Portishead Branch Line (MetroWest Phase 1)
TR040011
Applicant: North Somerset District Council 2.41 - Easton-in-Gordano Flood Mitigation Plan The Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009, regulation 5(2)(o) Planning Act 2008
Author: CH2M Date: November 2019
Document Index
2.41 Easton-in-Gordano Flood Mitigation Plan The Infrastructure Planning (Applications: Prescribed Forms 467470.BQ.04.20-SK20 Rev B and Procedure) Regulations 2009, regulation 5(2)(o)
MARSH LANE Drain
Lighting Tower Lighting Towers Drain 110 SECTION A NOTES
Lighting Tower Lighting Towers 109 1. All dimensions are in metres unless noted otherwise. ETL Lighting Tower 2. Elevations are shown at +100m due to Network Rail L Twr ETL requirements. L Twr 108 Lighting Towers
L Twr KEY: L Twr L Twr L Twr L Twr L Twr ROYAL PORTBURY DOCK ROAD ETL Drain L Twr 107
L Twr L Twr L Twr L Twr EXISTING ELEVATIONS Depot L Twr 107.80 107.83 107.90 107.95 107.98 108.00 108.07 108.20 108.30 108.30 108.31 108.39 108.41 108.51 108.60 108.60 L Twr L Twr [m AOD] 108.4 Proposed contour L Twr
L Twr
Cycle Way L Twr PROPOSED ELEVATIONS Depot ETL 107.80 107.81 107.84 107.88 107.90 107.94 107.98 108.02 108.06 108.11 108.16 108.23 108.41 108.51 108.60 108.60 L Twr [m AOD] El Sub Sta Approximate extent of stream L Twr Drain Tank
M 5
Drain compensation excavation Gordano House
GARONOR WAY
5 1 to 3 to 1 El Sub Sta Drain
Drain 11 Works 108.4 Existing contour
MARSH LANE Drain
4 Pond
14 Drain 10 Gantry
Drain Order limits Mast
GORDANO WAY
8.1m
Warehouse
Printing Works Royal Portbury Dock Road Railway (Disused) CD
MP 127 ESS's MARSH LANE
Boundary Stone M5 BRADLEY ROAD ESS 14.8m
M 5
Mast Easton-in-Gordano stream Drain Pond alignment Pond
Def Pond Lodway Farm Railway (Disused) Drain MetroWest rail alignment Drain Gantry 9.9m
52
Drain
Track 41
Mast
Drain Court House THE BREACHES Farm 34 36
Drains Mast 53
Gantry
ROYAL PORTBURY DOCK ROAD 2 64 Pond Refer to Inset A for1 details Drain
39 CD Issues
32
ST GEORGES LANE
49 BEECHWOOD 13 41 26 51
53
29 1 67
M 5 ROAD
28 47 12 2
Railway (Disused) 7
MARSH LANE Drain 44a
Sub Sta 46 25 El
CHURCH ROAD 1 BEECHWOOD ROAD 12
Gantry 45 5
6 43
23
10 2 44
8 7
9 39 1 20 DEBECCA'S LANE 8 6 20 56
Drain 2
19 1 El
Sub Sta 36 4
Drain 31a 1a 31 29d
29c
16
Drain 33 32 2 10 29b
29a
29 25 Drain 2a
CHURCH ROAD 14
Ward Bdy 30 Section A Mast 15 GORDANO 4
6 37 12 GARDENS
27d Hall 27b 27c
27a 14.3m
30
27
4 1
Monument Pavilion
St George's Church Shelter M 5 1 Easton-In-Gordano16.5m
LOCATION PLANA 369 5
8 Path (um)
3 Drains 1
1a Scale 1:5000 14
2
5 7a M5 J19 8 ROAD Football Ground 12
4 7 PRIORY El
OLD Sub Sta 3
PRIORY ROAD
6
0 50 100 150 200 250 300 350 400 450 500 16.1m 9
Easton-in-Gordano 5
Pond 7
MANOR CLOSE 11 14.2m
CHURCH ROAD The GordanoDef Services COURT HAY Conifers
Drain 26
6 SCALE 1:5000 (A1) METRES 1
El Sub Sta 1 6 14.2m
24
5 12
Drains HAY 4
SCALE 1:10000 (A3) 25 Larchwood COURT PRIORY GARDENS
FB 18 16c Gordano Service Area El Sub Sta 107.8
By adjusting the existing contours so it is slightly steeper, 107.9 the project is providing floodplain compensation for displaced Easton-in-Gordano Stream fluvial floodplain storage by the DCO scheme.
108.0 107.9
108.1 108.2 M5
108.0
B OHP ADL ADL 31/10/2019 Minor amendments Order limits 108.3 A ADS ADL ADL 20/09/2019 Location plan added 108.1 Rev By Chkd Apprvd Date Description
108.4
108.2 CH2M HILL 1 The Square Temple Quay Bristol BS1 6DG Tel +44 (0)117 910 2580 Fax +44 (0)117 910 2581 Gantry www.ch2m.com
108.5 108.3 Project PORTISHEAD BRANCH LINE M5 (METROWEST PHASE 1) 108.4
Drawing
Section A EASTON-IN-GORDANO FLOOD MITIGATION PLAN INSET A Scale 1:200
0 5 10 20 Drawn by: OHP Date: 07/08/2019
Checked by: ADL Date: 07/08/2019 U:\Projects\467470 NSC Framework 2013\BQ.04.20 MW Phase 1 Highway Engineering\90 AutoCAD\91 AutoCAD Prelim\ 467470.BQ.04.20-SK20 Rev B.dwg : : SCALE 1:200 (A1) METRES Approved by:ADL Date: 07/08/2019 SCALE 1:400 (A3) Drawing No. Revision North Somerset Council
100023397 467470.BQ.04.20-SK20 B
Drawing Scale: Varies Drawing file path & name