Oklahoma's Hydroelectric Power Dams
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Federal Register/Vol. 82, No. 8/Thursday, January 12, 2017/Notices
3766 Federal Register / Vol. 82, No. 8 / Thursday, January 12, 2017 / Notices of the protest or intervention to the Description: § 205(d) Rate Filing: Protests may be considered, but Federal Energy Regulatory Commission, Revisions to OATT Schedule 12— intervention is necessary to become a 888 First Street NE., Washington, DC Appendix A re: RTEP Projects party to the proceeding. 20426. Approved in Dec 2016 to be effective 4/ eFiling is encouraged. More detailed This filing is accessible on-line at 6/2017. information relating to filing http://www.ferc.gov, using the Filed Date: 1/6/17. requirements, interventions, protests, ‘‘eLibrary’’ link and is available for Accession Number: 20170106–5061. service, and qualifying facilities filings review in the Commission’s Public Comments Due: 5 p.m. ET 1/27/17. can be found at: http://www.ferc.gov/ Reference Room in Washington, DC. Docket Numbers: ER17–754–000. docs-filing/efiling/filing-req.pdf. For There is an ‘‘eSubscription’’ link on the Applicants: Southern California other information, call (866) 208–3676 Web site that enables subscribers to Edison Company. (toll free). For TTY, call (202) 502–8659. receive email notification when a Description: § 205(d) Rate Filing: GIA Dated: January 6, 2017. document is added to a subscribed and Distribution Service Agmt Kimberly D. Bose, docket(s). For assistance with any FERC Lendlease California City Solar LLC to Secretary. Online service, please email be effective 1/7/2017. [FR Doc. 2017–00564 Filed 1–11–17; 8:45 am] [email protected], or call Filed Date: 1/6/17. BILLING CODE 6717–01–P (866) 208–3676 (toll free). -
Lake Texoma Water Management Frequently Asked Questions (Faqs)
Lake Texoma Water Management Frequently Asked Questions (FAQs) Q1: Why is Lake Texoma so low? A1: A combination of factors is contributing to the current lake level. Even though there was substantial rainfall last May-July, there has been very little precipitation since. We need to have significant rainfall across the entire watershed that feeds Lake Texoma to bring water levels back up. In general, a persistent exceptional drought for the last three years has gripped much of the Lake Texoma watershed. Inflows into the lake for 2011 were the lowest since its construction and 2013 saw the second lowest inflows. Evaporation of water is also a contributing factor. On an average year, Lake Texoma loses approximately six feet (74”) of water to evaporation. When the Lake Texoma basin does not get enough rain, the combination of evaporation and ongoing water usage will cause the lake level to drop. The primary ongoing water usage from Lake Texoma is for municipal/ industrial water supply and hydropower, which are critical in meeting needs for water and electricity. The lake is designed and required to allow authorized project purposes such as water supply and hydropower to continue during drought periods. By this design, Texoma has historically maintained an elevation of 612 or above, approximately 85 percent of the time. Q2: Why are there water releases from Denison Dam during drought? A2: The Flood Control Act passed by Congress in 1938 allowed for the construction of Denison Dam for the authorized purposes of flood control and hydropower production. Other authorized project purposes, such as water supply and recreation were added later. -
February 1978
s ESS February 1978 Business Doctorates in Texas 29 An Interview with Jess R. Totten 31 .......Denison: A Center for Diversified Light Manufacturing 34 Rousing Market Outlook: 1978 37 A Compari•on ot Foreign and Texas Labor Costs 40 Texas Vol. 52, No. 2, February 1978 Business Review 29 Business Doctorates in Texas: A Study in Demand and Supply, Barry Render, William Wagoner, James R. Bobo, Stephen Corliss Published by the Bureau of Business 31 An Interview with Jess R. Totten, Ken Roberts Research, University of Texas at Austin Charles C. Holt, Director 34 Sherman-Denison: A Center for Diversified Light Manufac Lorna Monti, Associate Director turing, Carol T.F. Bennett, Charles P. Zlatkovich 37 Housing Market Outlook: 1978, Charles H. Wurtzebach 40 A Comparison of Foreign and Texas Labor Costs: Implica The Authors tions for Foreign Direct Investment in Texas, Sion Barry Render Raveed, Tim Meinershagen, Robert B. Morris III Acting Director, Division of Business and Economic Research University of New Orleans Tables William Wagoner Professor of Economics University of New Orleans 29 Business Ph.D. Demand and Supply in Texas, 1977 through 1981 Jam es R. Bobo 30 Business Ph.D. Demand and Supply in the Southern Region, 1977 Dean of the Graduate School of Business through 1981 University of New Orleans 30 Sources of New Business Faculty for Texas Schools, 1974 through 1977 Stephen Corliss 35 Nonagricultural Civilian Payroll Employment Percentages, Sherman Graduate Research Assistant College of Business Denison SMSA and United States, July 1977 Administration 35 Percentage of Personal Income by Major Sources, 1975, Sherman University of New Orleans Denison SMSA and Texas Ken Roberts Research Associate 36 Manufacturing Plants with More Than 250 Employees, Sherman-Denison Bureau of Business Research SMSA, 1977 Carol T.F. -
The University Op Oklahoma Graduate College An
THE UNIVERSITY OP OKLAHOMA GRADUATE COLLEGE AN ANALYSIS OP THE PRODUCTION AND DISTRIBUTION OP ELECTRIC POWER BY THE GRAND RIVER DAM AUTHORITY A DISSERTATION SUBMITTED TO THE GRADUATE FACULTY in partial fulfillment of the requirements for the degree of DOCTOR OP PHILOSOPHY BY C. ORVILLE ELLIOTT Norman, Oklahoma 1958 AN ANALYSIS OF THE PRODUCTION AND DISTRIBUTION OP ELECTRIC POWER BY THE GRAND RIVER DAM AUTHORITY APPROVED BY DISSERTATION COMMITTEE ACKNOWLEDGMENTS I wish to thank Dr. Jim E. Reese, professor of economics at the University of Oklahoma, for suggesting this topic for research. As director of the dissertation. Dr. Reese gave unselfishly of his counsel in the field of public policy and of his time. His advice and encouragement were invaluable. Dr. Paul A. Brinker, professor of economics; Dr. Virgle G. Wilhite, professor of economics; Mr. Dewey L. Bames, professor of accounting; and Mr. James M. Murphy, assistant professor of finance, all of the University of Oklahoma, deserve grateful acknowledgment for their suggestions as the research progressed and their careful study of the completed work. Mr. W. B. Hoss, General Manager; Mr. Q. B. Boydston, General Counsel; Mr. James I. Monroe, General Auditor; and the entire staff of the Grand River Dam Authority at Vinita, Oklahoma, were very cooperative and helpful in providing full access to the records of the Grand River Dam Authority and in making many suggestions as the research was conducted. Without their cooperation it would have been impossible for iii this study to have "been completed. Mr. Francis J. Borelli and his staff in the Division of Water Resources, of the Oklahoma Planning and Resources Board, were also very cooperative in permitting access to their records, files and publications. -
Mparative [Nfluences of Environmental
~~MPARATIVE [NFLUENCES OF ENVIRONMENTAL PARAMETERS ON ABUNDANCES OF HYBRID STRIPED BASS AND WHITE BASS IN THE .@RAND _!t-AKE !Ail,WATER, OKLAHOMA - !'>.'<~ ~ .. By TODD GREGORY ADORNATO !i Bachelor of Science Denison University Granville, Ohio 1986 Submitted to the Faculty of the Graduate College of the Oklahoma State University in partial fulfillment of the requi1~ements for the Degree of MASTER OF SCIENCE December 1990 .. :·..... J.. t~ ;' •.... ·(· }' d ru~D-LDJ \C:1c10 A:.t-n c._ top.~ Oklahoma State Univ. LibrlU'Y COMPARATIVE INFLUENCES OF ENVIRONMENTAL PARAMETERS ON ABUNDANCES OF HYBRID STRIPED BASS AND WHITE BASS IN THE GRAND LAKE TAil~WATER, OKLAHOMl~ Thesis Approved: 1380759 ii ACKNOWLEDGEMENTS I wish to expre~s sincere appreciation to Dr. Al Zale for his encouragement and advice throughout my graduate ~ candidacy. I al~o thank Dr. Tracy Carter and Dr. Larry Talent for serving on my graduate committee. To Dr. Bill Fisher and Matt Lechne~, who provided valuable assistance in the study, I extend my gratitude. For statistical advice, I am grateful to Dr. J. Leroy Folks. This project coul~ not. have been done without the help of the staff and technicians. of the Oklahoma Cooperative. Fish and Wildlife Research Unit; the time and equipment allocated is much appeciated. , Many thanks go to Jan Mord, Kent Sorenson, an~ Vince Tra~riichek for their help in the '' field and in the office. The project was much more enjoyable and efficient because of.them. I would also like to acknowledge the financial ·supp.ort and cooperation of the Grand River Dam Authority. ,, Finally, I would like .to thank my family. -
Frequently Asked Questions About Southwestern's Vegetation
One West Third Street Tulsa, OK 74103-3502 918-595-6600 www.swpa.gov Frequently Asked Questions – Lake Texoma Hydropower Generation April 3, 2014 Question. Why is Southwestern generating at Lake Texoma when the lake is so low? Answer. Southwestern is generating only a minimal amount to meet short-term peaking and critical power needs. The year 2013 marked the lowest generation year in the 70 year history of Lake Texoma and Denison Dam. The year 2011 was the second lowest. In fact, SWPA has been operating in drought mode since January 2011, generating only 25% of average. Since May 2012, generation has been even less, about 19% of average. Question. What gives Southwestern the right to generate at all? Answer. Southwestern is one of two project users which pay into the U.S. Treasury for water storage in Lake Texoma. The other is Municipal & Industrial (M&I) water supply. As an authorized user of the project with designated water storage, Southwestern has the right to use the water storage for which it has paid. That said, however, Southwestern and its customers have voluntarily reduced generation to save storage during the drought responsible for the low Lake Texoma elevations. Question. Who are Southwestern's customers at Denison? Answer. The entire output of the project is marketed to Rayburn Country Electric Cooperative and Tex-La Electric Cooperative, both of which are not-for-profit rural electric cooperatives serving electrical load mainly in the Electric Reliability Council of Texas (ERCOT) region. Question. What is ERCOT? Answer. ERCOT is one of nine Independent System Operators (ISO) in the United States. -
Lake Texoma State Park Resource Management Plan Marshall County, Oklahoma
Lake Texoma State Park Resource Management Plan Marshall County, Oklahoma Lowell Caneday, Ph.D. 6/30/2017 Fatemeh (Tannaz) Soltani, Ph.D. Chang-Heng (Hank) Yang This page intentionally left blank. i Acknowledgements The authors acknowledge the assistance of numerous individuals in the preparation of this Resource Management Plan (RMP). On behalf of the Oklahoma Tourism and Recreation Department’s Division of State Parks, staff members were extremely helpful in providing access to information and in sharing of their time. The essential staff providing assistance for the development of the RMP included Julie Roach, manager of Lake Texoma State Park. Assistance was also provided by Kris Marek, Doug Hawthorne, Don Schafer and Ron McWhirter – all from the Oklahoma City office of the Oklahoma Tourism and Recreation Department. Merle Cox, Regional Manager of the Southeastern Region of Oklahoma State Parks also attended these meetings and assisted throughout the project. This RMP supplements and updates an earlier document from 2009. Due to the events of the time, the 2009 RMP focused on other possible properties that could be considered for expansion and development within the Oklahoma State Park system. Given the events and circumstances present in 2017, this RMP focuses on the future of the properties remaining within the boundaries of the extant Lake Texoma State Park. The October 2016 kick-off meeting followed critical discussions between the Commissioners of the Land Office (CLO), OTRD, Pointe Vista, and other parties regarding properties formerly included in the original Lake Texoma State Park. Attending this kick-off meeting on behalf of Pointe Vista and Catfish Bay Marina was Ryan Chapman. -
Hunting Guide Lake Texoma
R 6 E RAVIA R 5 E MILBURN 6 1 6 TISHOMINGO R 5 E 1 R 4 E 4 13 78 7 11 7 11 12 9 R 7 E 12 R 6 E 12 . r C 13 14 18 15 d 177 18 n EMET 13 14 17 a S LAKE TEXOMA ig 20 N B 21 9919 PUBLIC HUNTING AREA DICKSON MANNSVILLE 19 24 ARDMORE 12 28 70 28 25 30 TISHOMINGO NATIONAL 25 26 30 . r WILDLIFE REFUGE C Johnston County 31 33 n e T 4 S P T 4 S T 5 S er TISHOMINGO WILDLIFE T 5 S 4 h c 1 4 3 2 1 t 70 MANAGEMENT AREA u NIDA B 11 y Cr. 22 ck 12 o BEE R 13 18 14 r. Johnston Co. s C 99 sa n 78 23 a 24 Bryan Co. 19 K OKLAHOMA 199 LEGEND MADILL 25 LITTLE CITY 29 Cr. 10 ow Moore Carter County Wid 199 31 32 36 Marshall County T 5 S Paved Road CUMBERLAND T 5 S T 6 S T 6 S 1 1 14 3 6 6 5 4 3 2 6 5 G R 6 E Improved Road Love County R 5 E l asses 12 11 12 7 7 OVERBROOK Lake Murray State Park 9 W 106 i 15 County Road l s o L Washita Arm itt n le 18 14 R 3 E R 2 E . G 15 C r la STATE GAME 14 C ss r E 4 R R 3 E E 3 R e . -
Download 2017-2022 Comprehensive
P a g e | 1 Prepared by the Texoma Council of Governments with assistance and funding from the Economic Development Administration (EDA), U.S. Department of Commerce P a g e | 2 Texoma Economic Development District Texoma Council of Governments Dr. Susan B. Thomas, Executive Director Staff: Deputy Executive Director Dr. Randy McBroom, GIS & Planning Program Manager Michael Schmitz, Economic Development Planner Nicole George Austin College Interns: Alison Boehmer, Juan Borda, Cody Derrick, Wes Nichols, Milo Opdahl Texoma Economic Development District CEDS Strategy Committee Terrence Steele, Texoma Workforce Solutions Gretchen Huff, Grayson College Monte Walker, Howe Economic Development Corporation Walter Menjivar, Local Business owner, La Placita, Sherman, TX Stephen J. Filipowicz, Executive Director, Bonham Economic Development Organization P a g e | 3 Texoma Economic Development District Governing Board Members President Honorable Jason Brinkley, County Judge, Cooke County Vice President Honorable Kevin Couch, Council Member City of Sherman Secretary/Treasurer Honorable Creta L. Carter II, County Judge, Fannin County Honorable Bob Thomas, Councilmember, City of Bonham Honorable Cliff Sicking, Cooke County Small City Representative, City of Muenster Honorable David Turner, Grayson County Small City Representative, City of Southmayd Honorable Jeff Whitmire, Commissioner, Precinct 01, Grayson County Honorable Jim Goldsworthy, Mayor, City of Gainesville Honorable Phyllis James, Community Representative, Grayson County Honorable Ronnie Bruce, -
GRDA), an Agency of the State of Oklahoma
PENSACOLA PROJECT FERC No. 1494 SHORELINE MANAGEMENT PLAN As Approved by the Board of Directors on June 11, 2008 GRAND RIVER DAM AUTHORITY VINITA, OKLAHOMA PENSACOLA PROJECT FERC No. 1494 SHORELINE MANAGEMENT PLAN June 11, 2008 GRAND RIVER DAM AUTHORITY VINITA, OKLAHOMA PENSACOLA PROJECT FERC NO. 1494 SHORELINE MANAGEMENT PLAN Executive Summary The Pensacola Project (FERC No. 1494) (Project) is an existing, federally licensed hydroelectric project located in northeastern Oklahoma that is owned and operated by the Grand River Dam Authority (GRDA), an agency of the State of Oklahoma. Completed in 1940, the Project’s Pensacola Dam is the longest multi-arched dam in the world. The Pensacola Dam impounds the waters of the Grand River to form the Grand Lake O’ The Cherokees (Grand Lake). Grand Lake encompasses approximately 46,500 surface acres of water and 1,300 miles of shoreline. The Project boundary is located in close proximity to the shoreline and privately owned land is generally found mere feet from the water’s edge. Since its creation, Grand Lake has been a popular recreational and residential destination. During its history, Grand Lake has hosted the National Governor’s Conference and several nationally recognized fishing tournaments. It is the home of the nation’s oldest long distance regatta on an inland lake and the oldest yacht club in Oklahoma. Current uses of the shoreline include residential and commercial development, agriculture, and wildlife management areas. Grand Lake also has considerable value as an environmental resource. It contains significant aquatic and terrestrial habitat for a host of species. Additionally, the shoreline serves an important function in the local ecology. -
Pawnee Nation of Oklahoma Energy Options Analysis
Pawnee Nation of Oklahoma � Energy Options Analysis � A Preliminary Review of Renewable Energy � Development and Utility Cost Savings Options � DOE award number: DE-FG36-06GO16021 � Submitted By: � Pawnee Nation of Oklahoma � 881 Little Dee Drive � Pawnee, OK 74058 � Summit Blue Consulting, LLC � 1722 14th Street, Ste. 230 � Boulder, CO 80302 � July 2009 � TABLE OF CONTENTS Executive Summary ............................................................................................................................. v E.1 Introduction ...................................................................................................... v E.2 Description of Activities Performed ...................................................................... v E.3 Findings and Recommendations ......................................................................... v i 1 Introduction ................................................................................................................... ix � 1.1 Project Objectives ............................................................................................... ix 1.2 Overview of Activities Performed .......................................................................... ix 1.3 Document Organization ........................................................................................ x 2 Background ................................................................................................................... xi � 2.1 Overview of Pawnee Nation ................................................................................ -
PENSACOLA DAM Respectfully Submitted, PO Box 70 Langley OK 74350 918-782-3382 Also Fax
Grand River Dam Authority A component unit of the state of Oklahoma Comprehensive Annual Financial Report for the Year Ended December 31, 2004 GRAND RIVER DAM AUTHORITY A component unit of the State of Oklahoma Comprehensive Annual Financial Report for the Year Ended December 31, 2004 Prepared by Accounting, Market Analysis & Strategic Development and Media Services Departments. MISSION STATEMENT Our mission is to provide low-cost, reliable electric power and related services to our customers and to be responsive to the interests and concerns of public power users, the communities we affect, and the people of the state of Oklahoma. We pledge to assist in area economic development and help our customers adapt to changes in their business environments, as well as making certain that on and around our lakes we will support recreational development, environmental awareness, and good safety practices to ensure the continued improvement of the quality of life for all of those who utilize our resources. Change is inevitable. Sometimes it happens on its own, and organizations find themselves reacting to it. In such cases, change is not always for the better. However, when an organization initiates the change—though that may mean making hard decisions and shaking up the status quo—it controls the change. In such cases, the end results are worth the effort. In 2004, GRDA initiated many changes within its organization. In the form of new management, new departments, new directions and a new focus on old issues, change came often. Now, as we look back on the year, GRDA believes the changes of 2004 were well worth the effort.