IBI GROUP FINAL REPORT TEN YEAR NETWORK IMPLEMENTATION PLAN Prepared for City of

10 Recommended Ten Year Cycling Network Implementation Plan The recommended Ten Year Cycling Network Implementation Plan identifies approximately 525 centreline kilometers (km) of new infrastructure (if counted in each lane direction, more than 1000 lane km). This new network includes:  280 centreline km of bicycle lanes or cycle tracks on Fast Busy Streets;  55 road km of sidewalk-level boulevard trails along Fast Busy Streets; and,  190 centreline km of cycling routes along Quiet Streets. Included within this proposed network are approximately 100 centreline km along eight arterial roadways for which Major Corridor Studies would be undertaken to evaluate the feasibility of cycling facilities. Five (5) major grade separations (bridges or tunnels) have been identified in order to provide cycling facilities that cross major highways, railways or ravines. A summary of the proposed network length by facility types is provided in Exhibit 10-2. The recommended 10-year Capital Plan scenario is the $16 M per year scenario ($140 M from 2017 to 2025). This scenario would provide the resources necessary to initiate the design and delivery of the vast majority (85%) of the proposed network projects. The program would allow for sixteen of the seventeen Major Corridor Studies identified to be initiated, so as to complete impact analysis, design and consultation. However, insufficient funding would be available to fund the construction of the proposed that may be recommended in four of the studies within the ten year period (namely cycling facilities along Midland Avenue and a Highway 401 crossing of Yonge Street would be unfunded). Four additional Full-time Equivalent (FTE) staff starting in year 2017 and two starting in year 2018 would be needed to deliver the projects. In addition to new projects identified to connect and grow the Cycling Network, part of the mandate of the Cycling Network Implementation Plan will be to renew existing Cycling Network routes, to improve their quality. Existing bike lanes may be "renewed" by updating or improving the quality of their signs and markings. In some cases this may include the addition of new markings to intersections or the addition of painted buffers. In some cases bike lanes may be upgraded to cycle tracks if it is feasible to add separation. Signed routes on Quiet Streets may be upgraded with the addition of wayfinding, shared-lane pavement markings, or with additional traffic calming or traffic operational interventions to slow down or reduce the motor vehicle traffic. The Renew component of the Cycling Network Implementation Plan includes funding for this work as well as intersection safety improvements and the expansion of the City's new wayfinding signage strategy (refer to Section 9.1.1).

April 17, 2016 86 EXHIBIT 10-1 TOWN OF Map of Ten Year Cycling Network RICHMOND HILL Implementation Plan CITY OF PICKERING TOWN LINE Recommended Routes MARKHAM CITY OF BEARE RD PICKERING

PLUG HAT RD OASIS BLVD Legend

FINCHE AVE TAPSCOTT RD PASSMORED AVE Y E N VE E A A Cycling Network and Trails Plan D AV M O CH

ES V LD FI N

EL L I E P C

CITY OF T G B S O M

O

N L I E

I D V D A R N D H D R C T H N H O C I T L N F G E FI D D R L L L A E O E I E O W F T T T L S N R Y I I

IN R E F R T A Q E

VAUGHAN M T L W PASSMORE K L / Cycle Track F D E

U AVE L D L S IE D A B F W T RL R W D C L T O E H D R R E R C S V T

U D D L T R

TR R T B H N S L E T A WO L IV G MILLIKEN BLVD IM OD R

S L CRT N M R CASEBRIDGE GE WY M C R B E U U VD ORNM O T

B A H R D

I R L T O R E DR Trail / Boulevard Trail T W IV

L S S L B E R N

L C I U R V L L P I A E R L R D B

E A N V

L B E S E D B T R G R B V X N O

L M D I JO O L I E V T M N V Y

L R U H E

O V D C V A EN

R G I E R P R R

M V D A L L R G E S N CONLINS RD B D D L T S B A VE C P C O Y T O A MCNICOLL AVE M M H N D T B I A A O N E R R O S V N C L U W E R M Quiet Street Route T B B M B N N B E H D E AN A H N F A L D A I A R L B R O N T L S E V D R K R S D N

R V E L A I G D A I

E E S L R O L

E N W T S R U S R M B C S D T R W I L R D I B P E D D R R O L E D N LV L V O VE B V D I H A O A E PORT UNION RD A A V M D SH R H W A A C G V V H M IN IN R E I A D F T B M T L V E L EAST AVE P

D R N E M B A VD OR E M K HU E L R L V M E N ( B N !

M L D L E R CA

N T C G A N LE E O Tunnel or Bridge S T N E MORRISH RD KINGSTON RD

V A L VD R A A E G I E L A

N D C H B O D U K

T C N D M C D V W R B O N BURROWS E E N O H N Y ILIT R E W N M A R HAVENDALE R N I M T RD D E Y L KI I R D C N MB E A IL T L D A D M R S I A CUMMER AVE A N N L L G N A IL D O O

C X H S V B V E D A

L R V R N MEADOWVALE RD LAWSON RD L O S O A A E N R T C E I R G

E V D R A A M N K

U E K R E R E E

A S N E E D

S E R V V V H S A E D V D O A

H V D C A N R A O A E E A A H V N A A P R EP M Major Corridor Study V M B I A T V S H D C D P D NI S N R R E A R R N E E O M D R R C A B L E L L I E N S I N F T RA D O G H A I T D IT O E O

A A

N P P D

E E R D O E T A PRODUCTION S L C X

L R S

S A A D U E U T WILFRED AVE T G BISHOP AVE V N ELLESMERE RD P A G D IN

E E B E D L H K I T R VILLAGE T R E B ALNESS ST S N V A DR D R R T E A L O E

N E GREEN V

A V EOR O O S O R V

T R T O S SQ E B A L S

T D O R CAS O I F O R R R DUFFERIN ST N T

F MANSE RD A D L D R G Y E R A R D V SL ON I A E O N S CHURCH N SS N C E E R O A D KENNETHAVE AVE B RD R R R T V A A D G D D T L O C R S E E L S P O U GH OK R D R E OD R O O P Existing Cycling Network E D V C W V D V N A T

Y E R A

E A D G U P M

V B A R O I G S N

A L ID D GOLDEN P R G R

ES IL ER R N R D R M D M A L H EMPRESS AVE SU N V E C R R R C L O K D U B TE R R D B B

S O HU I D GATE CRT K SS IN K Y

D S B B R

N C A K O B L

R L B R D

O O A L RD

P D E L C S L A D D D

D C A BRIMLEY O R N

E F E A VD R O ! N H I R I K ( C N N V K R M T T E O RO AT

T K O N NORELCODR C A E N K RC

H A GALLOWAY RD

H C W D L

E S U

H SENLAC RD R I O N E N R A F G H E B O U S D I WO G O V N I T O H R N E M H T O C ODSW Y H OR A L O F ELLERSLIE AVE Y K R O N

I I W R N I A D C

GARYRAY DR O R D F C D

S H N

E D I

D T

L A Bike Lane / Cycle Track S O N D A G

T B R RD

I R V R R E T M H E S

G U R LV D POPLAR RD S W L

O W L I O H T H O A S R

T R F F ELLESMERE RD N R S R E D N U L DE N U D

O D D NC A O L I

M R S AN E R I D E W E D R I E D G N R R A P R E IN L I AN D C I F O K S M I R S S D M H R I A H T C D L C W L RD N R K B E

C S D M I T T E C

O D R O E D R R O L H O D

I E E E C N D R R N F R R L FENMAR DR S

I P CANLISH RD E

O P F L D T

U I S E

D E B D V W D G R A A A

LL I E E L Y ELLINGTON DR R VE T R R K I C T AVONDALE AVE A N E R B M O D T D D R BURCANA RD C

K R N D S R D F D N R N N E E

O E LESLIE ST R T D K B R

D Y A R EW HOWDEN RD W

B BIRCHMOUNT RD A P O R

R I R D L L Trail / Boulevard Trail

O N A D N P D UPJOHN RD BELLAMY RD N LIVINGSTON RD

U WARDEN AVE V

R S

A D U I

DR K B ND A I O M E A A K N W A FLORENCE AVE R D N R S

I D E S V Y L R V R AV W V A K CA W

L A Y D D V E VA LE Y N CH L W C O BL PK

IN I E RO U D D F L E R B D O I S N R

D R F N A N O R L M R W R R O S N ST D D L O H IL A D D A U O D N I E LM N E I S E G

A A A L V E M N R N

I H R R U O L

R K E O M ! I R V ( T T C

A D S R A E E U Y S R H

F R C Quiet Street Route R I

C R D ND W R L N O G A R A D G

A D R U I

Y L C A G P E W

O T H Y N BAYVIEW AVE B

R D A L I R L R R

L L T W W AR N O K N L E E L L O T D R DEN W S S I

R TA E YORK MILLS RD A SA IN

A N O E V R N D A O C O B C Y R D

L A N B VD L C

T MASON RD D L A B IV R O K ST B E

E R A W R R S R D R D L U E S H E D A F L L P V L BELLAMY RD V D V V C E

CITY OF R A V O E H R D U EY E DON MILLS RD D L E D D T U I B L

ER L R N B R I A A R

M V P T M IP

E N P L A D C

E U V E

O T D I B P H V R C L R S R S N

S D E Y MILL ST

R N H E D A D A O B B CO SERVICE RD L

WESTMORE DR T U W E S R R I R KEELE ST N N L R H R IL ALBION RD S G RD Y C V L D C D B A L I E E Y W I H V T I R O E T E D N R L S R Y D N P E R R O P I E

L A Y B P I D S SW E A BRAMPTON D N H

E T D A

L E E S D R D T BERTRAND AVE N I L L E A

R H R C

D H N D V P D V U D E R

W D D R R

O

R M T P A H O A L T

D S A M D U E

D V ILT O L R E J L V E

G B E A G M PLEWES RD A

D B U D O E R B N V G C D L BROOKE AVE J S A I H R N E

B B D D R N A N E A R B Y S R N D T E R R O E P ASHTONBEE RD K T D N E R I E E N A D Y NG E O A D R D L N R I R N R S L R U LV B T I A E L N V G B A VE D G A O R U M Rail Line A L EX L C A ELM RD R S CIVIC H B SE E C D PRINCE V V O

E E O R E I ANDREW T U O D

R V L RD D

L EG EL A R E T M X E E L O CORVETTE AVE

M G C D E VE R A N T B F E A R

R E G N V H I D

E AW R O H E E T E L B N L N PL E A IN R G T M L D L ID L E A R H G R G E D X R H D ID WOBURN R F O R R A R D O W B VE RANEE AVE M D Y R

U AVE YONGE ST L E

R A L D F CLAYSON WILSON AVE F

O V R O L T MORNING A S

R I N I N L R Freeway O L S R E A U A A STAR DR B V T D ! COMSTOCK RD B ( B D D R E N NL HYMUS RD D RD UPTON RD R N I D M D T E N E N D I H V R TO R W K SUNRISE AVE M Q G E T L I A I N V W D A P S A L G T D E D S U N E ORFUS RD V L R E O R O O C H VE R U E E IC G E Y M A BATHURST ST W F T N P O X E A F S E A FA E A U DUVAL DR GL R

W WENDELL AVE T D I E N G L

S R S A AV R A R A L E LAIRD DR F E L A E V IR

R A A Y S F D Major Road Arterial A B H LA C X Y S IN A A AVE C E V GORDON JANE ST N W T 2 REXDALE BLVD RD E C AD D S P A T E 7 REDPATH O T E A DUFFERIN ST BR S V K L MACKAY RD DR IC S N F L A A E R W E E T L MARLEE AVE AVE E EDITH D PL D E MA S O E DR VD D C GARY DR BL R N (! R U A O T W I E S E A L MIDLAND AVE Road Network D S OAK B AV HIGHWAY 27 S E R D H ROSELAWN AVE R D RIDG C L E SOUDAN AVE MCINTOSH ST TH E R A C E FERRIS RD R N R N E ST U E O WOOD RALEIGH AVE B R R H C R LL R V W R I O C K M D S O LA R O D ELM MANOR RD E T S C PARK E E C I L M R TYCOS DR OLD H O S P A E RIDGE A W MACK D AM V O E P L G U RD L A R R E K DR I E N OG N N AVE I N T D C D O R P K M R E ROSELAWN E W AV AVE S K DAVISVILLE AVE D BELFIELD RD E INGRAM D W TON ST IS MARTIN GROVE RD ST EL O CONNOR DR Green Space O DR I MER C D TLE F C Y O R N R AS E G A KIPLING AVE D C DON N IN T D E T RETH L MOORE AVE SD D E A E UM DENTON AVE T U W R N L R WE S E E TR LANDS AVE AV D L Y R R O ON KILBARRY RD COSBURN AVE E L RONSON DR Y S D D RT R A BU D T EGLINTON O R K D M CARLINGVIEW DR D N AVE R E O W SPADINA RD E M X HEATH ST E V A R I Y A E D R DANFORTH AVE N W I I A E O LA MORTIMER AVE WOODBINE AVE Y V C V N R V A T O A T KEELE ST U A B O GHANR S R W T A S L S E D D T I D HEATH ST W SAMMON AVE S PAPE AVE T C N E C M C W E W W COXWELL AVE K A E K HE A M E A S T E E V S P I GERRARD ST E A S W ISLINGTON AVE R A V P F V N E V N I P O V AV A O E K I L T E E M E L LA D Y N S E IN P W O GL L V A R E R L A C T E L R R

A I A N L D ± A E

O T V ROGERS RD O

T R D A S R N R Y T N C STO O H R T T O NG B A I B K R AM O HOPE W O A L L R D R V ST I AVENUE RD B D N L O N E ROCKCLIFFE D NT GLEN RD A R E BLVD L O C W ES W HUMBER D R R FELSTEAD AVE R VE N C M D 0 3 6 km A A L CHRISTIE ST BEDFORD RD O R A SPADINA RD E D W AI D A O BLVD V L R E LOGAN AVE EAST DR C V V W E E E T A T S E S G A S RD T E D D S PARK R R D I T T OS V OR T RD EDALE VAL O P N L D L R N PO E R B E U ST GEORGE ST Y R N B V D A DA D R JONES AVE T N LA R L R T GERRARD ST E E D E O Y BE E R E D AR ISA G S A S GE T E SYMINGTON AVE S G L E EARL PL PARLIAMENT ST R KEELE ST V A E A M SHERBOURNE ST R S THE S K S S IN HALLAM ST P G BARTON AVE E T A E QUEEN ST E P C S LAPPIN O A B RIVER ST T RI N W D S L S V A JARVIS ST S E A W AVE I A Y E N Y D T T S U N S LAKE S D W V W S E I A L A TT DOVERCOURT RD N E CHURCH ST I E E S R N S E ST JOHNS RUNNYMEDE RD C G LAKE SHORE BLVD E V A S N SHAW ST GRACE ST RD T L D R I A T HARBORD ST A T L HUMBERSIDE S N D L MC CAUL ST U L ERINGATE DR U Y E AVE ON A T

E N N D N E S N EASTERN AVE

O A IV D

T D V W V S A VICTORIA ST L N E E B ONTARIO COLLEGE ST I GLENLAKE AVE D V R O E R E L R N O E ! R E ( G T S T A INDIAN BLOOR ST W O N H W E H E NASSAU I H N S F BROCK AVE T T E N RD ST S E O DR Y E K E AID LA R RATHBURN RD R K DE L I W A A T NGS A RONCESVALLES AVE O A M Y V H O Y CATHERINE P V FRONT ST E SORAUREN AVE E N A A W E E D T ST W T D Y G L R S V COMMISSIONERS ST R DA O L I I K ND B L N O C HO R M PRINCE EDWARD DR S M E D E Y S CH OR H R R D RI H D O I W S E Y D E HIGH T KE R S A S A R E T L O V R N R K PARK WELLINGTONO ST W E M FR U D W Y T ST R E R BLVD ADELAIDE N BURNHAMTHORPE RD H TO QUEENS D R G Y E QUEEN ST W ST W LIN E S K E L OR QUAY E T M A I E SH N L W W DUNN AVE E W I G L EAS AK Y L D T FORT YORKL W UA L A L S IS EENSW D Q LL W QU A Y LV S A E E Y JAMESON LIBERT N LH I D A TH KING ST W BLVD B EE VA D F R A V QU R R SHAVER Y E ST D NN STEPHEN T I BERING AVE FLEET S AVE S E

GIBBS RD AVE IR DR Q BERRY RD E BLOOR ST W U A N A N P E ADVANCE RD Y N W NORSEMAN ST A W IL LA VD R KE E BL S T HOR S K S O S DA L ND N AWN U TITAN RD E D GRAND AVE R N I T R R H JUTLAND RD E D A E D M CANMOTOR A Toronto E R

A P A ST LAWRENCE S R AVE D T !

NORTH QUEEN ST

T M

H AVE E A THE QUEENSWAY L

L W K I P E L I S N T G M EVANS AVE JUDSON ST A A MIMICO L V DWIGHT AVE AVE L LAKE E CITY OF ONTARIO

VALERMO DR

B HORNER AVE NEW TORONTO ST THIRTIETH ST R MISSISSAUGA O W NGHAM ST

N BIRMI

S

L I ELDER LAKE SHORE BLVD W N E AVE U.S.A

Data source: City of Toronto / IBI Group, 2016 Projection: NAD 1927 MTM 3

Date: April 2016 Cartography: Vélo Québec IBI GROUP FINAL REPORT TEN YEAR CYCLING NETWORK IMPLEMENTATION PLAN Prepared for City of Toronto

10.1 Integration of 2012 Trail Plan Recommendations The Ten Year Cycling Network Plan incorporates the projects identified in the 2012 Bikeway Trails Implementation Planxxiv. Approximately 17 km of trails were installed between 2012 and 2016 as part of this Plan. The remaining projects have been incorporated in the Ten Year Cycling Network Implementation Plan with the exception of the two trail segments as part of the Finch Corridor Trail (connection in west to Humber Trail and in the east to the Scarborough Railpath), and the northern limit of the proposed trail project along Black Creek was revised. These routes were identified as infeasible because they require large structures across highway and rail corridors and were replaced with the following on-street routing:  Finch Street West installation as per the Finch LRT project (multi-use trail and cycle track) to connect the western limits of the Finch Corridor Trail (at Norfinch) with the Humber Trail. This avoids the challenging Hwy 400 crossing;  McNicoll Avenue (between Pharmacy Avenue and Brahms Avenue) instead of the Finch Hydro Corridor to avoid the challenging Hwy 404 crossing;  Finch Street East and Middlefield Road to connect to Scarborough Railpath, which avoids the challenging rail crossing required with the Finch Corridor Trail; and,  Culford Road, between Black Creek Drive and Rustic Road, instead of following the boulevard for this northern segment of Black Creek Drive, which was found to be infeasible.

10.2 Implementation Plan Approval Process The proposed Cycling Network Implementation Plan identifies and recommends on-street cycling routes that are well integrated with the bikeway trail routes to provide a cohesive system of cycling routes across the city. If approved by Council, the Cycling Network would be implemented as follows:  Consider the capital funding required to implement the proposed Ten-Year Cycling Network Implementation Plan at a rate of $16 million dollars annually in the annual capital and operating budget process, as well as the operating budget required to fund the maintenance costs of newly constructed cycling infrastructure;  Undertake the detailed design and public consultation required to deliver cycling infrastructure projects contained within the Ten-Year Cycling Network Implementation Plan;  Undertake and manage the Major Corridor Studies identified for new cycling infrastructure contained within the Ten-Year Cycling Network Implementation Plan and report back to Public Works and Infrastructure Committee on each study's recommendations; and,  Provide a two year update to the Public Works and Infrastructure Committee on implementation progress of the Ten Year Cycling Network Implementation Plan, and future updates as appropriate.

10.3 Exploring the Impacts of the Recommended Network This discussion focuses on the impacts of providing a connected network. As the network plan outlined in this report is implemented, the quality and coverage of the Cycling Network will expand faster than it has ever before across the City of Toronto. To clarify the terminology used in this section:

April 17, 2016 88 IBI GROUP FINAL REPORT TEN YEAR CYCLING NETWORK IMPLEMENTATION PLAN Prepared for City of Toronto

• The existing network refers to all of the network links that were installed as of December 2015; • The recommended network refers to the full $16M network scenario identified through this plan, which includes all of the Major Corridor Studies; and, • The approved network refers to the plan approved by council in June 2016 which excludes several major corridor studies identified in the recommended plan. 10.3.1 Summary of Recommended Network by District The recommended network put forward in this plan provides a comprehensive network comprised of attractive and context-sensitive facilities throughout the four districts of the city. A summary of the types and length of facilities recommended to be implemented over the ten-year period is as follows, and as summarized in Exhibit 10-2 and Exhibit 10-3:  In Etobicoke York District, the recommended network consists of 59 km of cycling facilities on Fast Busy Streets, 47 km on Quiet Street facilities, 23 km of multi-use trails including boulevard trails and off-street trails for a total of 129 km. This will increase the existing cycling network by about 80% from 156 km to a total of 285 km;  In North York District, the recommended network consists of 64 km of cycling facilities on Fast Busy Streets, 67 km of Quiet Street facilities, and 28 km of multi- use trails. Added to the 122 km of existing cycling facilities, this will increase the network by about 130% to a total of 281 km in North York District;  In Scarborough District, the recommended network consists of 79 km of cycling facilities on Fast Busy Streets, 17 km of Quiet Street facilities, and 42 km of trails for a total of 138 km. Added to the 134 km of existing cycling facilities, this will double the cycling network length to 252 km; and,  In Toronto- District, the recommended network consists of 78 km of cycling facilities on Fast Busy Streets, 60 km on Quiet Streets, and 17 km of trails for a total of 155 km. Added to the 198 km of existing network, this will grow the cycling network by almost 80% to 353 km. Some observations about the type of facilities that are recommended to be implemented over the ten-year period in each District are as follows:  The grid network of local streets in the Etobicoke District, Toronto and East York District and North York District allows for the development of direct routes using Quiet Streets. The predominantly curvilinear design of local streets in Scarborough District provides fewer opportunities for direct travel by Quiet Streets; and,  There are fewer opportunities for boulevard trails along arterial roads in the Toronto and East York District due to the type of development fronting the streets. The cycling network in Toronto and East York District will be more extensive than the other Districts when the recommended Ten Year Cycling Network Plan routes are complete. The greater route coverage is due to a number of factors in this District, including more cyclists and cycling trips, higher population and employment density, more short trips, and a longer existing cycling network (by 20 to 40%).

April 17, 2016 89 IBI GROUP FINAL REPORT TEN YEAR CYCLING NETWORK IMPLEMENTATION PLAN Prepared for City of Toronto

Exhibit 10-2: Summary Table – Centreline Kilometres of Existing and Recommended Network for Scenario 3 (Uplift to $16M Annual Budget)

Total Etobicoke - North Toronto and Total Total Scarborough All Districts York York East York All Districts All Districts

Cycling Network Facility Type Existing + Existing Recommended Recommended Recommended Recommended Recommended (Centreline km) Recommended

Fast Busy Streets Bike lanes 104 km 31 km 40 km 27 km 23 km 120 km 224 km Buffered bike lanes 2 km 9 km 3 km 13 km 9 km 34 km 36 km Cycle tracks 19 km 20 km 21 km 39 km 46 km 126 km 145 km On-Street Facilities Subtotal 125 km 59 km 64 km 79 km 78 km 280 km 405 km

Trails Existing Boulevard multi-use trail 33 km 13 km 15 km 21 km 1 km 49 km 82 km Multi-use trail 264 km 2 km 2 km 2 km 0 km 6 km 270 km Trails previously approved for constrcution by City Council (2012 12 km 8 km 11 km 19 km 16 km n/a 66 km Bikeway Trails Plan) Trail Subtotal 309 km 23 km 28 km 42 km 17 km 55 km 418 km

Quiet Street Cycling Routes Existing Quiet Streets Facilities Subtotal 159 km 47 km 67 km 17 km 60 km 190 km 337 km

Existing Network 593 km 156 km 122 km 134 km 198 km km Recommended Network 579 km 128 km 159 km 138 km 154 km km Total (Existing + Recommended) Network 1,172 km 285 km 281 km 272 km 352 km 1,160 km

April 17, 2016 90 IBI GROUP FINAL REPORT TEN YEAR CYCLING NETWORK IMPLEMENTATION PLAN Prepared for City of Toronto

Exhibit 10-3: Scenario 3 Recommended Infrastructure - Centreline Kilometres by District

160

140

120

100

80

60

40

20

0 Etobicoke - York North York Scarborough Toronto and East York

Bike Lanes or Cycle Tracks Boulevard Trails Quiet Street Cycling Routes

10.3.2 Improving Access to Transit The proposed Cycling Network will dramatically improve access to both existing and proposed transit stations. For this analysis, the length of the existing, approved and recommended Cycling Networks that fall within 800m and 2000m of existing and future transit stations were summarized to provide a sense of the overall servicing of these stations, as illustrated in Exhibit 10-5. A summary was also developed to calculate the total number of stations that are served in each scenario. Presently, 15 GO stations and 62 TTC stations are located within 800m of a Cycling Network route. If approved and constructed, the Cycling Network Implementation Plan Routes would be built in proximity to 4 additional GO Transit stations and 12 TTC Stations. There are currently no Cycling Network routes in proximity to the following GO Transit and TTC Stations, but routes recommended as part of the Ten-Year Cycling Network Implementation Plan may be designed to serve these routes.

Exhibit 10-4: Existing Cycling Network and Transit Stations GO STATION TTC STATION Underserved By Existing Underserved By Existing Cycling Network Cycling Network Scarborough Station - GO Sheppard-Yonge - Wilson - TTC York Mills - TTC TTC Kipling - GO Kipling - TTC Bayview - TTC Downsview - TTC Sheppard-Yonge - Ellesmere - TTC Bessarion - TTC TTC North York Centre - McCowan - TTC Scarborough TTC Centre - TTC

April 17, 2016 91 y,//dϭϬͲϱ TOWN OF dZE^/d/Ed'Zd/KEt/d,d, RICHMOND HILL CITY OF y/^d/E'z>/E'EdtKZ< MARKHAM CITY OF PICKERING >ĞŐĞŶĚ

CITY OF džŝƐƚŝŶŐLJĐůŝŶŐEĞƚǁŽƌŬ VAUGHAN ŝŬĞ>ĂŶĞͬLJĐůĞdƌĂĐŬ dƌĂŝůͬŽƵůĞǀĂƌĚdƌĂŝů YƵŝĞƚ^ƚƌĞĞƚZŽƵƚĞ

dƌĂŶƐŝƚ&ĂĐŝůŝƚŝĞƐ 'K^ƚĂƚŝŽŶ >ŝŶĞϭ;zŽŶŐĞͲhŶŝǀĞƌƐŝƚLJͿ >ŝŶĞϮ;ůŽŽƌͲĂŶĨŽƌƚŚͿ>ŝŶĞ ϯ;^ĐĂƌďŽƌŽƵŐŚͿ>ŝŶĞϰ ;^ŚĞƉƉĂƌĚͿ CITY OF BRAMPTON ϴϬϬŵ^ƚĂƚŝŽŶƵĨĨĞƌ

ϮϬϬϬŵ^ƚĂƚŝŽŶƵĨĨĞƌ

ZĂŝů>ŝŶĞ &ƌĞĞǁĂLJ DĂũŽƌZŽĂĚ 'ƌĞĞŶ^ƉĂĐĞ

036km

LAKE ONTARIO

To ro nt o

LAKE CITY OF ONTARIO MISSISSAUGA

U.S.A

Data source: City of Toronto / IBI Group, 2016 Projection: NAD 1927 MTM 3

Date: July 2016 Cartography: Vélo Québec IBI GROUP FINAL REPORT TEN YEAR CYCLING NETWORK IMPLEMENTATION PLAN Prepared for City of Toronto

10.3.3 Crossing Barriers There were many comments received throughout plan consultation about the importance of crossing barriers, and the recommended network has the potential to dramatically improve access across some of the notable barriers throughout the city of Toronto, including Highway 401, Highway 427, Highway 400, the , the and Don Valley Parkway, and the many rail lines bisecting the city. In order to illustrate the potential impact of the network, a geographic analysis of barriers was carried out. For this analysis, various barriers were identified and mapped using ArcGIS (including watercourses, freeways, rail lanes and median-running transit). The existing, approved and recommended Cycling Networks were analyzed for intersections with these barriers to give a sense of the impact of these routes. As depicted in Exhibit 10-6, several types of barrier crossings are identified throughout the network. Proposed Tunnels and Bridges: Five (5) major grade separations (bridges or tunnels) have been identified in order to provide cycling facilities that cross major highways, railways or ravines. These grade separations would provide important links to cross significant barriers to Cycling Network connectivity and studies are recommended to further assess their feasibility and cost.

April 17, 2016 93 y,//dϭϬͲϲ TOWN OF dEzZz>/E'EdtKZ<E RICHMOND HILL CITY OF ZZ/ZZK^^/E'^ PICKERING TOWN LINE MARKHAM CITY OF BEARE RD PICKERING

PLUG HAT OASIS BLVD RD

FINCHE AVE

PAS SMOD RE AV E

Y S R

E L N E

E A AV C V E D H

A M C >ĞŐĞŶĚ V

ES R OL FIN W D

L L

E I P

E C C

T G B CITY OF O

S M O A T

O

T N I A L D E L D V

I P A R D T N N R H O D C C T O S N T IN H FI L E H L T G E C F D A R L D L I G E R T A O O R N L O F E D T E R W T T O T Y L M I N

IN E S A R H T L VAUGHAN N T E

W U PAS SMO RE K L Q E

A E W NASHDENE RD S

AVE B D D

T L C LD A R dĞŶzĞĂƌLJĐůŝŶŐEĞƚǁŽƌŬ A M

B E H I B B L R T D F

V R DR I

E T L H P

R T S L D S H

U D W W

L L R E U

V E O A C L F O R R U R D W O L H E E R R IM D C T T E

N G F R T IV VD M T T U B L W T R H N S L B R N E L CASEBRIDGE Y D E W M C Y MILLIKEN BLVD CRT M E S T

R A L V ZĞĐŽŵŵĞŶĚĞĚ^ĐĞŶĂƌŝŽϯ

C A V

Y B EA I T F E

L B I A

E L A L

V O L N L N A R D

S E N D

V L B I T L E

B D S X R O D V O

G C P L R J U D I T NI L V M D E O C B H W O M R V U L L I E D I C V R R L N R R A C E R L V D V G L N R V C D S B M D S P R O A

H E L

O N D D T B

E R A E R N S V E L WI C L C N R

T R B H B O B

S E D K S D H N T T ND BE L N F A R V LA A L A L O T O R L R T S K C N L GL E R N I S D R I L

A H E I E ŝŬĞ>ĂŶĞͬLJĐůĞdƌĂĐŬ M T CONLINS RD R I E E R E R D M E L U M R N Y M I M V B R B R B D A L L N OD C M S N L R L P O S B L O BL B E L R V D W O AV L PORT UNION RD D N D V V H G A O S A O E N L H L H K E TI T A A

A V D D V N M R H

L D V A A K E N C L H E D U E E D ORE I

V H H M V LV M EAST AVE P

E C D D G A B M R N B N E IN M R CA

F N C G R R LE

M A RROWS E MORRISH RD KINGSTON RD

S A U BU E VD A C D

W C N E L O

B N K B V M A L R I

C G O BLVD E R M A A dƌĂŝů ͬ ŽƵůĞǀĂƌĚ dƌĂŝů M R L W I HILDA AVE NEWTON DR I Y T E L X HAVENDALE IT KI N T E RD D F A D O N R O I N A M B R A Y T D M CUMMER AVE L G R N T CENTENNIAL RD M IL B V V N R H S H L E O A

E B D V RD L A L R MEADOWVALE RD E I N R

EC A L A IN O R

N V D G E K

S BRIAN DR D K

A E

D E E E D V AV H V O A

N VE D R A W R C E A PA D R P M R S E H

FISHERVILLE RD I D M H T R YƵŝĞƚ^ƚƌĞĞƚZŽƵƚĞ D I L D N S D R PATRICIA AVE P D O L A N O E R C

L A I B I N L O Y F E IT N O O G N L BA S P D O R I T

N

S L C N D

W O S

L D E M D I D D PRODUCTION E D R R E M V E X G

DREWRY AVE D W V L R U N T V T L A A E I L IRVIEW E L B T ELLESMERE RD I A A K W

P FA L B K S V R LS D

L E I L D D C

E ALL R E VILLAGE ORTON PARK RD D E H A R

E E R V F L E B M O DR B G

T ALNESS ST A B T M B O R I O A Y S GREEN ROV A NT B N R R

O WILFRED AVE E D E V S N O T T SQ V dƵŶŶĞůŽƌƌŝĚŐĞ

R R A I A L E S C M

R R D N I F DUFFERIN ST A A E L R A MANSE RD E D E L D L A L V R L E S S KENNETH AVE V A N I E O N Y N D DE O R F O AR DR T T A C C K R D R S R O R D M O O L D G

W E D O VE D R R

E Y S A U P IM V I B

O N A R D

D G A S R E G N N

E M N C R D D L R SU V E SENLAC RD L K L U B

TE D D O I A B Y B N R

S S A MO I

RD K B A L S L R

L L

R K N RD

D V C SB D

L S O N E DĂũŽƌŽƌƌŝĚŽƌ^ƚƵĚLJ

R F A METROPOLITAN D D A IO I RD B C R T N K D V K N D O A

THE POND RD T C C N C O N NORELCO DR E

M E A D A S

A R H R R

W N K D H DO R I E Y T Y V L E H R N A N O A PARK HOME A R N F E L T D IO R L E H B H U G AVE L GALLOWAY RD T S R G A E D A N POPLAR RD A N U H DSW I O O E H N OR N M ELLERSLIE AVE WO L M I R T C O GARYRAY D R L S I N R M A

O S R BIRCHMOUNT RD YR

E B S D A K D S

O N P

S S I EŽƚĞ͗ /ŶŝƚŝĂƚŝŽŶ ŽĨ Ă DĂũŽƌ ŽƌƌŝĚŽƌ R D

L T Y R R O A L N D D H O

I M Y D R R G R W H I D S S A P F K I W L

A L R ELLESMERE RD T

L R P N R

E U C DE N D I N A E G N I E E D N IA U

R R N F N A D EL I D E N L E S D N A R S A E E T IL C D L N E C C

Y M M R R S D N T NE D N D B

T T OVERBROOK PL T R D K O T E L

V R

D D ELLINGTON DR H W D O FENMAR DR W K I E A T N I WARDEN AVE C ^ƚƵĚLJŽŶĂŶĨŽƌƚŚǀĞŶƵĞƐƵďũĞĐƚƚŽ L F R D

R N L E C A D CANLISH RD E E

D R E S

D O R O T R V W R

LL E R R DR Y A E A L V I T R O R L D K I AVONDALE AVEE N D E M C O R O P D NC K D L E P O E

R E D L B RE

D T R P N E W

Y R A E HOWDEN RD L W R D S A

S D Y D L

O U A V

D O UPJOHN RD LIVINGSTON RD

A R D A D ŽƵŶĐŝůĚŝƌĞĐƚŝŽŶŝŶ&ĂůůϮϬϭϳ B ND

KIDRO N M K W S A RA FLORENCE AVE N I S I E V S

LV DR V A K A A W D C L A E VA LE N H C R O D C W RD

Y U N I S RO U LV D D FI L R ILL B B

F R V E N DR N R I S N A K M CA L N R I ST O C O O A H D R L Y LM

D A D E I N V T E N

D A M K N A H E R O U E R T P S O R R N M D D E O D I E Y R

W O D H R R R AV F R C U S R

L DR I I A U

G A I A N

O N R A I Y A L B O R Y N N

W L T

R RD G A H A L N P ŽƌƌŝĚŽƌǁŚĞƌĞĨƵƚƵƌĞƐƚƵĚLJŵĂLJďĞ W O E L C R T R W B L A T T

L A ENLO S

D D D S IN E S B A E R D O B M R S L R V O A A N R A L Y L D R V N D BLV MASON RD G P IVE R R B O O K ST H D D W V LE IN D R E D L D U L S IL V R A CITY OF A V D R E BELLAMY RD K I P LEY D T D E ĐŽŶƐŝĚĞƌĞĚĂƐƉĂƌƚŽĨƚŚĞLJĐůŝŶŐ V L R D B D U A A R H V P KEELE ST B T E M

C N EP L Y O

E E T A N H R C U P SH V C

A S DR Y MILL ST A N H A R D W E M E D

R O B D CO L

L T W A I

WESTMORE DR N N U S IL N R B R R N T A ALBION RD T W R S

R S G H

S Y L H

I V Y

E I EĞƚǁŽƌŬWůĂŶϮzĞĂƌZĞǀŝĞǁZĞƉŽƌƚ

I O L O E W

V I E W L E D B E R D

R T H D D P E I

BRAMPTON R A R B LANE CRCL B S O A

T PARK D R L R D P R H L L I D A N

I R R A D BERTRAND AVE D L N N D D U V T A D H E T R E P P L E A R H S M D T L E

D IL M U G B A

J PLEWES RD NE E O R D J

V A M U O V A N L T E U G B R B E E C H P R BROOKE AVE S A TORBARRIERD D B E R N R E D I Y D ELM RD D R Y ASHTONBEE RD N R BL A B R D L B E E

E A RY P N D T E

D RL N U E N N R G

R A B BI O V U E R A DR G C X S A V H T M H R V CIVIC L E O SE R D OAKRID GE H C B CALVINGTON DR Y R D E E

O E WILSON AVE A L G E I D U G E L PRINCE RD

L LE A W M AV ANDREW S CORVETTE AVE WƌŽƉŽƐĞĚĂƌƌŝĞƌƌŽƐƐŝŶŐ M E D I E R

L H C G

N A LIN E B D T E V O E

K D R E N AV R BAYVIEWAVE H

W R E

R E N A N F A L G T L D PL ID E H R

A G E X R R ID WOBUR N FO R A R R R O RM B E G D D

W V AVE YONGE ST L D Y F CLAYSON A F RANEE AVE E

MORNING E R VAR L N S L D L N

O L T I COMSTOCK RD M S T A STAR DR BLV H R A R B O D D U E HYMUS RD NL A D RD B UPTON RD R M D EN I E D N I I ON R M H V T E W T K SUNRISE AVE A NG R G S L I AV W L G T B L E BLYTHWOOD RD A ES ORFUS RD E V N R E O E R D U O O H V D S R D C Y M A R L N NG E X F V H E O W A F C BATH D L U A E

A I G F R C džŝƐƚŝŶŐLJĐůŝŶŐEĞƚǁŽƌŬ W T T R E

G WENDELL AVE S S D I V A L U P A A

A R L R E LAIRD DR F R D REXDALE BLVD R E FA U AV I Y AC B A SH L Y LA I V L A VE C NE GORDON JANE ST E W A T D E D S 2 R W F A D S URSTST X RO STEE 7 O B K E MACKAY RD W C E A WI S R S V E A V D T C EDITH EN E O R R W A DR D N L V D R BL RESOURCESRD D A R E VIE GLENCAIRN AVE L K W MIDLAND E R D OAK R ŝŬĞ>ĂŶĞͬLJĐůĞdƌĂĐŬ E RD ROSELAWN AVE PA

M M A G C ID EL SOUDAN AVE E L FERRIS RD MCIN TOSH ST R CHURCH ST IL RALEIGH AVE N

H ST R V BET A E O H AVE R G O O

L ID U S S O ELM R C D T E E

S C N CR D P R E GE O M R S D TYCOS DR D H I D M RI A T R MACK R T P R G O L O D S D A L V U DR IN I P N S L O R E AVE I I R E N N C O T R L NN K K I ROSELAWN L

H E O W G E A S C I P AVE E O D P INGRAM R L A A dƌĂŝůͬŽƵůĞǀĂƌĚdƌĂŝů BELFIELD RD I R E P S S A L D DR D C T I D N K A O D R N VE R T A D W N E W G B C OR DON N T O E N I L E Y M SD E A N A DENTON AVE D D SPADINA RD R M HOLLIS AVE O V LU E L U C A V L S D LANDS AVE A D E S N T K O R R COSBURN AVE R R U O Y C EGLINTON A D S S R R R K M CARLINGVIEW DR N T E E YƵŝĞƚ^ƚƌĞĞƚZŽƵƚĞ O E AVE W W S V IX Y HEATH ST EA A D E E IR A A I E O L WOODBINE AVE N K L C R V KEELE ST T B O L S R T A S T D D I D SAMMON AVE S E H PAP E AV E T Y C GREENWOOD AVE EN A C R A I K STW M K L S E A M A COXWELL AVE ISLINGTON AVE E V A W N S L F W E R V P S E AV E E H AV E E K T I SE L I R M O L L AVENUE RD Y N R E V E D A D W A L džŝƐƚŝŶŐĂƌƌŝĞƌƌŽƐƐŝŶŐ C L T R VE R ROGERS RD R N A O T A STO N T ING Y T O R K T HO T R MB HOPE O A D LA ENT O V D ST C L R S E O RE B R C GLEN RD BLVD N HUMBER L W RD D A E

R E V LOGAN AVE D

A BEDFORD RD O AV V R W D G I SPADINA RD O E LA JONES AVE

EAST DR C E C M N U L W E IA E ST E T G ALL RD AS R S ORT E E N NP V D L D VE PARK RD A CARLAW AVE R L I D T A D N D O V O R S A T E M L S OR S Y A B N STGEORGE ST N B O BL DUN D D O T N LA R L E E E O Y BE ST R R ED D AR DUPONT ST ISA A S GE T R SYMINGTON AVE S RG L VE EARL PL BROADVIEW AVE D A E A ZĂŝů>ŝŶĞ M SHERBOURNE ST R S TH S T E KEELE ST S S HALLAM ST P PARLIAMENT ST H E K BARTON AVE CHURCH ST RIVERST I T A N PALMERSTON E C G LA PP IN O PRI N A D S S JARVIS ST QUEEN ST E W AVE CLINTONST V I W E S N A E A H LAKE Y A E L I W N BLVD S V I DOVERCOURT RD V A G A A T ST JOHNS T C G LAKE SHORE BLVD E E R N SHAW ST S RD S H GRACEST &ƌĞĞǁĂLJ T BAY ST N M E L L R IT T S T E ON O E P BEVERLEY ST MC CAULST L A D Y N D

T E N N A EASTERN AVEE A U

S L A O D N D

I R V L V N W W A VICTORIA ST L L E K B ONTARIO T I R E V G O V R N E H N A E R E E C R E E E T T O E A V INDIAN O N NASSAU R S H H Y N E S A BROCK AVE E F H S E A K COLBECK RD ST SPADINA AVE D E O R V AI K D I ST IT L R A L RONCESVALLES AVE E E DĂũŽƌZŽĂĚ N R D R L C RATHBURN RD G Y A E E Y S AY T N T W S Y

M O T

T N E

H P A E O CATHERINE SORAUREN AVE O D

R R A S N A V N F D AN T T ST W YORK ST

G K R E PL

N R COMMISSIONERS ST B O S

I K E

I M R PRINCE EDWARD DR S N A L R E C E S D D A H V R D T H

L I T Y V D E HIGH E D S H E R P O R E T W 'ƌĞĞŶ^ƉĂĐĞ E PARK R A M QUEEN ST W S U D W NT Y R K T ST O E W E R BLVD N FR H R TO S E NG Y K E E LLI T S A I L KING STW WE T N L W W G I DUNN AVE E T Y D S AS UA M L S JAMESON S Q W A I Y RT N A E LBE RT O E I D V E S F K UE L F R A E LAK HO OR Q MILL RD R AVE L E S T Y D SHAVER Y B V BERING STEPHEN LV BL AVES D GIBBS RD AVE W EIREANN BERRY RD BLOOR ST W DR QUAY N P E ADVANCE RD W S NORSEMAN ST A L D IL AK BLV H R E E S HOR O S W K O ST R AS LAWN RD ND N D TITAN RD R N GRAND AVE R U R C E D D

D L N I I F JUTLAND RD R F E A E D CANMOTOR M A R A AVE P THE QU EENSWAY NORTH QUEEN ST

AVE NS EVA JUDSON ST MIMICO CITY OF AVE

VALERMO DR

B NEW TORONTO ST R W MISSISSAUGA O HORNER AVE D BLV W NGHAM ST E OR N BIRMI SH KE S LA L I ELDER N 036km E AVE

Data source: City of Toronto / IBI Group, 2016 Projection: NAD 1927 MTM 3

Date: July 2016 Cartography: Vélo Québec IBI GROUP FINAL REPORT TEN YEAR CYCLING NETWORK IMPLEMENTATION PLAN Prepared for City of Toronto

Proposed Network Projects that Cross Barriers: A number of the Cycling Network Projects also cross major barriers. The type of crossing provided will be worked out in detailed design with the appropriate approval agencies. The summary tables below illustrate the total number of crossings for each barrier type. Exhibit 10-9 also illustrates the additional crossings that make up the recommended network (including the Major Corridor Studies to be reviewed as part of the Cycling Network Implementation Plan Two Year Review Report) compared to the approved network. Of particular note are the four additional freeway crossings and ten additional rail line crossings associated with those corridors.

Exhibit 10-7: Proposed Cycling Network Projects that Cross Barriers

Project Name Barrier Crossed Proposed Facility Type(s) Avenue Road - York Downs / Hwy. 401 Bike Lanes or Cycle Tracks Armour / Bombay / Avenue / Ridley Bloor - Keele to Dundas Street Humber River Major Corridor Study West Dundas - Royal York to Scarlett Humber River Bike Lanes or Cycle Tracks Dufferin - Dufferin / Ranee / Hwy. 401 Bike Lanes or Cycle Tracks Flemington / Blossomfield / Varna Eglinton - Approved as part of Don Valley Parkway Bike Lanes or Cycle Tracks Eglinton Crosstown LRT Finch - Approved as part of Hwy. 400, Black Creek Bike Lanes or Cycle Tracks Eglinton Crosstown LRT Jane - Steeles to south of Hwy. Hwy. 401 Bike Lanes or Cycle Tracks 401 Bike Lanes, Cycle Tracks or Kipling - Bloor to Gardiner Expressway Boulevard Trail Midland - Lawrence to Sheppard Hwy. 401 Major Corridor Study Morningside - Connection over Hwy. 401, Highland Bike Lanes or Cycle Tracks Hwy. 401 Creek North Queen - Mississauga to Hwy. 427 Bike Lanes or Cycle Tracks Kipling Port Union - Sheppard to Hwy. 401 Bike Lanes or Cycle Tracks Waterfront Trail Progress - Midland to Sheppard Hwy. 401 Bike Lanes or Cycle Tracks Rathburn - East Mall to Hwy. 427 Bike Lanes or Cycle Tracks Mississauga Sheppard - to be undertaken in Hwy. 404 Bike Lanes or Cycle Tracks coordination with Sheppard LRT St. Philips – Westway / Martin Humber River Bike Lanes or Cycle Tracks Grove / Lawrence / St Phillips

April 17, 2016 95 IBI GROUP FINAL REPORT TEN YEAR CYCLING NETWORK IMPLEMENTATION PLAN Prepared for City of Toronto

Exhibit 10-8: Proposed Cycling Network Projects that May Require a Grade Separation to Cross a Barrier

Project Name Barrier Crossed

Overlea Bridge - (Thorncliff Park Drive to Don Mills Road) Don River Warden Hydro Corridor Tunnel - (Crocus to Warden Hydro Corridor) 401

Richmond-Adelaide - (Eastern to Power) Don River Yonge Street - (Linell - Don Valley Golf Course) 401

Rustic Road Bridge - (Connie Street to Cartwright Avenue) Railway

Exhibit 10-9: Summary of Barrier Crossings

Number of New Locations the Barrier is Crossed Type of Barrier Approved Network Recommended Network St. Clair Streetcar 8 9 Freeways 31 35 Rail Lines 84 94 Rivers and creeks 85 98 Total 208 236

In addition to the crossings identified as part of the Ten Year Cycling Implementation Plan, additional upgrades to existing crossings and new grade-separated crossings may be implemented as part of or Ministry of Transportation, Ontario projects or other related planned infrastructure work not identified in this Plan.

10.4 Streets Not Identified as Cycling Network Routes The approved network identifies capital projects for cycling infrastructure to be implemented over the ten years. It does not identify all potential cycling improvements or new infrastructure opportunities that may present themselves in the coming years or plan for a timeframe beyond the ten years. The following City of Toronto strategies will contribute to expansion of the cycling network beyond what has been identified in the Ten Year Cycling Implementation Plan.

10.4.1 Bicycle Friendly Streets In 2001 adopted the Toronto Bike Plan, which included Policy direction supporting investments for conceptual goals beyond the routes identified in the Cycling Network Ten Year Plan. Section 5.2-2 of the Bike Plan states that the City of Toronto will "Develop a two kilometre grid of north-south and east-west routes. The guiding principle for the Cycling Network is that it be accessible within a five minute bike ride from all residences. Assuming a moderate cycling speed of 12 km/h, a five minute ride would cover one kilometre."

April 17, 2016 96 IBI GROUP FINAL REPORT TEN YEAR CYCLING NETWORK IMPLEMENTATION PLAN Prepared for City of Toronto

10.4.2 Complete Streets Guidelines The City of Toronto’s Complete Streets Guidelinesxxv describe a design process which is inclusive for all modes. When observing the Complete Streets design process, the presence of the Cycling Network Implementation Plan routes means that the appropriate cycling facility type for the road class should be included as part of the scope of the project. When the Complete Streets Design process is applied to streets where a Cycling Network Route has not been identified, the outcome may be a cycling facility, or modifications to the roadway that will improve conditions for cycling in the absence of dedicated cycling infrastructure. Through this design process, space is allocated based on a variety of inputs including project objectives and constraints, local context, city-wide priorities and public engagement. The complete streets design process helps improve conditions for cycling in Toronto in two ways:  It ensures that cycling facilities are considered as part of the design process; and,  It ensures that bike friendly streets policies are applied to all streets. Safety is a fundamental goal of the Complete Streets Design process, and cannot be traded-off for other needs.

10.4.3 Streets Identified in Future Studies At the time that each proposed Cycling Network project is scheduled, Transportation Services will work with local area councillors and undertake public consultation as part of the detailed design process. This process may result in new routes being identified in a given network, which would change or enhance the original network recommendations. Finally, this implementation plan recognizes a number of studies being undertaken by other divisions or agencies, which may afford opportunities for additional routes to be added to the network. The studies actively underway at the time that the Ten Year Cycling Network Implementation Plan was being developed are mapped in Appendix F.

10.4.4 Revisions and Updates to the MCIC Projects Coordinating the implementation of cycling facilities with MCIC projects will require some flexibility in the Cycling Infrastructure Delivery Program. It is anticipated that the Cycling Network can be implemented more efficiently with co-ordination than has been achieved in the past. As discussed in Section 7.2, MCIC projects are reviewed and adjusted quarterly and projects are shifted from year to year based on a variety of changing resources and priorities. The MCIC co-ordinated Cycling Network projects will also need to shift accordingly to match assigned road projects. In addition, new MCIC projects may be added within the ten year timeframe and may provide opportunities to include cycling facilities that have not been identified in this plan or other strategies. Beyond ten years, continued MCIC co-ordination is recommended to enhance efficiencies of implementation and further expand the cycling network.

April 17, 2016 97