Investment opportunities of Nur-Sultan in the field of sports Advantages of the capital in numbers

Fast growing market Population of Nur-Sultan, at the beginning of the year, thousand people Annual growth 1031 rate 6.5% 853 743 605

Since 2009, the birth rate 714 852 has increased from 5 to 64 years 2 times

2009 2012 2015 2018

Solvency of the population Average monthly salary at the beginning of the year, KZT 237 538 2nd place in the country 189 970 on the expense for sports 148 287 and recreation more than 98 864 34 billion KZT per year

2009 2012 2015 2018

2 Market capacity

Involvement in sports For 2018 29% 673 sports and mass events

99 605 participants 307 841 people 738 069 spectators

719 Need 6 820 m2 sports facilities of sports facilities and constructions

3 Fitness clubs of the capital and places for doing sports

Number of fitness clubs in the districts

More than 100 fitness clubs B - 10 C - 10 class А - 17 class B - 46 class C - 44 А-2 B–5 C-5 А - 5 B - 11 C - 14 About 8 thousand people per one fitness club

А - 10 B - 20 C - 15

11 parks, 6 boulevards, 100 squares, Esil district Almaty district a total area of – 612 hectares Baikonur district Saryarka district

4 Main sports facilities

“Alau” “Saryarka”

Capacity 8 000 people. Capacity 9 270 people. with indoor arena, gym and Cycle track with indoor arena, gym, administrative building. swimming pools and administrative building.

“Barys Arena” “Alatau”

Capacity 11 626 people. Capacity 2 500 people. Multifunctional ice palace with indoor Sports palace with gym, swimming pool arena, gym, swimming pool and and administrative building. administrative building.

“Astana Arena” “Palace of martial arts”

Capacity 30 000 people. Capacity 5 000 people. Football stadium with retractable roof, Palace of sports with multifunctional gym and administrative building. sports arena, commentary boxes, area judicial board and administrative building.

5 State support measures 42.99

Land plots, buildings and structures, machinery and equipment of other engineering not Construction structures Full-scale grants ownership, etc. ! Market value of full-scale grant is not more than 30 % 93.11 of the total investment included other groups in Activity GCEA Code GCEA

Tax benefits of sports facilities VAT on imports of raw materials and equipment - 0%

Exemption from Customs duty 0% until 5 years for import: customs – technological equipment and its components; duties – spare parts, raw materials and material.

Business Road map 1. Subsidized interest rates; 2020 2. Loan guarantee; 3. Infrastructure laying.

6 International experience

Off-budget Budget Mixed financing financing Commercial: Direct : sponsorship, sale of tickets for sports events, sale of republican, regional, local financing rights to TV and radio broadcasts, merchandising Indirect : Public-private preferential financing, subsidies, partnership Noncommercial: charity, patronage preferential taxation or tax exemption

Stadium "Emirates" Stadium "Gazprom Arena" Stadium "Velodrome de Marselle " London, England Saint Petersburg, Russia Marseille, France

7 Possible projects Ice arena

Area: 3 600 – 4 000 m2 Approximate cost of the project: not less than 450 million KZT

Complex provides an air-supported building with a size of 40x70 m. rink field size of 26x56 m. four locker rooms for athletes with bathrooms and showers, room for placement of point of hire of skates and equipment. Indoor ice rink will provide an opportunity for training and competitive process of students of youth sports schools and development of hockey, figure skating, short track and organize sports clubs and societies for all age groups of amateurs.

8 Possible projects

Football arena

Area: 3 600 – 4 000 m2 Approximate cost of the project: not less than 200 million KZT

Indoor football arena with artificial turf that meets UEFA standards. Facility will meet the needs of residents of the city in football and mini-football classes all year round. There are mini-football field and administrative building with shower room, locker room and administrative area on the territory of the arena.

Example Standard FIFA field size is 25x42 m.

9 Possible projects

Dry slope

Area: 1,5 - 2 ha Approximate cost of the project: not less than 300 million KZT

Dry (artificial) ski slope is a slope that simulates characteristic properties using materials that are stable at room temperature, allowing people to ski, as well as snowboard or tubing in places where natural snow-covered slopes are uncomfortable or inaccessible.

10 Possible projects

Racing track

Race track is a plot of location equipped for specialized events in the field of auto-moto sports. Auto-moto sport is a category of technical sports in which people compete in the speed of passing the track on cars (prototype, car, motorcycle, truck, sport utility vehicle and etc.). Currently, there are many different subspecies of motorsport, each of which has its own rules and regulations. Implementation of the project contributes to the development of tourism, activation of auto/motorsport, which will allow athletes to reach the international level, improve driving skills, conduct classes on counter-driving and, as a result, reduce mortality and accidents on the roads, etc.

Area: from 15 ha Approximate cost of the project: not less than 1 billion KZT

11 Possible projects

Climbing wall Area: 1 500 – 2 500 m2 Surface area of climbing walls– about 1 000 m2 Premise height– 20 m Approximate cost of the project: not less than 250 million KZT

Full sports climbing wall with entertainment systems, open to all comers. All types of rock climbing: track speed — standard column, ten tracks on the difficulty with a good angle, slope, relief, bouldering plus rope town. Rock climbing is a dynamically developing type of sport. In 2010, it was recognized as an Olympic. In 2016, International Olympic Committee decided to include rock climbing in the program of the next summer Games in Tokyo. There is the only climbing wall in Almaty throughout that meets all international requirements. For today, rock climbing in Nur-Sultan is only in its infancy, and therefore the construction of a specialized sports center is not only a necessity, but also due to the lack of competition - a profitable business niche of the city.

12 Possible projects

Cyber sports arena

Area: 2 000 – 3 000 m2 Approximate cost of the project: not less than 500 million KZT

Multifunctional entertainment complex of game theme equipped with advanced equipment, which is designed to meet the needs of real gamers. Soundproof booths for players, professional sound and light and the ability to hold tournaments of international level. Cyber sport is a competition in the virtual space, where the game is an interaction of objects of control, providing equal conditions for competitions between a person and a person or a team with a team.

13 WE ARE READY TO COOPERATE

www.investinastana.kz

[email protected]

https://www.facebook.com/astanainvest/

+7 (7172) 64-72-01

R. Koshkarbayev Ave., №1/2, 3rd floor