Fy 2015-16 191

Total Page:16

File Type:pdf, Size:1020Kb

Fy 2015-16 191 POWER DEVELOPMENT IN ANDHRA PRADESH (STATISTICS) 2015-16 TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED CONTENTS Sl No Table No Particulars Page No 1 SALIENT FEATURES 1-3 POWER DEVELOPMENT-PLAN-WISE 2.1 Progress under Five year Plans-Generation 4 2.2 Progress under Five year Plans-Transmission & Distribution 5 2 2.3 Progress under Five year Plans-Rural Electrification 6 2.4 Progress under Five year Plans-Fixed Assets and Revenue 7 2.5 Outlays on power development in A.P 8 SIXTH AND SEVENTH FIVE YEAR PLANS 3.1 Achievements in Sixth Five Year Plan-Financial (1980-81 to 84-85) 9 3 3.2 Achievements in Sixth Five Year Plan-Physical (1980-81 to 1984-85) 10-11 3.3 Achievements in Seventh Five Year Plan-Financial (1985-86 to1989-90) 12 3.4 Achievements in Seventh Five Year Plan-Physical (1985-86 to 1989-90) 13-14 ANNUAL PLANS 1990-91 & 1991-92 AND EIGHTH FIVE YEAR PLAN (1992 -97) 4.1 Annual Plan 1990-91 (Financial) 15 4.2 Targets & Achievements in 1990-91 & 91-92 (Physical) 16 4 4.3 Annual Plan 1991-92 (Financial) 17 4.4 Achievement in Eighth Five Year Plan-Financial (1992-93 to 1996-97) 18-20 4.5 Achievements in Eighth Five Year Plan-Physical (1992-93 to 1996-97) 21-22 NINTH (1997-2002),TENTH(2002-2007) AND ELEVENTH (2007-2012)&TWELFTH FIVE YEAR PLANS 5.1 Achievements In Ninth Five Year Plan -Financial (1997-98 To 2001-02) 23-24 5.2 Achievements in Ninth Five Year Plan - Physical. 25-26 5.3 Achievements in Tenth Five Year Plan -Financial (2002-03 To 2006-07). APTRANSCO 27 5.4 Achievements in Tenth Five Year Plan - Physical 28 5.5 Capacity Additions For 10th Plan (2002-2007) 29 5 5.6 Capacity Additions/ Achivements/ Programme for 11th plan period (2007-08 to 2011-12) 30 5.7 Achievements in 11th Five Year Plan - Physical 31 5.8 Achievements in 11th Five Year Plan -Financial (2007-08 To 2011-12). APTRANSCO 32 5.9 Proposed Capacity Additions in 12 th Plan Period 33 5.10 Achievements in 12th Five Year Plan - Physical 34 5.11 Achievements in 12th Five Year Plan - Financial AP TRANSCO 35 A.P.GENCO GENERATION 6.1 Pattern of Installed Capacity and Power Generation-Andhra Pradesh 36-37 6.2 A.P.Progress in Installed Capacity-(1960-2014) 38-39 6.3 Installed Capacity & Net Generation during 2015-16 40 6.4(A) Commissioning dates of Generating Units in State Sector 41 6.4(B) Commissioning dates of Generating Units in Joint & Central Sector 42 6 6.4 (C) Commissioning dates of Generating Units in private sector 43-52 6.5 Station-wise Generation-Thermal (1971-72 to 2015-16) 53-54 6.6 Station-wise Generation-Hydel (1971-72) To 2015-16) 55 6.7 APSEB Generation, Purchase, Import & Export of Energy 56-57 6 CONTENTS Sl No Table No Particulars Page No 6.8 APSEB Sale of Energy and Line Losses (1972-1999) 58 6.9 Performance of Vijayawada Thermal Power Station 59 6.10 Performance of Nellore Thermal Power Station 60 6.11 Performance of Rayalaseema Thermal Power Station 61 6.12 Performance of Thermal Units since commissioning (1965-66 to 2015-16) 62-68 6.13 Thermal Power Stations-Fuel Particulars (1983-2016) 69-71 6.14 Hydel Reservoir Particulars 72 6 6.15 Year-wise storage and inflows (1983-2016) 73-74 6.16(A) Generation Schemes cleared and ready for execution as on 31.03.2016 75 6.16(B) Generation Schemes pending clearance as on 31.03.2016 76 6.17 Power Projects under construction progress as on 31.03.2016 77 6.18. Schemes under investigation as on 31.03.2016 78 6.19 Estimated potential & Harnessed in Renewable Energy sources As on 31.03.2016 79 TRANSMISSION & DISTRIBUTION 7.0 Commissioning dates of E.H.V.Sub-stations. 80-85 7.1 EHV Sub-stations commissioned during 2015-16 86 7.2 33/11 KV Sub-stations commissioned during 2015-16 87-88 7.3(A&B) 33 KV shunt capacitor Banks commissioned during 2015-16 89 7.3 © 33 KV shunt capacitor Banks commissioned from 1984-85 to 2015-16 90 7.4 Augmentation of Transformer capacity at EHV Sub-stations in 2015-16 91-92 7.5 Sub-stations District-wise as on 31.03.2016 93 7.6 EHV lines commissioned during 2015-16 94 7.7 Inter-State Transmission(energy) during 2015-16 95-96 7.8(A) AP TRANSCO Purchases of Energy 97-98 7 7.8(B) AP TRANSCO Sale of Energy and System losses 99 7.8(C) AP TRANSCO Energy Balance Sheet for 2015-16 100 7.9 Category-wise services as on 31.03.2016 (Excluding RESCO's) 101 7.9(A) Category-wise services as on 31.03.2016 (RESCOs) 102 7.9(B) Category-wise services as on 31.03.2016 (Including RESCO's) 103 7.10 Inter State Transmission lines 104 7.11 Growth of Consumers and connected load (1975 to 2016) 104-109 7.12 Lines and Sub-stations-Year wise (1960-2016) 110-111 7.13 Lines and Distribution Transformers as on 31.03.2016 112 7.14 Power Restrictions (1977-2016) 113-115 7.15 Theft of Energy (2001-2016) 116-117 CONTENTS Sl No Table No Particulars Page No RURAL ELECTRIFICATION 8.1 Rural Electrification as on 31.3.2016 118 Hamlets, Dalit Wadas and Weaker Section Colonies (District-wise) electrified as on 8.2 119 31.03.2016 Villages Electrified with SPV Panels-Replacement by conventional lines-District wise As on 8.3 120 31.03.2016 8.4 Agricultural Pumpsets energised (District-wise) as on 31.03.2016 121 8 8.5 Energisation of Agricultural PumpsetsYear Wise (1961-2016) 122 8.6 REC Schemes as on 31.03.2016 123 8.7 REC Schemes-Achievements (Physical) as on 31.03.2016 124 8.8 REC Schemes-Loans sanctioned/Released (category wise) 124 8.9 Accidents (1983-2016) 125 FINANCE 9.1 Pattern of Financing 126-128 9.2 Abstract Balance Sheet as on 31.03.2016 129-130 9.3 Revenue Receipts & Expenditure 131-133 9.4 Percentage of Income and Expenditure (1983-84 to 2015-16) 134-136 9.5(A) Cost per unit sold at various voltages (2015-16) 137 9.5(B) Average Revenue Realisation (2015-16) 138 9.6 Cost of Coal as on 31.03.2016(A.P.Genco) 139 9 9.7 Cost of Oil as on 31.3.2016(A.P.Genco) 139 9.8 Rates of power purchase 140-151 9.9 Revenue from sale of Power (1983-84 to 2015-16) 152 9.10 Sale of Energy Category wise (1970-71 to 2015-16) 153 9.10(A) Sale of Energy Category-wise, Annual Growth Rates (2015-16) 154 9.11 Pattern of Electricity consumption (%) 155 9.12 Arrears of Revenue (1982 to 2016) 156 9.13 Electricity Tariff (2015-16) 157-159 PERSONNEL 10.1 Cadre Strength in APTRANSCO/A.P.Genco 160-161 10 10.2 Man Power Details in APTRANSCO/A.P.Genco 162-164 10.3 Details of Other than Workmen in APTRANSCO/A.P.Genco 165 10.4 Details of Other than Workmen in DISCOMs 166 ALL INDIA STATISTICS 11.1 Region wise Installed Capacity of utilities 167 11.2 Transmission and Distribution losses (%) 168 11.3 Thermal Stations-Plant Load Factor 169 11 11.4 Growth of Transmission sector 170 11.5 Progress in Rural Electrification-All India 171 11.6 Peak Demand and Deficit 172 11.7 Power Supply and Shortages 173 CONTENTS Sl No Table No Particulars Page No 11.8 Mode wise Gross Electricity Generation 174-475 11.9 World Per Capita Consumption 176 11.10 World Electricity losses 177 APPENDIX I System Demand and Load Factors of Grid for 2015-16 178 II Growth of Max Demand and Energy Since Formation of AP Grid 179 III Length of 11kV and LT lines and Sale of Power Per KM of Length 180 IV Sub-Station wie PTR capacity and MVA 181 V Voltage wise PTR capacity and MVA 182 VI Distribution Transformers Capacity and MVA 183 VII Distribution Transformers and LT Sales per KVA since formation of AP Grid 184 12 VIII L.T. and H.T. Services and connected load from 1-4-2013 to 31-03-2016 185-187 IX Category wise Services as on 31-3-2016 (Incl Rescos) 188 X Discom wise Energy Sales (MU) during 2015-16 189 XI Percapita consumption All figures in Kwh (Units) 190 XII Scheme wise Capital Outlay for Transco for FY 2015-16 191 XIII Consolidated Balance Sheet for the year FY 2015-16 192 XIV Consolidated Profit and Loss Account for the year FY 2015-16 193 XV Net Revenue and Appropriation account (T & D) for 2015-16 194 ABBREVIATIONS 195 GRAPHS 1 Growth of Installed capacity & Demand & Load factors (1975-2016) - A.P 79A 2 Progress in Installed Capacity-A.P. 79B 3 Energy Generation (1960-2016) - A.P. 79C 4 APTRANSCO Energy Balance sheet for the year 2015-16 117A 5 Electrification of Hamlets, Towns & Villages, Dalitwadas (1974-2016) A.P. 125A 6 Agricultural Pumpsets in Service (1961-2016) - A.P. 125B 7 Pumpsets Energised All India State wise & year wise. 173A 1. SALIENT FEATURES SALIENT FEATURES OF APTRANSCO, APGENCO, and DISCOMs as on 31.03.2016 As on As on Achievement in S.No. I t e m Unit 31-03-2015 31-03-2016 2015-16 1.
Recommended publications
  • Incentives Ready to Release for the Year 2014-15
    2014-15 CONS.PROCEEDINGS - RTGS RETURNED / MIS-SENT/TO BE RELEASED CASES - READY TO RELEASE Sl.No. District Name and location of the Industry Amount in Rs. 1 Kurnool M/s Aiswaraya cottons (Tmc Unit) 2041084 Sy.No.348, Market Committee, Adoni(M) 2 Kurnool M/s Aiswaraya cottons (Tmc Unit) 1806630 Sy.No.348, Market Committee, Adoni(M) 3 Kurnool M/s Star Nio Chem Pvt.,Ltd., IE, 349330 Madhavaram Road, Adoni(M) 4 Kurnool M/s Bhavana Plastic Industries, 222440 Sy.No.275/11, Udumulapadu(v) Dhone(M) 5 Kurnool M/s Bhavana Plastic Industries, 24559 Sy.No.275/11, Udumulapadu(v) Dhone(M) 6 Kurnool M/s Sri Thirumala Venkataramana 8500 Inds., Sy.No.23/C1, Buganapalli(v) Bethamcherla(M) 7 Kurnool M/s Uma Maheswara Plastic Industries, 6595 Sy.No. 371/3, U.Kothapalli, Dhone(M) 8 Kurnool M/s Gayathri Granites Stona, Sy.No.235- 78620 11, Udumulapadu(v) Dhone(M) 9 Kurnool M/s Gayathri Granites Stona, Sy.No.235- 170630 11, Udumulapadu(v) Dhone(M) 10 Kurnool M/s Brundavan Granite Stones, 67940 Sy.No.275-11, Udumulapadu(v) Dhone(M) 11 Kurnool M/s Brundavan Granite Stones, 34580 Sy.No.275-11, Udumulapadu(v) Dhone(M) 12 Kurnool M/s Vivekananda Granites, 39010 Sy.No.567/3C-2-A-1&2, Dharmavaram 13 Kurnool M/s Vivekananda Granites, 44370 Sy.No.567/3C-2-A-1&2, Dharmavaram 14 Kurnool M/s Sri Ganamaddileti Swamy 39430 Pulverizers, Sy.No.215/2, Enakodla(v) Banaganapalli(M) Kurnool (District) 15 Kurnool M/s Sri Ganamaddileti Swamy 466177 Pulverizers, Sy.No.215/2, Enakodla(v) Banaganapalli(M) Kurnool (District) 16 Kurnool M/s Sri Ganamaddileti Swamy 287420 Pulverizers, Sy.No.215/2, Enakodla(v) Banaganapalli(M) Kurnool (District) 17 Kurnool M/s Sri Ganamaddileti Swamy 99570 Pulverizers, Sy.No.215/2, Enakodla(v) Banaganapalli(M) Kurnool (District) 18 Kurnool M/s Adi Lakshmi Inds, Plot.No.63, Indl.
    [Show full text]
  • MAP:East Godavari(Andhra Pradesh)
    81°0'0"E 81°10'0"E 81°20'0"E 81°30'0"E 81°40'0"E 81°50'0"E 82°0'0"E 82°10'0"E 82°20'0"E 82°30'0"E EAST GODAVARI DISTRICT GEOGRAPHICAL AREA (ANDHRA PRADESH) 47 MALKANGIRI SH Towards Sileru 18°0'0"N 18°0'0"N IR (EXCLUDING: AREA ALREADY AUTHORISED) ERVO I RES AY AR NK DO MALKANGIRI V IS H KEY MAP A K H A P A T N A M M Towards Polluru CA-02 A CA-01 M M ± A CA-07 H CA-35 CA-34 K V CA-60 I CA-03 CA-57 CA-58 S CA-33 CA-59 H CA-04 CA-57 CA-37 CA-36 AKH 17°50'0"N CA-32 CA-56 17°50'0"N CA-31 CA-55 CA-05 CA-38 CA-55 CA-39 AP CA-06 CA-30 CA-53 CA-54 CA-40 CA-39 A CA-07 CA-29 CA-41 CA-51 T CA-08 CA-41 T NAM CA-07 CA-28 CA-51 oward CA-42 CA-52 CA-27 CA-51 CA-09 CA-26 CA-44 CA-44 CA-25 s Tu T CA-10 CA-11 CA-43 CA-45 CA-46 o L lasipaka w W CA-24 A ar E CA-12 CA-23 S NG T CA-13 E d G CA-47 CA-22 B s O CA-48 D CA-21 F K A CA-14 CA-50 O V CA-20 o A R CA-49 Y.
    [Show full text]
  • Andhra Pradesh Pharmacy Council--Dispatch List Date
    ANDHRA PRADESH PHARMACY COUNCIL--DISPATCH LIST DATE 21.05.2021 - 24.05.2021 -31.05.2021 S.NO DESTINATION PINCODE BARCODE CANDIDATE NAME ADDRESS REMARKS 1 West Godavari 534112 RN712294181IN S Vasavi Lakshmi Dubacherla 25115 2 West Godavari 534301 RN712294195IN Barla Geetha Satya Sree Settipeta 25262 3 West Godavari 534001 RN712294204IN Sathi Tejasree Eluru 25113 4 East Godavari 533001 RN712294218IN Chanda Prathima Sowjanya Kakinada 24616 5 Visakhapatnam 531035 RN712294221IN Chappa Hymavathi Tavvavanipalem 24575 6 East Godavari 533468 RN712294235IN S Surya Tejasree Gollapalem 25253 7 West Godavari 534101 RN712294249IN P Ramya Sri Prasanna Tadepalligudem 24535 8 East Godavari 533217 RN712294252IN M Manohar Allavaram 24468 9 West Godavari 534202 RN712294266IN N Rishi Sai Kiran Bhimavaram 25195 10 Visakhapatnam 531173 RN712294270IN Immadi Pavani Neelakantapuram 24571 11 West Godavari 534123 RN712294283IN Juttuga Tejaswi Devathallapalem 24532 12 West Godavari 534176 RN712294297IN Chapala Swetha Pothavaram 24544 13 East Godavari 533255 RN712294306IN Lanka Anusha Kothuru 25273 14 West Godavari 534301 RN712294310IN Edupuganti Mounika Nidadavolu 25264 15 Srikakulam 532215 RN712294323IN Madugula Lizi Meliaputti 25254 16 Visakhapatnam 531127 RN712294337IN S Venkata Gayathri Satyavaram 25252 17 West Godavari 534411 RN712294345IN M Phani Raja Kumar Peddavelamilli 24614 18 Visakhapatnam 530002 RN712294354IN Dokula Keerthi Shivani Angatidibba 25133 19 West Godavari 534245 RN712294368IN N Ribca Rani Veeravasaram 25083 20 Visakhapatnam 530026 RN712294371IN
    [Show full text]
  • Senirority List of Sr.Assts 06.2015.Xlsx
    Proceedings of the Chief Executive Officer, Zilla Praja Parishad, E.G., Kakinada Present: Smt. K.PADMA., M.Gom., 19.06.2015 Rc.No.D2l 2661 12015, Dated: Sub:- Establishment - Ministerial - Zilla Praja Parishad, East Godavari, Kakinada - preparation of Provisional Seniority list of Senior Assistants - call for objections - communication - Regarding. Ref :- 1.Rule 33 of A.P State and Subordinate Service Rules, 1996 2.Earlier confirmed Seniority list of Senior Assistants communicated vide Rc. No. D21342812010. Dated 22.10.2010' ### ORDER: The Seniority list of Senior Assistants appointed on promotion under Rule 10(a) of AP State and Subordinate Service Rules from the feeder category of Junior Assistants and Typists in Zilla Praja parishad, East Godavari up to Panel year 2010-2011 has been confirmed and communicated to the concerned individuals vide reference 2nd cited. Now, the Senior Assistants who were appointed on promotion under said rule subsequent panels i.e 2010-11 to 2014-15 are added as per order ananged service, in the panels in to the Seniority list and the names of those Senior Assistants who retired from expired, promoted to the next category as the case may be deleted from the Seniority list' The provisional Seniority list now drawn is hereby communicated to all the individuals concerned. ihe concemed individuals are informed that if anybody wish to prefer an objection with to their seniority fixed in the list now communicated shall submit his/her objection in writing provisional list to the "gjrdatJng witn recorded evidence, if any, within 15 days from the date of issue of this from Sl.
    [Show full text]
  • Not Applicable for IOC/HPC
    APPOINTMENT OF RETAIL OUTLET DEALERSHIPS IN AP BY IOC Location Sl. Name Of Location Revenue District Type of RO Estimated Category Type of Site Minimum Minimum Minimum Estimated Estimated Mode of Fixed Fee / Security No. (Not (Regular/Rur monthly (CC/DC/CFS) Frontage of Depth of Site Area of site working fund selection Min bid Deposit ( Rs applicable al) Sales Site (in M) (in M) (in Sq. M.). capital required for (Draw of amount ( Rs in Lakhs) for IOC/HPC) Potential requirement developmen Lots/Bidding in Lakhs) (MS+HSD) in for t of ) Kls operation of infrastructur RO (Rs in e at RO (Rs Lakhs) in Lakhs ) DRAW OF 1 BUKKAPATNAM VILLAGE & MANDAL ANANTAPUR Rural 48 SC CFS 20 20 400 0 0 0 2 LOTS DRAW OF 2 GOTLUR VILLAGE, DHARMAVARAM MANDAL ANANTAPUR Rural 48 SC CFS 20 20 400 0 0 0 2 LOTS DRAW OF 3 VAYALPADU (NOT ON NH - SH), VAYALAPADU MANDAL CHITTOOR Rural 48 SC CFS 20 20 400 0 0 0 2 LOTS THONDAVADA VILLAGE (NOT ON NH/SH), CHANDRAGIRI DRAW OF 4 CHITTOOR Rural 48 SC CFS 20 20 400 0 0 0 2 MANDAL LOTS DRAW OF 5 DODDIPALLE (NOT ON NH/SH), PILERU MANDAL CHITTOOR Rural 48 SC CFS 20 20 400 0 0 0 2 LOTS NARAYANA NELLORE VILLAGE (NOT ON SH/NH) NANDALUR DRAW OF 6 KADAPA Rural 48 SC CFS 20 20 400 0 0 0 2 MANDAL LOTS DRAW OF 7 ARAKATAVEMULA NOT ON SH/NH , RAJUPALEM MANDAL KADAPA Rural 48 SC CFS 20 20 400 0 0 0 2 LOTS DRAW OF 8 GUTTURU VILLAGE, PENUKONDA MANDAL ANANTAPUR Rural 48 SC CFS 20 20 400 0 0 0 2 LOTS DRAW OF 9 MADDALACHERUVU VILLAGE, KANAGANAPALLE MANDAL ANANTAPUR Rural 48 SC CFS 20 20 400 0 0 0 2 LOTS DRAW OF 10 KALICHERLA (NOT ON NH/SH), PEDDAMANDYAM MANDAL CHITTOOR Rural 48 SC CFS 20 20 400 0 0 0 2 LOTS CHINNACHEPALLE, NOT ON SH/ NH, KAMALAPURAM DRAW OF 11 KADAPA Rural 48 SC CFS 20 20 400 0 0 0 2 MANDAL LOTS DRAW OF 12 GUDIPADU NOT ON SH/NH, DUVVUR MANDAL KADAPA Rural 48 SC CFS 20 20 400 0 0 0 2 LOTS BUGGANIPALLE VILLAGE NOT ON NH/SH, BETHAMCHERLA DRAW OF 13 KURNOOL Rural 48 SC CFS 20 20 400 0 0 0 2 MANDAL LOTS DRAW OF 14 GOVINDPALLE VILLAGE NOT ON NH/SH, SIRVEL MANDAL KURNOOL Rural 48 ST CFS 20 20 400 0 0 0 2 LOTS DRAW OF 15 POLAKAL VILLAGE NOT ON NH/SH, C .
    [Show full text]
  • Assessment of Waterlogging in Sriram Sagar Command Area
    CS(AR) 202 ASSESSMENT OF WATERLOGGING IN SRIRAM SAGAR COMMAND AREA \ e ana We Trans! NATIONAL INSTITUTE OF HYDROLOGY JAL VIGYAN BHAWAN ROORKEE - 247 667 (U.P.) INDIA 1995-96 PREFACE India has very large and ambitious plans for the development of irrigation and, which are indeed very essential for diversifying agriculture as also for increasing and stabilizing crop production. It is expected that when the various irrigation projects are completed, irrigation will be practiced over, at least double the present area. This is what it should be if the country has to make economic progress quickly. But if the intelligent use of water is not pre-planned, the dreadful history may repeat itself with all its attendant havocs of seepage, rise in water table, widespread waterlogging and salinity. Irrigated agriculture instead of ensuring prosperity and economic stability may threaten the very security of the'land. Waterlogging throws a challenge to irrigated agriculture. The success depends how we take up that challenge and save our national heritage, the soil, from deterioration. Irrigation projects involving interbasin transfer of water without adequate drainage has disrupted the equilibrium between the ground water recharge and discharge resulting in accretions to the ground water table. After commissioning of the Sriram Sagar Irrigation Project in 1970, there was a general rise in grOund water table. The Sriram Sagar command area faces problems of waterlogging resulting from over irrigation & seepage losses through distributory system. This study is an attempt to assess the areas affected by waterlogging and areas sensitive to waterlogging in the Sriram Sager command area using Indian Remote Sensing Satellite data.
    [Show full text]
  • East Godavari District Annual Report
    OM SRI SAIRAM East Godavari District Annual Report st st from 1 April 2018 - 31 March 2019 Contents FOREWORD FROM THE DISTRICT PRESIDENT ............................................................... SRI SATHYA SAI SEVA ORGANISATIONS – AN INTRODUCTION ......................................... WINGS OF THE ORGANISATIONS .............................................................................................. ADMINISTRATION OF THE ORGANISATION ............................................................................... THE 9 POINT CODE OF CONDUCT AND 10 PRINCIPLES ...................................................................... SRI SATHYA SAI SEVA ORGANISATIONS, [EAST GODAWARI District] ................................. BRIEF HISTORY .................................................................................................................................... DIVINE VISIT .............................................................................................................................. OVERVIEW ................................................................................................................................ SAI CENTRES ....................................................................................................................................... ACTIVITIES ................................................................................................................................ OFFICE BEARERS ...............................................................................................................................
    [Show full text]
  • Sri Vasavi Engineering College
    SRI VASAVI ENGINEERING COLLEGE (An Autonomous Institute permanently affiliated to JNTUK, Kakinada) (Sponsored by Sri Vasavi Educational Society, Tadepalligudem) (Approved by AICTE, New Delhi & Accredited by NAAC with ‘A’ Grade) Pedatadepalli, TADEPALLIGUDEM – 534 101. W.G.Dist. (A.P.) LIST OF CANDIDATES APPLIED FOR ADMISSION INTO UG PROGRAMMES (B.TECH. COURSES) UNDER CATEGORY ‘B’ (MANAGEMENT QUOTA) SEATS FOR THE ACADEMIC YEAR 2019-20 AS ON DATE 27-08-2019 S.No. Name of the Candidate Rank Details % of Marks in Branch Application Remarks and Address In JEE-Mains/ Qualifying Opted for Registration APEAMCET/ Examination Admn. In Date APICET PERUMALLA VAISHNAVI D/o P V N Ranga Rao 1. D.No. 5-76 Canal Road 42021 9.82 CSE 19-08-2019 Nil Chebrolu-534406 West Godavari District SRIPADA SAI SUBRAHMANYA SHARMA S/o S S V R S Prabhakar Telangana 2. NQ 797 CSE 19-08-2019 LIG-1-38, APHB Colony BIE TADEPALLIGUDEM-534101 West Godavari District. GUMMALLA SWATHI D/o G. Tata Rao 3. Maruthi Nagar NQ 9.57 CSE 19-08-2019 Nil KUNCHANAPALLI West Godavari District-534101 NAGASURI HEMA SREYA D/o N Eswara Prasad Gupta 4. D. No. 18-82, Main Road NQ 9.94 CSE 19-08-2019 Nil CHINTALAPUDI – 534460 West Godavari District SAGI RAJU ABHILASHVARMA S/o S Satyanarayana Raju 5. ARDHAVARAM Village NQ 7.34 CSE 19-08-2019 Nil GANAPAVARM (M) West Godavari District- 534 101 DUVVAPU SRAVANI D/o D Srinivasa Rao 6. High School Opposite Road NQ 8.71 CSE 19-08-2019 Nil UNDRAJAVARAM -534 216. West Godavari District.
    [Show full text]
  • Warangal District Census Handbook Deserve My Thanks Tor Their Contribution
    CENSUS OF INDIA 1981 SERIES 2 .ANDH ~A ,PRADESH DISTRICT CENSUS HANDBOOK WARANGAL PARTS XIII-A & B VILLAGE & TOWN DIRECTORY i VILLAGE & TOWNWISE PRIMARY CENSUS ABSTRACT S. S. JAYA RAO OF THE INDIAN ADMINISTRATIVE SERVICE DIRECTOR OF CENSUS OPERATIONS ANDHRA PRADESH PUBLISHED BY THE GOVERNMENT OF ANDHRA PRADESH 1986 POTHANA - THE GREAT DEVOUT POET The motif presented on the cover page represents Bammera Pothana, also called Pothanamatya, a devout poet belonging to the 15th century A. D. said to have hailed from the village Bammera near Warangal. The spiritual history of India is replete with devotional poetry and it was termed as BHAKTI movement, the 'CULT OF DEVOTION'. The SRIMADANDHRA MAHA­ BHAGA VATHAM rendered in Telugu by Pothana gave necessary fillip to this movement And nay! he could be treated as a progenitor of this movement. Pothana started this movement even before Chaitanya started the same movement in Bengal and Vallabh8chC/rya in Gujarat. In the Telugu country, this movement wastaken to great heights by Saints and lyricists like Annamacharya, Kshetrayya and Ramadas of Bhadrachalam fa"!e. Besides Bhagavatham,Pothana wrote VEERABHADRA VIJAYAM in praise of Lord Siva, which could be considered almost a Saivaite AGAMA SASTRA, BHOGINI DANDAKAM and NARA YANA SATAKAM, a devotional composition in praise of Lord Narayana or Vishnu. Pothana was a great poet of aesthetic eminence and his style was so simple and attractive to the common people as well as pedants. It is charming and sweet, and it won the hearts of the Telugu speaking people in a great sweep. He was one among the three or four top ranking Telugu poets of those days and even today.
    [Show full text]
  • F. No. 8-38/2016-FC Sub.: Proposal for Diversion of 469.18 Hectares Of
    F. No. 8-38/2016-FC Sub.: Proposal for diversion of 469.18 hectares of forest land in (12) R.Fs. of Eluru Forest Division for Chintalapudi Lift Irrigation Scheme Package – I & II, in favour of Chief Engineer, Godavari Delta System, Dowleswaram Government of Andhra Pradesh.– regarding. 1. The Government of Andhra Pradesh, Environment, Forests, Science & Technology (Section. II) vide their letter No. 3733/Section. II/2016 dated 09.08.2016 submitted a fresh proposal to obtain prior approval of the Central Government, in terms of the section-2 of the Forest (Conservation) Act, 1980 for diversion of 469.18 hectares of forest land in (12) R.Fs. of Eluru Forest Division for Chintalapudi Lift Irrigation Scheme Package – I & II, in favour of Chief Engineer, Godavari Delta System, Dowleswaram Government of Andhra Pradesh. 2. Details indicated in the proposal submitted by the Government of Andhra Pradesh vide letter dated 09.08.2016 are as below: FACT SHEET 1. Name of the Proposal Proposal for diversion of 469.18 hectares of forest land in (12) R.Fs. of Eluru Forest Division for Chintalapudi Lift Irrigation Scheme Package – I & II, in favour of Chief Engineer, Godavari Delta System, Dowleswaram Government of Andhra Pradesh.–regarding. 2. Location: State Andhra Pradesh. District West Godavari District. 3. Detail of user agency Name of the user agency M/s. Chief Engineer, Godavari Delta System, Dowleswaram, Government of Andhra Pradesh. Nature of user agency Government of Andhra Pradesh Irrigation & C.A.D. Department. 4. Particular of Forests Name of Forest Division Eluru (Territorial) Forest Division, Eluru. Area of Forest land proposed 469.18 Hectares.
    [Show full text]
  • Pv Narasimha Rao Kanthanapally Sujala Sravanthi Project
    EXECUTIVE SUMMARY OF FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT P V NARASIMHA RAO KANTHANAPALLY SUJALA SRAVANTHI PROJECT JAYASHANKAR BHUPALAPALLY DISTRICT, TELANGANA CHIEF ENGINEER IRRIGATION & CAD DEPARTMENT K C COLONY, CHINTAGATTU, WARANGAL- 506002, TELANGANA CONSULTANTS ENVIRONMENTAL HEALTH & SAFETY CONSULTANTS PVT LTD # 13/2, 1ST MAIN ROAD, NEAR FIRE STATION, INDUSTRIAL TOWN, RAJAJINAGAR, BENGALURU-560 010 NOVEMBER 2018 EXECUTIVE SUMMARY OF FINAL ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR P V NARASIMHA RAO KANTHANAPALLY SUJALA SRAVANTHI PROJECT IN JAYASHANKAR BHUPALAPALLY DISTRICT, TELANGANA Project By CHIEF ENGINEER IRRIGATION & CAD DEPT. K. C COLONY, CHINTAGATTU, WARANGAL - 506002, TELANGANA. Consultants ENVIRONMENTAL HEALTH & SAFETY CONSULTANTS PVT LTD # 13/2, 1ST MAIN ROAD, NEAR FIRE STATION, INDUSTRIAL TOWN, RAJAJINAGAR,BENGALURU-560 010, NABET/EIA/1518/SA 024 DOCUMENT NO. EHSC/I&CAD/KCC/ETR/2017 -18/PVNKSSP NOVEMBER 2018 P V Narasimha Rao Kanthanapally Sujala Sravathi Project in Executive summary Jayashankar Bhupalapally District, Telangana of Final EIA Report REVISION RECORD Rev. No Date Purpose Issued as Executive summary of Draft EIA Report EHSC/01 28.04.2018 for Comments and Suggestions Issued as Draft EIA Report for submission to EHSC/02 04.07.2018 TSPCB for conducting Environmental Public Hearing Issued as Final EIA Report to client and experts EHSC/03 19.11.2018 for comments and suggestions Issued as Final EIA Report for submission to EHSC/04 05.12.2018 MoEF&CC, New Delhi for issue of Environmental Clearance I&CAD Department, Government of Telangana 1 EHS Consultants Pvt Ltd, Bengaluru P V Narasimha Rao Kanthanapally Sujala Sravathi Project in Executive summary Jayashankar Bhupalapally District, Telangana of Final EIA Report TABLE OF CONTENTS 1.
    [Show full text]
  • Summary Report on Water Use Efficiency Studies for 35 Irrigation Projects
    Summary Report On Water Use Efficiency Studies For 35 Irrigation Projects Organized by Performance Overview & Management Improvement Organization Central Water Commission Government of India February, 2016 1 Contents S.No TITLE Page No Prologue 3 I Abbreviations 4 II SUMMARY OF WUE STUDIES 5 ANDHRA PRADESH 1 Bhairavanthippa Project 6-7 2 Gajuladinne (Sanjeevaiah Sagar Project) 8-11 3 Gandipalem project 12-14 4 Godavari Delta System (Sir Arthur Cotton Barrage) 15-19 5 Kurnool-Cuddapah Canal System 20-22 6 Krishna Delta System(Prakasam Barrage) 23-26 7 Narayanapuram Project 27-28 8 Srisailam (Neelam Sanjeeva Reddy Sagar Project)/SRBC 29-31 9 Somsila Project 32-33 10 Tungabadhra High level Canal 34-36 11 Tungabadhra Project Low level Canal(TBP-LLC) 37-39 12 Vansadhara Project 40-41 13 Yeluru Project 42-44 ANDHRA PRADESH AND TELANGANA 14 Nagarjuna Sagar project 45-48 TELANGANA 15 Kaddam Project 49-51 16 Koli Sagar Project 52-54 17 NizamSagar Project 55-57 18 Rajolibanda Diversion Scheme 58-61 19 Sri Ram Sagar Project 62-65 20 Upper Manair Project 66-67 HARYANA 21 Augmentation Canal Project 68-71 22 Naggal Lift Irrigation Project 72-75 PUNJAB 23 Dholabaha Dam 76-78 24 Ranjit Sagar Dam 79-82 UTTAR PRADESH 25 Ahraura Dam Irrigation Project 83-84 26 Walmiki Sarovar Project 85-87 27 Matatila Dam Project 88-91 28 Naugarh Dam Irrigation Project 92-93 UTTAR PRADESH & UTTRAKHAND 29 Pilli Dam Project 94-97 UTTRAKHAND 30 East Baigul Project 98-101 BIHAR 31 Kamla Irrigation project 102-104 32 Upper Morhar Irrigation Project 105-107 33 Durgawati Irrigation
    [Show full text]