NHS Listing by Route Number

Total Page:16

File Type:pdf, Size:1020Kb

NHS Listing by Route Number 01-JUL-21 National Highway System (NHS) Page: 1 XORP HIS PROD Primary Routes PL_NHS Route Begin End Route County Description MilePnt MilePnt Length FC R_U ------------ ------------ ---------------------------------------- -------- -------- --------- ------------ ----- KY 1 Carter From I-64 to KY 9 11.502 12.009 .507 Princ Art Urban ************ --------- sum .507 KY 4 Fayette From US 27 (Nicholasville Road) via New .000 9.324 9.324 Expressway Urban Circle Road to KY 922 (Newtown Pike) Fayette From KY 922 (Newtown Pike) via New 9.324 14.843 5.519 Princ Art Urban Circle Road to US 25 (Richmond Road) Fayette From US 25 (Richmond Road) via New 14.843 19.283 4.440 Expressway Urban Circle Road to US 27 (Nicholasville Road) ************ --------- sum 19.283 KY 7 Letcher From KY 15 to KY 15 13.497 14.157 .660 Princ Art Rural ************ --------- sum .660 KY 8 -NC Kenton From Crescent Avenue to Garrard Street 6.434 7.414 .980 Princ Art Urban ************ --------- sum .980 KY 8 Campbell From Kenton County line to US 27 North .000 .683 .683 Princ Art Urban Greenup From KY 8 Spur to US 23 at the south 2.000 3.023 1.023 Princ Art Rural limits of the U.S. Grant Bridge Kenton From 4th Street to Campbell County line 6.434 7.662 1.228 Princ Art Urban ************ --------- sum 2.934 KY 8X Campbell US 27 to I-471 .000 .513 .513 Princ Art Urban ************ --------- sum .513 KY 8S Greenup From KY 8 via Carl Perkins Bridge to .000 .610 .610 Princ Art Rural north limits of the bridge structure ************ --------- sum .610 KY 9 Bracken From Mason County line to Pendleton .000 19.857 19.857 Princ Art Rural County line Campbell From Pendleton County line to KY 1997 .000 8.021 8.021 Princ Art Rural Campbell From KY 1997 to North Limits of I-275 8.021 17.937 9.916 Princ Art Urban Interchange Carter From KY 1 and KY 7 to Lewis County line .000 18.262 18.262 Princ Art Rural Lewis From Carter County line to Mason County .000 31.218 31.218 Princ Art Rural line 01-JUL-21 National Highway System (NHS) Page: 2 XORP HIS PROD Primary Routes PL_NHS Route Begin End Route County Description MilePnt MilePnt Length FC R_U ------------ ------------ ---------------------------------------- -------- -------- --------- ------------ ----- KY 9 Mason From Lewis County line to KY 1448 .000 7.352 7.352 Princ Art Rural Mason From KY 1448 to CS 1027 (Downing Drive) 7.352 12.620 5.268 Princ Art Urban Mason From CS 1027 (Downing Drive) to the 12.620 19.541 6.921 Princ Art Rural Bracken County line Pendleton From Bracken County line to Campbell .000 4.339 4.339 Princ Art Rural County line ************ --------- sum 111.154 KY 10 Greenup From Lewis County line to Second .000 12.844 12.844 Princ Art Rural Landward Pier From Rivers Edge in Ohio Lewis From KY 9 to Greenup County line 6.788 19.834 13.046 Princ Art Rural ************ --------- sum 25.890 KY 15 Breathitt From Perry County line to Wolfe County .000 25.664 25.664 Princ Art Rural line Knott From Letcher County line to Perry County .000 9.329 9.329 Princ Art Rural line Letcher From US 119 to KY 7 .000 9.216 9.216 Princ Art Rural Letcher From KY 7 to Knott County line 9.216 10.675 1.459 Princ Art Rural Perry From Knott County Line to SUL of Hazard .000 5.868 5.868 Princ Art Rural at North Fork KY River Bridge Perry From SUL of Hazard at North Fork KY 5.868 16.480 10.612 Princ Art Urban River Bridge to CR-2256 (Old KY-15 N) Perry From CR-2256 (Old KY-15 N) to Breathitt 16.480 25.158 8.678 Princ Art Rural County Line Wolfe From Breathitt County line to KY 15S .000 9.515 9.515 Princ Art Rural ************ --------- sum 80.341 KY 15S Wolfe From KY 15 to the Mountain Parkway .000 1.058 1.058 Princ Art Rural ************ --------- sum 1.058 KY 16 Kenton From I-275 to KY 17 13.008 15.871 2.863 Princ Art Urban ************ --------- sum 2.863 KY 17 -NC Kenton From East 20th Street to KY-8 22.238 23.655 1.417 Princ Art Urban ************ --------- sum 1.417 KY 17 Kenton From I-275 Underpass to KY-8 18.555 23.728 5.173 Princ Art Urban ************ --------- sum 5.173 01-JUL-21 National Highway System (NHS) Page: 3 XORP HIS PROD Primary Routes PL_NHS Route Begin End Route County Description MilePnt MilePnt Length FC R_U ------------ ------------ ---------------------------------------- -------- -------- --------- ------------ ----- KY 18 Boone From KY 237 to I-75 11.778 15.073 3.295 Princ Art Urban ************ --------- sum 3.295 KY 22 Jefferson From KY-1747/CR-1004C (Springdale Road) 3.704 4.108 .404 Princ Art Urban to I-265 Underpass ************ --------- sum .404 US 23 Boyd From Lawrence County to CR 1107 .000 9.161 9.161 Princ Art Rural (Campbells Branch) Boyd From CR 1107 (Campbells Branch) to 9.161 20.938 11.777 Princ Art Urban Greenup County line Floyd From Pike County line to CR 1026 (Mare .000 4.029 4.029 Princ Art Urban Creek Rd) Floyd From CR 1026 (Mare Creek Rd) to CR 1050 4.029 10.105 6.076 Princ Art Rural (May Branch Spur Rd) Floyd From CR 1050 (May Branch Spur Rd) to CR 10.105 11.515 1.410 Princ Art Urban 1694 (Hillcrest Dr) Floyd From CR 1694 (Hillcrest Dr) to Johnson 11.515 21.986 10.471 Princ Art Rural County line Greenup From Boyd County line to CR 1022B .000 15.889 15.889 Princ Art Urban (Meadows Lane) Greenup From CR 1022B (Meadows Lane) to south 15.889 28.760 12.871 Princ Art Rural end of the U.S. Grant Bridge Johnson From Floyd County line to Lawrence .000 16.864 16.864 Princ Art Rural County line Lawrence From Johnson County line to Boyd County .000 29.069 29.069 Princ Art Rural line Letcher From Virginia State Line to Pike County .000 7.319 7.319 Princ Art Rural Line Pike From Letcher County Line to CR-1267Y .000 18.224 18.224 Princ Art Rural (Fords Branch Rd) Pike From CR-1267Y (Fords Branch Rd) to Floyd 18.224 32.828 14.604 Princ Art Urban County Line ************ --------- sum 157.764 US 23X Boyd From US 60 (11th Street) to US 23 1.551 1.796 .245 Princ Art Urban (Greenup Avenue) ************ --------- sum .245 US 23S -NC Boyd From north end of bridge over the Ohio .000 .483 .483 Princ Art Urban River 0.083 miles beyond the Ohio State 01-JUL-21 National Highway System (NHS) Page: 4 XORP HIS PROD Primary Routes PL_NHS Route Begin End Route County Description MilePnt MilePnt Length FC R_U ------------ ------------ ---------------------------------------- -------- -------- --------- ------------ ----- line via Martin Luther King Blvd. to US 60 (Winchester Avenue) ************ --------- sum .483 US 23S Boyd From US 60 (Winchester Avenue) via 13th .000 .483 .483 Princ Art Urban Street Bridge to north end of bridge over the Ohio River 0.083 miles beyond the Ohio State line ************ --------- sum .483 I 24 Caldwell From Lyon County line to Trigg County 54.842 57.389 2.547 Interstate Rural line Christian From Trigg County line to Tennessee 69.830 93.373 23.543 Interstate Rural State line Livingston From Marshall County line to Lyon County 29.352 33.880 4.528 Interstate Rural line Lyon From Livinston County line to Caldwell 33.880 54.842 20.962 Interstate Rural County line McCracken From Illinois State line to NWUL of .000 2.956 2.956 Interstate Rural Paducah McCracken From NWUL of Paducah to SUL of Paducah 2.956 16.269 13.313 Interstate Urban McCracken From SUL of Paducah to Marshall County 16.269 17.320 1.051 Interstate Rural line Marshall From McCracken County line to Livingston 17.320 29.352 12.032 Interstate Rural County line Trigg From Caldwell County line to Christian 57.389 69.830 12.441 Interstate Rural County line ************ --------- sum 93.373 US 25 -NC Fayette From the Main St intersection near 13.433 14.323 .890 Princ Art Urban Lexington Center to Main St intersection at Midland Ave ************ --------- sum .890 US 25 Fayette From KY 418 to KY 922 8.152 15.133 6.981 Princ Art Urban Fayette From KY 1973 (Iron Works Pike) to the 21.674 22.286 .612 Princ Art Urban Scott County line Madison From US 421 to KY 2872 12.027 13.028 1.001 Min Art Urban Madison From KY 876 to I-75 15.442 20.276 4.834 Princ Art Urban Rockcastle From KY 461 to I-75 15.018 15.797 .779 Princ Art Rural Scott From Fayette County Line to PR-1016 .000 1.815 1.815 Princ Art Rural (Mary Lynn Drive) 01-JUL-21 National Highway System (NHS) Page: 5 XORP HIS PROD Primary Routes PL_NHS Route Begin End Route County Description MilePnt MilePnt Length FC R_U ------------ ------------ ---------------------------------------- -------- -------- --------- ------------ ----- US 25 Scott From PR-1016 (Mary Lynn Drive) to US-62 1.815 2.038 .223 Princ Art Urban ************ --------- sum 16.245 US 25W Whitley From I 75 to KY 3041 29.618 30.425 .807 Princ Art Urban ************ --------- sum .807 US 25E Bell From Tennessee State line via the .000 3.503 3.503 Princ Art Urban Cumberland Gap Tunnel to CR 1138 (Yestown Road) Bell From CR 1138 (Yestown Road) to Knox 3.503 18.651 15.148 Princ Art Rural County line Knox From Bell County line to CR 1132 .000 1.096 1.096 Princ Art Rural (Evergreen Road) Knox From CR 1132 (Evergreen Road) to KY 1487 1.096 12.161 11.065 Princ Art Urban Knox From KY 1487 to CR 1325 (Old Highway 25) 12.161 19.458 7.297 Princ Art Rural Knox From CR 1325 (Old Highway 25) to Laurel 19.458 26.198 6.740 Princ Art Urban County line Laurel From Knox County line to West ramps of .000 2.024 2.024 Princ Art Urban I-75 ************ --------- sum 46.873 US 27 -NC Campbell From Monmouth Street to KY-8 21.463 22.303 .840 Princ Art Urban ************ --------- sum .840 US 27 Bourbon From Fayette County line to SWUL of .000 5.485 5.485 Princ Art Rural Paris Bourbon From SWUL of Paris to US 68 5.485 8.731 3.246 Princ Art Urban
Recommended publications
  • Experimental Maintenance Painting on the I-64 Riverside Expressway in Louisville
    ResearchReport KTC-00-10 KENTUCKY TRANSPORTATION CENTER CollegeofEngineering EXPERIMENTALMAINTENANCEPAINTING ONTHEI-64RIVERSIDEEXPRESSWAY INLOUISVILLE UNIVERSITYOFKENTUCKY UniversityofKentucky CollegeofEngineering KENTUCKYTRANSPORTATIONCENTER OurMission Weprovideservicestothetransportationcommunity throughresearch,technologytransferandeducation. Wecreateandparticipateinpartnershipstopromote safeandeffectivetransportationsystems. WeValue... Teamwork--ListeningandCommunicating,AlongwithCourtesyandRespectforOthers HonestyandEthicalBehavior DeliveringtheHighestQualityProductsandServices ContinuousImprovementinAllThatWeDo Formoreinformationoracompletepublicationlist,contactusat: KentuckyTransportationCenter 176RaymondBuilding UniversityofKentucky Lexington,Kentucky40506-0281 (859)257-4513 (859)257-1815(FAX) 1-800-432-0719 www.engr.uky.edu/ktc [email protected] TheUniversityofKentuckyisanEqualOpportunityOrganization Research Report KTC-00-10 EXPERIMENTAL MAINTENANCE PAINTING ON THE I-64 RIVERSIDE EXPRESSWAY IN LOUISVILLE By Theodore Hopwood II Associate Engineer, Research Bobby Meade Research Investigator And Sudhir Palle Engineer Associate Senior, Research Kentucky Transportation Center College of Engineering University of Kentucky Lexington, Kentucky In cooperation with Kentucky Transportation Cabinet Commonwealth of Kentucky And The Federal Highway Administration U.S. Department of Transportation The contents of this report reflect the views of the authors, who are responsible for the facts and accuracy of the data presented herein. The contents
    [Show full text]
  • 2013 Awards & Achievements
    100 North Senate Avenue PHONE: (317) 232-5533 Michael R. Pence, Governor Room N758 FAX: (317) 232-5118 Karl B. Browning, Commissioner Indianapolis, Indiana 46204 2013 Awards & Achievements American Council of Engineering Companies (ACEC) of Indiana Engineering Excellence Awards The American Council of Engineering Companies of Indiana recognizes outstanding engineering achievements based on uniqueness and originality, technical complexity, social and economic value, and public awareness. Award Year: 2013 – Grand Project Award – National Recognition Award Recipient: INDOT’s Sherman Minton Bridge Project Description: The Sherman Minton Bridge, which carries Interstate 64 over the Ohio River between southern Indiana and Louisville, Kentucky, reopened to traffic Feb. 17 after emergency repairs were completed two months sooner than originally estimated and 12 days ahead of the most recent scheduled target date. American Concrete Pavement Association (ACPA), Indiana Chapter 2013 Excellence in Concrete Pavement Award The ACPA Annual Awards for Excellence in Concrete Pavement are designed to honor quality concrete pavements constructed in the United States and Canada each year. The awards program encourages high-quality workmanship in every concrete pavement project and serves as a forum for sharing information about highly successful projects. Award Year: 2013 Recipient: INDOT Project Description: I-69 New Construction, Section 3, Contract 8 & 9, Daviess County; SR 25 Delphi to Lafayette, Tippecanoe & Carroll Counties; Maplecrest Road Extension, Allen County American Council of Engineering Companies (ACEC) National Recognition Award Award Year: 2013 Recipient: INDOT’s Sherman Minton Bridge Project Description: The Sherman Minton Bridge, which carries Interstate 64 over the Ohio River between southern Indiana and Louisville, Kentucky, reopened to traffic Feb.
    [Show full text]
  • 317-234-8926 [email protected]
    Scott.A.Milkey From: Clift, Mckenzie C Sent: Tuesday, December 01, 2015 6:04 PM To: Lloyd, Matthew;Hodgin, Stephanie Subject: RE: transcrip Attachments: Governor, Rafael Interview Transcription.docx Yes - see attached. McKenzie Clift Communications Specialist Office of Governor Michael R. Pence Office: 317-234-8926 [email protected] From: Lloyd, Matthew Sent: Tuesday, December 01, 2015 6:00 PM To: Hodgin, Stephanie <[email protected]>; Clift, Mckenzie C <[email protected]> Subject: transcrip Can you send me script from Rafael interview? Transcription This Week Interview with Governor Mike Pence – Airing 10/18 Rafael Sanchez, RTV 6: Governor Mike Pence: Governor, thank you for joining us. Rafael Sanchez, RTV 6:You bet. You announced a major road program which you say will not, in any way, raiGovernorse taxes. Mike How Pence:is that possible? Well, it’s a real testament to the strong, fiscal responsibility that Indiana’s demonstrated in recent years. Look, we have one of the strongest balance sheets in the country. We have a growing economy. We have record employment in the state of Indiana and the lowest unemployment rate in the Midwest. That’s all created an environment where, in the end of the last fiscal year, we actually ended up with near record reserves in the bank. So, as we were looking at the priorities of the coming session and the General Assembly, I knew it would be possible for us to invest in the kind of preservation of our infrastructure, of roads and bridges, across the state of Indiana. By leveraging our fiscal strength without having to raise taxes on Hoosier motorists and taxpayers.Rafael Sanchez, RTV 6: We’re talking about $1 billion.
    [Show full text]
  • Fy 2025 Transportation Improvement Program
    ADOPTED TDB FY 2020 - FY 2025 TRANSPORTATION IMPROVEMENT PROGRAM Louisville/Jefferson County, KY-IN Metropolitan Planning Area DRAFT The Kentuckiana Regional Planning & Development Agency is the federally designated Metropolitan Planning Organization for a five-county region in two states: Clark and Floyd counties in Indiana; and Bullitt, Jefferson, and Oldham counties in Kentucky. FUNDING DISCLAIMER | This report has been prepared in cooperation with or with financial assistance from all or several of the following public entities: Federal Transit Administration, Federal Highway Administration, Kentucky Transportation Cabinet, Indiana Department of Transportation, Transit Authority of River City, and local governments in the KIPDA region. This financial assistance notwithstanding, the contents of this report do not necessarily reflect the official views or policies of the funding agencies. Accuracy of the information presented herein is the responsibility of the Kentuckiana Regional Planning and Development Agency, based upon project information submitted by sponsoring agencies. 11520 Commonwealth Drive Louisville, KY 40299 TITLE VI COMPLIANCE | KIPDA fully complies with Title VI of the Civil DRAFTRights Act of 1964, the Civil Rights Restoration Act of 1987, Executive Order 12898 on Environmental Justice, and related nondiscrimination 502.266.6144 statutes and regulations in all programs and activities. KIPDA’s website, www.kipda.org, may be translated into multiple languages. Publications 502.266.5047 FAX and other public documents can be made available in alternative 800.962.8408 IN TDD languages and formats, if requested. KIPDA public meetings are always held in ADA-accessible facilities, and in transit-accessible locations when 800.648.6056 KY TDD possible. Auxiliary services can be provided to individuals who submit a request at least seven days prior to a public meeting.
    [Show full text]
  • Jefferson County State Primary Road System
    COMMONWEALTH OF KENTUCKY TRANSPORTATION CABINET FRANKFORT, KENTUCKY 40622 JEFFERSON COUNTY STATE PRIMARY ROAD SYSTEM This listing of the state maintained system by classification in Jefferson County is current as of June 22, 2020. Any listing of an earlier date should be discarded. Additional listings can be obtained from the DIVISION OF PLANNING, ROADWAY SYSTEMS TEAM. The routes as designated hereinafter were established by OFFICIAL ORDER # 87416 on February 16, 1983 and OFFICIAL ORDER # 87477 on March 23, 1983. Revisions to the original official orders are given at the end of this route listing. The revisions are in numerical order by route affected. STATE PRIMARY SYSTEM I-64, from the Indiana State Line to the Shelby County Line, a distance of 23.974 miles. (MP 0.000 to MP 23.974) I-65, from the Bullitt County Line to the north limits of the J.F. Kennedy Bridge, a distance of 14.138 miles. (MP 123.180 to MP 137.318) I-71, from the junction with I-64 to the Oldham County Line, a distance of 11.315 miles. (MP 0.000 to MP 11.315) I-264, from the junction with I-64 near the Sherman Minton Bridge, via the Georgia Davis Powers Expressway and the Henry Watterson Expressway, to the junction with I-71, a distance of 22.927 miles. (MP 0.000 to MP 22.927) I-265, from the junction with I-65 south of Louisville, via the Gene Snyder Freeway to the junction with I-71 northeast of Louisville, a distance of 24.477 miles.
    [Show full text]
  • General Discussion of Recent Ohio River Bridges Design Concepts
    :imbined strength ·elds are General Discussion of Recent Ohio River Bridges f ASTM Design Concepts s. These rocesses. FRANK B. WYLIE, JR., id build­ Principal Design Engineer : carbon Hazelet & Erda!, Consulting Engineers imit this :d use in The title of tl1is presentation requires some definition of the term "recent." For to 5 in. the purpose of this paper let us use five years and limit the number of bridges to three. These three will be those of which .the author has some personal and in­ ans and timate knowledge. They have been designed by the firm of Hazelet & Erda!, con­ 1posilion sulting engineers to the States of Kentucky and Indiana. 1stant in The three bridges lie across the Ohio River between the Commonwealth of Ken­ s, by in- tucky and the State of Indiana. This illustration ( Slide No. 1) shows the loca­ tions. In the order of construction, first is the Sherman Minton Bridge between kations. Louisvill e, Kentucky and New Albany, Indiana on the National Defense Highway :rease in designated Interstate 64. This bridge was completed and opened to traffic in De­ cember, 1961. in. thick The second is the new John F. Kennedy Memorial Bridge which was dedicated and opened to traffic on December 6, 1963. This is the bridge between Louisville, 1ich pre­ Kentucky and Jeffersonville, Indiana on Interstate 65. n is that The third bridge which is now under construction and scheduled for completion ncreased in 1965 is on US-41 between Henderson, Kentucky and Evansville, Indiana. .dability. tructural .perature Indianapolis \ content, O H I O :e up the N D A N A ,as good ~his fact, L L I N O I e to A-7, is rapid­ steel will '<.
    [Show full text]
  • TOLLING on OHIO RIVER BRIDGES to BEGIN DECEMBER 30 Kennedy, Lincoln and East End Bridges Will Be Tolled
    TOLLING ON OHIO RIVER BRIDGES TO BEGIN DECEMBER 30 Kennedy, Lincoln and East End bridges will be tolled JEFFERSONVILLE, Ind. (Dec. 13, 2016) – Tolling on the Louisville – Southern Indiana Ohio River Bridges Project is scheduled to begin Friday, December 30. Tolled bridges include the new I-65 Abraham Lincoln Bridge, the improved I-65 Kennedy Bridge and the new East End bridge. “Critical system testing is complete,” said Clint Murphy, director of tolling oversight for the Indiana Department of Transportation. “While system preparations are continuing, we’ve cleared the necessary hurdles to set a start date for tolling. The Ohio River Bridges Project will mean faster and safer commutes for drivers. Without tolling, this new and improved transportation system would not be possible.” Drivers opening their RiverLink accounts online or by phone are encouraged to do so by the end of this week (Dec. 17) to help ensure they get their transponders before the start of tolling. Drivers with transponders will pay the lowest toll rates. Drivers must set up a prepaid account to get a transponder. All drivers who set up their accounts and have transponders assigned to their vehicles will pay the lowest toll rates on the first day of tolling, even if they haven’t received their transponders. License plates will be scanned and the transponder rate applied until transponders are delivered. Crossings will not count toward the frequent-user discount until transponders are properly mounted in cars. Drivers who have their RiverLink local transponders are encouraged to mount them now, so they’re prepared for the start of tolling.
    [Show full text]
  • Southern Indiana Ohio River Bridges Project
    The Louisville – Southern Indiana Ohio River Bridges Project “The Art of the Possible” Michael W. Hancock, PE & Ken Sperry, PE HMB Professional Engineers, Inc. National ASHE Conference – May 10, 2019 Louisville Bridges Project Map The Louisville and Southern Indiana Ohio River Bridges Project Almost 50 years in the Making Kentucky Issues: Indiana Issues: • Mobility: Complete outer beltway • Mobility: Complete outer beltway on east side of Louisville on east side of Louisville metro area • Safety: “Spaghetti Junction” daily • Accessibility: Huge potential congestion at the intersection of Interstates 64, 65, and 71 in the economic development sites on heart of downtown Louisville Indiana side of East End crossing • Aging Infrastructure built in 1940s • Safety: Traffic congestion on the I-65 and 50s Kennedy Bridge and the 80-year old Second Street Bridge into Louisville • Extreme Public Opposition to East End Ohio River Crossing • Large volume of commuter traffic • Other Public Sentiment that an East from southern Indiana to work in End Bridge would solve the Louisville downtown traffic problem Louisville Bridges Project PURPOSE CROSS RIVER MOBILITY Recommended Interchange Two Bridges, One Project | The Downtown Bridge The Louisville and Southern Indiana Ohio River Bridges Project; Late 2009 Status: • Planning and Environmental documentation had virtually stopped due to cost of downtown and east end bridges being linked as one project. • The cost of this “Two Bridges, One Project” approach was $4.1 billion. • MPO fiscal constraint issues prevented the inclusion of the project in the Long Range Plan for the area. • KYTC and INDOT both knew that tolls would have to be part of any funding scenario for the project.
    [Show full text]
  • Phase 2 Evidence Report
    U.S. Surface Transportation Public-Private Partnerships: Objectives and Evidence – Extended Findings Lisardo Bolaños Morghan Transue Porter Wheeler Jonathan Gifford Release Date: March 1, 2019 Center for Transportation Public-Private Partnership Policy Schar School of Policy and Government George Mason University 3351 N. Fairfax Drive MS3B1 Arlington, VA 22201 U.S.A. http://p3policy.gmu.edu/ 1 2 ABSTRACT Effective public-private partnership (P3) policy evaluations must acknowledge the multiple and varied reasons why public agencies pursue alternative procurement approaches. While economic efficiency typically ranks high among evaluation criteria, it rarely represents a public agency’s sole or primary P3 objective. As a result, the following research expands a U.S. surface transportation P3 case study series to nine, from six, to further identify the objectives pursued and the evidence available for effectiveness evaluations. The case findings demonstrate that the studied agencies pursued 1) private sector financing; 2) private sector expertise and innovation; 3) accelerated project delivery; 4) cost, schedule, and quality certainty; 5) risk transfer and management; and 6) broader transit and development opportunities. The state and local public agencies largely achieved these goals but might benefit by a) pursuing private-sector expertise and innovation earlier; b) elevating risk transfer objectives; c) incorporating broader transit, local development, and value capture opportunities; and d) improving outcome measurement, analysis, and
    [Show full text]
  • State of the Logistics Industry MOVING INDIANA
    State of the Logistics Industry MOVING INDIANA 2021 MOVING INDIANA State of the Logistics Industry 2021 TABLE OF CONTENTS 2 Welcome Letters 4 Indiana’s Top-Ranked Business Environment 8 Foreign Investment in Indiana 9 Indiana’s COVID-19 Response 10 Defining the Future of Transportation 12 Ready-To-Work Talent Development 14 Transportation Network 20 Regional Profiles 20 Northwest 22 North Central 24 Northeast 26 Central 29 Southeast 31 Southwest 33 Resources 36 Thanks to Our Partners 38 Endnotes 1 MOVING INDIANA State of the Logistics Industry 2021 WELCOME STATE OF INDIANA Welcome to Indiana, We partner with organizations, such as Conexus the best place in Indiana, that bring industry, public-sector and the nation to start a academic partners together to sustain Indiana’s business, grow your advanced manufacturing and logistics leadership company and create for generations to come. When it comes to giving jobs. Indiana is known companies what they need to succeed on their own as the “Crossroads terms, we have shown over and over that Indiana of America” for good delivers on the motto, “A State That Works.” reason. The state is 1st in the nation in pass This report shows that Indiana understands through interstates, logistics. We listen to the needs of logistics home to the 2nd largest FedEx hub, is 4th companies, reduce regulatory burdens and nationally with 41 freight railroads, has the 8th provide stability and access to markets and largest cargo airport and is top 10 nationally in talent. That’s why companies, such as FedEx, domestic waterborne shipping. Amazon and Walmart, continue to make significant investments to expand their operations in Indiana.
    [Show full text]
  • Appendix I: Community Impact Assessment
    Appendix I: Community Impact Assessment and EJ Analysis Community Impact Assessment and Environmental Justice Analysis Technical Report Sherman Minton Renewal Project Indiana Department of Transportation April 10, 2020 Des. No. 1702255 Appendix I: Community Impact Assessment I 1 TABLE OF CONTENTS ES. EXECUTIVE SUMMARY...................................................................................................... 6 ES.1 Purpose and Need .................................................................................................... 7 ES.2 Public Perception.....................................................................................................10 ES.3 Existing Traffic Conditions .........................................................................................10 ES.4 Proposed Action and Maintenance of Traffic (MOT) Options ..........................................11 ES.5 Project Study Area and Timeline ................................................................................14 ES.6 CIA and EJ Methodologies .........................................................................................15 ES.7 Public Involvement Effort and EJ Outreach ..................................................................17 ES.8 Community Profiles and Demographics .......................................................................18 ES.9 CIA and EJ Impacts ...................................................................................................21 ES.10 CIA/EJ Findings and MOT Recommendations ...............................................................29
    [Show full text]
  • Clark Memorial Bridge Painting Projet Faqs 090318
    CLARK MEMORIAL BRIDGE PAINTING PROJECT FREQUENTLY ASKED QUESTIONS (FAQs) What is the scope of this project? Work on the Clark Memorial Bridge includes cleaning and painting of all the steel members on the bridge. This includes all of the steel beams underneath the bridge not visible to the motoring public. The old paint on the bridge is removed via a blast cleaning process prior to painting the steel using a three-coat system. Crews began work on the Indiana end of the bridge in February 2018 and are progressing south to Kentucky. Why is the work necessary? Built in 1929, painting and cleaning is part of a healthy maintenance cycle to preserve the steel and extend the useful life of the bridge. How long will the project take to complete? This project will span two construction seasons and is scheduled for completion in November of 2019. There will be periods when lanes are open to traffic during the winter months once construction activity pauses. What is the cost of this project? A $27.9 million contract was awarded for this project. How was the new paint color chosen for the bridge? The paint color for the bridge was chosen in 2010 by the Downtown Development Corporation (DDC) as part of its overall plan for revitalizing Second Street, which runs to the Clark Memorial Bridge. The DDC received a Transportation Enhancement grant for the Second Street project. The DDC selected the color from the Federal Highway Administration’s approved bridge paint colors. In accordance with a Louisville Metro ordinance for the Waterfront Development Overlay district, the Waterfront Development Corporation approved the paint choice as well.
    [Show full text]