LOCAL HIGHWAYS PANEL MEETING AGENDA Date: Thursday 28th January 2021 Time: 10:00 hrs Venue: Video Conference Call due to current Covid-19 restrictions

Chairman: CC Member Andrew Erskine Panel Members: CC Member Alan Goggin, CC Member Carlo Guglielmi, CC Member Andy Wood, CC Member Ivan Henderson, CC Member Paul Honeywood, CC Member Mark Platt, CC Member Mark Stephenson, TDALC Cllr Frank Belgrove

TDC Members: Cllr Nick Turner, Cllr Zoe Fairley, Cllr Graham Steady, Cllr Gina Placey

Officers: EH Thomas Eng – Assistant Highway Liaison Officer EH Vicky Presland – Head of Design ECC Chris Stoneham – Strategic Development Engineer

Secretariat: TDC Lizzie Ridout

Page Item Subject Lead Paper 1 Welcome & Introductions Chairman Verbal 2 Apologies for Absence Chairman Verbal 3 Minutes of meeting held on 19th November 2020 to be Chairman Verbal P1-3 agreed as a correct record 4 Matters arising from minutes of previous meeting Chairman Verbal 5 Public Questions Thomas Eng Verbal

P4-8 6 Report on Funded Schemes 2020/21 Thomas Eng Report 1 P9-26 7 Report on Schemes Awaiting Funding Thomas Eng Report 2 8 Appendix 1 (electronically only) Thomas Eng Verbal ❖ Rangers ❖ Traffic Surveys ❖ VAS Maintenance ❖ S106 and S278 9 ❖ Date of next meeting: 18th March 2021 Chairman Verbal

Any member of the public wishing to attend the Tendring Local Highways Panel (LHP) must arrange a formal invitation from the Chairman no later than 1 week prior to the meeting. Any public questions should be submitted to the Highway Liaison Officer no later than 1 week before the LHP meeting date; [email protected] MINUTES OF THE TENDRING LOCAL HIGHWAYS PANEL THURSDAY 19th NOVEMBER 2020 AT 10AM MEETING HELD VIRTUALLY DUE TO THE ONGOING COVID-19 PANDEMIC

Chairman: CC Member: Cllr Erskine

Panel CC Members: Cllrs Goggin, Guglielmi, Henderson, Honeywood, Platt, Members: Stephenson and Wood. TDC Members: Cllrs Placey and Steady, Turner. TDALC representative: Cllr Belgrove (Alresford Parish Council)

Officers: EH - Vicky Presland, Head of Design EH - Thomas Eng, Assistant Highway Liaison Officer ECC – Chris Stoneham – Strategic Development Engineer TDC - James Ennos, Coastal Manager

Secretariat: TDC - Lizzie Ridout, Leadership Support Manager

Item Owner 1 Welcome & Introductions Chair The Chairman welcomed those present to the meeting.

2 Apologies for absence Chair Apologies for absence had been received from TDC Cllr Fairley

3 Minutes of meeting held on 17th September 2020 to be agreed as a correct Chair record The minutes of the meeting were agreed as a correct record.

4 Matters arising from minutes of previous meeting Chair

• Officers to circulate a list of VAS for the district. • Cllr Belgrove reported he had undertaken his assigned actions. James Ennos (TDC) would be attending the next TDALC meeting on 25th November. • Cllr Honeywood queried the decision to cease speed surveys as one had appeared locally to him and the timing could affect the data. Officers confirmed they would assess the data to see if it was a true representation, and reinstate if necessary. Cllr Guglielmi also queried other instances of speed surveys in his area. Officers confirmed that developers can also carry out traffic surveys, and that information could be shared in some cases. • Cllr Goggin advised that the B1027 feasibility report had been published and thanked officers for their input. The report had resulted in five points going forward subject to funding and public consultation, with a further five potentially being taken to the Cabinet Member.

5 Report on funded schemes 2020/21 Officers Officers provided a summary of the current position of the funded schemes for 2020/21.

19/11/20 Tendring Local Highways Panel

Page 1 of 26 Members were reminded that the costs supplied were budget allocations only and there was the possibility that a final scheme cost could change dependant on issues which may arise especially during detailed design and construction. The panel would be informed of any budget adjustments required.

• Cllr Henderson - LTEN173007 Parkeston Road - Currently at the earliest stage and in the legal process. • Cllr Stephenson - LTEN162007 Marine Parade East, Clacton - Compensation events were submitted during the construction of this scheme. • Cllr Stephenson - Query over scheme number and associated costs. • Cllr Turner - LTEN201003 B1414 Road, Beaumont-cum-Moze - Officers confirmed the scheme had gone over by an additional £6000, and TDC Rangers would not be able to undertake vegetation clearance as the road is 60mph speed limit. • Cllr Goggin queried the compensation scheme for contractors. • Cllr Belgrove - reported the concerns of the parish council over the importance of signage at Beaumont. • Officers confirmed the updates on the schemes listed in the report. • Cllr Henderson - LTEN173007 - Officers clarified the governance process required for this scheme. Cllr Henderson wished the number of bus stops along the road to be explored, and the concerns raised over no crossing patrol currently. Officer to pass onto the officer writing the CMA. Officers also reported that this scheme will be delivered at the end of the financial year to facilitate the overspend in budget.

19/11/20 Tendring Local Highways Panel

Page 2 of 26 • Cllr Henderson - 20’s plenty sites. Appears to be a delay on the schemes being completed. • Cllr Guglielmi queried the difference in costs on zebra crossing schemes in the programme. Officers advised of the associated costs with the schemes, such as resurfacing and belisha beacons being powered. • Cllr Guglielmi provided an example of joined up working between officers on a scheme which had provided a saving of £16,500, and thanked officers for their communication. Officers confirmed they were meeting on a monthly basis to achieve more joined up working with local developments. • Cllr Wood - LTEN202006 - Officers confirmed funding had been received from TDC. • Cllr Henderson - Low Road - Speeding remains an issue. A local development was currently underway and could provide a contribution. Cllr Henderson and Cllr Erskine both declared an interest insofar as they lived locally to the issue. Officers confirmed that an application has been submitted but not yet decided, and would endeavour to look at measures that were suitable. • Cllr Wood - Road with a new development and footpath may be required. Cllr Placey advised that a proposed footpath along Little Clacton Road was originally a condition in the planning decision. Officers undertook to investigate.

9 Date of next meeting: Thursday 28th January 2021 at 10am via MS Teams All

• Cllr Goggin thanked the Chairman and his team for the efficiency of the Teams meetings held recently. • Cllr Placey asked about the pilot of e-scooters in Clacton. Officers advised there was a briefing about the scheme, and would circulate it to Members.

19/11/20 Tendring Local Highways Panel

Page 3 of 26 TENDRING LOCAL HIGHWAY PANEL REPORT 1 – 2020/21 FUNDED SCHEMES LIST

This report provides an update on the current position of all the schemes which the Tendring Local Highway Panel has recommended for inclusion in the 2020/21 programme.

Budget summary 2020/21 Capital Budget £395,000 Safer Roads Schemes £29,000 Total Value of other Commissioned Schemes £451,000 Remaining Budget to Allocate £0 Schemes Funded by other Revenue Streams £54,500

Members are reminded that the costs supplied are budget allocations only and there is the possibility that a final scheme cost could change dependant on issues which may arise especially during detailed design and construction.

Page 4 of 26 Funded Schemes 2020-21

Total Value of Completed Update Schemes £444,500

Scheme Allocated Ref Scheme name Description Division Parish Scheme stage Cost Code Comments Est Completion Category Budget

The Road Safety Engineering team recommended to Road, Great extend the 40mph limit slightly Bentley - Passenger Pedestrian refuge Island, Kassell Passenger 1 Implementation LTEN165048 £23,500 as part of these works. The Q4 Transport kerbing and pole and flag. Transport job pack has now been Improvements passed to the Direct Delivery gang for construction.

The job pack for this scheme Suffolk Street, Walton- Frinton and Frinton and Traffic has been sent to the direct 2 on-the-Naze - Width Width restriction signing. Implementation LTEN172037 £12,000 Q4 Walton Walton Management delivery gang for restriction implementation.

Tendring Road, Thorpe- Tendring Rural Traffic Scheme completed in 3 le-Soken - Speed Speed limit reduction. Thorpe-le-Soken Total Scheme LTEN182031 £6,500 COMPLETED East Management October 2020. reduction

Various locations Tendring Rural Traffic 4 around - Signing improvements Manningtree Total scheme LTEN162009 £5,000 Scheme completed. COMPLETED West Management Signing review

Due to the lack of Main Road, Harwich - 20s Plenty outside All Saints Traffic involvement from the school a 5 Harwich Harwich Total scheme LTEN182032 £3,000 COMPLETED 20's Plenty Primary School Management blank lower section of the sign will be installed.

Due to the lack of 20's Plenty signage outside Hall Lane, Harwich - Traffic involvement from the school a 6 Harwich and Dovercourt High Harwich Harwich Total scheme LTEN182037 £3,000 Q4 20's Plenty Management blank lower section of the School. sign will be installed.

Marine Parade East, Traffic 7 Clacton-on-Sea - Zebra Zebra Crossing. Clacton East Unparished Implementation LTEN162007 £76,000 Scheme completed. COMPLETED Management Crossing

Page 5 of 26 Funded Schemes 2020-21

Total Value of Completed Update Schemes £444,500

Scheme Allocated Ref Scheme name Description Division Parish Scheme stage Cost Code Comments Est Completion Category Budget

The job pack for this scheme has been sent to the direct A133 Clacton Road, delivery gang for Junction signage improvements Tendring Rural 8 Elmstead - Casualty Elmstead Safer Roads Total scheme LTEN201001 £5,500 implementation. The Q4 and vegetation clearance. West Reduction scheme vegetation clearance will be carried out by a specialist contractor.

A133 Main Road j/w Feasibility study to change the B1029 Road, signal timings to allow separate Tendring Rural 9 Safer Roads Feasibility LTEN201002 £14,500 Q4 Frating - Casualty northbound and southbound green West Reduction scheme phases.

The job pack for this scheme B1414 Harwich Road, Junction signage improvements Tendring Rural Beaumont Cum has been sent to the Direct 10 Safer Roads Total scheme LTEN201003 £6,500 Q4 Beaumont-cum-Moze and vegetation clearance. East Moze Delivery gang for construction.

The CMA has now been considered by Cllr Bentley, Long Road, Lawford - Tendring Rural 11 Zebra Crossing. Lawford Walking Implementation LTEN173001 £58,500 with his support this scheme Q4 Zebra Crossing West will be implemented in February 2021.

Cloes Lane, Clacton - Traffic 12 Zebra Crossing. Clacton North Unparished Implementation LTEN173006 £48,000 Scheme completed. COMPLETED Zebra Crossing Management

Page 6 of 26 Funded Schemes 2020-21

Total Value of Completed Update Schemes £444,500

Scheme Allocated Ref Scheme name Description Division Parish Scheme stage Cost Code Comments Est Completion Category Budget

The trial holes for this scheme Valley Road, Clacton- have now been completed, Traffic 13 on-Sea - Zebra Zebra Crossing. Clacton East Unparished Implementation LTEN163007 £57,000 and the main construction Q4 Management Crossing works are programmed to take place in March 2021.

Objections have been received during the Parkeston Road, Harwich Town Traffic consultation process. A CMA 14 Harwich - Zebra Zebra Crossing. Harwich Implementation LTEN173007 £57,000 Q4 Council Management has now been written and Crossing sent to Cllr Bentley for consideration.

Concerns raised by the Colne This design of this scheme Church Road, Community College in regards to Traffic has now been funded by the 15 Brightlingsea - Zebra Brightlingsea Brightlingsea Design LTEN152118 £9,500 Q4 speed of traffic and for students Management Colne School Expansion crossing crossing the road. Project.

B1032 Kirby Road, Cllr Platt has requested that a The job pack for this scheme Great Holland - Traffic speed and volume survey is Frinton and Frinton and Traffic has now been sent to the 16 Total scheme LTEN192007 £10,000 Q4 Management undertaken due to reported Walton Walton Management Direct Delivery gang for Improvements speeding issues. implementation.

Investigation and outline Parish Council have Bar Corner, St Osyth - Traffic design into traffic calming 17 raised concerns over the safety of Brightlingsea St Osyth Design LTEN192010 £10,500 Q4 Junction improvements Management measures on all approaches the crossroads. to Bar Corner.

This scheme has been Detailed design of signage Traffic 18 A133 Signage Review Various Various Design LTEN192020 £8,000 funded as part of the Q4 improvements along the A133. Management Infrastructure project. Wellington Road j/w Traffic Scheme completed in June 19 Church Street, Harwich New road layout ahead signing. Harwich Harwich Peninsula Design LTEN172010 £1,500 COMPLETED Management 2020 - Signing

Page 7 of 26 Funded Schemes 2020-21

Total Value of Completed Update Schemes £444,500

Scheme Allocated Ref Scheme name Description Division Parish Scheme stage Cost Code Comments Est Completion Category Budget

Post Construction Audit Road safety audits post scheme 20 for all Tendring Various Various Safer Roads Surveys RSA3LTEN £2,500 N/A installation. schemes

Signage improvements to the car This scheme has been Clacton Car Park - Traffic 21 park signage in Clacton town Various Non Parished LTEN202006 £6,000 funded by Q4 Signage review Management centre. Council.

Request by ECC to undertake a This scheme has been Jaywick Crossing 22 review of the crossing points within Clacton West Non Parished Walking Design LTEN203001 £8,000 funded as part of the Jaywick Q4 Review Jaywick. Infrastructure project.

Request by ECC to undertake a This scheme has been Jaywick Signage Traffic 23 review of the signage points within Clacton West Non Parished Design LTEN202008 £8,000 funded as part of the Jaywick Q4 Review Management Jaywick. Infrastructure project.

Signage improvements to the The job pack has now been Jaywick Lane, Jaywick - Traffic 24 junction of St John's Road and Clacton West Non Parished Total scheme LTEN202012 £4,500 sent to the Direct Delivery Q4 Signage Improvements Management West Road. gang for implementation.

Page 8 of 26 TENDRING LOCAL HIGHWAY PANEL REPORT 2 – SCHEMES AWAITING FUNDING

The following Schemes Awaiting Funding list identifies all the scheme requests which have been received for the consideration of the Tendring District Local Highways Panel.

Members are asked to review these schemes and consider removing any they would not wish to consider for future funding.

The breakdown of scheme types available for future consideration is as below:

Budget Summary

Safer Roads £0 Traffic Management £776,000 Walking £127,000 Passenger Transport £41,500 Public Rights of Way £16,500 Cycling £0 Total £961,000

Costs supplied are estimates only and there is the possibility that a final scheme cost can change significantly dependant on issues which may arise during detailed design and construction.

On the Schemes Awaiting Funding List, the RAG column acknowledges the status of the scheme request as shown below:

The scheme has been validated as being feasible and is available for G consideration The scheme has previously been approved for a feasibility study and the A results are awaited before the scheme can be fully considered A scheme request has been received but is against ECC policy or there is R no appropriate engineering solution A scheme request has been received and is in the initial validation V process

Page 9 of 26 Schemes Awaiting Funding

Traffic Management

Total Value of schemes £776,000

Estimated Ref Scheme name Description Division Parish Scheme stage Cost Code Comments RAG Cost Near misses and speeding Rectory Road, Little concerns have been Bentley - Traffic Meeting to be arranged with County Member on 1 reported to the Parish Tendring Rural West Validation LTEN182003 TBC V management Parish Council site. Council. Request to extend improvements speed limit.

Ravens Green Lack of signage, lining and Road, Little Bentley - speeding concerns have Little Bentley Meeting to be arranged with County Member on 2 Tendring Rural West Validation LTEN182004 TBC V Traffic management been raised to the Parish Parish Council site. improvements Council.

Local residents are calling for investigation into a speed Alresford Road, limit reduction to cover the Speed and volume survey information relayed 3 Elmstead - Speed row of houses on the Tendring Rural West Elmstead Total scheme LTEN182015 TBC back to Cllr Guglielmi. Awaiting confirmation of A limit eastern side of Alresford S106 contributions. Road between The Chase and Sunnymead Farm.

Great Bentley Parish Validation recommends not to proceed with this Heckfords Road, Council have raised the request, as installing a no right turn facility at this 4 Great Bentley - No Brightlingsea Great Bentley Validation LTEN182018 N/A R provision of introducing a no location is likely to push traffic down routes which right turn right turn on to the A133. are thought to be less suitable.

Elderly local residents are experiencing difficulty A speed reduction from 60mph to 40mph is B1027 Flag Hill, St. crossing the road to reach against the criteria highlighted within the 5 Osyth - Signing Brightlingsea St. Osyth Total scheme LTEN182021 N/A R the bus stop due to the Speed Management Strategy. The speed element improvements current speed limit of the will now be covered under LTEN192023. road.

Page 10 of 26 Schemes Awaiting Funding

Traffic Management

Total Value of schemes £776,000

Estimated Ref Scheme name Description Division Parish Scheme stage Cost Code Comments RAG Cost

Validation identified a package of 3 potential solutions to the issues raised. Option 1 - Road Sladbury's Lane, marking refreshments at £2,000 for design and Request to investigate Clacton-on-Sea (Old implementation. Option 2 - Replacement signage 6 protection of the properties Tendring Rural East Unparished Total scheme LTEN182027 £14,000 G House) - Bend works at £6,000. Option 3 - Trief kerbing on the on the bend. improvements northern section of the bend to prevent vehicles from leaving the carriageway at £14,000 for design and implementation.

Request for 20's Plenty Validation recommends to proceed with the Barrack Lane, signage to be placed design and implementation of 20's Plenty signage. 7 Harwich Harwich Total scheme LTEN182038 £3,000 G Harwich - 20's Plenty outside Harwich Community Exact locations to be identified at the design Primary School. stage.

Request for 20's Plenty Further investigations have identified that this The Drive, Harwich - signage to be placed location does not meet the criteria for 20s Plenty 8 Harwich Harwich Validation LTEN182041 N/A R 20's Plenty outside St Josephs Catholic as the school entrance does not front on to the School. carriageway.

Request for 20's Plenty Validation recommends to proceed with the Alton Park Road, signage to be placed design and implementation of 20's Plenty signage. 9 Clacton-on-Sea - Clacton West Unparished Total scheme LTEN182046 £3,000 G outside Alton Park Primary Exact locations to be identified at the design 20's Plenty School. stage.

Request for 20's Plenty Validation recommends to proceed with the signage to be placed Colchester Road, design and implementation of two "20's Plenty" 10 outside Highfields Primary Tendring Rural West Lawford Total scheme LTEN182050 £3,000 G Lawford - 20's Plenty signs. Exact locations to be identified at design School and Manningtree stage. High.

Request for 20's Plenty Validation recommends to proceed with the Halstead Road, signage to be placed design and implementation of two "20's Plenty" 11 - 20's Frinton and Walton Frinton and Walton Total scheme LTEN182051 £3,000 G outside Kirby Primary signs. Exact locations to be identified at design Plenty Academy. stage.

Page 11 of 26 Schemes Awaiting Funding

Traffic Management

Total Value of schemes £776,000

Estimated Ref Scheme name Description Division Parish Scheme stage Cost Code Comments RAG Cost

Request for 20's Plenty Validation recommends to proceed with the School Road, signage to be placed design and implementation of two "20's Plenty" 12 Elmstead - 20's Tendring Rural West Elmstead Total scheme LTEN182053 £3,000 G outside Market Fields signs. Exact locations to be identified at design Plenty School. stage.

Request for 20's Plenty Validation recommends to design and implement Norman Close, St signage to be placed 13 Brightlingsea St Osyth Total scheme LTEN182056 £2,000 one 20's Plenty sign, due to cul-de-sac nature. G Osyth - 20's Plenty outside St Osyth Primary Exact location to be identified at design stage. School.

Request for 20's Plenty Standley Road, Validation recommends to design and implement signage to be placed 14 Walton-on-the-Naze - Frinton and Walton Frinton and Walton Total scheme LTEN182059 £3,000 two 20's Plenty signs. Exact locations to be G outside Walton on the Naze 20's Plenty identified at the design stage. Primary School.

Request for 20's Plenty Validation recommends to remove 2 of the Colchester Road, signage to be placed 15 Tendring Rural West Wix Total scheme LTEN182060 £3,500 existing school signs and replace with 20's Plenty G Wix - 20's Plenty outside Wix and Wrabness signage. Primary School.

Design and implementation of "unsuitable for HGVs" Design and implementation of two advanced The Street, Ramsey - Ramsey and 16 signage in order to further Tendring Rural East Total scheme LTEN182061 £42,500 weight limit signs by Highways . A letter G HGV signage Parkeston deter vehicles from using has been sent to ask for a financial contribution. the route.

Speed and volume survey results - Southbound St Osyth Road, Little 36.3mph. Northbound 32.8mph. Validation 17 Installation of a VAS. Tendring Rural East Little Clacton Total scheme LTEN182064 £10,000 G Clacton - VAS recommends to proceed with the design and implementation of a VAS.

Page 12 of 26 Schemes Awaiting Funding

Traffic Management

Total Value of schemes £776,000

Estimated Ref Scheme name Description Division Parish Scheme stage Cost Code Comments RAG Cost

The proposal is against the Essex Speed Management Strategy due to the lack of Residents have raised substantial development. Speed and volume data B1035 Heath Road, concerns over the speed of shows average speeds of 37.2mph, which shows 18 Tendring - Speed the route, asking for a Tendring Rural West Tendring Total scheme LTEN182065 N/A R that implementing a 30mph speed limit could reduction reduction to 30mph to be result in overtaking vehicles. At a recent Highways considered. Surgery, it was agreed that this proposal should not proceed.

The proposal is against the Essex Speed Management Strategy due to the lack of Residents have raised substantial development. Speed and volume data B1035 Thorpe Road, concerns over the speed of shows average speeds of 42.3mph, which shows 19 Tendring - Speed the route, asking for a Tendring Rural West Tendring Total scheme LTEN182066 N/A R that implementing a 30mph speed limit could reduction reduction to 30mph to be result in overtaking vehicles. At a recent Highways considered. Surgery, it was agreed that this proposal should not proceed.

Old Road, The validation recommends to undertake a Traffic calming features to 20 Ardleigh - Traffic Tendring Rural West Ardleigh Feasibility LTEN182067 £6,000 feasibility study to provide potential parking, G address speeding concerns. Calming signing and junction improvements.

Beaumont-cum- Validation recommends to proceed to detailed Request for a signage Beaumont-cum- 21 Moze - Signage Tendring Rural East Design LTEN192001 £4,000 design to identify any remedial works that are G review of the area. Moze review required.

The Avenue, Red Validation recommends to proceed with the Barn Lane, Stone's Request for horse warning design and implementation of two 'horse warning' 22 Green Road, Great Tendring Rural East Great Oakley Total scheme LTEN192004 £3,500 G signage. signs. Exact locations to be identified at the design Oakley - Horse stage. warning signage

Page 13 of 26 Schemes Awaiting Funding

Traffic Management

Total Value of schemes £776,000

Estimated Ref Scheme name Description Division Parish Scheme stage Cost Code Comments RAG Cost

Request to improve Kirby Road, Walton- prominence of speed 23 on-the-Naze - Frinton and Walton Frinton and Walton Validation LTEN192006 N/A Awaiting pedestrian volume survey information. V signage and carriageway Signing and lining roundels.

Bradfield Parish Council The validation recommends to replace the Clacton Road, have raised concerns damaged warning sign, refresh the existing slow 24 Mistley - Signing and Tendring Rural West Bradfield Total scheme LTEN192011 £5,000 G regarding the junction with markings with a view to adding additional Lining Steam Mill Road. markings.

The request does not comply with the Essex Speed Management Strategy or DfT guidelines Cockaynes Lane, Request for a 20mph zone for a speed limit amendment as this is a rural 25 Alresford - 20mph Brightlingsea Alresford Validation LTEN192012 N/A R to be investigated. single track road. Further discussions with Essex zone Police have confirmed that they would also not support a reduction in speed.

Speed and volume survey results: Northbound - Alresford Parish Council 40.0mph. Southbound - 37.5mph, showing good B1027 St Osyth have requested compliance within the posted 40mph speed limit. 26 Road, Alresford - investigations into a speed Brightlingsea Alresford Validation LTEN192013 N/A R This request will now be covered as part of the Speed Reduction reduction from 40mph to B1027 speed limit review, reference 30mph. LTEN192023.

Burrs Road, Clacton- Residents had reported a Validation recommends to proceed with the on-Sea - Traffic 27 high number of vehicles Tendring Rural East Unparished Total scheme LTEN192017 £1,750 design and implementation of SLOW markings on G Management speeding along the route. the carriageway. Improvements

Page 14 of 26 Schemes Awaiting Funding

Traffic Management

Total Value of schemes £776,000

Estimated Ref Scheme name Description Division Parish Scheme stage Cost Code Comments RAG Cost

Great Bentley Parish Plough Road, Great Council have raised 28 Bentley - Lining concerns over inconsiderate Brightlingsea Great Bentley Validation LTEN192018 TBC Awaiting highway boundary information. V Improvements parking at the junction with Station Road.

Validation recommends to proceed to detailed Cllr Platt has requested a Walton-on-the-Naze - Frinton And design only. This will include site visits to identify 29 review of all signage within Frinton and Walton Validation LTEN192019 £8,000 G Signage Review Walton the works required and costing exercise for future Walton Town Centre. consideration by the Panel.

Bromley Road, Design and implementation Feasibility recommends to install Weight Slough Lane, of solutions identified from Restriction signage on Bromley Road, as well as 30 Ardleigh - Traffic Tendring Rural West Ardleigh Total scheme LTEN172024 £14,500 G the completed feasibility provide advisory HGV route signing to Martells management study. Industrial Estate. improvements

Church Road j/w Well St, Spring Chase and Feasibility recommends to proceed with the Investigation into junction 31 Ladysmith Avenue, Brightlingsea Brightlingsea Design LTEN172007 £42,000 design and transport modelling of 3 options G improvements. Brightlingsea - highlighted within the study. Traffic management improvements

Bateman Road, Red Building out the carriageway Construction of a pedestrian refuge island and Barn Road, 32 to improve visibility for Brightlingsea Brightlingsea Implementation LTEN152119 £32,500 associated footway improvements following G Brightlingsea - pedestrians. completed design. Pedestrian Refuge

Page 15 of 26 Schemes Awaiting Funding

Traffic Management

Total Value of schemes £776,000

Estimated Ref Scheme name Description Division Parish Scheme stage Cost Code Comments RAG Cost

Design of bollards as well as Clacton Road, Implementation of bollards, kerbing and footway 33 standard height kerbing and Tendring Rural West Elmstead Implementation LTEN162036 £11,500 G Elmstead - Bollards patching as well as junction marking refreshment. footway surfacing.

Investigate the cost of Further investigations by engineers has The Street, Kirby-Le- potentially extending the recommended not to proceed with the Soken - Traffic electricity mains to facilitate implementation of a priority working system. 34 Frinton and Walton Frinton and Walton Total scheme LTEN172016 N/A R management the implementation of However, it is recommended vegetation clearance improvements priority working signage at is pursued through the maintenance team to either end of the approach. increase visibility.

A137 Harwich Road, Implementation of bollards and grass area 35 Bollards Tendring Rural West Lawford Implementation LTEN182009 £8,500 G Lawford - Bollards following completed design.

Frinton Road, Design of a sign to denote Implementation of a new car park sign to denote 36 Holland-on-Sea - the free car park on Ipswich Clacton East Unparished Implementation LTEN182017 £1,750 G the free car park on Ipswich Road. Signage Road.

Implementation of a mini-roundabout at the Valley Road, Clacton- Mini-roundabout at the junction with Valleybridge Road following 37 on-Sea - Junction junction with Valleybridge Clacton East Clacton-on-Sea Implementation LTEN162010 £493,500 completed design. Cost includes the re-location of G modifications Road. utility apparatus present in the footway and carriageway.

Brook Street, Great Signing and lining Implementation of signing and lining 38 Bromley - Signing Tendring Rural West Implementation LTEN182055 £7,000 G improvements. improvements following completed design. and lining

Review of the TRO, street Reported to Rangers to investigate if the works Clacton Road, lighting and repeater can be undertaken by them. If the works are 39 Heath - signage, as well as design Tendring Rural East Weeley Implementation LTEN182062 N/A A beyond the remit of the Rangers, then they will be Repeater signage and implement roundels and passed to the maintenance team. vegetation clearance.

Page 16 of 26 Schemes Awaiting Funding

Traffic Management

Total Value of schemes £776,000

Estimated Ref Scheme name Description Division Parish Scheme stage Cost Code Comments RAG Cost

Review of the repeater Reported to Rangers to investigate if the works Little Clacton Road, signage and street lighting, can be undertaken by them. If the works are 40 Great Holland - as well as design and Frinton and Walton Frinton and Walton Implementation LTEN182063 N/A A beyond the remit of the Rangers, then they will be Repeater signage implement any measures passed to the maintenance team. which are identified.

Entrance to Weeley on B1033 Colchester Implementation of two gateway features and 41 Road and Thorpe Gateway feature Tendring Rural East Weeley Implementation LTEN152124 £10,500 G carriageway roundels. Road - Gateway feature

A Highways Surgery concluded that a CMA can Harwich Road, Investigation into a speed be prepared for Cllr Bentley to make a decision on 42 Great Bromley - reduction along Harwich Tendring Rural West Great Bromley Validation LTEN192021 N/A whether to proceed with this request. An additional A Speed limit reduction Road. surgery has since been requested by Cllr Guglielmi.

Main Road, Harwich - Investigation into a 20mph 43 Harwich Harwich Validation LTEN192022 TBC Awaiting speed and volume survey information. V 20mph limit limit along the High Street.

Review of the speed limits The speed limit review has been circulated to Cllr B1027 Speed Limit 44 along the B1027 between Various Various Validation LTEN192023 TBC Goggin to decide which measures should be A Review Alresford and St Osyth. implemented.

Request to investigate the possibility of installing weight The survey results have concluded that there is Bradfield Parish - 45 limits along Steam Mill Tendring Rural West Bradfield Validation LTEN192024 N/A 1.5% of HGVs using the routes in question, which R HGV Restrictions Road, Heath Road and are thought to be legitimate users. Cansey Lane.

Page 17 of 26 Schemes Awaiting Funding

Traffic Management

Total Value of schemes £776,000

Estimated Ref Scheme name Description Division Parish Scheme stage Cost Code Comments RAG Cost

The Street/ Review of the existing Validation recommends a review of the signing 46 Road, Little Clacton - signage on the bends and Tendring Rural East Little Clacton Design LTEN202001 £4,000 and lining, particularly within the vicinity of the G Signing and lining SLOW markings. bends along the route.

Design of 3 gateway Weeley Heath features, similar to the ones Implementation of gateway features following 47 Gateway Signage, Tendring Rural East Weeley Implementation LTEN182030 £7,500 G identifying Little Clacton completed detailed design. Weeley - Gateway village.

Request to investigate Wix Road, Bradfield - Design and implementation of improvements to potential improvements to 48 Junction Tendring Rural West Bradfield Validation LTEN202002 £12,500 the junction, including any kerbing and drainage G the junction with Heath improvements works. Road.

Speed and volume survey results: Northbound - 38.9mph, Southbound - 37.8mph. Panel will need Cox's Hill, Lawford - Request for a reduction of 49 Tendring Rural West Lawford Validation LTEN202003 TBC to decide whether they wish to pursue a 40mph A Speed Reduction speed along the A137. speed limit, and that the small section of 30mph would be removed as part of these works.

Request for improvements Speed and volume survey results: 30.4mph Road, to Thorrington Road 50 Brightlingsea Great Bentley Validation LTEN202004 TBC eastbound, 31.5mph westbound. In validation for V Great Bentley - TMI following reports of gateway improvements. speeding from residents.

Request for improvements Speed and volume survey results: 33.0mph Weeley Road, Great to Weeley Road following 51 Brightlingsea Great Bentley Validation LTEN202005 TBC eastbound, 32.1mph westbound. In validation for V Bentley - TMI reports of speeding from various improvements. residents.

Brook Street, South Validation recommends not to proceed with this Request for investigation Street, High Street, request due to the number of existing features on 52 into installing 20mph limits Tendring Rural West Manningtree Validation LTEN202007 N/A R Manningtree - site. 20mph limit not supported as vehicles are along all routes. 20mph already travelling at this speed.

Page 18 of 26 Schemes Awaiting Funding

Traffic Management

Total Value of schemes £776,000

Estimated Ref Scheme name Description Division Parish Scheme stage Cost Code Comments RAG Cost

Request for investigation Plough Road, 53 into improvements along Brightlingsea Great Bentley Validation LTEN202009 TBC In validation. V Aingers Green - TMI Plough Road.

Request for investigation Bradfield Parish - into placing gateway Validation recommends to install gateway features 54 Tendring Rural West Bradfield Validation LTEN202010 £12,000 G Gateway Features features on routes entering at 4 locations. the village.

Request for investigation Little Clacton - into placing a rotatable VAS 55 Tendring Rural East Little Bentley Validation LTEN202011 TBC In validation. V Rotatable VAS for four locations throughout the Parish.

Request to investigate The validation has concluded that this request Ravens Green, Little providing improvements to could not proceed due to a number of reasons, 56 Tendring Rural West Various Validation LTEN202013 N/A R Bentley deter vehicles from using including the lack of available land to introduce the route. measures at this location.

Request to investigate A133 Main Road, 57 reducing the speed through Tendring Rural West Frating Validation LTEN202014 TBC Awaiting speed and volume survey information. V Frating - 30mph Frating.

Mill Lane & Brook Request for change of Street, Manningtree - 58 priority at the junction and Tendring Rural West Manningtree Validation LTEN202015 TBC In validation. V Junction other improvements. Improvements Request for investigation Redbridge Road, 59 into perceived speeding Tendring Rural East Non Parished Validation LTEN20216 TBC Awaiting speed and volume survey information. V Clacton-on-Sea issues. Request for investigation Speed and volume survey demonstrated speeds Leas Road, Clacton- 60 into the route following Clacton West Non Parished Validation LTEN202017 N/A of 27.0mph, showing good compliance within the R on-Sea - TMI reports of speeding. posted 30mph speed limit.

Page 19 of 26 Schemes Awaiting Funding

Traffic Management

Total Value of schemes £776,000

Estimated Ref Scheme name Description Division Parish Scheme stage Cost Code Comments RAG Cost

Shore Lane/Ship Request for signage Lane, Bradfield - improvements to prevent 61 Tendring Rural West Bradfield Validation LTEN202018 TBC In validation. V Signage parking along the routes in Improvements question.

Page 20 of 26 Schemes Awaiting Funding

Walking

Total Value of schemes £127,000

Estimated Ref Scheme name Description Division Parish Scheme stage Cost Code Comments RAG Cost

Validation recommends to London Road, Request for a crossing Tendring Rural proceed to detailed design, legal 1 Little Clacton - Little Clacton Design LTEN183001 £7,500 G point close to no.11. East elements and target costing Zebra crossing within the first year. Scheme does not meet National guidelines for a zebra crossing for safety reasons due to high 85th percentile speeds of 38.7mph. Signalised crossing Perceived speeding issues Colchester Road, would require Cabinet Member and pedestrians Tendring Rural 2 Elmstead - Elmstead Feasibility LTEN183006 TBC sign off via a CMA. Section 106 A experiencing issues West Crossing point funding of £70,000 once crossing the road. development has completed 10 dwellings. Panel would then have to top up the scheme which could be approximately £130,000. Implementation of a new footway Grange Road, Request to provide a new Tendring Rural linking School Lane and Bromley 3 Lawford - New footway between School Lawford Implementation LTEN163009 £77,500 G West Road following completed Footway Lane and Bromley Road. design.

Page 21 of 26 Schemes Awaiting Funding

Estimated Ref Scheme name Description Division Parish Scheme stage Cost Code Comments RAG Cost

Option A - Provide dropped crossings including tactile paving and a central pedestrian refuge Request for investigation to access the bus stops. Option A133 Main Road, into the possibility of Tendring Rural B - Include PT infrastructure 4 Frating - Crossing Frating Total scheme LTEN193001 £42,000 G installing dropped kerbing West upgrades which include new Improvements near Frating park. poles, flags, timetables and raised kerbing. Scheme costs are based on design and implementation of both options.

Marine Parade Request for a crossing Agreement with Cllr Honeywood 5 West, Clacton-on- point close to the junction Clacton West Unparished Validation LTEN193002 TBC to undertake the survey during V Sea with Collingwood Road. summer months.

Speed and volume survey results - Eastbound 28.5mph, Kirby Road, Request to investigate the Westbound 27.7mph. CDPV2 Walton-on-the- possibility to install a Frinton and Frinton And 6 Validation LTEN193003 N/A Score - 0.052x10^8 which does R Naze - Crossing pedestrian crossing along Walton Walton not meet policy for a zebra Point the route. crossing. Information shared with Cllr Platt.

The validation has Request for pedestrian recommended not to proceed Frinton Road, 8 guard railing and slow Clacton East Non Parished Validation LTEN193005 N/A with this request, as it does not R Holland-on-Sea markings to be installed. meet the criteria highlighted in HPN50.

Walton Road, Kirby-le-Soken - Request for a new Frinton and Frinton And Awaiting pedestrian volume 9 Validation LTEN203001 TBC V Crossing pedestrian crossing facility. Walton Walton survey information. Improvements

Page 22 of 26 Schemes Awaiting Funding

Passenger Transport

Total Value of schemes £41,500

Estimated Ref Scheme name Description Division Scheme stage Cost Code Comments RAG Cost

The Street, Little The progression of bus Residents have raised a Clacton, outside No Tendring Rural shelters is currently on hold 1 request for the replacement Total scheme LTEN165028 TBC A 170 - Replacement East due pending a conclusion of of an ageing bus shelter. shelter a countywide audit.

Request from the Town Council for the north side of Church Road at the The progression of bus Church Road, Maltings Road Stop. This shelters is currently on hold 2 Brightlingsea - New stop will cover Maltings Brightlingsea Total scheme LTEN165049 TBC A due pending a conclusion of shelter Estate/Colne School a countywide audit. serving passengers travelling to the town centre.

Installation of raised kerbs, Tendring Rural 3 Cox's Hill, Lawford Total scheme LTEN165050 £23,000 G flags and poles West

Validation recommends to extend the yellow bus cage to allow buses to pull out Request to investigate the Station Road, Clacton- without driving onto the other 4 possibility of extending the Clacton West Total scheme LTEN195001 £3,000 G on-Sea - Bus cage side of the carriageway. The bus cage. Panel will need to be aware that this will result in the loss of a parking space.

Page 23 of 26 Schemes Awaiting Funding

Passenger Transport

Total Value of schemes £41,500

Estimated Ref Scheme name Description Division Scheme stage Cost Code Comments RAG Cost

Jaywick Infrastructure Cllr Honeywood and Cllr Upgrade - Passenger Overton have requested a 5 Various Validation LTEN195002 TBC In validation. V Transport review into the PT Improvements infrastructure in Jaywick.

Validation recommends to Cllr Guglielmi has proceed with the design and Colchester Road, requested a new bus cage Tendring Rural 6 Validation LTEN195003 £4,000 implementation of a bus cage G Ardleigh - Bus cage is installed opposite St West as well as the relevant Marys Primary School. signing works.

Validation recommends to B1027 Flag Hill, St Investigation into proceed to detailed design of Osyth - Passenger 7 passenger transport Brightlingsea Design LTEN195004 £3,500 improvements including the G Transport improvements. re-location of the stop outside Improvements "The Creek".

Wignall Street, Investigation into providing Lawford - Passenger bus stop infrastructure to a Tendring Rural 8 Validation LTEN195005 TBC In validation. V Transport stop that is not currently West Improvements marked.

Validation recommends to proceed with the design and Plough Road, Aingers Request for a new bus stop 9 Brightlingsea Validation LTEN205001 £8,000 implementation of a new G Green - New Stop to be installed. stop, with associated kerbing works.

Page 24 of 26 Schemes Awaiting Funding

Passenger Transport

Total Value of schemes £41,500

Estimated Ref Scheme name Description Division Scheme stage Cost Code Comments RAG Cost Request from ECC Landermere Road, Passenger Transport to Tendring Rural 10 Validation LTEN205002 TBC In validation. V Thorpe-le-Soken install two new stops along East the route.

Page 25 of 26 Schemes Awaiting Funding

Public Rights of Way

Total Value of schemes £16,500

Estimated Ref Scheme name Description Division Parish Scheme stage Cost Code Comments RAG Cost

To level the path, reverting the Footpath 5, St Resurfacing of a Public bank where needed, and to lay 1 Osyth - Surface Brightlingsea St Osyth Total scheme LTEN198001 £16,500 G Right of Way. and roll road planings, to be held improvements in place with timber edgings.