Traffic Impact and Access Study MGM Springfield

Total Page:16

File Type:pdf, Size:1020Kb

Traffic Impact and Access Study MGM Springfield TRAFFIC IMPACT AND ACCESS STUDY — TEC, INC. Traffic Impact and Access Study MGM Springfield Prepared for: MGM Resorts International Global Gaming Development, LLC Prepared by: TEC, Inc. 65 Glenn Street Lawrence, Massachusetts 01843 December 17, 2012 1 Table of Contents Table of Contents ................................................................................................................................................................ i List of Figures ....................................................................................................................................................................... ii Executive Summary ............................................................................................................................................................. 1 I. Introduction ....................................................................................................................................................................... 3 II. Existing Conditions .......................................................................................................................................................... 4 Traffic Study Area ............................................................................................................................... 4 Roadway Geometry ............................................................................................................................ 4 Intersection Geometry ....................................................................................................................... 6 Existing Traffic Volumes ................................................................................................................... 10 Seasonal Adjustment ........................................................................................................................ 12 III. Future Conditions ........................................................................................................................................................ 13 Background Traffic Growth .............................................................................................................. 13 No‐Build Traffic Volumes .................................................................................................................. 15 Site Access Summary ........................................................................................................................ 15 Site Generated Traffic ....................................................................................................................... 16 Trip Distribution ................................................................................................................................ 20 Redistributed Traffic (Closure of Howard and Bliss Streets) ........................................................... 22 Build Traffic Volumes ........................................................................................................................ 22 IV. Traffic Operations Analysis ..................................................................................................................................... 23 Methodology..................................................................................................................................... 23 Unsignalized Intersections ............................................................................................................... 24 Signalized Intersections .................................................................................................................... 27 V. Intersection and Roadway Improvements .............................................................................................................. 33 Intersection Capacity and Safety Improvements ............................................................................ 33 Transportation Demand Management ............................................................................................ 34 VI. Parking Summary ....................................................................................................................................................... 39 Parking Supply .................................................................................................................................. 39 Parking Demand................................................................................................................................ 39 VI. Conclusion .................................................................................................................................................................... 42 TEC, Inc. i 2 List of Figures No. Title 1 Project Location Map 2 2012 Existing Conditions – Weekday Evening and Saturday Evening Peak Hour Traffic Volumes 3 2022 No-Build Conditions – Weekday Evening and Saturday Evening Peak Hour Traffic Volumes 4 Site Circulation – Patron & Employee Car Traffic 5 Site Circulation – Bus & Delivery Truck Access 6 Site Circulation – Pedestrian & Shuttle Access 7 Trip Distribution – Casino & Hotel Employees 8 Trip Distribution – Casino & Hotel Patrons 9 Trip Distribution – Armory Square Retail Center 10 NET Site Generated Trips – Weekday Evening Peak Hour Traffic Volumes 11 NET Site Generated Trips – Saturday Evening Peak Hour Traffic Volumes 12 Total Trip Distribution – All Users – Entering Volumes 13 Total Trip Distribution – All Users – Exiting Volumes 14 NET Redistributed Trips – Weekday Evening and Saturday Evening Peak Hour Traffic Volumes 15 2022 Build Conditions – Weekday Evening and Saturday Midday Peak Hour Traffic Volumes 16 Route Options & Traffic Management for I-291 17 Route Options & Traffic Management for I-91 Northbound 18 Route Options & Traffic Management for I-91 Southbound TEC, Inc. ii 3 Executive Summary MGM Resorts International Global Gaming Development, LLC (MGM) proposes to construct a dynamic mixed-use casino, entertainment, hotel, shopping center, and residential apartment complex in the downtown core. The project site is bordered by East Columbus Avenue, State Street, Main Street, and Union Street. It was selected because it has significant potential for redevelopment, situated in an area of prior extensive tornado damage, and able to be woven into the fabric of an increasingly vibrant downtown. It lies is close proximity to several interstate highway ramps yet it is intricately tied to the downtown pedestrian experience along Main Street. The proposed uses, supply of parking, and pedestrian access points are expected to complement and revitalize the adjacent businesses and uses in Springfield’s South End, such as the MassMutual Convention Center. The site is currently occupied by multiple commercial, municipal, retail establishments, and for-fee surface parking fields and structures. MGM proposes to raze a majority of the structures on the site and construct the following: 592,700 SF casino resort that includes space for back of the house (BOH), retail / restaurant uses, and banquet facilities in addition to the gaming space 294-room multi-story hotel 54 residential apartment units 140,000 SF retail and entertainment center known as Armory Square, which will include multiple tenants, restaurants, event plaza, a multi-screen cinema and bowling alley 4,800-stall multi-story parking garage This following study is based on current traffic data collected at key study area intersections in August and November 2012. The traffic projections for the proposed casino complex are based on historic studies and MGM-specific data from a comparable facility in Detroit. The trip characteristics for the proposed complex are compatible with the adjacent uses because their peaking events are different. Parking data was collected to understand the needs for the adjacent courthouse and the downtown businesses. The courthouse and office uses see their demand peak in the weekday morning and midday periods when the casino complex is less active. Conversely, those same uses generate a negligible number of trips when the casino is most active during the weekday evening and weekend periods. This symbiosis of land uses allows for a shared parking supply in the MGM parking structure that can be used without fee. The vehicular access configuration for the site was determined after a careful review of the capacity of the area street system. Fortunately, the streets and intersections have reserve capacity to handle additional traffic. The four Interstate 91 and 291 exits serving this area of downtown can accommodate regional traffic associated with the casino development. The multiple access points to the highway network and the downtown will create additional bypass traffic for downtown businesses while avoiding the residential neighborhoods. One key to the successful management of traffic is public information. TEC will be working with the City and State staff to identify measures, such as social media and intelligent transportation and information systems, to route traffic to the most appropriate route. TEC, Inc. 1 4 This preliminary traffic impact study demonstrates that the surface intersections, with modest improvements, can accommodate the entire development program and still attain acceptable levels of service. All intersections are expected to operate at an overall level of service D or better when assessed in a 10-year horizon. This means that there is still reserve capacity following construction of the MGM facility to accommodate
Recommended publications
  • January 1St-January 7Th, 2018
    Chicopee Police Department Page: 1 Selective Search From: 01/01/2018 Thru: 01/07/2018 0000 - 2359 Printed: 01/08/2018 For Date: 01/01/2018 - Monday Call Number Time Call Reason Action 18-3 0025 Fireworks Complaint Unable to Locate Location/Address: 14 PERRAULT ST 18-4 0037 Property Damage Crash Report Made Location/Address: 175 MCKINSTRY AVE @ 1 EASTERN DR 18-6 0115 Assist Fire ASSIST GIVEN Location/Address: 722 CHICOPEE ST 18-7 0116 Property Damage Crash Report Made Location/Address: [01 1027] DUNKIN DONUTS - 820 MEMORIAL DR 18-9 0207 Disturbance Advised Location/Address: [01 971] PORTUGUESE AMERICAN CLUB - 147 EXCHANGE ST 18-10 0219 Property Damage Crash Report Made Location/Address: 380 GROVE ST 18-11 0221 Suspicious M/V Arrest Location/Address: [01 188] PRIDE SERVICE STATION - 167 CHICOPEE ST 18-12 0254 Property Damage Crash Criminal Complaint Reque Location/Address: MADISON ST @ HUNTINGTON AVE 18-15 0503 Transport Service Transport complete Location/Address: [02] BAYSTATE MEDICAL - 759 CHESTNUT ST 18-17 0523 Disturbance Advised Location/Address: 578 GRANBY RD @ 17 SZETELA DR 18-23 0840 Traffic/Parking Complaint Unable to Locate Location/Address: [01 174] COMMUNITY SUBSTANCE ABUSE CENTER - 628 CENTER ST 18-26 0842 Public Service NOT SERVED Location/Address: 269 CHICOPEE ST Apt. #1 18-28 0945 Abandoned 911 Call Complaint Taken Care Of Location/Address: 180 ROLF AVE 18-31 1032 Public Service Advised Location/Address: 63 CHARPENTIER BLVD 18-33 1048 Motor Vehicle Stop M/V Citation Issued Location/Address: 806 CHICOPEE ST @ 7 MT CARMEL
    [Show full text]
  • One Financial Plaza at 1350 Main Street
    ONE FINANCIAL PLAZA AT 1350 MAIN STREET Class A Office Space Available for Lease in Downtown Springfield 1350 Main Street | Springfield, MA 01103 1350MainStreet.com • 17-story, 330,000 SF Class A office tower. Smaller offices to 19,195 SF full floors available with reception, conference room, and corner offices. • 5 High Speed Elevators. • Palazzo Café, gourmet coffee and sandwich shop on the first floor. • New State-of-the-Art Fitness Center at 180 Fit located on the 9th floor • Prime access and visibility for tenants and visitors with all the amenities of downtown Springfield within steps including parking, restaurants, the Mass Mutual Center & City Hall. • Park-like setting with outdoor seating. • Amazing views of the City and the Connecticut River. • Brand New Riverfront Park located in close proximity with walking and bike trails. • Easy highway access, I-91 off ramp one block away. • Only 30 minutes north of Hartford and within minutes of Bradley International Airport. • 24/7 Security/Concierge-style service and Onsite Management. • Convenient parking only one block away with public transportation in front of the building. Located in the Heart of Downtown Springfield Main Street Entrance & Court Street Entrance Offering 372 SF to Full Floors of 19,195 SF Park-like Setting/ With Outdoor Seating Palazzo Café on the First Floor & 180Fit Gym on the 9th Floor Civic Center Garage One Block to Civic Center Garage Civic Center Garage Amazing Views of the City & Connecticut River Within Walking Distance to the New Riverfront Park & Walking/
    [Show full text]
  • Chicopee Police Department Page: 1 Selective Search From: 07/01/2019 Thru: 07/21/2019 0000 - 2359 Printed: 07/23/2019
    Chicopee Police Department Page: 1 Selective Search From: 07/01/2019 Thru: 07/21/2019 0000 - 2359 Printed: 07/23/2019 For Date: 07/01/2019 - Monday Call Number Time Call Reason Action 19-41567 0010 Property Check Parks/Bldgs PD Appears Secure After Check Location/Address: [CHI 670] CUMBERLAND FARMS - 1061 MEMORIAL DR 19-41571 0020 Disturbance * Could not Locate Location/Address: [CHI 1036] DUNKIN DONUTS - 953 FRONT ST 19-41572 0020 Unwanted Party/Undesirable PD Advised Location/Address: [CHI 188] PRIDE SERVICE STATION - 167 CHICOPEE ST 19-41570 0021 Property Check Parks/Bldgs PD Appears Secure After Check Location/Address: [CHI 1191] WALMART - 591 MEMORIAL DR 19-41574 0025 Property Check Parks/Bldgs PD Appears Secure After Check Location/Address: [CHI 719] PRICE RITE - 1600 MEMORIAL DR 19-41575 0036 Property Check Parks/Bldgs PD Appears Secure After Check Location/Address: 0 STONINA DR @ 0 PLANTE CIR 19-41577 0039 Property Check Parks/Bldgs PD Appears Secure After Check Location/Address: [CHI 857] SZOT PARK - 97 SGT TRACY DR 19-41578 0040 Motor Vehicle Stop PD Citation/Warning Issued Location/Address: 687 PROSPECT ST 19-41579 0045 Property Check Parks/Bldgs PD Appears Secure After Check Location/Address: [CHI 188] PRIDE SERVICE STATION - 167 CHICOPEE ST 19-41580 0046 Property Check Parks/Bldgs PD Appears Secure After Check Location/Address: [CHI 652] SCRAPPYS LIQUOR LOCKER INC. - 577 EAST ST 19-41581 0056 Motor Vehicle Stop PD M/V Citation Issued Location/Address: 399 HAMPDEN ST @ 640 SPRINGFIELD ST 19-41582 0101 Traffic/Parking Complaint
    [Show full text]
  • Massachusetts Department of Environmental Protection Provided by Massdep
    Massachusetts Department Of Transportation Highway Division Proposal No. 607560-106915 DOCUMENT A00860 MASSACHUSETTS DEPARTMENT OF ENVIRONMENTAL PROTECTION NOTICE OF INTENT A00860 - 1 Massachusetts Department Of Transportation Highway Division Proposal No. 607560-106915 THIS PAGE INTENTIONALLY LEEFT BLANK A00860 - 2 Proposal No. 607560 - 106915 Notice of Intent Connecticut River Stormwater Improvements and the I-391 Resurfacing Project Chicopee, Massachusetts Prepared for: Massachusetts Department of Transportation 10 Park Plaza Boston, MA 02116 Prepared by: July 2018 A00860 - 3 Proposal No. 607560 - 106915 July 19, 2018 Chicopee Conservation Commission 274 Front Street Fourth Floor, City Hall Annex Chicopee, MA 01013 Subject: Notice of Intent Application Connecticut River Stormwater Improvements and the I-391 Resurfacing Project Chicopee, Massachusetts Dear Commission members, On behalf of the Massachusetts Department of Transportation (MassDOT) - Highway Division, AECOM respectfully submits nine copies (including one original and eight copies) of this Notice of Intent (NOI) for proposed stormwater improvements for review under the Massachusetts Wetlands Protection Act (WPA) and Implementing Regulations. Improvements to existing stormwater management systems are proposed to be located adjacent to I-391 south on- and off-ramps at the I-391/Grattan Street (Rt. 141) Interchange (Exit 4) and at the on- and off-ramps at Exit 2 in Chicopee. The stormwater retrofits are part of the MassDOT Impaired Waters Program aimed at mitigating stormwater discharges to waterbodies through targeted upgrades to stormwater systems and installations of stormwater Best Management Practices (BMPs). The purpose of the stormwater retrofits is to improve water quality within the Connecticut River Watershed. I-391 resurfacing work consisting of repaving and resurfacing of the roadway from Main Street in Holyoke to the I-391/Rt.
    [Show full text]
  • Interstate Route I-91 Corridor Planning Study Existing Conditions
    Interstate Route I-91 Corridor Planning Study Springfield, Massachusetts: Interchanges 1 through 5. Existing Conditions Report Photography by PVPC Staff Imagery ©2013 Terra Metrics, Map data © 2013 Google. July 2015 Prepared in cooperation with the Massachusetts Department of Transportation and the U.S. Department of Transportation. The views and opinions of the Pioneer Valley Planning Commission expressed herein do not reflect those of the Massachusetts Department of Transportation or the U.S. Department of Transportation. TABLE OF CONTENTS I. INTRODUCTION .................................................................................................................................................. 1 I.1 STUDY AREA ....................................................................................................................................................... 1 I.1.1 Roadway Network ........................................................................................................................................... 1 II. PREVIOUS STUDIES REVIEW ........................................................................................................................ 5 II.1 INTERSTATE 91 CORRIDOR STUDY: AN IMPACT ANALYSIS OF THE CULTURAL LANDSCAPE ...... 5 II.1.1 Project Orientation ....................................................................................................................................... 5 II.1.2 Historic Review of the I-91 Highway Construction ......................................................................................
    [Show full text]
  • A Citywide Vision for Pedestrian and Bicycle Pathways in Chicopee, Massachusetts Stephanie Carlisle
    University of Massachusetts Amherst ScholarWorks@UMass Amherst Landscape Architecture & Regional Planning Landscape Architecture & Regional Planning Studio and Student Research and Creative Activity Fall 2016 Networks of Opportunity: A Citywide Vision for Pedestrian and Bicycle Pathways in Chicopee, Massachusetts Stephanie Carlisle Ambica Chadha Daniel Fontaine Sammi Gay Justin Gilmore See next page for additional authors Follow this and additional works at: https://scholarworks.umass.edu/larp_grad_research Part of the Environmental Design Commons, Landscape Architecture Commons, and the Urban, Community and Regional Planning Commons Carlisle, Stephanie; Chadha, Ambica; Fontaine, Daniel; Gay, Sammi; Gilmore, Justin; Hulten, GianPaula; Krevat, Derek; Li, Shuo; Smialek, Alexandra ‘Ola’; and Tapia, Melody, "Networks of Opportunity: A Citywide Vision for Pedestrian and Bicycle Pathways in Chicopee, Massachusetts" (2016). Landscape Architecture & Regional Planning Studio and Student Research and Creative Activity. 51. Retrieved from https://scholarworks.umass.edu/larp_grad_research/51 This Article is brought to you for free and open access by the Landscape Architecture & Regional Planning at ScholarWorks@UMass Amherst. It has been accepted for inclusion in Landscape Architecture & Regional Planning Studio and Student Research and Creative Activity by an authorized administrator of ScholarWorks@UMass Amherst. For more information, please contact [email protected]. Authors Stephanie Carlisle, Ambica Chadha, Daniel Fontaine, Sammi
    [Show full text]
  • Statewide Exit Renumbering Project Public Information Meeting
    STATEWIDE EXIT RENUMBERING PROJECT PUBLIC INFORMATION MEETING | DECEMBER 9, 2019 Project Overview The Massachusetts Department of Transportation (MassDOT) is converting all exit numbers on freeways to a milepost-based numbering system, per Federal Highway Administration (FHWA) requirement. • Currently, interstates and freeways in Massachusetts utilize a sequential exit numbering method. Background - MUTCD States are statutorily Massachusetts, New required to adopt the Hampshire, and Federal Highway Delaware are the only Administration’s three states remaining (FHWA’s) Manual on in non-compliance. Uniform Traffic Control • All others have either fully Devices (MUTCD). converted or have started • The 2009 MUTCD conversion efforts. mandated that all states establish a mile-based exit numbering system. Background - Massachusetts MassDOT has The MUTCD In January 2019, H. committed to FHWA to requirement applies to 3078 “An Act comply with mileage- all controlled access Establishing Mileage based exits by January roads with exits, Based Numbering for 2022. meaning interstates Exits Along Interstate • Non-compliance “could and freeways. Highways” was referred result in withdrawal of to the Joint Committee Federal-aid funds” MassDOT owns the only roads that the on Transportation requirement is Committee. applicable to. Project Benefits More accurate Emergency Reduced Maintenance Response Costs • Can improve reporting of • Sign numbering does not highway incidents, need to be changed if new resulting in better navigation of emergency interchanges are added to services a route Driver Friendly Navigation National uniformity • Allows drivers to • Same exit numbering determining distances to scheme as a majority of destinations quickly the states • Miles traveled can be calculated more easily Implementation Conversion will be “Old Exit” signs will be implemented on a installed at each route-by-route basis, converted exit for a generally starting in minimum of two years.
    [Show full text]
  • Comprehensive Tolling Plan for Additional Interstate and Controlled Access State Highways in the Commonwealth of Massachusetts
    Comprehensive Tolling Plan for Additional Interstate and Controlled Access State Highways in the Commonwealth of Massachusetts Report to the Legislature December, 2013 Report to the Legislature Comprehensive Tolling Plan Comprehensive Tolling Plan for Additional Interstate and Limited Access State Highways in the Commonwealth of Massachusetts EXECUTIVE SUMMARY ................................................................................................................................... i 1 PURPOSE AND NEED.......................................................................................................................... 1 1.1 Massachusetts Legislative Requirements............................................................................................ 1 1.2 Funding Goals .................................................................................................................................... 1 1.3 MassDOT Policy Goals ........................................................................................................................ 2 1.4 Federal Tolling Policy ......................................................................................................................... 4 1.5 State Laws and Tolling........................................................................................................................ 8 1.6 Study Approach ............................................................................................................................... 10 2 RECENT STUDIES AND TOLL DEVELOPMENTS
    [Show full text]
  • Council Backs Pot Ban Despite Planners' Vote
    Q&A SPORTS YOUTH Recycling Rivalry Wins advocate game a worth wastes not turkey a bird PAGE 2 PAGE 9 PAGE 16 AGAWAM ADVERTISER NEWS A TURLEY PUBLICATION ❙ www.turley.com December 5, 2019 ❙ Vol. 41, No. 40 ❙ $1.00 www.agawamadvertisernews.turley.com MARIJUANA BUSINESSES Council backs pot ban despite planners’ vote By Michael Ballway “I think that vote was enough [email protected] to convince me,” said Councilor Paul Cavallo. Though the turnout City councilors followed the was only 21 percent, he added, will of voters to ban recreation- “If they didn’t show up, shame al marijuana businesses this on them. If they were really for it, week, but not before receiving a they had an opportunity to vote pro-marijuana recommendation for it.” from the Planning Board. In voting for the ban, the Councilors voted 8-0, with council went against the rec- three members absent, to adopt ommendation of the Planning a permanent ban at their Dec. 2 Board, which co-hosted this meeting. The new law would es- week’s public hearing. sentially extend the current mor- The Planning Board itself atorium, which expires Dec. 31. was split, with member Mario Granger School pupils show off some of the snow globes they helped to As ordinances require two votes Tedeschi, a city councilor-elect, make while enjoying the relaxing sounds of a crackling “fire” in a class- to be adopted, the deciding vote siding with his future colleagues room on Nov. 27. From left are Alexis Gagno, Gabriella Sterner, Connor will be at the council’s next meet- in recommending the ban.
    [Show full text]
  • EJ Info Sheet for the City of Chicopee (Pdf)
    National Pollutant Discharge Elimination System (NPDES) Permits PUBLIC INFORMATION https://www.epa.gov/npdes-permits/massachusetts-draft-individual-npdes-permits Chicopee Community Information Sheet U.S. EPA | PERMITS UNDER THE CLEAN WATER ACT U.S. EPA IS SEEKING PUBLIC INPUT All facilities discharging pollutants from a point source into waters of the United States are required to obtain a National Pollutant Discharge Elimination System (NPDES) permit under the Clean Water Act (CWA). The U.S. Environmental Protection Agency (EPA) issues NPDES permits for all types of facilities, including publicly owned treatment works (POTWs), within the Commonwealth of Massachusetts to authorize the discharge of a specified amount of pollutants under certain conditions. NPDES permits expire after five years and must be subsequently reissued through a public process. The Draft NPDES Per- mit for the POTW is owned and operated by the City of Chicopee, (the Permittee), has KEY CONTACTS: been prepared and EPA is soliciting public comments on this Draft Permit from interested JANET DESHAIS parties for a period of 30 days. After this Draft Permit is finalized, the final permit will EPA NPDES Permit replace the City’s 2012 Permit. Writer (617) 918-1667 Chicopee’s Draft Permit authorizes treated industrial and domestic sewage (i.e., from [email protected] homes) wastewater to be discharged into the Connecticut River. Eighteen (18) industrial users contribute pretreated flow to this facility. Fifteen (15) combined sewer overflow MARCUS HOLMES (CSO) outfalls in Chicopee discharge to the Connecticut River (7 CSOs), Chicopee River EPA Environmental Justice (7 CSOs), and Willimansett Brook (1 CSO).
    [Show full text]
  • Unified Work Programs 1974 - 2015
    for the Pioneer Valley Metropolitan Planning Organization Fiscal Year 2016 October 1, 2015 to September 30, 2016 Unified Planning Work Program Work Planning Unified Unified Planning Work Program Work Planning Unified UPWP Prepared by Pioneer Valley Planning Commission 60 Congress Street - Floor 1 Springfield, MA 01104-3419 www.pvpc.org Pioneer Valley Unified Planning Work Program Fiscal Year 2016 October 1, 2015 to September 30, 2016 Final Document June 23, 2015 Prepared by the Pioneer Valley Planning Commission For the Pioneer Valley Metropolitan Planning Organization Pioneer Valley MPO Members Name Title Stephanie Pollack Secretary and CEO of the Massachusetts Department of Transportation Thomas Tinlin Acting Administrator of the Massachusetts Department of Transportation Highway Division Walter Gunn Chairman of the Pioneer Valley Executive Committee John Musante Chairman of the Pioneer Valley Transit Authority Advisory Board Mayor Domenic Sarno Mayor of Springfield Mayor Alexander Morse Mayor of Holyoke Mayor Richard Cohen Mayor of Agawam Mayor David Narkewicz Mayor of Northampton George Archible Belchertown Board of Selectmen Marcus Boyle Hatfield Board of Selectmen Alternates Mayor Richard Kos Mayor of Chicopee Mayor Daniel M. Knapik Mayor of Westfield Ex-Officio (Non-Voting) Pamela Stephenson Federal Highway Administration Mary Beth Mello Federal Transit Administration Stephen Roberts Economic Development Council of Western Massachusetts Mary MacInnes Administrator of the Pioneer Valley Transit Authority James Czach Chairman – Pioneer Valley Joint Transportation Committee Prepared in cooperation with the Massachusetts Department of Transportation, and the Federal Highway Administration and the Federal Transit Administration - U.S. Department of Transportation. The views and opinions of the Pioneer Valley Planning Commission expressed herein do not necessarily state or reflect those of the U.S.
    [Show full text]
  • 5.3 Environmental Comparison of Preferred Northern and Noticed-Alternative Southern Routes
    Energy Facilities Siting Board Petition Comparison of Proposed Facilities 5.3 ENVIRONMENTAL COMPARISON OF PREFERRED NORTHERN AND NOTICED-ALTERNATIVE SOUTHERN ROUTES The following subsections describe the following existing environmental conditions along both the Preferred Northern and Noticed-Southern Alternative Routes: traffic/transportation; land use; noise; visual and aesthetics; wetlands and vernal pools; surface waters; drinking water supplies; oil and/or hazardous materials (OHM); electric and magnetic fields; tree clearing; and historic and archeological resources. In addition to describing these existing environmental characteristics, each subsection presents an analysis of the potential impacts that would occur to that environmental feature as a result of the development of the 345-kV facilities along the Preferred Northern Route and the Noticed-Alternative Southern Route, as well as the potential measures that WMECO has identified to mitigate such effects. 5.3.1 Traffic/Transportation Infrastructure The existing environment and impacts and mitigation measures for the Preferred Northern Route and the Noticed-Alternative Southern Route are in the following subsections. 5.3.1.1 Existing Environment The existing traffic/transportation environment for the Preferred Northern Route and the Noticed- Alternative Southern Route are described below. 5.3.1.1.1 Preferred Northern Route A number of local, state, and federal roads are crossed by the existing ROW along the Preferred Northern Route. In addition, the route also follows the existing ROW across four railroads. Access along the Preferred Northern Route will be provided by existing access roads that WMECO has historically used to operate and maintain the existing 115-kV transmission lines that presently occupy the ROW.
    [Show full text]