European Structural and Investment Funds

LIST OF OPERATIONS OPERATIONAL PROGRAMME "ENVIRONMENT" 2014-2020, PRIORITY AXIS 2 “WASTE”

Operation start Total eligible Union co- date and Location of Category of Date of last Beneficiary name Operation name Operation summary expenditure financing Country operation end intervention update rate operation date (BGN)

Municipality of Investment This project proposal aims to design and 13.11.2017- 9 368 737.16 85% 017 13.11.2017 Sandanski project build a composting installation and 13.07.2020 "Composting installation of pre-treatment of mixed plant for waste, which will be located on a site within the administrative boundaries of the separately Municipality of Sandanski and will serve collected green all municipalities in the Regional and biodegradable Association for Waste Management - waste, Plants for Sandanski - Municipalities of Sandanski, pre-treatment of , Strumyani. household waste The expected result of the implementation and supporting of project measures is to reduce the amount infrastructure for of landfilled waste by providing additional the Regional capacity for pre-treatment of mixed waste and for separate collection and recycling system for waste through composting of green and management in biodegradable waste. the municipalities The implementation of the project activities of Sandanski, will contribute to the achievement of the Strumyani and national targets laid down in national Kresna" legislation and in the National Plan for Waste Management 2014-2020, to the limit of the amount of biodegradable waste to 35% The total amount of waste generated by 1995 and to increase - to the end of 2020, the proportion of recycled waste to be less than 50% of generated household waste. The construction of the composting installation and the pre-treatment of household waste, which will serve the

European Union European Structural and Investment Funds

municipalities of RAWM - Sandanski, will contribute to compliance with the waste management hierarchy in the region, according to European and national legislation: - preventing their formation; - preparation for reuse; - recycling; - other recovery, for example, recovery for power generation; - disposing.

Madan Design and The project proposal includes the 20.11.2017 - 9 039 369.69 85% Madan Bulgaria 017 20.11.2017 Municipality Construction of a construction of a composting plant for 20.10.2020 Composting plant separately collected green waste and/or and a Waste biodegradable waste and a waste pretreatment plant for mixed municipal pretreatment plant waste. The plants will be located at the for municipal Regional landfill for municipal solid waste solid waste on the of Madan municipality situated in Sharenka territory of Madan village. A plot of land 8410 m2 is municipality designated for the composting plant and the regional waste waste pretreatment plant of Madan’s disposal landfill Regional Waste Management System for the including the municipalities Madan, municipalities of and . The land plot is owned by Madan municipality. The Madan, Zlatograd forecasted composting plant capacity is and Nedelino. between 2063 t/y and 2100 t/y green and biodegradable waste, separately collected from the municipalities Madan, Zlatograd and Nedelino. The forecasted capacity of the composting plant guarantees the long term achievement of the objectives , set by The WMA of Bulgaria art.31, sec.1 p.2, for the three municipalities.. The forecasted capacity of the waste pretreatment plant for mixed municipal waste is up to 5000 t/y . The forecasted capacity of the pretreatment facility guarantees the long term achievement of the objectives set by The WMA of Bulgaria art.31, sec.1 p.2, for the

European Union European Structural and Investment Funds

three municipalities. With the implementation of the project a separate waste collection system for green and biodegradable waste will be established on the territories of the municipalities Madan, Zlatograd and Nedelino. For the organisation of the separate waste collection system for green and biodegradable waste, specific equipment will be delivered for the collection and transport of the biodegradable and green waste, as well as bins for separate collection. With the realization of the project proposal, the national objectives set by the Bulgarian legislation and the NWP for the decrease of the quantity of disposed waste by 2020 to 35% of their quantity as of 1995, and for increasing the share of recycled waste by 2020 to no less than 50% of the generated municipal solid waste.

Municipality Design and The overall goal of the Project is to reduce 29.11.2017- 10 313 535.20 85% Bulgaria 017 29.11.2017 the quantity of disposed waste and increase Petrich construction of the share of recycled and recovered waste 29.04.2020 an installation in municipality Petrich which forms a for composting separate waste management region. The project includes construction of a biodegradable composting installation with capacity 4150 waste and an t/y and an installation for pre-treatment of installation for household waste with capacity 10 841 t/y, and the needed site infrastructure, as well as pre-treatment the needed equipment for their operation. of household The two installations will be located at the waste in regional landfield Petrich. The project investments will contribute also to municipality improving resource efficiency as the Petrich infrastructure built under the project will turn the waste into useful products - the composting installation will produce quality compost, and the installation for pre- treatment of household waste will separate the useful components for recycling them.

European Union European Structural and Investment Funds

Within the project period, municipality Petrich will introduce a system of separate collection of green waste, that will include separate collection of waste from households in Petrich and villages , Marikostinovo, Mihnevo and Karnalovo and separate collection of green waste from public spaces in all settlements in the municipality. For this purpose, 60 bins of 1.1 m3 for the separate collection from households and two trucks for transportation of separate collected green waste on the territory of the municipality to the composting installation will be purchased under the project. The social and economic effects of the project consist in improved quality of the environment by reducing hazardous emissions related to waste disposal; provision of quality compost, creation of new jobs for the operation of the infrastructure built under the project.

Municipality Design and The overall goal of the Project is to reduce 30.11.2017- 13 563 028.56 85% Bulgaria 017 30.11.2017 Razgrad construction of an the quantity of disposed waste generated in 30.07.2020 installation for the municipalities members of RWMA composting Razgrad through ensuring infrastructure for separate collection and composting of green biodegradable biodegradable waste and for preliminary waste and an treatment of household waste before installation for disposal. This goal is compliant with the preliminary waste management hierarchy and the EU treatment of and national objectives for reducing the household waste quantity of biodegradable waste going to for municipalities landfills and increasing the quantities of in Razgrad Waste recycled waste of paper, glass, metals and Management plastics. The project contributes also to improving resource efficiency as the Region infrastructure built under the project will turn the waste into useful products. The specific objective of the Project is to ensure the needed infrastructure for

European Union European Structural and Investment Funds

increasing the quantities of separate collected, recycled and recovered wastes in the municipalities in Region Razgrad. The Project includes the following activities: 1. Preparation of the project proposal 2. Preparation of tender documentations 3. Preparation of design projects and preparation of tender documentation for design and construction of the two installations 4. Technical design and construction of a composting installation and an installation for preliminary treatment 5. Construction supervision 6. Implementation of information and communication measures 7. Organization and management of the Project As a result of the project, a composting installation and an installation for preliminary treatment will be constructed and put into operation. Equipment for separate collection of green waste will be ensured. The social and economic effects of the implementation of the project consist in improved quality of the environment by reducing hazardous emissions related to waste disposal; provision of a new waste service for the citizen and business. New jobs will be created for the operation of the infrastructure built under the project.

Municipality of Construction of The implementation of this project proposal 18.12.2017- 9 147 276.52 85% Gotse Bulgaria 017 18.12.2017 plant for pre- aims to build a composting installation and 18.03.2020 Delchev treatment of waste a pre-treatment plant for municipal waste and composting for the Gotse Delchev municipality, Garmen Municipality and plant in the region Municipality. The construction of these of Regional installations will contribute to the reduction Association for of the amount of landfilled household waste

European Union European Structural and Investment Funds

Waste in the regional landfill for non-hazardous Management waste, Dobrotino, Mokra Polyana, Gotse Gotse Delchev Delchev by providing additional capacity for pre-treatment of mixed municipal waste and for separate collection and recycling by composting of green and / or biodegradable waste.The proposed site for the construction of both facilities is located in property №004043, "Mokra polyana" area, in the land of the village of Dobrotino and occupies of the assigned property in which is located an active regional landfill for the municipal waste - Gotse Delchev region, its area amounts to 12.5 decares. There is an infrastructure on the site and there is no need to build a new one. Planned for construction and operation are the following facilities: - Composting plant with a capacity of 2100 t / year - pre-treatment plant for mixed municipal waste with a capacity of 12 300 t / year. - introduction of a system for separate collection of green waste, including containers with a capacity of 1.1 cubic meters (268 pcs) and waste disposal machinery - construction of a new transformer station at the site. The target group of this project proposal is the inhabitants of Gotse Delchev, Garmen and Hadzhidimovo.

Municipality of Design and The project proposal to receive grants under 20.12.2017- 6 200 343.30 85% Bulgaria 017 20.12.2017 Troyan construction of the procedure BG16M1OR002-2.002 20.02.2020 additional „Combined procedure for the design and infrastructure construction of composting installations and of installations for pre-treatment of (installation of waste“ under Priority axis 2 of Operational pre-treatment of Program „Environment 2014-2020“. It is waste and aimed at taking measures to improve waste composting plant management in accordance with the

European Union European Structural and Investment Funds

for separately national plan for waste management. collected A composting installation for separately biodegradable and collected green waste with a capacity of / or green waste) 2200 t/y will be built; The necessary equipment, equipment and equipment for for development separate collection of green waste (110 of regional system containers, 2 special vehicles for green of waste waste collection, mobile shredder with management telescopic loader and mobile sieve) will be region of Troyan, provided; An installation for pre-treatment including Troyan of mixed municipal waste will be and constructed with a capacity of 6300 t/y; The Municipalities necessary accompanying infrastructure to the site will also be built (a street with a width of 10 m with a length of about 100 m; a sewerage u 300 with a length of about 300 m; a water pipe u 110 with a length of about 4 m).

Municipality Combined The project proposal includes the design 15.02.2018- 19 693 675.14 85% Pazardjik Bulgaria 017 15.02.2018 Pazardjik procedure for the and construction of a pre-treatment plant 15.01.2021 Batak, design and for mixed collected municipal waste, a Belovo, construction of system for separate collection and recovery of green and biodegradable waste and its composting Lesichovo, recycling in composting plants. installations and Pre-treatment facility for mixed municipal and waste waste pretreatment It builds within the boundaries of PI installations for 000723, Aleko Konstantinovo village, the municipalities Pazardjik municipality, with manual sorting of Batak, Belovo, and aerobic stabilization technology of the Bratsigovo organic fraction, with a capacity of 43 000 t Lesichovo, / yr. Separation module: Capacity 43 000 t / y - a Peshtera, technological equipment hall is foreseen: and charging area, screening, manual sorting of Septemvri recyclable materials and energy recovery materials. Compacting of the separated light fractions is envisaged. Stabilization module: Capacity 14 000 t / g Stabilization of the organic fraction is carried out in polyethylene reactors, the

European Union European Structural and Investment Funds

process management being entirely automatic. There are 9 starter stations for composting. Composting plant - "Al. Konstantinovo "

Municipality Construction of The project proposal for grant under the 21.03.2018- 9 673 936.00 85% Bulgaria 017 21.03.2018 Velingrad installation for procedure BG16M1OP002-2.002 21.02.2021 pre-treatment of "Combined procedure for the design and mixed municipal construction of composting installations and installations for pre-treatment of waste and waste" under Priority Axis 2 of Operational composting plant Program "Environment 2014-2020" is of green waste aimed to take measures for improvement from of municipal waste management in municipalities of accordance with the National Waste Velingrad and Management Plan. Rakitovo Sustainable waste management will be achieved through investment in design and construction of composting plant for separately collected green and biodegradable waste, together with providing the necessary equipment, facilities and equipment for separate collection of green waste and pretreatment installation for mixed collected municipal waste, as well as the accompanying infrastructure to them.

Municipality of Construction of In connection with the set national and 05.04.2018- 13 498 945.68 85% Bulgaria 017 05.04.2018 Orqhovo installation for European targets for reduction of the 05.03.2021 Miziya pre-treatment and deposited waste and for the recycling and Borovan composting, utilization of specific waste streams, the municipalities of RWMA - Oryahovo, within the Byala based on information from preliminary Regional system analyzes and studies for the needs in Slatina of waste achieving the objectives under art. 31, para. Hayredin management in 1, item 1 and 2 of the WMA provide for the Region Oryahovo provision of investments for the construction of an additional waste treatment infrastructure, as follows: - Establishment of a pre-treatment plant for the treatment of domestic waste for the

European Union European Structural and Investment Funds

purpose of its recovery with a capacity of 15,300 tonnes (Objective: preparation for recycling and waste disposal and provision of a maximum of 50% of the input stream of the waste) - Construction of 2 composting plants for separate collected green and biodegradable waste: * Installation in General. Kozloduy, with a capacity of 4 400 t, For the needs of the Municipality; * Installation in General. Oryahovo for the needs of the other municipalities of RWMA - Oryahovo with a capacity of 4 500 t. (Objective: use of bio- waste for each municipality)

Municipality Design and The overall goal of the Project is to reduce 05.04.2018- 6 154 812.21 85% Montana Bulgaria 017 15.06.2018 Montana construction of an the quantity of disposed biodegradable 06.04.2020 installation for waste generated in Municipality Montana composting green through separate collection and composting of green and/or biodegradable waste. This and/or goal is compliant with the waste biodegradable management hierarchy and the EU and waste in national objectives for reducing the quantity municipality of biodegradable waste going to landfills. Montana The project contributes also to improving resource efficiency as the infrastructure built under the project will turn the waste into a useful product – compost. The specific objective of the Project is to ensure the needed infrastructure for separate collection and recovery of green/ biodegradable wastes in the municipality. A composting installation with a capacity 6150 t/y will be constructed that will be located on the territory of the Regional landfill in locality “Nedelishte”, at seven km south-east of town Montana, on the territory of village Krapchene, municipality Montana.

European Union European Structural and Investment Funds

Botevgrad Construction of a The overall objective of this project 12.04.2018- 9 600 617.51 85% , Bulgaria 017 12.04.2018 Municipality Composting proposal is to reduce the amount of 12.03.2021 , Facility and a landfilled municipal waste from the Facility for members of the RWMA – Botevgrad region by providing additional capacity for pre- Pretreatment of treatment of mixed municipal wastes and Municipal Wastes for separate collection and recycling by for the Needs of composting of green and biodegradable RWMA – waste. The project envisages the Botevgrad Region preparation, coordination and approval of an investment project and implementation of activities for the construction of an installation for the composting of green and biodegradable waste and for pre-treatment of mixed municipal waste. The installations will be located on a terrain, which is public property in the Temusha area. The capacity of the composting plant is 2770t/y with a selected process with aerobic degradation in two-sided serviceable open compost piles without forces aeration. The capacity of the pre-treatment plant for mixed municipal waste is up to 9000t/y, including sorting and separation of the recyclable fraction and substrate fraction stabilization module. This project proposal takes into account the attitudes of population of the municipalities of Botevgrad, Pravets, Etropoleq to the separate collection of green and biodegradable waste, to the use of compost from waste, as well as the level of awareness of the population for the needs of providing the necessary quantities of green and biodegradable municipal waste.

Harmanli Construction of a The current project proposal has been 12.04.2018- 3 246 963.78 85% Bulgaria 017 12.04.2018 municipality municipal developed in relation with grant procedure 13.04.2020 composting BG16M10P002-2.005. Taking into installation for consideration the requirements of the application guidelines, Harmanli separately Municipality commissioned the collected development of a complete set of

European Union European Structural and Investment Funds

biodegradable and application documents, which aimed at the green waste to investigation and analysis of the applied municipality of waste management system on the territory Harmanli of Harmanli Municipality. During the research and analysis period, it was

established that the existing situation requires and allows the Harmanli municipality to prepare a project proposal with which to apply for financing by the Managing Authority of the Operational Programme "Environment 2014-2020". In the process of preparation of the proposal and making of the concept of investment project, the framework and scope of the investment project was established and the main components included in it are: - Design of a composting installation in outdoor lines without forced aeration with a capacity of 2 690 t/year; - construction works for the construction of the installation and equipment supply for the same; - Delivery of equipment for separate collection of green and biodegradable waste; - Accompanying activities such as construction and author supervision, management and information and communication of the project.

Municipality of Design and This project proposal envisages to design 23.04.2018- 11 945 990.08 85% Bulgaria 017 23.04.2018 Blagoevgrad construction of and build a composting inst. and inst. of 23.09.2020 , Simitly, additional pretreatment of mixed collected waste, , infrastructure which will serve all municipalities in the RAWM-Blagoevgrad (Blagoevgrad, /installation for and Simitly, Rila, Kocherinovo and pretreatment of ).The composting inst. has a Boboshevo household waste capacity - 2516 t/y,and the inst. of and composting pretreatment has a capacity - 24117 t/y.The installations for composting inst. will be done in open cells separately with a shed, through automatically system, collected where maintenance of conditions

European Union European Structural and Investment Funds

biodegradable appropriate to the proper process of and/or green composting is less dependent on the waste/ for the climate.An aeration is planned for the development of compost. system.The inst. of pretreatment includes an optimal combination of the Regional mechanization,equipment and manual system for waste labor.The technological process includes management - mechanical sorting and separation of Blagoevgrad, recyclable fractions, as well as stabiliz. of including the sorted biodeg. waste by container municipalities of composting (with a capacity of stabiliz. Blagoevgrad, module to 3000 t/y) before landfilling.The , Rila, location of the site on which the two insts. Kocherinovo and are planned to be built covers the properties №000733 and №000272, the land of the Boboshevo. village of Buchino and №053020, a land of the village of Bulgarchevo, property of the Blagoevgrad.

Municipality of Design and The project proposal envisages the 22.05.2018- 9 654 503.76 85% Bulgaria 017 22.05.2018 Dospat construction of construction of two types of installations - a 22.10.2020 Satovcha the composting composting plant and a pre-treatment plant. Devin plant and a plant Both installations will serve the population Borino of all five municipalities in the RAWM - for pre-treatment Sarnitza Dospat. The installations are planned to be of waste for the built in property №016209, Gaitanina, needs of the village of Barutin, Dospat with an area of municipalities of 13.748 decares, the incoming infrastructure the RAWM (road 650 m. Water supply 30 m, electro Dospat 100 m.) Will be realized on properties №016205 and 016204. The capacity of the composting plant is 2150 t / y, and the pre-treatment plant - 6400 t / y mixed municipal waste. The system for separate collection of green waste in the municipalities of RAWM - Dospat is door-to-door. The local population will leave the green waste generated on the grain bag in a sack. There is no provision for the purchase of specialized equipment for the disposal of green waste.

European Union European Structural and Investment Funds

After the implementation of the project will be reduced the amount of municipal waste landfilled at the Regional Depot for non- hazardous waste in the village of Barutin.

Municicpality of Construction of a The project for the construction of a 04.06.2018- 9 023 913.84 85% Bulgaria 017 21.05.2018 Plovdiv Composting composting installation on the territory of 04.06.2020 Installation for Plovdiv Municipality envisages the Separately construction of the basic infrastructure in the plot with ID 56784.504.254, North area Collected Green - private municipal property. The zone in and/or which the investment plan will be Biodegradable implemented according to the General Waste Development Plan is a high-tech production zone. The capacity of the installation is 15 000 tonnes, only for plant waste. The composting technology is open composting of clusters covered with semipermeable membrane. Mobile equipment is provided to ensure the continuity of processes in order to obtain a product - compost. A shredder for plant waste shredding, a rotary shovel, a tractor with a trailer, a mini loader, a front loader, a compost sieving screen, a membrane and laboratory equipment are planned.

Municipality Design and he overall goal of the Project is to reduce 29.05.2018- 3 732 873.03 85% Bulgaria 017 29.05.2018 Berkovitsa construction of a the quantity of disposed biodegradable 29.05.2020 composting waste generated in Municipality Berkovitsa installation for and Municipality Varshets through separate collection and composting of green green biodegradable waste. This goal is compliant biodegradable with the waste management hierarchy and waste in the EU and national objectives for reducing municipality the quantity of biodegradable waste going Berkovitsa and to landfills. The project contributes also to municipality improving resource efficiency as the Varshets infrastructure built under the project will turn the waste into a useful product – compost. The specific objective of the Project is to

European Union European Structural and Investment Funds

ensure the needed infrastructure for separate collection and recovery of green wastes in the municipalities. A composting installation with a capacity 3696 t/y will be constructed that will be located on the territory of municipality Berkovitsa.

Maritsa Construction of a n connection with the implementation of 18.06.2018- 5 537 080.47 85% Maritsa Bulgaria 017 04.06.2018 Municipality composting plant the objectives set forth in Art. 31 of the 18.06.2020 for separately Waste Management Act, the Municipality collected green of Maritsa envisages the construction of a composting plant for separately collected and / or wood and green waste with a capacity of 6 biodegradable 200 t. the process of controlled aerobic, waste, including exothermic, biological degradation of provision of the separately collected bio-waste will use necessary garden waste from households and green equipment and and wood waste from the maintenance of equipment and municipal areas. equipment for The proposed project proposal provides for separate technology, the application of which will produce a quality finished product collection of "compost".Separate zones: Reception area, green and storage area at entrance material for biodegradable crushing and homogenization, for waste on the composting, for prospecting, for storing the territory of finished product, for storage of Maritza mechanization, for administrative building. Municipality Equipment and mechanization for 3 pcs. prisms - canvases, roller rails, fans, probes with oxygen and temperature sensors, aerating tubes, control panel, computer, portable laboratory, barrier, steam cleaner, portal weighing machine, wood waste shredder and homogenisation, front loader. A binary system with land-based and scheduled collection from certain points of the population is envisaged to ensure a higher collection rate at the green waste sources.

European Union European Structural and Investment Funds

Municipality of Design and n connection with National and European 04.06.2018- 17 399 308.80 85% Bulgaria 017 04.06.2018 Kostinbrod construction of specific requirements and targets for 04.05.2021 composting reduction of landfill waste, recycling and facilities and recovery of specific waste streams and waste prevention, Municipalities, members installation of pre- of RAWM - Kostinbrod: Kostinbrod, treatment of waste , Dragoman, on the territory of and , based on information from the the RAWM - preliminary analysis and research of the Kostinbrod needs in achieving the goals of art 31, para. 1of the WMA, provides additional investments in building infrastructure for waste management: 1. Construction of a pre-treatment plant for domestic waste for the purpose of their utilization and prevention of greenhouse gas emissions in RWSC with an annual capacity of 20 997 t, sufficient to achieve the objectives for preparation for reuse and waste materials and provision landfill of up to 50% of the waste stream. 2. Construction of 3 composting plants for separately collected green and/or biodegradable waste as follows: * Composting installation for separately collected green waste with a capacity of 5 078 t in landed property in Bogoyvtsi village, Kostinbrod, with a total area of 31 493 sq.m, for the municipalities of Kostinbrod, Bozhurishte and Godech.

Gorna Malina Design and The design, construction and put in 04.06.2018- 9 625 546.40 85% Gorna Bulgaria 017 04.06.2018 Municipality construction of operation of a pre-treatment and 04.10.2020 Malina composting plan composting plants under the current and installation procedure as well as ensuring the separate collection of green and/or biodegradable for pre-treatment municipal waste will contribute to the of waste in achievement of Specific Objective 1 of Region Gorna priority axis 2 "Waste" of OPE 2014 -2020 Malina - "Reduce the amount of municipal waste landfilled". The implementation of the measures under the procedure will help to

European Union European Structural and Investment Funds

achieve the national targets laid down in the Bulgarian legislation and in the NWMP. The measures to limiting the amount of biodegradable waste to be disposed to 35% of the total amount of the same waste generated by 1995, and increasing by the end of 2020 the share of recycled waste to at least 50% of the generated municipal waste.

Municipality of Construction of a The purpose of this project proposal is to 29.06.2018- 3 564 395.85 85% Bulgaria 017 29.06.2018 Svilengrad composting reduce the amount of municipal waste 29.06.2020 instalation for landfilled by the municipality of Svilengrad separately by providing additional capacity for separate collection and recycling by collected green composting of green and biodegradable and biodegradable waste. The project foresees working design, waste - coordination and approval of the investment Municipality of project and implementation of activities for Svilengrad the construction of an installation for composting of green and biodegradable waste. The capacity of the installation as well as the number, types and capaci-ty of the necessary waste containers and equipment for separable collection of green and biodegradable waste is determined on the basis of a prepared analysis of the morphological composition of the municipal waste generated on the territory of the municipality of Svilengrad and on the basis of the prognosis for the generated waste (with a detailed mass balance). This project proposal takes into account the attitudes of the municipality of Svilengrad to the separate collection of green and biodegradable waste; to the use of waste compost as well as the level of awareness of the population for the needs of providing the necessary quantities of green and biodegradable waste for the purpose of constructing of the foreseen composting plant.

European Union European Structural and Investment Funds

Municipaliti Second combined The project envisages the construction of a 16.07.2018- 13 245 456.73 85% Bulgaria 017 29.06.2018 Asenovgrad procedure for composting waste pre-treatment plant. The 16.08.2020 Laki design and construction and commissioning of construction of installations as well as the provision of Parvomay separate collection of municipal waste will composting contribute to the achievement of CC1 of the installations and PO2 "Waste". pre-treatment The capacity of the composting plant for faciliities the separated green and other biodegradable installations for waste is based on the morphological municipal weste analyzes performed by the municipalities of "under Axis 2 of the RWSC.The morphological analyzes OPE 2014-2020 were carried out according to the of RAWM - Methodology approved by Order MD- 744/2012 of MOEW.The estimated Assenovgrad capacity of the plant is set at 12,000 t/y. Region

Zlatitsa Construction of a The project proposal includes the 30.07.2018- 8 879 238.54 85% , Bulgaria 017 13.07.2018 Municipality Composting plant construction of a composting plant for 30.07.2020 Anton, and a Waste separately collected green waste and/or Koprivshtits pretreatment plant biodegradable waste and a waste a, Mirkovo, pretreatment plant for mixed municipal for municipal , waste. The plants will be located at the solid waste on the Regional landfill for municipal solid waste Chavdar and territory of of Zlatitsa municipality, Zlatitsa Chelopech Zlatitsa municipality. A plot of land (14,863 municipality decares) is designated for the composting regional waste plant and the waste pretreatment plant of disposal landfill Srednogorie Eko Regional Waste for the Management System including the municipalities of municipalities Zlatitsa, Anton, , Mirkovo, Pirdop, Chavdar Zlatitsa, Anton, and Chelopech. The land plot is owned by Koprivshtitsa, Zlatitsa municipality. The forecasted Mirkovo, Pirdop, composting plant capacity is between 2932 Chavdar and t/y and 3000 t/y green and biodegradable Chelopech waste, separately collected from the municipalities Zlatitsa, Anton,

European Union European Structural and Investment Funds

Koprivshtitsa, Mirkovo, Pirdop, Chavdar and Chelopech.

Municipality Implementation of The project proposal envisages two 15.08.2018- 2 230 595.39 85% , Bulgaria 017 01.08.2018 Sevlievo a decentralized composting plants on the territory of the 15.01.2020 bio-waste municipalities of Dryanovo and Sevlievo management with the respective capacities - 900 tons and 3000 tons of biodegradable waste treated model in the per year. The planned facility in the municipalities of Municipality of Dryanovo will be a Sevlievo, technology for composting outdoor rows, Dryanovo and and in Sevlievo municipality the technology , for composting outdoor rows with forced including the aeration. With regard to the installation in construction of the municipality of Sevlievo, an the necessary accompanying infrastructure will be technical constructed - a lead line with a total length of 163 m. On the sites will be delivered infrastructure - a mobile equipment, which will include for separate Sevlievo site - 1 pc. tractor, 1 pc. 1 vehicle. collection system tanker; for the Dryanovo site - 1 pc. 1 and a recycling vehicle. generator and 1 pc. water pump. facility for the collected bio- waste