Priority Axis 2 “Waste”

Priority Axis 2 “Waste”

European Union European Structural and Investment Funds LIST OF OPERATIONS OPERATIONAL PROGRAMME "ENVIRONMENT" 2014-2020, PRIORITY AXIS 2 “WASTE” Operation start Total eligible Union co- date and Location of Category of Date of last Beneficiary name Operation name Operation summary expenditure financing Country operation end intervention update rate operation date (BGN) Municipality of Investment This project proposal aims to design and 13.11.2017- 9 368 737.16 85% Sandanski Bulgaria 017 13.11.2017 Sandanski project build a composting installation and 13.07.2020 "Composting installation of pre-treatment of mixed plant for waste, which will be located on a site within the administrative boundaries of the separately Municipality of Sandanski and will serve collected green all municipalities in the Regional and biodegradable Association for Waste Management - waste, Plants for Sandanski - Municipalities of Sandanski, pre-treatment of Kresna, Strumyani. household waste The expected result of the implementation and supporting of project measures is to reduce the amount infrastructure for of landfilled waste by providing additional the Regional capacity for pre-treatment of mixed waste and for separate collection and recycling system for waste through composting of green and management in biodegradable waste. the municipalities The implementation of the project activities of Sandanski, will contribute to the achievement of the Strumyani and national targets laid down in national Kresna" legislation and in the National Plan for Waste Management 2014-2020, to the limit of the amount of biodegradable waste to 35% The total amount of waste generated by 1995 and to increase - to the end of 2020, the proportion of recycled waste to be less than 50% of generated household waste. The construction of the composting installation and the pre-treatment of household waste, which will serve the European Union European Structural and Investment Funds municipalities of RAWM - Sandanski, will contribute to compliance with the waste management hierarchy in the region, according to European and national legislation: - preventing their formation; - preparation for reuse; - recycling; - other recovery, for example, recovery for power generation; - disposing. Madan Design and The project proposal includes the 20.11.2017 - 9 039 369.69 85% Madan Bulgaria 017 20.11.2017 Municipality Construction of a construction of a composting plant for 20.10.2020 Composting plant separately collected green waste and/or and a Waste biodegradable waste and a waste pretreatment plant for mixed municipal pretreatment plant waste. The plants will be located at the for municipal Regional landfill for municipal solid waste solid waste on the of Madan municipality situated in Sharenka territory of Madan village. A plot of land 8410 m2 is municipality designated for the composting plant and the regional waste waste pretreatment plant of Madan’s disposal landfill Regional Waste Management System for the including the municipalities Madan, municipalities of Zlatograd and Nedelino. The land plot is owned by Madan municipality. The Madan, Zlatograd forecasted composting plant capacity is and Nedelino. between 2063 t/y and 2100 t/y green and biodegradable waste, separately collected from the municipalities Madan, Zlatograd and Nedelino. The forecasted capacity of the composting plant guarantees the long term achievement of the objectives , set by The WMA of Bulgaria art.31, sec.1 p.2, for the three municipalities.. The forecasted capacity of the waste pretreatment plant for mixed municipal waste is up to 5000 t/y . The forecasted capacity of the pretreatment facility guarantees the long term achievement of the objectives set by The WMA of Bulgaria art.31, sec.1 p.2, for the European Union European Structural and Investment Funds three municipalities. With the implementation of the project a separate waste collection system for green and biodegradable waste will be established on the territories of the municipalities Madan, Zlatograd and Nedelino. For the organisation of the separate waste collection system for green and biodegradable waste, specific equipment will be delivered for the collection and transport of the biodegradable and green waste, as well as bins for separate collection. With the realization of the project proposal, the national objectives set by the Bulgarian legislation and the NWP for the decrease of the quantity of disposed waste by 2020 to 35% of their quantity as of 1995, and for increasing the share of recycled waste by 2020 to no less than 50% of the generated municipal solid waste. Municipality Design and The overall goal of the Project is to reduce 29.11.2017- 10 313 535.20 85% Petrich Bulgaria 017 29.11.2017 the quantity of disposed waste and increase Petrich construction of the share of recycled and recovered waste 29.04.2020 an installation in municipality Petrich which forms a for composting separate waste management region. The project includes construction of a biodegradable composting installation with capacity 4150 waste and an t/y and an installation for pre-treatment of installation for household waste with capacity 10 841 t/y, and the needed site infrastructure, as well as pre-treatment the needed equipment for their operation. of household The two installations will be located at the waste in regional landfield Petrich. The project investments will contribute also to municipality improving resource efficiency as the Petrich infrastructure built under the project will turn the waste into useful products - the composting installation will produce quality compost, and the installation for pre- treatment of household waste will separate the useful components for recycling them. European Union European Structural and Investment Funds Within the project period, municipality Petrich will introduce a system of separate collection of green waste, that will include separate collection of waste from households in Petrich and villages Parvomay, Marikostinovo, Mihnevo and Karnalovo and separate collection of green waste from public spaces in all settlements in the municipality. For this purpose, 60 bins of 1.1 m3 for the separate collection from households and two trucks for transportation of separate collected green waste on the territory of the municipality to the composting installation will be purchased under the project. The social and economic effects of the project consist in improved quality of the environment by reducing hazardous emissions related to waste disposal; provision of quality compost, creation of new jobs for the operation of the infrastructure built under the project. Municipality Design and The overall goal of the Project is to reduce 30.11.2017- 13 563 028.56 85% Razgrad Bulgaria 017 30.11.2017 the quantity of disposed waste generated in Razgrad construction of an 30.07.2020 the municipalities members of RWMA installation for composting Razgrad through ensuring infrastructure for separate collection and composting of green biodegradable biodegradable waste and for preliminary waste and an treatment of household waste before installation for disposal. This goal is compliant with the preliminary waste management hierarchy and the EU treatment of and national objectives for reducing the household waste quantity of biodegradable waste going to for municipalities landfills and increasing the quantities of in Razgrad Waste recycled waste of paper, glass, metals and Management plastics. The project contributes also to improving resource efficiency as the Region infrastructure built under the project will turn the waste into useful products. The specific objective of the Project is to ensure the needed infrastructure for European Union European Structural and Investment Funds increasing the quantities of separate collected, recycled and recovered wastes in the municipalities in Region Razgrad. The Project includes the following activities: 1. Preparation of the project proposal 2. Preparation of tender documentations 3. Preparation of design projects and preparation of tender documentation for design and construction of the two installations 4. Technical design and construction of a composting installation and an installation for preliminary treatment 5. Construction supervision 6. Implementation of information and communication measures 7. Organization and management of the Project As a result of the project, a composting installation and an installation for preliminary treatment will be constructed and put into operation. Equipment for separate collection of green waste will be ensured. The social and economic effects of the implementation of the project consist in improved quality of the environment by reducing hazardous emissions related to waste disposal; provision of a new waste service for the citizen and business. New jobs will be created for the operation of the infrastructure built under the project. Municipality of Construction of The implementation of this project proposal 18.12.2017- 9 147 276.52 85% Gotse Bulgaria 017 18.12.2017 Gotse Delchev plant for pre- aims to build a composting installation and 18.03.2020 Delchev treatment of waste a pre-treatment plant for municipal waste and composting for the Gotse Delchev municipality, Garmen Municipality and Hadzhidimovo plant in the region Municipality. The construction of these of Regional installations will contribute to the reduction Association for of the amount of landfilled household waste European Union European Structural and Investment Funds Waste in the regional landfill

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    18 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us