LOOP Loop 360 construction The current Loop In 2016, TxDOT was started in March 360 program takes completed the Loop 360 1962 and completed into account the feasibility study which in December 1982 recommendations from identified and evaluated with the opening of the the feasibility study potential short- and Pennybacker Bridge. by upgrading multiple long-term transportation intersections along solutions for the corridor. the corridor, improving mobility and safety.

LOOP 360 PROGRAM STAY IN THE LOOP LOOP 360 TRAFFIC SUMMARY

Currently takes If nothing93 is Loop 360 from RM 2222 approximately 70% done by 2040: to RM 2244 is ranked longer to travel on Morning peak travel #7 on the 2018 Loop 360 during peak times could further Congestion Index (TCI), periods than during increase by an which measures how free-flow conditions. average of 46%. much longer a trip takes during peak periods vs. Evening peak travel free-flow. times could be nearly double the off peak/ free-flow travel times.

LOOP 360 PROGRAM STAY IN THE LOOP WHAT WE’VE HEARD

Improve mobility and Minimize impacts to safety along Loop 360 the environment for all users

Balance the needs of through Reduce cut-through traffic with local access traffic in neighborhoods

Minimize impacts to the Address delays at community signalized intersections

LOOP 360 PROGRAM STAY IN THE LOOP Pennybacker CHANNEL RD S Bridge A N

D P o t e n t i a l Project Limit Y A GCWA Habitat C R

E LAGUNA LN L Loop 360 N Boat Ramp

ROCKCLIFF RD IN D AUST IFF R TY OF CL CI K C O R

DR Raymond Bluepoint NA James Expern. Games N A Financl. Services P L A Z A O N Y Revionics, R Inc. T H E L A K E A

South Texas Money M Management, Ltd. UV360 WINDY CV Amherst

CITYOF Mitratech CA Technologies !m

Farm Credit Bank of Texas GREEN CLIFFS RD LPST AUSTIN N E COUNTRY L AK Remediation Wastewater E L CLUB W TH O ON L L LAZA !m O !m P R H O ARK C P K C L I F NALLE WOODS F R APARTMENTS D

R A V IN CITY OF AUSTIN E R ID G E T RL

BUNNY RUN Remembrance Gardens CHURCHILL DOWNS DR

P o t e n t i a l CHARLES AVE GCWA H a b i t a t ASCOT CV

!m WESTLAKE DR ARBUTUS CV

R CASSAVA DR K D EOA Riverbend LIV Church

L

O

N

G

Riverbend 360 C B UV H E A L Christian School M A M Q STEEPLECHASE P O U N D A R T CUESTA VERDE V P A R E I R R V K E D R E CITYOF AUSTIN BUNNY RUN D C D R R R P o t e n t i a l E S Castle Hill !m T CEDAR ST Fitness GCWA D Spa Renew H a b i t a t R Realty Austin-Wstlk. Dss. Prs. Cry. AVATAR LN Inspr. Day Spa Bridge Point Vlntns. Elementary School 360 Uno Fac. !m to Fac. Spa !m UBld. DAVENPORT VILLAGE KE DR !m WESTLA F Copeland Jewelers AW CITYOF AUSTIN Maxim Integrated Pink N Lady Lsh. C CPA Global V RE Jad. Rst. C EK SER P VMWare Westbank Dry PAS A CK F T Cleaning U A H Samsung SARC B W N BB&T ATM T R Casa de L Montecristo !m !m

Nrth. Mtl. Spcwrks. Clvst. Sftwr. HPI Real CARRY D Estt. Srv.&Inv. BA AY CK L S DR N TA KE R

LA C

R ST Jack Allen's V D E Kitchen 360

H W K

U E N E T E R BUNNY RUN R R C

W D D O S O O SAN CLEMENTE AT E D O L GREENSHORES DR DAVENPORT D P W E T G Wld. Orc. Sln. E O Ventr. D Welth. Mngm. Mesa Cleanrs. N Intn. 22 Ftn. CITY OF AUSTIN

DR H AC RO L APP 360 ROYA P o t e n t i a l UV BAREFOOT CV GCWA Habitat LOO KOU 3500 WESTLAKE T LN APARTMENTS

CITYOF AUSTIN R

I !m V V Hog Pen Creek CA ALC

A A R D I E V Shell CT R ROBBIN RD E Austin I P o t e n t i a l Gas D R W Java 360 C Station G GCWA Habitat R E E E S R S T L D T A D KE R DR S E B W EA R A O R T T E H R R S E B K A E N A C I K O R CV

B R U D D

N S R N EN Y H E P L R E T B U S A N T T S D N U HILLBILLYLN O R C CITYOF AUSTIN LARION CV W A Y

M P o t e n t i a l Y Project Limit A A K GCWA Habitat W E

R R

CITY OF AUSTIN OF CITY E

W K

A A

Y M Y E A G W BOWDITCH DR ID R Y K O M S UV360

RIVERCREST DR

FRIJOLITA SKISHORES TER !KZ-3 P E P o t e n t i a l A R C GCWA Habitat E R D FAR GAL LANT DR BALCONES Connors Creek CANYONLANDS Municipal Y A EDWARDS PRESERVE LAND LPST W Solid Waste R AQUIFER ULE Remediation D R St. Stephen's BOL CONTRIBUTING ZONE Project Limit Episcopal School C AN ON !m ER O D R STATE LOOP 360 AT ENVIRONMENTAL CONSTRAINTS MAP WESTLAKE DRIVE PROJECT Existing Right of Way Land Use !m Spring Canyon Rimrock/Bluff CSJ: 0113-13-166 City Limits Residential National Hydrography Dataset Potential Golden-cheeked (NHD) Flowline Warbler (GCWA) Habitat ¾5 School Retail/Office National Hydrography Dataset Karst Zone (KZ-#) ¤£183 V! Educational Facility Place of Worship (NHD) Waterbody 1 inch = 300 feet Edwards Aquifer Contributing UV360 Æï Place of Worship Feet UV1 UV275 Cemetery 100 Year Floodplain Zone Other Point of Interest Park, Preserve, Open Space, ¨¦§35 2 City of Austin Wetland ° 0 300 600 (labeled on map) Golf Course Austin ¤£290 Potential Wetland (National cG Potential HazMat Site Industrial Project Location Wetlands Inventory) City/County Park Undeveloped UV111 UV165 360 UV 343 Data Sources: City of Austin, Travis County, United States Fish & Wildlife Service, Texas Commission on Environmental UV Quality, Federal Emergency Management Agency, United States Geological Survey, Nearmap Aerial Imagery (2018) PROGRAM SCHEDULE

183

S S R 360

L BEGIN ENVIRONMENTAL STUDY, 1 DESIGN AND UTILITY WORK BEGIN CONSTRUCTION RM 2018 2019 2020 2021 2022 2023 2024 2025 2026

Westlake Drive MID 2018 EARLY 2022

Emma Long Metropolitan 2222 Spicewood Park Springs Road MID 2018 LATE 2022

Courtyard Drive/ 360 RM 2222 MID 2018 MID 2023 2244 1

RM Lakewood Drive MID 2018 EARLY 2023

Walsh Tarlton Lane LATE 2018 EARLY 2025

Lost Creek 2244 Boulevard/ L A LATE 2020 EARLY 2026 Westbank Drive Wilderness Park

RM 2244 MID 2022 MID 2026 T L 343

ALL DATES ARE SUBJECT TO CHANGE 360 290 71 1 S 290

LOOP 360 PROGRAM STAY IN THE LOOP PROJECT PROCESS

Feasibility Study Environmental Process and Design Utility Construction (1-2 years) (2-4 years) Relocation (2-3 years, COMPLETE (Approximately depending 1 year) on project)

Purpose Environmental Draft Documentation/ Final Environmental and Need Analysis of Public Involvement Documentation Decision Identify the Alternatives The draft environmental Review Either the preferred problem we are Thoroughly analyze document is prepared The final build alternative trying to solve alternatives for and reviewed environmental or the no build potential impacts document alternative is completed

WE ARE HERE STAKEHOLDER OUTREACH

LOOP 360 PROGRAM STAY IN THE LOOP PENNYBACKER BRIDGE The current Loop 360 projects will not impact the Pennybacker Bridge. The bridge will remain intact as built. TxDOT has plans for routine maintenance work on the bridge in summer 2019.

LOOP 360 PROGRAM STAY IN THE LOOP WHAT’S NEW

In September 2018, TxDOT In response to community input, presented three options for some changes have been made to the improvements at Westlake recommended underpass option. Drive to the community. 1 Cedar Street: Added a second left-turn lane from Based on community input, eastbound Cedar Street onto the TxDOT is recommending northbound Loop 360 connector road. moving forward with the underpass option. Westlake Drive: 2 Added a dedicated U-turn lane on the Loop The proposed improvements 360 connector roads in both directions. replace the traffic signals on 3 Added dedicated right-turn lanes to and the Loop 360 mainlanes with from the Loop 360 connector roads and underpasses at Westlake Westlake Drive. Drive and Cedar Street. 4 Added one lane in each direction on Westlake Drive east of Loop 360.

LOOP 360 PROGRAM STAY IN THE LOOP WHAT’S NEW TXDOT PARTNERED WITH AUSTIN TRANSPORTATION, EANES ISD, AND THE SAFE ROUTES TO SCHOOL PROGRAM ON BICYCLE AND PEDESTRIAN IMPROVEMENTS. Share your feedback about the changes.

5 To provide a safe crossing between the east and west sides of Loop 360, a shared-use path (SUP) was added on the Cedar Street bridge.

6 To provide connectivity to Bridge Point Elementary School, the sidewalk was extended on the south side of Cedar Street.

7 To provide connectivity with the Pennybacker Bridge, the SUP was extended on the north end of the project limits.

LOOP 360 PROGRAM STAY IN THE LOOP WHAT’S NEW SEPTEMBER 2018 DESIGN Loop 360 Boat Ramp Area Cedar Street Westlake Drive WESTLAKE DR

CURRENT DESIGN Loop 360 Boat Ramp Area Cedar Street Westlake Drive 4 3 3 2 7 1 5

CEDAR STREET 2 3 3 6 WESTLAKE DR

LEGEND EXISTING MAINLANES AT GRADE PROPOSED SHARED-USE PATH/SIDEWALK RETAINING WALL PROPOSED MAINLANES UNDERPASS PAVEMENT PROPOSED BRIDGE EXISTING RIGHT OF WAY (ROW) PROPOSED CONNECTOR ROAD, CROSS STREET, PROPOSED AUXILIARY LANE RAMP, U-TURNS, AND DRIVEWAY PAVEMENT

LOOP 360 PROGRAM STAY IN THE LOOP CONCEPTUAL LAYOUT UNDERPASS AT WESTLAKE DRIVE AND CEDAR STREET GENERAL DESCRIPTION 1. Existing mainlane signal at Westlake Drive replaced with mainlane underpass with non-signalized U-turns. 2. Existing mainlane signal at Cedar Street replaced with mainlane underpass. 3. Existing median crossovers removed and replaced with U-turn at the southern project limits.

LOOP 360 PROGRAM STAY IN THE LOOP UNDERPASS AT WESTLAKE DRIVE LOOKING NORTH

WESTLAKE DR

LOOP 360 MAINLANES

LOOP 360 NORTHBOUND CONNECTOR ROAD SHARED-USE PATH

LOOP 360 PROGRAM STAY IN THE LOOP UNDERPASS AT CEDAR STREET LOOKING NORTH

CEDAR STREET

LOOP 360 MAINLANES

SHARED-USE PATH LOOP 360 NORTHBOUND CONNECTOR ROAD

LOOP 360 PROGRAM STAY IN THE LOOP CROSS SECTION WITH PLAN VIEW

EXISTING ROW (EAST SIDE) EXISTING ROW (WEST SIDE)

EXISTING CLIFFS

SOUTHBOUND SHARED - SHARED - NORTHBOUND EXISTING ROADBED CONNECTOR ROAD USE PATH USE PATH CONNECTOR ROAD

LOOP 360 LOOP 360 NORTHBOUND MAINLANES SOUTHBOUND MAINLANES

NOT TO SCALE

The new configuration of Loop 360 just CROSS SECTION LOCATED HERE south of Westlake Drive will include free-flow underpass lanes and connector roads with through and turn lanes to Westlake Drive.

LOOP 360 PROGRAM STAY IN THE LOOP SHARE YOUR THOUGHTS WHAT I LIKE WHAT I DON’T LIKE ABOUT THIS CONCEPT ABOUT THIS CONCEPT

LOOP 360 PROGRAM STAY IN THE LOOP HOW CAN I STAY INFORMED? For questions or comments, visit the program website or email the project team.

www www.Loop360Project.com

[email protected]

LOOP 360 PROGRAM STAY IN THE LOOP