CURRENT AND VOTER APPROVED SERVICE

P Everett MAP KEY P Mukilteo Link Light Rail

Link (SeaTac/Airport–Westlake/) P South Everett Tacoma Link (Tacoma Dome–Theater District) Under Construction In Design Ash Way P In Planning/ Planned Sounder Everett–Seattle Sounder Lakewood–Tacoma–Seattle Sounder Lynnwood Target opening P Canyon Park P Edmonds date 2023 ST Express Regional Bus Mountlake P Express Bus Service Terrace Woodinville Future Bus Rapid Transit (BRT) P 185th Bothell Supporting Investments P 145th P Park & Ride – Rail Station or Bus Facility Rail Station, Transit Center or Bus Stop Target opening P Northgate Improvements date 2021 Totem Lake First Hill Streetcar (Opens 2016) Roosevelt Kirkland HOV/Transit Improvements Redmond Construction not HOV Direct Access Ramp, Freeway U District currently funded Station or Overpass Target opening SE Redmond Opens 2016 University of date 2023 P Overlake Transit Center Ferry Terminal Amtrak Evergreen Overlake Village Point Sea-Tac Airport P Bel-Red/130th

Opens 2016 Spring District/120th Wilburton Capitol Hill Convention Place Bellevue Transit Center Bellevue Westlake University Street East Main First Hill South Seattle Pioneer Square Bellevue P International District/Chinatown P P South & King Street Eastgate Sammamish Stadium Judkins Park Mercer Target opening Island date 2023 SODO Beacon Hill Issaquah P Mount Baker P Highlands Issaquah Columbia City

Westwood Othello Village Rainier Beach Tukwila/ International Blvd P Renton P Burien Tukwila P SeaTac/Airport

Angle Lake P Opens 2016

Target opening Kent/Des Moines P date 2023

P Kent

Construction not S 272nd/ P currently funded Federal Way

Federal Way P P Auburn Tacoma To Gig Harbor Construction and Purdy not fully funded Theater District/S 9th Commerce Street/S 11th Convention Center/S 15th Tacoma Union Station/S 19th Community S 25th College Puyallup P P P Sumner Tacoma Dome South Tacoma P

Bonney Lake

Lakewood P

DuPont P

2.16 PROJECT OVERVIEW

PUYALLUP STATION ACCESS IMPROVEMENTS PROJECT

• Improvements to Puyallup Station were approved by voters in 2008 as part of the Sound Transit 2 ballot measure to expand mass transit throughout the region • In August 2014, the Sound Transit Board identified a preferred package of access improvements at the Puyallup Station for environmental review and preliminary design • Proposed improvements include a parking garage and surface lot at the current Eagles site, as well as traffic, pedestrian and bicycle improvements • Improving easy and reliable access to the station will be necessary as ridership and service increases 167 • Average daily ridership on the south Sounder line is expected to increase by more than 13,000 by 2035 2

161 n d 7

t S h t N 4

N W S t h S

t N M e r i W 5 t t

N d h i W

a

5th Ave NE S t n N E

Additional surface lot (98 stalls) Eagles Site: Existing leased parking (68 stalls) 4th Av e NW 3rd Ave NW W P Stewa P rt Ave New garage P (503 stalls) 2nd Ave NE 2nd Ave NW 2nd Ave NW P P S W Main Ave W Main Ave Puyallup Existing parking (364 stalls) High School W Meeker S 2 7 4 5 3 6

n t t h t h r t h W Pioneer Ave M W Pioneer Ave h d d

3

S e S S S S S r r i t t t t t S d t S

S W S W S W d i S

S t W W a W n

S E

4th Ave SW 5th Ave SW 5 t h S t S W KEY Red Lot: Existing station area Existing leased 7th Ave SW P P Existing parking parking P Proposed garage (219 stalls) P Proposed surfacing parking W Stew art Av N e Optional pedestrian bridge

9th Ave SW W Pioneer Ave Not shown: additional non-motorized improvements Puyallup Fairgrounds

2.16 HOW WILL THE PROJECT IMPROVE STATION ACCESS FOR DRIVERS? PUYALLUP STATION ACCESS IMPROVEMENTS PROJECT

• Proposed 5-level parking garage (at the current Eagles site) would provide 503 parking spaces • 98 additional surface parking spaces proposed near the Eagles site

Before

Conceptual

After - Conceptual drawing (for discussion only)

2.16 HOW WILL THE PROJECT IMPROVE STATION ACCESS FOR PEDESTRIANS AND BICYCLISTS? PUYALLUP STATION ACCESS IMPROVEMENTS PROJECT

Sound Transit is working with city staff to identify improvements that will make it easier for people who walk and bike to the station. Sound Transit is also evaluating optional pedestrian bridges across 5th Street NW and the railroad tracks.

Potential improvements • New or improved • Sidewalk improvements crosswalks • Curb ramps • Flashing beacons with arrows • New bike storage • New bike lanes

Examples of a pedestrian crossing

2.16 WHAT IS A SEPA CHECKLIST?

PUYALLUP STATION ACCESS IMPROVEMENTS PROJECT

A State Environmental Policy Act (SEPA) checklist is an environmental evaluation that studies potential impacts and benefits of a project.

The following categories were studied*:

• Aesthetics • Air • Animals - includes Endangered Species Act • Coordination with local transit • Earth • Energy and natural resources • Environmental health – includes hazardous materials and noise • Historic and cultural preservation • Housing • Land and shoreline use • Light and glare • Recreation • Plants • Public services • Transportation – requires traffic improvements • Utilities • Water

* The project also complied with National Environmental Policy Act (NEPA) evaluation requirements. 2.16 PROPOSED TRAFFIC IMPROVEMENTS

PUYALLUP STATION ACCESS IMPROVEMENTS PROJECT t • A full traffic signal is

t

planned at 7th Street NW t

t t

and W Stewart Ave to e t e t a

improve traffic flow

ull tac nal n

• An additional right-turn opoe ale uace lot t tun lane onto ean lane is planned on e tea W Stewart Ave for traffic P t e opoe ale aae n e traveling onto southbound n e uallup taton N Meridian an e uallup cool eee n t t t onee e

t t t t t

N t e t e t t e ot t e P

2.16

Sound Transit plans, builds and operates regional transit systems and services to improve mobility for Cetntr al Peu get Sound. PROJECT COST

PUYALLUP STATION ACCESS IMPROVEMENTS PROJECT

$70.0M $6M

$60.0M $3.7M $3.4M $2.1M ST2 estimate $54.5M $50.0M $2.5M (2014 dollars)

Top garage level $4.4 M $40.0M

$30.0M $51M

$20.0M

$10.0M

$0.0 Total $68.7M

KEY

Garage and surface parking Bike/pedestrian station access SR 410/Traffic Avenue bike/ Pedestrian bridge across pedestrian improvements 5th St NW Traffic improvements Pedestrian bridge across railroad tracks

The Sound Transit Board may choose to defer or eliminate certain project elements.

2.16 PROJECT SCHEDULE

PUYALLUP STATION ACCESS IMPROVEMENTS PROJECT

WE ARE HERE

S C E P C P E E O

ulc noleent

S S at ultoal oa ente epae enonental ue tate nonental oun ant elect acce altenate peee pacae ocuentaton olc ct Ceclt poect to e ult eelope o poeent o pulc ee an ot open oue

M Coent peo

2.16 HOW CAN YOU STAY INVOLVED?

PUYALLUP STATION ACCESS IMPROVEMENTS PROJECT

In spring 2016, Sound Transit will select a project to be built. The project will enter preliminary engineering, then final design. Between now and construction, Sound Transit will: • Continue developing station design Stay tuned for future • Identify architectural elements opportunities in 2016 • Finalize non-motorized improvements to provide design input.

• Continue partnering with City of Puyallup staff Sign up for project email updates at: soundtransit.org/subscribe • Coordinate with private property owners

• Conduct field work

• Coordinate permits

• Define the construction schedule and methods

2.16