North Central Railway
Total Page:16
File Type:pdf, Size:1020Kb
NORTH CENTRAL RAILWAY SULTANPUR PARLIAMENTARY CONSTITUENCY Uttar Pradesh, the most populous state of Nation is served by North Central Railway along with Northern, North Eastern M. C. Chauhan and East Central Railways. Indian Railways (IR) plays a very General Manager North Central Railway important role in development of the state and provides connectivity for freight and passengers, including international tourists. IR has a history of more than 160 years in the state and has the highest route kilometers - 9100 route kilometers - within it, which is 14% of entire railway network. IR has made Uttar Pradesh proud by giving it Nation's first semi high speed train Gatimaan Express, which initially ran between Agra and Delhi. It has now been extended upto Jhansi with effect from 01.04.2018 - a move that will boost tourism in bundelkhand region of Uttar Pradesh. Efforts for further development of railway infrastructure in Uttar Pradesh have been intensified in last four years with 376% more investment in comparison to previous years. Results of such a massive investment are becoming visible with enhanced infrastructure and modern passenger amenities. Soon the era of congestion and inconvenience will be a matter of past and a new Railway equipped with state-of-the-art facilities will be able to serve the citizens with greater level of satisfaction. The longest stretch of the under construction Eastern Dedicated Freight Corridor i.e. almost 57% of the entire length lies in Uttar Pradesh from Pt. Deen Dayal Upadhyaya Jn. to Ghaziabad. In this brochure, we have compiled the important contributions and achievements of Indian Railways in the development of the SULTANPUR constituency of Uttar Pradesh in the last four years. I hope that it will serve as a ready reckoner for those eager to know about the role of Railways in the development of this constituency. It may be noted that the budgets allocated to various projects are not apportioned constituency wise but reflect the cost of the project. INPUTS BY RAILWAY IN SULTANPUR PARLIAMENTARY CONSTITUENCY SULTANPUR PARLIAMENTARY CONSTITUENCY A. ASSEMBLY SEGMENT : Sultanpur, Lambhua, Isauli, Kadipur, Sadar. B. WORK COMPLETED IN LAST FOUR YEARS : 1. Infrastructural Developments: Doubling Works: GBandhuabalan - Shivnagar stations. G Shivnagar-Adhinpur stations. GSultanpur-Lambhua stations. GLambhua-Koiripur stations. GKoiripur-Sri Krishna Nagar stations. Road over bridge in lieu of Glevel crossing No.74-B 2- lane on Sultanpur-Zafrabad section. Glevel crossing No.75-B near Sultanpur. GElimination of unmanned level crossings by diversion of approach roads and merger into adjacent manned level crossings. 2. Improvement in Passenger Amenities: GNew Foot Over Bridge at Sultanpur station. G4 platform shelters on PF No.2 at Shivnagar, Lambhua, Pakharaui & Bhadaiyan stations. G4 new Foot Over Bridges at Lambhua, Pakharaui. Bhadaiyan & Shivnagar stations in Sultanpur constituency. GLED light at all stations. GInstallation of 03 Water Vending Machines on platforms at Sultanpur station. GDisplay system at platforms and waiting rooms for Train enquiry at class Al, A and B stations of Lucknow division. C. OTHER DEVELOPMENTS New Trains introduced with stoppage over Sultanpur Constituency: GTrain No. 14117/14118 Basti - Allahabad Express (Five days a week). GTrain No. 22419/22420 Ghazipur City - Anandvihar (T) Tri-Weekly Express. GTrain No. 19305/19306 Indore-Guwahati Weekly Express. GTrain No. 14611/14612 Ghazipur City - Shri Mata Vaishno Devi Katra Weekly Express. D. ONGOING WORKS: GDoubling of Utraitia-Rae Bareli ( 65.6 km) section. GUtraitia-Zafrabad - Doubling of balance 148 km section with MMs for Rae Bareli - Abbarganj 46.9 km Sultanpur - Amethi 29.22 km with new MM of Sultanpur - Kadipur 38.7 km - new lines. GElectrification of 44 manned level crossings. GElimination of unmanned level crossings by diversion of approach roads and merger into adjacent manned level crossings. GImprovement to infrastructure at 10 Level Crossings in AF section. GElectric lifting barrier gates at Level Crossing gate on Lucknow-Sultanpur section. GElectric lifting barrier with sliding barrier at 6 Level Crossing gate on Lucknow Sultanpur section. GAutomatic banner flags at 12 manned non- interlocked level crossings. GLucknow-Sultanpur - Varanasi - Raising of platforms for running of electrical multiple unit trains. GIntegrated Emergency Response Management System Video Surveillance System at Sultanpur railway station. GPlatform shelter, small covering sheds, pay & use toilets, etc at several stations in Sultanpur Constituency. GLED light at Railway platform at Sultanpur Railway stations. GRoad over bridge in lieu of level crossing No. 33-B GMany Road under bridges & limited height subways in lieu of level crossings work in progress. GUp gradation of all running rooms lobbies of Lucknow Division. GACs in running rooms of Sultanpur. GOver Head tank with tubewell at Srikrishna Nagar-Lambhua Stations. Development of park on PF-1 at Sultanpur station Srikrishan nagar station - Provision of 15 RCC benches & 6 steel benches on PF - 1 & 2 Provision of shed & path way in circulating area at Shrikrishnanagar station.