(I) Basic Information

Sr. Item Details No 1. Name of the Project Tanmathra Aquarelle

2. Serial No. of the Schedule 8(a) Building and Construction project

3. Proposed capacity/area/length/tonnage The total built up area is 59,369.02 sq.m to be handled/command area/ lease area/ number of wells to be drilled

4. New/Expansion/Modernization New Building and Construction project

5. Existing capacity/ Area etc Total plot area is 53,215.72 sq.m

6. Category of Project i.e. ‘A’ or ‘B’ B

7. Does it attract the general condition? If No yes, please specify.

8. Does it attract the specific condition? If No yes, please specify.

9. Location

Plot/Survey/Khasra No. 114,115 &116

Village Thindlu

Tehsil Sarjapura Hobli

District Bangalore

State Karnataka

10. Nearest railway station/airport along Bangalore Railway Station: 29 km* towards north with distance in kms. west Heelalige Railway Station -  11 Km*towards west Kempegowda International Airport – 40 Km* towards north

*Aerial distance

11. Nearest Town, City, District Nearest town/city – Sarjapura – 1.7 Km Headquarters along with the distance in Hosur – 12.7Km kms. *Aerial distance District Head Quarters – Bangalore

1

12. Village Panchayats, Zilla Parishad, Bengaluru Metropolitan Regional development Municipal Corporation, Local body Authority (BMRDA) (complete postal addresses with No. 1, LRDE Building, Ali Askar road telephone nos. to be given) Bangalore Karnataka 560052 Phone no.080 2209 0200

13. Name of the applicant Tanmathra Aquarelle

14. Registered Address #523, 2nd Floor, 24th Main Road, HSR Layout Sector-2, Bangalore-560102 15. Address for correspondence:

Name Mr. Rajkumar. C

Designation (Owner/Partner/CEO) Partner

Address Tanmathra Aquarelle #523, 2nd Floor, 24th Main Road HSR Layout, Sector-2 Bangalore

Pin code 560102

E-mail [email protected]

Telephone +91 9880223444

Fax No. 16. Details of alternative sites examined, if No any. Location of these sites should be shown on a toposheet

17. Interlinked Projects No

18. Whether separate application of No interlinked project has been submitted?

19. If yes, date of submission -

20. If no reason -

21. Whether the proposal involves No approval/clearance under: if yes, details of the same and their status to be given. (a) The Forest (Conservation) Act, 1980? (b) The Wildlife (Protection) Act, 1972? (c) The C.R.Z Notification, 1991?

2

(I) Activity

1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)

Sr. Information/Checklist confirmation Yes Details thereof (with No. /No approximate quantities /rates, wherever possible) with source of information data 1.1 Permanent or temporary change in land Yes Land previously used for agricultural use, land cover or topography including purpose is converted for residential use. increase in intensity of land use (with (Refer Annex IX Land Ownership and respect to local land use plan) Conversion Document)

1.2 Clearance of existing land, vegetation and Yes No vegetation or buildings exist in the site. buildings? 1.3 Creation of new land uses? Yes Agricultural land is converted for residential use.

1.4 Pre-construction investigations e.g. bore No Preconstruction investigation has been houses, soil testing? done comprising of Soil testing& Ground water investigation.

1.5 Construction works? Yes 217 row houses with Ground floor + First floor + Terrace with other civic amenities.

The proposal is in conformity with the land use of Bangalore Metropolitan Regional Development Authority (BMRDA).

1.6 Demolition works? No Not applicable

1.7 Temporary sites used for construction No No labor colony is proposed at the Project works or housing of construction workers? site.

1.8 Above ground buildings, structures or Yes Earthwork will be for foundation work only earthworks including linear structures, cut as basements are not proposed. and fill or excavations

1.9 Underground works including mining or No Not applicable Tunneling?

1.10 Reclamation works? No Not applicable

1.11 Dredging? No Not applicable

1.12 Offshore structures? No Not applicable

1.13 Production and manufacturing processes? No Not applicable 4

Sr. Information/Checklist confirmation Yes Details thereof (with No. /No approximate quantities /rates, wherever possible) with source of information data 1.14 Facilities for storage of goods or Yes Temporary godowns/temporary storage materials? yards during construction phase.

1.15 Facilities for treatment or disposal of solid Yes Construction Phase: waste or liquid effluents? 1. Solid waste: will be segregated and reused on the Project site or sent for recycling. Substratum removed during foundation will be used for refilling at the Project site. Proper facility for storage of construction wastes will be made at the site. a. Steel scrap, packaging material etc. will be sold to recyclers. b. Liquid waste: The sewage generating from the temporary toilets will be treated in mobile STP. Care will be taken to ensure that the water used for construction purposes does not accumulate at the Project site.

Operation Phase: 1. Solid waste: The solid waste generated will be segregated into bio degradable, non-biodegradable and inert waste. The biodegradable waste will be composted in Organic Waste Convertor at the proposed Project site. Non bio degradable waste will be sent to Municipal Corporation solid waste land fill. Bottles, tins and other scrap will be sold to Recyclers. 2. Liquid waste: The sewage from the proposed buildings will be treated in the Sequencing Batch Reactor (SBR) technology based 200 kld Sewage Treatment Plant (STP). The treated water will be used for horticulture and flushing.

1.16 Facilities for long term housing of No Not applicable operational workers?

1.17 New road, rail or sea traffic during No Temporary/short-term/intermittent traffic construction or operation? of 10-15 trucks per day, during construction for the transport of material.

5

Sr. Information/Checklist confirmation Yes Details thereof (with No. /No approximate quantities /rates, wherever possible) with source of information data 1.18 New road, rail, air waterborne or other No Not applicable transport infrastructure including new or altered routes and stations, ports, airport etc?

1.19 Closure or diversion of existing transport No Not applicable routes or infrastructure leading to changes in traffic movements?

1.20 New or diverted transmission lines or No Not applicable pipelines?

1.21 Impoundment, damming, culverting, No Not applicable realignment or other changes to the hydrology of watercourses or aquifers?

1.22 Stream crossings? No Not applicable

1.23 Abstraction or transfers of water from Yes Construction phase:50 – 100kld ground or surface waters? Source: Tankers.

Operation phase:150 kld Freshwater + 73 kld recycled water Source: Mugalooru Grama Panchayath (Refer Annex X Water NOC).

1.24 Changes in water bodies or the land No Not applicable surface affecting drainage or run-off?

1.25 Transport of personnel or materials for Yes Construction Phase: construction, operation or  Construction materials will be decommissioning? transported to the Project site by the means of trucks/dumpers.  Workforce employed for the construction works will use the existing transport facility.  Approx. 100 people during peak season.

Operation Phase:  Residents or commuters during the operation phase will use self-owned/ public transportation facilities.  Approx. 20-25 workers for maintenance.

6

Sr. Information/Checklist confirmation Yes Details thereof (with No. /No approximate quantities /rates, wherever possible) with source of information data 1.26 Long-term dismantling or No Not applicable decommissioning or restoration works?

1.27 Ongoing activity during decommissioning No Not applicable which could have an impact on the environment?

1.28 Influx of people to an area in either No Construction Phase: temporarily or permanently? There will be a temporary minor and reversible influx of construction laborers due to employment opportunities generated during construction phase.

Operation Phase: Approx.1085 people will reside in the row houses.

1.29 Introduction of alien species? No Not applicable

1.30 Loss of native species or genetic diversity? No Not applicable

1.31 Any other actions? No Not applicable

2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non- renewable or in short supply):

Sr. Information/checklist Yes Details thereof (with approximate No. confirmation /No quantities /rates, wherever possible) with source of information data 2.1 Land especially undeveloped or No The proposed development is as per the agricultural land (ha) Bangalore Metropolitan Regional Development Authority (BMRDA).

2.2 Water (expected source & competing Yes Construction phase: users) unit: KLD Requirement: 50– 100kld Source: Tankers

Operation phase: Requirement: 150 kld of Freshwater + 73 kld of Recycled water. Source: Mugalooru Grama Panchayath.

7

Sr. Information/checklist Yes Details thereof (with approximate No. confirmation /No quantities /rates, wherever possible) with source of information data Refer Annex V for Water Balance of the Proposed Project.

2.3 Minerals (MT) No Not applicable

2.4 Construction material – stone, Yes Construction material requirement for aggregates, sand / soil (expected construction: source – MT) Steel : 2,400 MT Cement : 2,40,000 Bags Sand : 22,000m3 Masonry : 4,80,000 m³ RMC : 7,500 m³ Material shall be procured from local Dealers.

2.5 Forests and timber (source – MT) No Minimal use of timber poles in centering/shuttering in civil construction of the project.

2.6 Energy including electricity and fuels Yes Construction Stage: (source, competing users) Unit: fuel Approx. 50 kW from BESCOM and DG of 80 (MT), energy (MW) kvA backup with fuel (HSD) consumption of 16 l/hr.

Operation Phase: Approx.1467 kvA from BESCOM and DG sets of capacity 62.5 kvA as backup with fuel (Diesel) 12.5 l/hr.

2.7 Any other natural resources (use No Not applicable appropriate standard units)

3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health.

Sr. Information/Checklist Yes Details thereof (with approximate No. confirmation /No quantities/rates, wherever possible) with source of information data 3.1 Use of substances or materials, which No Not applicable are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna and water supplies).

8

3.2 Changes in occurrence of disease or No Not applicable affect disease vectors (e.g. insect or water borne diseases)

3.3 Affect the welfare of people e.g. by Yes Construction phase - 100 local labors are changing living conditions? expected to get employment during peak construction phase. Operation phase - 20-25 persons are expected to get indirect employment.

3.4 Vulnerable groups of people who No No applicable could be affected by the project e.g. hospital patients, children, the elderly etc.

3.5 Any other causes No No applicable

4. Production of solid wastes during construction or operation or decommissioning (MT/month)

Sr. Information/Checklist Yes Details thereof (with approximate No. confirmation /No quantities/rates, wherever possible) with source of information data 4.1 Spoil, overburden or mine wastes No Not applicable

4.2 Municipal waste (domestic and or Yes Operation Phase: commercial wastes) Total Solid Waste:  464 kg/day, of which 244 kg will be organic, 195 kg inorganic and 49 kg of inert waste, respectively. After segregation, biodegradable waste shall be composted in an Organic Waste Convertor (OWC) and will be used as manure at the Project site. Recyclable shall be sold to the vendors. Non-degradable waste shall be sent to the nearest sanitary Landfill site.

4.3 Hazardous wastes (as per Hazardous Yes Sump oil from the standby DG to be sold to Waste Management Rules) Authorized Recyclers.

4.4 Other industrial process wastes No Not applicable

4.5 Surplus product No Not applicable

4.6 Sewage sludge or other sludge from Yes Operation phase: effluent treatment Total sewage sludge generated from the proposed activity will be about 5 kg which will be used as manure at the Project site.

9

Sr. Information/Checklist Yes Details thereof (with approximate No. confirmation /No quantities/rates, wherever possible) with source of information data 4.7 Construction or demolition wastes Yes a. Concrete wastage and wasted mortar will be crushed, aggregated and mixed with other road sub-base construction material.

b. Waste/damaged construction material, sieved sand, broken brick bats and chipped plaster will also be used in the construction of roads and for backfill the under margins/pitching of storm water drains, periphery curbing of roads, etc.

c. Metal scraps will be sold to local scrap dealers for onward recycling. The material will be cleaned at Project site to remove possibility of contamination of any kind before handing over to the Scrap Dealer.

d. Waste packaging material and wooden waste, used plastic bags of cement and other construction material will be sold back to the supplier for reuse or to Registered Recyclers.

4.8 Redundant machinery or equipment No Not applicable

4.9 Contaminated soils or other materials No Not applicable

4.10 Agricultural wastes No Horticulture waste will be composted along with other biodegradable wastes and used as manure.

4.11 Other solid wastes No Not applicable

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)

Sr. Information/Checklist Yes Details thereof (with approximate No. confirmation /No quantities/rates, wherever possible) with source of information data 5.1 Emissions from combustion of fossil Yes There will be minor vehicular pollution during fuels from stationary or mobile source construction and operation phase. Negligible emissions from small DG sets is also possible 1 DG Sets of capacity 62.5 kvA to be operated intermittently during power shortage in operation Phase.

5.2 Emissions from production processes No Not applicable 10

5.3 Emissions from materials handling No Not applicable including storage or transport

5.4 Emissions from construction activities Yes Minimal fugitive emissions during unloading of including plant and equipment construction material, concrete mixers and negligible emission from small DG sets.

5.5 Dust or odors from handling of No During the construction phase, there will be materials including construction some dust generation due to handling of raw materials, sewage and waste material and movement of vehicles carrying raw material. Some odor is possible from STP.

5.6 Emissions from incineration of waste No Not applicable

5.7 Emissions from burning of waste in No Not applicable open air (eg. slash materials, construction debris)

5.8 Emissions from any other sources No Not applicable

6. Generation of Noise and Vibration, and Emissions of Light and Heat:

Sr. Information/Checklist Yes Details thereof (with approximate No. confirmation /No quantities/rates, wherever possible) with source of information data with source of information data 6.1 From operation of equipment e.g. Yes Construction phase - From concrete mixers, engines, ventilation plant, crushers trucks, tower cranes, etc.

Operation phase –Minimal traffic noise due to on-site traffic.

6.2 From industrial or similar processes No Not applicable

6.3 From construction or demolition No Noise will be generated from the construction activity and from concrete mixers, trucks, tower cranes, etc.

6.4 From blasting or piling No Not applicable

6.5 From construction or operational Yes Construction phase: traffic Noise will be generated due to trucks carrying the construction raw material/ debris and construction activities. Limited noise from the trucks and construction activities during construction period. Operation phase:

11

Sr. Information/Checklist Yes Details thereof (with approximate No. confirmation /No quantities/rates, wherever possible) with source of information data with source of information data During operation phase, noise will be generated due to traffic. Also due to the visitors coming into the premises of the Project site.

6.6 From lighting or cooling systems No Not applicable

6.7 From any other sources No Not applicable

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:

Sr. Information/Checklist Yes Details thereof (with approximate No. confirmation /No quantities/rates, wherever possible) with source of information data 7.1 From handling, storage, use or No Not applicable spillage of hazardous materials

7.2 From discharge of sewage or other Yes Approx. 180 kld of Sewage would be treated in effluents to water or the land Sewage Treatment Plant (STP) of 200 kld to (expected mode and place of meet the discharge standards of KSPCB. The discharge) treated wastewater will be reused for flushing, horticulture and car washing.

7.3 By deposition of pollutants emitted to No Dust particles generated during construction will air into the land or into water be settled continuously by spraying water.

7.4 From any other sources No Not applicable

7.5 Is there a risk of long term buildup of No Not applicable pollutants in the environment from these sources?

8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment:

Sr. Information/Checklist Yes Details thereof (with approximate No. confirmation /No quantities/rates, wherever possible) with source of information data 8.1 From explosions, spillages, fires etc. No Not applicable from storage, handling, use or production of hazardous substances

12

Sr. Information/Checklist Yes Details thereof (with approximate No. confirmation /No quantities/rates, wherever possible) with source of information data 8.2 From any other causes No Not applicable

8.3 Could the project be affected by No Project is in Earthquake Zone III. The design of natural disasters causing the building is as per the IS 1893: Part (1) 2002 environmental damage (e.g. floods, (Criteria for earth quake resistance design of earthquakes, landslides, cloudburst structures Part 1 General Provisions and etc.)? Buildings).

9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality:

Sr. Information/Checklist Yes Details thereof (with approximate No. confirmation /No quantities/rates, wherever possible) with source of information data 9.1 Lead to development of supporting Yes Proportionate development of infrastructure, facilities, ancillary development or creation of associated tertiary service sector development stimulated by the project and employments which could have impact on the Infrastructure that accompanies proposed environment e.g.: development include: . STP for treatment and recycling of waste  Supporting infrastructure (roads, water generated on site. power supply, waste or waste . Provision for treatment of organic waste water treatment, etc.) generated on site.  Housing development . Common amenity areas, landscaping and  Extractive industries green belt development.  Supply industries . Rainwater harvesting.  Other . Adequate parking space.

9.2 Lead to after-use of the site, which No Not applicable could have an impact on the environment

9.3 Set a precedent for later No Not applicable developments

9.4 Have cumulative effects due to No Not applicable proximity to other existing or planned projects with similar effects

13

(II) Environmental Sensitivity

Sr. Areas Name/ Aerial distance (within 15 No. Identity km.) Proposed Project location boundary 1 Areas protected under international No Not applicable conventions, national or local legislation for their ecological, landscape, cultural or other related value

2 Areas which are important or Yes Muthanallur Lake – approx.9 km* sensitive for ecological reasons - Sevaganapalli Lake – approx. 250 m* Wetlands, watercourses or other Chichuraganapalli Lake – approx. 860 m* water bodies, coastal zone, biospheres, mountains, forests State Boundary - approx. 500 m* (Tamil Nadu)

*Aerial Distance

3 Areas used by protected, important No Not applicable or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration

4 Inland, coastal, marine or No Not applicable underground waters

5 State, National boundaries No Not applicable

6 Routes or facilities used by the public No Not applicable for access to recreation or other tourist, pilgrim areas

7 Defense installations No Not applicable

8 Densely populated or built-up area Yes The proposed site falls within limits of BMRDA

9 Areas occupied by sensitive man- Yes The Project is located in the outskirt of made land uses (hospitals, schools, Bangalore city. places of worship, community facilities)

10 Areas containing important, high No Not applicable quality or scarce resources(ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals)

14

Sr. Areas Name/ Aerial distance (within 15 No. Identity km.) Proposed Project location boundary 11 Areas already subjected to pollution No Not applicable or environmental damage (those where existing legal environmental standards are exceeded)

12 Areas susceptible to natural hazard No Project is in Seismic Zone III. The building which could cause the project to will be designed as per IS 1893: Part (1) present environmental 2002 Criteria for earth quake resistance problems(earthquakes, subsidence, design of structures Part 1 general landslides, erosion, flooding or Provisions and Buildings. extreme or adverse climatic conditions)