As a large-scale building steel frame manufacturer with 10000 ton of the annual production capacity, In-house integrated system from ordering to on-site assembly, making full use of robot welding machine.

Noborio Iron Works Co., Ltd.

6-3-21 Takihama, Niihama, Ehime 792-0893 TEL (0897) 45-4588 FAX (0897) 45-4589 Akagane Museum http://www.noborio.co.jp Steel frame manufacturer

Manufactures many well-known large buildings such as public facilities and landmark facilities of large buildings. We also manufacture high-quality building steel frames with the latest technology for seismic retrofitting works and proper- ties with seismic isolation structures that require advanced technology. Matsuyama Airport, Botchan Stadium, Akagane Museum Kitaishikai Hospital, Saijo City's new government office building, Plant of Chinuya Holdings Co., Ltd., Kisuke Parking 3-bancho, etc. Takamatsu Red Cross Hospital, KSB Setonaikai Broadcasting Corporation's new building, Muroo Co., Ltd.'s Takamatsu Office Bannosu Terminal, etc. Kochi Prefecture Kochi Red Cross Hospital, Konan City's new office government building, etc. Shikoku's leading Muroo Co., Ltd.'s Tokushima Red Cross Hospital, etc. Takamatsu Office building steel factory Other Bannosu Terminal Ichimiya Logistics' Kanto Branch Office logistics center Chiba warehouse (2700 t) with an integrated production (Chiba Prefecture) Nissen Chemitech Corporation's Saitama Honjo Plant (Saitama Prefecture) system from steel products for large buildings to shipping and on-site assembly (Acquired Minister of Land, Infrastructure and Transportation's Grade H certification)

Kochi Red Cross Hospital Kisuke Parking 3-bancho (4000 t) (2000 t)

Large steel plate working , Sheet metal working and welding

Welding robot Overhead traveling cranes Noborio Iron Works Co., Ltd.

Founded March 1, 1961 Capital 20,000,000 yen Representative President Masahiro Noborio Locations 6-3-21 Takihama, Niihama, Ehime 792-0893 TEL (0897) 45-4588 FAX (0897) 45-4589 http://www.noborio.co.jp

Business summary Founded in 1961 and involved in steel frame fabrication and can manufacturing. Established as Noborio Iron Works Co., Ltd. in 1969. Received increasing numbers of orders in line with changes made to building structural designs over time. Shot blaster Numerous expansions and OA/FA systems have been implemented to date.

Main products Steel frames

Major facilities

Machine name Manufacturer Main Specifications Quantity

NC fully automatic drilling machine Amada 3DH-1000Ⅲ 1 Large column assembly welding robot Amada 6BH-1000Ⅲ 1 Band saw machine Amada Maximum cutting width 500 mm 1 Amada Maximum cutting width 800 mm 2 Amada Maximum cutting width 1000 mm 1 Auto borer Takeda Machinery ABP-516SMD 1 Overhead traveling and semi-gantry cranes Hitachi / Nippon Hoist 10 t 9 Hitachi / Nippon Hoist 5 t 1 Hitachi / Nippon Hoist 2.8 t 34 Plasma sheet metal cutting machine Rotating machines Shochiku / Kan Mechanical Industry / Herakusu 16 Shearing Amada ESH1213 2 Beam worker Amada CNCBW150 1 Beveling & scalloping machine Amada / Shinx For H-beam steel 3 Shinx For flat plates 2 Semi-automatic welding machine Panasonic / Daihen 500A 24 Panasonic / Daihen 350A 12 Gouging machine Panasonic / Daihen 21 H-shape steel drilling machine Shielded metal arc welding machine Daihen 300A 13 Shot blaster Sintokogio KACX-Ⅲ 1 Sintokogio KVCX-Ⅱ 1 Plasma sheet metal cutting machine Komatsu TFPL3082-052 1 Large assembly welding robot Kobelco 15T-1000MP2 2 Ultrasonic tester Krautkramer USM35X 2 35 t press Amada RGM23512AT 1

CAD Datalogic REAL4 4 Beam worker Taiwa Jissun Hoshi 14

Certified engineers Steel frame fabrication coordinator (senior - 1, associate - 5) Non-destructive testing personnel - ultrasonic testing (3) Structural steel inspection engineers (6) WES8103 welding coordination personnel (senior welding engineer - 1, welding engineer - 1, associate welding engineer - 3) Hot dip galvanized super high tension hexagon bolt engineers (4)

Band saw machine for structural steel Total production system at in-house factories

Material arrangement Inspection Inspection Primary machining Assembly Welding Product inspection On-site assembly

Design documents Working drawings Approval Full-scale

Full-scale inspection Inspection Inspection Inspection Manufacturing procedures Approval Shipping

Primary machining Assembly Welding On-site assembly