of Full Title of the Project : Diversion of 4.875 ha, of forest land for Four Laning safison-- Road (sH-11) from RD-158'300 to 159.970 & 160.220 to 162.300 Tehsil Assandh under Forest Division & Distt. (). File No. : FPiHR/ROAD/3137212018 Date of Proposal : 15.01 .2018

CHECK LIST SERIAL NUMBER: 18 ..ScHEMEFoRcoMPENSAToRYAFFoRESTATIoN,,

Four Laning of Name of the ForesuReach to be diverted: Diversion of 4.875 ha. of forest land for Safison-Assandh-Kaithal Road (SH-11) from RD-158 300 to 159.970 & 160.220 to 162 300 Tehsil Assandh under Forest Divisron & Distt. Karnal (Haryana)'

Forest Area = 4,875 Hect'

Details of degraded forest land/non-forest land where C.A. is to be carried out' Division .- :- Karnal Tehsil:- Assandh Range :- Assandh C A Site name : R.F., COUP NO'g (Yes or No):- a) Whether the site selected for Compensatory Afforestation is a Land bank No, the site selected for compensatory Afforestation is not a land bank. b) lf the cA site is other than the land bank, reasons be given.- There is no land available in the land bank in Karnal. Plantation will be carried out in reserved forest area. from the c) ln case of non-forest area identified for CA, then what is the distance of CA site Area' adjoining forest boundary :-:- C.A. will be carried out in reserved forest i) SoiltYPe: Sandv Loam ii) Topography a' Hilly/Undulating/Plain: Plain b. Slope:-Steep/Medium/Gentle Gentle iii) Whether the area is bearing any root stock of vegetation:- No

Plantation Model:- qA

Copy of the approved Compensatory Afforestation Scheme/Model showing component : -, wise s :al and financial break up is as under:

Detair of year wise break-up of requirements -^: of funds is as under:- plantation cost is carcurated prants for Tail norms at 4m 2yzm x spacing at the wage rate of Rs. -i.1,- per day as under:_ Year Rate per Plant t'f Vea i iosl-oianorestiti o n ns t i2i- per plant -Rs. ,mffi-- O

87750 ne grFer Plant 3m Y"rt rnaintenance ---'----.,, -;=ot;^t 9/UU ;ar 1ut- r Rs. AN lVlz'/v Per Plant - -ziie13oo ai ntenance --T-1t - - 7i o\ 1-oh Y;ffi r --=;%; olr R(lVl charge = 9 IKM (1 1) Barbed wjie fencing iTotat cA unarge" on t'e to Qurvv Mi -scerraneotJS l-ritrnnnv I bneirreaol f-ov; \ \ cn*nu. i-chafses- 7183s5( charses \ i suo t;, (Atroialc-'A' ruttrition )harges - n ar c om Put's"tory=-xto o B i Oram -NE -,,-'"@f 0 iili fm oai e"t et"t i ZnaY;i mamtenT:" i irl - - l [nJ. szi--eer Prant i - Itsi 3-ovJar ma-'rntenancl-=-- -1 "f maintenance l ffi-1- r'er I re"' ^-n--v;ar KS. zot- *+: - -

1 PeaPlani I i57- I Ra t

L Rs. 8/- Per Plant t-I I i ni el- PeiPiint l I i-Rs. ioi- Pei Pian I Year malnl_e i- tgl 9'n - t1i- Per Plant I fnt + maintenance l (r ol i oltrVeai - nt zozool- Per Rt .M1 charge= NA \ 1. Barbed wire fencing _--1 Aaa1ll NA Suu toiiiGFotar 'n"'n"" L--- lcL-- ID ffiatment CrtheTAaTA-f sotG@ch::s-es \ Sun Total (D) \ I l E SafetY Zone \E -1- T EaI'rt6naleharses*---- IF t1 \ -i - -- '+- - suu Totar (Fi- per-' ha' i*v to-EeTRs"-86-?ffi[6-----T;:--;frnnilJ- -- presenailrueot To'utt tand \ oiverteo o ,".1 peim. 21 \ 11u _:^_ : ] *,oooo,_ \ z'61 Per Ptant i [o; ., -o p-o iiteo 1 388 [#9.##r?]""' -ry- * e i i =-*oro-om,r##*u-r'e'm*.; \ i cRruPn runo I

Technical details:-

Technical details of Compensatory Afforestation Scheme are as follows.- General Detail :- Compensatory Afforestation will carried out along With, R.F. KHANDAKHERI, Spacing:- 4x4mtr a Parl Species:- Neem & Shisham, Jamun/Jamoa etc Plantation method :- Tall Plantation Soil and Moisture Conservation Works :- -Nil- Protection (Fencing, Watch man, People's, Participation etc) :- Fencing Proposed Monitoring Mechanism: - Checking of Plantation work will be done by RFO, DCF, CF & DCF (M&E) Any other information :- Nil Forcrt Ollleer Place:- Karnal tfldeffisPltun,

Note :- CF (T) should countersign this C.A scheme if area to be afforested is more than 5 hectare

I cF.-===:l-

f,

>-_ --]