Forest Service

Total Page:16

File Type:pdf, Size:1020Kb

Forest Service aOo 3th UNITED STATES DEPARTMENT OF AGRICULTURE FOREST SERVICE NATIONAL WILDERNESS PRESERVATION SYSTEM THREE SISTERS WILDERNESS The exterior boundary of the French Pete Creek Addition to the Three Sisters Wilderness, Willamette National Forest, Pacific Northwest Region, November 1, 1979, as covered into the National Wilderness Preservation System by the "Endangered Imerican Wilderness Act of 1978," P.L. 95-237, February 24, 1978. U. S. GOVEENMENT PRINTING OFFICE1977 0 - 251-012 6200-7 (10/13) NATIONAL WILDERNESS PRESERVATION SYSTEM French Pete Creek Addition To The Three Sisters Wilderness Willamette National Forest I hereby certify that the legal description and map herewith represent the location of the boundary of the French Pete Creek Addition to the Three Sisters Wilderness on the Willamette National Forest as covered into the National Wilderness Preservation System by the "Endangered American Wilderness Act of 1978," P.L. 95-237, February 24, 1978. Date Regional Forester BOUNDARY DESCRIPTION THREE SISTERS WILDERNESS ADDITION The Three Sisters Wilderness Addition consists of an area in the State of Oregon, referenced to the Willamette Meridian. The boundary description modifies the description approved June 10, 1965. Beginning at a point, which is described on the Three Sisters Boundary Description, approved June 10, 1965; "on a sidehill which is 0.16 mile south of the South Fork McKenzie River." This point is 0.19 mile west of the northeast corner of Sec. 9, 1. 6 E., R.19 S., W.M; Thence N. 00151 E., 0.16 mile to the north bank of the South Fork McKenzie R i v er; Thence westerly 3.14 miles along the north bank of the South Fork McKenzie River to an unnamed creek which flows south into the South Fork McKenzie River. Said creek is 3.05 miles, S. 25°3O' E. of Rebel Rock triangulation station, 3.30 miles, N. 46° E. of Chucksney Mtn. triangulation station, and about 1.00 mile easterly of Frissell Crossing Bridge; Thence northerly 0.18 mile along the east bank of the unnamed creed to a point 3.05 miles, S. 22°40' E. of Rebel Rock triangulation station, and 3.50 miles, N. 44° E. of Chucksney Mtn. triangulation station; Thence 0.85 mile, N. 79°30' W. to a point on a ridge which is 2.21 miles, S. 63°3O' E. of Rebel Rock triangulation station, and 3.09 miles, N. 31°30' E. of Chucksney Mtn. triangulation station; Thence westerly 5.18 miles along the 3,200-foot elevation toa point on a ridge which is 1.58 miles, S. 85°3O' W. of Rebel Rock triangulation station, and 4.08 miles, N. 29° W. of Chucksney Mtn. triangulation station; Thence 0.45 mile, S. 59°30' W., alonga broad ridge to a point 0.18 mile east of the centerline of the South Fork Road No. 19; Thence northerly, on a location 0.18 mile east of the centerline of the South Fork Road No. 19, for a distance of 2.63 miles toa point on a ridge which is 3.10 miles, N. 46°30' W. of Rebel Rock triangulation station, and 5.15 miles, S. 75°3O' W. of Olallie Mtn. triangulation station; Thence northeasterly on a location 0.10 mile south of the thread of Rebel Creek for a distance of 1.25 miles toa point 2.55 miles, N. 27° W. of Rebel Rock triangulation station, and 4.08 miles, S. 74° W. of Olallie Mtn. triangulation station; Thence 0.59 mile, N. 15° E. to a point 3.00 miles, N. 19W. of Rebel Rock triangulation station, and 3.82 miles, S. 82° W. of Olallie Mtn. triangulation station; 330 Thence 0.25 mile, N. 84° W. to a point 3.89 miles, 5 E. of Tipsoo Butte triangulation station, and 4.05 miles, S. 82°30' W. of Olallie Mtn. triangulation station; Thence 0.21 mile, S. 37°30' W. to a point 3.98 miles, S.290301E. of Tipsoo Butte triangulation station, and 4.2 miles, S. 81°30' W. of Olallie Mtn. triangulation station; Thence 0.50 mile, N. 88°30' W. to a point 3.75 miles, S. 23° E. of Tipsoo Butte triangulation station, and 4.70 miles, S. 83° W. of Olallie Mtn. triangulation station; Thence 0.22 mile, N. 16° W. to a point 3.54 miles, S. 24° E. of Tipsoo 0 Butte triangulation station, and 4.73 miles, S. 85W. of Olallie Mtn. triangulation station; Thence 0.50 mile, S. 76° W. to a point 0.19 mile east of the centerline of the South Fork Road No. 19. Said point is 3.50 miles, S. 15° E. of Tipsoo Butte triangulation station, and 5.14 miles, S. 83°30' W. of Olallie Mtn. triangulation station; Thence northerly, on a location 0.19 mile east of the centerline of the South Fork Road No. 19, for a distance of 2.94 miles to a point on Tipsoo Creek which is 0.19 mile east of the centerline of the South Fork Road; Thence east 0.06 mile, on the south bank of Tipsoo Creek to a point which is 0.25 mile from the centerline of the South Fork Road No. 19; Thence northerly, on a location 0.25 mile east of the centerline of the East Fork Road No. 19 for a distance of 1.06 miles to the 2,400-foot elevation point on the first ridge south of Smith Creek which is 1.3 miles, S. 7330' W. of Tipsoo Butte triangulation station, and 7.75 miles, N. 72 W. of Olallie Mtn. triangulation station; Thence on a northerly direction for 1.25 miles along the 2,400-foot elevation to a point on the south bank of Slide Creek; Thence in a westerly direction along the south bank of Slide Creek for 0.13 mile to the 2,240-foot elevation; Thence northerly along the 2,240-foot elevation for 1.94 miles to a point on the ridge between Walker Creek and the South Fork McKenzie River; Thence 0.10 mile, N.330W. on the ridge dividing Walker Creek and the South Fork McKenzie River to the 2,000-foot elevation; Thence southeasterly along the 2,000-foot elevation to the south bank of Walker Creek; Thence southeasterly 0.13 mile along the south bank of Walker Creek to the northeast corner of a timber harvest unit which is 1.98 miles, N. 28 W. of Tipsoo Butte triangulation station, and 3.95 miles, S. 3°30' E. of Castle Rock triangulation station; Thence 0.23 mile, S. 54°30' W. along the northwestern edge of a timber cutting unit to a point 0.02 mile northeast of the centerline of Road No. 1994541; Thence 0.75 mile on a location 0.02 mile downhill from the centerline of Road No. 1994541 to a point which is 1.75 miles, N. 450 W. of Tipsoo Butte triangulation station, and 4.45 miles, S. 0°30' W. of Castle Rock triangulation station; Thence 0.20 mile, S. 890 W. to the 3,200-foot elevation point which is 1.60 miles, N. 40° W. of Tipsoo Butte triangulation station, and 4.45 miles, S. 2° E. of Castle Rock triangulation station; Thence southeasterly around the ridge between the South Fork McKenzie River and Walker Creek, 1.38 miles along the 3,200-foot elevation toa point which is 1.18 miles, N. 28°30' W. of Tipsoo Butte triangulation station, and 4.68 miles, S. 7°30' E. of Castle Rock triangulation station; Thence northeasterly 0.5 mile to a pointon the thread of Walker Creek which is 0.19 mile upstream the centerline of Road No. 1994; Thence 3.40 miles in a northwesterly directionon a location 0.19 miles above the centerline of Road No. 1994 toa point 0.18 mile due south of the confluence of the East Fork Creek and the high water mark of Cougar Reservoir; Thence 0.18 mile due north to the confluence of East Fork Creek and high water mark of Cougar Reservoir; Thence easterly 4.40 miles on a location 0.05 mile south of the centerline of the East Fork Road No. 1993, or along the south bank of the East Fork Creek, whichever is nearest the centerline of the East Fork Road No. 1993, to a point 0.05 mile south of the centerline of the East Fork Road No. 1993 550 which is the northwest corner ofa timber harvest unit 4.0 miles, N. E. of Tipsoo Butte triangulation station, and 5.80 miles, N. 29°30' W. of Olallie Mtn. triangulation station; Thence 0.21 mile, S. 180301 W. along the west boundary ofa timber harvest unit, to the East Fork Creek; Thence 3.00 miles along to south and west bank of the East Fork Creek to the 4,000-foot elevation point; Thence 0.60 mile, S. 29°30' E. to a prominent pointon the ridgetop which is 4.16 miles, S. 85° E. of Tipsoo Butte triangulation station, and 3.10 miles, N. 38° W. of Olallie Mtn. triangulation station; Thence northeasterly along the ridge dividing the East Fork Creek drainage and French Pete Creek drainage for 0.31 mile to a point which is 4.43 milesô S. 87° E. of Tipsoo Butte triangulation station, and 3.10 miles, N. 33 W. of Olallie Mtn. triangulation station; Thence southeasterly along a spur ridge 0.30 mile to a point which is 0.06 mile from the centerline of the East Fork Road No.
Recommended publications
  • Mckenzie SOUTH FORK
    Bull Trout Population Study in the Middle Fork Willamette and McKenzie River Drainage Basins June - November 1994 Stephen D. Hammond Giles C. Thelen Oregon Department of Fish and Wildlife 3150 East Main Street Springfield, OR 97478 November 1994 CONTENTS Page MAINSTEM McKENZIE POPULATION SUMMARY........................................................................................................... 1 JUVENILE SURVEYS: Lower Separation Creek ................................................................................. 2 Upper Separation Creek and Separation Lake............................................... 4 Harvey Creek.................................................................................................. 5 George Creek ................................................................................................. 6 Anderson Creek.............................................................................................. 7 Olallie Creek ................................................................................................... 8 Creek 58 ......................................................................................................... 9 Buck Side Channel ......................................................................................... 10 Sweetwater Creek........................................................................................... 11 ADULT SURVEYS: McKenzie Standard Pool Check ..................................................................... 12 SPAWNING SURVEYS: Separation
    [Show full text]
  • Mckenzie River Sub-Basin Action Plan 2016-2026
    McKenzie River Sub-basin Strategic Action Plan for Aquatic and Riparian Conservation and Restoration, 2016-2026 MCKENZIE WATERSHED COUNCIL AND PARTNERS June 2016 Photos by Freshwaters Illustrated MCKENZIE RIVER SUB-BASIN STRATEGIC ACTION PLAN June 2016 MCKENZIE RIVER SUB-BASIN STRATEGIC ACTION PLAN June 2016 ACKNOWLEDGEMENTS The McKenzie Watershed Council thanks the many individuals and organizations who helped prepare this action plan. Partner organizations that contributed include U.S. Forest Service, Eugene Water & Electric Board, Oregon Department of Fish and Wildlife, Bureau of Land Management, U.S. Army Corps of Engineers, McKenzie River Trust, Upper Willamette Soil & Water Conservation District, Lane Council of Governments and Weyerhaeuser Company. Plan Development Team Johan Hogervorst, Willamette National Forest, U.S. Forest Service Kate Meyer, McKenzie River Ranger District, U.S. Forest Service Karl Morgenstern, Eugene Water & Electric Board Larry Six, McKenzie Watershed Council Nancy Toth, Eugene Water & Electric Board Jared Weybright, McKenzie Watershed Council Technical Advisory Group Brett Blundon, Bureau of Land Management – Eugene District Dave Downing, Upper Willamette Soil & Water Conservation District Bonnie Hammons, McKenzie River Ranger District, U.S. Forest Service Chad Helms, U.S. Army Corps of Engineers Jodi Lemmer, McKenzie River Trust Joe Moll, McKenzie River Trust Maryanne Reiter, Weyerhaeuser Company Kelly Reis, Springfield Office, Oregon Department of Fish and Wildlife David Richey, Lane Council of Governments Kirk Shimeall, Cascade Pacific Resource Conservation and Development Andy Talabere, Eugene Water & Electric Board Greg Taylor, U.S. Army Corps of Engineers Jeff Ziller, Springfield Office, Oregon Department of Fish and Wildlife MCKENZIE RIVER SUB-BASIN STRATEGIC ACTION PLAN June 2016 Table of Contents EXECUTIVE SUMMARY .................................................................................................................................
    [Show full text]
  • Chapter 5 State(S): Oregon Recovery Unit Name: Willamette River
    Chapter 5 State(s): Oregon Recovery Unit Name: Willamette River Recovery Unit Region 1 U.S. Fish and Wildlife Service Portland, Oregon DISCLAIMER Recovery plans delineate reasonable actions that are believed necessary to recover and protect listed species. Plans are prepared by the U.S. Fish and Wildlife Service and, in this case, with the assistance of recovery unit teams, contractors, State and Tribal agencies, and others. Objectives will be attained and any necessary funds made available subject to budgetary and other constraints affecting the parties involved, as well as the need to address other priorities. Recovery plans do not necessarily represent the views or the official positions or indicate the approval of any individuals or agencies involved in the plan formulation, other than the U.S. Fish and Wildlife Service. Recovery plans represent the official position of the U.S. Fish and Wildlife Service only after they have been signed by the Director or Regional Director as approved. Approved recovery plans are subject to modification as dictated by new findings, changes in species status, and the completion of recovery tasks. Literature Cited: U.S. Fish and Wildlife Service. 2002. Chapter 5, Willamette River Recovery Unit, Oregon. 96 p. In: U.S. Fish and Wildlife Service. Bull Trout (Salvelinus confluentus) Draft Recovery Plan. Portland, Oregon. ii ACKNOWLEDGMENTS Two working groups are active in the Willamette River Recovery Unit: the Upper Willamette (since 1989) and Clackamas Bull Trout Working Groups. In 1999, these groups were combined, and, along with representation from the Santiam subbasin, comprise the Willamette River Recovery Unit Team.
    [Show full text]
  • Schedule of Proposed Action (SOPA) 07/01/2013 to 09/30/2013 Willamette National Forest This Report Contains the Best Available Information at the Time of Publication
    Schedule of Proposed Action (SOPA) 07/01/2013 to 09/30/2013 Willamette National Forest This report contains the best available information at the time of publication. Questions may be directed to the Project Contact. Expected Project Name Project Purpose Planning Status Decision Implementation Project Contact R6 - Pacific Northwest Region, Occurring in more than one Forest (excluding Regionwide) Prescribed Fire in Wilderness: - Vegetation management In Progress: Expected:09/2013 06/2014 Michael Keown Scott Mountain and Cascade (other than forest products) Scoping Start 01/09/2013 541-549-7735 Lakes Areas, Deschutes and - Fuels management Est. 215 Comment Period Legal [email protected] Willamette NF Notice 05/2013 EA Description: The project would use prescribed fire in the Three Sisters Wilderness area to modify vegetation and fuels to sufficiently reduce the threats to values at risk outside of Wilderness in order to allow fire to play a more natural role within Wilderness Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=39655 Location: UNIT - Sisters Ranger District, McKenzie River Ranger District. STATE - Oregon. COUNTY - Deschutes, Lane, Linn. LEGAL - T15S R07E, sec. 21,22,23,24,26,26,27,28,33,34,35,36. T17SR08E, sec. 32,33,34,35,36; T17S R09E, sec. 31; T18S R08E, sec. 1,2,3,4,5,6,7,8,9,10,11,12,13,15,16,17,18. T18S R09E, sec. 5,6,7,8,17,18. There are two focus areas: Scott Mountain on the Willamette NF and Cascade Lakes on the Deschutes NF. Willamette National Forest, Forestwide (excluding Projects occurring in more than one Forest) R6 - Pacific Northwest Region Spring Chinook Release Site - Wildlife, Fish, Rare plants In Progress: Expected:07/2013 07/2013 Brett Blundon Improvements Scoping Start 01/29/2013 541-225-6447 EA Est.
    [Show full text]
  • Schedule of Proposed Action (SOPA) 07/01/2017 to 09/30/2017 Willamette National Forest This Report Contains the Best Available Information at the Time of Publication
    Schedule of Proposed Action (SOPA) 07/01/2017 to 09/30/2017 Willamette National Forest This report contains the best available information at the time of publication. Questions may be directed to the Project Contact. Expected Project Name Project Purpose Planning Status Decision Implementation Project Contact R6 - Pacific Northwest Region, Occurring in more than one Forest (excluding Regionwide) Central Cascades Wilderness - Recreation management In Progress: Expected:08/2018 06/2019 Beth Peer Strategies 2017 Scoping Start 06/01/2017 541-383-4761 EA Est. Comment Period Public [email protected] Notice 02/2018 Description: The Deschutes and Willamette National Forests are considering visitor use management strategies for five wilderness areas in the central Cascades in order to reduce resource impacts and negative effects to wilderness character due to high use. Web Link: http://www.fs.usda.gov/project/?project=50578 Location: UNIT - Bend/Fort Rock Ranger District, Sisters Ranger District, Middle Fork Ranger District, Detroit Ranger District, McKenzie River Ranger District. STATE - Oregon. COUNTY - Deschutes, Jefferson, Klamath, Lane, Linn. LEGAL - Not Applicable. Project addresses five Central Cascades Wildernesses. Mt. Jefferson, Mt. Washington, Three Sisters, Waldo Lake, and Diamond Peak. Willamette National Forest Detroit Ranger District (excluding Projects occurring in more than one District) R6 - Pacific Northwest Region 2017 Young Stand Density - Wildlife, Fish, Rare plants In Progress: Expected:11/2017 08/2018 Sue Crowder Management - Vegetation management Scoping Start 04/07/2017 503-854-4364 CE (other than forest products) [email protected] Description: Reduce stocking on approximately 4800 acres, district wide, in overstocked stands less than 40 years old by thinning.
    [Show full text]
  • Cultural Resource Overview of the \Villamette National Forest Western Oregon Rick Minor and Audrey Frances Pecor
    Cultural Resource Overview of the \Villamette National Forest Western Oregon Rick Minor and Audrey Frances Pecor University of Oregon Anthropological Papers No. 121977 CULTURAL RESOURCE OVERVIEW OF THE WILLAMETTE NATIONAL FOREST, WESTERN OREGON BY RICK MINOR AND AUDREY FRANCES PECOR UNIVERSITY OF OREGON ANTHROPOLOGICAL PAPERS NO. 12 1977 CULTIJRAL RESOURCE OVERVIEW OF THE WILLAMETTE NATIONAL FOREST, WESTENN ORECON by Rick Minor and Audrey Frances Pecor Uniwersity of Oregon Anthropological Papers No. 12 1977 Errata Page 16, paragraph 4, line 9,Read "North Santiain," rather than "South Santiam." Page 17, paragraph 3,This is misleading.Although a section of the western portion of the Oregon Central Military Wagon Road became part of the Willamette Pass highway, the Wagon Road itself crossed the Cascades at Eintnigrant Pass. Page 11, paragraph 4, line 3,Change to read ",. most important one has probably been that which was formerly located at McKenzie Bridge. Page 18, paragraph 4, line 4.Read "aite 31" rather than "site 32." Page 20, last paragraph, line 2.Read "Leo Paschelke" rather than "Las Paschelke." Page 28, paragraph 2, line 1.Read "Another hot springs..," rather than tA more recently developed hot springs, Page 33, Figure 3.Site 11 is misiocatedit should be placed 4 tijiles south and 2 miles weSt of the location shown,Site 12 is mislocated; it should be placed approximately 6 miles east and tmiles south of the position shown, Page 54.Caption for Figo 20 should reflect that the photograph was furnished by S. hear. Page 70-li, Table 4.dorrect as follows Site Nooi Map Reference North Santiam Mining tistrict Fig.
    [Show full text]
  • W V V 8 25 2012.Pdf
    Willamette Valley Voices: Connecting Generations In This Issue A Journal of Willamette Valley History This edition of Willamette Valley Voices: Connecting Generations is the first of the Willamette Volume 1 Summer 2012 Number 1 Heritage Center’s new biannual publication. The goal of the journal is to provide a showcase for scholarly writing pertaining to History and Heritage in the Oregon’s Willamette Valley, south of Portland, written by scholars, students, heritage professionals and historians - professional and amateur. The Importance of Public Space as Community Anchors Its purpose is to promote historical scholarship focused on the communities of the area. Each edition is Joy Sears themed to orient authors and readers to widely varied and important topics in Valley history. 4 Willamette Valley Voices’ first edition shares articles about Public Spaces. Public spaces, both built and Dancing its Way into your Heart: Cottonwoods Ballroom 1930-1960 natural, anchor the Valley’s communities and shape and inform community identities. Identity-making Toni Rush and Jim Creighton around community anchors is an important way to reinvigorate city centers and downtowns. Civic 9 institutions and public spaces help create vibrant towns and destinations, as well as serve as catalysts for revitalizing the neighborhoods and areas around them. Salem School Names Fritz Juengling The articles in this first issue vary greatly in topic, but generally seem to fall into three areas: Those that 18 focus on history specific to a city, town or place - “Dancing its Way into your Heart: Cottonwoods Oregon State Insane Asylum: A Sanctuary Ballroom 1930-1960” by Toni Rush & Jim Creighton and “Salem School Names” by Fritz Juengling; Dianne Huddleston topics that have a largely statewide emphasis, though they also have broader implications - “Oregon 31 State Insane Asylum: A Sanctuary” by Diane Huddleston and “The First Women to Cross the Continent by Covered Wagon, Welcomed by Dr.
    [Show full text]
  • Schedule of Proposed Action (SOPA) 10/01/2017 to 12/31/2017 Willamette National Forest This Report Contains the Best Available Information at the Time of Publication
    Schedule of Proposed Action (SOPA) 10/01/2017 to 12/31/2017 Willamette National Forest This report contains the best available information at the time of publication. Questions may be directed to the Project Contact. Expected Project Name Project Purpose Planning Status Decision Implementation Project Contact R6 - Pacific Northwest Region, Occurring in more than one Forest (excluding Regionwide) Central Cascades Wilderness - Recreation management In Progress: Expected:08/2018 06/2019 Beth Peer Strategies 2017 Scoping Start 06/01/2017 541-383-4761 EA Est. Comment Period Public [email protected] Notice 02/2018 Description: The Deschutes and Willamette National Forests are considering visitor use management strategies for five wilderness areas in the central Cascades in order to reduce resource impacts and negative effects to wilderness character due to high use. Web Link: http://www.fs.usda.gov/project/?project=50578 Location: UNIT - Bend/Fort Rock Ranger District, Sisters Ranger District, Middle Fork Ranger District, Detroit Ranger District, McKenzie River Ranger District. STATE - Oregon. COUNTY - Deschutes, Jefferson, Klamath, Lane, Linn. LEGAL - Not Applicable. Project addresses five Central Cascades Wildernesses. Mt. Jefferson, Mt. Washington, Three Sisters, Waldo Lake, and Diamond Peak. Willamette National Forest Detroit Ranger District (excluding Projects occurring in more than one District) R6 - Pacific Northwest Region 2017 Young Stand Density - Vegetation management In Progress: Expected:11/2017 08/2018 Sue Crowder Management (other than forest products) Scoping Start 04/07/2017 503-854-4364 CE [email protected] *UPDATED* Description: Reduce stocking on approximately 4800 acres, district wide, in overstocked stands less than 40 years old by thinning.
    [Show full text]
  • Schedule of Proposed Action (SOPA) 04/01/2017 to 06/30/2017 Willamette National Forest This Report Contains the Best Available Information at the Time of Publication
    Schedule of Proposed Action (SOPA) 04/01/2017 to 06/30/2017 Willamette National Forest This report contains the best available information at the time of publication. Questions may be directed to the Project Contact. Expected Project Name Project Purpose Planning Status Decision Implementation Project Contact R6 - Pacific Northwest Region, Occurring in more than one Forest (excluding Regionwide) Central Cascades Wilderness - Recreation management Developing Proposal Expected:07/2018 07/2019 Beth Peer Strategies 2017 Est. Scoping Start 05/2017 541-383-4761 EA [email protected] *UPDATED* Description: The Deschutes and Willamette National Forests are considering visitor use management strategies for five wilderness areas in the central Cascades in order to reduce resource impacts caused by increasing recreation use. Web Link: http://www.fs.usda.gov/project/?project=50578 Location: UNIT - Bend/Fort Rock Ranger District, Sisters Ranger District, Middle Fork Ranger District, Detroit Ranger District, McKenzie River Ranger District. STATE - Oregon. COUNTY - Deschutes, Jefferson, Klamath, Lane, Linn. LEGAL - Not Applicable. Project addresses five Central Cascades Wildernesses. Mt. Jefferson, Mt. Washington, Three Sisters, Waldo Lake, and Diamond Peak. Willamette National Forest Detroit Ranger District (excluding Projects occurring in more than one District) R6 - Pacific Northwest Region 2017 Young Stand Density - Wildlife, Fish, Rare plants Developing Proposal Expected:11/2017 08/2018 Sue Crowder Management - Vegetation management Est. Scoping Start 04/2017 503-854-4364 CE (other than forest products) [email protected] *NEW LISTING* Description: Reduce stocking on approximately 4800 acres, district wide, in overstocked stands less than 40 years old by thinning. Web Link: http://www.fs.usda.gov/project/?project=51338 Location: UNIT - Detroit Ranger District.
    [Show full text]
  • History of the Willamette National Forest
    HISTORY OF THE WILLAMETTE NATIONAL FOREST By Lawrence and Mary Rakestraw 1991 USDA - Forest Service Pacific Northwest Region TABLE OF CONTENTS INTRODUCTION The Willamette National Forest - A Personal Perspective Description of the Willamette National Forest Vicinity Map Willamette National Forest Map History of the Willamette National Forest Table of Contents CHAPTER I - BEGINNINGS 1891-1897 Early Forest Reserve Proposal in 1889 Forest Reserve Act of 1891 Cascade Range Forest Reserve, 1893-1897 Coville Report on Grazing Notes - Chapter I Chronological Summary, 1891-1897 CHAPTER II - EVOLUTION TO PROFESSIONAL LANDMANAGEMENT, 1898-1905 U.S. Geological Survey Report on the Cascade Range Forest Reserve Forest Reserve Administration by the General Land Office General Land Office Forest Rangers Notes - Chapter II Chronological Summary, 1898-1905 CHAPTER III - TAMING A WILD FOREST: 1905-1933 Introduction Administration Lands The Timber and Stone Act Mining Claims Wagon Road Grants and School Lands Agricultural Lands, Homesteaders, and Squatters Lieu Lands and Land Fraud The Oregon Land Fraud Cases Grazing Wildlife Developments Recreation Amenity Values Research Fire Control Timber Sales Notes - Chapter III Chronological Summary, 1905-1933 CHAPTER IV: DEPRESSION AND WAR, 1933-1945 Introduction Administration Timber Sales Subsistence Homesteads Wildlife and Grazing Recreation, Amenity Values, Developments Relief Work—The Civilian Conservation Corps World War II Notes - Chapter IV Chronological Summary, 1933-1944 CHAPTER V: ERA OF INTENSIVE FORESTRY,
    [Show full text]
  • Schedule of Proposed Action (SOPA) 01/01/2017 to 03/31/2017 Willamette National Forest This Report Contains the Best Available Information at the Time of Publication
    Schedule of Proposed Action (SOPA) 01/01/2017 to 03/31/2017 Willamette National Forest This report contains the best available information at the time of publication. Questions may be directed to the Project Contact. Expected Project Name Project Purpose Planning Status Decision Implementation Project Contact R6 - Pacific Northwest Region, Occurring in more than one Forest (excluding Regionwide) Central Cascades Wilderness - Recreation management Developing Proposal Expected:07/2018 07/2019 Beth Peer Strategies 2017 Est. Scoping Start 04/2017 541-383-4761 EA [email protected] *NEW LISTING* Description: The Deschutes and Willamette National Forests are considering visitor use management strategies for five wilderness areas in the central Cascades in order to reduce resource impacts caused by increasing recreation use. Web Link: http://www.fs.usda.gov/project/?project=50578 Location: UNIT - Bend/Fort Rock Ranger District, Sisters Ranger District, Middle Fork Ranger District, Detroit Ranger District, McKenzie River Ranger District. STATE - Oregon. COUNTY - Deschutes, Jefferson, Klamath, Lane, Linn. LEGAL - Not Applicable. Project addresses five Central Cascades Wildernesses. Mt. Jefferson, Mt. Washington, Three Sisters, Waldo Lake, and Diamond Peak. Willamette National Forest Detroit Ranger District (excluding Projects occurring in more than one District) R6 - Pacific Northwest Region Camp Pioneer Parking Lot - Recreation management In Progress: Expected:04/2017 06/2017 Penny Keen Outhouse - Special area management Scoping Start 09/08/2016 503-854-4202 CE - Watershed management [email protected] *UPDATED* - Special use management - Facility management Description: Camp Pioneer is requesting authorization to install an vault for an outhouse next to the parking lot. Location: UNIT - Detroit Ranger District.
    [Show full text]
  • UPDATE SOUTH FORK MCKENZIE RIVER WATERSHED ANALYSIS Mckenzie River Ranger District Willamette National Forest September 2010
    UPDATE SOUTH FORK MCKENZIE RIVER WATERSHED ANALYSIS McKenzie River Ranger District Willamette National Forest September 2010 Photo: Roaring Springs Prepared by: McKenzie River IDT ____________________________ Mary Allison District Ranger McKenzie River Ranger District South Fork McKenzie River WA Update EXECUTIVE SUMMARY In 1994 the Record of Decision for the Northwest Forest Plan was signed. That same year a “pilot” watershed analysis was completed for the South Fork McKenzie watershed by employees of the Willamette National Forest and the Blue River Ranger District. The South Fork McKenzie Watershed Analysis (1994) thoroughly documented existing conditions in the South Fork and made recommendations on restoration actions and management activities. In 2010 the employees of the McKenzie River Ranger District were charged with updating the 1994 analysis. With limited funding the interdisciplinary team sought to update the original watershed analysis with information on the existing condition, completed restoration projects, and recommendations for future activities. Significant changes have occurred in the fisheries and recreation arenas. The U.S. Army Corps of Engineers has constructed a water temperature control tower at Cougar Dam that has restored the historic temperature regime to the South Fork McKenzie downstream of the dam. More recently, the Corps of Engineers completed an adult fish collection facility downstream of Cougar Dam to collect and transport spring Chinook salmon, bull trout, rainbow trout, and cutthroat trout upstream of the dam during their spawning migrations. By the end of calendar year 2010 the Corps of Engineers will decide on how to implement safe and effective downstream passage for native fishes. There are 16 developed recreation sites within the South Fork watershed, and of these, ten are operated under a concessionaire special use permit.
    [Show full text]