Tamaki Drive Transport Safety Improvements

1

March 2012 City Council Actions

• Speed indicator signs • A cycle advance education sign at the intersection of Ngapipi and Tamaki Drive • Installation of clearways and cycle lanes • Installed ramps onto the footpath for ease of access by cyclists • Share the road education campaign • Enforcement activities

2 Aug 11-Dec 11 Jan-July 11 Design, consultation & Delivery of remaining implementation of Okahu minor safety projects Nov-Dec 09 Feb 11 Bay Boat trailer prohibition, including stakeholder Quick wins Safety audit Solent Street Intersection, engagement delivered received Stage 1 Averill Avenue

Feb-Apr 11 July 11 Preliminary Workshop with investigation Local Board 17 Nov 10 Sept 09 Jan-Feb 10 Apr 11 Consultation & Jan 13 and Tragic cyclist Jun-Sept 11 Aug 11-Feb 12 Dec 12-Nov 13 Cliff Road crash Eastern Bays & fatality Site walkover consent subject beyond Quay Street Review previous Lower priority to funding of Transport to decide high Safety & safety actions risk priority work, Business major capital Commencement Committee 20 Nov 10 improvements, designed & of major Resolutions parking removed actions in case preparation works cycle boxes delivered programmes capital works collaboration for RWC with CAA programme

Sept-Jan 2009 Jan-July 2010 Nov-Dec 2010 Jan-July 2011 July-Dec 2011 Jan-July 2012 Aug-Dec 2012 2013-2014

Aug 11 Dec 10 Jan-July 12 Oct-Dec 09 Jan-July 10 May-July 11 Auckland Council Safety Audit Additional Ngapipi Forum & Commissioned preliminary presentation on intersection option working group Medium term Maintenance study agree high actions delivered items delivered longer term priority actions options (Urban Jan-July 11 Investigation & Design Review Feasibility studies Design on Panel) undertaken projects commenced Share the road Education education campaigns campaign delivered

3 Auckland Transport Actions Three workstreams • Safety improvements and safety audit done in collaboration with CAA • Education and enforcement initiatives • Two major projects - Tamaki Ngapipi intersection - Takaparawha Point boardwalk (Kelly Tarlton’s to Millennium Bridge)

4 Safety Improvements • Four car parking spaces removed • Existing road safety audit of the full length of Tamaki • Completed February 2011 with 238 issues identified • Action plan developed and being implemented with following actions completed: - Prohibition boat trailers parking at “The Landing” - Solent Street and Tamaki Drive intersection and; - Averill Avenue improvements (Stage 1) - 44 maintenance items • Remaining fourteen high priority minor capital works for delivery by July 2012, subject to stakeholder engagement

5 Kelly Tarlton’s Safety Improvements • Design principles - Slow speed area for all road users - Improved pedestrian safety and accessibility - Improved cycle amenity through the Kelly Tarlton’s bend - Improve the amenity of the area as a key tourist destination - Incorporate “Tamaki Design Manual” design elements - Close collaboration with Auckland Council and the Tamaki Drive Masterplan

6 Tamaki Drive - Cycle Safety Campaigns

Campaign Start Date End Date Description Check before Nov ‘10 Feb ‘11 Public awareness and trailer owner campaign to outline changes to parking opening your door restrictions Boat Trailer Sept ‘11 Oct ‘11 Boat Trailer - Public awareness and trailer owner campaign to outline Parking Campaign changes to parking restrictions Bunch Cycling Mar ‘11 June ‘12 Bunch Cycling Leader Training aimed at experienced cyclists. Code of Campaign conduct cards developed for cyclists and distributed through cycle clubs and cyclists Share the Road Dec ‘10 On going Campaign is “Equal rights, Equal responsibilities” with primary messages of Campaign “Check before opening door”, “Watch out bikes about”, “Give bikes 1.5m” for motorists, and “Be safe be seen” for cyclists. Be Safe Be Seen May ‘12 June ‘12 The campaign promotes cyclist to wear brighter clothing in the darker Campaign winter months (May/June 2012), so that they are visible to the motorists and other road users. The promotion will include cyclist stations where cyclists on Tamaki Drive can safely stop and get information on cycle safety

7 Longer Term Actions

Takaparawha Point Okahu Bay

Boardwalk Ngapipi and Tamaki Drive

9 Programme Chart Tamaki Drive Safety Improvement Programme Stage 1 Project Name Mar-12 Apr-12 May-12 Jun-12 Jul-12 1 Safety improvements at Tamaki Drive/The Strand intersection. Design Construction Stakeholder Engagement 2 Tamaki Drive / Solent Street Intersection Completed 3 Prohibtion of boat trailer parking in the vicinity of The Landing Parking prohibition completed 4 Tamaki Drive / Watene Intersection Design Construction Stakeholder Engagement 5,6,7 Kelly Tarltons Safety improvements Design Construction Stakeholder Engagement 8,9,10,11, Mission Bay Safety improvements 12 Design Construction Stakeholder Engagement 13 Tamaki Drive / Road intersection Design Construction Stakeholder Engagement 14 Tamaki Drive/ Averill and Stage 1 Complete Stakeholder Engagement complete Construction 15 Tamaki Drive Long Drive/ Auckland Intersection Design Construction Stakeholder Engagement 16,17 Tamaki Goldie and Tamaki Vale, Cliff Road Intersection ( St Heliers improvements) Design Construction Stakeholder Engagement 10 Programme Chart (cont.)

Tamaki Drive Safety Major Capital Works Indicative Programme 2012 2013 2014 2015 2016 Mar -­‐ Jul Jul-­‐ Dec Jan-­‐ June Jul -­‐ Dec Jan-­‐ Jun Jul -­‐ Dec Jan-­‐ Jun Jul -­‐ Dec Jan-­‐ Jun Jul -­‐ Dec NGAPIPI INTERSECTION Investigation - stage 1 Stakeholder Engagement Investigation - stage 2 (SAR) Consents Design Procurement and Construction

TAKAPARAWHA POINT & BOARDWALK Investigation - stage 1 Stakeholder Engagement Investigation - stage 2 (SAR) Consents Design Procurement and Construction

11 Andrew Allen Manager Road Corridor Operations