Appendix A

Regional Transport Strategy 2015 – 2036 Refresh

Delivery Plan 2016 – 2021

Draft for Consultation

Contents

Introduction 1 Purpose 1 Structure of Document 2

1. Strategic Connectivity Policies/Proposals 3 Interventions 4

2. Health and Transport Policies/Proposals 12 Interventions 13

3. Active Travel Policies/Proposals 18 Interventions 19

4. Travel Planning Policies/Proposals 25 Interventions 26

5. Buses Policies/Proposals 28 Interventions 30

6. Park & Ride Policies/Proposals 33 Interventions 34

7. Rail Policies/Proposals 37 Interventions 38

8. Freight Policies/Proposals 42 Interventions 43

9. Travel Information Policies/Proposals 44 Interventions 45

10. Climate Change Policies/Proposals 47 Interventions 48

Appendix A – Delivery and Action Plans/Programmes Reviewed 50 Appendix B – List of Abbreviations 52

i

Tactran draft RTS Delivery Plan

Introduction Tactran’s Regional Transport Strategy 2015-2036 Refresh was formally approved by the Minister for Transport and Islands in July 2015. It is the first refresh of the Regional Transport Strategy 2008- 2023 (RTS) and the core aims and objectives of the RTS 2008-2023 remain consistent and relevant. The direction of the RTS has not been changed, though the Refresh extends the horizon to 2036 to align with the second TAYplan Strategic Development Plan and updates our policies and proposals which are aimed at supporting regional economic prosperity; connecting communities and being socially inclusive; and promoting environmental sustainability and improved health and wellbeing.

An RTS Delivery Plan was approved by the Partnership in June 2009 and has been regularly updated to reflect regional and local priorities in the intervening period. However, following Ministerial approval of the Refresh in July 2015 a comprehensive review of contributing actions and projects being delivered by Tactran and all our partners and stakeholders within the region has been undertaken.

This draft RTS Delivery Plan to date has been developed though a comprehensive review of all relevant partner and stakeholder contributing national, regional and local delivery and action plans that have been developed since the original RTS was approved in 2008, as well as consultation with our constituent Council officers. Appendix A contains a list of all contributing delivery and action plans reviewed.

Tactran now wishes to consult with all partners and stakeholders on this draft Delivery Plan to ensure all contributory actions and projects are appropriately captured.

Purpose The RTS Refresh and this associated draft Delivery Plan constitute a balanced and integrated strategy and package of policies, proposals and supporting actions and interventions which support Tactran’s Vision, Objectives and strategic themes.

The aim of this draft RTS Delivery Plan is to set out the interventions which support the fulfilment of the RTS Vision and Objectives. The Delivery Plan is not intended to be a fully costed programme. It is a framework for determining associated Capital and Revenue programmes and priorities which may be implemented by the Partnership, its partner Councils, Scottish Government, Transport and other relevant delivery agencies.

It identifies a range of transportation infrastructure, systems and service enhancements which will support delivery of the RTS Refresh, Single Outcome Agreements, the National Transport Strategy and other relevant local, regional and national strategies.

The draft RTS Delivery Plan concentrates on projects that will be delivered or developed over the next 5 years and it is intended it will be updated at regular intervals.

Prioritisation and implementation of individual RTS interventions is subject to resource availability and appraisal against RTS objectives, including their contribution towards promoting sustainable economic growth locally, regionally and nationally.

Securing the Revenue and Capital finances necessary to support delivery of the RTS is an ongoing and significant challenge for the Partnership and its partners.

In accordance with legislative requirements a Strategic Environmental Assessment (SEA) and full Equality Impact Assessment (EqIA) of the RTS 2015-2036 Refresh have been undertaken and are addressed in separate SEA and EqIA reports. Individual interventions included within this Delivery Plan will be assessed for environmental and equalities impacts by the appropriate project partner.

1

Structure of Document Chapter 5 of the RTS 2015-2036 Refresh sets out the detailed strategies and frameworks required to implement the RTS Refresh over the 21 years between 2015 and 2036. In addition Chapter 6 outlines Climate Change Duties and additional key priority mitigation areas where the Partnership has significant potential to contribute to or support reduction in transport carbon emissions.

The draft Delivery Plan is therefore structured around the RTS 2015 – 2036 Chapter 5 strategies and frameworks and Climate Change Duties outlined in Chapter 6 to ensure a clear connection between the RTS 2015-2036 Refresh and the draft Delivery Plan, as follows:

1. Strategic Connectivity 2. Health and Transport 3. Active Travel 4. Travel Planning 5. Buses 6. Park & Ride 7. Rail 8. Freight 9. Travel Information 10. Climate Change

Each section commences with the relevant policies and proposals included in Chapter 5 and 6 of RTS 2015-2036 Refresh required to implement the RTS Refresh over the 21 years between 2015 and 2036. This is followed by the draft RTS Delivery Plan interventions concentrating on actions and projects that will be delivered or developed over the next 5 years.

For each intervention the following information is provided:

Reference – unique reference number based on RTS Chapter 5 and 6 Policy/Proposal to which the intervention contributes

Project – project name/identity

Principal Objectives – the RTS overarching objectives and supporting sub-objectives the intervention supports.

Policy /Proposal – RTS Chapter 5 Policies/Proposals to which the intervention contributes towards achieving.

Description & Purpose – description and purpose of the intervention

Timing – identify timing of intervention to commence and/or be completed in next 5 years or completed in later years.

Partners – all partners involved in delivering the intervention. Lead partners in bold text.

Progress – description of progress to date.

Supporting Policy Documents – all partner and stakeholder delivery and action plan documents that support the particular intervention.

A list of all abbreviations used in the draft RTS Delivery Plan tables is included at Appendix B.

2

1. Strategic Connectivity

Rail Links and Services SC1: Work with Transport Scotland to deliver STPR Projects 6: Further Extension of Rail Electrification; 15 to Glasgow Rail Improvements; 17: Highland Main Line rail improvements; and 23: Aberdeen – Central Belt Rail Improvements. SC2: Work with train operators to reduce overcrowding and improve the reliability of passenger services to Edinburgh, Glasgow, Aberdeen and beyond. SC3: Support improvements to the , East Coast and CrossCountry services to London and other UK cities and regions. SC4: Support the extension of High Speed Rail between London and Central Scotland and to ensure that through services from the region use the new line. SC5: Support the provision of rail freight infrastructure, rolling stock and services to increase the role of rail freight serving the region.

Strategic Roads SC6: Work with Transport Scotland to support delivery of STPR Projects 16: to upgrade the A9 between Dunblane and Inverness; and 29: to improve the A90 through/around . SC7: Support partners in delivering improvements to the strategic road network around Perth and .

Inter-regional Bus and Coach Services SC8: Support the continuation and development of inter-city bus and coach services.

Ports SC9: Support the movement of freight by sea. SC10: Support the improvement of rail and road links to the region’s ports.

Air SC11: Support the continuation and development of direct routes from to London and other key destinations. SC12: Support the further development of facilities at Dundee Airport. SC13: Support enhanced surface access by all modes to Aberdeen, Edinburgh and Glasgow Airports. SC14: Support the continuation and development of services between Scottish Airports and major hubs, including London Heathrow.

3

1. Strategic Connectivity

Ref. Project Principal Objectives Policy / Description & Purpose Timing Partners Progress Supporting Proposal [Lead Policy 2016 - Later Partner(s) in Documents Overarching Sub 2021 Years Bold] Rail Links and Services Electrification of the 1, 3 1A, 1B, 1D, SC1 Electrification of the rail network Transport EGIP proposal to extend STPR (Project Strategic Rail Network 3A on a phased basis. Phase 1 -   Scotland, electrification to 6), TAYplan Committed improvements as   , Dunblane/Alloa removed SDP, Perth & part of the EGIP; Phase 2 - ScotRail from Phase 1 and added to Kinross LDP,

Remaining routes in the Central Phase 2. Phase 2 to be Network Rail   Belt; Phase 3 - Electrification of completed in CP5 (2014-19). CP5 Delivery SC1.1 routes between Edinburgh,   Dunblane/Alloa advance Plan Perth and Dundee; Phase 4 - route clearance completed. Electrification from Dunblane to Development work for CP6 Aberdeen; Phase 5 – Phases 3, 4, 5 ongoing. Electrification from Perth to Inverness.

Edinburgh Glasgow (Rail) 1, 2, 3 1A, 1B, 1D, SC1 Packages of infrastructure and  Transport Redevelopment of Scotland's Improvement Programme 2E, 3A service enhancements  Scotland, Haymarket Station and Economic (EGIP) Edinburgh to Glasgow including: Network Rail, Electrification of the Strategy,  an electrified railway between ScotRail Cumbernauld line completed. NPF3, STPR

Edinburgh and Glasgow Queen  Electrification to be fully (Project 15),

Street; shorter journey times and completed and Edinburgh IIP

more reliable services; a  Gateway Station to be cleaner, greener, quieter railway; opened by December 2016 SC1.2 improved capacity with less  and new rolling stock crowding at peak times; implemented by end of 2017. transformation of Glasgow Queen Street Station Queen Street Station. Redevelopment to be fully completed by March 2019. Dunblane/Alloa electrification removed from EGIP and added as Phase 2 of STPR project 6.

4

1. Strategic Connectivity

Ref. Project Principal Objectives Policy / Description & Purpose Timing Partners Progress Supporting Proposal [Lead Policy 2016 - Later Partner(s) in Documents Overarching Sub 2021 Years Bold] Rail enhancement on the 1, 3 1A, 1B, 1C, SC1 STPR Project 17: Infrastructure Transport A 10 minute journey time STPR (Project Highland Main Line between 1D, 3C and service enhancements to   Scotland, reduction; an hourly 17), NPF3, Perth and Inverness reduce journey time and provide   Network Rail, frequency service between IIP, TAYplan an hourly service between ScotRail Inverness and Central Belt SDP, Perth &

Inverness and Central Belt.   and improved freight Kinross LDP,

opportunities to be Network Rail

completed in Control Period CP5 Delivery SC1.3   (CP5) by 2019. Proposals to Plan, further improve journey time National and service frequency being Tourism developed during CP5 for Development implementation during CP6 Framework, by 2024. Cairngorms NP LDP

Rail Service Enhancements 1, 3 1A, 1B, 1D, SC1 Improve public transport Transport Phase 1 to be implemented STPR (Project between Aberdeen and 3C competitiveness between   Scotland, during CP5, 2019. Feasibility 23), IIP, NPF3, Central Belt Aberdeen and the Central Belt   Network Rail, work ongoing for Phase 2 Network Rail and provide enhanced ScotRail implementation CP6. CP5 Delivery

opportunities to move freight   Complementary hourly Plan, TAYplan

involving a recast of the stopping service between SDP, Angus   passenger timetable on the Arbroath and Glasgow being LDP, Perth & Aberdeen – Dundee –   promoted by Tactran through Kinross LDP Edinburgh / Glasgow corridors to TERS (see Rail Actions) provide hourly express to both   SC1.4 Edinburgh and Glasgow as well as stopping services; Phase 1 line speed improvements, additional loops to allow passing of freight trains, and upgraded signalling; Phase 2 removal of the single track at Usan, including a new bridge over Montrose Basin.

5

1. Strategic Connectivity

Ref. Project Principal Objectives Policy / Description & Purpose Timing Partners Progress Supporting Proposal [Lead Policy 2016 - Later Partner(s) in Documents Overarching Sub 2021 Years Bold] Strategic Roads A9 upgrading from Perth to 1, 2, 5 1A, 1B, 1C, SC6 STPR Project 16: Upgrade the Transport Overall objective is to Scotland's Inverness 1D, 2A, 5A A9 to dual carriageway between   Scotland, complete the full dualling Economic Perth and Inverness. Tactran, Perth between Inverness and Strategy,   & Kinross Perth by 2025 STPR (Project

  16), IIP, NPF3, Council, National   SEPA Tourism   Development Framework,   TAYplan SDP, SC6.1 Tactran Delivery Plan, Perth & Kinross LDP, Perth City Plan 2013-23, Cairngorms NP LDP , P&K SOA

A9 upgrading from 1, 5 1A, 1B, 1D, SC6 STPR project 16: Grade Transport Studies underway to identify Scotland's Dunblane to Perth 5A Separation of all junctions on A9   Scotland, and refine options between Economic from (and including) Keir Tactran, Perth Keir and Luncarty. Interim Strategy,   Roundabout to South of Broxden & Kinross works for the Broxden and STPR (Project

Roundabout.   Council, Inveralmond roundabouts 16), IIP, NPF3,

has been identified and the National Stirling   Council, design of these works is Tourism Developers, underway Development  SEPA Framework, SC6.2 TAYplan SDP, Tactran Delivery Plan, Perth & Kinross LDP, Perth City Plan 2013-23, P&K SOA

6

1. Strategic Connectivity

Ref. Project Principal Objectives Policy / Description & Purpose Timing Partners Progress Supporting Proposal [Lead Policy 2016 - Later Partner(s) in Documents Overarching Sub 2021 Years Bold] A90 upgrade through or 1, 4, 6 1A,1B, 1D, SC6 STPR Project 29: Proposed Transport Transport Scotland to lead STPR (Project around Dundee 4A, 6B upgrading of the A90 trunk road   Scotland, with initial discussions on the 29), NPF3, through or around Dundee.   Tactran, A90 proposed upgrade Tactran Dundee City through or around Dundee to Delivery Plan,

  Council, identify and agree further TAYplan SDP,

actions with TAYplan, SCA City Angus Council, Perth Tactran, Dundee City Investment SC6.3  & Kinross Council, Angus Council and Plans, Dundee Council, Perth & Kinross Council by SOA, Angus SEPA end of 2015 LDP, Dundee LDP, Dundee SULP

Dundee West Land Use & 1, 2, 6 1B, 2A, 2B, SC6, AT1, Integration of Transport  Dundee City A90/A85 Swallow Tactran Transport Integration 6B AT2, B1, Infrastructure requirements to  Council, Roundabout improvements Delivery Plan, B4 facilitate Dundee Western Developer, and sustainable transport TAYplan SDP, Gateway development  Tactran, measures to be implemented Dundee LDP aspirations including major Transport as part of Western Gateway SC6.4  improvements to A90/A85 Scotland Development Swallow Roundabout and sustainable transport measures.

Shaping Perth's Transport 1, 2, 6 1A, 1B, 2A, SC7 A9/A85 - Crieff Road Perth & Council approved funding Perth & Future - Phase 1 2B, 2C, 6B improvements to relieve traffic   Kinross June 2013. Planning Kinross LDP, congestion and facilitate   Council; application approved TAYplan SDP, development of west/north west Transport 2015 for A9/A85 upgrade Tactran

Perth. Cross Almond Link - Link including River Almond Delivery Plan, Scotland; from new A9/A85 junction over   Crossing. Perth City Developers; River Almond  Tactran Preferred route established. Plan 2013 - SC7.1 Detailed design work 23, NPF3, ongoing aiming for project SCA City completion in 2018. Investment Plans, National Tourism Development

7

1. Strategic Connectivity

Ref. Project Principal Objectives Policy / Description & Purpose Timing Partners Progress Supporting Proposal [Lead Policy 2016 - Later Partner(s) in Documents Overarching Sub 2021 Years Bold] Shaping Perth's Transport 1, 2, 6 1A, 1B, 2A, SC7 Cross Tay Link Road (CTLR) - Perth & Preferred route established Perth & Future - Phase 2 2B, 2C, 6B Construction of new road and   Kinross and detailed design work Kinross LDP, bridge over   Council; ongoing, aiming for project TAYplan SDP, Transport completion in 2022. Tactran

  Delivery Plan, Scotland; Perth City   Developers; SNH; SEPA; Plan 2013 - Tactran 23, NPF3, SC7.2   SCA City Investment Plans, National Tourism Development Framework, PKC AQAP Shaping Perth's Transport 1, 2, 6 1A, 1B, 2A, SC7 Berthapark Link Perth & Preferred route established Perth & Future - Phase 3 2B, 2C, 6B   Kinross and Berthapark development Kinross LDP, Council; masterplan completed, TAYplan SDP,

  Transport aiming for project completion Perth City

Scotland; in 2022. Plan 2013 - SC7.3   Tactran; 23, NPF3, Developers SCA City Investment Plans.

Shaping Perth's Transport 1, 3, 4, 6 1A, 1B, 3C, SC7, AT2, Perth Transport Plan including Perth & Timescale dependent on Perth & Future - Transport Plan 4A, 4C, 6A AT7, TP7, Active Travel infrastructure in   Kinross development of CTLR. Kinross LDP including Active Travel TP8, TP9, tandem with development of Council; SC7.4 B1, B2, B3 CTLR  Transport Scotland; Tactran; Developers

8

1. Strategic Connectivity

Ref. Project Principal Objectives Policy / Description & Purpose Timing Partners Progress Supporting Proposal [Lead Policy 2016 - Later Partner(s) in Documents Overarching Sub 2021 Years Bold] M9/A811 New Junction. 1, 2, 3, 6 1B, 2A, 2B, SC7 Improve access to city centre Stirling City of Stirling Strategic Stirling LDP, 2C, 3C, 6B and reduce traffic on A872 and   Council, Investment Plan (CISP Stirling City A9. Support events arena and Transport Project 2). Proposal being Transport heritage park. Maximise Scotland, investigated through Stirling Plan, National   strategic access to Stirling City Tactran LDP DPMTAG Tourism SC7.5 and minimise traffic to/from trunk   Development roads within the City area. Framework, NPF3, SCA City Investment Plans Kildean to Bridge of Allan 1, 2, 3, 6 1B, 2A, 2B, SC7 New road to open up Kildean Stirling City of Stirling Strategic Stirling LDP, Corridor – Phases 1 and 2. 2C, 3C, 6B and improve accessibility and   Council, Investment Plan (CISP Stirling City traffic flows north of the river Tactran Project 8). LDP identifies Transport Forth and keep unnecessary   requirement to safeguard Plan, Tactran traffic from out of the urban area land for new road link. Delivery Plan, SC7.6   and maintain access to key Proposal being developed NPF3, SCA employment locations. Phase 1 through Stirling LDP City Kildean to Cornton road link; DPMTAG Investment Phase 2 Cornton to Airthrey Plans road link Viewforth Link Road and 1, 2, 3, 6 1B, 2A, 2B, SC7 Complete Inner Ring Road to Stirling City of Stirling Strategic Stirling LDP, public realm improvements 2C, 3B, 3C, improve traffic flows and   Council, Investment Plan (CISP Stirling City to adjacent City Centre 6B accessibility across the city, Tactran Project 9). Masterplan in Transport streets. enhance city centre place referring to need to Plan, NPF3,   environment, Viewforth take account of the SCA City SC7.7 development site, and support   alignment of the road in the Investment modal shift. site design. Submission of Plans, planning application National imminent. Tourism Development Framework

9

1. Strategic Connectivity

Ref. Project Principal Objectives Policy / Description & Purpose Timing Partners Progress Supporting Proposal [Lead Policy 2016 - Later Partner(s) in Documents Overarching Sub 2021 Years Bold] Durieshill and South Stirling 1, 2, 3, 6 1B, 2A, 2B, SC7, PR2, Upfront delivery of road capacity Stirling City of Stirling Strategic Stirling LDP, Gateway Transport 2C, 3C, 6B R5 improvements, including park   Council, Investment Plan (CISP Stirling City Improvements. and ride facilities, walking and   Transport Project 5). Strategic Transport cycling routes to support Scotland, Development Sites transport Plan, NPF3,

outcomes of developments. Tactran requirements include SCA City provision of site for park & Investment SC7.8   ride and improvements to M9 Plans junction 9 Pirnhall and upgrading A91. Proposal being developed through Stirling LDP DPMTAG

Ports Inter-modal Regional Rail 1, 3, 6 1A, 1B, 1C, SC10, Development of freight facilities,  Dundee City Feasibility study into Tactran Freight Facilities at Dundee 3C, 6B SC5, SC9, building on existing proposals at  Council, road/rail/sea freight facility at Delivery Plan, F5, F6, R8 Dundee Port for inter-model  Forth Ports, Dundee Port completed. Dundee transfer between road, rail and Tactran, Discussions have taken SULP,

sea-borne freight. Network Rail place with Forth Port in TAYplan SDP, connection with renewables Dundee LDP SC10.1  proposals and potential site safeguarded. Included in Dundee Sustainable Urban Logistics Plan for 2023 and beyond.

Inter-modal Regional Rail 1, 3, 6 1A, 1B, 1C, SC10, Development of regional  Angus Support for Port Tactran Freight Facilities at 3C, 6B SC5, SC9, facilities, building on existing  Council, Development being taken Delivery Plan Montrose F5, F6, R8 proposals at Montrose Port for Tactran, forward through South

inter-model transfer between Network Rail Montrose Development  road, rail and sea-borne freight. Masterplan and potential SC10.2  links to A90 noting Laurencekirk junction position. No proposals identified to date in relation to an inter-modal regional rail freight facility.

10

1. Strategic Connectivity

Ref. Project Principal Objectives Policy / Description & Purpose Timing Partners Progress Supporting Proposal [Lead Policy 2016 - Later Partner(s) in Documents Overarching Sub 2021 Years Bold] Inter-modal Regional Rail 1, 3, 6 1A, 1B, 1C, SC10, Development of freight facilities, Perth & No progress to date in Tactran Freight Facilities at Perth 3C, 6B SC5, SC9, building on existing proposals at Kinross implementation Delivery Plan F5, F6, R8 Perth Harbour for inter-model Council, SC10.3 transfer between road, rail and Tactran, sea-borne freight. Network Rail

Air Promote services, routes 1,6 1A, 1C, 1D, SC11, Continued growth and HIAL, Public Service Obligation Dundee SOA, and facilities at Dundee 6B SC12 development of services and   Transport (PSO) London Service TAYplan SDP, Airport facilities at Dundee Airport. Scotland, operating. Proposals for Dundee LDP, Tactran, Amsterdam service being NPF3, SCA   Dundee City progressed. Further City SC11.1  Council, Air options for increased Investment Operators destinations and flight Plans, options for passengers National being investigated. Tourism Development Framework

11

2. Health and Transport Promoting Active Travel HT1: Increase the number of journeys made by active travel modes by making people aware of the benefits of active travel and ensuring that active travel infrastructure is available and attractive to use. HT2: Contribute to achieving road safety targets.

Transport and Public Health HT3: Improve air quality within any designated Air Quality Management Area (AQMA) to a point where the AQMA is revoked. HT4: Minimise the number of people exposed to intrusive noise levels. HT5: Reduce the rate of road accident casualties and achieve or better national road safety targets. HT6: Reduce the effects of severance on communities caused by transport infrastructure or its use.

Access to Healthcare HT7: Improve equality of access to healthcare. HT8: Provide, where possible, healthcare services in locations and at times that are readily accessible. HT9: Make transport to healthcare accessible for all, physically, socially and financially. HT10: Ensure transport to healthcare is undertaken by sustainable modes wherever possible.

NHS Staff Travel HT11: Find alternatives to travel for staff communications wherever appropriate. HT12: Ensure that essential journeys are undertaken by the most appropriate sustainable modes.

12

2. Health & Transport

Ref. Project Principal Objectives Policy / Description & Purpose Timing Partners Progress Supporting Proposal [Lead Policy 2016 - Later Partner(s) in Documents Overarching Sub 2021 Years Bold] Promoting Active Travel Promote active travel as a 2, 3, 4, 5 2A, 2B, 2C, HT1, TP7, For everyone living in the region NHS Tayside, Perth on the Go, Crieff on Stirling SOA, healthy means of transport, 3C, 4C, 5B AT9, to be able to, and choose to,   NHS Forth the Go, Angus on the Go Stirling LTS, leisure and means of travel safely by active modes Valley, developed to promote active Angus SOA, access to services and such as walking and cycling for travel. Other initiatives being Tactran HTF HT1.1  Tactran, opportunities the majority of their local Constituent considered. NHST journeys. Councils developing initiatives for Active Travel.

Expand the role of active 2, 4 2B, 4C HT1 For everyone living in the region NHS, LA's, Ongoing. NHST working with Tactran HTF prescriptions and social to be able to, and choose to,   Tactran Public Health colleagues to prescribing travel safely by active modes encourage Active Travel. HT1.2 such as walking and cycling for   the majority of their local journeys. Support delivery of road 5 5A, 5B HT2 Reduce the number of road Scottish Fire Ongoing support to Angus SOA, safety education casualties in the region.   & Rescue emergency services to Tactran RTS Service, deliver Safe Drive Stay Alive HT2.1   Police throughout Tactran region. Scotland, Tactran, LA's Continue programme of 5, 6 5A, 5B, 6B HT2, HT5 Reduce the number of road LA's, Ongoing Tactran RTS Accident Investigation and casualties in the region.   Transport Prevention (AIP) and road   Scotland, safety measures and ensure Police HT2.2 road safety considered in  Scotland new developments through road safety audit procedures.

Transport and Public Health Review traffic management 1, 4 1B, 4A HT3 Improve air quality at Dundee City Traffic management options Dundee at air quality hot spots within identified hot spots within the Council, at Seagate, Dundee being AQAP, PKC AQMAs. regions AQMAs developed. Perth City Centre AQAP, HT3.1 Perth &  Kinross traffic management review Tactran Council ongoing. Delivery Plan

13

2. Health & Transport

Ref. Project Principal Objectives Policy / Description & Purpose Timing Partners Progress Supporting Proposal [Lead Policy 2016 - Later Partner(s) in Documents Overarching Sub 2021 Years Bold] Develop and implement 3, 4 3A, 4A HT3,CC1 To ensure air quality is  Constituent Modernisation of fleet Dundee Green Procurement considered in the tendering Councils ongoing AQAP, PKC HT3.2 Strategies for Council fleet process for new Council  AQAP and public service vehicles vehicles Improve Councils' vehicle 1, 3, 4 1B, 3A, 4A HT3, CC1, Develop fleet management plan  Constituent Ongoing Dundee AQAP fuel consumption efficiency CC2 to improve fuel efficiency;  Councils by better management of Investigate fleet activities in HT3.3 fleet activities. relation to pollution hotspots e.g.  waste management fleet routes

DCC will Introduce 3, 4 3A, 4A HT3 To encourage environmental   Dundee City Ongoing 2014 - 17. Dundee SULP ECOstars environmental consideration in procurement of Council HT3.4 fleet recognition for cans, vehicles.  lorries, buses, coaches and possibly taxis. DCC in consultation with the 1, 4 1B, 4A HT3, CC1 Enforce no idling for taxis.  Dundee City Ongoing Dundee AQAP Taxi Liaison Group will Increase cleaner taxis in regards  Council, explore means of reducing to pollutant emissions Tayside Police HT3.5 emissions from taxis and  private car hire vehicles in AQMA. DCC will explore the 4 4A HT3 Improve Air Quality in central  Dundee City Ongoing 2014 - 17 Dundee SULP feasibility of a Low Emission Dundee Council HT3.6 Zone for the central area of  the city Transport Scotland will work 3, 4 3A, 4A HT3, CC1 Low Emission Vehicles to   Transport Commenced 2015/16 Cleaner Air for with key partners to improve air quality Scotland for completion Scotland HT3.7 investigate the use of  2016/17 hydrogen as a transport fuel. Transport Scotland will 3, 4 3A, 4A HT3, CC1 Low Emission Vehicles to  Transport To commence 2016/17 for Cleaner Air for continue to engage with improve air quality  Scotland completion 2019/20 Scotland partners on the role less  carbon intensive fuels such HT3.8 as LPG, CNG and biofuels  can play in the transition to a near zero emission road transport sector by 2050

14

2. Health & Transport

Ref. Project Principal Objectives Policy / Description & Purpose Timing Partners Progress Supporting Proposal [Lead Policy 2016 - Later Partner(s) in Documents Overarching Sub 2021 Years Bold] Transport Scotland will 4 4A HT3 Air Quality Management Areas  Transport To commence 2016/17 for Cleaner Air for review the impacts of trunk and the trunk road network  Scotland completion 2017/18 Scotland roads on AQMAs at Dundee, Perth and Crieff HT3.9 and implement mitigation  where trunk roads are the primary contributor to air pollutants by 2020 Design, develop and 1, 4 1B, 4A HT3 National Modelling Framework  SEPA, Commenced 2015/16 Cleaner Air for implement a two-level (NMF) aims to provide  Scottish for completion Scotland modelling system on Local Authorities with  Government, 2016/17 regional and local scales to the information Transport HT3.10 provide evidence for required to improve  Scotland, appraising and identifying urban air quality. potential transport and planning solutions to local air quality issues Undertake detailed 1, 4 1B, 4A HT3 National Modelling Framework  SEPA, To commence 2016/17. Cleaner Air for modelling of TAYplan area (NMF) aims to provide  Scottish Scotland cities and associated local authorities with the Government, HT3.11 adjoining spaces, covering information  Transport areas associated with required to improve urban air Scotland, highest levels of poor air quality. quality Transport Scotland, in 1, 4 1B, 4A HT3 National Low Emission  Scottish By April 2016 Cleaner Air for further consultation with Framework (NLEF) is designed  Government, Scotland partner organisations, to enable local authorities to  Transport ensure the NLEF criteria, appraise, justify the business Scotland, HT3.12 tests, and processes are case for, and implement a range  SEPA developed, agreed, and of, air quality improvement finalised options related to transport (and associated land use).

15

2. Health & Transport

Ref. Project Principal Objectives Policy / Description & Purpose Timing Partners Progress Supporting Proposal [Lead Policy 2016 - Later Partner(s) in Documents Overarching Sub 2021 Years Bold] Access to Healthcare Scottish Government to 4 4B HT7, HT9, Scottish Government to Scottish Ongoing Tactran provide an annual update on HT10, TI3, demonstrate progress on an   Government Delivery Plan evaluation of the national TI4 annual basis on the TNAP and Transportation Noise Action publish on Scottish Government  

Plan (TNAP) and Scottish Noise Mapping HT7.1 websites  

Work in Partnership to 2, 3, 6 2B, 3C, 6A HT7, HT9, Ensure patients are aware of the  NHS Tayside, Traveline Scotland App Tactran integrate NHS appointment HT10, TI3, travel choices they have to  NHS Forth Journey Planning to Delivery Plan process with Travel Options TI4 attend health care appointments. Valley, Hospitals included May

 Tactran, 2015. Further development

Traveline being undertaken for all HT7.2  Scotland health care locations. Travel information options provided on outpatient appointment letters. Links to GoToo and Traveline on NHST website.

Improve efficiency and co- 2, 6 2B, 2E, 6A HT9 To achieve integrated healthcare  NHS, Tactran, Ongoing Tactran HTF ordination of transport and and transport service delivery  LA's, SAS healthcare service delivery that enables patients and their visitors to access healthcare by  convenient, affordable transport HT9.1 appropriate to their needs. For  the environmental impacts of journeys to healthcare services to be minimised

16

2. Health & Transport

Ref. Project Principal Objectives Policy / Description & Purpose Timing Partners Progress Supporting Proposal [Lead Policy 2016 - Later Partner(s) in Documents Overarching Sub 2021 Years Bold] Increase travel to healthcare 2, 3, 4 2B, 2E, 3C, HT10 To achieve integrated healthcare NHS, Tactran, Improved accessibility by Tactran HTF facilities by active and 4C and transport service delivery   LA's bus - Stagecoach service sustainable modes that enables patients and their   333 PRI – Perth – Ninewells visitors to access healthcare by hospital has been extended

convenient, affordable transport as X7 to Royal Victoria appropriate to their needs. For Hospital, Dundee city centre, HT10.1   the environmental impacts of Arbroath, Montrose and journeys to healthcare services Aberdeen and new service to be minimised 20 connecting Dundee, and Stracathro Hospital

Improve active and 2, 3, 4 2B, 2E, 3C, HT10 To achieve integrated healthcare NHS, Tactran, Ongoing Tactran HTF sustainable travel 4C and transport service delivery   LA's infrastructure to healthcare that enables patients and their facilities visitors to access healthcare by   convenient, affordable transport HT10.2 appropriate to their needs. For   the environmental impacts of journeys to healthcare services to be minimised

NHS Staff Travel Work to eliminate 3, 4 3A, 4A HT11, For the environmental and   NHS, Tactran, Ongoing Tactran HTF unnecessary commuting or HT12 financial costs of NHS staff LA's HT11.1 business journeys by NHS travel to be minimised, whilst  staff maintaining an efficient, effective healthcare service. Ensure that all NHS staff 3, 4 3C, 4C HT12 For the environmental and   NHS, Tactran, Ongoing Tactran HTF travel is undertaken by financial costs of NHS staff LA's HT12.1 active or sustainable travel to be minimised, whilst   modes, where appropriate maintaining an efficient, effective healthcare service. Improve provision of active 3, 4 3C, 4C HT12 For the environmental and   NHS, Tactran, Ongoing Tactran HTF and sustainable travel financial costs of NHS staff LA's HT12.2 infrastructure for staff travel to be minimised, whilst   arriving by these modes maintaining an efficient, effective healthcare service.

17

3. Active Travel Strategic Integration AT1: Integration and Coordination Work with Councils, CPPs and other partners to deliver the strategy’s aims and ensure it is supported by non-transport policies and programmes.

High Quality Infrastructure AT2: Improved Walking and Cycling Links within the Region Develop walking and cycling links to and within town and city centres and to employment, health facilities, services, leisure and tourism activities. AT3: Regional Walking and Cycling Routes Establish routes of regional priorities and close gaps in the regional network for walking and cycling in line with expansion of the NCN, national long distance paths, tourism strategies and local active travel strategies. AT4: Improved Walking and Cycling Links to Education Facilities Promote walking and cycling links to schools as well as further and higher education facilities. Promote continuation and expansion of school travel plans, Cycle Friendly Schools and Campuses. AT5: High Quality Cycle Parking Provide secure and quality cycle parking at key trip destinations and make this an integral part of any infrastructure improvement or expansion. AT6: Audit Where opportunities arise, locally focused active travel audits will identify priorities for future investment in developing the regional walking and cycling network.

Making Better Use of the Transport System AT7: Public Transport Access Support the provision of improved walking and cycling access at public transport interchanges and on trains/buses. AT8: Priority Assign greater priority to pedestrians and cyclists in the design and management of the road network and design residential streets to keep vehicles at or below 20mph.

Influencing Travel Behaviour AT9: Promotion Promote active travel through publicity, events and information provision, Cycling Scotland’s Cycle Friendly schemes, forward planning and joint marketing with relevant partners. AT10: Training Support cycle training in schools and workplaces.

18

3. Active Travel

Ref. Project Principal Objectives Policy / Description & Purpose Timing Partners Progress Supporting Proposal [Lead Policy 2016 - Later Partner(s) in Documents Overarching Sub 2021 Years Bold] Strategic Integration Each local authority to 1, 2, 3, 4 1B, 2A, 2B, AT1 Develop for each local authority  Constituent All constituent Councils CAPS 2013, develop an Active Travel 2C, 2E, 3C, area a strategic approach to  Councils, aiming to have Active Travel NPF3 Strategy 4C supporting active travel, Tactran, or Cycling Strategies in place AT1.1 mapping the appropriate  Cycling during 2016. infrastructure improvements Scotland, required along with supporting Transport promotional work Scotland High Quality Infrastructure Continue to develop and 1, 2, 3, 4 1B, 2E, 3C, AT2, AT3 High quality, local infrastructure  Sustrans, National and Tactran CAPS 2013, maintain community links. 4C to support active travel  Tactran, Community Links Projects NPF3, Dundee particularly in urban areas where Constituent being progressed. AQAP

high levels of cycling can be Councils, AT2.1  achieved. Transport Scotland, Community Groups, Enhance active travel 3, 4, 6 3B, 3C, 4C, AT3 TAYplan Green Network TAYplan, Angus Council, Dundee City TAYplan SDP networks, taking account of 6B Strategy focussed on Green   Tactran, Council and Perth & Kinross priorities in the TAYplan Networks in Strategic   Dundee City Council Active Travel Green Network Strategy Development Areas, Dundee Council, Perth Strategies to be in place AT3.1 and Perth core areas and key  & Kinross during 2016. Tactran's active travel networks in Carse Council, refreshed Regional of Gowrie. Angus Council Transport Strategy incorporates an Active Travel Strategy. Enhance active travel 3, 4, 6 3B, 3C, 4C, AT3 Central Scotland Green Network SNH, Forestry Stirling Council's Active CSGN, NPF3 networks, taking account of 6B (CSGN) stretches from Ayrshire,   Commission Travel Strategy to be in priorities in the Central Inverclyde and Dunbartonshire   Scotland, place during 2016. Tactran's Scotland Green Network in the west, to west Fife and the Scottish refreshed Regional

Strategy Lothians in the east, including Enterprise, Transport Strategy   Stirling Council and the strategy Stirling incorporates an Active AT3.2 is focussed on transforming the  Council Travel Strategy. area into a place where the environment adds value to the economy and where people’s lives are enriched by its quality .

19

3. Active Travel

Ref. Project Principal Objectives Policy / Description & Purpose Timing Partners Progress Supporting Proposal [Lead Policy 2016 - Later Partner(s) in Documents Overarching Sub 2021 Years Bold] NWCN Long Distance 2, 3, 4 2E, 3B, 3C, AT3 New walking and cycling route  Perth & 5yr priority route. NWCN Action Route: Crook of to 4C and link that contributes to the  Kinross Feasibility/Consultation Plan, NPF3, Kinross NWCN. Create a continuous link  Council, 2014/15. Design and Tactran RTS between Stirling, Kinross and TRACKS construction commenced AT3.3 beyond to Fife for recreation.  2015/16 for completion 2016. Also identified as Regional Route in Tactran RTS Active Travel Strategy

NWCN Long Distance 2, 3, 4 2E, 3B, 3C, AT3 New walking and cycling route SNH, Stirling Tyndrum to Glen Ogle 5yr NWCN Action Route: Cross-Scotland 4C and link that contributes to the   Council, priority route, feasibility / Plan, NPF3 Pilgrim Way - Iona to St NWCN. Create tourism and LLTNPA, consultation 2014/15 - Andrews recreational facility with active Scottish ongoing for completion in   travel potential. 2 No. 5 year Pilgrims Route 2018. Glen Ogle to Crieff 5yr AT3.4 priority sections: Tyndrum to  Forum priority route, feasibility / Glen Ogle and Glen Ogle to consultation 2014/15/16 - Crieff. 2 No. longer term priority ongoing sections: Iona to Tyndrum and Crieff to St Andrews.

NWCN Long Distance Path: 2, 3, 4 2E, 3B, 3C, AT3 New walking and cycling route  The Great 5yr priority route. Design and NWCN Action Great Trossachs Path - 4C and link that contributes to the  Trossachs construction 2014. Plan, NPF3 Callander to Inversnaid NWCN. 6.5km path works Forest, Completion 2014 AT3.5  from Callander to Brig O'Turk LLTNPA, connecting Rob Roy Way and Stirling NCN7 to West Highland Way. Council NWCN Long Distance 2, 3, 4 2E, 3B, 3C, AT3 New walking and cycling route   Angus Longer term priority route: NWCN Action Route: Angus Coastal Path 4C and link that contributes to the Council Included in NWCN Project Plan, NPF3 AT3.6 NWCN. Contributes to   Plan completing gaps to create a continuous coastal path. NWCN Long Distance 2, 3, 4 2E, 3B, 3C, AT3 2 No. longer term priority links Perth & Longer term priority route: NWCN Action Route: Pitlochry - Ballater 4C connecting Rob Roy Way,   Kinross Included in NWCN Project Plan, NPF3 Cateran Trail and Deeside Way: Council, Perth Plan AT3.7 Pitlochry to Kirkmichael and  & Kinross Kirkmichael to Ballater Countryside Trust

20

3. Active Travel

Ref. Project Principal Objectives Policy / Description & Purpose Timing Partners Progress Supporting Proposal [Lead Policy 2016 - Later Partner(s) in Documents Overarching Sub 2021 Years Bold] NWCN Long Distance 2, 3, 4 2E, 3B, 3C, AT3 New walking and cycling route Stirling Longer term priority route: NWCN Action Route: Stirling to Drymen 4C and link that contributes to the   Council Included in NWCN Project Plan, NPF3 NWCN. Strategic link Plan AT3.8 connecting West Highland Way   with routes in Perth & Kinross & Fife. Connecting Communities.

NWCN Cycleway: NCN 76 - 2, 3, 4 2E, 3B, 3C, AT3 New walking and cycling route  Stirling 5yr priority route. NWCN Action Manor Powis Roundabout 4C and link that contributes to the  Council, Feasibility/Consultation Plan NWCN. 2km traffic free route Sustrans 2014/15 - ongoing. Ongoing AT3.9 avoiding major A91/A905  discussions related to land Roundabout and providing safe issues. active travel and recreational connection. NWCN Cycleway: NCN 2, 3, 4 2E, 3B, 3C, AT3 New walking and cycling route  Stirling Doune to Burn of Cambus NWCN Action 765 Stirling to Callander 4C and link that contributes to the  Council, 5yr priority route, feasibility / Plan NWCN. 1 No 5yr priority section Sustrans consultation 2013/14 - AT3.10 Doune to Burn of Cambus and 1  ongoing. Design and No. longer term priority Burn of construction be completed Cambus to Callander. 2019.

NWCN Cycleway: Dundee 2, 3, 4 2E, 3B, 3C, AT3, AT2 New walking and cycling route  Dundee City 5yr priority route. Ongoing NWCN Action AT3.11 Green Circular - alternative 4C and link that contribute to the  Council, discussions related to land Plan, Tactran to Docks NWCN Sustrans issues. Delivery Plan NWCN Cycleway: NCN 2, 3, 4 2E, 3B, 3C, AT3 New walking and cycling route Perth & 2 No. Longer term priority NWCN Action 775 - Almondbank to 4C and link that contributes to the   Kinross routes. Crieff to Plan Lochearnhead NWCN. 2 No longer term   Council, Lochearnhead feasibility / priorities Almondbank to Crieff LLTNPA, consultation 2008/09 and still AT3.12 and Crieff to Lochearnhead  Sustrans ongoing. Design and providing new railway path for a construction around traffic free alternative to A85 and Lochearnhead - ongoing link to LLTNP.

Aspirational NCN 777 2, 3, 4 2E, 3B, 3C, AT3 Aspirational NCN Walking and Tactran, Route identified as Tactran RTS Cycling Route: Bridge of 4C Cycling Route connecting   Angus Aspirational NCN 777 in Earn to Newburgh existing long distance and cross- Tactran's RTS Active Travel AT3.13  Council, boundary routes with local Perth & Strategy walking and cycling links. Kinross Council

21

3. Active Travel

Ref. Project Principal Objectives Policy / Description & Purpose Timing Partners Progress Supporting Proposal [Lead Policy 2016 - Later Partner(s) in Documents Overarching Sub 2021 Years Bold] Aspirational NCN 755 2, 3, 4 2E, 3B, 3C, AT3 Aspirational NCN Walking and Tactran, Route identified as Tactran RTS Cycling Route: Drymen to 4C Cycling Route connecting   Stirling Aspirational NCN 755 in Strathblane existing long distance and cross- Tactran's RTS Active Travel AT3.14 Council boundary routes with local   Strategy walking and cycling links.

Aspirational NCN 765 2, 3, 4 2E, 3B, 3C, AT3 Aspirational NCN Walking and Tactran, Route identified as facility Tactran RTS Cycling Route: Keir 4C Cycling Route connecting   Angus alongside de-trunked A9 Roundabout to Bridge of existing long distance and cross- and Aspirational NCN 765 AT3.15  Council, Allan boundary routes with local Perth & in Tactran's RTS Active walking and cycling links. Kinross Travel Strategy Council Regional Walking and 2, 3, 4 2E, 3B, 3C, AT3 Regional Walking and Cycling Tactran, Route identified in Tactran's Tactran RTS Cycling Route: Montrose - 4C Route connecting existing long   Angus RTS Active Travel Strategy Dunkeld (via Brechin, distance and cross-boundary AT3.16  Council, Forfar, Kirriemuir, routes with local walking and Perth & Blairgowrie) cycling links. Kinross Council Regional Walking and 2, 3, 4 2E, 3B, 3C, AT3 Regional Walking and Cycling   Tactran, Route identified in Tactran's Tactran RTS Cycling Route: Arbroath - 4C Route connecting existing long Angus RTS Active Travel Strategy AT3.17 Brechin distance and cross-boundary  Council routes with local walking and cycling links. Regional Walking and 2, 3, 4 2E, 3B, 3C, AT3 Regional Walking and Cycling   Tactran, Route identified in Tactran's Tactran RTS Cycling Route: Dundee - 4C Route connecting existing long Angus RTS Active Travel Strategy AT3.18 Forfar distance and cross-boundary  Council, routes with local walking and Dundee City cycling links. Council Regional Walking and 2, 3, 4 2E, 3B, 3C, AT3 Regional Walking and Cycling   Tactran, Route identified in Tactran's Tactran RTS Cycling Route: Dundee - 4C Route connecting existing long Angus RTS Active Travel Strategy AT3.19 Kirriemuir distance and cross-boundary  Council, routes with local walking and Dundee City cycling links. Council

22

3. Active Travel

Ref. Project Principal Objectives Policy / Description & Purpose Timing Partners Progress Supporting Proposal [Lead Policy 2016 - Later Partner(s) in Documents Overarching Sub 2021 Years Bold] Regional Walking and 2, 3, 4 2E, 3B, 3C, AT3 Regional Walking and Cycling Tactran, Route identified in Tactran's Tactran RTS Cycling Route: Dundee - 4C Route connecting existing long   Angus RTS Active Travel Strategy Blairgowrie (via Coupar distance and cross-boundary Council, Angus) routes with local walking and AT3.20  Dundee City cycling links. Council, Perth & Kinross Council Regional Walking and 2, 3, 4 2E, 3B, 3C, AT3 Regional Walking and Cycling   Tactran, Route identified in Tactran's Tactran RTS Cycling Route: Perth - 4C Route connecting existing long Perth & RTS Active Travel Strategy AT3.21 Blairgowrie distance and cross-boundary  Kinross routes with local walking and Council cycling links. Regional Walking and 2, 3, 4 2E, 3B, 3C, AT3 Regional Walking and Cycling Tactran, Route identified in Tactran's Tactran RTS Cycling Route: Perth - Crieff 4C Route connecting existing long   Angus RTS Active Travel Strategy (via Auchterarder) distance and cross-boundary Council, routes with local walking and AT3.22  Dundee City cycling links. Council, Perth & Kinross Council Regional Walking and 2, 3, 4 2E, 3B, 3C, AT3 Regional Walking and Cycling   Tactran, Route identified in Tactran's Tactran RTS Cycling Route: Cowie - 4C Route connecting existing long Stirling RTS Active Travel Strategy AT3.23 Denny distance and cross-boundary  Council routes with local walking and cycling links. Making Better Use of the Transport System Evaluate Pilot Cycle Hub at 3, 4 3C, 4C AT7 Intended outcome is for pilot to  Forth Stirling Cycle Hub launched CAPS 2013, Stirling Station 2013-5 for inform possible future  Environment in May 2013 with on-going NPF3 potential wider roll-out at developments elsewhere. Link, customer monitoring and

other railway stations  Transport evaluation to develop the

Scotland, services at the Hub. Further AT7.1  ScotRail, facilities being introduced at Stirling Kilmarnock and Dumfries Council, Sustrans

23

3. Active Travel

Ref. Project Principal Objectives Policy / Description & Purpose Timing Partners Progress Supporting Proposal [Lead Policy 2016 - Later Partner(s) in Documents Overarching Sub 2021 Years Bold] Influencing Travel Behaviour Deliver Mutual Respect 3, 4, 5 3C, 4C, 5A, AT9 Intended outcome is improved  Cycling Annual support by Tactran CAPS 2013, Campaign, Give Everyone 5B road safety to encourage greater  Scotland, and constituent Councils. NPF3 Cycle Space, aimed at participation in active travel Vulnerable drivers, within the Tactran Road Users AT9.1  area Forum, Tactran, constituent Councils Continue the promotion and 3, 4, 5 3C, 4C, 5A, AT9 Use resources and training  Bikeability Ongoing CAPS 2013, development of Bikeability 5B available to LAs to enable  Scotland NPF3 Scotland training. Bikeability training with the Delivery

intended outcome of more Forum , AT9.2  children cycling and expand Cycling Bikeability to adult training. Scotland; Sustrans, LAs,

24

4. Travel Planning Travel Plan Guidance and Support TP1: Maintain close working relationships with the Scottish Government, other RTPs, local authorities, travel organisations, business organisations and stakeholders to share best practice and establish a seamless approach to implementing and coordinating effective Travel Plans. TP2: Provide support and advice to establish effective Travel Plans throughout the public sector. TP3: Encourage the development of private sector Travel Plans with major employers. TP4: Provide support and advice to School Travel Plan Coordinators. TP5: Develop and implement a Travel Plan for Tactran staff and business travel. TP6: Encourage the production and implementation of effective Travel Plans in new developments.

Use of Awareness Campaigns TP7: Promote sustainable transport and travel choice to the community and encourage local authorities to promote initiatives in their area.

Promote Regional Liftshare and Car Clubs TP8: Promote and support a regional liftshare scheme, particularly within major employers. TP9: Support the establishment of Car Clubs in the region.

25

4. Travel Planning

Ref. Project Principal Objectives Policy / Description & Purpose Timing Partners Progress Supporting Proposal [Lead Policy 2016 - Later Partner(s) in Documents Overarching Sub 2021 Years Bold] Travel Plan Guidance and Support Tactran and Constituent 3, 4 3A, 3C, 4A, TP2, TP5, Staff Travel Plans including  Tactran, Tactran travel plan in place. Dundee Councils to develop and 4C encouraging flexible working,  Constituent Constituent Councils' Travel AQAP, PKC implement sustainable staff car / liftsharing / alternative Councils Plans in place. AQAP, TP2.1 travel plans. modes, salary sacrifice, bicycle  Cleaner Air for scheme, active travel and are Scotland consistent with relevant local air quality plans. Support and encourage 3, 4 3A, 3C, 4A, TP3 Staff Travel Plans including   Tactran, Ongoing. Tactran's Tactran RTS, development of Travel 4C encouraging flexible working, Constituent travelknowhow resource PKC AQAP, TP3.1 Plans with employers within car/liftsharing/alternative modes,  Councils promoted to employers. Angus SOA the Tactran region salary sacrifice, bicycle scheme, active travel Work to increase uptake 3, 4 3C, 4C TP4 Continue to support schools in   Constituent Ongoing. All schools in Dundee and implementation of developing Green Travel Plans Councils, Stirling Council area now AQAP, PKC TP4.1 School Travel Plans. through school co-ordinator and  Tactran have a Travel Plan in place. AQAP collect activity data to assess their use. Seek production and 3, 4 3A, 3C, 4A, TP6 Seek to ensure all relevant   Constituent Ongoing Tactran RTS, implementation of effective 4C planning applications have travel Councils, DCC AQAP, TP6.1 Travel Plans in new plan conditions applied in  Tactran PKC AQAP developments accordance with current best practice. Use of Awareness Campaigns Continue to undertake 3,4 3C, 4C TP7 Support Hearts and Minds   Constituent Ongoing Tactran Awareness Campaigns to campaigns which have been Councils, Delivery Plan, TP7.1 promote sustainable travel shown to be effective.  Transport Tactran RTS choices. Scotland, Tactran Encourage all employers 3,4 3C, 4C TP7, AT9 Intended outcome is an increase Sustrans, Ongoing CAPS 2013, across all sectors to in commuting to work by bike   Cycling NPF3 become Cycle Friendly   Scotland, (e.g., by offering support for Healthy TP7.2 workplace cycling facilities  Working and promotional resources, Lives, active travel champions, employers travel planning etc)

26

4. Travel Planning

Ref. Project Principal Objectives Policy / Description & Purpose Timing Partners Progress Supporting Proposal [Lead Policy 2016 - Later Partner(s) in Documents Overarching Sub 2021 Years Bold] Promote Regional Liftshare and Car Clubs Promote and support 1, 2, 3 1B, 2A, 2E, TP8 Strategic Objective: Promoting a   Tactran, Ongoing Tactran RTS, liftshare schemes at a 3C prosperous, inclusive and Constituent PKC SOA TP8.1 regional and local level sustainable Economy. Local  Councils Outcome: Employment opportunities for all Support for the 1, 2, 3 1B, 2E, 3C TP9 Establish and support car clubs   Constituent Dundee Co-Wheels Switched on establishment and as an efficient, affordable and Councils, established and expanded. Scotland TP9.1 promotion of Car Clubs in effective alternative to car  Tactran, Perth & Stirling feasibility Roadmap the region. ownership. Scottish work ongoing. Government

27

5. Buses Network Coverage B1: Accessibility to Key Destinations Work with local authorities, operators and developers to ensure that existing and new employment, education, retail, healthcare, and tourism destinations are serviced by road based passenger transport. (Key Destinations are listed in Appendix 3). B2: Pattern and Frequency of Bus Services Encourage the development of direct, frequent services on strategic routes, supported by an appropriate secondary network of scheduled and demand responsive (DRT) feeder services and efficient interchange provision, including linking with rail services. (Strategic Routes are listed in Appendix 3). B3: Supported Bus Network Encourage the regular review of supported bus networks to identify opportunities to improve the efficiency of use of available funding in support of policies B2 and B12. B4: New Developments Ensure that new developments are either located close to existing good public transport services or can be linked in using financial contributions and other funding and partnership mechanisms involving developers and others.

Infrastructure and Vehicles B5: Existing interchanges Encourage minimum standards for regionally Strategic Interchanges and deliver improvements. (Strategic Interchanges are listed in Appendix 4). B6: New Interchanges Assess opportunities for new interchange facilities. B7: Bus Stop Infrastructure Prioritise corridors and individual sites for improvement to bus stop infrastructure. B8: Whole Journey Approach Develop a partnership approach to passenger safety that considers the whole journey, including the safety of key walking and cycling routes to and from bus stops and interchanges. B9: CCTV Identify and prioritise opportunities for enhanced provision of CCTV on vehicles and at key interchanges and corridors. B10: Lighting Identify and prioritise a programme of improvements and set appropriate standards for lighting provision at bus stops and interchanges across the region. B11: Mobility Difficulties Undertake detailed consultation with disabled representative groups and passenger transport operators to identify barriers to travel.

28

B12: Buses Work in partnership to identify opportunities to raise the standard of vehicles, including promotion of alternative fuels to diesel. B13: CT/DRT Vehicles/Taxis Encourage a good supply of wheelchair accessible taxis and minibuses and other adapted vehicles to meet the needs of all of the population. B14: Environmental Responsibility Promote environmentally conscious construction, maintenance and operation of Bus/DRT and CT networks.

Network Performance B15: Integrated Ticketing Work with Transport Scotland, operators and local authorities to explore opportunities for the provision of multi-operator, multi-modal and multi-journey tickets, including the use of smartcard technology. B16: Quality Partnerships Explore opportunities for and facilitate the implementation of Quality Partnerships. B17: Bus Priority and Punctuality Improvement Partnerships Identify and prioritise key strategic corridors for bus priority measures and, in partnership with key stakeholders, explore the potential for introduction and support of Punctuality Improvement Partnerships. B18: Enforcement Encourage good enforcement of traffic regulations that facilitate efficient bus service provision. B19: Concessionary Fares Lobby for the Scottish Government concessionary fares scheme to include non-registered CT services. B20: Travel Discount Schemes Explore the potential for providing further discounted travel schemes. B21: Road Based Transport Funding Identify non transport and national government funding sources for road based transport and lobby for more national Government support.

29

5. Buses

Ref. Project Principal Objectives Policy / Description & Purpose Timing Partners Progress Supporting Proposal [Lead Policy 2016 - Later Partner(s) in Documents Overarching Sub 2021 Years Bold] Network Coverage Engage with public 1, 2, 3 1A, 1B, 1D, B1, B2, B3 Ensure employment, education, Public Ongoing Angus PT passenger transport service 2A, 2B, 2C, retail, health and tourism   Transport Statement, providers to ensure the 3C destinations are suitably Tactran RTS B1.1  Operators, delivery of high quality, serviced by good quality road Constituent reliable and efficient public based public transport Councils, transport services Tactran Determine the public 1, 2, 3 1C, 2D, 2E, B2, B3 Ensure socially necessary public Constituent Ongoing Angus PT transport service 3C, 6A transport requirements are best   Councils, Statement, requirements over and met within resources available. Public DCC PT B2.1 above the commercial  Transport Statement, network through Operators Tactran RTS consultation, monitoring and review Secure public transport 1, 2, 3 1C, 2D, 2E, B2, B3 Ensure socially necessary public Constituent Ongoing Angus PT services considered 3C, 6A transport requirements are best   Councils, Statement, necessary to meet met within resources available. Public DCC PT B2.2 requirements which would  Transport Statement, otherwise not be met by Operators, Tactran RTS commercial public transport Developers services Ensure Development Plans 3, 6 3C, 6A, 6B B4 Location of developments and Constituent Ongoing Angus PT take due cognisance of the financial contributions required   Councils, Statement, capacity of the road network for suitable public transport TAYplan DCC PT B4.1 and opportunities for both services and infrastructure.   Statement, existing and future public Tactran RTS transport provision

Infrastructure and Vehicles Create a new transport 1, 3, 6 1A, 1B, 3C, B6, AT2, New interchange facility   Perth Discussions ongoing Perth City interchange in the heart of 6A AT7, AT5 Council, Plan 2013 - 23 B6.1 Perth City that links directly  Tactran with trails and cycleways.

30

5. Buses

Ref. Project Principal Objectives Policy / Description & Purpose Timing Partners Progress Supporting Proposal [Lead Policy 2016 - Later Partner(s) in Documents Overarching Sub 2021 Years Bold] Provide and maintain bus 1, 2, 3 1B, 2E, 3C B7, B8, B9, Prioritise corridors and individual Constituent Ongoing Dundee SOA, infrastructure, such as bus B10, B11 sites for improvement to bus   Councils, Tactran stops, bus shelters and stop infrastructure, including Developers Delivery Plan, associated infrastructure, lighting and mobility access.   Angus PT including CCTV, lighting, Statement, B7.1   buildouts, laybys, raised DCC PT kerbs, etc. and ensure it Statement meets the needs of the elderly, disabled and other encumbered passengers. Introduce measures to 3, 4 3A, 4A B12, B14, To improve air quality  Transport Bus operators in area have Angus SOA, encourage uptake of low HT3, CC particularly in AQMA and assist  Scotland, introduced LEVs into their Dundee SOA, emission vehicles in achieving climate change  Public fleets. Ongoing support in Dundee requirements Transport principle for SCA Hydrogen AQAP, B12.1  Operators, Buses project. Switched on Constituent Scotland Councils Roadmap, Cleaner Air for Scotland Encouragement will be 2 2D, 2E B13 Making services and locations Constituent Ongoing Dundee PT given to meeting the needs accessible to elderly and   Councils, Statement of the elderly, disabled and disabled people. Tactran other encumbered B13.1 passengers through the   provision of accessible taxi, CT and DRT services

Network Performance Assist with development of 6 6A B15 To facilitate seamless travel  Transport Support the development of Dundee SOA, a successful multi-operator between operators and modes.  Scotland, Smart Ticketing being taken Dundee and multi-modal travel ticket forward in conjunction with AQAP, Perth B15.1  Constituent Councils, SCA. City Plan 2013- Operators, 23 Tactran

31

5. Buses

Ref. Project Principal Objectives Policy / Description & Purpose Timing Partners Progress Supporting Proposal [Lead Policy 2016 - Later Partner(s) in Documents Overarching Sub 2021 Years Bold] Dundee and Angus Bus 1, 3 1A, 1B, 3C B17, B18 Introduction of a Bus Punctuality  Angus Various work being carried Tactran Punctuality Improvement Improvement Partnerships on  Council, out in support of Dundee and Delivery Plan Partnership (BPIP) main corridors within Angus and Dundee City Angus BPIP. B17.1 Dundee Council areas.  Council, , Stagecoach Lobby Scottish Government 2 2D, 2E B19 Making services and locations  Tactran Ongoing Tactran RTS to include non-registered CT accessible to elderly and B19.1 services in free bus travel disabled people via bus travel.  scheme. Evaluate the Bus 1, 2, 3, 4 1A, 2E, 3A, B21 Increase mode share of bus  Transport Ring of Breadalbane Cleaner Air for Investment Fund (BIF) to 4A travel and introduce  Scotland Explorer and Muckhart & Scotland learn from supported environmentally friendly vehicles West-Kinrosshire DRT both projects and inform supported by BIF. Transport B21.1 decisions on options for  Scotland to evaluate future support for local Scotland-wide overall impact projects to improve public of BIF by 2016/17 transport

32

6. Park & Ride Promote New Bus and Rail Based Park & Ride PR1: Safeguard Land for Future Park & Ride Use Liaise with Planning Authorities to ensure that land identified as having potential for Park & Ride development is safeguarded within the appropriate Development Plan. PR2: New Bus Based Park & Ride Develop and implement proposals for new Park & Ride sites to the south, west, east and north of Dundee, to the north and east of Perth and to the south of Stirling. PR3: Park & Ride at New Rail Station Sites Support the provision of parking space at new rail stations in the region sufficient to match the anticipated parking demand. PR4: Local Parking Opportunities on Long Distance Bus Routes Monitor car parking near long distance bus and coach stops in order to facilitate rural interchange by providing small formal car parks next to bus stops where provision can be supported. PR5: Multi-modal Provision and Best Practice Ensure multi-modal facilities and other best practices are incorporated into any new Park & Ride site and corridor.

Enhance Existing Bus and Rail Based Park & Ride Provision PR6: Expansion and Enhancement of Existing Bus Based Park & Ride Review Park & Ride demand at existing sites and, (i) where there is demand and land is available, expand existing sites, and/or (ii) where deemed successful, provide enhanced facilities including staffing and waiting facilities. PR7: Enhanced Park & Ride at Existing Rail Stations Support the provision of additional car and cycle parking at railway stations where demand warrants. PR8: Multi-modal Provision and Best Practice Ensure multi-modal facilities and other best practices are incorporated into any upgrade of existing Park & Ride sites and corridors.

33

6. Park & Ride

Ref. Project Principal Objectives Policy / Description & Purpose Timing Partners Progress Supporting Proposal [Lead Policy 2016 - Later Partner(s) in Documents Overarching Sub 2021 Years Bold] Promote New Bus and Rail Based Park & Ride Strategic Park and Ride/ 1, 3, 4 1A, 1B, 1D, PR2, HT3 A site adjacent to the  Transport STPR Project 8. Design STPR, Park and Choose facilities 3C, 4A roundabout has been allocated  Scotland, work being progressed by Tactran serving Dundee at Dundee in St. Andrews and East Fife Tactran, Tactran, SEStran, Dundee Delivery Plan, South of Local Plan City Council and Fife TAYplan SDP, PR2.1  Sestran, Dundee City Council, in Partnership with Dundee LDP, Council, Fife Transport Scotland, Dundee Council. including lease of required AQAP, land. Dundee SOA Strategic Park and Ride/ 1, 3, 4 1A, 1B, 1D, PR2, PR1, Park and ride facility on western Transport STPR Project 8. Preferred STPR, Park and Choose facilities 3C, 4A HT3 approach to city centre.   Scotland, site identified and planning Tactran serving Dundee at Dundee Tactran, application submitted Delivery Plan, West summer 2013, but refused TAYplan SDP, PR2.2  Dundee City Council. by DCC in October 2013. Dundee LDP, Being reconsidered as part Dundee of overall P&R strategy for AQAP, Dundee. Dundee SOA Strategic Park and Ride/ 1, 3, 4 1A, 1B, 1D, PR2, PR1, Park and ride facility on eastern  Transport STPR Project 8. Longer term STPR, Park and Choose facilities 3C, 4A HT3 approach to city centre.  Scotland, possibility, but provision to Tactran serving Dundee at Dundee Tactran, protect land required. Delivery Plan,

East Dundee City TAYplan SDP, PR2.3  Council, Dundee LDP, Angus Council Angus LDP, Dundee AQAP

Strategic Park and Ride/ 1, 3, 4 1A, 1B, 1D, PR2, PR1, Park and ride facility on northern  Transport STPR Project 8. Longer term STPR, Park and Choose facilities 3C, 4A HT3 approach to city centre.  Scotland, possibility, but provision to Tactran serving Dundee at Dundee Tactran, protect land required. Delivery Plan,

North Dundee City TAYplan SDP, PR2.4  Council, Dundee LDP, Angus Council Angus LDP, Dundee AQAP

34

6. Park & Ride

Ref. Project Principal Objectives Policy / Description & Purpose Timing Partners Progress Supporting Proposal [Lead Policy 2016 - Later Partner(s) in Documents Overarching Sub 2021 Years Bold] Regional park and ride 1, 3, 4 1A, 1B, 1D, PR2, HT3 Park and ride facility on eastern Perth & Preferred site identified and Tactran facilities serving Perth at 3C, 4A approach to city centre at   Kinross technical outline design Delivery Plan, Perth East. Walnut Grove. Council, completed. Incorporated into TAYplan SDP,   Tactran Perth Transport Futures and Perth &

Perth & Kinross LDP. PKC Kinross LDP,

  developed design and National consulted public during 2015 Tourism PR2.5   prior to submitting planning Development application November 2015, Framework, with estimated year of PKC AQAP, opening 2018. NPF3, SCA City Investment Plan Regional park and ride 1, 3, 4 1A, 1B, 1D, PR2, PR1 Park and ride facility on northern  Perth & A9 North of Perth – will be Tactran facilities serving Perth at 3C, 4A approach to city centre.  Kinross considered through LDP and Delivery Plan, Perth North Council, Masterplan for this area of TAYplan SDP,  Tactran, Perth. Likely to be a medium Perth &

to longer term prospect as Kinross LDP,  Developers requires consideration NPF3, SCA PR2.6  alongside the proposed A94 City to A9 link road. Included Investment within masterplan for Plan, Perth Berthapark development, City Plan 2013- with estimated year of 23 opening 2022.

Regional Park & Ride facility 1, 3, 4 1A, 1B, 1D, PR2, PR1 Implement proposals for a new Stirling Detailed STAG feasibility Tactran - South of Stirling 3C, 4A bus Park & Ride site south of   Council, study completed. Proposals Delivery Plan, Stirling, incorporating multi-   Transport integrated into Stirling Stirling City modal and other best practice. Scotland, Council's LDP and Transport

Maximise the attractiveness of Tactran Masterplan for area. Study Plan, NPF3, using park and ride to access also submitted to Transport National PR2.7   City centre and beyond Scotland for their Tourism consideration of strategic Development Park & Ride, STPR project Framework 8. Proposal being developed through Stirling LDP DPMTAG

35

6. Park & Ride

Ref. Project Principal Objectives Policy / Description & Purpose Timing Partners Progress Supporting Proposal [Lead Policy 2016 - Later Partner(s) in Documents Overarching Sub 2021 Years Bold] Strategic Park & Ride facility 1, 2, 3 1B, 1D, 2A, PR3 Park and ride facility at   Transport Need to determine if STPR at Bannockburn, Stirling 3C Bannockburn, serving Scotland, proposal is to be taken PR3.1 Edinburgh, Glasgow and Stirling  Stirling forward. Council, Tactran A90 Forfar multi-modal 2, 3 2A, 3C PR4, PR1 Implementation of Park and Ride  Tactran, No progress to date in Tactran Interchange Strategy Action to facilitate rural Angus Council implementation Delivery Plan PR4.1 interchange at long distance bus  stops A90 Brechin multi-modal 2, 3 2A, 3C PR4, PR1 Implementation of Park and Ride  Tactran, No progress to date in Tactran Interchange Strategy Action to facilitate rural Angus Council implementation Delivery Plan PR4.2 interchange at long distance bus  stops Enhance Existing Bus and Rail Based Park & Ride Provision Bike & Go facilities at Perth 3, 4, 6 3C, 4C, 6A PR7 Commitment by Abellio ScotRail  ScotRail To be delivered early in Abellio and Dundee rail stations and franchise. ScotRail PR7.1 Cyclepoint at Stirling rail  Franchise Station. commitment Additional cycling spaces at 3, 4, 6 3C, 4C, 6A PR7 Commitment by Abellio ScotRail  ScotRail To be delivered early in Abellio Dunblane rail station franchise. ScotRail PR7.2  Franchise commitment Improved waiting facilities at 3, 6 3C, 6A PR7 Commitment by Abellio ScotRail  ScotRail To be delivered early in Abellio Dunblane and Bridge of franchise. ScotRail PR7.3 Allan rail stations  Franchise commitment

36

7. Rail R1: Implement the Tay Estuary Rail Study proposals to achieve an additional hourly service between Arbroath and Glasgow stopping at appropriate local stations, complementing fast Inter City services. R2: Support the provision of rail services that provide and enhance economic growth by connecting key business & employment sectors where possible. R3: Encourage improving the efficiency, reliability and integration of rail services in the Tactran area, specifically where this will benefit key business and employment sectors. R4: Support enhanced accessibility between key destinations within the Tactran area and key external destinations by rail without compromising wider inter-regional rail connectivity. R5: Support provision of new, relocated and enhanced stations where this will enhance access to the rail network and improve integration with the area being served. R6: Support the maintenance or improvement of real and perceived levels of safety and personal security on the rail network. R7: Seek to ensure that rail is fully integrated with relevant land-use and planning projects. R8: Support the provision of rail freight terminals, rolling stock and services for the region. R9: Ensure the rail network is integrated with the wider public transport network, including through promoting interchange with other modes via regionally Strategic Interchanges. (Strategic Interchanges are listed in Appendix 4). R10: Develop a partnership approach to passenger safety that considers the whole journey, including the safety of key walking and cycling routes to and from railway stations. R11: Work with disabled representative groups and rail operators to identify and overcome barriers to travel. R12: Support the development of Community Rail Partnerships.

37

7. Rail

Ref. Project Principal Objectives Policy / Description & Purpose Timing Partners Progress Supporting Proposal [Lead Policy 2016 - Later Partner(s) in Documents Overarching Sub 2021 Years Bold] Tay Estuary Rail Service 1, 2, 3 1A, 1B, 1C, R1, R2, Feasibility Study involving  Tactran, Refranchise in 2015 and Tactran from Arbroath to Glasgow 2A, 2B, 2C, R3, R4 Tactran, Transport Scotland,  Transport completion of EGIP in 2016 Delivery Plan, 3C First ScotRail and Network Rail Scotland, identified as opportunities to TAYplan SDP,

recommended hourly stopping  ScotRail, implement TERS. Tactran Dundee LDP, service between Arbroath and written to Minister for Perth & R1.1  Network Rail, Glasgow to complement existing Constituent Transport and Islands and in Kinross LDP, intercity service and STPR Councils, ongoing discussion with Dundee SOA, Project 23 proposals for ScotRail and Transport Perth & Aberdeen to Central Belt. Scotland. Kinross SOA

Rail enhancement between 1, 2, 3 1A, 1B, 1C, R2, R3 Increase line speed between  Transport To be implemented during TAYplan SDP Edinburgh and Perth 2A, 2B, 2C, Hilton Junction and Scotland, CP5, by 2019 NR CP5 R2.1 3C  Network Rail Delivery Plan

Perth depot stabling and 1 1B R3 Support the development of the  Network Rail, Continuing to develop NR CP5 servicing capacity and capability of  Transport options for site south of Delivery Plan general infrastructure and  Scotland, station for implementation network ScotRail, during CP5. Scottish R3.1  Perth & Network Improvement Fund. Kinross Project not currently funded. Council, Opens up options for Tactran redevelopment of Perth Station. Significant improvements to 1, 2, 3, 6 1A, 1D, 2A, R5, R9, Significant improvement in  Dundee City Contractor on site December Tactran Dundee railway station 2B, 2C, 3C, B5, AT2, function and form of Dundee  Council, 2015 to commence Delivery Plan, 6A AT7, TI5 railway station to provide a  Network Rail, construction of a new Dundee LDP, suitable gateway to the city. Transport concourse, hotel and Dundee SOA,

Scotland, escalator and lift to platform National

Tactran level, for completion by 2017. Tourism R5.1  Development Framework, NPF3, SCA City Investment Plans

38

7. Rail

Ref. Project Principal Objectives Policy / Description & Purpose Timing Partners Progress Supporting Proposal [Lead Policy 2016 - Later Partner(s) in Documents Overarching Sub 2021 Years Bold] Significant improvements to 1, 2, 3, 6 1A, 1D, 2A, R5, R9, Co-location of Perth's bus station Perth & Proposals included within Tactran Perth’s rail and bus stations 2B, 2C, 3C, B5, B6, with the railway station and   Kinross Abellio ScotRail Franchise Delivery Plan, and associated links to the 6A AT7, TI5 improved links to city centre. Council, agreement. PKC in TAYplan SDP,

city centre. ScotRail, discussion with ScotRail NPF3, SCA R5.2   Network Rail, Alliance. City Transport Investment Scotland, Plans Tactran Stirling Rail Station 1, 2, 3, 6 1A, 1D, 2A, R5, R9, Includes Access for All Stirling Stirling Station Gateway Tactran Enhancement 2B, 2C, 3C, B5, AT7 improvements, investigation of   Council, Street Enhancement public Delivery Plan, 6A car park enhancement and Network Rail, consultation being NPF3, SCA   Gateway Street Enhancement ScotRail, undertaken during December City

project that aims for public realm 2015. Investment   Transport and access enhancements to Scotland, Plans, Stirling key City Centre gateway, LDP R5.3  Tactran including streetscape improvements at Stirling Station Forecourt and surrounding streets. Better integration with walk, cycle, bus station, taxi and car park.

Relocation of Invergowrie 1, 2, 3, 6 1A, 1B, 2A, R5, R9, Station enhancements Tactran, Relocation of Invergowrie Tactran Station to Dundee West 2B, 3C, 6B AT7 recommended from TERS study   Dundee City Station outline business case Delivery Plan, include undertake a business Council, Perth completed 2015. Agreed to TAYplan SDP, case for relocating Invergowrie   & Kinross defer further work pending Dundee LDP,

Station to Dundee West. Council, implementation of TERS Perth & R5.4   Transport hourly stopping rail service. Kinross LDP, Scotland, SCA City Network Rail, Investment ScotRail Plans, NPF3

39

7. Rail

Ref. Project Principal Objectives Policy / Description & Purpose Timing Partners Progress Supporting Proposal [Lead Policy 2016 - Later Partner(s) in Documents Overarching Sub 2021 Years Bold] New Rail Station at Bridge 1, 2, 3, 6 1A, 1B, 2A, R5 Undertake a transport appraisal Perth & Pre-appraisal feasibility work Tactran of Earn 2B, 3C, 6B for the Bridge of Earn area. A   Kinross for new rail stations at Delivery Plan, STAG appraisal will consider all Council, Fife Oudenarde or Newburgh TAYplan SDP,   options for improving the Council, completed in December Perth &

transport system which could 2015. Partners are to Kinross LDP   Tactran, include public transport through  Sestran, discuss outcome with R5.5 improved provision of rail (new Developers, Transport Scotland and the station), bus or other; or through Network Rail, rail industry, prior to improved road schemes. Linked proceeding with STAG to development at appraisal. Oudenarde.

Close Cornton Level 1, 5 1B, 5A R6 To facilitate the closure of level  Network Rail, Design of road bridge at Stirling City Crossing and replace with crossing to improve level  Transport Cornton No 1 nearing Transport bridge. crossing safety and reduce Scotland, completion. Programmed to Plan, NR CP5 R6.1  wider rail industry costs. Stirling be completed in CP5, by Delivery Plan Council 2019

Support development of 2, 3, 6 2B, 2C, 2E, R12 Provide support to Community ScotRail, Highland Main Line CRP Tactran RTS Highland Main Line CRP 3C, 6A Rail Partnerships through   Transport achieved designated CRP ScotRail in the Community Scotland, status in late 2014. Officially Initiative linking communities to Network Rail, launched and inaugural R12.1   their rail network. Tactran, Perth meeting in 2015. & Kinross Council

Support Development of 2, 3, 6 2B, 2C, 2E, R12 Provide support to Community ScotRail, West Highland CRP Tactran RTS West Highland CRP 3C, 6A Rail Partnerships through   Transport achieved designated CRP ScotRail in the Community Scotland, status in March 2015. Initiative linking communities to Network Rail, Officially launched and R12.2   their rail network. Tactran, Perth inaugural meeting in 2015. & Kinross Council

40

7. Rail

Ref. Project Principal Objectives Policy / Description & Purpose Timing Partners Progress Supporting Proposal [Lead Policy 2016 - Later Partner(s) in Documents Overarching Sub 2021 Years Bold] Support Development of 2, 3, 6 2B, 2C, 2E, R12 Provide support to Community ScotRail, Strathallan CRP application Tactran RTS Strathallan CRP 3C, 6A Rail Partnerships through   Transport for designated CRP status ScotRail in the Community Scotland, approved by the Minister Initiative linking communities to   Network Rail, late 2015.

their rail network. Tactran, Perth R12.3   & Kinross Council, Stirling Council

41

8. Freight F1: Lorry Parking Explore opportunities for improved lorry parking on the region’s road network, including consideration of inclusion of overnight lorry parking in Park & Ride proposals. F2: Urban Logistics Promote the implementation of more efficient and environmentally friendly urban logistics, including giving consideration to the implementation of logistics service centres in the region’s main towns and cities. F3: Public Sector Logistics Support improvements in the efficiency of public sector logistics and the application of joint logistics solutions. F4: Timber Transport Promote timber transport and reduced environmental impacts through membership and supporting the Stirling & Tayside Timber Transport Group. F5: Port Development Support development of the region’s three ports, including the provision of multi-modal freight facilities. F6: Rail Connections Support the provision of rail connections for freight movements between the region and the rest of the country. F7: Improved Information for Road Freight Industry Use modern technology to improve routeing and other information for the road freight industry.

42

8. Freight

Ref. Project Principal Objectives Policy / Description & Purpose Timing Partners Progress Supporting Proposal [Lead Policy 2016 - Later Partner(s) in Documents Overarching Sub 2021 Years Bold] Implementation of Freight 1, 4, 6 1B, 4A, 6A F2 Freight Consolidation Centres at  Tactran, Following involvement with Tactran Consolidation Centres at Dundee and Perth to provide  Dundee City LaMiLo project a detailed Freight Action Dundee and Perth sustainable freight logistics. Council, Perth business plan Freight Plan, Dundee  & Kinross Consolidation Centres at SULP,

Council Dundee and Perth has been Dundee F2.1  completed. AQAP, Dundee SOA, Perth City Plan 2013-23, PKC AQAP Tactran Freight Quality 1, 3, 4 1B, 3C, 4A F2, F3, HT3 Tactran FQP already considers Tactran, Ongoing Cleaner Air for Partnership to continue to environmental and air quality.   Local Scotland consider the environmental Cleaner Air for Scotland   Authorities, impact of freight transport includes actions for FQPs to Transport F2.2 and bring forward consider environmental impacts  Scotland appropriate measures for and local air quality. improving local air quality.

Improve road connections to 1, 6 1A, 1B, 6B F5 Development of regional  Angus The South Montrose Tactran Montrose Port facilities, building on existing  Council, Consultancy Study is now Delivery plan, proposals at Montrose Port for Montrose complete. Proposals for road TAYplan SDP, F5.1 improved road links.  Port realignment being Angus LDP, Authority implemented. Tactran Freight Action Plan Improved Road Links to 1, 6 1A, 1B, 6B F5 Investigation, development and Perth & Detailed design of extension Tactran Perth Harbour implementation of a road link   Kinross of a link road to Perth Delivery Plan, extending to Perth Harbour to Council, Harbour has been TAYplan SDP, F5.2 facilitate road/rail interchange.  Tactran completed. PKC SOA, Perth City Plan 2013-23

Highland Spring Rail Access 1, 6 1A, 1B, 6B F6 Continuing support for Highland   Highland Freight Trial undertaken and Tactran at Blackford Spring Rail Access at Blackford Spring, proposals for permanent Freight Action F6.1  Scottish facility being progressed. Plan Government Planning application submitted.

43

9. Travel Information Informing Travel Choices and Awareness TI1: Travel Information that is up to date and current, consistent, coherent, comprehensive (including routes, journey times, cost and facilities), easily available and tailored to users’ needs. TI2: Implementation of the Regional Buses Information Strategy.

Facilitating Modal Shift/Sustainability TI3: Information on access to key locations. TI4: Information that allows for planning and comparing journey options, including sustainable/active travel options, along with guidance on reliability. TI5: Information that enhances journey experience and gives reassurance throughout the journey.

Making Efficient Use of the Transport Network TI6: Information on lifeline services. TI7: Information on planned and unplanned variations to services. TI8: Information on routeing for lorries.

44

9. Travel Information

Ref. Project Principal Objectives Policy / Description & Purpose Timing Partners Progress Supporting Proposal [Lead Policy 2016 - Later Partner(s) in Documents Overarching Sub 2021 Years Bold] Informing Travel Choices and Awareness Continue to develop and 1, 2, 6 1B, 2A, 2B, TI1, TI3, GoToo lifestyle focussed travel Tactran, GoToo launched in 2015. Tactran promote regional travel 2C, 2E, 6A TI4, TI5, website developed and   Constituent Promotion and Delivery Plan information through TI6, TI7 operational in 2015. Councils, improvements ongoing. TI1.1 dedicated websites. Dundeetravelinfo and Traveline  Traveline Further development and Scotland continue to provide Scotland promotion with partners to information within the region. ensure up to date and accurate and well used. Ensure the availability of 1, 2, 3 1B, 2A, 2B, TI2, TI1 Constituent Councils work in Constituent Ongoing Tactran RBIS, comprehensive and 2C, 2E, 3C partnership with bus operators   Councils, DCC PT accurate roadside bus to ensure availability of Operators Statement, TI2.1 information. comprehensive, accurate and   Angus PT current roadside bus Statement information. Produce and provide bus 1, 2, 3 1B, 2A, 2B, TI2, TI1 Constituent Councils work in Constituent Ongoing Tactran RBIS, service, area or corridor 2C, 2E, 3C partnership with bus operators to   Councils, DCC PT timetable booklets that provide service corridor leaflets   Operators Statement, include all supported and and area booklets that are Angus PT TI2.2 commercial bus services complete and comprehensive   Statement and include all operators’ services running in that corridor or within the area that they cover. Facilitating Modal Shift/Sustainability Upgrade and enhancement 1, 4 1A, 1B, 4A TI5 Enhancement to existing Car  Dundee City Consideration will be given to DCC AQAP of VMS car parking Parking VMS following Council complement revised Central TI5.1 navigation signage in completion of Central Waterfront  Waterfront road layout. Dundee road layout. Upgrade and enhancement 1, 4 1A, 1B, 4A TI5 Investigation of VMS car parking  Perth & Being considered as part of PKC AQAP of VMS car parking signage Kinross Smart City initiative. TI5.2 navigation signage in Perth  Council

Making Efficient Use of the Transport Network Real Time Information - 1, 3 1B, 3C TI7, TI5, Extending Real Time Passenger  Stirling Limited expansion into Tactran Stirling Council TI1, TI2, Information on next available Council, Stirling in partnership with Delivery Plan TI7.1 TI3 services into Stirling Council  Tactran, Sestran, with displays at key Area. Sestran locations.

45

9. Travel Information

Ref. Project Principal Objectives Policy / Description & Purpose Timing Partners Progress Supporting Proposal [Lead Policy 2016 - Later Partner(s) in Documents Overarching Sub 2021 Years Bold] Real Time Information - 1, 3 1B, 3C TI7, TI5, Extending Real Time Passenger  Perth & Feasibility Study completed Tactran Perth & Kinross Council TI1, TI2, Information on next available Kinross in 2012/13 and ongoing Delivery Plan TI7.2 TI3 services into Perth & Kinross  Council, discussion with Bus Council Area. Tactran Operators. Intelligent Transport 1, 6 1B, 1D, 6C TI7, TI5, Transport Scotland's ITS trunk   Transport Ongoing programme STPR Systems on Trunk Road TI1, TI3, road programme aims to provide Scotland TI7.3 Network journey time information to key  destinations.

Intelligent Transport 1, 4 1A, 1B, 4A TI7, TI5, ITS Dundee aims to provide  Dundee City Real time traffic information Tactran Systems, Dundee TI1, TI3, real time traffic information on  Council, provided on Dundee Delivery Plan the strategic road network co- Transport Western approach through ordinated with Transport Scotland, Tactran Capital Programme  Scotland's ITS trunk road Tactran in 2012/13. Further TI7.4 programme.  expansion in 2013/14 and 2014/15 on both North and North West Approaches. East approach and other improvements proposed in future years.. Improved Regional Travel 1 1A, 1B, 1C, TI8 Updating and further Tactran, Ongoing Tactran Information for Road Freight 1D development of Freight Page on Constituent Freight Action TI8.1 Industry www.tactran.gov.uk  Councils Plan, Dundee SULP

46

10. Climate Change CC1: Supporting low carbon vehicles and infrastructure. CC2: Promoting eco-driving training and advice.

47

10. Climate Change

Ref. Project Principal Objectives Policy / Description & Purpose Timing Partners Progress Supporting Proposal [Lead Policy 2016 - Later Partner(s) in Documents Overarching Sub 2021 Years Bold] Low Carbon Vehicles and Infrastructure Promote the uptake and use 3, 4 3A, 4A CC1, HT3 Scottish Government, Energy Scottish Ongoing Switched on of cleaner and/or alternative Saving Trust, Scottish   Government, Scotland, fuels where possible for Enterprise, Tactran, Constituent Transport Dundee SOA transport Councils continue to promote   Scotland,

wide scale adoption of electric Energy CC1.1   and alternative fuel vehicles. Savings Trust, Tactran, Constituent Councils Use of electric and 3, 4 3A, 4A CC1, HT3 Constituent Councils, NHS, Constituent Ongoing Tactran alternative fuel vehicles in etc. to investigate, purchase   Councils, Delivery Plan, public sector fleets. and expand existing electric   NHS. Dundee and alternative fuel vehicle SULP, Perth CC1.2 fleet   City Plan 2013- 23, Switched on Scotland Roadmap Work with the Scottish 3, 4 3A, 4A CC1, HT3 Progress funding and delivery of  Scottish Ongoing IIP, NPF3, Government and other domestic, workplace and en-  Government, Dundee SOA, partners to develop a route vehicle charging Transport Switched on

network of publically infrastructure. Deploy rapid  Scotland, Scotland available electric vehicles charge points at intervals of no Roadmap CC1.3  ScotRail, charging points across more than 50mile intervals on Tactran, Tactran region the primary road network and at Constituent major interchanges, rail stations Councils and park & ride sites.

Dundee eMission 3, 4 3A, 4A CC1 Dundee's Go Ultra Low City  Dundee City Dundee successfully Dundee SOA initiative aims to accelerate a  Council, awarded £1.8m from OLEV step change in ultra-low Office of Low to implement innovative emission vehicle uptake and charging hubs during CC1.4  Emission make Dundee a globally Vehicles 2016/17. Further funding recognised exemplar. (OLEV), opportunities being explored. Tactran

48

10. Climate Change

Ref. Project Principal Objectives Policy / Description & Purpose Timing Partners Progress Supporting Proposal [Lead Policy 2016 - Later Partner(s) in Documents Overarching Sub 2021 Years Bold] Dundee Ultra Low Emission 3, 4 3A, 4A CC1 Dundee's Ultra Low Emission  Dundee City Dundee one of 8 cities Dundee SOA Taxi Scheme Taxi Scheme bid aiming to  Council, funded for Energy Savings achieve a majority Ultra Low Office of Low Trust to undertake feasibility

Emission Vehicles taxi fleet by Emission study. Decision on  2020 Vehicles implementation of full CC1.5  (OLEV), scheme expected April 2016. Energy Savings Trust, Tactran, Support shared use of plug- 3, 4 3A, 4A CC1 Support for the promotion of   Constituent Dundee Co-Wheels Car Switched on in vehicles through Car shared plug-in vehicles through Councils, Club incorporates a number Scotland CC1.6 Clubs in the region. the Developing Car Clubs in  Scottish of plug-in vehicles. Perth & Roadmap Scotland programme Government Stirling feasibility work ongoing. Eco-driving Eco-driver training 3, 4 3A, 4A CC2, HT3 Promote Eco Driving training to Tactran, Ongoing PKC AQAP, CC2.1 all public and private sector  Constituent Tactran RTS organisations. Councils

49 Appendix A

Delivery and Action Plans/Programmes Reviewed

1. Regional Transport i. Tactran RTS 2015-36 Refresh (2015) ii. Tactran RTS Walking & Cycling Network – RTS Refresh Appendix 2 (2015) iii. Tactran RTS Sub-Strategies (2009) iv. Tactran RTS Delivery Plan (2014) v. Tactran Health & Transport Framework (Oct 11) vi. Tactran Regional Freight Action Plan (2015/16) vii. Tactran Regional Bus Information Strategy (2011) viii. Neighbouring Regional Transport Partnerships’ RTS’s

2. CPP SOA Delivery Action Plans i. Angus ii. Dundee iii. Perth & Kinross iv. Stirling

3. Strategic Development Plan/Local Development Plans i. TAYplan SDP– Proposed Action Programme (May 15) ii. Angus LDP – Draft Action Programme (Feb 15) iii. Dundee LDP – Action Programme (Dec 13) iv. Perth & Kinross LDP – Action Programme (Apr 15) v. Stirling LDP– Action Programme (Dec 14) vi. Cairngorm NP LDP – Action Programme (June 15) vii. Loch Lomond & The Trossachs NP LDP – Draft Action Programme (May 15)

4. Local Transport Strategies i. Stirling LTS – City Transport Plan (June 13) ii. Stirling LTS – Towns, Villages and Rural Areas Transport Plan (2014)

5. Other i. Perth City Plan 2013 – 2023 (May 13) ii. Dundee City Council Air Quality Action Plan 2011- update 2014 (2014) iii. Perth & Kinross Council Air Quality Action Plan 2009- progress 2012 (2012) iv. Sustainable Urban Logistics Plan for Dundee (Oct 2014) v. Local Authorities Public Transport Statements

6. National i. Scotland’s Economic Strategy (Mar 15) ii. Scottish Government – NPF3 Draft Action Programme (June 14) iii. Scottish Cities Alliance – City Investment Plans (2014) iv. National Transport Strategy Refresh (Jan 16) v. Transport Scotland – STPR (Oct 09) vi. Scottish Government Infrastructure Investment Plan (Dec 11) vii. Network Rail – CP5 Enhancements Delivery Plan (Dec 14) viii. National Tourism Development Framework (July 13) ix. Switched on Scotland: A Roadmap to Widespread Adoption of Plug-in Vehicles (Sept 2013) x. National Walking Strategy (2014)

50 Appendix A xi. National Walking and Cycling Network Project Plan (Dec 14/Jul 15) xii. CAPS 2013 (June 13) xiii. Audit Scotland – Transport for health and social care (Aug 11/June 13) xiv. Central Scotland Green Network Action Plan xv. Cleaner Air Scotland (Nov 2015)

51 Appendix B

List of Abbreviations

AC – Angus Council

AIP – Accident Investigation & Prevention

AQAP – Air Quality Action Plan

AQMA – Air Quality Management Area

CAPS 2013 – Cycling Action Plan for Scotland 2013

CISP – City of Stirling Strategic Investment Plan

CP5 – Control Period 5, 2014 – 2019

CRP – Community Rail Partnership

CTLR – Cross Tay Link Road

CSGN – Central Scotland Green Network

DCC – Dundee City Council

DPMTAG – Development Planning and Management Transport Appraisal Guidance

EGIP – Edinburgh Glasgow (Rail) Improvement Programme

FQP – Freight Quality Partnership

HTF – Health & Transport Framework

IIP – Infrastructure Investment Plan

ITS – Intelligent Transport Systems

LA’s – Local Authorities

LDP – Local Development Plan

LLTNPA – Loch Lomond and The Trossachs National Park Authority

LTS – Local Transport Strategy

NCN – National Cycle Network

NHS – National Health Service

NHST – NHS Tayside

NHSFV – NHS Forth Valley

NP – National Park

NPF3 – National Planning Framework 3

NR –

NWCN – National Walking & Cycling Network

52 Appendix B

OLEV – Office of Low Emission Vehicles

P&K – Perth & Kinross

P&R – Park & Ride

PKC – Perth & Kinross Council

PT Statement – Public Transport Statement

RTS – Regional Transport Strategy

SAS – Scottish Ambulance Service

SC – Stirling Council

SCA – Scottish Cities Alliance

SDP – Strategic Development Plan

SEPA – Scottish Environmental Protection Agency

SNH – Scottish Natural Heritage

SOA – Single Outcome Agreement

STAG – Scottish Transport Appraisal Guidance

STPR – Strategic Transport Projects Review

SULP – Sustainable Urban Logistics Plan

TRACKS – The Rural Access Committee of Kinross-shire

VMS – Variable Message Sign

53

tactran Bordeaux House, 31 Kinnoull Street, Perth, PH1 5EN Email: [email protected] Telephone: 01738 475775 February 2016