W000588 Midland Mainline A5bklt V3.Indd

Total Page:16

File Type:pdf, Size:1020Kb

W000588 Midland Mainline A5bklt V3.Indd Upgrading The Midland Main Line A Remarkable Success Story Britain’s railway is a remarkable success story. It is the fastest growing, the safest and one of the most reliable railways in Europe. However, passenger numbers have doubled since Between now and 2023 the MML will be 1996 and demand is accelerating. Rail freight is electrified, have track and signals modernised, also booming, showing a 70 per cent increase station platforms lengthened, bridges and since the mid-1990s. tunnels remodelled and see new trains with more seating introduced. Building new rail links, increasing capacity as well as line speed and modernising our infrastructure This will deliver capacity and journey time is therefore essential to allow trains to run faster, improvements for passengers whilst creating a more frequently and more reliably on our network. more flexible path for freight traffic and overall a more efficient Midland Main Line. The Midland Main Line (MML) Upgrade Programme re-energises one of Britain’s oldest railways through the biggest programme of improvements to the MML since it was completed in 1870. 2 Who we are Network Rail runs, maintains and develops Britain’s rail tracks, signalling, bridges, tunnels, level crossings and key stations. Including: miles of track train stations (most of which are leased to train operators) bridges and tunnels commercial properties A £40 billion investment programme is currently underway across the UK to deliver modern, efficient rail infrastructure – the largest rail investment and modernisation programme since Victorian times. Two-thirds of this will be invested in renewing and upgrading the railway and will be spent by March 2019. Key facts: • 1 September 2014 – Network Rail was • Network Rail does not operate passenger reclassified as a public sector company, trains. Train Operating Companies such as and became accountable to Parliament East Midlands Trains and Thameslink are among the 23 companies that do • Passenger numbers are forecast to grow 100% by 2041 and freight by 90% over • Network Rail does not set fares: a similar period • There are two types of fares: 1) those regulated by government • The rail industry has three main sources 2) unregulated fares set by Train Operating of funding: Companies • Passengers • Money from fares goes towards running and • Government bodies maintaining the railway – improving journeys, • Rents and track access charges creating jobs and helping to boost the • Over 35,500 staff are employed by economy Network Rail – three-quarters in operating and maintaining the railway 3 The Midland Main Line The Midland Main Line (MML) runs from London St Pancras to Sheffield - serving Luton, Bedford, Kettering, Corby, Leicester, East Midlands Parkway, Derby, Nottingham and Chesterfield. The Midland Main Line serves a diverse set of markets ranging from long distance and commuter travel to leisure passengers visiting Derby, Leicester and Nottingham, as well as London. Comprising: Sheeld Dronfield M1 Chesterfield miles of track tunnels stations Belper M1 (639 km) (between London Long Nottingham St Pancras and Sheffield) Derby Eaton Beeston East Midlands Parkway A1 Loughborough Melton Mowbray Oakham M6 Leicester Toll M69 Corby Market A1(M) Harborough M6 Kettering M1 A14 Wellingborough million increase in rise in the passengers 15 years next 10 Bedford years M40 A1(M) M11 Luton Luton Airport Parkway KEY High-speed services from London St Pancras Limited service M25 Major road London St Pancras The line was built in stages between 1837 and 1870 and became one of England’s first main railway lines. It is the last UK north-south main line to be electrified. Between Derby and Chesterfield are a series of historic structures built for George and Robert Stephenson’s North Midland Railway – classed by Historic England as being of national significance. 4 The Benefits of Electrification Electrification of the Midland Main Line (MML) north of Bedford to Kettering and Corby is scheduled to be completed by 2019; and the line north of Kettering to Leicester, Derby/Nottingham and Sheffield by 2023. Enabling electric trains to operate on the MML will mean: More seats Less track Faster trains maintenance Sheffield Chesterfield Enabling electric trains to operate on the full length of the MML (the section between London St Pancras and Bedford Nottingham was electrified in the 1980’s) will deliver numerous benefits. Trent South This will improve journey times and make services more Phase 2: comfortable and smoother for passengers, as well as cleaner 2023 completion and quieter for people living near the railway. Leicester • More capacity… for passenger and freight traffic will make our railway fit for the future and keep pace with growing demand Corby • Improved reliability… and performance as we modernise Kettering the route using state-of-the-art technology Phase 1: • Longer, faster and quieter trains… and improved 2019 completion journey times Bedford • More environmentally friendly… as greener trains enable our carbon footprint to be reduced by up to 11,000 tonnes – equivalent to the annual greenhouse gas emissions from 1,828 passenger vehicles Borehamwood • Stimulating and supporting economic growth… as we connect the region’s biggest economies Electrification is a vital aspect of Network Rail’s strategy to provide a safe, reliable and efficient railway, fit for the 21st century and beyond. London St Pancras 5 Preparing for Electrification In order to deliver the Midland Main Line upgrade programme a significant construction programme is required. To prepare for electrification, Network Rail may need to make the following changes: As we enhance our infrastructure we also work to minimise our impact on the natural environment. Before any work begins we carry out Strengthen Upgrade Carry out Assess ecological surveys and environmental railway bridges and enhancement footpaths/level impact assessments, where required, tunnels works to bridge embankments crossings and parapets remodel to identify any protected species or nesting birds and relocate them where necessary. Clear lineside Undertake piling Install Overhead vegetation work to install the Line Equipment foundations for structures that will carry overhead lines 6 Overhead Line Equipment The Midland Main Line (MML) will be electrified using a 25kV Overhead Line Equipment (OLE) design. This refers to the wires and supporting posts that distribute electricity at 25,000 volts to power trains. Generally, most types of railway Overhead Line Equipment have overhead conductors with a copper contact wire suspended from a catenary wire by ‘droppers’. The Overhead Line Equipment conductors are suspended from trackside steel masts mounted upon concrete or steel piled foundations which are spaced approximately 40m – 70m along the track (depending upon local terrain). The ‘live’ parts of the equipment are insulated from the steel structures by polymeric insulators. Electricity to power the MML will be drawn from the National Grid high voltage transmission network via four grid access points called ‘feeder stations’ and distributed along its length through 24 substations. We will aim to place new equipment where it will cause the least visual impact. However, this infrastructure will change the appearance of the railway and the surrounding area. 639 single track 12,500 OLE 4 National Grid 24 substations/ kilometres to be masts to be erected supply points distribution points electrified 7 Clearing Vegetation Before electrification, Network Rail will clear lineside vegetation along the route. This is to prevent interference with Overhead Line Equipment (OLE) and reduce the risk of short circuits to parts of the electrified system. Mature vegetation will usually be cleared to a distance of six metres from the railway – whilst a proportion of vegetation will be preserved for its ecological benefits. Unmanaged, overgrown trees and plants can cause serious safety problems as well as train performance issues, such as: Covering up signals or falling onto Stopping our workers finding a safe refuge tracks and overhead power lines when trains are passing and hampering their 1 2 ability to see trains approaching Reducing visibility at level and Autumn leaves falling onto tracks (crushed footpath crossings at 20 tons per square inch form a hard, 3 4 Teflon-like coating) reduce trains’ ability to grip and affect acceleration/braking – leading to delays 8 Minimising the impact of infrastructure Network Rail respects the environment and aims to minimise impact on it. The landscape is taken into account and, where practicable, structures such as substations are sited in less visibly intrusive locations, such as railway cuttings. If we renew fencing we use fencing that is appropriate to the area: Residential – holly green powder Industrial – existing chain link Rural – robust 7-strand wooden post coated palisade fencing (or in some fencing will not be replaced. New and wire with stock netting cases paladin fencing) fencing will be galvanised palisade The Midland Main Line is rich in heritage For example Ambergate Viaduct in Derbyshire and Network Rail has worked with specialist has now been listed as grade 2* indicating its consultants to make sure sensitive historic significance in historic and architectural terms. structures are safeguarded. We work closely with local authorities when Over 1,500 structures have been assessed, designing new infrastructure in areas of resulting in over 40 structures being listed, architectural or cultural significance. upgraded or amended by the Department of Culture, Media and Sport as a result of Historic England’s advice. 9 Working for You Network Rail brings the country together. We own, operate, maintain and invest in Britain’s rail network. Increasingly, we are delivering improved standards of safety, reliability and efficiency – which benefits everyone. Alongside our partners we try to make sure our Network Rail aims to complete work on time with sites are managed responsibly and to minimise minimal disruption and to keep people informed the impact of works on people living close to the of our work. railway. We minimise noise and brief teams on working responsibly in the local community.
Recommended publications
  • Solent to the Midlands Multimodal Freight Strategy – Phase 1
    OFFICIAL SOLENT TO THE MIDLANDS MULTIMODAL FREIGHT STRATEGY – PHASE 1 JUNE 2021 OFFICIAL TABLE OF CONTENTS EXECUTIVE SUMMARY .......................................................................................................................................................................... 4 1. INTRODUCTION TO THE STUDY .......................................................................................................................................................... 9 2. STRATEGIC AND POLICY CONTEXT ................................................................................................................................................... 11 3. THE IMPORTANCE OF THE SOLENT TO THE MIDLANDS ROUTE ........................................................................................................ 28 4. THE ROAD ROUTE ............................................................................................................................................................................. 35 5. THE RAIL ROUTE ............................................................................................................................................................................... 40 6. KEY SECTORS .................................................................................................................................................................................... 50 7. FREIGHT BETWEEN THE SOLENT AND THE MIDLANDS ....................................................................................................................
    [Show full text]
  • Midland Main Line Upgrade Programme Economic Case Department for Transport
    Midland Main Line Upgrade Programme Economic Case Department for Transport 30 August 2017 Midland Main Line Upgrade Programme Economic Case Report OFFICIAL SENSITIVE: COMMERCIAL Notice This document and its contents have been prepared and are intended solely for Department for Transport’s information and use in relation to Midland Main Line Upgrade Programme Business Case. Atkins assumes no responsibility to any other party in respect of or arising out of or in connection with this document and/or its contents. This document has 108 pages including the cover. Document history Job number: 5159267 Document ref: v4.0 Revision Purpose description Originated Checked Reviewed Authorised Date Interim draft for client Rev 1.0 - 18/08/2017 comment Revised draft for client Rev 2.0 18/08/2017 comment Revised draft addressing Rev 3.0 - 22/08/2017 client comment Rev 4.0 Final 30/08/2017 Client signoff Client Department for Transport Project Midland Main Line Upgrade Programme Document title Midland Main Line Upgrade Programme: KO1 Final Business Case Job no. 5159267 Copy no. Document reference Atkins Midland Main Line Upgrade Programme | Version 4.0 | 30 August 2017 | 5159267 2 Midland Main Line Upgrade Programme Economic Case Report OFFICIAL SENSITIVE: COMMERCIAL Table of contents Chapter Pages Executive Summary 7 1. Introduction 12 1.1. Background 12 1.2. Report Structure 13 2. Scope of the Appraisal 14 2.1. Introduction 14 2.2. Scenario Development 14 3. Timetable Development 18 3.1. Overview 18 4. Demand & Revenue Forecasting 26 4.1. Introduction 26 4.2. Forecasting methodology 26 4.3. Appraisal of Benefits 29 4.4.
    [Show full text]
  • Railways List
    A guide and list to a collection of Historic Railway Documents www.railarchive.org.uk to e mail click here December 2017 1 Since July 1971, this private collection of printed railway documents from pre grouping and pre nationalisation railway companies based in the UK; has sought to expand it‟s collection with the aim of obtaining a printed sample from each independent railway company which operated (or obtained it‟s act of parliament and started construction). There were over 1,500 such companies and to date the Rail Archive has sourced samples from over 800 of these companies. Early in 2001 the collection needed to be assessed for insurance purposes to identify a suitable premium. The premium cost was significant enough to warrant a more secure and sustainable future for the collection. In 2002 The Rail Archive was set up with the following objectives: secure an on-going future for the collection in a public institution reduce the insurance premium continue to add to the collection add a private collection of railway photographs from 1970‟s onwards provide a public access facility promote the collection ensure that the collection remains together in perpetuity where practical ensure that sufficient finances were in place to achieve to above objectives The archive is now retained by The Bodleian Library in Oxford to deliver the above objectives. This guide which gives details of paperwork in the collection and a list of railway companies from which material is wanted. The aim is to collect an item of printed paperwork from each UK railway company ever opened.
    [Show full text]
  • Network Rail Completes Major Work on £1.5Billion Midland Main Line Upgrade
    Network Rail completes major work on £1.5billion Midland Main Line Upgrade May 18, 2021 Network Rail has completed the biggest improvements to the Midland Main Line since it was built, meaning more seats, faster journeys and more reliable services for passengers travelling between the East Midlands and London. In the latest stage of the upgrade, teams have carried out vital work to install new overhead line equipment between Bedford and Corby, as well as improvements to station platforms and major work to upgrade bridges on the route – to make way for electrification between London St Pancras International and Corby. All of this work means there will be 50% more seats for passengers travelling at peak times between Corby and London. The new train timetable was introduced last Sunday (16 May), and East Midlands Railway launched its new all-electric service between Corby and London St Pancras International, providing a sixth train per hour. The upgrade, along with the new timetable, also boosts the number of seats on services across the East Midlands and cuts travel time between London and Derby, Leicester, Sheffield and Nottingham. It’s hoped the improvements will take more cars off the roads, as COVID restrictions ease and passengers return to the railway. Electric trains are quieter and much better for the environment that diesel trains. They produce almost 80% less carbon, benefitting people who live and work near the railway. Gary Walsh, Route Director for Network Rail’s East Midlands route, said: “As passengers return to the railway, it’s great to be welcoming them back with the biggest improvements in a generation on the Midland Main Line.
    [Show full text]
  • Railway Upgrade Plan – London North Eastern and East Midlands (LNE&EM)
    Railway Upgrade Plan – London North Eastern and East Midlands (LNE&EM) 2017/18 London North Eastern and East Midlands Glossary CaSL – Cancelled and Significantly Late. This measures how many trains are cancelled or are more than 29 minutes late at their terminating station. MAA – Moving Annual Average. PPM – Public Performance Measure. This is the percentage of trains that arrive at their terminating station within five minutes (for commuter services) or ten minutes (for long distance services) of when they were due. Reduction in railway work complaints measure – We believe that the number of complaints that we receive from the public about our work could be reduced if we improve how we inform people about work due to take place, and ensure all our staff behave considerately towards those living and working close to the railway. Each route is therefore aiming to reduce the number of complaints it receives in the coming year. Right Time Arrival – This measures the percentage of trains arriving at their terminating station early or within 59 seconds of schedule. 16 London North Eastern and East Midlands London North Eastern and East Midlands 17 London North Eastern and East Midlands (LNE&EM) Introduction from the route managing director – Rob McIntosh On LNE&EM, our purpose can be summarised with a simple phrase – we care about our people, we are proud about our work and we are passionate about railways. Each day, we serve around 20 per cent of the UK’s travelling public, with hundreds of commuter and leisure services connecting major cities and conurbations, supporting regional economies up and down the country.
    [Show full text]
  • Yorkshire Rail Campaigner Number 48 – March 2020
    Yorkshire Rail Campaigner Number 48 – March 2020 Yorkshire President: Alan Whitehouse: Vice-Presidents: Mike Crowhurst, Alan Williams & Chris Hyomes Trans-Pennine Upgrade Under Threat! By Mark Parry With the proposed trans-Pennine high speed line being supported, we feared the upgrade of the existing line had been quietly forgotten. Transpennine Express new rolling stock at Manchester Piccadilly–Photo by Robert Pritchard The following is a joint press release from our branch and HADRAG: The Halifax & District Rail Action Group; SHRUG: Stalybridge to Huddersfield Rail Users Group; UCVRSTG: Upper Calder Valley Renaissance Sustainable Transport Group. CAMPAIGNERS in West Yorkshire are extremely concerned about lack of progress by the Government and Network Rail on infrastructure proposals that should deliver improvements for travellers in the next few years, including the TransPennine Route Upgrade (TRU). Three rail user groups and the Yorkshire Branch of Railfuture have written to Andrew Haines, Chief Executive of Network Rail, who was recently been quoted as casting doubt on TRU. In a magazine interview (RAIL 897, 29 Jan’2020) Haines had said the scope of TRU could depend on the high-speed rail proposal “Northern Powerhouse Rail” (NPR). The campaigners say NPR is decades away and will not benefit stations on regional routes that desperately need investment now. Continued overleaf… Railfuture, Yorkshire & North West Joint Branch Meeting This meeting has been postponed because of concerns about the Coronavirus. We will contact members later about alterative arrangements. 1 | Railfuture: Yorkshire Rail Campaigner 4 8 – M a r c h 2020 The campaigners have also written to Secretary of State for Transport Grant Shapps MP, and to the new Chancellor of the Exchequer, Rishi Sunak, calling for urgent, overdue projects to go ahead without further delay.
    [Show full text]
  • Bedford the East West Rail Connection
    Bedford The East West Rail Connection The government and East-West Rail Company are planning new rail services linking Oxford and Cambridge to improve connections between East Anglia and central, southern and western England. Bedford lies at the heart of this route. Cambridge Bedford Bletchley Oxford This leaflet explains the case for east-west rail to directly serve Bedford. We are keen to keep you informed about these plans and hear your views. Find out more over the page Bedford The East-West Rail Connection East-west rail presents a once in a life time opportunity to locate Bedford at the centre of an international and national transport hub. Achieving this will re-establish Bedford on the inter-city network, reversing recent changes and optimizing travel north, south, east and west of Bedford. As a council we recognise the importance of rail and how it can boost the local economy and are calling on the government to support plans for east-west rail through Bedford. The case for east-west rail through central Bedford focuses on three key benefits: 1. Excellent connectivity - locally, nationally and internationally 2. Creating an international business hub 3. Regeneration - boosting jobs and the local economy East-West Rail Company is currently consulting on the future route of the central section of the east-west rail line. Securing east-west rail through Bedford is vital to creating opportunities not only as a key transport hub for both Bedford and the wider national transport network but also in providing key growth and vitality. East-West Rail and International Connectivity East-west rail plans present an excellent opportunity to not only connect the centre of Bedford with Oxford and Cambridge, but also enhance our international connectivity.
    [Show full text]
  • Scottish Railways: Sources
    Scottish Railways: Sources How to use this list of sources This is a list of some of the collections that may provide a useful starting point when researching this subject. It gives the collection reference and a brief description of the kinds of records held in the collections. More detailed lists are available in the searchroom and from our online catalogue. Enquiries should be directed to the Duty Archivist, see contact details at the end of this source list. Beardmore & Co (GUAS Ref: UGD 100) GUAS Ref: UGD 100/1/17/1-2 Locomotive: GA diesel electric locomotive GUAS Ref: UGD 100/1/17/3 Outline and weight diagram diesel electric locomotive Dunbar, A G; Railway Trade Union Collection (GUAS Ref: UGD 47) 1949-67 GUAS Ref: UGD 47/1/6 Dumbarton & Balloch Joint Railway 1897-1909 GUAS Ref: UGD 47/1/3 Dunbar, A G, Railway Trade Union Collection 1869-1890 GUAS Ref: UGD 47/3 Dunbar, A G, Railway Trade Union Collection 1891-1892 GUAS Ref: UGD 47/2 London & North Eastern Railway 1922-49 Mowat, James; Collection (GUAS Ref: UGD 137) GUAS Ref: UGD 137/4/3/2 London & North Western Railway not dated Neilson Reid & Co (GUAS Ref: UGD 10) 1890 North British Locomotive Co (GUAS Ref: UGD 11) GUAS Ref: UGD 11/22/41 Correspondence and costs for L100 contract 1963 Pickering, R Y & Co Ltd (GUAS Ref: UGD 12) not dated Scottish Railway Collection, The (GUAS Ref: UGD 8) Scottish Railways GUAS Ref: UGD 8/10 Airdrie, Coatbridge & Wishaw Junction Railway 1866-67 GUAS Ref: UGD 8/39 Airdrie, Coatbridge & Wishaw Junction Railway 1867 GUAS Ref: UGD 8/40 Airdrie, Coatbridge
    [Show full text]
  • 2005 Great Britain National Rail Passenger Operators Dingwall
    Thurso Wick 2005 Great Britain National Rail Passenger Operators Dingwall Inverness Kyle of Lochalsh Third edition (December 2005) Aberdeen Arriva Trains Wales (Arriva P.L.C.) Mallaig Heathrow Express (BAA) Eurostar (Eurostar (U.K.) Ltd.) First Great Western (First Group P.L.C.) Fort William First Great Western Link (First Group P.L.C.) First ScotRail (First Group P.L.C.) TransPennine Express (First Group P.L.C./Keolis) Hull Trains (G.B. Railways Group/Renaissance Railways) Dundee Oban Crianlarich Great North Eastern (G.N.E.R. Holdings/Sea Containers P.L.C.) Perth Southern (GOVIA) Thameslink (GOVIA) Chiltern Railways (M40 Trains) Cardenden Stirling Kirkcaldy ‘One’ (National Express P.L.C.) North Berwick Balloch Central Trains (National Express P.L.C.) Gourock Milngavie Cumbernauld Gatwick Express (National Express P.L.C.) Bathgate Wemyss Bay Glasgow Drumgelloch Edinburgh Midland Mainline (National Express P.L.C.) Largs Berwick upon Tweed Silverlink Trains (National Express P.L.C.) Neilston East Kilbride Carstairs Ardrossan c2c (National Express P.L.C.) Harbour Lanark Wessex Trains (National Express P.L.C.) Chathill Wagn Railway (National Express P.L.C.) Merseyrail (Ned-Serco) Northern (Ned-Serco) South Eastern Trains (SRA) Island Line (Stagecoach Holdings P.L.C.) South West Trains (Stagecoach Holdings P.L.C.) Virgin CrossCountry (Virgin Rail Group) Virgin West Coast (Virgin Rail Group) Newcastle Stranraer Carlisle Sunderland Hartlepool Bishop Auckland Workington Saltburn Darlington Middlesbrough Whitby Windermere Battersby Scarborough
    [Show full text]
  • Capacity on North-South Main Lines
    Capacity on North-South Main Lines Technical Report Report October 2013 Prepared for: Prepared by: Department for Transport Steer Davies Gleave Click here to enter text. 28-32 Upper Ground London SE1 9PD +44 (0)20 7910 5000 www.steerdaviesgleave.com Technical Report CONTENTS SUMMARY ..................................................................................................... I 1 CREATING THE TIMETABLES THAT DETERMINE CAPACITY PROVISION IS A COMPLEX ISSUE .................................................................................................. 1 2 EUROPEAN COMPARISONS ........................................................................ 5 3 HOW CAPACITY CAN BE MEASURED ............................................................ 7 4 TECHNOLOGICAL ADVANCES ..................................................................... 9 5 CAPACITY AND THE NORTH-SOUTH ROUTES ................................................ 11 West Coast Main Line .............................................................................. 11 Midland Main Line .................................................................................. 13 East Coast Main Line ............................................................................... 14 Route section categorisation: green/orange/red ............................................ 15 FIGURES Figure 5.1 Assessed post-2019 Capacity Pressures on North-South Main Lines 19 Contents Technical Report Summary 1. This note assesses the capacity of the North-South Rail Lines in the UK from the perspective
    [Show full text]
  • Hsuk London Terminal Strategy
    HSUK LONDON TERMINAL STRATEGY In the development of high speed rail systems, the issue of terminal location and onward distribution of passengers assumes almost as much importance as the more obvious question of route. The new lines are designed to carry large volumes of passengers on trains operating at high frequencies, and these factors combine to create major flows arriving at city terminals which must then be efficiently dispersed onto the local public transport networks. This demands full integration of high speed and local systems, with optimised transfer at dedicated and fit-for- purpose terminals. These issues apply at all UK cities where high speed lines are planned, but are most acute in London, where passenger flows are greatest, and congestion in the existing public transport system is most critical. The following diagrams review existing central London connectivity issues, and compare and contrast the London terminal solutions proposed for HS2, and for the alternative High Speed UK proposals. For precise details of the core High Speed UK proposals (as included in the cost estimates), see the ‘200k’ series of plans. LTS1 : LONDON MAIN LINE NETWORK CIRCA 1963 LTS2 : EXISTING CENTRAL LONDON RAIL NETWORK INCLUDING CROSSRAIL SCHEME These diagrams show the rail network of central London, dominated by the classic terminus stations of the Victorian era. These are mostly reliant for onward connectivity upon the Tube network, which tended to form ‘nodes’ around the busier/more important termini. However, the change from main line to Tube is inherently inefficient, with passengers forced to detrain en masse, and with massive congestion occurring especially at rush hours.
    [Show full text]
  • Land Disposal Riverside Car Park Leeds West Yorkshire Form
    Proposed Property Disposal Application by Network Rail Infrastructure Limited to dispose of land in accordance with the Land Disposal Condition of the Network Licence 1. Site Leeds: land within station Riverside car park. Site location and description The site is located at Riverside car park which forms part of Leeds Station in central Leeds, West Yorkshire. Leeds Station is a Network Rail managed station. Riverside car park is situated directly to the west of Leeds Station with the River Aire to the north and west and Princes Exchange car park (PXCP) to the east which adjoins an existing station multi-storey car park (MSCP). The proposed disposal is part of the surface level section of the station long-stay car park. It is surfaced and level and includes 32 no. delineated car parking spaces with associated access. Plans attached: Plan 1: Location Plan with proposed disposal site location shown by the red dot. (all site plans should be in JPEG format, numbered Plan 2: Disposal Plan (Plan number 6520126-2b) showing and should clearly show the proposed disposal land shaded blue colour. sites location approximate to the railway) Plan 3: Disposal Area in relation to PXCP (Plan Number 6520126-4) Plan 4: Land to be used for Platform 0 development where it relates to proposed disposal site and PXCP existing lease. Clearance CR/37504 dated 16th October 2018 Clearance Ref: Project:131080 Project No. 429662 E, 433207 N Ordnance survey coordinates The following photos are attached; Photographs (as required) 1. Site Photograph - view looking north east towards Princes Exchange Car Park 2.
    [Show full text]