VARIOUS SR 2821 (HARVEST ROAD) SR 1750 (NORTH ESTES SR 1212 (POND ROAD) I-40 I-73 NC 62 ORANGE COUNTY BICYCLE SR 1301 (ST. MARKS NC 86 SR 1577 / SR 1004 (ARCHDALE DRIVE) ROUTE 1 CHURCH ROAD / SOUTH ROAD) WILLIAMSON AVENUE) C-5555 B-5358 U-5169 B-5348 I-5812 I-5853 U-5848 U-5851 B-5737 U-3615A VARIOUS MODEL FARM ROAD I-74 / US 311 SR 1005 (OLD I-40 I-85 / US 29 / US 70 SR 1006 (ORANGE GROVE SR 1001 (CHURCH STREET) NC 700 SR 1820 (SKEET CLUB ROAD) GREENSBORO ROAD) ROAD) E-5501 C-5181 B-5349 I-5814 I-5854 U-5850 I-3306A U-5304A VARIOUS JONES CREEK GREENWAY SR 1149 (HUFFMAN MILL I-40 I-85 SR 1007 (RANDLEMAN I-40 US 15 / US 501 ROAD) ROAD) EB-5517 C-5184 B-5350 I-5821 I-5855 U-5852 U-5304B U-5774A NEW PEDESTRIAN BRIDGE RIVERWALK TRAIL SR 1768 (HUGHES MILL I-85 I-85 SR 2085 (BENJAMIN US 15 / US 501 NC 54 AND APPROACHES ROAD) / BRYAN BOULEVARD) EB-5518 C-5558 B-5351 I-5822 TE-5205A U-5304D U-5855 LATHAM PARK GREENWAY VARIOUS US 29 / US 70 / BUSINESS 85 I-40 DURHAM-ORANGE LIGHT US 15 / US 501 SR 1471 (MONTLIEU AVENUE) SR SB RAIL LINE 1486 (GREENSBORO ROAD) EB-5519 C-5602 B-5352 P-5700 U-4758 U-5304E SR 4121 (EAST MAIN VARIOUS US 220 (NORTHBOUND) NORFOLK SOUTHERN SR 1818 (JOHNSON US 15 / US 501 STREET) MAINLINE STREET) / SR 1850 (SANDY RIDGE ROAD) EL-4828A C-5605 B-5353 P-5701 U-5812 U-5774B MORGAN CREEK VARIOUS US 29 / US 70 / BUSINESS 85 NORFOLK SOUTHERN H VARIOUS NC 54 GREENWAY LINE EL-4828B C-5607 B-5354 U-2525C U-5841 MORGAN CREEK VARIOUS SR 4771 (REEDY FORK FUTURE I-840 LINDELL ROAD GREENWAY PARKWAY) EL-5101 C-5609 I-5762 U-5021 U-5849 VARIOUS VARIOUS I-40 VARIOUS AYCOCK STREET I-5110 C-5618 I-5789 U-5847 FUTURE I-73 VARIOUS I-85 SR 1010 (WEST FRANKLIN STREET / EAST MAIN STREET) P-4405 EB-4707A I-5790 VARIOUS SR 1838 / SR 2220 I-85 U-2412B EB-5700 R-5704 SR 1486 (GREENSBORO RD) DOWNTOWN GREENWAY NC 87 / SR 4121 (HIGH POINT RD)

U-2524BC I-5309 R-5725 I-73 / I-840 I-40 / I-85 NC 68 U-2524C I-5734 U-5550 FUTURE I-840 I-40 US 15 / US 501 (FORDHAM BOULEVARD) U-2525B I-5735 U-5752 FUTURE I-785 / FUTURE I- I-73 US 70 (SOUTH CHURCH 840 STREET) U-3615B I-5736 U-5842 SR 1820 (SKEET CLUB I-74 / US 311 PISGAH CHURCH ROAD ROAD) U-4726 U-2524D U-5843 VARIOUS FUTURE I-840 US 70 (CHURCH STREET) U-5306B U-5326 U-5846 US 220 (BATTLEGROUND SR 1008 (MARKET STREET) SR 1772 (GREENSBORO AVENUE) STREET) U-5854 SR 1008 (MT. CARMEL CHURCH ROAD) FOOTNOTE * DOES NOT INCLUDE STATEWIDE PROGRAM TYPE ACTIVITIES OR OTHER STATEWIDE HOLDOUTS IN WHICH INDIVIDUAL PROJECTS HAVE YET TO BE DETERMINED NOTE: DETAILED SCHEDULES FOR ALL PHASES OF WORK AND FUNDING FOR THESE PROJECTS AND OTHER PROJECTS WITH NON CONSTRUCTION TYPE WORK ARE SHOWN ON THE ATTACHED PAGES CATEGORY FUNDING

DIV - Division APD - Appalachian Development EX - Exempt BOND (R) - Revenue Bond HF - State Dollars (Non-STI) C - City REG - Regional CMAQ - Congestion Mitigation SW - Statewide DP - Discretionary or Demonstration TRN - Transition Project ER - Emergency Relief Funds FBUS - Capital Program - Bus Earmark (5309) FED - Federal Rail Funds FEPD - Elderly and Persons with Disablity (5310) FF - Federal Ferry FLAP - Federal Lands Access Program FLPI - Federal Lands Program (Indian Reservation Roads) FMOD - Fixed Guideway Modifications FMPL - Metropolitan Planning (5303) FNF - New Freedom Program FNS - New Starts - Capital (5309) FNU - Non Urbanized Area Formula Program (5311) FSPR - State Planning and Research FUZ - Urbanized Area Formula Program (5307) HFB - Highway Fund Bridge Replacement Program HP - Federal-Aid High Priority HRRR - High Risk Rural Roads HSIP - Highway Safety Improvement Program JARC - Job Assistance and Reverse Commute (3037) L - Local NHP - National Highway Performance Program NHPB - National Highway Performance Program (Bridge) NHPIM - National Highway Performance Program (Interstate Maintenance) O - Others RR - Rail-Highway Safety RTAP - Rural Transit Assistance Program S - State S (M) - State Match SMAP - Operating Assistance and State Maintenance SRTS - Safe Routes to School STAT - State STHSR - Stimulus High Speed Rail STP - Surface Transportation Program STPDA - Surface Transportation Program - Direct Attributable STPE - Surface Transportation Program, Enhancements STPEB - Surface Transportation Program, Enhancements (Bike) STPOFF - Surface Transportation Program (Off System Bridge) STPON - Surface Transportation Program Bridge (On System Bridge) T - State Highway Trust Funds T2001 - State Rail Funds TAP - Transportation Alternatives Program TIGER DISC - TIGER Discretionary Grants Draft STIP FY 2015 ‐ 2025 Division 7 Projects COST ESTIMATES ARE IN THOUSANDS OF DOLLARS CATEGORY MPO_RPO PROJECT ROUTE DIVISION COUNTIES DESCRIPTION COMMENT ACTIVITY FUNDING 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 UNFUNDED PIEDMONT TRIAD INTERNATIONAL AIRPORT SW GREENSBORO URBAN AREA MPO AV‐5701 (GSO) 7 GUILFORD RUNWAY 5R‐23L EXTENSION PROGRAM CONSTRUCTION T 500 SW GREENSBORO URBAN AREA MPO AV‐5701 PIEDMONT TRIAD INTERNATIONAL AIRPORT 7 GUILFORD RUNWAY 5R‐23L EXTENSION PROGRAM CONSTRUCTION O 19500 PIEDMONT TRIAD INTERNATIONAL AIRPORT SW GREENSBORO URBAN AREA MPO AV‐5707 (GSO) 7 GUILFORD CONSTRUCT TAXIWAY G. CONSTRUCTION T 500 SW GREENSBORO URBAN AREA MPO AV‐5707 PIEDMONT TRIAD INTERNATIONAL AIRPORT 7 GUILFORD CONSTRUCT TAXIWAY G. CONSTRUCTION O 15400 PIEDMONT TRIAD INTERNATIONAL AIRPORT CONSTRUCT TAXIWAY OVER FUTURE I‐73 EAST SW GREENSBORO URBAN AREA MPO AV‐5708 (GSO) 7 GUILFORD OF SR 2085 (BRYAN BOULEVARD). CONSTRUCTION T 500 SW GREENSBORO URBAN AREA MPO AV‐5708 PIEDMONT TRIAD INTERNATIONAL AIRPORT 7 GUILFORD CONSTRUCT TAXIWAY OVER FUTURE I‐73 EAST CONSTRUCTION O 15000 PIEDMONT TRIAD INTERNATIONAL AIRPORT SURFACE MOVEMENT GUIDANCE AND SW GREENSBORO URBAN AREA MPO AV‐5711 (GSO) 7 GUILFORD CONTROL SYSTEM (SMGCS) UPDATE. CONSTRUCTION T 500 SW GREENSBORO URBAN AREA MPO AV‐5711 PIEDMONT TRIAD INTERNATIONAL AIRPORT 7 GUILFORD SURFACE MOVEMENT GUIDANCE AND CONSTRUCTION O 7500 PIEDMONT TRIAD INTERNATIONAL AIRPORT SW GREENSBORO URBAN AREA MPO AV‐5715 (GSO) 7 GUILFORD RUNWAY 5R‐23L GROUP VI UPGRADE. CONSTRUCTION T 500 SW GREENSBORO URBAN AREA MPO AV‐5715 PIEDMONT TRIAD INTERNATIONAL AIRPORT 7 GUILFORD RUNWAY 5R‐23L GROUP VI UPGRADE. CONSTRUCTION O 9500 PIEDMONT TRIAD INTERNATIONAL AIRPORT SW GREENSBORO URBAN AREA MPO AV‐5718 (GSO) 7 GUILFORD HIGH SPEED TAXIWAY TO RUNWAY 5R‐23L. CONSTRUCTION T 500 SW GREENSBORO URBAN AREA MPO AV‐5718 PIEDMONT TRIAD INTERNATIONAL AIRPORT 7 GUILFORD HIGH SPEED TAXIWAY TO RUNWAY 5R‐23L. CONSTRUCTION O 2500

BURLINGTON‐GRAHAM URBAN AREA BURLINGTON‐ ALAMANCE REGIONAL AIRPORT OBTAIN NAVIGATION EASEMENTS AND CLEAR DIV MPO AV‐5737 (BUY) 7 ALAMANCE OBSTRUCTIONS IN THE RUNWAY 24 APPROACH. RIGHT‐OF‐WAY T 1080 DIV BURLINGTON‐GRAHAM URBAN AREA AV‐5737 BURLINGTON‐ ALAMANCE REGIONAL AIRPORT 7 ALAMANCE OBTAIN NAVIGATION EASEMENTS AND CLEAR RIGHT‐OF‐WAY L 120 ACQUIRE RUNWAY PROTECTION ZONE, BURLINGTON‐GRAHAM URBAN AREA BURLINGTON‐ALAMANCE REGIONAL AIRPORT DEMOLISH STRUCTURES AND CLEAR DIV MPO AV‐5768 (BUY) 7 ALAMANCE APPROACHES. RIGHT‐OF‐WAY T 5850 DIV BURLINGTON‐GRAHAM URBAN AREA AV‐5768 BURLINGTON‐ALAMANCE REGIONAL AIRPORT 7 ALAMANCE ACQUIRE RUNWAY PROTECTION ZONE, RIGHT‐OF‐WAY L 650 BURLINGTON‐GRAHAM URBAN AREA REPLACE BRIDGE NO. 160 OVER PRONG OF DIV MPO B‐4400 SR 1122 (EULISS ROAD) 7 ALAMANCE STINKING QUARTER CREEK. UNDER CONSTRUCTION BURLINGTON‐GRAHAM URBAN AREA REPLACE BRIDGE NO. 161 OVER NORTH PRONG DIV MPO B‐4401 SR 1124 (STAFFORD MILL ROAD) 7 ALAMANCE OF STINKING QUARTER CREEK. UNDER CONSTRUCTION REPLACE BRIDGE NO. 150 OVER US 220 SW PIEDMONT TRIAD RPO B‐4621 US 220 (NORTHBOUND) 7 ROCKINGHAM BUSINESS. UNDER CONSTRUCTION

DIV PIEDMONT TRIAD RPO B‐4623 SR 1128 (SARDIS CHURCH ROAD) 7 ROCKINGHAM REPLACE BRIDGE NO. 47 OVER HOGAN'S CREEK. UNDER CONSTRUCTION REPLACE BRIDGE NO. 80 OVER WOLF ISLAND HF PIEDMONT TRIAD RPO B‐4624 SR 1929 (ESTES ROAD) 7 ROCKINGHAM CREEK. PLANNING / DESIGN IN PROGRESS RIGHT‐OF‐WAY HFB 220 HF PIEDMONT TRIAD RPO B‐4624 SR 1929 (ESTES ROAD) 7 ROCKINGHAM REPLACE BRIDGE NO. 80 OVER WOLF ISLAND PLANNING / DESIGN IN PROGRESS MITIGATION HFB 1 HF PIEDMONT TRIAD RPO B‐4624 SR 1929 (ESTES ROAD) 7 ROCKINGHAM REPLACE BRIDGE NO. 80 OVER WOLF ISLAND PLANNING / DESIGN IN PROGRESS CONSTRUCTION HFB 975 REPLACE BRIDGE NO. 12 OVER COUNTRY LINE DIV PIEDMONT TRIAD RPO B‐4725 SR 1554 (YARBOROUGHS MILL ROAD) 7 CASWELL CREEK. UNDER CONSTRUCTION REPLACE BRIDGE NO. 120 OVER REEDY FORK DIV GREENSBORO URBAN AREA MPO B‐4756 SR 2128 (BUNCH ROAD) 7 GUILFORD CREEK IN GREENSBORO. UNDER CONSTRUCTION REPLACE BRIDGE NO. 159 OVER NORTH DIV GREENSBORO URBAN AREA MPO B‐4758 SR 2824 (CREEKVIEW ROAD) 7 GUILFORD BUFFALO CREEK. UNDER CONSTRUCTION

HF PIEDMONT TRIAD RPO B‐4802 SR 1002 (SCALESVILLE ROAD) 7 ROCKINGHAM REPLACE BRIDGE NO. 18 OVER HAW RIVER. PLANNING / DESIGN IN PROGRESS RIGHT‐OF‐WAY HFB 110 HF PIEDMONT TRIAD RPO B‐4802 SR 1002 (SCALESVILLE ROAD) 7 ROCKINGHAM REPLACE BRIDGE NO. 18 OVER HAW RIVER. PLANNING / DESIGN IN PROGRESS MITIGATION HFB 20 HF PIEDMONT TRIAD RPO B‐4802 SR 1002 (SCALESVILLE ROAD) 7 ROCKINGHAM REPLACE BRIDGE NO. 18 OVER HAW RIVER. PLANNING / DESIGN IN PROGRESS CONSTRUCTION HFB 1125 REPLACE BRIDGE NO. 97 OVER WOLF ISLAND DIV PIEDMONT TRIAD RPO B‐4803 SR 1925 (WORSHAM MILL ROAD) 7 ROCKINGHAM CREEK. RIGHT OF WAY IN PROGRESS CONSTRUCTION STPOFF 1700 REPLACE BRIDGE NO. 9 OVER PRONG OF DIV PIEDMONT TRIAD RPO B‐4805 SR 2406 (IRON WORKS ROAD) 7 ROCKINGHAM TROUBLESOME CREEK. PLANNING / DESIGN IN PROGRESS RIGHT‐OF‐WAY STPOFF 75 DIV PIEDMONT TRIAD RPO B‐4805 SR 2406 (IRON WORKS ROAD) 7 ROCKINGHAM REPLACE BRIDGE NO. 9 OVER PRONG OF PLANNING / DESIGN IN PROGRESS CONSTRUCTION STPOFF 675

HF PIEDMONT TRIAD RPO B‐4807 SR 2426 (CUNNINGHAM MILL ROAD) 7 ROCKINGHAM REPLACE BRIDGE NO. 6 OVER HAW RIVER. PLANNING / DESIGN IN PROGRESS RIGHT‐OF‐WAY HFB 140 HF PIEDMONT TRIAD RPO B‐4807 SR 2426 (CUNNINGHAM MILL ROAD) 7 ROCKINGHAM REPLACE BRIDGE NO. 6 OVER HAW RIVER. PLANNING / DESIGN IN PROGRESS MITIGATION HFB 21 HF PIEDMONT TRIAD RPO B‐4807 SR 2426 (CUNNINGHAM MILL ROAD) 7 ROCKINGHAM REPLACE BRIDGE NO. 6 OVER HAW RIVER. PLANNING / DESIGN IN PROGRESS CONSTRUCTION HFB 1600 BURLINGTON‐GRAHAM URBAN AREA DIV MPO B‐4953 SR 1912 (DICKEY MILL ROAD) 7 ALAMANCE REPLACE BRIDGE NO. 64 OVER QUAKER CREEK. RIGHT OF WAY IN PROGRESS CONSTRUCTION STPOFF 575 REPLACE BRIDGE NO. 25 OVER POLE CAT DIV GREENSBORO URBAN AREA MPO B‐4956 SR 1105 (EAST STEEPLE CHASE ROAD) 7 GUILFORD CREEK. RIGHT‐OF‐WAY STPOFF 100 DIV GREENSBORO URBAN AREA MPO B‐4956 SR 1105 (EAST STEEPLE CHASE ROAD) 7 GUILFORD REPLACE BRIDGE NO. 25 OVER POLE CAT CONSTRUCTION STPOFF 1050 REPLACE BRIDGE NO. 56 OVER RICHLAND CREEK DIV HIGH POINT URBAN AREA MPO B‐4957 SR 1193 (BAKER ROAD) 7 GUILFORD IN HIGH POINT. UNDER CONSTRUCTION REPLACE BRIDGE NO. 106 OVER REEDY FORK DIV GREENSBORO URBAN AREA MPO B‐4958 SR 2128 (BUNCH ROAD) 7 GUILFORD CREEK IN OAK RIDGE. RIGHT‐OF‐WAY STPOFF 170 DIV GREENSBORO URBAN AREA MPO B‐4958 SR 2128 (BUNCH ROAD) 7 GUILFORD REPLACE BRIDGE NO. 106 OVER REEDY FORK MITIGATION STPOFF 7 DIV GREENSBORO URBAN AREA MPO B‐4958 SR 2128 (BUNCH ROAD) 7 GUILFORD REPLACE BRIDGE NO. 106 OVER REEDY FORK CONSTRUCTION STPOFF 1700 REPLACE BRIDGE NO. 193 OVER BUFFALO HF GREENSBORO URBAN AREA MPO B‐4959 SR 2719 (HIGH ROCK ROAD) 7 GUILFORD CREEK. RIGHT OF WAY IN PROGRESS CONSTRUCTION HFB 1050

BURLINGTON‐GRAHAM URBAN AREA REPLACE BRIDGE NO. 214 OVER LITTLE DIV MPO, GREENSBORO URBAN AREA MPO B‐4960 SR 3058 (JUDGE ADAMS ROAD) 7 GUILFORD ALAMANCE CREEK. RIGHT OF WAY IN PROGRESS CONSTRUCTION STPOFF 875 REPLACE BRIDGE NO. 208 OVER LITTLE HF GREENSBORO URBAN AREA MPO B‐4961 SR 3051 (KNOX ROAD) 7 GUILFORD ALAMANCE CREEK. PLANNING / DESIGN IN PROGRESS RIGHT‐OF‐WAY HFB 100 HF GREENSBORO URBAN AREA MPO B‐4961 SR 3051 (KNOX ROAD) 7 GUILFORD REPLACE BRIDGE NO. 208 OVER LITTLE PLANNING / DESIGN IN PROGRESS CONSTRUCTION HFB 950 DURHAM‐CHAPEL HILL‐CARRBORO HF MPO B‐4962 US 70 BYPASS 7 ORANGE REPLACE BRIDGE NO. 46 OVER ENO RIVER. PLANNING / DESIGN IN PROGRESS RIGHT‐OF‐WAY HFB 600 HF DURHAM‐CHAPEL HILL‐CARRBORO B‐4962 US 70 BYPASS 7 ORANGE REPLACE BRIDGE NO. 46 OVER ENO RIVER. PLANNING / DESIGN IN PROGRESS CONSTRUCTION HFB 6000 REPLACE BRIDGE NO. 85 OVER SOUTHERN DIV PIEDMONT TRIAD RPO B‐4964 SR 2600 (MIZPAH CHURCH ROAD) 7 ROCKINGHAM RAILROAD. PLANNING / DESIGN IN PROGRESS RIGHT‐OF‐WAY STPOFF 95 DIV PIEDMONT TRIAD RPO B‐4964 SR 2600 (MIZPAH CHURCH ROAD) 7 ROCKINGHAM REPLACE BRIDGE NO. 85 OVER SOUTHERN PLANNING / DESIGN IN PROGRESS UTILITIES STPOFF 47 DIV PIEDMONT TRIAD RPO B‐4964 SR 2600 (MIZPAH CHURCH ROAD) 7 ROCKINGHAM REPLACE BRIDGE NO. 85 OVER SOUTHERN PLANNING / DESIGN IN PROGRESS CONSTRUCTION STPOFF 1100

REPLACE BRIDGE NO. 291 AND BRIDGE NO. 349 SW GREENSBORO URBAN AREA MPO B‐5119 I‐40 / BUSINESS 85 (WESTBOUND) 7 GUILFORD OVER US 29 / US 70 / US 220 IN GREENSBORO. RIGHT OF WAY IN PROGRESS CONSTRUCTION NHPB 5900 REPLACE BRIDGE NO. 35 OVER NORTH FORK DIV PIEDMONT TRIAD RPO B‐5162 SR 1523 (BLANCH ROAD) 7 CASWELL RATTLESNAKE CREEK. UNDER CONSTRUCTION

BURLINGTON‐GRAHAM URBAN AREA REPLACE BRIDGE NO. 126 OVER MILL RACE AND REG MPO B‐5239 NC 87 7 ALAMANCE REPLACE BRIDGE NO. 119 OVER HAW RIVER. PLANNING / DESIGN IN PROGRESS RIGHT‐OF‐WAY STPON 35

As of December 2014 1 of 15 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE Draft STIP FY 2015 ‐ 2025 Division 7 Projects COST ESTIMATES ARE IN THOUSANDS OF DOLLARS CATEGORY MPO_RPO PROJECT ROUTE DIVISION COUNTIES DESCRIPTION COMMENT ACTIVITY FUNDING 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 UNFUNDED REG BURLINGTON‐GRAHAM URBAN AREA B‐5239 NC 87 7 ALAMANCE REPLACE BRIDGE NO. 126 OVER MILL RACE AND PLANNING / DESIGN IN PROGRESS UTILITIES STPON 230 REG BURLINGTON‐GRAHAM URBAN AREA B‐5239 NC 87 7 ALAMANCE REPLACE BRIDGE NO. 126 OVER MILL RACE AND PLANNING / DESIGN IN PROGRESS CONSTRUCTION HFB 2600 REPLACE BRIDGE NO. 110 OVER WOLF ISLAND DIV PIEDMONT TRIAD RPO B‐5341 SR 1767 (MAYFIELD ROAD) 7 ROCKINGHAM CREEK. PLANNING / DESIGN IN PROGRESS RIGHT‐OF‐WAY STPOFF 70 DIV PIEDMONT TRIAD RPO B‐5341 SR 1767 (MAYFIELD ROAD) 7 ROCKINGHAM REPLACE BRIDGE NO. 110 OVER WOLF ISLAND PLANNING / DESIGN IN PROGRESS UTILITIES STPOFF 35 DIV PIEDMONT TRIAD RPO B‐5341 SR 1767 (MAYFIELD ROAD) 7 ROCKINGHAM REPLACE BRIDGE NO. 110 OVER WOLF ISLAND PLANNING / DESIGN IN PROGRESS CONSTRUCTION STPOFF 1450 BURLINGTON‐GRAHAM URBAN AREA DIV MPO B‐5342 SR 1148 (ANTHONY ROAD) 7 ALAMANCE REPLACE BRIDGE NO. 169 OVER GUM CREEK. PLANNING / DESIGN IN PROGRESS RIGHT‐OF‐WAY STPOFF 75 DIV BURLINGTON‐GRAHAM URBAN AREA B‐5342 SR 1148 (ANTHONY ROAD) 7 ALAMANCE REPLACE BRIDGE NO. 169 OVER GUM CREEK. PLANNING / DESIGN IN PROGRESS UTILITIES STPOFF 158 DIV BURLINGTON‐GRAHAM URBAN AREA B‐5342 SR 1148 (ANTHONY ROAD) 7 ALAMANCE REPLACE BRIDGE NO. 169 OVER GUM CREEK. PLANNING / DESIGN IN PROGRESS CONSTRUCTION HFB 925 REPLACE BRIDGE NO. 169 OVER CASCADE REG PIEDMONT TRIAD RPO B‐5343 US 311 / NC 770 7 ROCKINGHAM CREEK. PLANNING / DESIGN IN PROGRESS RIGHT‐OF‐WAY STPON 93 REG PIEDMONT TRIAD RPO B‐5343 US 311 / NC 770 7 ROCKINGHAM REPLACE BRIDGE NO. 169 OVER CASCADE PLANNING / DESIGN IN PROGRESS CONSTRUCTION HFB 925 REPLACE BRIDGE NO. 161 OVER SOUTH DIV GREENSBORO URBAN AREA MPO B‐5344 SR 2821 (HARVEST ROAD) 7 GUILFORD BUFFALO CREEK. PLANNING / DESIGN IN PROGRESS RIGHT‐OF‐WAY STPOFF 120 DIV GREENSBORO URBAN AREA MPO B‐5344 SR 2821 (HARVEST ROAD) 7 GUILFORD REPLACE BRIDGE NO. 161 OVER SOUTH PLANNING / DESIGN IN PROGRESS CONSTRUCTION STPOFF 800 REPLACE BRIDGE NO. 456 OVER BRUSH CREEK HF GREENSBORO URBAN AREA MPO B‐5345 SR 2136 (FLEMING ROAD) 7 GUILFORD IN GREENSBORO. PLANNING / DESIGN IN PROGRESS RIGHT‐OF‐WAY HFB 110 HF GREENSBORO URBAN AREA MPO B‐5345 SR 2136 (FLEMING ROAD) 7 GUILFORD REPLACE BRIDGE NO. 456 OVER BRUSH CREEK PLANNING / DESIGN IN PROGRESS MITIGATION HFB 12 HF GREENSBORO URBAN AREA MPO B‐5345 SR 2136 (FLEMING ROAD) 7 GUILFORD REPLACE BRIDGE NO. 456 OVER BRUSH CREEK PLANNING / DESIGN IN PROGRESS CONSTRUCTION HFB 1125 BURLINGTON‐GRAHAM URBAN AREA REPLACE BRIDGE NO. 3 OVER AN UNNAMED DIV MPO B‐5346 SR 1529 (DURHAM STREET) 7 ALAMANCE CREEK. PLANNING / DESIGN IN PROGRESS RIGHT‐OF‐WAY STPOFF 77 DIV BURLINGTON‐GRAHAM URBAN AREA B‐5346 SR 1529 (DURHAM STREET) 7 ALAMANCE REPLACE BRIDGE NO. 3 OVER AN UNNAMED PLANNING / DESIGN IN PROGRESS CONSTRUCTION STPOFF 770 BURLINGTON‐GRAHAM URBAN AREA REPLACE BRIDGE NO. 170 OVER PRONG OF HF MPO B‐5347 SR 1212 (POND ROAD) 7 ALAMANCE ALAMANCE CREEK IN ALAMANCE. PLANNING / DESIGN IN PROGRESS RIGHT‐OF‐WAY HFB 50 HF BURLINGTON‐GRAHAM URBAN AREA B‐5347 SR 1212 (POND ROAD) 7 ALAMANCE REPLACE BRIDGE NO. 170 OVER PRONG OF PLANNING / DESIGN IN PROGRESS CONSTRUCTION HFB 525 DURHAM‐CHAPEL HILL‐CARRBORO HF MPO B‐5348 SR 1005 (OLD GREENSBORO ROAD) 7 ORANGE REPLACE BRIDGE NO. 85 OVER PHIL'S CREEK. PLANNING / DESIGN IN PROGRESS RIGHT‐OF‐WAY HFB 95 HF DURHAM‐CHAPEL HILL‐CARRBORO B‐5348 SR 1005 (OLD GREENSBORO ROAD) 7 ORANGE REPLACE BRIDGE NO. 85 OVER PHIL'S CREEK. PLANNING / DESIGN IN PROGRESS CONSTRUCTION HFB 950 BURLINGTON‐GRAHAM URBAN AREA REPLACE BRIDGE NO. 173 OVER LITTLE DIV MPO B‐5349 SR 1149 (HUFFMAN MILL ROAD) 7 ALAMANCE ALAMANCE CREEK IN BURLINGTON. PLANNING / DESIGN IN PROGRESS RIGHT‐OF‐WAY STPOFF 180 DIV BURLINGTON‐GRAHAM URBAN AREA B‐5349 SR 1149 (HUFFMAN MILL ROAD) 7 ALAMANCE REPLACE BRIDGE NO. 173 OVER LITTLE PLANNING / DESIGN IN PROGRESS MITIGATION STPOFF 10 DIV BURLINGTON‐GRAHAM URBAN AREA B‐5349 SR 1149 (HUFFMAN MILL ROAD) 7 ALAMANCE REPLACE BRIDGE NO. 173 OVER LITTLE PLANNING / DESIGN IN PROGRESS CONSTRUCTION STPOFF 1400 BURLINGTON‐GRAHAM URBAN AREA REPLACE BRIDGE NO. 44 OVER JORDAN'S HF MPO B‐5350 SR 1768 (HUGHES MILL ROAD) 7 ALAMANCE CREEK. PLANNING / DESIGN IN PROGRESS RIGHT‐OF‐WAY HFB 50 HF BURLINGTON‐GRAHAM URBAN AREA B‐5350 SR 1768 (HUGHES MILL ROAD) 7 ALAMANCE REPLACE BRIDGE NO. 44 OVER JORDAN'S PLANNING / DESIGN IN PROGRESS CONSTRUCTION HFB 600

REPLACE BRIDGE NO. 242 OVER DEEP RIVER IN COORDINATE WITH B‐5730 ‐ HF HIGH POINT URBAN AREA MPO B‐5351 US 29 / US 70 / BUSINESS 85 SB 7 GUILFORD HIGH POINT. PLANNING / DESIGN IN PROGRESS RIGHT‐OF‐WAY HFB 390 HF HIGH POINT URBAN AREA MPO B‐5351 US 29 / US 70 / BUSINESS 85 SB 7 GUILFORD REPLACE BRIDGE NO. 242 OVER DEEP RIVER IN COORDINATE WITH B‐5730 ‐ CONSTRUCTION HFB 3950 REPLACE BRIDGE NO. 131 OVER NORFOLK SW PIEDMONT TRIAD RPO B‐5352 US 220 (NORTHBOUND) 7 ROCKINGHAM SOUTHERN RAILROAD. PLANNING / DESIGN IN PROGRESS RIGHT‐OF‐WAY NHPB 240 SW PIEDMONT TRIAD RPO B‐5352 US 220 (NORTHBOUND) 7 ROCKINGHAM REPLACE BRIDGE NO. 131 OVER NORFOLK PLANNING / DESIGN IN PROGRESS CONSTRUCTION NHPB 2350 REPLACE BRIDGE NO. 147 OVER SR 1993 HF HIGH POINT URBAN AREA MPO B‐5353 US 29 / US 70 / BUSINESS 85 7 GUILFORD (SOUTH MAIN STREET) IN HIGH POINT. PLANNING / DESIGN IN PROGRESS RIGHT‐OF‐WAY HFB 660 HF HIGH POINT URBAN AREA MPO B‐5353 US 29 / US 70 / BUSINESS 85 7 GUILFORD REPLACE BRIDGE NO. 147 OVER SR 1993 PLANNING / DESIGN IN PROGRESS CONSTRUCTION HFB 6800

REPLACE BRIDGE NO. 360 OVER US 29 IN COORDINATE WITH R‐4707 ‐ DIV GREENSBORO URBAN AREA MPO B‐5354 SR 4771 (REEDY FORK PARKWAY) 7 GUILFORD GREENSBORO. PLANNING / DESIGN IN PROGRESS RIGHT‐OF‐WAY NHPB 420 DIV GREENSBORO URBAN AREA MPO B‐5354 SR 4771 (REEDY FORK PARKWAY) 7 GUILFORD REPLACE BRIDGE NO. 360 OVER US 29 IN COORDINATE WITH R‐4707 ‐ CONSTRUCTION NHPB 4200 REPLACE BRIDGE NO. 106 OVER WOLF ISLAND HF PIEDMONT TRIAD RPO B‐5355 SR 1902 (DIBRELL ROAD) 7 ROCKINGHAM CREEK. RIGHT‐OF‐WAY HFB 270 HF PIEDMONT TRIAD RPO B‐5355 SR 1902 (DIBRELL ROAD) 7 ROCKINGHAM REPLACE BRIDGE NO. 106 OVER WOLF ISLAND CONSTRUCTION HFB 2675 REPLACE BRIDGE NO. 299 OVER SOUTH SW GREENSBORO URBAN AREA MPO B‐5356 I‐40 / BUSINESS 85 / US 29 / US 70 / US 220 7 GUILFORD BUFFALO CREEK IN GREENSBORO. PLANNING / DESIGN IN PROGRESS RIGHT‐OF‐WAY NHPB 820 SW GREENSBORO URBAN AREA MPO B‐5356 I‐40 / BUSINESS 85 / US 29 / US 70 / US 220 7 GUILFORD REPLACE BRIDGE NO. 299 OVER SOUTH PLANNING / DESIGN IN PROGRESS CONSTRUCTION NHPB 8200 REPLACE BRIDGE NO. 78 OVER AN UNNAMED HF PIEDMONT TRIAD RPO B‐5357 SR 2715 (HAMPTON ROAD) 7 ROCKINGHAM CREEK. RIGHT‐OF‐WAY HFB 60 HF PIEDMONT TRIAD RPO B‐5357 SR 2715 (HAMPTON ROAD) 7 ROCKINGHAM REPLACE BRIDGE NO. 78 OVER AN UNNAMED CONSTRUCTION HFB 600 PLANNING / DESIGN IN PROGRESS REPLACE BRIDGE NO. 428 OVER BRANCH OF BY CITY OF HIGH POINT ‐ MUNICIPAL DIV HIGH POINT URBAN AREA MPO B‐5358 MODEL FARM ROAD 7 GUILFORD RICHLAND CREEK IN HIGH POINT. BRIDGE RIGHT‐OF‐WAY STPOFF 111 DIV HIGH POINT URBAN AREA MPO B‐5358 MODEL FARM ROAD 7 GUILFORD REPLACE BRIDGE NO. 428 OVER BRANCH OF PLANNING / DESIGN IN PROGRESS RIGHT‐OF‐WAY L 28 DIV HIGH POINT URBAN AREA MPO B‐5358 MODEL FARM ROAD 7 GUILFORD REPLACE BRIDGE NO. 428 OVER BRANCH OF PLANNING / DESIGN IN PROGRESS MITIGATION STPOFF 37 DIV HIGH POINT URBAN AREA MPO B‐5358 MODEL FARM ROAD 7 GUILFORD REPLACE BRIDGE NO. 428 OVER BRANCH OF PLANNING / DESIGN IN PROGRESS MITIGATION L 9 DIV HIGH POINT URBAN AREA MPO B‐5358 MODEL FARM ROAD 7 GUILFORD REPLACE BRIDGE NO. 428 OVER BRANCH OF PLANNING / DESIGN IN PROGRESS CONSTRUCTION STPOFF 500 DIV HIGH POINT URBAN AREA MPO B‐5358 MODEL FARM ROAD 7 GUILFORD REPLACE BRIDGE NO. 428 OVER BRANCH OF PLANNING / DESIGN IN PROGRESS CONSTRUCTION L 125 PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY CITY OF REPLACE BRIDGE NO. 98 OVER A TRIBUTARY OF GREENSBORO ‐ MUNICIPAL BRIDGE DIV GREENSBORO URBAN AREA MPO B‐5553 BALLINGER ROAD 7 GUILFORD HORSEPEN CREEK IN GREENSBORO. PROJECT RIGHT‐OF‐WAY STPOFF 60 DIV GREENSBORO URBAN AREA MPO B‐5553 BALLINGER ROAD 7 GUILFORD REPLACE BRIDGE NO. 98 OVER A TRIBUTARY OF PLANNING / DESIGN / RIGHT OF RIGHT‐OF‐WAY L 15 DIV GREENSBORO URBAN AREA MPO B‐5553 BALLINGER ROAD 7 GUILFORD REPLACE BRIDGE NO. 98 OVER A TRIBUTARY OF PLANNING / DESIGN / RIGHT OF CONSTRUCTION STPOFF 600 DIV GREENSBORO URBAN AREA MPO B‐5553 BALLINGER ROAD 7 GUILFORD REPLACE BRIDGE NO. 98 OVER A TRIBUTARY OF PLANNING / DESIGN / RIGHT OF CONSTRUCTION L 150 REPLACE BRIDGE NO. 352 OVER I‐40 / BUSINESS DIV GREENSBORO URBAN AREA MPO B‐5713 WILLOW ROAD 7 GUILFORD 85 IN GREENSBORO. RIGHT‐OF‐WAY NHPB 166 DIV GREENSBORO URBAN AREA MPO B‐5713 WILLOW ROAD 7 GUILFORD REPLACE BRIDGE NO. 352 OVER I‐40 / BUSINESS MITIGATION NHPB 6 DIV GREENSBORO URBAN AREA MPO B‐5713 WILLOW ROAD 7 GUILFORD REPLACE BRIDGE NO. 352 OVER I‐40 / BUSINESS CONSTRUCTION NHPB 3318 REPLACE BRIDGE NO. 67 OVER DEEP RIVER IN HF HIGH POINT URBAN AREA MPO B‐5714 SR 1523 (DEEP RIVER ROAD) 7 GUILFORD HIGH POINT. RIGHT‐OF‐WAY HFB 190 HF HIGH POINT URBAN AREA MPO B‐5714 SR 1523 (DEEP RIVER ROAD) 7 GUILFORD REPLACE BRIDGE NO. 67 OVER DEEP RIVER IN CONSTRUCTION HFB 1918 GREENSBORO URBAN AREA MPO, DIV PIEDMONT TRIAD RPO B‐5715 SR 2351 (WITTY ROAD) 7 ROCKINGHAM REPLACE BRIDGE NO. 17 OVER HAW RIVER. RIGHT‐OF‐WAY STPOFF 69 DIV GREENSBORO URBAN AREA MPO, B‐5715 SR 2351 (WITTY ROAD) 7 ROCKINGHAM REPLACE BRIDGE NO. 17 OVER HAW RIVER. MITIGATION STPOFF 19 DIV GREENSBORO URBAN AREA MPO, B‐5715 SR 2351 (WITTY ROAD) 7 ROCKINGHAM REPLACE BRIDGE NO. 17 OVER HAW RIVER. CONSTRUCTION STPOFF 1373 REPLACE BRIDGE NO. 140 OVER DAN RIVER IN DIV PIEDMONT TRIAD RPO B‐5716 SR 1138 (LINDSEY BRIDGE ROAD) 7 ROCKINGHAM MADISON. RIGHT‐OF‐WAY STPOFF 255 DIV PIEDMONT TRIAD RPO B‐5716 SR 1138 (LINDSEY BRIDGE ROAD) 7 ROCKINGHAM REPLACE BRIDGE NO. 140 OVER DAN RIVER IN CONSTRUCTION STPOFF 2548 2548 REPLACE BRIDGE NO. 121 OVER SOUTH DIV GREENSBORO URBAN AREA MPO B‐5717 SR 4240 (EAST LEE STREET ‐ WESTBOUND) 7 GUILFORD BUFFALO CREEK IN GREENSBORO. RIGHT‐OF‐WAY NHPB 157 DIV GREENSBORO URBAN AREA MPO B‐5717 SR 4240 (EAST LEE STREET ‐ WESTBOUND) 7 GUILFORD REPLACE BRIDGE NO. 121 OVER SOUTH MITIGATION NHPB 22

As of December 2014 2 of 15 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE Draft STIP FY 2015 ‐ 2025 Division 7 Projects COST ESTIMATES ARE IN THOUSANDS OF DOLLARS CATEGORY MPO_RPO PROJECT ROUTE DIVISION COUNTIES DESCRIPTION COMMENT ACTIVITY FUNDING 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 UNFUNDED DIV GREENSBORO URBAN AREA MPO B‐5717 SR 4240 (EAST LEE STREET ‐ WESTBOUND) 7 GUILFORD REPLACE BRIDGE NO. 121 OVER SOUTH CONSTRUCTION NHPB 3133

REPLACE BRIDGE NO. 329 OVER I‐40 / BUSINESS DIV GREENSBORO URBAN AREA MPO B‐5718 PATTON AVENUE 7 GUILFORD 85 / US 29 / US 70 / US 220 IN GREENSBORO. RIGHT‐OF‐WAY NHPB 218 DIV GREENSBORO URBAN AREA MPO B‐5718 PATTON AVENUE 7 GUILFORD REPLACE BRIDGE NO. 329 OVER I‐40 / BUSINESS CONSTRUCTION NHPB 4353 REPLACE BRIDGE NO. 53 OVER TRIBUTARY OF DIV PIEDMONT TRIAD RPO B‐5719 SR 1527 (RIVER BEND ROAD) 7 CASWELL DAN RIVER. RIGHT‐OF‐WAY STPOFF 33 DIV PIEDMONT TRIAD RPO B‐5719 SR 1527 (RIVER BEND ROAD) 7 CASWELL REPLACE BRIDGE NO. 53 OVER TRIBUTARY OF CONSTRUCTION STPOFF 650 DURHAM‐CHAPEL HILL‐CARRBORO HF MPO, TRIANGLE AREA RPO B‐5720 SR 1336 (HALLS MILL ROAD) 7 ORANGE REPLACE BRIDGE NO. 11 OVER ENO RIVER. RIGHT‐OF‐WAY HFB 115 HF DURHAM‐CHAPEL HILL‐CARRBORO B‐5720 SR 1336 (HALLS MILL ROAD) 7 ORANGE REPLACE BRIDGE NO. 11 OVER ENO RIVER. CONSTRUCTION HFB 1150 REPLACE BRIDGE NO. 124 OVER MAYO RIVER IN DIV PIEDMONT TRIAD RPO B‐5721 SR 2177 (DAN VALLEY ROAD) 7 ROCKINGHAM MADISON. RIGHT‐OF‐WAY STPOFF 158 DIV PIEDMONT TRIAD RPO B‐5721 SR 2177 (DAN VALLEY ROAD) 7 ROCKINGHAM REPLACE BRIDGE NO. 124 OVER MAYO RIVER IN CONSTRUCTION STPOFF 3152

DIV PIEDMONT TRIAD RPO B‐5722 SR 1169 (ISLAND DRIVE) 7 ROCKINGHAM REPLACE BRIDGE NO. 277 OVER BEAVER CREEK. RIGHT‐OF‐WAY STPOFF 85 DIV PIEDMONT TRIAD RPO B‐5722 SR 1169 (ISLAND DRIVE) 7 ROCKINGHAM REPLACE BRIDGE NO. 277 OVER BEAVER CREEK. CONSTRUCTION STPOFF 1705 REPLACE BRIDGE NO. 54 OVER TWO MILE HF HIGH POINT URBAN AREA MPO B‐5723 SR 1158 (JACKSON LAKE ROAD) 7 GUILFORD CREEK IN HIGH POINT. RIGHT‐OF‐WAY HFB 240 HF HIGH POINT URBAN AREA MPO B‐5723 SR 1158 (JACKSON LAKE ROAD) 7 GUILFORD REPLACE BRIDGE NO. 54 OVER TWO MILE MITIGATION HFB 23 HF HIGH POINT URBAN AREA MPO B‐5723 SR 1158 (JACKSON LAKE ROAD) 7 GUILFORD REPLACE BRIDGE NO. 54 OVER TWO MILE CONSTRUCTION HFB 2400 REPLACE BRIDGE NO. 293 OVER LITTLE HF GREENSBORO URBAN AREA MPO B‐5724 SR 3314 (WILEY LEWIS ROAD) 7 GUILFORD ALAMANCE CREEK. RIGHT‐OF‐WAY HFB 50 HF GREENSBORO URBAN AREA MPO B‐5724 SR 3314 (WILEY LEWIS ROAD) 7 GUILFORD REPLACE BRIDGE NO. 293 OVER LITTLE CONSTRUCTION HFB 500

HF PIEDMONT TRIAD RPO B‐5725 SR 1710 (GRIERS CHURCH ROAD) 7 CASWELL REPLACE BRIDGE NO. 7 OVER HYCO CREEK. RIGHT‐OF‐WAY HFB 250 HF PIEDMONT TRIAD RPO B‐5725 SR 1710 (GRIERS CHURCH ROAD) 7 CASWELL REPLACE BRIDGE NO. 7 OVER HYCO CREEK. CONSTRUCTION HFB 2550 REPLACE BRIDGE NO. 135 OVER AN UNNAMED HF GREENSBORO URBAN AREA MPO B‐5726 SR 1001 (NORTH CHURCH STREET) 7 GUILFORD BRANCH. RIGHT‐OF‐WAY HFB 45 HF GREENSBORO URBAN AREA MPO B‐5726 SR 1001 (NORTH CHURCH STREET) 7 GUILFORD REPLACE BRIDGE NO. 135 OVER AN UNNAMED CONSTRUCTION HFB 425 BURLINGTON‐GRAHAM URBAN AREA REPLACE BRIDGE NO. 178 OVER LITTLE HF MPO B‐5727 SR 1154 (TUCKER STREET) 7 ALAMANCE ALAMANCE CREEK IN BURLINGTON. RIGHT‐OF‐WAY HFB 250 HF BURLINGTON‐GRAHAM URBAN AREA B‐5727 SR 1154 (TUCKER STREET) 7 ALAMANCE REPLACE BRIDGE NO. 178 OVER LITTLE MITIGATION HFB 4 HF BURLINGTON‐GRAHAM URBAN AREA B‐5727 SR 1154 (TUCKER STREET) 7 ALAMANCE REPLACE BRIDGE NO. 178 OVER LITTLE CONSTRUCTION HFB 2550 BURLINGTON‐GRAHAM URBAN AREA REPLACE BRIDGE NO. 112 OVER REEDY FORK HF MPO B‐5728 NC 87 7 ALAMANCE CREEK IN OSSIPEE. RIGHT‐OF‐WAY HFB 515 HF BURLINGTON‐GRAHAM URBAN AREA B‐5728 NC 87 7 ALAMANCE REPLACE BRIDGE NO. 112 OVER REEDY FORK CONSTRUCTION HFB 5120 REPLACE BRIDGE NO. 134 OVER DAN RIVER IN HF PIEDMONT TRIAD RPO B‐5729 NC 700 7 ROCKINGHAM EDEN. RIGHT‐OF‐WAY HFB 770 HF PIEDMONT TRIAD RPO B‐5729 NC 700 7 ROCKINGHAM REPLACE BRIDGE NO. 134 OVER DAN RIVER IN CONSTRUCTION HFB 7700 REPLACE BRIDGE NO. 237 OVER DEEP RIVER IN REG HIGH POINT URBAN AREA MPO B‐5730 US 29 / US 70 / BUSINESS 85 NB 7 GUILFORD HIGH POINT. COORDINATE WITH B‐5351 RIGHT‐OF‐WAY NHPB 147 REG HIGH POINT URBAN AREA MPO B‐5730 US 29 / US 70 / BUSINESS 85 NB 7 GUILFORD REPLACE BRIDGE NO. 237 OVER DEEP RIVER IN COORDINATE WITH B‐5351 CONSTRUCTION NHPB 2945 REPLACE BRIDGE NO. 112 OVER HAW RIVER IN HF GREENSBORO URBAN AREA MPO B‐5731 SR 2109 (EVERFIELD ROAD) 7 GUILFORD OAK RIDGE AND STOKESDALE. RIGHT‐OF‐WAY HFB 180 HF GREENSBORO URBAN AREA MPO B‐5731 SR 2109 (EVERFIELD ROAD) 7 GUILFORD REPLACE BRIDGE NO. 112 OVER HAW RIVER IN MITIGATION HFB 33 HF GREENSBORO URBAN AREA MPO B‐5731 SR 2109 (EVERFIELD ROAD) 7 GUILFORD REPLACE BRIDGE NO. 112 OVER HAW RIVER IN CONSTRUCTION HFB 1825 REPLACE BRIDGE NO. 412 OVER NORTH HF GREENSBORO URBAN AREA MPO B‐5732 SR 2526 (SUMMIT AVENUE) 7 GUILFORD BUFFALO CREEK IN GREENSBORO. RIGHT‐OF‐WAY HFB 245 HF GREENSBORO URBAN AREA MPO B‐5732 SR 2526 (SUMMIT AVENUE) 7 GUILFORD REPLACE BRIDGE NO. 412 OVER NORTH CONSTRUCTION HFB 2450 DURHAM‐CHAPEL HILL‐CARRBORO REPLACE BRIDGE NO. 39 OVER BOOKER CREEK HF MPO B‐5733 SR 1010 (EAST FRANKLIN STREET) 7 ORANGE IN CHAPEL HILL. RIGHT‐OF‐WAY HFB 180 HF DURHAM‐CHAPEL HILL‐CARRBORO B‐5733 SR 1010 (EAST FRANKLIN STREET) 7 ORANGE REPLACE BRIDGE NO. 39 OVER BOOKER CREEK CONSTRUCTION HFB 1775

HF PIEDMONT TRIAD RPO B‐5734 NC 86 7 CASWELL REPLACE BRIDGE NO. 60 OVER MOON CREEK. RIGHT‐OF‐WAY HFB 300 HF PIEDMONT TRIAD RPO B‐5734 NC 86 7 CASWELL REPLACE BRIDGE NO. 60 OVER MOON CREEK. CONSTRUCTION HFB 2950 BURLINGTON‐GRAHAM URBAN AREA HF MPO B‐5735 SR 1936 (STONE STREET EXTENSION) 7 ALAMANCE REPLACE BRIDGE NO. 307 OVER BACK CREEK. RIGHT‐OF‐WAY HFB 175 HF BURLINGTON‐GRAHAM URBAN AREA B‐5735 SR 1936 (STONE STREET EXTENSION) 7 ALAMANCE REPLACE BRIDGE NO. 307 OVER BACK CREEK. CONSTRUCTION HFB 1725 RIGHT OF WAY IN PROGRESS ‐ REG GREENSBORO URBAN AREA MPO B‐5736 NC 61 7 GUILFORD REPLACE BRIDGE NO. 38 OVER BEAVER CREEK. DIVISION DESIGN / CENTRAL LET CONSTRUCTION STPON 461 REPLACE BRIDGE NO. 108 OVER NC 14 / NC 87 / HF PIEDMONT TRIAD RPO B‐5737 NC 700 7 ROCKINGHAM NC 770 IN EDEN. RIGHT‐OF‐WAY HFB 480 HF PIEDMONT TRIAD RPO B‐5737 NC 700 7 ROCKINGHAM REPLACE BRIDGE NO. 108 OVER NC 14 / NC 87 / CONSTRUCTION HFB 4800

PIEDMONT TRIAD RPO, BURLINGTON‐ GRAHAM URBAN AREA MPO, DURHAM‐ CHAPEL HILL‐CARRBORO MPO, GREENSBORO URBAN AREA MPO, HIGH DIVISION 7 PURCHASE ORDER CONTRACT POINT URBAN AREA MPO, TRIANGLE ALAMANCE, CASWELL, GUILFORD, BRIDGE REPLACEMENT PROJECTS AT SELECTED IN PROGRESS ‐ BRIDGE PURCHASE DIV AREA RPO BD‐5107 VARIOUS 7 ORANGE, ROCKINGHAM LOCATIONS. ORDER CONTRACT (BPOC) RIGHT‐OF‐WAY STPOFF 200 DIV PIEDMONT TRIAD RPO, BURLINGTON‐ BD‐5107 VARIOUS 7 ALAMANCE, CASWELL, GUILFORD, DIVISION 7 PURCHASE ORDER CONTRACT IN PROGRESS ‐ BRIDGE PURCHASE CONSTRUCTION STPOFF 1800 TRIANGLE J COUNCIL OF GOVERNMENTS (COG). DEVELOP A FLEXIBLE WORK SCHEDULE FOR EMPLOYEES AND ORGANIZATIONS IN TRIANGLE CAPITAL AREA MPO, DURHAM‐CHAPEL OZONE NON‐ATTAINMENT AREA FOR THREE IN PROGRESS BY TRIANGLE J EX HILL‐CARRBORO MPO C‐4924 TRIANGLE J COUNCIL OF GOVERNMENTS 5, 7 WAKE, DURHAM, ORANGE YEARS. COUNCIL OF GOVERNMENTS

CAPITAL AREA MPO, DURHAM‐CHAPEL DEVELOP FLEXIBLE WORK SCHEDULES FOR EX HILL‐CARRBORO MPO C‐4924A TRIANGLE J COUNCIL OF GOVERNMENTS 5, 7 WAKE, DURHAM, ORANGE EMPLOYEES IN CAPITAL AREA MPO (CAMPO) IN PROGRESS DEVELOP FLEXIBLE WORK SCHEDULES FOR CAPITAL AREA MPO, DURHAM‐CHAPEL EMPLOYEES IN DURHAM‐CHAPEL HILL‐ EX HILL‐CARRBORO MPO C‐4924B TRIANGLE J COUNCIL OF GOVERNMENTS 5, 7 WAKE, DURHAM, ORANGE CARRBORO (DCHC) IN PROGRESS PARK AND RIDE FACILITY IN TOWN OF DURHAM‐CHAPEL HILL‐CARRBORO HILLSBOROUGH, INSTALL BUS SHELTERS AND UNDER CONSTRUCTION BY ORANGE EX MPO C‐4932A ORANGE COUNTY PARK‐AND‐RIDE LOT 7 ORANGE BIKE RACKS. COUNTY PARK AND RIDE FACILITY IN TOWN OF DURHAM‐CHAPEL HILL‐CARRBORO HILLSBOROUGH. PROVIDE OPERATING EX MPO C‐4932B ORANGE COUNTY PARK‐AND‐RIDE LOT 7 ORANGE ASSISTANCE FOR THREE YEARS. IN PROGRESS BY ORANGE COUNTY

As of December 2014 3 of 15 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE Draft STIP FY 2015 ‐ 2025 Division 7 Projects COST ESTIMATES ARE IN THOUSANDS OF DOLLARS CATEGORY MPO_RPO PROJECT ROUTE DIVISION COUNTIES DESCRIPTION COMMENT ACTIVITY FUNDING 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 UNFUNDED PIEDMONT AUTHORITY FOR REGIONAL GREENSBORO URBAN AREA MPO, GUILFORD, FORSYTH, CASWELL, TRANSPORTATION (PART). IMPLEMENT A IN PROGRESS BY PIEDMONT NORTHWEST PIEDMONT RPO, DAVIDSON, MONTGOMERY, RANDOLPH, REGIONAL AIR QUALITY AWARENESS AUTHORITY FOR REGIONAL EX WINSTON‐SALEM URBAN AREA MPO C‐4936 VARIOUS 7, 9, 8 ROCKINGHAM PROGRAM. TRANSPORTATION

CHARLOTTE REGIONAL TPO, DURHAM‐ INSTALL TWO STATE MAINTAINED E‐85 FUELING EX CHAPEL HILL‐CARRBORO MPO C‐5111 CHARLOTTE HILLSBOROUGH 7, 10 MECKLENBURG, ORANGE SITES IN CHARLOTTE AND HILLSBOROUGH. IN PROGRESS

NC 86 (MARTIN LUTHER KING, JR. BOULEVARD) TO CASWELL DRIVE IN CHAPEL HILL. CONSTRUCT FIVE FOOT SIDEWALKS AND FIVE FOOT BIKE LANES. NC 86 (MARTIN LUTHER KING, JR. BOULEVARD) PLANNING / DESIGN / RIGHT OF DURHAM‐CHAPEL HILL‐CARRBORO TO ELLIOTT ROAD IN CHAPEL HILL. CONSTRUCT WAY / CONSTRUCTION BY TOWN OF EX MPO C‐5179 SR 1750 (NORTH ESTES DRIVE) 7 ORANGE TEN FOOT MULTIUSE PATH. CHAPEL HILL ‐ IN PROGRESS RIGHT‐OF‐WAY CMAQ 240 EX DURHAM‐CHAPEL HILL‐CARRBORO C‐5179 SR 1750 (NORTH ESTES DRIVE) 7 ORANGE NC 86 (MARTIN LUTHER KING, JR. BOULEVARD) PLANNING / DESIGN / RIGHT OF RIGHT‐OF‐WAY L 60 EX DURHAM‐CHAPEL HILL‐CARRBORO C‐5179 SR 1750 (NORTH ESTES DRIVE) 7 ORANGE NC 86 (MARTIN LUTHER KING, JR. BOULEVARD) PLANNING / DESIGN / RIGHT OF CONSTRUCTION CMAQ 1630 EX DURHAM‐CHAPEL HILL‐CARRBORO C‐5179 SR 1750 (NORTH ESTES DRIVE) 7 ORANGE NC 86 (MARTIN LUTHER KING, JR. BOULEVARD) PLANNING / DESIGN / RIGHT OF CONSTRUCTION L 408

CONSTRUCT A 100 FOOT BRIDGE AND 650 FOOT PAVED TRAIL IN CARRBORO TO FILL GAP BETWEEN THE UPPER BOLIN TRAIL AND TWIN CREEKS GREENWAY AND IMPLEMENT PLANNING / DESIGN / RIGHT OF DURHAM‐CHAPEL HILL‐CARRBORO PROGRAM TO SUPPORT NON‐VEHICLE TRIPS TO WAY / CONSTRUCTION BY TOWN OF EX MPO C‐5181 JONES CREEK GREENWAY 7 ORANGE MORRIS GROVE ELEMENTRY SCHOOL. CARRBORO CONSTRUCTION CMAQ 247 EX DURHAM‐CHAPEL HILL‐CARRBORO C‐5181 JONES CREEK GREENWAY 7 ORANGE CONSTRUCT A 100 FOOT BRIDGE AND 650 FOOT PLANNING / DESIGN / RIGHT OF CONSTRUCTION L 61 EX DURHAM‐CHAPEL HILL‐CARRBORO C‐5181 JONES CREEK GREENWAY 7 ORANGE CONSTRUCT A 100 FOOT BRIDGE AND 650 FOOT PLANNING / DESIGN / RIGHT OF IMPLEMENTATION CMAQ 10 EX DURHAM‐CHAPEL HILL‐CARRBORO C‐5181 JONES CREEK GREENWAY 7 ORANGE CONSTRUCT A 100 FOOT BRIDGE AND 650 FOOT PLANNING / DESIGN / RIGHT OF IMPLEMENTATION L 2

RIVERWALK TRAIL, PHASE III IN HILLSBOROUGH. CONSTRUCT A PAVED OFF‐ROAD TAIL ALONG ENO RIVER CONNECTING RIVER PARK, GOLD PARK AND THE OCCONEECHEE MOUNTAIN STATE NATURAL AREA, AND CONSTRUCT PLANNING / DESIGN / RIGHT OF DURHAM‐CHAPEL HILL‐CARRBORO SIDEWALK TO PROVIDE PEDESTRIAN AND WAY / CONSTRUCTION BY TOWN OF EX MPO C‐5184 RIVERWALK TRAIL 7 ORANGE BICYCLE CONNECTIONS TO THE GREE HILLSBOROUGH ‐ IN PROGRESS RIGHT‐OF‐WAY CMAQ 80 EX DURHAM‐CHAPEL HILL‐CARRBORO C‐5184 RIVERWALK TRAIL 7 ORANGE RIVERWALK TRAIL, PHASE III IN HILLSBOROUGH. PLANNING / DESIGN / RIGHT OF RIGHT‐OF‐WAY L 20 EX DURHAM‐CHAPEL HILL‐CARRBORO C‐5184 RIVERWALK TRAIL 7 ORANGE RIVERWALK TRAIL, PHASE III IN HILLSBOROUGH. PLANNING / DESIGN / RIGHT OF CONSTRUCTION CMAQ 360 EX DURHAM‐CHAPEL HILL‐CARRBORO C‐5184 RIVERWALK TRAIL 7 ORANGE RIVERWALK TRAIL, PHASE III IN HILLSBOROUGH. PLANNING / DESIGN / RIGHT OF CONSTRUCTION L 90

RANDOLPH STREET INTERSECTION IN UNDER CONSTRUCTION BY CITY OF EX GREENSBORO URBAN AREA MPO C‐5511 FLORIDA STREET 7 GUILFORD GREENSBORO. CONSTRUCT LEFT TURN LANES. GREENSBORO PLANNING / DESIGN / RIGHT OF SIDEWALK PROJECTS AT SELECTED LOCATIONS WAY / CONSTRUCTION BY CITY OF EX GREENSBORO URBAN AREA MPO C‐5555 VARIOUS 7 GUILFORD IN GREENSBORO. GREENSBORO CONSTRUCTION CMAQ 2765 PLANNING / DESIGN / RIGHT OF SIDEWALK PROJECTS AT SELECTED LOCATIONS WAY / CONSTRUCTION BY CITY OF EX GREENSBORO URBAN AREA MPO C‐5555 VARIOUS 7 GUILFORD IN GREENSBORO. GREENSBORO CONSTRUCTION L 691 CITY OF HIGH POINT SIGNAL SYSTEM EX HIGH POINT URBAN AREA MPO C‐5558 VARIOUS 7 GUILFORD EXPANSION AND UPGRADE. PLANNING / DESIGN IN PROGRESS RIGHT‐OF‐WAY CMAQ 242 EX HIGH POINT URBAN AREA MPO C‐5558 VARIOUS 7 GUILFORD CITY OF HIGH POINT SIGNAL SYSTEM PLANNING / DESIGN IN PROGRESS RIGHT‐OF‐WAY L 7 EX HIGH POINT URBAN AREA MPO C‐5558 VARIOUS 7 GUILFORD CITY OF HIGH POINT SIGNAL SYSTEM PLANNING / DESIGN IN PROGRESS CONSTRUCTION CMAQ 8051 EX HIGH POINT URBAN AREA MPO C‐5558 VARIOUS 7 GUILFORD CITY OF HIGH POINT SIGNAL SYSTEM PLANNING / DESIGN IN PROGRESS CONSTRUCTION L 249 PIEDMONT AUTHORITY FOR REGIONAL IN ACQUISITION BY PIEDMONT BURLINGTON‐GRAHAM URBAN AREA TRANSPORTATION VANPOOL VEHICLE AUTHORITY FOR REGIONAL EX MPO C‐5561 REGIONWIDE 7 GUILFORD REPLACEMENT / EXPANSION. TRANSPORTATION TRIANGLE J COUNCIL OF GOVERNMENTS CAPITAL AREA MPO, DURHAM‐CHAPEL WAKE, DURHAM, ORANGE, JOHNSTON, TRANSPORTATION DEMAND MANAGEMENT EX HILL‐CARRBORO MPO C‐5565 VARIOUS 5, 7, 4, 8 FRANKLIN, CHATHAM, GRANVILLE PROGRAM ‐ PHASE II. CAPITAL AREA MPO, DURHAM‐CHAPEL DEVELOP FLEXIBLE WORK SCHEDULES IN DCHC HILL‐CARRBORO MPO C‐5565B VARIOUS 5, 7, 8 DURHAM, ORANGE, CHATHAM AREA.

BURLINGTON‐GRAHAM URBAN AREA PROJECTS TO IMPROVE CONGESTION AND AIR EX MPO C‐5602 VARIOUS 7 GUILFORD, ORANGE QUALITY IN THE BURLINGTON‐GRAHAM MPO. CONSTRUCTION CMAQ 85 85 PROJECTS TO IMPROVE CONGESTION AND AIR DURHAM‐CHAPEL HILL‐CARRBORO QUALITY IN THE DURHAM / CHAPEL HILL / EX MPO C‐5605 VARIOUS 5, 7, 8 DURHAM, ORANGE, CHATHAM CARRBORO MPO. CONSTRUCTION CMAQ 2515 2515 PROJECTS TO IMPROVE CONGESTION AND AIR QUALITY IN THE GREENSBORO URBAN AREA EX GREENSBORO URBAN AREA MPO C‐5607 VARIOUS 7 GUILFORD MPO. CONSTRUCTION CMAQ 2605 2605 PROJECTS TO IMPROVE CONGESTION AND AIR EX HIGH POINT URBAN AREA MPO C‐5609 VARIOUS 9, 7 DAVIDSON, GUILFORD, FORSYTH QUALITY IN THE HIGH POINT MPO. CONSTRUCTION CMAQ 1277 1277 PROJECTS TO IMPROVE CONGESTION AND AIR EX TRIANGLE AREA RPO C‐5618 VARIOUS 7, 8 CHATHAM, ORANGE QUALITY IN THE TRIANGLE AREA RPO. CONSTRUCTION CMAQ 225 225

ALBEMARLE RPO, UPPER COASTAL PLAIN RPO, BURLINGTON‐GRAHAM URBAN AREA MPO, DOWN EAST RPO, DURHAM‐CHAPEL HILL‐CARRBORO MPO, FRENCH BROAD RIVER MPO, MID‐ CAMDEN, CHOWAN, PASQUOTANK, EAST RPO, NEW BERN MPO, PEANUT WASHINGTON, ALAMANCE, BEAUFORT, BELT RPO, RPO, BRUNSWICK, BUNCOMBE, CRAVEN, WILMINGTON URBAN AREA MPO, 1, 2, 4, 7, 3, DARE, DURHAM, EDGECOMBE, FREEDOM ROADS. INSTALL INTERACTIVE TRN GREENSBORO URBAN AREA E‐5501 VARIOUS 5, 13 GUILFORD, HALIFAX, LENOIR, WAYNE WAYSIDE SIGNAGE FOR DESIGNATED SITES. CONSTRUCTION STPE 96 TRN ALBEMARLE RPO, UPPER COASTAL E‐5501 VARIOUS 1, 2, 4, 7, 3, CAMDEN, CHOWAN, PASQUOTANK, FREEDOM ROADS. INSTALL INTERACTIVE CONSTRUCTION O 128 US 15‐501 IN ORANGE COUNTY TO SR 1116 (GARRETT ROAD) IN DURHAM COUNTY. DIVISION DESIGN / CENTRAL LET; BICYCLE, PEDESTRIAN, AND TRANSIT STPDA PARTICIPATION FOR PART B DURHAM‐CHAPEL HILL‐CARRBORO SR 2220 (OLD CHAPEL HILL ROAD) SR 1838 (OLD IMPROVEMENTS; AND CONSTRUCTION OF NOT TO EXCEED $6.3 MILLION TRN MPO EB‐4707 DURHAM ROAD) 5, 7 DURHAM, ORANGE ROUNDABOUT. PENDING MPO APPROVAL

As of December 2014 4 of 15 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE Draft STIP FY 2015 ‐ 2025 Division 7 Projects COST ESTIMATES ARE IN THOUSANDS OF DOLLARS CATEGORY MPO_RPO PROJECT ROUTE DIVISION COUNTIES DESCRIPTION COMMENT ACTIVITY FUNDING 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 UNFUNDED DURHAM‐CHAPEL HILL‐CARRBORO US 15‐501 IN ORANGE COUNTY TO SR 1113 TRN MPO EB‐4707A SR 1838 / SR 2220 7, 5 ORANGE, DURHAM (POPE ROAD) IN DURHAM COUNTY RIGHT‐OF‐WAY L 2650 TRN DURHAM‐CHAPEL HILL‐CARRBORO EB‐4707A SR 1838 / SR 2220 7, 5 ORANGE, DURHAM US 15‐501 IN ORANGE COUNTY TO SR 1113 CONSTRUCTION L 3100 EXISTING SIDEWALK TO PIEDMONT ENVIRONMENTAL CENTER ENTRANCE IN HIGH POINT AND JAMESTOWN. CONSTRUCT PLANNING / DESIGN / RIGHT OF PEDESTRIAN BRIDGE OVER EAST FORK OF DEEP WAY / CONSTRUCTION BY TOWN OF TRN HIGH POINT URBAN AREA MPO EB‐5517 NEW PEDESTRIAN BRIDGE AND APPROACHES 7 GUILFORD RIVER. JAMESTOWN CONSTRUCTION STPEB 1200 BATTLEGROUND AVENUE TO MENDENHALL STREET IN GREENSBORO. REMOVE THROUGH PLANNING / DESIGN / RIGHT OF LANE ON HILL STREET AND CONSTRUCT MULTI‐ WAY / CONSTRUCTION BY CITY OF TRN GREENSBORO URBAN AREA MPO EB‐5518 LATHAM PARK GREENWAY 7 GUILFORD USE PATH. GREENSBORO ‐ IN PROGRESS CONSTRUCTION STPEB 350 EXISTING SIDEWALK NEAR JAMESTOWN MUNICIPAL BUILDING TO YORKLEIGH LANE NEAR GUILFORD TECHNICAL COMMUNITY COLLEGE JAMESTOWN CAMPUS/RAGSDALE PLANNING / DESIGN / RIGHT OF HIGH SCHOOL COMPLEX IN JAMESTOWN. WAY / CONSTRUCTION BY TOWN OF TRN HIGH POINT URBAN AREA MPO EB‐5519 SR 4121 (EAST MAIN STREET) 7 GUILFORD CONSTRUCT SIDEWALK. JAMESTOWN ‐ IN PROGRESS CONSTRUCTION STPEB 850

PHASES B, C, AND D ‐ CONSTRUCT GREENWAY ALONG MURROW BOULEVARD AND FISHER AVENUE IN GREENSBORO, FROM SR 4240 (EAST LEE STREET) TO NORTH ELM STREET ON EAST SIDE, AND FROM NORTH ELM STREET TO DIV GREENSBORO URBAN AREA MPO EB‐5700 DOWNTOWN GREENWAY 7 GUILFORD GREENE STREET ON SOUTH SIDE. CONSTRUCTION STPEB 400 DIV GREENSBORO URBAN AREA MPO EB‐5700 DOWNTOWN GREENWAY 7 GUILFORD PHASES B, C, AND D ‐ CONSTRUCT GREENWAY CONSTRUCTION L 100

SR 1398 (FREEMAN MILL ROAD) TO FLORIDA STREET IN GREENSBORO. CONSTRUCT SIDEWALKS ON WEST SIDE AND ON EAST SIDE DIV GREENSBORO URBAN AREA MPO EB‐5712 LOVETT STREET 7 GUILFORD FROM EXISTING SIDEWALK TO FLORIDA STREET. CONSTRUCTION SRTS 286 SR 2751 (CHURCH STREET) TO SR 2523 (YANCEYVILLE STREET) IN GREENSBORO. CONSTRUCT SIDEWALK ON BOTH SIDES WHERE DIV GREENSBORO URBAN AREA MPO EB‐5714 LEES CHAPEL ROAD 7 GUILFORD NONE EXISTS. CONSTRUCTION SRTS 144 SOUTH OF MEADOWVIEW ROAD TO SPRING GARDEN ROAD IN GREENSBORO. CONSTRUCT DIV GREENSBORO URBAN AREA MPO EB‐5716 HOLDEN ROAD 7 GUILFORD SIDEWALK ON WEST SIDE. CONSTRUCTION SRTS 204 MURROW BOULEVARD TO BESSEMER AVENUE IN GREENSBORO. CONSTRUCT SIDEWALK ON DIV GREENSBORO URBAN AREA MPO EB‐5717 EAST LINDSAY STREET 7 GUILFORD NORTH SIDE. CONSTRUCTION SRTS 170

CLELAND DRIVE TO WILLOW DRIVE IN CHAPEL DURHAM‐CHAPEL HILL‐CARRBORO HILL. UPGRADE EXISTING OFF‐ROAD PATH AND DIV MPO EB‐5721 ORANGE COUNTY BICYCLE ROUTE 1 7 ORANGE CONSTRUCT NEW SECTION OF PATH. ENGINEERING SRTS 89 DIV DURHAM‐CHAPEL HILL‐CARRBORO EB‐5721 ORANGE COUNTY BICYCLE ROUTE 1 7 ORANGE CLELAND DRIVE TO WILLOW DRIVE IN CHAPEL CONSTRUCTION SRTS 469

PIEDMONT TRIAD RPO, BURLINGTON‐ GRAHAM URBAN AREA MPO, GREENSBORO URBAN AREA MPO, TRIANGLE AREA RPO, DURHAM‐CHAPEL ALAMANCE, CASWELL, GUILFORD, ECOSYSTEM ENHANCEMENT PROGRAM FOR HILL‐CARRBORO MPO EE‐4907 VARIOUS 7 ORANGE, ROCKINGHAM DIVISION 7 PROJECT MITIGATION. IN PROGRESS EASTERN SECTION, US 15‐501 AT SR 1994 (CULBRETH ROAD TO SR 1919 (SMITH LEVEL ROAD) IN CHAPEL HILL. TEN FOOT MULTI‐USE PLANNING, DESIGN, RIGHT OF WAY DURHAM‐CHAPEL HILL‐CARRBORO ASPHALT PATH INCLUDING ACCESS TO MERRITT AND CONSTRUCTION BY TOWN OF MPO EL‐4601 MORGAN CREEK GREENWAY 7 ORANGE PASTURE. CHAPEL HILL ‐ IN PROGRESS

WESTERN SECTION, SR 1919 (SMITH LEVEL PLANNING, DESIGN, RIGHT OF WAY DURHAM‐CHAPEL HILL‐CARRBORO ROAD) TO UNIVERSITY LAKE IN CARRBORO. AND CONSTRUCTION BY TOWN OF TRN MPO EL‐4828 MORGAN CREEK GREENWAY 7 ORANGE CONSTRUCT GREENWAY AND CONNECTIONS. CARRBORO ‐ IN PROGRESS DURHAM‐CHAPEL HILL‐CARRBORO TRN MPO EL‐4828A MORGAN CREEK GREENWAY 7 ORANGE PHASE 1 CONSTRUCTION STPDA 298 TRN DURHAM‐CHAPEL HILL‐CARRBORO EL‐4828A MORGAN CREEK GREENWAY 7 ORANGE PHASE 1 CONSTRUCTION L 74 DURHAM‐CHAPEL HILL‐CARRBORO TRN MPO EL‐4828B MORGAN CREEK GREENWAY 7 ORANGE PHASE 2 CONSTRUCTION TAP 730 TRN DURHAM‐CHAPEL HILL‐CARRBORO EL‐4828B MORGAN CREEK GREENWAY 7 ORANGE PHASE 2 CONSTRUCTION L 182

PEDESTRIAN AND BICYCLE PROJECTS IN THE PLANNING, DESIGN, RIGHT OF WAY GREENSBORO URBAN AREA METROPOLITAN AND CONSTRUCTION BY OTHERS ‐ DIV GREENSBORO URBAN AREA MPO EL‐5101 VARIOUS 7 GUILFORD PLANNING ORGANIZATION (GUAMPO). IN PROGRESS RIGHT‐OF‐WAY STPDA 268 DIV GREENSBORO URBAN AREA MPO EL‐5101 VARIOUS 7 GUILFORD PEDESTRIAN AND BICYCLE PROJECTS IN THE PLANNING, DESIGN, RIGHT OF WAY RIGHT‐OF‐WAY L 67 DIV GREENSBORO URBAN AREA MPO EL‐5101 VARIOUS 7 GUILFORD PEDESTRIAN AND BICYCLE PROJECTS IN THE PLANNING, DESIGN, RIGHT OF WAY CONSTRUCTION STPDA 3949 1027 3518 DIV GREENSBORO URBAN AREA MPO EL‐5101 VARIOUS 7 GUILFORD PEDESTRIAN AND BICYCLE PROJECTS IN THE PLANNING, DESIGN, RIGHT OF WAY CONSTRUCTION L 987 257 880 DURHAM‐CHAPEL HILL‐CARRBORO CARRBORO, INSTALL BUS SHELTERS AT UNDER CONSTRUCTION BY TOWN MPO EL‐5103 VARIOUS 7 ORANGE SELECTED LOCATIONS. OF CARRBORO NC 86 IN ORANGE COUNTY TO SR 1728 (WADE DURHAM‐CHAPEL HILL‐CARRBORO AVENUE) IN WAKE COUNTY. CONSTRUCT MPO, CAPITAL AREA MPO FS‐1205A I‐40 5, 7 DURHAM, WAKE, ORANGE MANAGED LANES. FEASIBILITY STUDY IN PROGRESS

SR 2066 (KINGS HIGHWAY) IN EDEN. CONVERT PIEDMONT TRIAD RPO FS‐1507A NC 14 (VAN BUREN ROAD) 7 ROCKINGHAM AT‐GRADE INTERSECTION TO . SCHEDULED FOR FEASIBILITY STUDY WESTRIDGE AVENUE TO COTSWOLD DRIVE IN GREENSBORO. WIDEN TO 6 LANES WITH GREENSBORO URBAN AREA MPO FS‐1507B US 220 (BATTLEGROUND AVENUE) 7 GUILFORD MEDIAN. SCHEDULED FOR FEASIBILITY STUDY I‐85 IN ORANGE COUNTY TO NC 147 (DURHAM FREEWAY / TRIANGLE EXPRESSWAY) IN DURHAM‐CHAPEL HILL‐CARRBORO DURHAM COUNTY. WIDEN TO SIX LANES AND MPO I‐3306 I‐40 7, 5 ORANGE, DURHAM INSTALL ITS. DURHAM‐CHAPEL HILL‐CARRBORO REG MPO I‐3306A I‐40 7 ORANGE I‐85 TO DURHAM COUNTY LINE PLANNING / DESIGN IN PROGRESS RIGHT‐OF‐WAY NHP 100

As of December 2014 5 of 15 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE Draft STIP FY 2015 ‐ 2025 Division 7 Projects COST ESTIMATES ARE IN THOUSANDS OF DOLLARS CATEGORY MPO_RPO PROJECT ROUTE DIVISION COUNTIES DESCRIPTION COMMENT ACTIVITY FUNDING 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 UNFUNDED REG DURHAM‐CHAPEL HILL‐CARRBORO I‐3306A I‐40 7 ORANGE I‐85 TO DURHAM COUNTY LINE PLANNING / DESIGN IN PROGRESS MITIGATION NHP 33 REG DURHAM‐CHAPEL HILL‐CARRBORO I‐3306A I‐40 7 ORANGE I‐85 TO DURHAM COUNTY LINE PLANNING / DESIGN IN PROGRESS CONSTRUCTION NHP 22000 22000 44000 PROJECT COMPLETE ‐ GARVEE BOND BURLINGTON‐GRAHAM URBAN AREA NC 49 (MILE POST 145) TO NC 54 (MILE POST FUNDING $4.4 MILLION; PAYBACK GARVEE TRN MPO I‐4714 I‐40 / I‐85 7 ALAMANCE 148). MILL AND RESURFACE. FY 2007 ‐ FY 2018 CONSTRUCTION NHP 468 468 468 468 PROJECT COMPLETE ‐ GARVEE BOND SR 4121 (HIGH POINT ROAD) TO I‐85 BYPASS. FUNDING $9.3 MILLION; PAYBACK GARVEE TRN GREENSBORO URBAN AREA MPO I‐4715 I‐40 7 GUILFORD MILL AND RESURFACE. FY 2007 ‐ FY 2018 CONSTRUCTION NHP 836 836 836 836

NC 54 (MILE POST 148) IN ALAMANCE COUNTY PROJECT COMPLETE ‐ GARVEE BOND BURLINGTON‐GRAHAM URBAN AREA TO WEST OF SR 1114 (BUCKHORN ROAD) IN FUNDING $12.0 MILLION; PAYBACK GARVEE TRN MPO I‐4918 I‐40 / I‐85 7 ALAMANCE, ORANGE ORANGE COUNTY. MILL AND RESURFACE. FY 2007 ‐ FY 2018 CONSTRUCTION NHP 964 964 964 964 COMBINED WITH R‐2413A AND R‐ NC 68 TO GREENSBORO WESTERN LOOP. SIX‐ 2413B FOR DESIGN‐BUILD LET ‐ TRN GREENSBORO URBAN AREA MPO I‐5110 FUTURE I‐73 7 GUILFORD LANE FREEWAY ON NEW LOCATION. UNDER CONSTRUCTION RIGHT‐OF‐WAY NHP 27150 TRN GREENSBORO URBAN AREA MPO I‐5110 FUTURE I‐73 7 GUILFORD NC 68 TO GREENSBORO WESTERN LOOP. SIX‐ COMBINED WITH R‐2413A AND R‐ UTILITIES NHP 2000 TRN GREENSBORO URBAN AREA MPO I‐5110 FUTURE I‐73 7 GUILFORD NC 68 TO GREENSBORO WESTERN LOOP. SIX‐ COMBINED WITH R‐2413A AND R‐ CONSTRUCTION NHP 19400 19400 BURLINGTON‐GRAHAM URBAN AREA EAST OF GUILFORD COUNTY LINE TO EAST OF SW MPO I‐5309 I‐40 / I‐85 7 ALAMANCE NC 49. PAVEMENT REHABILITATION. PLANNING / DESIGN IN PROGRESS CONSTRUCTION NHPIM 6575 DURHAM‐CHAPEL HILL‐CARRBORO EAST OF I‐40 TO DURHAM COUNTY LINE. MPO I‐5312 I‐85 7 ORANGE PAVEMENT REHABILITATION. UNDER CONSTRUCTION

PIEDMONT TRIAD RPO, LUMBER RIVER SOUTH OF ELLERBE IN RICHMOND COUNTY TO I‐ RPO, GREENSBORO URBAN AREA MPO, RANDOLPH, MONTGOMERY, RICHMOND, 85 / US 421 IN GUILFORD COUNTY. UPGRADE HIGH POINT URBAN AREA MPO I‐5329 US 220 / I‐73 / I‐74 8, 7 GUILFORD SIGNING TO INTERSTATE STANDARDS. UNDER CONSTRUCTION I‐40 IN FORSYTH COUNTY TO EAST OF SR 1980 (OLD PLANK ROAD) IN GUILFORD COUNTY. WINSTON‐SALEM URBAN AREA MPO, INSTALL SIGNAGE TO REFLECT INTERSTATE TRN HIGH POINT URBAN AREA MPO I‐5511 I‐74 / US 311 9, 7 FORSYTH, GUILFORD DESIGNATION. UNDER CONSTRUCTION BURLINGTON‐GRAHAM URBAN AREA SR 1007 (MEBANE‐OAKS ROAD) IN MEBANE. SW MPO I‐5711 I‐40 / I‐85 7 ALAMANCE INTERCHANGE IMPROVEMENTS. PLANNING / DESIGN IN PROGRESS RIGHT‐OF‐WAY NHP 160 SW BURLINGTON‐GRAHAM URBAN AREA I‐5711 I‐40 / I‐85 7 ALAMANCE SR 1007 (MEBANE‐OAKS ROAD) IN MEBANE. PLANNING / DESIGN IN PROGRESS UTILITIES NHP 185 SW BURLINGTON‐GRAHAM URBAN AREA I‐5711 I‐40 / I‐85 7 ALAMANCE SR 1007 (MEBANE‐OAKS ROAD) IN MEBANE. PLANNING / DESIGN IN PROGRESS CONSTRUCTION NHP 1000

SR 1850 (SANDY RIDGE ROAD) IN GREENSBORO. SW GREENSBORO URBAN AREA MPO I‐5712 I‐40 / US 421 7 GUILFORD INTERCHANGE IMPROVEMENTS. RIGHT‐OF‐WAY NHP 300 SW GREENSBORO URBAN AREA MPO I‐5712 I‐40 / US 421 7 GUILFORD SR 1850 (SANDY RIDGE ROAD) IN GREENSBORO. CONSTRUCTION NHP 1875

1.3 MILES EAST OF SR 1850 (SANDY RIDGE ROAD) TO 1.1 MILES EAST OF SR 1556 (GALLIMORE DAIRY ROAD) IN GREENSBORO. SW GREENSBORO URBAN AREA MPO I‐5734 I‐40 7 GUILFORD PAVEMENT REHABILITATION. CONSTRUCTION NHPIM 6402

RANDOLPH COUNTY LINE TO 1.2 MILES NORTH SW GREENSBORO URBAN AREA MPO I‐5735 I‐73 7 GUILFORD OF NC 62. PAVEMENT REHABILITATION. CONSTRUCTION NHPIM 2620 FORSYTH COUNTY LINE TO SR 1300 (GREEN ROAD) IN HIGH POINT. PAVEMENT SW GREENSBORO URBAN AREA MPO I‐5736 I‐74 / US 311 7 GUILFORD REHABILITATION. COORDINATE WITH I‐5767 CONSTRUCTION NHPIM 829 FORSYTH COUNTY LINE TO 1.3 MILES EAST OF GREENSBORO URBAN AREA MPO, HIGH SR 1850 (SANDY RIDGE ROAD). PAVEMENT SW POINT URBAN AREA MPO I‐5762 I‐40 7 GUILFORD REHABILITATION. CONSTRUCTION NHPIM 3262 SR 1113 (KIVETT DRIVE) TO 0.4 MILE NORTH OF I‐85 BUSINESS IN HIGH POINT. PAVEMENT SW HIGH POINT URBAN AREA MPO I‐5789 I‐85 7 GUILFORD REHABILITATION. CONSTRUCTION NHPIM 3208

0.2 MILE NORTH OF SR 3039 (NELSON FARM ROAD) TO 1.3 MILES NORTH OF SR 3029 (YOUNGS MILL ROAD) IN GREENSBORO. SW GREENSBORO URBAN AREA MPO I‐5790 I‐85 7 GUILFORD PAVEMENT REHABILITATION. CONSTRUCTION NHPIM 4176 0.2 MILE EAST OF SR 1541 (WENDOVER AVENUE) TO 0.6 MILE EAST OF SR 4239 (PATTERSON STREET) IN GREENSBORO. SW GREENSBORO URBAN AREA MPO I‐5811 I‐40 7 GUILFORD PAVEMENT REHABILITATION. CONSTRUCTION NHPIM 613

1 MILE EAST OF SR 3029 (YOUNGS MILL ROAD) TO 0.2 MILE EAST OF SR 3045 (MOUNT HOPE CHURCH ROAD) IN GREENSBORO. PAVEMENT SW GREENSBORO URBAN AREA MPO I‐5812 I‐40 7 GUILFORD REHABILITATION. CONSTRUCTION NHPIM 334

0.4 MILE EAST OF SR 2632 ( ROAD) IN FORSYTH COUNTY TO 0.3 MILE WEST OF SR WINSTON‐SALEM URBAN AREA MPO, 1860 (MACY GROVE ROAD) IN GUILFORD SW HIGH POINT URBAN AREA MPO I‐5814 I‐40 9, 7 FORSYTH, GUILFORD COUNTY. PAVEMENT REHABILITATION. CONSTRUCTION NHPIM 3226 RANDOLPH COUNTY LINE TO 1 MILE EAST OF SR 1113 (KIVETT DRIVE). PAVEMENT SW HIGH POINT URBAN AREA MPO I‐5821 I‐85 7 GUILFORD REHABILITATION. CONSTRUCTION NHPIM 6692 1.6 MILES EAST OF NC 86 TO.0.8 MILE EAST OF DURHAM‐CHAPEL HILL‐CARRBORO SR 1734 (ERWIN ROAD). PAVEMENT SW MPO I‐5822 I‐40 7 ORANGE REHABILITATION. CONSTRUCTION NHPIM 1792 0.2 MILE EAST OF NC 49 TO 0.2 MILE EAST OF BURLINGTON‐GRAHAM URBAN AREA NC 54 IN GRAHAM. PAVEMENT SW MPO I‐5836 I‐40 / I‐85 7 ALAMANCE REHABILITATION. CONSTRUCTION NHPIM 1454

I‐40 / US 421 TO SR 2085 (BRYAN BOULEVARD) SW GREENSBORO URBAN AREA MPO I‐5852 I‐73 7 GUILFORD IN GREENSBORO. PAVEMENT REHABILITATION. CONSTRUCTION NHPIM 5174 0.4 MILE NORTH OF I‐85 BUSINESS TO 0.3 MILE NORTH OF I‐73 / US 421. PAVEMENT SW GREENSBORO URBAN AREA MPO I‐5853 I‐85 / US 29 / US 70 7 GUILFORD REHABILITATION. CONSTRUCTION NHPIM 930

As of December 2014 6 of 15 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE Draft STIP FY 2015 ‐ 2025 Division 7 Projects COST ESTIMATES ARE IN THOUSANDS OF DOLLARS CATEGORY MPO_RPO PROJECT ROUTE DIVISION COUNTIES DESCRIPTION COMMENT ACTIVITY FUNDING 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 UNFUNDED

0.3 MILE NORTH OF BUSINESS 85 TO 0.2 MILE NORTH OF SR 1115 (REHOBETH CHURCH SW GREENSBORO URBAN AREA MPO I‐5854 I‐85 7 GUILFORD ROAD). PAVEMENT REHABILITATION. CONSTRUCTION NHPIM 3391

0.8 MILE NORTH OF SR 3505 (PLEASANT GARDEN RD.) TO 0.2 MILE NORTH OF SR 3039 (NELSON FARM ROAD) IN GREENSBORO. SW GREENSBORO URBAN AREA MPO I‐5855 I‐85 7 GUILFORD PAVEMENT REHABILITATION. CONSTRUCTION NHPIM 5531

CABARRUS‐ROWAN URBAN AREA MPO, HIGH POINT URBAN AREA MPO, ADDITIONAL PROJECT FUNDING DURHAM‐CHAPEL HILL‐CARRBORO INCLUDES ANTICIPATED $6.6 MPO, BURLINGTON‐GRAHAM URBAN MILLION / YR LEGISLATIVE AREA MPO, GREENSBORO URBAN AREA GUILFORD, DAVIDSON, ROWAN, TRAIN 74 / 75 OPERATIONS BETWEEN APPROPRIATION FROM STATE MPO, CAPITAL AREA MPO, CHARLOTTE ALAMANCE, CABARRUS, ORANGE, WAKE, CHARLOTTE AND RALEIGH, EQUIPMENT AND HIGHWAY FUND, TO BE USED FOR EX REGIONAL TPO P‐2918 PIEDMONT CORRIDOR 7, 9, 5, 10, 8 DURHAM, MECKLENBURG, RANDOLPH CAPITAL YARD MAINTENANCE FACILITY. OPERATIONS OPERATIONS CMAQ 3750 3750

CABARRUS‐ROWAN URBAN AREA MPO, CAPITAL AREA MPO, CHARLOTTE REGIONAL TPO, GREENSBORO URBAN AREA MPO, BURLINGTON‐GRAHAM URBAN AREA MPO, DURHAM‐CHAPEL HILL‐CARRBORO MPO, HIGH POINT PRIVATE CROSSING SAFETY INITIATIVE TO CLOSE URBAN AREA MPO, TRIANGLE AREA GUILFORD, ALAMANCE, CABARRUS, OR ENHANCE PROTECTION AT RAILROAD RPO, WINSTON‐SALEM URBAN AREA DAVIDSON, DURHAM, MECKLENBURG, CROSSINGS BETWEEN RALEIGH AND TRN MPO P‐4405 VARIOUS 7, 5, 9, 10 ORANGE, ROWAN, WAKE CHARLOTTE. IN PROGRESS ENGINEERING STHSR 64 TRN CABARRUS‐ROWAN URBAN AREA MPO, P‐4405 VARIOUS 7, 5, 9, 10 GUILFORD, ALAMANCE, CABARRUS, PRIVATE CROSSING SAFETY INITIATIVE TO CLOSE IN PROGRESS RIGHT‐OF‐WAY STHSR 712 474 TRN CABARRUS‐ROWAN URBAN AREA MPO, P‐4405 VARIOUS 7, 5, 9, 10 GUILFORD, ALAMANCE, CABARRUS, PRIVATE CROSSING SAFETY INITIATIVE TO CLOSE IN PROGRESS CONSTRUCTION STHSR 3000 3000 941 TRN CABARRUS‐ROWAN URBAN AREA MPO, P‐4405 VARIOUS 7, 5, 9, 10 GUILFORD, ALAMANCE, CABARRUS, PRIVATE CROSSING SAFETY INITIATIVE TO CLOSE IN PROGRESS CONSTRUCTION O 881 880

GRADE SEPARATION AND ROAD REALIGNMENT, PIEDMONT CORRIDOR SR 2819 (MCLEANSVILLE CARMON ROAD CROSSING CLOSURE AND TRN GREENSBORO URBAN AREA MPO P‐5204 ROAD) 7 GUILFORD MCLEANSVILLE ROAD CROSSING CLOSURE. UNDER CONSTRUCTION BURLINGTON‐GRAHAM URBAN AREA GRAHAM TO HAW RIVER. SIDING AND CURVE TRN MPO P‐5205 PIEDMONT CORRIDOR 7 ALAMANCE REALIGNMENT. UNDER CONSTRUCTION

NORFOLK SOUTHERN "ROUNDHOUSE" PROPERTY. CONSTRUCT PARKING LOT WITH SPACE FOR INTERNATIONAL CONTAINERS, "OTHER" FUNDS REFLECT NORFOLK INCLUDING SECURITY FENCE, POLE‐MOUNTED SOUTHERN CORPORATION DIV GREENSBORO URBAN AREA MPO P‐5700 NORFOLK SOUTHERN MAINLINE 7 GUILFORD LIGHTING, AND PAVED ENTRANCE. PARTICIPATION CONSTRUCTION T 850 DIV GREENSBORO URBAN AREA MPO P‐5700 NORFOLK SOUTHERN MAINLINE 7 GUILFORD NORFOLK SOUTHERN "ROUNDHOUSE" "OTHER" FUNDS REFLECT NORFOLK CONSTRUCTION O 850 MILEPOST 41.7 IN HILLSBOROUGH. CONSTRUCT PLATFORM, PASSENGER RAIL STATION "OTHER" FUNDING REFLECTS DURHAM‐CHAPEL HILL‐CARRBORO BUILDING, SITE ACCESS, UTILITIES AND PARTICIPATION BY TRIANGLE DIV MPO P‐5701 NORFOLK SOUTHERN H LINE 7 ORANGE PARKING. TRANSIT CONSTRUCTION T 3315 3315 DIV DURHAM‐CHAPEL HILL‐CARRBORO P‐5701 NORFOLK SOUTHERN H LINE 7 ORANGE MILEPOST 41.7 IN HILLSBOROUGH. CONSTRUCT "OTHER" FUNDING REFLECTS CONSTRUCTION O 285 285

SR 2182 (HORSEPEN CREEK ROAD) TO US 220‐ NC 68 CONNECTOR (R‐2413) IN GREENSBORO GREENSBORO URBAN AREA MPO R‐2309 US 220 7 GUILFORD AND SUMMERFIELD. WIDEN TO MULTI‐LANES.

COTSWALD TERRACE NORTH OF GREENSBORO GREENSBORO URBAN AREA MPO R‐2309AA US 220 7 GUILFORD TO SR 2182 (HORSEPEN CREEK ROAD) COMPLETE

SR 2182 (HORSEPEN CREEK ROAD) TO NORTH GREENSBORO URBAN AREA MPO R‐2309AB US 220 7 GUILFORD OF SR 2313 (WINFREE ROAD) IN GREENSBORO UNDER CONSTRUCTION

NC 68 AT SR 2011 (EDGEFIELD ROAD) IN GUILFORD COUNTY TO US 220‐NC 68 INTERSECTION IN ROCKINGHAM COUNTY. FOUR‐LANE FREEWAY, ON NEW LOCATION, NC GREENSBORO URBAN AREA MPO, 68 TO US 220 AND FOUR LANES ALONG US 220 TRN PIEDMONT TRIAD RPO R‐2413 US 220 / FUTURE I‐73 7 GUILFORD, ROCKINGHAM TO NC 68 IN ROCKINGHAM COUNTY. COMBINED WITH I‐5110 AND R‐ GREENSBORO URBAN AREA MPO, FOUR LANES AT SR 2011 (EDGEFIELD ROAD) TO 2413B FOR DESIGN‐BUILD LET ‐ PIEDMONT TRIAD RPO R‐2413A FUTURE I‐73 7 GUILFORD SR 2127 (BROOK BANK ROAD) UNDER CONSTRUCTION COMBINED WITH I‐5110 AND R‐ GREENSBORO URBAN AREA MPO, 2413A FOR DESIGN‐BUILD LET ‐ PIEDMONT TRIAD RPO R‐2413B FUTURE I‐73 7 GUILFORD SR 2127 (BROOK BANK ROAD) TO HAW RIVER UNDER CONSTRUCTION GREENSBORO URBAN AREA MPO, PIEDMONT TRIAD RPO R‐2413C US 220 / FUTURE I‐73 7 ROCKINGHAM, GUILFORD HAW RIVER TO NC 68‐US 220 INTERSECTION UNDER CONSTRUCTION MULTI‐LANES NORTH OF US 421 / I‐40 WINSTON‐SALEM URBAN AREA MPO, BUSINESS IN WINSTON‐SALEM TO US 220 IN GREENSBORO URBAN AREA MPO R‐2577 US 158 9, 7 FORSYTH, GUILFORD STOKESDALE. WIDEN TO MULTI‐LANES. PLANNING / DESIGN IN PROGRESS SR 1965 (BELEWS CREEK ROAD) IN FORSYTH WINSTON‐SALEM URBAN AREA MPO, COUNTY TO SR 2034 (ANTHONY ROAD) IN GREENSBORO URBAN AREA MPO R‐2577B US 158 9, 7 FORSYTH, GUILFORD GUILFORD COUNTY RIGHT‐OF‐WAY T 6800 WINSTON‐SALEM URBAN AREA MPO, R‐2577B US 158 9, 7 FORSYTH, GUILFORD SR 1965 (BELEWS CREEK ROAD) IN FORSYTH CONSTRUCTION T 36100

WINSTON‐SALEM URBAN AREA MPO, NORTH OF SR 2034 (ANTHONY ROAD) TO US GREENSBORO URBAN AREA MPO R‐2577C US 158 7 GUILFORD 220 RIGHT‐OF‐WAY T 4800 WINSTON‐SALEM URBAN AREA MPO, R‐2577C US 158 7 GUILFORD NORTH OF SR 2034 (ANTHONY ROAD) TO US CONSTRUCTION T 25400

SR 2007 (BUNKER HILL ROAD) AT COLFAX TO NC GREENSBORO URBAN AREA MPO R‐2611 SR 1008 (WEST MARKET STREET) 7 GUILFORD 68 IN GREENSBORO. WIDEN TO MULTI‐LANES. UNDER CONSTRUCTION SR 3389 (WOODY MILL ROAD) AND SR 3418 (NEELLEY ROAD) SOUTH OF GREENSBORO. CONVERT AT‐GRADE INTERSECTIONS TO EX GREENSBORO URBAN AREA MPO R‐2612 US 421 7 GUILFORD INTERCHANGES.

As of December 2014 7 of 15 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE Draft STIP FY 2015 ‐ 2025 Division 7 Projects COST ESTIMATES ARE IN THOUSANDS OF DOLLARS CATEGORY MPO_RPO PROJECT ROUTE DIVISION COUNTIES DESCRIPTION COMMENT ACTIVITY FUNDING 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 UNFUNDED SR 3389 (WOODY MILL ROAD) INTERSECTION GREENSBORO URBAN AREA MPO R‐2612A US 421 7 GUILFORD SOUTH OF GREENSBORO COMPLETE SR 3418 (NEELLEY ROAD) INTERSECTION SOUTH TRN GREENSBORO URBAN AREA MPO R‐2612B US 421 7 GUILFORD OF GREENSBORO UNDER CONSTRUCTION

SR 1998 (WENTWORTH STREET) / SR 1001 (SANDY CROSS ROAD). CONSTRUCT REG PIEDMONT TRIAD RPO R‐5704 NC 87 7 ROCKINGHAM ROUNDABOUT AND REMOVE TRAFFIC SIGNAL. RIGHT‐OF‐WAY T 150 REG PIEDMONT TRIAD RPO R‐5704 NC 87 7 ROCKINGHAM SR 1998 (WENTWORTH STREET) / SR 1001 CONSTRUCTION T 625 NC 150 INTERSECTION IN OAK RIDGE. REG GREENSBORO URBAN AREA MPO R‐5725 NC 68 7 GUILFORD INTERSECTION IMPROVEMENTS. RIGHT‐OF‐WAY NHP 135 REG GREENSBORO URBAN AREA MPO R‐5725 NC 68 7 GUILFORD NC 150 INTERSECTION IN OAK RIDGE. CONSTRUCTION NHP 563

NC 68 AND SR 2269 (ALCORN ROAD) IN OAK DIVISION PURCHASE ORDER RIDGE. CONSTRUCT TURN LANES ON ALCORN CONTRACT (DPOC) ‐ UNDER GREENSBORO URBAN AREA MPO SF‐4907D NC 68; SR 2269 (ALCORN ROAD) 7 GUILFORD ROAD APPROACHES AND UPGRADE SIGNAL. CONSTRUCTION DURHAM‐CHAPEL HILL‐CARRBORO HF MPO TA‐4726 CHAPEL HILL TRANSIT 7 ORANGE REPLACEMENT BUS ‐ ARTICULATED CAPITAL FUZ 2423 2423 2423 2423 2423 2423 2423 2423 2423 DURHAM‐CHAPEL HILL‐CARRBORO DIV MPO TA‐4726A CHAPEL HILL TRANSIT 7 ORANGE 3 REPLACEMENT BUSES. ACQUISITION STPDA 973 720 DIV DURHAM‐CHAPEL HILL‐CARRBORO TA‐4726A CHAPEL HILL TRANSIT 7 ORANGE 3 REPLACEMENT BUSES. ACQUISITION L 362 180 DURHAM‐CHAPEL HILL‐CARRBORO HF MPO TA‐4748 CHAPEL HILL TRANSIT 7 ORANGE REPLACEMENT ‐ PARATRANSIT VEHICLE CAPITAL FUZ 1025 197 197 197 197 197 197 197 197 EX GREENSBORO URBAN AREA MPO TA‐4767 GREENSBORO TRANSIT AUTHORITY 7 GUILFORD REPLACEMENT ‐ PARATRANSIT VEHICLE CAPITAL CMAQ 666 EX GREENSBORO URBAN AREA MPO TA‐4767 GREENSBORO TRANSIT AUTHORITY 7 GUILFORD REPLACEMENT ‐ PARATRANSIT VEHICLE CAPITAL S 117 55 55 EX GREENSBORO URBAN AREA MPO TA‐4767 GREENSBORO TRANSIT AUTHORITY 7 GUILFORD REPLACEMENT ‐ PARATRANSIT VEHICLE CAPITAL L 124 62 62 EX GREENSBORO URBAN AREA MPO TA‐4767 GREENSBORO TRANSIT AUTHORITY 7 GUILFORD REPLACEMENT ‐ PARATRANSIT VEHICLE CAPITAL FBUS 553 553 553 EX GREENSBORO URBAN AREA MPO TA‐4771 GREENSBORO TRANSIT AUTHORITY 7 GUILFORD HYBRID REPLACEMENT BUSES CAPITAL CMAQ 3708 2544 567 EX GREENSBORO URBAN AREA MPO TA‐4771 GREENSBORO TRANSIT AUTHORITY 7 GUILFORD HYBRID REPLACEMENT BUSES CAPITAL S 426 254 57 52 EX GREENSBORO URBAN AREA MPO TA‐4771 GREENSBORO TRANSIT AUTHORITY 7 GUILFORD HYBRID REPLACEMENT BUSES CAPITAL L 479 286 64 58 EX GREENSBORO URBAN AREA MPO TA‐4771 GREENSBORO TRANSIT AUTHORITY 7 GUILFORD HYBRID REPLACEMENT BUSES CAPITAL FBUS 1108 664 554 DURHAM‐CHAPEL HILL‐CARRBORO HF MPO TA‐4818B TRIANGLE TRANSIT AUTHORITY 5, 7 DURHAM, ORANGE REPLACEMENT BUS CAPITAL FUZ 962 962 962 DURHAM‐CHAPEL HILL‐CARRBORO HF MPO TA‐4979 CHAPEL HILL TRANSIT 7 ORANGE REPLACEMENT VAN CAPITAL FUZ 792 792 792 DURHAM‐CHAPEL HILL‐CARRBORO HF MPO TA‐5123B TRIANGLE TRANSIT AUTHORITY 5, 7 DURHAM, ORANGE EXPANSION BUS CAPITAL FUZ 1352 1621 1621 1621 1621 HF GREENSBORO URBAN AREA MPO TA‐5124 GREENSBORO TRANSIT AUTHORITY 7 GUILFORD EXPANSION BUS CAPITAL FNF 234 117 117 117 117 117 117 117 117 HF GREENSBORO URBAN AREA MPO TA‐5132 GREENSBORO TRANSIT AUTHORITY 7 GUILFORD EXPANSION BUSES CAPITAL FUZ 1346 673 673 673 DURHAM‐CHAPEL HILL‐CARRBORO PURCHASE SUPPORT AND PARATRANSIT HF MPO TA‐5143 CHAPEL HILL TRANSIT 7 ORANGE VEHICLES CAPITAL S 20 HF DURHAM‐CHAPEL HILL‐CARRBORO TA‐5143 CHAPEL HILL TRANSIT 7 ORANGE PURCHASE SUPPORT AND PARATRANSIT CAPITAL L 20 HF DURHAM‐CHAPEL HILL‐CARRBORO TA‐5143 CHAPEL HILL TRANSIT 7 ORANGE PURCHASE SUPPORT AND PARATRANSIT CAPITAL FBUS 160 DURHAM‐CHAPEL HILL‐CARRBORO HF MPO TA‐5148 TRIANGLE TRANSIT AUTHORITY 5, 7 DURHAM, ORANGE, WAKE VANPOOL VANS ‐ REPLACEMENT (8) CAPITAL L 46 HF DURHAM‐CHAPEL HILL‐CARRBORO TA‐5148 TRIANGLE TRANSIT AUTHORITY 5, 7 DURHAM, ORANGE, WAKE VANPOOL VANS ‐ REPLACEMENT (8) CAPITAL FBUS 178 DURHAM‐CHAPEL HILL‐CARRBORO DIV MPO TA‐5154 TRIANGLE TRANSIT AUTHORITY 5, 7 DURHAM, ORANGE REPLACEMENT PARATRANSIT VEHICLES CAPITAL STPDA 215 DIV DURHAM‐CHAPEL HILL‐CARRBORO TA‐5154 TRIANGLE TRANSIT AUTHORITY 5, 7 DURHAM, ORANGE REPLACEMENT PARATRANSIT VEHICLES CAPITAL L 54 BURLINGTON‐GRAHAM URBAN AREA HF MPO TA‐6116 ALAMANACE COUNTY TRANSPORTATION 7 ALAMANCE CAPITAL CAPITAL FNU 1642 ROCKINGHAM COUNTY COUNCIL ON AGING, HF PIEDMONT TRIAD RPO TA‐6135 INC. 7 ROCKINGHAM CAPITAL CAPITAL FNU 538 HF PIEDMONT TRIAD RPO TA‐6175 CASWELL COUNTY 7 CASWELL CAPITAL CAPITAL FNU 171 HF GREENSBORO URBAN AREA MPO TA‐6263 GUILFORD COUNTY TRANSPORTATION 7 GUILFORD CAPITAL CAPITAL FNU 149 PIEDMONT AUTHORITY FOR REGIONAL REG WINSTON‐SALEM URBAN AREA MPO TA‐6522 TRANSPORTATION 7, 9 FORSYTH, GUILFORD PURCHASE VANS CAPITAL STPDA 300 REG WINSTON‐SALEM URBAN AREA MPO TA‐6522 PIEDMONT AUTHORITY FOR REGIONAL 7, 9 FORSYTH, GUILFORD PURCHASE VANS CAPITAL L 75 ROCKINGHAM COUNTY COUNCIL ON AGING, HF PIEDMONT TRIAD RPO TA‐6525 INC. 7 ROCKINGHAM CAPITAL CAPITAL S 19 HF PIEDMONT TRIAD RPO TA‐6525 ROCKINGHAM COUNTY COUNCIL ON AGING, 7 ROCKINGHAM CAPITAL CAPITAL L 19 HF PIEDMONT TRIAD RPO TA‐6525 ROCKINGHAM COUNTY COUNCIL ON AGING, 7 ROCKINGHAM CAPITAL CAPITAL FEPD 152 DURHAM‐CHAPEL HILL‐CARRBORO HF MPO TA‐6526 ORANGE COUNTY DEPARTMENT OF AGING 7 ORANGE CAPITAL CAPITAL S 1 HF DURHAM‐CHAPEL HILL‐CARRBORO TA‐6526 ORANGE COUNTY DEPARTMENT OF AGING 7 ORANGE CAPITAL CAPITAL L 1 HF DURHAM‐CHAPEL HILL‐CARRBORO TA‐6526 ORANGE COUNTY DEPARTMENT OF AGING 7 ORANGE CAPITAL CAPITAL FEPD 3 ROCKINGHAM COUNTY COUNCIL ON AGING, HF PIEDMONT TRIAD RPO TA‐6548 INC. 7 ROCKINGHAM CAPITAL ‐ EXPANSION VEHICLES CAPITAL S 13 HF PIEDMONT TRIAD RPO TA‐6548 ROCKINGHAM COUNTY COUNCIL ON AGING, 7 ROCKINGHAM CAPITAL ‐ EXPANSION VEHICLES CAPITAL L 13 HF PIEDMONT TRIAD RPO TA‐6548 ROCKINGHAM COUNTY COUNCIL ON AGING, 7 ROCKINGHAM CAPITAL ‐ EXPANSION VEHICLES CAPITAL FEPD 102 HF PIEDMONT TRIAD RPO TA‐6551 SENIOR RESOURCES OF GUILFORD 7 GUILFORD CAPITAL ‐ EXPANSION VEHICLE CAPITAL S 5 HF PIEDMONT TRIAD RPO TA‐6551 SENIOR RESOURCES OF GUILFORD 7 GUILFORD CAPITAL ‐ EXPANSION VEHICLE CAPITAL L 5 HF PIEDMONT TRIAD RPO TA‐6551 SENIOR RESOURCES OF GUILFORD 7 GUILFORD CAPITAL ‐ EXPANSION VEHICLE CAPITAL FEPD 43 HF TRIANGLE AREA RPO TA‐6554 ORANGE PUBLIC TRANSIT 7 ORANGE CAPITAL CAPITAL FNU 482 ROCKINGHAM COUNTY COUNCIL ON AGING, HF PIEDMONT TRIAD RPO TA‐9000 INC. 7 ROCKINGHAM CAPITAL ‐ PURCHASE OF SERVICE CAPITAL S 11 HF PIEDMONT TRIAD RPO TA‐9000 ROCKINGHAM COUNTY COUNCIL ON AGING, 7 ROCKINGHAM CAPITAL ‐ PURCHASE OF SERVICE CAPITAL L 11 HF PIEDMONT TRIAD RPO TA‐9000 ROCKINGHAM COUNTY COUNCIL ON AGING, 7 ROCKINGHAM CAPITAL ‐ PURCHASE OF SERVICE CAPITAL FEPD 86 HF PIEDMONT TRIAD RPO TA‐9003 CASWELL COUNTY 7 CASWELL CAPITAL ‐ PURCHASE OF SERVICE CAPITAL S 2 HF PIEDMONT TRIAD RPO TA‐9003 CASWELL COUNTY 7 CASWELL CAPITAL ‐ PURCHASE OF SERVICE CAPITAL L 2 HF PIEDMONT TRIAD RPO TA‐9003 CASWELL COUNTY 7 CASWELL CAPITAL ‐ PURCHASE OF SERVICE CAPITAL FEPD 12 DURHAM‐CHAPEL HILL‐CARRBORO HF MPO TD‐4710B CHAPEL HILL TRANSIT 7 ORANGE FACILITY ‐ PARK & RIDE 1 REPLACEMENT LTV (25') AND RADIO, VEHICLE DURHAM‐CHAPEL HILL‐CARRBORO LETTERING AND LOGOS, AND ON‐BOARD DIV MPO TD‐5155 ORANGE PUBLIC TRANSIT 7 ORANGE CAMERA. ACQUISITION STPDA 62 DIV DURHAM‐CHAPEL HILL‐CARRBORO TD‐5155 ORANGE PUBLIC TRANSIT 7 ORANGE 1 REPLACEMENT LTV (25') AND RADIO, VEHICLE ACQUISITION L 15 DURHAM‐CHAPEL HILL‐CARRBORO HF MPO TD‐5271 CHAPEL HILL TRANSIT 7 ORANGE RENOVATE BUS RELATED FACILITIES CAPITAL FBUS 50 FIXED GUIDEWAY ‐ LIGHT RAIL SERVICE‐ added unfunded $1.5B to match HF CAPITAL AREA MPO TE‐4903A TRIANGLE TRANSIT AUTHORITY 5, 7 WAKE, DURHAM, ORANGE CARY/RALEIGH 2040 estimates CAPITAL FED 500000 500000 500000

As of December 2014 8 of 15 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE Draft STIP FY 2015 ‐ 2025 Division 7 Projects COST ESTIMATES ARE IN THOUSANDS OF DOLLARS CATEGORY MPO_RPO PROJECT ROUTE DIVISION COUNTIES DESCRIPTION COMMENT ACTIVITY FUNDING 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 UNFUNDED UNC HOSPITALS IN CHAPEL HILL TO NC 55 DURHAM‐CHAPEL HILL‐CARRBORO (ALSTON AVENUE) IN DURHAM. CONSTRUCT REG MPO TE‐5205 DURHAM‐ORANGE LIGHT RAIL LINE 5, 7 DURHAM, ORANGE LIGHT RAIL SYSTEM. DURHAM‐CHAPEL HILL‐CARRBORO UNC HOSPITALS IN CHAPEL HILL TO DURHAM REG MPO TE‐5205A DURHAM‐ORANGE LIGHT RAIL LINE 7 ORANGE COUNTY LINE RIGHT‐OF‐WAY T 3306 3306 REG DURHAM‐CHAPEL HILL‐CARRBORO TE‐5205A DURHAM‐ORANGE LIGHT RAIL LINE 7 ORANGE UNC HOSPITALS IN CHAPEL HILL TO DURHAM RIGHT‐OF‐WAY L 3306 3306 REG DURHAM‐CHAPEL HILL‐CARRBORO TE‐5205A DURHAM‐ORANGE LIGHT RAIL LINE 7 ORANGE UNC HOSPITALS IN CHAPEL HILL TO DURHAM RIGHT‐OF‐WAY FBUS 6613 6612 REG DURHAM‐CHAPEL HILL‐CARRBORO TE‐5205A DURHAM‐ORANGE LIGHT RAIL LINE 7 ORANGE UNC HOSPITALS IN CHAPEL HILL TO DURHAM CONSTRUCTION T 12405 12405 12405 12404 REG DURHAM‐CHAPEL HILL‐CARRBORO TE‐5205A DURHAM‐ORANGE LIGHT RAIL LINE 7 ORANGE UNC HOSPITALS IN CHAPEL HILL TO DURHAM CONSTRUCTION L 12405 12405 12405 12404 REG DURHAM‐CHAPEL HILL‐CARRBORO TE‐5205A DURHAM‐ORANGE LIGHT RAIL LINE 7 ORANGE UNC HOSPITALS IN CHAPEL HILL TO DURHAM CONSTRUCTION FBUS 24812 24811 24811 24811 DURHAM‐CHAPEL HILL‐CARRBORO OPS FUNDED / HF MPO TG‐4731B CHAPEL HILL TRANSIT 7 ORANGE PREVENTIVE MAINTENANCE CAPITAL FUZ 5112 2931 3181 3431 3681 1343 1343 1343 1343

ROUTINE CAPITAL ‐ BUS STOP SHELTERS, DURHAM‐CHAPEL HILL‐CARRBORO BENCHES, SHOP EQUIPMENT, SPARE PARTS, HF MPO TG‐4732A CHAPEL HILL TRANSIT 7 ORANGE ENGINES, FAREBOX, SERVICE VEHICLES, ETC CAPITAL FUZ 540 540 540 540 540 DURHAM‐CHAPEL HILL‐CARRBORO HF MPO TG‐4732B CHAPEL HILL TRANSIT 7 ORANGE ROUTINE CAPITAL ‐ SERVICE VEHICLE CAPITAL FUZ 196 196 196 see amendment #1 to 2012‐2018 OPS FUNDED / DIV GREENSBORO URBAN AREA MPO TG‐4759 GREENSBORO TRANSIT AUTHORITY 7 GUILFORD PREVENTIVE MAINTENANCE STIP CAPITAL STPDA 1400 DIV GREENSBORO URBAN AREA MPO TG‐4759 GREENSBORO TRANSIT AUTHORITY 7 GUILFORD PREVENTIVE MAINTENANCE see amendment #1 to 2012‐2018 OPS FUNDED / L 350 DIV GREENSBORO URBAN AREA MPO TG‐4759 GREENSBORO TRANSIT AUTHORITY 7 GUILFORD PREVENTIVE MAINTENANCE see amendment #1 to 2012‐2018 OPS FUNDED / FUZ 7002 3501 3501 3501 3750 3750 3750 3750 3750

ROUTINE CAPITAL ‐ BUS STOP SHELTERS, BENCHES, SHOP EQUIPMENT, SPARE PARTS, ENGINES, FAREBOX, SERVICE VEHICLES, ETC HF HIGH POINT URBAN AREA MPO TG‐4814 HIGH POINT TRANSIT SYSTEM / HI TRAN 7, 8, 9 GUILFORD, DAVIDSON, RANDOLPH ($40K CAPITAL COST OF CONTRACTING) CAPITAL FUZ 458 229 229 229 229 229 229 229 229

ROUTINE CAPITAL ‐ BUS STOP SHELTERS, BENCHES, SHOP EQUIPMENT, SPARE PARTS, DURHAM‐CHAPEL HILL‐CARRBORO ENGINES, FAREBOX, SERVICE VEHICLES, ETC see March 2012 handout 2012‐2018 HF MPO TG‐4821B TRIANGLE TRANSIT AUTHORITY 5, 7 DURHAM, ORANGE INCLUDES ADA, PM AND SERVICE VEHICLES STIP CAPITAL FUZ 3548 1849 1909 1966 1969 1969 1969 1969 1969 OPERATING ASSISTANCE ‐ ADA PARATRANSIT see amendment #1 to 2012‐2018 OPS FUNDED / HF GREENSBORO URBAN AREA MPO TG‐4957 GREENSBORO TRANSIT AUTHORITY 7 GUILFORD SERVICE STIP CAPITAL FUZ 1210 594 594 594 616 616 616 616 616 HF GREENSBORO URBAN AREA MPO TG‐5101A GREENSBORO TRANSIT AUTHORITY 7 GUILFORD OPERATING ASSISTANCE OPERATIONS FUZ 1575 875 875 875 HF GREENSBORO URBAN AREA MPO TG‐5101A GREENSBORO TRANSIT AUTHORITY 7 GUILFORD OPERATING ASSISTANCE CAPITAL FUZ 175

ROUTINE CAPITAL ‐ BUS STOP SHELTERS, BENCHES, SHOP EQUIPMENT, SPARE PARTS, see amendment #1 of 2012‐2018 HF GREENSBORO URBAN AREA MPO TG‐5105 GREENSBORO TRANSIT AUTHORITY 7 GUILFORD ENGINES, FAREBOX, SERVICE VEHICLES, ETC STIP CAPITAL FUZ 130 65 65 65 61 61 61 61 61 EX GREENSBORO URBAN AREA MPO TG‐5105B GREENSBORO TRANSIT AUTHORITY 7 GUILFORD ROUTINE CAPITAL ‐ BUS SHELTERS CAPITAL CMAQ 86 PIEDMONT AUTHORITY FOR REGIONAL REG WINSTON‐SALEM URBAN AREA MPO TG‐5226 TRANSPORTATION 7, 9 FORSYTH, GUILFORD PREVENTIVE MAINTENANCE CAPITAL STPDA 812 ROUTINE CAPITAL ‐ PURCHASE BUS STOP SHELTERS, BENCHES, SHOP EQUIPMENT, SPARE DURHAM‐CHAPEL HILL‐CARRBORO PARTS, ENGINES, FAREBOX, SUPPORT HF MPO TG‐5227 CHAPEL HILL TRANSIT 7 ORANGE VEHICLES, REPLACE/REPAIR LIFTS CAPITAL L 66 HF DURHAM‐CHAPEL HILL‐CARRBORO TG‐5227 CHAPEL HILL TRANSIT 7 ORANGE ROUTINE CAPITAL ‐ PURCHASE BUS STOP CAPITAL FBUS 263 DURHAM‐CHAPEL HILL‐CARRBORO ROUTINE CAPITAL ‐ RESURFACE PARK & RIDE HF MPO TG‐5247 CHAPEL HILL TRANSIT 7 ORANGE LOTS CAPITAL S 7 HF DURHAM‐CHAPEL HILL‐CARRBORO TG‐5247 CHAPEL HILL TRANSIT 7 ORANGE ROUTINE CAPITAL ‐ RESURFACE PARK & RIDE CAPITAL L 7 HF DURHAM‐CHAPEL HILL‐CARRBORO TG‐5247 CHAPEL HILL TRANSIT 7 ORANGE ROUTINE CAPITAL ‐ RESURFACE PARK & RIDE CAPITAL FUZ 57 DURHAM‐CHAPEL HILL‐CARRBORO ROUTINE CAPITAL‐RESURFACE PARK & RIDE HF MPO TG‐5248 CHAPEL HILL TRANSIT 7 ORANGE LOTS CAPITAL L 20 HF DURHAM‐CHAPEL HILL‐CARRBORO TG‐5248 CHAPEL HILL TRANSIT 7 ORANGE ROUTINE CAPITAL‐RESURFACE PARK & RIDE CAPITAL FBUS 80 DURHAM‐CHAPEL HILL‐CARRBORO ROUTINE CAPITAL ‐ RESURFACE PARK & RIDE HF MPO TG‐5249 CHAPEL HILL TRANSIT 7 ORANGE LOTS CAPITAL L 14 HF DURHAM‐CHAPEL HILL‐CARRBORO TG‐5249 CHAPEL HILL TRANSIT 7 ORANGE ROUTINE CAPITAL ‐ RESURFACE PARK & RIDE CAPITAL FUZ 56 DURHAM‐CHAPEL HILL‐CARRBORO HF MPO TG‐5251 TRIANGLE TRANSIT AUTHORITY 5, 7 DURHAM, ORANGE, WAKE ROUTINE CAPITAL CAPITAL L 55 HF DURHAM‐CHAPEL HILL‐CARRBORO TG‐5251 TRIANGLE TRANSIT AUTHORITY 5, 7 DURHAM, ORANGE, WAKE ROUTINE CAPITAL CAPITAL FBUS 222 PIEDMONT AUTHORITY FOR REGIONAL HF HIGH POINT URBAN AREA MPO TG‐6173 TRANSPORTATION 7, 9 GUILFORD, FORSYTH ROUTINE CAPITAL CAPITAL L 75 HF HIGH POINT URBAN AREA MPO TG‐6173 PIEDMONT AUTHORITY FOR REGIONAL 7, 9 GUILFORD, FORSYTH ROUTINE CAPITAL CAPITAL FUZ 300 PIEDMONT AUTHORITY FOR REGIONAL HF HIGH POINT URBAN AREA MPO TG‐6173B TRANSPORTATION 7, 9 GUILFORD, FORSYTH ROUTINE CAPITAL CAPITAL L 38 HF HIGH POINT URBAN AREA MPO TG‐6173B PIEDMONT AUTHORITY FOR REGIONAL 7, 9 GUILFORD, FORSYTH ROUTINE CAPITAL CAPITAL FUZ 150 FORSYTH, GUILFORD, WATAUGA, HF STATEWIDE PROJECTS TI‐6103 COACH AMERICA 11, 7, 9 WILKES, YADKIN INTERCITY BUS ‐ GREENSBORO TO BOONE OPERATIONS FNU 2196 880 880 880 880 880 880 880 880 HF BURLINGTON‐GRAHAM URBAN AREA TK‐6103 ALAMANACE COUNTY TRANSPORTATION 7 ALAMANCE ADMINISTRATION OPERATIONS FNU 702 356 356 356 356 356 356 356 356 HF PIEDMONT TRIAD RPO TK‐6116 CASWELL COUNTY 7 CASWELL ADMINISTRATION OPERATIONS FNU 224 112 112 112 112 112 112 112 112 HF GREENSBORO URBAN AREA MPO TK‐6132 GUILFORD COUNTY TRANSPORTATION 7 GUILFORD ADMINISTRATION OPERATIONS FNU 452 227 227 227 227 227 227 227 227 HF TRIANGLE AREA RPO TK‐6151 ORANGE PUBLIC TRANSIT 7 ORANGE ADMINISTRATION OPERATIONS FNU 370 186 186 186 186 186 186 186 186 ROCKINGHAM COUNTY COUNCIL ON AGING, HF PIEDMONT TRIAD RPO TK‐6159 INC. 7 ROCKINGHAM ADMINISTRATION OPERATIONS FNU 352 177 177 177 177 177 177 177 177 HF GREENSBORO URBAN AREA MPO TM‐4705 GREENSBORO TRANSIT AUTHORITY 7 GUILFORD OPERATING ASSISTANCE OPERATIONS JARC 600 300 300 300 300 300 300 300 300 DURHAM‐CHAPEL HILL‐CARRBORO HF MPO TM‐5132 CHAPEL HILL TRANSIT 7 ORANGE OPERATING ASSISTANCE OPERATIONS L 99 HF DURHAM‐CHAPEL HILL‐CARRBORO TM‐5132 CHAPEL HILL TRANSIT 7 ORANGE OPERATING ASSISTANCE OPERATIONS JARC 99 BURLINGTON‐GRAHAM URBAN AREA PIEDMONT AUTHORITY FOR REGIONAL HF MPO TM‐5134 TRANSPORTATION 7 ALAMANCE OPERATING ASSISTANCE OPERATIONS JARC 400 200 200 200 200 200 200 200 200 DURHAM‐CHAPEL HILL‐CARRBORO HF MPO TM‐5305 CHAPEL HILL TRANSIT 7 ORANGE OPERATING ‐ NIGHT SERVICE OPERATIONS L 68 HF DURHAM‐CHAPEL HILL‐CARRBORO TM‐5305 CHAPEL HILL TRANSIT 7 ORANGE OPERATING ‐ NIGHT SERVICE OPERATIONS JARC 68 DURHAM‐CHAPEL HILL‐CARRBORO OPERATING ASSISTANCE ‐ CONTINUATION OF HF MPO TM‐5306 CHAPEL HILL TRANSIT 7 ORANGE SERVICE HOUR EXTENSIONA OPERATIONS L 72 HF DURHAM‐CHAPEL HILL‐CARRBORO TM‐5306 CHAPEL HILL TRANSIT 7 ORANGE OPERATING ASSISTANCE ‐ CONTINUATION OF OPERATIONS JARC 72 HF GREENSBORO URBAN AREA MPO TM‐5308 GREENSBORO TRANSIT AUTHORITY 7 GUILFORD TRANSIT ENHANCEMENTS CAPITAL L 24 12 12 12 HF GREENSBORO URBAN AREA MPO TM‐5308 GREENSBORO TRANSIT AUTHORITY 7 GUILFORD TRANSIT ENHANCEMENTS CAPITAL FUZ 98 49 49 49 DURHAM‐CHAPEL HILL‐CARRBORO HF MPO TM‐5311 TRIANGLE TRANSIT AUTHORITY 5, 7 DURHAM, ORANGE, WAKE SUNDAY ROUTES (400, 700, & 800) OPERATIONS L 235

As of December 2014 9 of 15 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE Draft STIP FY 2015 ‐ 2025 Division 7 Projects COST ESTIMATES ARE IN THOUSANDS OF DOLLARS CATEGORY MPO_RPO PROJECT ROUTE DIVISION COUNTIES DESCRIPTION COMMENT ACTIVITY FUNDING 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 UNFUNDED HF DURHAM‐CHAPEL HILL‐CARRBORO TM‐5311 TRIANGLE TRANSIT AUTHORITY 5, 7 DURHAM, ORANGE, WAKE SUNDAY ROUTES (400, 700, & 800) OPERATIONS JARC 235 5316 OPERATING ‐ GTA SUPPLEMENTAL HF GREENSBORO URBAN AREA MPO TM‐5312 GREENSBORO TRANSIT AUTHORITY 7 GUILFORD SERVICE TO GTCC JAMESTOWN CAMPUS OPERATIONS L 64 HF GREENSBORO URBAN AREA MPO TM‐5312 GREENSBORO TRANSIT AUTHORITY 7 GUILFORD 5316 OPERATING ‐ GTA SUPPLEMENTAL OPERATIONS JARC 64 PIEDMONT AUTHORITY FOR REGIONAL 6316 OPERATING ‐ PART: CAREER EXPRESS HF GREENSBORO URBAN AREA MPO TM‐5313 TRANSPORTATION 7 GUILFORD DEVIATED FIXED ROUTE SERVICE OPERATIONS L 250 250 HF GREENSBORO URBAN AREA MPO TM‐5313 PIEDMONT AUTHORITY FOR REGIONAL 7 GUILFORD 6316 OPERATING ‐ PART: CAREER EXPRESS OPERATIONS JARC 250 250 PIEDMONT AUTHORITY FOR REGIONAL HF GREENSBORO URBAN AREA MPO TM‐6139 TRANSPORTATION 7, 9 FORSYTH, GUILFORD OPERATING ASSISTANCE OPERATIONS L 317 HF GREENSBORO URBAN AREA MPO TM‐6139 PIEDMONT AUTHORITY FOR REGIONAL 7, 9 FORSYTH, GUILFORD OPERATING ASSISTANCE OPERATIONS JARC 317 HF PIEDMONT TRIAD RPO TM‐6147 ALAMANACE COUNTY TRANSPORTATION 7 ALAMANCE OPERATING OPERATIONS L 61 HF PIEDMONT TRIAD RPO TM‐6147 ALAMANACE COUNTY TRANSPORTATION 7 ALAMANCE OPERATING OPERATIONS JARC 61 DURHAM‐CHAPEL HILL‐CARRBORO OPERATING ASSISTANCE ‐ NEW FREEDOM ‐ HF MPO TN‐5102 DURHAM AREA TRANSIT AUTHORITY 5, 7 DURHAM, ORANGE URBAN OPERATIONS FNF 252 126 126 126 126 126 126 126 126 HF HIGH POINT URBAN AREA MPO TO‐4790 HIGH POINT TRANSIT SYSTEM 7, 8, 9 DAVIDSON, GUILFORD, RANDOLPH OPERATING ASSISTANCE OPERATIONS FUZ 7250 3640 3650 3660 2404 2404 2404 2404 2404 HF HIGH POINT URBAN AREA MPO TO‐4790 HIGH POINT TRANSIT SYSTEM 7, 8, 9 DAVIDSON, GUILFORD, RANDOLPH OPERATING ASSISTANCE OPERATIONS SMAP 870 435 435 435 475 475 475 475 475 HF GREENSBORO URBAN AREA MPO TO‐4971 GREENSBORO TRANSIT AUTHORITY 7 GUILFORD OPERATING ASSISTANCE ‐ FIXED ROUTE OPERATIONS L 2956 1328 1628 1328 3150 3150 3150 3150 3150 3150 HF GREENSBORO URBAN AREA MPO TO‐4971 GREENSBORO TRANSIT AUTHORITY 7 GUILFORD OPERATING ASSISTANCE ‐ FIXED ROUTE OPERATIONS FUZ 5612 2956 2656 2956 1335 1335 1335 1335 1335 1335 HF GREENSBORO URBAN AREA MPO TO‐4971 GREENSBORO TRANSIT AUTHORITY 7 GUILFORD OPERATING ASSISTANCE ‐ FIXED ROUTE OPERATIONS SMAP 3256 1628 1628 1628 1815 1815 1815 1815 1815 1815 OPS FUNDED / EX GREENSBORO URBAN AREA MPO TO‐5101B GREENSBORO TRANSIT AUTHORITY 7 GUILFORD OPERATING ASSISTANCE ‐ ADDED SUNDAY CAPITAL CMAQ 752 OPERATING ASSISTANCE ‐ ROUTE #12 OPS FUNDED / EX GREENSBORO URBAN AREA MPO TO‐5101C GREENSBORO TRANSIT AUTHORITY 7 GUILFORD MODIFIED CAPITAL CMAQ 1236 OPS FUNDED / EX GREENSBORO URBAN AREA MPO TO‐5101D GREENSBORO TRANSIT AUTHORITY 7 GUILFORD OPERATING ASSISTANCE ‐ ROUTE #15 CAPITAL CMAQ 456 OPS FUNDED / EX GREENSBORO URBAN AREA MPO TO‐5125 GREENSBORO TRANSIT AUTHORITY 7 GUILFORD OPERATING ASSISTANCE ‐ PRIORITY SERVICE CAPITAL CMAQ 2442 DURHAM‐CHAPEL HILL‐CARRBORO HF MPO TO‐5133 CHAPEL HILL TRANSIT 7 ORANGE OPERATING ASSISTANCE OPERATIONS SMAP 7140 3570 3570 3570 3570 3570 3570 3570 3570 BURLINGTON‐GRAHAM URBAN AREA PIEDMONT AUTHORITY FOR REGIONAL HF MPO TO‐5134 TRANSPORTATION 7 ALAMANCE, GUILFORD OPERATING ASSISTANCE OPERATIONS FUZ 434 200 200 200 200 200 200 200 200 PIEDMONT AUTHORITY FOR REGIONAL HF HIGH POINT URBAN AREA MPO TO‐5134B TRANSPORTATION 7, 9 GUILFORD, FORSYTH OPERATING ASSISTANCE OPERATIONS L 900 HF HIGH POINT URBAN AREA MPO TO‐5134B PIEDMONT AUTHORITY FOR REGIONAL 7, 9 GUILFORD, FORSYTH OPERATING ASSISTANCE OPERATIONS FUZ 900 PIEDMONT AUTHORITY FOR REGIONAL HF HIGH POINT URBAN AREA MPO TO‐5134C TRANSPORTATION 7, 9 GUILFORD, FORSYTH OPERATING Assistance OPERATIONS FUZ 700 BURLINGTON‐GRAHAM URBAN AREA PIEDMONT AUTHORITY FOR REGIONAL HF MPO TO‐5136 TRANSPORTATION 7 ALAMANCE, GUILFORD OPERATING ASSISTANCE OPERATIONS SMAP 1634 817 817 817 817 817 817 817 817 HF GREENSBORO URBAN AREA MPO TO‐6139 GREENSBORO TRANSIT AUTHORITY 7 GUILFORD ELDERLY AND DISABLED OPERATING OPERATIONS L 215 97 97 97 215 HF GREENSBORO URBAN AREA MPO TO‐6139 GREENSBORO TRANSIT AUTHORITY 7 GUILFORD ELDERLY AND DISABLED OPERATING OPERATIONS FEPD 215 97 97 97 215

HF GREENSBORO URBAN AREA MPO TO‐6140 GREENSBORO TRANSIT AUTHORITY 7 GUILFORD ADMINISTRATIVE OVERSIGHT OF 5310 FUNDS OPERATIONS FEPD 48 24 24 24 24 HF GREENSBORO URBAN AREA MPO TP‐4712 GREENSBORO TRANSIT AUTHORITY 7 GUILFORD PLANNING ASSISTANCE CAPITAL FUZ 376 250 250 250 250 250 250 250 250 DURHAM‐CHAPEL HILL‐CARRBORO see March 2012 handout 2012‐2018 HF MPO TP‐4732A TRIANGLE TRANSIT AUTHORITY 5, 7 DURHAM, ORANGE PLANNING ASSISTANCE STIP PLANNING/DESIGN FUZ 1332 696 717 738 738 738 738 738 738 HF GREENSBORO URBAN AREA MPO TP‐5101 GREENSBORO TRANSIT AUTHORITY 7 GUILFORD PLANNING ASSISTANCE ‐ 5303 CAPITAL FMPL 278 139 139 139 139 139 139 139 236 HF HIGH POINT URBAN AREA MPO TP‐5104 HIGH POINT TRANSIT SYSTEM / HI‐TRAN 7 GUILFORD PLANNING ASSISTANCE ‐ 5303 CAPITAL FMPL 88 44 44 44 44 44 44 44 44 SENIOR TRANSPORTATION EXPANSION, DURHAM‐CHAPEL HILL‐CARRBORO ASSESSMENT AND MOBILITY MANAGER HF MPO TQ‐3002 ORANGE COUNTY DEPARTMENT OF AGING 7 ORANGE INCLUDING PURCHASE OF SERVICE CAPITAL FEPD 163 DURHAM‐CHAPEL HILL‐CARRBORO HF MPO TQ‐5104 CHAPEL HILL TRANSIT 7 ORANGE EZ RIDER SENIOR SHUTLE OPERATIONS FEPD 216 ROCKINGHAM COUNTY COUNCIL ON AGING, HF PIEDMONT TRIAD RPO TQ‐6164 INC. 7 ROCKINGHAM OPERATING ASSISTANCE OPERATIONS L 246 HF PIEDMONT TRIAD RPO TQ‐6164 ROCKINGHAM COUNTY COUNCIL ON AGING, 7 ROCKINGHAM OPERATING ASSISTANCE OPERATIONS FEPD 246 DURHAM‐CHAPEL HILL‐CARRBORO HF MPO TQ‐6165 ORANGE COUNTY DEPARTMENT OF AGING 7 ORANGE MOBILITY MANAGEMENT CAPITAL S 15 HF DURHAM‐CHAPEL HILL‐CARRBORO TQ‐6165 ORANGE COUNTY DEPARTMENT OF AGING 7 ORANGE MOBILITY MANAGEMENT CAPITAL L 15 HF DURHAM‐CHAPEL HILL‐CARRBORO TQ‐6165 ORANGE COUNTY DEPARTMENT OF AGING 7 ORANGE MOBILITY MANAGEMENT CAPITAL FEPD 120 HF GREENSBORO URBAN AREA MPO TQ‐6783 GREENSBORO TRANSIT AUTHORITY 7 GUILFORD 5310 CAPITAL PROJECTS CAPITAL L 88 29 29 29 HF GREENSBORO URBAN AREA MPO TQ‐6783 GREENSBORO TRANSIT AUTHORITY 7 GUILFORD 5310 CAPITAL PROJECTS CAPITAL FEPD 354 118 118 118 ROCKINGHAM COUNTY COUNCIL ON AGING, HF PIEDMONT TRIAD RPO TQ‐6785 INC. 7 ROCKINGHAM OPERATING OPERATIONS L 125 HF PIEDMONT TRIAD RPO TQ‐6785 ROCKINGHAM COUNTY COUNCIL ON AGING, 7 ROCKINGHAM OPERATING OPERATIONS FEPD 125 HF PIEDMONT TRIAD RPO TQ‐6788 ALAMANACE COUNTY TRANSPORTATION 7 ALAMANCE OPERATING OPERATIONS L 114 HF PIEDMONT TRIAD RPO TQ‐6788 ALAMANACE COUNTY TRANSPORTATION 7 ALAMANCE OPERATING OPERATIONS FEPD 114 HF PIEDMONT TRIAD RPO TQ‐6793 GUILFORD COUNTY TRANSPORTATION 7 GUILFORD OPERATING OPERATIONS L 101 HF PIEDMONT TRIAD RPO TQ‐6793 GUILFORD COUNTY TRANSPORTATION 7 GUILFORD OPERATING OPERATIONS FEPD 101 HF GREENSBORO URBAN AREA MPO TQ‐7000 GREENSBORO TRANSIT AUTHORITY 7 GUILFORD ADMINISTRATIVE OVERSIGHT OF 5310 ADMINISTRATION FEPD 66 21 21 see amendment #1 for 2012‐2018 HF GREENSBORO URBAN AREA MPO TS‐4758 GREENSBORO TRANSIT AUTHORITY 7 GUILFORD SAFETY & SECURITY ‐ MIN. 1% SET ASIDE STIP CAPITAL FUZ 122 61 61 61 61 61 61 61 61 DURHAM‐CHAPEL HILL‐CARRBORO HF MPO TS‐5106 CHAPEL HILL TRANSIT 7 ORANGE SAFETY & SECURITY ‐ MIN. 1% SET ASIDE CAPITAL FUZ 55 35 35 35 35 18 18 18 18 HF HIGH POINT URBAN AREA MPO TS‐5113 HIGH POINT TRANSIT SYSTEM / HI‐TRAN 7, 8, 9 DAVIDSON, GUILFORD, RANDOLPH SAFETY & SECURITY ‐ MIN. 1% SET ASIDE CAPITAL FUZ 32 16 16 16 16 16 16 16 16 PIEDMONT AUTHORITY FOR REGIONAL HF WINSTON‐SALEM URBAN AREA MPO TS‐5115 TRANSPORTATION 7, 9 ALAMANCE, FORSYTH, GUILFORD SAFETY & SECURITY ‐ MIN. 1% SET ASIDE CAPITAL FUZ 422222222 DURHAM‐CHAPEL HILL‐CARRBORO HF MPO TS‐5119 TRIANGLE TRANSIT AUTHORITY 5, 7 DURHAM, ORANGE SAFETY & SECURITY ‐ MIN. 1% SET ASIDE CAPITAL FUZ 34 22 19 19 19 19 2 2 2 DURHAM‐CHAPEL HILL‐CARRBORO DIV MPO TT‐6107 CHAPEL HILL TRANSIT 7 ORANGE PURCHASE MOBILE DATA TERMINALS CAPITAL STPDA 64 DIV DURHAM‐CHAPEL HILL‐CARRBORO TT‐6107 CHAPEL HILL TRANSIT 7 ORANGE PURCHASE MOBILE DATA TERMINALS CAPITAL L 16 PUREFOY ROAD TO SR 1902 (MANNING DRIVE) DURHAM‐CHAPEL HILL‐CARRBORO IN CHAPEL HILL. CORRIDOR UPGRADE TO MPO U‐0624 NC 86 (SOUTH COLUMBIA STREET) 7 ORANGE INCLUDE BICYCLE LANES. UNDER CONSTRUCTION

PROPOSED US 311 BYPASS IN HIGH POINT TO SR HIGH POINT URBAN AREA MPO, SR 1486 (GREENSBORO ROAD) / SR 4121 (HIGH 1424 (HILLTOP ROAD) IN GREENSBORO. WIDEN GREENSBORO URBAN AREA MPO U‐2412 POINT ROAD) 7 GUILFORD TO MULTI‐LANES, PART ON NEW LOCATION. HIGH POINT URBAN AREA MPO, SR 1486 (GREENSBORO RD) / SR 4121 (HIGH US 311 BYPASS TO SR 4228 (VICKREY CHAPEL DIV GREENSBORO URBAN AREA MPO U‐2412A POINT RD) 7 GUILFORD ROAD) RIGHT OF WAY IN PROGRESS CONSTRUCTION NHP 12025 36075

As of December 2014 10 of 15 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE Draft STIP FY 2015 ‐ 2025 Division 7 Projects COST ESTIMATES ARE IN THOUSANDS OF DOLLARS CATEGORY MPO_RPO PROJECT ROUTE DIVISION COUNTIES DESCRIPTION COMMENT ACTIVITY FUNDING 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 UNFUNDED HIGH POINT URBAN AREA MPO, SR 1486 (GREENSBORO RD) / SR 4121 (HIGH SR 4228 (VICKREY CHAPEL ROAD) TO SR 1424 TRN GREENSBORO URBAN AREA MPO U‐2412B POINT RD) 7 GUILFORD (HILLTOP ROAD) UNDER CONSTRUCTION CONSTRUCTION STP 8826 GARVEE BOND FUNDING $105.9 M FOR SEGMENT C; PAYBACK FY 2013‐ GREENSBORO WESTERN LOOP, NORTH OF I‐85 2024 ‐ GARVEE BOND FUNDING $25 TO LAWNDALE DRIVE IN GREENSBORO. M FOR SEGMENT D; PAYBACK FY GREENSBORO URBAN AREA MPO U‐2524 I‐73 / I‐840 / FUTURE I‐840 / US 421 7 GUILFORD CONSTRUCT FREEWAY ON NEW LOCATION. 2017‐2028 SOUTH OF SR 1541 (WENDOVER AVENUE) TO GREENSBORO URBAN AREA MPO U‐2524AA SR 1546 ( ROAD) 7 GUILFORD NORTH OF SR 1560 (SAPP ROAD) COMPLETE

GREENSBORO WESTERN LOOP, NORTH OF I‐85 NEAR SR 1129 (GROOMETOWN ROAD) TO GREENSBORO URBAN AREA MPO U‐2524AB I‐73 / US 421 7 GUILFORD NORTH OF SR 4121 (HIGH POINT ROAD) COMPLETE

GREENSBORO WESTERN LOOP, NORTH OF SR GREENSBORO URBAN AREA MPO U‐2524AC I‐73 / US 421 7 GUILFORD 4121 (HIGH POINT ROAD) TO SOUTH OF I‐40 COMPLETE

GREENSBORO WESTERN LOOP, INTERCHANGE GREENSBORO URBAN AREA MPO U‐2524AE I‐73 / US 421 7 GUILFORD AT PROPOSED HIGH POINT ROAD RELOCATION UNDER CONSTRUCTION GREENSBORO WESTERN LOOP, SOUTH OF I‐40 TO NORTH OF SR 2147 (WEST FRIENDLY GREENSBORO URBAN AREA MPO U‐2524BA I‐73 / I‐840 7 GUILFORD AVENUE) COMPLETE GREENSBORO WESTERN LOOP, NORTH OF SR 2147 (WEST FRIENDLY AVENUE) TO NORTH OF GREENSBORO URBAN AREA MPO U‐2524BB I‐73 / I‐840 7 GUILFORD SR 2176 (BRYAN BOULEVARD) COMPLETE

SR 2085 (BRYAN BOULEVARD) INTERCHANGE MODIFICATIONS, INCLUDING AUXILIARY LANES, TRN GREENSBORO URBAN AREA MPO U‐2524BC I‐73 / I‐840 7 GUILFORD ITS, AND INMAN ROAD BRIDGE REPLACEMENT. CONSTRUCTION NHP 9900 GREENSBORO WESTERN LOOP, NORTH OF SR 2176 (BRYAN BOULEVARD) TO US 220 TRN GREENSBORO URBAN AREA MPO U‐2524C FUTURE I‐840 7 GUILFORD (BATTLEGROUND AVENUE) UNDER CONSTRUCTION CONSTRUCTION S(M) 8827 8827 TRN GREENSBORO URBAN AREA MPO U‐2524C FUTURE I‐840 7 GUILFORD GREENSBORO WESTERN LOOP, NORTH OF SR UNDER CONSTRUCTION GARVEE NHP 10857 10857 10857 10857 10857 10857 10857 10857 10857 10857 GREENSBORO WESTERN LOOP, US 220 (BATTLEGROUND AVENUE) TO SR 2303 SW GREENSBORO URBAN AREA MPO U‐2524D FUTURE I‐840 7 GUILFORD (LAWNDALE DRIVE) RIGHT OF WAY IN PROGRESS CONSTRUCTION S(M) 29600 SW GREENSBORO URBAN AREA MPO U‐2524D FUTURE I‐840 7 GUILFORD GREENSBORO WESTERN LOOP, US 220 RIGHT OF WAY IN PROGRESS GARVEE NHP 2563 2563 2563 2563 2563 2563 2563 2563 2563 2563 5126 GREENSBORO WESTERN LOOP, ITS GREENSBORO URBAN AREA MPO U‐2524E I‐73 / I‐840 7 GUILFORD INSTALLATION COMPLETE GREENSBORO WESTERN LOOP, INTERCHANGE AT PROPOSED LEWISTON‐FLEMING ROAD GREENSBORO URBAN AREA MPO U‐2524F FUTURE I‐840 7 GUILFORD EXTENSION CONSTRUCTION NHP 15000 GREENSBORO EASTERN LOOP, LAWNDALE DRIVE TO NORTH OF I‐40 / I‐85 IN GREENSBORO. CONSTRUCT FREEWAY ON NEW GREENSBORO URBAN AREA MPO U‐2525 I‐785 / I‐840; FUTURE I‐785; FUTURE I‐840 7 GUILFORD LOCATION. PLANNING / DESIGN IN PROGRESS GREENSBORO EASTERN LOOP, SOUTH OF SR 3041 (CLAPP FARMS ROAD) TO US 70 GREENSBORO URBAN AREA MPO U‐2525A I‐785 / I‐840 7 GUILFORD RELOCATION COMPLETE

GREENSBORO EASTERN LOOP, US 70 TRN GREENSBORO URBAN AREA MPO U‐2525B FUTURE I‐785 / FUTURE I‐840 7 GUILFORD RELOCATION TO US 29 NORTH OF GREENSBORO UNDER CONSTRUCTION CONSTRUCTION T 28775 28775 28775

GREENSBORO EASTERN LOOP, US 29 NORTH OF SW GREENSBORO URBAN AREA MPO U‐2525C FUTURE I‐840 7 GUILFORD GREENSBORO TO SR 2303 (LAWNDALE DRIVE) RIGHT‐OF‐WAY T 14245 SW GREENSBORO URBAN AREA MPO U‐2525C FUTURE I‐840 7 GUILFORD GREENSBORO EASTERN LOOP, US 29 NORTH OF MITIGATION T 214 SW GREENSBORO URBAN AREA MPO U‐2525C FUTURE I‐840 7 GUILFORD GREENSBORO EASTERN LOOP, US 29 NORTH OF CONSTRUCTION T 38900 38900 38900 38900 INTERCHANGE AT PROPOSED CONE GREENSBORO URBAN AREA MPO U‐2525D FUTURE I‐840 7 GUILFORD BOULEVARD EXTENSION CONSTRUCTION T 15000 ROCK HAVEN ROAD TO BRIDGE NO. 88 IN CARRBORO. WIDEN TO ADD BICYCLE LANES, DURHAM‐CHAPEL HILL‐CARRBORO SIDEWALKS, AND TURN LANES WITH A CENTER MPO U‐2803 SR 1919 (SMITH LEVEL ROAD) 7 ORANGE MEDIAN. UNDER CONSTRUCTION

NC 119 RELOCATION, I‐85 TO SOUTH OF SR BURLINGTON‐GRAHAM URBAN AREA 1918 (MRS. WHITE ROAD) IN MEBANE. FOUR‐ MPO U‐3109 NC 119 7 ALAMANCE TO‐SIX‐LANE FACILITY ON NEW LOCATION. PLANNING / DESIGN IN PROGRESS BURLINGTON‐GRAHAM URBAN AREA NC 119 RELOCATION, I‐40 / I‐85 TO NORTH OF MPO U‐3109A NC 119 7 ALAMANCE SR 1921 (MEBANE ROGERS ROAD). RIGHT OF WAY IN PROGRESS MITIGATION STP 10 BURLINGTON‐GRAHAM URBAN AREA U‐3109A NC 119 7 ALAMANCE NC 119 RELOCATION, I‐40 / I‐85 TO NORTH OF RIGHT OF WAY IN PROGRESS CONSTRUCTION STP 47800 NC 119 RELOCATION, NORTH OF SR 1921 BURLINGTON‐GRAHAM URBAN AREA (MEBANE ROGERS ROAD) TO SOUTH OF SR MPO U‐3109B NC 119 7 ALAMANCE 1918 (MRS. WHITE ROAD) RIGHT‐OF‐WAY STP 6600 BURLINGTON‐GRAHAM URBAN AREA U‐3109B NC 119 7 ALAMANCE NC 119 RELOCATION, NORTH OF SR 1921 UTILITIES STP 813 BURLINGTON‐GRAHAM URBAN AREA U‐3109B NC 119 7 ALAMANCE NC 119 RELOCATION, NORTH OF SR 1921 MITIGATION STP 8 BURLINGTON‐GRAHAM URBAN AREA U‐3109B NC 119 7 ALAMANCE NC 119 RELOCATION, NORTH OF SR 1921 CONSTRUCTION STP 10400 PART B, GARVEE BOND FUNDING BURLINGTON‐GRAHAM URBAN AREA NEW ROUTE, US 70 TO NC 100 IN ELON. MULTI‐ $10.5 MILLION; PAYBACK FY 2011 ‐ MPO U‐3110 NEW ROUTE 7 ALAMANCE LANES, PART ON NEW LOCATION. FY 2022 BURLINGTON‐GRAHAM URBAN AREA US 70 TO NORTH OF SR 1309 (WESTBROOK MPO U‐3110A NEW ROUTE 7 ALAMANCE AVENUE) COMPLETE IMPROVEMENTS ON SR 1311 (COOK ROAD), SR BURLINGTON‐GRAHAM URBAN AREA 1309 (WESTBROOK AVENUE) TO NC 100, PART GARVEE TRN MPO U‐3110B NEW ROUTE 7 ALAMANCE ON NEW LOCATION COMPLETE CONSTRUCTION STP 1148 1148 1148 1148 1148 1148 1148 1148 NC 86 (MARTIN LUTHER KING, JR. BOULEVARD) TO SR 1734 (ERWIN ROAD) IN CHAPEL HILL. DURHAM‐CHAPEL HILL‐CARRBORO CORRIDOR UPGRADE, PART ON NEW MPO U‐3306 SR 1733 (WEAVER DAIRY ROAD) 7 ORANGE LOCATION. UNDER CONSTRUCTION SOUTH SCALES STREET TO NC 14 IN REIDSVILLE. PIEDMONT TRIAD RPO U‐3326 US 29 BUSINESS / US 158 (FREEWAY DRIVE) 7 ROCKINGHAM WIDEN TO MULTI‐LANES.

As of December 2014 11 of 15 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE Draft STIP FY 2015 ‐ 2025 Division 7 Projects COST ESTIMATES ARE IN THOUSANDS OF DOLLARS CATEGORY MPO_RPO PROJECT ROUTE DIVISION COUNTIES DESCRIPTION COMMENT ACTIVITY FUNDING 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 UNFUNDED SOUTH SCALES STREET TO SR 2686 PIEDMONT TRIAD RPO U‐3326A US 29 BUSINESS (FREEWAY DRIVE) 7 ROCKINGHAM (RICHARDSON DRIVE) UNDER CONSTRUCTION PIEDMONT TRIAD RPO U‐3326B US 29 BUSINESS / US 158 (FREEWAY DRIVE) 7 ROCKINGHAM SR 2686 (RICHARDSON DRIVE) TO NC 14 UNDER CONSTRUCTION SR 1567 (ROBBINS COUNTRY ROAD) TO US 311 (MAIN STREET) IN ARCHDALE. WIDEN TO DIV HIGH POINT URBAN AREA MPO U‐3400 SR 1577 / SR 1004 (ARCHDALE ROAD) 8, 7 RANDOLPH, GUILFORD MULTI‐LANES. MITIGATION T 7 RANDOLPH COUNTY LINE TO SR 1993 (MAIN HIGH POINT URBAN AREA MPO U‐3400B SR 1577 / SR 1004 (ARCHDALE ROAD) 7 GUILFORD STREET). RIGHT‐OF‐WAY T 1111 RANDOLPH COUNTY LINE TO SR 1993 (MAIN HIGH POINT URBAN AREA MPO U‐3400B SR 1577 / SR 1004 (ARCHDALE ROAD) 7 GUILFORD STREET). UTILITIES T 209 RANDOLPH COUNTY LINE TO SR 1993 (MAIN HIGH POINT URBAN AREA MPO U‐3400B SR 1577 / SR 1004 (ARCHDALE ROAD) 7 GUILFORD STREET). CONSTRUCTION T 1342 US 311 TO NC 68 (EASTCHESTER DRIVE) IN HIGH HIGH POINT URBAN AREA MPO U‐3615 SR 1820 (SKEET CLUB ROAD) 7 GUILFORD POINT. WIDEN TO MULTI‐LANES.

US 311 TO EAST OF SR 1818 (JOHNSON STREET). WIDEN TO FIVE‐LANE FACILITY FROM US 311 TO NORTH OF US 311 AND TO FOUR‐LANE MEDIAN DIVIDED FACILITY FROM NORTH OF US 311 TO HIGH POINT URBAN AREA MPO U‐3615A SR 1820 (SKEET CLUB ROAD) 7 GUILFORD EAST OF SR1818 (JOHNSON STREET). RIGHT‐OF‐WAY T 5700 HIGH POINT URBAN AREA MPO U‐3615A SR 1820 (SKEET CLUB ROAD) 7 GUILFORD US 311 TO EAST OF SR 1818 (JOHNSON STREET). CONSTRUCTION T 15500

EAST OF SR 1818 (JOHNSON STREET) TO WEST OF NC 68 (EASTCHESTER DRIVE). WIDEN TO TRN HIGH POINT URBAN AREA MPO U‐3615B SR 1820 (SKEET CLUB ROAD) 7 GUILFORD FOUR‐LANE MEDIAN DIVIDED FACILITY. RIGHT OF WAY IN PROGRESS CONSTRUCTION T 10600 10600 10600

PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY OTHERS ‐ DURHAM‐CHAPEL HILL‐CARRBORO (DCHC) IN PROGRESS; TAP FUNDING MPO. BICYCLE, PEDESTRIAN, AND REFLECTS UNPROGRAMMED DURHAM‐CHAPEL HILL‐CARRBORO TRANSPORTATION ALTERNATIVES PROGRAM BALANCE ‐ PROGRAMMING SUBJECT DIV MPO U‐4726 VARIOUS 5, 7, 8 DURHAM, ORANGE, CHATHAM (TAP) – ELIGIBLE PROJECTS. TO MPO APPROVAL ENGINEERING STPDA 304 DIV DURHAM‐CHAPEL HILL‐CARRBORO U‐4726 VARIOUS 5, 7, 8 DURHAM, ORANGE, CHATHAM DURHAM‐CHAPEL HILL‐CARRBORO (DCHC) PLANNING / DESIGN / RIGHT OF ENGINEERING L 76 DIV DURHAM‐CHAPEL HILL‐CARRBORO U‐4726 VARIOUS 5, 7, 8 DURHAM, ORANGE, CHATHAM DURHAM‐CHAPEL HILL‐CARRBORO (DCHC) PLANNING / DESIGN / RIGHT OF CONSTRUCTION STPDA 2076 353 DIV DURHAM‐CHAPEL HILL‐CARRBORO U‐4726 VARIOUS 5, 7, 8 DURHAM, ORANGE, CHATHAM DURHAM‐CHAPEL HILL‐CARRBORO (DCHC) PLANNING / DESIGN / RIGHT OF CONSTRUCTION TAP 277 277 277 277 277 277 277 277 277 277 DIV DURHAM‐CHAPEL HILL‐CARRBORO U‐4726 VARIOUS 5, 7, 8 DURHAM, ORANGE, CHATHAM DURHAM‐CHAPEL HILL‐CARRBORO (DCHC) PLANNING / DESIGN / RIGHT OF CONSTRUCTION L 519 88

DURHAM‐CHAPEL HILL‐CARRBORO METROPOLITAN PLANNING ORGANIZATION DURHAM‐CHAPEL HILL‐CARRBORO (DCHCMPO) PLANNING ALLOCATION AND DIV MPO U‐4727 VARIOUS 5, 7, 8 DURHAM, ORANGE, CHATHAM UNIFIED WORK PROGRAM. IN PROGRESS ENGINEERING STPDA 1871 DIV DURHAM‐CHAPEL HILL‐CARRBORO U‐4727 VARIOUS 5, 7, 8 DURHAM, ORANGE, CHATHAM DURHAM‐CHAPEL HILL‐CARRBORO IN PROGRESS ENGINEERING L 468

CURRENT TERMINUS TO CHIMNEY ROCK ROAD IN GREENSBORO. EXTEND ROADWAY, INCLUDING A GRADE SEPARATION OVER THE IN PROGRESS BY CITY OF GREENSBORO URBAN AREA MPO U‐4750 HORNADAY ROAD 7 GUILFORD . GREENSBORO ‐ OPEN TO TRAFFIC HIGH POINT URBAN AREA MPO, SR 1818 (JOHNSON STREET) / SR 1850 (SANDY SR 1820 (SKEET CLUB ROAD) TO I‐40 IN HIGH DIV GREENSBORO URBAN AREA MPO U‐4758 RIDGE ROAD) 7 GUILFORD POINT. WIDEN TO MULTI‐LANES. PLANNING / DESIGN IN PROGRESS RIGHT‐OF‐WAY T 5000 DIV HIGH POINT URBAN AREA MPO, U‐4758 SR 1818 (JOHNSON STREET) / SR 1850 (SANDY 7 GUILFORD SR 1820 (SKEET CLUB ROAD) TO I‐40 IN HIGH PLANNING / DESIGN IN PROGRESS CONSTRUCTION T 6650 6650 GREENSBORO URBAN AREA METROPOLITAN PLANNING ORGANIZATION (GUAMPO) STPDA FUNDS ‐ RESERVED FOR FUTURE DIV GREENSBORO URBAN AREA MPO U‐5021 VARIOUS 7 GUILFORD PROGRAMMING. CONSTRUCTION STPDA 1815 3916 3916 3916 3916 3916 3916 DURHAM‐CHAPEL HILL‐CARRBORO METROPOLITAN PLANNING ORGANIZATION DURHAM‐CHAPEL HILL‐CARRBORO (DCHCMPO) STPDA FUNDS ‐ RESERVED FOR DIV MPO U‐5023 VARIOUS 5, 7, 8 DURHAM, ORANGE, CHATHAM FUTURE PROGRAMMING. CONSTRUCTION STPDA 4288 4365 4365 4365 4365 BURLINGTON‐GRAHAM URBAN AREA ELMIRA STREET IN BURLINGTON. INSTALL MPO U‐5152 NC 87 (WEBB STREET) 7 ALAMANCE METAL SIGN POST. UNDER CONSTRUCTION GREENSBORO URBAN AREA MPO U‐5157 VARIOUS 7 GUILFORD RESURFACING AT SELECTED LOCATIONS. MONTLIEU AVENUE TO US 311 BUSINESS GREENSBORO URBAN AREA MPO U‐5157A SR 1486/1768 (LEXINGTON AVENUE) 7 GUILFORD (MAIN AVENUE) COMPLETE RANDOLPH COUNTY LINE TO NORTH OF SR GREENSBORO URBAN AREA MPO U‐5157B US 421 7 GUILFORD 3485 (HARMONT DRIVE) COMPLETE ELM STRET TO SUMMIT AVENUE (1.5 MILES), FRIENDLY AVENUE, RADIANCE DRIVE TO ELAM AVENUE (0.7 MILE) AND SMITH STREET, BATTLEGROUND AVENUE TO EUGENE STREET GREENSBORO URBAN AREA MPO U‐5157C CONE BOULEVARD 7 GUILFORD (0.6 MILE) COMPLETE

SECTIONS OF HOLDEN ROAD, FLORIDA STREET, BESSEMER AVENUE, MEADOWVIEW ROAD, UNDER CONSTRUCTION BY CITY OF GREENSBORO URBAN AREA MPO U‐5157D VARIOUS 7 GUILFORD CONE BOULEVARD AND YANCEYVILLE STREET GREENSBORO PATTON AVENUE TO JJ DRIVE; RANDLEMAN ROAD FROM FLORIDA STREET TO FREEMAN MILL ROAD; SPRING GARDEN STREET FROM HOLDEN STREET TO MARKET STREET; MEADOWVIEW ROAD FROM RANDLEMAN ROAD TO ELM‐EUGENE STREET; CONE BOULEVARD FROM SUMMIT AVENUE TO 16TH GREENSBORO URBAN AREA MPO U‐5157E ELM‐EUGENE STREET 7 GUILFORD STREET; BENJ UNDER CONSTRUCTION BY CITY LAWNDALE DRIVE TO SR 2348 (BASS CHAPEL ROAD‐ELM STREET) IN GREENSBORO. WIDENING, INTERSECTION IMPROVEMENTS IN PROGRESS BY CITY OF GREENSBORO URBAN AREA MPO U‐5162 LAKE JEANETTE ROAD 7 GUILFORD AND SIDEWALKS. GREENSBORO ‐ OPEN TO TRAFFIC J. J. DRIVE TO VANDALIA ROAD IN GREENSBORO. MEDIAN AND SIDEWALK IN PROGRESS BY CITY OF GREENSBORO URBAN AREA MPO U‐5163 SOUTH ELM‐EUGENE STREET 7 GUILFORD CONSTRUCTION. GREENSBORO ‐ OPEN TO TRAFFIC

As of December 2014 12 of 15 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE Draft STIP FY 2015 ‐ 2025 Division 7 Projects COST ESTIMATES ARE IN THOUSANDS OF DOLLARS CATEGORY MPO_RPO PROJECT ROUTE DIVISION COUNTIES DESCRIPTION COMMENT ACTIVITY FUNDING 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 UNFUNDED

NC 68 (EASTCHESTER DRIVE) IN HIGH POINT. PLANNING / DESIGN IN PROGRESS RECONSTRUCT INTERCHANGE AND BY CITY OF HIGH POINT ‐ NCDOT DIV HIGH POINT URBAN AREA MPO U‐5169 I‐74 / US 311 7 GUILFORD APPROACHES. CENTRAL LET PROJECT RIGHT‐OF‐WAY NHP 1975

NC 68 (EASTCHESTER DRIVE) IN HIGH POINT. PLANNING / DESIGN IN PROGRESS RECONSTRUCT INTERCHANGE AND BY CITY OF HIGH POINT ‐ NCDOT DIV HIGH POINT URBAN AREA MPO U‐5169 I‐74 / US 311 7 GUILFORD APPROACHES. CENTRAL LET PROJECT MITIGATION NHP 14

NC 68 (EASTCHESTER DRIVE) IN HIGH POINT. PLANNING / DESIGN IN PROGRESS RECONSTRUCT INTERCHANGE AND BY CITY OF HIGH POINT ‐ NCDOT DIV HIGH POINT URBAN AREA MPO U‐5169 I‐74 / US 311 7 GUILFORD APPROACHES. CENTRAL LET PROJECT CONSTRUCTION NHP 7050 7050 I‐40 / I‐85 BUSINESS TO PHILLIPS AVENUE IN GREENSBORO. UPGRADE ELECTRICAL WIRING SYSTEM AND REPLACE METAL BREAKWAY GREENSBORO URBAN AREA MPO U‐5201 US 29 7 GUILFORD POLES. UNDER CONSTRUCTION NC 86 (SOUTH COLUMBIA STREET) TO DURHAM‐CHAPEL HILL‐CARRBORO EASTOWNE DRIVE / LAKEVIEW DRIVE IN CHAPEL MPO U‐5304 US 15 / US 501 (FORDHAM BOULEVARD) 7 ORANGE HILL. UPGRADE CORRIDOR. SCHEDULED FOR FEASIBILITY STUDY

NC 86 (SOUTH COLUMBIA STREET) TO SR 1742 (EPHESUS CHURCH ROAD) IN CHAPEL HILL. CAPACITY IMPROVEMENTS AND POSSIBLE INTERCHANGE AT SR 1902 (MANNING DRIVE), DURHAM‐CHAPEL HILL‐CARRBORO WITH SIDEWALKS, WIDE OUTSIDE LANES AND SW MPO U‐5304A US 15 / US 501 7 ORANGE TRANSIT ACCOMMODATIONS. RIGHT‐OF‐WAY T 18465 18465 18465 SW DURHAM‐CHAPEL HILL‐CARRBORO U‐5304A US 15 / US 501 7 ORANGE NC 86 (SOUTH COLUMBIA STREET) TO SR 1742 UTILITIES T 2216 2216 2215 SW DURHAM‐CHAPEL HILL‐CARRBORO U‐5304A US 15 / US 501 7 ORANGE NC 86 (SOUTH COLUMBIA STREET) TO SR 1742 CONSTRUCTION T 33288 SAGE ROAD TO EAST LAKEVIEW DRIVE IN DURHAM‐CHAPEL HILL‐CARRBORO CHAPEL HILL. UPGRADE ROADWAY TO SW MPO U‐5304B US 15 / US 501 7 ORANGE SUPERSTREET. CONSTRUCTION T 2052 DURHAM‐CHAPEL HILL‐CARRBORO SR 1742 (EPHESUS CHURCH ROAD). WORK TO BE COMPLETED UNDER U‐ MPO U‐5304C US 15 / US 501 7 ORANGE INTERSECTION IMPROVEMENTS. 5550. DURHAM‐CHAPEL HILL‐CARRBORO NC 54 (RALEIGH ROAD). INTERCHANGE SW MPO U‐5304D US 15 / US 501 7 ORANGE IMPROVEMENTS. RIGHT‐OF‐WAY T 160 SW DURHAM‐CHAPEL HILL‐CARRBORO U‐5304D US 15 / US 501 7 ORANGE NC 54 (RALEIGH ROAD). INTERCHANGE CONSTRUCTION T 1000 NC 54 / NC 86 INTERCHANGE. ADD LANE ON US DURHAM‐CHAPEL HILL‐CARRBORO 15 / US 501 NORTHBOUND RAMP ONTO REG MPO U‐5304E US 15 / US 501 7 ORANGE EASTBOUND NC 54. RIGHT‐OF‐WAY T 300 REG DURHAM‐CHAPEL HILL‐CARRBORO U‐5304E US 15 / US 501 7 ORANGE NC 54 / NC 86 INTERCHANGE. ADD LANE ON US CONSTRUCTION T 1875 INTERSECTION AND SIDEWALK IMPROVEMENTS AT CONE BOULEVARD‐BENJAMIN PARKWAY, WESTRIDGE ROAD, NEW GARDEN ROAD, AND PLANNING / DESIGN / RIGHT OF BRASSFIELD ROAD INTERSECTIONS IN WAY / CONSTRUCTION BY CITY OF GREENSBORO URBAN AREA MPO U‐5306 US 220 (BATTLEGROUND AVENUE) 7 GUILFORD GREENSBORO. GREENSBORO INTERSECTION WITH BENJAMIN PARKWAY / TRN GREENSBORO URBAN AREA MPO U‐5306A US 220 (BATTLEGROUND AVENUE) 7 GUILFORD CONE BOULEVARD AND APPROACHES RIGHT OF WAY IN PROGRESS INTERSECTION WITH WESTRIDGE ROAD AND REG GREENSBORO URBAN AREA MPO U‐5306B US 220 (BATTLEGROUND AVENUE) 7 GUILFORD APPROACHES PLANNING / DESIGN IN PROGRESS RIGHT‐OF‐WAY NHP 430 REG GREENSBORO URBAN AREA MPO U‐5306B US 220 (BATTLEGROUND AVENUE) 7 GUILFORD INTERSECTION WITH WESTRIDGE ROAD AND PLANNING / DESIGN IN PROGRESS CONSTRUCTION NHP 3100 INTERSECTION WITH NEW GARDEN ROAD AND TRN GREENSBORO URBAN AREA MPO U‐5306C US 220 (BATTLEGROUND AVENUE) 7 GUILFORD APPROACHES PLANNING / DESIGN IN PROGRESS CONSTRUCTION NHP 1000 INTERSECTION WITH BRASSFIELD ROAD AND GREENSBORO URBAN AREA MPO U‐5306D US 220 (BATTLEGROUND AVENUE) 7 GUILFORD APPROACHES UNDER CONSTRUCTION CLIFTON ROAD IN GREENSBORO. UNDER CONSTRUCTION BY CITY OF GREENSBORO URBAN AREA MPO U‐5322 SR 1541 / SR 2254 (WENDOVER AVENUE) 7 GUILFORD INTERSECTION IMPROVEMENTS. GREENSBORO

SR 1546 (COLLEGE ROAD) IN GREENSBORO. RIGHT OF WAY IN PROGRESS BY CITY DIV GREENSBORO URBAN AREA MPO U‐5326 SR 1008 (MARKET STREET) 7 GUILFORD INTERSECTION IMPROVEMENTS. OF GREENSBORO RIGHT‐OF‐WAY T 360 DIV GREENSBORO URBAN AREA MPO U‐5326 SR 1008 (MARKET STREET) 7 GUILFORD SR 1546 (COLLEGE ROAD) IN GREENSBORO. RIGHT OF WAY IN PROGRESS BY CITY CONSTRUCTION T 1500 ISAACSON BOULEVARD IN GREENSBORO. REALIGN FLEMING ROAD AND CONSTRUCT NEW UNDER CONSTRUCTION BY CITY OF GREENSBORO URBAN AREA MPO U‐5505 SR 2136 (FLEMING ROAD) 7 GUILFORD INTERSECTION. GREENSBORO GREENSBORO URBAN AREA MPO: BICYCLE, TAP FUNDING INCLUDES PEDESTRIAN, AND TRANSPORTATION UNPROGRAMMED BALANCE ‐ ALTERNATIVES PROGRAM (TAP) – ELIGIBLE PROGRAMMING SUBJECT TO MPO DIV GREENSBORO URBAN AREA MPO U‐5532 VARIOUS 7 GUILFORD PROJECTS APPROVAL RIGHT‐OF‐WAY TAP 64 20 10 10 DIV GREENSBORO URBAN AREA MPO U‐5532 VARIOUS 7 GUILFORD GREENSBORO URBAN AREA MPO: BICYCLE, TAP FUNDING INCLUDES RIGHT‐OF‐WAY L 16 6 3 3 DIV GREENSBORO URBAN AREA MPO U‐5532 VARIOUS 7 GUILFORD GREENSBORO URBAN AREA MPO: BICYCLE, TAP FUNDING INCLUDES CONSTRUCTION STPDA 359 1203 356 3169 DIV GREENSBORO URBAN AREA MPO U‐5532 VARIOUS 7 GUILFORD GREENSBORO URBAN AREA MPO: BICYCLE, TAP FUNDING INCLUDES CONSTRUCTION TAP 540 763 460 460 155 155 155 155 155 155 155 DIV GREENSBORO URBAN AREA MPO U‐5532 VARIOUS 7 GUILFORD GREENSBORO URBAN AREA MPO: BICYCLE, TAP FUNDING INCLUDES CONSTRUCTION L 225 453 165 868 ACCESS ROAD FROM SR 1981 (TROLLINGWOOD‐ HAWFIELDS ROAD) TO INDUSTRIAL SITE. BURLINGTON‐GRAHAM URBAN AREA CONSTRUCT TWO‐LANE ROAD ON NEW MPO U‐5538 NEW ROUTE 7 ALAMANCE LOCATION. UNDER CONSTRUCTION

VARIABLE MESSAGE SIGNS FOR TRAFFIC PLANNING / DESIGN / RIGHT OF DURHAM‐CHAPEL HILL‐CARRBORO MANAGEMENT ON MAJOR CORRIDORS IN WAY / CONSTRUCTION BY TOWN OF REG MPO U‐5543 VARIOUS 7, 5 ORANGE, DURHAM CHAPEL HILL. CHAPEL HILL ‐ IN PROGRESS DOWNTOWN ACCESS IMPROVEMENTS IN HILLSBOROUGH. CONSTRUCT CURB RELOCATIONS AND ADA‐COMPLIANT PLANNING / DESIGN / RIGHT OF DURHAM‐CHAPEL HILL‐CARRBORO INTERSECTION IMPROVEMENTS, AND REMOVE WAY / CONSTRUCTION BY TOWN OF DIV MPO U‐5549 VARIOUS 7 ORANGE ON‐STREET PARKING. HILLSBOROUGH CONSTRUCTION STPDA 125 DIV DURHAM‐CHAPEL HILL‐CARRBORO U‐5549 VARIOUS 7 ORANGE DOWNTOWN ACCESS IMPROVEMENTS IN PLANNING / DESIGN / RIGHT OF CONSTRUCTION L 31 FY 2018 PROGRAMMING REFLECTS DURHAM‐CHAPEL HILL‐CARRBORO SR 1742 (EPHESUS CHURCH ROAD) IN CHAPEL REIMBURSEMENT TO TOWN OF SW MPO U‐5550 US 15 / US 501 (FORDHAM BOULEVARD) 7 ORANGE HILL. INTERSECTION IMPROVEMENTS. CHAPEL HILL CONSTRUCTION NHP 2170

BURLINGTON‐GRAHAM URBAN AREA ST. MARKS CHURCH ROAD IN BURLINGTON. REG MPO U‐5752 US 70 (SOUTH CHURCH STREET) 7 ALAMANCE INTERSECTION IMPROVEMENTS. RIGHT‐OF‐WAY T 180

As of December 2014 13 of 15 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE Draft STIP FY 2015 ‐ 2025 Division 7 Projects COST ESTIMATES ARE IN THOUSANDS OF DOLLARS CATEGORY MPO_RPO PROJECT ROUTE DIVISION COUNTIES DESCRIPTION COMMENT ACTIVITY FUNDING 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 UNFUNDED REG BURLINGTON‐GRAHAM URBAN AREA U‐5752 US 70 (SOUTH CHURCH STREET) 7 ALAMANCE ST. MARKS CHURCH ROAD IN BURLINGTON. CONSTRUCTION T 750 I‐40 / BUSINESS 85 TO SOUTH OF FLORIDA STREET IN GREENSBORO. ADD LANE ON I‐40 / BUSINESS 85 EASTBOUND RAMP ONTO NORTHBOUND US 29 / US 70 / US 220 AND EXTEND US 29 / US 70 / US 220 SOUTHBOUND RAMP ONTO SR 3672 (MARTIN LUTHER KING, REG GREENSBORO URBAN AREA MPO U‐5754 US 29 / US 70 / US 220 (O'HENRY BOULEVARD) 7 GUILFORD JR. DRIVE) RIGHT‐OF‐WAY NHP 548 REG GREENSBORO URBAN AREA MPO U‐5754 US 29 / US 70 / US 220 (O'HENRY BOULEVARD) 7 GUILFORD I‐40 / BUSINESS 85 TO SOUTH OF FLORIDA UTILITIES NHP 66 REG GREENSBORO URBAN AREA MPO U‐5754 US 29 / US 70 / US 220 (O'HENRY BOULEVARD) 7 GUILFORD I‐40 / BUSINESS 85 TO SOUTH OF FLORIDA CONSTRUCTION NHP 16450

DURHAM‐CHAPEL HILL‐CARRBORO US 15 / US 501 IN CHAPEL HILL TO NC 55 IN PARTS A THROUGH F ON EXPANDED MPO U‐5774 NC 54 5, 7 DURHAM, ORANGE DURHAM. UPGRADE ROADWAY CORRIDOR. NHS DURHAM‐CHAPEL HILL‐CARRBORO MPO U‐5774A NC 54 7 ORANGE US 15 / US 501. UPGRADE INTERCHANGE RIGHT‐OF‐WAY NHP 6400 DURHAM‐CHAPEL HILL‐CARRBORO U‐5774A NC 54 7 ORANGE US 15 / US 501. UPGRADE INTERCHANGE CONSTRUCTION NHP 17300 US 15 / US 501 IN ORANGE COUNTY TO SR 1110 (BARBEE CHAPEL ROAD) IN DURHAM COUNTY, UPGRADE ROADWAY CORRIDOR AND CONVERT DURHAM‐CHAPEL HILL‐CARRBORO AT‐GRADE INTERSECTION WITH SR 1110 TO REG MPO U‐5774B NC 54 7, 5 ORANGE, DURHAM INTERCHANGE. RIGHT‐OF‐WAY NHP 4620 REG DURHAM‐CHAPEL HILL‐CARRBORO U‐5774B NC 54 7, 5 ORANGE, DURHAM US 15 / US 501 IN ORANGE COUNTY TO SR 1110 UTILITIES NHP 554 REG DURHAM‐CHAPEL HILL‐CARRBORO U‐5774B NC 54 7, 5 ORANGE, DURHAM US 15 / US 501 IN ORANGE COUNTY TO SR 1110 CONSTRUCTION NHP 13466 13466 LAWNDALE DRIVE AND PISGAH CHURCH ROAD IN GREENSBORO. INTERSECTION IMPROVEMENTS AT LAWNDALE ROAD AND PISGAH CHURCH ROAD, AT LAWNDALE ROAD AND MARTINSVILLE ROAD, AND AT MARTINSVILLE ROAD AND PISGAH CHURCH NON‐STATE‐SYSTEM ‐ LOCAL MATCH DIV GREENSBORO URBAN AREA MPO U‐5812 VARIOUS 7 GUILFORD ROAD BY CITY OF GREENSBORO RIGHT‐OF‐WAY STP 144 DIV GREENSBORO URBAN AREA MPO U‐5812 VARIOUS 7 GUILFORD LAWNDALE DRIVE AND PISGAH CHURCH ROAD NON‐STATE‐SYSTEM ‐ LOCAL MATCH RIGHT‐OF‐WAY L 36 DIV GREENSBORO URBAN AREA MPO U‐5812 VARIOUS 7 GUILFORD LAWNDALE DRIVE AND PISGAH CHURCH ROAD NON‐STATE‐SYSTEM ‐ LOCAL MATCH CONSTRUCTION STP 600 DIV GREENSBORO URBAN AREA MPO U‐5812 VARIOUS 7 GUILFORD LAWNDALE DRIVE AND PISGAH CHURCH ROAD NON‐STATE‐SYSTEM ‐ LOCAL MATCH CONSTRUCTION L 150 FRIENDLY AVENUE IN GREENSBORO. WIDEN LINDELL ROAD (SR 2254 [WENDOVER AVENUE] OFF‐RAMP) TO ADD A SECOND LEFT TURN DIV GREENSBORO URBAN AREA MPO U‐5841 LINDELL ROAD 7 GUILFORD LANE. RIGHT‐OF‐WAY T 45 DIV GREENSBORO URBAN AREA MPO U‐5841 LINDELL ROAD 7 GUILFORD FRIENDLY AVENUE IN GREENSBORO. WIDEN CONSTRUCTION T 188

NORTH ELM STREET IN GREENSBORO. NON‐STATE‐SYSTEM ‐ LOCAL MATCH DIV GREENSBORO URBAN AREA MPO U‐5842 PISGAH CHURCH ROAD 7 GUILFORD INTERSECTION IMPROVEMENTS. BY CITY OF GREENSBORO RIGHT‐OF‐WAY STP 144 DIV GREENSBORO URBAN AREA MPO U‐5842 PISGAH CHURCH ROAD 7 GUILFORD NORTH ELM STREET IN GREENSBORO. NON‐STATE‐SYSTEM ‐ LOCAL MATCH RIGHT‐OF‐WAY L 36 DIV GREENSBORO URBAN AREA MPO U‐5842 PISGAH CHURCH ROAD 7 GUILFORD NORTH ELM STREET IN GREENSBORO. NON‐STATE‐SYSTEM ‐ LOCAL MATCH CONSTRUCTION STP 600 DIV GREENSBORO URBAN AREA MPO U‐5842 PISGAH CHURCH ROAD 7 GUILFORD NORTH ELM STREET IN GREENSBORO. NON‐STATE‐SYSTEM ‐ LOCAL MATCH CONSTRUCTION L 150

BURLINGTON‐GRAHAM URBAN AREA SR 1817 (GRAHAM‐HOPEDALE ROAD) IN DIV MPO U‐5843 US 70 (CHURCH STREET) 7 ALAMANCE BURLINGTON. INTERSECTION IMPROVEMENTS. RIGHT‐OF‐WAY T 225 DIV BURLINGTON‐GRAHAM URBAN AREA U‐5843 US 70 (CHURCH STREET) 7 ALAMANCE SR 1817 (GRAHAM‐HOPEDALE ROAD) IN CONSTRUCTION T 938 SR 1430 (RAMADA ROAD) TO US 70 (CHURCH BURLINGTON‐GRAHAM URBAN AREA STREET) IN BURLINGTON. WIDEN TO DIV MPO U‐5844 NC 62 7 ALAMANCE MULTILANES. RIGHT‐OF‐WAY T 1900 DIV BURLINGTON‐GRAHAM URBAN AREA U‐5844 NC 62 7 ALAMANCE SR 1430 (RAMADA ROAD) TO US 70 (CHURCH CONSTRUCTION T 5200 DURHAM‐CHAPEL HILL‐CARRBORO I‐40 TO ENO RIVER IN HILLSBOROUGH. WIDEN DIV MPO U‐5845 SR 1009 (SOUTH CHURTON STREET) 7 ORANGE TO MULTILANES. COORDINATE WITH U‐5848 RIGHT‐OF‐WAY T 1952 DIV DURHAM‐CHAPEL HILL‐CARRBORO U‐5845 SR 1009 (SOUTH CHURTON STREET) 7 ORANGE I‐40 TO ENO RIVER IN HILLSBOROUGH. WIDEN COORDINATE WITH U‐5848 UTILITIES T 234 DIV DURHAM‐CHAPEL HILL‐CARRBORO U‐5845 SR 1009 (SOUTH CHURTON STREET) 7 ORANGE I‐40 TO ENO RIVER IN HILLSBOROUGH. WIDEN COORDINATE WITH U‐5848 CONSTRUCTION T 24054 DURHAM‐CHAPEL HILL‐CARRBORO SR 1780 (ESTES DRIVE) IN CARRBORO. DIV MPO U‐5846 SR 1772 (GREENSBORO STREET) 7 ORANGE CONSTRUCT ROUNDABOUT. RIGHT‐OF‐WAY T 150 DIV DURHAM‐CHAPEL HILL‐CARRBORO U‐5846 SR 1772 (GREENSBORO STREET) 7 ORANGE SR 1780 (ESTES DRIVE) IN CARRBORO. CONSTRUCTION T 625 SR 1771 / SR 1927 (MERRITT MILL ROAD) / BREWER LANE INTERSECTION IN CHAPEL HILL DURHAM‐CHAPEL HILL‐CARRBORO SR 1010 (WEST FRANKLIN STREET / EAST MAIN AND CARRBORO. INTERSECTION DIV MPO U‐5847 STREET) 7 ORANGE IMPROVEMENTS. RIGHT‐OF‐WAY T 150 DIV DURHAM‐CHAPEL HILL‐CARRBORO U‐5847 SR 1010 (WEST FRANKLIN STREET / EAST MAIN 7 ORANGE SR 1771 / SR 1927 (MERRITT MILL ROAD) / CONSTRUCTION T 625

EXISTING SR 1006 (ORANGE GROVE ROAD) TO US 70 BUSINESS) IN HILLSBOROUGH. EXTEND DURHAM‐CHAPEL HILL‐CARRBORO ORANGE GROVE ROAD ON NEW LOCATION DIV MPO U‐5848 SR 1006 (ORANGE GROVE ROAD) 7 ORANGE WITH SIDEWALKS AND BICYCLE LANES. COORDINATE WITH U‐5845 RIGHT‐OF‐WAY T 1067 DIV DURHAM‐CHAPEL HILL‐CARRBORO U‐5848 SR 1006 (ORANGE GROVE ROAD) 7 ORANGE EXISTING SR 1006 (ORANGE GROVE ROAD) TO COORDINATE WITH U‐5845 UTILITIES T 128 DIV DURHAM‐CHAPEL HILL‐CARRBORO U‐5848 SR 1006 (ORANGE GROVE ROAD) 7 ORANGE EXISTING SR 1006 (ORANGE GROVE ROAD) TO COORDINATE WITH U‐5845 CONSTRUCTION T 4104

SR 4240 (WEST LEET STREET) TO SPRING GARDEN STREET IN GREENSBORO. REPLACE NON‐STATE‐SYSTEM ‐ LOCAL MATCH DIV GREENSBORO URBAN AREA MPO U‐5849 AYCOCK STREET 7 GUILFORD RAILROAD OVERPASS AND WIDEN ROADWAY. BY CITY OF GREENSBORO RIGHT‐OF‐WAY STP 366 DIV GREENSBORO URBAN AREA MPO U‐5849 AYCOCK STREET 7 GUILFORD SR 4240 (WEST LEET STREET) TO SPRING NON‐STATE‐SYSTEM ‐ LOCAL MATCH RIGHT‐OF‐WAY L 91 DIV GREENSBORO URBAN AREA MPO U‐5849 AYCOCK STREET 7 GUILFORD SR 4240 (WEST LEET STREET) TO SPRING NON‐STATE‐SYSTEM ‐ LOCAL MATCH UTILITIES STP 44 DIV GREENSBORO URBAN AREA MPO U‐5849 AYCOCK STREET 7 GUILFORD SR 4240 (WEST LEET STREET) TO SPRING NON‐STATE‐SYSTEM ‐ LOCAL MATCH UTILITIES L 11 DIV GREENSBORO URBAN AREA MPO U‐5849 AYCOCK STREET 7 GUILFORD SR 4240 (WEST LEET STREET) TO SPRING NON‐STATE‐SYSTEM ‐ LOCAL MATCH CONSTRUCTION STP 1066 DIV GREENSBORO URBAN AREA MPO U‐5849 AYCOCK STREET 7 GUILFORD SR 4240 (WEST LEET STREET) TO SPRING NON‐STATE‐SYSTEM ‐ LOCAL MATCH CONSTRUCTION L 266 ELMSLEY DRIVE TO GLENDALE DRIVE IN DIV GREENSBORO URBAN AREA MPO U‐5850 SR 1007 (RANDLEMAN ROAD) 7 GUILFORD GREENSBORO. WIDEN TO MULTLANES. RIGHT‐OF‐WAY T 467 DIV GREENSBORO URBAN AREA MPO U‐5850 SR 1007 (RANDLEMAN ROAD) 7 GUILFORD ELMSLEY DRIVE TO GLENDALE DRIVE IN UTILITIES T 56 DIV GREENSBORO URBAN AREA MPO U‐5850 SR 1007 (RANDLEMAN ROAD) 7 GUILFORD ELMSLEY DRIVE TO GLENDALE DRIVE IN CONSTRUCTION T 1635

US 220 (WENDOVER AVENUE) TO EAST CONE DIV GREENSBORO URBAN AREA MPO U‐5851 SR 1001 (CHURCH STREET) 7 GUILFORD BOULEVARD IN GREENSBORO. ADD LANES. RIGHT‐OF‐WAY T 3088 DIV GREENSBORO URBAN AREA MPO U‐5851 SR 1001 (CHURCH STREET) 7 GUILFORD US 220 (WENDOVER AVENUE) TO EAST CONE UTILITIES T 371 DIV GREENSBORO URBAN AREA MPO U‐5851 SR 1001 (CHURCH STREET) 7 GUILFORD US 220 (WENDOVER AVENUE) TO EAST CONE CONSTRUCTION T 12312 SR 2085 (BENJAMIN PARKWAY / BRYAN NORTHAMPTON DRIVE TO HOLDEN ROAD IN DIV GREENSBORO URBAN AREA MPO U‐5852 BOULEVARD) 7 GUILFORD GREENSBORO. ADD LANES. RIGHT‐OF‐WAY T 855

As of December 2014 14 of 15 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE Draft STIP FY 2015 ‐ 2025 Division 7 Projects COST ESTIMATES ARE IN THOUSANDS OF DOLLARS CATEGORY MPO_RPO PROJECT ROUTE DIVISION COUNTIES DESCRIPTION COMMENT ACTIVITY FUNDING 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 UNFUNDED DIV GREENSBORO URBAN AREA MPO U‐5852 SR 2085 (BENJAMIN PARKWAY / BRYAN 7 GUILFORD NORTHAMPTON DRIVE TO HOLDEN ROAD IN UTILITIES T 103 DIV GREENSBORO URBAN AREA MPO U‐5852 SR 2085 (BENJAMIN PARKWAY / BRYAN 7 GUILFORD NORTHAMPTON DRIVE TO HOLDEN ROAD IN CONSTRUCTION T 12458 SR 1228 (BOONE STATION DRIVE) IN BURLINGTON‐GRAHAM URBAN AREA SR 1301 (ST. MARKS CHURCH ROAD / SOUTH BURLINGTON TO EAST LEBANON AVENUE IN DIV MPO U‐5853 WILLIAMSON AVENUE) 7 ALAMANCE ELON. WIDEN TO MULTILANES. RIGHT‐OF‐WAY T 4949 DIV BURLINGTON‐GRAHAM URBAN AREA U‐5853 SR 1301 (ST. MARKS CHURCH ROAD / SOUTH 7 ALAMANCE SR 1228 (BOONE STATION DRIVE) IN UTILITIES T 594 DIV BURLINGTON‐GRAHAM URBAN AREA U‐5853 SR 1301 (ST. MARKS CHURCH ROAD / SOUTH 7 ALAMANCE SR 1228 (BOONE STATION DRIVE) IN CONSTRUCTION T 19276 SR 1913 (BENNETT ROAD) IN CHAPEL HILL. DURHAM‐CHAPEL HILL‐CARRBORO CONSTRUCT ROUNDABOUT AND RELATED DIV MPO U‐5854 SR 1008 (MT. CARMEL CHURCH ROAD) 7 ORANGE SAFETY IMPROVEMENTS. RIGHT‐OF‐WAY T 150 DIV DURHAM‐CHAPEL HILL‐CARRBORO U‐5854 SR 1008 (MT. CARMEL CHURCH ROAD) 7 ORANGE SR 1913 (BENNETT ROAD) IN CHAPEL HILL. CONSTRUCTION T 625 MONTLIEU AVENUE FROM NORTH COLLEGE DRIVE TO GREENSBORO ROAD AND GREENSBORO ROAD FROM MONTLIEU AVENUE SR 1471 (MONTLIEU AVENUE) SR 1486 TO I‐74 / US 311 IN HIGH POINT. WIDEN DIV HIGH POINT URBAN AREA MPO U‐5855 (GREENSBORO ROAD) 7 GUILFORD ROADWAY. RIGHT‐OF‐WAY T 1737 DIV HIGH POINT URBAN AREA MPO U‐5855 SR 1471 (MONTLIEU AVENUE) SR 1486 7 GUILFORD MONTLIEU AVENUE FROM NORTH COLLEGE UTILITIES T 208 DIV HIGH POINT URBAN AREA MPO U‐5855 SR 1471 (MONTLIEU AVENUE) SR 1486 7 GUILFORD MONTLIEU AVENUE FROM NORTH COLLEGE CONSTRUCTION T 8107

SR 2142 (MT. WILLEN ROAD‐SALEM CHURCH DIVISION PURCHASE ORDER BURLINGTON‐GRAHAM URBAN AREA ROAD) INTERSECTION. INSTALL TRAFFIC SIGNAL CONTRACT (DPOC) ‐ UNDER MPO W‐4705 NC 54 7 ALAMANCE AND CONSTRUCT TURN LANES ON NC 54. CONSTRUCTION

SR 2422 (MONROETON ROAD) / SR 2426 UNDER CONSTRUCTION ‐ DIVISION (CUNNINGHAM MILL ROAD). WIDEN FOR LEFT PURCHASE ORDER CONTRACT PIEDMONT TRIAD RPO W‐5003 US 158 7 ROCKINGHAM TURN LANES AND INSTALL TRAFFIC SIGNAL. (DPOC) NC 119 INTERSECTION. INSTALL ALL‐WAY STOP BURLINGTON‐GRAHAM URBAN AREA AND CHANNELIZATION, AND IMPROVE SIGHT MPO W‐5011 NC 49 7 ALAMANCE DISTANCE. UNDER CONSTRUCTION

SOUTH OF SR 2111 (EAST HARRELL ROAD) TO SR 4831 (BARTONSHIRE DRIVE) IN OAK RIDGE AND SUMMERFIELD. CONSTRUCT TURN LANES, CLOSE ACCESS TO SR 2029 (WEST HARRELL ROAD), AND RELOCATE SR 2111 INTERSECTION GREENSBORO URBAN AREA MPO W‐5114 NC 68 7 GUILFORD AND PORTION OF SR 2111. UNDER CONSTRUCTION

SR 1110 (ELLISBORO ROAD) SOUTH OF MADISON. FIRST MEDIAN OPENING SOUTH OF INTERSECTION, PROVIDE A LIMITED DIVISION PURCHASE ORDER MOVEMENT CROSSOVER, CONSTRUCT A BULB‐ CONTRACT (POC) ‐ PLANNING / TRN PIEDMONT TRIAD RPO W‐5142 US 220 7 ROCKINGHAM OUT AND UPGRADE TWO LEFT‐TURN LANES. DESIGN IN PROGRESS RIGHT‐OF‐WAY HSIP 20 TRN PIEDMONT TRIAD RPO W‐5142 US 220 7 ROCKINGHAM SR 1110 (ELLISBORO ROAD) SOUTH OF DIVISION PURCHASE ORDER CONSTRUCTION HSIP 525 NORTH OF INTERSECTION WITH SR 1332 (HIGHLAND FARM ROAD). IMPROVE HORIZONTAL ALIGNMENT OF CURVE TO PROVIDE A MINIMUM OF 60 MPH DESIGN TRN TRIANGLE AREA RPO W‐5143 SR 1004 (EFLAND‐ CEDAR GROVE ROAD) 7 ORANGE SPEED. RIGHT OF WAY IN PROGRESS CONSTRUCTION HSIP 325

PIEDMONT TRIAD RPO, BURLINGTON‐ GRAHAM URBAN AREA MPO, DURHAM‐ CHAPEL HILL‐CARRBORO MPO, GREENSBORO URBAN AREA MPO, HIGH DIVISION 7 RUMBLE STRIPS, GUARDRAIL, POINT URBAN AREA MPO, TRIANGLE ALAMANCE, CASWELL, GUILFORD, SAFETY AND LIGHTING IMPROVEMENTS AT DIVISION PURCHASE ORDER AREA RPO W‐5207 VARIOUS 7 ORANGE, ROCKINGHAM SELECTED LOCATIONS. CONTRACT (DPOC) ‐ IN PROGRESS

SR 1129 AT SR 4019 (GROOMETOWN ROAD); NC 62 AT SR 1129 (GROOMETOWN ROAD). HIGH POINT URBAN AREA MPO, REALIGN BOTH INTERSECTIONS AND REMOVE REG GREENSBORO URBAN AREA MPO W‐5305 NC 62; SR 1129 (GROOMETOWN ROAD) 7 GUILFORD ACCESS BETWEEN SR 4019 AND NC 62. RIGHT OF WAY IN PROGRESS CONSTRUCTION HSIP 490

NORTH OF SR 1111 (BYRDS SAWMILL ROAD) TO SOUTH OF SR 1759 (ROSCOE DAMERON ROAD). GEOMETRIC IMPROVEMENTS, PAVED PIEDMONT TRIAD RPO W‐5325 NC 62 7 CASWELL SHOULDERS, AND RESURFACING. UNDER CONSTRUCTION

As of December 2014 15 of 15 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE B-5719 B-5343 DRAFT STIP 220 Eden 700 FY 2015-2025 STI Projects 29 86 770 B-5341 62 311

B-4803 DIVISION 7

B-5352 14 87 119 158 BRIDGES FUNDED THROUGH STI B-5722 CASWELL STATEWIDE AVIATION B-5721 704 R-5704

B-5716 ROCKINGHAM REGIONAL AVIATION Reidsville

DIVISION AVIATION

B-4805 DIVISION FERRY 65 REGIONAL RAIL

B-4964 158 DIVISION RAIL REGIONAL TRANSIT DIVISION TRANSIT 62 B-5715 SAFETY 150 TRANSITION * 68 R-2413B 87 TRANSITION *

29 INTERSTATE MAINTENANCE STATEWIDE HIGHWAY R-5725 86 61 B-5239 B-5354 REGIONAL HIGHWAY B-4958 220 R-2413A U-2525C DIVISON HIGHWAY U-2524D 57 U-5842 B-4953 DIVISION BIKE/PEDESTRIAN I-5110 U-5306B U-2525B EB-5714 INTERSTATE ROUTE B-5346 U-2524BC U-5812 Kernersville P-5204 ORANGE US ROUTE B-5344 U-5851 70 I-5762 I-5712 U-5852 NC ROUTE I-5852 U-5853 U-5843 Greensboro EB-5700 U-5752 Burlington Mebane AV-5711 U-5326 U-5841 U-5844 SECONDARY ROAD I-5711 U-5848 EB-5717 U-4758 EB-5716 I-5836 40 UNDER CONSTRUCTION I-5734 U-5849 I-5812 70 119 40 I-5811 70 EB-5712 U-5754 Graham P-5701 MUNICIPAL BOUNDARIES B-4960 P-5700 B-5717 U-5845 B-5349 85 MILITARY BASE U-3615B I-5790 NCDOT DIVISION BOUNDARY B-5356 40 I-5736 I-5855 62 I-5854 COUNTY BOUNDARY U-5850 I-3306A U-5169 85 WATER FEATURES U-2412A I-5853 R-2612B B-5736 68 U-5855 I-5789 I-5822 High 73 * Note: Reflects 108 of the Major Transition Projects Point B-5730 GUILFORD Note: FY 2015 projects represent major projects not U-5304B 74 87 54 let as of November 2014 I-5821 Chapel B-4956 49 Hill U-5550 ALAMANCE Carrboro U-5846 62 I-5735 421 EB-5721 U-5304D U-5847

U-5304A U-5854 U-5304E U-5774B 15 0 2.5 5 10

Miles